HomeMy WebLinkAboutNC0005088_CSS_Appendix L_20191231Corrective Action Plan Update December 2019
Cliffside Steam Station
APPENDIX L
SUSTAINABILITY CALCULATIONS
SynTerra
APPENDIX L - SUSTAINABILITY CALCULATIONS
REMEDIAL ALTERNATIVES - INPUTS
CORRECTIVE ACTION PLAN UPDATE
CLIFFSIDE STEAM STATION - FORMER ASH STORAGE AREA
DUKE ENERGY CAROLINAS, LLC, MOORESBORO, NC
Alternative
Remedial Alternative 1 -
Groundwater
Remediation by MNA
Remedial Alternative 2 —
Groundwater Remediation
by Extraction and Clean Water Infiltration
Remedial Alternative 3 —
Groundwater Remediation
by Extraction and Clean
Water Infiltration Wells
and Galleries
New Monitoring Wells
Number of MWs
3
3
3
Average depth of MWs (ft. bgs)
80
80
80
Average screen length of MWs (ft.)
10
10
10
Casing material
Sch 80 PVC
Sch 80 PVC
Sch 80 PVC
Well diameter
6
6
6
Borehole diameter
8
8
8
Extraction Wells
Number of Extraction Wells
23
7
Average depth (ft. bgs)
75
70
Average screen length (ft.)
25
25
Total flow (gpm)
160
14
Casing material
Sch 80 PVC
Sch 80 PVC
Well diameter
6
6
Borehole diameter
8
8
Horizontal Wells
Number of Horizontal Wells
1
1
Length of Each Horizontal Well (ft.)
240
225
Total flow (gpm)
75
23
Casing material
Sch 80 PVC
Sch 80 PVC
Well diameter
8
8
Borehole diameter
10
10
Clean Water Infiltration Wells
Number of Clean Water Infiltration Wells
46
12
Average depth (ft. bgs)
58
90
Average screen length (ft.)
23
25
Total flow (gpm)
165.9
33.5
Casing material
Sch 80 PVC
Sch 80 PVC
Well diameter
6
6
Borehole diameter
8
8
Number of pumps
1
1
Infiltration Galleries
Number of Infiltration Galleries
1
Total area (acres)
7
Total flow (gpm)
26
Pipe material
Sch 40 PVC
Pipe diameter
2
Chemical Injection Wells
Number of Injection Wells
Average depth (ft. bgs)
Average screen length (ft.)
Total flow (gpm)
Casing material
Well diameter
Borehole diameter
Injection Pumps
Tree Wells
Total area (acres)
Trenches
Number of trenches
Length (ft.)
Width (ft.)
De th ft.
Page 1 of 2
APPENDIX L - SUSTAINABILITY CALCULATIONS
REMEDIAL ALTERNATIVES - INPUTS
CORRECTIVE ACTION PLAN UPDATE
CLIFFSIDE STEAM STATION - FORMER ASH STORAGE AREA
DUKE ENERGY CAROLINAS, LLC, MOORESBORO, NC
Alternative
Remedial Alternative 1 -
Groundwater
Remediation by MNA
Remedial Alternative 2 —
Groundwater Remediation
by Extraction and Clean Water Infiltration
Remedial Alternative 3 —
Groundwater Remediation
by Extraction and Clean
Water Infiltration Wells
and Galleries
Conveyance Pipe
Pipe length
2000
2000
Pipe material
Sch 80 HDPE
Sch 80 HDPE
Pipe diameter
6
6
Number of conveyance pumps
2
2
Permeable Reactive Barriers
Number of PRBs
Fill Material
Length (ft.)
Width (ft.)
Depth (ft.)
Removal of Waste Materials
Tons of waste
Waste Profile
Treatment Media
Media
Pounds
Well Abandonment
Number of wells
Average well depth
Well diameter
Fill Material
Laboratory Analysis
$ of laboratory analysis spent
Length of Active Remediation
Years of Active Remediation 0 6 6
Notes:
ft. - foot
gpm - gallon per minute
Sch - schedule
HDPE - high density polyethylene
bgs - below ground surface
PVC - polyvinyl chloride
PRB - permeable reactive barrier
MW - monitoring wells
MINA - monitored natural attenuation
Prepared By: GTC Checked By: SJB
Page 2 of 2
APPENDIX L - SUSTAINABILITY CALCULATIONS
REMEDIAL ALTERNATIVES-SUSTAINABILITY
CORRECTIVE ACTION PLAN UPDATE
CLIFFSIDE STEAM STATION - FORMER ASH STORAGE AREA
DUKE ENERGY CAROLINAS, LLC, MOORESBORO, NC
Remedial Alternative 1 - Groundwater Remediation by MNA
Activities
CO2
Emissions
Percent
Total
Onsite NOx
Emissions
Percent
Total
Onsite SO.
Emissions
Percent
Total
Onsite
PMld
Emissions
percent
Total
Total NOx
Emissions
Percent
Total
Total SO.
Emissions
Percent
Total
Total PM10
Emissions
Percent
Total
Total
Energy
Used
Total
Energy
Used
percent
Total
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
MMBTU
MWH
Material Productions
12.58
60.64
NA
-
NA
-
NA
-
5.9E-03
13.9
9.1E-03
68.3
1.3E-03
33.8
3.8E+03
NA
97.30
Transportation -Personnel
4.86
23.42
NA
-
NA
-
NA
-
1.1E-02
25.0
1.0E-03
7.6
1.5E-04
3.9
6.4E+01
NA
1.6
Transportation-Equip/materials
0.49
2.36
NA
-
NA
-
NA
-
1.5E-04
0.4
2.7E-06
0.0
1.4E-05
0.4
6.4E+00
NA
0.2
Equipment Use and Misc
2.54
12.26
2.4E-02
100.0
2.5E-03
100.0
2.2E-03
100.0
2.6E-02
60.5
3.2E-03
24.0
2.4E-03
61.7
3.1E+01
0.0E+00
0.8
Residual Handling
0.27
1.32
0.0E+00
-
0.0E+00
-
0.0E+00
-
8.8E-05
0.2
3.6E-06
0.0
7.2E-06
0.2
3.8E+00
NA
0.1
Total
20.75
100
2.43E-02
100.0
2.48E-03
100
2.19E-03
100
4.25E-02
100
1.34E-02
100
3.88E-03
100
1 3.88E+03
0.00E+00
1 100
Remedial Alternative 2 - Groundwater Remediation by Extraction and Clean Water Infiltration
Activities
COz
Emissions
Percent
Total
Onsite NOx
Emissions
Percent
Total
Onsite SO.
Emissions
Percent
Total
Onsite
Emissions
percent
Total
Total NOx
Emissions
Percent
Total
Total SO,
Emissions
Percent
Total
Total PMlo
Emissions
Percent
Total
Total
Energy
Total
Energy
percent
Total
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
MMBTU
MWH
0/0
Material Productions
558.07
12.21
NA
-
NA
-
NA
-
1.0E+00
4.7
7.3E-01
8.2
2.3E-01
4.0
7.2E+05
NA
95.70
Transportation -Personnel
24.64
0.54
NA
-
NA
-
NA
-
1.8E-02
0.1
1.3E-03
0.0
1.6E-03
0.0
3.1E+02
NA
0.0
Transportation-Equip/materials
0.98
0.02
NA
-
NA
-
NA
-
3.1E-04
0.0
5.5E-06
0.0
2.7E-05
0.0
1.3E+01
NA
0.0
Equipment Use and Misc
3,987.26
87.23
1.3E+01
100.0
1.3E+00
100.0
1.1E+00
100.0
2.1E+01
95.2
8.1E+00
91.8
5.6E+00
96.0
3.2E+04
1.5E-01
4.3
Residual Handling
0.27
0.01
1 0.0E+00
0.0E+00
0.0E+00
8.8E-05
0.0
3.6E-06
0.0
7.2E-06
0.0
3.8E+00
NA
1 0.0
Total
4,571.22
100
1 1.26E+01
100.0
1 1.29E+00
100
1 1.14E+00
100
1 2.21E+01
100
8.84E+00
100
5.85E+00
1 100
7.50E+05
1.45E-01
1 100
Remedial Alternative 3 - Groundwater Remediation by Extraction and Clean Water Infiltration Wells and Galleries
Activities
CO2
Emissions
Percent
Total
Onsite NOx
Emissions
Percent
Total
Onsite SO.
Emissions
Percent
Total
Onsite
PMld
Emissions
percent
Total
Total NOx
Emissions
Percent
Total
Total SO.
Emissions
Percent
Total
Total PM10
Emissions
Percent
Total
Total
Energy
Used
Total
Energy
Used
percent
Total
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
MMBTU
MWH
Material Productions
32,329.93
97.53
NA
-
NA
-
NA
-
6.5E+01
95.4
8.6E+01
98.3
1.1E+01
87.3
4.3E+06
NA
99.87
Transportation -Personnel
12.37
0.04
NA
-
NA
-
NA
-
1.3E-02
0.0
1.1E-03
0.0
7.2E-04
0.0
1.6E+02
NA
0.0
Transportation-Equip/materials
0.98
0.00
NA
-
NA
-
NA
-
3.1E-04
0.0
5.5E-06
0.0
2.7E-05
0.0
1.3E+01
NA
0.0
Equipment Use and Misc
803.80
2.42
1.4E+00
100.0
1.4E-01
100.0
1.2E-01
100.0
3.1E+00
4.6
1.5E+00
1.7
1.6E+00
12.7
5.2E+03
6.5E-02
0.1
Residual Handling
0.27
1
0.00
0.0E+00
-
0.0E+00
-
I 0.0E+00
-
8.8E-05
0.0
3.6E-06
0.0
7.2E-06
0.0
3.8E+00
NA
0.0
Total
33,147.35
100
1.39E+00
100.0
1.42E-01
100
1 1.25E-01
100
6.81E+01
100
8.74E+01
100
1.25E+01
100
4.32E+06
6.50E-02
1 100
Notes:
CO, - Airborne emissions of carbon dioxide
MMBTU - Million British Thermal Units
NOx - Airborne emissions of nitrogen oxides (combination of nitrogen monoxide and nitrogen dioxide)
SOx - Airborne emissions of sulfur oxides (combination of sulfur monoxide, sulfur dioxide, sulfur trioxide, and others)
PM,o - Airborne emissions of particulate matter that is 10 micrometers or less in diameter
Prepared By: GTC Checked By: SIB
Page 1 of 1
APPENDIX L - SUSTAINABILITY CALCULATIONS
REMEDIAL ALTERNATIVES - INPUTS
CORRECTIVE ACTION PLAN UPDATE
CLIFFSIDE STEAM STATION - FORMER UNITS 1-4 ASH BASIN
DUKE ENERGY CAROLINAS, LLC, MOORESBORO, NC
Alternative
Remedial Alternative 1 -
Groundwater Remediation by
MNA
Remedial Alternative 2 -
Groundwater Remediation by
TreeWellsTM
New Monitoring Wells
Number of MWs
3
3
Average depth of MWs (ft. bgs)
80
80
Average screen length of MWs (ft.)
10
10
Casing material
Sch 80 PVC
Sch 80 PVC
Well diameter
6
6
Borehole diameter
8
8
Extraction Wells
Number of Extraction Wells
Average depth (ft. bgs)
Average screen length (ft.)
Total flow (gpm)
Casing material
Well diameter
Borehole diameter
Horizontal Wells
Number of Horizontal Wells
Length of Each Horizontal Well (ft.)
Total flow (gpm)
Casing material
Well diameter
Borehole diameter
Clean Water Infiltration Wells
Number of Clean Water Infiltration Wells
Average depth (ft. bgs)
Average screen length (ft.)
Total flow (gpm)
Casing material
Well diameter
Borehole diameter
Number of pumps
Infiltration Galleries
Number of Infiltration Galleries
Total area (acres)
Total flow (gpm)
Pipe material
Pipe diameter
Chemical Injection Wells
Number of Injection Wells
Average depth (ft. bgs)
Average screen length (ft.)
Total flow (gpm)
Casing material
Well diameter
Borehole diameter
Injection Pumps
Page 1 of 2
APPENDIX L - SUSTAINABILITY CALCULATIONS
REMEDIAL ALTERNATIVES - INPUTS
CORRECTIVE ACTION PLAN UPDATE
CLIFFSIDE STEAM STATION - FORMER UNITS 1-4 ASH BASIN
DUKE ENERGY CAROLINAS, LLC, MOORESBORO, NC
Alternative
Remedial Alternative 1 -
Groundwater Remediation by
MNA
Remedial Alternative 2 -
Groundwater Remediation by
TreeWellsTM
Tree Wells
Total area (acres)
2
Trenches
Number of trenches
Length (ft.)
Width (ft.)
Depth (ft.)
Conveyance Pipe
Pipe length
Pipe material
Pipe diameter
Number of conveyance pumps
Permeable Reactive Barriers
Number of PRBs
Fill Material
Length (ft.)
Width (ft.)
Depth (ft.)
Removal of Waste Materials
Tons of waste
Waste Profile
Treatment Media
Media
Pounds
Well Abandonment
Number of wells
Average well depth
Well diameter
Fill Material
Laboratory Analysis
$ of laboratory analysis spent
Length of Active Remediation
Years of Active Remediation
0
0
Notes:
ft. - foot
gpm -
gallon per minute
Sch -
schedule
HDPE
- high density polyethylene
bgs -
below ground surface
PVC -
polyvinyl chloride
PRB -
permeable reactive barrier
MW -
monitoring wells
MINA -
monitored natural attenuation
Prepared By: GTC Checked By: SJB
Page 2 of 2
APPENDIX L - SUSTAINABILITY CALCULATIONS
REMEDIAL ALTERNATIVES-SUSTAINABILITY
CORRECTIVE ACTION PLAN UPDATE
CLIFFSIDE STEAM STATION - FORMER UNITS 1-4 ASH BASIN
DUKE ENERGY CAROLINAS, LLC, MOORESBORO, NC
Remedial Alternative 1 - Groundwater Remediation by MNA
Activities
CO2
Emissions
Percent
Total
Onsite NOx
Emissions
Percent
Total
Onsite SOx
Emissions
Percent
Total
Onsite
PM10
Emissions
Percent
Total
Total NOx
Emissions
Percent
Total
Total SOx
Emissions
Percent
Total
Total PM10
Emissions
Percent
Total
Total
Energy
Used
Total
Energy
Used
Percent
Total
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
MMBTU
MWH
%
Material Productions
12.58
60.64
NA
-
NA
-
NA
-
5.9E-03
13.9
9.1E-03
68.3
1.3E-03
33.8
3.8E+03
NA
97.30
Transportation -Personnel
4.86
23.42
NA
-
NA
-
NA
-
1.1E-02
25.0
1.0E-03
7.6
1.5E-04
3.9
6.4E+01
NA
1.6
Transportation-Equip/materials
0.49
2.36
NA
-
NA
-
NA
-
1.5E-04
0.4
2.7E-06
0.0
1.4E-05
0.4
6.4E+00
NA
0.2
Equipment Use and Misc
2.54
12.26
2.4E-02
100.0
2.5E-03
100.0
2.2E-03
100.0
2.6E-02
60.5
3.2E-03
24.0
2.4E-03
61.7
3.1E+01
0.0E+00
0.8
Residual Handling
0.27
1.32
0.0E+00
-
0.0E+00
-
0.0E+00
-
8.8E-05
0.2
3.6E-06
0.0
7.2E-06
0.2
3.8E+00
NA
0.1
Total
20.75
100
2.43E-02
100.0
2.48E-03
100
2.19E-03
100
4.25E-02
100
1.34E-02
100
3.88E-03
100
3.88E+03
0.00E+00
100
Remedial Alternative 2 - Groundwater Remediation by TreeWelISTM
Activities
CO2
Emissions
Percent
Total
Onsite NOx
Emissions
Percent
Total
Onsite SOx
Emissions
Percent
Total
Onsite
PM 10
Emissions
Percent
Total
Total NOx
Emissions
Percent
Total
Total SOx
Emissions
Percent
Total
Total PM10
Emissions
Percent
Total
Total
Energy
Used
Total
Energy
Used
Percent
Total
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
MMBTU
MWH
%
Material Productions
13.27
-7.63
NA
-
NA
-
NA
-
7.2E-03
4.0
1.1E-02
34.5
1.6E-03
9.6
3.8E+03
NA
93.32
Transportation -Personnel
5.01
-2.88
NA
-
NA
-
NA
-
1.1E-02
5.9
1.0E-03
3.1
1.6E-04
1.0
6.6E+01
NA
1.6
Transportation-Equip/materials
0.49
-0.28
NA
-
NA
-
NA
-
1.5E-04
0.1
2.7E-06
0.0
1.4E-05
0.1
6.4E+00
NA
0.2
Equipment Use and Misc
-192.88
110.96
1.5E-01
100.0
1.6E-02
100.0
1.4E-02
100.0
1.6E-01
90.0
2.0E-02
62.3
1.5E-02
89.4
1.9E+02
0.0E+00
4.8
Residual Handling
0.27
0.16
0.0E+00
0.0E+00
0.0E+00
8.8E-OS
0.0
3.6E-06
0.0
7.2E-06
0.0
3.8E+00
NA
0.1
Total
-173.83
100
1.54E-01
100.0
1.58E-02
100
1.39E-02
100
1.81E-01
100
3.27E-02
100
1.70E-02
100
4.06E+03
0.00E+00
100
Notes:
CO, - Airborne emissions of carbon dioxide
MMBTU - Million British Thermal Units
NOx - Airborne emissions of nitrogen oxides (combination of nitrogen monoxide and nitrogen dioxide)
SOx - Airborne emissions of sulfur oxides (combination of sulfur monoxide, sulfur dioxide, sulfur trioxide, and others)
PM,a - Airborne emissions of particulate matter that is 10 micrometers or less in diameter
Prepared By: GTC Checked By: SIB
Page 1 of 1
APPENDIX L - SUSTAINABILITY CALCULATIONS
REMEDIAL ALTERNATIVES - INPUTS
CORRECTIVE ACTION PLAN UPDATE
CLIFFSIDE STEAM STATION - UNIT 5 INACTIVE ASH BASIN
DUKE ENERGY CAROLINAS, LLC, MOORESBORO, NC
Alternative
Remedial Alternative 1 -
Groundwater
Remediation by MNA
Remedial Alternative 2 -
Groundwater Remediation
by Extraction Trench and
Extraction Wells
Remedial Alternative 3 -
Groundwater Remediation
by pH Adjustment Trench
and Extraction Wells
New Monitoring Wells
Number of MWs
Average depth of MWs (ft. bgs)
Average screen length of MWs (ft.)
Casing material
Well diameter
Borehole diameter
Extraction Wells
Number of Extraction Wells
12
12
Average depth (ft. bgs)
100
100
Average screen length (ft.)
25
25
Total flow (gpm)
24
24
Casing material
Sch 80 PVC
Sch 80 PVC
Well diameter
6
6
Borehole diameter
8
8
Horizontal Wells
Number of Horizontal Wells
Length of Each Horizontal Well (ft.)
Total flow (gpm)
Casing material
Well diameter
Borehole diameter
Clean Water Infiltration Wells
Number of Clean Water Infiltration Wells
Average depth (ft. bgs)
Average screen length (ft.)
Total flow (gpm)
Casing material
Well diameter
Borehole diameter
Number of pumps
Infiltration Galleries
Number of Infiltration Galleries
Total area (acres)
Total flow (gpm)
Pipe material
Pipe diameter
Chemical Injection Wells
Number of Injection Wells
Average depth (ft. bgs)
Average screen length (ft.)
Total flow (gpm)
Casing material
Well diameter
Borehole diameter
Injection Pumps
Tree Wells
Total area (acres)
Trenches
Number of trenches
1
1
Length (ft.)
600
550
Width (ft.)
4
6
Depth (ft.)
20
10
Page 1 of 2
APPENDIX L - SUSTAINABILITY CALCULATIONS
REMEDIAL ALTERNATIVES - INPUTS
CORRECTIVE ACTION PLAN UPDATE
CLIFFSIDE STEAM STATION - UNIT 5 INACTIVE ASH BASIN
DUKE ENERGY CAROLINAS, LLC, MOORESBORO, NC
Alternative
Remedial Alternative 1 -
Groundwater
Remediation by MINA
Remedial Alternative 2 -
Groundwater Remediation
by Extraction Trench and
Extraction Wells
Remedial Alternative 3 -
Groundwater Remediation
by pH Adjustment Trench
and Extraction Wells
Conveyance Pipe
Pipe length
1320
1320
Pipe material
Sch 80 HDPE
Sch 80 HDPE
Pipe diameter
6
6
Number of conveyance pumps
1
1
Permeable Reactive Barriers
Number of PRBs
Fill Material
Length (ft.)
Width (ft.)
Depth (ft.)
Removal of Waste Materials
Tons of waste
Waste Profile
Treatment Media
Media
Limestone
Cubic Feet
33000
Well Abandonment
Number of wells
Average well depth
Well diameter
Fill Material
Laboratory Analysis
$ of laboratory analysis spent
Length of Active Remediation
Years of Active Remediation 0 9 9
Notes:
ft. - foot
gpm - gallon per minute
Sch - schedule
HDPE - high density polyethylene
bgs - below ground surface
PVC - polyvinyl chloride
PRB - permeable reactive barrier
MW - monitoring wells
MINA - monitored natural attenuation
Prepared By: GTC Checked By: SJB
Page 2 of 2
APPENDIX L - SUSTAINABILITY CALCULATIONS
REMEDIAL ALTERNATIVES-SUSTAINABILITY
CORRECTIVE ACTION PLAN UPDATE
CLIFFSIDE STEAM STATION - UNIT 5 INACTIVE ASH BASIN
DUKE ENERGY CAROLINAS, LLC, MOORESBORO, NC
Remedial Alternative 1 - Groundwater Remediation by MNA
Activities
CO2
Emissions
Percent
Total
Onsite NOx
Emissions
Percent
Total
Onsite SOx
Emissions
Percent
Total
Onsite
PM10
Emissions
Percent
Total
Total NOx
Emissions
Percent
Total
Total SOx
Emissions
Percent
Total
Total PM10
Emissions
Percent
Total
Total
Energy
Used
Total
Energy
Used
Percent
Total
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
MMBTU
MWH
Material Productions
0.00
-
NA
-
NA
-
NA
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
NA
-
Transportation -Personnel
1.14
100.00
NA
-
NA
-
NA
-
4.2E-04
100.0
1.5E-05
100.0
8.6E-05
100.0
1.4E+01
NA
100.0
Transportation-Equip/materials
0.00
-
NA
-
NA
-
NA
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
NA
-
Equipment Use and Misc
0.00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
0.0E+00
-
Residual Handling
0.00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
Total
1.14
100
0.00E+00
0.0
0.00E+00
0
0.00E+00
0
4.23E-04
I 100
1.49E-OS
100
8.58E-OS
100
1.44E+01
0.00E+00
100
Remedial Alternative 2 - Groundwater Remediation by Extraction Trench and Extraction Wells
Activities
CO2
Emissions
Percent
Total
Onsite NOx
Emissions
Percent
Total
Onsite SOx
Emissions
Percent
Total
Onsite
PM 10
Emissions
Percent
Total
Total NOx
Emissions
Percent
Total
Total SOx
Emissions
Percent
Total
Total PM10
Emissions
Percent
Total
Total
Energy
Used
Total
Energy
Used
Percent
Total
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
MMBTU
MWH
Material Productions
215.48
42.37
NA
-
NA
-
NA
-
6.2E-01
32.7
3.7E-01
31.3
1.4E-01
56.3
4.5E+05
NA
99.43
Transportation -Personnel
5.01
0.99
NA
-
NA
-
NA
-
1.1E-02
0.6
1.0E-03
0.1
1.6E-04
0.1
6.6E+01
NA
0.0
Transportation-Equip/materials
0.98
0.19
NA
-
NA
-
NA
-
3.1E-04
0.0
5.5E-06
0.0
2.7E-05
0.0
1.3E+01
NA
0.0
Equipment Use and Misc
286.77
56.39
4.0E-01
100.0
2.0E-02
100.0
1.4E-02
100.0
1.3E+00
66.7
8.1E-01
68.6
1.1E-01
43.6
2.5E+03
7.0E-02
0.6
Residual Handling
0.27
0.05
0.0E+00
-
0.0E+00
-
0.0E+00
-
8.8E-05
0.0
3.6E-06
0.0
7.2E-06
0.0
3.8E+00
NA
1 0.0
Total
508.51
100
4.02E-01
100.0
2.04E-02
100
1.43E-02
100
1.89E+00
100
1.18E+00
100
2.47E-01
100
4.48E+05
7.00E-02
1 100
Remedial Alternative 3 - Groundwater Remediation by pH Adjustment Trench and Extraction Wells
Activities
CO2
Emissions
Percent
Total
Onsite NOx
Emissions
Percent
Total
Onsite SOx
Emissions
Percent
Total
Onsite
PM10
Emissions
Percent
Total
Total NOx
Emissions
Percent
Total
Total SOx
Emissions
Percent
Total
Total PM10
Emissions
Percent
Total
Total
Energy
Used
Total
Energy
Used
Percent
Total
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
MMBTU
MWH
Material Productions
1,245.20
82.32
NA
-
NA
-
NA
-
2.7E+00
70.8
4.5E+00
84.9
9.6E-01
90.3
4.5E+05
NA
99.51
Transportation -Personnel
5.01
0.33
NA
-
NA
-
NA
-
1.1E-02
0.3
1.0E-03
0.0
1.6E-04
0.0
6.6E+01
NA
0.0
Transportation-Equip/materials
0.98
0.06
NA
-
NA
-
NA
-
3.1E-04
0.0
5.5E-06
0.0
2.7E-05
0.0
1.3E+01
NA
0.0
Equipment Use and Misc
261.17
17.27
2.5E-01
100.0
1.6E-02
100.0
1.3E-02
100.0
1.1E+00
28.9
8.0E-01
15.1
1.0E-01
9.7
2.1E+03
7.0E-02
0.5
Residual Handling
0.27
1
0.02
0.0E+00
-
0.0E+00
-
I 0.0E+00
-
I 8.8E-05
0.0
3.6E-06
0.0
7.2E-06
0.0
3.8E+00
NA
0.0
Total
1,512.64
100
2.50E-01
100.0
1.61E-02
100
1 1.25E-02
100
1 3.78E+00
100
5.29E+00
100
1.07E+00
100
4.55E+05
7.00E-02
1 100
Notes:
CO, - Airborne emissions of carbon dioxide
MMBTU - Million British Thermal Units
NOx - Airborne emissions of nitrogen oxides (combination of nitrogen monoxide and nitrogen dioxide)
SOx - Airborne emissions of sulfur oxides (combination of sulfur monoxide, sulfur dioxide, sulfur trioxide, and others)
PM,r - Airborne emissions of particulate matter that is 10 micrometers or less in diameter
Prepared By: GTC Checked By: SIB
Page 1 of 1