HomeMy WebLinkAboutNC0004987_01_MSS_List of Appendices_20191231Corrective Action Plan Update December 2019
Marshall Steam Station SynTerra
LIST OF APPENDICES
Appendix A Regulatory Correspondence
Appendix B Comprehensive Site Assessment Update Report Review Comments
and Responses
Appendix C Updated Comprehensive Analytical Data Tables
Appendix D HB 630 Provision of Water Supply Completion Documentation
Appendix E Human Health and Ecological Risk Assessment
Appendix F Fractured Bedrock Evaluation
Appendix G Updated Groundwater Flow and Transport Modeling Report
Appendix H Geochemical Model Report
COI Management Plan Approach
Appendix I Monitored Natural Attenuation Report
Appendix J Surface Water Evaluation to Assess 15A NCAC 02B .0200
Compliance for Implementation of Corrective Action under 15A
NCAC 02L .0106 (k) and (1)
Surface Water Future Conditions Evaluation
to Assess 15A NCAC 02B .0200 Compliance for Implementation and
Termination of Corrective Action under 15A NCAC 02L .0106 (k), (1),
and (m)
Appendix K Remedial Alternative Cost Estimate Details
Appendix L Sustainability Calculations
Appendix M Remediation Alternative Summary
Appendix N Proposed Remedial Alternative Design Calculations
Appendix O Effectiveness Monitoring Plan
Appendix P 2019 Additional Assessments