Loading...
HomeMy WebLinkAboutNC0024406_01_BCSS_CAP Update 2019_List of Appendices_20191231Corrective Action Plan Update December 2019 Belews Creek Steam Station SynTerra LIST OF APPENDICES Appendix A Regulatory Correspondence Appendix B Comprehensive Site Assessment Update Report Review Comments and Responses Appendix C Updated Comprehensive Analytical Data Tables Appendix D HB 630 Provision of Water Supply Completion Documentation Appendix E Human Health and Ecological Risk Assessment Appendix F Fractured Bedrock Evaluation Appendix G Updated Groundwater Flow and Transport Modeling Report Appendix H Geochemical Model Report COI Management Plan Approach Appendix I Monitored Natural Attenuation Report Appendix J Interim Remediation Action Construction Drawings Interim Action Plan Accelerated Remediation Groundwater Extraction System 2018 Startup and Effectiveness Monitoring Report Interim Action Plan 2019 Effectiveness Monitoring Report Appendix K Surface Water Evaluation to Assess 15A NCAC 02B .0200 Compliance for Implementation of Corrective Action under 15A NCAC 02L .0106 (k) and (1) Report Surface Water Future Conditions Evaluation to Assess 15A NCAC 02B .0200 Compliance for Implementation and Termination of Corrective Action under 15A NCAC 02L .0106 (k), (1), and (m) Report Appendix L Remedial Alternative Cost Estimate Details Appendix M Sustainability Calculations Appendix N Remediation Alternatives Summary Appendix O Proposed Remedial Alternative Design Calculations Appendix P Groundwater Effectiveness Monitoring Plan