Loading...
HomeMy WebLinkAboutNC0005088_CSS_Appendix L_20191231Corrective Action Plan Update December 2019 Cliffside Steam Station APPENDIX L SUSTAINABILITY CALCULATIONS SynTerra APPENDIX L - SUSTAINABILITY CALCULATIONS REMEDIAL ALTERNATIVES - INPUTS CORRECTIVE ACTION PLAN UPDATE CLIFFSIDE STEAM STATION - FORMER ASH STORAGE AREA DUKE ENERGY CAROLINAS, LLC, MOORESBORO, NC Alternative Remedial Alternative 1 - Groundwater Remediation by MNA Remedial Alternative 2 — Groundwater Remediation by Extraction and Clean Water Infiltration Remedial Alternative 3 — Groundwater Remediation by Extraction and Clean Water Infiltration Wells and Galleries New Monitoring Wells Number of MWs 3 3 3 Average depth of MWs (ft. bgs) 80 80 80 Average screen length of MWs (ft.) 10 10 10 Casing material Sch 80 PVC Sch 80 PVC Sch 80 PVC Well diameter 6 6 6 Borehole diameter 8 8 8 Extraction Wells Number of Extraction Wells 23 7 Average depth (ft. bgs) 75 70 Average screen length (ft.) 25 25 Total flow (gpm) 160 14 Casing material Sch 80 PVC Sch 80 PVC Well diameter 6 6 Borehole diameter 8 8 Horizontal Wells Number of Horizontal Wells 1 1 Length of Each Horizontal Well (ft.) 240 225 Total flow (gpm) 75 23 Casing material Sch 80 PVC Sch 80 PVC Well diameter 8 8 Borehole diameter 10 10 Clean Water Infiltration Wells Number of Clean Water Infiltration Wells 46 12 Average depth (ft. bgs) 58 90 Average screen length (ft.) 23 25 Total flow (gpm) 165.9 33.5 Casing material Sch 80 PVC Sch 80 PVC Well diameter 6 6 Borehole diameter 8 8 Number of pumps 1 1 Infiltration Galleries Number of Infiltration Galleries 1 Total area (acres) 7 Total flow (gpm) 26 Pipe material Sch 40 PVC Pipe diameter 2 Chemical Injection Wells Number of Injection Wells Average depth (ft. bgs) Average screen length (ft.) Total flow (gpm) Casing material Well diameter Borehole diameter Injection Pumps Tree Wells Total area (acres) Trenches Number of trenches Length (ft.) Width (ft.) De th ft. Page 1 of 2 APPENDIX L - SUSTAINABILITY CALCULATIONS REMEDIAL ALTERNATIVES - INPUTS CORRECTIVE ACTION PLAN UPDATE CLIFFSIDE STEAM STATION - FORMER ASH STORAGE AREA DUKE ENERGY CAROLINAS, LLC, MOORESBORO, NC Alternative Remedial Alternative 1 - Groundwater Remediation by MNA Remedial Alternative 2 — Groundwater Remediation by Extraction and Clean Water Infiltration Remedial Alternative 3 — Groundwater Remediation by Extraction and Clean Water Infiltration Wells and Galleries Conveyance Pipe Pipe length 2000 2000 Pipe material Sch 80 HDPE Sch 80 HDPE Pipe diameter 6 6 Number of conveyance pumps 2 2 Permeable Reactive Barriers Number of PRBs Fill Material Length (ft.) Width (ft.) Depth (ft.) Removal of Waste Materials Tons of waste Waste Profile Treatment Media Media Pounds Well Abandonment Number of wells Average well depth Well diameter Fill Material Laboratory Analysis $ of laboratory analysis spent Length of Active Remediation Years of Active Remediation 0 6 6 Notes: ft. - foot gpm - gallon per minute Sch - schedule HDPE - high density polyethylene bgs - below ground surface PVC - polyvinyl chloride PRB - permeable reactive barrier MW - monitoring wells MINA - monitored natural attenuation Prepared By: GTC Checked By: SJB Page 2 of 2 APPENDIX L - SUSTAINABILITY CALCULATIONS REMEDIAL ALTERNATIVES-SUSTAINABILITY CORRECTIVE ACTION PLAN UPDATE CLIFFSIDE STEAM STATION - FORMER ASH STORAGE AREA DUKE ENERGY CAROLINAS, LLC, MOORESBORO, NC Remedial Alternative 1 - Groundwater Remediation by MNA Activities CO2 Emissions Percent Total Onsite NOx Emissions Percent Total Onsite SO. Emissions Percent Total Onsite PMld Emissions percent Total Total NOx Emissions Percent Total Total SO. Emissions Percent Total Total PM10 Emissions Percent Total Total Energy Used Total Energy Used percent Total metric ton % metric ton % metric ton % metric ton % metric ton % metric ton % metric ton % MMBTU MWH Material Productions 12.58 60.64 NA - NA - NA - 5.9E-03 13.9 9.1E-03 68.3 1.3E-03 33.8 3.8E+03 NA 97.30 Transportation -Personnel 4.86 23.42 NA - NA - NA - 1.1E-02 25.0 1.0E-03 7.6 1.5E-04 3.9 6.4E+01 NA 1.6 Transportation-Equip/materials 0.49 2.36 NA - NA - NA - 1.5E-04 0.4 2.7E-06 0.0 1.4E-05 0.4 6.4E+00 NA 0.2 Equipment Use and Misc 2.54 12.26 2.4E-02 100.0 2.5E-03 100.0 2.2E-03 100.0 2.6E-02 60.5 3.2E-03 24.0 2.4E-03 61.7 3.1E+01 0.0E+00 0.8 Residual Handling 0.27 1.32 0.0E+00 - 0.0E+00 - 0.0E+00 - 8.8E-05 0.2 3.6E-06 0.0 7.2E-06 0.2 3.8E+00 NA 0.1 Total 20.75 100 2.43E-02 100.0 2.48E-03 100 2.19E-03 100 4.25E-02 100 1.34E-02 100 3.88E-03 100 1 3.88E+03 0.00E+00 1 100 Remedial Alternative 2 - Groundwater Remediation by Extraction and Clean Water Infiltration Activities COz Emissions Percent Total Onsite NOx Emissions Percent Total Onsite SO. Emissions Percent Total Onsite Emissions percent Total Total NOx Emissions Percent Total Total SO, Emissions Percent Total Total PMlo Emissions Percent Total Total Energy Total Energy percent Total metric ton % metric ton % metric ton % metric ton % metric ton % metric ton % metric ton % MMBTU MWH 0/0 Material Productions 558.07 12.21 NA - NA - NA - 1.0E+00 4.7 7.3E-01 8.2 2.3E-01 4.0 7.2E+05 NA 95.70 Transportation -Personnel 24.64 0.54 NA - NA - NA - 1.8E-02 0.1 1.3E-03 0.0 1.6E-03 0.0 3.1E+02 NA 0.0 Transportation-Equip/materials 0.98 0.02 NA - NA - NA - 3.1E-04 0.0 5.5E-06 0.0 2.7E-05 0.0 1.3E+01 NA 0.0 Equipment Use and Misc 3,987.26 87.23 1.3E+01 100.0 1.3E+00 100.0 1.1E+00 100.0 2.1E+01 95.2 8.1E+00 91.8 5.6E+00 96.0 3.2E+04 1.5E-01 4.3 Residual Handling 0.27 0.01 1 0.0E+00 0.0E+00 0.0E+00 8.8E-05 0.0 3.6E-06 0.0 7.2E-06 0.0 3.8E+00 NA 1 0.0 Total 4,571.22 100 1 1.26E+01 100.0 1 1.29E+00 100 1 1.14E+00 100 1 2.21E+01 100 8.84E+00 100 5.85E+00 1 100 7.50E+05 1.45E-01 1 100 Remedial Alternative 3 - Groundwater Remediation by Extraction and Clean Water Infiltration Wells and Galleries Activities CO2 Emissions Percent Total Onsite NOx Emissions Percent Total Onsite SO. Emissions Percent Total Onsite PMld Emissions percent Total Total NOx Emissions Percent Total Total SO. Emissions Percent Total Total PM10 Emissions Percent Total Total Energy Used Total Energy Used percent Total metric ton % metric ton % metric ton % metric ton % metric ton % metric ton % metric ton % MMBTU MWH Material Productions 32,329.93 97.53 NA - NA - NA - 6.5E+01 95.4 8.6E+01 98.3 1.1E+01 87.3 4.3E+06 NA 99.87 Transportation -Personnel 12.37 0.04 NA - NA - NA - 1.3E-02 0.0 1.1E-03 0.0 7.2E-04 0.0 1.6E+02 NA 0.0 Transportation-Equip/materials 0.98 0.00 NA - NA - NA - 3.1E-04 0.0 5.5E-06 0.0 2.7E-05 0.0 1.3E+01 NA 0.0 Equipment Use and Misc 803.80 2.42 1.4E+00 100.0 1.4E-01 100.0 1.2E-01 100.0 3.1E+00 4.6 1.5E+00 1.7 1.6E+00 12.7 5.2E+03 6.5E-02 0.1 Residual Handling 0.27 1 0.00 0.0E+00 - 0.0E+00 - I 0.0E+00 - 8.8E-05 0.0 3.6E-06 0.0 7.2E-06 0.0 3.8E+00 NA 0.0 Total 33,147.35 100 1.39E+00 100.0 1.42E-01 100 1 1.25E-01 100 6.81E+01 100 8.74E+01 100 1.25E+01 100 4.32E+06 6.50E-02 1 100 Notes: CO, - Airborne emissions of carbon dioxide MMBTU - Million British Thermal Units NOx - Airborne emissions of nitrogen oxides (combination of nitrogen monoxide and nitrogen dioxide) SOx - Airborne emissions of sulfur oxides (combination of sulfur monoxide, sulfur dioxide, sulfur trioxide, and others) PM,o - Airborne emissions of particulate matter that is 10 micrometers or less in diameter Prepared By: GTC Checked By: SIB Page 1 of 1 APPENDIX L - SUSTAINABILITY CALCULATIONS REMEDIAL ALTERNATIVES - INPUTS CORRECTIVE ACTION PLAN UPDATE CLIFFSIDE STEAM STATION - FORMER UNITS 1-4 ASH BASIN DUKE ENERGY CAROLINAS, LLC, MOORESBORO, NC Alternative Remedial Alternative 1 - Groundwater Remediation by MNA Remedial Alternative 2 - Groundwater Remediation by TreeWellsTM New Monitoring Wells Number of MWs 3 3 Average depth of MWs (ft. bgs) 80 80 Average screen length of MWs (ft.) 10 10 Casing material Sch 80 PVC Sch 80 PVC Well diameter 6 6 Borehole diameter 8 8 Extraction Wells Number of Extraction Wells Average depth (ft. bgs) Average screen length (ft.) Total flow (gpm) Casing material Well diameter Borehole diameter Horizontal Wells Number of Horizontal Wells Length of Each Horizontal Well (ft.) Total flow (gpm) Casing material Well diameter Borehole diameter Clean Water Infiltration Wells Number of Clean Water Infiltration Wells Average depth (ft. bgs) Average screen length (ft.) Total flow (gpm) Casing material Well diameter Borehole diameter Number of pumps Infiltration Galleries Number of Infiltration Galleries Total area (acres) Total flow (gpm) Pipe material Pipe diameter Chemical Injection Wells Number of Injection Wells Average depth (ft. bgs) Average screen length (ft.) Total flow (gpm) Casing material Well diameter Borehole diameter Injection Pumps Page 1 of 2 APPENDIX L - SUSTAINABILITY CALCULATIONS REMEDIAL ALTERNATIVES - INPUTS CORRECTIVE ACTION PLAN UPDATE CLIFFSIDE STEAM STATION - FORMER UNITS 1-4 ASH BASIN DUKE ENERGY CAROLINAS, LLC, MOORESBORO, NC Alternative Remedial Alternative 1 - Groundwater Remediation by MNA Remedial Alternative 2 - Groundwater Remediation by TreeWellsTM Tree Wells Total area (acres) 2 Trenches Number of trenches Length (ft.) Width (ft.) Depth (ft.) Conveyance Pipe Pipe length Pipe material Pipe diameter Number of conveyance pumps Permeable Reactive Barriers Number of PRBs Fill Material Length (ft.) Width (ft.) Depth (ft.) Removal of Waste Materials Tons of waste Waste Profile Treatment Media Media Pounds Well Abandonment Number of wells Average well depth Well diameter Fill Material Laboratory Analysis $ of laboratory analysis spent Length of Active Remediation Years of Active Remediation 0 0 Notes: ft. - foot gpm - gallon per minute Sch - schedule HDPE - high density polyethylene bgs - below ground surface PVC - polyvinyl chloride PRB - permeable reactive barrier MW - monitoring wells MINA - monitored natural attenuation Prepared By: GTC Checked By: SJB Page 2 of 2 APPENDIX L - SUSTAINABILITY CALCULATIONS REMEDIAL ALTERNATIVES-SUSTAINABILITY CORRECTIVE ACTION PLAN UPDATE CLIFFSIDE STEAM STATION - FORMER UNITS 1-4 ASH BASIN DUKE ENERGY CAROLINAS, LLC, MOORESBORO, NC Remedial Alternative 1 - Groundwater Remediation by MNA Activities CO2 Emissions Percent Total Onsite NOx Emissions Percent Total Onsite SOx Emissions Percent Total Onsite PM10 Emissions Percent Total Total NOx Emissions Percent Total Total SOx Emissions Percent Total Total PM10 Emissions Percent Total Total Energy Used Total Energy Used Percent Total metric ton % metric ton % metric ton % metric ton % metric ton % metric ton % metric ton % MMBTU MWH % Material Productions 12.58 60.64 NA - NA - NA - 5.9E-03 13.9 9.1E-03 68.3 1.3E-03 33.8 3.8E+03 NA 97.30 Transportation -Personnel 4.86 23.42 NA - NA - NA - 1.1E-02 25.0 1.0E-03 7.6 1.5E-04 3.9 6.4E+01 NA 1.6 Transportation-Equip/materials 0.49 2.36 NA - NA - NA - 1.5E-04 0.4 2.7E-06 0.0 1.4E-05 0.4 6.4E+00 NA 0.2 Equipment Use and Misc 2.54 12.26 2.4E-02 100.0 2.5E-03 100.0 2.2E-03 100.0 2.6E-02 60.5 3.2E-03 24.0 2.4E-03 61.7 3.1E+01 0.0E+00 0.8 Residual Handling 0.27 1.32 0.0E+00 - 0.0E+00 - 0.0E+00 - 8.8E-05 0.2 3.6E-06 0.0 7.2E-06 0.2 3.8E+00 NA 0.1 Total 20.75 100 2.43E-02 100.0 2.48E-03 100 2.19E-03 100 4.25E-02 100 1.34E-02 100 3.88E-03 100 3.88E+03 0.00E+00 100 Remedial Alternative 2 - Groundwater Remediation by TreeWelISTM Activities CO2 Emissions Percent Total Onsite NOx Emissions Percent Total Onsite SOx Emissions Percent Total Onsite PM 10 Emissions Percent Total Total NOx Emissions Percent Total Total SOx Emissions Percent Total Total PM10 Emissions Percent Total Total Energy Used Total Energy Used Percent Total metric ton % metric ton % metric ton % metric ton % metric ton % metric ton % metric ton % MMBTU MWH % Material Productions 13.27 -7.63 NA - NA - NA - 7.2E-03 4.0 1.1E-02 34.5 1.6E-03 9.6 3.8E+03 NA 93.32 Transportation -Personnel 5.01 -2.88 NA - NA - NA - 1.1E-02 5.9 1.0E-03 3.1 1.6E-04 1.0 6.6E+01 NA 1.6 Transportation-Equip/materials 0.49 -0.28 NA - NA - NA - 1.5E-04 0.1 2.7E-06 0.0 1.4E-05 0.1 6.4E+00 NA 0.2 Equipment Use and Misc -192.88 110.96 1.5E-01 100.0 1.6E-02 100.0 1.4E-02 100.0 1.6E-01 90.0 2.0E-02 62.3 1.5E-02 89.4 1.9E+02 0.0E+00 4.8 Residual Handling 0.27 0.16 0.0E+00 0.0E+00 0.0E+00 8.8E-OS 0.0 3.6E-06 0.0 7.2E-06 0.0 3.8E+00 NA 0.1 Total -173.83 100 1.54E-01 100.0 1.58E-02 100 1.39E-02 100 1.81E-01 100 3.27E-02 100 1.70E-02 100 4.06E+03 0.00E+00 100 Notes: CO, - Airborne emissions of carbon dioxide MMBTU - Million British Thermal Units NOx - Airborne emissions of nitrogen oxides (combination of nitrogen monoxide and nitrogen dioxide) SOx - Airborne emissions of sulfur oxides (combination of sulfur monoxide, sulfur dioxide, sulfur trioxide, and others) PM,a - Airborne emissions of particulate matter that is 10 micrometers or less in diameter Prepared By: GTC Checked By: SIB Page 1 of 1 APPENDIX L - SUSTAINABILITY CALCULATIONS REMEDIAL ALTERNATIVES - INPUTS CORRECTIVE ACTION PLAN UPDATE CLIFFSIDE STEAM STATION - UNIT 5 INACTIVE ASH BASIN DUKE ENERGY CAROLINAS, LLC, MOORESBORO, NC Alternative Remedial Alternative 1 - Groundwater Remediation by MNA Remedial Alternative 2 - Groundwater Remediation by Extraction Trench and Extraction Wells Remedial Alternative 3 - Groundwater Remediation by pH Adjustment Trench and Extraction Wells New Monitoring Wells Number of MWs Average depth of MWs (ft. bgs) Average screen length of MWs (ft.) Casing material Well diameter Borehole diameter Extraction Wells Number of Extraction Wells 12 12 Average depth (ft. bgs) 100 100 Average screen length (ft.) 25 25 Total flow (gpm) 24 24 Casing material Sch 80 PVC Sch 80 PVC Well diameter 6 6 Borehole diameter 8 8 Horizontal Wells Number of Horizontal Wells Length of Each Horizontal Well (ft.) Total flow (gpm) Casing material Well diameter Borehole diameter Clean Water Infiltration Wells Number of Clean Water Infiltration Wells Average depth (ft. bgs) Average screen length (ft.) Total flow (gpm) Casing material Well diameter Borehole diameter Number of pumps Infiltration Galleries Number of Infiltration Galleries Total area (acres) Total flow (gpm) Pipe material Pipe diameter Chemical Injection Wells Number of Injection Wells Average depth (ft. bgs) Average screen length (ft.) Total flow (gpm) Casing material Well diameter Borehole diameter Injection Pumps Tree Wells Total area (acres) Trenches Number of trenches 1 1 Length (ft.) 600 550 Width (ft.) 4 6 Depth (ft.) 20 10 Page 1 of 2 APPENDIX L - SUSTAINABILITY CALCULATIONS REMEDIAL ALTERNATIVES - INPUTS CORRECTIVE ACTION PLAN UPDATE CLIFFSIDE STEAM STATION - UNIT 5 INACTIVE ASH BASIN DUKE ENERGY CAROLINAS, LLC, MOORESBORO, NC Alternative Remedial Alternative 1 - Groundwater Remediation by MINA Remedial Alternative 2 - Groundwater Remediation by Extraction Trench and Extraction Wells Remedial Alternative 3 - Groundwater Remediation by pH Adjustment Trench and Extraction Wells Conveyance Pipe Pipe length 1320 1320 Pipe material Sch 80 HDPE Sch 80 HDPE Pipe diameter 6 6 Number of conveyance pumps 1 1 Permeable Reactive Barriers Number of PRBs Fill Material Length (ft.) Width (ft.) Depth (ft.) Removal of Waste Materials Tons of waste Waste Profile Treatment Media Media Limestone Cubic Feet 33000 Well Abandonment Number of wells Average well depth Well diameter Fill Material Laboratory Analysis $ of laboratory analysis spent Length of Active Remediation Years of Active Remediation 0 9 9 Notes: ft. - foot gpm - gallon per minute Sch - schedule HDPE - high density polyethylene bgs - below ground surface PVC - polyvinyl chloride PRB - permeable reactive barrier MW - monitoring wells MINA - monitored natural attenuation Prepared By: GTC Checked By: SJB Page 2 of 2 APPENDIX L - SUSTAINABILITY CALCULATIONS REMEDIAL ALTERNATIVES-SUSTAINABILITY CORRECTIVE ACTION PLAN UPDATE CLIFFSIDE STEAM STATION - UNIT 5 INACTIVE ASH BASIN DUKE ENERGY CAROLINAS, LLC, MOORESBORO, NC Remedial Alternative 1 - Groundwater Remediation by MNA Activities CO2 Emissions Percent Total Onsite NOx Emissions Percent Total Onsite SOx Emissions Percent Total Onsite PM10 Emissions Percent Total Total NOx Emissions Percent Total Total SOx Emissions Percent Total Total PM10 Emissions Percent Total Total Energy Used Total Energy Used Percent Total metric ton % metric ton % metric ton % metric ton % metric ton % metric ton % metric ton % MMBTU MWH Material Productions 0.00 - NA - NA - NA - 0.0E+00 - 0.0E+00 - 0.0E+00 - 0.0E+00 NA - Transportation -Personnel 1.14 100.00 NA - NA - NA - 4.2E-04 100.0 1.5E-05 100.0 8.6E-05 100.0 1.4E+01 NA 100.0 Transportation-Equip/materials 0.00 - NA - NA - NA - 0.0E+00 - 0.0E+00 - 0.0E+00 - 0.0E+00 NA - Equipment Use and Misc 0.00 - 0.0E+00 - 0.0E+00 - 0.0E+00 - 0.0E+00 - 0.0E+00 - 0.0E+00 - 0.0E+00 0.0E+00 - Residual Handling 0.00 - 0.0E+00 - 0.0E+00 - 0.0E+00 - 0.0E+00 - 0.0E+00 - 0.0E+00 Total 1.14 100 0.00E+00 0.0 0.00E+00 0 0.00E+00 0 4.23E-04 I 100 1.49E-OS 100 8.58E-OS 100 1.44E+01 0.00E+00 100 Remedial Alternative 2 - Groundwater Remediation by Extraction Trench and Extraction Wells Activities CO2 Emissions Percent Total Onsite NOx Emissions Percent Total Onsite SOx Emissions Percent Total Onsite PM 10 Emissions Percent Total Total NOx Emissions Percent Total Total SOx Emissions Percent Total Total PM10 Emissions Percent Total Total Energy Used Total Energy Used Percent Total metric ton % metric ton % metric ton % metric ton % metric ton % metric ton % metric ton % MMBTU MWH Material Productions 215.48 42.37 NA - NA - NA - 6.2E-01 32.7 3.7E-01 31.3 1.4E-01 56.3 4.5E+05 NA 99.43 Transportation -Personnel 5.01 0.99 NA - NA - NA - 1.1E-02 0.6 1.0E-03 0.1 1.6E-04 0.1 6.6E+01 NA 0.0 Transportation-Equip/materials 0.98 0.19 NA - NA - NA - 3.1E-04 0.0 5.5E-06 0.0 2.7E-05 0.0 1.3E+01 NA 0.0 Equipment Use and Misc 286.77 56.39 4.0E-01 100.0 2.0E-02 100.0 1.4E-02 100.0 1.3E+00 66.7 8.1E-01 68.6 1.1E-01 43.6 2.5E+03 7.0E-02 0.6 Residual Handling 0.27 0.05 0.0E+00 - 0.0E+00 - 0.0E+00 - 8.8E-05 0.0 3.6E-06 0.0 7.2E-06 0.0 3.8E+00 NA 1 0.0 Total 508.51 100 4.02E-01 100.0 2.04E-02 100 1.43E-02 100 1.89E+00 100 1.18E+00 100 2.47E-01 100 4.48E+05 7.00E-02 1 100 Remedial Alternative 3 - Groundwater Remediation by pH Adjustment Trench and Extraction Wells Activities CO2 Emissions Percent Total Onsite NOx Emissions Percent Total Onsite SOx Emissions Percent Total Onsite PM10 Emissions Percent Total Total NOx Emissions Percent Total Total SOx Emissions Percent Total Total PM10 Emissions Percent Total Total Energy Used Total Energy Used Percent Total metric ton % metric ton % metric ton % metric ton % metric ton % metric ton % metric ton % MMBTU MWH Material Productions 1,245.20 82.32 NA - NA - NA - 2.7E+00 70.8 4.5E+00 84.9 9.6E-01 90.3 4.5E+05 NA 99.51 Transportation -Personnel 5.01 0.33 NA - NA - NA - 1.1E-02 0.3 1.0E-03 0.0 1.6E-04 0.0 6.6E+01 NA 0.0 Transportation-Equip/materials 0.98 0.06 NA - NA - NA - 3.1E-04 0.0 5.5E-06 0.0 2.7E-05 0.0 1.3E+01 NA 0.0 Equipment Use and Misc 261.17 17.27 2.5E-01 100.0 1.6E-02 100.0 1.3E-02 100.0 1.1E+00 28.9 8.0E-01 15.1 1.0E-01 9.7 2.1E+03 7.0E-02 0.5 Residual Handling 0.27 1 0.02 0.0E+00 - 0.0E+00 - I 0.0E+00 - I 8.8E-05 0.0 3.6E-06 0.0 7.2E-06 0.0 3.8E+00 NA 0.0 Total 1,512.64 100 2.50E-01 100.0 1.61E-02 100 1 1.25E-02 100 1 3.78E+00 100 5.29E+00 100 1.07E+00 100 4.55E+05 7.00E-02 1 100 Notes: CO, - Airborne emissions of carbon dioxide MMBTU - Million British Thermal Units NOx - Airborne emissions of nitrogen oxides (combination of nitrogen monoxide and nitrogen dioxide) SOx - Airborne emissions of sulfur oxides (combination of sulfur monoxide, sulfur dioxide, sulfur trioxide, and others) PM,r - Airborne emissions of particulate matter that is 10 micrometers or less in diameter Prepared By: GTC Checked By: SIB Page 1 of 1