HomeMy WebLinkAboutNC0024406_02_BCSS_CAP Update 2019_Figures_20191231Corrective Action Plan Update December 2019
Belews Creek Steam Station
FIGURES
(CAP Content Section 10)
SynTerra
^� DAN RIVER���
1 f c
C�r� `PARCELA ��y I '`.��•� T �4 ���
ASH BASIN COMPLI�CE •�■ J
BOUNDARY �- LINED RETENTION]
�- l' ' .l • BASIN
�} Z, )�] ) p ASH BASIN-,---,_
/i
n PARCEL LINE
0
PILE
I1�
PLANT
PINE HALL f
&p ROAD LANDFILL v n S e L
'J (CLOSED) STRUCTURAL FILL
(CLOSED)
LUG l�
FGD LANDFILL
■
! CRAIG ROAD }
r �� - • - LANDFILL
SOURCE: ' L
2016 USGS TOPOGRAPHIC MAP, BELEWS LAKE
QUADRANGLE, OBTAINED FROM THE USGS STORE AT
https://store.usgs.gov/map-locator.
DUKE COUNTY
ENERGY®
CAROLINAS ti^P`r vnNSTONsa
w
r
FIGURE ES-1
USGS LOCATION MAP
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
DRAWN BY: B.YOUNG DATE: 05/15/2019 1 GRAPH ICSCALE
REVISEDBY: B.YOUNG DATE: 07/08/2019 1,000 0 1,000 2,000
CHECKED BY: A. ALBERT DATE: 07/08/2019
APPROVED BY: A. ALBERT DATE: 07/08/2019 (IN FEET)
PROJECT MANAGER: A. ALBERT
NOTES:
/
1. THE BOUNDARY OF THE AREA PROPOSED FOR GROUNDWATER REMEDIATION REPRESENTSTHE
MAXIMUMAREAOF COI CONCENTRATION IN GROUNDWATER GREATER THAN CRITERIAEALTA
♦,
ENVIRONMENTAL, 2019).
2. NATURAL RESOURCES TECHNICAL REPORT (NRTR) WAS PREPARED BYAMEC FOSTER WHEELER
INC., JULV 2, 2015.
3.ALLBOUNDARIES ARE APPROXIMATE.
p �
PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS.
♦ ��• ,.F
♦
~, 0
2
` O /
5. AERIAL PHOTOGRAPHY OBTAINED FROM GOGGLE EARTH PRO ON JUNE 11, 2019. AERIAL WAS
COLLECTED ON FEBRUARY 3, 2019.
SS. DRAWG HAS BEEN SET WITH APROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE
YSTEM FIINPS3200 INAD8312011 ).
I
,
L
/
ti
a K
a/
°I
I OPO
NJ�C pP�P
r.
i'
�w
.N
•4
LEGEND
AREA PROPOSED FOR
GROUNDWATER REMEDIATION
ASH BASIN WASTE BOUNADRY
ASH BASIN COMPLIANCE
BOUNDARY
PINE HALL ROAD LANDFILL
(CLOSED)
STRUCTURAL FILL (CLOSED)
LANDFILL COMPLIANCE BOUNDARY
LINED RETENTION BASIN
_ DUKE ENERGY CAROLINAS
PROPERTY LINE
STREAM (AMEC NRTR 2015)
7-7 WETLANDS (AM EC NRTR 2015)
GRAPHIC SCALE
DUKE 600 0 600 1,200 FIGURE ES-2
ENERGY® (IN FEET) AREA PROPOSED FOR
CAROLINAS CORRECTIVE ACTION
DRAWN BY: J. KIRTZ DATE: 05/16/2019 CORRECTIVE ACTION PLAN UPDATE
141p REVISED BY: C. WYATT DATE: 12/16/2019
CHECKED BY: C. EADY DATE: 12/16/2019 BELEWS CREEK STEAM STATION
APPROVED BY: C. EADY DATE: 12/16/2019
synTerra PROJECT MANAGER: A.ALBERT BELEWS CREEK, NORTH CAROLINA
www.synterracorp.com
I
0°
a's
PROPOSED
/
/ a
yo a o o-
� o s
° o �48"MANHOLE �
° ° WITH AIR VENT � I
a\
a FLOW i
P I
• p - / 48"MANHOLE? � �--_____- _----- ---
wlrHAiR vENr = FLO-NOT FOR CONSTRUCTION
•�/ ,�(�� �� r — � � W � — ---
PARCEL A / 1`
(2.67ACRES) D LEGEND
EXISTING EXTRACTION SYSTEM WELLS EX-1 THRU EX-10
P Q PROPOSED EXTRACTION WELL IN SAPROLITE
i
PROPOSED ® PROPOSED CLEAN WATER INFILTRATION WELL IN SAPROLITE
CLEAN PHYSICAL -CHEMICAL — _ • PROPOSED EXTRACTION WELL IN TRANSITION ZONE
• WATER TREATMENT SYSTEM \ — -
• INFILTRATION o — ® PROPOSED CLEAN WATER INFILTRATION WELL IN TRANSITION ZONE
• HORIZONTAL WELL �i PROPOSED EXTRACTION WELL IN BEDROCK
�
® PROPOSED CLEAN WATER INFILTRATION WELL IN BEDROCK
PROPOSED EXTRACTION PROPOSED CLEAN WATER INFILTRATION HORIZONTAL WELL (SAPROLITE)
• EX-4? COLLECTION AND PUMP STATION PROPOSED CLEAN WATER INFILTRATION PIPING
4 ° PROPOSED CLEAN WATER INFILTRATION PIPING FLOW DIRECTION
PROPOSED EXTRACTION PIPING
I / PROPOSED EXTRACTION PIPING FLOW DIRECTION
•,' EX-6— — — — — — — DECANT PIPING
FLOW DECANT PIPING FLOW DIRECTION
• EX-11 DUKE ENERGY CAROLINAS PROPERTY LINE
r ASH BASIN — — — — ASH BASIN COMPLIANCE BOUNDARY
• EX-8 WASTE BOUNDARY
EXISTING EXTRACTION ® ASH BASIN PONDED WATER
SYSTEM (EX-1 THRU EX-10) NOTES
/ 1.) ALL BOUNDARIES ARE APPROXIMATE.
2.) DUKE ENERGY PROPERTY LINES ARE REPRESENTED SAMPLE LOCATIONS WERE DERIVED FROM VARIOUS SOURCES AND ARE A MIX OF SURVEYED AND
I APPROXIMATE LOCATIONS. THEREFORE LOCATIONS ARE DEEMED TO BEAPPROXIMATE.
3 )THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLY AND SHOULD NOT BE USED FOR DESIGN OR ENGINEERING PURPOSES THE TOPOGRAPHY BASED
EX- ON A COMBINATION OF SOURCES.
LIDAR DATA OBTAINED FROM NC FLOODPLAIN MAPPING PROGRAM -SPATIAL DATA DOWNLOAD AT htt Sdd.nc. o DaWD°wni° xN d.as Ps// B / p
DATA WAS SOURCED FROM THEIR PHASE 3-2015 Q L2 LIDAR
DROPOSED CLEAN WATER 4.) THE WATERS OF THE US DELINEATION HAS NOT BEEN APPROVED BY THE U.S. ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS
PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE PRELIMINARY WETLANDS AND STREAM BOUNDARIES WETLANDS AND STREAMS BOUNDARIES WERE
=1 LTRATIO N STO RAG E TAN K OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL AND INFRASTRUCTURE INC. NATURAL RESOURCE TECHNICAL REPORT (NRTR) FOR BELEWS CREEK
Q ° STATION", DATED TUNE 2015.
5.) SITE FEATURES INCLUDING UTILITIES ARE BASED ON SEVERAL SOURCES. ANY UTILITIES SHOWN ARE FOR REFERENCE PURPOSES ONLY AND HAVE NOT BEEN
'ER APPROXIMATELYITHR DARDSTOTHEIR HORIZONTAL ORVERTICAL LOCATIONS INTHE FIELD. ALL FEATURES INCLUDING UTILITIES ARE DEEMED TOBE
2017 AERIAL PHOTOGRAPHS OBTAINED FROM NC ONE MAP AT
https://n nemap.maps.arcgis,com/apps/web,ppviewer/,,de.hlm171d=2c8a9b366c4841f1be2b464347dO4a2b
2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM WSP FLOWN ON APRIL 17, 2014.
O 6.) DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIP 3200 (NAD83 AND NAVD 88.
o GRAPHIC SCALE
DUKE 200 0 100 200
A' ENERGY IN FEET FIGURE ES-3
CAROLINAS DRAWN BY: J. CHASTAIN DATE:12/15/2019 PROPOSED CORRECTIVE ACTION APPROACH
REVISED BY: DATE:- CORRECTIVE ACTION PLAN UPDATE
APPROVED BY, J. CL MMER DATE:12/15/2019 BELEWS CREEK STEAM STATION
PROJECT MANAGER: A. ALBERT BELEWS CREEK, NORTH CAROLINA
W/Tear www.synterracorp.com
DAN RIVER
--.
NJ ., �
1
`PARCEL � � _ ��� ■ �� �C1.
ASH BASIN COMPLIANCE; � •� �� �� ti�
X. BOUNDARY LINED RETENTION
i BASIN
�� �� - �,■] : �� ASH BASIN
� �� PARCEL LINE 5 �
COAL PILE
zi ( 5�
_ o ■ n PINE HALL
ROAD LANDFILLJ, \ � , , o r,
(CLOSED) t V STRUCTURAL FILL
� K1 � ] (CLOSED)
C7
SOURCE: � L
2016 USGS TOPOGRAPHIC MAP, BELEWS LAKE
QUADRANGLE, OBTAINED FROM THE USGS STORE AT
https://store.usgs.gov/map-locator.
STOKES
4� DUKE COUNTY
ENERGY®
CAROLINAS ti P �s-wNsroNse
POWER PLANTN-=�f
n
CRAIG ROAD,
r//LANDFILL -_
1
U
v
FGD LANDFILL
w
FIGURE 1-1
USGS LOCATION MAP
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
DRAWN BY. C. WYATT DATE: 09/11/2019 1 GRAF ICSCALE
REVISED BY. C. WYATT DATE: 12/04/2019 1,000 0 1,000 2,000
CHECKED BY: A. ALBERT DATE: 12/04/2019
APPROVED BY: A. ALBERT DATE: 12/04/2019 (IN FEET)
PROJECT MANAGER: A. ALBERT
7 - FORMER UNT 2_DNSOC ♦ • •
q� OUTFALL 003
S_5 p0 GWA-24S OUTFACE 111 ` .M` -O=LOOP • • SD-BL-D ) . - -
_ 02 .. GGWWAA--2211DS - GG-WWAA--1111SD EX_-1 CCR-13S . �` oQ s 1S1-10GWA-24Df. CC - •~
.
• •
'GWA-24BR S-10 MW-200GWA-32S 0
0CCR-4S 13r -• GWA-1MW-200D BG-2S
CCR-D GWA30S-11 BG-1S BGSB-2
CCR-4D MW-200BR BGSB-1 BG-2D
BG-1 D EX0B1 CCR-136R GW0D GWA-16R g_18 R ■
S-3 S_3 BG-2BRA� y ♦ -
-SD4-B!
"L-
-DI
2
kS*,E S-a `CCR-6S CCR-7D MW-103D GWA-2S
■�� .. SB-3 CCR-8SEX-3 i A CCR-6DCCR-8DGWA-27S -MW-201 D
,GWA-27D 4 S_2 •GWA-31S � � AB-3S W-201BR � GWA-22S
GWA-27BR -5 AB-2S ^ AB-1S fi GWA-22D
' G ; A-31 D Q I �� AB-1 D AB-2D AB-3D �,■ ,� . .
► EX-7 �+ CCR-5S AB-2BR/BRD AB-3BR S-6
1■ i GWA-19SA AB-1BR/BRD CCR-5D CCR-9S
EX-8 i GWA-19D CCR-9D �+S-s/BL SD-BL-S-6
`GWA-3S
CCR-2S EX-9 GWA-196R MW-101S/D CCR-11S GWA-3D
CCR-2D EX-10 GWA-10S CCR-11D ■ ,A •
J-I 'YVVUH-IOi / "'
' S-1 ■ LRB-1BR
GWA-18SA
:�•:a;.. GWA-18D �. _ •.� -.' ■, 3s.
CCR-12S
L - GWA-17S ,
;.F::r; �.r .. }:+?r. • -.•� - CCR-12DA ` S-14 LEGEND
GWA-17D MW-204S tit +
_ LRB-2S SD-BL-S-13/14
GWA-16S MW-204D - - _ - .r; � MONITORING WELL IN ASH PORE
LRB-2D
GWA-16D/DA,*,r,�.°'• -•- LRB-2BR MONITORING WELL IN SHALLOW ZONE
OUTFACE 006 • GWA-16BR MONITORING WELL IN DEEP ZONE
8 2 DRDNSOC �SD-DR
_ .' MONITORING WELL IN BEDROCK ZONE
• AB-5S/SL
SD-DR-D AB-5D %�B-IGTB
Mw-104s.10
MONITORING WELL
AB-as/SLEXTRACTION WELL IN DEEP ZONE
MW-203S MW-104D w
SD-DR-U �•'4 AB-4SAP "'AB-5 FgsT
E 2 DRUPSOC SD-DR-1 I MW-203D • y _ i+ MW-1046RA Fqq� ■ EFFLUENT WATER SAMPLE LOCATION
MW-203BR AB-4D AB-4-LOWERASH // a
SD-DR-3� .►
• F �� " AB-4BR/BRD ; CgNrRp ■ SURFACE WATER SAMPLE LOCATION
SD-DR-TFC .-
SOIL SAMPLE LOCATION
•'` SD-DR-BG i ► �� ♦- / ♦ ♦ +) AB-8S/SL
NON -CONSTRUCTED SEEP MONITORED UNDER SOC
SD-DR-2 '". X
AB-8D GWA-6S S 7 r l
APPROXIMATE
:.. Fi `...� `- GWA-9GTB OB_5 ^ �a GWA-6D SD-BL-S-6 (APPROXIMATE)
.._..... -- ... % II■ oe-4 '' AB-9s , CP-3S O DISPOSITIONED SEEP (APPROXIMATE)
OUTFACE 002
i, AB-9BR/BRD �� J CP-3D SEEP PART OF NPDES WASTEWATER TREATMENT
i " • • / ,a CP-1S CP 2D CP-3BR SYSTEM (APPROXIMATE)
.f MW2 1 MW2-7
w • GWA 7SA CP-1D CP-2BR ❑ IN -STREAM SURFACE WATER SAMPLE LOCATION
` a► PER SOC APPROXIMATE
l MW-5 GWA-7D CP-1 BR CP-4S (APPROXIMATE)
MW2-9 % CP-4D ❑ SEDIMENT SAMPLE LOCATION
- .... + .. .';• o OB_9 . • , i , i a 4*MW
GWA-8S�_ _•W-7 GWA-SDCP-5S A NPDES OUTFALL LOCATION
SFMW-2D.• CP-5Dp'- • WATER SUPPLY WELL
CP-8BR CP-5BR.��5 cPas _ — ASH BASIN WASTE BOUNDARY
GWA-26S MW-1D / r _ r GWA-23S SFMW-1D sFMw-sD CP-7BR CP-6Si` • — - — - ASH BASIN COMPLIANCE BOUNDARY
GWA-26D �•'- _ r LANDFILL BOUNDARY (CLOSED)
SFSW-1DE CP-6D •�
REGIONAL INSET SCALE: 1 " = 3, 500' • GWA-266R r GWA-23D - „
• GWA-25BR - MW-1 r MW-2 MW-6 S 9 SFMW-1BR SFMW-4D _ CP-6BR•f STRUCTURAL FILL BOUNDARY (CLOSED)
�, ,' . „ ,.�ti. • � �, S_9 P � LANDFILL COMPLIANCE BOUNDARY
', r �' • • S_8 GWA-12S SFMW-3D - OUTFALLOOs
''�.° • I -- S-8 GWA-12D SFMW-7S LINED RETENTION BASIN
NOTES: BG-3S SFMW-6D
BGSB-3 GWA-12BR GWASB-12 SFMW-7D ' COAL PILE STORAGE
1. SOC - SPECIAL ORDER BY CONSENT BG-3D ,
- DUKE ENERGY CAROLINAS PROPERTY LINE
2. SAMPLE LOCATIONS WERE DERIVED FROM VARIOUS SOURCES AND ARE A MIX OF SURVEYED I - •• OUTFACE 007 ;f' - _
AND APPROXIMATE LOCATIONS. THEREFORE, SAMPLE LOCATIONS ARE TO BE DEEMED 1 STREAM (AMEC NRTR)
APPROXIMATE -
3. THE WATERS OF THE US HAVE NOT BEEN APPROVED BY THE US ARMY CORPS OF ENGINEERS AT + Mw-2025 WETLAND (AMEC NRTR)
THE TIME OF THE MAP CREATION. THIS MAP IS NOT TO BE USED FOR JURISDICTIONAL MW-202BR
DETERMINATION PURPOSES. THE WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM MW-202D _
GRAPHIC SCALE
AMEC FOSTER WHEELER ENVIRONMENTAL &INFRASTRUCTURE, INC. NATURAL RESOURCE • � r - - � .: � f 500 0 500 1,000
TECHNICAL REPORT FOR BELEWS CREEK STEAM STATION DATED JULY 2, 2015. 1 �- - - - DUKE 4> ENERGY® FIGURE 1-2
4. ALL BOUNDARIES ARE APPROXIMATE. + -� .� - - ^ CAROLINAS ON Feer� SITE LAYOUT MAP
5. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS. DRAWN BY: C. WYATT DATE:09/09/2019 CORRECTIVE ACTION PLAN UPDATE
6. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON JUNE 11, 2019. AERIAL WAS ^ - •' REVISED BY: C. WYATT DATE: 12/04/2019 BELEWS CREEK STEAM STATION
COLLECTED ON FEBRUARY 3, 2019. •� CHECKED BY: A. ALBERT DATE: 12/04/2019
APPROVED BY: C. EADY DATE: 12/04/2019 BELEWS CREEK, NORTH CAROLINA
7. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE' "-'• • • '�I Terra PROJECT MANAGER: A. ALBERT
RIPS PS 3200 (NAD83). .'Y -'�'; _"�syn�•= �" www.synterracorp.com
I
r
hi
�l
rl
I
I
I
L DUKEENERGY
PARCEL LINE
SOURCE:
APRIL 15, 1966 AERIAL PHOTOGRAPH OBTAINED FROM THE USGS EARTH EXPLORER WEB SITE AT
http,.//earthexplorer.usgs.gov/
V
DUKE
ENERGY
CAROLI NAS
16AV
synTena
GRAPHIC SCALE
275 0 275 550
IN FEET
DRAWN BY: J. CHASTAIN DATE: 8/16/2017
REVISED BY: C. NEWELL DATE: 12/20/2019
CHECKED BY: D. AVARD DATE: 12/20/2019
APPROVED BY: A.ALBERT DATE:12/20/2019
PROJECT MANAGER: A. ALBERT
www.synterracorp.com
FIGURE 1-3
1966 AERIAL PHOTOGRAPH
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
0
SD-DR-TFC �
SD-DR-BG2 "
AS
MIDDLETON LOOP
1
■
I r
�r l
Lf
l
m.- -- �k
T.
M � s
SD-DR-TFC ISD-DR-BG ••
'1
f r
R
■
y. QO . • I ♦ r
♦ . -
1 • L -. r
r BG3S BG-3D
L SD-BL U2
7jj
-
.' M W-202S
'-1 MW-202BR
MW-202D
REGIONAL INSET SCALE: 1- = 4,5001
■
• BJ
� n•
• BG-2D
5
BG-2BRA '
[ELE
TEA
P�
0
LEGEND
O GROUNDWATER SAMPLE
• SOIL SAMPLE LOCATION
• SURFACE WATER SAMPLE
O SEDIMENT SAMPLE
• WATER SUPPLY WELL
ASH BASIN WASTE
- — - ASH BASIN COMPLIANCE
LANDFILL BOUNDARY
STRUCTURAL FILL BOUNDARY
LANDFILL COMPLIANCE
LINED RETENTION BASIN
COAL PILE STORAGE
- - DUKE ENERGY CAROLINAS PROPERTY
STREAM (AMEC NRTR)
WETLAND (AMEC NRTR)
NOTES:
1. *ABANDONED MONITORING WELL LOCATION.
2. SD PREFIX INDICATES A SEDIMENT SAMPLE ID.
3. SW INDICATES SURFACE WATER.
4. THE WATERS OF THE US HAVE NOT BEEN APPROVED BY THE US ARMY CORPS OF
ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS NOT TO BE USED FOR
• JURISDICTIONAL DETERMINATION PURPOSES. THE WETLANDS AND STREAMS
BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL &
INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL REPORT FOR BELEWS
CREEK STEAM STATION DATED JULY 2, 2015.
5. ALL BOUNDARIES ARE APPROXIMATE.
6. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS.
7. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON JUNE 11, 2019.
AERIAL WAS COLLECTED ON FEBRUARY 3, 2019.
�'' •• 8. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE
COORDINATE SYSTEM RIPS 3200 (NAD83/2011).
GRAPHIC SC LE
(►� DUKE
ENERGY®
500 O 1,000
CAROLINAS
(IN FEET)
DRAWN BY: C. WYATT DATE: 04/02/2019
REVISED BY: C. WYATT DATE: 12/04/2019
CHECKED BY: A. ALBERT DATE: 12/04/2019
APPROVED BY: A. ALBERT DATE: 12/04/2019
synTerra
PROJECT MANAGER: A. ALBERT
www.synterracorp.com
FIGURE 4-1
BACKGROUND SAMPLE LOCATION MAP
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
SITE FEATURES KEY
GROUNDWATER FLOWS FROM RIDGES THAT COINCIDE WITH
O GROUNDWATER DIVIDES WHICH PROVIDE HYDRAULIC CONTROL WITHIN
THE FORMER STREAM VALLEY AND AWAY FROM POTENTIAL RECEPTORS
AND WATER SUPPLY WELLS
® LIMITED COI MIGRATION THROUGH INTERCONNECTED BEDROCK
FRACTURES. BEDROCK FRACTURE OCCURRENCE AND
APERTURE DIMINISHES WITH DEPTH
OFORMER STREAM CHANNELS IN ASH BASIN
O PONDED WATER IN THE ASH BASIN CAUSES LIMITED AREA OF
DOWNWARD VERTICAL MIGRATION OF CONSTITUENTS NEAR
THE DAM DUE TO ELEVATED HYDRAULIC HEAD
UPWARD VERTICAL GRADIENTS IN GROUNDWATER O
IMMEDIATELY DOWNGRADIENT OF THE ASH BASIN DAM
LIMIT VERTICAL MIGRATION OF CONSTITUENTS
UNITS NOT CONSIDERED HYDRAULICALLY ASSOCIATED WITH
ASH BASIN DUE TO GROUNDWATER DIVIDES. ADDITIONAL
ASSESSMENT BEING CONDUCTED UNDER NCDEQ OVERSIGHT.
COAL PILE AND STRUCTURAL FILL ASSESSMENTS ONGOING
AND ARE THEREFORE NOT ADDRESSED IN THE CORRECTIVE
ACTION PLAN UPDATE.
AREA OF COI CONCENTRATION IN GROUNDWATER GREATER THAN CRITERIA
(SEE GENERAL NOTE 1)
GENERALIZED GROUNDWATER FLOW DIRECTION
GENERALIZED ASH PORE WATER FLOW DIRECTION
STREAM
-- j APPROXIMATE FORMER STREAM
ASH BASIN WASTE BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
LANDFILL WASTE BOUNDARY
LANDFILL COMPLIANCE BOUNDARY
SITE FEATURES
OGENERAL AREA OF WATER SUPPLY WELL USERS
(SEE GENERAL NOTE 2)
INTERIM ACTION GROUNDWATER EXTRACTION SYSTEM
- - BEDROCK FRACTURE ORIENTATION
GENERAL NOTES
1) GENERALIZED AREAL EXTENT OF MIGRATION REPRESENTED BY NCAC 02L, IMAC, OR APPROVED
BACKGROUND THRESHOLD VALUE EXCEEDANCE OF BORON CONSTITUENT IN MULTIPLE FLOW
ZONES. OTHER CONSTITUENT OF INTEREST THAT EXCEED THE CRITERIA ABOVE ARE WITHIN THE
BORON CONSTITUENT AREA.
2) PERMANENT WATER SUPPLY HAS BEEN IMPLEMENTED PROVIDING 36 SURROUNDING WELL USERS
WITH WATER TREATMENT SYSTEMS, THIS WORK WAS COMPLETED IN ACCORDANCE WITH HB630
AND SUBSEQUENTLY APPROVED BY NCDEQ ON OCTOBER 12, 2018.
3) ALL BOUNDARIES ARE APPROXIMATE.
1
NORTH
CONCEPTUAL CROSS-SECTION OF PRE -DECANTING CONDITIONS
■
(NOT TO SCALE - APPROX, 5,500 L/NEAR FEET)
(830 ELEV.) (630 ELEV.) I
aft, ® I
F-01111
TRIB
i
i /10,
1
MIDDLETON
LOOP U
TR
'DUKE
ENERGY
CAROLINAS
41P
synTerra
VISUAL AID ONLY -
DEPICTION NOT TO SCALE
DRAWN BY: A. FEIGL DATE: 6/2/2019
REVISED BY: C. NEWELL DATE: 12/13/2019
CHECKED BY: D. AVARD DATE: 12/13/2019
APPROVED BY: A. ALBERT DATE: 12/13/2019
PROJECT MANAGER: A.ALBERT
www.synterracorp.com
FIGURE 5-1
CONCEPTUAL SITE MODEL -
PRE -DECANTING CONDITIONS
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
Corrective Action Plan Update December 2019
Belews Creek Steam Station
Figure 5-2
Legrand Slope Aquifer System
Included in Section 5 text
SynTerra
Corrective Action Plan Update December 2019
Belews Creek Steam Station SynTerra
Figure 5-3
General Profile of Ash Basin
Pre -Decanting Flow Conditions in the
Piedmont
Included in Section 5 text
Corrective Action Plan Update December 2019
Belews Creek Steam Station SynTerra
Figure 5-4a
Water Level Map — Shallow Flow Zone
(April 8, 2019)
Provided in separate electronic figure file as a
large sheet size
Corrective Action Plan Update December 2019
Belews Creek Steam Station SynTerra
Figure 5-4b
Water Level Map - Transition Flow Zone
(April 8, 2019)
Provided in separate electronic figure file as a
large sheet size
Corrective Action Plan Update December 2019
Belews Creek Steam Station SynTerra
Figure 5-4c
Water Level Map — Bedrock Flow Zone
(April 8, 2019)
Provided in separate electronic figure file as a
large sheet size
/Aff
lot
16
LEGEND
ASH BASIN WASTE BOUNDARY
' �`� ��• �`� �*��� ���~ �.��� �,� ASH BASIN COMPLIANCE
���' LINED RETENTION BASIN
INN,;' } ����� � � �'�� ,t�� . %:Z:' — - - — DUKE ENERGY CAROLINAS PROPERTY
STREAM (AMEC NRTR)
�► �� •� �� �� NOTES:
�� �� �+�• � +�+�
*� �� � 1 � 1� �-�� y � �� :-��+ � � �� �� •��� y� *� ��� — - � 1. VELOCITY MAGNITUDES IN FEET PER DAY (FT/DAY).
r� �� �� • ram• f+�' ��� �� �� y� �� +� F� F ��1 •, 2. VELOCITY VECTORS ARE IN THREE DIMENSIONS.
3. VELOCITY VECTOR DIRECTIONS SHOWN AS BLACK ARROWS.
� � � • �� �� �{ �� �� �; �� �* r r � � y� �� � 4. MODEL LAYER 16 FROM UPDATED GROUNDWATER FLOW AND TRANSPORT
w� •� • �* �� �+ �� �� �+ ■ �r �� �- w� �� �� �� MODELING REPORT FOR BELEWS CREEK STEAM STATION, BELEWS CREEK, NC,
�do *— r OCTOBER 2019 (FALTA, GRAZIANO, YU & MURDOCH, 2019)
r •��� r {� �� ����� � 5. THE WATERS OF THE US HAVE NOT BEEN APPROVED BY THE US ARMY CORPS OF
y r+ •�►�f �_ r� �� �� �� �� �� �� �= ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS A PRELIMINARY
ro ��+► �+ �w !� 4� +� •f �� •fi �~ �� JURISDICTIONAL DETERMINATION ONLY. THE PRELIMINARY WETLANDS AND
STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER
• i �`� � f f ENVIRONMENTAL &INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL
_+ t+ REPORT (NRTR) FOR BELEWS CREEK STEAM STATION DATED JULY 2, 2015.
;`� 6. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE
COORDINATE SYSTEM FIPS 3200 (NAD83).
—W ` 7!
` • GRAPHIC SCALE FIGURE 5-5a
DUKE ENERGY. 250 0 250 Soo VELOCITY VECTOR MAP
�0 CAROLINAS (IN FEET) FOR PRE -DECANTING CONDITIONS
DRAWN BY: C. WYATT DATE: 10/04/2019 DEEP FLOW ZONE
REVISED BY: C. WYATT DATE: 12/16/2019
�` • —�" --" �� CHECKED BY: A.ALBERT DATE:12/16/2019 CORRECTIVE ACTION PLAN UPDATE
�� } ' APPROVED BY: A.ALBERT DATE:12/16/2019 BELEWS CREEK STEAM STATION
�� i.► �y sy �� ` j PROJECT MANAGER: A. ALBERT
`" 111 i 1 f synTerra BELEWS CREEK, NORTH CAROLINA
� '� � � � �; I' t www.synterracorp.com
.7
LEGEND •
Xl-
PROPOAECOMRID LANDFILL WASTE
EXTENT
ASH BASIN COMPLIANCE BOUNDARY
t
�+�f� �� LINED RETENTION BASIN
DUKE ENERGY CAROLINAS PROPERTY
STREAM (AMEC NRTR)
NOTES:
•� � i � � Fl� 4i� 4`� `� \� � � � - � 1. VELOCITY MAGNITUDES IN FEET PER DAY (FT/DAY).
�� �'�1 J]�r� ��� �� l �� { ��■ ��\ ��\ ��� ��� �• 2. VELOCITY VECTORS ARE IN THREE DIMENSIONS.
3. VELOCITY VECTOR DIRECTIONS SHOWN AS BLACK ARROWS.
�.��� �� .� ■ r ��{1l �`��� �� \ �� \ �� \ ��� 4. MODEL LAYER 16 FROM UPDATED GROUNDWATER FLOW AND TRANSPORT
MODELING REPORT FOR BELEWS CREEK STEAM STATION, BELEWS CREEK, NC,
OCTOBER 2019 (FALTA, GRAZIANO, YU & MURDOCH, 2019).
5. THE WATERS OF THE US HAVE NOT BEEN APPROVED BY THE US ARMY CORPS OF
r+ fr *{l ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS A PRELIMINARY
JURISDICTIONAL DETERMINATION ONLY. THE PRELIMINARY WETLANDS AND
STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER
ENVIRONMENTAL &INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL
NN
REPORT (NRTR) FOR BELEWS CREEK STEAM STATION DATED JULY 2, 2015.
�� �� '��� ���# } +�� ! �� { �� f ■ ���•� ������ . 6. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE
11 11 a 11 {1 11 COORDINATE SYSTEM FIPS 3200 (NAD83).
250 ORAPHICSC250 500 FIGURE 5-5b
!> DUKE ENERGY VELOCITY VECTOR MAP FOR
CAROLINAS (IN FEET) CLOSURE -IN -PLACE CONDITIONS (HYBRID)
DRAWN BY: C.WYATT DATE:10//2019 DEEP FLOW ZONE
ij 777 111 L REVISED BY: C. WYATT DATE: 12/1616/2019
} CHECKED BY: A. ALBERT DATE:12/16/2019 CORRECTIVE ACTION PLAN UPDATE
���� ����� �� ' PROJECT MANAGER: A. ALBERT APPROVED BY: A. ALBERT DATE: 12/16/2019 BELEWS CREEK STEAM STATION
F� �� rt �+ at t
1r11 11 Terra BELEWS CREEK, NORTH CAROLINA
+ www.synterracorp.com
..
'\ON
401 LEGEND
0/0
14
' � � � �i*t` �� �� •��� <"� � ��� tip~ ti�� ��� -��� -�� -�
%N Amu
PROPOSED NORTH LANDFILL WASTE EXTENT
(AECOM)
t
ASH BASIN COMPLIANCE BOUNDARY
~ �� ♦�,�� .�� �� �� �� LINED RETENTION BASIN
DUKE ENERGY CAROLINAS PROPERTY LINE
STREAM (AMEC NRTR)
,-� NOTES:
1. VELOCITY MAGNITUDES IN FEET PER DAY (FT/DAY).
�� �F �� r �� w� F� f� �� +� ` ' •, 2. VELOCITY VECTORS ARE IN THREE DIMENSIONS.
-Z +Z � � 3. VELOCITY VECTOR DIRECTIONS SHOWN AS BLACK ARROWS.
4. MODEL LAYER 16 FROM UPDATED GROUNDWATER FLOW AND TRANSPORT
MODELING REPORT FOR BELEWS OCTOBER 201CREEK
9 (FALTA, GRAZIANO YU& MURD CH, 2001 9),BELEWS CREEK, NC,
�� s� r r� �� r� ■ r� F� 5. THE WATERS OF THE US HAVE NOT BEEN APPROVED BY THE US ARMY CORPS OF
�� +� ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS A PRELIMINARY
JURISDICTIONAL �� ,� ++ � ~� �� �� �� �� +� �� •T �� ��� �� STREAMS OUNDARIES WERE1ON 06TANLY. THE PRELIMINARY WETLANDS NED FROM AMEC FOSTER WHEELER D
db�Wr
r
4+
+--
*�+*�` ���'�� �~ �� ENVIRONMENTAL & INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL
0 REPORT (NRTR) FOR BELEWS CREEK STEAM STATION DATED JULY 2, 2015.
� sy
�►� �r�` �� w��^+�� �� �� 6. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE
N� �� COORDINATE SYSTEM FIPS 3200 (NAD83).
—o GRAPHIC SCALE FIGURE 5-5c
i DUKE �> ENERGY. 250 0 250 500 VELOCITY VECTOR MAP FOR
CAROLINAS (IN FEET) CLOSURE -BY -EXCAVATION CONDITIONS
DRAWN BY: C. WYATT DATE: 10/04/2019 DEEP FLOW ZONE
� 111 !J REVISED BY: C. WYATT DATE: 12/16/2019
�� CHECKED BY: A. ALBERT DATE:12/16/2019 CORRECTIVE ACTION PLAN UPDATE
APPROVED BY: A. ALBERT DATE:12/16/2019 BELEWS CREEK STEAM STATION
1,1 synTerra PROJECT MANAGER: A. ALBERT BELEWS CREEK, NORTH CAROLINA
- ZZ www.synterracorp.com
1. THE DAN RIVER (CLASS WS-IV, WS-V) AND BELEWS RESERVOIR (CLASS WS-IV) ARE WATERBODIES
LOCATED WITHIN 0.5 MILES OF THEASH BASIN COMPLIANCE BOUNDARY.
2. GROUNDWATER -TO -SURFACE WATER (02L- 02B) SAMPLE WERE COLLECTED TO ASSESS WHETHER
GROUNDWATER MIGRATION IS CAUSING CONSTITUENT CONCENTRATIONS IN THE DAN RIVER AND BELEWS
RESERVOIR TO BE GREAT THAN APPLICABLE 02B STANDARDS. 02L- 02B SAMPLING WAS CONDUCTED FROM
FEBRUARY 12 THROUGH 15, 2018 FOLLOWING DIVISION APPROVED LOCATION AND PROTOCOLS. IN THE FIVE
DAYS PRIOR TO SAMPLING A TOTAL OF 2.38 INCHES OF RAINFALL WAS OBSERVED AT THE BELEWS CREEK
STEAM STATION. DURING THE FOUR DAY SAMPLING EVEN A TOT OF 0.04 INCHES OF RAINFALL WAS
OBSERVED AT THE BELEWS CREEK STEAM STATION.
3. TURBIDITY WAS GREAT THAN THE APPLICABLE 02B STANDARDS AT THE FOLLOWING 02L- 02B SAMPLE
LOCATIONS DURING THE FIRST THREE DAYS OF SAMPLING: SW-DR-BG, SW-DR-BG2, AND SW-DR-TFC, SW-DR-
1, SW-DR-2, SW-DR-3, AND SW-DR-4
4. NO COI CONCENTRATION WERE GREATER THAN THE APPLICABLE 02B STANDARDS IN 02L- 02B SAMPLES
COLLECTED AT THE BELEWS CREEK STEAM STATION.
fit
�� r��� ; ♦, ,♦•,
♦ �i ♦I
•�' UNT 2_DNSOC o �'•
■- '
s-e FORMER '� o ♦♦♦ ♦�
' OUTFALL 003 ♦♦ '
♦ 1 S_3 S_q �iOUTFALL111 s-» .�..—►-.�♦,.i-,�.•� ,♦
sl
*71
� . � ♦ • D 3 DNSOC /
� � � . / • �, S 13 �
♦ lll� � l.� ookep
°2� v /i °wFRST � LEGEND
�♦ °°°i % • F�M <4yr ■ 02L-02B SAMPLE LOCATION
,� j t` �I S_7 ; ■ SURFACE WATER SAMPLE LOCATION
• / wV� �� ��® / O
NON -CONSTRUCTED SEEP MONITORED UNDER THE
' I SOC (APPROXIMATE)
OUTFACE 002 • DISPOSITIONED SEEP (APPROXIMATE)
PART OF NPDES WASTEWATER TREATMENT SYSTEM
■�0 7 j/ ,I (APPROXIMATE)
o ��'-�1 '{� '0� / IN -STREAM SURFACE WATER SAMPLE LOCATION
♦ • • �� •El PER SOC (APPROXIMATE)
Z�b �.� • , , , •Ii I
� '-. - - i' �� ��� � �� • A NPDES OUTFACE LOCATION
r= 0.5-MILE RADIUS FROM ASH BASIN COMPLIANCE
RAW WATER — . — .
♦ .....�.,tP1HeNN``�O'••'• �: v • , : INTAKEPLANT
BOUNDARY
ASH BASIN WASTE BOUNDARY
OPERATIONS
� � ^ • • s-3 � - OUTFACE 001 A
• ; �,� � S_9 ♦ OUTFALL005 LANDFILL BOUNDARY (CLOSED)
STRUCTURAL FILL BOUNDARY (CLOSED)
' •� •� 0� — - — - ASH BASIN COMPLIANCE BOUNDARY
0�� OUTFACE 007 �
♦� �� LANDFILL COMPLIANCE B01JNDARY
VUTNERK\NO'RRD ♦``� 1••.• �'�• LINED RETENTION BASIN
p ♦� 1•+•'� '�..�•� '�,• � �.'�• COAL PILE STORAGE AREA
i '���L -----.------- ----� —••—• DUKE ENERGY CAROLINAS PROPERTY LINE
�,•t•'—••—••—� F_z_DNsoc STREAM AMEC NRTR
1
OTES:
THE WATERS OF THE US HAVE NOT BEEN APPROVED BY THE US ARMY CORPS OF ENGINEERS AT THE TIME OF THE
AP CREATION. THIS MAP IS NOT TO BE USED FOR JURISDICTIONAL DETERMINATION PURPOSES. THE WETLANDS AND
TREAMS BOUNDARIES WERE OBTAINED FROMAMEC FOSTER WHEELER ENVIRONMENTAL& INFRASTRUCTURE, INC.
ATURAL RESOURCE TECHNICAL REPORT FOR BELEWS CREEK STEAM STATION DATED JULY 2, 2015.
ALL BOUNDARIES ARE APPROXIMATE.
PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS.
AERIAL PHOTOGRAPHY OBTAINED FROM GOGGLE EARTH PRO ON JUNE 11, 2019. AERIAL WAS COLLECTED ON
EBRUARY 3, 2019.
DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM RIPS 3200
(NAD83/2011).
JL
40DUKE
) ENERGY®
CAROLINAS
GRAPHIC SCALE
700 0 700 1,400
(IN FEET)
DRAWN BY: C. WYATT DATE: 09/09/2019
REVISED BY: J. DATE: 12/29/2019
CHECKED BY: A. ALBERT DATE: 12/29/2019
A. ALB
APPROVED BY: A. ALBERT DATE: 12/29/2019
s)mTerra
PROJECT MANAGER: A. ALBERT
www.synterracorp.com
WETLAND (AMEC NRTR)
FIGURE 5-6
MAP OF SURFACE WATERS
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
BC-2 PERDUE HOLCOWRD
BC-29
BC-32 BC-30
OLD PLANTATION RD
BC-28 BC-35
BC-23-2
BC-23-1
Bc-zoo7
Bc-zozs
Bc-2000
BC-33
�
r �•r
• /
'
BC-23-4 I
1 / ♦
BC-23-5 I
•/
♦
�
'•♦
BC-23-3 •♦
„
. �•I
D-46 ••I
oil
Y ���•• =.•r•
'
D-27 u
� •I
•�••�.•
BC-2021
�
O
BC-2025 �
I•
Dp-10 ••
1
�
o
• •I
Alk
i `
• MIDD _ETON LOOP
o
BC-2022
BC-2027
..''�..•
A
j
BC-1 BC-2037-C
1
BC-2037
1 •,
• • � II
4
BC-2o09 / l� )11 BC-2010 • 'I
o .0`
ec-zoos Bc-zols
�o Bc-zols r
4 '■ ■ ■
Bc-2oao % ■ • ■ �%
P BC-2013 ' •rj ••
BC-2o17 •�
� ■ .ram••
■ ,r..•
BC-2004C BC-2014 BC-1002 D-42 �P`'LµD••' ,
BC-2004 IC-2034 : .. spPiO N
�v;
C-2031 �.
BC-2003 BC-8 .
Bc-zo11 1
BC-2034C
D-61 BC-2005 ' ••
BC-2034C
BC-2006 D-5I, •
BC-2031 C
D-67 D-12 11-10 BC-2002
BC-2034C jll�
MPR'C1N LOtN0, MNO dR RO BC-2036 ❑ BC-2012 ; +!.•`• �, "•'1
rc
Z
i/
`/ oLkFa
i/ RSrFgMa
I�
COAL
PILE
OPO
RPV\,P
GRAPHIC SCALE
DUKE
625 0
625 1,250
ENERGY®
CAROLINAS
(IN FEET)
DRAWN BY: C. WYATT
REVISED BY: C. WYATT
DATE: 11/22/2019
DATE: 12/29/2019
CHECKED BY: A. ALBERT
DATE: 12/29/2019
APPROVED BY: A. ALBERT
DATE: 12/29/2019
PROJECT MANAGER: A. ALBERT
LEGEND
BELEWS
RESERVOIR
• WATER SUPPLY WELL
ASH BASIN WASTE BOUNDARY
LANDFILL BOUNDARY (CLOSED)
STRUCTURAL FILL BOUNDARY (CLOSED)
— - — - ASH BASIN COMPLIANCE BOUNDARY
LANDFILL COMPLIANCE BOUNDARY
LINED RETENTION BASIN
COAL PILE STORAGE AREA
—••—• DUKE ENERGY CAROLINAS PROPERTY LINE
STREAM (AMEC NRTR)
WETLAND (AMEC NRTR)
NOTES
1. INFORMATION PROVIDED IN BELEWS CREEKHB 630 PROVISION OF PERMANENT
WATER SUPPLY COMPLETION DOCUMENTATION, DUKE ENERGY, AUGUST 31, 2018
(APPENDIX D ).
2. THE WATERS OF THE US HAVE NOT BEEN APPROVED BY THE US ARMY CORPS OF
ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS NOT TO BE USED FOR
JURISDICTIONAL DETERMINATION PURPOSES. THE WETLANDS AND STREAMS
BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL &
INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL REPORT FOR BELEWS
CREEK STEAM STATION DATED JULY 2, 2015.
3. ALL BOUNDARIES ARE APPROXIMATE
4. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS
5. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON JUNE 11, 2019.
AERIAL WAS COLLECTED ON FEBRUARY 3, 2019.
6. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE
COORDINATE SYSTEM RIPS 3200 (NAD83/2011).
FIGURE 5-7a
WATER SUPPLY WELL SAMPLE LOCATIONS
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
•
•
•
'P°
•
' • o •
•
MIODLETpN Lppp p • • ,♦
�• LEGEND
• WATER TREATMENT SYSTEM
OPT OUT OR NON -RESPONSIVE
LOCATIONS DEEMED NOT ELIGIBLE PER HOUSE BILL
630 (BUSINESS/CHURCH/SCHOOL) BUT VOLUNTARILY
SUPPLIED PERMANENT WATER SOLUTION
i
t • VACANT PARCELS WITHIN HALF -MILE RADIUS
b • WATER SUPPLY WELL
• _ _ _ 0.5-MILE RADIUS FROM ASH BASIN COMPLIANCE
BOUNDARY
8 ; ASH BASIN WASTE BOUNDARY
s
.► : LANDFILL BOUNDARY (CLOSED)
• '� �� STRUCTURAL FILL BOUNDARY (CLOSED)
ASH BASIN COMPLIANCE BOUNDARY
LAND�°`°o� kFpp�FR SrF9g�A � ♦ FILL L NEDRETEONT' PLIANCE BOUNDARY
ON BASIN
<AryT'PO I COAL PILE STORAGE
—••—• DUKE ENERGY CAROLINAS PROPERTY LINE
)► STREAM (AMEC NRTR)
WETLAND (AMEC NRTR)
• r 1
•
7 1
•
'0 1
t
O�
I
NPVV 0.p
• • • • PANE �
I
PP���ppo ♦' ♦
I �
GRAPHIC SCALE
DUKE 625 0 625 1,250
ENERGY N FEET,
DRAWN BY: C. WYATT DATE: 11/22/2019
REVISED BY: C. WYATT DATE: 12/16/2019
CHECKED • ► - - - - �' BBY: A.A
APPROVED
ALLBERT DATE: 12/16/2019
synTerra PROJECT MANAGER: A. ALBERT
www.synterracorp.com
NOTES
1. INFORMATION PROVIDED IN BELEWS CREEK HB 630 PROVISION OF PERMANENT
WATER SUPPLY COMPLETION DOCUMENTATION, DUKE ENERGY, AUGUST 31, 2018
(APPENDIX D ).
2. NON -DUKE PARCEL BOUNDARIES PROVIDED BY NC ONEMAP, DATED 2018.
http://data.nconemap.gov/downloads/vector/parcels.
3. THE WATERS OF THE US HAVE NOT BEEN APPROVED BY THE US ARMY CORPS OF
ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS NOT TO BE USED FOR
JURISDICTIONAL DETERMINATION PURPOSES. THE WETLANDS AND STREAMS
BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL &
INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL REPORT FOR BELEWS
CREEK STEAM STATION DATED JULY 2, 2015.
4. ALL BOUNDARIES ARE APPROXIMATE
5. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS
6. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON JUNE 11, 2019.
AERIAL WAS COLLECTED ON FEBRUARY 3, 2019.
7. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE
COORDINATE SYSTEM RIPS 3200 (NAD83/2011).
FIGURE 5-7b
HB 630 PROVISION OF PERMANENT
WATER SUPPLY COMPLETION MAP
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
Corrective Action Plan Update December 2019
Belews Creek Steam Station SynTerra
Figure 6-1
Fly Ash and Bottom Ash Interbedded
Depiction
Included in Section 6 text
A --a
(SOUTH)
- A'
(NORTH)
f STRUCTURAL FILL
COMPLIANCE
BOUNDARY
a m oDo o N DAN RIVER
r2 is Q Q y u O
� �' r Q
Iz.
900 N a �'c7„ m 8 �� �a o rnomm 900
f/i O m m Q C' G' J � N
I FILL vi z - T01OfOf J fAOYO�YY
m mmmm ay0 ay0ro �J �� 1 1NNN aaaa d.
m00000Cmm mm00 110
mSAPROITE ' I �Q Q Q -FILL u800 \ N 800
ASH FILL APPROX. WATER LEVEL-747.6' mASH PORE WATER ASH PORE WATERO O O
TRANSITION ZONE N N N COMPLIANCE
700 \ — 1 i /\_' \ \ 1 SAPROLITE /BOUNDARY 700
_ TRANSITION ZONE I//
/ \` ' T I • / \\/ I / \` / \ / \�/ \ , •I / \ I \ / / SAPROLITE UNNAMED
TRIBUTARY
oo
I*A\/\ /1,/1,1,/1,/1, / \ / __ CO
00 �'�i� [.-� _ 1 ' /.-/ \ - 1 /\- \ 1 /.-�T \ /\-f�-- \ - 1 ' /\ \ - \ j /`-- \ - \ ' /\- - 1 /\-- \ - 1 ' / ' \ \ j /\-- \ - 1 ' /\- - \ /.-� \ - 1 ' 1 : \ - j /`- \ - 1 /\-_ \�. / 00
' 600 /\li \/I/\/�\/I/\/i�'I/\/i/\ i \/I"Ni/\/I/\/i/I/\/ 1/ /\li \/I/\/il\/I/\li \/I/\/i/\� \/1�(G/\/I/\/i \/I/\/i/\ I/ \t/\ \li \/I/l\/I I 600 1
/ / \I \ / I ♦ / / \I \ / I \ / / \I \ / - ♦ / / \I \ / I \ / / \I \' -}-f� / \I \ / I \ / I ♦ / I I ♦ / I \ / I ♦ /
> /1,�\/\ /1 \ /1,\/\ / /\ /1,�\/\ /1 \ \ /1 \/\ /1 \ /\ /1 ` 1 >
\ i BEDROCK / \ / \ \ / _ \ / \ / _ \ \ / _ \ / _ \ / \ \ / \ / _'\� l\ \ / - 1 ' \ \ / _ • • \ ' \ \
? / \il\ / Z
\ \ I \ I _ _-500
\ \ I \ \ I \ \ I \
O\TT/1�\/\I/1\/\I/1'\/\I/1\/\I/1\'\/\I/1�\/\I/1\'\/\I/1\/\I/1\/\/\I/1,\/\I/1\'\/\I/1\/\I/1'\/\I/1,\/\I/ \' /\I/1\�� _O
BEDROCK
>400\/\I/\/\I/1`\`L\I/1\\I_/\I/1\/\I/1\�jl\/1 \ /\ ♦'_
_ F I \/ I I \/ I I \/ I \/ I
LJJ / \ ; \ /I - \\ \ ; /I / \ - � � \ /I - \\ \ \ /I / \- � � \ /I - \\ \ ; /I ` � \ /I - \\ \ � \ /I / \- ` � �I _�\\i' �Imo\ T \\i � 4-_-\ \ I _ \ i / I / \ i � \ /I \\i � / I / \ i /I � \\ \ � \ /I � \_/I W
/\/\I/1�'\/\I/1/'\/\I/1/'\/\I/1//\/\I/1,�\/\I/1/'\/\I/1�'\/\I/1/'\/\I/1/\�\\I/1♦/\'/1/�\/\I/1\'\/\I/1//\/\I/1\/\�I/�'\/\I/1♦�\\I/1��/\I/1\'\/\I/1/�\/\I/1♦/\/\I/1,
—300
/\/I/\/� l\/I/\lamy
`\/\I/1♦' \/\I/1♦ �\/\I/1\' \/\I/1\ �\/\I/1♦ / \/\I/1\ �\/\I/1\'\/\I/1\ �\/\I/1\ / \/\I/1\ �\/\I/1\'\/\I/1\ �\/\I/1\' \/\I/1\ �\/\I/1\ / \/\I/1\ �\/\I/1♦'\/\I �\ `\/\I/1\ / \/\I/1\ �\/\I/1♦
200 / \` / \\/ I / \ i / \\/ I / \ / \ I / \ i l \\/ I / \` / \\/ I / \ i l \\/ I / \\ / \ I / \ i l \\/ I / \\ / \ I / \ i l \\/ I / \` / \\/ I / \ i l \\/ I / \` l \ I / \ i l \\/ I / \` / \\/ I / \ i l \\/ I / \` l \ I / \ i l \\/ I / \ l `\/ I / \ i l \\/ I / \` / `\/ I 200
`\ / \I / 1 \ � / \ I ` � \ / \ I / 1 \ ' / \ I ♦ � \ / \I / 1 \ / / \ I \ � \ / \ I / 1 \ ' / \ I ` � \ / \I / 1 \ / / \ I \ � \ / \I / 1 \ ' / \I ` � \ / \ I / 1 \ ' / \ I ♦ � \ / \I / 1 \ / / \ I \ � \ / \ I / 1 ♦ ' / \ I ` � \ / \I / 1 \ / / \ I \ � \ / \I / 1 \
100 1100
LEGEND
AB 9S
WELL IN SHALLOW/SAPROLITE ZONE
ASH PORE WATER FLOW LAYER
WATER LEVEL ELEVATION NOTES:
AB 9D
WELL IN DEEP/TRANSITION ZONE
SHALLOW FLOW ZONE 1.
WATER ELEVATIONS REPRESENT THE MANUAL WATER LEVELS COLLECTED FOR APRIL 8,
AB 9BR
0
WELL IN COMPETENT BEDROCK
ATER LEVERLEVE L ELEVATION
GROUNDWATER
2019 FOR EACH WELL. NOTE ELEVATIONS WITHIN EACH CLUSTER ARE MEASURED IN THE
AB 4S
WELL IN ASH PORE WATER
SAME DAY. ASH BASIN WATER ELEVATION IS RECORDED FROM APRIL 8, 2019.
DEEP/TRANSITION ZONE FLOW ZONE
REFERENCED TO NORTH AMERICAN VERTICAL DATUM 1988.
GENERALIZED WATER TABLE
GROUNDWATER LEVEL ELEVATION
2.
FRACTURES DEPICTED ON THIS CROSS SECTION REPRESENT THE GENERALIZED FRACTURE
BEDROCK FRACTURE
V
BEDROCK FLOW ZONE GROUNDWATER
ORIENTATIONS BASED ON TELEVIEWER LOGGING AT SITE -SPECIFIC BOREHOLES. AS
ORIENTATION
LEVEL ELEVATION
CONCEPTUALLY ILLUSTRATED HERE, TELEVIEWER LOGGING RESULTS DID NOT INDICATE
GENERALIZED GROUNDWATER
WATER LEVEL ELEVATION (NAVD 88)
ANY DISTINCT, CONSISTENT FRACTURE SETS, BUT A WIDE VARIETY OF FRACTURE
FLOW DIRECTION
ORIENTATIONS AT THE SITE. THE ACTUAL NUMBER OF FRACTURES IS FAR TOO NUMEROUS
GENERALIZED ASH PORE
(LABEL COLORING BY FLOW ZONE)
TO ILLUSTRATE AT THIS SCALE. IN ADDITION, THE DEPTHS AND LENGTHS OF FRACTURES
WATER FLOW DIRECTION
VERSUS DEPTH ARE CONCEPTUAL ONLY.
WELL SCREEN
GENERALIZED VERTICAL
HYDRAULIC GRADIENT
0
ASH
- — -
COMPLIANCE BOUNDARY
0
ASH PORE WATER
FILL
DUKE
0 125 250 500
HORIZONTAL SCALE: 1" = 500'
0
SAPROLITE
4' ENERGY
VERTICAL SCALE: 1 " = 200' FIGURE 6-2
5X VERTICAL EXAGGERATION GENERAL CROSS SECTION A
®
WEATHERED ROCK
CAROLINAS
ASH BASIN
DRAWN BY: C. BRUCE DATE:08/01/2019
CORRECTIVE ACTION PLAN UPI
;• % _"; :
BEDROCK
REVISED BY: C. BRUCET DATE: 11/15/2019
RCI MA/C !`DCCI! CTCAIIA CTAT
CROSS SECTION LOCATION
900
800
700
co
Q600
Z
Z
_O 500
H
Lu
J 400
W
300
200
100
ACCELERATED
REMEDIATION
EXTRACTION
SYSTEM
BELEWS CREEK ASH BASIN DAM
g -a -- B,
(WEST) (EAST)
COMPLIANCE
BOUNDARY
PARCEL IQ
I�
n�1 e e
COMPLIANCE
BOUNDARY
I
I
to
/ I i \li V.\/i
ml
l
BEDRIblCK✓/-
/I/\ -'y/�i/\/I/\/ice /I/\/il\/I/\li� /I/\/ /�/I�\/�/I/\/ \ _\li� /I/\/ /I/ lip /I/�il\/I/\li�fil'/\/mil`/I/\li� /I/\/il�/Its►-ice /I/\/il\/I/\li� /1/\/il�/I/ i�
./\/�/\I/1`/-�\I�/\��/\I/1`/-\\I�/\��/\I\/ \iI�/\/_/\I�/\/- �4�./ /\I\/\ _♦ I•��'-/\I\/\//'_\�I�/\,-/\I\/\/-\'I�/\�-/\I\/\/-`��/♦/-/\I\/\/-\'I�/\�-/\�/\/-\'I�/\�-/\I
//I `\ �`� /I / `\ i`�/j `\_ ♦ 'BEDROCK`L i`\/i / \\ /I / \\ �Ti ��iK\\ \.//I / `L i`\/j \\ ♦ ��� /I / `\ i`�//I `\ ♦ �`� /I - \7 T�/j / `\�� /u� i`\//I `\ i`\.
/T/\I/1`/\/\I/
GENERALIZED
GDIIRE�IONTOTWATER HE
w
/1,/\ NORTHj/\/�
/ / / _ /
-`/-\.-\-1_/`/-\\l/`.-\-\_/`/-\�1j/-_\-1�/\-\-11/--\-1�--\�1'/\--\-\/--\-1'/�-_\-1\�-\-1�/�-_\-1'/�- \-1'/�-_\-\�/\
l_ i� / I/.. l / = l / l l / l 1, l / l . .
LEGEND
AB 9S
WELL IN S HALLOW/SAPRO LITE ZONE
V
ASH PORE WATER FLOW LAYER
WATER LEVEL ELEVATION NOTES:
AB-9D
WELL IN DEEP/TRANSITION ZONE
AB-9BR
0
WELL IN COMPETENT BEDROCK
SHALLOW/SAPROLITE FLOW ZONE 1.
WATER ELEVATIONS REPRESENT THE MANUAL WATER LEVELS COLLECTED FOR APRIL 8,
GROUNDWATER LEVEL ELEVATION
2019 FOR EACH WELL. NOTE ELEVATIONS WITHIN EACH CLUSTER ARE MEASURED IN THE
AB 4S
WELL IN ASH PORE WATER
SAME DAY. ASH BASIN POND ELEVATION IS RECORDED FROM APRIL 8, 2019.
V
DEEP/TRANSITION ZONE FLOW ZONE
REFERENCED TO NORTH AMERICAN VERTICAL DATUM 1988.
GENERALIZED WATER TABLE
GROUNDWATER LEVEL ELEVATION
BEDROCK FRACTURE
BEDROCK FLOW ZONE GROUNDWATER 2.
FRACTURES DEPICTED ON THIS CROSS SECTION REPRESENT THE GENERALIZED FRACTURE
ORIENTATION
LEVEL ELEVATION
ORIENTATIONS BASED ON TELEVIEWER LOGGING AT SITE -SPECIFIC BOREHOLES. AS
GENERALIZED VERTICAL
CONCEPTUALLY ILLUSTRATED HERE, TELEVIEWER LOGGING RESULTS DID NOT INDICATE
��
HYDRAULIC GRADIENT
A
WATER LEVEL ELEVATION (NAND 88)
ANY DISTINCT, CONSISTENT FRACTURE SETS, BUT A WIDE VARIETY OF FRACTURE
(LABEL COLORING FLOW ZONE)
ORIENTATIONS AT THE SITE. THE ACTUAL NUMBER OF FRACTURES IS FAR TOO NUMEROUS
0
ASH
TO ILLUSTRATE AT THIS SCALE. IN ADDITION, THE DEPTHS AND LENGTHS OF FRACTURES
VERSUS DEPTH ARE CONCEPTUAL ONLY.
0
ASH PORE WATER
WELL SCREEN
FILL
0
SAPROLITE
'DUKE
0 125500
TAL SCALE:
HORIZONTAL ALE: 1" = 500'
®
WEATHERED ROCK
VERTICAL SCALE: 1"=200'
5X VERTICAL EXAGGERATION
FIGURE 6-34ENERGY
BEDROCK
(`AC?(ll INIA¢
GENERAL CROSS SECTION B-1
AQW RAQIAI
— — — COMPLIANCE BOUNDARY
900
800
700
co
co
600 �
Q
Z
Z
5000
Lu
400 J
W
300
200
100
CROSS SECTION LOCATION
. `
a ♦," 4
zr (
PRE -DECANTING %//� _
//i— \���� ��-- �■j
limp
POST CLOSURE - \\ ` r( - �. I
Lw
CONDITIONS FORIr 4 ` - ,T./,■
CONDITIONS ■ ,�
■ m —� /
1�'r
CLOSURE -IN -PLACE I I -�� s
I
116
/
it
Jill( I 4L
- ,
��
nti
,.
�o`o . m��`� = �/� I 1 � ```` / /� / � � '' r{-® y,�,�sl•Fg4kFpo
�
moo`
� 4�_
xv
ar:.
s� t
I
-•.
�• • , e'er'41
. ♦
•'. . .� "-+ i* 9,", 1 •
■ 9 . e s
r ,
� , � ..�" _ � -90 FEET
I--" -_
I
-90 FEET
� ,- '+ 't •� - <
- .
I
f
--I 10FEET
f
10FEET -
o
w ■ � � 1r i
■
o
w ■
LEGEND NOTES:
—� —APPROXIMATE SATURATED ASH THICKNESS ISOPACH
LINED RETENTION BASIN 1. ASH THICKNESS ISOPACH SURFACES FROM FLOW AND TRANSPORT MODELS (FALTAAND OTHERS,
COAL PILE BOUNDARY
DUKE
� ENERGY. .
GRAPHIC SCALE
500 0 500 1,000
FIGURE 6-4
SATURATED ASH THICKNESS MAP
ASH BASIN WASTE BOUNDARY 2. SATURATED ASH THICKNESS FOR CLOSURE -IN -PLACE IS BASED ON CLOSURE MODEL RESULTS
— - — - -ASH BASIN COMPLIANCE BOUNDARY WITH UNDERDRAINS.
PROPOSED HYBRID LANDFILL WASTE EXTENT
CAROIINAS
(IN FEET)
FOR PRE -DECANTING AND
POST -CLOSURE CONDITIONS
DRAWN BY: C. WYATT DATE: 06/07/2019
REVISED BY: A. ROBINSON DATE: 12/04/2019
LANDFILL BOUNDARY 3. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS.
STRUCTURAL FILL BOUNDARY 4. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO FEBRUARY 2019.
LANDFILL COMPLIANCE BOUNDARY
J�
CHECKED BY: A. ALBERT DATE: 12/04/2019
APPROVED BY: C. EADY DATE: 12/04/2019
PROJECT MANAGER: A. ALBERT
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
.. DUKE ENERGY CAROLINAS PROPERTY LINE 5. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE
SYSTEM FIPS 3200 (NAD83).
synTerlQ
www.synterracorp.com
O Sample ID (Depth)
{ O `� IDDLETON BG-01D(1-21
2 . LOOP BG-01D(11-1)
"O r . r Molybdenum
% Sample ID (Depth) r`
MW-200BR(0-1.5) ♦ +� {
BG-01D (31-31)
Arsenic `� ♦!
_ Sample ID(Depth)
{ sample ID (Depth) ' r ma e: + — BGSB-01 (1-2) I Sample 0 (Depth)
■ GwA-o15 (zo-z1.$) " r ► r — - A r - Arsenic ! f BGSB-02 (1-2)
Arsenic ,■ BGSB-02 (10-12)
BGSB-01 (5-7) 1
BGSB-02 (15-17)
[� Ej k BGSB-01 (10-12)
■ .� a - '}f'";t',u'; = ■ BGSB-02 (20-22)
- BGSB-01 (15-17)
■ - ! I ■ BGSB-02 (30-32)
♦ BGSB-01 (20-22)
SamplelD(Depth) ;r 1 BGSB-02 (30-32)
AB-01S(20-21.5) ® • Sam pie lD(Depth) '
■ � Arsenic.. a .. AB-03D (40-41.5) �I i
■ ;I #
■,♦ 1`f r #jr Sam ple lD (De pth)
■ Sample lD (De pth) ■ ,c /♦ O GWA-03D (34-35.5)
■ GWA-100 (2-3) /
Arsenic
a
I<
♦ 1 �I
7
" I
a
Sample ID (Depth)
MW-203BR (20-21.5)
pH
6
Sample ID(Depth)
GWA-09GTB (40-41.5)
Chromum / ��r
Oki ■ ■ . Sam ple lD (Depth)
GWA-08D (20-21.5)•
: +
+r+
J +r
Sample ID (Depth) Sample ID (Depth)
■ GWASB-12 (5-7) GWA-12D (10-12)
■ - PH GWA-12D(15-17)
Sample ID (Depth) I Sam ple lD(D2 pth) GWASB-12(10-12) W GWA-12D(20-22)
BC-035 (1-2) ■ J BGSB-03 (1-2) GWASB-12 (15-17) GWA-12D (25-27)
BG-03S (10-12) a� BGSB-03 (5-7) GWASB-12 (20-22)
BG-03S (20-22) BGSB-03 (10-12) Selenium
■ BGSB-03 (15-17) GWASB-12 (25-27) )_
■ BGSB-03 (20-22) Selenium
Sample ID(Depth)
r MW-202BR (40-42)
!a �� MW-202BR(47-49)
MW-202BR(60-61.5)
■
DUKE
ENERGY®
CAROLINAS
41
synTerra
BELEWS CREEK
STEAM STATION
s,-
GRAPHIC SCALE
490 0 490 980
(IN FEET)
DRAWN BY: C. WYATT DATE: 08/05/2019
REVISED BY: C. WYATT DATE: 12/16/2019
CHECKED BY: A. ALBERT DATE: 12/16/2019
APPROVED BY: A. ALBERT DATE: 12/16/2019
PROJECT MANAGER: A. ALBERT
m
BELEWS
RESERVOIR
LEGEND
BACKGROUND SOIL SAMPLE LOCATION WITH
0 NO EXCEEDANCES
LOCATION WITH NO EXCEEDANCES
BACKGROUND LOCAITON WITH ONE OR MORE
EXCEEDANCES OF REGULATORY CRITERIA
O LOCATION WITH ONE OR MORE EXCEEDANCE OF
REGULATORY CRITERIA
ASH BASIN WASTE BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
•--- LANDFILL BOUNDARY (CLOSED)
STRUCTURAL FILL BOUNDARY (CLOSED)
LANDFILL COMPLIANCE BOUNDARY
LINED RETENTION BASIN
COAL PILE STORAGE AREA
- - DUKE ENERGY CAROLINAS PROPERTY LINE
3 STREAM (AMEC NRTR)
71-1 WETLAND (AMEC NRTR)
NOTES:
1.THE WATERS OF THE US HAVE NOT BEEN APPROVED BY THE US ARMY CORPS OF
ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS A PRELIMINARY
JURISDICTIONAL DETERMINATION ONLY. THE PRELIMINARY WETLANDS AND
STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER
ENVIRONMENTAL & INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL
REPORT (NRTR) FOR BELEWS CREEK STEAM STATION DATED JULY 2, 2015.
2. ALL BOUNDARIES ARE APPROXIMATE
�];Zi]�q:��� Zi11J�1■l_1:��,:Zi1�11■]�H:17■1111���I�:iH'L9_Vii]RI�G6'.'
4. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON JUNE 11, 2019.
AERIAL WAS COLLECTED ON FEBRUARY 3, 2019.
5. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE
COORDINATE SYSTEM FIPS 3200 (NAD83).
FIGURE 6-5
UNSATURATED SOIL SAMPLE
LOCATIONS AND EXCEEDANCES
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
900
800
700
a
00
0 600
a
z
Z 500
O
H
a
W 400
J
W
300
200
100
A ---a
(SOUTH)
f STRUCTURAL FILL
COMPLIANCE
BOUNDARY
NOTES:
1. ALL CONCENTRATIONS SHOWN ARE STATISTICAL MEAN OR GEOMEAN
LEGEND
CALCUALTED BASED ON CENTRAL TENDANCY OF DATASET USING DATA RANGING
FROM JANUARY 2018 TO APRIL 2019.
AB 9S
WELL IN S HALLOW/SAPRO LITE ZONE
ASH PORE WATER FLOW LAYER
2. /L, Boron (B) AND LITHIUM (U) CONCENTRATIONS ARE IN MICROGRAMS PER LITER
(pgWATER
AB 9D
WELL IN DEEP/TRANSITION ZONE
LEVEL ELEVATION
3. Chloride (Cl) AND TOTAL DISSOLVED SOLIDS (TDS) CONCENTRATIONS ARE IN
MILLIGRAMS PER LITER (mg/L)
AB 9BR
WELL IN COMPETENT BEDROCK
SHALLOW/SAPROLITE FLOW ZONE
4. NO MEAN ANALYSIS FOR BEDROCK WELLS (AB-2BRD AND AB-36RD) FOR
GROUNDWATER LEVEL ELEVATION
CONSTITUENTS; CHLORIDE, LITHIUM AND TOTAL DISSOLVED SOLIDS
AB 4S
WELL IN ASH PORE WATER
5. SFMW-2D IS PART OF THE SOLID WASTE STRUCTURAL FILL MONITORING
DEEP/TRANSITION ZONE FLOW ZONE
NETWORK. THIS UNIT IS NOT CONTIGUOUS WITH THE ASH BASIN HYDRAULIC
GENERALIZED WATER TABLE
GROUNDWATER LEVEL ELEVATION
SYSTEM AND IS PART OF SEPARATE ONGOING SITES ASSESSMENT.
— _
BEDROCK FRACTURE
BEDROCK FLOW ZONE GROUNDWATER
- NO DATA AVAILABLE
ANALYTICAL PARAMETER B CI u TDS
ORIENTATION
LEVEL ELEVATION
REPORTING UNITS Ng/L mg/L Ng/L mg/L
GENERALIZED GROUNDWATER
FLOW DIRECTION
Aegisw 50
MEAN BORON (B) CONCENTRATION (�ag/L)
15A NCAC 02L STANDARD 700 250 NE Soo
GENERALIZED ASH PORE
1.1
MEAN CHLORIDE (CI) CONCENTRATION (mg/L)
BACKGROUND THRESHOLD VALUE 50 19 2 93
_►
WATER FLOW DIRECTION
is
6.6
LITHIUM (Li) CONCENTRATION (Ng/L)
(SHALLOW FLOW ZONE)r
BACKGROUND THRESHOLD VALUE
MEAN TOTAL DISSOLVED SOLIDS (TDS)
50 19 95 134
(DEEP FLOW ZONE),
ASH
CONCENTRATION (mg/L)
BACKGROUND THRESHOLD VALUE SO 3 30 181
(BEDROCK FLOW ZONE)1
0
ASH PORE WATER
'BACKGROUND THRESHOLD VALUES WERE CALCULATED USING DATA FROM
WELL SCREEN
BACKGROUND GROUNDWATER SAMPLES COLLECTED MAY 2015 TO DECEMBER 2018
FILL
AS SUBMITTED IN TUNE 2019.
COMPLIANCE BOUNDARY
0
SAPROLITE
WEATHERED ROCK
DUKE
tn
0 125 250 500
HORIZONTAL SCALE: 1" = 500'
GEC
®
VERTICAL SCALE: 1" =
BEDROCK
ENERGY
TI
SX VERTICAL EXAGGERATION
ASH B
nnCA AI Plc M^I
— A'
(NORTH)
DAN RIVER
900
800
700
a
00
600
a
z
500 Z
O
I —
a
400 W
J
W
300
200
100
CROSS SECTION LOCATION
900
800
700
co
00
600
Q
Z
Z 500
_O
H
Q
W 400
J
W
300
200
A --a
(SOUTH)
f STRUCTURAL FILL
COMPLIANCE
BOUNDARY
j
�
OD 00 p
v
wD
a
A'
(NORTH)
DAN RIVER
900
800
700
ao
600 0
Q
Z
500 Z
_O
H
Q
400 W
J
W
300
200
100
NOTES: 100
1. ALL CONCENTRATIONS SHOWN ARE STATISTICAL MEAN OR GEOMEAN
CALCUALTED BASED ON CENTRAL TENDANCY OF DATASET USING DATA RANGING
LEGEND
FROM JANUARY 2018 TO APRIL 2019.
2. ALL CONCENTRATIONS ARE IN MICROGRAMS PER LITER (yg/L)
AB 9S
WELL IN S HALLOW/SAPRO LITE ZONE
ASH PORE WATER FLOW LAYER
3. NO MEAN ANALYSIS FOR WELLS AB-2BRD AND GWA-24S FOR CONSTITUENTS;
ARSENIC (As), BERYLLIUM (Be), STRONTIUM (Sr) AND THALLIUM (TI)
WATER LEVEL ELEVATION
AB 9D
WELL IN DEEP/TRANSITION ZONE
4. SFMW-2D IS PART OF THE SOLID WASTE STRUCTURAL FILL MONITORING
SHALLOW/SAPRO LITE FLOW ZONE
NETWORK. THIS UNIT IS NOT CONTIGUOUS WITH THE ASH BASIN HYDRAULIC
AB-9BR
WELL IN COMPETENT BEDROCK
GROUNDWATER LEVEL ELEVATION
SYSTEM AND IS PART OF SEPARATE ONGOING SITES ASSESSMENT.
AB-4S
WELL IN ASH PORE WATER
-NO DATA AVAILABLE
Q
DEEP/TRANSITION ZONE FLOW ZONE
ANALYTICAL PARAMETER As Be Sr TI
GENERALIZED WATER TABLE
GROUNDWATER LEVEL ELEVATION
BEDROCK FRACTURE
REPORTING UNITS ug/L Ug/L ug/L Ng/L
ORIENTATION
BEDROCK FLOW ZONE GROUNDWATER
15ANCAC 02LSTANDARD 10 4* NE 0.2-
LEVEL ELEVATION
GENERALIZED GROUNDWATER
BACKGROUND THRESHOLD VALUE
1 0.3 46 0.2
ASH BASIN
FLOW DIRECTION
A64—
MEAN ARSENIC (AS) CONCENTRATION (Ng/L)
(SHALLOW FLOW ZONE)'
BACKGROUND THRESHOLD VALUE
GENERALIZED ASH PORE
as
MEAN BERYLLIUM (Be) CONCENTRATION (�Ig/L)
(DEEP FLOW ZONE)' 1 0.1 73 0.2
WATER FLOW DIRECTION
ee
m.l
MEAN STRONTIUM CONCENTRATION
gACKGROUND THRESHOLD VALUE
z o.z 99 0.1
(Sr) (pg/L)
(BEDROCK FLOW ZONE)'
oPo
e
ASH
m.
MEAN THALLIUM (TI) CONCENTRATION (ug/L)
* -INTERIM MAXIMUM ALLOWABLE CONCENTRATIONS (IMACS) OF THE 15A NCAC
�P O
=
ASH PORE WATER
02L STANDARD APPENDIX 1, APRIL 1, 2013.
e`
WELL SCREEN
'BACKGROUND THRESHOLD VALUES WERE CALCULATED USING DATA FROM
FILL
BACKGROUND GROUNDWATER SAMPLES COLLECTED MAY 2015 TO DECEMBER 2018
Q
AS SUBMITTED IN JUNE 2019.
00
SAPROLITE
�02
_ _ _
COMPLIANCE BOUNDARY
DUKE
0 125 250 500
FIGURE 6-6b
o ®
PINE HALL ROAD
ASH LANDFILL
WEATHERED ROCK
BEDROCK
'
%
4 ENERGY
HORIZONTAL SCALE 1"=500'
VERTICAL SCALE: 1" = 200'
5XVERTICAL EXAGGERATION
GENERAL CROSS SECTION A -A'
ASH BASIN -NON-CONSERVATIVE GROUP
CROSS SECTION LOCATION
900
800
700
00
600
Q
Z
Z 500
_O
H
Q
W 400
J
W
300
200
100
A --a
(SOUTH)
f STRUCTURAL FILL
COMPLIANCE
BOUNDARY
N
(gDo0
J ao aD rc
a Q
LEGEND
AB 9S
WELL IN SHALLOW/SAPROLITE ZONE
AB 9D
WELL IN DEEP/TRANSITION ZONE
AB 9BR
WELL IN COMPETENT BEDROCK
AB 4S
WELL IN ASH PORE WATER
V
GENERALIZED WATER TABLE
BEDROCK FRACTURE
ORIENTATION
GENERALIZED GROUNDWATER
FLOW DIRECTION
NNW-*-
GENERALIZED ASH PORE
WATER FLOW DIRECTION
0
ASH
0
ASH PORE WATER
FILL
0
SAPROLITE
®
WEATHERED ROCK
BEDROCK
NOTES:
1. ALL CONCENTRATIONS SHOWN ARE STATISTICAL MEAN OR GEOMEAN
CALCUALTED BASED ON CENTRAL TENDANCY OF DATASET USING DATA
RANGING FROM JANUARY 2018 TO APRIL 2019.
2. ALL CONCENTRATIONS ARE IN MICROGRAMS PER LITER (mg/L)
ASH PORE WATER FLOW LAYER
3. NO MEAN ANALYSIS FOR BEDROCK WELLS AB-2BRD AND GWA-24S FOR
WATER LEVEL ELEVATION
CONSTITUENTS; COBALT (CD), IRON (Fe) AND MAMGAMESE (Mn)
4. SFMW-2D IS PART OF THE SOLID WASTE STRUCTURAL FILL MONITORING
SHALLOW SAPROLITE FLOW ZONE
NETWORK. THIS UNIT IS NOT CONTIGUOUS WITH THE ASH BASIN HYDRAULIC
GROUNDWATER LEVEL ELEVATION
SYSTEM AND IS PART OF A SEPARATE ONGOING SITES ASSESSMENT.
-NO DATA AVAILABLE
DEEP/TRANSITION ZONE FLOW ZONE
ANALYTICAL PARAMETER Co Fe Mn
GROUNDWATER LEVEL ELEVATION
REPORTING UNITS
ug/L ug/L Ug/L
BEDROCK FLOW ZONE GROUNDWATER
15ANCAC 02LSTANDARD 1* 300 so
LEVEL ELEVATION
BACKGROUND THRESHOLD VALUE
(SHALLOW FLOW ZONE)i 0.6 1600 40
A848RD
MEAN COBALT (Co) CONCENTRATION (pg/L)
BACKGROUND THRESHOLD VALUE 2 226 57
IRON Fe CONCENTRATION L
( ) (I-I� )
DEEPMEAN
(THRESHOL ZALUE
F.
BACKGROUND THRESHOLD VALUE
0.8 341 64
�D
MEAN MANGANESE (Mn) CONCENTRATION (ug/L)
(BEDROCK FLOW ZONE)i
* - INTERIM MAXIMUM ALLOWABLE CONCENTRATIONS (IMACS) OFTHE 15A
NCAC 02L STANDARD APPENDIX 1, APRIL 1, 2013.
'BACKGROUND THRESHOLD VALUES WERE CALCULATED USING DATA FROM
0
WELL SCREEN
BACKGROUND GROUNDWATER SAMPLES COLLECTED MAY 2015 TO DECEMBER
2018 AS SUBMITTED IN JUNE 2019.
COMPLIANCE
0 125 250 500
BOUNDARY
,�� DUKE
HORIZONTAL SCALE: 1" = 500'
- A'
(NORTH)
DAN RIVER —
900
800
700
a
co
600 0
Q
Z
500 Z
O
H
Q
400 W
J
W
300
200
100
CROSS SECTION LOCATION
AB-4 LOWER ASH
GWA-20D
2/1/2019 4/1/2019 6/1/2019 8/1/2019 10/1/2019
2/1/2019 4/1/2019 6/1/2019 8/1/2019 10/1/2019
11
8
n 10
? 7
9
Vf 6
C8
L
c. 5
, 1-��
♦
7
4
I
No new data collected
Stable trend observed
6
due to ash basin access
3
restrictions.
Stable trends observed
-400
n� -
-ti' --- ^ -` r
- _ _ 600
450
rr/
Drift continued after
�r /�, 400 E
.O
500 IL
r.,"
ORP data drift
recalibration
J� I
200 CL
observed,
/
550 O
rendering data unreliable.
0 G
Trend line included for
ORP sensor
information purposes only.
replaced
-600
-200
0
0
Total change in water
++
Total change in water 5
4-J
level from decanting is 5
756
level from decanting is ^
> 748
-7.9 feet between
=
p
approximately -1.2 feet 4 =
W Go
decantingdecanting start date 4
"•' 00 755
between decanting start `�
W co 744
and November 1, 2019
3
G
date and July 28, 2019 3 �p
y 740
f0
'V Q 754
2 =
> Q
2 =
Z
Z 736
_
I
a� 753
1
d
J
1 OC
a+
�+ 732
i
'
M
0
3 752 0
02/01/19 04/01/19 06/01/19 08/01/19 10/01/19
02/01/19 04/01/19 06/01/19 08/01/19 10/01/19
Date
Date
AB-4 LOWER ASH: Ash pore water well located central to the
GWA-20D: Deep flow zone well located downgradient and
ash basin delta. See Figure 6-9 for monitoring location.
northwest of the ash basin. See Figure 6-9 for monitoring
location.
AB-4 SAP
AB-2D
2/1/2019 4/1/2019 6/1/2019 8/1/2019 10/1/2019
02/01/19 04/01/19 06/01/19 08/01/19 10/01/19
8
8
M 7
= 7
6
.�. 6
�. 5
�. 5
4
4
I
Stable trends observed
3
Stable trends observed
3
No new data collected
due to ash basin access
restrictions.
"7450
>
250
I 200 �
375
150
300 �
�
C
100 O
225
50
150
Increasing trend
observed prior
Total change in specific
to decanting
conductivity is approximately
commencement
184 uS/cm since decanting
�=
:= 1600
commenced
++ 216
++
^ 1550
E 210
Total change in specific
c
conductivity is
1500
0
204
0
approximately 18
decanting
0"
0
UV)
uS/cm since
V 1450
198
commenced
L-
1400
a 192
0.
V)
U) 1350
c
Total change in water
r-
Total change in water
level from decanting is 5
0
level from decanting is 5
756
approximately -2.1
4-1
732
approximately -11.2 feet =
4
^
feet between 4 —
> ^
between decanting start —
w00 755
decanting start date 3 _
-2 00 728
date and November 1, 3 V
754
and July 28, 2019 jp
724
2019^ M
>>
2 =
>>
2
iV 753
1
J V 720
I
1
I J
OG
(
I
Ilk,I
it
M 716
0
752 0
3 02/01/19 04/01/19 06/01/19 08/01/19 10/01/19
3 02/01/19 04/01/19 06/01/19 08/01/19 10/01/19
Date
Date
AB-4SAP: Shallow flow zone monitoring well located within the
AB-2D: Deep flow zone well located downgradient of the ash
footprint of the ash basin, below ash pore water well A13-4
basin, below the ash basin dam. See Figure 6-9 for monitoring
LOWER ASH. See Figure 6-9 for monitoring location.
location.
LEGEND Notes:
Specific conductivity is monitored at
(S.U.) AB-4SAP and AB-2D only.
t��ENERGY DUKE
DRAWN BY:D. AVARD DATE: 11/20/2019
�
FIGURE 6-7
Oxidation
Oxidation Reduction Potential (ORP)(mV) NAVD 88 - North American Vertical
Cn^'
REVISED BY:M. ROZIER DATE: 12/03/2019
GEOCHEMICAL WATER QUALITY
- - ORP data included for information purposes Datum
PLOTS
Specific Conductivity ([6/cm) in -inches
CHECKED BY:A. ALBERT DATE:12/03/201
CORRECTIVE ACTION PLAN UPDATE
Decanting Start (03/27/2019) pS/cm - micro Siemens per
centimeter
APPROVED BY:A. ALBERT DATE:12/03/2019
BELEWS CREEK STEAM STATION
Decanting Suspended (07/29/2019)
my -millivolts
PROJECT MANAGER:A. ALBERT
BELEWS CREEK NC
Daily Total Rainfall (inches) SU - standard unit
Tff
OCalibrated Field Parameter Measurements (pH and specific conductivity)
m
www.synterracorp.com
Deep Groundwater Legend
• AB-04S
■ GWA-01D
♦
MW-200D
♦ AB-04LOWERASH0
GWA-03D
•
MW-201D
■ AB-5S
A GWA-11D
Z
MW-204D
a
A AB-5SL
V GWA-16DA
*
BG-11D
'O o
Z AB-6S
♦ GWA-17D
■
BG-2D
—
* AB-6SL
Z GWA-19D
•
BG-3D
/
V AB-7S
* GWA-20D
♦
MW-202D
ao
O AB-8S
❑ GWA-21D
X AB-8SL
O GWA-22D
V GWA-24D
g
0 GWA-27D
O*ge
O GWA-30D
X GWA-31 D
3
�7 GWA-32D
Shallow
o�
Groundwater
80°/
ti
Affected —
0
G 60
x
Potential Mixing
Generally 7
Unaffected •
g�I
60%
80%
2
CEO 8(
*
-
", ¢O
-
•
a�
�00
g � El
� ♦
�
cAo
Z
I
g
cl 61.
Q5
�—�Ca
— CI —10
Shallow
Groundwater Legend
• AB-04S
♦
GWA-01S
X GWA-30S
♦ AB-04LOWERASH
■
GWA-03S
❑ GWA-31S
■ AB-5S
A AB-5SL
•
GWA-16S
• MW-200S
Z AB-6S
GWA-17S
■ MW-204S
* AB-6SL
Z
GWA-20SA
♦ BG-2S
V AB-7S
*
GWA-22S
* MW-202S
O AB-8S
O
GWA-27S
X AB-8SL
Deep
Groundwater
•' DUKE
ENERGY
c,
DRAWN BY: R. BADUM
REVISED BY: R. BADUM
CHECKED BY: A.ALBERT
APPROVED BY: A. ALBERT
PROJECT MANAGER: A.ALBERT
0
4—Ca —
DATE: 08/23/2019
Syf 1Terlcl www.synterracorp.com
Bedrock Groundwater Legend
• AB-04S
■
GWA-01BR
♦ AB-04LOWERASH
•
GWA-16BR
■ AB-5S
♦
GWA-19BR
AB-5SL
A
GWA-20BR
Z AB-6S
v
GWA-24BR
* AB-6SL
Z
MW-200BR
V AB-7S
*
MW-201 BR
O AB-8S
•
BG-2BRA
X AB-8SL
*
MW-202BR
Bedrock
Groundwater
0 / `01
0—
x
O" O
00
io 00
L Anoi
— CI
FIGURE 6-8
ASH PORE WATER AND
GROUNDWATER PIPER DIAGRAMS
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
GWA-21 S/D GWA-11 S/D
EX-OB1
1
� GWA-20SA
GWA-27D I ;oa
Jfo
I INSET A SCALE: 1- = 500'
AB-4,1
,.. = LOWE
3HR FINGER_Mll
r
-r0` -NLoop `
:1 +
CCR-6D ,
1 ,
ify
Y ..
CCR-11S/D40
Loa
_ y
�� STFgMp
r► y x9PINE HALL
oQ +ROADLANDFILL
(CLOSED) ��♦
o° I D~� •�-r�r
p\NE� r r f
I
'5-
Se u!F "a r�' Vic... •r :a -
,��,-.,� !" �•�` �_� ►DUKE
ENERGY.
CAROLINAS
•`
� r
synTerra
O
PO
10'1Q
GRAPHIC SCALE
500 0 500 1,000
(IN FEET)
DRAWN BY: C. WYATT DATE: 11/25/2019
REVISED BY: C. WYATT DATE: 12/04/2019
CHECKED BY: A. ALBERT DATE: 12/04/2019
APPROVED BY: C. EADY DATE: 12/04/2019
PROJECT MANAGER: A. ALBERT
m
0
LEGEND
PROPOSED TRANSDUCER LOCATION FOR ASH
• BASIN FINGER PONDED WATER LEVEL
MONITORING
TRANSDUCER LOCATION FOR ASH BASIN
O GROUNDWATER LEVEL MONITORING
■ GEOCHEMICAL SONDE LOCATION FOR ASH BASIN
GROUNDWATER LEVELAND WATER QUALITY MONITORING
ASH BASIN WASTE BOUNDARY
- — - ASH BASIN COMPLIANCE BOUNDARY
LANDFILL BOUNDARY (CLOSED)
STRUCTURAL FILL BOUNDARY (CLOSED)
LANDFILL COMPLIANCE BOUNDARY
LINED RETENTION BASIN
COAL PILE STORAGE AREA
- DUKE ENERGY CAROLINAS PROPERTY LINE
3111, STREAM (AMEC NRTR)
WETLAND (AMEC NRTR)
NOTES:
1. PHR - PINE HALL ROAD
2. WCP - WEST OF CHEMICAL POND
3. NCP - NORTH OF CHEMICAL POND
4. LRB - LINED RETENTION BASIN
5. THE WATERS OF THE US HAVE NOT BEEN APPROVED BY THE US ARMY CORPS OF
ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS NOT TO BE USED FOR
JURISDICTIONAL DETERMINATION PURPOSES. THE WETLANDS AND STREAMS
BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL &
INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL REPORT FOR BELEWS
CREEK STEAM STATION DATED JULY 2, 2015.
6. ALL BOUNDARIES ARE APPROXIMATE.
7. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS.
8. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON JUNE 11, 2019.
AERIAL WAS COLLECTED ON FEBRUARY 3, 2019.
9. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE
COORDINATE SYSTEM RIPS 3200 (NAD83).
FIGURE 6-9
SITE LAYOUT
DECANTING MONITORING NETWORK
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
Ash Basin Pond
5
Ash Basin Fingers Monitoring
5
MW-2-7
750
Total change in water level
760
Average total change in
level from
No new data collected from
Total change in water level
5
from decanting is
approxlmately -13 feet
ter
decanting is
Lined Retention Basin
Ponds Water due to ash
766
from decanting Is
tel 3.
approxima y - 3 feet
pp
w 748
between decantingtart
s
date and July 28, 2019
4
pp
W 758
approximately -3.0 feet
between decanting start
date
basin access restrictions.
4
co
00
between decanting start date
and November 1, 2019
4
and November 1,
2019
Z 746
Z
;
Z 765
0744
3 V
o 756
3°
v 742
W
10
C
>
W
i0
C
'iii
v 764
W
10
e
y
q
2 Cc
y 754
2 CC
y
29
y 740
y
m
J
J
J 763
0
738
3
1
0
3 752
1
N
m
3
1
736
I I
J,
762
11
I III I I �I IIAL734
0
i
750 0
0
01/01/19 03/01/19 05/01/19 07/01/19 09/01/19 11/01/19
01/01/19 03/01/19 05/01/19 07/01/19 09/01/19 11/01/19
01/01/19 03/01/19 05/01/19 07/01/19 09/01/19 11/01/19
Date
Date
Date
— Lined Retention Basin Ponded Water Elevation (NAVD 88)
— Ash Basin Pond Level Elevation (NAVD 88)
— North of Chemical Pond Ponded Water Elevation (NAVD 88)
— MW-2-7 Water Elevation (NAVD 88)
— West of Chemical Pond Ponded Water Elevation (NAVD 88)
— Pine Hall Road Ponded Water Elevation (NAVD 88)
AB-9 Cluster
GWA-9 Cluster
CCR-11 Cluster
5
Average total change in 9
level from decanting
5
756
5
Water level has dropped
762
water is
appro ma[ely -4.8 feet
754
below 5
transducer, wall is
between decanting start
2753
s
2
nearly dry
date and November 1, 2019
4
W
Average total change In water level
4
Go
4
> 760
0 750
>
from decanting is approximately -3.1
feet between decanting start date
> 752
ZZ
747
and November 1, 2019
Z
Average total change In
water level from decanting
C758
c
C
3 :.
C
0 744
3C
;,,
2 750
is approximately -4.5 feet
between decanting stare
C
i8
j
A
j
date and November 1,
2019
i6
j
N
756
C
ly
to
— 717
10
2�
W 748
rg
2X
i
v
2
>
y 714
i
y
J 754
J
J
y
- 711
d 746
m
3
o 708
3
1
m
3
1
752
1
7os
1744
750
702
ILA
0
01/01/19 03/01/19 05/01/19 07/01/19 09/01/19 11/01/19
0
01/01/19 03/01/19 05/01/19 07/01/19 09/01/19 11/01/19
0
01/01/19 03/01/19 05/01/19 Date 07/01/19 09/01/19 11/01/19
Date
Date
AB-9S Water Elevation (NAVD 88)
— GWA-9S Water Elevation (NAVD 88)
— CCR-11 S Water Elevation (NAVD 88)
AB-9D Water Elevation (NAVD 88)
— GWA-9D Water Elevation (NAVD 88)
— CCR-11 D Water Elevation (NAVD 88)
— AB-9BR Water Elevation (NAVD 88)
GWA-9BR Water Elevation (NAVD 88)
LEGEND
C('DUKE
DRAWN BY: D.AVARD DATE:11/10/2019
FIGURE 6-10a
Notes:
— Ash Pore Water
! ENERGY.
REVISED BY: M.ROZIER DATE:12/03/2019
HYDROGRAPHS — ASH BASIN AND SOUTH f
— Decanting Start (03/2712019) NAVD 88 - North
— Flow
l Zone
CAROLINAS
CHECKED BY: A.ALBERT DATE:12/03/2019
EAST, AND WEST OF ASH BASIN
DeepShallow
— Decanting Suspended (07/29I2019) Dee Flow Groundwater Zone American Vertical
Groundwater Z
APPROVED BY: A.ALBERT DATE:12/03/2019
CORRECTIVE ACTION PLAN UPDATE
Daily Total Rainfall (inches) — Bedrock Flow Groundwater Zone Datum1988
in - inches
PROJECT MANAGER: A.ALBERT
BELEWS CREEK STEAM STATION
synTerra
BELEWS CREEK, NC
www.synterracorp.com
A13-4 Cluster
756
00
W
C
Q
E 755
0
N
W 754
7
N
N
.753
3
752 p
01/01/19 03/01/19 05/01/19 07/01/19 09/01/19 11/01/19 01/01/19 03/01/19 05/01/19 07/01/19 09/01/19 11/01/19 01/01/19 03/01/19 05/01/19 07/01/19 09/01/19 11/01/19
Date Date Date
— A13-4 Lower Ash Water Elevation (NAVD 88) — AB-1 BR Water Elevation (NAVD 88) — AB-2D Water Elevation (NAVD 88)
AB-4 SAP Water Elevation (NAVD 88)
AB-3 D
AB-1BR
5
732
00
4 Go
G 730
>
Q
Z
c 728
3V o
1p v 726
C
'� W
2 > 724
J
m 722
1 3
720
AB-2D
5
723
00
00
0720
Q
z
0 717
w
lu 714
v
J
,711
m
3
708
Average total change in
High variability in water
a ter level from
elevation is a result of
decanting is
the ]AP extraction
approximately -1.7 feet
system pump cycling
between tlecantmg start
date and July 28, 2019.
Restrictetl ash basin
cc
a ss has constrained
transducer data
downloads.
Reduction in water
elevation is a result
of temporary natural
siphoning effect from
IAP extraction well
EX-1.
No new data
collected due to ash
b,,in access
-bons.
5
732
co
4 W
,729
Z
3 ° 726
A >
C N
2 Cc 723
J
0 720
1 3
717
0
5 645
W
4 a0
> 644
z_
c
3 C o
0 > 643
`c
•� lu
2 cd w
v
J
v 642
1 3
0
01/01/19 03/01/19 05/01/19 07/01/19 09/01/19 11/01/19
Date
— AB-31D Water Elevation (NAVD 88)
CCR-6D
Total change In water level from
decanting is approximately -9.6
-
feet between decanting start date
andNovember 1, 2019
4
3V
m
e
29
1
641 0
01/01/19 03/01/19 05/01/19 07/01/19 09/01/19 11/01/19 01/01/19 03/01/19 05/01/19 07/01/19 09/01/19 11/01/19
Date Date
— CCR-613 Water Elevation (NAVD 88) — EX013-1 Water Elevation (NAVD 88)
Total change in water level
from decanting is
approximately -0.84 feet
between decanting start
date and November 1, 2019
EXOB-1
5 744 5
W 741
4 0D
O
i 738
3Vc
0
m 735
c v
•� W
2 m 732
J
N
1 3 729
726
0
Total change in water level from
decanting is approximately -11.4
feet between decanting start data
and November 1, 2019
LEGEND
('DUKE
DRAWN BY: D.AVARD
DATE:11/10/2019
FIGURE 6-10b
— Ash Pore Water
Notes:
ENERGY.
REVISED BY: M.ROZIER
DATE:12/03/2019
HYDROGRAPHS — WITHIN ASH BASIN AND
— Decanting Start (03/2712019)
— Shallow Flow Groundwater Zone
NAVD 88 —
CAROLINAS
NORTH OF ASH BASIN
— Decanting Suspended (07/29/2019)
— Deep Flow Groundwater Zone
North American
CHECKED BY: A. ALBERT
DATE:12/03/2019
Daily Total Rainfall (inches)
Bedrock Flow Groundwater Zone
Vertical Datum
/�
APPROVEDBY: A. ALBERT
DATE: 12/03/2019
CORRECTIVE ACTION PLAN UPDATE
�r
BELEWS CREEK STEAM STATION
in - i
n -nches
SynTerra
PROJECT MANAGER: A. ALBERT
BELEWS CREEK, NC
www.synterracorp.com
EX013-2
5
CCR-2 Cluster
GWA-20 Cluster
750
5
750
5
747
Total change in water
level from decanting is
Average total change in
water level from decanting is
Water level has
decreased below CCR-25
Average total change in
_
approximately -11.3 feet
between decanting start
74]
approximately -6.2 feet
between tlecan[ing start
transducer elevation,
well Is pearl d
Y dry.
W 747
ter level from
decanting is -).9 feet
between decanting start
Go
date and November 1,
4
G
date and November 1, 2019
4
00
date and November 1,
4
744
2019
2019
Z 744
Z
Z 744
0 741
3 V
o
3V
a
3V
741
0
0
0) 741
0),0r
Water level has decreased
W 738
—0
2 N
W
—y
2K
W
y 738
below GWA-209A
transducer elevation, well is
C
738
I
>
nearylry.
J
735
J
0
0
0 735
3
1
3 735
1
0
1
732
I
732
IIII
I�I
732
0J
0
0
01/01/19 03/01/19 05/01/19 07/01/19 09/01/19 11/01/19
01/01/19 03/01/19 05/01/19 07/01/19 09/01/19 11/01/19
01/01/19 03/01/19 05/01/19 07/01/19 09/01/19 11/01/19
Date
Date
Date
— CCR-2S Water Elevation (NAVD 88)
— GWA-20SA Water Elevation (NAVD 88)
— EX013-2 Water Elevation (NAVD 88)
— CCR-213 Water Elevation (NAVD 88)
— GWA-20D Water Elevation (NAVD 88)
GWA-11D
5
GWA-21D
724 5
GWA-27D
747 5
Total change in water level
Total change in water
Total change in water level
]32
00
from decanting is
approximately -9'1 feet
between decanting start
722
level from decanting is
approximately -6.2 feet
between decanting start
%^
]44
from decanting is
approximately -10.2 feet
between decanting start
00
date and November 1, 2019
Q
W
date and November 1,
2D 19
4
y
date and November 1,
2019
4
11
C
G
Z 729
Z 720
i
741
4
3 C
4
3v
4
35
i 726
718
i
0
W
C
0
C
0
4!738
C
w
Z
21
W
0716
Z
2�
W
0
M
J 723
`0
J
735
3 720
1
a
m 714
3
1
01
m
3 732
1
All
712
1 J 1111AL4UL
L, iii a
717 0
0
729 0
01/01/19 03/01/19 05/01/19 07/01/19 09/01/19 11/01/19
01/01/19 03/01/19 05/01/19 07/01/19 09/01/19 11/01/19
01/01/19 03/01/19 05/01/19 07/01/19 09/01/19 11/01/19
Date
Date
Date
— GWA-11 D Water Elevation (NAVD 88)
— GWA-21 D Water Elevation (NAVD 88)
GWA-27D Water Elevation (NAVD 88)
LEGEND
( DUKE
DRAWN BY: D. AVARD DATE: 11/10/2019
Notes:
� ENERGY.
REVISED BY: M. ROZIER DATE: 12/03/2019
FIGURE 6-10c
— Shallow Groundwater Flow Zone
— Decanting Start (03/2712019) NAVD 88
CAROLINAs
HYDROGRAPHS — NORTHWEST OF ASH BASIN
— Dee Flo.
— Decanting Suspended (07/29/2019) D North American
CHECKED BY: A.ALBERT DATE:12/03/2019
CORRECTIVE ACTION PLAN UPDATE
Dail Total Rainfall inches Vertical Datum
Y (inches)
APPROVED BY: A.ALBERT DATE:12/03/2019
BELEWS CREEK STEAM STATION
1988
in - inches
S�/I�TQR,a
PROJECT MANAGER: A.ALBERT
BELEWS CREEK, NC
www.syntermcorp.com
imr
I
I;l0 610
630 Y ` Rg0 �_. 500
600
590—_., 6ti0
0 & o
a. p
>g�
l el
4'.
ry
• 790
ao ,
� 760 'QO � \ �g0
74.
�o �o s?o
� 0
f
66°� ••���
gg0
._„j�tToN LOOP 820
730
790 4�✓ T 11Oti0
7o
LEGEND
- ; 7800
75p
6O# 1 • • I 1
Ili j9�/ � STFgM,,
0
s40� • / ��
870
(� DUKE
ENERGY
CAROLINAS
QNOTES:
COAL PILE
BELEWS
GRAPHIC SCALE I
500 0 500 1,000
(IN FEET)
DRAWN BY: C. WYATT DATE: 11/12/2019
REVISED BY: C. WYATT DATE: 12/16/2019
CHECKED BY: A. ALBERT DATE: 12/16/2019
APPROVED BY: A. ALBERT DATE: 12/16/2019
PROJECT MANAGER: A. ALBERT
>40
740
FIGURE 6-11a
ISOCONCENTRATION MAP
ARSENIC IN DEEP FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
imr
Vo
I
>g�
4'.
•P\NENP��
no
11,0 - )2 710
! O ,
/ 690:1/ '�0 f 760
690
\\
700 , L.�MIDp g10 110
810
7901170
0'YO I
110 v �
�10 oo"
1g0 FpDwFIVSIgo
TFgM
O
I
0
(\ �' • 790 740 ;'60
00
?j0
I
SO
LEGEND
o � �
O
MEMO
J
NOTES:
I�
BELEWS CREEK
)40
�g
O
h�
P
'40
3 (DUKE 500 GRAPHIC SCALE500 1,000
ENERGY
CAROLINAS (IN FEET)
DRAWN BY: C. WYATT DATE: 11/12/2019
REVISED BY: C. WYATT DATE: 12/16/2019
CHECKED BY: A. ALBERT DATE: 12/16/2019
APPROVED BY: A. ALBERT DATE: 12/16/2019
YTem PROJECT MANAGER: A. ALBERT
��r, WWW_ CVIItprrAr,.nr 1_f:nm
FIGURE 6-11b
ISOCONCENTRATION MAP
ARSENIC IN BEDROCK FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
750
730
A10
i
'4p
720
360
'go
680
71 ell
ON
a
4'.
90 ,o
8
--__1 R�✓f���J111tl�1���
720 790 lio0
701,gQ\\,,�1 \l.Pyypp �,t/i �.ry `. 7q0 L71Q
690
`♦ 780 .. I I ' . I I � Q�� . �jg
0
700 8A
`R�\\ON LOOP 820 A
730
820
810
\ '� �
6 � I r
�A60
— rvwl 4, r.i�"
60�• . • . .
Ili 79 // � �STF•9iHa
Q
,,. 840
g30 630 g'20 /•
821
850
g10
860
�g
0
O
�r
(� DUKE
u ENERGY
CAROLINAS
0
BELEWS
RESERVOIR
p800J �:`
'40
740 .
f/ 790 �•
,40
ao
0 I _
74(
GRAPHIC SCALE
500 0 500 1,000
(IN FEET)
DRAWN BY: C. WYATT DATE: 11/12/2019
REVISED BY: C. WYATT DATE: 12/16/2019
CHECKED BY: A. ALBERT DATE: 12/16/2019
APPROVED BY: A. ALBERT DATE: 12/16/2019
PROJECT MANAGER: A. ALBERT
LEGEND
FIGURE 6-12a
ISOCONCENTRATION MAP
BERYLLIUM IN SHALLOW FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
70
0590;f7rot
�°� A 70a,g�,,�i \�Pyypp ���710 °
0 \� L71Q
/ \ B 74
L 8Y0 �O
, vr
111 _.. 690, (-MIDDIETON730
4 /
too 9?0
�A11 I 7
1160
If..
41 0 ,
0 I 720 1AO
♦ > ' �. I LEGEND
6g0 •�/'P V
880
6j0 B60
�s6° l� ✓� Il4 \1 I
6
a
'g0
.:y
6110
STFg4?
}
NOTES:.
(J800J ��
® �40
740 ,
I \Igo
�/'
�>> -- -�"
16
�8
o O
O
P
ems.° �PVVR
It DUKE
DUKE
ENERGY
CAROLINAS
J � Apo
Apo
i A0
740
GRAPHIC SCALE
50C 0 500 1,000
(IN FEET)
DRAWN BY: C. WYATT DATE: 11/12/2019
REVISED BY: C. WYATT DATE: 12/16/2019
CHECKED BY: A. ALBERT DATE: 12/16/2019
APPROVED BY: A. ALBERT DATE: 12/16/2019
PROJECT MANAGER: A. ALBERT
FIGURE 6-12b
ISOCONCENTRATION MAP
BERYLLIUM IN DEEP FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
620
I
sq
610 �►-' 60 �aap ♦ 660 8 1,0 I ) /� \'\ ) \ (
♦ � � B�� 1 , 20 690� � � 780 JB�\\i 870 /
• �� so � ��� (k) � I� o `s'O �6zo ss0 � �' �� ° � ��° � � op♦ >> �"/�J���
` 690 61' 690 ♦ 80 - I • • I I I I _ a� ♦ ,o
MW 200S
GWA-30S GWA-1� szo �So
ei0� I S 62
o 0 610
� CCR-13S GWA-32S
� <50 <50 -� 786♦f�",—BG-1S � It
CCR6S CCR7S '�`°►���i'�♦ 36
GWA-2S / o
GWA-11$ CCR-4S NA 84 J oti
. WA-21S 1338 793 MW-103S <50 7908jo I1
364
i GWA-31S � �, AB -2S
CCR-5S B-3S
a <50 jGWA-27S GWA-20S 10630 51 10510
533
AB-1S
GWA-20SA
, 11176 10240
G
GWA-19SV CCR-2S
WA- 19SA
710 2225 I 7To 6266
GWA-10S GWA-18, GWA-111SA
327 693
( i CCR-28
28
r� GWA 17S
7so t � - - —155
�3o MW-204S
IIO�<50
GWA-16S
<50
�s8 � wir
o � �
� 00✓" M 790
18� O
1°O�Oy
$ MW-203S
<50
g0
610 = GWA-9S
t l U <58 OB-5
aso <50
840 /� I
9793
o — CCR-9S GWA-22S
289 <50
t.CCR-11S C
IPERCHED WATER CONDITIONS OBSERVED IN
HE FIELD SUPPORT THAT THIS LOCATION IS
DISCONNECTED FROM SHALLOW FLOW ZONE
i 900 MW-4
746
o,
1. DATA INCLUDED IN THIS FIGURE ARE THE MEAN OR GEOMEAN RESULTS FOR
WELLS BASED ON THE CENTRAL TENDENCY OF THE DATA SET FROM SAMPLES
BETWEEN JANUARY 2018 AND JUNE 2019. FOR WELLS WITH DATASETS
CONTAINING FEWER THAN FOUR VALID RESULTS, THE MOST RECENT VALID
SAMPLE DATA WAS USED.
2. THE 02L FOR BORON IS 700 ug/L.
3. THE BACKGROUND VALUE FOR BORON IS 50 ug/L (AS SUBMITTED JUNE
2019).
4. GROUNDWATER FLOW AND TRANSPORT BORON PLUME SIMULATION IS
MODIFIED FROM MODEL LAYER 13 (FALTAAND OTHERS, 2019)
5. HYDROLOGIC DIVIDE IDENTIFIED IN CSA UPDATE (SYNTERRA, 2017) AND
UPDATED GROUNDWATER FLOW AND TRANSPORT MODELING REPORT (FALTA
AND OTHERS, 2019).
6. THE WATERS OF THE U.S. DELINEATION HAS NOT BEEN APPROVED BY THE
US ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS
MAP IS NOT TO BE USED FOR JURISDICTIONAL DETERMINATION PURPOSES.
THE WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM STREAM
AND WETLAND DELINEATION CONDUCTED BY AMEC FOSTER WHEELER
ENVIRONMENTAL R INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL
REPORT (NRTR) FOR BELEWS CREEK STEAM STATION DATED JULY 2, 2015.
7. THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLY AND
SHOULD NOT BE USED FOR DESIGN OR ENGINEERING PURPOSES.
TOPOGRAPHY IS BASED ON LIDAR BARE EARTH DATA OBTAINED FROM THE
NORTH CAROL NA SPATIAL DATA SITE AT
https://sdd.nc.gov/sdd/DataDownload/aspx.
8. COAL PILE AND STRUCTRUAL FILL ASSESSMENT ARE ONGOING AND ARE
THEREFORE NOT ADDRESSED IN THE CORRECTIVE ACTION PLAN UPDATE.
9. ALL BOUNDARIES ARE APPROXIMATE
10. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS
11. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON JUNE 11,
2019. AERIAL WAS COLLECTED ON FEBRUARY 3, 2019.
12. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE
PLANE COORDINATE SYSTEM FIPS 3200 (NAD83).
MW 5 °
<50
• I I• I I I I W; I Sao 3W07 so M O-3 (030
0 8�0 1
.<Q ♦ 1 I ♦ 820`
.'
210
Z 9°p a�
m GWA-26S ♦ 'ENP
<50 g0 MW-6 . •PN GWA23S
fj gso MW-1 <50
<50
MW-2
g 8" 6060860 BG-3S
i;l
<50
YD
LINED
RETENTION
BASIN
Lrl�\
1♦
,7go� JI
CP-15
lei
J i/a
69 A 7:
I/
850
g10
`_.,�STFgMp
' <4Nrk
� o
r
BELEWS
STEAM S
(� DUKE
500 ORAPHICSCALE
500 1,000
ENERGY
CAROLINAS
(IN FEET)
DRAWN BY: C. DAVIS
REVISED BY: C. WYATT
DATE: 05/09/2019
DATE: 12/23/2019
CHECKED BY: A. ALBERT
DATE: 12/23/2019
APPROVED BY: A. ALBERT
DATE: 12/23/2019
PROJECT MANAGER: A. ALBERT
LEGEND
ASSESSMENT MONITORING WELL - GREATER THAN
USEPA DRINKING WATER EQUIVALENT LEVEL (4000
Ng/L)
ASSESSMENT MONITORING WELL -GREATER THAN15A
NCAC 2L .0202 STANDARD (700 Ng/L)
ASSESSMENT MONITORING WELL -GREATER THAN
CONSTITUENT BACKGROUND THRESHOLD VALUE (50
Ng/L)
ASSESSMENT MONITORING WELL - LESS THAN
BACKGROUND THRESHOLD VALUE
BACKGROUND MONITORING WELL
WELLABANDONED
STRUCTURAL FILL AND COAL PILE MONITORING WELL
BORON PLUME GREATER THAN THE USEPA DRINKING
WATER EQUIVALENT LEVEL (4000Ng/L) FROM MEAN
ANALYSIS. FLOW AND TRANSPORT MODEL PREDICTED
PLUME IS USED WHERE EMPIRICAL DATA IS NOT
AVAILABLE.
BORON PLUME GREATER THAN NC 02L STANDARD
(700 Ng/L) FROM MEAN ANALYSIS. FLOW AND
TRANSPORT MODEL PREDICTED PLUME IS USED
WHERE EMPIRICAL DATA IS NOTAVAILABLE.
BORON PLUME GREATER THAN BTV (50 Ng/L) FROM
MEAN ANALYSIS. FLOW AND TRANSPORT PREDICTED
PLUME IS USED WHERE EMPIRICAL DATA IS NOT
AVAILABLE.
ASH BASIN WASTE BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
LANDFILL BOUNDARY (CLOSED)
STRUCTURAL FILL BOUNDARY (CLOSED)
LANDFILL COMPLIANCE BOUNDARY
COAL PILE STORAGE AREA
LINED RETENTION BASIN
DUKE ENERGY CAROLINAS PROPERTY LINE
GROUNDWATER FLOW DIRECTION
STREAM (AMEC NRTR)
® WETLAND (AMEC NRTR)
APPROXIMATE HYDROLOGIC DIVIDE
FIGURE 6-13a
ISOCONCENTRATION MAP
BORON IN SHALLOW FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
710
610 660
GI
620 <c
65° GWA-lDj CCR-6C
CCR-13D GWA-30D 1 <50 1 1 1082E
<50 <50
GWA-11D CCR-4D
GWA-21 D 419 6685
// 529 tso M W-101 D
770
a GWA-31D GWA-275EXOB-1 CCf
<50 7663 7845 55
GWA-19D ; GWA-20D AB-1 D
> <50 V 9690 9265
M
710 `� EXOB-2
GWA-10D 8083
GWA-18D
GWA-10DA <50
GW
,50 CCR-1 D
zjo 9z l 1 A 11
I�r GWA-17D
760 51
MW-204D
<5p
GWA-16D
800 GWA-16DA
s8p <50 ,+�
� Bo �'790 +
t el
NOTES:
1. DATA INCLUDED IN THIS FIGURE ARE THE MEAN OR GEOMEAN RESULTS
FOR WELLS BASED ON THE CENTRAL TENDENCY OF THE DATA SET FROM
SAMPLES BETWEEN JANUARY 2018 AND JUNE 2019. FOR WELLS WITH
DATASETS CONTAINING FEWER THAN FOUR VALID RESULTS, THE MOST
RECENT VALID SAMPLE DATA WAS USED.
2. THE 02L FOR BORON IS 700 ug/L.
3. THE BACKGROUND VALUE FOR BORON IS 50 ug/L (AS SUBMITTED JUNE
2019).
4. GROUNDWATER FLOW AND TRANSPORT BORON PLUME SIMULATION IS
MODIFIED FROM MODEL LAYER 15 (FALTAAND OTHERS, 2019).
5. HYDROLOGIC DIVIDE IDENTIFIED IN CSA UPDATE (SYNTERRA, 2017) AND
UPDATED GROUNDWATER FLOW AND TRANSPORT MODELING REPORT (FALTA
AND OTHERS, 2019).
6. THE WATERS OF THE U.S. DELINEATION HAS NOT BEEN APPROVED BY THE
US ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS
MAP IS NOT TO BE USED FOR JURISDICTIONAL DETERMINATION PURPOSES.
THE WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM STREAM
AND WETLAND DELINEATION CONDUCTED BY AMEC FOSTER WHEELER
ENVIRONMENTAL R INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL
REPORT (NRTR) FOR BELEWS CREEK STEAM STATION DATED JULY 2, 2015.
7. THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLY AND
SHOULD NOT BE USED FOR DESIGN OR ENGINEERING PURPOSES.
TOPOGRAPHY IS BASED ON LIDAR BARE EARTH DATA OBTAINED FROM THE
NORTH CAROL NA SPATIAL DATA SITE AT
https://sdd.nc.gov/sdd/DataDownload/aspx.
8. COAL PILE AND STRUCTRUAL FILL ASSESSMENT ARE ONGOING AND ARE
THEREFORE NOT ADDRESSED IN THE CORRECTIVE ACTION PLAN UPDATE.
9. ALL BOUNDARIES ARE APPROXIMATE.
10. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS.
11. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON JUNE
11, 2019. AERIAL WAS COLLECTED ON FEBRUARY 3, 2019.
12. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA
STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83).
V 6g0 v
C��-1
s70 860
7) <50
op N
a
oQM MW-203D
<50
1 �
' ,8O
GWA-9U
<50
°
MW2-1
780
90
24D sso v �o
�88p 7(� MIS°LET�LOOP 82�=
MW 200D % 820 e BG-1D� sto , sso
o
%we
159 ° GWA--32/�=
42 �. � ♦ � // �92
CCR-7D I' I
5148 MW-103D GWA-2D 1 °tio
CCR 8D <50 90 1 ,✓ago , 10017 � ( ��{( •� �
MW-102D 1
CCR-8AD MW-201D I
1 AB-2D AB-3D 9363 Iso <50 G A-22D i1
9552 2836 CCR-9D r/
<50
CCR-11D r . -. . .
r
I wo (P;j 51
�Er.11
�770 CCR-12D�0
I 3`
CCR-12DA GWA-5D
5 -
LRB-2D
60� /
71� `
AB-6D
<50 MW-104D ti
1T� <50 °Ok
P
1 jO BTFq,N
AB-7D°° •���� P�NraO
<50 ,. (l eo i i
�
13600 MW2-4
FOB-9 MW2-9 ..
26233 ( � 292 /�((
.. ♦
828 � I 830
ago /
szo
o
O o
O°
.01
! qh°
GWA-26D aso
<50
830
�a60
s
)I 1 / \ U-1,11 .-
II MW-202D
;s <50
Sao )
GWA-7D
D A <50
V-2D 870 i l aa0o9 ..
i
SF
SFMW-4D
o t�hro
so SFMW-7D
SFMW-3D
'
-6D
80
4DUKE
� ENERGY.
CAROLINAS
n
800
i
'9° 790
CP 5D
2
m
1
740
;4
GRAPHIC SCALE
500 0 500 1,000
(IN FEET)
DRAWN BY: C. DAVIS DATE: 05/09/2019
REVISED BY: C. WYATT DATE: 12/23/2019
CHECKED BY: A. ALBERT DATE: 12/23/2019
APPROVED BY: A. ALBERT DATE: 12/23/2019
PROJECT MANAGER: A. ALBERT
LEGEND
ASSESSMENT MONITORING WELL -GREATER THAN
USEPA DRINKING WATER EQUIVALENT (4000 pg/L)
ASSESSMENT MONITORING WELL -GREATER THAN15A
NCAC 2L .0202 STANDARD (700 pg/L)
ASSESSMENT MONITORING WELL -GREATER THAN
CONSTITUENT BACKGROUND THRESHOLD VALUE (50
Ng/L)
ASSESSMENT MONITORING WELL- LESS THAN
BACKGROUND THRESHOLD VALUE
BACKGROUND MONITORING WELL
WELLABANDONED
STRUCTURAL FILL AND COAL PILE MONITORING WELL
BORON PLUME GREATER THAN THE USEPA DRINKING
WATER EQUIVALENT LEVEL (4000Ng/L) FROM MEAN
ANALYSIS. FLOW AND TRANSPORT MODEL PREDICTED
PLUME IS USED WHERE EMPIRICAL DATA IS NOT
AVAILABLE.
BORON PLUME GREATER THAN NC 02L STANDARD
(700pg/L) FROM MEAN ANALYSIS. FLOW AND
TRANSPORT MODEL PREDICTED PLUME IS USED
WHERE EMPIRICAL DATA IS NOT AVAILABLE.
BORON PLUME GREATER THAN BTV (50pg/L) FROM
MEAN ANALYSIS. FLOW AND TRANSPORT PREDICTED
PLUME IS USED WHERE EMPIRICAL DATA IS NOT
AVAILABLE.
ASH BASIN WASTE BOUNDARY
ASH BASIN COMPLIANCE BOUNDARY
LANDFILL BOUNDARY (CLOSED)
STRUCTURAL FILL BOUNDARY (CLOSED)
LANDFILL COMPLIANCE BOUNDARY
COAL PILE STORAGE AREA
LINED RETENTION BASIN
DUKE ENERGY CAROLINAS PROPERTY LINE
GROUNDWATER FLOW DIRECTION
STREAM (AMEC NRTR)
® WETLAND (AMEC NRTR)
APPROXIMATE HYDROLOGIC DIVIDE
FIGURE 6-13b
ISOCONCENTRATION MAP
BORON IN DEEP FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
l el
c-' 600 —65 660 8, .-.�.1q0 _. �2 �710
670 0 ,�-\\ -._.r 4 0 690�O SI p 780 '
690
GWA52046R-/I\���
LOOP aZ0 810
MW-200BR
CCR-13BR /GW50
A-1BR 156 B>o�•�
<50 0
Boo
I 11( s • ` • ♦ 1 ' r • •• ' - • �`'' , ;No
' 11
♦ 790 T 870 p�0 �-
` ♦� AB-3BR
AB t1
0 - I l` GWA-27BR r - 63 A-20BR 4221BRD 88706R 538 p v I MW-2016R
<50 • AB-1BR AB-2BRD
1 / 760
GWA-19BR �•5630 20
<50
.... . .
o DEEP BEDROCK GROUNDWATER MONITORING WELLS a o
C\�, 4, J AB-1 BIRD, ARAULICALLY LRB-16R
B-2BRD, AB-3BR WELLS ARE HYD
ISOLATED FROM SHALLOWER BEDROCK. <50
i , • ,40�
• �� GWA-16BR GWA-5BR
ao <50
0 GWA-5BR�2j't(�
\� 0,
s8p LRB-213R
ao° � $2 11 d MW 104BRA ;' '
MW-203BR AB-4BR <50 / 7��lw�
♦ <50 AB 46 50
50 �' o 1yo oke s ^ 1so
10 �790 R TF4
• . . ) l 770—� (.. MW-104BR -44"
Q. a
r.
1ao �
9 GWA-9BR Sao AB-9BR Tao �ti
� aso
840 223 AB-9BRD <50 �. 810 . CP-3BR S
<50
0 � 900 \l � � CP-2BR 800 $40.. ♦ Leo "0 790
NOTES:
1. DATA INCLUDED IN THIS FIGURE ARE THE MEAN OR GEOMEAN RESULTS
FOR WELLS BASED ON THE CENTRAL TENDENCY OF THE DATA SET FROM
SAMPLES BETWEEN JANUARY 2018 AND JUNE 2019. FOR WELLS WITH
DATASETS CONTAINING FEWER THAN FOUR VALID RESULTS, THE MOST
RECENT VALID SAMPLE DATA WAS USED.
2. THE 02L FOR BORON IS 700 ug/L.
3. THE BACKGROUND VALUE FOR BORON IS 50 ug/L (AS SUBMITTED JUNE
2019).
4. GROUNDWATER FLOW AND TRANSPORT BORON PLUME IS MODIFIED FROM
MODEL LAYER 17 (FALTA AND OTHERS, 2019)..
5. HYDROLOGIC DIVIDE IDENTIFIED IN CSA UPDATE (SYNTERRA, 2017) AND
UPDATED GROUNDWATER FLOW AND TRANSPORT MODELING REPORT (FALTA
AND OTHERS, 2019).
6. THE WATERS OF THE U.S. DELINEATION HAS NOT BEEN APPROVED BY THE
US ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS
MAP IS NOT TO BE USED FOR JURISDICTIONAL DETERMINATION PURPOSES.
THE WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM STREAM
AND WETLAND DELINEATION CONDUCTED BY AMEC FOSTER WHEELER
ENVIRONMENTAL R INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL
REPORT (NRTR) FOR BELEWS CREEK STEAM STATION DATED JULY 2, 2015.
7. THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLYAND
SHOULD NOT BE USED FOR DESIGN OR ENGINEERING PURPOSES.
TOPOGRAPHY IS BASED ON LIDAR BARE EARTH DATA OBTAINED FROM THE
NORTH CAROL NA SPATIAL DATA SITE AT
https://sdd.nc.gov/sdd/DataDownload/aspx.
8. COAL PILE AND STRUCTRUAL FILL ASSESSMENT ARE ONGOING AND ARE
THEREFORE NOT ADDRESSED IN THE CORRECTIVE ACTION PLAN UPDATE.
9. ALL BOUNDARIES ARE APPROXIMATE.
10. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS.
11. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON JUNE
11, 2019. AERIAL WAS COLLECTED ON FEBRUARY 3, 2019.
12. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA
STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83).
azo
° ♦ 8aa
szo
0
O a00 6p � /n•ab'
90 9 / F��- ♦� 60 ;
D �p�NENp�` 9 SFN
i0
i` ,.
GWA-26BR „• ' Gwi
<50 s0o e
860
�8a0
\ MW 202BR °s0�
<50
1
R
SFMW-2BR
CP-8BR ><0
R �• 190
0 CP-6BR
i
--i V SFMW-4BR
t1 0
�9p0Y FAO
ao
DUKE
ENERGY.
CAROLINAS
am
GRAPHIC SCALE
500 0 500 1,000
(IN FEET)
DRAWN BY: C. DAVIS DATE: 05/09/2019
REVISED BY: C. WYATT DATE: 12/23/2019
CHECKED BY: A. ALBERT DATE: 12/23/2019
APPROVED BY: A. ALBERT DATE: 12/23/2019
PROJECT MANAGER: A. ALBERT
LEGEND
ASSESSMENT MONITORING WELL - GREATER THAN
USEPA DRINKING WATER EQUIVALENT LEVEL (4000
Ng/L)
ASSESSMENT MONITORING WELL- IN EXCEEDANCE
OF 15A NCAC 2L .0202 STANDARD (700 Ng/L)
ASSESSMENT MONITORING WELL -GREATER THAN
CONSTITUENT BACKGROUND THRESHOLD VALUE
(50 Ng/L)
ASSESSMENT MONITORING WELL- WITHIN
STANDARD
BACKGROUND MONITORING WELL
WELLABANDONED
• STRUCTURAL FILL AND COAL PILE MONITORING
WELL
BORON PLUME GREATER THAN THE USEPA
DRINKING WATER EQUIVALENT LEVEL (4000NG/L)
FROM MEAN ANALYSIS. FLOW AND TRANSPORT
MODEL PREDICTED PLUME IS USED WHERE
EMPIRICAL DATA IS NOT AVAILABLE.
BORON PLUME GREATER THAN NC 02L STANDARD
(700 Ng/L) FROM MEAN ANALYSIS. FLOW AND
TRANSPORT MODEL PREDICTED PLUME IS USED
WHERE EMPIRICAL DATA IS NOTAVAILABLE.
BORON PLUME GREATER THAN BTV (50 Ng/L) FROM
MEAN ANALYSIS. FLOW AND TRANSPORT
PREDICTED PLUME IS USED WHERE EMPIRICAL
DATA IS NOT AVAILABLE.
ASH BASIN WASTE BOUNDARY
• • ASH BASIN COMPLIANCE BOUNDARY
LANDFILL BOUNDARY (CLOSED)
STRUCTURAL FILL BOUNDARY (CLOSED)
LANDFILL COMPLIANCE BOUNDARY
COAL PILE STORAGE AREA
LINED RETENTION BASIN
• • DUKE ENERGY CAROLINAS PROPERTY LINE
GROUNDWATER FLOW DIRECTION
�— STREAM (AMEC NRTR)
® WETLAND (AMEC NRTR)
APPROXIMATE HYDROLOGIC DIVIDE
FIGURE 6-13c
ISOCONCENTRATION MAP
BORON BEDROCK FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
I
a
g10
840
820
ppo
�►-' -60 -65° I 660
70
' A � o
0 7'Gr
� GWA-30S
CCR-13S 5.2
i 12.6
GWA-11S
i, GWA-21S 203
GWA-31 S 137 _ p
� 2.7
GWA-27S ` GWA-20S
i 47.4 ,
GWA-19SA ,� ♦
191
i
,o GWA-10SS . GWA-18SA
116 , i 145
'CCR-1S WA-18S
16.8
\ '60 r GWA-17S
I 1.1
• .. GWA-16S
0.78
2 9 204S
8BO n 9°° •
°ro0
6
11,0 )2O I 1
i 780 /
GWA-24S 690 (1( °
\_6zoNA `'�
iao-"/.�\�. �3 r�_.!� - ♦/ ♦-♦ ♦ O♦ k700
Q�P��r�✓�
oa° y/DDLETO �..
NLOOP 820 11\i
MW-200S
BG-1S BG-2S '
4. 25.9 GWA-32S r e°o 7.6 - 310 12.6
49.6
�• CCR-6S CCR-7S '"'�'G�
WA-2S v
NA 82.0 1.5 790 ,✓azo � °�'° ♦
mm�i �mS MW-102S
\ � 06�♦ ♦ 80
o
1
Oa 610
GWA-26S
6.5
MW-2
v-1� .� �13.7
2.2 660
-3S
40
I LEGEND
6 -9S 2 2 A-22S ASSESSMENT MONITORING WELL- GREATER THAN NC
0
02L STANDARD (250mg/L)
^6 ♦ TJo ASSESSMENT MONITORING WELL- GREATER THAN
CCR-11S GWA-3S BACKGROUND THRESHOLD VALUE (19mg/L)
22.0 9 ASSESSMENT MONITORING WELL- LESS THAN
PERCHED WATER CONDITIONS OBSERVED IN 1 '- -_ ♦ ♦ Sao BACKGROUND THRESHOLD VALUE
HE FIELD SUPPORT THAT THIS LOCATION IS LRB-1 S sa BACKGROUND MONITORING WELL
DISCONNECTED FROM SHALLOW FLOW ZONE. + 7/, 1.1 la WELLABANDONED
STRUCTURAL FILLAND COAL PILE MONITORING WELL
CHLORIDE PLUME GREATER THAN NC 02L STANDARD
♦ -
aso 7.5
tVVA-
2.8
E120
Ile
r
/NJ1\
O E■
SFMW-7S
�r
e
�O . O
� VI
O
LkF pOw
L PRSrFgMpt4
BELEWS
RESERVOIR
I -- Q 11 1 -s' \\\ JA '\�` x,A% I I L
8_0 / `-� MW-202S DUKE 500 ORAPHICSCALE
500 1,000
1.4 - fe ENERGY
(IN FEET)
&. o 760 \77p --_ CAROLINAS
DRAWN BY: C. WYATT DATE: 11/12/2019
_ REVISED BY: C..WYATT
ALBE DATE: 12/23/2019
770 �,a 780 ''gO� ��ioo. CHECKED BY: A. ALBERT DATE: 12/23/2019
APPROVED BY: A. ALBERT DATE: 12/23/2019
sO 790 'I6° s)mTerra PROJECT MANVVAGN/E1RV'.S nterracor .com
y A. ALBERT
otio . .
�40
- (250mg/L) FROM MEAN ANALYSIS. FLOW AND
TRANSPORT MODEL PREDICTED PLUME IS USED WHERE
EMPIRICAL DATA IS NOT AVAILABLE.
CHLORIDE PLUME GREATER THAN BTV (19mg/L) FROM
MEAN ANALYSIS. FLOW AND TRANSPORT MODEL
PREDICTED PLUME IS USED WHERE EMPIRICAL DATA IS
NOT AVAILABLE.
ASH BASIN WASTE BOUNDARY
- - - ASH BASIN COMPLIANCE BOUNDARY
LANDFILL BOUNDARY (CLOSED)
STRUCTURAL FILL BOUNDARY (CLOSED)
- - LANDFILL COMPLIANCE BOUNDARY
LINED RETENTION BASIN
COAL PILE STORAGE AREA
- - • DUKE ENERGY CAROLINAS PROPERTY LINE
TOPOGRAPHIC CONTOUR (10' INTERVAL)
GROUNDWATER FLOW DIRECTION
STREAM (AMEC NRTR)
® WETLAND (AMEC NRTR)
APPROXIMATE HYDROLOGIC DIVIDE
NOTES:
1. DATA INCLUDED IN THIS FIGURE ARE THE MEAN OR GEOMEAN RESULTS FOR WELLS
BASED ON THE CENTRAL TENDENCY OF THE DATA SET FROM SAMPLES BETWEEN JANUARY
2018 AND JUNE 2019. FOR WELLS WITH DATASETS CONTAINING FEWER THAN FOUR VALID
RESULTS, THE MOST RECENT VALID SAMPLE DATA WAS USED.
2. THE 02L FOR CHLORIDE IS 250 mg/L.
3. THE BACKGROUND VALUE FOR CHLORIDE IS 19 mg/L (AS SUBMITTED JUNE 2019).
4. GROUNDWATER FLOW AND TRANSPORT CHLORIDE PLUME SIMULATION IS MODIFIED
FROM MODEL LAYER 13 (FALTAAND OTHERS, 2019).
5. HYDROLOGIC DIVIDE IDENTIFIED IN CSA UPDATE (SYNTERRA, 2017 AND UPDATED
GROUNDWATER FLOW AND TRANSPORT MODELING REPORT (FALTA NO OTHERS, 2019).
6. THE WATERS OF THE U.S. DELINEATION HAS NOT BEEN APPROVED BY THE US ARMY
CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS NOT TO BE USED
FOR JURISDICTIONAL DETERMINATION PURPOSES. THE WETLANDS AND STREAMS
BOUNDARIES WERE OBTAINED FROM STREAM AND WETLAND DELINEATION CONDUCTED BY
AMEC FOSTER WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. NATURAL RESOURCE
TECHNICAL REPORT (NRTR) FOR BELEWS CREEK STEAM STATION DATED JULY 2, 2015.
7. THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLY AND SHOULD NOT BE
USED FOR DESIGN OR ENGINEERING PURPOSES. TOPOGRAPHY 13 BASED ON LIDAR BARE
EARTH DATA OBTAINED FROM THE NORTH CAROLINA SPATIAL DATASITE AT
https://sdd.nc.gov/sdd/DataDownload/aspx.
8. COAL PILE AND STRUCTRUAL FILL ASSESSMENT ARE ONGOING AND ARE THEREFORE NOT
ADDRESSED IN THE CORRECTIVE ACTION PLAN UPDATE.
9. ALL BOUNDARIES ARE APPROXIMATE.
10. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS.
11. AERIAL PHOTOGRAPHY OBTAINED FROM GOGGLE EARTH PRO ON JUNE 11, 2019. AERIAL
WAS COLLECTED ON FEBRUARY 3, 2019.
12. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINASTATE PLANE
COORDINATE SYSTEM FIPS 3200 (NAD83).
FIGURE 6-14a
ISOCONCENTRATION MAP
CHLORIDE IN SHALLOW FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
i
I
I
�►-' -60 _
r r 670\� . 690_' " _ >>°`�++ �9° / 780.o\ nC
1`v✓' l Ill ,! \1�j0
GWA-24D y
I
\ � 690
°° 650 700 '/�j y �IDDLETIN Loop 0
I ~ MW-200D BG-1D BG-2D
t� 8,20'
CCR-13D ~ GWA-30D GWA-1D 38.6 GWA-32D - o00 12.2 sto,
• ���� ? 13.5 4.3 89.4 r ...1a° 70.8 ` ♦ • ♦ ' %�% •
h.� I I04 . �f"�♦,�-�-fir rIr♦� /
11
• GWA-215GWA-2D ?gyp /870 ? etio
238 MW-102D MW-1031
I GWA-31 D
i _LJ - MW-101D
• 2.3 � r 720
i ♦A >so 4.9 �� GWA-22D
rt
�10.9
GWA-19D ,� °° ♦,
• + � � - � - ti CCR-9D
3.6 CCR-2D 17.6
GWA-3C
237a,� �CR-11D / 9.7
GWA-10D • 16
• GWA-1ODA GWA-18D ��°°
� 8.4 21.3 � GWA-4D� _
CCR-1 D
' LRB-1 D
2.4
26.5
�O
r GWA-17D CCR-12DA • \
'60 • 1.1 2.3 CCR-12D
> A-16D '�I®
`a GWA-5D
GWA-10.991F
MW-204D
(1.9 LRB-2D j0°
goo/ Z 6.2 • • •
D 0.88 1.4d MW-104D
Y `°q MW-203D AB-4D,; 1io 1.2 ookFp,
3.6 _ Q 3.3 1�. a - 1p0 OtiF 1�0
770
> AB-7D
ff
• 6 6 6 ` AB-8D 1, \,1
0 790 15.6 0o GWA-6D v
GWA-9D > 0 4.9 �40
60
- 5 V (\
-
IL
CP-3D
l
7To 1 CP-2D ,B 800
MW2-7 / - o >90 790
�9 .I •.w 10.1 S . 840,
FOB-9 jOII MW2-9
• 9.9 8?° 3.5 �. / GWA-8D
♦� ♦ 83o 7 83o 5.5Jp���
90 86p 1 820, ♦ !I� 800
( ♦♦ ♦� ♦ A• SFMW-2D CP-SD
f / 0
'4r
BELEWS
RESERVOIR
Z • � ' � • � 9°° g3p �LRD� h0 >40
�
�O �p\NENP` r $ SFMW-5D 190 CP-7D
Bap GWA-26D g8 r �i I r r , r • Q
6 -10.2 .� r % i `` 'do sF !� Aa° o
�. • GWA-23D SFMW-4D U >4
60 9p° S: �i880 -L l�aa Epp
860{`""`7j
g1p 860 e6° GWA-12D .-1 SFMW-3D SFMW-(D ^A°
630 -.... J�E, SFMW-6D °Po
VVV ,SO
740
DUKE 500 ORAPHICSCALE
500 1,000
EENERGY.t BSO 780 ♦ ♦ 770 (IN FEET)
\ CARO
1 4 DRAWN BY: C..WYATT
WYA DATE: 12/23/2019
1 `J 760 ♦ �64 _ REVISED BY: C.. ALBE DATE: 12/23/2019
770 7y0 780 g0� ?60. CHECKED BY: A. ALBERT DATE: 12/23/2019
APPROVED BY: A. ALBERT DATE: 12/23/2019
B0 790 'Ip° °s)mTerra PR1 OJECT MANAGER: A. ALBERT
y www.synterracorp.com
ti° . .
LEGEND
ASSESSMENT MONITORING WELL- GREATER THAN NC
02L STANDARD (250mg/L)
• ASSESSMENT MONITORING WELL- GREATER THAN
BACKGROUND THRESHOLD VALUE (19mg/L)
ASSESSMENT MONITORING WELL- LESS THAN
BACKGROUND THRESHOLD VALUE
BACKGROUND MONITORING WELL
WELLABANDONED
STRUCTURAL FILLAND COAL PILE MONITORING WELL
CHLORIDE PLUME GREATER THAN NC 02L STANDARD
- (250mg/L) FROM MEAN ANALYSIS. FLOW AND
TRANSPORT MODEL PREDICTED PLUME IS USED WHERE
EMPIRICAL DATA IS NOT AVAILABLE.
CHLORIDE PLUME GREATER THAN BTV (19mg/L) FROM
MEAN ANALYSIS. FLOW AND TRANSPORT MODEL
PREDICTED PLUME IS USED WHERE EMPIRICAL DATA IS
NOT AVAILABLE.
ASH BASIN WASTE BOUNDARY
- - - ASH BASIN COMPLIANCE BOUNDARY
LANDFILL BOUNDARY (CLOSED)
STRUCTURAL FILL BOUNDARY (CLOSED)
- - LANDFILL COMPLIANCE BOUNDARY
LINED RETENTION BASIN
COAL PILE STORAGE AREA
- - • DUKE ENERGY CAROLINAS PROPERTY LINE
TOPOGRAPHIC CONTOUR (10' INTERVAL)
GROUNDWATER FLOW DIRECTION
3111 STREAM (AMEC NRTR)
® WETLAND (AMEC NRTR)
APPROXIMATE HYDROLOGIC DIVIDE
NOTES:
1. DATA INCLUDED IN THIS FIGURE ARE THE MEAN OR GEOMEAN RESULTS FOR WELLS
BASED ON THE CENTRAL TENDENCY OF THE DATA SET FROM SAMPLES BETWEEN
JANUARY 2018 AND JUNE 2019. FOR WELLS WITH DATASETS CONTAINING FEWER THAN
FOUR VALID RESULTS, THE MOST RECENT VALID SAMPLE DATA WAS USED.
2. THE 02L FOR CHLORIDE IS 250 mg/L.
3. THE BACKGROUND VALUE FOR CHLORIDE IS 19 mg/L (AS SUBMITTED JUNE 2019).
4. ` - CONSTITUENT CONCENTRATION SHOWN IS THE MOST RECENT VALID SAMPLE
AVAILABLE BETWEEN JANUARY 2018 AND APRIL 2019.
5. GROUNDWATER FLOW AND TRANSPORT CHLORIDE PLUME SIMULATION IS MODIFIED
FROM MODEL LAYER 15 (FALTAAND OTHERS, 2019).
6. HYDROLOGIC DIVIDE IDENTIFIED IN CSA UPDATE (SYNTERRA, 2017) AND UPDATED
GROUNDWATER FLOW AND TRANSPORT MODELING REPORT (FALTAAND OTHERS, 2019).
7. THE WATERS OF THE U.S. DELINEATION HAS NOT BEEN APPROVED BY THE US ARMY
CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS NOT TO BE USED
FOR JURISDICTIONAL DETERMINATION PURPOSES. THE WETLANDS AND STREAMS
BOUNDARIES WERE OBTAINED FROM STREAM AND WETLAND DELINEATION CONDUCTED
BY AMEC FOSTER WHEELER ENVIRONMENTAL& INFRASTRUCTURE, INC. NATURAL
RESOURCE TECHNICAL REPORT (NRTR) FOR BELEWS CREEK STEAM STATION DATED JULY
2, 2015.
8. THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLY AND SHOULD NOT BE
USED FOR DESIGN OR ENGINEERING PURPOSES. TOPOGRAPHY IS BASED ON LIDAR BARE
EARTH DATA OBTAINED FROM THE NORTH CAROLINA SPATIAL DATA SITE AT
https://sdd.nc.gov/sdd/DataDownload/aspx.
9. COAL PILE AND STRUCTRUAL FILL ASSESSMENT ARE ONGOING AND ARE THEREFORE
NOTADDRESSED IN THE CORRECTIVE ACTION PLAN UPDATE.
10. ALL BOUNDARIES ARE APPROXIMATE.
11. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS.
12. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON JUNE 11, 2019.
AERIAL WAS COLLECTED ON FEBRUARY 3, 2019.
13. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE
COORDINATE SYSTEM FIPS 3200 (NAD83).
FIGURE 6-14b
ISOCONCENTRATION MAP
CHLORIDE IN DEEP FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
i
Clm
I
FAO
>g�
o=
A
I °
,yo
6
I 1
� r
U V
8g° n 800
4'.
L
0 I 710
try I ,�0 690
10
♦ I
♦ 610
700 `• LID
AAO
OLETO Wop B20
820- •.
r
,,,'''������ 61 o 1 ° ` 740 60
L7.
`so
0 9
790 91170 t -
t
♦t C♦
LEGEND
lie
t
1 7g Gk P
Ili 6 - oo-� oJ.yF�STFgMa 130 _
NOTES:
\•
• B g00 gZ0\� g30 7 830
1' 620
I • . �. � � ig6� � � � gs j
O �
-60
740
BELEWS CREEK
U ~ �40
/per !� Apo
1
gg
P�
'rho /
P
740
(DUKE 500 ORAPHICSCALE
500 1,000
ENERGY
CAROLINAS (IN FEET)
DRAWN BY: C. WYATT DATE: 11/12/2019
REVISED BY: C. WYATT DATE: 12/23/2019
CHECKED BY: A. ALBERT DATE: 12/23/2019
APPROVED BY: A. ALBERT DATE: 12/23/2019
PROJECT MANAGER: A. ALBERT
FIGURE 6-14c
ISOCONCENTRATION MAP
CHLORIDE IN BEDROCK FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
\m'�
ON
a
780
�MIDDLET {�\\ A10
_ON LOOP ; 2 \l
�s
' I 110 ! 810
O
. t I
8>0 . �-
1 T
�I
(\ �'SAO 790 >90 �60
L74.
i 730
i
I
ell
c LEGEND
i
0
• '4p
1 �_... ..
Z�
� 1 ' • • I 1
t ,
A60- �
8 .-, 100 Dk'F,p 3TFq ' 18°
go f< M'O<gpr
Q. `,./'„/ f✓���f _\�; 1p0 -�`J If. QO ��- NOTES:
. 6A0
. - • • . .. I10
d 870 O b°° ♦ 8 � , - 30
830
`, - yj 850 -WOO'
•860740
® '40
•� 03 O. �Apo
I Q
Igo
O
600 °9° \-i l�aa � 60 .. '1A� �'S# Apo
i $+
g70 860
B3 6p 'sp 16 �V��OP s O • O u ,'1
'40
GRAPHIC SCALE
6p0 DUKE 500 0 500 1,000 FIGURE 6-15a
� ENERGY
ISOCONCENTRATION MAP
CAROLINAS (IN FEET) COBALT IN SHALLOW FLOW ZONE
DRAWNBYc.WYATT.WYA DATE:12/16/2019 CORRECTIVE ACTION PLAN UPDATE
REVISED BY: C. WYATT DATE: 12/16/2019
770 ➢,Q ' 780 'p0 '60. CHECKED BY: A.ALBERT DATE:12/16/2019 BELEWS CREEK STEAM STATION
APPROVED BY: A.ALBERT DATE:12/16/2019 BELEWS CREEK, NORTH CAROLINA
a. 0' PROJECT MANAGER: A. ALBERT
-r
ago
GWA-24D
�590 61'° I 090
1101., 700
GWA-30D 9.0 , 0 064064 D
WA
050 � 0.09 G-1D `0.
• CCR-13D � - -- .
07RCCR-5D CCR-6D
34A-11D =' ? CR4D` / 15.4
1.
2.8 M\
840
° 8°
6
7C
I
GWA-21D
GWA-31D . 0.9 MW-102D
<0.1 192 MW-101D
GWA-27D
9.6 ��
GWA-19D - GWA-2OD AB-1D AB-2D AB-3
34.8 70.2.8
i �•2.9 3�
EXOB-2
GWA-10DA 1 CCR-2D 139
7.5
° GWA-18D
0.12
CCR-1 D
0.78
GWA-17D
'60 0.31
•�--
-.. �.. .. MW-204D
265
GWA-1 GWA-16DA
Sop 0.92
I
690 - � J 780
...iJ; ��o:� p
♦f 8t0
�MIDDLET . 14p �
_ON LOOP 820 _
R-7D i .
BG-2D
820s l BG-1 D
1100
0.49`sto
GW-32D
0.050
CCR-8D
42.6
� GWA-2D
0.31
CCR-8AD l i V 11- MW-201 D 1�
0.81 0.04 -/ K". GWA-221
� <0.1
GWA-3D
CCR-9D 0.1
0.14
CCR-11 D
1.0
GWA- 4 D'
♦! ��
LRB-1 D
• . ccc \\\ 40\
AB-5D
< 0.1
Dq AB-4D
0.09
/-203D
1 1
r ttp �0
GWA-9D ,0
-- 10.18
0.11 �g Zca
CCR-12D 9
.r- LRB-2D
///'''``` GWA-5D' ♦ 1.4
t �
AB-6D 1
<0.1
�� 0 J ram,✓,° MW-104D 1g0 OI.I,F�S7Fq'
AB-7DHa• moo* T9 0.06 44"
0.09
OB-9 1.0� W(() V\T[//
0.36 �. GWA-SD
o ezp - 88p ♦ 880 7 8`�0 0.10 '
♦ 860
830 •, .y,,
.saw♦-� So yo
o
ato -
♦p1NE N
SFMW-iD
10 / GW123D
�- °s0 GWA-12D
• '\ 790 ,.7Q 760
a,o / o
SRO . 5p0 740
Py/
730
�So
LEGEND
I
� ASSESSMENT MONITORING WELL
BACKGROUND MONITORING WELL
WELLABANDONED
STRUCTURAL FILL AND COAL PILE MONITORING
ISOLATED EXCEEDANCE OF BACKGROUND
--- INFERRED BACKGROUND CONTOUR
ASH BASIN WASTE BOUNDARY
- - ASH BASIN COMPLIANCE BOUNDARY
LANDFILL BOUNDARY (CLOSED)
STRUCTURAL FILL BOUNDARY (CLOSED)
LANDFILL COMPLIANCE BOUNDARY
JLINED
RETENTION BASIN
COAL PILE STORAGE AREA
- - DUKE ENERGY CAROLINAS PROPERTY LINE
TOPOGRAPHIC CONTOUR (10' INTERVAL)
GROUNDWATER FLOW DIRECTION
STREAM (AMEC NRTR)
® WETLAND (AMEC NRTR)
MEMO
APPROXIMATE HYDROLOGIC DIVIDE
: GWA-6D
o s1.2 !V(}
CP-3D
♦ /, V CP-2D �Bo " 807 2 1 • s
90
� GWA-7D
0.06
800
CP-SD
IAW�-2D�% pZ0
':1/L9!•I:I:1� (it740 rS77t1'�717►_7tf 'Qo
SFMW-4D
�4
..:.%l1 ° 1Q0
SFMW-3D
) SFMW-7D Ao
0
0
rd�
f' DUKE 500 ORAPHICSCALE
500 1,000
ENERGY
CAROLINAS (IN FEET)
DRAWN BY: C. WYATT DATE: 11/12/2019
REVISED BY: C. WYATT DATE: 12/05/2019
CHECKED BY: A. ALBERT DATE: 12/05/2019
APPROVED BY: A. ALBERT DATE: 12/05/2019
PROJECT MANAGER: A. ALBERT
NOTES
1. DATA INCLUDED IN THIS FIGURE ARE THE MEAN OR GEOMEAN RESULTS FOR
WELLS BASED ON THE CENTRAL TENDENCY OF THE DATA SET FROM SAMPLES
BETWEEN JANUARY 2018 AND JUNE 2019. FOR WELLS WITH DATASETS
CONTAINING FEWER THAN FOUR VALID RESULTS, THE MOST RECENT VALID
SAMPLE DATA WAS USED.
2. THE IMAC FOR COBALT IS 1pg/L.
3. THE BACKGROUND VALUE FOR COBALT IS 2pg/L (AS SUBMITTED JUNE 2019).
4. ` - CONSTITUENT CONCENTRATION SHOWN IS THE MOST RECENT VALID
SAMPLE AVAILABLE BETWEEN JANUARY 2018 AND APRIL 2019.
5. HYDROLOGIC DIVIDE IDENTIFIED IN CSA UPDATE (SYNTERRA, 2017 AND
UPDATED GROUNDWATER FLOW AND TRANSPORT MODELING REPORT (FALTA AND
OTHERS, 2019).
6. THE WATERS OF THE U.S. DELINEATION HAS NOT BEEN APPROVED BY THE US
ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS
NOT TO BE USED FOR JURISDICTIONAL DETERMINATION PURPOSES. THE
WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM STREAM AND
WETLAND DELINEATION CONDUCTED BY AMEC FOSTER WHEELER
ENVIRONMENTAL & INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL
REPORT (NRTR) FOR BELEWS CREEK STEAM STATION DATED JULY 2, 2015.
7. THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLYAND SHOULD
NOT BE USED FOR DESIGN OR ENGINEERING PURPOSES. TOPOGRAPHY IS BASED
ON LIDAR BARE EARTH DATA OBTAINED FROM THE NORTH CAROLINASPATIAL
DATA SITE AT hftps://sdd.nc.gov/sdd/DataDownload/aspx.
8. COAL PILE AND STRUCTRUAL FILL ASSESSMENT ARE ONGOING AND ARE
THEREFORE NOT ADDRESSED IN THE CORRECTIVE ACTION PLAN UPDATE.
9. ALL BOUNDARIES ARE APPROXIMATE
10. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS
11. AERIAL PHOTOGRAPHY OBTAINED FROM GOGGLE EARTH PRO ON JUNE 11,
2019. AERIAL WAS COLLECTED ON FEBRUARY 3, 2019.
12. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE
PLANE COORDINATE SYSTEM RIPS 3200 (NAD83).
FIGURE 6-15b
ISOCONCENTRATION MAP
COBALT IN DEEP FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
\P
I
,4
�610
580 .. 580
. ,.•Y",•�6g0i � 6,y0
�4U
>g�
180
88
°ro0
l- a 110 - p2 110 0
690 690L74.
760 ,0\,��1 \l
�g5p 620 / ` `�'jg0 ��.. i�i T,1.. _, - I I ' • • I � Q\�.� ��0 ('
730
I _ _ goo`
r -
go
690 10j _. ,•/ ' -1 LEGEND
000
'So
1 I
— I U
g6g
00� 1 • • I 1
JI 'I
190
/ ,g
0 owF�STFgM 136
NOTES:
I
I
i1
I
STRUCTURAL
FILL
(CLOSED)
A
DUKE
ENE
i►'
j%
CAR••
v �1A0.
90
740
III1
BELEWS CREEK
'°°
o
a .
GRAPHIC SCALE
500 0 500 1,000
(IN FEET)
DRAWN BY: C. WYATT DATE: 11/12/2019
REVISED BY: C. WYATT DATE: 12/05/2019
CHECKED BY: A. ALBERT DATE: 12/05/2019
APPROVED BY: A. ALBERT DATE: 12/05/2019
PROJECT MANAGER: A. ALBERT
FIGURE 6-16
ISOCONCENTRATION MAP
IRON IN DEEP FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
i
I
..4 -/._- -• Q
I;lO 610 s r►-' -600 I°30 660
63° • 58
0 ° 5J �ti I 690 700
v
C
760 I r •�
7 800 i[k JJ
18� 7680, 790
0
y" it
100 OOQ�
Q i
01
I • • I I 0
0
8810
� / /� °°° �qp0
8577
840
e?p �9U0 - e1
�� I I• • I I- U' Imo`
7 870 , �� �00 8z8 830
830
D E 00
6
�`90 Y��r g°OgJ'
y ••�I •1
-�
-
880
I
860
g70 860
1 i
I v (
'00
000
8p0 �6
yy O�
11° '60
k"
Y,QO ♦ °° L74.
730
O°,I 1 ' • • I 1
P
190 0k'P , 130
do-
�i ♦ ,9� NS7FgMP �
NOTES:
�p0
P
(� DUKE
u ENERGY
CAROLINAS
0
_p696J s �
-.g20
® �40
i 740 ,
�-
J
Ap°
.O
.. 1p0.:... 740
GRAPHIC SCALE
500 0 500 1,000
(IN FEET)
DRAWN BY: C. WYATT DATE: 11/12/2019
REVISED BY: C. WYATT DATE: 12/16/2019
CHECKED BY: A. ALBERT DATE: 12/16/2019
APPROVED BY: A. ALBERT DATE: 12/16/2019
PROJECT MANAGER: A. ALBERT
FIGURE 6-17a
ISOCONCENTRATION MAP
LITHIUM IN SHALLOW FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
i
1;10 610
63g Y ` RgO �_. 580
690 6'Y
p & p
a. p
l el
880
BB° jBB� � T � •��..,
0
gj0 B60 u
BBO
Bap , _ .8330 \
83, ,.
810 /• 790 \� 740
�60
8Y0 AAO ',
� �.
730
I �
s
_ � a'
♦ � � �� • ~ � � �
O
790� '�870 gti I i.
LEGEND
780
—770
701 .
6�-
780
. i
o —
�(
..► ' 8ro
B`5.O g50
Gk
♦.✓ Agg ) (FpOwFa 3rFgMp
� • �Nr
No
as
(� DUKE
ENERGY
CAROLINAS
i
0
(3800J
/ 740 r1�111r
Igo
BELEWS
RESERVOIR
�40
J � Apo
O
h
1Ao 740
GRAPHIC SCALE I
500 0 500 1,000
(IN FEET)
DRAWN BY: C. WYATT DATE: 11/12/2019
REVISED BY: C. WYATT DATE: 12/05/2019
CHECKED BY: A. ALBERT DATE: 12/05/2019
APPROVED BY: A. ALBERT DATE: 12/05/2019
PROJECT MANAGER: A. ALBERT
NOTES:
FIGURE 6-17b
ISOCONCENTRATION MAP
LITHIUM IN DEEP FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
MOW
>g�
Vo
go 0
6S0
/ A j
F
1 28 �. _ -0\ r 0 780790 740 i i
'"^--✓'/ /i����� SS �9 �
♦ g10
)0 � �MIDD
ON LOOP 82
730
S
R,-820 ♦ 0
I 90O ♦ ..� 810
/II
� 71
ag
LEGEND
.. O
• �40
1 �0
I 1 ' • • I 1
t ,
770 9a0 Z* Ov
k
i / Igo FpO6yF i 1ao
< 1
g6 �STFgMa
770
NOTES:
)g0 '8p Q
0
Z -• <I •I g S10 RD
8S0
I
880 �.. g00 . •_g0
1�1
880 I800 S T -�...... 880 1
870 B60
�q0 � 760' ♦ 770
ljVV1 ♦
R ili
illwhilmom"I'lao
pf
A 311HAll
J \(�" 83p 838/•/�
820 �
.y 850
O
0
(� DUKE
u ENERGY
CAROLINAS
Q
p800J �e'
® �40
740 I
Igo
�40
Ap0
'40
GRAPHIC SCALE
500 0 500 1,000
(IN FEET)
DRAWN BY: C. WYATT DATE: 11/12/2019
REVISED BY: C. WYATT DATE: 12/13/2019
CHECKED BY: A. ALBERT DATE: 12/13/2019
APPROVED BY: A. ALBERT DATE: 12/13/2019
PROJECT MANAGER: A. ALBERT
W Ww.svnterracorD.COM
FIGURE 6-18a
ISOCONCENTRATION MAP
MANGANESE IN SHALLOW FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
\P
a
,4
�610
580 5p0
pp
T
1pp� Dy
C,f I • / / I I ` ,?� J
'j8p ppp i
850
p INe6p�
8g� �._ pep
666 I8�
8j0 B60
JAG 790 \ (\r
�p v f 780 s\,e/�,,�iAO 400
'QO L71O
690 :. I J / .J j
690
700
�—� �,�DN LOOP 820 '.
J �� 7 ♦ 820; ♦ � � `r0
1s
86
810 ♦ -
N. _
\7 90
LEGEND
780 I
ppp• . • . .
\
v ' 110 Dv/NF
P
' �� n J 19 / 1g0 DwF�STF,q , 13p
770 NOTES:
44,
�— 060 ' V90
♦ '`' �� �- 830 ♦`y
J f/ 860
V ppp 81p
I I NpdYR ppp ... ,
Q
90
,. 1pp
840
870 WOO
e ♦ /. `,off
O
740
o � /
�60 ✓ \ �, :�So �P\VR
f� DUKE
%I ENERGY
CAROLINAS
� 1Ap
1dp
o '
740
GRAPHIC SCALE I
500 0 500 1,000
(IN FEET)
DRAWN BY: C. WYATT DATE: 11/12/2019
REVISED BY: C. WYATT DATE: 12/05/2019
CHECKED BY: A. ALBERT DATE: 12/05/2019
APPROVED BY: A. ALBERT DATE: 12/05/2019
PROJECT MANAGER: A. ALBERT
FIGURE 6-18b
ISOCONCENTRATION MAP
MANGANESE IN DEEP FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
imr
V o
a
no
� Y
i • � � I � I 9°° � 870 - R
�� • I J /" .P1NER���
6s6 , ♦ /, �
880 °9° �_ 60
880
810 860
I � 830
L
20
690
• I I I I 1
700 g10 AAO
(�MIDDJE-ro" LOOP 820
1160
r� 1 /� "790/ ~ ■. /810
1Ap I�t
j90 ,g0 FpowF�SrFgM
fr
0
r; ♦ 790 r80
t
6,o fir. 7a0
°
T
1 'So
BELEWS
RESERVOIR
IW,
ELEWS CREEK
�0
4
1 y
7 "SO \
R
'40
3 (DUKE 500 GRAPHIC SCALE500 1,000
ENERGY
CAROLINAS (IN FEET)
DRAWN BY: C. WYATT DATE: 11/12/2019
REVISED BY: C. WYATT DATE: 12/05/2019
CHECKED BY: A. ALBERT DATE: 12/05/2019
APPROVED BY: A. ALBERT DATE: 12/05/2019
YTem PROJECT MANAGER: A. ALBERT
��r, WWW-CVIItprrAr,.nr 1-f:nm
FIGURE 6-18c
ISOCONCENTRATION MAP
MANGANESE IN BEDROCK FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
\P
a
>g�
I
I10 6 p30
/ 7A
I, 000
I
I
/
I�
1 �.r
c
'60 /
60��80
780 \l 810 /♦ 790 \� ` 74 �80
♦ 0 O
�. 690 ♦
620
• DD1E7pN L
i
690 1�'°. ��� :, g40 /(-LOOpi0 , -6 \ ; 0
�. / ''lam i� ..... � ♦f.'.♦ � •
— �.�`� .r —mow. —. err♦ ���� �� -I
• � J � V 1111{{{11J���Jh\
M 0 '80 80� . • .
79 ,
it
!o� N % 170
A Fp
0
'j90 R STFq
Mp
'8p _
BELEWS
RESERVOIR
' r �900 840 I�,' ��� •� �80 �y0 8079
i R I g10
870 � ����I�• . �� � � c740�
870 \ ; �� Op �� ♦ - TQ
d �e � e ♦ o ggo azo, � I/ p600J
.go , ♦♦�♦ sso
PINE HALL
'SOROAD LANDFILL 740
_ �y
.�
I� I 1 • •
g60 �I/ • � g30 000 _ � .1p0
I o
880 000 �_ l I
g70 860
o - ;• h"
- P
'40
GRAPHIC SCALE
DUKE 500 goo Aga ! 0 500 1,000
ENERGY
�„p30 b fgs8g1 17B0, , \77p CAROLINAS (IN FEET)
g . Q �—
IV! ' �88 DRAWN BY: C. WYATT DATE: 11/12/2019 26p
REVISED BY: C. WYATT DATE: 12/05/2019
770 )�Q 780 0� �80. CHECKED BY: A. ALBERT DATE: 12/05/2019
APPROVED BY: A. ALBERT DATE: 12/05/2019
160 ,.. Y�w....... PROJECT MANAGER: A. ALBERT
'b
.p www.synterracorp.com
LEGEND
NOTES
FIGURE 6-19a
ISOCONCENTRATION MAP
STRONTIUM IN SHALLOW FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
I
I
�_
o
lio
690
�O 610 -,0 s7 630,� t 000 f 660� C \� \ �'�O ,Bp� 81 �/090 �QO l ,sp
OO y30 5g0 A ..� 62 � '\690 �1 19 ,�� .,J O W
�� 740 v
0 O I 0
• . ' ,' � �� 650 \ • 700 ?,,, ' ` { TTO /
LOOp� B20-82 - p730
v�oi C� `S
- 1100 r Bio
it . ''L IT
.
750
� O - �
v I L 1 780 LEGEND
��
--
760
7 `68
0 47asp `� 000• I • • • I
90 R t
O�
170 0U
o. P k
1y0 A a� 0 - ,g0 FpOlyF� i 130
0 F
_ • I : • • I I ! '0
0 1 • , i'� t \../Jf I / 1 i NraO ;\�_ NOTE
900 010�� `i L3Y(/ �) �11 'TO �8�j90lu79
100 / O
(� 10
,9 ,c740�
870 I I ' • • I I (� Sz0 - / 03p , 630
6
<o I t pep 6 U eoo
� � ♦ 83slo0 � ..
.O _ 740
40
aso
szo
880
880 Ipp1
p �---.� 860
B60
P 740
DUKE GRAPHIC SCALE
pp0 'pa ! 500 0 500 1,000
ENERGY
��.g30 a fey. 8p1 780 . \770 CAROLINAS (IN FEET)
p Q
IV! 76p� ' Epp DRAWN BY: C. WYATT DATE: 11/12/2019
REVISED BY: C. WYATT DATE: 12/05/2019
770 7�0 780 0 'p0. CHECKED BY: A. ALBERT DATE: 12/05/2019
APPROVED BY: A. ALBERT DATE: 12/05/2019
790 �.r .�..r 160 YTwPROJECT MANAGER: A. ALBERT
'b
.y www.synterracorp.com
FIGURE 6-19b
ISOCONCENTRATION MAP
STRONTIUM IN DEEP FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
imr
Clm
I
0
>g�
el"°
' a' ♦ � � ♦ 630 ♦ , 660 I � 110
�►-' 600 , - �p690
690
4 90 �ti ' ° ggO650 700 'f ` �MIDDIET g10 rr
NWop B20
�%� � � R �1 ` \1
820"" �
r 0
" ♦ _ i _ _
1170
Sp
I •
.ao
A
�9p� � � �8p � g°� 1 ' • •
79 ,
1
v
1
Ili 0 - I � BpDwF�STFgMp
), -
0
g30 �� 830 a30
I/ "0 %�
880 °9° 60
8go 18e, r
0 160
880 I I.. �.
l I
830
AAL
0
l� �go� S0 OPO
�P1�R
(� DUKE
u ENERGY
CAROLINAS
a
r
74.
I ,
♦.
BELEWS
RESERVOIR
40
'40
GRAPHIC SCALE
500 0 500 1,000
(IN FEET)
DRAWN BY: C. WYATT DATE: 11/12/2019
REVISED BY: C. WYATT DATE: 12/05/2019
CHECKED BY: A. ALBERT DATE: 12/05/2019
APPROVED BY: A. ALBERT DATE: 12/05/2019
PROJECT MANAGER: A. ALBERT
LEGEND
FIGURE 6-19c
ISOCONCENTRATION MAP
STRONTIUM IN BEDROCK FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
>g�
I
690lio / ,BO >�i �O ♦ � p 790
74 740
I, I 63pI❑ 0 660 p , , 690/�❑ 0l p-.;�/ .J❑ > �1 ♦ ♦.'.. ` 0>0
� �7 >j .Sil �J Y ! � 780 810
AJBG
.' 620 JI❑ ❑ i� E
i
650 700
y�/ MIDp 8 - AAp C
0 !
II y� � 07 6 ;SON LOOP 8Z0730
�1
810
� ❑ "'//l�� 111/// „�... o � �� � � , -
0000
El El
o
� 0
' � ', ❑ it �g
i `�❑ ,6p Q .
0 4>
9pp
790 R
g80 9Ap 880
pro0
a
r
'b
4
L-i
�0
83p 830
86p
g
I
RO�� I pyo
�p\NE
❑ 860 ❑
Gk
19° FPOwFF ,'
(STFq
>40 _.
BELEWS
RESERVOIR
(DUKE 500 ORAPHICSCALE
500 1,000
.g
a
7 � ENERGY N FEET,
J CAROLINAS
DRAWN BY: C. WYATT DATE: 11/12/2019
REVISED BY: C. WYATT DATE: 12/18/2019
CHECKED BY: A. ALBERT DATE: 12/18/2019
APPROVED BY: A. ALBERT DATE: 12/18/2019
PROJECT MANAGER: A. ALBERT
>So
LEGEI
NOTES:
FIGURE 6-20a
ISOCONCENTRATION MAP
TOTAL DISSOLVED SOLIDS
IN SHALLOW FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
0
I
- 4
--0M.
110 '`_ 790 �80
s� 600 I — 9 �O 78aA�BO iV 7q0�
_��<. 690 ,%
F
5g0 0 p �o szp690
G� A 24D 7
Tao
sso 700 � MIDD � 11°
0
yo°N LOOpi�, 730
\\\\\
MW-200D BG-1D BG-2D
GWA-1D 156��� a2o� o00 209 �- 123 ♦��
GWA-30D
CCR-13D i 233 -�-��� o GWA-32D `
I 725�. 116� .. 1A.356 _ .--` . • /.. .. LEGEND
♦ • �`♦' • ,,�� ASSESSMENT MONITORING WELL - GREATER THAN
GWA-2D p �,
4�� f GWA-21 D 55 q90 670 pry NC 02L STANDARD (500mg/L)
468 ie e ASSESSMENT MONITORING WELL- GREATER THAN
11 ..
Q GWA-31 D • R-5D' 0 -
I MW-201D BACKGROUND THRESHOLD VALUE (148mg/L)
104 1
CCC3 :lip . �� T - 99.3 ASSESSMENT MONITORING WELL- LESS THAN 6a
GWA-22D l
BACKGROUND THRESHOLD VALUE
GWA-19D I',� ❑ ❑ CCR150 146 JUVVA-JDI
BACKGROUND MONITORING WELL
<250 F'
�gq ie WELLABANDONED
i776 ' CCR-2D %
1 GWA-10DA 477 STRUCTURAL FILL AND COAL PILE MONITORING
WELL
` 4 IS l j ; 128 GWA-18D pp TDS PLUME GREATER THAN NC 02L STANDARD
J� GWA-10D <250 GWA-4D LRB 1 D
128 TRANSPORT
FROM MEAN ANALYSIS. FLOW AND
CCR-1 D ® ® —TRANSPORT MODEL PREDICTED PLUME IS USED
155 . 1 WHERE EMPIRICAL DATA IS NOT AVAILABLE.
I I r
GWA-176
6p - � 100
GWA-16DA
<250 0 MW-204D —
<250
C GWA-16
'00� 1790 �00 —�+..�
16p
°q MW-203D
+ 94.8
I
0
GWA-9D
C 9 <250
AB-5D <250
<250 1
AB-4D
172 o
o AB-7D
<250
AB-8D
<250 so
110 '9p
�80
AB-9D 780
/\ 205
0
0
4v
! \ GWA
l MW2-9 �: <250
. • . . 1 a'` -e ♦ - GWA-8D J
820
90 , �♦ J.
• _
IC
g8o �-p1NEH SFMW-iD
IeGWA-26D -
- GWA-23D
l�aa � g60
860 GWA-12D .�
\I
8110
7 //�� ///�J1^'/� 9 880 �• JG:.. SFMW-6D o �
LRB-2D
GWA ' � 135
MW MW-104D
109 0
LkP
79 / .1gp a°N,F�SrFq'Ha 130
o NrRO
A
GWA-6D \U v
<250 �A
QQQ �o
�CP-3D
CP-2D 800
ao "o 790 1Ap
\ O
.fl
800
CP-5D
g7,0
�40
740
SFMW 4D 1� 7ijqre^"j)� • U �40
SFMW-7D 1
1 A0
�GRAPHIC SCALE
DUKE 500 0 500 1,000
ENERGY
90 070\ 830 b BSO801 17B0, ♦ \77p CAROLINAS (IN FEET)
V ♦ DRAWN BY: C. WYATT DATE: 11/12/2019
_ REVISED BY: C. WYATT DATE: 12/23/2019
�(j 9ou � � >so • �0q
770 y�Q 700 d@�i e �00. 10 APPROVED BY: A. CHECKED BY: A. ALBERT DATE: 12/23/2019
.__ PROJECT MANAGER: ALBERT DATE: 12/23/2019
ERT
_
TDS PLUME GREATER THAN BTV (148mg/L) FROM
MEAN ANALYSIS. FLOW AND TRANSPORT MODEL
PREDICTED PLUME IS USED WHERE EMPIRICAL
DATA IS NOT AVAILABLE.
ASH BASIN WASTE BOUNDARY
- • ASH BASIN COMPLIANCE BOUNDARY
LANDFILL BOUNDARY (CLOSED)
STRUCTURAL FILL BOUNDARY (CLOSED)
LANDFILL COMPLIANCE BOUNDARY
LINED RETENTION BASIN
COAL PILE STORAGE AREA
- - DUKE ENERGY CAROLINAS PROPERTY LINE
TOPOGRAPHIC CONTOUR (10' INTERVAL)
GROUNDWATER FLOW DIRECTION
STREAM (AMEC NRTR)
WETLAND (AMEC NRTR)
APPROXIMATE HYDROLOGIC DIVIDE
NOTES:
1. DATA INCLUDED IN THIS FIGURE ARE THE MEAN OR GEOM EAN RESULTS FOR WELLS
BASED ON THE CENTRAL TENDENCY OF THE DATA SET FROM SAMPLES BETWEEN JANUARY
2018 AND JUNE 2019. FOR WELLS WITH DATASETS CONTAINING FEWER THAN FOUR VALID
RESULTS, THE MOST RECENT VALID SAMPLE DATA WAS USED.
2. THE 02L FOR TOTAL DISSOLVED SOLIDS IS 500 mg/L.
3. THE BACKGROUND VALUE FOR TOTAL DISSOLVED SOLIDS IS 148 mg/L (AS SUBMITTED
JUNE 2019).
4.' - CONSTITUENT CONCENTRATION SHOWN IS THE MOST RECENT VALID SAMPLE
AVAILABLE BETWEEN JANUARY 2018 AND APRIL 2019.
5. GROUNDWATER FLOW AND TRANSPORT TDS PLUME SIMULATION IS MODIFIED FROM
MODEL LAYER 15 (FALTAAND OTHERS, 2019).
6. HYDROLOGIC DIVIDE IDENTIFIED IN CSA UPDATE (SYNTERRA, 2017 AND UPDATED
GROUNDWATER FLOW AND TRANSPORT MODELING REPORT (FALTA NO OTHERS, 2019).
7. THE WATERS OF THE U.S. DELINEATION HAS NOT BEEN APPROVED BY THE US ARMY
CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS NOT TO BE USED
FOR JURISDICTIONAL DETERMINATION PURPOSES. THE WETLANDS AND STREAMS
BOUNDARIES WERE OBTAINED FROM STREAM AND WETLAND DELINEATION CONDUCTED BY
AMEC FOSTER WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. NATURAL RESOURCE
TECHNICAL REPORT (NRTR) FOR BELEWS CREEK STEAM STATION DATED JULY 2, 2015.
8. THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLY AND SHOULD NOT BE
USED FOR DESIGN OR ENGINEERING PURPOSES. TOPOGRAPHY IS BASED ON LIDAR BARE
EARTH DATA OBTAINED FROM THE NORTH CAROLINA SPATIAL DATASITE AT
https://sdd.nc.gov/sdd/DataDownload/aspx.
9. COAL PILE AND STRUCTRUAL FILL ASSESSMENT ARE ONGOING AND ARE THEREFORE NOT
ADDRESSED IN THE CORRECTIVE ACTION PLAN UPDATE.
10. ALL BOUNDARIES ARE APPROXIMATE.
11. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS.
12. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON JUNE 11, 2019. AERIAL
WAS COLLECTED ON FEBRUARY 3, 2019.
13. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINASTATE PLANE
COORDINATE SYSTEM FIPS 3200 (NAD83).
FIGURE 6-20b
ISOCONCENTRATION MAP
TOTAL DISSOLVED SOLIDS
IN DEEP FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
i
Ir
14m
I
�0 610 ~. •a
~_ s
630 • ` 580 5a0
690
0 & O
a. p
Ig�
R
rro= rs —630660 `�
6�'O I 89
/ 660
A7 i
/
I \
.p
770
c
760
I r �
1,30 - �a
800 ,
90 /
O� M , �1790
l"! V6g6
gg0 n 000 _
4'.
11,0 - )2 710
690
0
700
\� (-MIDD-Ory LOOP 820 1 810 i
820 ��♦.
r
6Q ♦ 1-♦�► --fir+• ` ,ram ,�I
.,90 70 +'
ASH BASIN
,gJo 830 7 830 l
1- • _. 860 62U
_ g
860
9°
g80 r , �r p\NE
o
(� DUKE
u ENERGY
CAROLINAS
STFgMa
790 740 ?60
V1. A 61 o/0 L..f..
i
r
BELEWS
RESERVOIR ����
jOv 'Q0
F Ad0
� a
I: 3d0. '40
GRAPHIC SCALE
500 0 500 1,000
(IN FEET)
DRAWN BY: C. WYATT DATE: 11/12/2019
REVISED BY: C. WYATT DATE: 12/23/2019
CHECKED BY: A. ALBERT DATE: 12/23/2019
APPROVED BY: A. ALBERT DATE: 12/23/2019
PROJECT MANAGER: A. ALBERT
FIGURE 6-20c
ISOCONCENTRATION MAP
TOTAL DISSOLVED SOLIDS
IN BEDROCK FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
\P
I
I;lo 610
63p Y ` 580 560
690 6'Y
p & o
a. p
r
650
4
pp0
o
4p
A70
690
j:
- p 710
- 20 690 :� � � � � f 760
♦ f g10
-MIDDIET ` AAo
_ON LOOP 820 `�
810
.r
8z0 630 030
820
g10 •��1. RDA' • e`'° .i1��v
p\N
a , o00
_
GkP
�' " , 1g0 PDlyF�s .i A30
'-/App TFgMp�N
k"
O C\
610
800
6Ap
v ,8
O
)&o
I'�}
(� DUKE
ENERGY
CAROLINAS
790 ,60
� 730
"j 40 V
810
800 S
�90 790 Apo
l
740
BELEWS CREEK
J C> pp
V 1
App
h�
740
GRAPHIC SCALE I
500 0 500 1,000
(IN FEET)
DRAWN BY: C. WYATT DATE: 11/12/2019
REVISED BY: C. WYATT DATE: 12/05/2019
CHECKED BY: A. ALBERT DATE: 12/05/2019
APPROVED BY: A. ALBERT DATE: 12/05/2019
PROJECT MANAGER: A. ALBERT
LEGEND
NOTES
FIGURE 6-21a
ISOCONCENTRATION MAP
THALLIUM IN SHALLOW FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
i
I
I;lo 610
630 Y ` RgO �_. 580
690 6'Y
p & p
a. p
g80
880 �._ a9p
880 I8f
8j0 B60
Jf/
r G
83n 1 � 1 n
780 �Bo\ �1 \l 81o/• L..�90 �.ry �QO L71�
8Y0 AAO ',
DD1ET0 / 0-.
820 � �� ♦ .,i 'SO
860
♦ � � `�� • ~ � � � � fey ��J'
710 `"�"L✓ 8 °�°
'1p° ^ • 78�
LEGEND
83p 7 oD0 �/•
'0
836 % A•y.
•DIY ` �" i" _.Li.. s_ O
O
860
�P
00 (n DUKE
ENERGY
e J-� CAROLINAS
1y0 FpOb%F
'j9l �STF-14,
0
(3800J
r
740 .�WIIIr
1 \Igo
BELEWS �///I
RESERVOIR
�40
J � Aao
Apo
740
GRAPHIC SCALE
500 0 500 1,000
(IN FEET)
DRAWN BY: C. WYATT DATE: 11/12/2019
REVISED BY: C. WYATT DATE: 12/05/2019
CHECKED BY: A. ALBERT DATE: 12/05/2019
APPROVED BY: A. ALBERT DATE: 12/05/2019
PROJECT MANAGER: A. ALBERT
FIGURE 6-21b
ISOCONCENTRATION MAP
THALLIUM IN DEEP FLOW ZONE
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
900
800
700
Z
0500
H
J 400
W
300
200
100
g -a -- Bt
(WEST) (EAST)
COMPLIANCE
BOUNDARY
PARCEL
I_ J IQ
- III
I n
ACCELERATED
REMEDIATION
EXTRACTION BELEWS CREEK ASH BASIN DAM
SYSTEM u
COMPLIANCE
BOUNDARY
I
I<
rc
I�
GW/4t9D /�I ITDS I 922 _ a _ .�..-
\ GWA-27BR Li 70 SIB-2BR
♦ / ♦ �/ / B 2836\/ / / \.`� ♦/ / \ ♦// / GWA-225 \- /
i \ / I / \ / / \ B <sO / \ / GWA-20BR ! \TDS 864 �B 5630 \ \Li fi / / \ I / \ B 8870 d 292 \ / \ 1 / Li 60 I /� i \ / I \ I \ / \ / I / \ / \ /�{� \ / \ / I / \ / \ I / \ / \`Li 74 V I \ / \ / \
\ / .cl _ \ / ♦ B 63 / . /- _ - 'd 3aa \ \ . \ / \ / - \ \ \ / \ / - / - \ \ / . / - _ \ / . / - \ \ / \ / - . / - \ \ / . / - ' ` \ / \' \ \B <50 - \'
.d a\I / \I — IrDS 9ta / \I ♦-.� ,d atD -Li t98 — I ♦ ,rss 773 \ /— I \ / / \I \ /— I \ / - \ /— I \ / -BEDROCK ✓i— 7DS 727 / \I ♦ /— / \I
/1 \/\ .Li /d 27 \ /1 V\ Li 93 �\ \ _ /1 \ \/\ /1/\ /1 \ !jl \/\ / I /1 \/d 2 \
/ 704 TDS 720.8 / / /- / / / / / / / /
\ `-- \ TDS 7z3 \-- \ TDS tt00 \ ` — \ / ♦-- \ / 1' ♦ / 1' \ — \ / 1' ♦ — \ / \ Li /
��I/\/l \/ I / / l� \ l / l / \/I/\/I/ // /\///I/\///I/\//\/ /\/ / \
rss 4250I \ I TDs <250 \ I \ / \ rss
A&2BRD
B 422 / B TO
//I `_ \ \\ /I — \\ i /I \ _-\?\♦ BEDROCK /I `_ Li - \\ i / I / \ / \\ /I — \\ \� /I `\ ` \ \\ /I — \\/ i �Ij\ / \♦ /I — \\/ i / I / ` / \� /I / \\ i /I / \_ \ \\ /I —, \ 7
TDS
GENERALIZED
GROUNDWATER FLOW
DIRECTION TO THE
NORTH
LEGEND
NOTES:
1. ALL CONCENTRATIONS SHOWN ARE STATISTICAL MEAN OR GEOMEAN CALCUALTED BASED ON
CENTRALTENDANCY OF DATASET USING DATA RANGING FROM JANUARY 2018 TO APRIL 2019.
2. BORON (B) AND LITHIUM (Li) CONCENTRATIONS ARE IN MICROGRAMS PER LITER (Ng/L)
3. CHLORIDE (CI) AND TOTAL DISSOLVED SOLIDS (TDS) CONCENTRATIONS ARE IN MILLIGRAMS
PER LITER (mg/L)
4. NO MEAN ANALYSIS FOR BEDROCK WELLS (GWA-27BR, AB-113RD, AB-2BRD AND AB-3BRD) FOR
CONSTITUENTS; CHLORIDE AND TOTAL DISSOLVED SOLIDS
AB 9S
WELL IN S HALLOW/SAPRO LITE ZONE
V
ASH PORE WATER FLOW LAYER NO DATA AVAILABLE
WATER LEVEL ELEVATION
AB 9D
WELL IN DEEP/TRANSITION ZONE
ANALYTICAL PARAMETER B
Cl Li TDS
AB 9BR
WELL IN COMPETENT BEDROCK
SHALLOW/SAPROLITE FLOW ZONE
GROUNDWATER LEVEL ELEVATION REPORTING UNITS Ng/L
mg/L Ng/L mg/L
AB 4S
WELL IN ASH PORE WATER
15A NCAC 02L STANDARD 700
250 NE 500
.
DEEP/TRANSITION ZONE FLOW ZONE
BACKGROUND THRESHOLD VALUE
GENERALIZED WATER TABLE
GROUNDWATER LEVEL ELEVATION 50
19 2 93
BEDROCK FRACTURE
(SHALLOW FLOW ZONE)'
BEDROCK FLOW ZONE GROUNDWATER BACKGROUND THRESHOLD VALUE
ORIENTATION
50
LEVEL ELEVATION (DEEP FLOW ZONE)'
19 95 134
FILL
MEAN BORON B CONCENTRATION L BACKGROUND THRESHOLD VALUE
( ) (R S0
3 30 181
SAPROLITE
p
<50
S
MEAN CHLORIDE (CI) CONCENTRATION (mg/L) (BEDROCK FLOW ZONE)'
TDS
+n
MEAN TOTAL DISSOLVED SOLIDS (TDS) 'BACKGROUND THRESHOLD VALUES WERE CALCULATED
USING DATA FROM BACKGROUND
®
WEATHERED ROCK
CONCENTRATION (mg/L) GROUNDWATER SAMPLES COLLECTED MAY 2015 TO DECEMBER 2018 AS SUBMITTED IN JUNE
2019.
BEDROCK
DUKEHORIZONTAL
0 125 250 500
SCALE: 1" = 500'
FIGURE 6-22a
WELL SCREEN
4nENERGY
5XVERTICAL SCALE:1 =200'
VERTICAL EXAGGERATION
GENERAL CROSS SECTION
ASH BASIN - CONSERVATIVE C
COMPLIANCE
CAROLINAS
DRAWN BY: C. BRUCE DATE: 08/01/2019
MEAN OF BORON, CHLORIDE, LITHIUM
BOUNDARY
/ _
REVISED BY: C. BRUCE DATE: 11/15/2019
DISSOLVED SOLIDS
900
800
700
600
Z
5000
H
400 J
W
300
200
100
CROSS SECTION LOCATION
g --a -- B1
(WEST) (EAST)
COMPLIANCE
BOUNDARY
COMPLIANCE
BOUNDARY ACCELERATED
EXTRACTION PARCEL SYSTEM BELEWS CREEK ASH BASIN DAM
lz
L L �L O
w w w
a o
CCR-4S o 0 o G O m
900 GWA I9SA fA p m GWA 20SA I o (A C m As 1.3 a rc N N I¢
Q Q Q As 6.1 N N N 1AB.7S
� N .. , im
As
SB07C7 O NNNIVAs07
m m m m w�LL
Y N
U m Oa800 �
3 -a
0
Sr 32
NA�Q NNQ
U TI 0.7 SAPROLITE U C7 U BELEWS
- FILL - RESERVOIR
SApROLITE Be <0.1 AB -IS
As 3.9 ��
700 / - " Gwh27S / - _ \ / - \ Sr Be O7 As 1.0 CCR�S A-2D TRANSITION ZONE - \ \ ` /I \\i hs 0.1 IGWA-22S
GWA-09BR GWh27D \ I I GWA-ZOD I ♦ DTI <0.1 Sr 680 Be 0.1 ' pe 0.6 3.3 _ / \ \ / \ / \ I / 1 \ / / \ I \ / \ / \ I / 1 \ / ♦ / <0.1 \ / I / I <0.1 'I \ 1
' 1 As 0.3 As 2A / _ _ _
/ r2-2
- Sr 666 / \ / 1 / , \ / 1 / GWA-22D ,
2.5 ;I /� As 4.1 EXOB-1 ✓ /\ \ DTI 0.3 1_ _ _ _ CCB-8AD /` ♦ \ - \ / /�-- \ �\-'Sr 62 \ / /� 0. <0.1 J�-_AsL87
00 \ \ / i '\ n a✓ /sr \ l sr 2a \ / I / \ / / / \ / I / \ / / /�-- \ / I / \ TI <0.1 / \ /I se 32 Be 1.5 \ z5/ \ I I \ / \ l i \ I \ l I \ l \ I . sr 42AB-0BR \ - / _ AB-30TI 02 �\ / I / As 3.3 rB. >600 1 n <0.1 oA TI 02 / 797 \ \ { / \ ^T� / \ / \ / 1 /\-/Ag.26R Be ._\_a
/ \ I Sr.As 1.0 \ / I �' � /1 \ /1\/♦ /1 \ \ /1�\/�/ TI [a1 / 15 Sr CCR-8D / - / - /\ \ - \ / ' As \ \ - 1 ' / - ��1 ��� \ - \ ' ' /1 \ ' TI
/ `, GwA2oert \ I eo 1 Be 0.1 sr s90 \- I Be os Be [0.1 TI oz \ ns o _ \ . / �/ �� \ \ \ / {-• T~ _
-/ y� / -/ \ /// -/ \ / _ -/ B.
Z •/ GWA-190 \ / I / \ \ / I i \ i Sr 824 i\ - I i \ /� / /
_\TI OA _ \ / - \ .Sr 1680 -Sr 436 \ i / = 0.3 - \ i / - \ \ / - \ / \ / - \ i \ i
I -\ \ \ �/ - _�J \ �/ -
h%_- I \ \I/71 co.1 - �� / \I \�L- -BEDROCK ✓�-
Z As 15 02 /
05001
/Sr
Ti
W \�-
J 400 ;//I / \` \ �\` /I / \\ ` \`//I / \`�\` BEDROCK �\\//I / \ i\� /I / \\ \ i\\//I \\ \� /I / \\ i\�//I \\ ♦ \\ /I \\ i\�//I / \\ \� /I / \\ \�iK\\ \\ /I / \\ i\�//I \\ ♦ \� /I / \\ i\�//I \\ ♦ \� /1 -, //I / \\� /�~ i\�//I \\ ♦ \.
W \ I/1\ /-/\I I -/\I I/1\ /-/\I I\ /- \I I/1\ -/\I I/1\ /-/\I I/1\ /-/\I I/1\ /-/\I I/1\ /-
300,1♦/\/\I/1\//\I/1\/\/\I/1\//\I/1\/\/\I/1\/�/\I/1\/\/\I/1\/-i.I\/�/\lip\//\I/1\/\/\I/1\//\I/1\/\/\I/1\//\I/1\/\/\I/1\//\I/1\/\/\I/1\/�/\I/1\/\/\I/1\/\/\I/1\/\/\I
GENERALIZED
DIRECTION GROUNDWATER W TO
DI \\ i\�//1 \\ /\� /1 / \\ i\�//I \\ /\� /1 / \\ i\�//1 \\ /\� /I / \\ i\�//I \\ /\� /1 / \\ i\�//I
NORTH
200 /
\2`.-\ \ li-\�1%-7\ \ li-\�\ l�`.-\ -1 /-\�\ l-� 1 /. -\ 1 -7\ .- -\
NOTES:
100 1. ALL CONCENTRATIONS SHOWN ARE STATISTICAL MEAN OR GEOMEAN CALCUALTED BASED ON
CENTRAL TENDANCY OF DATASET USING DATA RANGING FROM JANUARY 2018 TO APRIL 2019.
2. ALL CONCENTRATIONS ARE IN MICROGRAMS PER LITER (pg/L)
3. NO MEAN ANALYSIS FOR BEDROCK WELLS (GWA-27BR, AB-113RD, AB-213RD AND AB-313RD) FOR
CONSTITUENTS; ARESNIC (As), BERYLLIUM (Be), STRONTIUM (Sr) AND THALLIUM (TI)
LEGEND
AB 9S WELL IN SHALLOW/SAPROLITE ZONE
AB 9D WELL IN DEEP/TRANSITION ZONE
AB 9BR WELL IN COMPETENT BEDROCK
AB 4S WELL IN ASH PORE WATER
V GENERALIZED WATER TABLE
BEDROCK FRACTURE
ORIENTATION
FILL
0 SAPROLITE
® WEATHERED ROCK
BEDROCK
WELL SCREEN
COMPLIANCE
BOUNDARY
V ASH PORE WATER FLOW LAYER
WATER LEVEL ELEVATION
SHALLOW/SAPROLITE FLOW ZONE
GROUNDWATER LEVEL ELEVATION
V DEEP/TRANSITION ZONE FLOW ZONE
GROUNDWATER LEVEL ELEVATION
BEDROCK FLOW ZONE GROUNDWATER
LEVEL ELEVATION
f
D o.5 MEAN ARSENIC (As) CONCENTRATION (pg/L)
o3 MEAN BERYLLIUM (Be) CONCENTRATION (pg/L)
-MEAN STRONTIUM (Sr) CONCENTRATION (pg/L)
o.1 MEAN THALLIUM (TI) CONCENTRATION (pg/L)
- NO DATA AVAILABLE
ANALYTICAL PARAMETER As Be Sr TI
REPORTING UNITS pg/L pg/L pg/L pg/L
15A NCAC 02LSTANDARD 10 4* NE 0.2*
BACKGROUND THRESHOLD VALUE 1 0.3 46 0.2
(SHALLOW FLOW ZONE)'
BACKGROUND THRESHOLD VALUE 1 0.1 73 0.2
(DEEP FLOW ZONE)'
BACKGROUND THRESHOLD VALUE 2 0.2 99 0.1
(BEDROCK FLOW ZONE)'
- INTERIM MAXIMUM ALLOWABLE CONCENTRATIONS (IMACs) OFTHE 15A NCAC 02LSTANDARD
APPENDIX 1, APRIL 1, 2013.
'BACKGROUND THRESHOLD VALUES WERE CALCULATED USING DATA FROM BACKGROUND
GROUNDWATER SAMPLES COLLECTED MAY 2015 TO DEC EMBER 2018 AS SUBMITTED IN JUNE
2019,
900
800
700
00
co
600 >
Q
Z
Z
5000
Lu
400 J
W
300
200
100
CROSS SECTION LOCATION
900
800
700
00
IO
Q600
Z
Z
0500
Q
J 400
W
300
200
100
g -a -- BF
(WEST) (EAST)
III
COMPLIANCE
BOUNDARY
PARCEL IQ
/II
IO
ACCELERATED
REMEDIATION
EXTRACTION BELEWS CREEK ASH BASIN DAM
SYSTEM u
COMPLIANCE
BOUNDARY
I
I
Io
♦ I ♦ / \ I \ /_ I l� 1 slss / \ ; '
IF. 2400 \/ -♦ \/ �\ / / I ra s+ /\ -1 /- - ♦/ / \ I \/ \/ -\— 1'%/I �/- 1♦/�/ -�\/ '\ �I / T\ /\/ --- � - /7 I /-1- \/ `/ -\ \/ '\ /I -/ '//\ \/ -\— 1'/I /-1/ \/ / \ /I - \/ \/_ -\— 1'/I /-�/7 am
m/ \i l\i Mh +zz0ozw,llr-ms; = 'i\— /I /\ / \— /I /-1•/�
w„ s� /I \♦ / \ _ ♦ /I \ 2+ \ / ♦ / �_\ ♦ / — ♦ /I / ��� \ — _ . I ♦ ♦ / / / ♦ / ♦ / — ♦ /I / ♦ ♦ / ♦ / — _ ?JI \ / ♦ ♦ / \ / — -BEDROCK ✓i ♦ / \ / — — ♦ /I �/ ♦ / \ / — — \ /I
\/\I/F• /\/ \I/1\/\/\�l1 \ \I/1♦/\/\/1 \ I wssa/n6 /♦/1/ \/\I/1\/ 1 1♦/\/\/1 \/\I/1\/\'I/1♦/\..��/�\/\I/1\/\/\/1/�\/\I/ ♦/\/\
F.
♦/\/\I/1//\/\I 1♦/\/\I/1i\�il/1♦/\/ca �\ \I/1♦/\/�I/�\/— \I ,r'F.
/\I/1♦ \/ /\I ♦/ I ♦/ /\I ♦/ I ♦/ /\I ♦/ I ♦/ /\I ♦/ I ♦/ /\ ♦/ I ♦/ /\I
/ i l \ / I / \ i l \\/ I / \♦�\ 'BEDROCK / \\/ I \ \ / \�/ I / \♦i l \ / I / \ l \�/ I / i l \ / I \ i \ / I \♦� / \ / I / \ iT\\7�I1� l \ / I / \ i / \\/ I \♦� / \ / I / \ i l \\/ I �\ / I -�\♦%/I
, 1 ♦ � \ / \I / 1 \ � \ / \ I / 1 ♦ � \ / \ I / 1 \ \ / \I / 1 ♦ � \ / \ I / 1 \ � \ / \ I / 1 ♦ � \ / \ I j f"\ � \ \I / 1 ♦ � \ / \ I / 1 ♦ � \ / \ I / 1 ♦ � \ / \I / 1 \ � \ / \I / 1 ♦ � \ / \ I / 1 ♦ � \ / \I / 1 ♦ � \ / \I / 1 \ � \ / \ I / 1 ♦ � \ / \I / 1 \ � \Trj � �\ / \I / 1 ♦ � \ / \ I / 1 ♦ � \ / \I
�1♦�\/\I/1�/�/\I/1♦�\/\I/1//�/\I/1\�\/\I/1�/\/\I/1♦�\/\I/1��,.I\/�/\I,�i/�/\I/1\�\/\I/1�/�/\I/1\�\/\I/1,/�/\I/1\�\/\I/1//�/\I/1♦�\/\I/1�/\/\I/1\�\/\I/1�/\/\I/1♦�\/\I
GENERALIZED
//I \\ /�\ /I / \�� /\\/ I \♦� /�\ /I / \\� /\`/ I \\� /�\ /I / \�� /\\/ I \\� /�\ /I / DIRECTION GROUNDWATER W TO
DIO/ \\i �\\/ I i \\i �\` /I / \\i �\\/ I / \♦i �\` /I / \\i �\\/ I i \\i ��\ /I / \\i �\\/ I i \\i ��` /I / \`i �\\/ I / \♦i �\\ /I / \\i �\`/ I i \\i l
♦ / I ♦ /— \ I \ / ♦ - \ I ♦ /— \ I \ / ♦ - \ I ♦ /— \ I \ / ♦ - ♦ I \ / NORTH ♦ /— ♦ I \ / \ - \ I ♦ /— \ I \ / ♦ - ♦ I ♦ /— ♦ I \ / ♦ - \ I ♦ /— \ I \ / ♦ - ♦ I ♦ /— \ I \ / ♦ - \ I ♦ /— \ I \ / ♦ _ \ /I
/ _ / _ / /
7/ -1 ./ �\ \.-\.r./, �\ \ _\ /, �\ \ -\ r-/ �1 \,-� r.l, ,,1 \,-� r.l, �1 \ -\ r./. ,,1 \.-� r./, �1 \--\ r./, \ \.'�
LEGEND
AB 9S
WELL IN SHALLOW/SAPROLITE ZONE
AB 9D
WELL IN DEEP/TRANSITION ZONE
AB 96R
WELL IN COMPETENT BEDROCK
AB 4S
WELL IN ASH PORE WATER
GENERALIZED WATER TABLE
BEDROCK FRACTURE
ORIENTATION
FILL
0
SAPROLITE
®
WEATHERED ROCK
BEDROCK
WELL SCREEN
COMPLIANCE
BOUNDARY
NOTES:
1. ALL CONCENTRATIONS SHOWN ARE STATISTICAL MEAN OR GEOMEAN
CALCUALTED BASED ON CENTRAL TENDANCY OF DATASET USING DATA
2. ALL CONCENTRATIONS ARE IN MICROGRAMS PER LITER (mg/L)
3. NO MEAN ANALYSIS FOR BEDROCK WELLS (GWA-27BR, AB-1BRD, AB-2BRD
AND AB-3BRD) FOR CONSTITUENTS; COBALT (Co), IRON (Fe) AND MANGANESE
(Mn)
- NO DATA AVAILABLE
ASH PORE WATER FLOW LAYER
ANALYTICAL PARAMETER
Co
Fe
Mn
WATER LEVEL ELEVATION
REPORTING UNITS
Ng/L
pg/L
Ng/L
S HALLOW/SAPRO LITE FLOW ZONE
15A NCAC 02L STANDARD
1*
300
50
GROUNDWATER LEVEL ELEVATION
BACKGROUND THRESHOLD VALUE
0.6
1600
40
DEEP/TRANSITION ZONE FLOW ZONE
(SHALLOW FLOW ZONE)'
GROUNDWATER LEVEL ELEVATION
BACKGROUND THRESHOLD VALUE
2
226
57
(DEEP FLOW ZONE)'
BEDROCK FLOW ZONE GROUNDWATER
BACKGROUND THRESHOLD VALUE
0.8
341
64
LEVEL ELEVATION
(BEDROCK FLOW ZONE)'
w6= a 3 MEAN COBALT (Co) CONCENTRATION (pg/L)
MEAN IRON (Fe) CONCENTRATION (ug/L)
MN +=z6B MEAN MANGANESE (Mn) CONCENTRATION (pg/L)
* - INTERIM MAXIMUM ALLOWABLE CONCENTRATIONS (IMACs) OF THE 15A
NCAC 02L STANDARD APPENDIX 1, APRIL 1, 2013.
'BACKGROUND THRESHOLD VALUES WERE CALCULATED USING DATA FROM
BACKGROUND GROUNDWATER SAMPLES COLLECTED MAY 2015 TO DECEMBER
2018 AS SUBMITTED IN JUNE 2019.
900
800
700
600
Z
5000
Q
400 J
W
300
200
100
CROSS SECTION LOCATION
Notes:
1. Surface water samples identified with "SW-BL" are
Surface Water moo
�o\° Affected
collected from Belews Reservoir
Legend
2. Surface water samples identified with "SW -DR" are
collected from the Dan River
■ S-02D
p 5W-BL-U2 G o
00 �X
• S-03D
O SW-BL-U3 ��"
• °
SW-BL-BG
g SW-DR-01 / oo
\
Potential Mixing
Seeps
V SW-BL-D
*SW-DR-02
SW-BL-D2
■ SW-DR-03
Affected
goo o\°
X SW-BL-GWA-04D/S 0 SW-DR-04
Generally
T
*SW-BL-5-06
5W-DR-BG
0
Unaffected
❑ SW-BL-S-07
SW-DR-U
o o\
m �x
0 SW- BL-5-13/14
*SW-DR-UA
o�
�� `s\
A SW-BL-U
Potential Mixing
�o\°
/
\
moo
TO.
° ry\°
80 /o
o
C� 80% R
❑
Generally
Unaffected
0 *
�°� 60%
S� 60% 00
❑
■ cO
•
40%
40%\
❑ °\°
O�
Oo
20%
20%
80%
80%
Io oo
2 CCI
X
o 0 0 o
ry0 �O 00 Co
ao o o
60% Z�
60% Nd
�—Ca — —CIS
Surface
• o\° goo
/40%
40%\
Water
V
O o
g ❑ � 0
20% Z 0 0 0
p 20%
g
coon o IS oa N o
moo°
Ca — Seep Legend —
Cl
■ S-01 ❑ S-08
S-02 O S-09
DUKE
DRAWN BY: R. Badum DATE: 9/9/2019
FIGURE 6-23
S-03 A S-10
ENERGY
REVISED BY:
CHECKED BY: A.ALBERT
SEEP AND SURFACE PIPER
S-04 '7 S- 11
APPROVED BY: A. ALBERT
DIAGRAMS
S-05 0 S- 12
PROJECT MANAGER: A. A.LBERT
CORRECTIVE ACTION PLAN UPDATE
Z S-06 X S-15
116'1
BELEWS CREEK STEAM STATION
* S-07
synTerra
www.synterracorp.com
BELEWS CREEK, NORTH CAROLINA
Corrective Action Plan Update December 2019
Belews Creek Steam Station SynTerra
Figure 6-24
Pourbaix Diagram for Iron -Water System
Included in Section 6 text
O
OUTFALL
DAN RIVER WATER
INTAKE LOCATION � �
�
I
EXTRACTION AND CLEAN
•
WATER INFILTRATION
9 0 ,
WET WELL AND /
PUMP STATION p
o
0�
vv
PROPOSED EXTRACTION
o
PHYSICAL- CHEMICAL
COLLECTOION AND PUMP STATION
PROPOSED EXTRACTION / \
TREATMENTSYSTEM
COLLECTION AND PUMP STATION
PROPOSED CLEAN WATER
I I � °
�
` FILTRATION STORAGE TANK
Q °/
ASH BASIN
o o
�48" MANHOLE I
PROPosED SUHEACE
e
WITH AIR VENT
WATER TREATMENT SYSTEM A>
,
I
O\
/
v�
p
— / 48" MANHOLE?
• •
WITH
AIR VENT _ _ = NOT FOR CONSTRUCTION
�� -
•� p
LEGEND
(2.67 ACRES)
EXISTING EXTRACTION SYSTEM WELLS EX-1 THRU EX-10
PROPOSED EXTRACTION WELL IN SAPROLITE
4
PROPOSED /
\— ® PROPOSED CLEAN WATER INFILTRATION WELL IN SAPROLITE
°
CLEAN
• ' WATER
PHYSICAL -CHEMICAL
TREATMENT SYSTEM
— —; _ • PROPOSED EXTRACTION WELL IN TRANSITION ZONE
—
4
° • INFILTRATION
--- ® PROPOSED CLEAN WATER INFILTRATION WELL IN TRANSITION ZONE
• �
• HORIZONTAL o /
� WELL
�i PROPOSED EXTRACTION WELL IN BEDROCK
PROPOSED MAIN WATER LINE FROM THE
® PROPOSED CLEAN WATER INFILTRATION WELL IN BEDROCK
DAN RIVER WATER INTAKE LOCATION TO
THE WATER TREATMENT SYSTEM
ION
PROPOSED CLEAN WATER INFILTRATION HORIZONTAL WELL (SAPROLITE)
p / • EX-4?
COLLECTION AND PUMP STATION
PROPOSED CLEAN WATER INFILTRATION PIPING
PROPOSED CLEAN WATER INFILTRATION PIPING FLOW DIRECTION
4g
PROPOSED EXTRACTION PIPING
N =IBM- PROPOSED EXTRACTION PIPING FLOW DIRECTION
0
•,' EX 6
— — — — — — — DECANT PIPING
op
FLOW DECANT PIPING FLOW DIRECTION
✓ • EX-7
0
I
DUKE ENERGY CAROLINAS PROPERTY LINE
ASH BASIN COMPLIANCE BOUNDARY
%/ • EX-8
WASTE BOUNDARY
a \\
ASH BASIN PONDED WATER
\ a
/ / EXISTING EXTRACTION
NOTES
SYSTEM (EX-1 THRU EX-10)
1.)ALL BOUNDARIES ARE APPROXIMATE.
I
2.) DUKE ENERGY PROPERTY LINES AR E REPRESENTED SAMPLE LOCATIONS WERE DERIVED FROM VARIOUS SOURCES AND ARE A M IX OF SURVEYED AND
APPROXIMATE LOCATIONS. THEREFORE LOCATIONS ARE DEEMED TO BE APPROXI MATE.
\\
° PROPOSED EXTRACTION
IJ
3 )THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLY AND SHOULD NOT BE USED FOR DESIGN OR ENGINEERING PURPOSES THE TOPOGRAPHY BASED
/
\\ COLLECTION AND PUMP STATION
/
"O
EX-
ONACOMBINATIONOFSOURCES.
LIDAR DATA OBTAINED FROM NC FLOODPLAIN MAPPING PROGRAM -SPATIAL DATA DOWNLOAD AT https://sdd.nc.gw/Dat Download.asp,#
DATA WAS SOURCED FROM THEIR PHASES -2015 QL2 LIDAR
\\\ \ /
\ /
PROPOSEDCLEAN WATER
4.) THE WATERS OF THE US DELINEATION HAS NOT BEEN APPROVED BY THE U.S. ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS
PRELIMINARY JURISDICTIONAL DETERMINATION ONLY. THE PRELIMINARY WETLANDS AND STREAM BOUNDARIES WETLANDS AND STREAMS BOUNDARIES WERE
\\ \ //
FILTRATION STORAGE TANK
OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL AND INFRASTRUCTURE INC. NATURAL RESOURCE TECHNICAL REPORT(NRTR) FOR BELEWS CREEK
STATION", DATED JUNE 2015.
5.)SITE FEATURES INCLUDING UTILITIES ARE BASED ON SEVERAL SOURCES. ANY UTILITIES SHOWN ARE FOR REFERENCE PURPOSES ONLY AND HAVE NOT BEEN
FIELD VERIFIED WITH REGARDS TO THEIR HORIZONTAL OR VERTICAL LOCATIONS IN THE FIELD. ALL FEATURES INCLUDING UTILITIES ARE DEEMED TO BE
APPROXIMATELYLOCATED.
\ o o \\ PROPOSED SURFACE
\;
2017 AERIAL PHOTOGRAPHS OBTAINED FROM NCONEMAPAT
hops://nconemap.maps.a,,g,s,�m/apps/V,ebaPP"eWar/,nd..hvnnm=208a9b36a°4841rma2ha64347dO4a2h
WATER TREATMENT
\
SYSTEM
2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM WSP FLOWN ON APRIL 17, 2014.
6.) DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIP 3200(NAD83 AND NAVD 88.
/
GRAPHIC SCALE
200 0 100 200
ENERGY
REMEDIAL AETERNATIVE 3
IN FEET
WELL SYSTEM LAYOUT
CAROLINAS
DRAWN BY: J. CHASTAIN DATE:12/15/2019 GROUNDWATER REMEDIATION BY EXTRACTION WITH
o\� /
,
REVISED BY: DATE: -
CHECKED BY: J.CLEMMER DATE:12/15/2019 CLEAN WATER INFILTRATION AND TREATMENT
/
APPROVED BY; J.CLEMMER DATE:12/15/2019 CORRECTIVE ACTION PLAN UPDATE
PROJECT MANAGER: A.ALBERT BELEWS CREEK STEAM STATION
s /
WnTerra
www.synterracorp.com BELEWS CREEK, NORTH CAROLINA
PRESSURE CONTROL VALVE
MAGNETIC FLOW METER
FINISHED GRADE\ S \
PRESSURE GAUGE/
/CONCRETE VAULT
1LT WATER LEVEL SEN OR
A NU
ISIBLE MOUNDING OF GROUNI
APPROXIMATE
n
VAULT LID WITH
CHANNEL FRAME
FLOW SHUTOFF
SOLENOID
,/VALVE
-(NORMALLY
ENT WITH 5 %
M////
r
MAGNETIC FLOW METER
SIGNAL FROM:
LOW LEVEL SHUT-OFF SENSOR
VAULT WATER LEVEL SENSOR
INSTRUMENTATION CONDUIT
SIGNAL FROM:
FLOW SHUTOFF SOLENOID
MAGNETIC FLOW METER
PRESSURE CONTROL VALVE
WELL HEAD PRESSURE TRANSDUCER
INSTRUMENTATION/
CONDUIT HEADER
ELECTRICAL
CONDUIT
Eli HEADER
ELECTRICAL CONDUIT /
SEALED OPENING (TYP.)
RECHARGE PIPE, 1" HDPE/
RECHARGE HEADER PIPI
/HDPE DIAMETER VARIES
DUKE
NOT TO SCALE
FIGURE 6-2N
REMEDIAL ALTERNATIVE 3
tnENERGY
CONCEPTUAL VERTICAL CLEAN WATER
CAROLINAS
DRAWN BY: J. CHASTAIN DATE:12/9/2019
INFILTRATION WELL SCHEMATIC
REVISED BY: DATE:-
REMEDIATION BY EXTRACTION COMBINED WITH
CHECKED BY: J. CLEMMER DATE: 12/9/2019
APPROVED BY: I. CLEMMER DATE:12/9/2019
CLEAN WATER INFILTRATION AND TREATMENT
PROJECT MANAGER: A. ALBERT
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
synTena
www.synterracorp.com
BELEWS CREEK, NORTH CAROLINA
VAULT (SEE FIGURE 6-25b) FOR
REMOVABLE WATER TIGHT SEAL VAULT WELL CONTROLS WITH VERTICAL
(CLEAN -OUT) WITH AIR VENT / /SENORS IN THE HORIZONTAL
WELL REPOSITIONED
GROUND SURFACE
WELL CASING
GENERALLY BASED ON INFORMATION FROM ELLINGTON, DTD
ORIZONTAL WELL SCREEN
tDUKE
ENERGY
CAROLINAS
4
synTerra
LOW LEVEL SHUT-OFF SENSOR AND
PRESSURE TRANSDUCER REPOSITIONED
NOT TO SCALE
DRAWN BY: J. CHASTAIN DATE: 12/9/2019
REVISED BY: DATE: -
CHECKED BY: J. CLEMMER DATE: 12/9/2019
APPROVED BY: J. CLEMMER DATE: 12/9/2019
PROJECT MANAGER: A.ALBERT
www.synterracorp.com
CLEAN WATER
INFILTRATE SUPPLY LINE
WELL CASING WITH TYPICAL CONSTRUCTION ANGLE
OF 12° FROM HORIZONTAL GROUND SURFACE
NOT FOR CONSTRUCTION
FIGURE 6-25c
REMEDIAL ALTERNATIVE 3
CONCEPTUAL HORIZONTAL WELL
REMEDIATION BY EXTRACTION COMBINED WITH
CLEAN WATER INFILTRATION AND TREATMENT
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
FINISHED GRADE
VAULT LID WITH
CHANNELFRAM
MAGNETIC FLOW METER
PRESSURE GAUGE
SAMPLE VALVE
SWITCH BOX
TO:
RSIBLE PUMP
VAULT WATER LEVEL SENSOR
ROCK BEDDING
jCASING
CENTRALIZE
APPROXIMATE LEVEL CONTROL SENSOR C
tDUKE
ENERGY
CAROLINAS
0
synTena
R
A
yG�
2 t
WWIII
LEVEL CONTROL SENSOR
WELL SCREEN
l�1
MANUAL FLOW
CONTROL VALVE
DRAIN W/COMPRESSION CAP/
I
WELL/PIPE GUIDES
I
°a CEMENTWITH5 % BENTONITE
12' BOREHOLE
6" WELL CASING
THREADED JOINTS
to
I
I°
I
BENTONITE SEAL
I
I
I
I
WATER LEVEL PRESSURE TRANSDUCER CABI
I
I
I
WELL PUMP POWER CABLE
I
SAND PACK
I
I
I
I
I
I
GNAL FROM:
)W LEVEL CONTROL SENSOR
'GH LEVEL CONTROL SENSOR
)W-LOW SHUT-OFF SENSOR
INSTRUMENTATION CONDUIT
SIGNAL FROM:
MAGNETIC FLOW METER
PRESSURE TRANDUCER
INSTRUMENTATION
CONDUIT HEADER
ELECTRICAL
CONDUIT
ELECTRICAL CONDUIT
SEALED OPENING (TYP.)
j DISCHARGE PIPE, 1" HDPE/
HEA
y j
ER IPE
/HDPDE DIAMETER VARIES
FOR CONSTRUCTION
NOT TO SCALE FIGURE 6-25d
REMEDIAL ALTERNATIVE 3
CONCEPTUAL EXTRACTION WELL SCHEMATIC
DRAWNBY:: CHASTAIN DATE:12/9/2019 REMEDIATION BY EXTRACTION COMBINED WITH
REVISED BY: DATE: -
CHECKEDBY:J.CLEMMER DATE:12/9/2019 CLEAN WATER INFILTRATION AND TREATMENT
APPROVPROJECEDBY:J.G R:A.ALR DATE:12/9/2019 CORRECTIVE ACTION PLAN UPDATE
PROJECT MANAGER: A. ALBERT
BELEWS CREEK STEAM STATION
www.synterracorp.com BELEWS CREEK, NORTH CAROLINA
36" MIN
OR TOPSOIL TO
'ING SURFACE
FABRIC
6" MAGNETIC LOCATION TAPE
12" DEEP
CLASS II BACKFILL
(EXISTING FILL MAYBE USED IF ACCEPTABLE)
MAINTAIN VERTICAL
OR SLOPED FACE
MINIMUM 4" SEPARATION BETWEEN PIPES
CLASS I BEDDING
6" MIN ,ELECTRICAL CONDUIT
ELECTRICAL CONDUIT
O O�
HDPE CLEAN WATER OR
GROUNDWATER CONVEYANCE
6" +MIN
1
4" MIN
24" MIN
4" MIN
NOTES:
1. 4" MINIMAL HORIZONTAL SEPARATION BETWEEN ALL PIPE
AND CONDUIT.
2. 6" VERTICAL SEPARATION WHEN CROSSING OVER ALL PIPE
AND CONDUIT.
3. 36" MINIMUM COVER FOR ALL PIPE AND CONDUIT.
4. PLACE BACKFILL AND FILL SOIL MATERIALS IN LAYERS NOT
MORE THAN 8" IN LOOSE DEPTH FOR MATERIAL COMPACTED
BY HEAVY COMPACTION EQUIPMENT AND NOT MORE THAN 4
INCHES LOOSE DEPTH FOR MATERIAL COMPACTED BY HAND
OPERATED TAMPERS.
5. PLACE BACKFILL AND FILL MATERIALS EVENLY ON ALL
SIDES OF STRUCTURES TO REQUIRED ELEVATIONS AND
UNIFORMLY ALONG THE FULL LENGTH OF EACH STRUCTURE.
6. COMPACT SOIL MATERIALS TO NOT LESS THAN 95
PERCENT OF MAXIMUM DRY UNIT WEIGHT ACCORDING TO
ASTM D 698.
tn DUKE
ENERGY
NOT TO SCALE
CAROLINAS
DRAWN BY: J. CHASTAIN DATE: 12/9/2019
REVISED BY: DATE: -
CHECKED BY: J. CLEMMER DATE: 12/9/2019
APPROVED BY: J. CLEMMER DATE: 12/9/2019
l0p
PROJECT MANAGER: A. ALBERT
synTero
www.synterracorp.com
NOT FOR CONSTRUCTION
FIGURE 6-25e
REMEDIAL ALTERNATIVE 3
CONCEPTUAL TRENCH DETAIL
REMEDIATION BY EXTRACTION COMBINED WITH
CLEAN WATER INFILTRATION AND TREATMENT
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
BASE FLOOD LEVEL
DAN RIVER
r. 91
L A
INTAKE BOX
PUMP HOUSE
a
m
NOT FOR CONSTRUCTION
DUKE
NOT TO SCALE
FIGURE 6-25f
tnENERGY
REMEDIAL ALTERNATIVE 3
DAN RIVER WATER INTAKE SCHEMATIC
CAROLINAS
DRAWN BY: J.cHASTAIN DATE:12/9/2019
REMEDIATION BY EXTRACTION COMBINED WITH
REVISED BY: DATE: -
REV
CHECKED BY: J.cLEMMER DATE:12/9/2019
CLEAN WATER INFILTRATION AND TREATMENT
l0p
PoNEAABDATE:12/9/2019RO MAAGR
CORRECTIVE ACTION PLAN UPDATE
ERT
—
BELEWS CREEK STEAM STATION
synTero
www.synterracorp.com
BELEWS CREEK, NORTH CAROLINA
MODEL TIMEFRAME:
4 STARTUP AND OPE
�L.
-7"4-
MIM
�] ❑
BORON CONCENTRATION RANGE (>4,000 Ng/L)
LANDFILL BOUNDARY (CLOSED)
NO WASTE BOUNDARY SHOWN FOR MODEL TIMEFRAMES 12 AND 36 YEARSAFTER SYSTEM STARTUP AND OPERATION DUE TO COMPLETION
O BORON CONCENTRATION RANGE (700 - 4,000 Ng/L)
STRUCTURAL FILL BOUNDARY (CLOSED)
OF ASH BASIN CLOSURE. FUTURE WASTE BOUNDARY WILL BE DETERMINED BY THE SELECTED CLOSURE OPTION.
EXISTING EXTRACTION WELL
DUKE ENERGY CAROLINAS BELEWS CREEK
THE WATERS OF THE US HAVE NOT BEEN APPROVED BY THE US ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS
MAP IS NOT TO BE USED FOR JURISDICTIONAL DETERMINATION PURPOSES. THE WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED
PROPOSED EXTRACTION WELL
PLANT SITE BOUNDARY
FROM AMEC FOSTER W HEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. NATURAL RESOURCE TECHNICAL REPORT FOR BELEWS CREEK
STEAM STATION DATED JULY 2, 2015.
PROPOSED CLEAN WATER INFILTRATION WELL
LINED RETENTION BASIN
ALL BOUNDARIES ARE APPROXIMATE.
PROPOSED INFILTRATION HORIZONTAL WELL
COAL PILE STORAGE AREA
PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS.
ASH BASIN WASTE BOUNDARY
• ASH BASIN COMPLIANCE BOUNDARY
STREAM (AMEC NRTR)
® WETLAND (AMEC NRTR)
AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO ON JUNE 11, 2019. AERIAL WAS COLLECTED ON FEBRUARY 3, 2019.
DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINASTATE PLANE COORDINATE SYSTEM FIPS 3200 (NADB3).
• LANDFILL COMPLIANCE BOUNDARY
MODEL TIMEFRAME:
APPROXIMATELY 13 YEARS AFTER r' ■'
SYSTEM STARTUP AND OPERATION
r
as
(' DUKE 600 GRAPHIC SC 600 1,200
f' ENERGY®
CAROLINAS (IN FEET)
DRAWN BY: C. WYATT DATE: 11/23/2019
REVISED BY: C. WYATT DATE: 11/25/2019
CHECKED BY: A. ALBERT DATE: 11/25/2019
APPROVED BY: A. ALBERT DATE: 11/25/2019
PROJECT MANAGER: A. ALBERT
MODEL TIMEFRAME:
APPROXIMATELY 36 YEARS AFTER
SYSTEM STARTUP AND OPERATION
P:;=
C,
FIGURE 6-25g
REMEDIAL ALTERNATIVE 3
GROUNDWATER REMEDIATION
BY CLEAN WATER INFILTRATION AND EXTRACTION TERM
SIMULATED BORON CONCENTRATIONS IN ALL FLOW ZONES
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
INTAKE PUMP
AND SCREEN
0 0
DAN RIVER
__DCQ.
Not to Scale
EQ TANK
EQ TANK
I
SODIUM
HYPOCHLORITE
FEED
POLYMER FEED
I
I
I
I
I
I
I
I
POLYMER
FEED
RAPID
SEDIMENTATION FILTRATION
MIX
BASIN
RAPID
SEDIMENTATION FILTRATION
MIX
BASIN
SODIUM
HYPOCHLORITE
FEED
I
I
V
I
I
I
I
I
DRAIN AND
SOLIDS
REMOVAL
9
IE I
I
FILTRATE TO
WWTP
0
0
i
PRESSURE GAUGE AND SHUTOFF VALVE AT EACH WELL HEAD
CLEAN WATER
INFILTRATION WELLS
I DECHLORINATION —+
I
I
I
GRAVITY
FEED
NOTE: PUMP AS NEEDED
LEGEND
~
®
Rotameter
DUKE
tENERGY
DRAWN BY: T. COLTON DATE: 11/17/2019
REVISED BY: B. GREEN
FIGURE 6-26
CONCEPTUAL PROCESS FLOW DIAGRAM
HH - High high
E3:�D Flow totalizer
Check valve
CCQ
Ball valve, normal) o
y en p
CAROLINAS
CHECKED BY: A. ALBERT
CLEAN WATER INFILTRATION SYSTEM
H - High low
L — Low
Q Pressure gauge
>V< Three-way valve
><
Diaphragm valve, normally open
APPROVED BY: A. ALBERT
PROJECT MANAGER: A. ALBERT
CORRECTIVE ACTION PLAN UPDATE
�'
TYP -Typical
sP Sampling port
00 Ball valve, normally
H
Diaphragm valve, normally closed
SynTerra
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
closed
I
www.synterracorp.com
EXTRACTION WELLS
NORTHWEST AREA
0:oQA t >< N
EXTRACTION WELLS
VICINITY OF TOE DRAIN
DISCHARGE TO
EXISTING NPDES
OUTFALL OR
BENEFICIAL REUSE
Not to Scale
LEVEL CONTROL I
HH WET WELL
H
I
L �►
TRANSFER GROUNDWATER
PUMP TREATMENT
LEVEL CONTROL (PROPOSED ASH
BASIN DECANTING
PHYSICAL CHEMICAL
TREATMENT PLANT)
HH EXTRACTION
H COLLECTION
TANK
TRANSFER
PUMP
EXISTING
SAMPLE
PORT
EXISTING
SEEPS
EXISTING EFFLUENT
FROM LINED
RETENTION BASIN
EXISTING TOE DRAIN
COLLECTION SYSTEM
LEGEND
~
®
Rotameter
DUKE
tENERGY
DRAWN BY: T. COLTON DATE: 11/17/2019
REVISED BY: B. GREEN
FIGURE 6-27
CONCEPTUAL PROCESS FLOW DIAGRAM
HH - High high
E01 Flow totalizer
Check valve
CCQ
Ball valve, normal) o
y en p
CAROLINAS
CHECKED BY: A. ALBERT
GROUNDWATER EXTRACTON SYSTEM
H - High low
L — Low
Q Pressure gauge
>V< Three-way valve
><
Diaphragm valve, normally open
APPROVED BY: A. ALBERT
PROJECT MANAGER: A. ALBERT
CORRECTIVE ACTION PLAN UPDATE
�'
TYP -Typical
sP Sampling port
00 Ball valve, normally
H
Diaphragm valve, normally closed
SynTerra
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
closed
I
r www.synterracorp.com
I COAGULANT
I CAUSTIC I
EXTRACTED GROUNDWASTATIC MIXER
>_ (k x CD
TER
xx Da
FLOW CONTROL
BLEACH
ACID
ASH BASIN DECANT WATER
Not to Scale
STATIC MIXER
SKIDDED
CLARIFIER
COMAG
SERVICE
go WATER TANK
TREATED
WATER TANK
SODIUM
BISULFATE
STATIC MIXER I
DISCHARGE
NOTE: TREATMENT SYSTEM
PROCESS FLOW BASED ON
DESIGN BY EVOQUA
LEGEND
®
Rotameter
DUKE
tENERGY
DRAWN BY: T. COLTON DATE: 11/17/2019
REVISED BY: B. GREEN
FIGURE 6-28
CONCEPTUAL PROCESS FLOW DIAGRAM
HH - High high
E3:�D Flow totalizer
Check valve
CCQ
Ball valve, normal) open
y p
CAROLINAS
CHECKED BY: A. ALBERT
GROUNDWATER TREATMENT SYSTEM
H - High low
L — Low
(�
7 Pressure gauge
>V< Three-way valve
><
Diaphragm valve, normally open
APPROVED BY: A. ALBERT
PROJECT MANAGER: A. ALBERT
CORRECTIVE ACTION PLAN UPDATE
TYP - Typical
sP Sampling port
NI Ball valve, normally
1
H
Diaphragm valve, normally closed
0
synTerra
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
closed
I
r www.synterracorp.com
Days
0 150 300 450 600 750 900 1050 1200 1350
Submit CAP to NCDEQ (1 day)
NCDEQ Review and Comment Period (90 days)**
Duke Energy Responds to CAP Comments (60 days)
CAP Approved by NCDEQ (1 day)
Implement Effectiveness Monitoring Plan (30 days)*
Submit Pilot Test Work Plan and Associated Permit Applications to NCDEQ (30 days)* ,
Implement Quarterly Progress Reporting to NCDEQ (30 days)
Permit Applications Approved by NCDEQ (60 days)**
Conduct Pilot Test (182 days)
Submit Detailed Design and Specifications Report (182 days)
Review Design Report with NCDEQ (1 day)
Bid documents, Procurement, Permitting (182 days)
Installation of Full -Scale Groundwater Remediation System (243 days)
System Start -Up and Optimization (90 days)
Submit As -Built Construction and Start -Up Information Report (90 days)
Ongoing System Operation and Reporting
Notes:
- Either submittal of the Effectiveness Monitoring Plan
DUKE
4S
or the pilot test work plan and permit applications (as
ENERGY
applicable) will fulfill section G.S.130A-309.209.(b)(3).
CAROLINAS
" - Actual time may vary due to a variety of factors
��
including agency review and approvals, weather
delays, equipment availability, etc.
synTerra
DRAWN BY: R. ISHAM DATE: 12/5/2019
REVISED BY:
CHECKED BY: S. WOOD
APPROVED BY:
PROJECT MANAGER: A. ALBERT
www.synterracorp.com
n
u
FIGURE 6-29
CAP IMPLEMENTATION GANTT CHART
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
I
a�.
.l
lo
I 1 .
2 . ,
pp ^s I / OGkF
figy i
%%
rod
40
. •�' '
L
LEGEND
I OPO
� RP�VR
NOTES.
L
BG-7SID, BG-2SIDIBRA,BG-3SID,MW-200SIDIBR GRAPHIC SCALE
DUKE 400 0 aoo aoo FIGURE 6-30
i ENERGY (IN FEET) EFFECTIVENESS MONITORING WELL
'+S NETWORK AND FLOW PATHS
DRAWN BY: C. WYATT DATE: 12/9/2019 CORRECTIVE ACTION PLAN UPDATE REVISED BY: C. WYATT DATE: 12/119/2019
CHECKED BY: A. ALBERT DATE: 12/19/2019 BELEWS CREEK STEAM STATION
APPROVED BY: A. ALBERT DATE: 12/19/2019
synTerra PROJECT MANAGER: A. ALBERT BELEWS CREEK, NORTH CAROLINA
www.synterracorp.com
Interim
Monitoring Plan Corrective Action
(IMP) sampling Plan Approval
Effectiveness Monitoring Plan (EMP)
monitor downgradient, sidegradient,
and background groundwater in
accordance with G.S. 130A-
309.214(a)(4)k for compliance with
NCAC 02L .0202 Groundwater Quality
applicable Standards
Based on
annual evaluation,
is the remedial
system performance
\ effective? /
No
Adjust remedial system
components; continue with EMP
or
Implement contingency plan in
accordance with CAP Update
Section 6.8.8; continue with EMP
Yes
No
Continue EMP sampling and Continue PCMP sampling
Annual Review and and Annual Review and
Reporting I I Reporting
/ Post -Closure Monitoring Plan (PCMP)
Post -closure monitoring to begin
Is the ash basin Yes following closure certification.
certified closed? Monitoring parameters and locations
to be determined at that time and in
accordance with G.S. 130A-
309.214(a)(4)k.2.
No
Are the groundwater
Based on
monitoring results Yes
annual evaluation,
below applicable
is the plume stable
standards at the
at the compliance
compliance boundary
boundary?
for three years?
DUKE
ENERGY.
Notes: CAROLS
NCAC - North Carolina Administrative Code
02L - NCAC Title 15A, Subchapter 02L. Groundwater Classification and ��
Standards
synTerra
Yes Request completion of active remediation
or
Request completion of PCMP post -closure monitoring
in accordance with G.S. 130A-309.214(a)(3)b
DRAWN BY: T. PLATING
DATE: 10/112019
REVISED BY: K SHECK
DATE: 10/16/2019
CHECKED BY: A. ALBERT
DATE: 12/16/2019
APPROVED BY: A. ALBERT
DATE: 12/18/2019
PROJECT MANAGER: A. ALBERT
www.synterracorp.com
FIGURE 6-31
No
EFFECTIVENESS MONITORING PLAN
WORK FLOW AND
OPTIMIZATION FLOW DIAGRAM
CORRECTIVE ACTION PLAN UPDATE
BELEWS CREEK STEAM STATION
BELEWS CREEK, NORTH CAROLINA
Submit
Request for
Termination
Request shall include:
• Discuss duration and
cost for continuation
• Evaluate success of CAP
• Evaluate alternate
technologies
• Discuss health an
safety impacts if
constituent levels
remain
Demonstrate
• Continuation of CAP will
Implement GW
not result in significant
monitoring plan at
reduction of constituents
Has the site
Termination
location of no less
• Constituents have not and
been identified
authorized
after health
than one year'
will not migrate onto
for resource
and safety
predicted time o
adjacent properties
development?
analysis
travel upgradient of
• GW discharge to surface
any existing or
water will not violate 02B
foreseeable receptor
standards
• Public notice of the request
per Rule 0.0114 (b)
• Proposed termination is
consistent with all other
environmental laws
Is there
..
sufficient
.
evidence
that concentrations are
less than 02L standards
from multiple
sampling
events?
No
further
action