Loading...
HomeMy WebLinkAboutNC0005088_01_CSS List of Appendices_20191231Corrective Action Plan Update December 2019 Cliffside Steam Station SynTerra LIST OF APPENDICES Appendix A Regulatory Correspondence Appendix B Comprehensive Site Assessment Update Report Review Comments and Responses Appendix C Updated Comprehensive Analytical Data Tables Appendix D HB 630 Provision of Water Supply Completion Documentation Appendix E Human Health and Ecological Risk Assessment Appendix F Fractured Bedrock Evaluation Appendix G Updated Groundwater Flow and Transport Modeling Report Appendix H Geochemical Model Report COI Management Plan Approach Appendix I Monitored Natural Attenuation Report Appendix J Surface Water Sampling to Assess 15A NCAC 2B Compliance for Implementation of Corrective Action Under 15A NCAC 02L .0106 Surface Water Sampling to Assess 15A NCAC 2B Compliance for Implementation of Corrective Action Under 15A NCAC 02L .0106 Addendum Surface Water Future Conditions Evaluation to Assess 15A NCAC 02B .0200 Compliance for Implementation and Termination of Corrective Action under 15A NCAC 02L .0106 (k), (1), and (m) Report Appendix K Remedial Alternative Cost Estimate Details Appendix L Sustainability Calculations Appendix M Remediation Alternative Summary Corrective Action Plan Update December 2019 Cliffside Steam Station SynTerra LIST OF APPENDICES (CONTINUED) Appendix N Proposed Remedial Alternative Design Calculations Appendix O Effectiveness Monitoring Plan Appendix P Additional Assessment Monitoring Well Boring Logs and Well Construction Table