HomeMy WebLinkAboutNCG110101_Inspection Report_20200107 �STA7pa
ROY COOPER
Governor
MICHAEL S.REGAN
Secretary
S.DANIEL SMITH NORTH CAROLINA
Director Environmental Quality
January 7, 2020
Town of Murphy
Attention: Tyler White
Post Office 130
Murphy, North Carolina 28906
Subject: Compliance Evaluation Inspection
Permit: NCG110000
Certificate of Coverage: NCG110101
Cherokee County, North Carolina
Dear Mr. White:
Enclosed please find a copy of the Compliance Evaluation Inspection Report for the
inspection I conducted at the subject facility on December 18, 2019.
The report should be self-explanatory; however, should you have any questions
concerning this report,please do not hesitate to contact me at (828) 296-4500 or by email
at Isaiah.reed@ncdenr.gov.
SincerjJ
Isaiah Reed, S Q, CEPSCI, S4CECI
Environmental Specialist
Land Quality Section
Enclosure: Inspection Report
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Asheville Regional Office 12090 U.S.Highway 70 l Swannanoa,North Carolina 28778
NORm 0uw
828,296.4500
Compliance Inspection Report
Permit: NCG110101 Effective: 06/01/18 Expiration: 05/31/23 Owner: Townof Murphy
SOC: Effective: Expiration: Facility: Murphy WWTP
County:Cherokee Payne St
Region: Asheville
Murphy NC 28906
Contact Person: Chad B Simons Title: Phone: 828-837-2510 -
Directions to Facility:
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
Related Permits:
Inspection Date: 12/18/2019 Entry Time: 01:15PM Exit Time: 01:45PM
Primary Inspector: Isaiah L Reed Phone: 828-296-4614
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Municipal WWTP>1 MGD,Stormwater Discharge,COC
Facility Status: Compliant F1 Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCGI10101 Owner-Facility:Town of Murphy
Inspection Date: 1 211 8/2 01 9 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On December 18,2019 this facility was inspected for compliance. No facility staff were available during the site visit.A
follow-up inspection will be conducted on or after January 29, 2020.The permittee is directed to provide facility staff and
make available any documentation pertaining to the Industrial Stormwater Permit.
If you have any questions,please contact this office at(828)296-4614
Page 2 of 3