HomeMy WebLinkAboutNC0024406_01_BCSS_CAP Update 2019_List of Appendices_20191231Corrective Action Plan Update December 2019
Belews Creek Steam Station SynTerra
LIST OF APPENDICES
Appendix A
Regulatory Correspondence
Appendix B
Comprehensive Site Assessment Update Report Review Comments
and Responses
Appendix C
Updated Comprehensive Analytical Data Tables
Appendix D
HB 630 Provision of Water Supply Completion Documentation
Appendix E
Human Health and Ecological Risk Assessment
Appendix F
Fractured Bedrock Evaluation
Appendix G
Updated Groundwater Flow and Transport Modeling Report
Appendix H
Geochemical Model Report
COI Management Plan Approach
Appendix I
Monitored Natural Attenuation Report
Appendix J
Interim Remediation Action Construction Drawings
Interim Action Plan Accelerated Remediation Groundwater
Extraction System 2018 Startup and Effectiveness Monitoring Report
Interim Action Plan 2019 Effectiveness Monitoring Report
Appendix K
Surface Water Evaluation to Assess 15A NCAC 02B .0200
Compliance for Implementation of Corrective Action under 15A
NCAC 02L .0106 (k) and (1) Report
Surface Water Future Conditions Evaluation to Assess 15A NCAC
02B .0200 Compliance for Implementation and Termination of
Corrective Action under 15A NCAC 02L .0106 (k), (1), and (m) Report
Appendix L
Remedial Alternative Cost Estimate Details
Appendix M
Sustainability Calculations
Appendix N
Remediation Alternatives Summary
Appendix O
Proposed Remedial Alternative Design Calculations
Appendix P
Groundwater Effectiveness Monitoring Plan