Loading...
HomeMy WebLinkAbout20190466 Ver 1_CAMA General Permit Mod Request_20200106Carpenter, Kristi From: Ward, Garcy Sent: Monday, January 06, 2020 11:34 AM To: Barnes, Kyle W CIV USARMY CESAW (US); Williams, Paul C; Daisey, Greg Subject: RE: [External] RE: CAMA General Permit Modification Request - Hyde 35 Paul, A modification of the 401 will not be required. The information you have provided is sufficient for our files. Any necessary dewatering will need to be done in a manner that does not violate water quality standards. Thanks. Garcy Ward Environmental Specialist NC Divison of Water Resources (252)948-3917 -----Original Message ----- From: Barnes, Kyle W CIV USARMY CESAW (US)[maiIto: Kyle.W.Barnes@usace.army.mi1] Sent: Friday, January 3, 2020 3:39 PM To: Williams, Paul C <pcwilliams2@ncdot.gov>; Daisey, Greg <Greg.Daisey@ncdenr.gov> Cc: Ward, Garcy <garcy.ward@ncdenr.gov> Subject: [External] RE: CAMA General Permit Modification Request - Hyde 35 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov> Paul, This modification will not require the a formal submittal to the Corps to utilize coffer dams in your construction methods to install this bridge. These temporary dams need to be removed in their entirety after construction is complete. You may utilize this correspondence as the Corps approval to modify the construction methodology for this project. The information you submitted and this email will be added to the official file for this project. Let me know if you have any questions. Kyle -----Original Message ----- From: Williams, Paul C [mailto:pcwilliams2@ncdot.gov] Sent: Friday, January 3, 2020 2:06 PM To: Daisey, Greg <Greg.Daisey@ncdenr.gov> Cc: Ward, Garcy <garcy.ward@ncdenr.gov>; Barnes, Kyle W CIV USARMY CESAW (US) <Kyle.W.Barnes@usace.army.mil> Subject: [Non-DoD Source] CAMA General Permit Modification Request - Hyde 35 G reg, After the preconstruction meeting for Bridge 35 in Hyde County, we discussed the water levels at the project with the contractor further. It was decided temporary cofferdams would be needed for the interior bent and the end bents to ensure the caps could be poured without contacting surface waters. I have attached a drawing depicting 2 phases of cofferdams. The cofferdams would be sequentially constructed and not installed at the same time. NCDOT requests the modification of CAMA General Permit No. 72612 to construct the phased cofferdams. This would temporarily impact approx. 1,750 sq. ft. in total of surface waters. Thanks, and let me know if you need additional information. Paul C. Williams, Jr. Division Environmental Officer Division One NC Department of Transportation (252) 482-1861 office (252) 333-9812 mobile (252) 482-8722 fax pcwilliams2@ncdot.gov <mailto:pcwilliams2@ncdot.gov> 113 Airport Dr. Suite 100 Edenton, NC 27932 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.