Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW4191202_Calcs and Narrative_1/2/2020
Starmwater Report Matcor Metal Fabricat0. ion. Site Improvements Project Location: Welcome, North Carolina Project #: 17-042 Designer: Triad Design Group, P.C. 4807-C Koger Blvd Greensboro, NC 27407 5=ryti,1119flrlrerjfr+' ti5b s� y Y II>JAL/ rr'�rrirAN ri�a�►i►�►>>►� December 19, 2019 triaddesigngroup ARCHITECTURE I ENGINEERIN 0 (INTERIOR 0ESI�GN ON - C Koger Boulevard; Greensboro, NC 27407 I T - 33$-218.8282. F - 335=218-8016 .I www.triied=desi.gngroup.com Storrriwater Report Matcor Metal Fabrication Site improvements welcome, Davidson County North Carolina 17-m Narrative: The purpose. of this project is. to construct al ruck drive, trailer parking, and new employee parking to serve. a.n existing 1. 931 000 sf manufacturing facility on a. 32.1.1 acre. site located at the physical address of 835. Salem Road in Welcome, NC. The existing site currently has. approximately 8.57 acres of existing BUA. An additional 1.87 acres of BUA are being proposed and approximately 0.37 acres of existing BUA will be removed due to the construction bringing the total BUA for the entire site to 10.07 acres or 31.W% BOA. The proposed Project Area will be 4.46 acres. The proposed 5CM is a wet detention pond. A total of 3.38 acres will drain to the proposed pond. A total of 2.49 acres of BUA will drain to the. pond. including approxirriately1.47 acres of existing BUA. Which will more than offset the 0.14 acres of new BUA that will bypass the pond. The 1, 2, and 10 year storm events have been. modeled and the past -development runoff from the project area will be reduced to below pre - development rates.. A summary. of the flows is listed below. nrninnrio Arimn. I - Pre -Development DA-1 post -Development DA-1 Pond Post -Development DA-1 (Bypass) Drainage Area 4,46 AG 3.38 AC 1..08 AC CN 77 90 86 BLIA 1..82 Acres 2.49 Acres 0.62 Acres Tc 5 ruin 5. min 5 min Flows Design Storm. Pre-Dev Past-Dev to Pond Routed. Flow From.Pond Post-Dev Bypass Post-Dev Total 1-Year 6.120 cfs 9.142 cfs 0.540 cfs 2.426 cfs 2.453 cfs 2�-Year 8.923. cfs 11.77 cfs 2.19 cfs 3.241 cfs 3.479 cfs 10=Year 19.00 cfs 20.25 cfs 8.835 cfs 5.939 cfs 13.95. cfs 100-Year 33.86 cfs. 31.55 cfs 23.75 cfs 9:595 cfs 25:57 cfs IIPa.ge Pond Check Rev 2019-09-30.gpw PERMANENT WET DETENTION POND DESIGN - RISERIBARREL Revised 8-24-99 _ ECT: Matcor Fong 1. TION:, Welcome, NC: iiTE DATA TOTAL SITE AREA = PROPOSED BUILT UPON AREA= FUTURE BUILT.UPON AREA TOTAL ON -SITE BUILT UPON AREA PERCENT BUILT -UPON= ON=SITE DRAINAGE AREA TO POND ON -SITE BUA TO POND = )NSITE % BUA FOR POND SUB -BASIN = .OFF -SITE DRAINAGE AREA TO POND TOTAL WATERSHED AREA TO POND DISTURBED AREA = TEMP. SED. STOR. USED YIN 11 CHECKED. BY: DATE: REVISED:: 32.111 WATERSHED = NIA 2A9 CLASSIFICATION: WS - NIA 0.00 GWAIWCA = NIA 2.49 7.75% 2.49 73,67% 0.00 VAX. OFF-SITE.B.U.-.% = 0% 3.38 138 TEMPORARY SEDIMENT STORAGE. PERMANENT SEDIMENT STORAGE PERMANENT WATER QUALITY COMPOSITE B.U. DEPTH minimum`3 feet SA/DA Fi ure 5.6_2 TEMPORARY WATER QUALITY PRINCIPAL SPILLWAY TYPE DESIGN STORM RAINFALL INTENSITY JNOFF COEFFICIENT DESIGN STORM RAINFALL INTENSITY RUNOFF COEFFICIENT ecember 2.201 12119119. 0.5 acre=inch par disturbed w 0.125 acre -in per total drainage 73.67 :percent 3A feet (Average, De tb 2.5 percent 1.0 rainfall to be controlled X corru reinfor 10 ear 89 inches aluminum concrete hour X concrete: box rip-raprip-mp lined 100. year 8.3. inches Per hour 0.8 ELEV. . BOT. OF POND = 807 SU.RFACE.ARFA = 1754 ELEV: BOT, OF PSS =. 807 SURFACE AREA = 1784 ELEV. @ BOT. OF PWQ = 808 SURFACE AREA = 2034 ELEV. NORMAL POOL = 812 SURFACE AREA = 5196 ELEV. TOP. OF RISER = 813.75. SURFACE AREA = 7290 ELEV. A EMER. SPILLWAY = 814.75 ELEV. @ TOP OF DAM = 8.16.5 INVERT OF BARREL = 807 MPORARY SEDIMENT STORAGE VOLUME Page Pond .Check Rev 2019-09-30,gpw 12/19/19 VOLUME PROVIDED ELEV. BOT. OF POND= ELEV. @ NORMAL POOL = ALLOW 75% 807.00 812.00 OF BASIN VOLUME SURFACE AREA = SURFACE AREA = TO WQ ORIFICE _. 1784 5196 13088 OK PERMANENT SEDIMENT STORAGE VOLUME REQUIRED 1534 VOLUME PROVIDED ELEV: BOT. OF PSS = 807.00 SURFACE AREA .= 17.84 ELEV. @_BOT. OF PWQ 808.00 SURFACE AREA = VOLUME PROVIDED = 2034 1909 OK PERMANENT WATER QUALITY .SURFACE AREA RE '❑ 3581 NORMAL POOL ELEVATION =. 812.00 SURFACE AREA PROVIDED = 5196. OK TEMPORARY WATER. QUALITY STORAGE REQUIRED � Rv= 0,711 VOLUME REQUIRED 8748. VOLUME PROVIDED ELEV.. BOT. OF TWQ = 812.00 SURFACE AREA = 5196 ELEV. P, TOP OF TWQ = 813.75 SURFACE AREA .= 7290 VOLUME. PROVIDED = 10925 OK Page 2 SUBJECT .... Al��i]]��Gl�J-._.._:...._», w ...:.........:.....W....... PROD. ka. Alvu.......11.i�f.... ... ._..................... _... _ ....:..., SHEETNO ]DESIGNED. BY CHECKED BY ©ATE DATE CHI Lo a CQ . r r- rm . r- a a LO N LL.) r,-. DD CD. s^ - ti co: co a. .Q 'C7. a Q C] r- C14 r (Y). r LO N ITN m LO I` 0) Y- 0 LO Co a M O q ci 6 r r r. . r N.. N. r- i- l rn r 0 a ti -r- C\r cr) co CO. Q cY} 00. co m 1I7. Ca a s r s-^ r r N CAI C\i d CD 07 (N LO r`: '� (4 r` N Cv N 47 CD r LO r! 0 Ln a CV U). 6 Q r Y r• N N N m C67 r- C1j, m :.[f .' LO [�. ''ram.: .: Co... ::0)%:.,'a : 4'1 Bilinear Interpolation Equation.Formula. Calculator - Double Interpolator Page 1. of 3 AJ Design Math Geometry Physics Force Finance Loan Calculator 5PON50RED.SEARC.HES. equation calculator with solution 01 C:::ma�them�aflcsformula solver R Fluid Mechanics n equation solving calculator car. scientific calculator with form" Bilinear InterpolaEtion. Equation Calculator Engineering Double Interpolator Formula To interpolate the. P value xr, X2, x3, Yi, Y2, Q11, Q12, Qaj and Q22 need to be entered/copied from the table. x and y defines point to perform the interpolation. P is the interpolated value and solution Soling for P Px2 — x)(Y2 —Y) ail + (x — x1)(Y2 - Y): �sl + (x2 — X)(Y ---Y) Q� + (x — xl)(Y —Yi) � �aa (x2 - xi)(Y2 -Yl) (x2—N1)(Y2.—Yi) (XI _ x1)(Y2 --Yl). (x2.—X0(Y2.—,Yl) Inguts: x 3 x 3.35 X2 4 y, 170 y 73.67 y2 8Q Qi.j 2.51 Qzi 2.09 Ql2 2.92 Qaz 12.41 Calculate Like Share w Ic https:llwww.aidesigner.com/phpinterpplationlbilinear interpolation-equation.php 12/18/2019 Bilinear. Tnterpolation Equation Formula. Calculator - Double Interpolator Page 2 of 3 Solution: DARE MORE MEMORIES flA EASY ONLINE.ORDERINO P = 2.5419095 Change:Equation orrormula Select to solve for a different unknown �1 fit. linear interpolation Y2 single interpolator Rry]3 bilinear interpolation EY-2 IY1rF double interpolator �21 Y2 �1� � �22 Infant Growth Charts - Baby Percentiles Overtime Pay Rate Calculator Water Quality Craw Dawn Time Size of Hole 1 0.005454 Storage Volume 10981 Surface.Area.of bond ft"2 (As) .5.196 Head of Water above Hole, ft (h) 1.76 Coefficient of Contraction of an orrifice (0.0) 0 6 Time to Dewater Days 3.65837 Q 0, 03474 cfs Omin 0.02542 5 .days Amax 0.06355 2 days SLIEJI~C:T %........................_.....___._----------- PR ....... OD. NO, .............:. �.............,.,.»........,... . 1..r.lC..w.....::...:...:...... SHEEFNO. .__:..::..._ ... .0� ........_.................. DESIGNEE) BY. y /.f W DATE . CHECKED BY .., .............. _.._._........... ................. .._.........._... _................... DATE 4807 Koger Blvd., Suite C Greensboro, NC 27407 336-218-8282 www.triad-designgroup.com Hydraflow Table of Contents Matcor Pond 1 Rev: 1,gpW Hydraflow Hydrographs by Intelbolve v9,22 Wednesday, Dec 18, 2Q19 Watershed Model Schematic ............ .... .................. ............................. I Hydrograph; Return Period Recap ............................... a ............................. ..:...... 2 Year SummaryReport ....................... ..... .................... ......................................................3 Hydrograph Reports .......... .......................................................... 4 Hydrograph No, 1, SCS Runoff, Pre-Dev Flow_...................... ..................................... 4 Hydrograph No..2; SCS Runoff, Post Dev Flow to Pond ........................................ .......... Hydrograph No.. 3, SCS Runoff, Post ❑ev Bypass..........:.................................................. 5 Hydrograph No. 4, Reservoir, Post Dev From Pond ...................... PondReport Pond 1 ...... ....................... ................ ..... ........................................ . 8 Hydrograph No. 5, Combine, Post Dev Total................................................................ 10 2'-Year SummaryReport .................................. ......... ... ..... ... ............... ............ 11 HydrographReports................................................................................................ Hydrograph No. 1, SCS Runoff, Pre-Dev Flow............................................................... 12 Hydrograph No. 2, SCS Runoff, Post Dev Flow to Pond .................... I ................. .... .... .13 .Hydrograph No. 3, SCS Runoff, Post Dev Bypass ...................... 14 Hydrograph No. 4, Reservoir, Post Dev From Pond ..................................................... 15 Hydrograph No. 5, Combine, Post Dev Total.................................................................. 16 10 - Year SummaryReport ..................................... ......................... ...................... ..... ..... 17 Hydrograph Reports ............... ................. .......................................... 18. Hydrograph No.. 1, SCS Runoff,�.Pre-Dev Flow .. ......................... 18 ........... Hydrograph No. 2, SCS Runoff; Post Dev Flow to Pond .....:.:....:.....,.....,....:....,,..... 19 Hydrograph No. 3, SCS Runoff, Post Dev Bypass:..................:..................................... 20 Hydrograph No. 4, Reservoir, Post Dev From Pond .... .......................... 21 Hydrograph No. 5, Combine, Post Dev Total ................ ........................ ...... ........ 22 100 -Year SummaryReport ...,... ....................................................................................... 23 HydrographReports. .............................................. .........._............................... ........ 24 Hydrograph No. 1, SCS Runoff, Pre-Dev Flow............................................................. 24 Hydrograph No, 2, SCS Runoff, Post Dev Flow to Pond .............................................. 25 Hydrograph No. 3, SCS Runoff, Past Dev Bypass ..............................::...............,..:... 26 Hydrograph No. 4, Reservoir, Post Dev From Pond .....,,......... 27 Hydrograph No. 5, Combine, Post Dev Total . .......... ............ ...,.,........ I. ...... ... ............. ... 28 OFReport.........................................................................................................29 ►lllatarshed Model Schematic Hydraflow Hydrographs by Intelisolve v9.22 Hyd rog raph Return Period Recap Hydraflow Hydro graphs by InteI!so lye v9.22. Hydrograph Summary Report Hydraflow.Hydaographs.by Intelisalve v9.22 Hyd. No. Hydrograph We. (origin) Peak flow WS) Time interval (min) Time to peak (Hh) Hyd. volume. (tuft) inflow hyd(s) Maximum Elevation M. Tdtai strge. used. {euft) Hydrograph description. 1 SCS Runoff 6.120 2 718 12,297 -- ---- -- - Pre-Dev. Flow 2 SCS Runoff 9.142 2 71.8 18,744 -- ----. ------ Post.oev Flow to Pond .3 SCS Runoff 2.426 .2 716 .4,903 -- Post Dev Bypass: 4 Reaervoir 0.540 2 766 14,875 2 813.80 .26;849 Post Dev From Pond 5. Combine 2:A53. 2 716 19,778 3, 4 - -- . Post Dell Total Matcor Pond 1 Rev 1.gpw Rettarn. Period: 1 Year Wednesday, .Dec 18, 2019 4 lHydrograph Report Hydraflaw liydrographs by Intelisolve v9.22 Hyd. No. 1 Pre-Dev Flow Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage:.area = 4.466 ac. Basin Slope = 0.09/0 Tc method = USER Total precip. = 2.61 in Storm duration = 24 hrs * Composite (Area/CN) =1(1.820 x 98) +.{1..930 x 60} + (0 710 x.69)] 14.460 Q (cfs; 7.00 • f1 5.00 .4.00 3.00: M Wednesday, Dec 1.8, 2019 Peak discharge = 6.120 cfs Time to peak = 718:min Hyd. volume = 121297 tuft Curve number = 77* Hydraulic length a ft Time .of cane. (Tc) _ 5.00 min Distribution = Type 11 Shape factor = 484 Q (Cfs) 7.00 "Mid 5.00 MR 8.00 2.00 1.00 0.00 I I I i l l 1 l -- — 0.00 0 120 240 360 480 600 72G .840 960 1080 1200 13.20 1440. 1660 Time (min) Hyd No. 1 V Hlydrograph Report Hydraflow Hydrographs by inteIisglve. v9.22 Hyd. No. 2 Post Dev Flow to Pond Hydrograph type = SCS. Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area. = 3.380 ac Basin Slope = 0...0 % Tc method = USER Total precip. = 2.61 in Storm duration = 24 hrs Composite Orea1CN.7 = [(2:490 x 98) + (0.890 x 69)113.380 Post Dev Flow to. Pond Wednesday, Dec 18, 201.9 Peak discharge =. 9.142 cfs Time to peak = 716 min Hyd. volume = 18,744 cuff Curve number = 9o* Hydraulic length = 0 ft Time of conc.(Tc) = MO min Distribution = Type Il Shape factor = 484 Q (cfs) Hyd: No. 2 -- 1 Year Q (cfs) 10,00 10.00 8.00. 8.00 6.00. 6.00 4.00 4.00 2 2.00 .00 0.00 . 0.00 0 120 240 3.60 480 600 720 840 960 1080: 1200 1320 Time (min) Hyd No. 2 Hydrograph Report Hydraflow Hydrograpns by lntelisoive v9.22 Wednesday, Dec 18, 2019 Hyd. No. 3 Past Dev Bypass Hydrograph type = SCS..Runoff. Peak discharge = 2.426 cfs Storm frequency = 1 yrs Time to peak 716 min Time interval = 2 min Hyd. volume = 4,903 cuft Drainage area = 1.080 ac Gurve.number - 86* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of cane. (Tc) 5.00 min Total precip. = 2;61 in Distribution = Type 11 Storm duration = 24 hrs Shape factor = :484 * Camposite.(Area/CN) = f(0.620 x 98) + (OA60 x 6.9)]./ 1.080 Q (Cfs) 100 2.00 1.00. Post De►r Bypass Hyd. No. 3-- 1 Year Q WS) 3.00 2.00 1.00 0.00 L 0:Q.0 0 120 240 $60 480 .600 720 8.40 9601080 1240 1320 1440 1:560 Time Amin) Hyd, No. 3 7 Hydrvgraph Report Hydraflow Hydragraphs by [ntelisolve v9.22 Wednesday, Dec 18, 2019 Hyd. No. 4 Post ❑ev From Pond Hydrograph type = Reservoir Peak discharge = 0.540 efs Storm frequency = 1 yrs Time to peak = 766 min Time interval = 2 min Hyd. volume = 14,875 daft .Inflow hyd. No. = 2 - Post Dev Flow to Pond Max. Elevation = 813.80 ft Reservoir name = Pond.1 Max. Storage _ 26,849 cuft Storage Indication method used. Wat.pond routing start elevation = 8.12-00 ft Q (Cfs) 10.Oa •M WIIIIII Post Dev From Pond Hyd. No..4 — 1 Year 0. �Cfs) 10.00 EL, . 11 [KIL 2.00 0.00 man 0:00 0 600 1200 1800 240.0 . 3000 3600 42.00 4800 54D0 6000 Time (min) Hyd No. 4 Hyd No..2 ® Total storage used -- 26,849 cuff Pond Report $ I-Iydraflow Hydrographs. by Intellsolve v9.22 Wednesday, Dec 1.8, 261.9 Pond No. 1 - Fond t Pond .Data Contours : User -defined contour areas..Conic.method used for voiurrle calculation:.Bagining Elevation = 80.7.00 ft Stage,l Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cuft) 0.00 807.00 1.784 0 0 1,00 808.00 2.034 1,907 1;907 4.00 811.00 4,028. 8,923 10,831 4650 811:50 4,612 2;158 12,989 .5:00 8.12:00 5,196. 2;450 15,439 5.50 812.50 5,879 2,767 18,208 6:75 813,75 7,290 81214 25,420 9.00. 816.00 9,603 18;943 45,363 9.50 816,50 10,190 4,947 50,310 Culvert1 Orifice Structures Weir Structures. [A] [B] [C] [PrfRsrl [A] IS] [C] [D] Rise (in) = 12.00 1.00 0.00 0:00 Crest Le.n (ft) = 6.28 12.60 0.00 0.00 Span (10) = 12.00. 1.06. 0,00 0.00 Crest El. tit} = 8.1.3..75 614.75 .0.60 0,00 :No. Barrels. = 1 1 0 0 Weir Coeff. = 3:33 2,80 3.33 3.33 invert El. (ft) = 808,00 812.00 0.00 0.00 Weir Type = Riser Broad -- - F_ength.(ft) = 70,00 .0.00 0.00 0,00 Multistage. = Yes No No No Slope {%] = 1.00 0.66 0,00 nla N-Value. _ .013 013 :013 n/a Orifice Coeff. = 0.60 MO 0.60 0.60 Exfil.(inlhr) = 0.000 (by Contour) Multi -Stage = nla No No No TW Elev. (ft) = 0:00 Note: CufverUotiffce Quill ows are analyzed under IN at (ic)'and outlet (no) control, Weir risers checked for oriffce candiunns (ic) and submergence (s). Stage ! Storage ! Discharge Table Stage Storage Elevation Civ A Clv. B CIv C. PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft. cfs Cfs efs cfs cfs: cfs cfs cfs cfs cfs cfs 0:00 0 807.00 .6.00 0,00 -- - 0.00 0.00 - - _ 0.000 0.10 191 801.10. 0.00 a:00. -- - 0.00 .0.00 - - - - - 0,000. 0.20 381 807.26 0.00 0.06 - -- 0.00 0.00. - -- - _ 0,000 0.30 572 807.30 .0,00 0.00 -. - 0.00 .0.0a -. - - 01000 0.40 763 807A.. 0.00 Mo -- 0:00 0.00 --- - . 0.000 .0.50 954 60.7.56. 0.00 0.00 -- -- 0.00 0.00 0.60 1,144. 807.60 0.0o fl.00 0.00 0.00 -- -- - -- 0.000 0.70 1,535 807:.70 0.00. 0.100 - 0,00 0,00 - w. - 0.000 0.8o 1,526. 807,80 0.00 0.00 -- -- 0.00 0.00 - -- - -- 0.000 0,90 1,717 80.7.90 0.00 0.00 - . -- 0.00 0 00 - - - 0:0mo 1..0o 1,907 .806.00 0.00 0.00. -- -- woo 0:00 - -- - -- 0,000 1.30 2,800 808.30 bm 0.00. -_ - O.Oo 0,00 __ _ ... 0,000 1.60 3,692 808.60 0.06 0.00 0.00 0.00 - --- - 0.000 1.90. 4,584 808.90 0:00 0,00 --. -- 0:60 0.00 - --- - -- 0.000 210 5,477 849:20 0.00 0,00 -- 0,0.0 0.00. w- - -- -- 0,00.0 2:50 6,368 MOM .0:00 0.00 -- -- 0,00 0.6o -- -- - -- 0.000 2.80 .7,2.62 80.9.80 0.00 0.00 -- 0,00 0:06 --- -- -- 0.000 3A o 8,154 81010 .0:0.0 0.00. --- -- 0.00 0.00 -- - - -- 0.000 3.40 9.046 810.40 0:o0 0.00. -- -- 0.00 0,00 - » - . - - 0:000 3.70 9;939. 0.00 0:00 --- -- 0A0 0.00 -- -- - --- 0.000 .810,70 4:0.0 10.831 811.0.0 0.06 ma-» - 0.00 O.flO - --- -- 0,000 4.05 11,047 811.05 0.00 0.00 -- 0.00: 0.00 -- --- 0.000. 4.10 11,263 811:10 0.00 0:00 - - -- 0:00 0.00 -- -_ - - 0.000 4.15, 1.1.478 811:15 6,00 .0,60 _- - 0.00 0.00 - - - 0,000 4.20 11,694 811.26 0.00 0.00 - 4.00 0.00 - - 0,000. 4,25 11,910 .811.25 0.00 0.00 -- - 0.00 0.00 - - _- -- 0.000 4.30 12,126 811.30. 00 0:00 - -- 0.00 0.00 -- -- -- - 0.000 4;3.5 12,342. 811:35 0.00 Mo -. 0:00 0,00 -- -- -- 0.000 4.40 12,557 811.:40 0.00 0.00 - --- 0.00 0.00 -_ __. _ 0.000 4.45 12.773 811.45 .0.00 0,00 0.00 0A0 - - -- -- -- 0.000 4.50 12,989 811.50 6.06. 6.00 - - . 0.00 6,00 - - -- -- -- 0.000 4.$5 13,234 .811.:55. 0.06 0.00 - - 0.00 0.00 - -- --- 0.000 4.60 13,479 811.60 0.00 0.00 - -- 0.00 0.00. -- -- -- - 0;000 Continues on next page... Pond 1 Stage I, Storage 1 ❑ischarge Table stage Storage Elevation Clv'A CIv B CIV C PrfRsr Wr A Wr B Wr C. Wr. R Exfll User Total ft cuff ft cfs as cfs cfs cfs cfs cfs cfs cts cfs cfs 4.65 13,724 811.65 0.00 0.00 - 0.00. MO -- - -- - 0.000. 4.70 13,969 811.70: 0.00 oxc) - 0.00 0,00. -- - --- 0.000 4,.75 14,214 811.75 0400 0.00 - - 0.00 0.00 - - -- 0.000 4.80 14;459 81.1 M. 0,00 0.00 - - 0.00 .0.00 0.000 4.86 14,704 811.86 MO 0.00 - 0.00 0.00 0.000 4x 14,949 811.90: 0.00 O.oO. - _ 0.00 0.00 -- --- - --- 0.000. 4,95 16,194 811.96 0,00 0:60 -- 0.00 0.00 - - --- - U00 5:00 16,439 81 no 0.00 6.00 - -- 0,00 0.00 -- - --. 0,000. 6.65 15,716 81.2,05. 0.06 0.06 is - - 0:00 6,00 - - --- 0.003 5.10 15,993 812.10 0.00 0.01 is - -- 0.00. 0.00 -- - -- -- 0.006 :5;1.5 16,269 812A 5. 0.00 0.01 is -- 6,00 0.00 0:009 5.20 16,546 812.20. 0,0o 0.0.1 is - - 0.00 0.00 -- - 0.0,10. 6: 5 16.823 812.25 o:o0 0,01 is - -_ o,00 6.00 -_. - - -- 0.012 5.30 17,099 812.30. 0.00 0.01 is - 0:00 0.00 - - - 0,0.13 5.35. 17,376 812.35 0.00. 6.01 is - - 0;00 0.00 - - -- - 0.015 5.40 17,653 812.40 o:00 0,62 is -- -- Mo. 0.00 -- -- - - 0;016 5.45 17,929 812.45 0.00 0.02:1c 0.00 0.60 -- -- - - 06017 6.50 18,206 812.50 0.00 OM is - - --- 0.00 0.00 -.. - - 0.01.$. 5.63 19,027 812.63 O,00 0.02 is - - - 0.00. 0.00 0.020 5.75 19,849 812.76 0.00 0:02 id -- 0.06 0.00 - -- - - o.o22 5.88. 20,670 812.88. O.W. 0.02 is -- - 0.06 0.00 -- __ -. _. 6.024. 6.00 21,492 81.3.,00 0.00. 0.03 is --- 0,00 0.00 - - --- - 0.026. 6.13 22,313 813;13 6.00 0,03 is -- 0;00 0.00 - -. - - - 0.027 625 23;134 613.25 0.00 0.Q3 is --- --- o:0.0 0.00 - -w -- 0.029 6,38 23,956 81.3.38 0.00 o;o3.1c --- 0,00 .0.00 0.030. 6.56 24;777 813.50.. 0.00 0.03 is - _ 0.00 0,00 --- -- 0.032 6.63 25;599 813.63 0.00 0.03 Pc -- - 0,00 0.00 -- - -- - OM3. 6.75 261420 813;75 0.00 0.03Ic - -.. 0.00 0,00 --- =. -- 0:034 6.98 28,3.14 813,95 2.24 ic. 0.04 is --- --- 2,23 0.00 -- -- -- 2.268 7.20 30,209 814.20 6131 oc 0.04 is - - - 6.31 0.00 --- 7.43 Mj 03 814.42 8.02 oc 0.04. is - -. 8m s 0.00 iB.057 7.65 33,997 614,65 8.24 oc 0,04 is -- -- 8:23 s 0,00 --- - -- --- 8.276 7.88 3502 814..87 8:41.oe 0,04 is --- 8.40.s 1.38 - - - -- 9.823 8.10 31,786 815:10 8.58 do 0.05. is - -. - 856 s 6.46 -•- - - -. 15.06 8.38 39,680 815.32. 8.71 oc 6,05 is - - - 6:70 s 13.60 --- -- 22.35 6.55 41.,575 815.55 8,85: oc. 0.06 is - -- 8.84 s. 22.32 - - -- -- 31.20 . 8.78 43,469 815.77 8.9.9 oc 0,0.5 is -- 8.98 s U.37 --- --- - - 41.4.0 9.00 45;363 816.00 9,1300 0.05 is - -- 9.11 s 43.60 - - --- 52.75 9.05 45,858 816.05 9::16 ac 0.05 is -- 9,15 s 46,24 --- - - _ 55:44 9.10 .46; 353 816:10 9.19. oc 0.05 is --- 9.16 s 46.94. __ _ __ -. 5& 15. 9.15. 46,847 818.15 9.21 oc 0,05 is - -. - 9,21 s 51.68 M- - - 60:94 9.20 47;342 81.6420 9.24 oc 0.05 is -- --- 9.20 s.. 54A7 -- -- -- - 63,73 9:25 47;837 816,25 9.27 oc 0.05.ic - -• 9.22 s. 57.31 - 66.59. 9.30 48,331 816.30 9.30 oc o:06 is - -- 9.30.s 6o:20 - - - - -- 69.55 0.35 48,8.26 816:35 9.33 or. 0.05 is -- - 9.30:s 63.14 -- -- -- - - 72.4.9. 9.40. 4%321 816:40 9.36 oc: 0.05: is -- -.- 9.29. s 6fi; ! 2 - -- 75,47 9.46 49,815 816.45. 9.39 oc 0.06 Ic - -- 9.34 s 69A 5 - - - -- 78.54 9.50 .50,310 816.50 9.42:oc 0.06Ic - -- 9.39..s 72.23 ...End Hydlrograph Report 10 Hyd rafiow Hyd Tog raphs by InteIisoive A22 Hyd. No. 5 Post Dev Total Hydrograph type = Combine Storm frequency = 1 yrs Time interval = 2 min Inflow hyds. = 3, 4 Q (ds) 3.00 2.00 1.00 R�L 0.00 :0 .480 Hyd. No. 5 Post Deg Total Hyd. No..6 -- 1. Year 960 1440 1920 Hyd No. 3. Wednesday, Dec 18, 2019 Peak discharge = 2.4.53 cfs Time to peak = 716 min Hyd. volume 19,778. cuft Contrib. drain. area- 1.08.0 ac 2400 288e: - Hyd' No. 4 3360 384o 4320 Q (ds) 3.00. f►IKIFIII 1.00 -- .0.00 4800 Tirne (min). 11 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time Interval (mint' Time. to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation {ft} Total strga used (Cuft) Hydrograph description 1 SCS Runoff 8.923 2 718 17,852 -- -- -- --- Pre-Dev Flow 2 .5C5 Runoff 11.77 2 716. 24,412 — - --- Post Dev Flow to Pond 3 SC5 Runoff 3.241 2 716 6;585 — — - - Post Dev Bypass 4 Reservoir 2.190 .2 726 M,544 2 81.3697 28,249 Post Dev From Porld 5 Combine 3.479 2. 7k 27,126 3,4 -- -- --- Post Dev Total. Matcor Pond:1 Rev 1.gpw Return Period`. 2 Year Wednesday, Dec 18, 2019 12 Hydrograph Report Hydraflow Hydregraphsby Inteliselve V6.22 Wednesday, E}ec 18,:2019 Hyd. No. I Pre-Dev Flow Hydrograph type = SCS Runoff Peak discharge = 8.923 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = .2 min Hyd. volume = 17,852 cuff. Drainage area = 4...450 ac Curve number = 77* Basin Slope 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 3.15 in Distribution. = Type 11 Storm duration = 24 hrs Shape factor = .484 ' Composlte.[ArealCNV = [(1.820 x 98) * (1,930 x 60) t (0.710 x 69)] l,4.460 Q.(Cfs) 1.0.00 E-MiIfl AM ►•M '2.00 .Pre -Deg Flow Hyd. No. 1 � 2 Year Q (Cfs) 1 o.00 NMI 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320. 1440 1560 Time (min) Hyd No,. 1 13 Hydrograph Report Hydraflow Hydrographs by Intefisolve v9.22 Wednesday, bec:18, 2019 Hyd. No. 2 Post Dev Flo►nr to Pond Hydrograph type = SCS Runoff Peak discharge = 11.77 cfs Storm frequency = 2 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 24,412. cuff Drainage area = 3..380. ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = p ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 3.15 in Distribution = Type 11 Storm duration = 24 hrs Shape factor = 484 . Composite'(Area1CN) = 1(2.490 x 98) + (0.890 x 69)111380 Post Dev Flow to Pond Q (efs) Hyd. No. 2 -- 2. Year Q (cfs) 12.00 U00 1.0,00 10.00 8.00 8,00 6..00 6.00 4.00 4.00 2.00. 2.00 0.00 . 0.00 0 120 240 360 480 .600 M 840 960 1080 1200 1320 Time (m1h) Hyd No. 2 Hydrograph Report 14 Hydrailcw Hydrographs by I.Mellsolve v9.22 Hyd. No. 3 Post ❑ev Bypass Hydrograph type = SCS Runoff Storm. frequency = 2 yrs Time interval = 2 mire Drainage area = 1.0.80 ac Basin Slope = 0.0 % Tc method =USER Total precip. = 3.15 in Storm duration = 24 hrs Wednesday, Dec 1$, 2019 Peak discharge = 3.241 cfs Time to peak = 716 min Hyd. volume. = 6,585 tuft Curve number = 86* :Hydraulic length = 0 ft Time of cone (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Hydrograph Report 116 Hydraflow Hydrographs try Intelisolve A22 Hyd, No. 4 Post Dev From Pond Hydrograph type = Reservoir Storm frequency = .2 yrs Time interval = 2 min Inflow hyd. No. = 2 - Post Deb Flow to Pond Reservoir name = Pond 1 Storage Indlcafion method used. Wet pond routing start elevati6ft = 812.0.0 ft. Post Dev From Pond Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Wednesday, bec 18, 201.9 = 2.190 cfs = 726 m i n 20,540 cuff = 81197 ft - 28,249 cuft Q cfs Q (ds) � } Hyd. No. 4 -- 2 Year 12.00 12.00 10, 00 10.00 6.00 8:00 6.00 6.00 4.00 4.00 2.00 2.00 Lj 0.00. 0.00 0 480 960 1440 1920 2400 2880 3360. 3840 :4320 4800 5280 5760 Time (rain) --� Hyd No. 4 -- Hyd No.:2 ® Total storage used = 28,249 cuff 16 IHydrograph Report Hydraflow Hydrographs by Infellsolve v9.22 Wednesday, Dec:18, 2019 Hyd. No. 5 Post ❑ev Total Hydrograph type = Combine Peak discharge = 3.479 cfs. Storm frequency. = .2 yrs Time to peak. = 720 min Time interval = 2 min Hyd. volume = 27,126. cuff Inflow hyds. _ 3, 4 Contrib. drain. area= 1.080 ac Q {cfs} 4.00 MIX 1.00 Post Dev Total Hyd, No: 5 - 2 Year. Q (cfs) 4M 3.00 2.00 1.00 0.00 �� -.0.00 0 120 240 360 480 600 720 840 .960 1080 MG 1320 1440 1560 Time (min} Hyd No. 5 Hyd No. 3 Hyd No. 4. iIN Hlyd rog ra ph. Summary Report Hydraf low Hydrbgraphs by intelisolve v9.22. Hyd. No. .Hydrograph type (origin) Peak flow (efs) Time Interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation {fQ Total strge used (cuft) Hydrograph description 1 SCS. Runoff 19.00 2 .716 38,419 - — ---- -- -- Pre-Dev Flow 2 SCS Runoff 20.25 2 716 43,368. -- - - -- Post Dev Flow to Pond 3 SC5 Runoff 5:939 2 716 12,366 - - --- Post Dev Bypass 4 Resembir 8.835 2 722 39,488. 2 814-74 34,682 Posf. Dev From Pond 5 Combine 13.95 2 718 51,853 3,4 ---- --- Posh Dev Total Matcoi Pond 1 Rev 1.9PW Return Period: 10 Year Wednesday, Dec 18, 2019. 18 Hydrograph Report Hydra4low Hydrdgraphs by lntellsalve v9:22 Wednesday, Dec 18; 2019 Hyd. No. I Pre-Dev Flow Hydrograph type = SCS Runoff Peak discharge = 19.00 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 38A19 tuft Drainage area = 4.460 ac Curve number = 77* Basin Slope 0.0 % Hydraulic length = 0 ft Tc method = USER Time of cone. (Tc) = 5.00 min Total precip. = 4.89 in Distribution Type If Storm duration = 24 hrs. Shape factor 484 Gornpaslte (ArealGl�} _ [(T,820 x 98} + {1.930.x 60} + (0.710 x 69}] 14.480. Q (cfs; 21.00 18.01a 15.0g 1.2.00 OM .Ii 3,00 Q (cfs) 21..00 18,00 15.00 12.00 i 3.00 0 120. 240 360 480 600 720 840 960 1080 12.00 1320. 1440 Hyd No..1 Time (min) 19 Hydrograph Report Hyd raflow Hyd ragraphs,by IMefisolve v912 Wednesday, Oeeo 18, 2019 Hyd. No. 2 Post Dev Flow to Pand Hydrograph type =- SCS Runoff Peak. discharge = 20.25 cfs Storm frequency = 10 yrs Time to peak. = 716 min Time interval = 2 min Hyd.. volume = 43,368 tuft. Drainage area. = 3.380 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 4.89 in Distribution = Type 11 Storm duration = 24 hrs Shape factor = 484 * CornposRe (AreaIGN). r [(2.490 x 98) -r (0:890:x 69)] / 3.380 Q (cfs; 21.00 18.00 15.00 12.00 M 20 Q f cfs) 21.00 MR9611] `P 0 S • li . 11 3.00 0.00-�..�,,, _ z — 0.00 0 120 240 360 480 600 120 840 950 1080 1200. --�-- Hyd No. 2 Time (min) 28 Hydrograph Report Hydrafldw Hydrographs by Intelisolve v9.2.2 Wednesday, Dec 18, 20.1.9 Hyd. No. 3 Post Dev Bypass Hydrograph type = SCS Runoff Peak discharge = 5:939 cfs Storm frequency = 10 yrs. Time to peak 71.6 min Time interval = 2 min Hyd. volume = 12,366 cuff; Drainage area = 1.080 ac Curve number = 86* Basin Slope 0.0 %. Hydraulic length = 0 ft Tc. method = USER Time of conc. (Tc) = 5.00 .min. Total. precip. = 4.89 in Distribution = Type. [I Storm duration = 24 hrs Shape factor = 484 Cornpasite (ArealCN) = [(0.620 x 98):+ (0.460 x 69)11.1.O8D Q (cfs} 5.00 5.Oq 4.00 3.00 2.00 1..00 0.06 0 120 240 Hyd No. 3: Post Deg Bypass Hyd. No. 3 --10 Year 360 480 600 720. 840 Q (Cfs) 6.00 5.00 4,00 3,00 2.00 Sul 91 0.00 960 1080 1200 1.320. Time (min) Hydrograph. Report 2'i Hyd raflow Hydrograp hs by: Intelisolve V..9.22 Hyd. No. 4 Post Dev From Pond Hydrograph type = Reservoir Storm frequency = 1 Q..yrs Time interval = 2 min Inflow hyd. No. = 2 - Post Dev Flow to Pond Reservoir name = Pond 1 Storage Indication method. used. Wet pond routing start elevation = 812.00 ft. Post Dev From Pond Peak discharge Time to peak Hyd. volume Max. Elevation Max, Storage Wednesday, pea 18, 2019 = 8.835 cfs = 722 min = 39,488 cuff = 814.74 ffi = 34,682 cuft Q {cfs} Hyd. No. 4 -- IQ Year Q {cfs} 21.00 21:00 18.00 18.00 15.00 1.5.00 12,00 12.00 .9.00 9:00 6.00 6.00 3.00 3.00 10.00 0 120 240 360 480 600. 720 8.40 960 1080 1200 1320 1440 1560 Time (min) �-- Hyd No;. 4 Hyd No. 2 Total storage used = 34,682 cuff 22 IHydrograph Report Hydraflow Hydrographs by fntellsolve.:v9.,22 Wedriesday, Dec 18,.2019 Hyd. No. 5 Post ❑ev Total Hydrograph type = Combine. Peak discharge = 13.95 cfs Storm frequency = 10 yrs Time to peak = 71.8 min Time interval _ 2 min Hyd. volume = .51,853 cuf�t Inflow hyds. = 3,.4. Contrib. drain. area-- 1.080 ac Post Dev Total 23 Hydrograph Summary Report Hydraflow Hydmgraphs by Intelisotve AN Hyd. No. Hydrograph type. (Origin) Peak: flow (cfsy. Time interval (min) Time to peak (miny Hyd. volume (Cuft). Inflow hyd(s) Maximum elevation {ft} Total strge used jcuft) Hydrograph description 1 SCS Runoff 33.86 2 7% 69,547 -- — Pre-Dev Now 2. SCS Runoff 31.55 2 716 69,689 -- -. :Post Dev Fiow to Pond' .3 SCS Runoff 9.595 2 716 20,570 -- -_- - -- Post Dev Bypass 4 Reservoir. 23.75. 2 720 s5;801 2 815.38 39,981 Post Dev From Pond 5 Combine 31,00 2 720 86,371 3,.4 - Post Dev Total. Matcor Pond 1 Rev 1.9Pw Return Period: 1.00 Year Wednesday, Dec 18, 2019 24 Hydrvgraph Report Hydraffow Hyd rographs by Irite Iisolve.v9.22 Wednesday, Dec 18, 2019. Hyd. No. 1 Pre-Dev Flaw Hydrograph type = SCS Runoff Peak discharge = 33.86 cfs. Storm frequency = 10.0 yrs Time to peak = 716 min Time interval = .2 min Hyd, volume = 69,547 cult Drainage area = 4.80 ac Curve number = 77* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of colic. (Tc) _ 5,00 min Total precip. = 7.24 in Distribution = Type 11 Storm duration = 24 hrs Shape factor W 484. Composite (Area/CN) =.[(1.820 x 98) + (1..930'x 60) + (0,710 x 69)] 14,460 Q �Cfs) 35.170 30.00 25.0.0 20..00 15.00 iD]16Iil 5.00 0.00 ' ' 0 120 240 Hyd No. 1 Pre -Deg Flow Hyd. No..1 -- 100 Year 360 480 600 720 840 Q (Cfs) 35.00 30.00 25.00 20.00 15:00 1.o.00 5.00 ` 0.00 060 1080 1200 1320 Time (min.) q.-I Hydrvgraph Report Hydraflow Hydrag rephs by IMel isoive v9;22 Wednesday, Dec 18,.2019 Hyd. No. 2 Post Dev Flow to Pond Hydrograph type = 5C5 Runoff Peak discharge = 31.55 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min `Hyd. volume = 69,689 cuff Drainage area = 3380 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft TO method = USER. Time of.conc. (TO = 5.00 min Total precip. = 7.24 in Distribution = Type 11 Storm.duration = 24 hrs Shape factor = 484 " Composite' (Area1CN).=;(2,490 x 98) + (0.890. x 69)] / 1380 Q (cfs, 35.00 c� �t 25;00 20.00 15,00 10.00 19/11111 Q (cfs) 35.00. 30..00 IKIIIIII 15.00 MOO 5.00 0.00 - 0.00 0 120 240 360 480 600 720 840 950 1080 1200 Hyd Na. 2 Time (min) Hydrograph Report Hydraflow Hydrographs by:Intelisolve v9.22 Wednesday; Dec 1 81: 2019 Hyd. No. 3 Post Dev Bypass Hydrograph type = SC5 Runoff Peak discharge = 91595 efs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 20,570 cuff Drainage:area = 1.080 ac Curve number = 86* Basin Slope 0.0 % Hydraulic length = 0 ft Tc method W USER Time of conc: (Tc) = 5.00 min Total precip, = 7.24 in ❑istribution = Type 11 Storm duration = 24 hrs Shape factor = 484 Composite Area/c N) = [(0.626 x 98) + (0,460 x 69)] 11.080 Post Dev Bypass Hydrograph Repot. 27 Hydraflow. Hydrogrsphs by [ntelisolve v9.22 Wednesday, Dec 18, 2019 Hyd. No. 4 Post Dev From Pond. Hydrograph type = Reservoir Peak discharge. = 23.75 cfs Storm frequency = 1..Oa yrs Time to peak = 720 min Time interval = 2 min Hyd. volume. = 65,801 cuff [nflow hyd. No. = 2 - Post Dev Flow to Pond. Max. Elevation = 81 5:36 ft Reservoir name = Pond 1 Max. Stora9e = 39,981 cuft Storage. Indication method used. Wet pond routing start elevation = 812100 ft Post Dev From Pond Hydrograph Report W. Hydraflow Hydrographs by.intelisolve A.22. Hyd. NO. 5 Post rev Total Hydrograph type = Combine Storm frequency = 100 yrs. Time interval = 2 min Inflow hyds. = 3, 4 Q (cfs; 35.00 30.00 �&71101 t 20.00 `Willi 10.00 • li Wednesday, Dec 18, 2019 Peak discharge = 3 1. 00 cfs Time to peak = 720 min Hyd'. volume 86,371 cuft Contrib. drain. area 1.08.0 ac Q (cfs) 35.00 30.00 25M 20.00 15.00 fiN11il1 0.00. UO 0 120 240 360 480 600 720 840 960 1080 1200. 1320 1440 1.560. Hyd Na. 5 - Hyd No, `3 Hyd N0. 4 Time (min) Hydraflow Rainfall Report 29 Hydrafiaw Hydro.graphs,by IntellsolVe V922 Return Intensity -duration -Frequency Equation Coefficients (FHA) Period (Yrs) B Q E (NIA} 1 0.0000 0.0000 0,0000. --- 2 65.6146 13,2000. 0.8864. 3 0.0000 0,0000 0.0000 -- . 5 73.9494 13,3000 0,85i4 -- - - 10 69M11 12.6000 0:8085 ---- .25 25 62,4174 11.5000 0.7526 ---- 50 52.8628 10.1000 O.6973 -- 100 48.3280 0,4000 0,6611 ---- Fite dame: SampieFHA:idf Intensity = B 1(Te + D)AE Wednesday, Pee 18.2019 Return Period Intensify Values (lnlhr) (Yrs) 5 min 10 15 20 25 30 35 .40 45 56 55 60 1 0.00 0.00 0.00 0,00. 0:00 0.00 0.00 0.00 0.00 0:00 0.00 0,00 2 .5.Q1 4.04 3,40 194 2.60 2.33 2.11 1.04 1,79 1.66 1..55 1.46 3 0.00 0.00 6.00 0.00. 0.00 0.00 0.00 0;00 0.00 .0;00 0,00 0.60 5 6.22: 5.07. 4.29 3.14 332 2.99 2,72. 2.51 152 2.16 2.63• 1.,91 10 6.89 6.63 479 4.18 3.73 3,37 3.08 2.84 2.64 2.47 2.32 2.10 25 T57 6.20. 5.30 4.65 4.16 3,18 3.47 3.21 3.00 2.81 2,65 2.51 50 7.95 6.52 5.59 4.92 4:42 4.03 317.1 145 123 3.04 2.87 2.73 100 8.29 6.81 5.85 5..17 4.66 4.26 3.94 3.67 3.44 3.25 3.08 2.93 Tc = time in.min utes,.ValLies may exceed .6Q: Precis. file name: Samole.bcn storm Rainfall Precipitation Table (in) Distribution 1-yr 2-yr 3-yr 5-yr 16-yr 25-yr 50-yr 1p0-.yr S.CS 24-hour 2.61 3.15 0,Q0 3.30 4:89 5.81 6.52. 7,24 SCS 6-Hr 1.00. 2.22 0106 0.00 3.42 4:03 4,48 0.00 Huff-1 st 0.00 0;00 0.00 0.00 0:00` 0.00 0.00 0,00 Huff-2nd 0.00 0.00 0.00 0.00. 0.00 0.00 0.00 0:00 Huff-3rd 0:60 0,00 am 0.00 0.00. 0.00 0.00 0.00 Fluff-4th 0:00 0.00 0.00 0.00 0.00. 0.00 0.00 0,06 Huff-lndy 0.00 0.00 0.00 0.00 OM 0.00 0.00 0:00 Custom .0.00 1.75. 0.00 2,80. 3,90 5.25 6.00 7.10