Loading...
HomeMy WebLinkAbout20200022 Ver 1_PCN Form Submission (3)_20200106DWR mrlslon of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Change only if needed. BIMS # Assigned 20200022 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Select Project Reviewer* April Norton:eads\arnorton Information for Initial Review 1a. Name of project: SR 1324 (Nashville Church Road) culvert 1a. Who is the Primary Contact?* Rex Badgett 1b. Primary Contact Email:* jsbadgett@ncdot.gov Date Submitted 1/6/2020 Nearest Body of Water Juniper Creek Basin Lumber Water Classification C;Sw Site Coordinates Latitude: 34.899857 A. Processing Information County (or Counties) where the project is located: Scotland Is this project a public transportation project?* IT Yes r No Is this a NCDOT Project?* IT Yes r No (NCDOT only) T.I.P. or state project number: WBS # (?) DF15408.2083803 1a. Type (a) of approval sought from the Corps: Longitude: -79.471572 Version#* 1 Reviewing Office* Central Office - (919) 707-9000 1c. Primary Contact Phone:* (910)773-8016 U W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: 03 - Maintenance NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit le. Is this notification solely for the record because written approval is not required? For the record only for DWR401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - Express r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? r Yes r No B. Applicant Information 1d. Who is applying for the permit? V Owner r Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: Brandon Jones, Division Engineer 2b. Deed book and page no.: 2c. Responsible party: NCDOT Highway Division 8 2d.Address Street Address 121 DOT Drive Address Line 2 City Carthage Rostal / Zip Code 28327 2e. Telephone Number: (910)773-8000 2g. Email Address:* State / Rovince / Rion NC Country USA 2f. Fax Number: (910)947-3783 r Yes r No r Yes r No bhjones@ncdot.gov C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/ town: Laurinburg 2. Project ctct Identification 2a. Property Identification Number: 2b. Property size: NA 1 2c. Project Address Street Address Nashville Church Road Address Line 2 City State / Province / legion Laurinburg North Carolina Rbstal / Zip Code Country 28363 USA 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Juniper Creek 3b. Water Resources Classification of nearest receiving water:* C;Sw 3c. What river basin(s) is your project located in?* Lumber 3d. Please provide the 12-digit HUC in which the project is located. 030402040302 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The land surrounding the project area is low-lying and surrounded by bottomland swamp. Uplands in the vicinity are primarily commercial pine plantations of varying age. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* t^ Yes r No t^ Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) Nashville Ch Rd culvert topo map.pdf 298.33KB 4e. Attach an 8 112 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) Nashville Ch Rd culvert soils map.pdf 1.26MB 4f. List the total estimated acreage of all existing wetlands on the property: .3 4g. List the total estimated linear feet of all existing streams on the property: 80 4h. Explain the purpose of the proposed project:* The previous culvert was damaged in Hurricane Florence and repaired with a temporary structure. The temporary structure is cannot adequately convey storm flows and therefore needs to be replaced with an appropriately sized permanent structure. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* Ebsting Culvert 82-2030, 84in. CMP appx 60' in length on SR-1324 was blown out during Hurricane Florence. Emergency 84in. CMP of appx 48 ft. in length and Roadway fill was installed to establish temporary service. Emergency 84in. CMP is undersized and will not support high conveyance during major flood events. The proposed culvert is a 2@10'xT RCBC with bevels, 51 ft. in length, buried 1ft. with sills and filled with native material. Upstream invert 234.52ft. and downstream invert 234.52ft, slope 0.0%. Roadway drainage runs off on either side of the proposed roadway and disperses into wetlands and/or natural ground. Construction of the new culvert will take place while an off -site detour maintains traffic. Bank Stabilization rip -rap will be installed as necessary to prevent streambank degradation. Clearing on this project shall be performed to limits established by Method III. 4j. Please upload project drawings for the proposed project. DF15408.2083803_Scotland_E5 Wetland and Surface Water Impacts Permit Dravdngs.pdf 1.64MB 5. Jurisdictional Determinations U 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary f Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): B. Reed and M. Richards Agency/Consultant Company: Kimley-Horn Other: 5d1. Jurisdictional determination upload _Nashville_(SR1324)_DataForms. pdf 6. Future Project Plans 6a. Is this a phased project?* r Yes r No 540.94KB r Unknown Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): W Wetlands r Streams -tributaries r Buffers r— Open Waters r Pond Construction 2. Wetland Impacts 2a. Site #* (?) ��2al Reason(?) 2b. Impact type * M 2c. Type of W. 2d. W. name * 2e. Forested * �2f. Type of 2g. Impact Jurisdicition*M area* Fill T Riverine Swamp Forest Juniper Creek Yes Corps 0.020 (acres) Fill T Riverine Swamp Forest Juniper Creek Yes Corps 0.010 (acres) 2g. Total Temporary Wetland Impact 0.030 2g. Total Wetland Impact 0.030 2h. Comments: Wetland impacts in diversion channel will be restored to original elevation E. Impact Justification and Mitigation 1. Avoidance and Minimization 2g. Total Permanent Wetland Impact 0.000 la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: NCDOT's best management practices for the installation of pipe in jurisdictional waters will be adherred to thorughout the life of the project. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Temporary diversions wetland repairs: The temporary diversions in the wetland areas will be restored to preconstruction slope and contours. Excavated material shall be strategically stockpiled and protected. This material will be used to backfill the excavated areas to the original density. The area will then be reseeded with the appropriate native wetland seed mix 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? f Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Impacts do not meet the threshold for required mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes f• No If no, explain why: Juniper Creek does not fall under any NC Riparian Buffer Protection Rules. 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No Comments: Stormwater management plan attached. G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No u 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? * r Yes r No 1c. If you answered "yes" to the above, has the document review been finalized bythe State Clearing House?* r Yes r No Comments:* NCDOT State Minimum Criteria Checklist Completed 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. The new structure is a minor deviation from the original culvert. There is no anticipated change in land usage or development in the area. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5d. Is another Federal agency involved?* r Yes r No 5e. Is this a DOT project located within Division's 1-8? r Yes r No r Unknown 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NC Natural Heritage Program and USFWS IPaC. Consultation Documentation Upload project report nashviI le_ch u rch_road_cu Ive_18312_18312. pdf Species List. pdf Nashville Ch. Rd. Endangered Species Survey Checklist.pdf 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA and USFWS IPaC. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 3.3MB 204.77KB 112.33KB 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* The project has been submitted to NCDOT Human Environment Section for screening. No nearby historic properties were noted on the State Historic Preservation Office online map. 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-yearfloodplain?* r Yes f No 8b. If yes, explain how project meets FEMA requirements: Culvert is designed to meet the hydraulic requirements of the 100 year floodplain. 8c. What source(s) did you use to make the floodplain determination?* USA Flood Hazard Areas layer on ESRI. Miscellaneous Comments Miscellaneous attachments not previously requested. Nashville Ch. Rd. culvert SW Mgmt. Plan.pdf 58.4KB Signature * W By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Jonathan Sutton "Rex" Badgett Signature C76-1111f" 15, O-ZeAl�G Date 1/6/2020