Loading...
HomeMy WebLinkAboutSW6190903_Comment Response 1-2-2020_1/2/2020Double D Engineering, PLLC January 2, 2020 NCDEQ Division of Energy, Minerals and Land Resources 512 N. Salisbury Street Raleigh, NC 27699-1612 Attn: Jim Farkas Ref: Short Stop Gas Station Hoke County Additional Information Request — SW6190903 Dear Mr. Farkas, We received your email dated December 19, 2019 with comments concerning the proposed Short Stop Gas Station Project. In response, we offer the following; 1. We adjusted the calculations to have the bottom of the pond elevation match the contours — bottom of pond is now 127.0. We adjusted the average depth and other calculations to match as well as updated the plan sheet. The updated plan sheets are attached. 2. We adjusted supplement to show new average depth, pond volume, design volume, forebay depth & forebay clean -out depth. The revised calculations are attached. Also attached is the revised original signed EZ form. If you have any questions or need any additional information regarding this project, please feel free to contact this office. Sincerely, DO BLE D ENGINEERING, PLLC l ; 2 Lee Humphrey, roject Manager 150 South Page Street Southern Pines, NC 28387 PH: (910) 684-8646 Firm No. P-1275