Loading...
HomeMy WebLinkAbout20200015 Ver 1_CAMA Application_20191220ROY COOPER i 1 Govemor MICHAEL S. REGAN ? Secretory BRAXTON DAVIS NORTH CAROLINA Direclor DivisionofCoasral Environmental Qaa(ity Management January 2, 2020 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) g regg. bod nar(rD ncden r. gov SUBJECT: CAMA Major Permit Application Review Applicant: City of Washington Project Location: Stewart Parkway off the Pamlico River Beaufort County Proposed Project: Proposes to construct 6 new transient day docks along the bulkhead to connect all the currently existing day docks and create four additional slips. Please indicate below your agency's position or viewpoint on the proposed project and return this form to Greoa Bodnar at the address above by February, 18 2020. If you have any questions regarding the proposed project, contact Heather Styron (252) 808-2808 when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. "*Additional comments may be attached" This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAM AGENCY SIGNATURE U_\Iq Stale of North Carolina I Environmental Quality I Coastal Management 400 Commerce Ave. Morehead City, NC 28557 (252) 808-2808 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: City of Washington Marina 2. LOCATION OF PROJECT SITE: Beaufort County, at Stewart Parkway in the City of Washington adjacent the Pamlico River, North Carolina Photo Index - 2006:100-8159; Q-1,2,3,4,5 2000:100-1143; R-20,21,22,23,24 1995:100-1065; 5-8,9,10,11,12 1989: 2-64-12;J-1,2,3,4,5 Location - 35' 32' 26" N 77° 3' 21" W 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit — 10 December 2019 Was Applicant Present — No 5. PROCESSING PROCEDURE: Application Received - 5 December 2019 Office - Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Beaufort County Land Classification From LUP; Municipal District (B) AEC(s) Involved: PTA (D) Water Dependent: Yes (D) Intended Use: Public Marina (E) Wastewater Treatment: Existing - City of Washington sewer system Planned - N/A (F) Type of Structures: Existing - bulkhead, docks with finger piers, boardwalk, paved road, parking lot Planned - transient dock expansion, boardwalk replacement (G) Estimated Annual Rate of Erosion: N/A HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (B) Non -Vegetated Wetlands f3,644 ft' Shaded River bottom (new) (c) Other t13,874 ft' Shaded (Coastal Shoreline/storm water (replace) and (D) Total Area Disturbed: 17,518 ft' (0.40 acres) (E) Primary Nursery Area: Yes (F) Water Classification: SC -NSW Open: NO PROJECT SUMMARY: The applicant proposes to construct 6 new transient day docks along the bulkhead to connect all of the currently existing day docks and create four additional slips. Additionally, the applicant is proposing to replace the existing 7' wide by 1,982 linear feet boardwalk in the existing footprint. City of Washington City of Washington Marina Beaufort County Project setting The applicant is the City of Washington which is located in Beaufort County. A portion of the City lies adjacent to both the Tar and Pamlico Rivers. The downtown or business portion of the City is separated from the Pamlico River by Stewart Parkway which is a ±54' wide paved street that runs parallel to the River in an East-West direction. The parkway was constructed in 1969 and extends for a distance of 2000'. The City owns an additional 1,200 feet of shoreline downstream that is used as the Stewart Parkway storm water pond. The City maintains a boardwalk along this portion of shoreline. A Federal navigation channel extends along the entire length of the project area. On 8 September 1998 the City of Washington was issued CAMA Major Permit No. 119-98 for the construction of 33 slips on 6 finger pier systems as well as a floating dock at the western end for small boat access. At the same time, the City began a renovation plan of Stewart Parkway and the existing concrete boardwalk at the permitted dock location was replaced with a newt 12'6" wide architectural paver boardwalk, and the existing bulkhead was refitted with a new concrete cap and railing system. CAMA Major Permit No. 119-98 was later refined to add 3 additional slips and delete the floating dock portion of the project. A pumpout was required by the permit and is in place for use. CAMA Major Permit 119-98 was modified on 12 October 2000 to install 11 additional boat slips and transient dockage for small boats and canoes. All work authorized by the permit has been completed. This CAMA Major Permit expired on 31 December 2001. The City of Washington submitted an Environmental Assessment dated revised September 2009 to enlarge the existing facility by an additional 68 slips. The City of Washington received a Finding of No Significant Impact (FONSI) on 27 April 2010 for the construction of the additional slips. The additional slips would have brought the total number of mooring to 116. On 13 January 2011 CAMA Major Permit #6-11 was issued to the City of Washington for the construction of 68 formalized boat slips (15 transient and 53 permanent boat slips) for a total of 116 formalized slips. An amended Permit was issued on 11 April 2011 which removed a condition on the original Permit. The City did not build any of the slips permitted by this Permit. On 19 April 2011 the permit was modified to construct a 20' x 40'platform adjacent to the existing bulkhead. On 12 February 2012 the Permit was modified to replace and reorient the floating dingy dock on the upstream end of the Parkway. The Permit was refined on 2 October 2013 to reorient impervious sidewalks in order to construct a boater facility and public restrooms. On 14 March 2014 the Permit was modified to remove Dock I and construct a pier and covered platform. On 2 December 2014 the Permit was modified to add an additional 20' x 40' platform. The Permit was renewed on 11 February 2016. The Permit was refined on 21 September 2016 in order to replace an existing storage building. The Permit expired on 18 December 2017. The Pamlico River at the project site has been classified as SC -NSW by the Environmental Management Commission. The Pamlico River at this location is classified as inland fishing waters, primary nursery area and is not open to shell fishing. Water depths in the location of the proposed docks range from -6.0' to -11.0' below Normal Water Level. City of Washington City of Washington Marina Beaufort County Page 2 Project description The City of Washington is proposing the construct 6 new transient day docks along the bulkhead to connect all of the currently existing day docks. These docks will be 7' in width and range in length from 49' to 120'. The resulting transient day dock will be approximately 860 linear feet in length. Four finger piers will be constructed in front of the Estuarium on the downstream end of the Parkway to create four permanent docks. One finger pier will be 25' long and 3 will be 30' long. All of these finger piers will be 6' in width. Additionally, the City is proposing to replace the existing 7' wide by 1,982 linear feet boardwalk in the same footprint as the existing. Anticipated impacts The project as proposed will result in the shading of approximately f3,644 ftz of River bottom associated with the construction of the Dock expansion. The replacement of the existing boardwalk will not result in any additional permanent impact. Currently the boardwalk shades approximately 13,097 ft2 of storm water pond which is located within the Coastal Shoreline AEC and the Tar -Pamlico Riparian Buffer. There will be temporary localized turbidity associated with piling installation of both the docks and boardwalk replacement. Kelly Spivey —16 December 2019 Project Narrative: Waterfront Dock and Boardwalk Improvements This project will provide additional boating access for public use and reconstruct the existing 1,982' wetlands boardwalk. The City of Washington has developed public boat docking facilities along the downtown waterfront at Stewart Parkway. The existing facilities contain for 51 slips, 48 as part of the Washington Waterfront Docks and 3 at the Estuarium. The City plans to add 6 new alongside day dock pier sections. We will replace and reconfigure the existing docks at the NC Estuarium to include 4 new fingers piers. There will be a total of 59 boat slips in the marina when this project is finished. The existing boardwalk is almost 17 years old and has seen a tremendous amount of use. The boardwalk gives the public a continuous walking space of 3/<'s of a mile along the waterfront. During the 17 years of use there has been the occasional repair to the boardwalk in certain areas along the decking but the continuous use has also made the wooden railings unstable creating a safety hazard. The City looked at several ways in which to solve the safety issue with the boardwalk and we plan to replace the existing walkway with a new concrete marine slat walkway and replace the wooden pilings, decking and railings. The replacement of the existing boardwalk will be done in 2 phases. ROM MP-1 APPLICATION for Major Development Permit (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1, Primary Applicant/ Landowner Information Business Name Project Name (if applicable) City Of Washington Waterfront Dock & Boardwalk Improvements Applicant 1: First Name MI Last Name Mike Dail Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address PO Box City State 1988 Washington NC ZIP Country Phone No. FAX No. 278891988 USA 252-975-9384 ext. - - Street Address (if different from above) City State ZIP same Email mdall@washingtonnc.gov 2. Agent/Contractor Information Business Name N/A Agent/ Contractor 1: First Name MI Last Name Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State ZIP Phone No. 1 - - ext. one No. 2 - - ext. FAX No. Contractor # Street Address (if different from above) City Slate IF Email <Form continues on back> DCM-WARO 252.808.2808 :: 1.888-4RCOAST :: www. nccoastal management. net Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Beaufort Stewart Parkway & Waterfront NA Subdivision Name City State Zip NA Washington NC 27889 - Phone No. Lot No.(s) (if many, attach additional page with list) NA- ext. NA, I , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Tar/Pamlico River Basin Pamlico River c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ®Natural ❑Manmade ❑Unknown Pamlico River e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed Was ❑No work falls within. City of Washington 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 3,900 274,863 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or NA, I NWL (normal water level) (If many lot sizes, please attach additional page with a list) 4 to 8 feet ❑NHW or ®NWL e. Vegetation on tract Grass and trees. f. Man-made features and uses now on tract Bulkhead, 51 boat slips, canoe/kayak launch, promenade, dock station with restrooms and shower facilities, existing boardwalk (to be repalced), Festival Park and Crab Park including a playground, gazebo's and picnic tables. g. Identify and describe the existing land uses adjacent to the proposed project site. Property immediately adjacent on east is multi -family residential, property west of site is commercial. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? B1 H (Attach zoning compliance certificate, if applicable) ®Yes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ®Yes ❑No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. ®Yes ❑No ❑NA If yes, by whom? Tidewater Atlantic Research I. Is the proposed project located in a National Registered Historic District or does it involve a ®Yes ❑No ❑NA National Register listed or eligible property? D) CEnam �T <Form continues on next page> DEC 0 5 2019 V ' S 252.808-2808 :: 1-888.4RCOAST :: www. nccoasta lmanagement. net Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permit m. (i) Are there wetlands on the site? []Yes NNo (ii) Are there coastal wetlands on the site? ❑Yes NNo (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes NNo (Attach documentation, if available) n. Describe existing wastewater treatment facilities. City of Washington municipal system for collection and treatment. o. Describe existing drinking water supply source. City of Washington municipal water supply system. p. Describe existing storm water management or treatment systems. Yes, -partial treatment by created Wetlands south of project location. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ❑Commercial NPubllc/Government ❑Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. This project will provide additional boating access for public use. Marina will be operated by the City of Washington Community and Cultural Services Department which maintains a harbor master or dock attendant on site at all times. This project will also reconstruct the existing wetlands boardwalk. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Typcial marine construction using barge mounted pile driving equipment and land based timber dock construction. Marine construction equipment will be stored onsite and will be removed after construction is complete. d. List all development activities you propose. Construction of 6 new alongside day dock pier sections, replace and reconfigure existing docks at esluarium including 4 new finger piers and replacing a 1,982' boardwalk. There will be a total of 59 boat slips in the marina when this project is completed. In addition, this project will reconstruct the existing wetlands boardwalk. e. Are the proposed activities maintenance of an existing project, new work, or both? both f. What is the approximate total disturbed land area resulting from the proposed project? None ❑Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area NYes ❑No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. There are two existing discharges from small upland areas adjacent to the marina site. Outfalls are shown on Attachment. I. Will wastewater or stormwater be discharged into a wetland? ❑Yes ❑No NNA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑ j. Is there any mitigation proposed? ❑Yes ❑ A If yes, attach a mitigation proposal. <Form continues on back> DCM-WARD 252-808.2808 :: 1.888.4RCOAST :: www.nccoastalmanagement.net Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional information In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (0 are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guideagency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Litchfield Holdings, LLC Phone No. Address 135 Harbor Road, Washington, NC 27889-------------- - -- --_-- _-- -_- Name Beacon Street Moss Landing, LLC Phone No. Address PO Box 6474, Raleigh, NC 27628 Name H-D Holdings, LLC Phone No. Address 418 E. Water Street, Washington, NC 27889 g. A list of previous slate or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. 119-98 Sept 8, 1988, City of Washington 119-98 Modified August 1999 06-11 Major Permit, January 13, 2011, City of Washington h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10). if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 1 7. Certification and Permission to Enter on Land ____1 I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify t et t information provided in this application is truthfu to the bq of my knowledge. Date 17,^ Print Name Signature Please indicate application attachments pertaining to your proposed project. ❑DCM MP-2 Excavation and Fill Information ❑DCM MF ❑DCM MP-3 Upland Development ®DCM MP-4 Structures Information RECEIVED Bridges and Culverts DEC 05 2019 DCIM-WARO 252.808-2808 :: 1-888.4RCOAST :: www.ncco2staimanagement.net Form ®CM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ❑Commercial NPublic/Government ❑Private/Community El This section not applicable b. (i) Will the facility be open to the general public? ®Yes ❑No c. (i) Dock(s) and/or pier(s) d. (i) Are Finger Piers included? ®Yes []No (ii) Number 6 If yes: (iii) Length a-60% b-49', c-60' d-59' a-120' f-74' (ii) Number 4 (iv) Width 7' (iii) Length 1 A 25' 13 aR 30' (v) Floating ❑Yes ®No (iv) Width 6' (v) Floating ❑Yes ®No e. (i) Are Platforms included? ❑Yes ®No f. (i) Are Boatlifts included? ❑Yes ®No If yes: If yes: (ii) Number (ii) Number (iii) Length (iii) Length _ (iv) Width (iv) Width (v) Floating []Yes ❑No Note: Roofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. 59 ❑ Full service, including travel lift and/or rail, repair or (ii) Number of slips existing maintenance service 51 ❑ Dockage, fuel, and marine supplies ® Dockage ("wet slips') only, number of slips: 59 ❑ Dry storage; number of boats: ❑ Boat ramp(s); number of boat ramps: ❑ Other, please describe: i. Check the proposed type of siting: ❑ Land cut and access channel ❑Open water; dredging for basin and/or channel ®Open water; no dredging required ❑Other; please describe: k. Typical boat length: 1818=60' m. (i) Will the facility have tie pilings? ❑Yes ®No (ii) If yes number of tie pilings? None Proposed j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). mixed types I. (i) Will the facility be open to the ge ®Yes ❑No rEC��nEDI�J'vED DEC 0 5 2019 DCM-WARO 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmananement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 2 of 4) 2, DOCKING FACILITY/MARINA OPERATIONS ❑This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ❑ Office Toilets N Toilets for patrons; Number: 6; Location: West end of marina in Lighthouse N Showers N Boatholding tank pumpout; Give type and location: Existing - West end of marina, Dock A b. Describe treatment type and disposal location for all sanitary wastewater. City of Washington Municipal System c. Describe the disposal of solid waste, fish offal and trash. Trash cans located on bulkhead at each dock access point. Collection is daily. d. How will overboard discharge of sewage from boats be controlled? Marina rules and regulations prohigit discharges. Sewer pumpout located on end of Dock A. e. (i) Give the location and number of "No Sewage Discharge' signs proposed. 6 - at entrance to each dock, A-F (ii) Give the location and number of "pumpout Available' signs proposed. 6 - at entrance to each dock, A-F f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. Boat maintenance is not permitted by marina rules and regulations.. g. Where will residue from vessel maintenance be disposed of? Boat maintenance is not permitted by marina rules and regulations. h. Give the number of channel markers and "No Wake" signs proposed. 4 - existing "No Wake" signs. i. Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. No fuel -handling faclities are proposed. j. What will be the marina policy on overnight and live -aboard dockage? Live-aboards are mot permitted by marina rules and regulations; Overnight dockage is permitted in accordance with Rules and Regulations for Waterfront Dockage. k. Describe design measures that promote boat basin Flushing? Marina is on open waters of Pamlico River and flushes naturally. I. If this project is an expansion of an existing marina, what types of services are current) RECEIVED P 1 P 9 YP y provided? Services currently provided include restrooms, showers, free day dockage, transitent and long terry e rvll.Ztina has full time harbor master. u �� DCM-WARO 252-808.2808 :: 1.888-4RCOAST :: www.nccoastaimanaaement.net revised: 12/27/06 Form ►aCM MP-4 (Structures, Page 3 of 4) m. Is the marina/docking facility proposed within a primary or secondary nursery area? ®Yes ❑No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? []Yes ®No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SIB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB ❑WL ®None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ®No If yes, give the name and address of the leaseholder(s); and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ®This section not applicable a. (i) Is the boathouse slructure(s): [-]Commercial ❑Publio/Government ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from ddpline dimensions. 14. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a. (i) Number (ii) Length (iii) Width 15. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a. Length c. Maximum distance beyond NHW, NWL or wetlands b. Average distance from NHW, NWL, or wetlands 6. MOORING PILINGS and BUOYS ®This section not applicable a. Is the structure(s): ❑Commercial ❑Public/Government ❑Private/Community c. Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc.) DEC 0 5 2019 0.d C.sdV1-WARo 252.808.2808 :: 1.888.4RCOAST :: www.nccoastalmonagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines East 65' West 80' Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 990' narrowest. 2 680' widest e. (i) Will navigational aids be required as a result of the project? ❑Yes ®No ❑NA (ii) If yes, explain what type and how they will be implemented. b. Proximity of structure(s) to adjacent docking facilities. East 75' West 430' d. Water depth at waterward end of structure at NLW or NWL -15.0 8. OTHER ❑This section not applicable a. Give complete description: Construct 6 new sections of along side day docks to fill in gaps between exisitng alongside day docks, replace and reconfigure docks in front of the Estuarium and replace existing Tx 1,982' boardwalk. This boardwalk is both waterward and landward of the normal water lever of the Pamlico River. Date Dee, V e 14- �l ProjecctttNNaame ApAY ` br lX-'�� b�G�✓ scant N me Applicant Signature RECEIVED DEC 0 5 2019 DCM-WARO 252-808-2808 :: 9.8884RCOAST :: www.nccoastalmanagenient.net revised: 12/27/06 � I ♦ .�. Y �, r y�a„ « \ tear.>!.; i i £ Hu6hard ECi. . •� i _l ,, .. t S ` � `� �� Anami ° a 0aybeacons - o- e� / - • 11 ate eti y _ i Pili' -•.ice ``+ \% �R\�% �\ i •\• o / ��•/ , °Piling '� ��wg / •$ i ./" `' Castle �� ... `• _ The Cae as\ AJ„/. o R(WHrower PROJECT LOCATION ' Foul Pilmg �6 �\ Grendpap I O O� >rea R OL'H q s dljight (C) A Grove (C�` f I - 'A Soft (C) ..Q v O o _ .Radio towers �� -- MRRf1 i P l ng Rodman Pt Bright iCP A Light ';C) c. 5° . RECEIVED, , Creek (C)r' DEC 0 5 2019 ' - N I PPvvp�p - �� f,-�ablor Cr awrIY CI 4/CRvt-y��NYARO C, siir" PROJECT CLIENT.' DRAWING TlIIE' �� N.T.S. FlG�a 06115/10 ]RAY"Mr.='•W CITY OF WASHINGTON CITY OF WASHINGTON ° MARINA -PHASE III P. 0. BOX 1988Jjw designgroup BEAUFORT COUNTY WASHINGTON, NC 27889 10121 a m O '2 � z d� I Y Y•+ I R, 'ry � m 4 m iy F I„ 4 ry a I PY K w Q C` V1 Q 4 I a N Q m 4 q � AO WO JIIdStlM --�---- - a U � as N g N P Y Z IL m Q ow J LL ~ Z Z K 0 R CEI D DEC05 y LL Z DC -WARO U y o e Match Line 1 a V R ..........................See Sheet 2 of 4_ _.___._._._._._._._._ Z g 5 x to sl _ n w v Coo . ti c i Ip I R $9y99y A� pgR g3 ¢�� !e a3 Si � � m � 3w w3 w; W O e I d g o oa^otlC's'wS ! C¢H W L' �a ,,ppyy � LL 3otlC^u u'e' i � � 4.V1 i �I � g I 0 €n \PP Niry dd$ 5� -4 .� � 3 _ `NU1u111lllggi 8a $Sm 'wgg - ,w Ja N! E ,per \ o RY yy €€QS" s m ./�..A �112 H-H y �C£s1 It ax 4P6ac� Rif I Din t g _ate z .(Zpa.Rhp.pt,a4 Match Linw s Sheet 1 of 4 ! )%#y @ q if ! \ \ J ®) � ƒ\®\ B m s•g a � � w � ai e� Ng� a I g at s ............ M s t m y s i c & 3 _ x a s NIB% t4ofa .\ a e Sheers EH i z8 a e o (] ii ",r pp°afis �33yE i, .tt� �A 8 � o rj WE I // Li0 a g _________ I W O w1 �N r. WUU G W (� cc cm V ! ! �\I j1 �•go•Io Est �' rc oil ! Hit �i EI £gg� I� i i 'o. � a.. e• 8 N -AR% / __-_ �io �g�APL boj •. $� \may 8 og3 99g8e-.r - -- I I Match Line 2 �' � a o a a� @` /1 �SeeSheet2of4 y a�s y.agy%§g ` 4Ri a�$ a RUM '23 .i E irveyor's Cerlificate and Parcel Status 1 i 1 Pmks " LaMSurveywNWp 3hfe dN-W GmIMe, j / el was tlnwn u,Aarmy auprvlabnfignen xWLaumyperM1nne! l s' ThsIIM PwMaMsaumyeaen OeflnNNOpad amhWA boot, pa Maumyatlere Gouty IWp to. p wo, eacwaryaa ttkWelpais f/ y)ma Nnaysu.M" We GPe OPS rembem uaea: S'.. SP A ;Q1' IV, 61au Msumy:c PosXbnal ett✓ y;O03' — •G UAL _ :y l-2ke ¢' rypeacpsflalw= 'VRS Ostia NaumY:AWuaI1d, 1019 ' g0 OelumEpW:NA083/Nfl egvsbnanl Nfla' "\ GR.^��' emWused: Gads Msi&: EOIDIM /AjKIW31A Canb. OWF.0 :099900M IIMa: 1/SFO T fiWel lryhls os,me VS d�750secdw Fff as 7hwmY� aemlM,�sd, not lleymyuan exttpNn blM tlaf amo/a auWrviabn. �� w,Wawm ,oslsl9Mhoa, atanp{ number a,ao.lmh Ozoaym/1/>J Survey Purpose M. pu/pOsp of this survey u fo provide an htvanfory orahas line imp/ovemsnfa ma Us by M. City of WaaW,L,e,, NO. AS M Is/wl rm pwpoass oflend fide aschanga, elements &G S 4740, where unnecpaaaryaodns Vd ad. W U 0 SO 1N 150 iW A IlwgGheutyaGbpny/eGa lM1Nmeypeda?ite06Y eR-0anaemxalaliM teem',,wwetleae�ynaNdwayv emwa, zaNng repJ.dww eM maldli,e wnnanfa Wma'aMNwn Mrtm. fl MevmipaMEyMa MNMfdWvgnek Cewmtry c. Aa dGanwa en rwtr-9damaaawrewpurerMa.mKd a wwawa w-. my aaswa-m.ppaaapki9ma my E I/MapouW'Nsooso. auh ..assay. f� Litchfield Holding, LLC need Book 17M Pag& 866 9T O ti N Q Lez O � V L—) O River 4f 'n: 0.37' NAVD 88 An Inrenrory Slwre ❑/a Survey be City of Washington, NC SMIe 1�o fwasMngbn, NC SurvpBea"Cl f96 NCP019 pus Sorrell Land Surveying, Inc, Nu9AA$-rear Pm.. lens$u»yw . f0]VMan Moy Wsymvgan, Nc aanPlaMsurveyHp mm qay f139Y16NB1 6n'roaryliaa+aa'F]a9B MNaalibE19148,8B W E 6 'Sam,-NalaMaurveyup �reeae olEeNe'nNC 10 — 4o GFS PROJECT. CITY OF WASHINGTON MARINA - PHASE III BEAUFORT COUNTY CLIENT. CITY OF WASHINGTON P. 0. BOX 1988 WASHINGTON, NC 27889 DEED PAGES 51-54 �IGVEIED DRAWING TIRE PROPER s f 3 DEED AAAP DEC 0 5 2019 m N.T.& jUNE 2010 J - --- ----- -- - ----- - c 0 (A z 0 00 H 001 z z 'L 1-1 Ll J z z OU z z O. 10 t; -i RECEIVED DEC 0 5 2019 OCM-WARO Vicinity Map Control Corner Point "AT' NC Grid Coordinates N= 658,347.25 E = 2,577,417.70 (Now or Formerly) H-D Holdings of Washington, LLC Deed Book 1960 Page 296 Green Area River Water stop Here 2 Frame Building_ C2 S - -_ M Ns D Al B 81Bulkhead G2 "A, 8, C & D" are Concrete Pads for Picnic Tables �enotes 2 New1 �1 1 Picnic Tables Floating , 1- Dock , 1 C1i I N I a Survey Purpose The purpose of this survey is to provide an inventory of shore line improvements made by the City of Washington, NC. As it is not for purposes of land title exchange, elements of G.S. 47-30, where unnecessary and not followed. Surveyor's Certificate and Parcel Status 0- 0. o Metes & Bounds of Concrete Bulkhead From To Bearing Distance B2 A2 N 26038'57" E 50.00, B2 C2 S 2603857" W 2.00' D2 C2 N 2803943" E 49.92' E2 D2 N 33006'57" E 1.85, F2 E2 N 29013'25" E 21.88' G2 F2 N 6004452" W 76.72' G2 Al N 4305242" E 2.89' Al B1 S 59055'05" E 3.94' B1 C1 S 18°38'50" W o , " 96.51' , -_-_•�rgen Area •_ Brick Walk Concrete Bulkhead -- _ ------ ------ 77.38' Existing Permanent Dock 1265 sq ft 1, Hugh A. Sorrell, a Professional Land Surveyor in the State of North Carolina, certify that this plat was drawn under my supervision from an actual survey performed under my supervision. That the boundaries surveyed are defined in Deed Book N/A Page N/A. That the boundaries not surveyed are clearly dicate at the ratio of precision or positional accuracy as calculated is I.;" That the following information was used to perform the GPS survey. receivers s�d: Spectra SP 80 � \v,\e\1IIIIill/f/GPS ///�� Cass of survey Positional accuracy: 0.03'D� ®®\\�,°\YA CAROL 0 w Type of GPS field procedure: VRS o ef. SEAL ". Dates of survey: August 14, 2019 Datum/Epoch : NAD 8312011 adjustment - y L-2849 Qz.- Published/ Fixed control used: "VRS" Geoid Model: GEOID 12A �r� r°�49UR4�e Combined Grid Factor: 0.9998830 °°,�� Units: US FOOT That this plat was prepared in accordance with GS 47-30 as amended. That this plat meets the requirements of GS 47-30 section F-11, item d. This survey is of another category or an exception to the definition of a subdivision. Witness my original signature, 2019 / A. This plat is subject to any facts that maybe disclosed by a full and accurate title search, as well as any right of ways easements, zoning regulations and restrictive covenants of record not shown hereon. B. Area computed by the Method of Coordinate Geometry C. All distances are horizontal ground unless otherwise noted D. Wetlands were not defined or mapped during this survey. E. Underground utilities are not included in this survey. Special Notes Existing Impervious Area within 50' of the Water's Edge is: 20,917 sq ft Stewart Parkway i I Asphalt Roadway —•---•i CD rnm-min rrvh;-- •_-_ Limits ofSurver50_fromW... Edge—•—•_.—•----------_•—•_-_•_. 683.49------•—•--- •_---- Limits of Survey Water'sEdge (D ,. rcr#e—•—netwIk6=w___-_-_-_-_-_-_-_-_-_-_ Pad Green Area 30' from Wa Brick Walk Area Bulkhead Concrete Curbing-- ----- --------------•------- —. Cot �crete �eg1�_�--_Pad_ -t n 7 ------------_-Lquacetr A63UL _------•—•—• Water's Edg —•---.flu ralfi? raLk._._. Green Area 30' froth Green Area �-� tD Area Brick Walk Brick Walk I rt Di � IN Concrete Bulkhead Concrete Bulkhead Concrete .0 I CD '•� - Bulkhead ► ---------------- _ 60.72' 78,33' ExistingPermanent Dock 1265 sq ft Pamlico River Mean Water Elevation : 0.37' NAVD 88 ---------------- g 65.96' 79.22' Existing Permanent Dock 1265 sq ft Legend O EIP = Existing Iron Pipe O NIP = New Iron Pipe O Ex. Mon. = Existing Concrete Monument O Mag Nail= Magnetic Survey Nail O NPS = No Point Set • = Power Pole — - - - — = Right of Way — — = Centerline = Lines Surveyed — — = Lines Not Surveyed -A- = Power Line = Curbing R/W = Right of Way PC = Point of Curvature PT = Point of Tangency All NIP's set are black iron pipe 1 " in Diameter by 24" long 50 0 50 100 150 200 I I ----------------- 58.76' 79.17' Existing Permanent Dock 1265 sq ft RECEIVED DEC 05 2019 Sheet 1 of 4 An Inventory Shore Line Survey for: City of Washington, NC City of Washington, NC Beaufort County, NC Scale 1 " = 50' Surveyed August 14 & 15, 2019 Sorrell Land Surveying, Inc. Hugh A. Sorrell, Professional Land Surveyor L-2849 107 Union Alley Washington, NC www.sorrelflandsurvoying.com Office (252) 948-2464 Company License: C-3508 Mobile (252) 944-9798 "Serving the land surveying needs of Eastern NC" ! D1 Brick Walk „___ I (D I 5. n I tD �- (D r► I rook *Ala • 1 ,Oo .,a I � I I I i i i City of Washington Existing Impervious Area within 50' of the Water's Edge is 13,933.31 sq ft City of Washington Metes & Bounds of Concrete Bulkhead From To Bearing Distance D1 E1 S 51 °40'23" E 921.41' E1 F1 N 67040'06" E 60.97' F1 G1 S 51 °30'40" E o n 0.79' r A. This plat is subject to any facts that maybe disclosed by a full and accurate title search, as well as any right of ways easements, zoning regulations and restrictive covenants of record not shown hereon. B. Area computed by the Method of Coordinate Geometry C. All distances are horizontal ground unless otherwise noted D. Wetlands were not defined or mapped during this survey. E. Underground utilities are not included in this survey. Special Notes GI�H1 Brick Walk Concrete Bulkhead Brick Walk E1,1 81 ' X 7' 59' 81 ' X 7' id 83' X 7' -- - --- 59' Permanent Dock Permanent Dock Permanent Dock 80.3' X 7.3'/ Proposed Dock `` Permanent Dock Addition "A" Proposed Dock cli Addition "B" Proposed Dock "' Addition "C" 41.1' Permanent Dock Survey Purpose The purpose of this survey is to provide an inventory of shore line improvements made by the City of Washington, NC. As it is not for purposes of land title exchange, elements of G.S. 47-30, where unnecessary and not followed. Surveyor's Certificate and Parcel Status !, Hugh A. Sorrell, a Professional Land Surveyor in the State of North Carolina, certify that this plat was drawn under my supervision from an actual survey performed under my supervision. That the boundaries surveyed are defined in Deed Book N/A Page N/A. That the boundaries not surveyed are clearly indicated. That the ratio of precision or positional accuracy as calculated is 1: 10,000+. That the following information was used to perform the GPS survey. GPS receivers used: Spectra SP 80� Class of survey: C `e ®�� °CAR. /11 Positional accuracy: 0. 03' � � . , , Type of GPS field procedure: VRS ` <°Q Dates of survey : August 14, 2019 SEA; Datum/Epoch : NAD 83 / 2011 adjustment = : 9 L ` 8�t - Published/ Fixed control used: "VRS" ° Geoid Model: GEOID 12A Combined Grid Factor: 0.9998830 '�,� ',y �` � r,, `.'; Units: US FOOT 80 p1ox That this plat was prepared in accordance with GS 47-30 as amended. fis plat meets the requirements of GS 47-30 section F-11, item d. This survey is of another category or an exception to the definition of a subdivision. Witness my original signaturee�license7numberAnd seal t�js 2 day of December, 2019 r----------i Floating Dock L---------- I Pamlico River Mean Water Elevation: 0.37' NAVD 88 Legend O EIP = Existing Iron Pipe O NIP = New Iron Pipe O Ex. Mon. = Existing Concrete Monument O Mag Nail= Magnetic Survey Nail O NPS = No Point Set = Power Pole — - - - — = Right of Way — — = Centerline = Lines Surveyed — — = Lines Not Surveyed -A- = Power Line = Curbing R/W = Right of Way PC = Point of Curvature PT = Point of Tangency All NIP's set are black iron pipe 1 " in Diameter by 24" long 59' Addition "D" 81 "X 7' Permanent Dock Proposed Dock Addition "E" j Scale 1 " =10' i I I I I I Ele anon 2.94' I Elevation of Deck 2.5 I i 6. I Elevation of Water a 0.68' ber 24, 2019 I °�° � a I i ` -a o U L ! Elevation Elevatio -6. ' -7.5' y I River Bottom I I I i Typical Section of Existing and Proposed Docks L-----------------------------------------J 101'X 7' Permanent Dock RECEIVE® DEC 05 2019 Sheet 2 of 4 An Inventory Shore Line Survey for: City of Washington, NC City of Washington, NC Beaufort County, NC Scale 1"= 50' Surveyed August 14 & 15, 2019 Sorrell Land Surveying, Inc. Hugh A. Sorrell, Professional Land Surveyor L-2849 107 Union Alley Washington, NC www.sorrelllandsurveying.com Office (252) 948-2464 Company License: C-3508 Mobile (252) 944-9798 Land Surveyor 50 25 0 50 100 150 200 "Serving the land surveying needs of Eastern NC" A. This plat is subject to any facts that maybe disclosed by a full and accurate title search, as well as any right of ways easements, zoning regulations and restrictive covenants of record not shown hereon. B. Area computed by the Method of Coordinate Geometry C. All distances are horizontal ground unless otherwise noted D. Wetlands were not defined or mapped during this survey. ti% ' I E. Underground utilities are not included in this survey. Special Notes Vicinity Map not drawn to Scale Vicinity Map I (Now or Formerly) Moss LandingHarbour Homes (Now or Formerly) ti-� ti Moss Landing Harbour Homes Plat Cabinet "I" Slide 21-4, 21-5, 21-6 1 „ „ I i , CP G�� Plat Cabinet Slide 21-4, 21-5, 21-6 LP q- 1111 11 � I 11 1 11 � I it 1 11 I 11 Bulkhead j II j I .-•'' � I I � i —• I Retention Pond 3 I I a �(p — w I I "' •— 50' from River's Edge I 1 1 1 — --.—.— — — — u,t'I• 1 Eoxisting7'WoodWalkwa 1 1 I I 1 be re is Y 1 1 '•� I _..— p ced with same d �' • 1 � 30' from River's Edge ' — • I • �' �' size and � i •-------•---•---•-----•— ! Retention Pon —, 1 1 -'• I •' •�,�•t" ; footprint �' ;� �-- - —Wood Pie S - L — — _ �, ; Spillway 1 / • r,*. H1• 74' 27' 11 1 '"'—•---•—.--_ _ _ /M 18' 18' 16' 1 �- -��� I - -, / 0 w Zn Z" `° __1 �� I I Exisfing7'WoodWalkway _-----_-- Cl) _ J L �2bgr�/aced with same —Gan ' \ T _ A M N M M ch 32, �' `� �_, gi i '�� . �'y'1 �•-_`,�'O�f%'OmRi , ' r _ __ r .J �.�.�ersEdge I 5 6 5 6' — —size and foot print J Plan ` = J r — — �, — 30' •�-�• — 30, — ��� from Ri — 1 . —� _VeT_rs�, Edge—•—.—.� � � ��� � r---_ — ---' � �1 f� I I I j� �I i� j �Docks� I �--_•�7=W�V1!alk�---�. ��� 1 ( s (gyp Proposed New Docks "F" I f 1 j ^ I I i L I I I LJ C J LJ LJ LJ LJ G I I I I LJ �� 1 LJ \\�1 // `\1 ���� \\�� i/I'ang L � T ~Plank Floating j 1Floatmg/)� ~) /r Docks , Docks > 1 CD L.J 1 I I 1 1 Floating 1 1 1 I A Typical Section of the Existingand Proposed`.J l Docks / l yp Estuarium Dockp Pamlico R►ver Jl l '•—•—•-----•—•---•—•--------- -............. , Mean Water Elevation. 037 NAVD 88 / j WaterE/evation j J a Deck Width is 5' 0.68' 1,e, I a Deck Length is39' October 24, 2019 RECEIVEb j7 Elevation of Deck 3.40' i m _ _ j DEC 0 5 2019 Survey Purpose I 6--- 4.4' 5.4' 4.9' 5.3' 3.9' 6.7' j j =Elevation j The purpose of this survey is to provide an inventory of shore line o< -10 2 CC M-VVAR0 improvements made by the City of Washington, NC. As it is not for purposes of land title exchange, elements of G. S. 47-30, where I Elevation River Bottom unnecessary and not followed. j -7.0' I Sheet 3 of 4 j All Deck Materials j Surveyors Certificate and Parcel Status are Salt Treated Legend i „ _ , i _ Inset Scale 1 15 Timbers i Hugh A. Sorrell, a Professional Land Surveyor in the State of North Carolina, L'—•—•—.................................... J O EIP = Existing Iron Pipe An Inventory Shore Line Survey for: certify that this plat was drawn under my supervision from an actual survey performed O NIP = New Iron Pipe under my supervision. That the boundaries surveyed are defined in Deed Book N/A O Ex. Mon. = Existing Concrete Monument Page N/A. That the boundaries not surveyed are clearly i is ted. at the ratio * Mag Nail= Magnetic Survey Nail City of Washington, NC of precision or positional accuracy as calculated is 1: . That the O NPS = No Point Set following information was used to perform the GPS sure y. 8I91/ff • =Power Pole ��� � ff� ----- =Right of Way GPS receivers used: Spectra SP 80 ®®®® ���� '� — — = Centerline City of Washington, NC Beaufort County, NC ®m • ° ` ` • �, � = Lines Surveyed Scale 1 = 50 Surveyed August 14 & 15, 2019 Class of survey: C �4 . �F E$s =Lines Not Surveyed Positional accuracy: 0.03 e @- ;` _= Power y Type of GPS field procedure: VRS = SEAL —^ Dates of survey:August 14 2019 — ° �' = Curbing Sorrell Land Surveying Inc. 9 - L-284c- .� R/W = Right of Way Datum/Epoch : NAD 83 / 2011 adjustment `� p • ` Hu h A. Sorrell, Professional Land Surveyor L-2849 ® • PC = Point of Curvature 9 y Published /Fixed control used: VRS ir'`• � �, . � o� 107 Union Alley Washington NC Geoid Model: GEOID 12A di/', `r�o` PT = Point of Tangency All NIP's set are black iron pipe 1"in www.sorrelllandsurveying.com UnitsCom: Ued S FOid OT Factor: 0.9998830 �fi��,f�3t.��®� Diameter by 24" long Company License: C-3508 Office (252) 948-2464 Y Mobile (252) 944-9798 That this plat was prepared in accordance with GS 47-30 as amended. That this plat meets the requirements of GS 47-30 section F-11, item d. This survey is of another category or an exception to the definition of a subdivision. C - Witness my original 'gnature license ber and I this day of r 2019 ugh A. Sorrell, Professional Land Surveyor L-2849 50 25 0 50 100 150 200 "Serving the land surveying needs of Eastern NC" Vicinity Map Surveyor's Certificate and Parcel Status 1, Hugh A. Sorrell, a Professional Land Surveyor in the State of North Carolina, certify that this plat was drawn under my supervision from an actual survey performed under my supervision. That the boundaries surveyed are defined in Deed Book N/A Page N/A. That the boundaries not surveyed are clearly indicated. That the ratio of precision or positional accuracy as calculated is 1: 10,000+. That the following information was used to perform the GPS survey. Ili GPS receivers used: Spectra SP 80 Class of survey: C Positional accuracy: 0.03' Type of GPS field procedure: VRS Dates of survey: August 14, 2019 Datum/Epoch : NAD 83 / 2011 adjustment Published / Fixed control used: "VRS" Geoid Model: GEOID 12A Combined Grid Factor: 0.9998830 Units: US FOOT That this plat was prepared in accordance with GS 47-30 as amended. That this plat meets the requirements of GS 47-30 section F-11, item d. This survey is of another category or an exception to the definition of a subdivision. Witness my original signature, license number andAa6l this 2 day of December, 2019 Plank r / Floating Docks Floating Docks \ J Survey Purpose A. This plat is subject to any facts that maybe disclosed by a full and accurate title search, as well as any right of ways easements, zoning regulations and restrictive covenants of record not shown hereon. B. Area computed by the Method of Coordinate Geometry C. All distances are horizontal ground unless otherwise noted D. Wetlands were not defined or mapped during this survey. E. Underground utilities are not included in this survey. Special Notes (Now or Formerly) Litchfield Holding, LLC Deed Book 1755 Page 886 Pamlico River Mean Water Elevation: 0.37' NAVD 88 The purpose of this survey is to provide an inventory of shore line improvements made by the City of Washington, NC. As it is not for purposes of land title exchange, elements of G.S. 47-30, where unnecessary and not followed. Le-gend O EIP = Existing Iron Pipe O NIP = New Iron Pipe O Ex. Mon. = Existing Concrete Monument O Mag Nail= Magnetic Survey Nail O NPS = No Point Set • = Power Pole — - - - — = Right of Way — — = Centerline = Lines Surveyed = Lines Not Surveyed —A— = Power Line = Curbing R/W = Right of Way PC = Point of Curvature PT = Point of Tangency All NIP's set are black iron pipe I" in Diameter by 24" long Sheet 4 of 4 An Inventory Shore Line Survey for: City of Washington, NC City of Washington, NC Beaufort County, NC Scale 1"= 50' Surveyed August 14 & 15, 2019 Sorrell Land Surveying, Inc. Hugh A. Sorrell, Professional Land Surveyor L-2849 107 Union Alley Washington, NC www.sorrelllandsurveying.com Office (252) 948-2464 Company License: C-3508 Mobile (252) 944-9798 yor 50 25 0 50 100 150 200 "Serving the land surveying needs of Eastern NC"