Loading...
HomeMy WebLinkAbout20200022 Ver 1_Nashville Ch. Rd. culvert SW Mgmt. Plan_20200106(Version 2.08; Released April 2018)DF15408.2083803TIP No.:County(ies):SCOTLANDPage 1 of 1TIP Number:Date:Phone:Phone:Email:Email:County(ies):CAMA County?YesAquatic T&E Species?NoComments:YesNoNoN/ADeck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative)(If yes, provide justification in the General Project Narrative)ac.2 lanes undivided highway with 11ft lanes, normal crown. Project Includes Bridge Spanning Water Body?Deck Drains Discharge Over Buffer?Dissipator Pads Provided in Buffer?NRTR Stream ID:Annual Avg Daily Traffic (veh/hr/day):Existing SiteProject Length (lin. miles or feet): ac.Surface Water Body (1): Class CNCDWR Surface Water Classification for Water BodyN/ABuffer Rules in Effect:N/ANone2 Lanes undivided highway with 11ft lanes, normal crownWaterbody InformationNCDWR Stream Index No.:DF15408.2083803Impairments:Other Stream Classification: Primary Classification: Project Built-Upon Area (ac.)Design/Future: UNK Year: Existing: UNK Year:Existing Culvert 82-2030, 84in. CMP appx. 60' in length on SR-1324 was blown out during Hurricane Florence. Emergency 84in. CMP of appx. 48 ft. in length and Roadway fill was installed to establish temporary service. Emergency 84in. CMP is undersized and will not support high conveyance during major flood events. The proposed culvert is a 2@10'x7' RCBC with bevels, 51 ft. in length, buried 1ft. with sills and filled with native material. Upstream invert 234.52ft. and downstream invert 234.52ft, slope 0.0%. Roadway drainage runs off on either side of the proposed roadway and disperses into wetlands and/or natural ground. Construction of the new culvert will take place while an off-site detour maintains traffic. Bank Stabilization rip rap will be installed as necessary to prevent streambank degradation. 1011 Schaub DrNorth Carolina Department of TransportationHighway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTSProject Type:121 DOT DriveAddress:General Project InformationWBS Element:OtherWBS Element:MI Engineering, PLLC NCDOT Contact:(910) 773-8032Suite 100Raleigh, NC 27606Contractor / Designer:(919) 851-6606twelch@ncdot.govAddress:ScotlandSilver HillTim Welch, PECarthage, NC 28327River Basin(s): City/Town:0.3Typical Cross Section Description: Surrounding Land Use: General Project Narrative:(Description of Minimization of Water Quality Impacts)NoWoodsJuniper Creek Upper14-34-4-30.20.095 mi.Project DescriptionProposed ProjectLumberNoneSupplemental Classification: Swamp Waters (Sw) Wetlands within Project Limits?