HomeMy WebLinkAboutNC0005088_01_CSS List of Appendices_20191231Corrective Action Plan Update December 2019
Cliffside Steam Station SynTerra
LIST OF APPENDICES
Appendix A Regulatory Correspondence
Appendix B Comprehensive Site Assessment Update Report Review Comments
and Responses
Appendix C Updated Comprehensive Analytical Data Tables
Appendix D HB 630 Provision of Water Supply Completion Documentation
Appendix E Human Health and Ecological Risk Assessment
Appendix F Fractured Bedrock Evaluation
Appendix G Updated Groundwater Flow and Transport Modeling Report
Appendix H Geochemical Model Report
COI Management Plan Approach
Appendix I Monitored Natural Attenuation Report
Appendix J Surface Water Sampling to Assess 15A NCAC 2B Compliance for
Implementation of Corrective Action Under 15A NCAC 02L .0106
Surface Water Sampling to Assess 15A NCAC 2B Compliance for
Implementation of Corrective Action Under 15A NCAC 02L .0106
Addendum
Surface Water Future Conditions Evaluation to Assess 15A NCAC
02B .0200 Compliance for Implementation and Termination of
Corrective Action under 15A NCAC 02L .0106 (k), (1), and (m) Report
Appendix K Remedial Alternative Cost Estimate Details
Appendix L Sustainability Calculations
Appendix M Remediation Alternative Summary
Corrective Action Plan Update December 2019
Cliffside Steam Station SynTerra
LIST OF APPENDICES (CONTINUED)
Appendix N Proposed Remedial Alternative Design Calculations
Appendix O Effectiveness Monitoring Plan
Appendix P Additional Assessment Monitoring Well Boring Logs and Well
Construction Table