Loading...
HomeMy WebLinkAboutNC0004987_03_MSS_CAP Update 2019_Figures Large Sheets_20191231Corrective Action Plan Update December 2019 Marshall Steam Station FIGURES (CAP Content Section 10) LARGE SHEETS SynTerra ��//// ° � � � - o ' o -. � � o �c ; ..7✓�•0 � � °� � .� 1 ��i' L,r.,.�',- / \ - :dam. q I �l �9 / PROPOSED CLEAN WATER I o INFILTRATION STORAGE TANK ✓° .9 Ly a P � b �Ci O O "' � ` K,7.�,y T O I \ \ ° o � �� n� 4 /\ aa9°�.. (�.° � �^ 4' � `'. , �'.. o - 4 � y �° °a ¢� ��Ss'a °• ;CCR-15S � i e o - � ° �"o�J�'e'•a�ge °, v�'6 `�.• °.� p' � � P' _ .e CCR-15D // �� -07 / °Qp / / � — — � 1 � f ° %° �. ° o > ` •,, �r • ° �' �_� MW-2 ' \ °� •e _ �/ / EX-06/ ° 1 a • e�' si \ ° EX-04 MW-14 ° o GQ AB-10D ® MW 14S'' 4 fl ° EX-0301 •�. - °~ AB 10BR / ° PROPOSED EXTRACTION ' D EX-0COLLECTION \ GWA-10S EX-01 PROPOSED EXTRACTION COLLECTION *q b q IN-1 0 Q, _ _ r r� °4 •$ ,;,• AND PUMP STATION EX-56 0 a.. j�D \\ _ •a'aQ EX-12 `\ / ° � \ -\d // \\D � a,. - 3 t.m De?3.. ^ ° ati• `a �� �,jo - fl / BORROW AREA • / P ° ° j� -- o�j o 4' \ I � 6,q \1\\°o-� vy / �IN,15' � • . EX-13 9 • IN-16 / AL-1S $� // b / // � °�4• ° ° ' moo• a =�io�� ea EX-17 IN-10 \ GWA-11BR I N-20 IN-21 • / /� \\ ° EX-19 IN-12 �-IN-224 EX-20 DRY ASH LANDFILL -PHASE I (PERMIT NO. 1804 o ya / / / /' a o a a / / / / CCR-12S - 9 °� 1 TREANMENTEPLANT TO THE S ORAGE TA OK OSED r� a .. •I t= ) � .� _ 1 CCR-12D G7 , \� � • Ex-24 PIPING TO INSTALLED BYBOR/NG $ Ex-27 CONCRETE SPILLWAY EMERGENCY SPILLWAY r \ // �/ °i o \ NEW WASTE WATER TREATMENT PAD 9 / \ •• n �'�'� � I NEW OUTFLOW STRUCTURE \ \ EXISTING 36" DISCHARGE PIPE TO / / /� (APPROXIMATE) / / CCR-91 TIE TREATED GROUNDWATER LINE TO EXISTING 36" LINE WHICH DISCHARGES TO NPDES OUTFALL 002 a \ sl Q• o "- D s ° P a \ \\ % / / AB-16RLL o. \ \� °16 (INACTIVE) LEGEND \ \ d \ \ \\ �. // / / / EX-45 O EX-44 EXTRACTION WELL IN BEDROCK FLOW ZONE DUKE ENERGY CAROLINAS PROPERTY LINE �i EX-06 EXTRACTION WELL IN SAPROLITE, TRANSITION AND BEDROCK FLOW ZONE — — — — ASH BASIN COMPLIANCE BOUNDARY ® IN-14 CLEAN WATER INFILTRATION WELL IN THE SAPROLITE FLOW ZONE — ASH BASIN WASTE BOUNDARY ABMW-0 MONITORING WELL IN ASH PORE WATER LANDFILL COMPLIANCE BOUNDARY EX47 / MW-06S MONITORING WELL IN SAPROLITE MATERIAL — — LANDFILL BOUNDARY GWA-51D MONITORING WELL IN TRANSITION ZONE PROPOSED CLEAN WATER INFILTRATION PIPING Q• / / 14 \ F} \ �� o a ©a / / / } a.;0 � \ 6g• °tom.. ,'ooG>.a Cc_�-• d a• / / / MW-01BR MONITORING WELL IN COMPETENT BEDROCK PROPOSED CLEAN WATER INFILTRATION PIPING FLOW DIRECTION AB-3BR ABANDONED MONITORING WELL PROPOSED EXTRACTION WELL COLLECTION LINE b / \ e °° ° ' - / / EX-48 O S- NON -CONSTRUCTED SEEP (APPROXIMATE) PROPOSED EXTRACTION WELL COLLECTION LINE FLOW DIRECTION ® NPDES REGULATED PLANT WATER PROPOSED EXTRACTION WELL COLLECTION MAIN LINE NPDES REGULATED PLANT WATER FLOW DIRECTION y PROPOSED EXTRACTION WELL COLLECTION MAINLINE FLOW DIRECTION EX-49 EFFLUENT CHANNEL (APPROXIMATE) [NON -JURISDICTIONAL] 720 10 FOOT CONTOUR (2016 LIDAR BASED) ® ASH BASIN PONDED WATER (APPROXIMATE) 2 FOOT CONTOUR (2016 LIDAR BASED) _ $ / / EX-50 0 WETLAND BY McKIM & CREED 1A 0 -2B STREAM BY McKIM & CREED O SURFACE WATER (AERIAL PHOTOGRAPH AND TOPOGRAPHIC MAP BASED) NOTES m 1.) ALL BOUNDARIES ARE APPROXIMATE. \ / / 2.) SAMPLE LOCATIONS WERE DERIVED FROM VARIOUS SOURCES AND ARE A MIX OF SURVEYED AND APPROXIMATE LOCATIONS. THEREFORE LOCATIONS ARE DEEMED TO BE APPROXIMATE. \ ° \ o• ° / 3.) DUKE ENERGY PROPERTY LINES ARE REPRESENTED BASED ON DUKE ENERGY'S INTERPRETATION OF HISTORICAL DOCUMENTED PROPERTY BOUNDARIES AND CURRENT CATAWBA EX-52 COUNTYGIS. 4.) THE WATERS OF THE US DELINEATION HAS NOT BEEN APPROVED BY THE U.S. ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS NOT TO BE USED FOR �� o< \ ° \` ` m /�• / �' JURISDICTIONAL DETERMINATION PURPOSES. THE WETLANDS AND STREAM BOUNDARIES WERE OBTAINED FROM A STREAM AND WETLAND DELINEATION BY McKIM & CREED MARCH 2O16. 5.) THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLY AND SHOULD NOT BE USED FOR DESIGN OR ENGINEERING PURPOSES. THE TOPOGRAPHY BASED ON A COMBINATION OF SOURCES. LIDAR DATA OBTAINED FROM NC FLOODPLAIN MAPPING PROGRAM -SPATIAL DATA DOWNLOAD AT https://sdd.nc.gov/DataDownload.aspx# ° \ O \ \ \ pa ' / /° / d EX-53 DATA WAS SOURCED FROM THEIR PHASE 4 - 2016 QL2 LIDAR �•{ _ `"'°. d 6.) SITE FEATURES INCLUDING UTILITIES ARE BASED ON SEVERAL SOURCES. ANY UTILITIES SHOWN ARE FOR REFERENCE PURPOSES ONLYAND HAVE NOT BEEN FIELD VERIFIED WITH / ° / REGARDS TO THEIR HORIZONTAL OR VERTICAL LOCATIONS IN THE FIELD. ALL FEATURES INCLUDING UTILITIES ARE DEEMED TO BE APPROXIMATELY LOCATED. CCR 5S \ _\\\ \ / �' � 2015 AERIAL PHOTOGRAPHS OBTAINED FROM NC ONE MAP AT https://nconemap.maps.arcgis.com/apps/webappviewer/index.html. id_ 2c8a9b366c4841f1be2b464347d04a2b 2014 AERIAL PHOTOGRAPH FROM WSP DATED APRIL 2014. DRAWING TITLED "ASBUILT SURVEY, SHEET 1 OF 1 BY CHRISTIAN P SHURTER, PROFESSIONAL LAND SURVEYORP, PROJECT NUMBER 2482 AND CADD NO. 2482 2011003 DRAWING TITLED AERIAL TOPOGRAPHIC SURVEY FOR CLIFFSIDE BY WSP, JOB NUMBER 1570002.000 AND DRAWING FILE NAME APRIL2014_CLIFSIDE_FINAL_10-30-15.DWG DRAWING BY BECHTEL, LOS ANGLES TITLED "DRAINAGE PLANT AREA", REVISED FEBRUARY 23,1994, DRAWING NUMBER C-3027, REVISION 23 7.) DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIP 3200 (NAD83 AND NAVD 88). / ��, � \\ PROPOSED EXTRACTION COLLECTION � DUKE GRAPHIC SCALE'` 200 0 100 200 400 ENERGY (IN FEET) FIGURE ES-3 CAROLINAS DRAWN BY: J. CHASTAIN DATE: 12/21/2019 PROPOSED CORRECTIVE ACTION APPROACH 4 o Q �, - �\� \ w. /. o•P // ccR.4s ro REVISED BY: - DATE:- CORRECTIVE ACTION PLAN UPDATE CHECKED BY: B. GREEN DATE: 12/21/2019 MARSHALL STEAM STATION VIP APPROVED BY: W. GERALD DATE: 12/21/2019 TERRELL, NORTH CAROLINA PROJECT MANAGER: B WILKER o\ \ Terra www.synterracorp.com ° P ' syn IRGE STRUCTURE I TE) 002 TDOCK C:3° 0 LLECTION PROPOSED GROUND WATER EXTRACTION TREATMENT SYSTEM RA1 PROPOSED CLEAN WATER el LAKE NORMAN r/ ((Q_��A_Y ""T V Lv, m A Ins. HMO= V HN J, GWA-4S TT( Ll 7=_ Y-Atz, jj D PC� RD INDUSTRIAL LMINDFIL (PERMIT NO. 1 J. A '2 V V7� D III to BG-3S AlikZ A 67 ,"77 V BG 1SJ 8 0.05 ..... ............. .... J7 4/ 51, 1::77 > /7-, �j/l N, vo LAKE NORMAN W.E. 760'± 71 WELL ID - SHALLOW ZONE ASH BASIN CC LANDFILL CON TER LEVEL IN SHALLOW ZONE (NAVD 88, FEET) WELL IN DEEP ZONE STRUCTURAL WELL IN COMPETENT BEDROCK ZONE ASH BASIN P( NPDESREGU WETLAND BY McKIM & CREED c PIEZOMETER IN SHALLOW ZONE WELLABANDONED IJ �VE --------- STREAM BY 0 WATER SUPPLY WELL LOCATION (APPROXIMATE) _—Al NPDES OUTFALL LOCATION (APPROXIMATE) STREAM BY N )02B _540- TOPOGRAPHIC CONTOUR (10'INTERVAL) )02 UKE GRAPHIC SCALE TOPOGRAPHI y 300 0 150 300 600 GROUNDWAT _4 FIGURE 5-4a 111 1 F ENERG (IN FEET) WATER LEVEL MAP CAROLINAS SHALLOW FLOW ZONE DRAWN BY: J. CHASTAIN DATE: 2/21/2018 NOTES. (MAY 2019) 1. WATER LEVELS COLLECTED BY PACE ANALYTICAL, MAY 2019. REVISED BY: C. NEWELL DATE: 12/11/2019 CORRECTIVE ACTION PLAN UPDATE 2. NOT ALL UTILITIES ARE IDENTIFIED ON THIS DRAWING. THE UTILITIES SHOWN ON THIS DRAWING ARE VISUAL AIDS TO LOCATE THE STREAMS AND GREENWOOD RD CHECKED BY: E. WEBSTER DATE: 12/11/2019 VERTICAL LOCATION HAVE NOT BEEN FIELD LOCATED ON ANY UTILITIES AND THE SHOWN LOCATIONS ARE APPROXIMATE. 4 MARSHALL STEAM STATION 3. THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLY AND SHOULD NOT BE USED FOR DESIGN OR ENGINEERING PURPOSES. TOPOGR­ . ... ....... .. APPROVED BY: W. GERALD DATE: 12/11/2019 THE NORTH CAROLINA SPATIAL DATA SITE AT https*.//sdd.nc.gov/sdd/DataDownload.aspx k, A�- Z % ONLY. THE PRELIMINARY WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM McKIM&CREED DRAWINGS FOR MARSHALL STEAM PU ILL" 8. 2018 AERIAL PHOTOGRAPH WAS OBTAINED FROM NC ONEMAP AT http,.//data.nconemap.gov/geoporLal/catalog/main. ia�lmw�\\ synTerra 7. THE WATERS OF THE US DELINEATION HAS NOT BEEN APPROVED BY THE US ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. TI PROJECT MANAGER: B. WILKER TERRELL, NORTH CAROLINA 9. ALL BOUNDARIES ARE APPROXIMATE. ren www.synterracorp.com J-) �v 1�� D LAKE NORMAN �7 0, SKIMMER WALL LAKE NORMAN W.E. 7601 ± :�j 40 0 y q MOLITI 71 IQ70 m < 1_�v w 0. (1804-INDUS-19 AR '20 FAB -16S] \k, r%/ 0.1804 v L \,\\\&qAL-2b CCR-11 c ol4 lj�i oim� 790 won— -waft,, 1791.17 10S L �:60 -�A!371 OSL A 7 A '860 A&, u Lr ;4po 790 *pow GWA-13DA G I el of T� .0 B-7DU 21.68 1758.70 t AB-7S AB-7D k kol, 7. �ALL�00 B IGWA-122BRI u C GWA-12S w, ASH� 7 MW-lOD LL� 7 % MS-15 9 -4 UBMERGED FLIGI­ Ljlvv=yL)m 0000' mv DR' rA10 V lo LULLL 762.57 LEGEND ou G 18201 INFERRED WATER LEVEL IN SHALLOW ZONE (NAVD88, FEET) DUKE ENERGY CAROLINAS PARCEL LINE FffB-,_4slL WELL I D -ASH PORE WATER ASH BASIN W) WATER LEVEL IN SHALLOW ZONE tNAVD 88 FEET� /"77 V A F"? ITF 7117 z �V z � k 0 1----�-I/l 7, A� H- �GWA-� 10111p, A J, )W J,— I 74� L2 4-4 y ju M� IT NO. (1 JA yw IAB-16 , J-1 J L-4 40 co 14 T -wV [A '940 �N JAB-15SL Z f I qIAb-2Ub 'vt fff Aft v, 14� V. AV� f FA B - 1-4 DI JAB -14DU GWA-13DA J 868.8 GWA-13S P. --N '777 7 7, CCR-13D 4j4j-u WE- L8 2 70 v v8" u FM—W -1] 1 i b FGvv,,--L-L. 16--b- (OB1 (5AF) DRY A.' - (PE RMIT NO. 1804-INE NEW EMERGENCY SP.-L..... Z;� Ab-bU 1(-iVVA-I:ZU JGW) q -lis CCR-9! IN IEW OUTFLOW STRUCTURE CESS ROAD UCTUR 1-1 (ASH BASIN) alu JEW DISCh DISCHARGE TOWER (INAC11VE) 'TRUCTUR� UTFALL 002 AF V Ms A AA MW-9D S4 4 --7 9'. 760.66 PSI 4OF "A CCR-5S 763.19 1;Hl ---.OERGED FL V ;TING G LECTIO '�'B!��& T, S LEGEND A DUKE ENERGY CAROLI 1820, INFERRED WATER LEVEL IN DEEP ZONE (NAVD 88, FEET) ASH BASIN WASTE BOUNDARY WELL ID - DEEP ZONE ASH BASIN COMPLIAN WATER LEVEL IN DEEP ZONE (NAVD 88, FEET) WELL I D - SHALLOW ZONE LANDFILL BOUNDARY �(j �v LANDFILL COMPLIANC WELL IN DEEP ZONE WELL IN COMPETENT BEDROCK ZONE STRUCTURAL FILL BOt IN ASH BASIN PONDED V WELL ABANDONED NPIDES REGULATED 1A -j c PIEZOMETER IN SHALLOW ZONE WETLAND BY McKIM WATER SUPPLY WELL LOCATION (APPROXIMATE) STREAMBY (AERIAL P1101 0-1-1 11 1 01 0-1-1 BASED, )02BJ )-02-A-1 A NPIDES OUTFALL LOCATION (APPROXIMATE) STREAM BY McKIM & CREED —54o— TOPOGRAPHIC CONTC w TOPOGRAPHIC CONTC GROUNDWATER FLO\A NOTES: 1. WATER LEVELS COLLECTED BY PACE ANALYTICAL, MAY 2019. 2. NOT ALL UTILITIES ARE IDENTIFIED ON THIS DRAWING. THE UTILITIES SHOWN ON THIS DRAWING ARE VISUAL AIDS TO LOCATE THE STREAMS AND WETILANDS11, 11-11—D. I I 1 1-1-14 W-1 I — VERTICAL LOCATION HAVE NOT BEEN FIELD LOCATED ON ANY UTILITIES AND THE SHOWN LOCATIONS ARE APPROXIMATE. NJ, 3. THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLY AND SHOULD NOT BE USED FOR DESIGN OR ENGINEERING PURPOSES. TOPOGRAPHY IS Bp THE NORTH CAROLINA SPATIAL DATA SITE AT https*.//sdd.nc.gov/sdd/DataDownload.aspx 7. THE WATERS OFTHE US DELINEATION HAS NOT BEEN APPROVED BY THE US ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IE ONLY. THE PRELIMINARY WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM McKIM&CREED DRAWINGS FOR MARSHALL STEAM PLANT DATED 9. ALL BOUNDARIES ARE APPROXIMATE. o 8. 2018 AERIAL PHOTOGRAPH WAS OBTAINED FROM NC ONEMAP AT http.,//data.nconemap.gov/geoportal/catalog/main. -j LL Z 7=— os C3, GREENW OD RD r �y LAKE NORMAN W.E. 760'± 810.06 VV ANN LL - AI . . ........ N v 'A U J 1�� D r k- LAKE NORMAN \w \X "N SKIMMER WALL LAKE NORMAN W.E. 7601 ± Ad GRAPHIC SCALE UKE y 300 0 150 300 600 ENERG (IN FEET) FIGURE 5-4b WATER LEVEL MAP CAROLINAS DRAWN BY: J. CHASTAIN DATE: 2/21/2018 DEEP FLOW ZONE REVISED BY: C, NEWELL DATE: 12/11/2019 (MAY 2019) CHECKED BY: E. WEBSTER DATE: 12/11/2019 CORRECTIVE ACTION PLAN UPDATE MARSHALL STEAM STATION APPROVED BY: W. GERALD DATE: 12/11/2019 PROJECT MANAGER: B, WILKER TERRELL, NORTH CAROLINA synTerra www.synterracorp.com S7 Witt% I�N FI ILF-1 A 2� 41� 111� LM 1=?11 ST ANDFI 0 AB-18D PVSF-3D z 7_7\ P k� M FG)WA- _9E!jR M1 "U7 821.23 V A 15SQ 4� 4 1 "A �� 22- ny ZA 0 FM—R 2-21 '1w- -ILL /AL r /4 4 7777 V 1�1,�__ CID '0 v 0- GWA-13DA GWA-13S �Pvsz t]CCR-14D 111A 00 IMD-1 u �w =A=D FM_w_11 �7, J, DRY ASH LANDFILL "`w , ") " - /I (PERMIT I k5l CCR-19n NEWEMERGENCY, M� 14 4� *�M �R, "'x 04 ND PONT INDLISTRV L LA PERMIT NO. 1812-INDLIS-210-08),\�:)) L V, V,,,' k! I I ce� J� C3 ;0011 GWA-12BR IUVV/A-__ZZ) R-9DA NEWOUTFLOWS qv 7 j A g_ A— I 1w 7 % X 9 V,/ we lk (FtF(IVII I 1\4u. :LbiI )IA/<Z:Oj 4 '4 FM R2 91 or f �'j �GoR-� RD GR lN BAS 0 XPI LEGEND DUKE ENERGY CAROLINAS PARCEL LINE A ASH BASIN WASTE BOUNDARY u8201 INFERRED WATER LEVEL IN COMPETENT BEDROCK (NAVD 88, FEET) WELL ID - COMPETENT BEDROCK —ASH BASIN COMPLIANCE BOUNDARY WATER LEVEL IN COMPETENT BEDROCK (NAVD 88, FEET) LANDFILL BOUNDARY ftft WELL IN ASH PORE WATER LANDFILL COMPLIANCE BOUNDARY T f WELL IN SHALLOW ZONE STRUCTURAL FILL BOUNDARY - — ---- WELL IN DEEP ZONE ASH BASIN PONDED WATER WELL ABANDONED NPIDES REGULATED WATER FEATURE PIEZOMETER IN SHALLOW ZONE WETLAND BY McKIM & CREED 4' -Y WATER SUPPLY WELL LOCATION (APPROXIMATE) STREAM BY (AERIAL PHOTOGRAPH & TOPOGRAPHIC MAP BASED) A N PDES OUTFALL LOCATION (APPROXIMATE) STREAM BY McKIM & CREED 7 _540- TOPOGRAPHIC CONTOUR (10'INTERVAL) TOPOGRAPHIC CONTOUR (2'INTERVAL) GROUNDWATER FLOW DIRECTION o NOTES: V, 1. WATER LEVELS COLLECTED BY PACE ANALYTICAL, MAY 2019. 2. NOT ALL UTILITIES ARE IDENTIFIED ON THIS DRAWING. THE UTILITIES SHOWN ON THIS DRAWING ARE VISUAL AIDS TO LOCATE THE STREAMS AND WETLANDS IN THE FIELD. THE HORIZONTAL LOCATION AND J& VERTICAL LOCATION � AVE NOT BEEN FIELD LOCATED ON ANY UTILITIES AND THE SHOWN LOCATIONS ARE APPROXIMATE. 3. THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLY AND SHOULD NOT BE USED FOR DESIGN OR ENGINEERING PURPOSES. TOPOGRAPHY IS BASED ON LIDAR BARE EARTH DATA OBTAINED FROM THE NORTH CAROLINA SPATIAL DATA SITE AT https*.//sdd.nc.gov/sdd/DataDownload.aspx 7. THE WATERS OF THE US DELINEATION HAS NOT BEEN APPROVED BY THE US ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS A PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE PRELIMINARY WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM McKIM&CREED DRAWINGS FOR MARSHALL STEAM PLANT DATED MARCH, 2016. 8. 2018 AERIAL PHOTOGRAPH WAS OBTAINED FROM NC ONEMAP AT http,.//data.nconemap.gov/geoportal/catalog/main. 9. ALL BOUNDARIES ARE APPROXIMATE. L� 72!�R? 19 LAKE NORMAN W.E. 760'± X/ :`j \tV 0, X �j j ALfth� ov �� 4 �, I � �, 1j � /I LAKE NORMAN SKIMMER WALL FIRM 1 (1((11 1 01 - P10 foa; LAKE NORMAN W.E. 760'± UKE GRAPHIC SCALE y 300 0 150 300 600 FIGURE 5-4c ENERG (IN FEET) WATER LEVEL MAP CAROLINAS DRAWN BY: J. CHASTAIN DATE: 2/21/2018 BEDROCK FLOW ZONE REVISED BY: C. NEWELL DATE: 12/11/2019 (MAY 2019) CHECKED BY: E. WEBSTER DATE: 12/11/2019 GREENWOOD RD CORRECTIVE ACTION PLAN UPDATE 16% APPROVED BY: W. GERALD DATE: 12/11/2019 MARSHALL STEAM STATION PROJECT MANAGER: B. WILKER TERRE L, NORTH CAROLINA synTerra www.synterracorp.com DATE PRINTED: 12/23/2019 12:57 PM FILE PATH: P:\Duke Energy Carolinas\18. MARSHALL\06.EHS CAMA Compliance Support\06C. CAP Update 2019\100% FINAL CAP\DWG\DE MARSHALL WIL MAP 2019-100%CAP.dwg ��//// ° � � � - o ' o -. � � o �c ; ..7✓�•0 � � °� � .� 1 ��i' L,r.,.�',- / \ - :dam. q I �l �9 / PROPOSED CLEAN WATER I o INFILTRATION STORAGE TANK ✓° .9 Ly a P � b �Ci O O "' � ` K,7.�,y T O I \ \ ° o � �� n� 4 /\ aa9°�.. (�.° � �^ 4' � `'. , �'.. o - 4 � y �° °a ¢� ��Ss'a °• ;CCR-15S � i e o - � ° �"o�J�'e'•a�ge °, v�'6 `�.• °.� p' � � P' _ .e CCR-15D // �� -07 / °Qp / / � — — � 1 � f ° %° �. ° o > ` •,, �r • ° �' �_� MW-2 ' \ °� •e _ �/ / EX-06/ ° 1 a • e�' si \ ° EX-04 MW-14 ° o GQ AB-10D ® MW 14S'' 4 fl ° EX-0301 •�. - °~ AB 10BR / ° PROPOSED EXTRACTION ' D EX-0COLLECTION \ GWA-10S EX-01 PROPOSED EXTRACTION COLLECTION *q b q IN-1 0 Q, _ _ r r� °4 •$ ,;,• AND PUMP STATION EX-56 0 a.. j�D \\ _ •a'aQ EX-12 `\ / ° � \ -\d // \\D � a,. - 3 t.m De?3.. ^ ° ati• `a �� �,jo - fl / BORROW AREA • / P ° ° j� -- o�j o 4' \ I � 6,q \1\\°o-� vy / �IN,15' � • . EX-13 9 • IN-16 / AL-1S $� // b / // � °�4• ° ° ' `�o• a =�io�� ea EX-17 IN-10 \ GWA-11BR I N-20 IN-21 • / /� \\ ° EX-19 IN-12 �-IN-224 EX-20 DRY ASH LANDFILL -PHASE I (PERMIT NO. 1804 o ya / / / /' a o a a / / / / CCR-12S - 9 °� 1 TREANMENTEPLANT TO THE S ORAGE TA OK OSED r� a .. •I t= ) � .� _ 1 CCR-12D G7 , \� � • Ex-24 PIPING TO INSTALLED BYBOR/NG $ Ex-27 CONCRETE SPILLWAY EMERGENCY SPILLWAY r \ // �/ °i o \ NEW WASTE WATER TREATMENT PAD 9 / \ •• n �'�'� � I NEW OUTFLOW STRUCTURE \ \ EXISTING 36" DISCHARGE PIPE TO / / /� (APPROXIMATE) / / CCR-91 TIE TREATED GROUNDWATER LINE TO EXISTING 36" LINE WHICH DISCHARGES TO NPDES OUTFALL 002 a \ sl Q• o "- D s ° P a \ \\ % / / AB-16RLL o. \ \� °16 (INACTIVE) LEGEND \ \ d \ \ �\ �. // / / / EX-45 O EX-44 EXTRACTION WELL IN BEDROCK FLOW ZONE DUKE ENERGY CAROLINAS PROPERTY LINE �i EX-06 EXTRACTION WELL IN SAPROLITE, TRANSITION AND BEDROCK FLOW ZONE — — — — ASH BASIN COMPLIANCE BOUNDARY ® IN-14 CLEAN WATER INFILTRATION WELL IN THE SAPROLITE FLOW ZONE — ASH BASIN WASTE BOUNDARY ABMW-0 MONITORING WELL IN ASH PORE WATER LANDFILL COMPLIANCE BOUNDARY EX47 / MW-06S MONITORING WELL IN SAPROLITE MATERIAL — — LANDFILL BOUNDARY GWA-51D MONITORING WELL IN TRANSITION ZONE PROPOSED CLEAN WATER INFILTRATION PIPING Q• / / 14 \ F} \ �� o a ©a / / / } a.;0 � \ 6g• °tom.. ,'ooG>.a Cc_�-• d a• / / / MW-01BR MONITORING WELL IN COMPETENT BEDROCK PROPOSED CLEAN WATER INFILTRATION PIPING FLOW DIRECTION AB-3BR ABANDONED MONITORING WELL PROPOSED EXTRACTION WELL COLLECTION LINE b / e °° ° ' - / / EX-48 O S- NON -CONSTRUCTED SEEP (APPROXIMATE) PROPOSED EXTRACTION WELL COLLECTION LINE FLOW DIRECTION ® NPDES REGULATED PLANT WATER PROPOSED EXTRACTION WELL COLLECTION MAIN LINE NPDES REGULATED PLANT WATER FLOW DIRECTION y PROPOSED EXTRACTION WELL COLLECTION MAINLINE FLOW DIRECTION EX-49 EFFLUENT CHANNEL (APPROXIMATE) [NON -JURISDICTIONAL] 720 10 FOOT CONTOUR (2016 LIDAR BASED) ® ASH BASIN PONDED WATER (APPROXIMATE) 2 FOOT CONTOUR (2016 LIDAR BASED) _ $ / / EX-50 0 WETLAND BY McKIM & CREED 1A 0 -2B STREAM BY McKIM & CREED O SURFACE WATER (AERIAL PHOTOGRAPH AND TOPOGRAPHIC MAP BASED) NOTES m 1.) ALL BOUNDARIES ARE APPROXIMATE. \ / / 2.) SAMPLE LOCATIONS WERE DERIVED FROM VARIOUS SOURCES AND ARE A MIX OF SURVEYED AND APPROXIMATE LOCATIONS. THEREFORE LOCATIONS ARE DEEMED TO BE APPROXIMATE. \ ° \ o• ° / 3.) DUKE ENERGY PROPERTY LINES ARE REPRESENTED BASED ON DUKE ENERGY'S INTERPRETATION OF HISTORICAL DOCUMENTED PROPERTY BOUNDARIES AND CURRENT CATAWBA EX-52 COUNTYGIS. 4.) THE WATERS OF THE US DELINEATION HAS NOT BEEN APPROVED BY THE U.S. ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS NOT TO BE USED FOR �� o< \ ° \` ` m /�• / �' JURISDICTIONAL DETERMINATION PURPOSES. THE WETLANDS AND STREAM BOUNDARIES WERE OBTAINED FROM A STREAM AND WETLAND DELINEATION BY McKIM & CREED MARCH 2O16. 5.) THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLY AND SHOULD NOT BE USED FOR DESIGN OR ENGINEERING PURPOSES. THE TOPOGRAPHY BASED ON A COMBINATION OF SOURCES. LIDAR DATA OBTAINED FROM NC FLOODPLAIN MAPPING PROGRAM -SPATIAL DATA DOWNLOAD AT https://sdd.nc.gov/DataDownload.aspx# ° \ O \ \ \ pa ' / /° / d EX-53 DATA WAS SOURCED FROM THEIR PHASE 4 - 2016 QL2 LIDAR �•{ _ `"'°. d 6.) SITE FEATURES INCLUDING UTILITIES ARE BASED ON SEVERAL SOURCES. ANY UTILITIES SHOWN ARE FOR REFERENCE PURPOSES ONLYAND HAVE NOT BEEN FIELD VERIFIED WITH / ° / REGARDS TO THEIR HORIZONTAL OR VERTICAL LOCATIONS IN THE FIELD. ALL FEATURES INCLUDING UTILITIES ARE DEEMED TO BE APPROXIMATELY LOCATED. CCR 5S \ _\\ \ / �' � 2015 AERIAL PHOTOGRAPHS OBTAINED FROM NC ONE MAP AT https://nconemap.maps.arcgis.com/apps/webappviewer/index.html. id_ 2c8a9b366c4841f1be2b464347d04a2b 2014 AERIAL PHOTOGRAPH FROM WSP DATED APRIL 2014. DRAWING TITLED "ASBUILT SURVEY, SHEET 1 OF 1 BY CHRISTIAN P SHURTER, PROFESSIONAL LAND SURVEYORP, PROJECT NUMBER 2482 AND CADD NO. 2482 2011003 DRAWING TITLED AERIAL TOPOGRAPHIC SURVEY FOR CLIFFSIDE BY WSP, JOB NUMBER 1570002.000 AND DRAWING FILE NAME APRIL2014_CLIFSIDE_FINAL_10-30-15.DWG DRAWING BY BECHTEL, LOS ANGLES TITLED "DRAINAGE PLANT AREA", REVISED FEBRUARY 23,1994, DRAWING NUMBER C-3027, REVISION 23 7.) DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIP 3200 (NAD83 AND NAVD 88). / ��, � \\ PROPOSED EXTRACTION COLLECTION � DUKE GRAPHIC SCALE'` 200 0 100 200 400 ENERGY (IN FEET) FIGURE 6-30 GROUNDWATER REMEDIAL SYSTEM LAYOUT CAROLINAS DRAWN BY: J. CHASTAIN DATE: 12/24/2019 ALTERNATIVE 3 4 o a - /• o P / ccR 4s REVISED BY: - DATE:- CORRECTIVE ACTION PLAN UPDATE CHECKED BY: B. GREEN DATE: 12/24/2019 MARSHALL STEAM STATION \\\ } //' \✓/// VIP APPROVED BY: W. GERALD DATE: 12/24/2019 TERRELL, NORTH CAROLINA \ \ PROJECT MANAGER: B WILKER o\ \ erra www.synterracorp.com synT IRGE STRUCTURE I TE) 002 TDOCK C:3° 0 LLECTION PROPOSED GROUND WATER EXTRACTION TREATMENT SYSTEM RA1 PROPOSED CLEAN WATER el LAKE NORMAN