Loading...
HomeMy WebLinkAboutWQ0031807_Sewer Extension Permit Status Update_72011222 B. R. KORNEGAY, Li° C. LAND SURVEYING • ENGINEERING • PLANNING 300 E. Walnut Street Goldsboro, North Carolina 27530 (919) 735-5886 www.kornegaysep.com Fax. (919) 580-9053 Firm No. F-1054 December 19, 2019 NCDEQ/DWG RECEIVED WQPS-PERCS UNIT DEC 2 7 2019 1617 Mail Service Center Raleigh, NC 27699-1617 NCDEQ/DWR/NPDES RE: Genoa Crossing Wayne County, NC W000318O7 Please find enclosed the completed Sewer Extension Permit Status Update, Engineer's Certification and one set of record drawings for the completed sewer line extension at Genoa Crossing. Please contact me if you need anything further. Sincerely, Jeffrey L. Kornegay, PE, PLS jeffrey@kornegaysep.com R;quest for Engineering Certification Date of Letter. August 16,2019 Sewer Extension Permit Status Update Please complete the applicable portion of this form for each permit and return to the Division by the delivery method below and within 30 days of the date of this letter. NCDEQ/DWR WQPS—PERCS UNIT By U.S.Postal Service: By Courier/Special Delivery: By Email: 1617 Mail Service Center 512 N.Salisbury St.Suite 925 Nyle Hothem Raleigh,NC 27699-1617 Raleigh,NC 27604 Nyle.Hothem@ncdenr.gov *************'********************************************************************************************* ` Permit No.: W Q 003 6°1 Permittee: COO M OF 1N1 i>4.N Project Name: N ********************************************************************************************************** Project Status (Check appropriate box to indicate Permittee's response and complete&sign below) ❑ Permit to Remain Open: The Permittee certifies that the permitted project has not been constructed but shall be constructed in the future in conformity with the approved Permit,project plans,specifications,and supporting documents.The Permittee understands that the appropriate certification documents will need to be forwarded to the Division prior to operation. Subject permit shall be maintained in Active status. The Permitted project has been constructed and the required Engineer's Certification and supporting documents will be submitted to the Division with this form. Permittee understands that failure to submit required certification documents for an active,in-service system may result in enforcement action. ❑ Request Extension: Permittee requestsextension to reply to this letter not to exceed 60 days of the date of this letter. Name&Title(print): / n // Le /i I,CJ LI-ec3hv' Signature: Date: /,2— /9—I? Comments: RECEIVED fFC 72019 MCDEf/DWRINPDS, *********************************************************************************************************** Permit Rescission Request The Permittee requests that the subject permit be rescinded and certifies that the permitted sewer system has not been and shall not be constructed nor made operational.We understand that,in the future,should we wish to operate a non-discharge sewer system,we shall apply for and receive a new Wastewater Collection System Permit. Name&Title(Print): Signature: Date: Comments: ********************************************************************************************************** Contact Information Updates Updated Contact Person: Updated Mailing Address: Updated Email: K.15*4h»L • �--� w S'10►D1/, GOC'\ Permit No.WQ0031807 = - - - --June 6,2007 --- - - ENGINEER'S CERTIFICATION Complete and submit this form to the permit issuing office (address below)with the following: • One copy of the project record drawings (plan/profile views and detail drawings of sewer lines) of the wastewater collection system extension. Final record drawings should be clear on the plans. Record drawings should indicate the design and the marked up changes during construction. • Supporting design calculations (selected pumps,system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria. Modifications should be submitted prior to certification. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEER'S CERTIFICATION ❑ Partial tx .Final �fp I,Jr(L. Koc.ME6i T/ as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (la periodically, 0 weekly, ❑ full time) the construction of the Genoa Crossing, Wayne County project, consisting of approximately 951 linear feet of 8-inch gravity sewer for the Permittee hereby state that,to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable;the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable;and other supporting materials. North Carolina Professional Engineer's seal,sjg�,�fu�'"','6tliej°date: $� Z t2/I1• 2el`l 16813 c��' *• •• • SEND THIS FORM&SUPPORTING DOCUMENTATION Krtttt` WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS NORTH CAROLINA DIVISION OF WATER QUALITY WASHINGTON REGIONAL OFFICE-SURFACE WATER PROTECTION SECTION ATTN: REGIONAL SUPERVISOR 943 WASHINGTON SQUARE MALL WASHINGTON, NC 27889 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. 4 -