Loading...
HomeMy WebLinkAboutSW3191204_SW Report_20200106BOHLER E N G I N E E R I N G STORMWATER MANAGEMENT REPORT PREPARED FOR: ARKA HEIGHTS, LLC 1151 COASTAL LANE UNIT III MYRTLE BEACH, SC 29577 BEPC #NCC 182110 December 12, 2019 PREPARED BY: BOHLER ENGINEERING, NC, PLLC 1927 S. TYRON ST. SUITE 310 CHARLOTTE, NC 28203 (980) 272-3400 NORTH CAROLINA LICENSE #047366 STEVE FARMARTINO, P.E. PROFESSIONAL CERTIFICATION: I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED REGISTERED ENGINEER UNDER THE LAWS OF THE STATE OF NORTH CAROLINA CIVIL & CONSULTING ENGINEERS • SURVEYORS -TRAFFIC CONSULTANTS www.bolilereng.com BOHLER ENGINEERING 1927 S TRYON ST. ♦ SUITE 310 ♦ CHARLOTTE, NC 28203 ♦ 980.272.3400 Table of Contents General Project Description... ....... 3 Stormwater Management Analysis and BMP Calculations................................................................ 4 Appendix............................................................................................................................................ 5 HydroCADOutput............................................................................................................................. StormsewerOutput........................................................................................................................... General Project Description/Stormwater Management GENERAL PROJECT OVERVIEW AND EXISTING CONDITIONS The subject site is situated at the north-western corner of Old Statesville Highway and Brick Yard Road, in Union County. The project site currently contains an abandoned farmstead and consists of approximately 10.40 acres. The proposed project will include approximately 210 multifamily residential units spread throughout 6 buildings, as well as a clubhouse, community pool, and all associated infrastructure. The Site drains to two Point of Interests (POIs), the first and larger of which (POI-1) drains to the north and into the heart of the Yadkin Pee Dee watershed, and the second POI (POI-2) is the sum of waters being conveyed across Old Charlotte Highway via two existing culverts. The site is majority pasture with woods along the northern and south-eastern property line, with Type B and Type D soils across the site with average existing slopes of 1% to 3%. There is currently no stormwater measure provided on the site. There is no off -site area examined in this analysis. STORMWATER REQUIREMENTS AND DESIGN OVERVIEW This project is located in the Yadkin Pee Dee watershed per the NCDENR Watershed Interactive Mapper and is upstream of Stewart Creek. This project is classified as a high -density project because the largest drainage area has greater than 12% built upon area. Stormwater quality treatment systems shall treat the runoff generated from the first inch of rainfall. All structural stormwater treatment systems used to meet these requirements shall be designed to have a minimum of 85% average annual removal for total suspended solids and 70% average annual removal for total phosphorus. General engineering design criteria shall be accordance with 15 A NCAC 2H. 1008(c) in the design manual. The peak discharge is attenuated for both the 2-year, 24-hr storm and the 25-year, 24-hr storm events. The 100-year, 24-hr storm event has been analyzed to provide 1' of freeboard to the top of berm. To meet the above requirements, two wet ponds located at the Northwest and Northeast corners of the subject property will be used. These ponds are linked hydraulically through an equilibrium pipe. The pipe has 0% slope, has an invert equal to the permanent pool elevation, and will be water tight. STORMSEWER DESIGN Stormwater run-off from the site will be directed to the existing outfall locations via a system of storm sewer pipes. The storm sewer was modeled in Hydraflow Storm Sewers Extension for Autodesk AutoCAD Civil 3D. The storm sewer pipes were modeled to ensure their adequate capacity with a minimum slope of 0.5% to promote flushing of the pipes. Stormwater Management and BMP Calculations PRE VS. POST ANALYSIS PEAK ATTENUATION See table below for final flow calculations for the pre and post conditions. It should be noted that time of concentration is accounted for in the summation of the combined peak discharge values. Two POI's we're analyzed as part of the Stormwater Design for this project. POI-1 is a combination of drainage areas (DA-1 & DA-2) discharging to the north of the site through the wet pond system, and POI-2 is a combination of the drainage areas (DA-3 & DA-4) discharging across Old Charlotte Highway via the two existing culverts. See below for a summary of both POI's pre- versus post- drainage values. DRAINAGE AREA 2-YR 24 HR(cfs) 25-YR 24 HR(cfs) POI-1 Existing Conditions 11.85 30.23 Developed Conditions 8.95 25.80 POI-2 Existing Conditions 4.74 11.83 Developed Conditions 4.58 10.61 All associated calculations have been provided within the Appendix section of this report. WATER QUALITY Water quality treatment of the 1" water quality volume, is also provided within the proposed above -ground wet detention pond and is to be detained between 2-5 days (See appendix for calculations). Appendix 0 F � o cl�i a o0 w io oLTJ I z �o IIIiWOM4 � m � w o 7 FBI ® - N P ¢ U5 R C� di w o 418 15" OAK 410 419 409 14" OAK 15" OAK 421 423 25" OAK 408 " v 1 F~ oz = 417 16" MAPLE 21 MAPLE 420 412 22 1 w o= m 426 22" OAK 416 407AK " 17" OAK 21 DAK 18" OAK 18" OAK 15" 425 13" CDR 427 13" CDR OAK 424 411 406 422 18" OAK 1B,%'CDR `, 403 404 32" OAK 32" OAK - -9Al(� 19" OAK ,, , ,' \ _ 402 20" OAK . 401 �\ ---- -e-- CON --- \ ,--- �r I ; 1¢'OAK \ � 400 MON PNT — _ _ ` S52°16'20"E 956.78' ' ` � � ` 18" PINE` �-'L`ONCRETE-" — ��� `�_ _ — — — a'aREVISIONS 3�a6 �O, --1 — sr---------65 — 6 66G �`6 `� MONUMENT `` 428 20" CDR i �\ \ ___ L \-c,� I �\ �\ -�, - - --668�_, ,.`o�°�- - - 60�--c�`��°- - - - - - - T— - - - - 397 - - - - - \\20" CDR REV DATE COMMENT BY 429 �`. ` S �\ ��k _S S .\ `. �- \ -------- `. ;' �`� • 13" OAK 15" OAK / �� `. ' `-S \ \ 00000 �`._ -', 18" PlN" 12 M�IPLE{T9R%` 184 OAK(TBR% 13 �\ � ■ ! 20" MAPLE�T8R)'" �` ■ J ` ■ ■ `�� �\ ( l ♦�--� ----- 664------- 15" CDR _ I %, / _ ■' \ ■ ■ ■ ■ , ■■�■■■�■■ 4 1 398 �. rn �`_-�,_ \ i i '\ 1 `. / \ / 14" OAK 4JIo 16" OAK `� `, �`. \� '\ 1171 GUM I 15" OAK \ \ it SHALLOW CONCENTRATED / ` l -----__ FLOW _ ___- -------_-- LENGTd"b30'" � - ``Je MINUTES I ,- I / 4 EX DA-2' / --- \ D I ��,, 13" OAK 20" CDR `1\ ';---.. EX D,4-1 A=�'91 AC. CN=67 / `�� ; CN=67 TOC-2,- M/NS / d ' OAr , 2 i ; 434 (� ` `� \ ,; \'' �`,` ; ' \ TOC-20 MINS / ■-392 SHALLOW CONCENTRATED FLOW ■ 4 / , 16" OA' 16" 15" OAK i , `, .' � / `. LENGTH -140' / ' �I Tc 9.7 MINUTES , ' 1 ' KNOW WHAT'S BELOW \�l�s'10`T-T-F NIF ;' - / '' 391 ALWAYS CALL 811 --------------'','' STORE ;'------------ : 666' `�-`-----------------� 18» cL BEFORE YOU DIG 435 19" CDR , ' ' \ � TA�i3O— 09 366 "20 / ; % / - "'-- d �'' �` 390 ' 25" OAK It's fast. It's free. It's the law. \ I " � I ' ` ♦ D DB 72Ti8J PIG 554-- / NOT APPROVED FOR 4J6 \ \ 18" OAK 19" OAK _ S'�'�IG1, AY 06JJACRES .-' � 3B4 � 19 K CONSTRUCTION 437 20" OAK � ` � _,,``` \ � , _ _- / 22" OAK NCC1 PROJECT No � 82110 \ ` ■ ■ _ \ 388 DRAWN BY: SOM BY: 20SRF " CDR i �`� ■ ■ \ \ / _--�, $ 16" OAK I �j DATE:CHECKED 12/11/ 0119 \ CONCRETE N53°13'22"W MONUMENT ` \ ' �. ' ` �` \ - " -'"� '� _ _ 601 ______ -/---------- - - --- ` / 52" OAK (TB#) 4 L�l 387 I � J 14" OAK _ SCALE: 1"-40' CAD I.D.: NCC182110HPO 208.43' (tie) \�\ \\ / ;','' ____________�___ �� 602 �^r`) ��, / ■ 22 0AK I PROJECT: 439 , , `, �` , �\\ - ,-- ,--''�����' 28" OAK (TBR) S a/ / �� EX DA-4 383 ���� 15' MAPLE I t 41 ,, \ o ,,_,--''"� ; ' -----\ / HEET FLOW \ �� A=1.40 AC. _ ``� /� LENGTH - 75' 13" OAK EX. WELD i \ o r� 42" OAK(TBRRJ `, ��� \ / ii-" _-_-_---- __-_ l J CN=68 ` \\ a/ Tc 1112.8 MINUTES TOC=10.6 M/NS \� 382 16" OAK HEIGHTS 45 12" OAK(TBR) `. 18' OAK(TBR) \ \ / J " R4GE I \ \��J` 00 K (TBR) 377 MV I 21 OAK FOR / 443 i 20" OAK � I '` �� 47 - � 17" OAK(TBR) \ ✓ \ i �\ UILD C�(TBR S � � / i 18" OAK(TBRR) �I � / \ 381 25" OAK ��pp ARK HEIGHTS (TBR) ! 442 , 46 0111 16" OAK TBR 6 r� Q, • J\ `, ��� �� 2" OAK(TBR) �" i ' ,; �\ -' " SHEET BLOW _.�S .� ' f �' �1` I `, l \\ ■ I 14'" OAK I LLC 1B" OAK (TBR) ' � � , " L N TH - 75 EX. TBR �� ' POLE ( ) 9.7 54 x30 0 1 STORY 4 `, / ' 379 I �\ `a Je = MINUTES � / FRAME \/�ti \ � \ 22" OAK I I 444 I 42" OAK (TBR) ' _ 454 i I ; S I i 50 ; 40" OAK TBR ' ( I i .1 % EX. /"� ,;4H0� /� LINES v \ RESIDENCE ,�� ( TBR .. ,b?� �� �� ; / SHEET FLOW/ , \\ , LENGTH j 75' LOCATION OF SITE 4610 OLD CHARLOTTE HIGHWAY 15" OAK (TBR% % 51 - , v a- _ I (TBR), z \ \ I 598}.....; ,� _ _ '.: :.:. ; :.. ` :..::� �s Tc-8.7MINUTES , ( R 38; OAK TB X CONCRETE ) MONROE NC 28110 COUNTY 455 28" OAK ; S 42" OAK TBR 1 , _S ��� _ ( ) EX DA-3 ' I-s - 1.22 AC PROP. RNVLINE �l�-5 0 ` 20" MAPLE TBR . ` l ) �` - --- / ��D.` .. ��y %� - o�\ , DRIVE (TBR) UNION i 456, 18" PINE S I - SHALLOW CONCENTRATED FLOW i CN-76 _-`co`o/ -- ' J --/ /-------- - LENGTH 300' --- -- - 1 OC=19.2 M/NS ' 1 STOFm� RY STORAGE BUILDING- .\ Z 64'X68' `.- o ` + �� - - �` �' � ' p .. ....... , \ \ \� / - - - \ - - - -SHALLOW CONCENTRATED FLOW - - - - - - - - - �� \ INV=666.73 _ I `� �- 52 - Tc-6.4MINUTES' S 0 `0 0 (TBR) . I BUILDING I /� +" ' I a I / :.::.` . .:.. ...:. � � 1 V '. EX. 14�4 ! i � \ LENGTF1=140' h.:.':. �� \ f -- _ INV 667 4 `�- , ✓I '4 ON ¢� 42" OAK(TBR) i IIN.= EX. Wl,' 6 (OR) I 6 o EX. WM ( ) -4- l: .: . :.'' ' . ' .� �6 �� �.. _ ;4 6 !�L �. ....� �j Tc-,f.9 MINUTES :r , . � N �n� /N .- h 6�° �` s�� �9 \ \ I I B O Y� L E R 16" TBR)�63.10 -4- -4- -Q=—a— --.-: -'-- ' ...'.F.. ' 4 _"-' o ) ENGINEERING NC PLLC ----------- \ '' _ - -- __ ` , - LOp _ �� -4- -Z1- �` OH OH_ ` �` SHEET F - _ „" us LOWT L _ ____-- _' f - -' - - °�-s-s - , --E!-� 0��0 _--OHLOD NCBELS P-1132 - -------` - -_ --_---------� 24"RCP- `` - - � ------ `------ ---------------� _ - - -- '� W EX. WV w ��`� -----------dBdd/OOd/Ea��QC=WAFEAZ-- do-- W--4w W W _.' W �-- ----- - ---w W -- _�. ---- ----- __.---- -- —------------------------ -- ,' _. --- LE _. - ;.d�... NGTH-75 -- -- - K, y t.: Tc 12.8 MINUTES.:: d �, _ _ _ \ ��W n ------ .. �:�-------------- — �^,9BA8" - - - -- 1927 T, S 310 -w w _ ----------------- - Ju' ^���— wUC —� �,�,� w — —w-w----- ��y— / � ', E, N CHARLOTTE, ---- ------ ---- _" � OLD CHARLO E HWY"- — — � 27228 003 _ Fax: (980)272-3401 f�------------- (S - - "---=----'�' R 1009 wmfv( 60' PUBLIC - RIW) - `-�- --- - A _10 (tied ---____ _ _ - 74 7' - Pl OL��JL J11L NC@)3ohlerEng.com ---------- ' '" II EX C„L ", , ------- ------ ----------- ---- --------------- �' -- --------- — — - — — -- ---- - ---- — — — — — — — — — ------ EX. EDGE OF i — — — — — _ _ _ '�, : ' ' '-- EX EDGE OF FU�1/L'"INTER MAIN------- �`��, �� CONCRETE --------------- ------- °° FESS °° G PAVEMENT EX. EDGE OF _ A i _ _ 661.69 ` I , : t_---------- ' PAVEMENT - /-------. (BY 0THERS,_,SS e PLANS `� 8RE-PAREl1 BY KENNEY DESIGN ; R1M=663.35 ' , INV. 1N=6 J5 GROUP, P.A. TITLED HARKEY MONUMEW E. 5123, 72.804 ° 1/1 = _ ° = _ PAVEMENT - `, FUTURE 8" WATER MAIN 1GI OTHERS; SEE PLANS , PREPARED BY KENNEY DESIGN GROUP, P.A. TITLED DI CREEK PHASE 2" INV OUT=660.79 R1M=656.65 EX. C/L CURRENTLY s INV. 1N=656.B7 ACTING AS PROPERTY I EX. PROPERTY LINE = o ° 'VG �e L °° I NE HARKEY CREEK PHASE 2" ° , % ° I INV. OUT=656.66 LINE. SEE SITE PLAN 1 FOR ROW DEDICATION F I I�yy r DETAILS I I I I i s \ SHEET TITLE: I PRE -DRAINAGE I AREA MAP SHEET NUMBER: 40 20 10 0 40 EXDA-1 1 "= 40' \\BOHLERENG.NET\SHARES\NC-PROJECTS\2018\NCC182110\DRAWINGS\PLAN SETS\CONSTRUCTION DOCUMENTS\NCC182110HPO.DWG PRINTED BY: MMOORE 12.16.19 @ 5:30 PM LAST SAVED BY: MMOORE 0 F � o cl�i a o0 w yLTJ I z �o �MM4 � m � w o U5 FBI P, ¢ R C� di w o 410 �r 14" OAK 421 16" MAPLE 408 v 1 - 22 "" OAK 407 1 g o m 426 425 18" OAK N 427 13" CDR 13" CDR 406 404 32 OAK o 15"' OAK 424 18,'," CDR ` ,` 32" OAK 402 2 - - - ' 20" OAK \ j401 -- -- -------- / CON 38.08' - 24" RCP @ 0.50%'------- � -` -�� =_ ' ' ' �` ` `\ \ `, 400 STM - I ' S52°16'20"E 956.78' � ' ` \ � ` 18" PINE`-'L`ONCRETE-" \ 428 / G6 moo/ - =- � o�6i 0 66� I -T �6"O, rn --------6r _ ------_ - ----- r-, -e- - - - �6� - - \ \ \ J MONUMENT ` `REVISIONS `\'\207 REV DATE COMMENT BY 20" CDR / `� o° �68-� i i Iwo `\ \` 6 I I I CDR N 429 \\ STM STM :••. t A-1.1 STM `\ o A-1.2 ° STM A-1.3 STM -' --___ A-1.4 -`.` .•..• .` 662 \ ° 13 OA K 15" OAK / `� \ STM 87.82' -18" RCP @ 0.60 /0 88.62' -18" RCP @ 0.60 /0 k 0.60% '111.70' 24' RCP @ 0 � 92.56' -18" RCP @ 0.60 /o _ • .r�► 665 661 660 , _-'-_--- ,,, 659 \ , 396 I \ `, 665 665 ■ ■ - ■ ■ `` STM ■ �� ----_-- -------------- -�_, ,-' • ♦ STM 658 18" PIX `. STM _- \ 040.14 -18" RCP 0.00% @ , �' EP-1 ■ ■ _ \ ■ ° ((,348.1 4' 18" RCP @ 0.00 /o ■ . B-EP 657 656 ■ � 394 A-EP �, , _, `-�------ 664- 15"' CDR i / \ �`. �� ,, ■ i ■ ■ ' ■ ■ ``, �♦ `\ STM rA STM ' J, 8 � c� ♦ 6 ._- '. •_ .:.. '.`s :,: .:.'_ ,...b a 1.'' rl`' ,'\. i.. . 1 ' 1•:' i.. -.65.9'- o ■ 6 18" RCP @ 0.60 % OAK 16" OAK i of l ^ co oD N ; ' I \'` \\`. sss �351, 1 STM \ 6pco I3� GUM I 430 ' o `fl c'o co o �:: i, APPROK.ADA � 6S ■ I 15"' OAK ' 66 I SSP-_-'�-�_, '' 180i7=_ UNIT LOCATION 180.2' ` t I APPROX. ADA � h� s 656 UNIT 657 665 � ,-- , LOCATION 78' 658 �` / - ____ UNIT LOCATION - ,, BUILDING 2 °o i BUILDING 3 E +/-16,300 SF ' ' .1 659 0 660 661 - 432 = ` ♦,- F +/-16,300 SF ^ 44 UNITS (2 ADA) 69 BEDS ' r - - - - - I I 45 UNITS (3 ADA) APPROX. ADA 69 BEDS I 1' _ ��� `� ��� ` : i 658 S96 662 663 STM 664 13" OAK - -_ - FFE: 667.17 ' I I UNIT LOCATION FFE: 4-F \\ 1 6 1 �� F I 3 CmB "' `-' / i " `.... S 12 OAS ' 20 CDR \+ c`no I I I I ; / a i ss i � coo . STM 1 434 15 OAK v `♦ I ,' ------,---------------- 1 J; °, ♦�� - s'.. .. B-1.1 0 co co ♦` yl.:.: '. . o� ` :`_5 �� 16" OAS 1 W WHA BELOW KNOW WHAT'S OW / STM '` JI : ' ; ' ;� '`, PROP DA-2 ,% 391 ALWAYS CALL 811 ---' BATH °'� .` ``, A _3.5ZAG.- 666 18 cL BEFORE YOU DIG 435 ' i e; 78'-----' _ , 78.5 :' ( ' •.' 168.3' CN=89 _390 - --------------- ' ' ' \� It's fast. It's free. It's the law. 19"" CDR ' ' \ 661 660 662 � ��� ` J PROP DA-1 1. F o co BUILDING TOC=5 MINS �'. i O_ 25'" OAK NOT APPROVED FOR 663 I I +/-15,800 SF 436 I ; rn 665 664 �o>s I .'' A=5.25AC. // F, ' :.:': 44 UNITS (2 ADA) i 1890AK Iq CN= 89 I 19"" OAK \ \ 666 - \ ,� TOC= 5 MINS / I ,.g, APPROX. ADA 64 BEDS e N UNIT LOCATION FFE:666.17 ' 194 OAK - CONSTRUCTION 437 20" OAK 1 I `♦ ♦ f ^ _ Q6 '-`---------- O°---- ■ o I ------- _---'' I I I CLUBHOUSE / I I _ I ,. j/ I -'` o 11.18' -18" RCP @ 0.60 /o o STM c90 D B-1.5.1 � �4 \ 22" OAK PROJECT No.: NCC182110 DRAWN BY: SOM 438 '� 1 ° -... I +/-6,000 SF ,' / -- S STM388 6.1.4 OAK I V CHECKED BY. SRF „ 20 CDR \ \ STM :. _ - - -_ s.° : ;`.. ,.. 6.'.. A-z1 I FFE:667.5 _ _ - ,','' ":..- -, 4 .•. 1''+ 1. y� ; r`.... -- -----1 ��---" STM ■ \-387 12/ 111 019 ♦ �, \ ` APPROX. ADA (<<' .. ° ' ' : Z 666 / --,, T- ---- - - B-1.3------- ------ - j SSCALE: =40' ° N53 1322 W CONCRETE MONUMENT \ UNIT LOCATION `` 11 4.10' 24" RCP 5 • I 72.T W --- - -__ r 18" STM 90. RCP @ 0.60% 00 94.13' 24" RCP 0, o STM R @ 60% B-1.5 K 14 OAK ` CAD I.D.: NCC182110HP0 208.43' (tie) , \ z . 3 @ 0.60% .' �� / / . l __--- o '��� __ 05 � gg 6 ��� 6 5.9s 18"RcP 386 I 22" OAK I PROJECT: I gig 15" MAPLE I \ \`�� 78\ \ ' ♦`♦� S \ S ss \ /� / 'y S tkf` ` S' __� S �`\\ 1� :' '� ' ``\ ARKA L- - ,. - - - 6 I HEIGHTS EX. WELD I `♦ `• i i `� 0` 380 I BUILDING 1 `, `♦ 666 i o� 21 "OAK FOR f I \ +/ 15,700 SF 39 UNITS (3 ADA) • ; \\... p _ _. • 1 . ,1. • :.. '.. � . • -� T U o 6 6 6 f 5 i b . _. 1 q , 1.• _., 4. . \ a ARK HT ' \ `♦ 66 BEDS I Q � FFE: 667.17 66 `♦ `• � 66 S S 34.90' -18" RCP @ 0.60%'-- / LL �o : i I A ROX. ADA 26.68' 18" RCP @ 0.50% `. P DA �P ROX. A ` 9 ' APPROX. ADA/ � ■ ` I i UN LOCATION STM STM :. \ 171.6' t 162.1' Uf�f LOCATION UNIT LOCATI N I o f co ♦\ , , •: 84.97' -18" RCP @ ° 0 ; , ' .60% A-z.4 A-z.5 6' e i STM ' `\ BUILDION S5 i BUILDING 6 / \ I N .': � ao ,� "' STM : .. A-z.3 . �'�. r ' a - ' .. , `\ +/ 10 i ,0 F I Lo ' cn rr, � � I 8 00 SF� / I IC,OC1�17CIO1� OF SITE QPPROX. ADA ; WLL WLL F F .' °0 .(14 • . ,• 6 ' ' 666 , T ; 24 UNITS (1 ADA) , 45 BEDS 24 UNITS (1 ADA) UNI / 6., i �2 4610 WAY OLD CHARLOTTE HIGH i IONIT LOCATION ' e , ' ' % FFE: 668.17 BEDS i FFE: 667.17 MONROE, NC 28110 I •% UNION COUNTY 455 28 "' OAK ; I , , � I \ ; : \ `� I -' 1' ' 456, I �°� PROP DA-3 A=1.01AC. ! ��� ' ��� ':��` � ,\\ l 666 lNV 18"P/NE ,; -----�---- `� ' . ---- _�--- h --- CN = ,' - - - ---------- ----- ''b -- ----- --- ;?: :PROPDA4 ° - ------------- -- e e. 1 lNV 667.14 - `;- 4 ON ; _ TOC=5 MINS ' D 1 L ' D_z 667 68 � °e 665 . 1 CN=85 _. h _ �\ <,-` 666 665 664 ; 666 PR PROPERTY LINE ' Ul =5 IVliiVj %---,, �`` 667 _____________ sss f , ENGINEERING NC, PLLC ------------- --- `___---------'/ �`\`------- ------- -- - /f_-, LOD �_ - - ,,,__ -- - - - z 76 68' 1 ° - .. n - - - - - ny ny nH � � - - - - - - - - , W , 666 n 74 99' 18" RCP @ 0 60% ` LOD w�.� -- -----------------% 24'" RCP- _- -----------------_Inn w_ �y - ---- ---- ----' -- , , - - �--- ---------------- - -' - _ S TRYON STREET, SUITE 1927 310 w -wIIV-�CJ� --------- '- --- - _ - rC -� � � w w _ --- - ., � w _ ou CHARLOTTE, NC 28203 ----- ''�-�, 7�V7�4 II11 II11 M Phone 980 272 3400 - - Fax 8 72 3401 / `° '� tf�--------- `� - - - "---=----'-'"" R 1009 60' PUBVC ,- - --- --- - _19 (tied _______ _ _ 74 7' - PH OLD L NC@)30hierEng.com ,- 213A=133' 100'T9PER' d ---_____ 100'STORAGE EX. L - -- �� ------ ------------ ------- ----------- -------- -------------- ---- --- -� -- ----------- - - - - - - - - -- ---- --- - - - - - - - - - - - ------------------------------------------ ' / ��, EX. EDGE OF i - - - - - _ - '.� ; ' '�-, EX. EDGE OF Fb7VF_16 - TER A9W---- "---� \ ---- CONCRETE ---------------------- PAVEMENT EX. EDGE OF _ - __-\ I _---- I i - I J 661.69 I / I .� , ' �' t- ---------- `� PAVEMENT �` ; ; (BY OTHERS,• ,5fr PLANS ` D1 `� F_RE-PAR BY KENNEY DESIGN , RIM=663.35 " , GROUP, P.A. TITLED HARKEY INV. 1N=661.12 MONUMEW N.472, 698.127 -- 1, 5123, 72.804 _ by o i 0 " ° ° _ = o _ PAVEMENT FUTURE 8" WATER MAIN (BY OTHERS,• SEE PLANS -- '♦ , INV OUT=660.79 DI CREEK PHASE 2" RIM=656.65 EX. CIL CURRENTLY EX. PROPERTY LINE o �L °°° 4G PREPARED BY KENNEY DESIGN GROUP, P.A. TITLED s INV. 1N=656.87 ACTING AS PROPERTY I - I NE��°°° HARKEY CREEK I PHASE 2" INV. OUT=656.66 LINE. SEE SITE PLAN 1 FOR ROW DEDICAT10N % _ ° ]F I I�yy r DETAILS I I i s SHEET TITLE: I I \ IPOST-DRAINAGE I AREA MAP SHEET NUMBER: 40 20 10 0 40 PIRIN.DA-1 1 "= 40' \\BOHLERENG.NET\SHARES\NC-PROJECTS\2018\NCC182110\DRAWINGS\PLAN SETS\CONSTRUCTION DOCUMENTS\NCC182110HPO.DWG PRINTED BY: MMOORE 12.16.19 @ 5:30 PM LAST SAVED BY: MMOORE 0 F � o cl�i a o0 w io oLTJ I z �o � m � / !1 w o m N/F 4 7 ® BOREN CLAY P w U5 o PRODUCTS, CO. TAX 1D.• 09-363-024 410 OB. 2072, PG. 309 \ w 14 OAK ��1\ z 421 16" MAPLE 408 v 1 - 22" OAK 407 1 g o m 426 425 18" OAK N 427 13 CDR 13" CDR 406 404 32 OAK o 15 OAK 424 18,'," ` CDR ,` 32 OAK 402 1. r `.� 20" OAK `� `� \ \ 401 ------- 18 CDI� , 38.08' - 24 RCP 0.50 /o -- " @ ° ----- ------ '- �%� =---- , � ' \ � TOWN OF /NDMN TRAIL , 400 ` REVISIONS _- --- STM ------ � \ �18" PINE` _ ` � \ S52°16'20"E 956.78' ' ` AO -r� \ i - 661 G6 rn- ate- cato- 0 a 6r, �a;71 a, OOl _ OOl rna,-------66 '?- - OOl 0 - _ 0 l -00l CIO 0 1 T,. 428 / _ _ S ------_ _ - - - - - 66 - J - 00�: OOI�-00 0 OOl , ` REV DATE COMMENT BY 20 CDR o° \20" CDR STM STM STM �� STM STM -' 666 --___ ``� �6s ;' 663 664 662 % o H 13 OA K 429 15" OAK ' i `I \ A A-1.1 87.82' -18" RCP 0.60% 24' RCP @ 0. 0% @ A-1.2 88.62' -18" RC @ A-1.3 0.60% ` 92.56' -18" RC A-1.4 @ 0.60 /o ° A-1.4 . ` ` 665 A= 0.111AC. - 661 \ , ' 396 660 r 111.70' __ - ---- _ CN= 98 0 \ 665 665 STM 665 A= 0.44 AC. ■ ■ ■ %\m ■ ■ •---------------- --- - 659 658 \ 18" PIX • A-1.1 34814' -18" RCP @ 0. A_1 2 , A-1.3 EP-1 ■ _~ CN= 98 _ ■ TOC= 5 MINS • `` 348.14' 18" RCP @ 0.00% ■ • TOC= 5 MINS B EP 657 656 ■ `� 394 / A-EP A= 0.14 AC. `66`' A= 0.31 AC. A- 0.31 AC. , `-� --- 664 15" CDR 15" CN= 98 � CN= 98 , / CN= 98 - ■ ■ ` `� STM STM `\ 6, TOC= 5 MINS TOC= 5 MINS ' TOC= 5 MINS `� Ba.z B-z.1 ■ ■ ■ • • ■ 14" OAK B 2.2 65.96' - 18" RCP @ 0.609/ 9 431 \ • `, 16" OAK / orI �� a� 18-1 / i ; A= 0.42 AC. `\ CN= 98 1-S7' STM 66 1g"RCP e_2 \ \ ' I 13� GUM I N/F I coo �o of o ,� rn c7 66 �`'- i ' APPRO K. ADA 66 MINS s / s \ BOREN CLAY 430 15" OAK 'ssP�___ ' ---__ 180.7' �' UNIT LOCATION 180.2' APPROX.ADA UNIT LOCATION 8 • s 656 ' '� 658 657 , 665 PRODUCTS CO. I TAX ID: 09-366-001 I 7 O8. 2072, PG. 309 i BUILDING 3 ' 659 I I `.,- '" BUILDING 2 +/-16,300 SFL I 660�66 _ _ /Qcl, �` UNIT LOCATION +/_16,300 SF aO , °o `� ��� 09 662 Q p J \ = ° F 44 UNITS (2 ADA) ' - - - - - 45 UNITS 3 ADA ( ) 69 BEDS 658 s�, 664 432 N F / 13" OAK BOREN CLAY - V I _ _ `sss` 69 BEDS FFE: 667.17 % : I I I APPROX. ADA UNIT LOCATION FFE: 667.17 I ���\ ; e_1� . 3 CmB PRODUCTS, CO. 433 TAX 0' 09-363-024 I \ ~ z \�i �` �` ss oo ' 12 OAS , 20" CDR DR 2072, PG. 309 , , , `� - `, I ; so _ I 6 ' `, `� STM I ' 392 1 - - - - - - - - - 1 B-1.1 �^ 15" OAK ,% 1 KNOW WHAT'S BELOW 1 STM '` � ,' `. %" 391 ALWAYS CALL 811 , i I i l A_2 --------- I BATH B 1.5.1 �\ ` \ • , _---� 666 18" CG BEFORE YOU DIG 435 I 659 - ;• 78'---- ",,' ' 78.5' A=o.46Ac. CN= __ 168.3' - o I `q - ---------------'" ' \`• 390 It's fast. It's free. It's law. 19 CDR / f 660 661 662 `�,� �' 98 F TOC= 5 MINS BUILDING 4 o �°o va � 25" OAK the 663 +/-15,800 SF co v 389 436 19" OAK i I `�\ - 664 0 > A-2.1 rn 665 666 _ A= 0.36 AC. ?Q�c CN=89 `` ,. r -J ,� � F- I � APPROX. ADA ' UNIT LOCATION 64 BEDS FFE:666.17 \ N ; 1B" OAK 3B4 ' NOT APPROVED FOR CONSTRUCTION 437 2D" OAK I I `� \ _ `_ �� O TOC= 5 MINS Q6 `��-------- I ---- I cn ,.g, o STM � o B-1.3 c90 385 OAK 22" OAK 4 PROJECT No.: NCC182110 I O° ■ o __-''" I I CLUBHOUSE I _ 11.18' -18" RCP @ 0.60 /o e.1.5.1 CN= 98 TO 5 MINS 4' 388 DRAWN BY: SOM 438 20 CDR l , STM � +/-6,000 SF ''"" ,' �• �•P=tl � •° " e STM � ----------`� STM 16" OAK I V CHECKED BY: SRF DATE: 12/11/2019 `\ \ APPROX. ADA �<<, A-z1 � 6 66 I FFE:66 .5 r,''"' ''" _ 90.00' RCP 0.60 _ ------- -- _-- B-1.3---___-- ------ - I v 387 I J 14" OAK SCALE: 1"=40' CAD I.D.: N53°13'22"W o UNIT LOCATION 1 114, 10'_ 24"RCP@0.60% 5 6 L \ 72. /- "-% / _ STM -18" _B-1.5 @ o `� 94.13'-24RCP o @0.60% I NCC182110HP0 208.43' (tie) ,, I o `� 7 \` \ STM A-z.z I _ - - - /� ' / "- ---------------�' 05 '"�" �6 ��� 665 s B-1.3.1 5.9s - 18"RCP I 386 22 OAK I PROJECT: 439 i 15' MAPLE i I I� I \ �\ ` o ' r \ 0.55 AC. s� - a 663, UN= 89 TOC= 5 MINS � - - - L_ - - - _ _ - - - - J / ' ' / �'�� - - - ' ; B-1.6 A= 0.27 AC. a -" CN= 98 > S a S B-1.5 S TOC= 5 MINS 666 A= 0.21 AC. CN= 98 v` a \ ` `� � _ a A= 0 34 AC. B-1.3.1 `\ I A= 0.22 AC. ` I CN= ARKA HEIGHTS EX. WELD i I ` ` ��, ° �y .� mm.. - - ,% _-------- TOC= 5 MINS ' CN= 98 TOC= 5 MINS = 98 TOC= 5 MINS BUIL�10NICS1 `�` A-2.3 666 �'�'' 'A-2.5 i i \� II IT I®R �\ 21 OAK _. S CN= 89 A= 0.25 AC. 666 CN= 89 A= 0.20 AC. A-2.6 5 A= 0.51 AC. ( _. m' T I ARKA HEIGHTS \ \ 66 B DS TO 5 MINS TOC= 5 MINS CN- 81 �� FFE: 67.17 o 34.90'- 8" RCP @ 0.60% TOC= 5 MINS 26.68' 18" RCP @ 0.50% PPROX. ADA `� 9 LLC NlfAVID `\` OX. ADA LOCATION 171.6' j ` �� LOCATION APPROX. ADA/ 162.1 UNIT LOCATI N P. HUD50N ' o Ff M o UN STM STM , A-2.4 A-2.5 STM \i B-1.4.1 GINA L. HUDSON lD.• 09-366-020A i o N ca / / 164.9' 84.97' -18" RCP @ 0.60% 6 r rn / A-zs ' BUILDING 5 / --- , A= 0.15 AC. BUILDI G 6 \ I I I I 8.. 2072, PG. 309 ' w ' , STM A-z.3 I I o , , ' 24 UNITS (1 A A) I ' CN= 98 TOC= 5 MINS � � ®����®� ®� ���� QPPR ADA � L L WF WF . 666 �' T � � � 45 BEDS � 24 UNI � � � ) �2 I 4610 OLD CHARLOTTE HIGHWAY i 10NI OCATION ' M M M M M M�� ' FFE:668. 7 i ;� f BEDS � FFE:667.17 MONROE, NC 28110 F F F ' F F UNION COUNTY 28" OAK i I 456, i I I �b i �' co`o� \ D_2 666 18"PINE lNV=666.73 L- _ "--" ' -- ' ----- �1-- `� `a� --- EX.CULVERT1 -- -------------- A= 0.68 AC. h �� h - ' - - - `----------- `� A=0.42AC. CN=69 '' ----- ----- - C2 ----- e - ------------- e ,--"------- -- INV= 667.14 � / ' ` - CN- 74 � � - STM D 1 STM D_z TOC= 5 MINS 667 A= 0.23 AC. 66 8 CN= 76 � _ , - ^ ---- � EX. CULVERT 2 665 A= 0.47 AC. I I` B O h L E R TOC= 5 MINS 666 665 664 ' 666 666 ® TOC= 5 MINS PR LINE rn / �D rn6 3' 73 � _- `. , 667 _ .PROPERTY 66� �/ � TOC= 5 MINS ENGIN LLC ENGINEERING NC ENCBELS -- --- -------- - ` -___--------------- ----- ---- ----- ' 1f__ �Owl-- - - - - - 176 68' 18" RCP @ 0. 0% ' - - - � pN OH�OH - - - - - - {y - 666 -- 74. 9' 18" RCP@ 0 60% W W W �' W P 1132 24' RCP `�`------- -- -------------' ------ - W W l4'�du -�f%I� W CIB �- -� W W W ` STM W TM------- / W W CHARLOTTE, NC 28203 I I -------- ---------------- -------- c-2 CHARLOTTE H `` ti -- Phone' (980) 272-3400 -------- -&53T05'1= --- --- ------ Fax: (980)272-3401 -- ,- ; tfQ------------- N53�44'24"�I _ 919.83' _"----" ------'-' (SR- 1009 60' PUBLIC oD LOD - R/wJ ; ''�' LOD - LF}D � LOD _------- ----- -74 Q- (tied -- - --------_ _ NC a�ohlerEng.com - , ------ ---------- -------- ---- -------- '` ,"--- - - - - ------------- --- ------------------------------------ `,` - - - -- EX. EDGE OF - - - i _ _ - - I _ _ , ` /' '-_, EX. EDGE OF ; F07VP-F 9''�IfR A9W - _ --- ° oFESS I�°°°% PAVEMENT EX. EDGE OF N/F 661.69 _ \ J / i i , �� / ,' t----------" : ' PAVEMENT ````` N F TAX lD. 09-366-154 � , " /-----------� _D/ / \ RlM-663.35 � � INV. 1N=661.12 (BY OTHERS- ,5frl PLANS P-l�� BY KENNEY DESIGN GROUP, P.A. TITLED HARKEY - ° - = PAVEMENT TAX ID. 09-366-020F FUTURE 8" WATER MAIN OTHERS; SEE PLANS - , lNV DI OUT=660.79 R1M=656.65 CREEK PHASE 2" EX. C/L CURRENTLY EX. PROPERTY LINE o = 'VG �e 1GI PREPARED BY KENNEY DESIGN GROUP, P.A. TITLED s INV. 1N=656.B7 ACTING AS PROPERTY I ° ° L °° I NE ° A , HARKEY CREEK PHASE 2" I INV. OUT=656.66 LINE. SEE SITE PLAN 1 FOR ROW DEDICATION _ ° ]F�(� I I�yy r DETAILS I I i s SHEET TITLE: I I \ I SUB -DRAINAGE I AREA MAP SHEET NUMBER: 40 20 10 0 40 S U� D A e 1 1 "= 40' \\BOHLERENG.NET\SHARES\NC-PROJECTS\2018\NCC182110\DRAWINGS\PLAN SETS\CONSTRUCTION DOCUMENTS\NCC182110HPO.DWG PRINTED BY: MMOORE 12.16.19 @ 5:30 PM LAST SAVED BY: MMOORE C:\USERS\MMOORE64PPDATA\LOCAL\TEMPWCPUBLISH_7388\NCC182110GPO.DWG PRINTED BY: MMOORE 12.16.19 @ 5:28 PM LAST SAVED BY: MMOORE v v ra H � 1G7 ' Z 7D 000 �Om:0cn mz =� =mODDm Z rn Z ='60m H r 0 0 H nD>> r 0 ` O z SHEET 1 OF 2 840.03 43" NOTE: USE TYPE "E", "F" AND "G" GRATE UNLESS OTHERWISE NOTED. PLAN FRAME,GRATE, & HOOD ASS'Y SECTION - AA 1�6 11 rr p� rr --IF-- .syl1- - Lx 31/2 6 3' 0„ 6rr 3rr SECTION - KK ALIGN FRAME"EN EDGE OF WAL FOR VERTICA SECTION - BB � rnnnlc r�r4n 3' - 0?'8" R c� NT T r� 2h" II SECTION - LL T SECTION - PP I Err 2r-0" Err O J��"" _ 2'-111/2" R HOOD ELEVATION z 00 H- Q PI P z�=ci H " 0=02 I LL H- C. 21) J L.�" N- N H2r ZW (n H- LL 0 SECTION - NWI O Q Z 11Q d IJJ T T SECTION - NN 4" \I t�_ Ji- IN; n O Q CO _ = 0 = i rr 1Z1 Q U H 01 Q U c\ N 0= W U Q ~ z Q SECTION - JJ ft O 5�/8" SW _ J fn C7 3rr R z LL LL v 1/2 SECTION - RR SHEET 1 OF 2 840.03 1L MANHOLE E D F <- ,- ` D ¢�H AID CZ,ma ).54 Ci FOR MANHOLE COVER & FRAME P LANOPTIONAL SPACED 6" C. TO C. BRICK MAY BE USED TO ADJUST FRAME & COVER TO SURFACE ELEVATION MAX. 1' OUTLET PIPE E OR F 1%2" T A 1 INLET PIPE SECTION C-C OR D-D SECTION X-X �c 6" 1j" X 6" EXP. JOINT 9" 6" a i - 3 B. 6 SEE NOTE 3 DOWEL SECTION Y-Y Y PLAN WITH GRATE & FRAME REMOVED SECTION X-X GENERAL NOTES: CHAMFER ALL EXPOSED CORNERS 1" USE CLASS "B" CONCRETE THROUGHOUT. OPTIONAL CONSTRUCTION - MONOLITHIC POUR, 2" KEYWAY, OR #4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. USE FORMS TO CONSTRUCT THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BASE SLAB OF BOX, ADD TO BASE AS SHOWN ON STANDARD NO. 840.00. PROVIDE ALL JUNCTION BOXES OVER 3'-6" IN DEPTH WITH STEPS 12" ON CENTERS IN ACCORDANCE WITH STD. NO. 840.66. ADJUST THE STEEL, CONCRETE AND BRICK MASONRY QUANTITIES TO INCLUDE THE ADDITION OF THE MANHOLE (I.E. DIAGONAL BARS SHORTENED AROUND OPENING IN TOP SLAB, ADDITIONAL VARIABLE HEIGHT BRICK MASONRY, OPENING IN TOP SLAB.) MAX. DEPTH OF THIS STRUCTURE FROM TOP OF BOTTOM SLAB TO TOP ELEVATION IS 12 FEET. T #4 BAR NIT DOWEL DIMENSIONS AND QUANTITIES FOR CONCRETE JUNCTION BOXES DIMENSIONS OF BOX AND PIPE REINFORCEMENT BARS "A" TOP SLAB DIMENSIONS CUBIC YARDS IN BOX TOTAL QUANTITIES BOX AND SLABS DEDUCTIONS FOR ONE PIPE CU. PIPE SPAN WIDTH HEIGHT D A B H N0. LENGTH E F TOP SLAB BOTTOM SLAB WALL/ FT, OF HT. LBS. REIN'F CU. YDS. MIN. "H" C.S. R. C. 12" 2'-0" 2'-0" 2'-3" 12 2'-9" T-0" T-0" 0.167 0.167 0.185 22 0.750 0.015 0.024 1.5 2'-3" 2'-3" 2'-6" 12 3' 0" 3'-3" 3'-3" 0.196 0.196 0.204 24 0.902 0.023 0.036 18" 2'-6" 2'-6" 2'-9" 14 3'-3" 3'-6" 3'-6" 0.227 0.227 0.222 1 30 1.065 1 0.033 0.049 24" 3'-0" 3'-0" 3'-3" 16 3'-9" 4'-0" 4'-0" 0.296 0.296 0.259 40 1.434 0.059 0.085 30" 3'-6" 3'-6" 3'-9" 18 4'-3" 4'-6" 4'-6" 0.375 0.375 0.296 51 1.860 0.092 0.127 36" 4'-0" 4'-0" 4'-3" 20 4'-9" 5'-0" 5'-0" 0.463 0.463 0.333 64 2.341 0.132 0.178 42" 4'-6" 4'-6" 4'-9" 22 5'-3" 5'-6" 5'-6" 0.560 0.560 0.370 77 2.878 0.180 0.243 48" 5'-4" 5'-4" 5'-3" 26 6'-3" 6'-4" 6'-4" 0.743 0.743 0.407 111 3.623 0.235 0.317 54" 5'-10" 5'-10" 5'-9" 28 W-7" 6'-10" 6'-10" 0.865 0.B65 0.444 126 4.283 0.297 0.401 60" 6'-6" 6'-6" 6'-3" 30 7'-3" 7'-6" 7'-6" 1.042 1.042 0.481 145 5.090 0.367 0.495 66" 7'-1" 7'-1" 6'-9" 32 7'-10" 8'-1" 8'-1" 1.210 1.210 O'5111 169 5.917 0.444 0.589 WEEP HOLES GENERAL NOTES: USE CLASS "B" CONCRETE THROUGHOUT. PROVIDE ALL DROP INLETS OVER 3'-6" IN DEPTH WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. OPTIONAL CONSTRUCTION - MONOLITHIC POUR 2" KEYWAY OR #4 BAR DOWELS AT X 12" CENTERS AS DIRECTED BY THE ENGINEER. - USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB AS SHOWN ON STD. NO. 840.00. CONSTRUCT WITH PIPE CROWNS MATCHING. SEE STANDARD DRAWING 840.25 FOR ATTACHMENT OF FRAMES AND GRATES NOT SHOWN. INSTALL 2" WEEPHOLES AS DIRECTED BY THE ENGINEER. INSTALL STONE DRAINS, OF A MINIMUM OF 1 CUBIC FOOT OF NO. 78M STONE IN A POROUS FABRIC BAG OR WRAP, AT EACH WEEP HOLE OR AS DIRECTED BY THE ENGINEER CHAMFER ALL EXPOSED CORNERS 1". DRAWING NOT TO SCALE. .Vr 1IVU I IIAU1U[IN 1HL) )P ELEVATION 840.16 FRAME - RATE (SEE NOTE) MAX. PIPE THIS SIDE SECTION Y-Y DIMENSIONS AND QUANTITIES FOR DROP INLET(BASED ON MIN. HEIGHT, H) DIMENSIONS OF BOX & PIPE CUBIC YARDS CONC. IN BOX DEDUCTIONS FOR ONE PIPE PIPE SPAN WIDTH MIN. HEIGHT D A B H BOTTOM SLAB WALL PER FT. HT. cONGRiE -MINIMUM HEIGHT, H C.M. R. C. 12" 3'-0" 2'-0" 2'-0" 0.222 0.222 0.592 0.015 0.026 15" 2'-3" 0.648 0.023 0.036 181, 2'-6" 0.703 0.033 0.049 24" 3'-0" 0.814 0.059 0.085 30" 3'-0" 2'-0" 3'-6" 0.222 0.222 0.925 0.092 0.127 #4 BAR N s" DOWEL z 00 <Q Q Fz-1 LL J0H O O x Z W QZLLx Q 0 = O H H- U) LL 0 _j o ocf)a Z jr, H 1 W 0 o X LL O - 0 CO LLI O z H Q I..I < d o Q _ Q J (0 = z Q (o z o O CC < W o U) LLJ r jy H p z Q O V cr 840.31 Z 00 �Q Q FZ-I CC 0 . ILL J 0 _L o Cn x LL1Q Z ULx QU�01�- H- (/)HLLOJ oo�Q Z FH 1 �~ Win O LL W (D J H Z W EL H o_ a o 0 co < C Qcr � 0 z W x � H (n W _ y cc N � z T �O O c> 840.14 GENERAL NOTES 2'-0D W T As z o� �� �> < � USE 4000 PSI MINIMUM COMPRESSIVE STRENGTH CONCRETE. INTERNAL MIN. MIN. MIN. CIRCUMFERENTIAL F- < 1 Z CONCENTRIC Q Q F- Cn O FABRICATE, ASSEMBLE AND DESIGN PRECAST MANHOLE COMPONENTS DIAMETER WALL TOP/BOTTOM AREA OF STEEL Q D H O CONE SECTION I- U) ACCORDANCE WITH AASHTO M199. (FT.) THICKNESS SLAB THICKNESS PER VERTICAL FT. FZ-I CC C-) H Z = D ASSEMBLE RISER AND GRADE RINGS WITH THE STEPS SPACED 12" (IN.) (IN.) (SO. IN.) 00 LL 0 = Z = O m n m FROM THE TOP TO THE BOTTOM OF THE MANHOLE. W Q Z LL ^ m O WHERE THE MANHOLE IS EXPOSED TO ROAD TRAFFIC, CONSTRUCT 4 4 6 0.12 Q U O N Z x -0 O m THE TOP OF THE MANHOLE FLUSH WITH THE GROUND AND A MINIMUM 5 5 8 0.15 H = Z W 0 0 �r-I OF 9" ABOVE THE GROUND AT OTHER LOCATIONS. 6 6 8 0.18 Cn ~ U O J [[ H n = � Z LIMIT DEPTH OF FILL TO 30'-0" FROM FINISH GRADE TO TOP OF 0 O CD CC D BOTTOM SLAB. D Z Cn H r THE IN. SLAB THICKNESS 'T' IS THE DIMENSION OF THE r IL 0 Z THINNEST PORTION OF THE TOP/BOTTOM SLAB. ALTERNATE CONE SECTION 2�- ` W N GRADE RING �� T 0 * TOP MAT OF REINFORCEMENT MAY BE NEGLECTED IF TOP SLAB HAS MIN. AREA OF STEEL A DISTINGUISHABLE TOP AND BOTTOM. ° IS 0.07 in.2 ECCENTRIC CONE m'D'+2'W' W C7 ADDITIONAL 6" MAX. SPACING L u 1" MIN. OF CIRCUM. R/F D CLR. #4 REBAR LOCATE WALL REINFORCEMENT CO IN MIDDLE THIRD OF WALL o m .•.;,. n .• ;;.: e: 2 Q Z 1" MIN. O Be O CLR. USE MIN. AREA OF STEEL IN TOP n• LL r SLAB OF #4'S @ B" CTS. STEP STD. _ Z 0 EACHWAY/EACH FACE *. NO. 840.66 Z N 0 x FLAT TOP SLAB As (CIRCUMFERENTIAL I-' G O- r Z cn FRAME AND GRATES BTD. NO. REINFORCEMENT) Q H m TRAFFIC BEARING 840.37 a = Z ADDITIONAL #4 EACH LONGITUDINAL -Phv SIDE OF OPENING (1" NONTRAFFIC BEARING: 840.22 ADDITIONAL #4 EACH REINFORCEMENT O LL) co C D CLEAR OF BOTTOM FACE 140.24 SIDE OF OPENING (1" RISER *' PLACE BARS DIAGONAL 640. 00 CLEAR OF BOTTOM FACE) "_ OD O TO CORNERS (TYP. ) 640.29 Z v 840.33 = DD - - - rWr 'DI 'W' J ~ FRAME & GRATE i ` O m _ SEE STD. 840.54 = = r Z 7 _ _ _ _ _ X r i �X FOR MANHOLE BASE RING AND COVER z J O I- - JL =-II I l 1 � . r c J _IL _ ;I I ; t k]e)�j �� REINFORCED CONC. W \ �--JL--11 r 1 1 �(� - e, e, ...e,. -FIG. (SEE STD. `-y r 7 .:io• ..•y':s'w :•: ;s':rr :•.•r;:io'':.•c 1525.01 IF N m X \ , _ - r I USE MIN. AREA OF STEEL REQUIRED) Q I \ ♦ 7 - I IN BASE SLAB OF Lu m Lu � `` ir' ``� ie' I ------FOOT EACH12 in PER LINEAR - - - - - - , _ d TYPICAL MANHOLE SECTION SHEET 1 of 1 GRATED INLET OPTION MANHOLE OPTION SHEET 1 of 1 840.52 840.52 .. 1" MIN. CLR.(TYP) ; •' •v 4x4 W4xW4 :q WWF (LAP WWF 6" ON- TO FABRIC) o• v GENERAL NOTES: Z O THIS PRECAST BOX MAY BE USED FOR THE FOLLOWING STANDARDS: H �f �r"•4� =6- �f �� 840.04, 840.05, 840.14, 840.15, 840.31, 840.32, 840.34, 840.35, 840.36 AND 840.41. QQ Z < 1" MIN. {•�=a V * INSTALL AND PAY FOR PRECAST DRAINAGE STRUCTURES IN ACCORDANCE H 0 C3 CLR. TYP ( ) SECTION VIEWS WITH NCDOT STANDARD SPECIFICATION SECTION 840. 1L _J a = z * USE 4000 PSI MINIMUM COMPRESSIVE STRENGTH CONCRETE. 2 Z OPTIONAL JOINT DETAILS * USE ASTM A615 GRADE 60 REINFORCING STEEL. USE ASTM A185 U WELDED WIRE FABRIC (WWF). O Q #5 REBARS @ 12" * LIMIT MAXIMUM DEPTH TO TOP OF BOTTOM SLAB TO 15'-0". F- F_W CENTERS (HORIZ. & VERT.) * PLACE LIFT HOLES OR PINS IN ACCORDANCE WITH OSHA STANDARD 1926.704. cr LLC,1--1 Q O Coo) cr (USE WITH * ORIENT STRUCTURES SO THAT CORNERS WILL NOT BE CUT OR MODIFIED Z • j 4' X 4' & LARGER UNLESS ALLOWED BY DETAIL IN PLANS. N (L H DRAINAGE STRUCTURES * PRECAST ALL ELEMENTS TO MEET ASTM C913. T W 0 TYPICAL) - 'L' BARS WITH * FRAME AND GRATE HEIGHT MAY BE ADJUSTED WITH CONCRETE 1'-6" LEGS OR BRICK IN ACCORDANCE WITH STANDARD 840.25. PLAN VIEW OF BASE UNIT * PROVIDE PRECAST STRUCTURES OVER 4'-0" IN DEPTH WITH STEPS 12" ON CENTERS IN ACCORDANCE WITH STD. NO. 840.66. 6" L' OR 'W' fi" * WELDED WIRE FABRIC MAY BE SUBSTITUTED FOR REBAR IF MIN. MIN. THE SAME MIN. AREA OF STEEL IS PROVIDED. * SEAL JOINTS WITH AN APPROVED SEALANT (SEE SECTION 840 OF NGDOT i co* STANDARD SPECIFICATIONS. #4 REBARS @ LIMIT MAXIMUM STRUCTURE SIZE INSIDE CLEAR DIMENSIONS #4 REBARS @ 6" CENTERS m TO 6'-0" X 6'-0". :i) EACHWAYITE '°: EACH WAY * THE OUTSIDE PIPE DIAMETER PLUS 2" IS THE MINIMUM STRUCTURE LL a W IN SIZE OR THE OPENING REQUIRED FOR GRATE AND FRAME WHICHEVER 0 'o CENTEROTHIRD TYPICAL PRECAST IS GREATER. W OF WALL ROUND MANHOLE MAY BE USED IN LIEU OF SQUARE PROVIDED 2 EXTRA ,Zy RISER SECTION #5'S ARE PLACED ON EVERY SIDE NOT ADJACENT TO A WALL. SEE STD. 3 d DWG. 840.34 FOR MANHOLE INSTALLATION. c 0 m > y PRECAST RISER PLANcc N y m v 2 #5 BARS EACH SIDE O Q z OF OPENING FULL SPAN _ .Z4 6" L' 6" Z W W Cv 1" MIN. CLEAR 'O MIN. MIN. H m Q O m cn I L' OR 'W' + 2 WALLS " S N a z o, 1 MIN. CLR. O C m I 64 CENTERS W_ �,,, .�. H LL O STEPS m m I¢ REBAR ro 4x4 W4xW4 J o v' .o' „ c7 a 0 a O I 3 o WWF ( LAP WWF CO D' O' D' Z 6" ONTO FABRIC) C H CID D ' .. •.Q. Q: 0 ' W I- R - - - - - - - - - OPENING1 "@ #5 REBARS 12" CLEAR (SEE NOTES) CENTERS LOCATE OPENING Z TYPICAL SECTION •' :_°' �/°' AS REQUIRED m (SEE NOTES) TOP SLAB Z of 1 6" 'L' 6" TYPICAL SECTION .46 MI"' PLAN TOP SLAB MIN. OF BASE UNIT v m H Z D H o DETAIL SHOWING TYPES OF GRATES USE ACCORDING TO WATER FLOW. 2` 113/" 2 rr 1 1/22 "� z 0 Cn >` Q Q Z < U mZT1=� B CD �JIL OOmC-) = m z m0 n rr n r rr TYPE G TYPE E TYPE F A A 1 rr� I 9/8" O O O S WQZW ^ F_ U m o H Z o m \v cT ��LL0 J v z D y D �- WATER FLOW -� �- SAG WATER FLOW -•- T T I9 Z IEEEH H 2E 1 B �2 1 4 rr CL ' 0 - - - - - - - - - - - - - - - - - - - - - - - H ih rrrr ���"� SECTION B-B O-n ----------------------------•------ 1 rr 21/4" I m z WATER FLOW SAG �- WATER FLOW �- 1�- G~ O O Q LL cn r SECTION A -A = m mmc~npu z = TYPE "F11 TYPE "E,, TYPE "G" TYPE - E z = Z cn A Z Q Q Q 9 RAISED FLOW ARROW D z y Q. RAISED FLOW ARROW 2 3" 1s HIGH 2�'1 Imo- Q N a N vv %s" HIGH -� QD Q W 0 0 � z v� O Q O 1 rr Q =cn � > Z 1 rr _m \ I z O v Z = 0 D TO 1 it O '//] a ♦✓ T 1 ig rr CRC 13/" Y cl) W W C��S O Q' 1Y2 rr 1�rr 1�2rrR f01 z 11/2n 1n l 2'-113/4r 11/2rr 11/2''1f /grr T 2'-113/41r �grr 1�2n W 0 LL SECTION A -A =LL81%2"13/4 SECTION A A SHEET 2 OF 2 SHEET 2 OF 2 840.03 840.03 v v m H � 1 1' Z 70000 r O TIRO 1_4 --Am:D =0Zym =Cn00 O m �DDD In 0 o Z � m 0 Z O 0 z H j OCD = N m =mZ c C) D � -1v D F•-I cL _v W H m N z O H m z p BACK OF CURB - r-m► X PLAN X SECTION Y-Y RISER HT. VARIES A _ - 0 6" 0 'o WHERE 30" TO 36" PIPE IS USED RISER HT. VARIES - - - - PA 0 WHERE 42" TO 54" PIPE IS USED DETAIL SHOWING METHOD OF RISER CONSTRUCTION Y SECTION X-X GENERAL NOTES: USE CLASS "B" CONCRETE THROUGHOUT. PROVIDE ALL CATCH BASINS OVER 3'-6" IN DEPTH WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. OPTIONAL CONSTRUCTION - MONOLITHIC POUR, 2" KEYWAY, OR #4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB AS SHOWN ON STD. NO. 840.00. USE TYPE "E", "F" AND "G" GRATES UNLESS OTHERWISE INDICATED. FOR 8'-0" IN HEIGHT OR LESS USE 6" WALLS AND BOTTOM SLAB. OVER 8'-0' TO 16'-0" IN HEIGHT USE B" WALLS AND BOTTOM SLAB. ADJUST QUANTITIES ACCORDINGLY. CONSTRUCT WITH PIPE CROWNS MATCHING. CHAMFER ALL EXPOSED CORNERS 1". DRAWING NOT TO SCALE. 6„ 6" D vb EC " T SECTIONv J-J WHERE 30" TO 36" PIPE IS USED SEE NOTE L PLAN WHERE 42" TO 54" PIPE IS USED J A A a, of o PLAN Z 00 Q Q H2=C.) LL J a 1 Z o0Ux ccLu Z H-0cc0 H ►-1 c)HLLOJ 0OCDQ Z 1 ,1­4 9� �0 Q o Z LL m 0 CA Z CC M c = 0- 0 z cr o LO Qcc W = H-H� In UJ N U) r H z J O 0 V Z W 0 [� f o0 Q OLT 44 O 44 �o cQ - `w Pf) o 44 g � m 44 oz u" a w pp w P4 U - PH �oC -- �LL o o REVISIONS REV DATE I COMMENT I BY KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION PROJECT No.: NCC182110 DRAWN BY: SOM CHECKED BY: SRF DATE: 12/11 /2019 SCALE: 1 "=60' CAD 1. D.: NCC182110GPO PROJECT: AKA HEIGHTS FOR ARKA HEIGHTS LLC LOCATION OF SITE 4610 OLD CHARLOTTE HIGHWAY MONROE, NC 28110 UNION COUNTY 0 00 L �TE I 11INGIIN EEKING NC, P LILC NCBELS P-1132 1927 S. TRYON STREET, SUITE 310 CHARLOTTE, NC 28203 Phone: (980) 272-3400 Fax: (980) 272-3401 NC@)3ohlerEng.com rSHEET TITLE: S7["ORMWA7["E1I� DETAILS SHEET NUMBER: C-402 C:\USERS\MMOOREAPPDATA\LOCAL\TEMP\ACPUBLISH-7388W CC182110GPO.DVVG PRINTED BY: MMOORE 12.16.19 @ 5:28 PM LAST SAVED BY: MMOORE TRENCH WIDTH _ I I TRENCH III WIDTH _ -III -I GRADE 111� _ I _ -III I I III7 M I II -I1 I- I= -I I I -I I z FF I I� -ICI w W �18 -III III IIIII IIII O IIIII 0 �I-IIII �J a III _-III 6' I I I III a e a a 12" -III I 1 I -I a '��°. O-RING a . . 6" 24°. " RCP I ' e =III I II -I ° I 116 -III ANTI -SEEP -I I III n I II ° a ° ° II I I COLLAR I D_' I I d: 'a .. I I d da d ° 12" -III I I ANTI -SEEP COLLAR. I= CLASS B CONCRETE OR III- I i COMPACTED CLAY WITH I- INFILTRATION RATE OF 0.01 INCHES PER HOUR OR LESS. SECTION A -A ANTI -SEEP COLLAR NTS SCREW TYPE PLUG 6" 4" PVC PIPE AND TEE 'PERMANENT POOL 61 BOHLER ENGINEERING DETAIL PVC CAP WITH 2.0" HOLE DRILLED PER WATER QUALITY ORIFICE SIZE LISTED FOR WET POND NOTES: 1. DRAW DOWN ASSEMBLY SHALL NOT BE INSTALLED UNTIL WET DETENTION BASIN IS STABILIZED. DRAWDOWN ASSEMBLY NOT TO SCALE BOHLER ENGINEERING DETAIL TEMPORARY SEDIMENT CLEANOUT ELEV. = 659.00' INFLOW �i BOTTOM OF TEMPORARY SKIMMER BASIN = 658.00' (SEE EROSION CONTROL PLANS) 3:1 SIDE SLOPES SEDIMENT CLEANOUT ELEV. 657.00'--/ BOTTOM OF POND ELEV. 656 - L 100-YEAR STORM EVENT @ ELEVATION 662.79' V 25-YEAR STORM EVENT @ ELEVATION 662.34' L 2-YEAR STORM EVENT @ ELEVATION 661.11' TEMPORARY POOL (1" WQV) @ ELEVATION 659.47' L PERMANENT POOL @ ELEVATION 659.00' CLASS 1, 15" THICK RIP -RAP BERM CREST ELEV. = 658.50' PUMP TO DRAIN IF NECESSARY FOR POND MAINTENANCE MENT CLEANOUT ELEV. 657.00' BOTTOM OF POND ELEV. 656.00' GENERAL NOTES: WHET POND I (WEST) CIROSS 1. SEE WET POND PLANTING PLAN FOR LANDSCAPING REQUIREMENTS SECTION 2. POND TO BE LINED WITH COMPACTED CLAY WITH INFILTRATION RATE OF 0.01 INCHES PER HOUR OR LESS NTS (10:1 VERTICAL EXAGGERATION) FABRICATED ALUMINUM BAR C GRATE TRASH RACK WITH TOP OF POND ELEV. 664.00' 5"X5"OPENINGS - - - - - - - - - - TOP OF RISER ELEV.661.50' 24"X12" RECTANGULAR WEIR ELEV. 659.75' 24"X12" RECTANGULAR WEIR ELEV. 659.75 4' X 4' BOX STRUCTURE (INTERNAL DIMS) 24" OUTLET CULVERT ELEV. 659.00' PERMANENT POOL ELEV. 659.00' 2" ORIFICE CONNECTED TO ----NOTES: o 1 � 1 l� 1 ' 1 1 g 1, 1 DRAWDOWN ASSEMBLY SEE NCDOT STANDARDS FOR 24" OUTLET CULVERT ELEV.659.00' OUTLET STRUCTURE BOX, GRATE, ELEV. 659.00' REINFORCING, ETC. 2"ORIFICE CONNECTED TO 5'X5'X1.5' CONCRETE BALLAST PAID -,"""" AD ALL CONCRETE TO BE 3,600 PSI DRAWDOWN ASSEMBLY ' (INCLUDING PRECAST BOX WALLS COMPRESSIVE STRENGTH. ELEV. 659.00' ' X AND BOTTOM SLAB, FILL BOTTOM i O OF STRUCTURE TO 1.5' BELOW OUTLET CULVERT WITH CONCRETE AND PROVIDE SMOOTH FINISH AT INVERT OF STRUCTURE) / 1 WHET POND I RISER STRUCTURE NTS Tnn nr I-1nAIr% rl r\ / P-PT A nnI WET POND I SPILLWAY DETAIL NTS TOP OF POND ELEV. 664.00' 40' WIDE CIPOLETTI SPILLWAY ELEV. LINED WITH 18" THICK CLASS 1 R MAX 3:1 SLOPES FOR TEMPO DRAWDOWN PIPE 3:1 SLOPES UNDER PERMANENT POOL A-EP G 664.30 0 X ` TC 665.88 BC 665.38 L ���-- co co I il TC 666.09 664.97 TC 666.47 BC 665.97 70 o� OUTFLOW / `t-ANTI-SEEP COLLARS �6' WIDE, 6:1 VEGETATED SHELF AFTER STABILIZATION BUT PRIOR TO PAVING, POND TO BE DREDGED AND CONVERTED FROM SKIMMER SEDIMENT BASIN TO PERMANENT WET POND. CONTRACTOR TO PUMP/DREDGE BASIN ONLY IF TOP OF SEDIMENT STORAGE ELEVATION IS ABOVE 660.00'. ---------- T -T L -L -L -L -L i LP 664.87 101 REVISIONS REV DATE T COMMENT I BY KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. A-1.1 111.70'- 2 4" RCP @ 0.60% NOT APPROVED FOR P HCONSTRUCTION EQUILIBRIUM PIPE CONNECTION POND 1 AND POND 2 PROJECT No.: NCC182110 I I 348.14' DRAWN BY: SOM /�?n-7 I-18" RCP @ 0.00% CHECKED BY: SRF lim DATE: 12/11 /2019 SCALE: 1..=60' CAD I.D.: NCC18211OGPO D TC 666.53 D D TC 666.2 ` BC 666.03 1 BC 665.7 TC 665.90 e BC 665.40 D ° TC 666. � BC 666. e D F F D G 666.50 1M eD LL 5. T -1D - D O� LTEH TC 665.ENGINEERING NC, P LILC e BC 665.24 4 NCBELS P-1132 TC 665.74�J��OP� BC 665.24 66A' ° G 666.01 gg5 G 665.14 ; a; G 665.57 I oo� I o°I G 665.36 � Ga � G 666.28 z r ±'F 666.50 ®R (2) 30 15 7.5 0 30 1..= 30' 1927 S. TRYON STREET, SUITE 310 CHARLOTTE, NC 28203 Phone: (980) 272-3400 Fax: (980) 272-3401 NC@)3ohlerEng.com SHEET TITLE: BOND DETAILS SHEET NUMBER: C-403 C:\USERS\MMOORE'APPDATA\LOCAL\TEMPWCPUBLISH_7388\NCC182110GPO.DWG PRINTED BY: MMOORE 12.16.19 @ 5:28 PM LAST SAVED BY: MMOORE C:\USERS\MMOORE64PPDATA\LOCAL\TEMPWCPUBLISH_7388\NCC182110GPO.DWG PRINTED BY: MMOORE 12.16.19 @ 5:29 PM LAST SAVED BY: MMOORE DESIGN: GIVEN: WET POND #1 ARKA HEIGHT (MONROE, NC) DRAINAGE AREA TO FACILITY = -Ac. LAND USE = Apartments ESTIMATED PERCENT IMPERVIOUS = - 1) SA/DA RATIO: AVERAGE POOL DEPTH = 3 FEET PERCENT IMPERVIOUS = 80% SA/DA = 2.92 % = 0.0292 SA REQUIRED = 5.25 Ac. X 0.0292 = 0.15 Ac. = 6,678 SF 2) TEMPORARY WATER QUALITY POOL REQUIREMENTS PROVID E TO DETAIN THE 1" STORM EVENT ABOVE THE ELEVATION ALLOCA A PERMANENT POOL THE VOL= FOR THE 1" STORM EVENT CAN BE CALCULATED AS: V, _ (Design Rainfall)(Rv)(Drainage Area) Design Rainfall = 1 Inch Drainage Area = 5.25 Acres Rv = 0.05 + 0.9(1) 1 = Percent Impervious = 80% Rv = 0.77 in./in. V, = 0.337 acre-feet = 14,674 fts 3) Pond Drawdown Time Pond Height above Orifice =� feet Orifice Invert Elevation = feet Orifice Diameter (D) _- inches = 0.17 feet Orifice Area (a) = 0.0218 square feet Gravitational Constant (g) = 32.2 ft/sec2 Head (H) = 0.39 feet Driving Head (Ho) = 0.129 feet Discharge Coefficient (CD) = 0.6 Drawdown rate (Q) = 0.038 cfs Time (t) = 389,105 seconds = 4.50 days Note: The calculation is based on the orifice equation where: ]above Y - CD 2gH. 12/16/2019 3:35 PM Page 1 of 1 Wet Pond #1 Design Wet Pond D Treatment Volume Elev Area (sf) Inc Storage (cf) Total Storage (cf) 659.00 8,329 0 0 660.00 9,595 8,962 8,962 661.00 10,918 10,257 19,219 662.00 12,297 11,608 30,826 663.00 13,733 13,015 43,841 664.00 15,225 14,479 58,320 Wet Pond D Permanent Pool Volume - Main Pool Elev Area (sf) Inc Storage (cf) Total Storage (cf) 656.00 2,160 0 0 657.00 2,860 2,510 2,510 658.00 3,628 3,244 5,754 659.00 5,256 4,442 10,196 Wet Pond D Permanent Pool - Forebav Elev Area (sf) Inc Storage (cf) Total Storage (cf) 656.00 738 0 0 657.00 1,560 1,149 1,149 658.00 2,042 1,801 2,950 659.00 3,083 2,563 5,513 Wet Pond 5 - Treatment Summary Requirements Total Treatment Volume Req. (cf) = 14,674 Total Treatment Volume Prov. (cf) = 30,826 Total Treatment Surface Area Req. (sf) = 6,678 Total Treatment Surface Area Prov. (sf) = 8,329 Wet Pond 5 - Permanent Pool Summary Requirements Total Permanent Pool Surface Area (sf) = 8,329 Permanent Pool Average Depth Req. (ft) = 6.5 Permanent Pool Average Depth Prov.(ft) = 3.0 Wet Pond 5 - Forebav Summary Requirements Forebay#1 Volume Req. (20%) = 1,151 Forebay#1 Provided (cf) = 5,513 Forebay#1 Percentage Provided - 54.07% Forebay Treatment Volumes PROVIDE VOLUME TO DETAIN THE 1" STORM EVENT ABOVE THE ELEVATION ALLOCATED AS A PERMANENT POOL Forebay #1 THE VOLUME FOR THE 1" STORM EVENT CAN BE CALCULATED AS: V, _ (Design Rainfall)(Rv)(Drainage Area) Impervious Design Rainfall = -Inch Drainage Area = -Acres Rv = 0.05 + 0.009(1) 1 = Percent Impervious= - Rv=-in./in. V,= acre-feet= Vreq= 2934.855 Permanent Pool Average Depth Calculation Surface area at bottom of shelf, including forebay (sq. ft) = 5,967 Surface area at permanent pool level, including forebay (sq. ft) = 8,329 Surface area at the bottom of pond (sq. ft) = 2,899 Depth, distance btwn bottom of shelf and pond bottom (ft) = 3.50 Permanent pool average depth = 12/11/2019 9:15 PM Page 1 of 1 WET POND #2 ARKA HEIGHT (MONROE, NC) DESIGN: WATER QUALITY TO MEET 90% TSS REMOVAL GIVEN: DRAINAGE AREA TO FACILITY = 3.54 Ac. LAND USE = Apartments ESTIMATED PERCENT IMPERVIOUS = 80% 1) SA/DA RATIO: AVERAGE POOL DEPTH = 3 FEET PERCENT IMPERVIOUS = 80% SA/DA = 2.92 % = 0.0292 SA REQUIRED = 3.54 Ac. X 0.0292 = 0.10 Ac. = 4,503 SF 2) TEMPORARY WATER QUALITY POOL REQUIREMENTS PROVIDE VOLUME TO DETAIN THE 1" STORM EVENT ABOVE THE ELEVATION ALLOCATED AS A PERMANENT POOL THE VOLUME FOR THE 1" STORM EVENT CAN BE CALCULATED AS: V, _ (Design Rai nfall)(Rv)(Drainage Area) Design Rainfall = 1 Inch Drainage Area = 3.54 Acres Rv = 0.05 + 0.9(1) 1 = Percent Impervious = 80% Rv = 0.77 in./in. 0.227 acre-feet = 9,895 ft'j 12/11/2019 9:15 PM Page 1 of 1 Wet Pond #2 Design Wet Pond D Treatment Volume Elev Area (sf) Inc Storage (cf) Total Storage (cf) 659.00 9,604 0 0 660.00 1 1, 638 10,621 10,621 661.00 13,738 12,688 23,309 662.00 15,894 14,816 38,125 663.00 18,107 17,001 55,126 664.00 20,376 19,242 74,367 Wet Pond D Permanent Pool Volume - Main Pool Area (sf) Inc Storage (cf) Total Storage (cf) 655 4600 0 0 656 5515 5,058 5,058 657 6450 5,983 11,040 658 7517 6,984 18,024 659 9641 8,579 26,603 Wet Pond D Permanent Pool - Forebav Elev Area (sf) Inc Storage (cf) Total Storage (cf) 657.00 584 0 0 658.00 950 767 767 659.00 1,500 1,225 1,992 Wet Pond 5 - Treatment Summary Requirements Total Treatment Volume Req. (cf) = 9,895 Total Treatment Volume Prov. (cf) = 74,367 Total Treatment Surface Area Req. (sf) = 4,503 Total Treatment Surface Area Prov. (sf) = 9,604 Wet Pond 5 - Permanent Pool Summary Requirements Total Permanent Pool Surface Area (sf) = 11,279 Permanent Pool Average Depth Req. (ft) = 4.0 Permanent Pool Average Depth Prov.(ft) = 3.5 Wet Pond 5 - Forebav Summary Requirements Forebay#1 Volume Req. (20%) = 1,979 Forebay#1 Provided (cf) = 1,992 Forebay#1 Percentage Provided - 20.13% Forebay Treatment Volumes PROVIDE VOLUME TO DETAIN THE 1" STORM EVENT ABOVE THE ELEVATION ALLOCATED AS A PERMANENT POOL Forebay #1 THE VOLUME FOR THE 1" STORM EVENT CAN BE CALCULATED AS: V, _ (Design Rainfall)(Rv)(Drainage Area) Impervious Design Rainfall = -Inch Drainage Area = -Acres Rv = 0.05 + 0.009(1) 1 = Percent Impervious= _ Rv= 0.64 in./in. V, = 0.227 acre-feet = Vreq= 1978.931 Permanent Pool Average Depth Calculation Surface area at bottom of shelf, including forebay (sq. ft) = 8,651 Surface area at permanent pool level, including forebay (sq. ft; = 11,279 Surface area at the bottom of pond (sq. ft) = 4,600 Depth, distance btwn bottom of shelf and pond bottom (ft) = 4.00 Permanent pool average depth = 12/16/2019 5:25 PM Page 1 of 1 23 (i� (i� s EX DA 1 EX DA 2 Prop pA-1 Prop A-2 4L I EX DA (Combined) 6P 8P Wet Pond 1 Wet Pond 2 11S 3S gS i EX DA-3 12L EX DA-4Prop DA-3 a Ex POI-2 10L 11 L Prop POI-1 Prop POI-2 12S Prop DA-4 Subcat Reach on Link NCC182110 - Acra Heights Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 2 Area Listing (all nodes) Area CN Description (acres) (su bcatch me nt-n u mbe rs) 0.719 69 50-75% Grass cover, Fair, HSG B (11 S) 2.553 61 >75% Grass cover, Good, HSG B (5S, 7S, 9S, 12S) 0.874 80 >75% Grass cover, Good, HSG D (5S, 7S) 4.582 69 Pasture/grassland/range, Fair, HSG B (1 S, 3S) 3.106 84 Pasture/grassland/range, Fair, HSG D (1 S, 2S) 0.586 98 Paved parking, HSG B (3S, 9S) 7.067 98 Paved parking, HSG D (5S, 7S, 11 S, 12S) 0.182 60 Woods, Fair, HSG B (1S) 1.137 79 Woods, Fair, HSG D (1 S, 2S, 3S) 20.806 82 TOTAL AREA NCC182110 - Acra Heights Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 3 Soil Listing (all nodes) Area Soil Subcatchment (acres) Group Numbers 0.000 HSG A 8.622 HSG B 1 S, 3S, 5S, 7S, 9S, 11 S, 12S 0.000 HSG C 12.184 HSG D 1 S, 2S, 3S, 5S, 7S, 11 S, 12S 0.000 Other 20.806 TOTAL AREA NCC182110 - Acra Heights Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 4 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 0.719 0.000 0.000 0.000 0.719 50-75% Grass cover, Fair 11 S 0.000 2.553 0.000 0.874 0.000 3.427 >75% Grass cover, Good 5S, 7S, 9S, 12S 0.000 4.582 0.000 3.106 0.000 7.688 Pasture/grassland/range, Fair is, 2S, 3S 0.000 0.586 0.000 7.067 0.000 7.653 Paved parking 3S, 5S, 7S, 9S, 11 S, 12S 0.000 0.182 0.000 1.137 0.000 1.319 Woods, Fair is, 2S, 3S 0.000 8.622 0.000 12.184 0.000 20.806 TOTAL AREA NCC182110 - Acra Heights Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 5 Pipe Listing (all nodes) Line# Node In -Invert Out -Invert Length Slope n Diam/Width Height Inside -Fill Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) 1 6P 659.00 658.90 20.0 0.0050 0.011 24.0 0.0 0.0 2 8P 659.00 659.00 660.0 0.0000 0.011 24.0 0.0 0.0 NM 82110 - Acra Heights Type 1124-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 6 Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1 S: EX DA 1 Runoff Area=5.910 ac 0.00% Impervious Runoff Depth>1.28" Flow Length=605' Tc=20.0 min CN=74 Runoff=8.14 cfs 0.631 of Subcatchment2S: EX DA 2 Runoff Area=1.879 ac 0.00% Impervious Runoff Depth>1.91" Flow Length=515' Tc=22.5 min CN=83 Runoff=3.73 cfs 0.299 of Subcatchment3S: EX DA-4 Runoff Area=1.400 ac 13.00% Impervious Runoff Depth>1.28" Flow Length=215' Tc=10.6 min CN=74 Runoff=2.64 cfs 0.150 of Subcatchment5S: Prop DA-1 Runoff Area=5.250 ac 70.00% Impervious Runoff Depth>2.42" Tc=6.0 min CN=89 Runoff=21.22 cfs 1.059 of Subcatchment7S: Prop DA-2 Runoff Area=3.537 ac 70.51% Impervious Runoff Depth>2.42" Tc=6.0 min CN=89 Runoff=14.30 cfs 0.713 of Subcatchment9S: Prop DA-3 Runoff Area=1.010 ac 40.00% Impervious Runoff Depth>1.41" Tc=6.0 min CN=76 Runoff=2.49 cfs 0.119 of Subcatchment 11 S: EX DA-3 Runoff Area=1.220 ac 41.07% Impervious Runoff Depth>1.76" Flow Length=375' Tc=19.2 min CN=81 Runoff=2.43 cfs 0.179 of Subcatchment 12S: Prop DA-4 Runoff Area=0.600 ac 66.17% Impervious Runoff Depth>2.08" Tc=6.0 min CN=85 Runoff=2.12 cfs 0.104 of Pond 6P: Wet Pond 1 Peak Elev=661.11' Storage=20,442 cf Inflow=22.58 cfs 1.663 of Primary=8.95 cfs 1.485 of Secondary=0.00 cfs 0.000 of Outflow=8.95 cfs 1.485 of Pond 8P: Wet Pond 2 Peak Elev=660.28' Storage=15,455 cf Inflow=14.30 cfs 0.713 of Primary=2.51 cfs 0.605 of Secondary=0.00 cfs 0.000 of Outflow=2.51 cfs 0.605 of Link 4L: EX DA (Combined) Inflow=11.85 cfs 0.929 of Primary=11.85 cfs 0.929 of Link 10L: Prop POI-1 Link 11L: Prop POI-2 Link 12L: Ex POI-2 Inflow=8.95 cfs 1.485 of Primary=8.95 cfs 1.485 of Inflow=4.58 cfs 0.223 of Primary=4.58 cfs 0.223 of Inflow=4.74 cfs 0.328 of Primary=4.74 cfs 0.328 of Total Runoff Area = 20.806 ac Runoff Volume = 3.252 of Average Runoff Depth = 1.88" 63.22% Pervious = 13.153 ac 36.78% Impervious = 7.653 ac NM 82110 - Acra Heights Type 1124-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 1S: EX DA 1 Runoff = 8.14 cfs @ 12.14 hrs, Volume= 0.631 af, Depth> 1.28" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.57" Area (ac) CN Description 0.182 60 Woods, Fair, HSG B 0.565 79 Woods, Fair, HSG D 1.592 84 Pasture/grassland/range, Fair, HSG D 3.571 69 Pasture/grassland/range, Fair, HSG B 5.910 74 Weighted Average 5.910 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.7 75 0.0100 0.13 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 3.57" 10.3 530 0.0150 0.86 Shallow Concentrated Flow, Shallow Concentrated Flow Short Grass Pasture Kv= 7.0 fps 20.0 605 Total Subcatchment 1S: EX DA 1 Hydrograph 9 8.14 Type ,11 24,hr -2--Year RaInfaH=3:5 '" - - 7 -R"o f Area=568a-0-ac� _'1 6 Flu o f o'I u m 631 of ---------------------------- 5 Runoff Depth>�1.28" 4 �lo�nr Length^505' f-c=2(�.Q min, --'--- -- --rt 3 -'' =74-�-- ------------�--� 2 ------------------------------- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 8 Hydrograph for Subcatchment 1S: EX DA 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.01 0.00 0.00 0.50 0.02 0.00 0.00 0.75 0.03 0.00 0.00 1.00 0.04 0.00 0.00 1.25 0.05 0.00 0.00 1.50 0.06 0.00 0.00 1.75 0.07 0.00 0.00 2.00 0.08 0.00 0.00 2.25 0.09 0.00 0.00 2.50 0.10 0.00 0.00 2.75 0.11 0.00 0.00 3.00 0.12 0.00 0.00 3.25 0.13 0.00 0.00 3.50 0.15 0.00 0.00 3.75 0.16 0.00 0.00 4.00 0.17 0.00 0.00 4.25 0.18 0.00 0.00 4.50 0.20 0.00 0.00 4.75 0.21 0.00 0.00 5.00 0.22 0.00 0.00 5.25 0.24 0.00 0.00 5.50 0.25 0.00 0.00 5.75 0.27 0.00 0.00 6.00 0.29 0.00 0.00 6.25 0.30 0.00 0.00 6.50 0.32 0.00 0.00 6.75 0.34 0.00 0.00 7.00 0.35 0.00 0.00 7.25 0.37 0.00 0.00 7.50 0.39 0.00 0.00 7.75 0.41 0.00 0.00 8.00 0.43 0.00 0.00 8.25 0.45 0.00 0.00 8.50 0.47 0.00 0.00 8.75 0.50 0.00 0.00 9.00 0.52 0.00 0.00 9.25 0.55 0.00 0.00 9.50 0.58 0.00 0.00 9.75 0.61 0.00 0.00 10.00 0.65 0.00 0.00 10.25 0.68 0.00 0.00 10.50 0.73 0.00 0.00 10.75 0.78 0.00 0.01 11.00 0.84 0.01 0.05 11.25 0.91 0.01 0.10 11.50 1.01 0.02 0.20 11.75 1.38 0.11 0.63 12.00 2.37 0.53 4.94 12.25 2.52 0.62 6.34 12.50 2.62 0.68 2.51 12.75 2.70 0.72 1.39 13.00 2.76 0.76 1.00 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 2.81 0.79 0.83 13.50 2.85 0.82 0.72 13.75 2.89 0.84 0.64 14.00 2.93 0.86 0.57 14.25 2.96 0.88 0.51 14.50 2.99 0.90 0.48 14.75 3.02 0.92 0.46 15.00 3.05 0.94 0.44 15.25 3.07 0.95 0.41 15.50 3.10 0.97 0.39 15.75 3.12 0.99 0.37 16.00 3.14 1.00 0.35 16.25 3.16 1.01 0.33 16.50 3.18 1.03 0.31 16.75 3.20 1.04 0.31 17.00 3.22 1.05 0.30 17.25 3.24 1.06 0.29 17.50 3.25 1.07 0.28 17.75 3.27 1.08 0.27 18.00 3.29 1.10 0.27 18.25 3.30 1.11 0.26 18.50 3.32 1.12 0.25 18.75 3.33 1.13 0.24 19.00 3.35 1.14 0.23 19.25 3.36 1.15 0.22 19.50 3.37 1.15 0.22 19.75 3.39 1.16 0.21 20.00 3.40 1.17 0.20 20.25 3.41 1.18 0.19 20.50 3.42 1.19 0.19 20.75 3.43 1.19 0.19 21.00 3.44 1.20 0.18 21.25 3.46 1.21 0.18 21.50 3.47 1.22 0.18 21.75 3.48 1.22 0.18 22.00 3.49 1.23 0.18 22.25 3.50 1.24 0.18 22.50 3.51 1.25 0.17 22.75 3.52 1.25 0.17 23.00 3.53 1.26 0.17 23.25 3.54 1.27 0.17 23.50 3.55 1.27 0.17 23.75 3.56 1.28 0.17 24.00 3.57 1.29 0.17 NM 82110 - Acra Heights Type 1124-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 2S: EX DA 2 Runoff = 3.73 cfs @ 12.16 hrs, Volume= 0.299 af, Depth> 1.91" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.57" Area (ac) CN Description 0.365 79 Woods, Fair, HSG D 0.284 84 Pasture/grassland/range, Fair, HSG D 1.230 84 Pasture/grassland/range, Fair, HSG D 1.879 83 Weighted Average 1.879 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.8 75 0.0050 0.10 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 3.57" 9.7 440 0.0116 0.75 Shallow Concentrated Flow, Shallow Concentrated Flow Short Grass Pasture Kv= 7.0 fps 22.5 515 Total Subcatchment 2S: EX DA 2 Hydrograph ■ Runoff a 3.73 cfs Type ',11 24,hr 2-Year Rainfall=3.57" 3 Ruhoff Arch=16879 ac' Runoff Vo''Iurmq=0.209'', af Runaf# DeiptK>1-91"---,-- -+--'--'---'---'--+-- ----'---'---'-- 2 ploW Length,^515' LL Tc=2�.5 min 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 10 Hydrograph for Subcatchment 2S: EX DA 2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.01 0.00 0.00 0.50 0.02 0.00 0.00 0.75 0.03 0.00 0.00 1.00 0.04 0.00 0.00 1.25 0.05 0.00 0.00 1.50 0.06 0.00 0.00 1.75 0.07 0.00 0.00 2.00 0.08 0.00 0.00 2.25 0.09 0.00 0.00 2.50 0.10 0.00 0.00 2.75 0.11 0.00 0.00 3.00 0.12 0.00 0.00 3.25 0.13 0.00 0.00 3.50 0.15 0.00 0.00 3.75 0.16 0.00 0.00 4.00 0.17 0.00 0.00 4.25 0.18 0.00 0.00 4.50 0.20 0.00 0.00 4.75 0.21 0.00 0.00 5.00 0.22 0.00 0.00 5.25 0.24 0.00 0.00 5.50 0.25 0.00 0.00 5.75 0.27 0.00 0.00 6.00 0.29 0.00 0.00 6.25 0.30 0.00 0.00 6.50 0.32 0.00 0.00 6.75 0.34 0.00 0.00 7.00 0.35 0.00 0.00 7.25 0.37 0.00 0.00 7.50 0.39 0.00 0.00 7.75 0.41 0.00 0.00 8.00 0.43 0.00 0.00 8.25 0.45 0.00 0.00 8.50 0.47 0.00 0.00 8.75 0.50 0.00 0.01 9.00 0.52 0.01 0.01 9.25 0.55 0.01 0.02 9.50 0.58 0.01 0.03 9.75 0.61 0.02 0.03 10.00 0.65 0.02 0.04 10.25 0.68 0.03 0.05 10.50 0.73 0.04 0.06 10.75 0.78 0.06 0.08 11.00 0.84 0.07 0.11 11.25 0.91 0.10 0.14 11.50 1.01 0.14 0.21 11.75 1.38 0.31 0.43 12.00 2.37 0.96 2.26 12.25 2.52 1.07 3.21 12.50 2.62 1.15 1.30 12.75 2.70 1.21 0.67 13.00 2.76 1.25 0.45 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 2.81 1.29 0.35 13.50 2.85 1.33 0.30 13.75 2.89 1.36 0.27 14.00 2.93 1.39 0.24 14.25 2.96 1.41 0.21 14.50 2.99 1.44 0.20 14.75 3.02 1.46 0.19 15.00 3.05 1.48 0.18 15.25 3.07 1.51 0.17 15.50 3.10 1.53 0.16 15.75 3.12 1.54 0.15 16.00 3.14 1.56 0.14 16.25 3.16 1.58 0.13 16.50 3.18 1.59 0.13 16.75 3.20 1.61 0.12 17.00 3.22 1.62 0.12 17.25 3.24 1.64 0.12 17.50 3.25 1.65 0.11 17.75 3.27 1.67 0.11 18.00 3.29 1.68 0.11 18.25 3.30 1.69 0.10 18.50 3.32 1.71 0.10 18.75 3.33 1.72 0.10 19.00 3.35 1.73 0.09 19.25 3.36 1.74 0.09 19.50 3.37 1.75 0.09 19.75 3.39 1.76 0.08 20.00 3.40 1.77 0.08 20.25 3.41 1.78 0.07 20.50 3.42 1.79 0.07 20.75 3.43 1.80 0.07 21.00 3.44 1.81 0.07 21.25 3.46 1.82 0.07 21.50 3.47 1.83 0.07 21.75 3.48 1.84 0.07 22.00 3.49 1.85 0.07 22.25 3.50 1.86 0.07 22.50 3.51 1.87 0.07 22.75 3.52 1.87 0.07 23.00 3.53 1.88 0.07 23.25 3.54 1.89 0.07 23.50 3.55 1.90 0.07 23.75 3.56 1.91 0.06 24.00 3.57 1.92 0.06 NM 82110 - Acra Heights Type 1124-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 3S: EX DA-4 Runoff = 2.64 cfs @ 12.03 hrs, Volume= 0.150 af, Depth> 1.28" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.57" Area (ac) CN Description 1.011 69 Pasture/grassland/range, Fair, HSG B 0.207 79 Woods, Fair, HSG D 0.182 98 Paved parking, HSG B 1.400 74 Weighted Average 1.218 87.00% Pervious Area 0.182 13.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.7 75 0.0133 0.14 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 3.57" 1.9 140 0.0305 1.22 Shallow Concentrated Flow, Shallow Concentrated Flow Short Grass Pasture Kv= 7.0 fps 10.6 215 Total Subcatchment 3S: EX DA-4 Hydrograph 2. Type ',11 24,hr 2-Year Rainfall'=31'.5p" u1h - Ro�fi Arch='f,400-at'i - -1 Runoff Vo'lurmq=0.1'$6 of Runoff Depth>'�1.28'1 FloW Length^215' -�c 4(F 6, min', - - -- 4N=7�4 I I ❑Runoff 64 cfs Time (hours) NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 12 Hydrograph for Subcatchment 3S: EX DA-4 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.01 0.00 0.00 0.50 0.02 0.00 0.00 0.75 0.03 0.00 0.00 1.00 0.04 0.00 0.00 1.25 0.05 0.00 0.00 1.50 0.06 0.00 0.00 1.75 0.07 0.00 0.00 2.00 0.08 0.00 0.00 2.25 0.09 0.00 0.00 2.50 0.10 0.00 0.00 2.75 0.11 0.00 0.00 3.00 0.12 0.00 0.00 3.25 0.13 0.00 0.00 3.50 0.15 0.00 0.00 3.75 0.16 0.00 0.00 4.00 0.17 0.00 0.00 4.25 0.18 0.00 0.00 4.50 0.20 0.00 0.00 4.75 0.21 0.00 0.00 5.00 0.22 0.00 0.00 5.25 0.24 0.00 0.00 5.50 0.25 0.00 0.00 5.75 0.27 0.00 0.00 6.00 0.29 0.00 0.00 6.25 0.30 0.00 0.00 6.50 0.32 0.00 0.00 6.75 0.34 0.00 0.00 7.00 0.35 0.00 0.00 7.25 0.37 0.00 0.00 7.50 0.39 0.00 0.00 7.75 0.41 0.00 0.00 8.00 0.43 0.00 0.00 8.25 0.45 0.00 0.00 8.50 0.47 0.00 0.00 8.75 0.50 0.00 0.00 9.00 0.52 0.00 0.00 9.25 0.55 0.00 0.00 9.50 0.58 0.00 0.00 9.75 0.61 0.00 0.00 10.00 0.65 0.00 0.00 10.25 0.68 0.00 0.00 10.50 0.73 0.00 0.00 10.75 0.78 0.00 0.01 11.00 0.84 0.01 0.02 11.25 0.91 0.01 0.04 11.50 1.01 0.02 0.07 11.75 1.38 0.11 0.36 12.00 2.37 0.53 2.52 12.25 2.52 0.62 0.71 12.50 2.62 0.68 0.36 12.75 2.70 0.72 0.25 13.00 2.76 0.76 0.21 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 2.81 0.79 0.18 13.50 2.85 0.82 0.16 13.75 2.89 0.84 0.14 14.00 2.93 0.86 0.13 14.25 2.96 0.88 0.12 14.50 2.99 0.90 0.11 14.75 3.02 0.92 0.11 15.00 3.05 0.94 0.10 15.25 3.07 0.95 0.10 15.50 3.10 0.97 0.09 15.75 3.12 0.99 0.08 16.00 3.14 1.00 0.08 16.25 3.16 1.01 0.08 16.50 3.18 1.03 0.07 16.75 3.20 1.04 0.07 17.00 3.22 1.05 0.07 17.25 3.24 1.06 0.07 17.50 3.25 1.07 0.07 17.75 3.27 1.08 0.06 18.00 3.29 1.10 0.06 18.25 3.30 1.11 0.06 18.50 3.32 1.12 0.06 18.75 3.33 1.13 0.06 19.00 3.35 1.14 0.05 19.25 3.36 1.15 0.05 19.50 3.37 1.15 0.05 19.75 3.39 1.16 0.05 20.00 3.40 1.17 0.05 20.25 3.41 1.18 0.04 20.50 3.42 1.19 0.04 20.75 3.43 1.19 0.04 21.00 3.44 1.20 0.04 21.25 3.46 1.21 0.04 21.50 3.47 1.22 0.04 21.75 3.48 1.22 0.04 22.00 3.49 1.23 0.04 22.25 3.50 1.24 0.04 22.50 3.51 1.25 0.04 22.75 3.52 1.25 0.04 23.00 3.53 1.26 0.04 23.25 3.54 1.27 0.04 23.50 3.55 1.27 0.04 23.75 3.56 1.28 0.04 24.00 3.57 1.29 0.04 NM 82110 - Acra Heights Type 1124-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 5S: Prop DA-1 Runoff = 21.22 cfs @ 11.97 hrs, Volume= 1.059 af, Depth> 2.42" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.57" Area (ac) CN Description 3.675 98 Paved parking, HSG D 1.068 61 >75% Grass cover, Good, HSG B 0.507 80 >75% Grass cover, Good, HSG D 5.250 89 Weighted Average 1.575 30.00% Pervious Area 3.675 70.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Direct Entry Subcatchment 5S: Prop DA-1 Hydrograph 23 22 -----�---- -- - - ----1--L-------�- 21.22 cfs ---- --i-------------------L-{-,�-- ■Runoff 21 r-------r--r--r--r--------I--r 11 --r--t--r--r-----I� Hr3-hr - 20 19 ----- - - - I -- -_ --- -----I--- ------------1--L--L-----I---I-- I i -- -- -- _�'I�- 'I ------ --1---2TYearRait�fall= �M 1"- 17 ---------- -- -- --18 ----------- I I I I I I I I I I I -- -- rrb-AweA=5.250-ad - I I Iff 16 15 ---------- -- -- ------------ ------------- --r-- --------- -- --+-- --------- -- --+-- -- -- -- RpnpffrVplr�me=1.���- ^ w 13 � I I I ------------+--+------------ I I I I I I I +--Rumgfl~IDepth>Z.42'�_ 12 0 11 LL 10 i --'---------------------------'--- --r-------y--rt--r--r--r-----I--y -- ------------------IiriTV.i lillfll-- I --rt--+--r--r--I-----y----+--r�-pr-- ---1--L------------ -1--1--L----1---1--J--1-- L-- -- 7 6 - -I---I---I-- r-- r-- r-- r-- r--r--I--r --'--------------------------'---' I I I I I I I I I I I --r--r--r--r--I--- I--r--r--r--r--r-- ---'--'---'---'---'---'---'---'---'--'---'--- I I I I I I I I I I I 5 ---------- -- -- ------------ - --+-- --------- -- --+-- -- -- 4 3 --------7--r--r--r--------T--r--r----------T--r--+-- ----------!--! --! --!--------'-- I I I I I I I I I I -! --! --!-----------'--! --! --! --'--- I I I I I I I I I I I 2 ----------+--+--+--+--------�-- - -+--+--+-------+--+--+--+--+-- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 14 Hydrograph for Subcatchment 5S: Prop DA-1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.01 0.00 0.00 0.50 0.02 0.00 0.00 0.75 0.03 0.00 0.00 1.00 0.04 0.00 0.00 1.25 0.05 0.00 0.00 1.50 0.06 0.00 0.00 1.75 0.07 0.00 0.00 2.00 0.08 0.00 0.00 2.25 0.09 0.00 0.00 2.50 0.10 0.00 0.00 2.75 0.11 0.00 0.00 3.00 0.12 0.00 0.00 3.25 0.13 0.00 0.00 3.50 0.15 0.00 0.00 3.75 0.16 0.00 0.00 4.00 0.17 0.00 0.00 4.25 0.18 0.00 0.00 4.50 0.20 0.00 0.00 4.75 0.21 0.00 0.00 5.00 0.22 0.00 0.00 5.25 0.24 0.00 0.00 5.50 0.25 0.00 0.00 5.75 0.27 0.00 0.01 6.00 0.29 0.00 0.02 6.25 0.30 0.00 0.03 6.50 0.32 0.00 0.03 6.75 0.34 0.01 0.04 7.00 0.35 0.01 0.05 7.25 0.37 0.01 0.06 7.50 0.39 0.01 0.07 7.75 0.41 0.02 0.08 8.00 0.43 0.02 0.10 8.25 0.45 0.03 0.11 8.50 0.47 0.03 0.14 8.75 0.50 0.04 0.16 9.00 0.52 0.05 0.19 9.25 0.55 0.06 0.21 9.50 0.58 0.07 0.23 9.75 0.61 0.08 0.26 10.00 0.65 0.10 0.31 10.25 0.68 0.11 0.37 10.50 0.73 0.13 0.44 10.75 0.78 0.16 0.55 11.00 0.84 0.19 0.69 11.25 0.91 0.23 0.93 11.50 1.01 0.29 1.27 11.75 1.38 0.54 6.36 12.00 2.37 1.34 19.97 12.25 2.52 1.47 2.78 12.50 2.62 1.56 1.80 12.75 2.70 1.63 1.32 13.00 2.76 1.68 1.11 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 2.81 1.73 0.96 13.50 2.85 1.77 0.84 13.75 2.89 1.80 0.74 14.00 2.93 1.83 0.66 14.25 2.96 1.86 0.61 14.50 2.99 1.89 0.58 14.75 3.02 1.92 0.55 15.00 3.05 1.94 0.52 15.25 3.07 1.97 0.50 15.50 3.10 1.99 0.47 15.75 3.12 2.01 0.44 16.00 3.14 2.03 0.41 16.25 3.16 2.05 0.39 16.50 3.18 2.06 0.38 16.75 3.20 2.08 0.37 17.00 3.22 2.10 0.36 17.25 3.24 2.12 0.35 17.50 3.25 2.13 0.34 17.75 3.27 2.15 0.33 18.00 3.29 2.16 0.32 18.25 3.30 2.18 0.31 18.50 3.32 2.19 0.29 18.75 3.33 2.20 0.28 19.00 3.35 2.22 0.27 19.25 3.36 2.23 0.26 19.50 3.37 2.24 0.25 19.75 3.39 2.25 0.24 20.00 3.40 2.26 0.23 20.25 3.41 2.27 0.22 20.50 3.42 2.28 0.22 20.75 3.43 2.30 0.22 21.00 3.44 2.31 0.22 21.25 3.46 2.32 0.22 21.50 3.47 2.33 0.21 21.75 3.48 2.34 0.21 22.00 3.49 2.35 0.21 22.25 3.50 2.36 0.21 22.50 3.51 2.37 0.21 22.75 3.52 2.38 0.20 23.00 3.53 2.38 0.20 23.25 3.54 2.39 0.20 23.50 3.55 2.40 0.20 23.75 3.56 2.41 0.20 24.00 3.57 2.42 0.19 NM 82110 - Acra Heights Type 1124-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 15 Summary for Subcatchment 7S: Prop DA-2 Runoff = 14.30 cfs @ 11.97 hrs, Volume= 0.713 af, Depth> 2.42" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.57" Area (ac) CN Description 2.494 98 Paved parking, HSG D 0.367 80 >75% Grass cover, Good, HSG D 0.676 61 >75% Grass cover, Good, HSG B 3.537 89 Weighted Average 1.043 29.49% Pervious Area 2.494 70.51 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Direct Entry N 3 0 LL Subcatchment 7S: Prop DA-2 Hydrograph 16 15 14. 14.:'----------+--+--+--+--------I--+ 13 --� 12 11 �I I I I I I I I I I ------------------------------- . 1 1 1 1 1 1 1 1 1 1 1 10 --I 7--7--r--r--i --I- - 9 I 8 7 I I I I I I --------I-- - -+- - + ----------I-- 6 5 4 ------------------------------- 3 7-- 7-- T-- 7 7 2 I 1 I I I I I I I I - -L--L--L-------L----L--L--L-- ■Runoff 30 cfs ------------------------------- -4--+-- --' -- TYPQ-1(24-h'+r - - - +Y-ea-r Freitnfell= �1 71"- - -- RwnOff-Awe&a.v37 arc-- --! --!--L--'---'---'---'--! --!--L--'--- --,Ptjrtpff7Vp1L;m'e=0.7f$ Elf - -- --Runoff1IDeptFr>2�k21L --7--------------- cT .i lilli ll - - + - - + - - + - - + - - - - - - - + - - + - - + - - + - -- yI - - - - - - - - - ---------I---l�=i/V-- - 7 - - T - - 7 - - L 7 - - 7 - - T - - T - - 7 - - 1 - - L - - L - - L - -I- - -I- - L - - L - - L - - L - - L - - 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 16 Hydrograph for Subcatchment 7S: Prop DA-2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.01 0.00 0.00 0.50 0.02 0.00 0.00 0.75 0.03 0.00 0.00 1.00 0.04 0.00 0.00 1.25 0.05 0.00 0.00 1.50 0.06 0.00 0.00 1.75 0.07 0.00 0.00 2.00 0.08 0.00 0.00 2.25 0.09 0.00 0.00 2.50 0.10 0.00 0.00 2.75 0.11 0.00 0.00 3.00 0.12 0.00 0.00 3.25 0.13 0.00 0.00 3.50 0.15 0.00 0.00 3.75 0.16 0.00 0.00 4.00 0.17 0.00 0.00 4.25 0.18 0.00 0.00 4.50 0.20 0.00 0.00 4.75 0.21 0.00 0.00 5.00 0.22 0.00 0.00 5.25 0.24 0.00 0.00 5.50 0.25 0.00 0.00 5.75 0.27 0.00 0.01 6.00 0.29 0.00 0.01 6.25 0.30 0.00 0.02 6.50 0.32 0.00 0.02 6.75 0.34 0.01 0.03 7.00 0.35 0.01 0.04 7.25 0.37 0.01 0.04 7.50 0.39 0.01 0.05 7.75 0.41 0.02 0.06 8.00 0.43 0.02 0.06 8.25 0.45 0.03 0.08 8.50 0.47 0.03 0.09 8.75 0.50 0.04 0.11 9.00 0.52 0.05 0.13 9.25 0.55 0.06 0.14 9.50 0.58 0.07 0.15 9.75 0.61 0.08 0.17 10.00 0.65 0.10 0.21 10.25 0.68 0.11 0.25 10.50 0.73 0.13 0.30 10.75 0.78 0.16 0.37 11.00 0.84 0.19 0.46 11.25 0.91 0.23 0.63 11.50 1.01 0.29 0.85 11.75 1.38 0.54 4.28 12.00 2.37 1.34 13.46 12.25 2.52 1.47 1.87 12.50 2.62 1.56 1.21 12.75 2.70 1.63 0.89 13.00 2.76 1.68 0.75 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 2.81 1.73 0.64 13.50 2.85 1.77 0.57 13.75 2.89 1.80 0.50 14.00 2.93 1.83 0.45 14.25 2.96 1.86 0.41 14.50 2.99 1.89 0.39 14.75 3.02 1.92 0.37 15.00 3.05 1.94 0.35 15.25 3.07 1.97 0.33 15.50 3.10 1.99 0.31 15.75 3.12 2.01 0.29 16.00 3.14 2.03 0.27 16.25 3.16 2.05 0.26 16.50 3.18 2.06 0.26 16.75 3.20 2.08 0.25 17.00 3.22 2.10 0.24 17.25 3.24 2.12 0.23 17.50 3.25 2.13 0.23 17.75 3.27 2.15 0.22 18.00 3.29 2.16 0.21 18.25 3.30 2.18 0.21 18.50 3.32 2.19 0.20 18.75 3.33 2.20 0.19 19.00 3.35 2.22 0.18 19.25 3.36 2.23 0.18 19.50 3.37 2.24 0.17 19.75 3.39 2.25 0.16 20.00 3.40 2.26 0.16 20.25 3.41 2.27 0.15 20.50 3.42 2.28 0.15 20.75 3.43 2.30 0.15 21.00 3.44 2.31 0.15 21.25 3.46 2.32 0.15 21.50 3.47 2.33 0.14 21.75 3.48 2.34 0.14 22.00 3.49 2.35 0.14 22.25 3.50 2.36 0.14 22.50 3.51 2.37 0.14 22.75 3.52 2.38 0.14 23.00 3.53 2.38 0.14 23.25 3.54 2.39 0.13 23.50 3.55 2.40 0.13 23.75 3.56 2.41 0.13 24.00 3.57 2.42 0.13 NM 82110 - Acra Heights Type 1124-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment 9S: Prop DA-3 Runoff = 2.49 cfs @ 11.98 hrs, Volume= 0.119 af, Depth> 1.41" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.57" Area (ac) CN Description 0.404 98 Paved parking, HSG B 0.606 61 >75% Grass cover, Good, HSG B 1.010 76 Weighted Average 0.606 60.00% Pervious Area 0.404 40.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, N 3 0 LL Subcatchment 9S: Prop DA-3 Hydrograph I I ❑Runoff 9 cfs Type 11124-hr 2-TYear Rainfe11T3.577" T--F T - -T - -r I Runbff'I Awea=1.010 at ROnpff'IIVQIL;me=0.1 clf Runoff I'IDepth>1.411" TcT6.0 Mid - - - - - I,T I, Fig Time (hours) NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 18 Hydrograph for Subcatchment 9S: Prop DA-3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.01 0.00 0.00 0.50 0.02 0.00 0.00 0.75 0.03 0.00 0.00 1.00 0.04 0.00 0.00 1.25 0.05 0.00 0.00 1.50 0.06 0.00 0.00 1.75 0.07 0.00 0.00 2.00 0.08 0.00 0.00 2.25 0.09 0.00 0.00 2.50 0.10 0.00 0.00 2.75 0.11 0.00 0.00 3.00 0.12 0.00 0.00 3.25 0.13 0.00 0.00 3.50 0.15 0.00 0.00 3.75 0.16 0.00 0.00 4.00 0.17 0.00 0.00 4.25 0.18 0.00 0.00 4.50 0.20 0.00 0.00 4.75 0.21 0.00 0.00 5.00 0.22 0.00 0.00 5.25 0.24 0.00 0.00 5.50 0.25 0.00 0.00 5.75 0.27 0.00 0.00 6.00 0.29 0.00 0.00 6.25 0.30 0.00 0.00 6.50 0.32 0.00 0.00 6.75 0.34 0.00 0.00 7.00 0.35 0.00 0.00 7.25 0.37 0.00 0.00 7.50 0.39 0.00 0.00 7.75 0.41 0.00 0.00 8.00 0.43 0.00 0.00 8.25 0.45 0.00 0.00 8.50 0.47 0.00 0.00 8.75 0.50 0.00 0.00 9.00 0.52 0.00 0.00 9.25 0.55 0.00 0.00 9.50 0.58 0.00 0.00 9.75 0.61 0.00 0.00 10.00 0.65 0.00 0.00 10.25 0.68 0.00 0.00 10.50 0.73 0.00 0.01 10.75 0.78 0.01 0.02 11.00 0.84 0.01 0.03 11.25 0.91 0.02 0.05 11.50 1.01 0.04 0.07 11.75 1.38 0.14 0.51 12.00 2.37 0.62 2.40 12.25 2.52 0.71 0.37 12.50 2.62 0.77 0.24 12.75 2.70 0.82 0.18 13.00 2.76 0.85 0.15 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 2.81 0.89 0.13 13.50 2.85 0.92 0.12 13.75 2.89 0.94 0.11 14.00 2.93 0.97 0.09 14.25 2.96 0.99 0.09 14.50 2.99 1.01 0.08 14.75 3.02 1.03 0.08 15.00 3.05 1.05 0.08 15.25 3.07 1.06 0.07 15.50 3.10 1.08 0.07 15.75 3.12 1.10 0.06 16.00 3.14 1.11 0.06 16.25 3.16 1.13 0.06 16.50 3.18 1.14 0.06 16.75 3.20 1.15 0.05 17.00 3.22 1.17 0.05 17.25 3.24 1.18 0.05 17.50 3.25 1.19 0.05 17.75 3.27 1.20 0.05 18.00 3.29 1.21 0.05 18.25 3.30 1.22 0.05 18.50 3.32 1.24 0.04 18.75 3.33 1.25 0.04 19.00 3.35 1.26 0.04 19.25 3.36 1.27 0.04 19.50 3.37 1.27 0.04 19.75 3.39 1.28 0.04 20.00 3.40 1.29 0.03 20.25 3.41 1.30 0.03 20.50 3.42 1.31 0.03 20.75 3.43 1.32 0.03 21.00 3.44 1.32 0.03 21.25 3.46 1.33 0.03 21.50 3.47 1.34 0.03 21.75 3.48 1.35 0.03 22.00 3.49 1.36 0.03 22.25 3.50 1.36 0.03 22.50 3.51 1.37 0.03 22.75 3.52 1.38 0.03 23.00 3.53 1.39 0.03 23.25 3.54 1.39 0.03 23.50 3.55 1.40 0.03 23.75 3.56 1.41 0.03 24.00 3.57 1.42 0.03 NM 82110 - Acra Heights Type 1124-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 19 Summary for Subcatchment 11S: EX DA-3 Runoff = 2.43 cfs @ 12.12 hrs, Volume= 0.179 af, Depth> 1.76" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.57" Area (ac) CN Description 0.501 98 Paved parking, HSG D 0.719 69 50-75% Grass cover, Fair, HSG B 1.220 81 Weighted Average 0.719 58.93% Pervious Area 0.501 41.07% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.8 75 0.0050 0.10 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 3.57" 6.4 300 0.0125 0.78 Shallow Concentrated Flow, Shallow Concentrated Flow Short Grass Pasture Kv= 7.0 fps 19.2 375 Total N 3 0 LL Subcatchment 11S: EX DA-3 Hydrograph Type ',11 24,hr -2--Year-Ra1n#All'_=_3.57" � - - 2 Runoff Arch=16220 66 Flupoff Vo'Iurmq=0.119', of Runoff Depth>1.76" FloW Length^375' Tc=19.21 rein 4N=8'I Time (hours) NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 20 Hydrograph for Subcatchment 11S: EX DA-3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.01 0.00 0.00 0.50 0.02 0.00 0.00 0.75 0.03 0.00 0.00 1.00 0.04 0.00 0.00 1.25 0.05 0.00 0.00 1.50 0.06 0.00 0.00 1.75 0.07 0.00 0.00 2.00 0.08 0.00 0.00 2.25 0.09 0.00 0.00 2.50 0.10 0.00 0.00 2.75 0.11 0.00 0.00 3.00 0.12 0.00 0.00 3.25 0.13 0.00 0.00 3.50 0.15 0.00 0.00 3.75 0.16 0.00 0.00 4.00 0.17 0.00 0.00 4.25 0.18 0.00 0.00 4.50 0.20 0.00 0.00 4.75 0.21 0.00 0.00 5.00 0.22 0.00 0.00 5.25 0.24 0.00 0.00 5.50 0.25 0.00 0.00 5.75 0.27 0.00 0.00 6.00 0.29 0.00 0.00 6.25 0.30 0.00 0.00 6.50 0.32 0.00 0.00 6.75 0.34 0.00 0.00 7.00 0.35 0.00 0.00 7.25 0.37 0.00 0.00 7.50 0.39 0.00 0.00 7.75 0.41 0.00 0.00 8.00 0.43 0.00 0.00 8.25 0.45 0.00 0.00 8.50 0.47 0.00 0.00 8.75 0.50 0.00 0.00 9.00 0.52 0.00 0.00 9.25 0.55 0.00 0.01 9.50 0.58 0.01 0.01 9.75 0.61 0.01 0.01 10.00 0.65 0.01 0.02 10.25 0.68 0.02 0.02 10.50 0.73 0.03 0.03 10.75 0.78 0.04 0.04 11.00 0.84 0.05 0.06 11.25 0.91 0.07 0.08 11.50 1.01 0.10 0.12 11.75 1.38 0.26 0.29 12.00 2.37 0.85 1.67 12.25 2.52 0.96 1.73 12.50 2.62 1.03 0.65 12.75 2.70 1.08 0.35 13.00 2.76 1.13 0.25 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 2.81 1.17 0.21 13.50 2.85 1.20 0.18 13.75 2.89 1.23 0.16 14.00 2.93 1.26 0.14 14.25 2.96 1.28 0.13 14.50 2.99 1.31 0.12 14.75 3.02 1.33 0.11 15.00 3.05 1.35 0.11 15.25 3.07 1.37 0.10 15.50 3.10 1.39 0.10 15.75 3.12 1.41 0.09 16.00 3.14 1.42 0.09 16.25 3.16 1.44 0.08 16.50 3.18 1.45 0.08 16.75 3.20 1.47 0.08 17.00 3.22 1.48 0.07 17.25 3.24 1.50 0.07 17.50 3.25 1.51 0.07 17.75 3.27 1.53 0.07 18.00 3.29 1.54 0.07 18.25 3.30 1.55 0.06 18.50 3.32 1.56 0.06 18.75 3.33 1.57 0.06 19.00 3.35 1.59 0.06 19.25 3.36 1.60 0.05 19.50 3.37 1.61 0.05 19.75 3.39 1.62 0.05 20.00 3.40 1.63 0.05 20.25 3.41 1.64 0.05 20.50 3.42 1.65 0.05 20.75 3.43 1.65 0.05 21.00 3.44 1.66 0.04 21.25 3.46 1.67 0.04 21.50 3.47 1.68 0.04 21.75 3.48 1.69 0.04 22.00 3.49 1.70 0.04 22.25 3.50 1.71 0.04 22.50 3.51 1.72 0.04 22.75 3.52 1.72 0.04 23.00 3.53 1.73 0.04 23.25 3.54 1.74 0.04 23.50 3.55 1.75 0.04 23.75 3.56 1.76 0.04 24.00 3.57 1.77 0.04 NM 82110 - Acra Heights Type 1124-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 21 Summary for Subcatchment 12S: Prop DA-4 Runoff = 2.12 cfs @ 11.97 hrs, Volume= 0.104 af, Depth> 2.08" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.57" Area (ac) CN Description 0.397 98 Paved parking, HSG D 0.203 61 >75% Grass cover, Good, HSG B 0.600 85 Weighted Average 0.203 33.83% Pervious Area 0.397 66.17% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, N 3 0 LL 1 Subcatchment 12S: Prop DA-4 Hydrograph I I ❑Runoff 2 cfs - r-- ,Typed',,-2 -fir- 2-Year RainfellT3.577 Runbff Awea=0.600 at RL;npff',VQ1L;me=,0.�,104 Of Ru��noff'Depth>2.08" PN=85 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 22 Hydrograph for Subcatchment 12S: Prop DA-4 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.01 0.00 0.00 0.50 0.02 0.00 0.00 0.75 0.03 0.00 0.00 1.00 0.04 0.00 0.00 1.25 0.05 0.00 0.00 1.50 0.06 0.00 0.00 1.75 0.07 0.00 0.00 2.00 0.08 0.00 0.00 2.25 0.09 0.00 0.00 2.50 0.10 0.00 0.00 2.75 0.11 0.00 0.00 3.00 0.12 0.00 0.00 3.25 0.13 0.00 0.00 3.50 0.15 0.00 0.00 3.75 0.16 0.00 0.00 4.00 0.17 0.00 0.00 4.25 0.18 0.00 0.00 4.50 0.20 0.00 0.00 4.75 0.21 0.00 0.00 5.00 0.22 0.00 0.00 5.25 0.24 0.00 0.00 5.50 0.25 0.00 0.00 5.75 0.27 0.00 0.00 6.00 0.29 0.00 0.00 6.25 0.30 0.00 0.00 6.50 0.32 0.00 0.00 6.75 0.34 0.00 0.00 7.00 0.35 0.00 0.00 7.25 0.37 0.00 0.00 7.50 0.39 0.00 0.00 7.75 0.41 0.00 0.00 8.00 0.43 0.00 0.00 8.25 0.45 0.00 0.00 8.50 0.47 0.01 0.01 8.75 0.50 0.01 0.01 9.00 0.52 0.02 0.01 9.25 0.55 0.02 0.01 9.50 0.58 0.03 0.01 9.75 0.61 0.03 0.02 10.00 0.65 0.04 0.02 10.25 0.68 0.05 0.03 10.50 0.73 0.07 0.03 10.75 0.78 0.08 0.04 11.00 0.84 0.10 0.05 11.25 0.91 0.14 0.08 11.50 1.01 0.18 0.11 11.75 1.38 0.38 0.58 12.00 2.37 1.07 2.02 12.25 2.52 1.20 0.29 12.50 2.62 1.28 0.19 12.75 2.70 1.34 0.14 13.00 2.76 1.39 0.12 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 2.81 1.43 0.10 13.50 2.85 1.47 0.09 13.75 2.89 1.50 0.08 14.00 2.93 1.53 0.07 14.25 2.96 1.55 0.06 14.50 2.99 1.58 0.06 14.75 3.02 1.60 0.06 15.00 3.05 1.63 0.06 15.25 3.07 1.65 0.05 15.50 3.10 1.67 0.05 15.75 3.12 1.69 0.05 16.00 3.14 1.71 0.04 16.25 3.16 1.73 0.04 16.50 3.18 1.74 0.04 16.75 3.20 1.76 0.04 17.00 3.22 1.77 0.04 17.25 3.24 1.79 0.04 17.50 3.25 1.80 0.04 17.75 3.27 1.82 0.03 18.00 3.29 1.83 0.03 18.25 3.30 1.85 0.03 18.50 3.32 1.86 0.03 18.75 3.33 1.87 0.03 19.00 3.35 1.88 0.03 19.25 3.36 1.90 0.03 19.50 3.37 1.91 0.03 19.75 3.39 1.92 0.03 20.00 3.40 1.93 0.02 20.25 3.41 1.94 0.02 20.50 3.42 1.95 0.02 20.75 3.43 1.96 0.02 21.00 3.44 1.97 0.02 21.25 3.46 1.98 0.02 21.50 3.47 1.99 0.02 21.75 3.48 2.00 0.02 22.00 3.49 2.01 0.02 22.25 3.50 2.02 0.02 22.50 3.51 2.02 0.02 22.75 3.52 2.03 0.02 23.00 3.53 2.04 0.02 23.25 3.54 2.05 0.02 23.50 3.55 2.06 0.02 23.75 3.56 2.07 0.02 24.00 3.57 2.08 0.02 NM 82110 - Acra Heights Type 1124-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 23 Summary for Pond 6P: Wet Pond 1 [81] Warning: Exceeded Pond 8P by 0.85' @ 12.05 hrs Inflow Area = 8.787 ac, 70.21 % Impervious, Inflow Depth > 2.27" for 2-Year event Inflow = 22.58 cfs @ 11.97 hrs, Volume= 1.663 of Outflow = 8.95 cfs @ 12.11 hrs, Volume= 1.485 af, Atten= 60%, Lag= 8.3 min Primary = 8.95 cfs @ 12.11 hrs, Volume= 1.485 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 661.11' @ 12.11 hrs Surf.Area= 11,073 sf Storage= 20,442 cf Plug -Flow detention time= 97.0 min calculated for 1.482 of (89% of inflow) Center -of -Mass det. time= 44.9 min ( 886.1 - 841.2 ) Volume Invert Avail.Storage Storage Description #1 659.00' 58,293 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 659.00 8,330 0 0 660.00 9,595 8,963 8,963 661.00 10,920 10,258 19,220 662.00 12,300 11,610 30,830 663.00 13,700 13,000 43,830 664.00 15,225 14,463 58,293 Device Ro Invert Outlet Devices #1 Primary 659.00' 24.0" Round RCP -Round 24" L= 20.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 659.00' / 658.90' S= 0.0050 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 659.00' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 659.75' 24.0" W x 12.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 661.50' 20.0' long Sharp -Crested Rectangular Weir 1 End Contraction(s) #5 Secondary 662.50' 40.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=8.92 cfs @ 12.11 hrs HW=661.11' (Free Discharge) L1=RCP_Round 24" (Passes 8.92 cfs of 14.61 cfs potential flow) 12=Orifice/Grate (Orifice Controls 0.15 cfs @ 6.85 fps) 3=Orifice/Grate (Orifice Controls 8.77 cfs @ 4.39 fps) 4=Sharp-Crested Rectangular Weir( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=659.00' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 24 Inflow• • Peak- lE Y • • • ' J J i • i • RIN /01, ///// • • •'//////////////////////////////////////////. ////////////////////////////// 664 663 660 659 0 Pond 6P: Wet Pond 1 Stage -Discharge 20 40 60 80 100 120 140 160 180 200 220 Discharge (cfs) ■ Inflow ❑ Outflow ■ Primary ■ Secondary ■ Total ■ Primary ■ Secondary NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 25 Pond 6P: Wet Pond 1 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000 12,000 13,000 14,000 15,000 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 55,000 Storage (cubic -feet) ■ Surface ■ Storage NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 26 Hydrograph for Pond 6P: Wet Pond 1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 659.00 0.00 0.00 0.00 0.50 0.00 0 659.00 0.00 0.00 0.00 1.00 0.00 0 659.00 0.00 0.00 0.00 1.50 0.00 0 659.00 0.00 0.00 0.00 2.00 0.00 0 659.00 0.00 0.00 0.00 2.50 0.00 0 659.00 0.00 0.00 0.00 3.00 0.00 0 659.00 0.00 0.00 0.00 3.50 0.00 0 659.00 0.00 0.00 0.00 4.00 0.00 0 659.00 0.00 0.00 0.00 4.50 0.00 0 659.00 0.00 0.00 0.00 5.00 0.00 0 659.00 0.00 0.00 0.00 5.50 0.00 0 659.00 0.00 0.00 0.00 6.00 0.02 16 659.00 0.00 0.00 0.00 6.50 0.03 62 659.01 0.00 0.00 0.00 7.00 0.05 140 659.02 0.00 0.00 0.00 7.50 0.07 251 659.03 0.00 0.00 0.00 8.00 0.10 398 659.05 0.00 0.00 0.00 8.50 0.14 593 659.07 0.01 0.01 0.00 9.00 0.19 865 659.10 0.02 0.02 0.00 9.50 0.23 1,209 659.14 0.03 0.03 0.00 10.00 0.31 1,629 659.19 0.03 0.03 0.00 10.50 0.45 2,237 659.26 0.04 0.04 0.00 11.00 0.71 3,177 659.37 0.06 0.06 0.00 11.50 1.34 4,837 659.56 0.07 0.07 0.00 12.00 21.71 18,071 660.89 7.65 7.65 0.00 12.50 4.03 16,617 660.76 6.62 6.62 0.00 13.00 2.79 13,457 660.45 3.92 3.92 0.00 13.50 2.12 11,935 660.30 2.76 2.76 0.00 14.00 1.67 10,993 660.21 2.11 2.11 0.00 14.50 1.40 10,348 660.14 1.69 1.69 0.00 15.00 1.21 9,906 660.10 1.42 1.42 0.00 15.50 1.06 9,565 660.06 1.23 1.23 0.00 16.00 0.92 9,278 660.03 1.07 1.07 0.00 16.50 0.83 9,040 660.01 0.94 0.94 0.00 17.00 0.76 8,859 659.99 0.85 0.85 0.00 17.50 0.70 8,710 659.97 0.78 0.78 0.00 18.00 0.65 8,581 659.96 0.72 0.72 0.00 18.50 0.60 8,467 659.95 0.66 0.66 0.00 19.00 0.56 8,360 659.94 0.62 0.62 0.00 19.50 0.52 8,256 659.93 0.57 0.57 0.00 20.00 0.48 8,157 659.92 0.53 0.53 0.00 20.50 0.45 8,071 659.91 0.49 0.49 0.00 21.00 0.44 8,007 659.90 0.47 0.47 0.00 21.50 0.42 7,953 659.89 0.45 0.45 0.00 22.00 0.41 7,906 659.89 0.43 0.43 0.00 22.50 0.39 7,865 659.88 0.41 0.41 0.00 23.00 0.38 7,827 659.88 0.40 0.40 0.00 23.50 0.37 7,793 659.88 0.39 0.39 0.00 24.00 0.36 7,761 659.87 0.38 0.38 0.00 NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 27 Stage -Discharge for Pond 6P: Wet Pond 1 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 659.00 0.00 0.00 0.00 659.05 0.00 0.00 0.00 659.10 0.01 0.01 0.00 659.15 0.03 0.03 0.00 659.20 0.04 0.04 0.00 659.25 0.04 0.04 0.00 659.30 0.05 0.05 0.00 659.35 0.05 0.05 0.00 659.40 0.06 0.06 0.00 659.45 0.06 0.06 0.00 659.50 0.07 0.07 0.00 659.55 0.07 0.07 0.00 659.60 0.08 0.08 0.00 659.65 0.08 0.08 0.00 659.70 0.08 0.08 0.00 659.75 0.09 0.09 0.00 659.80 0.16 0.16 0.00 659.85 0.29 0.29 0.00 659.90 0.47 0.47 0.00 659.95 0.67 0.67 0.00 660.00 0.90 0.90 0.00 660.05 1.16 1.16 0.00 660.10 1.44 1.44 0.00 660.15 1.73 1.73 0.00 660.20 2.05 2.05 0.00 660.25 2.38 2.38 0.00 660.30 2.73 2.73 0.00 660.35 3.10 3.10 0.00 660.40 3.48 3.48 0.00 660.45 3.88 3.88 0.00 660.50 4.29 4.29 0.00 660.55 4.72 4.72 0.00 660.60 5.16 5.16 0.00 660.65 5.61 5.61 0.00 660.70 6.08 6.08 0.00 660.75 6.56 6.56 0.00 660.80 6.97 6.97 0.00 660.85 7.34 7.34 0.00 660.90 7.69 7.69 0.00 660.95 8.01 8.01 0.00 661.00 8.32 8.32 0.00 661.05 8.61 8.61 0.00 661.10 8.89 8.89 0.00 661.15 9.16 9.16 0.00 661.20 9.42 9.42 0.00 661.25 9.68 9.68 0.00 661.30 9.93 9.93 0.00 661.35 10.17 10.17 0.00 661.40 10.40 10.40 0.00 661.45 10.63 10.63 0.00 661.50 10.86 10.86 0.00 661.55 11.81 11.81 0.00 661.60 13.36 13.36 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 661.65 15.30 15.30 0.00 661.70 17.55 17.55 0.00 661.75 19.80 19.80 0.00 661.80 20.37 20.37 0.00 661.85 20.93 20.93 0.00 661.90 21.47 21.47 0.00 661.95 22.00 22.00 0.00 662.00 22.52 22.52 0.00 662.05 23.03 23.03 0.00 662.10 23.52 23.52 0.00 662.15 24.01 24.01 0.00 662.20 24.48 24.48 0.00 662.25 24.95 24.95 0.00 662.30 25.41 25.41 0.00 662.35 25.86 25.86 0.00 662.40 26.30 26.30 0.00 662.45 26.73 26.73 0.00 662.50 27.16 27.16 0.00 662.55 28.70 27.58 1.11 662.60 31.15 28.00 3.15 662.65 34.19 28.41 5.79 662.70 37.72 28.81 8.91 662.75 41.74 29.21 12.54 662.80 46.19 29.60 16.60 662.85 51.04 29.99 21.06 662.90 56.27 30.37 25.91 662.95 62.08 30.74 31.33 663.00 68.31 31.12 37.19 663.05 74.97 31.49 43.48 663.10 82.04 31.85 50.19 663.15 88.75 32.21 56.54 663.20 95.70 32.57 63.13 663.25 102.87 32.92 69.95 663.30 110.26 33.27 76.99 663.35 117.85 33.61 84.24 663.40 125.65 33.95 91.70 663.45 133.64 34.29 99.35 663.50 141.82 34.62 107.20 663.55 150.40 34.96 115.45 663.60 159.19 35.28 123.91 663.65 168.18 35.61 132.57 663.70 177.38 35.93 141.44 663.75 186.35 36.25 150.10 663.80 195.46 36.57 158.89 663.85 204.72 36.88 167.84 663.90 214.11 37.19 176.91 663.95 223.45 37.50 185.95 664.00 232.91 37.81 195.10 NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 28 Stage -Area -Storage for Pond 6P: Wet Pond 1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 659.00 8,330 0 659.05 8,393 418 659.10 8,457 839 659.15 8,520 1,264 659.20 8,583 1,691 659.25 8,646 2,122 659.30 8,709 2,556 659.35 8,773 2,993 659.40 8,836 3,433 659.45 8,899 3,877 659.50 8,963 4,323 659.55 9,026 4,773 659.60 9,089 5,226 659.65 9,152 5,682 659.70 9,216 6,141 659.75 9,279 6,603 659.80 9,342 7,069 659.85 9,405 7,537 659.90 9,468 8,009 659.95 9,532 8,484 660.00 9,595 8,963 660.05 9,661 9,444 660.10 9,728 9,929 660.15 9,794 10,417 660.20 9,860 10,908 660.25 9,926 11,403 660.30 9,992 11,901 660.35 10,059 12,402 660.40 10,125 12,906 660.45 10,191 13,414 660.50 10,258 13,926 660.55 10,324 14,440 660.60 10,390 14,958 660.65 10,456 15,479 660.70 10,523 16,004 660.75 10,589 16,531 660.80 10,655 17,062 660.85 10,721 17,597 660.90 10,787 18,135 660.95 10,854 18,676 661.00 10,920 19,220 661.05 10,989 19,768 661.10 11,058 20,319 661.15 11,127 20,874 661.20 11,196 21,432 661.25 11,265 21,993 661.30 11,334 22,558 661.35 11,403 23,127 661.40 11,472 23,698 661.45 11,541 24,274 661.50 11,610 24,853 661.55 11,679 25,435 661.60 11,748 26,020 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 661.65 11,817 26,610 661.70 11,886 27,202 661.75 11,955 27,798 661.80 12,024 28,398 661.85 12,093 29,001 661.90 12,162 29,607 661.95 12,231 30,217 662.00 12,300 30,830 662.05 12,370 31,447 662.10 12,440 32,067 662.15 12,510 32,691 662.20 12,580 33,318 662.25 12,650 33,949 662.30 12,720 34,583 662.35 12,790 35,221 662.40 12,860 35,862 662.45 12,930 36,507 662.50 13,000 37,155 662.55 13,070 37,807 662.60 13,140 38,462 662.65 13,210 39,121 662.70 13,280 39,783 662.75 13,350 40,449 662.80 13,420 41,118 662.85 13,490 41,791 662.90 13,560 42,467 662.95 13,630 43,147 663.00 13,700 43,830 663.05 13,776 44,517 663.10 13,853 45,208 663.15 13,929 45,902 663.20 14,005 46,601 663.25 14,081 47,303 663.30 14,157 48,009 663.35 14,234 48,718 663.40 14,310 49,432 663.45 14,386 50,149 663.50 14,463 50,871 663.55 14,539 51,596 663.60 14,615 52,325 663.65 14,691 53,057 663.70 14,768 53,794 663.75 14,844 54,534 663.80 14,920 55,278 663.85 14,996 56,026 663.90 15,072 56,778 663.95 15,149 57,533 664.00 15,225 58,293 NM 82110 - Acra Heights Type 1124-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 29 Summary for Pond 8P: Wet Pond 2 Inflow Area = 3.537 ac, 70.51 % Impervious, Inflow Depth > 2.42" for 2-Year event Inflow = 14.30 cfs @ 11.97 hrs, Volume= 0.713 of Outflow = 2.51 cfs @ 12.17 hrs, Volume= 0.605 af, Atten= 82%, Lag= 12.2 min Primary = 2.51 cfs @ 12.17 hrs, Volume= 0.605 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 660.28' @ 12.17 hrs Surf.Area= 12,886 sf Storage= 15,455 cf Plug -Flow detention time= 172.6 min calculated for 0.604 of (85% of inflow) Center -of -Mass det. time= 105.0 min ( 908.0 - 803.0 ) Volume Invert Avail.Storage Storage Description #1 659.00' 72,948 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 659.00 11,241 0 0 660.00 12,512 11,877 11,877 661.00 13,839 13,176 25,052 662.00 15,232 14,536 39,588 663.00 16,664 15,948 55,536 664.00 18,161 17,413 72,948 Device Routing Invert Outlet Devices #1 Primary 659.00' 24.0" Round RCP -Round 24" L= 660.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 659.00'/659.00' S= 0.0000 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Secondary 663.50' 30.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=2.50 cfs @ 12.17 hrs HW=660.28' (Free Discharge) L1=RCP_Round 24" (Barrel Controls 2.50 cfs @ 1.68 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=659.00' (Free Discharge) L2= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 30 16 15 14 13 12 11 10 H 9 U 3 8 LL 7 6 5 4 3 i 2 0.00 CfS Pond 8P: Wet Pond 2 Hydrograph -+--r-+--+----+----+--I -+--+-+--r----+----+----+-- 14.30 cfs ■Inflow OW-.'" rea=:J.�7a7�-�aC ❑ outflow M Primary - -- - -- ---- ---- ---- -- -Iftf ■Se Secondary ----'i --'--'i --'-- �--r-�--r--I--T--I--7--r-�--I -7--Y-7--Y--I--t--I--rt--I--L--I - t--r-t--t- T - T- �-�--r-�--r--I--r--I--T--I--7-- --r-L--r-7--Y--I--Y--I--t--I--rt-- T-t- -li--t--li --Ir- --r-t--r--li--t--li--t----t-- -J--L-J--L--1--1--1--1--1--L--' --II--II---II-- -T--7--1 II---II- 1--I--T--I--T L__I__1__I__LI -II--II- --L- L -- L-L--L- L-- L--'--L--'--1-- L_LL_JLILIL__I__1__ - -- ----------------------I--II-- 2.51 cfs - -- --- T----t----T- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Pond 8P: Wet Pond 2 Stage -Discharge ■ Total ■ Primary ■ Secondary 0 5 10 15 20 25 30 35 40 Discharge (cfs) NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 31 Pond 8P: Wet Pond 2 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 55,000 60,000 65,000 70,000 Storage (cubic -feet) 18,000 Surface ❑ Storage NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 32 Hydrograph for Pond 8P: Wet Pond 2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 659.00 0.00 0.00 0.00 0.50 0.00 0 659.00 0.00 0.00 0.00 1.00 0.00 0 659.00 0.00 0.00 0.00 1.50 0.00 0 659.00 0.00 0.00 0.00 2.00 0.00 0 659.00 0.00 0.00 0.00 2.50 0.00 0 659.00 0.00 0.00 0.00 3.00 0.00 0 659.00 0.00 0.00 0.00 3.50 0.00 0 659.00 0.00 0.00 0.00 4.00 0.00 0 659.00 0.00 0.00 0.00 4.50 0.00 0 659.00 0.00 0.00 0.00 5.00 0.00 0 659.00 0.00 0.00 0.00 5.50 0.00 0 659.00 0.00 0.00 0.00 6.00 0.01 11 659.00 0.00 0.00 0.00 6.50 0.02 42 659.00 0.00 0.00 0.00 7.00 0.04 95 659.01 0.00 0.00 0.00 7.50 0.05 173 659.02 0.00 0.00 0.00 8.00 0.06 275 659.02 0.00 0.00 0.00 8.50 0.09 412 659.04 0.00 0.00 0.00 9.00 0.13 607 659.05 0.00 0.00 0.00 9.50 0.15 859 659.08 0.00 0.00 0.00 10.00 0.21 1,168 659.10 0.00 0.00 0.00 10.50 0.30 1,603 659.14 0.01 0.01 0.00 11.00 0.46 2,245 659.20 0.03 0.03 0.00 11.50 0.85 3,310 659.29 0.07 0.07 0.00 12.00 13.46 12,910 660.08 1.73 1.73 0.00 12.50 1.21 14,584 660.21 2.23 2.23 0.00 13.00 0.75 12,725 660.07 1.68 1.68 0.00 13.50 0.57 11,245 659.95 1.28 1.28 0.00 14.00 0.45 10,099 659.86 1.01 1.01 0.00 14.50 0.39 9,207 659.78 0.82 0.82 0.00 15.00 0.35 8,528 659.73 0.69 0.69 0.00 15.50 0.31 7,983 659.68 0.59 0.59 0.00 16.00 0.27 7,522 659.65 0.51 0.51 0.00 16.50 0.26 7,129 659.61 0.45 0.45 0.00 17.00 0.24 6,806 659.59 0.41 0.41 0.00 17.50 0.23 6,533 659.56 0.37 0.37 0.00 18.00 0.21 6,297 659.54 0.34 0.34 0.00 18.50 0.20 6,086 659.53 0.31 0.31 0.00 19.00 0.18 5,893 659.51 0.29 0.29 0.00 19.50 0.17 5,715 659.49 0.27 0.27 0.00 20.00 0.16 5,545 659.48 0.25 0.25 0.00 20.50 0.15 5,388 659.47 0.23 0.23 0.00 21.00 0.15 5,254 659.46 0.22 0.22 0.00 21.50 0.14 5,138 659.45 0.20 0.20 0.00 22.00 0.14 5,035 659.44 0.20 0.20 0.00 22.50 0.14 4,943 659.43 0.19 0.19 0.00 23.00 0.14 4,861 659.42 0.18 0.18 0.00 23.50 0.13 4,786 659.42 0.17 0.17 0.00 24.00 0.13 4,718 659.41 0.17 0.17 0.00 NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 33 Stage -Discharge for Pond 8P: Wet Pond 2 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 659.00 0.00 0.00 0.00 659.05 0.00 0.00 0.00 659.10 0.00 0.00 0.00 659.15 0.01 0.01 0.00 659.20 0.03 0.03 0.00 659.25 0.05 0.05 0.00 659.30 0.07 0.07 0.00 659.35 0.11 0.11 0.00 659.40 0.16 0.16 0.00 659.45 0.21 0.21 0.00 659.50 0.27 0.27 0.00 659.55 0.35 0.35 0.00 659.60 0.43 0.43 0.00 659.65 0.52 0.52 0.00 659.70 0.62 0.62 0.00 659.75 0.74 0.74 0.00 659.80 0.86 0.86 0.00 659.85 0.99 0.99 0.00 659.90 1.13 1.13 0.00 659.95 1.28 1.28 0.00 660.00 1.45 1.45 0.00 660.05 1.62 1.62 0.00 660.10 1.79 1.79 0.00 660.15 1.98 1.98 0.00 660.20 2.18 2.18 0.00 660.25 2.38 2.38 0.00 660.30 2.59 2.59 0.00 660.35 2.81 2.81 0.00 660.40 3.03 3.03 0.00 660.45 3.26 3.26 0.00 660.50 3.49 3.49 0.00 660.55 3.73 3.73 0.00 660.60 3.97 3.97 0.00 660.65 4.22 4.22 0.00 660.70 4.47 4.47 0.00 660.75 4.72 4.72 0.00 660.80 4.97 4.97 0.00 660.85 5.22 5.22 0.00 660.90 5.47 5.47 0.00 660.95 5.72 5.72 0.00 661.00 5.96 5.96 0.00 661.05 6.20 6.20 0.00 661.10 6.44 6.44 0.00 661.15 6.67 6.67 0.00 661.20 6.89 6.89 0.00 661.25 7.10 7.10 0.00 661.30 7.30 7.30 0.00 661.35 7.48 7.48 0.00 661.40 7.65 7.65 0.00 661.45 7.79 7.79 0.00 661.50 7.91 7.91 0.00 661.55 7.99 7.99 0.00 661.60 8.01 8.01 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 661.65 7.92 7.92 0.00 661.70 7.92 7.92 0.00 661.75 8.20 8.20 0.00 661.80 8.47 8.47 0.00 661.85 8.73 8.73 0.00 661.90 8.98 8.98 0.00 661.95 9.23 9.23 0.00 662.00 9.47 9.47 0.00 662.05 9.70 9.70 0.00 662.10 9.93 9.93 0.00 662.15 10.15 10.15 0.00 662.20 10.37 10.37 0.00 662.25 10.59 10.59 0.00 662.30 10.80 10.80 0.00 662.35 11.00 11.00 0.00 662.40 11.20 11.20 0.00 662.45 11.40 11.40 0.00 662.50 11.60 11.60 0.00 662.55 11.79 11.79 0.00 662.60 11.98 11.98 0.00 662.65 12.16 12.16 0.00 662.70 12.35 12.35 0.00 662.75 12.53 12.53 0.00 662.80 12.70 12.70 0.00 662.85 12.88 12.88 0.00 662.90 13.05 13.05 0.00 662.95 13.22 13.22 0.00 663.00 13.39 13.39 0.00 663.05 13.56 13.56 0.00 663.10 13.72 13.72 0.00 663.15 13.88 13.88 0.00 663.20 14.04 14.04 0.00 663.25 14.20 14.20 0.00 663.30 14.36 14.36 0.00 663.35 14.52 14.52 0.00 663.40 14.67 14.67 0.00 663.45 14.82 14.82 0.00 663.50 14.97 14.97 0.00 663.55 15.96 15.12 0.84 663.60 17.63 15.27 2.36 663.65 19.75 15.41 4.34 663.70 22.24 15.56 6.68 663.75 25.11 15.70 9.40 663.80 28.29 15.84 12.45 663.85 31.78 15.99 15.79 663.90 35.55 16.12 19.43 663.95 39.76 16.26 23.50 664.00 44.30 16.40 27.90 NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 34 Stage -Area -Storage for Pond 8P: Wet Pond 2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 659.00 11,241 0 659.05 11,305 564 659.10 11,368 1,130 659.15 11,432 1,700 659.20 11,495 2,274 659.25 11,559 2,850 659.30 11,622 3,429 659.35 11,686 4,012 659.40 11,749 4,598 659.45 11,813 5,187 659.50 11,877 5,779 659.55 11,940 6,375 659.60 12,004 6,973 659.65 12,067 7,575 659.70 12,131 8,180 659.75 12,194 8,788 659.80 12,258 9,400 659.85 12,321 10,014 659.90 12,385 10,632 659.95 12,448 11,252 660.00 12,512 11,877 660.05 12,578 12,504 660.10 12,645 13,134 660.15 12,711 13,768 660.20 12,777 14,405 660.25 12,844 15,046 660.30 12,910 15,690 660.35 12,976 16,337 660.40 13,043 16,987 660.45 13,109 17,641 660.50 13,176 18,298 660.55 13,242 18,959 660.60 13,308 19,623 660.65 13,375 20,290 660.70 13,441 20,960 660.75 13,507 21,634 660.80 13,574 22,311 660.85 13,640 22,991 660.90 13,706 23,675 660.95 13,773 24,362 661.00 13,839 25,052 661.05 13,909 25,746 661.10 13,978 26,443 661.15 14,048 27,144 661.20 14,118 27,848 661.25 14,187 28,555 661.30 14,257 29,266 661.35 14,327 29,981 661.40 14,396 30,699 661.45 14,466 31,421 661.50 14,536 32,146 661.55 14,605 32,874 661.60 14,675 33,606 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 661.65 14,744 34,342 661.70 14,814 35,081 661.75 14,884 35,823 661.80 14,953 36,569 661.85 15,023 37,318 661.90 15,093 38,071 661.95 15,162 38,828 662.00 15,232 39,588 662.05 15,304 40,351 662.10 15,375 41,118 662.15 15,447 41,888 662.20 15,518 42,663 662.25 15,590 43,440 662.30 15,662 44,222 662.35 15,733 45,006 662.40 15,805 45,795 662.45 15,876 46,587 662.50 15,948 47,383 662.55 16,020 48,182 662.60 16,091 48,984 662.65 16,163 49,791 662.70 16,234 50,601 662.75 16,306 51,414 662.80 16,378 52,231 662.85 16,449 53,052 662.90 16,521 53,876 662.95 16,592 54,704 663.00 16,664 55,536 663.05 16,739 56,371 663.10 16,814 57,209 663.15 16,889 58,052 663.20 16,963 58,898 663.25 17,038 59,748 663.30 17,113 60,602 663.35 17,188 61,460 663.40 17,263 62,321 663.45 17,338 63,186 663.50 17,413 64,055 663.55 17,487 64,927 663.60 17,562 65,803 663.65 17,637 66,683 663.70 17,712 67,567 663.75 17,787 68,455 663.80 17,862 69,346 663.85 17,936 70,241 663.90 18,011 71,139 663.95 18,086 72,042 664.00 18,161 72,948 NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 35 Summary for Link 4L: EX DA (Combined) Inflow Area = 7.789 ac, 0.00% Impervious, Inflow Depth > 1.43" for 2-Year event Inflow = 11.85 cfs @ 12.14 hrs, Volume= 0.929 of Primary = 11.85 cfs @ 12.14 hrs, Volume= 0.929 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Link 4L: EX DA (Combined) Hydrograph ■ Inflow 13 �I - J--L--L-------L-- L --'-- -1---1--1--L--1-----L--L--L--'-- ■ Primary 12 L J - JIII��� I����=7.I� 11.85 cfs -L-------+--L-----'-- --L--L--'-- 10 --I-- ----r-----I-- --+-- I --I- --------+--r-----I-- --r -- --I-- 9 - 8 y ' ----L--L--L-------L--L-----'-- I I I I I I I I -L----J--1--L-------L--L--L--'-- I I I I I I I I I I I I I .V.. 7 i l ----J--J--L-------J--J-----'- I I I I I I I -L-------+--L-------J--L--L--'-- I I I I I I I I I I I I I LL 5 --I-- ----r-----I- + --I- ------+--r-----I-- --r-- --I-- Q i it I I I I I I I I I I I I I I I I I I I I I i I I I I I I I I I I I I I I I I I I I I I 2 1 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 36 Hydrograph for Link 4L: EX DA (Combined) Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 0.25 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.75 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.25 0.00 0.00 0.00 1.50 0.00 0.00 0.00 1.75 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.25 0.00 0.00 0.00 2.50 0.00 0.00 0.00 2.75 0.00 0.00 0.00 3.00 0.00 0.00 0.00 3.25 0.00 0.00 0.00 3.50 0.00 0.00 0.00 3.75 0.00 0.00 0.00 4.00 0.00 0.00 0.00 4.25 0.00 0.00 0.00 4.50 0.00 0.00 0.00 4.75 0.00 0.00 0.00 5.00 0.00 0.00 0.00 5.25 0.00 0.00 0.00 5.50 0.00 0.00 0.00 5.75 0.00 0.00 0.00 6.00 0.00 0.00 0.00 6.25 0.00 0.00 0.00 6.50 0.00 0.00 0.00 6.75 0.00 0.00 0.00 7.00 0.00 0.00 0.00 7.25 0.00 0.00 0.00 7.50 0.00 0.00 0.00 7.75 0.00 0.00 0.00 8.00 0.00 0.00 0.00 8.25 0.00 0.00 0.00 8.50 0.00 0.00 0.00 8.75 0.01 0.00 0.01 9.00 0.01 0.00 0.01 9.25 0.02 0.00 0.02 9.50 0.03 0.00 0.03 9.75 0.03 0.00 0.03 10.00 0.04 0.00 0.04 10.25 0.05 0.00 0.05 10.50 0.06 0.00 0.06 10.75 0.10 0.00 0.10 11.00 0.16 0.00 0.16 11.25 0.25 0.00 0.25 11.50 0.41 0.00 0.41 11.75 1.06 0.00 1.06 12.00 7.19 0.00 7.19 12.25 9.55 0.00 9.55 12.50 3.81 0.00 3.81 12.75 2.06 0.00 2.06 13.00 1.45 0.00 1.45 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 13.25 1.18 0.00 1.18 13.50 1.03 0.00 1.03 13.75 0.91 0.00 0.91 14.00 0.81 0.00 0.81 14.25 0.72 0.00 0.72 14.50 0.68 0.00 0.68 14.75 0.64 0.00 0.64 15.00 0.61 0.00 0.61 15.25 0.58 0.00 0.58 15.50 0.55 0.00 0.55 15.75 0.52 0.00 0.52 16.00 0.49 0.00 0.49 16.25 0.46 0.00 0.46 16.50 0.44 0.00 0.44 16.75 0.43 0.00 0.43 17.00 0.42 0.00 0.42 17.25 0.41 0.00 0.41 17.50 0.39 0.00 0.39 17.75 0.38 0.00 0.38 18.00 0.37 0.00 0.37 18.25 0.36 0.00 0.36 18.50 0.35 0.00 0.35 18.75 0.34 0.00 0.34 19.00 0.32 0.00 0.32 19.25 0.31 0.00 0.31 19.50 0.30 0.00 0.30 19.75 0.29 0.00 0.29 20.00 0.28 0.00 0.28 20.25 0.27 0.00 0.27 20.50 0.26 0.00 0.26 20.75 0.26 0.00 0.26 21.00 0.26 0.00 0.26 21.25 0.25 0.00 0.25 21.50 0.25 0.00 0.25 21.75 0.25 0.00 0.25 22.00 0.25 0.00 0.25 22.25 0.24 0.00 0.24 22.50 0.24 0.00 0.24 22.75 0.24 0.00 0.24 23.00 0.24 0.00 0.24 23.25 0.24 0.00 0.24 23.50 0.23 0.00 0.23 23.75 0.23 0.00 0.23 24.00 0.23 0.00 0.23 NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 37 Summary for Link 10L: Prop P0I-1 Inflow Area = 8.787 ac, 70.21 % Impervious, Inflow Depth > 2.03" for 2-Year event Inflow = 8.95 cfs @ 12.11 hrs, Volume= 1.485 of Primary = 8.95 cfs @ 12.11 hrs, Volume= 1.485 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Link 10L: Prop P0I-1 Hydrograph --I--r--r--r--r--I--r--r--r--I--r--t--r--r--I--r--r--I---I--r--r--r--I-- 10 ■Inflow 8.95 C.fS--1---1-- i --i--1---1-- i -- i --i --1-- ■Primary 9 _ Illlnloivv!Airea=8.!7 --1-- -11L--III---III--i--! --III---II1--1--L--IIL--III-- ,IIIIIIIIIII IIIIIIIIIII 8 1--II--�--�--�--II---II--�--+--II---11--1L--II---II--+--�--II---II--�--�--I --11-- 7 - -1 - -I T -T F 6 y I I I I I I I I I I I I I I I I I I I I U I I I I I I I I I I I I I I I I I I I I i I I 3 5 p LL I I I I I I I I I I I I I I I I I I I Q----r--r--Y-------r--r-----I- ------Y--r-------r--Y--r--I-- 3 ---I-- - ---- - -- --- - ---- - ---- I I I I I I I I I I I I I I I I I I I 2--1--J--1--L--1---1--L--L--1-- L-- -L--1---1--L--L--L--1-- 1 I I I I I I I I I I I 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 38 Hydrograph for Link 10L: Prop P0I-1 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 0.25 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.75 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.25 0.00 0.00 0.00 1.50 0.00 0.00 0.00 1.75 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.25 0.00 0.00 0.00 2.50 0.00 0.00 0.00 2.75 0.00 0.00 0.00 3.00 0.00 0.00 0.00 3.25 0.00 0.00 0.00 3.50 0.00 0.00 0.00 3.75 0.00 0.00 0.00 4.00 0.00 0.00 0.00 4.25 0.00 0.00 0.00 4.50 0.00 0.00 0.00 4.75 0.00 0.00 0.00 5.00 0.00 0.00 0.00 5.25 0.00 0.00 0.00 5.50 0.00 0.00 0.00 5.75 0.00 0.00 0.00 6.00 0.00 0.00 0.00 6.25 0.00 0.00 0.00 6.50 0.00 0.00 0.00 6.75 0.00 0.00 0.00 7.00 0.00 0.00 0.00 7.25 0.00 0.00 0.00 7.50 0.00 0.00 0.00 7.75 0.00 0.00 0.00 8.00 0.00 0.00 0.00 8.25 0.01 0.00 0.01 8.50 0.01 0.00 0.01 8.75 0.01 0.00 0.01 9.00 0.02 0.00 0.02 9.25 0.02 0.00 0.02 9.50 0.03 0.00 0.03 9.75 0.03 0.00 0.03 10.00 0.03 0.00 0.03 10.25 0.04 0.00 0.04 10.50 0.04 0.00 0.04 10.75 0.05 0.00 0.05 11.00 0.06 0.00 0.06 11.25 0.06 0.00 0.06 11.50 0.07 0.00 0.07 11.75 0.31 0.00 0.31 12.00 7.65 0.00 7.65 12.25 8.30 0.00 8.30 12.50 6.62 0.00 6.62 12.75 4.93 0.00 4.93 13.00 3.92 0.00 3.92 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 13.25 3.24 0.00 3.24 13.50 2.76 0.00 2.76 13.75 2.39 0.00 2.39 14.00 2.11 0.00 2.11 14.25 1.87 0.00 1.87 14.50 1.69 0.00 1.69 14.75 1.55 0.00 1.55 15.00 1.42 0.00 1.42 15.25 1.32 0.00 1.32 15.50 1.23 0.00 1.23 15.75 1.14 0.00 1.14 16.00 1.07 0.00 1.07 16.25 1.00 0.00 1.00 16.50 0.94 0.00 0.94 16.75 0.89 0.00 0.89 17.00 0.85 0.00 0.85 17.25 0.82 0.00 0.82 17.50 0.78 0.00 0.78 17.75 0.75 0.00 0.75 18.00 0.72 0.00 0.72 18.25 0.69 0.00 0.69 18.50 0.66 0.00 0.66 18.75 0.64 0.00 0.64 19.00 0.62 0.00 0.62 19.25 0.60 0.00 0.60 19.50 0.57 0.00 0.57 19.75 0.55 0.00 0.55 20.00 0.53 0.00 0.53 20.25 0.51 0.00 0.51 20.50 0.49 0.00 0.49 20.75 0.48 0.00 0.48 21.00 0.47 0.00 0.47 21.25 0.46 0.00 0.46 21.50 0.45 0.00 0.45 21.75 0.44 0.00 0.44 22.00 0.43 0.00 0.43 22.25 0.42 0.00 0.42 22.50 0.41 0.00 0.41 22.75 0.41 0.00 0.41 23.00 0.40 0.00 0.40 23.25 0.39 0.00 0.39 23.50 0.39 0.00 0.39 23.75 0.38 0.00 0.38 24.00 0.38 0.00 0.38 NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 39 Summary for Link 11 L: Prop P0I-2 Inflow Area = 1.610 ac, 49.75% Impervious, Inflow Depth > 1.66" for 2-Year event Inflow = 4.58 cfs @ 11.97 hrs, Volume= 0.223 of Primary = 4.58 cfs @ 11.97 hrs, Volume= 0.223 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Link 11 L: Prop P0I-2 Hydrograph - ---T -- T-----I-- T-- T--T- ---T -- T--T - -I-- T-- T--T- ---T -- T--T - -I-- T-- T -- ■ Inflow 5 ❑ Primary 4.58 cfs Inflow 'IArea=1.'161�10 'lar q - -'- - J - - L - -'- - -'- - J - - L - - L - -'- - J - - -'- - J - - 1 - - L - -'- - J - - L - - L - -'- - J - - 1 - - w 3 - LL 2 ----T--T--I----T--T--T--I--T- ----T--T--T----T--T--T----T- -T-- I I I I I I I I I I I I I I I I I I I I I NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 40 Hydrograph for Link 11 L: Prop P0I-2 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 0.25 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.75 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.25 0.00 0.00 0.00 1.50 0.00 0.00 0.00 1.75 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.25 0.00 0.00 0.00 2.50 0.00 0.00 0.00 2.75 0.00 0.00 0.00 3.00 0.00 0.00 0.00 3.25 0.00 0.00 0.00 3.50 0.00 0.00 0.00 3.75 0.00 0.00 0.00 4.00 0.00 0.00 0.00 4.25 0.00 0.00 0.00 4.50 0.00 0.00 0.00 4.75 0.00 0.00 0.00 5.00 0.00 0.00 0.00 5.25 0.00 0.00 0.00 5.50 0.00 0.00 0.00 5.75 0.00 0.00 0.00 6.00 0.00 0.00 0.00 6.25 0.00 0.00 0.00 6.50 0.00 0.00 0.00 6.75 0.00 0.00 0.00 7.00 0.00 0.00 0.00 7.25 0.00 0.00 0.00 7.50 0.00 0.00 0.00 7.75 0.00 0.00 0.00 8.00 0.00 0.00 0.00 8.25 0.00 0.00 0.00 8.50 0.01 0.00 0.01 8.75 0.01 0.00 0.01 9.00 0.01 0.00 0.01 9.25 0.01 0.00 0.01 9.50 0.01 0.00 0.01 9.75 0.02 0.00 0.02 10.00 0.02 0.00 0.02 10.25 0.03 0.00 0.03 10.50 0.04 0.00 0.04 10.75 0.06 0.00 0.06 11.00 0.08 0.00 0.08 11.25 0.12 0.00 0.12 11.50 0.18 0.00 0.18 11.75 1.09 0.00 1.09 12.00 4.42 0.00 4.42 12.25 0.66 0.00 0.66 12.50 0.43 0.00 0.43 12.75 0.32 0.00 0.32 13.00 0.27 0.00 0.27 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 13.25 0.23 0.00 0.23 13.50 0.21 0.00 0.21 13.75 0.18 0.00 0.18 14.00 0.16 0.00 0.16 14.25 0.15 0.00 0.15 14.50 0.15 0.00 0.15 14.75 0.14 0.00 0.14 15.00 0.13 0.00 0.13 15.25 0.12 0.00 0.12 15.50 0.12 0.00 0.12 15.75 0.11 0.00 0.11 16.00 0.10 0.00 0.10 16.25 0.10 0.00 0.10 16.50 0.10 0.00 0.10 16.75 0.09 0.00 0.09 17.00 0.09 0.00 0.09 17.25 0.09 0.00 0.09 17.50 0.09 0.00 0.09 17.75 0.08 0.00 0.08 18.00 0.08 0.00 0.08 18.25 0.08 0.00 0.08 18.50 0.08 0.00 0.08 18.75 0.07 0.00 0.07 19.00 0.07 0.00 0.07 19.25 0.07 0.00 0.07 19.50 0.06 0.00 0.06 19.75 0.06 0.00 0.06 20.00 0.06 0.00 0.06 20.25 0.06 0.00 0.06 20.50 0.06 0.00 0.06 20.75 0.06 0.00 0.06 21.00 0.06 0.00 0.06 21.25 0.06 0.00 0.06 21.50 0.06 0.00 0.06 21.75 0.05 0.00 0.05 22.00 0.05 0.00 0.05 22.25 0.05 0.00 0.05 22.50 0.05 0.00 0.05 22.75 0.05 0.00 0.05 23.00 0.05 0.00 0.05 23.25 0.05 0.00 0.05 23.50 0.05 0.00 0.05 23.75 0.05 0.00 0.05 24.00 0.05 0.00 0.05 NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 41 Summary for Link 12L: Ex P0I-2 Inflow Area = 2.620 ac, 26.07% Impervious, Inflow Depth > 1.50" for 2-Year event Inflow = 4.74 cfs @ 12.06 hrs, Volume= 0.328 of Primary = 4.74 cfs @ 12.06 hrs, Volume= 0.328 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Link 12L: Ex P0I-2 Hydrograph ■ Inflow ❑ Primary 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type 11 24-hr 2-Year Rainfall=3.57" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 42 Hydrograph for Link 12L: Ex P0I-2 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 0.25 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.75 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.25 0.00 0.00 0.00 1.50 0.00 0.00 0.00 1.75 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.25 0.00 0.00 0.00 2.50 0.00 0.00 0.00 2.75 0.00 0.00 0.00 3.00 0.00 0.00 0.00 3.25 0.00 0.00 0.00 3.50 0.00 0.00 0.00 3.75 0.00 0.00 0.00 4.00 0.00 0.00 0.00 4.25 0.00 0.00 0.00 4.50 0.00 0.00 0.00 4.75 0.00 0.00 0.00 5.00 0.00 0.00 0.00 5.25 0.00 0.00 0.00 5.50 0.00 0.00 0.00 5.75 0.00 0.00 0.00 6.00 0.00 0.00 0.00 6.25 0.00 0.00 0.00 6.50 0.00 0.00 0.00 6.75 0.00 0.00 0.00 7.00 0.00 0.00 0.00 7.25 0.00 0.00 0.00 7.50 0.00 0.00 0.00 7.75 0.00 0.00 0.00 8.00 0.00 0.00 0.00 8.25 0.00 0.00 0.00 8.50 0.00 0.00 0.00 8.75 0.00 0.00 0.00 9.00 0.00 0.00 0.00 9.25 0.01 0.00 0.01 9.50 0.01 0.00 0.01 9.75 0.01 0.00 0.01 10.00 0.02 0.00 0.02 10.25 0.02 0.00 0.02 10.50 0.03 0.00 0.03 10.75 0.05 0.00 0.05 11.00 0.07 0.00 0.07 11.25 0.11 0.00 0.11 11.50 0.18 0.00 0.18 11.75 0.65 0.00 0.65 12.00 4.19 0.00 4.19 12.25 2.44 0.00 2.44 12.50 1.01 0.00 1.01 12.75 0.60 0.00 0.60 13.00 0.46 0.00 0.46 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 13.25 0.39 0.00 0.39 13.50 0.34 0.00 0.34 13.75 0.30 0.00 0.30 14.00 0.27 0.00 0.27 14.25 0.24 0.00 0.24 14.50 0.23 0.00 0.23 14.75 0.22 0.00 0.22 15.00 0.21 0.00 0.21 15.25 0.20 0.00 0.20 15.50 0.19 0.00 0.19 15.75 0.18 0.00 0.18 16.00 0.16 0.00 0.16 16.25 0.16 0.00 0.16 16.50 0.15 0.00 0.15 16.75 0.15 0.00 0.15 17.00 0.14 0.00 0.14 17.25 0.14 0.00 0.14 17.50 0.14 0.00 0.14 17.75 0.13 0.00 0.13 18.00 0.13 0.00 0.13 18.25 0.12 0.00 0.12 18.50 0.12 0.00 0.12 18.75 0.11 0.00 0.11 19.00 0.11 0.00 0.11 19.25 0.11 0.00 0.11 19.50 0.10 0.00 0.10 19.75 0.10 0.00 0.10 20.00 0.09 0.00 0.09 20.25 0.09 0.00 0.09 20.50 0.09 0.00 0.09 20.75 0.09 0.00 0.09 21.00 0.09 0.00 0.09 21.25 0.09 0.00 0.09 21.50 0.09 0.00 0.09 21.75 0.09 0.00 0.09 22.00 0.08 0.00 0.08 22.25 0.08 0.00 0.08 22.50 0.08 0.00 0.08 22.75 0.08 0.00 0.08 23.00 0.08 0.00 0.08 23.25 0.08 0.00 0.08 23.50 0.08 0.00 0.08 23.75 0.08 0.00 0.08 24.00 0.08 0.00 0.08 NM 82110 - Acra Heights Type 1124-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 43 Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1 S: EX DA 1 Runoff Area=5.910 ac 0.00% Impervious Runoff Depth>3.35" Flow Length=605' Tc=20.0 min CN=74 Runoff=22.02 cfs 1.652 of Subcatchment2S: EX DA 2 Runoff Area=1.879 ac 0.00% Impervious Runoff Depth>4.28" Flow Length=515' Tc=22.5 min CN=83 Runoff=8.27 cfs 0.669 of Subcatchment3S: EX DA-4 Runoff Area=1.400 ac 13.00% Impervious Runoff Depth>3.36" Flow Length=215' Tc=10.6 min CN=74 Runoff=6.98 cfs 0.392 of Subcatchment5S: Prop DA-1 Runoff Area=5.250 ac 70.00% Impervious Runoff Depth>4.94" Tc=6.0 min CN=89 Runoff=41.58 cfs 2.163 of Subcatchment7S: Prop DA-2 Runoff Area=3.537 ac 70.51% Impervious Runoff Depth>4.94" Tc=6.0 min CN=89 Runoff=28.02 cfs 1.457 of Subcatchment9S: Prop DA-3 Runoff Area=1.010 ac 40.00% Impervious Runoff Depth>3.57" Tc=6.0 min CN=76 Runoff=6.16 cfs 0.300 of Subcatchment 11 S: EX DA-3 Runoff Area=1.220 ac 41.07% Impervious Runoff Depth>4.07" Flow Length=375' Tc=19.2 min CN=81 Runoff=5.61 cfs 0.414 of Subcatchment12S: Prop DA-4 Runoff Area=0.600 ac 66.17% Impervious Runoff Depth>4.51" Tc=6.0 min CN=85 Runoff=4.45 cfs 0.225 of Pond 6P: Wet Pond 1 Peak Elev=662.34' Storage=35,127 cf Inflow=46.81 cfs 3.487 of Primary=25.80 cfs 3.293 of Secondary=0.00 cfs 0.000 of Outflow=25.80 cfs 3.293 of Pond 8P: Wet Pond 2 Peak Elev=661.30' Storage=29,224 cf Inflow=28.02 cfs 1.457 of Primary=7.29 cfs 1.324 of Secondary=0.00 cfs 0.000 of Outflow=7.29 cfs 1.324 of Link 4L: EX DA (Combined) Inflow=30.23 cfs 2.321 of Primary=30.23 cfs 2.321 of Link 10L: Prop POI-1 Link 11L: Prop POI-2 Link 12L: Ex POI-2 Inflow=25.80 cfs 3.293 of Primary=25.80 cfs 3.293 of Inflow=10.61 cfs 0.525 of Primary=10.61 cfs 0.525 of Inflow=11.83 cfs 0.806 of Primary=11.83 cfs 0.806 of Total Runoff Area = 20.806 ac Runoff Volume = 7.273 of Average Runoff Depth = 4.19" 63.22% Pervious = 13.153 ac 36.78% Impervious = 7.653 ac NM 82110 - Acra Heights Type 1124-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 44 Summary for Subcatchment 1S: EX DA 1 Runoff = 22.02 cfs @ 12.13 hrs, Volume= 1.652 af, Depth> 3.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.22" Area (ac) CN Description 0.182 60 Woods, Fair, HSG B 0.565 79 Woods, Fair, HSG D 1.592 84 Pasture/grassland/range, Fair, HSG D 3.571 69 Pasture/grassland/range, Fair, HSG B 5.910 74 Weighted Average 5.910 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.7 75 0.0100 0.13 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 3.57" 10.3 530 0.0150 0.86 Shallow Concentrated Flow, Shallow Concentrated Flow Short Grass Pasture Kv= 7.0 fps 20.0 605 Total Subcatchment 1S: EX DA 1 Hydrograph 24 I- 22102 cfs --+--r--+--+---- --'---'---'---'---' -----T--r--+-- ---' --'---'--- ■Runoff 22 -!17II �-�hr--------------,- -- -- --------------,-- -- -----,--- 21 20 19 - X - +--+ +--+--+-+--+- -+--+--+--+--+-+--+--+--+--+--+-- -2-�5(�IarRinfa�C=III2'r-J--1--1--L--IL-------J-- --1--L--IL-- 18 affAC6a�91Q-At-�I I I I I I I I I I I I I�I�I�I --�--------1 I I I III1_Ru I �17 I 15 - Q ff �l1 MQ7- - p� II�4'I ---- --- --- -------- --- ------------ y 14 13 -- - - - I - - I -* �I - \- I - -q - C- -I- - -I- - � - -1 - - -Run Depth>3,357----- ---T--r-- + - - I - - - - -I- ------- - -I- - � - - -- 4 - - --T--r--I1-- + - - L - - I - - 3 12 a 11 - ----- ----L----------'---1--1--L--L--1---1--J--1--1--L-- -F]oW-LenOW'-5,--+--I-- - -- --; --+--+--I--+-- -- --; --+-- -- 10 9 ----------- -----I-----I--------- - c=2( V.Q M111+--r--+-----i--- ---+--r--+--+-+-- -- --+--r--+-- 8 7 ---w-----Iw-- -- --, --,--------,--- - -- /-014=7`- -- -- ------------ --+-- --, --, -- --------,-- ------- -- -- --+-- --, --, -- -- -- 6 5 --I---I---I--1--+--1--1--I-----I--� 7--+-- ----------------------------I---I -----------------------------I--- I I I I I I I I I I I I I 1--1 I -------1-- I I I I 1--+-- I I 1--1-- I I 4 ----------+--+--+--+--------I--+ +--+--r--+--I---I--+--+--+--+--+-- 2 1 --I--- I --- --+--+--+--+-----+--I--+ -+- --+--+-+--+--+--+--+--+-- 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Time (hours) 15 16 17 18 19 20 21 22 23 24 NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 45 Hydrograph for Subcatchment 1S: EX DA 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.03 0.00 0.00 0.75 0.05 0.00 0.00 1.00 0.07 0.00 0.00 1.25 0.08 0.00 0.00 1.50 0.10 0.00 0.00 1.75 0.12 0.00 0.00 2.00 0.14 0.00 0.00 2.25 0.16 0.00 0.00 2.50 0.17 0.00 0.00 2.75 0.19 0.00 0.00 3.00 0.21 0.00 0.00 3.25 0.23 0.00 0.00 3.50 0.26 0.00 0.00 3.75 0.28 0.00 0.00 4.00 0.30 0.00 0.00 4.25 0.32 0.00 0.00 4.50 0.34 0.00 0.00 4.75 0.37 0.00 0.00 5.00 0.39 0.00 0.00 5.25 0.42 0.00 0.00 5.50 0.44 0.00 0.00 5.75 0.47 0.00 0.00 6.00 0.50 0.00 0.00 6.25 0.53 0.00 0.00 6.50 0.56 0.00 0.00 6.75 0.59 0.00 0.00 7.00 0.62 0.00 0.00 7.25 0.65 0.00 0.00 7.50 0.68 0.00 0.00 7.75 0.71 0.00 0.00 8.00 0.75 0.00 0.00 8.25 0.78 0.00 0.02 8.50 0.82 0.00 0.04 8.75 0.87 0.01 0.06 9.00 0.91 0.01 0.09 9.25 0.96 0.02 0.12 9.50 1.01 0.03 0.15 9.75 1.07 0.03 0.18 10.00 1.13 0.05 0.23 10.25 1.19 0.06 0.29 10.50 1.27 0.08 0.37 10.75 1.36 0.10 0.48 11.00 1.46 0.13 0.63 11.25 1.59 0.18 0.84 11.50 1.76 0.24 1.21 11.75 2.41 0.56 2.76 12.00 4.12 1.69 14.91 12.25 4.39 1.89 16.47 12.50 4.57 2.03 6.15 12.75 4.70 2.12 3.28 13.00 4.80 2.21 2.31 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 4.89 2.28 1.89 13.50 4.97 2.34 1.64 13.75 5.04 2.40 1.44 14.00 5.10 2.44 1.28 14.25 5.16 2.49 1.15 14.50 5.21 2.53 1.07 14.75 5.26 2.57 1.02 15.00 5.31 2.61 0.97 15.25 5.35 2.65 0.92 15.50 5.40 2.68 0.87 15.75 5.44 2.72 0.81 16.00 5.47 2.75 0.76 16.25 5.51 2.78 0.72 16.50 5.54 2.80 0.69 16.75 5.58 2.83 0.67 17.00 5.61 2.86 0.65 17.25 5.64 2.88 0.63 17.50 5.67 2.91 0.61 17.75 5.70 2.93 0.60 18.00 5.73 2.96 0.58 18.25 5.76 2.98 0.56 18.50 5.78 3.00 0.54 18.75 5.81 3.02 0.52 19.00 5.83 3.04 0.50 19.25 5.86 3.06 0.48 19.50 5.88 3.08 0.47 19.75 5.90 3.10 0.45 20.00 5.92 3.12 0.43 20.25 5.94 3.14 0.41 20.50 5.96 3.15 0.40 20.75 5.98 3.17 0.40 21.00 6.00 3.19 0.39 21.25 6.02 3.20 0.39 21.50 6.04 3.22 0.39 21.75 6.06 3.23 0.38 22.00 6.08 3.25 0.38 22.25 6.10 3.27 0.38 22.50 6.11 3.28 0.37 22.75 6.13 3.30 0.37 23.00 6.15 3.31 0.37 23.25 6.17 3.33 0.36 23.50 6.19 3.34 0.36 23.75 6.20 3.36 0.35 24.00 6.22 3.37 0.35 NM 82110 - Acra Heights Type 1124-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 46 Summary for Subcatchment 2S: EX DA 2 Runoff = 8.27 cfs @ 12.15 hrs, Volume= 0.669 af, Depth> 4.28" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.22" Area (ac) CN Description 0.365 79 Woods, Fair, HSG D 0.284 84 Pasture/grassland/range, Fair, HSG D 1.230 84 Pasture/grassland/range, Fair, HSG D 1.879 83 Weighted Average 1.879 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.8 75 0.0050 0.10 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 3.57" 9.7 440 0.0116 0.75 Shallow Concentrated Flow, Shallow Concentrated Flow Short Grass Pasture Kv= 7.0 fps 22.5 515 Total Subcatchment 2S: EX DA 2 Hydrograph --r--I---I-- --r--r--r--I---I--r--r--t--r--r--r--I---I--r--r--r--r--I---I- g ! ■Runoff 8.27 cfs 8 � �I hype 'III 24,hr�;----,�--�,---�,---�,-- i -- i --i --�,I--�,---�,-- 26=N-e'aT Raittfa'I1-6.212'I' - - --IL-- - - -- --; --; -- - - -- 7 I I I I I I I I I I -Ruhaf# Ar6a='1i-8711-6c'-- - - - - - -- - - - - -- RunoffVo'IIurmq=0.669'I af -------------------------I--, - r----I---I---I----r------I ---I-- V 5 Runoff Delpth>4.28'' 3 -FloW-tern- - th�^5'C5 a 4 �+I I I I I I I I I I I 3 -T-c�2�.Sipfn,-- -- -- - ------------+-- ------------ z 'I 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 47 Hydrograph for Subcatchment 2S: EX DA 2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.03 0.00 0.00 0.75 0.05 0.00 0.00 1.00 0.07 0.00 0.00 1.25 0.08 0.00 0.00 1.50 0.10 0.00 0.00 1.75 0.12 0.00 0.00 2.00 0.14 0.00 0.00 2.25 0.16 0.00 0.00 2.50 0.17 0.00 0.00 2.75 0.19 0.00 0.00 3.00 0.21 0.00 0.00 3.25 0.23 0.00 0.00 3.50 0.26 0.00 0.00 3.75 0.28 0.00 0.00 4.00 0.30 0.00 0.00 4.25 0.32 0.00 0.00 4.50 0.34 0.00 0.00 4.75 0.37 0.00 0.00 5.00 0.39 0.00 0.00 5.25 0.42 0.00 0.00 5.50 0.44 0.00 0.00 5.75 0.47 0.00 0.00 6.00 0.50 0.00 0.01 6.25 0.53 0.01 0.01 6.50 0.56 0.01 0.02 6.75 0.59 0.01 0.03 7.00 0.62 0.02 0.03 7.25 0.65 0.02 0.04 7.50 0.68 0.03 0.05 7.75 0.71 0.04 0.05 8.00 0.75 0.05 0.06 8.25 0.78 0.06 0.07 8.50 0.82 0.07 0.08 8.75 0.87 0.08 0.09 9.00 0.91 0.10 0.11 9.25 0.96 0.12 0.13 9.50 1.01 0.14 0.14 9.75 1.07 0.16 0.15 10.00 1.13 0.19 0.17 10.25 1.19 0.22 0.20 10.50 1.27 0.25 0.24 10.75 1.36 0.30 0.29 11.00 1.46 0.36 0.36 11.25 1.59 0.43 0.45 11.50 1.76 0.54 0.61 11.75 2.41 0.99 1.18 12.00 4.12 2.39 5.35 12.25 4.39 2.63 6.99 12.50 4.57 2.79 2.73 12.75 4.70 2.90 1.38 13.00 4.80 3.00 0.91 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 4.89 3.08 0.71 13.50 4.97 3.15 0.61 13.75 5.04 3.21 0.53 14.00 5.10 3.27 0.47 14.25 5.16 3.32 0.42 14.50 5.21 3.36 0.39 14.75 5.26 3.41 0.37 15.00 5.31 3.45 0.35 15.25 5.35 3.50 0.33 15.50 5.40 3.54 0.31 15.75 5.44 3.57 0.29 16.00 5.47 3.61 0.27 16.25 5.51 3.64 0.26 16.50 5.54 3.67 0.25 16.75 5.58 3.70 0.24 17.00 5.61 3.73 0.23 17.25 5.64 3.76 0.22 17.50 5.67 3.79 0.22 17.75 5.70 3.81 0.21 18.00 5.73 3.84 0.20 18.25 5.76 3.87 0.20 18.50 5.78 3.89 0.19 18.75 5.81 3.91 0.18 19.00 5.83 3.94 0.18 19.25 5.86 3.96 0.17 19.50 5.88 3.98 0.16 19.75 5.90 4.00 0.16 20.00 5.92 4.02 0.15 20.25 5.94 4.04 0.15 20.50 5.96 4.06 0.14 20.75 5.98 4.07 0.14 21.00 6.00 4.09 0.14 21.25 6.02 4.11 0.14 21.50 6.04 4.13 0.14 21.75 6.06 4.15 0.13 22.00 6.08 4.16 0.13 22.25 6.10 4.18 0.13 22.50 6.11 4.20 0.13 22.75 6.13 4.21 0.13 23.00 6.15 4.23 0.13 23.25 6.17 4.25 0.13 23.50 6.19 4.26 0.13 23.75 6.20 4.28 0.12 24.00 6.22 4.30 0.12 NM 82110 - Acra Heights Type 1124-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 48 Summary for Subcatchment 3S: EX DA-4 Runoff = 6.98 cfs @ 12.02 hrs, Volume= 0.392 af, Depth> 3.36" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.22" Area (ac) CN Description 1.011 69 Pasture/grassland/range, Fair, HSG B 0.207 79 Woods, Fair, HSG D 0.182 98 Paved parking, HSG B 1.400 74 Weighted Average 1.218 87.00% Pervious Area 0.182 13.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.7 75 0.0133 0.14 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 3.57" 1.9 140 0.0305 1.22 Shallow Concentrated Flow, Shallow Concentrated Flow Short Grass Pasture Kv= 7.0 fps 10.6 215 Total Subcatchment 3S: EX DA-4 Hydrograph ------I--,--t--------I-- 6. Type ',I1 24,hrl -2v=Ye�Iar Rainfa11t-6.221IF- Ruhoff Arch=16400 ac'� --I- - - I - -- -- -- ------ - - ---- -- Runoff Vo'IIurmq=0.301 of -Runoff DeI'Ipth>1.36';�- -- _MoW-Len�th^215' Tc=%6'I rein - 14=7,4- T T --I- - ---T ---- - - - - ---------- - - -- - - 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 49 Hydrograph for Subcatchment 3S: EX DA-4 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.03 0.00 0.00 0.75 0.05 0.00 0.00 1.00 0.07 0.00 0.00 1.25 0.08 0.00 0.00 1.50 0.10 0.00 0.00 1.75 0.12 0.00 0.00 2.00 0.14 0.00 0.00 2.25 0.16 0.00 0.00 2.50 0.17 0.00 0.00 2.75 0.19 0.00 0.00 3.00 0.21 0.00 0.00 3.25 0.23 0.00 0.00 3.50 0.26 0.00 0.00 3.75 0.28 0.00 0.00 4.00 0.30 0.00 0.00 4.25 0.32 0.00 0.00 4.50 0.34 0.00 0.00 4.75 0.37 0.00 0.00 5.00 0.39 0.00 0.00 5.25 0.42 0.00 0.00 5.50 0.44 0.00 0.00 5.75 0.47 0.00 0.00 6.00 0.50 0.00 0.00 6.25 0.53 0.00 0.00 6.50 0.56 0.00 0.00 6.75 0.59 0.00 0.00 7.00 0.62 0.00 0.00 7.25 0.65 0.00 0.00 7.50 0.68 0.00 0.00 7.75 0.71 0.00 0.00 8.00 0.75 0.00 0.00 8.25 0.78 0.00 0.01 8.50 0.82 0.00 0.01 8.75 0.87 0.01 0.02 9.00 0.91 0.01 0.03 9.25 0.96 0.02 0.03 9.50 1.01 0.03 0.04 9.75 1.07 0.03 0.05 10.00 1.13 0.05 0.06 10.25 1.19 0.06 0.08 10.50 1.27 0.08 0.10 10.75 1.36 0.10 0.13 11.00 1.46 0.13 0.17 11.25 1.59 0.18 0.24 11.50 1.76 0.24 0.35 11.75 2.41 0.56 1.39 12.00 4.12 1.69 6.82 12.25 4.39 1.89 1.73 12.50 4.57 2.03 0.85 12.75 4.70 2.12 0.57 13.00 4.80 2.21 0.48 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 4.89 2.28 0.41 13.50 4.97 2.34 0.36 13.75 5.04 2.40 0.32 14.00 5.10 2.44 0.28 14.25 5.16 2.49 0.26 14.50 5.21 2.53 0.25 14.75 5.26 2.57 0.23 15.00 5.31 2.61 0.22 15.25 5.35 2.65 0.21 15.50 5.40 2.68 0.20 15.75 5.44 2.72 0.19 16.00 5.47 2.75 0.17 16.25 5.51 2.78 0.16 16.50 5.54 2.80 0.16 16.75 5.58 2.83 0.16 17.00 5.61 2.86 0.15 17.25 5.64 2.88 0.15 17.50 5.67 2.91 0.14 17.75 5.70 2.93 0.14 18.00 5.73 2.96 0.13 18.25 5.76 2.98 0.13 18.50 5.78 3.00 0.13 18.75 5.81 3.02 0.12 19.00 5.83 3.04 0.12 19.25 5.86 3.06 0.11 19.50 5.88 3.08 0.11 19.75 5.90 3.10 0.10 20.00 5.92 3.12 0.10 20.25 5.94 3.14 0.10 20.50 5.96 3.15 0.09 20.75 5.98 3.17 0.09 21.00 6.00 3.19 0.09 21.25 6.02 3.20 0.09 21.50 6.04 3.22 0.09 21.75 6.06 3.23 0.09 22.00 6.08 3.25 0.09 22.25 6.10 3.27 0.09 22.50 6.11 3.28 0.09 22.75 6.13 3.30 0.09 23.00 6.15 3.31 0.09 23.25 6.17 3.33 0.09 23.50 6.19 3.34 0.08 23.75 6.20 3.36 0.08 24.00 6.22 3.37 0.08 NM 82110 - Acra Heights Type 1124-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 50 Summary for Subcatchment 5S: Prop DA-1 Runoff = 41.58 cfs @ 11.96 hrs, Volume= 2.163 af, Depth> 4.94" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.22" Area (ac) CN Description 3.675 98 Paved parking, HSG D 1.068 61 >75% Grass cover, Good, HSG B 0.507 80 >75% Grass cover, Good, HSG D 5.250 89 Weighted Average 1.575 30.00% Pervious Area 3.675 70.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Direct Entry Subcatchment 5S: Prop DA-1 Hydrograph --I---I---I--�--1--L--�--1---1---1--J--1--1--1--L--�--1---1--J--1--1--L--�-- 46 --r--I---I--+--+--r--r--r--I----- -- --- --+--r--r--r--I--+--+--+--r--r-- ■Runoff 44 ' ---------- -- - - -----I- 41.58 cfs ----------- - - ---- ----I--11I-- 42 40 --------I----1--- --r-------+--+--r--r--r-----I--+ L- ---------- -- --+--+--r--r--r--I p �j p --1--L-------I�\�`4-+��ul�-- 38 36 --------------Ir--I --------I----1--L-- - -I --------I-- --11---11---11 -- --1--25ZYear Rajftfa[Cz6 �'�-- 34 ----------+--+--+--+--------I--+ --+--+�nVf�e�5�-- KK ��- RtJrt6ff-AteA7-5-25Qad 32 -- 30 30 ------------1--L--L--1------I--� --+� �/ t n +V me�2. -6 Lf 28 _1 N 26 24 - - --L--L-- L--L --- ---- -'I --L--L--L_-noffllDe�#�i11r- 0 22 11LIIL11 -- --+-- --11---11---II-- -- --+----'+--11---11 a 20 --------I-- -----I--- -- ----- ---- 18 --------I----1--L--L--------I-- --1--1--L--L--1---1--J--1-= 16 --r--I---I--r--r--r--r--r--I---I--r --r--t--r--r--r--I--r--r---r-- - r� 14 --1,---1,---1,------1,---1,---1,---1,---1,---1, ------1,---1,---1,---1,---1,------1,---1,--- 12 --------I----1--L--L--------I-- --1--1--L-- --1---1--J--1--1--L-- -- 10 I I I I --r-------+--+--r--r--r-----I--+ I I I I I I I --+--+--r--r--r----+--+--+--r--r-- I I I I I I I I I I I 8 -----1,---1,-- -- -- -- --I, --1,---1,-- - I-----1--1--6 --L-t --I---I---I--!--1--! --L--I---I----1--4 --r-------+--+--r--r--r-----I-- - --r--r----+--+--+--r--r-- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 51 Hydrograph for Subcatchment 5S: Prop DA-1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.03 0.00 0.00 0.75 0.05 0.00 0.00 1.00 0.07 0.00 0.00 1.25 0.08 0.00 0.00 1.50 0.10 0.00 0.00 1.75 0.12 0.00 0.00 2.00 0.14 0.00 0.00 2.25 0.16 0.00 0.00 2.50 0.17 0.00 0.00 2.75 0.19 0.00 0.00 3.00 0.21 0.00 0.00 3.25 0.23 0.00 0.00 3.50 0.26 0.00 0.00 3.75 0.28 0.00 0.02 4.00 0.30 0.00 0.03 4.25 0.32 0.00 0.05 4.50 0.34 0.01 0.06 4.75 0.37 0.01 0.08 5.00 0.39 0.02 0.10 5.25 0.42 0.02 0.12 5.50 0.44 0.03 0.14 5.75 0.47 0.03 0.16 6.00 0.50 0.04 0.18 6.25 0.53 0.05 0.20 6.50 0.56 0.06 0.22 6.75 0.59 0.07 0.24 7.00 0.62 0.08 0.26 7.25 0.65 0.10 0.28 7.50 0.68 0.11 0.30 7.75 0.71 0.13 0.33 8.00 0.75 0.14 0.35 8.25 0.78 0.16 0.39 8.50 0.82 0.18 0.45 8.75 0.87 0.21 0.52 9.00 0.91 0.23 0.58 9.25 0.96 0.26 0.62 9.50 1.01 0.29 0.64 9.75 1.07 0.33 0.72 10.00 1.13 0.37 0.83 10.25 1.19 0.41 0.97 10.50 1.27 0.46 1.13 10.75 1.36 0.53 1.37 11.00 1.46 0.60 1.66 11.25 1.59 0.70 2.18 11.50 1.76 0.83 2.88 11.75 2.41 1.37 13.63 12.00 4.12 2.94 38.72 12.25 4.39 3.19 5.25 12.50 4.57 3.36 3.38 12.75 4.70 3.48 2.47 13.00 4.80 3.58 2.07 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 4.89 3.67 1.78 13.50 4.97 3.74 1.56 13.75 5.04 3.81 1.38 14.00 5.10 3.87 1.23 14.25 5.16 3.92 1.13 14.50 5.21 3.97 1.08 14.75 5.26 4.02 1.02 15.00 5.31 4.07 0.97 15.25 5.35 4.11 0.92 15.50 5.40 4.15 0.86 15.75 5.44 4.19 0.81 16.00 5.47 4.23 0.75 16.25 5.51 4.26 0.72 16.50 5.54 4.29 0.70 16.75 5.58 4.33 0.68 17.00 5.61 4.36 0.66 17.25 5.64 4.39 0.64 17.50 5.67 4.42 0.62 17.75 5.70 4.45 0.60 18.00 5.73 4.47 0.58 18.25 5.76 4.50 0.56 18.50 5.78 4.53 0.54 18.75 5.81 4.55 0.52 19.00 5.83 4.57 0.50 19.25 5.86 4.60 0.48 19.50 5.88 4.62 0.46 19.75 5.90 4.64 0.44 20.00 5.92 4.66 0.42 20.25 5.94 4.68 0.41 20.50 5.96 4.70 0.41 20.75 5.98 4.72 0.40 21.00 6.00 4.74 0.40 21.25 6.02 4.75 0.40 21.50 6.04 4.77 0.39 21.75 6.06 4.79 0.39 22.00 6.08 4.81 0.38 22.25 6.10 4.83 0.38 22.50 6.11 4.85 0.38 22.75 6.13 4.86 0.37 23.00 6.15 4.88 0.37 23.25 6.17 4.90 0.36 23.50 6.19 4.92 0.36 23.75 6.20 4.93 0.36 24.00 6.22 4.95 0.35 NM 82110 - Acra Heights Type 1124-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 52 Summary for Subcatchment 7S: Prop DA-2 Runoff = 28.02 cfs @ 11.96 hrs, Volume= 1.457 af, Depth> 4.94" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.22" Area (ac) CN Description 2.494 98 Paved parking, HSG D 0.367 80 >75% Grass cover, Good, HSG D 0.676 61 >75% Grass cover, Good, HSG B 3.537 89 Weighted Average 1.043 29.49% Pervious Area 2.494 70.51 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Direct Entry H 1 1 3 0 1 LL Subcatchment 7S: Prop DA-2 Hydrograph __�--I---I---I-- �__ �__� __� __ ■Runoff 02 CfS--+--r--r--1---1-- ----+--r--r-- -I�-N''12 -h''I� - -- 2v-Y-ear Rlaifafh6.22"-- IlRwnbffl Awed=3.537 ai: r �Runbff AeO=3.537ai: --iR-qnq f;LV-plgme=1:457-Elf - -- ----Runaff��1De-Pth>4.9414- 1�c,6.0tnih T--7--T--T--T--1---I--T--T--T-_'T�_}/_�(yrM�_ J __1__1__L__L__1___1__J__1_ PINS VV I I 7 7 - - T - - T - - 7 - -I- - -I- 7 - - 7 - - T - - T - - r - - J - - J - - 1 - - L - - L - _1_ - _I_ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 53 Hydrograph for Subcatchment 7S: Prop DA-2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.03 0.00 0.00 0.75 0.05 0.00 0.00 1.00 0.07 0.00 0.00 1.25 0.08 0.00 0.00 1.50 0.10 0.00 0.00 1.75 0.12 0.00 0.00 2.00 0.14 0.00 0.00 2.25 0.16 0.00 0.00 2.50 0.17 0.00 0.00 2.75 0.19 0.00 0.00 3.00 0.21 0.00 0.00 3.25 0.23 0.00 0.00 3.50 0.26 0.00 0.00 3.75 0.28 0.00 0.01 4.00 0.30 0.00 0.02 4.25 0.32 0.00 0.03 4.50 0.34 0.01 0.04 4.75 0.37 0.01 0.05 5.00 0.39 0.02 0.07 5.25 0.42 0.02 0.08 5.50 0.44 0.03 0.09 5.75 0.47 0.03 0.10 6.00 0.50 0.04 0.12 6.25 0.53 0.05 0.13 6.50 0.56 0.06 0.15 6.75 0.59 0.07 0.16 7.00 0.62 0.08 0.17 7.25 0.65 0.10 0.19 7.50 0.68 0.11 0.20 7.75 0.71 0.13 0.22 8.00 0.75 0.14 0.23 8.25 0.78 0.16 0.26 8.50 0.82 0.18 0.30 8.75 0.87 0.21 0.35 9.00 0.91 0.23 0.39 9.25 0.96 0.26 0.42 9.50 1.01 0.29 0.43 9.75 1.07 0.33 0.48 10.00 1.13 0.37 0.56 10.25 1.19 0.41 0.65 10.50 1.27 0.46 0.76 10.75 1.36 0.53 0.92 11.00 1.46 0.60 1.12 11.25 1.59 0.70 1.47 11.50 1.76 0.83 1.94 11.75 2.41 1.37 9.18 12.00 4.12 2.94 26.09 12.25 4.39 3.19 3.54 12.50 4.57 3.36 2.28 12.75 4.70 3.48 1.67 13.00 4.80 3.58 1.39 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 4.89 3.67 1.20 13.50 4.97 3.74 1.05 13.75 5.04 3.81 0.93 14.00 5.10 3.87 0.83 14.25 5.16 3.92 0.76 14.50 5.21 3.97 0.73 14.75 5.26 4.02 0.69 15.00 5.31 4.07 0.65 15.25 5.35 4.11 0.62 15.50 5.40 4.15 0.58 15.75 5.44 4.19 0.54 16.00 5.47 4.23 0.51 16.25 5.51 4.26 0.48 16.50 5.54 4.29 0.47 16.75 5.58 4.33 0.46 17.00 5.61 4.36 0.44 17.25 5.64 4.39 0.43 17.50 5.67 4.42 0.42 17.75 5.70 4.45 0.40 18.00 5.73 4.47 0.39 18.25 5.76 4.50 0.38 18.50 5.78 4.53 0.36 18.75 5.81 4.55 0.35 19.00 5.83 4.57 0.34 19.25 5.86 4.60 0.32 19.50 5.88 4.62 0.31 19.75 5.90 4.64 0.30 20.00 5.92 4.66 0.28 20.25 5.94 4.68 0.28 20.50 5.96 4.70 0.27 20.75 5.98 4.72 0.27 21.00 6.00 4.74 0.27 21.25 6.02 4.75 0.27 21.50 6.04 4.77 0.26 21.75 6.06 4.79 0.26 22.00 6.08 4.81 0.26 22.25 6.10 4.83 0.26 22.50 6.11 4.85 0.25 22.75 6.13 4.86 0.25 23.00 6.15 4.88 0.25 23.25 6.17 4.90 0.25 23.50 6.19 4.92 0.24 23.75 6.20 4.93 0.24 24.00 6.22 4.95 0.24 NM 82110 - Acra Heights Type 1124-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 54 Summary for Subcatchment 9S: Prop DA-3 Runoff = 6.16 cfs @ 11.97 hrs, Volume= 0.300 af, Depth> 3.57" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.22" Area (ac) CN Description 0.404 98 Paved parking, HSG B 0.606 61 >75% Grass cover, Good, HSG B 1.010 76 Weighted Average 0.606 60.00% Pervious Area 0.404 40.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, N 3 0 LL Subcatchment 9S: Prop DA-3 Hydrograph 6.1 I I ■Runoff 6 cfs --�--�---�---�-- ITyjp� 11�,2�-h�r- 25-T�Yoar R'ainfaill�6.221' --------I---I----- I -- I---,---------, -- Runbff Awea=1.010 at - - �,Rgnpff'VQl q me=0.-$00 -clf- Runoff 'Depth>3.'57" CAN=76 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 55 Hydrograph for Subcatchment 9S: Prop DA-3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.03 0.00 0.00 0.75 0.05 0.00 0.00 1.00 0.07 0.00 0.00 1.25 0.08 0.00 0.00 1.50 0.10 0.00 0.00 1.75 0.12 0.00 0.00 2.00 0.14 0.00 0.00 2.25 0.16 0.00 0.00 2.50 0.17 0.00 0.00 2.75 0.19 0.00 0.00 3.00 0.21 0.00 0.00 3.25 0.23 0.00 0.00 3.50 0.26 0.00 0.00 3.75 0.28 0.00 0.00 4.00 0.30 0.00 0.00 4.25 0.32 0.00 0.00 4.50 0.34 0.00 0.00 4.75 0.37 0.00 0.00 5.00 0.39 0.00 0.00 5.25 0.42 0.00 0.00 5.50 0.44 0.00 0.00 5.75 0.47 0.00 0.00 6.00 0.50 0.00 0.00 6.25 0.53 0.00 0.00 6.50 0.56 0.00 0.00 6.75 0.59 0.00 0.00 7.00 0.62 0.00 0.00 7.25 0.65 0.00 0.00 7.50 0.68 0.00 0.00 7.75 0.71 0.00 0.01 8.00 0.75 0.00 0.01 8.25 0.78 0.01 0.01 8.50 0.82 0.01 0.02 8.75 0.87 0.02 0.02 9.00 0.91 0.02 0.03 9.25 0.96 0.03 0.04 9.50 1.01 0.04 0.04 9.75 1.07 0.05 0.05 10.00 1.13 0.07 0.06 10.25 1.19 0.08 0.07 10.50 1.27 0.11 0.09 10.75 1.36 0.14 0.12 11.00 1.46 0.17 0.16 11.25 1.59 0.22 0.22 11.50 1.76 0.30 0.31 11.75 2.41 0.64 1.67 12.00 4.12 1.83 5.86 12.25 4.39 2.04 0.84 12.50 4.57 2.19 0.55 12.75 4.70 2.29 0.40 13.00 4.80 2.37 0.34 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 4.89 2.45 0.29 13.50 4.97 2.51 0.26 13.75 5.04 2.57 0.23 14.00 5.10 2.62 0.20 14.25 5.16 2.67 0.19 14.50 5.21 2.71 0.18 14.75 5.26 2.75 0.17 15.00 5.31 2.79 0.16 15.25 5.35 2.83 0.15 15.50 5.40 2.87 0.14 15.75 5.44 2.90 0.14 16.00 5.47 2.93 0.13 16.25 5.51 2.96 0.12 16.50 5.54 2.99 0.12 16.75 5.58 3.02 0.11 17.00 5.61 3.05 0.11 17.25 5.64 3.07 0.11 17.50 5.67 3.10 0.11 17.75 5.70 3.12 0.10 18.00 5.73 3.15 0.10 18.25 5.76 3.17 0.10 18.50 5.78 3.19 0.09 18.75 5.81 3.22 0.09 19.00 5.83 3.24 0.09 19.25 5.86 3.26 0.08 19.50 5.88 3.28 0.08 19.75 5.90 3.29 0.08 20.00 5.92 3.31 0.07 20.25 5.94 3.33 0.07 20.50 5.96 3.35 0.07 20.75 5.98 3.36 0.07 21.00 6.00 3.38 0.07 21.25 6.02 3.40 0.07 21.50 6.04 3.41 0.07 21.75 6.06 3.43 0.07 22.00 6.08 3.45 0.07 22.25 6.10 3.46 0.07 22.50 6.11 3.48 0.06 22.75 6.13 3.49 0.06 23.00 6.15 3.51 0.06 23.25 6.17 3.53 0.06 23.50 6.19 3.54 0.06 23.75 6.20 3.56 0.06 24.00 6.22 3.57 0.06 NM 82110 - Acra Heights Type 1124-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 56 Summary for Subcatchment 11S: EX DA-3 Runoff = 5.61 cfs @ 12.11 hrs, Volume= 0.414 af, Depth> 4.07" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.22" Area (ac) CN Description 0.501 98 Paved parking, HSG D 0.719 69 50-75% Grass cover, Fair, HSG B 1.220 81 Weighted Average 0.719 58.93% Pervious Area 0.501 41.07% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.8 75 0.0050 0.10 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 3.57" 6.4 300 0.0125 0.78 Shallow Concentrated Flow, Shallow Concentrated Flow Short Grass Pasture Kv= 7.0 fps 19.2 375 Total Subcatchment 11S: EX DA-3 Hydrograph 5.61 Type ''III �4�hrl - - 7 - - T I - 25-Velar Rainfalll=;6.22" Ruhoff Arpsa=1 �220 ac' --r-------r--r--r--r--Iac- --r Flu po f f Vo''II u rmq=0.4''114''I of _Runaf# DeiptK>4 07','--.--4� ploW Length,^375' 4N=81'I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 57 Hydrograph for Subcatchment 11S: EX DA-3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.03 0.00 0.00 0.75 0.05 0.00 0.00 1.00 0.07 0.00 0.00 1.25 0.08 0.00 0.00 1.50 0.10 0.00 0.00 1.75 0.12 0.00 0.00 2.00 0.14 0.00 0.00 2.25 0.16 0.00 0.00 2.50 0.17 0.00 0.00 2.75 0.19 0.00 0.00 3.00 0.21 0.00 0.00 3.25 0.23 0.00 0.00 3.50 0.26 0.00 0.00 3.75 0.28 0.00 0.00 4.00 0.30 0.00 0.00 4.25 0.32 0.00 0.00 4.50 0.34 0.00 0.00 4.75 0.37 0.00 0.00 5.00 0.39 0.00 0.00 5.25 0.42 0.00 0.00 5.50 0.44 0.00 0.00 5.75 0.47 0.00 0.00 6.00 0.50 0.00 0.00 6.25 0.53 0.00 0.00 6.50 0.56 0.00 0.01 6.75 0.59 0.01 0.01 7.00 0.62 0.01 0.01 7.25 0.65 0.01 0.02 7.50 0.68 0.02 0.02 7.75 0.71 0.02 0.02 8.00 0.75 0.03 0.03 8.25 0.78 0.04 0.03 8.50 0.82 0.05 0.04 8.75 0.87 0.06 0.05 9.00 0.91 0.07 0.06 9.25 0.96 0.09 0.07 9.50 1.01 0.10 0.08 9.75 1.07 0.12 0.08 10.00 1.13 0.14 0.10 10.25 1.19 0.17 0.12 10.50 1.27 0.20 0.14 10.75 1.36 0.24 0.17 11.00 1.46 0.30 0.22 11.25 1.59 0.36 0.28 11.50 1.76 0.46 0.38 11.75 2.41 0.88 0.84 12.00 4.12 2.23 4.08 12.25 4.39 2.46 3.86 12.50 4.57 2.61 1.39 12.75 4.70 2.72 0.74 13.00 4.80 2.81 0.52 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 4.89 2.89 0.43 13.50 4.97 2.96 0.37 13.75 5.04 3.02 0.33 14.00 5.10 3.07 0.29 14.25 5.16 3.12 0.26 14.50 5.21 3.17 0.24 14.75 5.26 3.22 0.23 15.00 5.31 3.26 0.22 15.25 5.35 3.30 0.21 15.50 5.40 3.34 0.20 15.75 5.44 3.37 0.18 16.00 5.47 3.41 0.17 16.25 5.51 3.44 0.16 16.50 5.54 3.47 0.16 16.75 5.58 3.50 0.15 17.00 5.61 3.53 0.15 17.25 5.64 3.56 0.14 17.50 5.67 3.58 0.14 17.75 5.70 3.61 0.13 18.00 5.73 3.64 0.13 18.25 5.76 3.66 0.13 18.50 5.78 3.69 0.12 18.75 5.81 3.71 0.12 19.00 5.83 3.73 0.11 19.25 5.86 3.75 0.11 19.50 5.88 3.77 0.10 19.75 5.90 3.79 0.10 20.00 5.92 3.81 0.10 20.25 5.94 3.83 0.09 20.50 5.96 3.85 0.09 20.75 5.98 3.87 0.09 21.00 6.00 3.88 0.09 21.25 6.02 3.90 0.09 21.50 6.04 3.92 0.09 21.75 6.06 3.94 0.09 22.00 6.08 3.95 0.08 22.25 6.10 3.97 0.08 22.50 6.11 3.99 0.08 22.75 6.13 4.00 0.08 23.00 6.15 4.02 0.08 23.25 6.17 4.04 0.08 23.50 6.19 4.05 0.08 23.75 6.20 4.07 0.08 24.00 6.22 4.08 0.08 NM 82110 - Acra Heights Type 1124-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 58 Summary for Subcatchment 12S: Prop DA-4 Runoff = 4.45 cfs @ 11.97 hrs, Volume= 0.225 af, Depth> 4.51" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 25-Year Rainfall=6.22" Area (ac) CN Description 0.397 98 Paved parking, HSG D 0.203 61 >75% Grass cover, Good, HSG B 0.600 85 Weighted Average 0.203 33.83% Pervious Area 0.397 66.17% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, N 3 0 LL Subcatchment 12S: Prop DA-4 Hydrograph I I ❑Runoff 5 cfs -- I'Type I(24-hr- 257Ynar R'ainfaill:;6.221' Runbff Awea=0.600 at Ln9ff'1�-9 me C1 RuOff'Dept' h>4.'51" PN=85 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 59 Hydrograph for Subcatchment 12S: Prop DA-4 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.03 0.00 0.00 0.75 0.05 0.00 0.00 1.00 0.07 0.00 0.00 1.25 0.08 0.00 0.00 1.50 0.10 0.00 0.00 1.75 0.12 0.00 0.00 2.00 0.14 0.00 0.00 2.25 0.16 0.00 0.00 2.50 0.17 0.00 0.00 2.75 0.19 0.00 0.00 3.00 0.21 0.00 0.00 3.25 0.23 0.00 0.00 3.50 0.26 0.00 0.00 3.75 0.28 0.00 0.00 4.00 0.30 0.00 0.00 4.25 0.32 0.00 0.00 4.50 0.34 0.00 0.00 4.75 0.37 0.00 0.00 5.00 0.39 0.00 0.00 5.25 0.42 0.00 0.00 5.50 0.44 0.00 0.01 5.75 0.47 0.01 0.01 6.00 0.50 0.01 0.01 6.25 0.53 0.02 0.01 6.50 0.56 0.02 0.01 6.75 0.59 0.03 0.02 7.00 0.62 0.03 0.02 7.25 0.65 0.04 0.02 7.50 0.68 0.05 0.02 7.75 0.71 0.06 0.02 8.00 0.75 0.07 0.03 8.25 0.78 0.08 0.03 8.50 0.82 0.10 0.04 8.75 0.87 0.12 0.04 9.00 0.91 0.14 0.05 9.25 0.96 0.16 0.05 9.50 1.01 0.18 0.06 9.75 1.07 0.21 0.06 10.00 1.13 0.24 0.07 10.25 1.19 0.27 0.09 10.50 1.27 0.31 0.10 10.75 1.36 0.36 0.13 11.00 1.46 0.43 0.16 11.25 1.59 0.51 0.21 11.50 1.76 0.62 0.28 11.75 2.41 1.10 1.39 12.00 4.12 2.57 4.17 12.25 4.39 2.81 0.57 12.50 4.57 2.97 0.37 12.75 4.70 3.09 0.27 13.00 4.80 3.19 0.23 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 4.89 3.27 0.20 13.50 4.97 3.34 0.17 13.75 5.04 3.40 0.15 14.00 5.10 3.46 0.14 14.25 5.16 3.51 0.13 14.50 5.21 3.56 0.12 14.75 5.26 3.61 0.11 15.00 5.31 3.65 0.11 15.25 5.35 3.70 0.10 15.50 5.40 3.74 0.10 15.75 5.44 3.77 0.09 16.00 5.47 3.81 0.08 16.25 5.51 3.84 0.08 16.50 5.54 3.87 0.08 16.75 5.58 3.90 0.08 17.00 5.61 3.93 0.07 17.25 5.64 3.96 0.07 17.50 5.67 3.99 0.07 17.75 5.70 4.02 0.07 18.00 5.73 4.05 0.06 18.25 5.76 4.07 0.06 18.50 5.78 4.10 0.06 18.75 5.81 4.12 0.06 19.00 5.83 4.15 0.06 19.25 5.86 4.17 0.05 19.50 5.88 4.19 0.05 19.75 5.90 4.21 0.05 20.00 5.92 4.23 0.05 20.25 5.94 4.25 0.05 20.50 5.96 4.27 0.05 20.75 5.98 4.28 0.04 21.00 6.00 4.30 0.04 21.25 6.02 4.32 0.04 21.50 6.04 4.34 0.04 21.75 6.06 4.36 0.04 22.00 6.08 4.38 0.04 22.25 6.10 4.39 0.04 22.50 6.11 4.41 0.04 22.75 6.13 4.43 0.04 23.00 6.15 4.44 0.04 23.25 6.17 4.46 0.04 23.50 6.19 4.48 0.04 23.75 6.20 4.49 0.04 24.00 6.22 4.51 0.04 NM 82110 - Acra Heights Type 1124-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 60 Summary for Pond 6P: Wet Pond 1 [81] Warning: Exceeded Pond 8P by 1.09' @ 12.05 hrs Inflow Area = 8.787 ac, 70.21 % Impervious, Inflow Depth > 4.76" for 25-Year event Inflow = 46.81 cfs @ 11.97 hrs, Volume= 3.487 of Outflow = 25.80 cfs @ 12.07 hrs, Volume= 3.293 af, Atten= 45%, Lag= 6.2 min Primary = 25.80 cfs @ 12.07 hrs, Volume= 3.293 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 662.34' @ 12.07 hrs Surf.Area= 12,780 sf Storage= 35,127 cf Plug -Flow detention time= 66.0 min calculated for 3.293 of (94% of inflow) Center -of -Mass det. time= 35.4 min ( 849.4 - 814.0 ) Volume Invert Avail.Storage Storage Description #1 659.00' 58,293 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 659.00 8,330 0 0 660.00 9,595 8,963 8,963 661.00 10,920 10,258 19,220 662.00 12,300 11,610 30,830 663.00 13,700 13,000 43,830 664.00 15,225 14,463 58,293 Device Ro Invert Outlet Devices #1 Primary 659.00' 24.0" Round RCP -Round 24" L= 20.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 659.00' / 658.90' S= 0.0050 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 659.00' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 659.75' 24.0" W x 12.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 661.50' 20.0' long Sharp -Crested Rectangular Weir 1 End Contraction(s) #5 Secondary 662.50' 40.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=25.57 cfs @ 12.07 hrs HW=662.32' (Free Discharge) L1=RCP_Round 24" (Barrel Controls 25.57 cfs @ 8.14 fps) 12=Orifice/Grate (Passes < 0.19 cfs potential flow) 3=Orifice/Grate (Passes < 13.82 cfs potential flow) 4=Sharp-Crested Rectangular Weir (Passes < 48.23 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=659.00' (Free Discharge) L5= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 61 46.81 • 81BTaq • Y • • • i• �I ///////////////////////////////////////////////////////% 664 663 660 659 0 Pond 6P: Wet Pond 1 Stage -Discharge 20 40 60 80 100 120 140 160 180 200 220 Discharge (cfs) Lry ■ Total ■ Primary ■ Secondary NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 62 Pond 6P: Wet Pond 1 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000 12,000 13,000 14,000 15,000 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 55,000 Storage (cubic -feet) ■ Surface ■ Storage NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 63 Hydrograph for Pond 6P: Wet Pond 1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 659.00 0.00 0.00 0.00 0.50 0.00 0 659.00 0.00 0.00 0.00 1.00 0.00 0 659.00 0.00 0.00 0.00 1.50 0.00 0 659.00 0.00 0.00 0.00 2.00 0.00 0 659.00 0.00 0.00 0.00 2.50 0.00 0 659.00 0.00 0.00 0.00 3.00 0.00 0 659.00 0.00 0.00 0.00 3.50 0.00 0 659.00 0.00 0.00 0.00 4.00 0.03 28 659.00 0.00 0.00 0.00 4.50 0.06 110 659.01 0.00 0.00 0.00 5.00 0.10 251 659.03 0.00 0.00 0.00 5.50 0.14 455 659.05 0.01 0.01 0.00 6.00 0.18 720 659.09 0.01 0.01 0.00 6.50 0.22 1,046 659.12 0.02 0.02 0.00 7.00 0.26 1,433 659.17 0.03 0.03 0.00 7.50 0.31 1,886 659.22 0.04 0.04 0.00 8.00 0.36 2,413 659.28 0.05 0.05 0.00 8.50 0.48 3,065 659.36 0.06 0.06 0.00 9.00 0.63 3,945 659.46 0.06 0.06 0.00 9.50 0.72 5,042 659.58 0.07 0.07 0.00 10.00 0.94 6,368 659.72 0.08 0.08 0.00 10.50 1.33 7,992 659.90 0.46 0.46 0.00 11.00 1.98 9,478 660.05 1.18 1.18 0.00 11.50 3.49 11,251 660.23 2.28 2.28 0.00 12.00 44.88 32,446 662.13 23.82 23.82 0.00 12.50 9.25 25,198 661.53 11.42 11.42 0.00 13.00 5.90 20,276 661.10 8.87 8.87 0.00 13.50 4.16 15,820 660.68 5.92 5.92 0.00 14.00 3.11 13,576 660.47 4.01 4.01 0.00 14.50 2.52 12,322 660.34 3.04 3.04 0.00 15.00 2.14 11,553 660.27 2.49 2.49 0.00 15.50 1.84 10,999 660.21 2.11 2.11 0.00 16.00 1.59 10,551 660.16 1.82 1.82 0.00 16.50 1.43 10,194 660.13 1.60 1.60 0.00 17.00 1.31 9,934 660.10 1.44 1.44 0.00 17.50 1.21 9,724 660.08 1.32 1.32 0.00 18.00 1.12 9,545 660.06 1.22 1.22 0.00 18.50 1.04 9,385 660.04 1.13 1.13 0.00 19.00 0.97 9,235 660.03 1.05 1.05 0.00 19.50 0.89 9,090 660.01 0.97 0.97 0.00 20.00 0.82 8,952 660.00 0.90 0.90 0.00 20.50 0.78 8,830 659.99 0.84 0.84 0.00 21.00 0.75 8,740 659.98 0.80 0.80 0.00 21.50 0.73 8,669 659.97 0.76 0.76 0.00 22.00 0.70 8,612 659.96 0.73 0.73 0.00 22.50 0.68 8,562 659.96 0.71 0.71 0.00 23.00 0.66 8,518 659.95 0.69 0.69 0.00 23.50 0.65 8,477 659.95 0.67 0.67 0.00 24.00 0.63 8,438 659.95 0.65 0.65 0.00 NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 64 Stage -Discharge for Pond 6P: Wet Pond 1 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 659.00 0.00 0.00 0.00 659.05 0.00 0.00 0.00 659.10 0.01 0.01 0.00 659.15 0.03 0.03 0.00 659.20 0.04 0.04 0.00 659.25 0.04 0.04 0.00 659.30 0.05 0.05 0.00 659.35 0.05 0.05 0.00 659.40 0.06 0.06 0.00 659.45 0.06 0.06 0.00 659.50 0.07 0.07 0.00 659.55 0.07 0.07 0.00 659.60 0.08 0.08 0.00 659.65 0.08 0.08 0.00 659.70 0.08 0.08 0.00 659.75 0.09 0.09 0.00 659.80 0.16 0.16 0.00 659.85 0.29 0.29 0.00 659.90 0.47 0.47 0.00 659.95 0.67 0.67 0.00 660.00 0.90 0.90 0.00 660.05 1.16 1.16 0.00 660.10 1.44 1.44 0.00 660.15 1.73 1.73 0.00 660.20 2.05 2.05 0.00 660.25 2.38 2.38 0.00 660.30 2.73 2.73 0.00 660.35 3.10 3.10 0.00 660.40 3.48 3.48 0.00 660.45 3.88 3.88 0.00 660.50 4.29 4.29 0.00 660.55 4.72 4.72 0.00 660.60 5.16 5.16 0.00 660.65 5.61 5.61 0.00 660.70 6.08 6.08 0.00 660.75 6.56 6.56 0.00 660.80 6.97 6.97 0.00 660.85 7.34 7.34 0.00 660.90 7.69 7.69 0.00 660.95 8.01 8.01 0.00 661.00 8.32 8.32 0.00 661.05 8.61 8.61 0.00 661.10 8.89 8.89 0.00 661.15 9.16 9.16 0.00 661.20 9.42 9.42 0.00 661.25 9.68 9.68 0.00 661.30 9.93 9.93 0.00 661.35 10.17 10.17 0.00 661.40 10.40 10.40 0.00 661.45 10.63 10.63 0.00 661.50 10.86 10.86 0.00 661.55 11.81 11.81 0.00 661.60 13.36 13.36 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 661.65 15.30 15.30 0.00 661.70 17.55 17.55 0.00 661.75 19.80 19.80 0.00 661.80 20.37 20.37 0.00 661.85 20.93 20.93 0.00 661.90 21.47 21.47 0.00 661.95 22.00 22.00 0.00 662.00 22.52 22.52 0.00 662.05 23.03 23.03 0.00 662.10 23.52 23.52 0.00 662.15 24.01 24.01 0.00 662.20 24.48 24.48 0.00 662.25 24.95 24.95 0.00 662.30 25.41 25.41 0.00 662.35 25.86 25.86 0.00 662.40 26.30 26.30 0.00 662.45 26.73 26.73 0.00 662.50 27.16 27.16 0.00 662.55 28.70 27.58 1.11 662.60 31.15 28.00 3.15 662.65 34.19 28.41 5.79 662.70 37.72 28.81 8.91 662.75 41.74 29.21 12.54 662.80 46.19 29.60 16.60 662.85 51.04 29.99 21.06 662.90 56.27 30.37 25.91 662.95 62.08 30.74 31.33 663.00 68.31 31.12 37.19 663.05 74.97 31.49 43.48 663.10 82.04 31.85 50.19 663.15 88.75 32.21 56.54 663.20 95.70 32.57 63.13 663.25 102.87 32.92 69.95 663.30 110.26 33.27 76.99 663.35 117.85 33.61 84.24 663.40 125.65 33.95 91.70 663.45 133.64 34.29 99.35 663.50 141.82 34.62 107.20 663.55 150.40 34.96 115.45 663.60 159.19 35.28 123.91 663.65 168.18 35.61 132.57 663.70 177.38 35.93 141.44 663.75 186.35 36.25 150.10 663.80 195.46 36.57 158.89 663.85 204.72 36.88 167.84 663.90 214.11 37.19 176.91 663.95 223.45 37.50 185.95 664.00 232.91 37.81 195.10 NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 65 Stage -Area -Storage for Pond 6P: Wet Pond 1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 659.00 8,330 0 659.05 8,393 418 659.10 8,457 839 659.15 8,520 1,264 659.20 8,583 1,691 659.25 8,646 2,122 659.30 8,709 2,556 659.35 8,773 2,993 659.40 8,836 3,433 659.45 8,899 3,877 659.50 8,963 4,323 659.55 9,026 4,773 659.60 9,089 5,226 659.65 9,152 5,682 659.70 9,216 6,141 659.75 9,279 6,603 659.80 9,342 7,069 659.85 9,405 7,537 659.90 9,468 8,009 659.95 9,532 8,484 660.00 9,595 8,963 660.05 9,661 9,444 660.10 9,728 9,929 660.15 9,794 10,417 660.20 9,860 10,908 660.25 9,926 11,403 660.30 9,992 11,901 660.35 10,059 12,402 660.40 10,125 12,906 660.45 10,191 13,414 660.50 10,258 13,926 660.55 10,324 14,440 660.60 10,390 14,958 660.65 10,456 15,479 660.70 10,523 16,004 660.75 10,589 16,531 660.80 10,655 17,062 660.85 10,721 17,597 660.90 10,787 18,135 660.95 10,854 18,676 661.00 10,920 19,220 661.05 10,989 19,768 661.10 11,058 20,319 661.15 11,127 20,874 661.20 11,196 21,432 661.25 11,265 21,993 661.30 11,334 22,558 661.35 11,403 23,127 661.40 11,472 23,698 661.45 11,541 24,274 661.50 11,610 24,853 661.55 11,679 25,435 661.60 11,748 26,020 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 661.65 11,817 26,610 661.70 11,886 27,202 661.75 11,955 27,798 661.80 12,024 28,398 661.85 12,093 29,001 661.90 12,162 29,607 661.95 12,231 30,217 662.00 12,300 30,830 662.05 12,370 31,447 662.10 12,440 32,067 662.15 12,510 32,691 662.20 12,580 33,318 662.25 12,650 33,949 662.30 12,720 34,583 662.35 12,790 35,221 662.40 12,860 35,862 662.45 12,930 36,507 662.50 13,000 37,155 662.55 13,070 37,807 662.60 13,140 38,462 662.65 13,210 39,121 662.70 13,280 39,783 662.75 13,350 40,449 662.80 13,420 41,118 662.85 13,490 41,791 662.90 13,560 42,467 662.95 13,630 43,147 663.00 13,700 43,830 663.05 13,776 44,517 663.10 13,853 45,208 663.15 13,929 45,902 663.20 14,005 46,601 663.25 14,081 47,303 663.30 14,157 48,009 663.35 14,234 48,718 663.40 14,310 49,432 663.45 14,386 50,149 663.50 14,463 50,871 663.55 14,539 51,596 663.60 14,615 52,325 663.65 14,691 53,057 663.70 14,768 53,794 663.75 14,844 54,534 663.80 14,920 55,278 663.85 14,996 56,026 663.90 15,072 56,778 663.95 15,149 57,533 664.00 15,225 58,293 NM 82110 - Acra Heights Type 1124-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 66 Summary for Pond 8P: Wet Pond 2 Inflow Area = 3.537 ac, 70.51 % Impervious, Inflow Depth > 4.94" for 25-Year event Inflow = 28.02 cfs @ 11.96 hrs, Volume= 1.457 of Outflow = 7.29 cfs @ 12.12 hrs, Volume= 1.324 af, Atten= 74%, Lag= 9.4 min Primary = 7.29 cfs @ 12.12 hrs, Volume= 1.324 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 661.30' @ 12.12 hrs Surf.Area= 14,253 sf Storage= 29,224 cf Plug -Flow detention time= 128.4 min calculated for 1.321 of (91 % of inflow) Center -of -Mass det. time= 81.3 min ( 864.5 - 783.1 ) Volume Invert Avail.Storage Storage Description #1 659.00' 72,948 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 659.00 11,241 0 0 660.00 12,512 11,877 11,877 661.00 13,839 13,176 25,052 662.00 15,232 14,536 39,588 663.00 16,664 15,948 55,536 664.00 18,161 17,413 72,948 Device Routing Invert Outlet Devices #1 Primary 659.00' 24.0" Round RCP -Round 24" L= 660.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 659.00'/659.00' S= 0.0000 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Secondary 663.50' 30.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=7.25 cfs @ 12.12 hrs HW=661.29' (Free Discharge) L1=RCP_Round 24" (Barrel Controls 7.25 cfs @ 2.53 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=659.00' (Free Discharge) L2= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 67 30 28 26 24 22 20 H 18 'U 16 ° 14 LL 12 10 8 6 4 0.00 Cfs Pond 8P: Wet Pond 2 Hydrograph -J--L-J--L--1--1--1--1--'-- --'-- --L- --L_1--L--1--L----1----1-- 28 02 CfS ■ Inflow Ouff low ----------------------,-- -�En 11 ftfiOW, -IKrGAT3:�7-1ia-- ■Primary ■ Secondary - --T- -y--r-y--t----T----t----�--II --T----T---- ---- -- ---TPO_A-r-le-=061--30rt'-- --Ir - I t2% -J--L-J--L--1--1--1--1--1-- - 7 - - Y - 7 - - Y - - - - t - - ee}}A /+ --' --L- -- -1-- - - I - - - - I - -I - - r - I - - r - 7 - - Y - - - - Y - - - - t - - - - I -J--1-J--L--1--1--1--1--1--1--' --I, -- - T- I - T I _ T --I,-- - T-- T----T --I, ----_T --L-1--L-1--L--1--L--1--1--1--1-- 7.29 Cfs -- --,-- --,- F -T --T---T----T----T----T-- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Pond 8P: Wet Pond 2 Stage -Discharge ■ Total ■ Primary ■ Secondary 0 5 10 15 20 25 30 35 40 Discharge (cfs) NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 68 Pond 8P: Wet Pond 2 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 55,000 60,000 65,000 70,000 Storage (cubic -feet) 18,000 Surface ❑ Storage NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 69 Hydrograph for Pond 8P: Wet Pond 2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 659.00 0.00 0.00 0.00 0.50 0.00 0 659.00 0.00 0.00 0.00 1.00 0.00 0 659.00 0.00 0.00 0.00 1.50 0.00 0 659.00 0.00 0.00 0.00 2.00 0.00 0 659.00 0.00 0.00 0.00 2.50 0.00 0 659.00 0.00 0.00 0.00 3.00 0.00 0 659.00 0.00 0.00 0.00 3.50 0.00 0 659.00 0.00 0.00 0.00 4.00 0.02 19 659.00 0.00 0.00 0.00 4.50 0.04 75 659.01 0.00 0.00 0.00 5.00 0.07 172 659.02 0.00 0.00 0.00 5.50 0.09 312 659.03 0.00 0.00 0.00 6.00 0.12 500 659.04 0.00 0.00 0.00 6.50 0.15 736 659.07 0.00 0.00 0.00 7.00 0.17 1,020 659.09 0.00 0.00 0.00 7.50 0.20 1,352 659.12 0.01 0.01 0.00 8.00 0.23 1,729 659.15 0.01 0.01 0.00 8.50 0.30 2,175 659.19 0.02 0.02 0.00 9.00 0.39 2,743 659.24 0.04 0.04 0.00 9.50 0.43 3,393 659.30 0.07 0.07 0.00 10.00 0.56 4,100 659.36 0.12 0.12 0.00 10.50 0.76 5,005 659.43 0.19 0.19 0.00 11.00 1.12 6,221 659.54 0.33 0.33 0.00 11.50 1.94 8,092 659.69 0.61 0.61 0.00 12.00 26.09 25,597 661.04 6.15 6.15 0.00 12.50 2.28 24,800 660.98 5.87 5.87 0.00 13.00 1.39 19,251 660.57 3.84 3.84 0.00 13.50 1.05 15,727 660.30 2.60 2.60 0.00 14.00 0.83 13,427 660.12 1.88 1.88 0.00 14.50 0.73 11,852 660.00 1.44 1.44 0.00 15.00 0.65 10,767 659.91 1.17 1.17 0.00 15.50 0.58 9,955 659.85 0.98 0.98 0.00 16.00 0.51 9,301 659.79 0.84 0.84 0.00 16.50 0.47 8,764 659.75 0.73 0.73 0.00 17.00 0.44 8,342 659.71 0.65 0.65 0.00 17.50 0.42 7,998 659.68 0.59 0.59 0.00 18.00 0.39 7,705 659.66 0.54 0.54 0.00 18.50 0.36 7,446 659.64 0.50 0.50 0.00 19.00 0.34 7,209 659.62 0.46 0.46 0.00 19.50 0.31 6,987 659.60 0.43 0.43 0.00 20.00 0.28 6,775 659.58 0.40 0.40 0.00 20.50 0.27 6,579 659.57 0.37 0.37 0.00 21.00 0.27 6,417 659.55 0.35 0.35 0.00 21.50 0.26 6,282 659.54 0.33 0.33 0.00 22.00 0.26 6,164 659.53 0.32 0.32 0.00 22.50 0.25 6,062 659.52 0.31 0.31 0.00 23.00 0.25 5,971 659.52 0.30 0.30 0.00 23.50 0.24 5,890 659.51 0.29 0.29 0.00 24.00 0.24 5,816 659.50 0.28 0.28 0.00 NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 70 Stage -Discharge for Pond 8P: Wet Pond 2 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 659.00 0.00 0.00 0.00 659.05 0.00 0.00 0.00 659.10 0.00 0.00 0.00 659.15 0.01 0.01 0.00 659.20 0.03 0.03 0.00 659.25 0.05 0.05 0.00 659.30 0.07 0.07 0.00 659.35 0.11 0.11 0.00 659.40 0.16 0.16 0.00 659.45 0.21 0.21 0.00 659.50 0.27 0.27 0.00 659.55 0.35 0.35 0.00 659.60 0.43 0.43 0.00 659.65 0.52 0.52 0.00 659.70 0.62 0.62 0.00 659.75 0.74 0.74 0.00 659.80 0.86 0.86 0.00 659.85 0.99 0.99 0.00 659.90 1.13 1.13 0.00 659.95 1.28 1.28 0.00 660.00 1.45 1.45 0.00 660.05 1.62 1.62 0.00 660.10 1.79 1.79 0.00 660.15 1.98 1.98 0.00 660.20 2.18 2.18 0.00 660.25 2.38 2.38 0.00 660.30 2.59 2.59 0.00 660.35 2.81 2.81 0.00 660.40 3.03 3.03 0.00 660.45 3.26 3.26 0.00 660.50 3.49 3.49 0.00 660.55 3.73 3.73 0.00 660.60 3.97 3.97 0.00 660.65 4.22 4.22 0.00 660.70 4.47 4.47 0.00 660.75 4.72 4.72 0.00 660.80 4.97 4.97 0.00 660.85 5.22 5.22 0.00 660.90 5.47 5.47 0.00 660.95 5.72 5.72 0.00 661.00 5.96 5.96 0.00 661.05 6.20 6.20 0.00 661.10 6.44 6.44 0.00 661.15 6.67 6.67 0.00 661.20 6.89 6.89 0.00 661.25 7.10 7.10 0.00 661.30 7.30 7.30 0.00 661.35 7.48 7.48 0.00 661.40 7.65 7.65 0.00 661.45 7.79 7.79 0.00 661.50 7.91 7.91 0.00 661.55 7.99 7.99 0.00 661.60 8.01 8.01 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 661.65 7.92 7.92 0.00 661.70 7.92 7.92 0.00 661.75 8.20 8.20 0.00 661.80 8.47 8.47 0.00 661.85 8.73 8.73 0.00 661.90 8.98 8.98 0.00 661.95 9.23 9.23 0.00 662.00 9.47 9.47 0.00 662.05 9.70 9.70 0.00 662.10 9.93 9.93 0.00 662.15 10.15 10.15 0.00 662.20 10.37 10.37 0.00 662.25 10.59 10.59 0.00 662.30 10.80 10.80 0.00 662.35 11.00 11.00 0.00 662.40 11.20 11.20 0.00 662.45 11.40 11.40 0.00 662.50 11.60 11.60 0.00 662.55 11.79 11.79 0.00 662.60 11.98 11.98 0.00 662.65 12.16 12.16 0.00 662.70 12.35 12.35 0.00 662.75 12.53 12.53 0.00 662.80 12.70 12.70 0.00 662.85 12.88 12.88 0.00 662.90 13.05 13.05 0.00 662.95 13.22 13.22 0.00 663.00 13.39 13.39 0.00 663.05 13.56 13.56 0.00 663.10 13.72 13.72 0.00 663.15 13.88 13.88 0.00 663.20 14.04 14.04 0.00 663.25 14.20 14.20 0.00 663.30 14.36 14.36 0.00 663.35 14.52 14.52 0.00 663.40 14.67 14.67 0.00 663.45 14.82 14.82 0.00 663.50 14.97 14.97 0.00 663.55 15.96 15.12 0.84 663.60 17.63 15.27 2.36 663.65 19.75 15.41 4.34 663.70 22.24 15.56 6.68 663.75 25.11 15.70 9.40 663.80 28.29 15.84 12.45 663.85 31.78 15.99 15.79 663.90 35.55 16.12 19.43 663.95 39.76 16.26 23.50 664.00 44.30 16.40 27.90 NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 71 Stage -Area -Storage for Pond 8P: Wet Pond 2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 659.00 11,241 0 659.05 11,305 564 659.10 11,368 1,130 659.15 11,432 1,700 659.20 11,495 2,274 659.25 11,559 2,850 659.30 11,622 3,429 659.35 11,686 4,012 659.40 11,749 4,598 659.45 11,813 5,187 659.50 11,877 5,779 659.55 11,940 6,375 659.60 12,004 6,973 659.65 12,067 7,575 659.70 12,131 8,180 659.75 12,194 8,788 659.80 12,258 9,400 659.85 12,321 10,014 659.90 12,385 10,632 659.95 12,448 11,252 660.00 12,512 11,877 660.05 12,578 12,504 660.10 12,645 13,134 660.15 12,711 13,768 660.20 12,777 14,405 660.25 12,844 15,046 660.30 12,910 15,690 660.35 12,976 16,337 660.40 13,043 16,987 660.45 13,109 17,641 660.50 13,176 18,298 660.55 13,242 18,959 660.60 13,308 19,623 660.65 13,375 20,290 660.70 13,441 20,960 660.75 13,507 21,634 660.80 13,574 22,311 660.85 13,640 22,991 660.90 13,706 23,675 660.95 13,773 24,362 661.00 13,839 25,052 661.05 13,909 25,746 661.10 13,978 26,443 661.15 14,048 27,144 661.20 14,118 27,848 661.25 14,187 28,555 661.30 14,257 29,266 661.35 14,327 29,981 661.40 14,396 30,699 661.45 14,466 31,421 661.50 14,536 32,146 661.55 14,605 32,874 661.60 14,675 33,606 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 661.65 14,744 34,342 661.70 14,814 35,081 661.75 14,884 35,823 661.80 14,953 36,569 661.85 15,023 37,318 661.90 15,093 38,071 661.95 15,162 38,828 662.00 15,232 39,588 662.05 15,304 40,351 662.10 15,375 41,118 662.15 15,447 41,888 662.20 15,518 42,663 662.25 15,590 43,440 662.30 15,662 44,222 662.35 15,733 45,006 662.40 15,805 45,795 662.45 15,876 46,587 662.50 15,948 47,383 662.55 16,020 48,182 662.60 16,091 48,984 662.65 16,163 49,791 662.70 16,234 50,601 662.75 16,306 51,414 662.80 16,378 52,231 662.85 16,449 53,052 662.90 16,521 53,876 662.95 16,592 54,704 663.00 16,664 55,536 663.05 16,739 56,371 663.10 16,814 57,209 663.15 16,889 58,052 663.20 16,963 58,898 663.25 17,038 59,748 663.30 17,113 60,602 663.35 17,188 61,460 663.40 17,263 62,321 663.45 17,338 63,186 663.50 17,413 64,055 663.55 17,487 64,927 663.60 17,562 65,803 663.65 17,637 66,683 663.70 17,712 67,567 663.75 17,787 68,455 663.80 17,862 69,346 663.85 17,936 70,241 663.90 18,011 71,139 663.95 18,086 72,042 664.00 18,161 72,948 NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 72 Summary for Link 4L: EX DA (Combined) Inflow Area = 7.789 ac, 0.00% Impervious, Inflow Depth > 3.58" for 25-Year event Inflow = 30.23 cfs @ 12.13 hrs, Volume= 2.321 of Primary = 30.23 cfs @ 12.13 hrs, Volume= 2.321 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Link 4L: EX DA (Combined) Hydrograph --Ir- ----r--li---li----r--Ir--I---- --I--li---li--7--r--Ir--li-- --r--Ir--li-- ■Inflow 32 - -+--+--+--+-+--+--+-- �I�'1}��O'V1f /4����.� L + an --+-+--+--+----+--+--+--+--I-- 30.23 cfs � -L--1---1--1-- --1---1--1--L--L--'-- L ■Primary 30 28 26 -----I-------I-- --I------I-- -----I-- --I-- ----7--rt--Y--I_-------+--I_--I-- -r--_----Y--r-------rt--Y--r--I-- 22 --I--+--+--+--1-------+-----I-- --------+---------------I-- 20 � I --1--J--1--L--1---'--1--L--1---1- -L--1---1--1--L--1---1--1--L--�--'-- V18 -I- -- -i 16 - - - - - - - - - - - - - -I_- .2 14 7 T - + 12 ' 10 - -J--1--L--1---'--1--L--1---1- -L--1---1--1--L--1---1--1--L--+--'-- 6 ---- - - - - -; 4 - 2 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 73 Hydrograph for Link 4L: EX DA (Combined) Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 0.25 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.75 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.25 0.00 0.00 0.00 1.50 0.00 0.00 0.00 1.75 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.25 0.00 0.00 0.00 2.50 0.00 0.00 0.00 2.75 0.00 0.00 0.00 3.00 0.00 0.00 0.00 3.25 0.00 0.00 0.00 3.50 0.00 0.00 0.00 3.75 0.00 0.00 0.00 4.00 0.00 0.00 0.00 4.25 0.00 0.00 0.00 4.50 0.00 0.00 0.00 4.75 0.00 0.00 0.00 5.00 0.00 0.00 0.00 5.25 0.00 0.00 0.00 5.50 0.00 0.00 0.00 5.75 0.00 0.00 0.00 6.00 0.01 0.00 0.01 6.25 0.01 0.00 0.01 6.50 0.02 0.00 0.02 6.75 0.03 0.00 0.03 7.00 0.03 0.00 0.03 7.25 0.04 0.00 0.04 7.50 0.05 0.00 0.05 7.75 0.05 0.00 0.05 8.00 0.06 0.00 0.06 8.25 0.08 0.00 0.08 8.50 0.11 0.00 0.11 8.75 0.15 0.00 0.15 9.00 0.20 0.00 0.20 9.25 0.25 0.00 0.25 9.50 0.29 0.00 0.29 9.75 0.33 0.00 0.33 10.00 0.40 0.00 0.40 10.25 0.49 0.00 0.49 10.50 0.61 0.00 0.61 10.75 0.77 0.00 0.77 11.00 0.99 0.00 0.99 11.25 1.29 0.00 1.29 11.50 1.82 0.00 1.82 11.75 3.94 0.00 3.94 12.00 20.25 0.00 20.25 12.25 23.46 0.00 23.46 12.50 8.88 0.00 8.88 12.75 4.66 0.00 4.66 13.00 3.22 0.00 3.22 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 13.25 2.60 0.00 2.60 13.50 2.25 0.00 2.25 13.75 1.97 0.00 1.97 14.00 1.75 0.00 1.75 14.25 1.57 0.00 1.57 14.50 1.46 0.00 1.46 14.75 1.38 0.00 1.38 15.00 1.31 0.00 1.31 15.25 1.25 0.00 1.25 15.50 1.18 0.00 1.18 15.75 1.11 0.00 1.11 16.00 1.04 0.00 1.04 16.25 0.97 0.00 0.97 16.50 0.93 0.00 0.93 16.75 0.91 0.00 0.91 17.00 0.88 0.00 0.88 17.25 0.86 0.00 0.86 17.50 0.83 0.00 0.83 17.75 0.81 0.00 0.81 18.00 0.78 0.00 0.78 18.25 0.76 0.00 0.76 18.50 0.73 0.00 0.73 18.75 0.71 0.00 0.71 19.00 0.68 0.00 0.68 19.25 0.66 0.00 0.66 19.50 0.63 0.00 0.63 19.75 0.60 0.00 0.60 20.00 0.58 0.00 0.58 20.25 0.56 0.00 0.56 20.50 0.54 0.00 0.54 20.75 0.54 0.00 0.54 21.00 0.53 0.00 0.53 21.25 0.53 0.00 0.53 21.50 0.52 0.00 0.52 21.75 0.52 0.00 0.52 22.00 0.51 0.00 0.51 22.25 0.51 0.00 0.51 22.50 0.50 0.00 0.50 22.75 0.50 0.00 0.50 23.00 0.49 0.00 0.49 23.25 0.49 0.00 0.49 23.50 0.48 0.00 0.48 23.75 0.48 0.00 0.48 24.00 0.47 0.00 0.47 NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 74 Summary for Link 10L: Prop P0I-1 Inflow Area = 8.787 ac, 70.21 % Impervious, Inflow Depth > 4.50" for 25-Year event Inflow = 25.80 cfs @ 12.07 hrs, Volume= 3.293 of Primary = 25.80 cfs @ 12.07 hrs, Volume= 3.293 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Link 10L: Prop P0I-1 Hydrograph ■ Inflow 28 ---------------,-- ------ -----,-- --------,-- --------,-- ❑ Primary ������ p p rea 25.80 cfs 26 24 --------,--,---------, ------ --r---------r ---------r --r --,-- 22 -J--1--L-------1--L--1---1- -L--1---1--1--L--1---1--1--L--L--'-- 20 ----r--r--r---------r------ -r--r--I- -r - ------ --r --r--r---- 18 w 16 ----+--+--+--+-+--+--+--+-+- -+--+-+--+--+----+--+--+--+-+-- 0 14 a 12 --'-- -- -------'-- -- -----' -------+-- -----'- -- --'-- 10 ,i q 2 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 75 Hydrograph for Link 10L: Prop P0I-1 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 0.25 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.75 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.25 0.00 0.00 0.00 1.50 0.00 0.00 0.00 1.75 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.25 0.00 0.00 0.00 2.50 0.00 0.00 0.00 2.75 0.00 0.00 0.00 3.00 0.00 0.00 0.00 3.25 0.00 0.00 0.00 3.50 0.00 0.00 0.00 3.75 0.00 0.00 0.00 4.00 0.00 0.00 0.00 4.25 0.00 0.00 0.00 4.50 0.00 0.00 0.00 4.75 0.00 0.00 0.00 5.00 0.00 0.00 0.00 5.25 0.00 0.00 0.00 5.50 0.01 0.00 0.01 5.75 0.01 0.00 0.01 6.00 0.01 0.00 0.01 6.25 0.02 0.00 0.02 6.50 0.02 0.00 0.02 6.75 0.03 0.00 0.03 7.00 0.03 0.00 0.03 7.25 0.04 0.00 0.04 7.50 0.04 0.00 0.04 7.75 0.04 0.00 0.04 8.00 0.05 0.00 0.05 8.25 0.05 0.00 0.05 8.50 0.06 0.00 0.06 8.75 0.06 0.00 0.06 9.00 0.06 0.00 0.06 9.25 0.07 0.00 0.07 9.50 0.07 0.00 0.07 9.75 0.08 0.00 0.08 10.00 0.08 0.00 0.08 10.25 0.19 0.00 0.19 10.50 0.46 0.00 0.46 10.75 0.80 0.00 0.80 11.00 1.18 0.00 1.18 11.25 1.64 0.00 1.64 11.50 2.28 0.00 2.28 11.75 5.28 0.00 5.28 12.00 23.82 0.00 23.82 12.25 21.67 0.00 21.67 12.50 11.42 0.00 11.42 12.75 10.09 0.00 10.09 13.00 8.87 0.00 8.87 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 13.25 7.45 0.00 7.45 13.50 5.92 0.00 5.92 13.75 4.78 0.00 4.78 14.00 4.01 0.00 4.01 14.25 3.45 0.00 3.45 14.50 3.04 0.00 3.04 14.75 2.73 0.00 2.73 15.00 2.49 0.00 2.49 15.25 2.29 0.00 2.29 15.50 2.11 0.00 2.11 15.75 1.96 0.00 1.96 16.00 1.82 0.00 1.82 16.25 1.70 0.00 1.70 16.50 1.60 0.00 1.60 16.75 1.51 0.00 1.51 17.00 1.44 0.00 1.44 17.25 1.38 0.00 1.38 17.50 1.32 0.00 1.32 17.75 1.27 0.00 1.27 18.00 1.22 0.00 1.22 18.25 1.17 0.00 1.17 18.50 1.13 0.00 1.13 18.75 1.09 0.00 1.09 19.00 1.05 0.00 1.05 19.25 1.01 0.00 1.01 19.50 0.97 0.00 0.97 19.75 0.93 0.00 0.93 20.00 0.90 0.00 0.90 20.25 0.87 0.00 0.87 20.50 0.84 0.00 0.84 20.75 0.82 0.00 0.82 21.00 0.80 0.00 0.80 21.25 0.78 0.00 0.78 21.50 0.76 0.00 0.76 21.75 0.75 0.00 0.75 22.00 0.73 0.00 0.73 22.25 0.72 0.00 0.72 22.50 0.71 0.00 0.71 22.75 0.70 0.00 0.70 23.00 0.69 0.00 0.69 23.25 0.68 0.00 0.68 23.50 0.67 0.00 0.67 23.75 0.66 0.00 0.66 24.00 0.65 0.00 0.65 NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 76 Summary for Link 11 L: Prop P0I-2 Inflow Area = 1.610 ac, 49.75% Impervious, Inflow Depth > 3.92" for 25-Year event Inflow = 10.61 cfs @ 11.97 hrs, Volume= 0.525 of Primary = 10.61 cfs @ 11.97 hrs, Volume= 0.525 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Link 11 L: Prop P0I-2 Hydrograph 11 10.61 cfs 10 --I-- ----r--r--I----r-----I- 8--1--1--4--L--1---1----+--1---1- I I I I I I I I I I 7--1--J--L--L--1---1----L--1---1- y I I I I I I I I I I U 0 6--11- LL 5 4 i � I -rI I I I I I I I I I 3 ----r--r--r----r--r--r--I- I 2 i --I--7--I--Y----------r--r--I- 1 . 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 77 Hydrograph for Link 11 L: Prop P0I-2 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 0.25 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.75 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.25 0.00 0.00 0.00 1.50 0.00 0.00 0.00 1.75 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.25 0.00 0.00 0.00 2.50 0.00 0.00 0.00 2.75 0.00 0.00 0.00 3.00 0.00 0.00 0.00 3.25 0.00 0.00 0.00 3.50 0.00 0.00 0.00 3.75 0.00 0.00 0.00 4.00 0.00 0.00 0.00 4.25 0.00 0.00 0.00 4.50 0.00 0.00 0.00 4.75 0.00 0.00 0.00 5.00 0.00 0.00 0.00 5.25 0.00 0.00 0.00 5.50 0.01 0.00 0.01 5.75 0.01 0.00 0.01 6.00 0.01 0.00 0.01 6.25 0.01 0.00 0.01 6.50 0.01 0.00 0.01 6.75 0.02 0.00 0.02 7.00 0.02 0.00 0.02 7.25 0.02 0.00 0.02 7.50 0.02 0.00 0.02 7.75 0.03 0.00 0.03 8.00 0.04 0.00 0.04 8.25 0.04 0.00 0.04 8.50 0.05 0.00 0.05 8.75 0.06 0.00 0.06 9.00 0.08 0.00 0.08 9.25 0.09 0.00 0.09 9.50 0.10 0.00 0.10 9.75 0.11 0.00 0.11 10.00 0.13 0.00 0.13 10.25 0.16 0.00 0.16 10.50 0.20 0.00 0.20 10.75 0.25 0.00 0.25 11.00 0.31 0.00 0.31 11.25 0.43 0.00 0.43 11.50 0.59 0.00 0.59 11.75 3.05 0.00 3.05 12.00 10.03 0.00 10.03 12.25 1.41 0.00 1.41 12.50 0.92 0.00 0.92 12.75 0.67 0.00 0.67 13.00 0.57 0.00 0.57 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 13.25 0.49 0.00 0.49 13.50 0.43 0.00 0.43 13.75 0.38 0.00 0.38 14.00 0.34 0.00 0.34 14.25 0.31 0.00 0.31 14.50 0.30 0.00 0.30 14.75 0.28 0.00 0.28 15.00 0.27 0.00 0.27 15.25 0.25 0.00 0.25 15.50 0.24 0.00 0.24 15.75 0.22 0.00 0.22 16.00 0.21 0.00 0.21 16.25 0.20 0.00 0.20 16.50 0.20 0.00 0.20 16.75 0.19 0.00 0.19 17.00 0.18 0.00 0.18 17.25 0.18 0.00 0.18 17.50 0.17 0.00 0.17 17.75 0.17 0.00 0.17 18.00 0.16 0.00 0.16 18.25 0.16 0.00 0.16 18.50 0.15 0.00 0.15 18.75 0.15 0.00 0.15 19.00 0.14 0.00 0.14 19.25 0.14 0.00 0.14 19.50 0.13 0.00 0.13 19.75 0.12 0.00 0.12 20.00 0.12 0.00 0.12 20.25 0.12 0.00 0.12 20.50 0.12 0.00 0.12 20.75 0.11 0.00 0.11 21.00 0.11 0.00 0.11 21.25 0.11 0.00 0.11 21.50 0.11 0.00 0.11 21.75 0.11 0.00 0.11 22.00 0.11 0.00 0.11 22.25 0.11 0.00 0.11 22.50 0.11 0.00 0.11 22.75 0.11 0.00 0.11 23.00 0.10 0.00 0.10 23.25 0.10 0.00 0.10 23.50 0.10 0.00 0.10 23.75 0.10 0.00 0.10 24.00 0.10 0.00 0.10 NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 78 Summary for Link 12L: Ex P0I-2 Inflow Area = 2.620 ac, 26.07% Impervious, Inflow Depth > 3.69" for 25-Year event Inflow = 11.83 cfs @ 12.05 hrs, Volume= 0.806 of Primary = 11.83 cfs @ 12.05 hrs, Volume= 0.806 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Link 12L: Ex P0I-2 Hydrograph I I I I I I I I I I I I I I I I I I I I I ■Inflow IPrimary 13 --1--J--1--L--1-----1--+--'- --1---1--1--L--1-----1--L--+--'-- ■ 12 - - ����1'�1V�111��K��i'� 11.83 cfs -+--+-+--+--+----+--+--+--+-+-- �T.�V I I I I I I I I I I 11 --I----rt--r--I---li-----r--Ir--li- --Ir--Ir--li--7--r--li---li--rt--r--Ir--li-- 10 I I I I I I I --I-- ----r-----I-- --+-- I I I I I --I- ---------T--r-----I-- I I I I I I --r-- I I --I-- I I I I I I I I I I I I I I I I I I I I I I g y -----'---' --'-----'---' --' --' I I I I I I I I --'- --'-----'---' I I I I I I --'-----'---' I I I I --' I --' --'-- I I .V.. 7 i l ----J--J--L-------J--+-----'- I I I I I I I --L-------J--L-------J--L--L--'-- I I I I I I I I I I I I I LL 5 --I-- ----r-----I-- --+ --I- ------T--r-----I-- --r-- --I-- Q i + I I I I I I I I I I I I I I F I I I I i I I I I I I I I I I I I I I I I I I I I I I 2 1 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type 11 24-hr 25-Year Rainfall=6.22" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 79 Hydrograph for Link 12L: Ex P0I-2 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 0.25 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.75 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.25 0.00 0.00 0.00 1.50 0.00 0.00 0.00 1.75 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.25 0.00 0.00 0.00 2.50 0.00 0.00 0.00 2.75 0.00 0.00 0.00 3.00 0.00 0.00 0.00 3.25 0.00 0.00 0.00 3.50 0.00 0.00 0.00 3.75 0.00 0.00 0.00 4.00 0.00 0.00 0.00 4.25 0.00 0.00 0.00 4.50 0.00 0.00 0.00 4.75 0.00 0.00 0.00 5.00 0.00 0.00 0.00 5.25 0.00 0.00 0.00 5.50 0.00 0.00 0.00 5.75 0.00 0.00 0.00 6.00 0.00 0.00 0.00 6.25 0.00 0.00 0.00 6.50 0.01 0.00 0.01 6.75 0.01 0.00 0.01 7.00 0.01 0.00 0.01 7.25 0.02 0.00 0.02 7.50 0.02 0.00 0.02 7.75 0.02 0.00 0.02 8.00 0.03 0.00 0.03 8.25 0.04 0.00 0.04 8.50 0.05 0.00 0.05 8.75 0.07 0.00 0.07 9.00 0.08 0.00 0.08 9.25 0.10 0.00 0.10 9.50 0.12 0.00 0.12 9.75 0.13 0.00 0.13 10.00 0.16 0.00 0.16 10.25 0.20 0.00 0.20 10.50 0.24 0.00 0.24 10.75 0.30 0.00 0.30 11.00 0.39 0.00 0.39 11.25 0.52 0.00 0.52 11.50 0.73 0.00 0.73 11.75 2.23 0.00 2.23 12.00 10.90 0.00 10.90 12.25 5.59 0.00 5.59 12.50 2.23 0.00 2.23 12.75 1.31 0.00 1.31 13.00 1.00 0.00 1.00 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 13.25 0.84 0.00 0.84 13.50 0.73 0.00 0.73 13.75 0.65 0.00 0.65 14.00 0.57 0.00 0.57 14.25 0.52 0.00 0.52 14.50 0.49 0.00 0.49 14.75 0.46 0.00 0.46 15.00 0.44 0.00 0.44 15.25 0.42 0.00 0.42 15.50 0.39 0.00 0.39 15.75 0.37 0.00 0.37 16.00 0.35 0.00 0.35 16.25 0.33 0.00 0.33 16.50 0.32 0.00 0.32 16.75 0.31 0.00 0.31 17.00 0.30 0.00 0.30 17.25 0.29 0.00 0.29 17.50 0.28 0.00 0.28 17.75 0.27 0.00 0.27 18.00 0.26 0.00 0.26 18.25 0.26 0.00 0.26 18.50 0.25 0.00 0.25 18.75 0.24 0.00 0.24 19.00 0.23 0.00 0.23 19.25 0.22 0.00 0.22 19.50 0.21 0.00 0.21 19.75 0.20 0.00 0.20 20.00 0.19 0.00 0.19 20.25 0.19 0.00 0.19 20.50 0.18 0.00 0.18 20.75 0.18 0.00 0.18 21.00 0.18 0.00 0.18 21.25 0.18 0.00 0.18 21.50 0.18 0.00 0.18 21.75 0.18 0.00 0.18 22.00 0.17 0.00 0.17 22.25 0.17 0.00 0.17 22.50 0.17 0.00 0.17 22.75 0.17 0.00 0.17 23.00 0.17 0.00 0.17 23.25 0.17 0.00 0.17 23.50 0.16 0.00 0.16 23.75 0.16 0.00 0.16 24.00 0.16 0.00 0.16 NM 82110 - Acra Heights Type 1124-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 80 Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1 S: EX DA 1 Runoff Area=5.910 ac 0.00% Impervious Runoff Depth>4.79" Flow Length=605' Tc=20.0 min CN=74 Runoff=31.41 cfs 2.358 of Subcatchment2S: EX DA 2 Runoff Area=1.879 ac 0.00% Impervious Runoff Depth>5.83" Flow Length=515' Tc=22.5 min CN=83 Runoff=11.15 cfs 0.912 of Subcatchment3S: EX DA-4 Runoff Area=1.400 ac 13.00% Impervious Runoff Depth>4.80" Flow Length=215' Tc=10.6 min CN=74 Runoff=9.88 cfs 0.560 of Subcatchment5S: Prop DA-1 Runoff Area=5.250 ac 70.00% Impervious Runoff Depth>6.55" Tc=6.0 min CN=89 Runoff=54.12 cfs 2.867 of Subcatchment7S: Prop DA-2 Runoff Area=3.537 ac 70.51% Impervious Runoff Depth>6.55" Tc=6.0 min CN=89 Runoff=36.46 cfs 1.932 of Subcatchment9S: Prop DA-3 Runoff Area=1.010 ac 40.00% Impervious Runoff Depth>5.03" Tc=6.0 min CN=76 Runoff=8.58 cfs 0.424 of Subcatchment 11 S: EX DA-3 Runoff Area=1.220 ac 41.07% Impervious Runoff Depth>5.60" Flow Length=375' Tc=19.2 min CN=81 Runoff=7.64 cfs 0.569 of Subcatchment 12S: Prop DA-4 Runoff Area=0.600 ac 66.17% Impervious Runoff Depth>6.08" Tc=6.0 min CN=85 Runoff=5.90 cfs 0.304 of Pond 6P: Wet Pond 1 Peak Elev=662.79' Storage=41,028 cf Inflow=61.37 cfs 4.653 of Primary=29.55 cfs 4.317 of Secondary=16.04 cfs 0.134 of Outflow=45.59 cfs 4.451 of Pond 8P: Wet Pond 2 Peak Elev=661.87' Storage=37,628 cf Inflow=36.46 cfs 1.932 of Primary=8.84 cfs 1.785 of Secondary=0.00 cfs 0.000 of Outflow=8.84 cfs 1.785 of Link 4L: EX DA (Combined) Inflow=42.42 cfs 3.270 of Primary=42.42 cfs 3.270 of Link 10L: Prop POI-1 Link 11L: Prop POI-2 Link 12L: Ex POI-2 Inflow=45.59 cfs 4.451 of Primary=45.59 cfs 4.451 of Inflow=14.48 cfs 0.728 of Primary=14.48 cfs 0.728 of Inflow=16.48 cfs 1.129 of Primary=16.48 cfs 1.129 of Total Runoff Area = 20.806 ac Runoff Volume = 9.926 of Average Runoff Depth = 5.72" 63.22% Pervious = 13.153 ac 36.78% Impervious = 7.653 ac NM 82110 - Acra Heights Type 1124-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 81 Summary for Subcatchment 1S: EX DA 1 Runoff = 31.41 cfs @ 12.12 hrs, Volume= 2.358 af, Depth> 4.79" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.87" Area (ac) CN Description 0.182 60 Woods, Fair, HSG B 0.565 79 Woods, Fair, HSG D 1.592 84 Pasture/grassland/range, Fair, HSG D 3.571 69 Pasture/grassland/range, Fair, HSG B 5.910 74 Weighted Average 5.910 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.7 75 0.0100 0.13 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 3.57" 10.3 530 0.0150 0.86 Shallow Concentrated Flow, Shallow Concentrated Flow Short Grass Pasture Kv= 7.0 fps 20.0 605 Total Subcatchment 1S: EX DA 1 Hydrograph 34 i i i i i i i i i i i i i i i i i i i � Runoff ---------- 1--L-- -- -- 31141 cfs --1--L--L-------J--1--1--L--L-- 32 -'--J ----- + -- r 30 Y s� 28 -l'DOQ YeaK-Rainfall;=7�.87",--rt--t--r--'r-----'-- ----t--r--'r-- 26 24- - + -+--+--+--+--+-+--+--+--+--+--+-- -RunoffArch :5,11-0-At--+- 22-FlQfkNe7_$(1'�F'i - --' --'-----------'-- --' --' --' -- i w 20 1 1 1 1 1 1 1 1 }I --i--r r- +- r- r- r 18 r- Rane#f Depth>4.79 1 i -+--+--+--+--+--I---i--+ -+--+--r--+--+--i--+--+--+--+--+-- -605 LL 12 1' �i.V' Min' ------------ --- --- --- -- --- --- --- ------------------------------I 10 -(*=74-r--r--r--r--r-----�--r r--+--r--�r-------r--r--+--r--�r-- 8 6--'---------1--L-------------+---------------+--+--�-- 4 2 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type/1 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 82 Hydrograph for Subcatchment 1S: EX DA 1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.10 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.32 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.43 0.00 0.00 4.75 0.46 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.56 0.00 0.00 5.75 0.59 0.00 0.00 6.00 0.63 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.70 0.00 0.00 6.75 0.74 0.00 0.00 7.00 0.78 0.00 0.02 7.25 0.82 0.00 0.03 7.50 0.86 0.01 0.06 7.75 0.90 0.01 0.08 8.00 0.94 0.02 0.10 8.25 0.99 0.02 0.12 8.50 1.04 0.03 0.16 8.75 1.10 0.04 0.20 9.00 1.16 0.05 0.25 9.25 1.22 0.07 0.31 9.50 1.28 0.08 0.35 9.75 1.35 0.10 0.39 10.00 1.42 0.12 0.47 10.25 1.51 0.15 0.57 10.50 1.61 0.18 0.70 10.75 1.72 0.23 0.87 11.00 1.85 0.28 1.10 11.25 2.01 0.36 1.42 11.50 2.23 0.46 1.98 11.75 3.05 0.94 4.35 12.00 5.22 2.54 21.81 12.25 5.56 2.82 23.18 12.50 5.78 3.00 8.52 12.75 5.94 3.14 4.49 13.00 6.08 3.25 3.15 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.19 3.34 2.57 13.50 6.29 3.43 2.22 13.75 6.38 3.50 1.95 14.00 6.45 3.57 1.73 14.25 6.52 3.63 1.55 14.50 6.59 3.69 1.44 14.75 6.66 3.74 1.37 15.00 6.72 3.80 1.30 15.25 6.77 3.85 1.23 15.50 6.83 3.89 1.16 15.75 6.88 3.94 1.09 16.00 6.93 3.98 1.02 16.25 6.97 4.02 0.96 16.50 7.01 4.05 0.92 16.75 7.06 4.09 0.90 17.00 7.10 4.13 0.87 17.25 7.14 4.16 0.85 17.50 7.17 4.19 0.82 17.75 7.21 4.23 0.80 18.00 7.25 4.26 0.77 18.25 7.28 4.29 0.75 18.50 7.32 4.32 0.72 18.75 7.35 4.35 0.70 19.00 7.38 4.38 0.67 19.25 7.41 4.40 0.65 19.50 7.44 4.43 0.62 19.75 7.47 4.45 0.60 20.00 7.49 4.47 0.57 20.25 7.52 4.50 0.55 20.50 7.54 4.52 0.54 20.75 7.57 4.54 0.53 21.00 7.59 4.56 0.53 21.25 7.62 4.58 0.52 21.50 7.64 4.61 0.52 21.75 7.67 4.63 0.51 22.00 7.69 4.65 0.51 22.25 7.71 4.67 0.50 22.50 7.74 4.69 0.50 22.75 7.76 4.71 0.49 23.00 7.78 4.73 0.49 23.25 7.80 4.75 0.48 23.50 7.83 4.77 0.48 23.75 7.85 4.79 0.47 24.00 7.87 4.81 0.47 NM 82110 - Acra Heights Type 1124-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 83 Summary for Subcatchment 2S: EX DA 2 Runoff = 11.15 cfs @ 12.15 hrs, Volume= 0.912 af, Depth> 5.83" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.87" Area (ac) CN Description 0.365 79 Woods, Fair, HSG D 0.284 84 Pasture/grassland/range, Fair, HSG D 1.230 84 Pasture/grassland/range, Fair, HSG D 1.879 83 Weighted Average 1.879 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.8 75 0.0050 0.10 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 3.57" 9.7 440 0.0116 0.75 Shallow Concentrated Flow, Shallow Concentrated Flow Short Grass Pasture Kv= 7.0 fps 22.5 515 Total Subcatchment 2S: EX DA 2 Hydrograph --�---�---�--J--1--L--L--1---1---1--J--1--i--1--L--IL--�---�--J--J--J--L--L- ■ Runoff 12 11.15 cfs 11 _type-1-1�4-,hr, --'- --'- 10 1'100-Year Rainfa11;=7.87" 9 Ruhoff Arch=1 ,879 da& RUMOff _ 1 1 1 1 1 1 -r--r--r--r--1---1--r--r--r--r--r-- v 7 Runoff * QQ�1 — -Runoff Depth>5-.8-3-1---1--y-rt--t--r--r--r--1--y----t--r--r-- 1 1 1 1 1 1 1 1 1 1 1 1 1 1 6 Mo�v-�L-enoth-545, -- -- -;--;- -- ----;--;- -- -- LL 5 - -c=-2�.Si MFn L L J 1 1 L L J 1 1 L L 4- 3 2- 0- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type/1 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 84 Hydrograph for Subcatchment 2S: EX DA 2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.10 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.32 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.43 0.00 0.00 4.75 0.46 0.00 0.00 5.00 0.50 0.00 0.01 5.25 0.53 0.01 0.02 5.50 0.56 0.01 0.02 5.75 0.59 0.02 0.03 6.00 0.63 0.02 0.04 6.25 0.67 0.03 0.05 6.50 0.70 0.04 0.05 6.75 0.74 0.05 0.06 7.00 0.78 0.06 0.07 7.25 0.82 0.07 0.08 7.50 0.86 0.08 0.09 7.75 0.90 0.10 0.10 8.00 0.94 0.11 0.11 8.25 0.99 0.13 0.12 8.50 1.04 0.15 0.14 8.75 1.10 0.17 0.16 9.00 1.16 0.20 0.18 9.25 1.22 0.23 0.21 9.50 1.28 0.26 0.23 9.75 1.35 0.30 0.24 10.00 1.42 0.34 0.27 10.25 1.51 0.38 0.31 10.50 1.61 0.44 0.37 10.75 1.72 0.51 0.44 11.00 1.85 0.59 0.54 11.25 2.01 0.71 0.67 11.50 2.23 0.85 0.89 11.75 3.05 1.48 1.68 12.00 5.22 3.37 7.33 12.25 5.56 3.68 9.37 12.50 5.78 3.89 3.63 12.75 5.94 4.04 1.82 13.00 6.08 4.16 1.20 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.19 4.27 0.93 13.50 6.29 4.36 0.80 13.75 6.38 4.44 0.69 14.00 6.45 4.51 0.61 14.25 6.52 4.58 0.55 14.50 6.59 4.64 0.51 14.75 6.66 4.70 0.48 15.00 6.72 4.76 0.45 15.25 6.77 4.82 0.43 15.50 6.83 4.87 0.41 15.75 6.88 4.91 0.38 16.00 6.93 4.96 0.36 16.25 6.97 5.00 0.33 16.50 7.01 5.04 0.32 16.75 7.06 5.08 0.31 17.00 7.10 5.12 0.30 17.25 7.14 5.16 0.29 17.50 7.17 5.19 0.28 17.75 7.21 5.23 0.27 18.00 7.25 5.26 0.27 18.25 7.28 5.30 0.26 18.50 7.32 5.33 0.25 18.75 7.35 5.36 0.24 19.00 7.38 5.39 0.23 19.25 7.41 5.42 0.22 19.50 7.44 5.44 0.21 19.75 7.47 5.47 0.21 20.00 7.49 5.49 0.20 20.25 7.52 5.52 0.19 20.50 7.54 5.54 0.18 20.75 7.57 5.57 0.18 21.00 7.59 5.59 0.18 21.25 7.62 5.61 0.18 21.50 7.64 5.64 0.18 21.75 7.67 5.66 0.17 22.00 7.69 5.68 0.17 22.25 7.71 5.70 0.17 22.50 7.74 5.73 0.17 22.75 7.76 5.75 0.17 23.00 7.78 5.77 0.17 23.25 7.80 5.79 0.16 23.50 7.83 5.81 0.16 23.75 7.85 5.83 0.16 24.00 7.87 5.85 0.16 NM 82110 - Acra Heights Type 1124-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 85 Summary for Subcatchment 3S: EX DA-4 Runoff = 9.88 cfs @ 12.02 hrs, Volume= 0.560 af, Depth> 4.80" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.87" Area (ac) CN Description 1.011 69 Pasture/grassland/range, Fair, HSG B 0.207 79 Woods, Fair, HSG D 0.182 98 Paved parking, HSG B 1.400 74 Weighted Average 1.218 87.00% Pervious Area 0.182 13.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.7 75 0.0133 0.14 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 3.57" 1.9 140 0.0305 1.22 Shallow Concentrated Flow, Shallow Concentrated Flow Short Grass Pasture Kv= 7.0 fps 10.6 215 Total IL N 3 0 E Subcatchment 3S: EX DA-4 --I --- -- -- -- -- --I -tXp-e-II-4�h-r --1 -- -- 1,00-Year Rainfa11;:7.87" Runoff Arch=1 i400 Ac'i Flunoff Vo''Iuimq=O.%0''of Runoff Depth>4.80" FloW Ldnoth^2'15,' Tc=1.6'', rein'--- - -- - - -N=74 ---------- --;-- ---------- Hydrograph - 9.88 cfs 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ■ Runoff NCC182110 - Acra Heights Type/1 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 86 Hydrograph for Subcatchment 3S: EX DA-4 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.10 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.32 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.43 0.00 0.00 4.75 0.46 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.56 0.00 0.00 5.75 0.59 0.00 0.00 6.00 0.63 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.70 0.00 0.00 6.75 0.74 0.00 0.00 7.00 0.78 0.00 0.01 7.25 0.82 0.00 0.01 7.50 0.86 0.01 0.02 7.75 0.90 0.01 0.02 8.00 0.94 0.02 0.03 8.25 0.99 0.02 0.03 8.50 1.04 0.03 0.04 8.75 1.10 0.04 0.05 9.00 1.16 0.05 0.07 9.25 1.22 0.07 0.08 9.50 1.28 0.08 0.09 9.75 1.35 0.10 0.10 10.00 1.42 0.12 0.12 10.25 1.51 0.15 0.15 10.50 1.61 0.18 0.19 10.75 1.72 0.23 0.23 11.00 1.85 0.28 0.30 11.25 2.01 0.36 0.40 11.50 2.23 0.46 0.56 11.75 3.05 0.94 2.14 12.00 5.22 2.54 9.71 12.25 5.56 2.82 2.39 12.50 5.78 3.00 1.15 12.75 5.94 3.14 0.78 13.00 6.08 3.25 0.65 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.19 3.34 0.55 13.50 6.29 3.43 0.49 13.75 6.38 3.50 0.43 14.00 6.45 3.57 0.38 14.25 6.52 3.63 0.35 14.50 6.59 3.69 0.33 14.75 6.66 3.74 0.31 15.00 6.72 3.80 0.30 15.25 6.77 3.85 0.28 15.50 6.83 3.89 0.27 15.75 6.88 3.94 0.25 16.00 6.93 3.98 0.23 16.25 6.97 4.02 0.22 16.50 7.01 4.05 0.21 16.75 7.06 4.09 0.21 17.00 7.10 4.13 0.20 17.25 7.14 4.16 0.20 17.50 7.17 4.19 0.19 17.75 7.21 4.23 0.19 18.00 7.25 4.26 0.18 18.25 7.28 4.29 0.17 18.50 7.32 4.32 0.17 18.75 7.35 4.35 0.16 19.00 7.38 4.38 0.16 19.25 7.41 4.40 0.15 19.50 7.44 4.43 0.14 19.75 7.47 4.45 0.14 20.00 7.49 4.47 0.13 20.25 7.52 4.50 0.13 20.50 7.54 4.52 0.13 20.75 7.57 4.54 0.12 21.00 7.59 4.56 0.12 21.25 7.62 4.58 0.12 21.50 7.64 4.61 0.12 21.75 7.67 4.63 0.12 22.00 7.69 4.65 0.12 22.25 7.71 4.67 0.12 22.50 7.74 4.69 0.12 22.75 7.76 4.71 0.12 23.00 7.78 4.73 0.11 23.25 7.80 4.75 0.11 23.50 7.83 4.77 0.11 23.75 7.85 4.79 0.11 24.00 7.87 4.81 0.11 NM 82110 - Acra Heights Type 1124-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 87 Summary for Subcatchment 5S: Prop DA-1 Runoff = 54.12 cfs @ 11.96 hrs, Volume= 2.867 af, Depth> 6.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.87" Area (ac) CN Description 3.675 98 Paved parking, HSG D 1.068 61 >75% Grass cover, Good, HSG B 0.507 80 >75% Grass cover, Good, HSG D 5.250 89 Weighted Average 1.575 30.00% Pervious Area 3.675 70.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Direct Entry N 0 LL Subcatchment 5S: Prop DA-1 Hydrograph -- -- -- --i-- ---- -- -- - -- Runoff 12 cfs -- ---I -- - - -IType-u 2 -h'Ix - ---400-Year R'ainfall=�7.877 - -- --R-urt f i Ae1 ea=r.2a0-at-- -- R-prtq fl-Volgme=2.$67-clf - Runoff Depth>&.65��"-- T-C*6. -Miff-- T--T--T--T--T--I--- I--T--T-PW89- - - - - + - - I - - - -I- - -I- - - - I - - T- - L - - I - - 1 _ _ L _ _ L _ _I_ _ _I_ _ J _ _ L _ _ 1 _ _ L _ _ L _ I I I I I I I I I I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type/1 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 88 Hydrograph for Subcatchment 5S: Prop DA-1 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.10 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.01 3.25 0.30 0.00 0.03 3.50 0.32 0.00 0.06 3.75 0.35 0.01 0.08 4.00 0.38 0.01 0.10 4.25 0.41 0.02 0.12 4.50 0.43 0.02 0.14 4.75 0.46 0.03 0.17 5.00 0.50 0.04 0.19 5.25 0.53 0.05 0.22 5.50 0.56 0.06 0.25 5.75 0.59 0.08 0.27 6.00 0.63 0.09 0.30 6.25 0.67 0.11 0.33 6.50 0.70 0.12 0.36 6.75 0.74 0.14 0.39 7.00 0.78 0.16 0.42 7.25 0.82 0.18 0.44 7.50 0.86 0.20 0.47 7.75 0.90 0.23 0.50 8.00 0.94 0.25 0.53 8.25 0.99 0.28 0.59 8.50 1.04 0.31 0.68 8.75 1.10 0.35 0.76 9.00 1.16 0.39 0.86 9.25 1.22 0.43 0.91 9.50 1.28 0.47 0.93 9.75 1.35 0.52 1.03 10.00 1.42 0.57 1.17 10.25 1.51 0.64 1.37 10.50 1.61 0.71 1.59 10.75 1.72 0.80 1.91 11.00 1.85 0.90 2.29 11.25 2.01 1.04 2.99 11.50 2.23 1.22 3.91 11.75 3.05 1.94 18.17 12.00 5.22 3.98 50.25 12.25 5.56 4.31 6.77 12.50 5.78 4.53 4.35 12.75 5.94 4.68 3.18 13.00 6.08 4.81 2.66 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.19 4.92 2.29 13.50 6.29 5.01 2.01 13.75 6.38 5.10 1.78 14.00 6.45 5.18 1.57 14.25 6.52 5.24 1.45 14.50 6.59 5.31 1.38 14.75 6.66 5.37 1.31 15.00 6.72 5.43 1.24 15.25 6.77 5.49 1.17 15.50 6.83 5.54 1.10 15.75 6.88 5.59 1.03 16.00 6.93 5.64 0.96 16.25 6.97 5.68 0.92 16.50 7.01 5.72 0.89 16.75 7.06 5.76 0.87 17.00 7.10 5.80 0.84 17.25 7.14 5.84 0.82 17.50 7.17 5.88 0.79 17.75 7.21 5.92 0.77 18.00 7.25 5.95 0.74 18.25 7.28 5.98 0.72 18.50 7.32 6.02 0.69 18.75 7.35 6.05 0.67 19.00 7.38 6.08 0.64 19.25 7.41 6.11 0.62 19.50 7.44 6.14 0.59 19.75 7.47 6.16 0.56 20.00 7.49 6.19 0.54 20.25 7.52 6.21 0.53 20.50 7.54 6.24 0.52 20.75 7.57 6.26 0.52 21.00 7.59 6.29 0.51 21.25 7.62 6.31 0.51 21.50 7.64 6.34 0.50 21.75 7.67 6.36 0.50 22.00 7.69 6.38 0.49 22.25 7.71 6.40 0.49 22.50 7.74 6.43 0.48 22.75 7.76 6.45 0.48 23.00 7.78 6.47 0.47 23.25 7.80 6.49 0.47 23.50 7.83 6.52 0.46 23.75 7.85 6.54 0.46 24.00 7.87 6.56 0.45 NM 82110 - Acra Heights Type 1124-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 89 Summary for Subcatchment 7S: Prop DA-2 Runoff = 36.46 cfs @ 11.96 hrs, Volume= 1.932 af, Depth> 6.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.87" Area (ac) CN Description 2.494 98 Paved parking, HSG D 0.367 80 >75% Grass cover, Good, HSG D 0.676 61 >75% Grass cover, Good, HSG B 3.537 89 Weighted Average 1.043 29.49% Pervious Area 2.494 70.51 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Direct Entry Subcatchment 7S: Prop DA-2 Hydrograph _I-- -- - - --I ---- -i-- -- 40 - - --I _I-- -- - -I--- ■Runoff 38--------'----1--L-------'- 36.46 cfs--1--L--L--1----'--1T--J--1--1--L-- -- 36--------'----L-- L--L--------'--L--1--1--L--L-- ylpel N124-hT - 34------------------------'--�---------------------�-- 4OII-Year Rainfar<11;;7 87'1'-- 30------'-- --------',-----'-- -- -- wn6ff-Awe&a.537arc-- 28--r-------r--r--r--r--r-----i--r --r--t--r--r--r----r--rr--r--r--r-- 26--li---li---li----7--r--r--Ir--Ir--li-- -- ngffirVg1urne= J1.;3 -cf - 24---------------------------,------------- 22 -- -- --Runoff ===l_ _==D_e�psthII>'6-.W5J15 18I ilii li _�Tcc_ a 16----------L--1--L--L--------'--L--1--1--L--L--1---1--J--L_N=S- 14---------- L-- L--L-- L------ --'--L--1--1--L--L--1---1--J--L---L--L-- 12--------i----+--+----------i----+--+-- ---------+-- --+-- -- -- 10-----------+--+---------i--�--+--+-----------+----+----�-- 8-------ti--y--rt--r--r--�r-----�i--�-rt--+--r--�r-----------+--r--�r-- 6--__------r--r--r__r__I___I___I__ _r--t--r--r --I---I--r--r--Y--r--r-- i 4-------_I----------------- - -----------------------I-- 7 I I I I I I I I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type/1 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 90 Hydrograph for Subcatchment 7S: Prop DA-2 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.10 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.01 3.25 0.30 0.00 0.02 3.50 0.32 0.00 0.04 3.75 0.35 0.01 0.05 4.00 0.38 0.01 0.07 4.25 0.41 0.02 0.08 4.50 0.43 0.02 0.10 4.75 0.46 0.03 0.11 5.00 0.50 0.04 0.13 5.25 0.53 0.05 0.15 5.50 0.56 0.06 0.17 5.75 0.59 0.08 0.19 6.00 0.63 0.09 0.20 6.25 0.67 0.11 0.22 6.50 0.70 0.12 0.24 6.75 0.74 0.14 0.26 7.00 0.78 0.16 0.28 7.25 0.82 0.18 0.30 7.50 0.86 0.20 0.32 7.75 0.90 0.23 0.34 8.00 0.94 0.25 0.36 8.25 0.99 0.28 0.40 8.50 1.04 0.31 0.46 8.75 1.10 0.35 0.51 9.00 1.16 0.39 0.58 9.25 1.22 0.43 0.61 9.50 1.28 0.47 0.63 9.75 1.35 0.52 0.69 10.00 1.42 0.57 0.79 10.25 1.51 0.64 0.92 10.50 1.61 0.71 1.07 10.75 1.72 0.80 1.28 11.00 1.85 0.90 1.54 11.25 2.01 1.04 2.01 11.50 2.23 1.22 2.63 11.75 3.05 1.94 12.24 12.00 5.22 3.98 33.86 12.25 5.56 4.31 4.56 12.50 5.78 4.53 2.93 12.75 5.94 4.68 2.14 13.00 6.08 4.81 1.79 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.19 4.92 1.54 13.50 6.29 5.01 1.35 13.75 6.38 5.10 1.20 14.00 6.45 5.18 1.06 14.25 6.52 5.24 0.98 14.50 6.59 5.31 0.93 14.75 6.66 5.37 0.89 15.00 6.72 5.43 0.84 15.25 6.77 5.49 0.79 15.50 6.83 5.54 0.74 15.75 6.88 5.59 0.70 16.00 6.93 5.64 0.65 16.25 6.97 5.68 0.62 16.50 7.01 5.72 0.60 16.75 7.06 5.76 0.59 17.00 7.10 5.80 0.57 17.25 7.14 5.84 0.55 17.50 7.17 5.88 0.53 17.75 7.21 5.92 0.52 18.00 7.25 5.95 0.50 18.25 7.28 5.98 0.48 18.50 7.32 6.02 0.47 18.75 7.35 6.05 0.45 19.00 7.38 6.08 0.43 19.25 7.41 6.11 0.41 19.50 7.44 6.14 0.40 19.75 7.47 6.16 0.38 20.00 7.49 6.19 0.36 20.25 7.52 6.21 0.36 20.50 7.54 6.24 0.35 20.75 7.57 6.26 0.35 21.00 7.59 6.29 0.34 21.25 7.62 6.31 0.34 21.50 7.64 6.34 0.34 21.75 7.67 6.36 0.33 22.00 7.69 6.38 0.33 22.25 7.71 6.40 0.33 22.50 7.74 6.43 0.32 22.75 7.76 6.45 0.32 23.00 7.78 6.47 0.32 23.25 7.80 6.49 0.31 23.50 7.83 6.52 0.31 23.75 7.85 6.54 0.31 24.00 7.87 6.56 0.30 NM 82110 - Acra Heights Type 1124-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 91 Summary for Subcatchment 9S: Prop DA-3 Runoff = 8.58 cfs @ 11.97 hrs, Volume= 0.424 af, Depth> 5.03" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.87" Area (ac) CN Description 0.404 98 Paved parking, HSG B 0.606 61 >75% Grass cover, Good, HSG B 1.010 76 Weighted Average 0.606 60.00% Pervious Area 0.404 40.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, N 3 0 LL Subcatchment 9S: Prop DA-3 Hydrograph L--L--1---1---1--L--L----------'-- ■Runoff 8 cfs -'1L- - - -- Typ�aI'I-2�--h'I�- 1©O-TYear R�ainfaillT7.87" -------;-- Runbff AweA=1.010 arc ROnOff'IVQI�m'1e='10.424f - - I - - I II - - - - RunoffllDe 5-037- --'I---'I---'I---'I---'- I--'1 - T&-v.0 tr I I I I I I I I I I I I I I I I I I I I I I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type/1 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 92 Hydrograph for Subcatchment 9S: Prop DA-3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.10 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.32 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.43 0.00 0.00 4.75 0.46 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.56 0.00 0.00 5.75 0.59 0.00 0.00 6.00 0.63 0.00 0.00 6.25 0.67 0.00 0.00 6.50 0.70 0.00 0.01 6.75 0.74 0.00 0.01 7.00 0.78 0.01 0.01 7.25 0.82 0.01 0.02 7.50 0.86 0.02 0.02 7.75 0.90 0.02 0.02 8.00 0.94 0.03 0.03 8.25 0.99 0.04 0.04 8.50 1.04 0.05 0.04 8.75 1.10 0.06 0.05 9.00 1.16 0.07 0.06 9.25 1.22 0.09 0.07 9.50 1.28 0.11 0.08 9.75 1.35 0.13 0.09 10.00 1.42 0.16 0.11 10.25 1.51 0.19 0.13 10.50 1.61 0.23 0.16 10.75 1.72 0.28 0.20 11.00 1.85 0.34 0.26 11.25 2.01 0.42 0.35 11.50 2.23 0.54 0.48 11.75 3.05 1.05 2.48 12.00 5.22 2.72 8.10 12.25 5.56 3.00 1.14 12.50 5.78 3.19 0.74 12.75 5.94 3.33 0.54 13.00 6.08 3.45 0.46 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.19 3.54 0.39 13.50 6.29 3.63 0.35 13.75 6.38 3.71 0.31 14.00 6.45 3.77 0.27 14.25 6.52 3.84 0.25 14.50 6.59 3.90 0.24 14.75 6.66 3.95 0.23 15.00 6.72 4.01 0.22 15.25 6.77 4.06 0.20 15.50 6.83 4.10 0.19 15.75 6.88 4.15 0.18 16.00 6.93 4.19 0.17 16.25 6.97 4.23 0.16 16.50 7.01 4.27 0.16 16.75 7.06 4.31 0.15 17.00 7.10 4.34 0.15 17.25 7.14 4.38 0.14 17.50 7.17 4.41 0.14 17.75 7.21 4.45 0.14 18.00 7.25 4.48 0.13 18.25 7.28 4.51 0.13 18.50 7.32 4.54 0.12 18.75 7.35 4.57 0.12 19.00 7.38 4.60 0.11 19.25 7.41 4.62 0.11 19.50 7.44 4.65 0.10 19.75 7.47 4.67 0.10 20.00 7.49 4.70 0.10 20.25 7.52 4.72 0.09 20.50 7.54 4.74 0.09 20.75 7.57 4.77 0.09 21.00 7.59 4.79 0.09 21.25 7.62 4.81 0.09 21.50 7.64 4.83 0.09 21.75 7.67 4.85 0.09 22.00 7.69 4.88 0.09 22.25 7.71 4.90 0.09 22.50 7.74 4.92 0.09 22.75 7.76 4.94 0.08 23.00 7.78 4.96 0.08 23.25 7.80 4.98 0.08 23.50 7.83 5.00 0.08 23.75 7.85 5.02 0.08 24.00 7.87 5.04 0.08 NM 82110 - Acra Heights Type 1124-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 93 Summary for Subcatchment 11S: EX DA-3 Runoff = 7.64 cfs @ 12.11 hrs, Volume= 0.569 af, Depth> 5.60" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.87" Area (ac) CN Description 0.501 98 Paved parking, HSG D 0.719 69 50-75% Grass cover, Fair, HSG B 1.220 81 Weighted Average 0.719 58.93% Pervious Area 0.501 41.07% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.8 75 0.0050 0.10 Sheet Flow, Sheet Flow Grass: Short n= 0.150 P2= 3.57" 6.4 300 0.0125 0.78 Shallow Concentrated Flow, Shallow Concentrated Flow Short Grass Pasture Kv= 7.0 fps 19.2 375 Total N 0 LL Subcatchment 11S: EX DA-3 Hydrograph 7 Type-lWZ4,,hTT - - - - - r 1I�100-Year Rainfal[=71.87" --'--- ' --- 11111111 ---'---'---'-- I Runoff Arda�1 6220 ac'' -Runoff Depth>15.60"-- -- FloW Length,^375' 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type/1 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 94 Hydrograph for Subcatchment 11S: EX DA-3 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.10 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.32 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.43 0.00 0.00 4.75 0.46 0.00 0.00 5.00 0.50 0.00 0.00 5.25 0.53 0.00 0.00 5.50 0.56 0.00 0.01 5.75 0.59 0.01 0.01 6.00 0.63 0.01 0.02 6.25 0.67 0.02 0.02 6.50 0.70 0.02 0.03 6.75 0.74 0.03 0.03 7.00 0.78 0.04 0.04 7.25 0.82 0.05 0.04 7.50 0.86 0.06 0.05 7.75 0.90 0.07 0.05 8.00 0.94 0.08 0.06 8.25 0.99 0.09 0.07 8.50 1.04 0.11 0.08 8.75 1.10 0.13 0.09 9.00 1.16 0.16 0.11 9.25 1.22 0.18 0.12 9.50 1.28 0.21 0.13 9.75 1.35 0.24 0.14 10.00 1.42 0.28 0.16 10.25 1.51 0.32 0.19 10.50 1.61 0.37 0.22 10.75 1.72 0.43 0.27 11.00 1.85 0.51 0.33 11.25 2.01 0.61 0.42 11.50 2.23 0.75 0.56 11.75 3.05 1.35 1.22 12.00 5.22 3.18 5.64 12.25 5.56 3.48 5.21 12.50 5.78 3.69 1.85 12.75 5.94 3.83 0.98 13.00 6.08 3.95 0.69 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.19 4.06 0.57 13.50 6.29 4.15 0.49 13.75 6.38 4.23 0.43 14.00 6.45 4.30 0.38 14.25 6.52 4.36 0.34 14.50 6.59 4.43 0.32 14.75 6.66 4.49 0.30 15.00 6.72 4.54 0.29 15.25 6.77 4.60 0.27 15.50 6.83 4.65 0.26 15.75 6.88 4.69 0.24 16.00 6.93 4.74 0.23 16.25 6.97 4.78 0.21 16.50 7.01 4.82 0.20 16.75 7.06 4.86 0.20 17.00 7.10 4.90 0.19 17.25 7.14 4.93 0.19 17.50 7.17 4.97 0.18 17.75 7.21 5.00 0.17 18.00 7.25 5.04 0.17 18.25 7.28 5.07 0.16 18.50 7.32 5.10 0.16 18.75 7.35 5.13 0.15 19.00 7.38 5.16 0.15 19.25 7.41 5.19 0.14 19.50 7.44 5.21 0.14 19.75 7.47 5.24 0.13 20.00 7.49 5.26 0.12 20.25 7.52 5.29 0.12 20.50 7.54 5.31 0.12 20.75 7.57 5.34 0.12 21.00 7.59 5.36 0.11 21.25 7.62 5.38 0.11 21.50 7.64 5.40 0.11 21.75 7.67 5.43 0.11 22.00 7.69 5.45 0.11 22.25 7.71 5.47 0.11 22.50 7.74 5.49 0.11 22.75 7.76 5.51 0.11 23.00 7.78 5.54 0.11 23.25 7.80 5.56 0.10 23.50 7.83 5.58 0.10 23.75 7.85 5.60 0.10 24.00 7.87 5.62 0.10 NM 82110 - Acra Heights Type 1124-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 95 Summary for Subcatchment 12S: Prop DA-4 Runoff = 5.90 cfs @ 11.96 hrs, Volume= 0.304 af, Depth> 6.08" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 100-Year Rainfall=7.87" Area (ac) CN Description 0.397 98 Paved parking, HSG D 0.203 61 >75% Grass cover, Good, HSG B 0.600 85 Weighted Average 0.203 33.83% Pervious Area 0.397 66.17% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, N 3 0 LL Subcatchment 12S: Prop DA-4 Hydrograph ' ' ' ' ' ' ' ' ' ' ' ' ❑Runoff O cfs L -- L--------�-- L L L--------�-- Type 11, 24-hr -- lDO--rYear-Rainfa fl= 7.87"— Runbff Awea=0.600 at -- R-nOff'V-91AOm;e=0.$04--1f- RunoffDepth>6.0811" TcT6.0 Mid -r- T--r- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type/1 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 96 Hydrograph for Subcatchment 12S: Prop DA-4 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 0.00 0.00 0.00 0.00 0.25 0.02 0.00 0.00 0.50 0.04 0.00 0.00 0.75 0.06 0.00 0.00 1.00 0.08 0.00 0.00 1.25 0.10 0.00 0.00 1.50 0.13 0.00 0.00 1.75 0.15 0.00 0.00 2.00 0.17 0.00 0.00 2.25 0.20 0.00 0.00 2.50 0.22 0.00 0.00 2.75 0.25 0.00 0.00 3.00 0.27 0.00 0.00 3.25 0.30 0.00 0.00 3.50 0.32 0.00 0.00 3.75 0.35 0.00 0.00 4.00 0.38 0.00 0.00 4.25 0.41 0.00 0.00 4.50 0.43 0.00 0.01 4.75 0.46 0.01 0.01 5.00 0.50 0.01 0.01 5.25 0.53 0.02 0.01 5.50 0.56 0.02 0.02 5.75 0.59 0.03 0.02 6.00 0.63 0.04 0.02 6.25 0.67 0.05 0.02 6.50 0.70 0.06 0.03 6.75 0.74 0.07 0.03 7.00 0.78 0.08 0.03 7.25 0.82 0.10 0.04 7.50 0.86 0.11 0.04 7.75 0.90 0.13 0.04 8.00 0.94 0.15 0.04 8.25 0.99 0.17 0.05 8.50 1.04 0.19 0.06 8.75 1.10 0.22 0.07 9.00 1.16 0.25 0.08 9.25 1.22 0.29 0.08 9.50 1.28 0.32 0.09 9.75 1.35 0.36 0.10 10.00 1.42 0.40 0.11 10.25 1.51 0.46 0.13 10.50 1.61 0.52 0.15 10.75 1.72 0.60 0.19 11.00 1.85 0.69 0.23 11.25 2.01 0.81 0.30 11.50 2.23 0.97 0.40 11.75 3.05 1.63 1.90 12.00 5.22 3.57 5.51 12.25 5.56 3.89 0.75 12.50 5.78 4.10 0.48 12.75 5.94 4.25 0.35 13.00 6.08 4.37 0.30 Time Precip. Excess Runoff (hours) (inches) (inches) (cfs) 13.25 6.19 4.48 0.25 13.50 6.29 4.57 0.22 13.75 6.38 4.66 0.20 14.00 6.45 4.73 0.18 14.25 6.52 4.80 0.16 14.50 6.59 4.86 0.15 14.75 6.66 4.92 0.15 15.00 6.72 4.98 0.14 15.25 6.77 5.04 0.13 15.50 6.83 5.09 0.12 15.75 6.88 5.14 0.12 16.00 6.93 5.18 0.11 16.25 6.97 5.22 0.10 16.50 7.01 5.27 0.10 16.75 7.06 5.31 0.10 17.00 7.10 5.35 0.09 17.25 7.14 5.38 0.09 17.50 7.17 5.42 0.09 17.75 7.21 5.46 0.09 18.00 7.25 5.49 0.08 18.25 7.28 5.52 0.08 18.50 7.32 5.56 0.08 18.75 7.35 5.59 0.07 19.00 7.38 5.62 0.07 19.25 7.41 5.65 0.07 19.50 7.44 5.67 0.07 19.75 7.47 5.70 0.06 20.00 7.49 5.72 0.06 20.25 7.52 5.75 0.06 20.50 7.54 5.77 0.06 20.75 7.57 5.80 0.06 21.00 7.59 5.82 0.06 21.25 7.62 5.84 0.06 21.50 7.64 5.87 0.06 21.75 7.67 5.89 0.06 22.00 7.69 5.91 0.06 22.25 7.71 5.94 0.05 22.50 7.74 5.96 0.05 22.75 7.76 5.98 0.05 23.00 7.78 6.00 0.05 23.25 7.80 6.02 0.05 23.50 7.83 6.05 0.05 23.75 7.85 6.07 0.05 24.00 7.87 6.09 0.05 NM 82110 - Acra Heights Type 1124-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 97 Summary for Pond 6P: Wet Pond 1 [81] Warning: Exceeded Pond 8P by 1.15' @ 12.00 hrs Inflow Area = 8.787 ac, 70.21 % Impervious, Inflow Depth > 6.35" for 100-Year event Inflow = 61.37 cfs @ 11.97 hrs, Volume= 4.653 of Outflow = 45.59 cfs @ 12.05 hrs, Volume= 4.451 af, Atten= 26%, Lag= 4.9 min Primary = 29.55 cfs @ 12.05 hrs, Volume= 4.317 of Secondary = 16.04 cfs @ 12.05 hrs, Volume= 0.134 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 662.79' @ 12.05 hrs Surf.Area= 13,411 sf Storage= 41,028 cf Plug -Flow detention time= 57.0 min calculated for 4.442 of (95% of inflow) Center -of -Mass det. time= 32.5 min ( 837.6 - 805.1 ) Volume Invert Avail.Storage Storage Description #1 659.00' 58,293 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 659.00 8,330 0 0 660.00 9,595 8,963 8,963 661.00 10,920 10,258 19,220 662.00 12,300 11,610 30,830 663.00 13,700 13,000 43,830 664.00 15,225 14,463 58,293 Device Ro Invert Outlet Devices #1 Primary 659.00' 24.0" Round RCP -Round 24" L= 20.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 659.00' / 658.90' S= 0.0050 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Device 1 659.00' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 659.75' 24.0" W x 12.0" H Vert. Orifice/Grate C= 0.600 #4 Device 1 661.50' 20.0' long Sharp -Crested Rectangular Weir 1 End Contraction(s) #5 Secondary 662.50' 40.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=29.52 cfs @ 12.05 hrs HW=662.79' (Free Discharge) L1=RCP_Round 24" (Barrel Controls 29.52 cfs @ 9.40 fps) 12=Orifice/Grate (Passes < 0.20 cfs potential flow) 3=Orifice/Grate (Passes < 15.32 cfs potential flow) 4=Sharp-Crested Rectangular Weir (Passes < 95.14 cfs potential flow) Secondary OutFlow Max=15.76 cfs @ 12.05 hrs HW=662.79' (Free Discharge) L5= Broad -Crested Rectangular Weir (Weir Controls 15.76 cfs @ 1.36 fps) NCC182110 - Acra Heights Type/1 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 98 '=1 q [.^] AYM1'1 1 q f Hydrograph 61.37 Cfs II�p+,aInflow - -- - -- ----+--I-- --I - -- - -- Area_#8.�/ Iaq-,r Ll Q7 r-,i -,-i i-i-- r -r _ - ------ 65 Pe- 60 , 55 45.59 cfs Sf0ta 6_1- 026 C 50 45 -+--r-+--+----+----+--r-+- --r-+--r-+--r----+----+----+-- w 40 V 35 ?---- 29.55 Cfs ---- -----------------?----?-- a 30 --'--'I----I-------'---' --'-- -'I--'--'I--'--'I--'--'I-------'---' -- ,' 25 20 -r--r-r--r----r--i-- ---- r-r--r-r--r-r--r--i--r--i--r-- I I 1 16.04 cfs 15 10 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) 664 663 660 659 0 Pond 6P: Wet Pond 1 Stage -Discharge 20 40 60 80 100 120 140 160 180 200 220 Discharge (cfs) ■ Total ■ Primary ■ Secondary NCC182110 - Acra Heights Type/1 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 99 Pond 6P: Wet Pond 1 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000 12,000 13,000 14,000 15,000 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 55,000 Storage (cubic -feet) ■ Surface ■ Storage NCC182110 - Acra Heights Type/1 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 100 Hydrograph for Pond 6P: Wet Pond 1 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 659.00 0.00 0.00 0.00 0.50 0.00 0 659.00 0.00 0.00 0.00 1.00 0.00 0 659.00 0.00 0.00 0.00 1.50 0.00 0 659.00 0.00 0.00 0.00 2.00 0.00 0 659.00 0.00 0.00 0.00 2.50 0.00 0 659.00 0.00 0.00 0.00 3.00 0.01 4 659.00 0.00 0.00 0.00 3.50 0.06 65 659.01 0.00 0.00 0.00 4.00 0.10 201 659.02 0.00 0.00 0.00 4.50 0.15 414 659.05 0.00 0.00 0.00 5.00 0.20 707 659.08 0.01 0.01 0.00 5.50 0.25 1,078 659.13 0.02 0.02 0.00 6.00 0.31 1,528 659.18 0.03 0.03 0.00 6.50 0.37 2,066 659.24 0.04 0.04 0.00 7.00 0.43 2,702 659.32 0.05 0.05 0.00 7.50 0.50 3,445 659.40 0.06 0.06 0.00 8.00 0.58 4,308 659.50 0.07 0.07 0.00 8.50 0.76 5,368 659.62 0.08 0.08 0.00 9.00 0.99 6,782 659.77 0.11 0.11 0.00 9.50 1.13 8,156 659.92 0.53 0.53 0.00 10.00 1.46 9,099 660.01 0.98 0.98 0.00 10.50 2.01 10,004 660.11 1.48 1.48 0.00 11.00 2.93 11,133 660.22 2.20 2.20 0.00 11.50 5.00 13,039 660.41 3.59 3.59 0.00 12.00 58.22 39,662 662.69 37.07 28.74 8.34 12.50 12.29 26,842 661.67 16.18 16.18 0.00 13.00 8.25 23,687 661.40 10.40 10.40 0.00 13.50 5.63 19,056 660.98 8.22 8.22 0.00 14.00 4.07 15,345 660.64 5.50 5.50 0.00 14.50 3.23 13,504 660.46 3.95 3.95 0.00 15.00 2.71 12,483 660.36 3.16 3.16 0.00 15.50 2.32 11,788 660.29 2.65 2.65 0.00 16.00 2.00 11,242 660.23 2.27 2.27 0.00 16.50 1.79 10,815 660.19 1.99 1.99 0.00 17.00 1.65 10,510 660.16 1.79 1.79 0.00 17.50 1.52 10,269 660.13 1.64 1.64 0.00 18.00 1.41 10,063 660.11 1.52 1.52 0.00 18.50 1.31 9,878 660.09 1.41 1.41 0.00 19.00 1.21 9,704 660.08 1.31 1.31 0.00 19.50 1.12 9,537 660.06 1.21 1.21 0.00 20.00 1.03 9,375 660.04 1.12 1.12 0.00 20.50 0.98 9,234 660.03 1.05 1.05 0.00 21.00 0.94 9,133 660.02 0.99 0.99 0.00 21.50 0.91 9,055 660.01 0.95 0.95 0.00 22.00 0.89 8,992 660.00 0.92 0.92 0.00 22.50 0.86 8,938 660.00 0.89 0.89 0.00 23.00 0.84 8,886 659.99 0.87 0.87 0.00 23.50 0.82 8,838 659.99 0.84 0.84 0.00 24.00 0.80 8,792 659.98 0.82 0.82 0.00 NCC182110 - Acra Heights Type/1 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 101 Stage -Discharge for Pond 6P: Wet Pond 1 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 659.00 0.00 0.00 0.00 659.05 0.00 0.00 0.00 659.10 0.01 0.01 0.00 659.15 0.03 0.03 0.00 659.20 0.04 0.04 0.00 659.25 0.04 0.04 0.00 659.30 0.05 0.05 0.00 659.35 0.05 0.05 0.00 659.40 0.06 0.06 0.00 659.45 0.06 0.06 0.00 659.50 0.07 0.07 0.00 659.55 0.07 0.07 0.00 659.60 0.08 0.08 0.00 659.65 0.08 0.08 0.00 659.70 0.08 0.08 0.00 659.75 0.09 0.09 0.00 659.80 0.16 0.16 0.00 659.85 0.29 0.29 0.00 659.90 0.47 0.47 0.00 659.95 0.67 0.67 0.00 660.00 0.90 0.90 0.00 660.05 1.16 1.16 0.00 660.10 1.44 1.44 0.00 660.15 1.73 1.73 0.00 660.20 2.05 2.05 0.00 660.25 2.38 2.38 0.00 660.30 2.73 2.73 0.00 660.35 3.10 3.10 0.00 660.40 3.48 3.48 0.00 660.45 3.88 3.88 0.00 660.50 4.29 4.29 0.00 660.55 4.72 4.72 0.00 660.60 5.16 5.16 0.00 660.65 5.61 5.61 0.00 660.70 6.08 6.08 0.00 660.75 6.56 6.56 0.00 660.80 6.97 6.97 0.00 660.85 7.34 7.34 0.00 660.90 7.69 7.69 0.00 660.95 8.01 8.01 0.00 661.00 8.32 8.32 0.00 661.05 8.61 8.61 0.00 661.10 8.89 8.89 0.00 661.15 9.16 9.16 0.00 661.20 9.42 9.42 0.00 661.25 9.68 9.68 0.00 661.30 9.93 9.93 0.00 661.35 10.17 10.17 0.00 661.40 10.40 10.40 0.00 661.45 10.63 10.63 0.00 661.50 10.86 10.86 0.00 661.55 11.81 11.81 0.00 661.60 13.36 13.36 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 661.65 15.30 15.30 0.00 661.70 17.55 17.55 0.00 661.75 19.80 19.80 0.00 661.80 20.37 20.37 0.00 661.85 20.93 20.93 0.00 661.90 21.47 21.47 0.00 661.95 22.00 22.00 0.00 662.00 22.52 22.52 0.00 662.05 23.03 23.03 0.00 662.10 23.52 23.52 0.00 662.15 24.01 24.01 0.00 662.20 24.48 24.48 0.00 662.25 24.95 24.95 0.00 662.30 25.41 25.41 0.00 662.35 25.86 25.86 0.00 662.40 26.30 26.30 0.00 662.45 26.73 26.73 0.00 662.50 27.16 27.16 0.00 662.55 28.70 27.58 1.11 662.60 31.15 28.00 3.15 662.65 34.19 28.41 5.79 662.70 37.72 28.81 8.91 662.75 41.74 29.21 12.54 662.80 46.19 29.60 16.60 662.85 51.04 29.99 21.06 662.90 56.27 30.37 25.91 662.95 62.08 30.74 31.33 663.00 68.31 31.12 37.19 663.05 74.97 31.49 43.48 663.10 82.04 31.85 50.19 663.15 88.75 32.21 56.54 663.20 95.70 32.57 63.13 663.25 102.87 32.92 69.95 663.30 110.26 33.27 76.99 663.35 117.85 33.61 84.24 663.40 125.65 33.95 91.70 663.45 133.64 34.29 99.35 663.50 141.82 34.62 107.20 663.55 150.40 34.96 115.45 663.60 159.19 35.28 123.91 663.65 168.18 35.61 132.57 663.70 177.38 35.93 141.44 663.75 186.35 36.25 150.10 663.80 195.46 36.57 158.89 663.85 204.72 36.88 167.84 663.90 214.11 37.19 176.91 663.95 223.45 37.50 185.95 664.00 232.91 37.81 195.10 NCC182110 - Acra Heights Type/1 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 102 Stage -Area -Storage for Pond 6P: Wet Pond 1 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 659.00 8,330 0 659.05 8,393 418 659.10 8,457 839 659.15 8,520 1,264 659.20 8,583 1,691 659.25 8,646 2,122 659.30 8,709 2,556 659.35 8,773 2,993 659.40 8,836 3,433 659.45 8,899 3,877 659.50 8,963 4,323 659.55 9,026 4,773 659.60 9,089 5,226 659.65 9,152 5,682 659.70 9,216 6,141 659.75 9,279 6,603 659.80 9,342 7,069 659.85 9,405 7,537 659.90 9,468 8,009 659.95 9,532 8,484 660.00 9,595 8,963 660.05 9,661 9,444 660.10 9,728 9,929 660.15 9,794 10,417 660.20 9,860 10,908 660.25 9,926 11,403 660.30 9,992 11,901 660.35 10,059 12,402 660.40 10,125 12,906 660.45 10,191 13,414 660.50 10,258 13,926 660.55 10,324 14,440 660.60 10,390 14,958 660.65 10,456 15,479 660.70 10,523 16,004 660.75 10,589 16,531 660.80 10,655 17,062 660.85 10,721 17,597 660.90 10,787 18,135 660.95 10,854 18,676 661.00 10,920 19,220 661.05 10,989 19,768 661.10 11,058 20,319 661.15 11,127 20,874 661.20 11,196 21,432 661.25 11,265 21,993 661.30 11,334 22,558 661.35 11,403 23,127 661.40 11,472 23,698 661.45 11,541 24,274 661.50 11,610 24,853 661.55 11,679 25,435 661.60 11,748 26,020 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 661.65 11,817 26,610 661.70 11,886 27,202 661.75 11,955 27,798 661.80 12,024 28,398 661.85 12,093 29,001 661.90 12,162 29,607 661.95 12,231 30,217 662.00 12,300 30,830 662.05 12,370 31,447 662.10 12,440 32,067 662.15 12,510 32,691 662.20 12,580 33,318 662.25 12,650 33,949 662.30 12,720 34,583 662.35 12,790 35,221 662.40 12,860 35,862 662.45 12,930 36,507 662.50 13,000 37,155 662.55 13,070 37,807 662.60 13,140 38,462 662.65 13,210 39,121 662.70 13,280 39,783 662.75 13,350 40,449 662.80 13,420 41,118 662.85 13,490 41,791 662.90 13,560 42,467 662.95 13,630 43,147 663.00 13,700 43,830 663.05 13,776 44,517 663.10 13,853 45,208 663.15 13,929 45,902 663.20 14,005 46,601 663.25 14,081 47,303 663.30 14,157 48,009 663.35 14,234 48,718 663.40 14,310 49,432 663.45 14,386 50,149 663.50 14,463 50,871 663.55 14,539 51,596 663.60 14,615 52,325 663.65 14,691 53,057 663.70 14,768 53,794 663.75 14,844 54,534 663.80 14,920 55,278 663.85 14,996 56,026 663.90 15,072 56,778 663.95 15,149 57,533 664.00 15,225 58,293 NM 82110 - Acra Heights Type 1124-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 103 Summary for Pond 8P: Wet Pond 2 Inflow Area = 3.537 ac, 70.51 % Impervious, Inflow Depth > 6.55" for 100-Year event Inflow = 36.46 cfs @ 11.96 hrs, Volume= 1.932 of Outflow = 8.84 cfs @ 12.12 hrs, Volume= 1.785 af, Atten= 76%, Lag= 9.6 min Primary = 8.84 cfs @ 12.12 hrs, Volume= 1.785 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 661.87' @ 12.12 hrs Surf.Area= 15,052 sf Storage= 37,628 cf Plug -Flow detention time= 117.6 min calculated for 1.782 of (92% of inflow) Center -of -Mass det. time= 76.9 min ( 852.5 - 775.6 ) Volume Invert Avail.Storage Storage Description #1 659.00' 72,948 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 659.00 11,241 0 0 660.00 12,512 11,877 11,877 661.00 13,839 13,176 25,052 662.00 15,232 14,536 39,588 663.00 16,664 15,948 55,536 664.00 18,161 17,413 72,948 Device Routing Invert Outlet Devices #1 Primary 659.00' 24.0" Round RCP -Round 24" L= 660.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 659.00'/659.00' S= 0.0000 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 3.14 sf #2 Secondary 663.50' 30.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=8.78 cfs @ 12.12 hrs HW=661.86' (Free Discharge) L1=RCP_Round 24" (Barrel Controls 8.78 cfs @ 2.79 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=659.00' (Free Discharge) L2= Broad -Crested Rectangular Weir( Controls 0.00 cfs) NCC182110 - Acra Heights Type/1 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 104 '1 1 MA AYM1'1 1 HK Hydrograph - -- - -- ---- ---- -- 36.46 - cfS -- - -- ---- ---- ---- -- ■ Inflow ❑ outflow --'--'---'--'---'--'---'---'--'---'--' -Iftflo Area=J.�7J7_� ■Primary 40 -1--L- --L----1----1----1--I' -L-1-- ---L--'----1--1--'--1- - ■Secondary 38 - --r- --r----T---- ------- --r- - 36 �����i�i'��� '34 S-tot-aq6-3t,1_6� Ci 32 30 - - - - - - - 28 -J--L-J--L--1--1----1----1--' -L-1-- ---L--'----1--1--'--1- 26 ---r-7--r--li--rt--li--7--Ir- --li --Ir- --r- --r--li--r--li--rt----7-- w 24 --------------------------- -------------- ---------------- u22 - -- - -- ----+---- ---- -- -- - -- - -- --------+---- -- 3 20 -;--r- --r----rt----7----;-- --r-,--r-;--r----r----rt----7-- a18 --------------------------- ------------------------------ 16 - - - - - - -- ----+---- -- - - -- - -- --------+---- -- 14 ---r-7--r--li--rt--li--7 8.84. S -Ir- --r- --r--li--r--li--rt----7-- 12 10 -----------------------------------�-- 8 6 0.00 Cfs 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Pond 8P: Wet Pond 2 Stage -Discharge ■ Total ■ Primary ■ Secondary 0 5 10 15 20 25 30 35 40 Discharge (cfs) NCC182110 - Acra Heights Type/1 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 105 Pond 8P: Wet Pond 2 Stage -Area -Storage Surface/Horizontal/Wetted Area (sq-ft) 2,000 4,000 6,000 8,000 10,000 12,000 14,000 16,000 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 55,000 60,000 65,000 70,000 Storage (cubic -feet) 18,000 Surface ❑ Storage NCC182110 - Acra Heights Type/1 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 106 Hydrograph for Pond 8P: Wet Pond 2 Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic -feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 659.00 0.00 0.00 0.00 0.50 0.00 0 659.00 0.00 0.00 0.00 1.00 0.00 0 659.00 0.00 0.00 0.00 1.50 0.00 0 659.00 0.00 0.00 0.00 2.00 0.00 0 659.00 0.00 0.00 0.00 2.50 0.00 0 659.00 0.00 0.00 0.00 3.00 0.01 3 659.00 0.00 0.00 0.00 3.50 0.04 44 659.00 0.00 0.00 0.00 4.00 0.07 137 659.01 0.00 0.00 0.00 4.50 0.10 284 659.03 0.00 0.00 0.00 5.00 0.13 488 659.04 0.00 0.00 0.00 5.50 0.17 755 659.07 0.00 0.00 0.00 6.00 0.20 1,083 659.10 0.00 0.00 0.00 6.50 0.24 1,472 659.13 0.01 0.01 0.00 7.00 0.28 1,918 659.17 0.02 0.02 0.00 7.50 0.32 2,414 659.21 0.03 0.03 0.00 8.00 0.36 2,950 659.26 0.05 0.05 0.00 8.50 0.46 3,553 659.31 0.08 0.08 0.00 9.00 0.58 4,290 659.37 0.13 0.13 0.00 9.50 0.63 5,089 659.44 0.20 0.20 0.00 10.00 0.79 5,908 659.51 0.29 0.29 0.00 10.50 1.07 6,937 659.60 0.42 0.42 0.00 11.00 1.54 8,313 659.71 0.65 0.65 0.00 11.50 2.63 10,458 659.89 1.09 1.09 0.00 12.00 33.86 32,688 661.54 7.96 7.96 0.00 12.50 2.93 32,406 661.52 7.93 7.93 0.00 13.00 1.79 24,015 660.92 5.59 5.59 0.00 13.50 1.35 18,661 660.53 3.62 3.62 0.00 14.00 1.06 15,405 660.28 2.50 2.50 0.00 14.50 0.93 13,320 660.11 1.85 1.85 0.00 15.00 0.84 11,955 660.01 1.47 1.47 0.00 15.50 0.74 10,976 659.93 1.22 1.22 0.00 16.00 0.65 10,208 659.87 1.04 1.04 0.00 16.50 0.60 9,590 659.82 0.90 0.90 0.00 17.00 0.57 9,117 659.78 0.80 0.80 0.00 17.50 0.53 8,736 659.75 0.73 0.73 0.00 18.00 0.50 8,414 659.72 0.67 0.67 0.00 18.50 0.47 8,132 659.70 0.62 0.62 0.00 19.00 0.43 7,872 659.67 0.57 0.57 0.00 19.50 0.40 7,628 659.65 0.53 0.53 0.00 20.00 0.36 7,394 659.63 0.49 0.49 0.00 20.50 0.35 7,177 659.62 0.46 0.46 0.00 21.00 0.34 7,002 659.60 0.43 0.43 0.00 21.50 0.34 6,857 659.59 0.41 0.41 0.00 22.00 0.33 6,733 659.58 0.40 0.40 0.00 22.50 0.32 6,626 659.57 0.38 0.38 0.00 23.00 0.32 6,532 659.56 0.37 0.37 0.00 23.50 0.31 6,447 659.56 0.36 0.36 0.00 24.00 0.30 6,370 659.55 0.34 0.34 0.00 NCC182110 - Acra Heights Type/1 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 107 Stage -Discharge for Pond 8P: Wet Pond 2 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 659.00 0.00 0.00 0.00 659.05 0.00 0.00 0.00 659.10 0.00 0.00 0.00 659.15 0.01 0.01 0.00 659.20 0.03 0.03 0.00 659.25 0.05 0.05 0.00 659.30 0.07 0.07 0.00 659.35 0.11 0.11 0.00 659.40 0.16 0.16 0.00 659.45 0.21 0.21 0.00 659.50 0.27 0.27 0.00 659.55 0.35 0.35 0.00 659.60 0.43 0.43 0.00 659.65 0.52 0.52 0.00 659.70 0.62 0.62 0.00 659.75 0.74 0.74 0.00 659.80 0.86 0.86 0.00 659.85 0.99 0.99 0.00 659.90 1.13 1.13 0.00 659.95 1.28 1.28 0.00 660.00 1.45 1.45 0.00 660.05 1.62 1.62 0.00 660.10 1.79 1.79 0.00 660.15 1.98 1.98 0.00 660.20 2.18 2.18 0.00 660.25 2.38 2.38 0.00 660.30 2.59 2.59 0.00 660.35 2.81 2.81 0.00 660.40 3.03 3.03 0.00 660.45 3.26 3.26 0.00 660.50 3.49 3.49 0.00 660.55 3.73 3.73 0.00 660.60 3.97 3.97 0.00 660.65 4.22 4.22 0.00 660.70 4.47 4.47 0.00 660.75 4.72 4.72 0.00 660.80 4.97 4.97 0.00 660.85 5.22 5.22 0.00 660.90 5.47 5.47 0.00 660.95 5.72 5.72 0.00 661.00 5.96 5.96 0.00 661.05 6.20 6.20 0.00 661.10 6.44 6.44 0.00 661.15 6.67 6.67 0.00 661.20 6.89 6.89 0.00 661.25 7.10 7.10 0.00 661.30 7.30 7.30 0.00 661.35 7.48 7.48 0.00 661.40 7.65 7.65 0.00 661.45 7.79 7.79 0.00 661.50 7.91 7.91 0.00 661.55 7.99 7.99 0.00 661.60 8.01 8.01 0.00 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 661.65 7.92 7.92 0.00 661.70 7.92 7.92 0.00 661.75 8.20 8.20 0.00 661.80 8.47 8.47 0.00 661.85 8.73 8.73 0.00 661.90 8.98 8.98 0.00 661.95 9.23 9.23 0.00 662.00 9.47 9.47 0.00 662.05 9.70 9.70 0.00 662.10 9.93 9.93 0.00 662.15 10.15 10.15 0.00 662.20 10.37 10.37 0.00 662.25 10.59 10.59 0.00 662.30 10.80 10.80 0.00 662.35 11.00 11.00 0.00 662.40 11.20 11.20 0.00 662.45 11.40 11.40 0.00 662.50 11.60 11.60 0.00 662.55 11.79 11.79 0.00 662.60 11.98 11.98 0.00 662.65 12.16 12.16 0.00 662.70 12.35 12.35 0.00 662.75 12.53 12.53 0.00 662.80 12.70 12.70 0.00 662.85 12.88 12.88 0.00 662.90 13.05 13.05 0.00 662.95 13.22 13.22 0.00 663.00 13.39 13.39 0.00 663.05 13.56 13.56 0.00 663.10 13.72 13.72 0.00 663.15 13.88 13.88 0.00 663.20 14.04 14.04 0.00 663.25 14.20 14.20 0.00 663.30 14.36 14.36 0.00 663.35 14.52 14.52 0.00 663.40 14.67 14.67 0.00 663.45 14.82 14.82 0.00 663.50 14.97 14.97 0.00 663.55 15.96 15.12 0.84 663.60 17.63 15.27 2.36 663.65 19.75 15.41 4.34 663.70 22.24 15.56 6.68 663.75 25.11 15.70 9.40 663.80 28.29 15.84 12.45 663.85 31.78 15.99 15.79 663.90 35.55 16.12 19.43 663.95 39.76 16.26 23.50 664.00 44.30 16.40 27.90 NCC182110 - Acra Heights Type/1 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 108 Stage -Area -Storage for Pond 8P: Wet Pond 2 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 659.00 11,241 0 659.05 11,305 564 659.10 11,368 1,130 659.15 11,432 1,700 659.20 11,495 2,274 659.25 11,559 2,850 659.30 11,622 3,429 659.35 11,686 4,012 659.40 11,749 4,598 659.45 11,813 5,187 659.50 11,877 5,779 659.55 11,940 6,375 659.60 12,004 6,973 659.65 12,067 7,575 659.70 12,131 8,180 659.75 12,194 8,788 659.80 12,258 9,400 659.85 12,321 10,014 659.90 12,385 10,632 659.95 12,448 11,252 660.00 12,512 11,877 660.05 12,578 12,504 660.10 12,645 13,134 660.15 12,711 13,768 660.20 12,777 14,405 660.25 12,844 15,046 660.30 12,910 15,690 660.35 12,976 16,337 660.40 13,043 16,987 660.45 13,109 17,641 660.50 13,176 18,298 660.55 13,242 18,959 660.60 13,308 19,623 660.65 13,375 20,290 660.70 13,441 20,960 660.75 13,507 21,634 660.80 13,574 22,311 660.85 13,640 22,991 660.90 13,706 23,675 660.95 13,773 24,362 661.00 13,839 25,052 661.05 13,909 25,746 661.10 13,978 26,443 661.15 14,048 27,144 661.20 14,118 27,848 661.25 14,187 28,555 661.30 14,257 29,266 661.35 14,327 29,981 661.40 14,396 30,699 661.45 14,466 31,421 661.50 14,536 32,146 661.55 14,605 32,874 661.60 14,675 33,606 Elevation Surface Storage (feet) (sq-ft) (cubic -feet) 661.65 14,744 34,342 661.70 14,814 35,081 661.75 14,884 35,823 661.80 14,953 36,569 661.85 15,023 37,318 661.90 15,093 38,071 661.95 15,162 38,828 662.00 15,232 39,588 662.05 15,304 40,351 662.10 15,375 41,118 662.15 15,447 41,888 662.20 15,518 42,663 662.25 15,590 43,440 662.30 15,662 44,222 662.35 15,733 45,006 662.40 15,805 45,795 662.45 15,876 46,587 662.50 15,948 47,383 662.55 16,020 48,182 662.60 16,091 48,984 662.65 16,163 49,791 662.70 16,234 50,601 662.75 16,306 51,414 662.80 16,378 52,231 662.85 16,449 53,052 662.90 16,521 53,876 662.95 16,592 54,704 663.00 16,664 55,536 663.05 16,739 56,371 663.10 16,814 57,209 663.15 16,889 58,052 663.20 16,963 58,898 663.25 17,038 59,748 663.30 17,113 60,602 663.35 17,188 61,460 663.40 17,263 62,321 663.45 17,338 63,186 663.50 17,413 64,055 663.55 17,487 64,927 663.60 17,562 65,803 663.65 17,637 66,683 663.70 17,712 67,567 663.75 17,787 68,455 663.80 17,862 69,346 663.85 17,936 70,241 663.90 18,011 71,139 663.95 18,086 72,042 664.00 18,161 72,948 NCC182110 - Acra Heights Type/1 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 109 Summary for Link 4L: EX DA (Combined) Inflow Area = 7.789 ac, 0.00% Impervious, Inflow Depth > 5.04" for 100-Year event Inflow = 42.42 cfs @ 12.13 hrs, Volume= 3.270 of Primary = 42.42 cfs @ 12.13 hrs, Volume= 3.270 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Link 4L: EX DA (Combined) Hydrograph --I--y--rt--r--r--I--�--t--r--I--y--t--r--r--I--t--r--I---I--rt--r--r--I-- -----'-- --'-----'-- --' ---- -----'--' --'-----'-- --' -----'-- ■ Inflow 46 as -- -- --------- -- -- - 11fTF0�1IVrl��'�:� 42.42 cfs -------+-- -r-------T--r-----I-- ------- -- --r--r--I-- -- ---- ■Pnmary 42 - w r ----- --------- --------- -- -- ---- 40 ----1--r--r-------r--r-----II- --r-------r--r-------r--r--Ir--II-- 38 ---------------------------- -------------------------------- 36 --I-- ----r-----I----+-----I- -r-------+--r-----I-- --r--r--I-- 32 --i-- ----r--r--i----+-----i-- -r--r----+--r-----i-- --r--r--i-- 30 �I — — — — I r—I —I 28 --1--J--1--L--1---'----L-----'- -L-------1--L--1-----1--L--L--'-- y u 26 I I I I I I I I ----r--r--r-------r--r--r--I- I I I I I -r-------r--r-------r--r--r--I-- I I I I I I I I 24 0 22 ----y--rt--r--r--I----r--r--I- -r--r----+--r-------rt--r--r--I-- a 20 18 ---- -- ------------------- --------+-- ------- -- -- ---- 16 -;-- - - - I -- --;-- - - - I -- -_- -_ - -- I -- 14 --1--J--1--L--1-----1--L--1---1- -L--1---1--1-- --1---1--1--L--L--'-- 12 ---- ----r---------r--r--- r-------r--r-------r--r--r---- 10 ------------------ ---------- ------------------------------ 8 --I 7 rt r-- r-- r- - - --I- ------Y--r-------r--r--r--I-- 6 ---------------------------- --- --------------------- 4 2 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type/1 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 110 Hydrograph for Link 4L: EX DA (Combined) Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 0.25 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.75 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.25 0.00 0.00 0.00 1.50 0.00 0.00 0.00 1.75 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.25 0.00 0.00 0.00 2.50 0.00 0.00 0.00 2.75 0.00 0.00 0.00 3.00 0.00 0.00 0.00 3.25 0.00 0.00 0.00 3.50 0.00 0.00 0.00 3.75 0.00 0.00 0.00 4.00 0.00 0.00 0.00 4.25 0.00 0.00 0.00 4.50 0.00 0.00 0.00 4.75 0.00 0.00 0.00 5.00 0.01 0.00 0.01 5.25 0.02 0.00 0.02 5.50 0.02 0.00 0.02 5.75 0.03 0.00 0.03 6.00 0.04 0.00 0.04 6.25 0.05 0.00 0.05 6.50 0.05 0.00 0.05 6.75 0.07 0.00 0.07 7.00 0.09 0.00 0.09 7.25 0.12 0.00 0.12 7.50 0.15 0.00 0.15 7.75 0.18 0.00 0.18 8.00 0.21 0.00 0.21 8.25 0.24 0.00 0.24 8.50 0.30 0.00 0.30 8.75 0.36 0.00 0.36 9.00 0.44 0.00 0.44 9.25 0.52 0.00 0.52 9.50 0.58 0.00 0.58 9.75 0.63 0.00 0.63 10.00 0.74 0.00 0.74 10.25 0.88 0.00 0.88 10.50 1.07 0.00 1.07 10.75 1.31 0.00 1.31 11.00 1.64 0.00 1.64 11.25 2.09 0.00 2.09 11.50 2.87 0.00 2.87 11.75 6.03 0.00 6.03 12.00 29.14 0.00 29.14 12.25 32.55 0.00 32.55 12.50 12.15 0.00 12.15 12.75 6.31 0.00 6.31 13.00 4.34 0.00 4.34 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 13.25 3.50 0.00 3.50 13.50 3.02 0.00 3.02 13.75 2.64 0.00 2.64 14.00 2.35 0.00 2.35 14.25 2.09 0.00 2.09 14.50 1.95 0.00 1.95 14.75 1.85 0.00 1.85 15.00 1.75 0.00 1.75 15.25 1.66 0.00 1.66 15.50 1.57 0.00 1.57 15.75 1.48 0.00 1.48 16.00 1.38 0.00 1.38 16.25 1.29 0.00 1.29 16.50 1.24 0.00 1.24 16.75 1.21 0.00 1.21 17.00 1.17 0.00 1.17 17.25 1.14 0.00 1.14 17.50 1.11 0.00 1.11 17.75 1.07 0.00 1.07 18.00 1.04 0.00 1.04 18.25 1.00 0.00 1.00 18.50 0.97 0.00 0.97 18.75 0.94 0.00 0.94 19.00 0.90 0.00 0.90 19.25 0.87 0.00 0.87 19.50 0.84 0.00 0.84 19.75 0.80 0.00 0.80 20.00 0.77 0.00 0.77 20.25 0.74 0.00 0.74 20.50 0.72 0.00 0.72 20.75 0.71 0.00 0.71 21.00 0.70 0.00 0.70 21.25 0.70 0.00 0.70 21.50 0.69 0.00 0.69 21.75 0.69 0.00 0.69 22.00 0.68 0.00 0.68 22.25 0.67 0.00 0.67 22.50 0.67 0.00 0.67 22.75 0.66 0.00 0.66 23.00 0.65 0.00 0.65 23.25 0.65 0.00 0.65 23.50 0.64 0.00 0.64 23.75 0.63 0.00 0.63 24.00 0.63 0.00 0.63 NCC182110 - Acra Heights Type/1 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 111 Summary for Link 10L: Prop P0I-1 Inflow Area = 8.787 ac, 70.21 % Impervious, Inflow Depth > 6.08" for 100-Year event Inflow = 45.59 cfs @ 12.05 hrs, Volume= 4.451 of Primary = 45.59 cfs @ 12.05 hrs, Volume= 4.451 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Link 10L: Prop P0I-1 Hydrograph ■ Inflow 50--1--J--1--L--1-----1--r---------1--L--1-----1--L-- ---- ■ Primary 45.59 cfs 45 I'Inlo'uv'IAire 18.'17 --I--r--r--r--r--I--r--r--r--I-- --r--r--I--r--r--I---I--r--r--r--I-- 40 35 ---- -- --------- -- ------ --------- --------- -- -- ---- w30 --I-- ----r---------r--r----r-------7--r---------r--r---- � I I I I I I I I I I I I I I I I I I I I I 0 25-----i-- li--i-----i-- li--i --i --i- -i-----i-- li--i-----i--- --i --i-- LL i i 20 ---- --'--------- -- ------ --------+---------' -- ---- 15 10 5 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type/1 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 112 Hydrograph for Link 10L: Prop P0I-1 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 0.25 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.75 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.25 0.00 0.00 0.00 1.50 0.00 0.00 0.00 1.75 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.25 0.00 0.00 0.00 2.50 0.00 0.00 0.00 2.75 0.00 0.00 0.00 3.00 0.00 0.00 0.00 3.25 0.00 0.00 0.00 3.50 0.00 0.00 0.00 3.75 0.00 0.00 0.00 4.00 0.00 0.00 0.00 4.25 0.00 0.00 0.00 4.50 0.00 0.00 0.00 4.75 0.01 0.00 0.01 5.00 0.01 0.00 0.01 5.25 0.02 0.00 0.02 5.50 0.02 0.00 0.02 5.75 0.03 0.00 0.03 6.00 0.03 0.00 0.03 6.25 0.04 0.00 0.04 6.50 0.04 0.00 0.04 6.75 0.05 0.00 0.05 7.00 0.05 0.00 0.05 7.25 0.05 0.00 0.05 7.50 0.06 0.00 0.06 7.75 0.06 0.00 0.06 8.00 0.07 0.00 0.07 8.25 0.07 0.00 0.07 8.50 0.08 0.00 0.08 8.75 0.08 0.00 0.08 9.00 0.11 0.00 0.11 9.25 0.30 0.00 0.30 9.50 0.53 0.00 0.53 9.75 0.75 0.00 0.75 10.00 0.98 0.00 0.98 10.25 1.21 0.00 1.21 10.50 1.48 0.00 1.48 10.75 1.80 0.00 1.80 11.00 2.20 0.00 2.20 11.25 2.74 0.00 2.74 11.50 3.59 0.00 3.59 11.75 7.59 0.00 7.59 12.00 37.07 0.00 37.07 12.25 25.00 0.00 25.00 12.50 16.18 0.00 16.18 12.75 11.31 0.00 11.31 13.00 10.40 0.00 10.40 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 13.25 9.44 0.00 9.44 13.50 8.22 0.00 8.22 13.75 6.86 0.00 6.86 14.00 5.50 0.00 5.50 14.25 4.58 0.00 4.58 14.50 3.95 0.00 3.95 14.75 3.51 0.00 3.51 15.00 3.16 0.00 3.16 15.25 2.89 0.00 2.89 15.50 2.65 0.00 2.65 15.75 2.45 0.00 2.45 16.00 2.27 0.00 2.27 16.25 2.12 0.00 2.12 16.50 1.99 0.00 1.99 16.75 1.88 0.00 1.88 17.00 1.79 0.00 1.79 17.25 1.71 0.00 1.71 17.50 1.64 0.00 1.64 17.75 1.58 0.00 1.58 18.00 1.52 0.00 1.52 18.25 1.46 0.00 1.46 18.50 1.41 0.00 1.41 18.75 1.36 0.00 1.36 19.00 1.31 0.00 1.31 19.25 1.26 0.00 1.26 19.50 1.21 0.00 1.21 19.75 1.16 0.00 1.16 20.00 1.12 0.00 1.12 20.25 1.08 0.00 1.08 20.50 1.05 0.00 1.05 20.75 1.02 0.00 1.02 21.00 0.99 0.00 0.99 21.25 0.97 0.00 0.97 21.50 0.95 0.00 0.95 21.75 0.93 0.00 0.93 22.00 0.92 0.00 0.92 22.25 0.90 0.00 0.90 22.50 0.89 0.00 0.89 22.75 0.88 0.00 0.88 23.00 0.87 0.00 0.87 23.25 0.85 0.00 0.85 23.50 0.84 0.00 0.84 23.75 0.83 0.00 0.83 24.00 0.82 0.00 0.82 NCC182110 - Acra Heights Type 11 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 113 Summary for Link 11 L: Prop P0I-2 Inflow Area = 1.610 ac, 49.75% Impervious, Inflow Depth > 5.42" for 100-Year event Inflow = 14.48 cfs @ 11.97 hrs, Volume= 0.728 of Primary = 14.48 cfs @ 11.97 hrs, Volume= 0.728 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Link 11 L: Prop P0I-2 Hydrograph ------- -- ------- --T --- ------- --------- -- ---11 ■ Inflow 16 1s ----+--+--r------- --+- 14.48 cfs r- ----+-r------ + - -r---- lJn�ow�AreaT-.6'o ae- ■ Primary 14 -'-- -- -- -----'-- -- -----'- ----+--+--r-- ' I - - - I- - +- -+-- - - - I- ---------+---------------I-- 10 - -J--L--L--'---'--L--L--1---1- --L--1---1--1--L--1---1--L--L--+--'-- w 9 U T- -T- -r------- --r- - --- --r-------T--r-------T--r--r---- --r--I---I--+--r--I---I--+--r--r--I-- 3 8- 0 E 7 i --J--L--L-------L-- L-- - - - '- --L--'---'--L--L--'---'--L--L--L--'-- 6 -----I-- --I- -----I-------I-- --I-- 5 --r-r--r--r--r--i- - r- - r- ---i- r --r--r--i--r--r--r--i--r--r--r--i-- Q ------------------- - --- ----�- -------------------------- --- -�-- 2 ----r--r--r-----I-- --r-----I- --------T--r-------r--r--r--I-- 1 Z 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) NCC182110 - Acra Heights Type/1 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 114 Hydrograph for Link 11 L: Prop P0I-2 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 0.25 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.75 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.25 0.00 0.00 0.00 1.50 0.00 0.00 0.00 1.75 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.25 0.00 0.00 0.00 2.50 0.00 0.00 0.00 2.75 0.00 0.00 0.00 3.00 0.00 0.00 0.00 3.25 0.00 0.00 0.00 3.50 0.00 0.00 0.00 3.75 0.00 0.00 0.00 4.00 0.00 0.00 0.00 4.25 0.00 0.00 0.00 4.50 0.01 0.00 0.01 4.75 0.01 0.00 0.01 5.00 0.01 0.00 0.01 5.25 0.01 0.00 0.01 5.50 0.02 0.00 0.02 5.75 0.02 0.00 0.02 6.00 0.02 0.00 0.02 6.25 0.03 0.00 0.03 6.50 0.03 0.00 0.03 6.75 0.04 0.00 0.04 7.00 0.04 0.00 0.04 7.25 0.05 0.00 0.05 7.50 0.06 0.00 0.06 7.75 0.07 0.00 0.07 8.00 0.07 0.00 0.07 8.25 0.09 0.00 0.09 8.50 0.10 0.00 0.10 8.75 0.12 0.00 0.12 9.00 0.14 0.00 0.14 9.25 0.15 0.00 0.15 9.50 0.16 0.00 0.16 9.75 0.19 0.00 0.19 10.00 0.22 0.00 0.22 10.25 0.26 0.00 0.26 10.50 0.32 0.00 0.32 10.75 0.39 0.00 0.39 11.00 0.48 0.00 0.48 11.25 0.65 0.00 0.65 11.50 0.88 0.00 0.88 11.75 4.39 0.00 4.39 12.00 13.61 0.00 13.61 12.25 1.89 0.00 1.89 12.50 1.22 0.00 1.22 12.75 0.90 0.00 0.90 13.00 0.75 0.00 0.75 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 13.25 0.65 0.00 0.65 13.50 0.57 0.00 0.57 13.75 0.50 0.00 0.50 14.00 0.45 0.00 0.45 14.25 0.41 0.00 0.41 14.50 0.40 0.00 0.40 14.75 0.38 0.00 0.38 15.00 0.36 0.00 0.36 15.25 0.34 0.00 0.34 15.50 0.32 0.00 0.32 15.75 0.30 0.00 0.30 16.00 0.28 0.00 0.28 16.25 0.26 0.00 0.26 16.50 0.26 0.00 0.26 16.75 0.25 0.00 0.25 17.00 0.24 0.00 0.24 17.25 0.24 0.00 0.24 17.50 0.23 0.00 0.23 17.75 0.22 0.00 0.22 18.00 0.21 0.00 0.21 18.25 0.21 0.00 0.21 18.50 0.20 0.00 0.20 18.75 0.19 0.00 0.19 19.00 0.19 0.00 0.19 19.25 0.18 0.00 0.18 19.50 0.17 0.00 0.17 19.75 0.16 0.00 0.16 20.00 0.16 0.00 0.16 20.25 0.15 0.00 0.15 20.50 0.15 0.00 0.15 20.75 0.15 0.00 0.15 21.00 0.15 0.00 0.15 21.25 0.15 0.00 0.15 21.50 0.15 0.00 0.15 21.75 0.14 0.00 0.14 22.00 0.14 0.00 0.14 22.25 0.14 0.00 0.14 22.50 0.14 0.00 0.14 22.75 0.14 0.00 0.14 23.00 0.14 0.00 0.14 23.25 0.14 0.00 0.14 23.50 0.13 0.00 0.13 23.75 0.13 0.00 0.13 24.00 0.13 0.00 0.13 NCC182110 - Acra Heights Type/1 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 115 Summary for Link 12L: Ex P0I-2 Inflow Area = 2.620 ac, 26.07% Impervious, Inflow Depth > 5.17" for 100-Year event Inflow = 16.48 cfs @ 12.05 hrs, Volume= 1.129 of Primary = 16.48 cfs @ 12.05 hrs, Volume= 1.129 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Link 12L: Ex P0I-2 Hydrograph ■ Inflow 18 1 - - -T--T--r-----I-- I I I --r--r ---------r-----I-- I T I I --r-- --I-- ■ Primary 17 - - -- I O-WFAra-, -----T eI 16.4cfs - --r-----I--T--r--I---I--7--r--r--I-- T-r I -----I-- --r-- --I-- 16 --I--�--�--t--Ir--Ii--�--t--I---Ii- --Ir--Ir--Ii--t--t--Ir--Ii--�--t--Ir--Ii-- 15 �I --I--r--r--r--I---I--r--r--r--I- --r--I---I--r--r--I---I--r--r--r--I-- 14 --I--�--�--t--Ir--Ii--�--t--Ii --Ii----Ir--Ir--Ii--t--t--Ii---Ii--�--t--IT--Ii-- 13 �I --r-r--r--r--r--I--r--r--r--I- --r--r-�--r--r--r--I--4--r--r--I-- 12 --I--r--r--r--r--I--r--r--r--I- --r--r--I--r--r--I---I--r--r--r--I-- 11 10 --I--r--r--r--I---I--r-- r--r--I---r--I--�--r--r--I---I--r--r--r--I-- p 9 t t LL 8 - ---t--t--t--Ir------t- - - -Ii- -t--Ir---- - -t-------t--t--t- --- ----+--+--r-------+--+-----I- -r------- +- - r-------+--r--r--I-- 7 ' ----+--+--r--r----+--+--r--I- -r--r----+- -r-------+--r--r--I-- 6 --I--+--+--r--I---I--+--+--I---I- -r--I---I--+--r--I---I--+--r--r--I-- 5 4 3 2 Time (hours) NCC182110 - Acra Heights Type/1 24-hr 100-Year Rainfall=7.87" Prepared by Bohler Engineering Printed 12/16/2019 HydroCAD® 10.00-20 s/n 08311 © 2017 HydroCAD Software Solutions LLC Page 116 Hydrograph for Link 12L: Ex P0I-2 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 0.00 0.00 0.00 0.00 0.25 0.00 0.00 0.00 0.50 0.00 0.00 0.00 0.75 0.00 0.00 0.00 1.00 0.00 0.00 0.00 1.25 0.00 0.00 0.00 1.50 0.00 0.00 0.00 1.75 0.00 0.00 0.00 2.00 0.00 0.00 0.00 2.25 0.00 0.00 0.00 2.50 0.00 0.00 0.00 2.75 0.00 0.00 0.00 3.00 0.00 0.00 0.00 3.25 0.00 0.00 0.00 3.50 0.00 0.00 0.00 3.75 0.00 0.00 0.00 4.00 0.00 0.00 0.00 4.25 0.00 0.00 0.00 4.50 0.00 0.00 0.00 4.75 0.00 0.00 0.00 5.00 0.00 0.00 0.00 5.25 0.00 0.00 0.00 5.50 0.01 0.00 0.01 5.75 0.01 0.00 0.01 6.00 0.02 0.00 0.02 6.25 0.02 0.00 0.02 6.50 0.03 0.00 0.03 6.75 0.03 0.00 0.03 7.00 0.04 0.00 0.04 7.25 0.05 0.00 0.05 7.50 0.06 0.00 0.06 7.75 0.07 0.00 0.07 8.00 0.09 0.00 0.09 8.25 0.10 0.00 0.10 8.50 0.12 0.00 0.12 8.75 0.14 0.00 0.14 9.00 0.17 0.00 0.17 9.25 0.20 0.00 0.20 9.50 0.22 0.00 0.22 9.75 0.24 0.00 0.24 10.00 0.28 0.00 0.28 10.25 0.34 0.00 0.34 10.50 0.41 0.00 0.41 10.75 0.50 0.00 0.50 11.00 0.63 0.00 0.63 11.25 0.82 0.00 0.82 11.50 1.13 0.00 1.13 11.75 3.37 0.00 3.37 12.00 15.35 0.00 15.35 12.25 7.60 0.00 7.60 12.50 3.01 0.00 3.01 12.75 1.76 0.00 1.76 13.00 1.34 0.00 1.34 Time Inflow Elevation Primary (hours) (cfs) (feet) (cfs) 13.25 1.12 0.00 1.12 13.50 0.98 0.00 0.98 13.75 0.86 0.00 0.86 14.00 0.77 0.00 0.77 14.25 0.69 0.00 0.69 14.50 0.65 0.00 0.65 14.75 0.62 0.00 0.62 15.00 0.59 0.00 0.59 15.25 0.55 0.00 0.55 15.50 0.52 0.00 0.52 15.75 0.49 0.00 0.49 16.00 0.46 0.00 0.46 16.25 0.43 0.00 0.43 16.50 0.42 0.00 0.42 16.75 0.41 0.00 0.41 17.00 0.39 0.00 0.39 17.25 0.38 0.00 0.38 17.50 0.37 0.00 0.37 17.75 0.36 0.00 0.36 18.00 0.35 0.00 0.35 18.25 0.34 0.00 0.34 18.50 0.33 0.00 0.33 18.75 0.31 0.00 0.31 19.00 0.30 0.00 0.30 19.25 0.29 0.00 0.29 19.50 0.28 0.00 0.28 19.75 0.27 0.00 0.27 20.00 0.26 0.00 0.26 20.25 0.25 0.00 0.25 20.50 0.24 0.00 0.24 20.75 0.24 0.00 0.24 21.00 0.24 0.00 0.24 21.25 0.24 0.00 0.24 21.50 0.23 0.00 0.23 21.75 0.23 0.00 0.23 22.00 0.23 0.00 0.23 22.25 0.23 0.00 0.23 22.50 0.23 0.00 0.23 22.75 0.22 0.00 0.22 23.00 0.22 0.00 0.22 23.25 0.22 0.00 0.22 23.50 0.22 0.00 0.22 23.75 0.21 0.00 0.21 24.00 0.21 0.00 0.21 Hydraflow Storm Sewers Extension for Autodesk@ AutoCAD@ Civil 3D@ Plan Outfall 12 13 Outfall 1 15 2 3 20 4 5 19 6 Outfall Outfall 7 10 8 17 9 18 Project File: Arka Heights.stm Number of lines: 20 Date: 12/16/2019 Storm Sewers v2018.30 Page 1 Line Inlet ID Q = Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry rapt Byp Type Line Ht L Area L W So W SW Sx n Depth Spread Depth Spread Depr No (cfs) (cfs) (cfs) (cfs) (in) (ft) (sgft) (ft) (ft) (fttft) (ft) (fttft) (fttft) (ft) (ft) (ft) (ft) (in) 1 A-2.1 1.28 0.00 1.28 0.00 DrGrt 0.0 0.00 6.00 2.00 3.00 Sag 1.00 0.030 0.030 0.013 0.12 11.14 0.12 11.14 0.0 Off 2 A-2.2 1.96 0.00 1.96 0.00 DrGrt 0.0 0.00 6.00 2.00 3.00 Sag 1.00 0.030 0.030 0.013 0.16 13.80 0.16 13.80 0.0 Off 3 A-2.3 1.14 0.38 1.52 0.00 DrGrt 0.0 0.00 6.00 2.00 3.00 Sag 1.00 0.030 0.030 0.013 0.14 12.11 0.14 12.11 0.0 Off 4 A-2.4 0.89 0.00 0.51 0.38 DrGrt 0.0 0.00 0.00 2.00 3.00 0.030 1.00 0.015 0.015 0.013 0.07 10.47 0.07 10.47 0.0 5 A-2.5 0.71 0.00 0.42 0.29 DrGrt 0.0 0.00 0.00 2.00 3.00 0.030 1.00 0.015 0.015 0.013 0.07 10A7 0.07 10A7 0.0 6 A-2.6 1.65 0.29 1.94 0.00 DrGrt 0.0 0.00 6.00 2.00 3.00 Sag 1.00 0.030 0.030 0.013 0.16 13.73 0.16 13.73 0.0 Off 7 B-1.1 0.00 0.00 0.00 0.00 MH 0.0 0.00 0.00 0.00 0.00 Sag 2.00 0.050 0.020 0.013 0.00 0.00 0.00 0.00 0.0 Off 8 B-1.3 0.55 0.00 0.55 0.00 DrGrt 0.0 0.00 6.00 2.00 3.00 Sag 1.00 0.020 0.020 0.013 0.07 9.93 0.07 9.93 0.0 Off 9 B-1.4 1.33 0.00 1.33 0.00 DrGrt 0.0 0.00 6.00 2.00 3.00 Sag 1.00 0.030 0.030 0.013 0.13 11.35 0.13 11.35 0.0 Off 10 B-1.5 0.82 0.00 0.82 0.00 DrGrt 0.0 0.00 6.00 2.00 3.00 Sag 1.00 0.020 0.020 0.013 0.09 12.09 0.09 12.09 0.0 Off 11 B-1.6 1.06 0.00 1.06 0.00 DrGrt 0.0 0.00 6.00 2.00 3.00 Sag 1.00 0.020 0.020 0.013 0.11 13.74 0.11 13.74 0.0 Off 12 A-1.1 0.55 0.00 0.55 0.00 DrGrt 0.0 0.00 16.00 4.00 4.00 Sag 2.00 0.020 0.020 0.013 0.05 9.07 0.05 9.07 0.0 Off 13 A-1.2 1.22 0.00 1.22 0.00 DrGrt 0.0 0.00 6.00 2.00 3.00 Sag 2.00 0.020 0.020 0.013 0.12 14.78 0.12 14.78 0.0 Off 14 A-1.3 1.22 0.00 1.22 0.00 DrGrt 0.0 0.00 6.00 2.00 3.00 Sag 2.00 0.020 0.020 0.013 0.12 14.78 0.12 14.78 0.0 Off 15 A-1.4 1.72 0.00 1.72 0.00 DrGrt 0.0 0.00 6.00 2.00 3.00 Sag 2.00 0.025 0.025 0.013 0.15 14.91 0.15 14.91 0.0 ff 16 B-1.5.1 1.80 0.00 1.80 0.00 DrGrt 0.0 0.00 6.00 2.00 3.00 Sag 1.00 0.030 0.030 0.013 0.15 13.22 0.15 13.22 0.0 Off 17 B-1.4.1 0.59 0.00 0.59 0.00 DrGrt 0.0 0.00 6.00 2.00 3.00 Sag 1.00 0.030 0.030 0.013 0.07 7.84 0.07 7.84 0.0 Off 18 13-1.3.1 0.86 0.00 0.86 0.00 DrGrt 0.0 0.00 6.00 2.00 3.00 Sag 1.00 0.030 0.030 0.013 0.09 9.25 0.09 9.25 0.0 Off 19 B-2.1 0.43 0.00 0.43 0.00 DrGrt 0.0 0.00 6.00 2.00 3.00 Sag 1.00 0.015 0.015 0.013 0.06 10.87 0.06 10.87 0.0 Off 20 B-2.2 1.65 0.00 1.65 0.00 DrGrt 0.0 0.00 6.00 2.00 3.00 Sag 1.00 0.025 0.025 0.013 0.14 14.54 0.14 14.54 0.0 Off Project File: Arka Heights.stm Number of lines: 20 Run Date: 12/11/2019 NOTES: Inlet N-Values = 0.016; Intensity = 4.041(Inlet time + 5.50) A 0.00; Return period = 1 Yrs. ; Indicates Known Q added. All curb inlets are throat. Storm Sewers v2018.30 Page 1 Station Len Drng Area Rnoff Area x C Te Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd / Rim Elev Line ID coeff (1) flow full Incr Total otal Inlet Syst Size Slope Dn Up Dn Up Dn Up e (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft1s) (in) (ft) (ft) (ft) (ft) (ft) (ft) I End 101.366 0.36 2.19 0.89 0.32 1.91 5.0 6.4 6.9 13.09 17.55 6.05 24 0.60 659M 659.61 660.30 660.91 661.25 664A1 SID - (2) 2 1 114.096 0.55 1.83 0.89 0.49 1.59 5.0 6.1 7.0 11.04 17.46 5.38 24 0.60 659.61 660.29 660.91 661.48 664.41 664.36 SID - (3) 3 2 78.071 0.32 1.28 0.89 0.28 1.10 5.0 5.8 7.0 7.71 8.15 5.19 18 0.60 660.29 660.76 661.48 661.92 664.36 664.23 SID - (4) 4 3 84�971 0.25 0.96 0.89 0.22 0.81 5.0 5.4 7.1 5.81 8.14 3.29 18 0.60 660.76 661 �27 662�56 662.77 664�23 665.96 SID - (5) 5 4 34.904 0.20 0.71 0.89 0.18 0.59 5.0 5.1 7.2 4.26 8.14 2.44 18 0.60 661.27 661.48 662.85 662.90 665.96 665.90 SID - (6) 6 5 22.373 0.51 0.51 0.81 0.41 0.41 5.0 5.0 7.2 Z99 8.00 2M 18 0.58 661.48 661.61 662.95 662.27 665.90 664.90 SID - (7) 7 End 3M61 0.00 1.79 0.00 0.00 1.75 0.0 6.8 6.8 11�85 17.59 5.83 24 0.61 659.00 659�24 66&23 660.47 661 �25 664.51 SID - (14) 8 7 110.890 0.14 1.79 0.98 0.14 1.75 5.0 6.5 6.8 11M 17.45 5.87 24 0.60 659.24 659M 660A7 661.14 664�51 665.53 SID - (15) 9 8 94�131 0.34 1.43 0.98 0.33 1.40 5.0 6.2 6.9 9.69 17.60 5.06 24 0.61 659.90 660A7 661 � 14 661.58 665M 664.69 SID - (16) 10 9 9&000 0.21 0.94 0.98 0.21 0.92 5.0 5.9 7.0 6A5 8.13 4.92 18 0.60 660.47 661 �01 661 �58 661.99 664�69 664.27 SID - (17) 11 10 60.912 0.27 0.27 0.98 0.26 0.26 5.0 5.0 7.2 1.92 8.07 1.14 18 0.59 661.01 661.37 662.63 662.64 664.27 664.87 SID - (27) 12 End 111.699 0.14 1.20 0.98 0.14 1.18 5.0 6.1 6.9 8.16 17.52 4.85 24 0.60 659.00 659.67 660.10 660.69 660.71 664.87 SID - (8) 13 12 87.823 0.31 1.06 0.98 0.30 1.04 5.0 5.8 7.0 7.29 8.16 5.22 18 0.60 659.67 660.20 660.78 661.31 664.87 664.70 SID - (9) 14 13 88.617 0.31 0.75 0.98 0.30 0.74 5.0 5.4 7.1 5.23 8.12 4.02 18 0.60 660.20 660.73 661.52 661.61 664.70 664.76 SID - (10) 15 14 92�558 0.44 0.44 0.98 0.43 0.43 5.0 5.0 7.2 3.13 8.10 3.49 18 0.59 660.73 661 �28 661 �61 661.95 66476 664.82 SID - (11) 16 10 11�177 0.46 0.46 0.98 0.45 0.45 5.0 5.0 7.2 3.27 8.31 1.85 18 0.63 661.01 661 M 662M 662.64 664�27 664.45 SID - (18) 17 9 83.047 0.15 0.15 0.98 0.15 0.15 5.0 5.0 7.2 1.07 8.15 1.87 18 0.60 660.47 660.97 661.58 661.36 664.69 664.52 SID - (23) 18 8 65.961 0.22 0.22 0.98 0.22 0.22 5.0 5.0 7.2 1.56 8.18 2�16 18 0.61 659.90 660M 661 � 14 660.77 665M 665.09 SID - (20) 19 End 7&509 0.11 0.53 0.98 0.11 0.52 5.0 5.3 7.2 3.72 8.12 4.30 18 0.60 659.00 659A4 65974 660.18 66071 664.03 SID - (21) 20 19 65.956 0.42 0.42 0.98 0.41 0.41 5.0 5.0 7.2 Z98 8.18 3.74 18 0.61 659.44 65M4 66&18 660.50 664M 664.05 SID - (21) (1) Project File: Arka Heights.strn Number of lines: 20 Run Date: 12/11/2019 NOTES:Intensity = 86.72 / (Inlet time + 15.30) 1 0.82; Return period =Yrs. 10 c = cir e = ellip b = box Storm Sewers v2018.30 Culvert Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3DO by Autodesk, Inc. Ex. Culvert 1 (West) Subdrainage areas D-2 and Ex. Culvert 2- Q = CiACf Invert Elev Dn (ft) = 661.69 C = 0.72 Calculations Pipe Length (ft) = 65.00 i = 9.05 Qmin (cfs) Slope (%) = 2.17 A = 1.10 Acres Qmax (cfs) Invert Elev Up (ft) = 663.10 Cf = 1.2 (50-yr) Tailwater Elev (ft) Rise (in) Shape Span (in) No. Barrels n-Value Culvert Type Culvert Entrance Coeff. K,M,c,Y,k Embankment Top Elevation (ft) Top Width (ft) Crest Width (ft) El- (ft) 668.00 66700 666.00 665.00 664.00 663.00 662.00 661.00 660.00 = 24.0 = Circular = 24.0 = 1 = 0.012 = Circular Concrete = Groove end projecting (C) = 0.0045, 2, 0.0317, 0.69, 0.2 = 667.13 = 50.00 = 50.00 Ex. Culvert 1 (West) Circular CUIvel1 HGL Embank Highlighted Qtotal (cfs) Qpipe (cfs) Qovertop (cfs) Veloc Dn (ft/s) Veloc Up (ft/s) HGL Dn (ft) HGL Up (ft) Hw Elev (ft) Hw/D (ft) Flow Regime Monday, Dec 16 2019 = 8.61 = 8.61 = (dc+D)/2 = 8.61 = 8.61 = 0.00 = 3.36 = 5.18 = 663.21 = 664.15 = 664.58 = 0.74 = Inlet Control Hw Depth (ft) 4.90 3 90 2.90 1.90 0.90 -0.10 -1.10 -2.10 -3.10 Reach (ft) Culvert Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3DO by Autodesk, Inc. Monday, Dec 16 2019 Ex. Culvert 2 (East) Subdrainage areas C-2 and Ex. Culvert 2: Q = CiAC, Invert Elev Dn (ft) = 661.12 C = 0.74 Calculations Pipe Length (ft) = 54.00 i = 9.05 Qmin (cfs) = 5.63 Slope (%) = 2.74 A = 0.70 Acres Qmax (cfs) = 5.63 Invert Elev Up (ft) = 662.60 Cf = 1.2 (50-yr) Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 18.0 Shape = Circular Highlighted Span (in) = 18.0 Qtotal (cfs) = 5.63 No. Barrels = 1 Qpipe (cfs) = 5.63 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 3.69 Culvert Entrance = Groove end projecting (C) Veloc Up (ft/s) = 4.99 Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.2 HGL Dn (ft) = 662.33 HGL Up (ft) = 663.51 Embankment Hw Elev (ft) = 663.93 Top Elevation (ft) = 665.93 Hw/D (ft) = 0.88 Top Width (ft) = 34.00 Flow Regime = Inlet Control Crest Width (ft) = 50.00 El- (ft) 666.00 665.00 664.00 663.00 66200 661 00 660.00 Ex. Culvert 2 (East) Circular CUIvel1 HGL Embank Hw Depth (ft) 3.40 2.40 1.40 0.40 -0 60 -1 60 -2.60 Reach (ft) Culvert Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3DO by Autodesk, Inc. Monday, Dec 16 2019 Culvert D-2 Q = CiACf C = 0.69 Invert Elev Dn (ft) = 664.54 i = 9.05 Calculations Pipe Length (ft) = 76.68 A = 0.42 Acres Qmin (cfs) = 3.15 Slope (%) = 0.60 Cf = 1.2 (50-yr) Qmax (cfs) = 8.61 Invert Elev Up (ft) = 665.00 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 18.0 Shape = Circular Highlighted Span (in) = 18.0 Qtotal (cfs) = 3.15 No. Barrels = 1 Qpipe (cfs) = 3.15 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 2.30 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 4.06 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 665.63 HGL Up (ft) = 665.68 Embankment Hw Elev (ft) = 665.96 Top Elevation (ft) = 667.61 Hw/D (ft) = 0.64 Top Width (ft) = 39.00 Flow Regime = Inlet Control Crest Width (ft) = 50.00 El- (ft) 668.00 667.00 66600 66500 664.00 663.00 Culvert D2 Circular CUIvel1 HGL Embank Hw Depth (ft) 3.00 2.00 1 00 000 -1 .00 -2.00 Reach (ft) Inlet Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3DO by Autodesk, Inc. Monday, Dec 16 2019 C 2 Subdrainage areas C-2: Drop Grate Inlet Q C = CiACf = 0.76 Calculations Location = Sag i = 9.05 Compute by: Known Q Curb Length (ft) = -0- A = 0.23 Acres Q (cfs) = 1.90 Throat Height (in) = -0- Cf = 1.2 (50-yr) Grate Area (sqft) = 3.00 Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 1.90 Grate Length (ft) = 3.00 Q Capt (cfs) = 1.90 Q Bypass (cfs) = -0- Gutter Depth at Inlet (in) = 1.90 Slope, Sw (ft/ft) = 0.330 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.330 Gutter Spread (ft) = 3.96 Local Depr (in) = -0- Gutter Vel (ft/s) = -0- Gutter Width (ft) = 3.00 Bypass Spread (ft) = -0- Gutter Slope (%) = -0- Bypass Depth (in) = -0- Gutter n-value = -0- All dimensions in feet Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3DO by Autodesk, Inc. Monday, Dec 16 2019 D-2 - Roadside Ditch - 10-yr Storm Trapezoidal Highlighted Bottom Width (ft) = 6.00 Depth (ft) = 0.13 Side Slopes (z:1) = 4.10, 3.10 Q (cfs) = 2.200 Total Depth (ft) = 2.00 Area (sqft) = 0.84 Invert Elev (ft) = 665.00 Velocity (ft/s) = 2.62 Slope (%) = 1.00 Wetted Perim (ft) = 6.97 N-Value = 0.013 Crit Depth, Yc (ft) = 0.16 Top Width (ft) = 6.94 Calculations EGL (ft) = 0.24 Compute by: Known Q Subdrainage areas D-2: Known Q (cfs) = 2.20 Q = CiA C = 0.69 i = 7.60 A = 0.42 Acres Elev (ft) Section Depth (ft) 668.00 3.00 667.50 2.50 667.00 666.50 2.00 1.50 666.00 665.50 665.00 AAA tin 1.00 0.50 0.00 0 50 0 5 10 15 20 25 30 Reach (ft) 35 Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3DO by Autodesk, Inc. Monday, Dec 16 2019 Ex. Culvert 1 - Roadside Ditch - 10-yr Storm Trapezoidal Highlighted Bottom Width (ft) = 6.00 Depth (ft) = 0.23 Side Slopes (z:1) = 4.00, 3.00 Q (cfs) = 6.020 Total Depth (ft) = 3.00 Area (sqft) = 1.57 Invert Elev (ft) = 663.10 Velocity (ft/s) = 3.85 Slope (%) = 1.00 Wetted Perim (ft) = 7.68 N-Value = 0.013 Crit Depth, Yc (ft) = 0.30 Top Width (ft) = 7.61 Calculations EGL (ft) = 0.46 Compute by: Known Q Known Q (cfs) = 6.02 Subdrainage areas D-2 and Ex. Culvert 1: Q=CiA C = 0.72 i = 7.60 A = 1.10 Acres Elev (ft) 667.00 665.00 664.00 663.00 662.00 Section Depth (ft) 3.90 2.90 1.90 gel •1 -0.10 _ 1 1 r) 0 5 10 15 20 25 30 35 40 v Reach (ft) "Ill INN 11111 I ll i l l l III.. NMI III 11 I I"Ir. ■FFNIaIIEIIIIHIIIIIFIF1lil1111i:1 e Y ■■■FI■IIIIEIIIIIIIIIIIII.i1.1If1;!iFJll ■■■■�FF1111IIIlllllllllIIIF1111!/wl i ■■!■■■■FFF111111111111IIIIFIFili;llrili A Mons■■ Mons■■!.I I II III II IIM 111111 lFf 'r iCl!il'I�IF,H'. IIInIYI III IlI IlI IlIIlI IlI 1IlI 2inI1II IIlIIIlI IlII IIIIIIIIIIIIIIIIIH11II�aaI1■■■■■■■■1■■ ■■■MoIIIIII■■ mom ■■a on IIIIIIIIIHIa■■■■■■Mo■ns■nsns■. a■■■ ■ ■■■■ns...u1II 1I1I1IIIIrIrrrill1ll' 1li11l1lIlIll�lFIlI'irGSli�.trI�1�lIIiI1 :l1 l1i1!llIrFit iR�l ' :+"IIIII■ aA,II Alur dalrll'Mons■S F...I.. i H alP/lilr i1;1+',I .I 1111 k11111 I II II iUU111U�■■■■■ � ■��IIF�Ril;l�il?' I�IIiInsi+llr �Sh ,I1 ill 11111n111I11 IIfI11141U�■■■■■ �■��1'.r`+ll:u:En��';III7�+L�51r.I11111 uulminuul.IllaL■■■lMoMoans.fsElr�1!��rIE u1tlllr'rxR 14111111 11111111111IIIIIIIIIIIIIir■■■■■i�YRII•�I�`I' e11+.II+�1lwIFL� 1 11111 11111n111IIlIIIIlIII1111�■■E ■Sf:nsRr.rr� �IlI I Ill::1III 11lFllI111!1111111 IIIEIIIIIIIIIIIIIIIIIIillal■�� rK�tlSrPi■,iF'�I`5'.+I IIIIfI I hill I IIII ���1I�Illlh �!:�yllll I11I.I 11111Imul III..I.I u11111RM. ■FFNIaIIEIIIIHIIIIIFIFI1i11111i:1 e Y ■■■FI■III III 111111111111.i1.1If1;!iFJll I1I1IY11II1II1II1II11II11I!11I!12i!11II1III1III1IlI1IIIIIIIIIIIIIIIIIHIIIl■aaII■■■■■■■■■■■■1■■ ■■■■■a ■■ai■■F![IF...1I1II 1I1I1I1I1I1II IIIIIIIIrIIrIIrr1iI111!I1I1' II1l1iII1I1•IMII1 I1III1III1I�I1IFI1I!I1I'I1lrFFGSi1fl�.1'rI�i1�l1CIiiri!lli�IlIFit�I■■FF1II ■■■■■■■F ■aIIIIIIa■■■■■oE IIIIIIIIIHIa■■■■■■■ER. a■■■■■■■■�.0Hl11111.dit111II1rl1riRiI�I A'+"IIIII■ FA,II Alur rEil ryl'■EE.S F...I.i.. i H alP/lilr i1;1+',I .I IIII k11111 I II II iUU111U�■■■■■ � ■��IIF�Ril;l�il?' 1�11iIf i+11r �Sh ,I1 ill 11111n111III IIfI11141U�■■■■■ �■��1'.r`+Iw:u:En��';1117�+L�51r.I11111 11111n111111111IIIIIIIIIEEi■■■■aEiali.fSEi•�I!��lIE IIItIIIr'rxR 141111i1 11111111111II111111111l1i■■■■■■i�YRII•�I�`I' e11+.II+�11wIFL� 1 11111 11111n111IIlI1IIIIIIIlIIEa■■E ■Sf:FRr.rr� �IlI IllII 11loll 1Ill! 1111111 IIIEIIIIIIIIIIIIIIIIIIil9■■�� rK�tlSrPi■,iF'�I`5'.+I IIIIEI 1111111111...I IIIII1111111111� IIIIIITIIII I IIII IrIF111A11 Y�r' .IIII I11I.I 11111Imul III..I.I u11111RM. ■FFNIaIIEIIIIHIIIIIFIFI1i11111i:1 e Y ■■■FI■III III 111111111111.i1.1If1;!iFJll I1I1IY11II1II1II1II11II11I!11I!12i!11II1III1III1IlI1IIIIIIIIIIIIIIIIIHIIIl■aaII■■■■■■■■■■■■1■■ ■■■■■a ■■ai■■F![IF...1I1II 1I1I1I1I1I1II IIIIIIIIrIIrIIrr1iI111!I1I1' II1l1iII1I1•IMII1 I1III1III1I�I1IFI1I!I1I'I1lrFFGSi1fl�.1'rI�i1�l1CIiiri!lli�IlIFit�I■■FF1II ■■■■■■■F ■aIIIIIIa■■■■■oE IIIIIIIIIHIa■■■■■■■ER. a■■■■■■■■�.0Hl11111.dit111II1rl1riRiI�I A'+"IIIII■ FA,II Alur rEil ryl'■EE.S F...I.i.. i H alP/lilr i1;1+',I .I IIII k11111 I II II iUU111U�■■■■■ � ■��IIF�Ril;l�il?' 1�11iIf i+11r �Sh ,I1 ill 11111n111III IIfI11141U�■■■■■ �■��1'.r`+Iw:u:En��';1117�+L�51r.I11111 11111n111111111IIIIIIIIIEEi■■■■aEiali.fSEi•�I!��lIE IIItIIIr'rxR 141111i1 11111111111II111111111l1i■■■■■■i�YRII•�I�`I' e11+.II+�11wIFL� 1 11111 11111n111IIlI1IIIIIIIlIIEa■■E ■Sf:FRr.rr� �IlI IllII 11loll 1Ill! 1111111 IIIEIIIIIIIIIIIIIIIIIIil9■■�� rK�tlSrPi■,iF'�I`5'.+I IIIIEI 1111111111...I IIIII1111111111� IIIIIITIIII I IIII IrIF111A11 Y�r' .IIII "Ill INN 11111 I ll i l l l III.. NMI III 11 I I"Ir. ■FFNIaIIEIIIIHIIIIIFIF1lil1111i:1 e Y ■■■FI■IIIIEIIIIIIIIIIIII.i1.1If1;!iFJll ■■■■�FF1111IIIlllllllllIIIF1111!/wl i ■■!■■■■FFF111111111111IIIIFIFili;llrili A Mons■■ Mons■■!.I I II III II IIM 111111 lFf 'r iCl!il'I�IF,H'. IIInIYI III IlI IlI IlIIlI IlI 1IlI 2inI1II IIlIIIlI IlII IIIIIIIIIIIIIIIIIH11II�aaI1■■■■■■■■1■■ ■■■MoIIIIII■■ mom ■■a on IIIIIIIIIHIa■■■■■■Mo■ns■nsns■. a■■■ ■ ■■■■ns...u1II 1I1I1IIIIrIrrrill1ll' 1li11l1lIlIll�lFIlI'irGSli�.trI�1�lIIiI1 :l1 l1i1!llIrFit iR�l ' :+"IIIII■ aA,II Alur dalrll'Mons■S F...I.. i H alP/lilr i1;1+',I .I 1111 k11111 I II II iUU111U�■■■■■ � ■��IIF�Ril;l�il?' I�IIiInsi+llr �Sh ,I1 ill 11111n111I11 IIfI11141U�■■■■■ �■��1'.r`+ll:u:En��';III7�+L�51r.I11111 uulminuul.IllaL■■■lMoMoans.fsElr�1!��rIE u1tlllr'rxR 14111111 11111111111IIIIIIIIIIIIIir■■■■■i�YRII•�I�`I' e11+.II+�1lwIFL� 1 11111 11111n111IIlIIIIlIII1111�■■E ■Sf:nsRr.rr� �IlI I Ill::1III 11lFllI111!1111111 IIIEIIIIIIIIIIIIIIIIIIillal■�� rK�tlSrPi■,iF'�I`5'.+I IIIIfI I hill I IIII ���1I�Illlh �!:�yllll Skimmer Basin 1 Okay 7.13 Disturbed Area (Acres) 20.43 Peak Flow from 10-year Storm (cfs) i = C= 12834.00 Required Volume ft3 8887.49 Required Surface Area ftZ 66.66 Suggested Width ft 133.32 Suggested Length ft 90.00 Trial Top Width at Spillway Invert ft 205.00 Trial Top Length at Spillway Invert ft 3.00 Trial Side Slope Ratio Z:1 3.00 Trial Depth ft (2 to 3.5 feet above grade) 72.00 Bottom Width ft 187.00 Bottom Length ft 13464.00 Bottom Area ftZ 47709.00 Actual Volume ft3 Okay 18450.00 Actual Surface Area ftZ Okay 7.50 Trial Weir Length ft 1.00 Trial Depth of Flow ft 22.50 Spillway Capacity cfs Okay 1.50 Skimmer Size (inches) 0.13 Head on Skimmer (feet) 2.25 Orifice Size (1/4 inch increments) 3.10 Dewatering Time (days) Suggest about 3 days 5.21 in/hr 0.55 Skimmer Basin 2 Okay 2.30 Disturbed Area (Acres) 6.59 Peak Flow from 10-year Storm (cfs) i = C= 4140.00 Required Volume ft3 2866.93 Required Surface Area ftZ 37.86 Suggested Width ft 75.72 Suggested Length ft 160.00 Trial Top Width at Spillway Invert ft 210.00 Trial Top Length at Spillway Invert ft 2.00 Trial Side Slope Ratio Z:1 3.00 Trial Depth ft (2 to 3.5 feet above grade) 148.00 Bottom Width ft 198.00 Bottom Length ft 29304.00 Bottom Area ftZ 94284.00 Actual Volume ft3 Okay 33600.00 Actual Surface Area ftZ Okay 10.00 Trial Weir Length ft 0.50 Trial Depth of Flow ft 10.61 Spillway Capacity cfs Okay 1.50 Skimmer Size (inches) 0.125 Head on Skimmer (feet) 1.25 Orifice Size (1/4 inch increments) 3.24 Dewatering Time (days) Suggest about 3 days 5.21 in/hr 0.55 Hydrologic Soil Group —Union County, North Carolina (Arca Heights - USDA Soil Survey) 533510 533560 533610 533660 533710 533760 533810 533860 lie ft FA ilk� 4r � �� � l`x.lUlL'J ' � •'' t •x . +�. 1 A �i .. A" Soil Map may not he valiel at this scale.• #. 350 2' 15" N � I 533510 533560 533610 533660 533710 533760 533810 533860 - Map Scale: 1:2,380 if printed on A landscape (11" x 8.5") sheet. Meters $ N 0 35 70 140 210 Feet 0 100 200 400 E00 Map projection: Web Mercator Conermordinates: WGS84 Edge tics: UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey aIiiiiiiiIIIIIIII Conservation Service National Cooperative Soil Survey 533910 533960 534010 • r I 35° 2' 26" N i k" 49 Ilk it :. 1 350 2' 15" N 533910 533960 534010 11 /13/2019 Pagel of 4 Hydrologic Soil Group —Union County, North Carolina (Arca Heights - USDA Soil Survey) MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D 0 C 0 C/D 0 D 0 Not rated or not available Soil Rating Lines r 0 A r 0 A/D B r B/D N 0 C r 0 C/D r 0 D r 0 Not rated or not available Soil Rating Points 0 A 0 A/D 0 B 0 B/D ❑ C 0 C/D 0 D ❑ Not rated or not available Water Features Streams and Canals Transportation — Rails ­0 Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Union County, North Carolina Survey Area Data: Version 19, Sep 16, 2019 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 18, 2011—Nov 25, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources Web Soil Survey 11/13/2019 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group —Union County, North Carolina Arca Heights - USDA Soil Survey Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CmB Cid channery silt loam, 1 to 5 percent slopes D 2.3 21.9% GsB Goldston-Badin complex, 2 to 8 percent slopes D 7.4 69.4% TaB Tarrus gravelly silt loam, 2 to 8 percent slopes B 0.9 8.6% Totals for Area of Interest 10.6 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. USDA Natural Resources Web Soil Survey 11/13/2019 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Union County, North Carolina Arca Heights - USDA Soil Survey Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 11/13/2019 Conservation Service National Cooperative Soil Survey Page 4 of 4