HomeMy WebLinkAboutSW3191204_Geotech Report_20200106rA� i Civil — Geotechnical — Surveying November 14, 2019 Mr. KP Maganti Arka Heights, LLC 151 Coastal Lane, Unit 111 Myrtle Beach, SC 29577 Reference: Supplemental Geotechnical Engineering Test Pit Evaluation Proposed Arka Heights Development 4610 and 4612 Old Charlotte Highway Monroe, North Carolina CESI Proposal Number 190631.P00 Mr. Maganti, Concord Engineering & Surveying, Inc. (CESI) has performed a supplemental geotechnical engineering evaluation for the proposed Arka Heights Development located on Union County Parcel 09366020 positioned on the north side of Old Charlotte Highway in Monroe, North Carolina. We completed this geotechnical engineering evaluation in general accordance with proposal number 190631.P00 This report explains our understanding of the project, documents our findings, and presents our conclusions and engineering recommendations. After you have reviewed our report, we recommend either a meeting or a telephone conference to discuss our recommendations. We appreciate the opportunity to be of service to you and we look forward to helping you through project completion. If you have any questions, please call. Respectfully submitted by CESI 1:: 6 cjf� James G. Eaves III, PE Division Manager N.C. Registration Number 27837 ATTACHMENTS Test Pit Excavation Location Plan Record of Test Pit Excavation 1,�4kx�l{tilltllfllrl�!{�f SEAL 27837 frfff{f�11!llIJ11Y4ti111���A,�L�`` 45 Spring Street, SW P.O. Box 268 Concord, NC 28026-0268 704-786-5404 www.cesicqs.com NC License No C-0263 SUPPLEMENTAL GEOTECHNICAL ENGINEERING EVALUATION Proposed Arka Heights Development 4610 and 4612 Old Charlotte Highway Monroe, North Carolina INTRODUCTION 1.1 General CESI has completed a subsurface exploration and engineering evaluation for the proposed Arka Heights Development to be located on the north side of Old Charlotte Highway, in Monroe, North Carolina. The evaluation was performed on the entire portion of the 10.4-acre parcel. The purpose of the subsurface exploration was to obtain data for the geotechnical engineering evaluation and to determine the occurrence of suitable and unsuitable soils, rock and groundwater on the site. This report describes our understanding of the project, the field testing performed, and the general subsurface conditions encountered at the soil test pit excavation locations. Presented herein are our geotechnical engineering design and construction recommendations. 1.2 Report Summary The proposed development area is positioned on a 10.4-acre parcel identified as Union County Parcel Number 09366020. The development area is bound to the South by Old Charlotte Highway, to the east by Brick Yard Road, to the north by a parcel owned by Boren Clay Products and to the west by a Sun Valley Animal Hospital and undeveloped land. The proposed development area is currently overgrown and unused farmland. In accordance with the requirements of the Underground Utility Safety and Damage Prevention Act (2013), CESI contacted the North Carolina Utility Locator Service (NC One Call, or NC 811) and requested that the local member utility providers identify, and visibly mark the utilities present, prior to conducting the subsurface exploration activities. In response to CESI's request, North Carolina 811 assigned Ticket Number Al92982621, on October 25, 2019. The procedures used by CESI for field sampling and testing are in general accordance with established geotechnical engineering practice. Prior to test pit equipment mobilization, a CESI Field Engineer located the 13 soil test boring locations previously explored by Summit Engineering (test borings B-1 through B-11 and SW-1 and SW-2) and identified on the enclosed "Test Pit Excavation Location Plan". Test pit excavations were performed adjacent to the boreholes, with an additional 7 test pit excavations added to broaden our understanding of current subsurface conditions. On November 4 and 5, 2019 a Caterpillar 315-C track hoe owned and operated by Almond Farm, was used to excavate the 20 test pits. Soil strata in each test pit was identified and recorded by our Project Engineer. Once complete, the excavations were backfilled with the previously excavated soils. Below is a table summarizing our FINDINGS. Arka Heights Development, Monroe, North Carolina November 14, 2019 CESI Project Number 190512.000 Page 2 Table 1: Summary of Test Pit Data Test Pit Plow Zone, Topsoil, and Root Zone (inches below ground surface) Depth to Weathered Rock (depth below ground surface) Test Pit Termination Depth (inches below ground surface) TP-1 8" 60" Test Pit Terminated — 124" TP-2 6" 36" Test Pit Terminated — 93" TP-3 8" 34" Test Pit Terminated — 105" TP-4 8" 28" Test Pit Terminated — 102" TP-5 8.5" 32" Test Pit Terminated — 108" TP-6 6" 40" Test Pit Terminated — 111" TP-7 6" 42" Test Pit Terminated — 90" TP-8 8" 42" Test Pit Terminated — 108" TP-9 7" 42" Test Pit Terminated — 114" TP-10 12" 60" Test Pit Terminated — 120" TP-11 8" 38" Test Pit Terminated — 92" TP-12 101, 36" Test Pit Terminated — 114" TP-13 9" 24" Test Pit Terminated — 100" TP-14 9" 26" Test Pit Terminated — 110" TP-15 9" 30" Test Pit Terminated — 108" TP-16 8" 36" Test Pit Terminated — 124" TP-17 6" 45" Test Pit Terminated — 84" TP-18 2" 18" Test Pit Terminated — 84" TP-19 6" 36" Test Pit Terminated — 84" TP-20 7" 24" Test Pit Terminated — 78" Plow zone, topsoil, roots and leaf litter was encountered at each of the excavated test pits. This surface stratum ranged from 2" to 12" deep. This material is not satisfactory for use as structural fill or recommended for foundation, slab and pavement support. Beneath the unusable surface materials we encountered residual soils primarily in the form of clayey SILT (ML) with small amounts of silty CLAY (CL) and varying amounts of WEATHERED ROCK. WEATHERED ROCK (residual) was encountered in each of the test pits. WEATHERED ROCK varied in depth and consistency but can be excavated utilizing a CAT 315-C (or larger) excavator. Arka Heights Development, Monroe, North Carolina November 14, 2019 CESI Project Number 190512.000 Page 3 PROJECT INFORMATION The proposed development area is located between 4610 and 4612 Old Charlotte Highway on a 10.4-acre parcel identified by Union County as Parcel Number 09366020. The proposed construction area is currently undeveloped and contains one uninhabited house, an old general store, two barns, and a detached garage on the property. The rest of the property consists of cultivated soils. Conceptual site design, provided in Summit Engineering's Geotechnical Report, reflects nine multi- story, multi -family residences, a club house with pool, associated asphalt pavement and utilities, and two stormwater management features. However, it is our understanding that the final site design will combine the buildings but foundation bearing requirements and construction will be similar. PUBLISHED INFORMATION 3.1 Site Geology Residual Materials The residual soil overburden of this area was formed by in -place weathering of Metamudstone, Meta-argilite, Phyllite and Schist metavolcanic rocks of the Carolina Slate Belt. A typical upland soil profile consists of topsoil underlain by a clayey SILT (ML) and channery silty loam. Separating the completely weathered soil overburden from the unaltered parent rock is a transition zone of very high consistency materials locally referred to as weathered rock. In this area, weathered rock retains much of the bedding planes, cleavage and striations of the parent bedrock and may consist of alternating layers of high consistency soil and rock. If soil test borings were performed, weathered rock would exhibit Standard Penetration Resistances in excess of 100 blows per foot (bpf). Weathered rock and rock and fragments of weathered rock were encountered in each of the test pits excavated. The weathering processes that formed the overburden soils and weathered rock are extremely variable, depending on such factors as rock mineralogy, past groundwater conditions, and the tectonic history (joints, faults, igneous intrusions, etc.) of the specific area. Differential weathering of the rock mass has resulted in erratically varying subsurface conditions, evidenced by abrupt changes in soil type and consistency in relatively short horizontal and vertical distances. Furthermore, depths to rock can be irregular and isolated boulders, discontinuous rock layers, or rock pinnacles can be present within the overburden and transition zones. Reci mck The project site is located within in the Carolina Slate Belt of the Piedmont Physiographic Province. According to the Geologic Map of North Carolina by Rhodes and Conrad (1985), the bedrock at the site is metamorphosed rock of the Later Proterozoic -Paleozoic Era, Late Proterozoic -Cambrian Period. Arka Heights Development, Monroe, North Carolina November 14, 2019 CESI Project Number 190512.000 Page 4 EXPLORATION METHODS The procedures used by CESI for field sampling and testing are in general accordance with ASTM procedures and established geotechnical engineering practice. The locations of 13 previously explored borehole evaluations performed by Summit Engineering were located prior to performing our test pits. Additionally, each of the 20 soil test borings were located by our Project Engineer during the time of the test pit evaluations using GPS equipment. Soil test pit were excavated using a 315-C tracked excavator to depths ranging from 78" to 124" below ground surface (BGS). Soil samples were visually classified by our Field Engineer at the time of test pit excavation. A Record of Test Pit Excavation was prepared for each test pit and is included in the Attachments. The Logs were prepared using the observations made in the field by our Field Engineer and are based on the Unified Soil Classification System (USCS); classifications presented on the Logs were based on visual evaluations. The actual transition between strata may be gradual in both the vertical and horizontal directions. SUBSURFACE CONDITIONS 5.1 General Subsurface Profile Topsoil, roots and leaf litter was encountered at the surface of each of the test pits. The depth of the surface organics and organic laden soils measured 2" to 10" deep. The topsoil and organics are not satisfactory for use as structural fill or recommended for foundation, slab and pavement support. Beneath the surface materials, we encountered residual soils in the form of clayey SILT (ML). These soils may contain varying amounts of ELASTIC SILT (MH) in the soil matrix. Based on published materials, It was anticipated that we would encounter some amount of FAT CLAY (CH) and ELASTIC SILT (MH) soils. However, no FAT CLAY (CH) or ELASTIC SILT (MH) soils were encountered during our investigation. The FAT CLAY (CH) and ELASTIC SILT (MH) soils have a high shrink -swell potential when dried or exposed to water, respectively. These soils are not satisfactory for direct foundation, slab and pavement support. If encountered in areas of residence or roadway structural influence, they should be removed and replaced with satisfactory structural fill soils. WEATHERED ROCK (residual) was encountered in each of the test pits. Based on our site operations to date, we anticipate the WEATHERED ROCK can be excavated utilizing a CAT 315- C (or larger) excavator. Also, it is noted that our test pit operations included an evaluation in a trench condition. As our evaluation was performed in trench conditions, it was noted that WEATHERED ROCK near termination depth in test pits TP-11, TP-13, TP-18, TP-19, and TP-20 was difficult to dig but not hard enough to be considered track hoe refusal. Excavation in a mass condition or with larger equipment may allow the WEATHERED ROCK to be excavated more easily and to potential greater depths. TRACK HOE REFUSAL ROCK was not encountered any of the test pit excavations but may be present in other unexplored areas of the site. The Natural Resources Conservation Service (NRCS) has mapped the proposed development area as containing soils of the Goldston-Badin series. Goldston-Badin series soils are channery silty loam, clayey SILT (ML), and silty CLAY (CL). The Badin soil series can have varying amounts of FAT CLAY (CH) and ELASTIC SILT (MH). FAT CLAY (CH) and ELASTIC SILT (MH) soils were not encountered in the test pits but may be present in other unexplored areas of the site. Arka Heights Development, Monroe, North Carolina November 14, 2019 CESI Project Number 190512.000 Page 5 5.2 Groundwater No groundwater was encountered in the test pit locations and no construction issues due to groundwater are anticipated. CONCLUSIONS AND RECOMMENDA-nONS 6.1 Earthwork Considerations CESI recommends construction be scheduled carefully to maximize the benefits of seasonal weather conditions and minimize downtime for soil modification or remediation. For maximum benefit, it is recommended that mass grading operations be performed during the summer months. Grading and building operations should not occur during or immediately following periods of heavy precipitation. Once the structural areas (building, drives, parking) have been stripped, we recommend that the areas to provide foundation and pavement support be carefully evaluated for the presence of soft surficial soils by proofrolling with a 25-ton, four -wheeled, rubber -tired roller, a loaded dump truck, or similar approved equipment. The proofroll operation should be carefully monitored by our Engineer. Areas that wave, rut, or deflect excessively and continue to do so after several passes of the proofroller may need to be undercut to stiffer soils. The undercut areas should be backfilled in thin lifts with approved, compacted fill materials. CESI recommends our Field Engineer be present to evaluate these areas during preparation for site development. It is imperative that the grading contractor maintain adequate surface drainage to prevent water from ponding and deteriorating the graded surface. The surface should be rolled smooth to enhance drainage if precipitation is expected. Subgrades damaged by construction equipment should be immediately repaired to avoid further degradation in adjacent areas and to help prevent water ponding. 6.2 Fill Material and Placement Recommended criteria for soil fill characteristics and compaction procedures are listed below. The project design documents should include the following recommendations to address proper placement and compaction of project fill materials. Earthwork operations should not begin until representative samples are collected and tested (allow 3 to 4 days for sampling and testing). Earth Fill Materials ❑ General guidelines for project fill should control properties such as Plasticity Index (PI), gradation, and organic content. The use of the following USCS soil types, as defined by ASTM D 2487, should be satisfactory for use as project fill: GW, GP, GM, GC, SW, SP, SM, SC, CL, ML, MH (provided the PI is 25 percent or less for MH soils), or combinations thereof. ❑ Organic content should be no greater than 5 percent by weight, and no large roots should be allowed. Additionally, maximum particle sizes should be limited to 4 inches or less. Arka Heights Development, Monroe, North Carolina November 14, 2019 CESI Project Number 190512.000 Page 6 Compaction Recommendations ❑ One standard Proctor compaction test and one Atterberg limits test for each soil type used as project fill. Atterberg as well as gradation tests should be performed at the Project Geotechnical Engineer's discretion. ❑ Maximum loose lift thickness — 8 inches. ❑ Compaction requirements — 95 percent of the maximum dry density as determined by the standard Proctor compaction test at all depths for building, parking and drive areas, 100 percent of the maximum dry density for the top 12 inches. ❑ Soil moisture content at time of compaction — within plus 3 percent to minus 3 percent of the optimum moisture content. ❑ One density test every 2,500 square feet for each lift or two tests per lift, whichever is greater (for preliminary planning only; the test frequency should be determined by our Geotechnical Engineering staff). ❑ Trench fill areas — one density test every 75 linear feet at vertical intervals of 2 feet or less. 6.3 Shallow Foundations Desia n The building foundations should be sized for a maximum net allowable bearing pressure of 3,000 pounds per square foot. The exploration findings indicate the building may be supported by shallow spread footings bearing on residual soil or newly placed structural fill soil. All footings should bear at a minimum depth of 12 inches below exterior grades for frost protection. Based on our field observations and implementation of the above compaction requirements, differential settlement if encountered will be minimal. Properly reinforced building footings with adequate slab control joints are recommended to handle slight differential settlements, if they occur. Construction Foundation bearing surfaces should be inspected by our Engineering Technician under our Engineer's review prior to concrete placement to confirm that suitable soils are present at the bearing elevation. We recommend that bearing surfaces be evaluated by hand auger borings with Dynamic Cone Penetrometer (DCP) testing equipment prior to concrete placement to determine whether the foundation bearing soils encountered during construction are similar to those found during our geotechnical exploration. DCP testing is a verification tool to be used for an economical bearing grade evaluation during construction. It will help detect isolated areas of soft residual soils or loosely compacted soils. Unsuitable soil detected during this evaluation should be repaired as directed by the geotechnical engineer. Footing bearing grades identified as having soft soils should be undercut and replaced with properly compacted structural fill soils or crushed aggregate. The depth and width of undercutting should be recommended by our Engineer. Bearing surfaces for shallow spread foundations should not be disturbed or left exposed during inclement weather. Saturation of the on -site soils will cause a loss of strength and increased compressibility. Excavations for footings in stiff residual soils or newly placed structural fill should be completed with a smooth bucket backhoe following excavation to reduce disturbance of the subgrade soils. Confined excavations should conform to applicable OSHA regulations and North Carolina State Building Codes. Upon their exposure, bearing grades should have excess and loosened material removed. The final grades should be firm and stable, and free of loose soil, rock, mud, water, or frost. If construction occurs during inclement weather and concreting of the foundation is not possible at the time it is excavated, a layer of lean concrete should be placed on the over -excavated bearing surface subsequent to testing for protection. Also, Arka Heights Development, Monroe, North Carolina November 14, 2019 CESI Project Number 190512.000 Page 7 concrete should not be placed on frozen subgrades. Also, the presence of groundwater should be anticipated. See Groundwater section, below. Seismic Information In accordance with the International Building Code (IBC) as adapted by North Carolina and Chapter 20, Table 20.3-1 of the American Society of Civil Engineers (ASCE) 7-16 Design Standards, a Site Class "C" should be assigned to the site for seismic design purposes. 6.4 Slab -On -Grade Recommendations The building floor slabs may be supported at grade provided the subgrades are prepared as previously discussed in section 6.1 and 6.2. The slabs should be constructed over at least 4 inches of compacted aggregate base course. A vapor retarder should be included if moisture -sensitive floor coverings will be used. 6.5 Pavement Recommendations Below are the recommendations for asphalt and concrete pavement sections. The recommended sections are for a properly prepared surface thoroughly proofrolled and approved under the direction of our Engineer. Drive Lanes and Parking Stalls - Asphalt Pavement Section Recommended Thickness Recommended Pavement Section 1.5 inches Asphalt Surface Course — Type S 9.513 (NCDOT Section 610) 1.5 inches Asphalt Surface Course — Type S 9.513 (NCDOT Section 610) 8.0 inches Aggregate Base Course (ABC) — (NCDOT Section 520) Thoroughly Proofrolled and Approved Soil Subgrade 11 inches Total Recommended Section Standard Duty CONCRETE Pavement Section Recommended Thickness Recommended Pavement Section 6.0 inches 4,000 psi, air -entrained concrete 4.0 inches Aggregate Base Course (ABC) — (NCDOT Section 520) Thoroughly Proofrolled and Approved Soil Subgrade r10 inches Total Recommended Section Arka Heights Development, Monroe, North Carolina November 14, 2019 CESI Project Number 190512.000 Page 8 6.6 Excavation Excavation problems due to WEATHERED ROCK and refusal rock may occur during mass grading and utility installation. For contractual purposes, CESI recommends that rock be defined as the following: General Mass Rock Excavation: Any material which cannot be excavated with a single -tooth ripper drawn by a crawler tractor having a draw bar pull rated at not less than 56,000 pounds (Caterpillar D8K or equivalent) or excavated by a track hoe having a bucket curling force rated at not less than 33,000 pounds (Caterpillar 315C or equivalent). Trench Rock Excavation: Any material which cannot be excavated with a backhoe having a bucket curling force rated at not less than 33,000 pounds (Caterpillar 315C or equivalent). If these rock excavation conditions are encountered, CESI should be notified for verification and quantification. Excavation of encountered general mass and trench rock will then require fracturing using jack hammering or blasting. Groundwater Control Construction complications due to groundwater are not anticipated. However, if groundwater is encountered, CESI should be contacted to supply engineering recommendations for groundwater control and release. Arka Heights Development, Monroe, North Carolina November 14, 2019 CESI Project Number 190512.000 Page 9 FOLLOW-UP SERVICES Field observations, monitoring, and quality assurance testing during earthwork, foundation installation and pavement construction are an extension of the geotechnical design. As a result, we recommend the following: • Proofroll observations of stripped surface prior to fill placement, • Verification of undercutting of unsuitable soils and unstable fill soils from within structural areas, • Density testing during structural fill soil placement and utility trench backfill, • Building foundation bearing evaluations, • Sampling and testing of concrete for building foundations, slabs on grade and pavement areas, • Reinforcing and structural steel inspections, • Structural masonry inspections, • Proofroll observations within the pavement areas prior to aggregate base course stone, asphalt and concrete placement. LIMITATIONS OF REPORT This report has been prepared for the exclusive use of Arka Heights, LLC and their designers for specific application to the proposed project described in this report using generally accepted standards of geotechnical engineering practice in the State of North Carolina. No other warranty is expressed or implied. This company is not responsible for the conclusions, opinions, or recommendations of others based on this data, nor do we accept any responsibility for others' job -site safety, which is the sole responsibility of each contractor. Our conclusions and recommendations are based on the design information furnished to us, the assumptions outlined above, and our experience. They do not reflect variations in the subsurface conditions, which are likely to exist between our test locations in unexplored areas of the site. If such variations become apparent during construction, it will be necessary for us to re-evaluate our conclusions and recommendations based upon on -site observation of the conditions. ACKNOWLEDGMENT CESI appreciates the opportunity to participate in this phase of the proposed Arka Heights project in Monroe, North Carolina. Please contact us if you have any questions regarding this report or if we may be of further service. Arka Heights Development, Monroe, North Carolina November 14, 2019 CESI Project Number 190512.000 Page 10 No - U1194 46 Spnng street SW PO Box 268 C--d, N. Carolina, 28026-0268 Phone: (]04)]86-6404 Fax: (704)786-]464 m License C-0263 TEST PIT EXCAVATION LOCATION PLAN Arka Heights Development Old Charlotte Highway Monroe, North Carolina DATE: 11-14-19 DRAWN BY: JGE PROJECT #: 190512.000 SCALE: NTS DRAWING NO.: 1 CESt RECORD OF TEST PIT EXCAVATION PROJECT: Arka Heights Development EXCAVATOR: CAT 315C CLIENT: Arka Heights, LLC DATE: 11-4-19 CESI REPRESENTATIVE: Tom Gray CESI JOB NO 190512.000 TEST PIT NO. DEPTH in. DESCRIPTION From To TP-1 0 8 Plow zone, topsoil, roots 8 60 Tan and gray clayey SILT (ML) with seams of tan and yellow silty CLAY (CL) 60 66 Tan and gray clayey SILT (ML) with WEATHERED ROCK fragments sampled as tan SILT (ML) 66 96 Tan and gray clayey SIL T(ML) with WEATHERED ROCK sampled as brown and tan SILT (ML) 96 124 Olive and tan clayey SILT (ML) with WEATHERED ROCK sampled as olive, brown, and gray SILT ML and WEATHERED ROCK sampled as black and white slightly clayey SILT ML Terminated at 124" TP-2 0 6 Plow zone, topsoil, roots 6 36 Tan, yellow, and gray clayey SILT (ML) 36 60 Tan, yellow, olive and brown clayey SILT (ML) with WEATHERED ROCK sampled as tan, olive, and gray slightly clayey SILT ML 60 80 WEATHERED ROCK sampled as olive, gray, and brown SILT (ML) 80 93 WEATHERED ROCK sampled as olive and brown clayey SILT (ML) Terminated at 93" CESt RECORD OF TEST PIT EXCAVATION PROJECT: Arka Heights Development EXCAVATOR: CAT 315C CLIENT: Arka Heights, LLC DATE: 11-4-19 CESI REPRESENTATIVE: Tom Gray CESI JOB NO 190512.000 TEST PIT NO. DEPTH in. DESCRIPTION From To TP-3 0 8 Plow zone, topsoil, roots 8 34 Yellow and tan clayey SILT (ML) with loose rock fragments 34 68 Tan and gray clayey SILT (ML) with WEATHERED ROCK fragments sampled as tan and gray slightly clayey SILT ML 68 84 WEATHERED ROCK sampled as olive, brown, and gray SILT (ML) 84 105 WEATHERED ROCK sampled as olive and gray SILT (ML) Terminated at 105" TP-4 0 8 Plow zone, topsoil, roots 8 28 Yellow and tan clayey fine sandy SILT (ML) 28 68 Yellow and tan clayey SILT (ML) with WEATHERED ROCK sampled as olive, light brown, and gray SILT ML 68 102 WEATHERED ROCK sampled as olive, light brown, and gray SILT (ML) Terminated at 102" CESt RECORD OF TEST PIT EXCAVATION PROJECT: Arka Heights Development EXCAVATOR: CAT 315C CLIENT: Arka Heights, LLC DATE: 11-4-19 CESI REPRESENTATIVE: Tom Gray CESI JOB NO 190512.000 TEST PIT NO. DEPTH in. DESCRIPTION From To TP-5 0 8.5 Plow zone, topsoil, roots 8.5 32 Yellow and tan clayey SILT (ML) with WEATHERED ROCK fragments sampled as tan and gray SILT ML 32 48 Yellow and tan clayey SILT (ML) with streaks of gray and tan silty CLAY (CL) and WEATHERED ROCK sampled as olive and brown SILT (ML) 48 108 WEATHERED ROCK sampled as olive, tan, yellow and brown SILT (ML) Terminated at 108" TP-6 0 6 Plow zone, topsoil, roots 6 40 Yellow and tan clayey SILT (ML) 40 60 Yellow and tan clayey SILT (ML) with WEATHERED ROCK sampled as gray, tan, and olive brown SILT ML 60 111 WEATHERED ROCK sampled as olive brown and gray SILT (ML) Terminated at 111" TP-7 0 6 Plow zone, topsoil, roots 6 42 Yellow and tan clayey SILT (ML) 42 72 WEATHERED ROCK sampled as olive, gray, and tan SILT (ML) 72 90 WEATHERED ROCK sampled as olive brown, black and tan SILT (ML) Terminated at 90" CESt RECORD OF TEST PIT EXCAVATION PROJECT: Arka Heights Development EXCAVATOR: CAT 315C CLIENT: Arka Heights, LLC DATE: 11-4-19 CESI REPRESENTATIVE: Tom Gray CESI JOB NO 190512.000 TEST PIT NO. DEPTH in. DESCRIPTION From To TP-8 0 8 Plow zone, topsoil, roots 8 42 Yellow and tan clayey SILT (ML) 42 60 WEATHERED ROCK sampled as gray, white, and tan SILT (ML) with small seams of gray silty CLAY CL 60 84 WEATHERED ROCK sampled as olive brown, tan, gray and white SILT (ML) 84 108 WEATHERED ROCK sampled as olive, brown, and black SILT (ML) Terminated at 108" TP-9 0 7 Plow zone, topsoil, roots 7 42 Yellow and tan slightly clayey SILT (ML) with seams of tan and gray silty CLAY (CL) 42 54 WEATHERED ROCK sampled as olive brown, tan, and gray SILT (ML) with seams of gray and white silty CLAY CL 54 114 WEATHERED ROCK sampled as olive, brown, tan, and gray SILT (ML) Terminated at 114" CESt RECORD OF TEST PIT EXCAVATION PROJECT: Arka Heights Development EXCAVATOR: CAT 315C CLIENT: Arka Heights, LLC DATE: 11-4-19 CESI REPRESENTATIVE: Tom Gray CESI JOB NO 190512.000 TEST PIT NO. DEPTH in. DESCRIPTION From To TP-10 0 12 Plow zone, topsoil, roots 12 40 Yellow and tan clayey SILT (ML) 40 60 Yellow and tan clayey SILT (ML) with orangish tan and gray slightly clayey SILT (ML) 60 72 WEATHERED ROCK sampled as orangish tan, olive, brown, and gray SILT (ML) 72 120 WEATHERED ROCK sampled as olive, red, brown, and gray SILT (ML) Terminated at 120" TP-11 0 8 Plow zone, topsoil, roots 8 38 Yellow and tan clayey SILT (ML) 38 54 WEATHERED ROCK sampled as olive, brown, and gray SILT (ML) with small streaks of gray and white silty CLAY CL 54 92 WEATHERED ROCK sampled as olive, brown, gray, and tan SILT (ML) Terminated at 92" — Rock becomes very hard, but not refusal CESt RECORD OF TEST PIT EXCAVATION PROJECT: Arka Heights Development EXCAVATOR: CAT 315C CLIENT: Arka Heights, LLC DATE: 11-4-19 CESI REPRESENTATIVE: Tom Gray CESI JOB NO 190512.000 TEST PIT NO. DEPTH in. DESCRIPTION From To TP-12 0 10 Plow zone, topsoil 10 36 Yellow and tan slightly clayey SILT (ML) 36 56 WEATHERED ROCK sampled as gray, olive, tan SILT (ML) with small seams of gray and white silty CLAY CL 56 114 WEATHERED ROCK sampled as olive, brown, and gray SILT (ML) Terminated at 114" TP-13 0 9 Topsoil, leaf litter 9 24 Yellow and tan slightly clayey SILT (ML) 24 44 WEATHERED ROCK sampled as gray, olive, and brown SILT (ML) with small seams gray and white silty CLAY CL 44 100 WEATHERED ROCK sampled as olive, brown, and gray SILT (ML) Terminated at 100"— Rock becomes very hard, but not refusal CESt RECORD OF TEST PIT EXCAVATION PROJECT: Arka Heights Development EXCAVATOR: CAT 315C CLIENT: Arka Heights, LLC DATE: 11-4-19 & 11-5-19 CESI REPRESENTATIVE: Tom Gray CESI JOB NO 190512.000 TEST PIT NO. DEPTH in. DESCRIPTION From To TP-14 0 9 Plow zone, topsoil, roots 9 26 Yellow and tan clayey SILT (ML) 26 39 Yellow and tan slightly clayey SILT (ML) with WEATHERED ROCK fragments sampled as gray, olive, and light brown SILT ML 39 66 WEATHERED ROCK sampled as olive, brown, and gray SILT (ML) with small seams gray and white silty CLAY CL 66 110 WEATHERED ROCK sampled as olive, brown, tan and black SILT (ML) Terminated at 110" TP-15 0 9 Plow zone, topsoil, roots 9 30 Yellow and tan clayey SILT (ML) 30 48 Yellow and tan clayey SILT (ML) with WEATHERED ROCK fragments sampled as gray, olive, brown SILT (ML) with small seams gray and white silty CLAY (CL) 48 66 WEATHERED ROCK sampled as olive, brown, reddish brown, gray, and tan SILT (ML) 66 108 WEATHERED ROCK sampled as olive, brown, reddish brown, gray, and tan SILT (ML) with small seams of gray and white silty CLAY CL Terminated at 108" CESt RECORD OF TEST PIT EXCAVATION PROJECT: Arka Heights Development EXCAVATOR: CAT 315C CLIENT: Arka Heights, LLC DATE: 11-5-19 CESI REPRESENTATIVE: Tom Gray CESI JOB NO 190512.000 TEST PIT NO. DEPTH in. DESCRIPTION From To TP-16 0 8 Topsoil, leaf litter, roots 8 36 Reddish brown clayey SILT (ML) with WEATHERED ROCK fragments sampled as reddish brown and black SILT M L 36 86 WEATHERED ROCK sampled as reddish brown, olive, tan, black, and white SILT (ML) 86 124 WEATHERED ROCK sampled as reddish brown, olive, black, and tan SILT (ML) Terminated at 124" TP-17 0 6 Plow zone, topsoil, roots, 1-4" quartz fragments 6 45 Yellow and tan slightly clayey SILT (ML) 45 66 Yellow and tan slightly clayey SILT (ML) with WEATHERED ROCK fragments sampled as gray, olive brown, and tan SILT ML 66 84 WEATHERED ROCK sampled as olive, brown, gray and tan SILT (ML) Terminated at 84" CESt RECORD OF TEST PIT EXCAVATION PROJECT: Arka Heights Development EXCAVATOR: CAT 315C CLIENT: Arka Heights, LLC DATE: 11-5-19 CESI REPRESENTATIVE: Tom Gray CESI JOB NO 190512.000 TEST PIT NO. DEPTH in. DESCRIPTION From To TP-18 0 2 Plow zone, topsoil, 1-4" quartz fragments 2 18 Tan slightly clayey SILT (ML) with 2-8" quartz fragments 18 54 WEATHERED ROCK sampled as gray, olive, and brown SILT (ML) with small seams of gray silty CLAY CL 54 84 WEATHERED ROCK sampled as olive, brown, tan, and gray SILT (ML) Terminated at 84"— Rock becomes very hard, but not refusal TP-19 0 6 Plow zone, topsoil, 1-6" quartz fragments 6 36 Yellow and tan slightly clayey SILT (ML) 36 60 WEATHERED ROCK sampled as reddish brown, gray, olive SILT (ML) with nodules of embedded quartz 60 84 WEATHERED ROCK sampled as gray, olive, reddish brown SILT (ML) Terminated at 84"— Rock becomes very hard, but not refusal CESt RECORD OF TEST PIT EXCAVATION PROJECT: Arka Heights Development EXCAVATOR: CAT 315C CLIENT: Arka Heights, LLC DATE: 11-5-19 CESI REPRESENTATIVE: Tom Gray CESI JOB NO 190512.000 TEST PIT NO. DEPTH in. DESCRIPTION From To TP-20 0 7 Topsoil, grass 7 24 Yellow and tan slightly clayey SILT (ML) with WEATHERED ROCK fragments sampled as olive, brown, and tan SILT ML 24 30 WEATHERED ROCK sampled as olive, brown, tan, and gray SILT (ML) with small seams of gray silty CLAY (CL) 30 78 WEATHERED ROCK sampled as olive, brown, tan, gray, and reddish -brown SILT (ML) Terminated at 78"— Rock becomes very hard, but not refusal