Loading...
HomeMy WebLinkAboutNCG110101_Inspection Report_20200107 �STA7pa ROY COOPER Governor MICHAEL S.REGAN Secretary S.DANIEL SMITH NORTH CAROLINA Director Environmental Quality January 7, 2020 Town of Murphy Attention: Tyler White Post Office 130 Murphy, North Carolina 28906 Subject: Compliance Evaluation Inspection Permit: NCG110000 Certificate of Coverage: NCG110101 Cherokee County, North Carolina Dear Mr. White: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on December 18, 2019. The report should be self-explanatory; however, should you have any questions concerning this report,please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. SincerjJ Isaiah Reed, S Q, CEPSCI, S4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Asheville Regional Office 12090 U.S.Highway 70 l Swannanoa,North Carolina 28778 NORm 0uw 828,296.4500 Compliance Inspection Report Permit: NCG110101 Effective: 06/01/18 Expiration: 05/31/23 Owner: Townof Murphy SOC: Effective: Expiration: Facility: Murphy WWTP County:Cherokee Payne St Region: Asheville Murphy NC 28906 Contact Person: Chad B Simons Title: Phone: 828-837-2510 - Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 12/18/2019 Entry Time: 01:15PM Exit Time: 01:45PM Primary Inspector: Isaiah L Reed Phone: 828-296-4614 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Municipal WWTP>1 MGD,Stormwater Discharge,COC Facility Status: Compliant F1 Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCGI10101 Owner-Facility:Town of Murphy Inspection Date: 1 211 8/2 01 9 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: On December 18,2019 this facility was inspected for compliance. No facility staff were available during the site visit.A follow-up inspection will be conducted on or after January 29, 2020.The permittee is directed to provide facility staff and make available any documentation pertaining to the Industrial Stormwater Permit. If you have any questions,please contact this office at(828)296-4614 Page 2 of 3