Loading...
HomeMy WebLinkAbout20040882 Ver 1_COMPLETE FILE_20040528??F WATF9p Michael F. Easley, Governor William G. Ross Jr., Secretary ,O G North Carolina Department of Environment and Natural Resources r Alan W. Klimek, P. E. Director 7 - I Coleen H. Sullins, Deputy Director O Division of Water Quality July 14, 2004 Charlotte Mecklenburg Utilities Attn: Mr. Barry Shearin, PE 5100 Brookshire Blvd. Charlotte, NC 28216 DWQ Project # 04-0882 Mecklenburg County Page 1 of 3 Subject Property: 2003 Annexation Long Creek Area CMU No. 170-02-658, CMU No. 170-02-656 & CMU No. 170-02-651 Approval of 401 Water Quality Certification with Additional Conditions Dear Mr. Shearin: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 0.007 acres of wetlands and 70 feet of streams for the purpose of installing the proposed sewer system at the subject property, as described within your application dated May 18, 2004 and received by the N.C. Division of Water Quality (DWQ) on May 28, 2004. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3374 (GC3374). The Certification(s) allows you to use Nationwide Permit(s) 12 when issued by the US Army Corps of Engineers (USAGE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control and Non-discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved - The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: N. C. Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location) (919) 733-1786 (phone), 919-733-6893 (fax), (hfto://h2o.enr.state.nc.us/ncwetlands) Charlotte Mecklenburg Utilities / DWQ Project No. 04-0882 Page 2 of 3 July 14, 2004 Amount Approved Plan Location or Reference (Units) Stream 50 (feet) CMU No. 170-02-658 NO IMPACT Plan station 0+75 Bore under creek / no impact to creek proposed Wetlands 0.007 (acres) CMU No. 170-02-656 2 nd Site Station 5+20 Stream 30 (feet) CMU No. 170-02-656 ls` Site Station -0+40 Aerial Sewer Stream 25 (feet) CMU No. 170-02-656 2nd Site Sta. 5+20 & 8+15 Stream 15 (feet) CMU170-02-651 Plan Sheet 3 Station 5+50 2. Sewer Systems -The project shall comply with 15A NCAC 2H.0219(i)(2)(G) and all other State, Federal and local sewer system regulations. 3. Water Quality Certification(s) - The proposed project must comply with all of the conditions of General Water Quality Certification(s) (GC) 3374. 4. Erosion & Sediment Control Practices - Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. 5. No Waste, Spoil, Solids, or Fill of Any Kind - No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 6. No Sediment & Erosion Control Measures w/n Wetlands or Waters - Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent Charlotte Mecklenburg Utilities / DWQ Project No. 04-0882 Page 3 of 3 July 14, 2004 practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. Sincerely, 7. Certificate of Completion - Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the Central Office in Raleigh at 919-733-9721 or Alan Johnson in the DWQ Mooresville Regional Office at (704) 663-1699. AWKIJRD/bz Enclosures: GC 3374 Certificate of Completion W. li ek, P.E cc: Brian Long, PE, Stantec, 5265 Parkway Plaza Blvd., Suite 130, Charlotte, NC 28217 USACE Asheville Regulatory Field Office DWQ Mooresville Regional Office DLR Mooresville Regional Office File Copy Central Files Filename: 040882 VVE11ANGS / 401 GROUP stantec.com Transmittal Stantec Consulting Services Inc. 5265 Parkway Plaza Blvd Ste. 130 Charlotte NC 28217 Tel: (704) 32 329--0900 0900 Fax: (704) 329-0905 StanteC To: Reviewer Office: Division of Water Quality 401/Wetlands Unit 1650 Mail Service Center Raleigh, NC 27699-1650 Date: May 25, 2004 File: 73100235 Vb-- - N QUALI'h' O; L:- From: J. Brian Long, P.E. 41, f D 8 8 2 ? For Your Information 0 For Your Approval 0 For Your Review ? As Requested r!. Reference: CMU 2003 Annexation - Overlook, Mallard Creek and Long Creek Areas - Preconstruction Notification Please find enclosed seven copies of the preconstruction notification form with supporting documents for the above referenced project. Also enclosed is a check in the amount of $200. Please review the notification. You may contact me at 704-329-0900 should you have any questions. Thank you. STANTEC CONSULTING SERVICES INC. /J. rian Long, P.E. I'J 4n1 [S%SLIEF-) Project Manager Tel: 704-329-0900 Fax: 704-329-0905 blong@stantec.com Enclosures Office Use Only: Form Version May 2002 040882 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: NWP 12 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: ? If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information Owner/Applicant Information VIIPTLRlQS/401 GROUP Name: Mr. Barry Shearin PE Mailing Address: Charlotte Mecklenburg Utilities 1 5100 Brookshire Blvd. Charlotte NC 28216 1 rti)o' ,V I Jew Telephone Number: 704-399-2551 Fax Number: 704-398-9180 E-mail Address: bshearin(&i.charlotte.nc.us 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Mr. Brian Long PE Company Affiliation: Stantec Consulting Services, Inc. Mailing Address: 5265 Parkway Plaza Blvd. Suite 130 Charlotte NC 28217 Telephone Number: 704-329-0900 Fax Number: 704-329-0905 E-mail Address: blong(a)stantec.com Page 5 of 13 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: 2003 Annexation Long Creek Area CMU No. 170-02-658 2. T.I.P. Project Number or State Project Number (NCDOT Only): NA 3. Property Identification Number (Tax PIN): 031-152-17 & 031152-25 4. Location County: Mecklenburg Nearest Town: Charlotte Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): Mt. Holly Huntersville Rd. to Hardwood Ln. to the end of Riverside Dr. at Catawba River Trib. #2 5. Site coordinates, if available (UTM or Lat/Long): N 35d 18m 48s, W 80d 59m 32s (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct water body.) 6. Property size (acres): NA sewer runs through many parcels 7. Nearest body of water (stream/river/sound/ocean/lake): Catawba River Trib. 42 8. River Basin: Catawba (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Open field near residential vacant lot and camping grounds Page 6of13 10. Describe the overall project in detail, including the type of equipment to be used: Project involves installing a 8" gravity sewer, equipment tracked back hoe, boring rig, mechanical clearing equipment and trucks 11. Explain the purpose of the proposed work: To provide sanitary sewer extension to serve area annexed by the City of Charlotte IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. None anticipated VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream Page 7 of 13 mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: Creek crossing of sewer by bore minimal impact to actual creek 2. Individually list wetland impacts below: Wetland Impact Site Number indicate on ma) Type of Impact* Area of Impact (acres) Located within 100-year Floodplain** (yes/no) Distance to Nearest Stream linear feet) Type of Wetland*** None * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://www.fema.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: Total area of wetland impact proposed: 3. Individually list all intermittent and perennial stream impacts below: Stream Impact Site Number (indicate on ma) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? (please secif Plan station 0+75 Creek crossing by bore 50 Catawba River Trib. #2 >50 Perennial * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. Page 8 of 13 ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usgs.gov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.mgpquest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 0 bore under creek not disturbed 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact (acres) Name Wate) (if applicable) Type of Waterbody (lake, pond, estuary, sound bay, ocean, etc.) * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Topography dictated the routing of the sewer crossing unavoidable bore and casing under creek to minimize impact of crossing Page 9 of 13 VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o. enr. state.nc.us/ncwetlands/strm_gide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of Page 10 of 13 the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ? No If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact Multiplier Required (square feet) Mitigation Page 11 of 13 I I I 3 2 1.5 Total I I I * Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 213.0242 or.0260. XI. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. No increase of impervious acreage XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Sewer extended from an existing out fall of the Charlotte Mecklenburg Utilities System flow to McAlpine Creek WWTP NC 0024970 XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Page 12 of 13 Ap icant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 13 of 13 5 1, D - I ), 1 I? . l 1 S f1 + ,mr t l/ rS/?L'j ) vac ? , / J r J ? ) I E OL ?? ? 1 ( 0 5 6f _ C) y - \ ` 1 y ,l?\? _ ?% If J A\N? )M? / ^\\ o? /? r `), ! 11 f V( \jly? ?? 90se #?• ? _.,/1v!^ / ?,??.1 ?, is ? i ? /? ?? X ?l. ? V J ?lj c` o 57D KY Y _ NO' -??Y 0 -` 1 f L ?• Sig, L v? 80 SkI,er ?V/, ? 6E W1'l .,,? ?" ) 1 f ---"j.?r jf( 'T 1? t` v f?? -?- .( art, ? :?: r r ?. _.?? A ?? l/?? ? _/ ??. ? ?/? ? ?? -.\. ?? ??? v \1 (( ?J v\((l 6066 f J ` \ l I /? \? 'y ' ,, ? , r t t ?I' {1 ? ? / j? C(?11? ?\j / ?? ??f /%A, • •?-, \\\?? jr?\,J? ?3 \I- \?I , ? ? a •?yla? ?? ?,- `? ??'.? ,'lid; ?,; ?? ' v/v °° 1.,??? Vl!', i? ????%? ? ? ?` ???- _?,% • \ ? > ? ? ?' r? I ? ? ?' ??e? .n? aue?daaMO?? ? ? g , . MA, puels] uie?unotN f J ` r 1 _ "M j, n \ ? cr v1 ?? ??? V ?? --- ?„???? ? ??? 1 \?_ ? c9 ? Cdr y? ?? o/ ( ? lr? ?t??`-'•? __ allazzoa v X, J 60 7 ?vt,? ? ? • ? ? ` ' ? ? - ? ? "?'? a ,; ?? ? ? ??;? ? s ? ? v , ?,• ? e ? Else r1?L???LS? D (•I ` _1n r? 3 I?'J 1_!%?1??? /? /_V` `??\? {'?;f J) ?'3', ,l `_J / ?? ?..? ?OAJA --== 3 N r ? w v 0 X 91 LL- W&ON 3)4V7! 50s 40s-+,0£,L9 EOs ZOs 3woootOs OOoTEi 1l 7487 10M ?HDI3IV\d iUMfIS "IX3I001020 ,MA 30 -L 3W-LHVd3Q a0Ia2lMI 2HI JO .I.N2WDJVd2[Q ?ti?s s? S? ION 30 AIMS L?l LS Q? LIi?ifl i ' '4 yy FS i. r 1 ? \ 0, ?7 ( r r a m n ,•, rP't?' tt ?:: (tZ??.r ., ';tDa? °? `` ? . ? \i- 1 ,)? ; / fed ?N. ? ? y ? ? ??, ? ?? ??+??? r ft it ?' Cd ?" ?? m ? , " ?y ? ? '', ? w , 7@u v r 7W 4cD y ` N m s ,;;A rx {' +lTf? '?q_ H;J m = ; .?y ro ro co M c ?? ? y?^? 3 :?. ? r ,? :? , ? r",? ??' y? m., is 0? ? m 1?,,,: ???_ rri ' ? r) '' ? ? kF 3 ??ea?j ,,',?Oy? O ?;?i-? L_ -- -,',???-?//J?///' yi ?.!.: \ r'? •?_'r ,}.+?,... f??,??. c .f.. `('J .?.? ? n 'cam ``-?` ?N 3 k am.;r'= W / W Q ?q tidy m tgeN m - n~ o SF w, Y u b2 N v sf 4 T ??< ?^ o ?I p! ?:, cj: t? ,t r ? , 6?' ? N,? `s,?t .4':S ,e? ? o. ,N?(C7:? ?? ??, ?, ??? - - _ ?V J 1 +r ???.? ? t ? + ,4 ? n-?1?'r c.' i ?ri ???-_.'? c ?? d? ?rl,Qa? +m.,' :Y ?? d0a?? ? ???J ti? _ W Qa is c' v c? J 4 ! m ? c5 ter, a ?? ?, r• ? t, _ ,f4 m \ ? ? _ ?_ [L N m ? r, -. m +,' `, ,?, ?k?'? ??'!r ?? ,?.O ?j "?,?: ,:•i x L y,? ? e, 1??•r G ? ,y m.. ?? , ? ? \ d( ir.? ?.• ,, , 0 'a F ?m m? r? {cB' , >rt t1 q ? i , ; v O •a. ? i ? .a ? / ??: Oaf a ? ,i ? ? ?. ?3 f S m a I ?, al? S :UKU 4 ??t F 5 \? T ?. r~ ? P t ., .\ ct ? t?;'?y ',?,i?i )' r ?-\ iy4'l?,Y i r S ? •r? .'iA aF '?/ ? % y '? , ?. ,M' __ ? '? M ? :j-,.. 'i'd .+ F. rv ??`bt#„v. ? +' .,ti N r 1' .,•'. ` vµr?,?', 1i y? ???? t' ` ,d ' +i i;.'r ,?s '? ? . r i?.\. ..? +' `} ?, y _ CEO ?? ? ? ?.'?•??? 1 G¢? ?'? ;\ i ?? t •?; > m}". 2 x ?? w 6°? S W c.? `'} Q` s T A ?> >? c o A p??? b r J ?? W ?A W (in ?? 11 ?' \ ` +a , .,irk' Y ? '? t;, t?' ;? 3J` ' N1k8 / . , ? ` " ? ,?;?i` r W '• t Itt sr 4 6,"?j;\pI 5??. ,Q 11A ?J u1.4 k d:>' ro ;. .,? ?,y.,. s tlf- n .'h,r. r ?Oit.'f r'? 't+ ?+•?A+I .,J_'?O?",?..:??' ???,?„ C ? t ?? acv u ??}} ?. v O x U ! m •W ??? ? • W N w. dxa'4` t ? ?tf/ ??Q l; ? D `? 10 W ? ?? F fV'?r W r 4 z i nn ?, ?, A.s co oV" ?'??!ft y?{ FtS r? .l, IS? v, u z ? 3 L r-' I. _ f A i w w w ' W I r peD w ILI r\J D F w , P i? , c , }? ??? ? y' 1 i? '('ytr,r? Gx? .?? S1 t t1t?n+t 'N ^t O'+2 q}?' ,? + U % 5. p ?:4 ' r '.p. t"+4Sah;F.{l?r. ''?'+ ?,;+??? 1'S em' !O r{ 'm' '? y? W? C^' WI rL?{t w 1 ?? ? r 4 xki:'h' k`??"?'u,..?x*•;! ??? ?_ . i .•ti>''?.SN ?`., -t _?!'^?..'?A?_J .,_ , ). _.+, i J a 40 3 ?0 »??o??,? © x{ ?• I I i '' I it : ? l ? !a g 5 C.J ? ? 1p £ E?Si ?d ? W w ~ ? p.D ^ic n. .o? m +? oF3 iu ? pUp < ~ ? ? ? 7 ? ? > ` ? ? ? U U ? r O ^ m ? sl ~ oD pOy U h .} y?E? p yj ? in p, Y! c? y m o y c? ? a N m a c? c? Z o a c vs } cFZ 2: }G W NFF a N a o O ,= w VI , l?/f 1''i ? z Y ' 7 p W . V. S ?i a Li 5a F, ) o>>°?I??°aPiw M ?mwa mL`I 1~i b+'w KL- rr"1 p? Z z U x O Lw O ? Ifu ll U x U PI) C) °00o rn O N I.a., 1 1 I t j O a??F W VI N Vf Q I I 1 lz a EE wecoo (n Lm G? a U) (6 W M It 0: 0,w ww 0--- UUW IX W w w U) L 0 x w 0 z .- N IM It u) 00000 z z z z z F- F- h !- F- wwwww W W W w W x?2xx In In 0 to V L Ir l ' W c W r r ? O r u A , O AO U 1-4 V L O O x O O P-+ O 7^ I?l ? r r t age ; g t o ? m o p //// p ?P ((((( i-E o N ((((! .... Q ? : N iU ? (Z? N J ?t2 f O ? ?. O d q C F ° V' W ? 2 = Uy ? O Q g QQ Z N rz F F wJ O=)v Q?i.. U w ?ma W Z N ??. m6o J Q ??- a? zz ??rn yJ~ Q W 2X U? ?Q a c>?o OS,' S??{Rp19 V"' N pO?(S? d 't1J11LVL CWN181?? ' 'gtcg obi ???? ? at rnn usm ? S W 3T A?ITNPO, Y1 Mih h i ? y?? YIy, ?YI ,3 3yy - V § 9 - yy 7l )dylYN 'Obls ?. Ytr NAPDNC[0 ?1PIRK 4 ??S ??n S E?j. .g NAII', 1\pl 1 d i?a Nb I BAE ea ?l?se v4 NYB4 fY 30'/3M13B 80 C °ryW NLLby 01Sb JJ?? d 'NN Qw6f nryl n ? a Y gC? i =Q ??s I om , ?' ? a a a b g E ? v o _ ? ? G e b g b ?a 9 a ?j?s Y?LO tl?N;?i ur , ................ F?A m 11' Nlygg i g ? l T (n zz rQi r4j U Q ? UP S ppI? l ti z WHO Z 1.1 N o ... ?5 U v& Ld I U O W? II ? ITa Off.Q Zpf15 -f LdJ <C LL- Q LL • IS3 WV IE?LS'LO E002/91/10 5"0213/?0]-SS-NIVW-IS-OOICL\S131dW31 \B•p\SC200p1 \SE2001fL\Sf200IEC\ani}?o\IEC9S\/? ? EMI W E, Z y QQz z? h? 8 l Woo ?? a T O Z ?? :, W E E O 0 O 0 r O t VIS ?? 0 3NIlH01dW 0 W P-1 E-4 U o , h OE O bF N to n + 00+ L V1S 3NIIH0lVW ? Q ' W J I i - ? - ql? ? ti 3 =a== ---=a-- WY 0 L: - LJ ? ON fl, r4 zo I I Z O ei 3a lsa3n[a'a'l Q 8 m 'ad Sat SaJAld 101[ L22 DJ LECCE '0¢ w 22-291-LCD Ndl H131kl3a 'Q3LIHM W l 91-19[-ICO.IIdl • - II VS3a31 'aNVa1S ? .J••1 W W m Ala3w403 aD wN E-1 _ }-._ 1 I .... _ - --, s31atl H] Lota3e83e 3 V13HVd H0I833a3H ; E- Z 0 -. f a I I 1 I- I I I - ! I I- ii I p x183.803 as RON - 3 L. H O 0 m I -?i. 1--?•-I-. Y J-•1- ;. .; ,.-?.. -TT - - I ;I L. I -f-' T- - - O Q NO 3EIS83nla ECOI , . z b d 0 ? H ---_ -a-,=-- `=`-a_- 1N••1 m 6: ,. w • _. I 1 , ?. i'..' I ...., - ... y- F.. `. , . . L. 1_-_ 60? Dd 6018 CO ?HU SI SI I I ' -_-.: 5 µ3 E'•1 W 3a IS83AIa 2&01 5 a 'aa L F 8 - I as 9 91 , I 1F I 1 I 3 I 4 d 'H NN319 SV]nl A183Ha03, a0 ALri LO S L [O Y W t] 'S Aa3333r 'a3NNOD.0 FTI ,7hI . ?... L_ I -?- I I i 1 _-_ - ..1 Y x183.903 30 AON ?1 U I z a p Y L L ! I _. _ I 1 I I I 1 I--? :.. --- r • , a9d B20bI6?80 "s N i e _... .. __{ ?. _. - _.; ..._ .i _?.. I' .. , 4. . - _ • Y1-I9I-1CO Ndl 3 NAtlA NI1Sna Altl38 T . aQ 381 Sa3A [8 8201 bEE '9d E 106 'aa M I ' B 10 ' 1 j..... : I I Ala3N6O3 80 MQJ O 2S 1 pdL - "0 3[NNOa 'NV313H •••.......... I- - I N VA WisnT A1tl3H Ald3HdOJ NO AON 3 I ! T` . : _ I 1 - ?' r- !"? p ::..--- } e3ro3Q9a 92s[S¢o b ... ----r-a---_.--- a--- -??° ?? z: _ - ad 3a[S43Ala b201 'U "? ?: ? m ' S ° U ' 1 ' ._ ...y ..... 1 1S1 L NeL Qt N11V9 M V39 _ _ _ f ; od e 02 9d s060[ ad 60-2SI- + ` -. I j f tp I : 1 3NAVA 39d03'J UV3H ' Ala3H8DJ ? AfJN LEO Mdl ,?.... i,••. 1HD18A A31d IHS '"dHJOJ 'Al83Na0 0 __1 (, 1 I 1_ pL.® 9 J 8 AON •????? .._ I .. as 381 991 1291 • . j°? ' { I.. ~ I ,. ! , f.__... - 6cS 94 d C992 '¢0 IE0 qdl ••4. . . aU 3Q1 Sa3nla 0201 `•?tlAP .w...,, •J?\ L 116 I 1 _'} _ I I _- '_ I I 4 r ... r I -.. I I I A138 1N3 Afl aNtl NAl83NaDJ BO SMOHN] + . I 1f0 qdl OI ZS A-N3VHaP JA 80 MON =U ? 7 T _ 7 { 1 1 00 - a tea- srdo ; rg?ag T as 3a ISa3Ata LI01 LBE 9d OLObI' 'Aa -._• nW I• -)_ )- _yl 1 I -. ..._ I ?_.. 3. ( , 1-. - ._.. I'- . ' ' 1-_.. . II -ISl `[Ca Ydl. ! 11-1 3 '8a 3a ISa3Ata-9101 Ha r " bl1-2 I I ? - l-I t 1- r 1 ,_ . i Y ¢ 1 390 Ala3Va0J No nON - - S EO Nd $ Z - 3N390 13Y 311 !NOSN]Vr 1 z 11 3 0 I l L I f - L I { ' _ r.... y 8 WWA a MON ?- 1; B0q _ - . -. _ - - . ' - I __?_r -•..?-__T -. ._. r _ . :...I.. I. j.. I I .f... T as 3alsa3ma 6001 2e2 'od LEOS1 'Ha -191-IEO Nd1 AD O1 A3983S 'anVA l3S A a3Ha 01 90 M0N g n rsD '9d a es as 3alsa3nta il ¢Ala3AS0J 80J N L ? _;_ ! 04 V) Q. l • rSNIp MQ7 IN4 H11M lY/3 .. ? I{ D . , i I pQ r._ ? ZQ - 396 50' a C60 'a [ O . . p , ti Otb .. -'Ba-3Q IS83n la 6001 ''- • CLI 9d S SC Ed N J + ' N6$ 1d0?/d 1 3 _ -I - Sl E Ndl Yatlaa 8 'NOS138dVH HAOH 'NOSl38atlH 3 K Q IZ- I IEO Nd Q J r H NAladvi 'JS331. Y S ] NOAtla '3 S33a ' - ' ! A183maj a0 RON ` VO ry U O A183Na03 30 not+ 4 V .. I O 3 I I I I I I - ?? o .i f I - . o?6m? m to u?p •,n 1 z? ? ? I t I ~ ? 'arc 3 ? ? I f 4 W ?r_.•'.....•-Y-"•''-!-•'-}' f"" .?'^?'-Y---? I_' -._..J_.._{_-- yl•--',•- I I-'-'-• Y as 3aISa3AIa 9E6 .....:$ 019 'Dd 968b HO j ?i ?•'? P W p V C pa: ? „- _ 1 1 -I... ••1 o I i o 191-LCO "di + L 'ar 1 3103 Aa093N9 . Ala3HaoJ a naN _ _ W pp~ W V -?- . o / A LLJ t I 1 I L q4t - I ad 3a ISa3Ata ICs Lit Od CL29 as 9 0-[S1 ICO Ndl I1 'aa a.2E6 3¢ISa3A[ S 3x1 ; : I ! • I N]aV1NYH3 ltlltlNYAVf 131Vd ItlHava lH 'ltllIlNVAtlf Ald3Ha0J a0 AON LO I H I?-J Q'Xtl3l[S 31i 3la la3NaNOJ93sumc I . -. l .I._.. _.._I t. ..I .: , I.. t ? I..- I O , i E I l J . I r I - - T 21 g p ?? N Z? p ? w ? ad 3115a3n I8 926 Lot d C609 ad I 3N318tl3 tlIN[Daln?%O]l]S i A183H80J W :AON I I _ , I ,-, 'Ba 3a[Sa3A18 22fi I ; ? .... .. y - 1 1 -... LOl '9d 2609 ea 0 d + I __ _ I 1 3N3103 VINI9a IAp 'XO3119 Al a3HaaJ 80 AON .- o+ - r11 ' .- .. - ' I 1 •• i I 1 O - I J I ------ ?'-r --r-- ..! - ; '80 3aIS83nla LtA IOL Od 0YI91 'Ha b0 [SI If0 sdl, -- - -- -a yqj - I .._.I ..1 I J.... ! I .__` -?. -i.._ , ...I..-I? vT..-.i_...'.1L, I 'd tlaN319 'AORWD A1a3HZne aD MON p I`O o A, , I I 1 1 r _ I I I I ' ? _ O 1 _ , .. wi ?m 1 I I . 1 - - ;: L J W t ... ' A Q wi f O Q h LV b - aa 3alsa3nla TE6 Lb0 9d 120E ad i?ga. aw x O y 1 _ .. -1 I } L _ m(n.Z I ED11-1CO Nd1 3113HN3 'NI101 __ 2 v m ?F N I ,..... + 3 - I 1 t ...I ! ... 4 3 .1 1 W W p 't(U , z . Ala3H80J a0 MaN ^ a ..? O to F (`P / . g F 0 I Uw ad 'IV' w ad r 1 W W II VV a, V11 L I i I 3?(0 gP 13i?Vd i YO e h QO o.= 4 ?OO a?a a O? 1 f H`J/1N?lY M I I ,?d0?7b N ? } o Uom6U o o ?J w a I I I I 1 ! -90 r 2 a¢ 3alsa3n'ta I -.. -. r L -f - C _.a 141 1`91 +! Vl S._.. !- M/Y NVS d0?/d -- I 41 T - ... r ',I-.. I t.... - 2Z ! T 219 '9d L899': HO 70 19[-IEO, L sudVH r Allad 1 SllaH H .111111A la3HM]J !ft RUN /%?'.Y x4 a .V? 1 -. N-> ,' 3 g F m L f b- p ` i°w uww a _ I I N - .-- p a - ? I I I ? ( 1._ .. I I _I_.J I ?? ?. _ ? Sl?rya ¢ L Ub,+? l? SGE ?. U ' O I L 1 I- I 1 1 1 L_ I I i I I I I ? qy I La i ?? h'.II M, u? o o$w . o I H I NV 1 1J ? 1? dw?° r 1 1 I I 1 1 t . I II I Wa lI '- 4 ~°? '" 1 1' 1 fw a a-6 1 4 ??',j W zZy1 a +O ti( i n 1 4 I ...N I 14 - - (0 U z L... I a 1, p O p z :j ° 9 'Z Z I 1 ? lL ? z a w 14 O N w Lgou ?ate .o-?3 I Q3?m 2 tl __ a - _ ? T -_•_ r } - , o U I a v u a 1 Aso I ? g 1 O ..- IF .I IQ Z .U ° ° ti? ? ad 4 r I }-?- d li o f t ?J a ? I I.._.I. 1.....j . _ .. 1 .... 1 ,. I ,... J -_ , ',...-? _.?. ... , ?... x J J T W U I 1 ;'.;. Q tl ?.1'm I I VVV ° 4 y qp, 00+0 MdS" P`6+ ! 4 S ;_ - ' I I W U a <J' I a ZN a o z ? n v?aaJ s 1 I ! H (WS !V. d0 d 14 m uu as a z 0 0 0 oa o zx vrN a w ' ° O I 1 L .- '.. aZ Iro o ; z Q ? ua ?4 P IL am o ax w I I . { { : I.. '. '` W Ir}. .•L , W? >d zV=i °6(? [ ?N? u1 Y I I I . r J ?i l mW ?W m Z N U 3JOB I g?z a awo m Uaw L L_ _ ? F? 5z a°a a ^° z O ? z O OJ O (\ O CD O N ova wiw° a¢ o° n N n o In os =zz 'z?wa 4?=o WU N r? aN? aomx 4o?u ?w 00 N n a n ° z blTs...g-NL-MLWICL\wNd T•Vl ^-K\6'V\t'pl-S[ 1YiW r[i\?aLiW?u\fl (.w n) a - 13>HS 1YN'itl0 Office Use Only: Form Version May 2002 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: NWP 12 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information Owner/Applicant Information Name: Mr. Barry Shearin PE Mailing Address: Charlotte Mecklenburg Utilities 5100 Brookshire Blvd. Charlotte. NC 28216 Telephone Number: 704-399-2551 Fax Number: 704-398-9180 E-mail Address: bshearin(aDci.charlotte.nc.us 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Mr. Brian Long PE Company Affiliation: Stantec Consulting Services, Inc. Mailing Address: 5265 Parkway Plaza Blvd. Suite 130 Charlotte NC 28217 Telephone Number: 704-329-0900 Fax Number: 704-329-0905 E-mail Address: blong_@sta.ntec.com Page 5 of 13 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: 2003 Annexation Overlook Drive Area CMU No. 170-02-656 2. T.I.P. Project Number or State Project Number (NCDOT Only): NA 3. Property Identification Number (Tax PIN): 033-221-12,033-221-01,&033-201-99 4. Location County: Mecklenburg Nearest Town: Charlotte Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): 1st site Brookshire Blvd. to Long Creek South of I-485. East to trib. North to Mt. Holly Huntersville Rd. 2nd site Mt. Holly Huntersville Rd. to Pump Station North to Eagle Chase then to Forest Winds Dr. 5. Site coordinates, if available (UTM or Lat/Long):1s` Site Sta. -0+40 N 35d 19m 16s W 80d 56m 31s, 2nd Site Sta. 5+20 N 35d 20m 16s W 80d 56m 3Is Sta. 8+15 N 35d 20m 16s W 80d 56m 28s (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct water body.) 6. Property size (acres): NA sewer crosses many parcels 7. Nearest body of water (stream/river/sound/ocean/lake):ls` Site Sta. -0+40 Long Creek, 2nd Site Sta. 5+20 & Sta. 8+15 unnamed trib. Catawba River 8. River Basin: Catawba (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/mgps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: ls` Site Vacant Land flood plain, 2nd Site Residential woods Page 6 of 13 10. Describe the overall project in detail, including the type of equipment to be used: 1st Site -0+40 Cross Long Creek with aerial sewer install piers equipment track hoe, pile driver , trucks 2°d Site install gravity sewer by open cut , track hoe , trucks, mechanical clearing equipment 11. Explain the purpose of the proposed work: To install sanitary sewer to provide service to area annexed to City of Charlotte 2003 IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. NA V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. None anticipated VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a Page 7 of 13 delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: 1" Site Sta. -0+40 to install piers for aerial sewer and rip rap either H-pile or Doured concrete viers will be installed at contractors option or soil condition dictates. RiD raD will be installed to stabilize bank 2" Site Sta. 5+2 0 & 8+15 require mechanical clearing, and excavation to install gravity sewer Station 8+15 will require rip rap bank stabilization 2. Individually list wetland impacts below: Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact (acres) Located within 100-year Floodplain** yes/no) Distance to Nearest Stream (linear feet) Type of Wetland*** 2 nd Stite Sta. 5+20 Install gravity sewer excavated trench > 0.007 no 25+/- Forested wetland origin road fill drainage backup * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://www.femagov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: >0.02 Acres Total area of wetland impact proposed: >0.007 3. Individually list all intermittent and perennial stream impacts below: Stream Impact Length of Average Width Perennial or Site Number Type of Impact* Impact Stream Name** of Stream Intermittent? (indicate on ma) (linear feet) Before Impact (please secif Aerial Sewer 1s1 Site Sta. -0+40 excavate or drive 30 Long Creek 30' Perennial piers and Rip Ran banks Page 8 of 13 2°d Site Sta. 5+20 & 8+15 Excavate trench and install gravity sewer 25 UT to Catawba River Mt. Island lake 6 Intermittent * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.us,s.gov. Several intemet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.mapquest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: approx 30 ft. 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: Open Water Impact Site Number (indicate on ma Type of Impact* Area of Impact (acres) Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 5. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): NA Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and Page 9 of 13 financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. 1st Site Aerial Sewer is to be installed as a Temporary Measure until future sewer is installed existing 15" sewer invert is above creek flow line. Aerial sewer in lieu of inverted siphon selected because of maintenance issues and very low flow and cost. 2nd site topography and efforts to save large existing trees dictated routing. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/strmgide.html. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Page 10 of 13 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wip/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federaUstate) funds or the use of public (federal/state) land? Yes ? No If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Page 11 of 13 Yes ? No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation 1 3 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. XI. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. No increase of impervious area created by project XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Wastewater will be connected to Charlotte Mecklenburg County Sewer System to McAlpine Creek WWTP NC 0024970 by applied permits XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Page 12 of 13 Is this an after-the-fact permit application? Yes ? No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). 4&9_? LL_Q-_? L ?/r9/a ?Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 13 of 13 1- �.� �_—i ''call f`^ 3aana f ' rY 1-41� ��� owerplant }1 y% r\ \ \UU11 r _��� (•�i`a2 �� ��' Jl��,\ jf �:�l �. ". j ,\ 1 � �_ 4. /l l ;, ( ``,� , 1� �;�\� ive .'(n�, .,`` I�/J � 'srl�t)\0� \-�/ --_ ✓ /�/� � �� x lJ� 0 i / /.` V/ _��i Rozzelle J �- _ —__ _. � � � v / BridgeAl 7 AIN m 14 Mountain All,Isla vv 11 �' �,� � � , �• nder / _ t cl Vowerplant.#c_ - � u •M �# o� '�: �� yt l/� 1 „ ��� L �� AJC cA����_._�� , �`✓� ?j, iy s: c -� aA ���\< ���--l� ._� 17y, . o $:RS -' � � .i�. A, A I � �� .. ,• �re �' ,a. 1 1,°' (, � k� 14 rzl91 ,;, . ' � � ��� A i�—� 1� �� � ���o �„ C P r � p Noy o , In- • �c' \� alllnJ\�/�� � \ \, \\I �1n_\ �� \�11 �. ° •- C 71 f\ If '` 11�� \VIII.///` / ,, i �\�g ?_._ v �, ill > AO • /1 �� As �J.. � j o 65 lr 1 .a yj WV I - CFO \�\ JJ 'loo 070 i n t bJV1 r U 1\ - EFI 5 09 r� - `i• t , , (\�( J\� i %ori -� c � I i� lit . hyo .//( ll\ `/Cl Cmr(o/ r\\\v..— 3)II �I •1 f� �� (.�7'!:'.. / i 11 E II H\\1 IW\ Ott= V wku u '\ CeD2 En6 y CAF ? En8 EnD CeD2 PaE ti VaB Ab OD PaF VaD IG VA Cd w M ?+ ?MeB WkD V CAD o D2 I. 's hda I?. " ?!' Ce v I o ?`t n f- .. III Me13 _.?.?. PaEN r y? FUG CeD2 mom. ?'aF c? MO - dF - ?O McDm MeB- PaE q 'He8 IrB (;? ? WItE ? _ _ CeD1 y CeD2 PaF `1> s> > En6 ?? jf. n t7 P ? ? ` VaD 'eD7 EnD D , "- O P h 1 GeH2. a ? d. ? ? Wlap ? ?? .? i ?•_ O ? , . VaR ?UkU 'Y y `A PaE f P?? W F > dd PaE G i r 9r vsr w Twin D2 y F? W fF n 9 kE CeB2 f uD? O Vid) CeO \Ir c? ? a 0 C4D EhB ? He8 EnY). .t ? f'le? ? ? ab ?? Wl?? ?" ?? EnB? 1 ??. ??,E?Iley ;.B ?F'hD, S ?- rnD ?EnD HeE3 w Nk h. ?CeB2? Mn V, CeD2 EnD?? Ln8 w EnD ii EnD .WuD C 'IyleD Ilul3 ?. `.. .???? EiB MeD ) ?? Me13 WkB kE CeD D EnB/ 1" ?Eh? e0 Paf Ur 1 I 8 vnD, leB EdD ?y-?• J ? I t U n? c? r o j?, m e C?f?? " na ?% Er L ? ,B o o r M 0? ? 0 ,' f; n d': ,2 O ?- ` qf. it Irl1 !IcF Hde LnS? F En ? ?? ? F??? ?/??? ? ?-y ,CeD ? ? f 4 ,n rr ? ? I ? CeUL ?' ? 00 i? 643 En C EnD a f?-~, \ ? E flea J \ \ ??? D Ur ?/? /? A Nip„ .. ' V,\56731\octi,P\73100235\73100235\ Itl00235\dwg\TEMPLF.TS\OVERLOOK SS_COVER.H.g 01/21/2D03 0252,00 PM EST Q ? a ? z^.. ?? ?^ A g i 6 yt? Z 8; ??Jk :SS ZZZZ m -l -11 A ;v m d WZ ?O ?? Lo S ac0 r A F1 r $? -Ti O Z] <D FT, F- n Z Z y N IN f ? R£ s A ? F 4 REV, B J C y' q R ? s. p n7R 4 m ? y1 > ? r <n r o t ?: ? ? a . ° ? A ??f p?sA L UE] ??s A 4 v? EM 8 a ? ? g Q ? F M m m m m m m m m m m m m m 1 -1 -i 1 -1 1 --1 -i 1 1 -1 -1 1 z z Z Z z z Z Z Z Z Z Z 2 0 0 0 0 0 0 0 0 0 0 0 0 0 W N O W V Of N D W N D VIm N? IAD In N; NN; N; WE WE N; (7 D !*1 1 1 1 W 1 "'1 1 1 1 1 1 .i 1 ...1 1 ..1 1 ...1 1'r1 Q .? DO1? DA DA Dm D DD D D' D D ( FC9 A +m I+OD +D + Vr? O? W N 4+0 + W 0 8> o-< °-( 8° 8i ggi 81 gi 81 S, 2 I I ;u 16 0 1 rx I X x ?o 2 -1 0 N• IJl. z V1 c Z c z c z , z v 2 0 p? > n s D? aye N?r? $ a o + W l0 1O ° + 11D 5 +1.5 AS wS NS +5 a? m N + o _, ®€ 8 000 v o 0 0 ma X98 I-A a x° ? m q $ Q? Y ?`n?R V 1 a Tw- ca -? RIIERHA ry Op01A0 YN P rA -P y1 AUlNNOD ? i2 ?A 10 6r Nei ?•Q ? <oN ? ?'? Cqs ?F 6 2 no ?! V£1 rV^ Npp s?N?rgN ? glyy.4p? G , 8 cp 7 ?t _ g s Nn wv,Nno 5 ? ry0 S ND Pry NcL rta ? u. /9b r5 ? e .? ', $ rti ry'Rr Sao art^? " ' K, H 4/A ??' S2'/r y j54?d ?' 4 1R \ •3? ?5 ? e y ? ABtl dNDd udl`' \ SCf p,NO ?? ? WtlNN301 A -r 'Z1d Mt?s ??tl '?1 V MOUNUw -crm 9 b a °8M dva M 0 GuW30Y 3NN3y PIPoN AMn3 ? lA. 4 4 a °a ? a o 0 O n > > r D D r m [l. N [ > vl ? z z • m S ? s z ° ? Y' A 4 a so x,9 C,'...... L ? K g ? a? 1. 0 n ?A o? p n t n q? 5 4F ! T r? ?j RZ m ? tin ?? (7771110 i ? ?b l ^ rx ii Z T p ?. c? An ., c ^ ' yN ,. V l O O C O O C _ y 0 0 ?-4 0 U? O Z F-t 1 1C ` ? `1 MCo L J M? l J { /? ' J \ 1 z F1 X O to 2 m M Ln y I11??? y y ? x O m s m ? B O .? ? ? FT?'..11 C D lxl --? A C7 f•l f+l 'p Z7 ? m y C C O C C ? (Tl ? ('? ? (?1 ? f?7 'O ?.1 A 'D n .? C'1 ° A D r I+?i m N vm .'Cl O y [n C O O S ?O 25 .'o N po N 5T N c O? x? z;? m rc?,.rn N o O 6 f'1 1 ? z O? g< z?????? y p? i yQ?? i v Z v? p i { p? Z o z ?° Do z a Z R r? N m g o o o t? C D t? D H C ??n 5 ° Y2 O. m In -Di = 2 F = _? D C Y-[?1 z F R o z o o °z n m ?, z r? z z> CJ o m 3 c ° z M ~ i ;.s biz rno w 3 c u+ °f ? Fi o pp D N C7 D p Q ? o R ? ?P'IT;! !! ! ; A I ! IIII I fi • 6+ I ?? X fl 11 O g O z I m r4i K C K # • G ?? • 11 i t I I I I I I I u.\nlroau\nl00235 i 23s-0- k\Sw\s...r TM: rsn\731=35u-o--W x.y n Wmfte.q 1 /-a-b 11:1LW 1. z 0 ?onoy??yyyx?ZZyOy?AQ?? n1°D-Z-II22p ?0 n0(>:lf AL Wn '? NA?pnp Z°ZZ^O? ? zU ?? ??pG?1 (/2? DnFPrZ' A2?yp D?2?A?0;U -Ci2 ??O a oimrnm m<>Km y>Ah? mm>rx?c yr?CZ x_p1rn .?yy?1Z Q ?i CI ?'?{p C;f OZOm Dpn Xt? >a•A? ZtnA Z °HU yZ-nU A?Or-ZO?NN5 ?o v °zz m?=?DDZVyD °o?a A h?F n v+iooy?°?yZ? Xln .D ,Z9j ppp? n6oz°?pvg m K A °[ ° "_ p U A °6"n. my D I Z Z_ m m?A o> o° ??o ?by omin 9D p?A `non mczi DZI 2b I 2 F z O?+ «iK yam ? AI g=pu?n nyv Il q' V? o OI?UZ 2 ? W. S T 55 Z i55/ Q ? ? ?tti? SSi va i mss pt. T'S4 ? O / ?:u -7 ? FT1 D g IRnI F ",~? p O a a• W? bn hhhA SOO$ AMM? ?xx?r rvgy? 6' ^ " ?A N N m U O D of of D N Z D A m r N < ? CJ S J C w 0 MOM Z iz$ V dl 11ROM Al '44 m -y QF «:y W III nL ? Z e C 2 11 O fL ? II Cad ?? r0I- V I Sy, '_ . a' 4' I s' a' ss' 0 _-i ti. .. YB?ZsSS/ '.? 4' ?'q55 b OX F I r / C Q '.. '? rAU1 A U1 % 0 FK U N nb. O OAS _Z-V ^ ; s In 0 /' row Ay 2A? O '. ?2I ' \ ?:w [o ?yam ? ?FiI ? I ( y, II hhh? ' ? O !Q l III S?? ` e ? Il n$i I??I TT II ,o.d h wry +?I o ?h \ I to > A Z= J Y ? ?N y I.q O Q CC th Nyy ?O ivO -? V st O T+.O O a C.1 'r + vl Q '- i 1 i I I. 0 ii i Ol J i i ?. '. i 0 i_J-- O i_ i CO ''. _. + O -r O - 00 10 l_1_... + 0 0 ; V Y Z w ? yl N`' If ?f n f nn T 1 AC)1, u e ? ?e ;i q0 o 'D u tip ? iCl / h a "n u ^? ?n =U a ., hyy? ANph I 11??= \ wC 81w $E 0',,'0 xb Oe ?' rn m rn m w 0 0 0 0 i Lb I Y O O O 0 wU 7]10071l5\751D0775?tl007D5-D,4wk\Ep\Sww T,W Rsu\77IOOTSSe-4-Mrp 51atim-fawlvnbLp -0,-b 1131W IDem z m ? u ti A SOfn? n O ?S OODIn? C--11SO? fn OO DS mm-ZD G nZ A Z Z A rn C 2 9 Z n S o° C Z S? mm? OZ 7?p=1 ,p m0 jP On ?D°1oZ z .? K to Z AO f'1 A O f1 O > DO ^o* Z ZN pZ C?mO KEN y°°Z z G12 A m O ? V D O D A Z A= 0 D A 2'? A S g ti S ,,OF S0>D ?0?Z AA- D?A O1 Z N ?n ?inov?D mm"Fom Dny rnrn2 °cz _A r?az p AR- FO Z A OmyC°l ?-Zn Z-1 ?A D °yIV U, Z(n AO -? rn0 ANi0 O r2 z p?tA ?O °O yA D C ti 2_ D O° o Omn C tiD N D n °ZyyyyZ Z m A O D S rn< m A 50O N '5d 'IT F ? O D %-( V ~ 0 ? O no ZN =100 A A L ?° S O N Zm xDZ 90C °D ?rnD m?A rn Dc,? ?zo 0 mrnt ° vl '"• °P"°z °00 >Z> mmz n01 Z A ? z a, a = < N t???y ?Cm yco ? 7J?1?[rJ o ??2 2y ' ?dHC) n = '? ?2 0 C „ c ? ?A g n Vl ?W o a 1 r-- 1 I 1 z X222 $II 11 1 111 II OIW; T a+,o$ 1 T p11 '22 N 1 g ?vI -E, Nm.Z y I r ? I Tm I +o f?l n emrn N???A D ? 1 -_/ ?ZK P?? ? \ 1 yrnT N•° z I I ?A? oo9o Aid a zo ?, n?;??tia "D,noz?=p o'o m?NpA md?'2? 8??^ \ N e ;$o AD Z tD W V O' tP 4' P, N ' m m N -I o Dn D-y1 n zm D O m m x O 3 " gg Z- F ?` ?m Z z A z M D? W Dr -i n ~ n -nC N VI ?? > ri r NZ rn 'r o A OY m m O N Z l m - ° I p 9 O " f u Z b z 0 p o r? m p NC ° AZ 0 ' rV S O >o f l iZ 0 rn 0A I O m rn ?- p y y I <j ,ln, n n O m m z o D? 0°noo 0 P vl vi z cm a o og a° N o L > L??? F- G 2 D ran F z ? ° D A zN T A A ° to °Ln z m m (> m m o M 'j z z o cn I m O o y C m Zp ?N O-a A O O ul A ZO > m ON A z f- -iF = O D O f -? o D -+ < m z G) m z 0O DZ o m ° m Cn ? r? - i ° F* v n w ` m N S? z rn ?rn? Z IA zn n> D N ?N ? OJ 9 n, i o? i k? ?o r ?r w?- prin?? I , G)j ?I J- it n n o ;? O _j I I n l _ co U t0 on p O < a N ? ru I I ?; I I I I-. I p O :. T + o .. Ts- = t STA. 0 pQ O O o l?lh = 84.22 I 9EGIN ONSTROCTIONi I _, o % CORE D R U C INTO AM. ! u PROP MH 971 I I L :ST,A. 0+55.''88 I I ? I U)?a RIM 6yM 1'1 I ? - 4 I w ? O V W I -? I. . I I- I I- I I I I I I 1 i '! a 2 I , I I I i I I ? ? I M I I I I I I - ? O O ! w , 7 I I Ch 'n i ? ,. I ? I 1 , I I I I W , 11 I --r .. I_ . _. , .. . I I '' I . ! m m I ? PRDP MhI B-P i _ _ TA 13t6v6 9 PI p I I DTAiNETER '.... MH1 o OD p t r a rh $ FORE TWIIYDS LQN - O ?I O °? T C7 + I , l I ol? q i VI r r , I ti I I I r., Y" M o 1 ( L. 1 I ~ I ? ? I ? m I _ I I I F 1._ .? !_ . r + PR 1 I + O j :- l o STA. 15 !Z/b? _08491 T i pip, i ro 85:33 l ; i r .._. ^ 1 _ oy m y •..- ? Y ; _ f t12 ) f rtZ1_ r 1 o?I ; ; i-l f ..' r A— Lj .I __ ti •: --?l/7 .I ?I. J II. .I ..i i I i-:. I. O ' '. I I I I I I - I I-- I , I I I I I , I I I . - 0 oD I ; f I i, , I I I I ? 1- I I ? i .. I I I 1 + 1 I O p Zz I ?-?-- 'I I '?- ! ! n I r 1 6A. MH . - m l STq 174,58. 76 ow itz)INya 69;7. 51 ! ! n ! DD i - M ?' 16 _4 I { I 1 ar L L" C' 2w , p I . a T ?O 4 ?? I ^ 1 _ I I - ON 1 I ..1 I - . I= m ti I. 1 I 1 I I ? -__I ! ! -'-1 ID R ! ?I ! J_ 1 I 1 I ? I 1 I ? ? I ' _ y._ _ _ w ?_L_ 1 r'., -•\.r I _. 1._l I. j_..i_. I. _.. I - I.. ' .. Z 1 J._ 9+00 0 MATCHLINE 0) STA o °J' ? 00 O O O O Office Use Only: Form Version May 2002 USACE Action ID No. DWQ No. (It any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: NWP 12 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: ? If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information Owner/Applicant Information Name: Mr. Barry Shearin PE Mailing Address: Charlotte Mecklenburg Utilities 5100 Brookshire Blvd. Charlotte NC 28216 Telephone Number: 704-399-2551 Fax Number: 704-398-9180 E-mail Address: bshearin(a-,ci.charlotte.nc.us 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Mr. Brian Long PE Company Affiliation: Stantec Consulting Services, Inc. Mailing Address: 5265 Parkway Plaza Blvd. Suite 130 Charlotte NC 28217 Telephone Number: 704-329-0900 Fax Number: 704-329-0905 E-mail Address: blong@stantec.com Page 5 of 13 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: 2003 Annexation Mallard Creek West Area CMU No. 170-02-651 2. T.I.P. Project Number or State Project Number (NCDOT Only): NA 3. Property Identification Number (Tax PIN): 047-152-39 4. Location County: Mecklenburg Nearest Town: Charlotte Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): Mallard Creek Rd. to Alexander Rd. to end of College View Ln. 5. Site coordinates, if available (UTM or Lat/Long): N 35d 19m 53s, W 80d 46m 14s (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct water body.) 6. Property size (acres): NA sewer runs through many parcels 7. Nearest body of water (stream/river/sound/ocean/lake): Unnamed trib. Of Mallard Creek 8. River Basin: Catawba (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/mal)s/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Open field near residential and commercial properties Page 6 of 13 10. Describe the overall project in detail, including the type of equipment to be used: Project involves installing a 8„ gravity sewer, equipment tracked back hoe and trucks 11. Explain the purpose of the proposed work: To provide sanitary sewer extension to serve area annexed by the City of Charlotte IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. NA V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. None anticipated VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream Page 7 of 13 mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: Creek crossing of sewer and installation of Rip Rap bank protection. 2. Individually list wetland impacts below: Wetland Impact Site Number (indicate on ma Type of Impact* Area of Impact acres) Located within 100-year Floodplain** (es/no Distance to Nearest Stream (linear feet) Type of Wetland*** None * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://www.fema.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: Total area of wetland impact proposed: 3. Individually list all intermittent and perennial stream impacts below: Stream Impact Site Number indicate on ma) Type of Impact* Length of Impact (linear feet) Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? especify) Plan Sheet 3 Station 5+50 Creek crossing and rip rap 15 Unnamed trib. Of Mallard Creek >5 Intermittent * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. Page 8 of 13 ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usgs.gov. Several intemet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.mapguest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 15 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact (acres) Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 5. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Topography dictated the routing of the sewer crossing unavoidable Page 9 of 13 VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at htlp://h2o.enr.state.nc.us/ncwetlands/strmgide.html. I. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wm/indox.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Page 10 of 13 Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ? No If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (MEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233 (Meuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact Multiplier Required (square feet) Mitigation 1 3 2 1.5 Page 11 of 13 Total * Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0260. XI. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. No increase of impervious acreage XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Sewer extended from an existing out fall of the Charlotte Mecklenburg Utilities System flow to Mallard Creek WWTP NC 0030210 XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Page 12 of 13 ,e--I/?>/dy Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 13 of 13 so ,AE,L 90 to co 90 60 ,0 of ZI 133 00006 Eli VI „O?,zZoSf Ic 3N /11 OIHdVHOOdO.L) SDINRS ' LMHIW 9'2 „os,zz, ? I bb+y I I I I xl ?! ''' ??T i x? ii???? II N U•3 4f??»o??jc? ??ia?? © 111 f l i 11 1 .......... G v o N ? 6 3 C3 ui w z U N p °' E W z° c Q S ti 1- W V W ^ m L N Z N S O_ ?a 3 -J m L.? Z S J Q W (O w Q O - aqz i W IF.1 L J w Q w cW? ? a 5 r? '^ V"') 3 3 3 aw c? 9 O z ?`j` = a m a -? a b > b aw 'm C-7 COS: 6 :3 C, ?a <a? ?za. 0 moo awOZ ?z ?oz U?W L Va Z --- - ' UDC W Do. ROAD ?NRGN P?9 ? ? ? ? 1 r. ? ?¢l ?oa? BETbpp ?Nl E%rWOE N ar U 'A U? U //? ICI hd.+o S?YOY Y? `t'N?? cl, a{- ?? nq `p Nom- ???69 b W? (n • ? o T ?'1 1 O ^ E?'? o ??uy0. .tos o ?q??? I? Z y 0 C N ? roM%'Y dJ a no ?-0 W P4 oa N a ?da,N? ? o C9 ^ O dOYy O) y VIA IV I?1 1'?1 w W L.Li off` ? YJy? m O ?li'3' d oft ? !7 1711 3D?OJ ? ?? y0 LL- H Np. b9 'M ? pG PPOSPEP ? J ? ? M33? .i? `? N°°? ? obh?? bg o H V1 ? 00 ^ 6 } t` j o a "=z OD C,4 a o e °ah ~ ~ ~ 2 En ?' ? ? s ? ? ? I I aj C ? ? ? ? ? ogy3a ? R Si 3 3En En a? w w w m $ gig i k Lij 5; 5: d 9, ce (L 0 00 LLJ V )- I* lad LAJ V Y N N N `? 8? 1 ?? ?` BBm b S § b? 2 04 W) W) o z z z i i g m z m = z 6 d 6 Eli &oo?s?w a a€ s ?g? ? a g as E ?I o a?o` v=i lYi??c o ? ? 3 ? n W ? Q ? i jnN G O 43 ?: 3 ? Q 3 d S ' N x m 44 vJJ Z 3 ? L? b G w ^ s Z ? S ' J Sir ? N O O d N 6 D r m ? W Z ? 6 6 ? 0 o a ? o 0 1S3 Wd ZE-S6S0 E0021121I0 6wp,y3n07 SS 1S3n N33i17 Otltl3ltlW?Sl3ldW31?6?p?SE200p1 \SE2001EL\SEd00iEL\an?}?o?lEL95\V? 0 0 o 013+8 ` iS 3NIIHO1dW I II I , ? I ' i I i I I ! I i 1 _, _. 1-?- I .y _ I ,.? I f I - lep t.. ? I I _ + V T- 1 I- i, I 1 I' 7 I I.J ggy y I I ? 1 ? sd? r 1. i 1 I I 11.1ad? _ . I?I ,..I I L. i t I i- --I Q1 V a _._I vZ.t I._i I , - F - f i I t' I 1 I I , I . _... O O 00 p 0 + 0 00 r r ? r o rn V+ (D > O O a) 00 0 II _L.. I i I I. ? I I. ? L..I I ! + I C+ I ? + L l l I ? i?0£I91? IVl I .._ ? I. s i-, 8'6 r d1Sl +4 F I 1 _.I °?4 1 j. t : t 1 % > t O ? I__ t r m ? t I I , { ? ' ' ? I r I .- I I : 0 ... - - I I In I ?_I I I! I ?H I I h l ( ?_I I IQO2? I_L_, ??.?!_ 11 I. ' ,- ?-I I L. I ,. I I I _j W ? I > I a ? j I I 'ry? i. k{ i_ l I I! l , t I { I ` 4 I ' ?• QQ ?h W ? ? . I ? - - I I ..i_ .- ... . , { .a y r I 14 . ' . _ ? + I ? : r t - NW od ' t t -. I r l I? r F.1 C -I 1 I. - ? 1 I I i 1( t ?o ? I I I-; I ,.- - } I I -. I I l 4 t06. o a O J .1. UL- J. 1 N I I t I L ! ?I ^ b I - I , { • _ I I , I ' .. I ._ t I I I l D I I 3 • l I 0 - . X99 I F1 ` --,- - 4- - I I I I I I L-r? Hlr I •dobd 4 , I I _I L_I ! I I _i I ?7OHNVW OINII 3!!08 l ._. '..? . , NO%?0/lblSNdO N19?9 1. ' - t m -- 96 ?Lo 2l I j M P= r v L 4 o _ o od+o d S o a o HW 1 VS ISI 3 I I I I I '- ? f 1 -- O ? I I .?...I -_I bal I I I IhCh I ' E'. _ o 4 ' '? I I 1 ? 1 1 04?i 1 ? o^ b i I I i I I I{ I I I i I S I ? I I C I I . I ?b!,o 40 CC) Ln CD 2222 0--iBg9RA °E \ 1 1 at w ?b b 2 ? hW? LI y h ? UV ?\ o ;I WCb°II y'O h J W ? v ?0113 4oW?? U R?hy ~ I ?. awl x I 0 1 , z r. Q a ys .? z Wry M? ? 7 a li W Ina WI ~Wc 7 &y? I;I I J 1. I ?1 I ? '11 1 ? ? 1112 of 10 r; q ?W Wh h `o v W 00 r? y> ? ? J H W W U1 rafl>U 111 ¢o W Q W 4 V, ? I a Hz WHa ? W i cn? h CO E W gb O ?0 a a x w ? x s a ? U U a? _ a N u 114 ...... ^ ?? ! ?J [ O?y.' i • N N J m U < Z N < I.j J FF- a 3 a Y S Q U a ? h W ` = W , ' ? uVll tp ? ? u ? 4 aog3 I n 06 I Y .?i ?d QI~/1NN ??a??3 7 `? B a=? 7 X Iw ??_ m° ?? _o iT ?yW~?N 4 r' 3 sx ?_ 3 IIY,/ I ? I y I bQ k Q f 1 O x I ?s a ? x? h Is gJJ, O ?Ndmo 2W 3 Id Av e slx3 -ss _ - m? 114 m a II" m o m o " D'A M NON311 0 - cr - _ Im G t' - ? c m y ?' ? IN I ? zz e i ?0 p' ,N,1 k ? I g2qq,?, ZW O ,its O Yka A° zl Ld Q W LL- 0 0 Li- U cn a IaI ? =Z ? ? a h 1? F $ =Q Z J ?NV Zo m11''tt ?N W MO??? ? Va tW ??a Fp Z?<K 2W2 aSa2 O <W V F3$ F- Roy, 1?,U Z70j ?qyy V?FZyZ IW.~1? W? < Q ?W U ?8 ? 6 O V < < ? ? y ? ? ? U ? U a 80 ?6a V a- U ? ? 1I??. Z IppI?11 W ,I H mVt NZIno ?F FNN W W m N W Z 7 a pJ, -N Nr7 ?-?ic°i ?y44gqN??111l???<Z? ?ai sOO ij1 ??Z?g3ZU?a cFi,?m?? o V?d? g¢ p5? vW R Q>:8 a ?+'7? Z 7e c'7 aaa' a Q.JppZZOZZ ND ?mi OSLO4 ai<Uglr 0 Z 6.PN1 "UN 361i10?-tl,-'LSf't001f[\•+^I! ?un.1 ..ro5 6w '?'V1 '1 "........... , \ vxy??non-saooln?utaolsz\suoolsc?n 1^ `,6 CL W '7 ObVJ c y? W W u