Duke Energy Carolinas, LLC - Allen Steam Station
APPENDIX L
SUSTAINABILITY CALCULATIONS
SynTerra
APPENDIX L - SUSTAINABILITY CALCULATIONS
REMEDIAL ALTERNATIVES - INPUTS
CORRECTIVE ACTION PLAN UPDATE
ALLEN STEAM STATION - HORIZONTAL CLEAN WATER INFILTRATION WELL SCENARIO
DUKE ENERGY CAROLINAS, LLC, BELMONT, NC
Alternative
Remedial Alternative 1 -
Groundwater
Remediation by MNA
Remedial Alternative 2 -
Groundwater Remediation
by Extraction
Remedial Alternative 3 -
Groundwater Remediation
by Clean Water Infiltration
and Extraction
New Monitoring Wells
Number of MWs
5
5
Average depth of MWs (ft. bgs)
108
108
Average screen length of MWs (ft.)
15
15
Casing material
Sch 80 PVC
Sch 80 PVC
Well diameter
6
6
Borehole diameter
8
8
Extraction Wells
Number of Extraction Wells
81
81
Average depth (ft. bgs)
136
136
Average screen length (ft.)
15
15
Total flow (gpm)
905
905
Casing material
Sch 80 PVC
Sch 80 PVC
Well diameter
6
6
Borehole diameter
8
8
Horizontal Wells
Number of Horizontal Wells
22
Length of Each Horizontal Well (ft.)
401
Total flow (gpm)
157
Casing material
Sch 80 PVC
Well diameter
6
Borehole diameter
8
Clean Water Infiltration Wells
Number of Clean Water Infiltration Wells
48
Average depth (ft. bgs)
100
Average screen length (ft.)
25
Total flow (gpm)
214
Casing material
Sch 80 PVC
Well diameter
6
Borehole diameter
8
Number of pumps
1
Infiltration Galleries
Number of Infiltration Galleries
Total area (acres)
Total flow (gpm)
Pipe material
Pipe diameter
Chemical Injection Wells
Number of Injection Wells
Average depth (ft. bgs)
Average screen length (ft.)
Total flow (gpm)
Casing material
Well diameter
Borehole diameter
Injection Pumps
Tree Wells
Total area (acres)
Trenches
Number of trenches
Length (ft.)
Width (ft.)
De th ft.
Page 1 of 2
APPENDIX L - SUSTAINABILITY CALCULATIONS
REMEDIAL ALTERNATIVES - INPUTS
CORRECTIVE ACTION PLAN UPDATE
ALLEN STEAM STATION - HORIZONTAL CLEAN WATER INFILTRATION WELL SCENARIO
DUKE ENERGY CAROLINAS, LLC, BELMONT, NC
Alternative
Remedial Alternative 1 -
Groundwater
Remediation by MNA
Remedial Alternative 2 -
Groundwater Remediation
by Extraction
Remedial Alternative 3 -
Groundwater Remediation
by Clean Water Infiltration
and Extraction
Conveyance Pipe
Pipe length
15000
21000
Pipe material
Sch 80 HDPE
Sch 80 HDPE
Pipe diameter
6
6
Number of conveyance pumps
9
5
Permeable Reactive Barriers
Number of PRBs
Fill Material
Length (ft.)
Width (ft.)
Depth (ft.)
Removal of Waste Materials
Tons of waste
Waste Profile
Treatment Media
Media
Pounds
Well Abandonment
Number of wells
Average well depth
Well diameter
Fill Material
Laboratory Analysis
$ of laboratory analysis spent
Length of Active Remediation
Years of Active Remediation 0 500 8
Notes:
ft. - foot
gpm - gallon per minute
Sch - schedule
HDPE - high density polyethylene
bgs - below ground surface
PVC - polyvinyl chloride
PRB - permeable reactive barrier
MW - monitoring wells
MINA - monitored natural attenuation
Prepared By: GTC Checked By: CBC
Page 2 of 2
APPENDIX L - SUSTAINABILITY CALCULATIONS
REMEDIAL ALTERNATIVES - SUSTAINABILITY
CORRECTIVE ACTION PLAN UPDATE
ALLEN STEAM STATION - HORIZONTAL CLEAN WATER INFILTRATION WELL SCENARIO
DUKE ENERGY CAROLINAS, LLC, BELMONT, NC
Remedial Alternative 1 - Groundwater Remediation by MNA
Activities
COZ
Emissions
Percent
Total
Onsite
NOx
Emissions
Total
Onsite SO.
Emissions
Percent
Total
OnsiPercent
PM,
MI
Emissioons
Percent
Total
Total NOx
Emissions
Percent
Total
Total SO.
Emissions
Percent
Total
Total PM10
Emissions
Percent
Total
Total
Energy
Used
Total
Energy
Used
Percent
Total
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
MMBTU
MWH
Material Productions
0.00
-
NA
-
NA
-
NA
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
NA
-
Transportation -Personnel
4.57
100.00
NA
NA
NA
1.7E-03
100.0
6.0E-05
100.0
3.4E-04
100.0
5.8E+01
NA
100.0
Transportation-Equip/materials
0.00
-
NA
-
NA
-
NA
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
NA
-
Equipment Use and Misc
0.00
0.0E+00
0.0E+00
0.0E+00
0.0E+00
0.0E+00
0.0E+00
0.0E+00
0.0E+00
Residual Handling
0.00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
NA
-
Total
4.57
100
0.00E+00
0.0
0.00E+00
0
0.00E+00
0
1.69E-03
100
5.96E-05
100
3.43E-04
100
5.75E+01
0.00E+00
100
Remedial Alternative 2 - Groundwater Remediation by Extraction
Activities
Emissions
Percent
Total
OnsitCO2
NOx
NOx
Emissions
Percent
Total
Onsite SOx
Emissions
Percent
Total
PM,Onsi
PM,
Emissions
Percent
Total
Total NOx
Emissions
Percent
Total
Total SO,
Emissions
Percent
Total
Total PMIo
Emissions
Percent
Total
Total
Energy
Used
Total
Energy
Used
Percent
Total
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
MMBTU
MWH
%
Material Productions
2,230.21
0.46
NA
-
NA
-
NA
-
6.9E+00
0.4
4.1E+00
0.2
1.6E+00
0.8
5.0E+06
NA
57.77
Transportation -Personnel
85.16
0.02
NA
-
NA
-
NA
-
4.0E-02
0.0
2.1E-03
0.0
6.2E-03
0.0
1.1E+03
NA
0.0
Transportation-Equip/materials
0.98
0.00
NA
-
NA
-
NA
3.1E-04
0.0
5.5E-06
0.0
2.7E-05
0.0
1.3E+01
NA
0.0
Equipment Use and Misc
484,156.06
99.52
9.1E+01
100.0
9.3E+00
100.0
8.2E+00
100.0
1.8E+03
99.6
1.6E+03
99.8
1.9E+02
99.2
3.7E+06
5.0E-01
42.2
Residual Handling
0.27
0.00
0.0E+00
0.0E+00
0.0E+00
8.8E-05
0.0
3.6E-06
0.0
7.2E-06
0.0
3.8E+00
NA
0.0
Total
486,472.68
100
9.06E+01
100.0
1 9.26E+00
100
1 8.16E+00
100
1 1.83E+03
100
1.63E+03
100
1.94E+02
100
8.72E+06
4.95E-01
100
Remedial Alternative 3 - Groundwater Remediation by Clean Water Infiltration and Extraction
Activities
Emissions
Percent
Total
Onsite
NOx
Emissions
Percent
Total
Onsite SO.
Emissions
Percent
Total
OnsiCO2
PM,
PM,
Emissions
Percent
Total
Total NOx
Emissions
Percent
Total
Total SO.
Emissions
Percent
Total
Total PMld
Emissions
Percent
Total
Total
Energy
Used
Total
Energy
Used
Percent
Total
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
MMBTU
MWH
Material Productions
3,460.62
13.20
NA
-
NA
-
NA
-
1.0E+01
6.1
6.3E+00
11.8
2.3E+00
9.7
7.1E+06
NA
97.01
Transportation -Personnel
10.69
0.04
NA
-
NA
-
NA
-
1.3E-02
0.0
1.1E-03
0.0
5.9E-04
0.0
1.4E+02
NA
0.0
Transportation-Equip/materials
0.98
0.00
NA
-
NA
-
NA
-
3.1E-04
0.0
5.5E-06
0.0
2.7E-05
0.0
1.3E+01
NA
0.0
Equipment Use and Misc
22,738.35
86.75
1.1E+02
100.0
1.2E+01
100.0
1.0E+01
100.0
1.6E+02
93.9
4.7E+01
88.2
2.1E+01
90.3
2.2E+05
5.1E-01
3.0
Residual Handling
0.27
0.00
0.0E+00
1
-
0.0E+00
-
I 0.0E+00
-
I 8.8E-05
0.0
3.6E-06
0.0
7.2E-06
0.0
3.8E+00
NA
0.0
Total
26,210.91
100
1.14E+02
100.0
1.16E+01
100
1 1.03E+01
100
1 1.66E+02
100
5.37E+01
100
2.34E+01
100
7.30E+06
5.05E-01
100
Notes:
CO2 - Airborne Emissions of carbon dioxide
MMBTU - Million British Thermal Units
NOX - Airborne Emissions of nitrogen oxides (combination of nitrogen monoxide and nitrogen dioxide)
SOX - Airborne Emissions of sulfur oxides (combination of sulfur monoxide, sulfur dioxide, sulfur trioxide, and others)
PM10 - Airborne Emissions of particulate matter that is 10 micrometers or less in diameter
Prepared By: GTC Checked By: CBC
Page 1 of 1
APPENDIX L - SUSTAINABILITY CALCULATIONS
REMEDIAL ALTERNATIVES - INPUTS
CORRECTIVE ACTION PLAN UPDATE
ALLEN STEAM STATION - VERTICAL CLEAN WATER INFILTRATION WELL SCENARIO
DUKE ENERGY CAROLINAS, LLC, BELMONT, NC
Alternative
Remedial Alternative 1 -
Groundwater
Remediation by MNA
Remedial Alternative 2 -
Groundwater Remediation
by Extraction
Remedial Alternative 3 -
Groundwater Remediation
by Clean Water Infiltration
and Extraction
New Monitoring Wells
Number of MWs
5
5
Average depth of MWs (ft. bgs)
108
108
Average screen length of MWs (ft.)
15
15
Casing material
Sch 80 PVC
Sch 80 PVC
Well diameter
6
6
Borehole diameter
8
8
Extraction Wells
Number of Extraction Wells
81
81
Average depth (ft. bgs)
136
136
Average screen length (ft.)
15
15
Total flow (gpm)
888
888
Casing material
Sch 80 PVC
Sch 80 PVC
Well diameter
6
6
Borehole diameter
8
8
Horizontal Wells
Number of Horizontal Wells
Length of Each Horizontal Well (ft.)
Total flow (gpm)
Casing material
Well diameter
Borehole diameter
Clean Water Infiltration Wells
Number of Clean Water Infiltration Wells
76
Average depth (ft. bgs)
93
Average screen length (ft.)
25
Total flow (gpm)
380
Casing material
Sch 80 PVC
Well diameter
6
Borehole diameter
8
Number of pumps
1
Infiltration Galleries
Number of Infiltration Galleries
Total area (acres)
Total flow (gpm)
Pipe material
Pipe diameter
Chemical Injection Wells
Number of Injection Wells
Average depth (ft. bgs)
Average screen length (ft.)
Total flow (gpm)
Casing material
Well diameter
Borehole diameter
Injection Pumps
Tree Wells
Total area (acres)
Trenches
Number of trenches
Length
Width (ft.)
De th ft.
Page 1 of 2
APPENDIX L - SUSTAINABILITY CALCULATIONS
REMEDIAL ALTERNATIVES - INPUTS
CORRECTIVE ACTION PLAN UPDATE
ALLEN STEAM STATION - VERTICAL CLEAN WATER INFILTRATION WELL SCENARIO
DUKE ENERGY CAROLINAS, LLC, BELMONT, NC
Alternative
Remedial Alternative 1 -
Groundwater
Remediation by MNA
Remedial Alternative 2 -
Groundwater Remediation
by Extraction
Remedial Alternative 3 -
Groundwater Remediation
by Clean Water Infiltration
and Extraction
Conveyance Pipe
Pipe length
15000
21000
Pipe material
Sch 80 HDPE
Sch 80 HDPE
Pipe diameter
6
6
Number of conveyance pumps
9
5
Permeable Reactive Barriers
Number of PRBs
Fill Material
Length (ft.)
Width (ft.)
Depth (ft.)
Removal of Waste Materials
Tons of waste
Waste Profile
Treatment Media
Media
Pounds
Well Abandonment
Number of wells
Average well depth
Well diameter
Fill Material
Laboratory Analysis
$ of laboratory analysis spent
Length of Active Remediation
Years of Active Remediation 0 500 8
Notes:
ft. - foot
gpm - gallon per minute
Sch - schedule
HDPE - high density polyethylene
bgs - below ground surface
PVC - polyvinyl chloride
PRB - permeable reactive barrier
MW - monitoring wells
MINA - monitored natural attenuation
Prepared By: GTC Checked By: CBC
Page 2 of 2
APPENDIX L - SUSTAINABILITY CALCULATIONS
REMEDIAL ALTERNATIVES - SUSTAINABILITY
CORRECTIVE ACTION PLAN UPDATE
ALLEN STEAM STATION - VERTICAL CLEAN WATER INFILTRATION WELL SCENARIO
DUKE ENERGY CAROLINAS, LLC, BELMONT, NC
Remedial Alternative 1 - Groundwater Remediation by MNA
Activities
CO2
Emissions
Percent
Total
Onsite
NOx
Emissions
percent
Total
Onsite SOx
Emissions
Percent
Total
Onsite
PM10
Emissions
percent
Total
Total NOx
Emissions
Percent
Total
Total SOx
Emissions
Percent
Total
Total PM10
Emissions
Percent
Total
Total
Energy
Used
Total
Energy
Used
percent
Total
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
MMBTU
MWH
Material Productions
0.00
-
NA
-
NA
-
NA
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
NA
-
Transportation -Personnel
4.57
100.00
NA
NA
NA
1.7E-03
100.0
6.0E-05
100.0
3.4E-04
100.0
5.8E+01
NA
100.0
Transportation-Equip/materials
0.00
-
NA
-
NA
-
NA
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
NA
-
Equipment Use and Misc
0.00
0.0E+00
0.0E+00
0.0E+00
0.0E+00
0.0E+00
0.0E+00
0.0E+00
0.0E+00
Residual Handling
0.00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
-
0.0E+00
NA
-
Total
4.57
100
0.00E+00
0.0
0.00E+00
0
0.00E+00
0
1.69E-03
100
5.96E-05
100
3.43E-04
100
5.75E+01
0.00E+00
100
Remedial Alternative 2 - Groundwater Remediation by Extraction
Activities
CO2
Emissions
Percent
Total
Onsite
NOx
Emissions
Total
Onsite SOx
Emissions
Percent
Total
Onspercent
PM10
PM10
Emissions
percent
Total
Total NOx
Emissions
Percent
Total
Total SOx
Emissions
Percent
Total
Total PM10
Emissions
Percent
Total
Total
Energy
Used
Total
Energy
Used
Percent
Total
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
MMBTU
MWH
Material Productions
2,230.21
0.47
NA
-
NA
-
NA
-
6.9E+00
0.4
4.1E+00
0.3
1.6E+00
0.8
5.0E+06
NA
58.21
Transportation -Personnel
85.16
0.02
NA
-
NA
-
NA
-
4.0E-02
0.0
2.1E-03
0.0
6.2E-03
0.0
1.1E+03
NA
0.0
Transportation-Equip/materials
0.98
0.00
NA
-
NA
-
NA
3.1E-04
0.0
5.5E-06
0.0
2.7E-05
0.0
1.3E+01
NA
0.0
Equipment Use and Misc
475,239.60
99.51
9.1E+01
100.0
9.3E+00
100.0
8.2E+00
100.0
1.8E+03
99.6
1.6E+03
99.7
1.9E+02
99.2
3.6E+06
5.0E-01
41.8
Residual Handling
0.27
0.00
0.0E+00
0.0E+00
0.0E+00
8.8E-05
0.0
3.6E-06
0.0
7.2E-06
0.0
3.8E+00
NA
0.0
Total
477,556.23
100
9.06E+01
100.0
1 9.26E+00
100
1 8.16E+00
100
1 1.80E+03
100
1.60E+03
100
1.90E+02
100
8.65E+06
4.95E-01
100
Remedial Alternative 3 - Groundwater Remediation by Clean Water Infiltration and Extraction
Activities
CO2
Emissions
Percent
Total
Onsite
NOx
Emissions
percent
Total
Onsite SOx
Emissions
Percent
Total
Onsite
PM10
Emissions
percent
Total
Total NOx
Emissions
Percent
Total
Total SOx
Emissions
Percent
Total
Total PM10
Emissions
Percent
Total
Total
Energy
Used
Total
Energy
Used
percent
Total
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
metric ton
%
MMBTU
MWH
Material Productions
3,303.58
11.17
NA
-
NA
-
NA
-
9.8E+00
5.0
5.8E+00
10.6
2.2E+00
7.1
7.1E+06
NA
96.54
Transportation -Personnel
10.73
0.04
NA
-
NA
-
NA
-
1.3E-02
0.0
1.1E-03
0.0
5.9E-04
0.0
1.4E+02
NA
0.0
Transportation-Equip/materials
0.98
0.00
NA
-
NA
-
NA
-
3.1E-04
0.0
5.5E-06
0.0
2.7E-05
0.0
1.3E+01
NA
0.0
Equipment Use and Misc
26,254.41
88.79
1.5E+02
100.0
1.5E+01
100.0
1.3E+01
100.0
1.9E+02
95.0
4.9E+01
89.4
2.9E+01
92.9
2.5E+05
5.1E-01
3.5
Residual Handling
0.27
0.00
0.0E+00
1
-
0.0E+00
-
I 0.0E+00
-
I 8.8E-05
0.0
3.6E-06
0.0
7.2E-06
0.0
3.8E+00
NA
0.0
Total
29,569.98
100
1.45E+02
100.0
1.48E+01
100
1 1.31E+01
100
1 1.97E+02
100
5.46E+01
100
3.10E+01
100
7.34E+06
5.05E-01
100
Notes:
CO2 - Airborne emissions of carbon dioxide
MMBTU - Million British Thermal Units
NOX - Airborne emissions of nitrogen oxides (combination of nitrogen monoxide and nitrogen dioxide)
SOX - Airborne emissions of sulfur oxides (combination of sulfur monoxide, sulfur dioxide, sulfur trioxide, and others)
PM10 - Airborne emissions of particulate matter that is 10 micrometers or less in diameter
Prepared By: GTC Checked By: CBC