Loading...
HomeMy WebLinkAboutNCG090019_Additional Information_20191230 ,FlL RPM Wood Finishes Group ' MS��S 2220 US Highway 70 SE,Suite 100 Hickory, NC 28602 • 828-261-0325 • FAX 828-261-0850 Group December 26,2019 NC Department of Environmental Quality Division of Energy, Mineral and Land Resources Attn: Isaiah Reed,Environmental Specialist,Land Quality Section Subject:Response to Compliance Evaluation Inspection on November 26,2019 Permit:NCG090000 Certificate of Coverage:NCG090019 Caldwell County,NC Mr. Reed: The addition noted on the evaluation as item#1 should be finished by mid-January. I ran the calculations for containment on the square footage for a 330-gallon tote,which is the largest anticipated container that will be in the area,and figure we need a berm with sidewalls 0.064 inches high for 363 gallons(48.5331 cubic feet). The walls are sealed to the floor and we will install a sealed 0.25-inch metal berm in all wall openings that do not have any other type of berm. The liquid products in the upper storage area(Covered Raw Material Warehouse)noted on the evaluation as item#2 are in containment in the form of the eastern pond.The drain that is just outside there goes to the retainment pond on the east side of the property, which does not discharge further until the water level reaches approximately 10 feet. I am enclosing our site drainage plan which shows detail of above as well as for the rest of the facility. The Finished Goods Warehouse as well as the Manufacturing Area and Indoor Raw Material Warehouse are all sloped towards floor drains which are directed to an underground concrete cistern just north of the Finished Goods Warehouse. The Distribution Center has containment in the form of the Retainment Pond on the North end of the property. This pond does not discharge toward the creek until water level reaches approximately 3.5 feet. Please contact me if you need further details or have any recommendations or questions by email to aberwick@rpmwfg.com or by regular mail(please note the updated mailing address on this letterhead). Sincerely, Aaron Berwick Environmental,Health and Safety Manager RPM Wood Finishes Group,Inc. Enclosure: Site Drainage Plan DEC 3 0 2019 Land ' .cdon ` ) # § § ! B ! § , E= ! ■ ; k ; E J�E « §! {/ @q@mn | MMOD - M / { Id . OFF k!§ ! ^ { \ ! %° = Z / \ � . , ✓ � � | . ! - iRoom f e] `& k i .! § ƒ IL 2 /:1 0 Om ) 0 7■ \ ( }/\E 2 A ! G« «9 wn \ . { r / )�( § § c �