CONSTRUCTION SEQUENCE
PHASE 1A
1. OBTAIN PLAN APPROVAL AND GRADING PERMIT. SCHEDULE PRE -CONSTRUCTION
MEETING WITH NCDEQ STAFF.
2. OBTAIN CERTIFICATE OF COVERAGE FROM THE NC DEPARTMENT OF ENVIRONMENTAL
QUALITY FOR NPDES NCGO1 CONSTRUCTION STORMWATER DISCHARGE PERMIT.
3. MARK CLEARING LIMITS, STREAM BUFFERS, AND WETLANDS PRIOR TO BEGINNING
CONSTRUCTION. CALL NCDEQ INSPECTION STAFF FOR INSPECTION OF CLEARING
LIMITS.
4. INSTALL GRAVEL CONSTRUCTION ENTRANCE AS SHOWN ON PLANS.
5. INSTALL ROCK CHECK DAM IN SMALL DITCH DOWNHILL TO THE EAST OF THE EXISTING
24" RCP OUTLET.
6. INSTALL SILT FENCE AND SILT FENCE STONE OUTLETS ALONG WEST SIDE OF
EXISTING DITCH.
7. CLEAR SITE ONLY AS REQUIRED TO INSTALL PROPOSED PIPE AS SHOWN ON PHASE 1A
PLAN.
8. BEGINNING AT THE DOWNSTREAM END, INSTALL PROPOSED 48" STORM PIPE.
9. AS INSTALLATION OF THE 48" PIPE PROGRESSES, INSTALL PROPOSED 24" STORM
PIPE.
10. INSTALL ENERGY DISSIPATOR AT OUTLET OF 48" PIPE.
11. CONSTRUCT STORM STRUCTURES AND DIVERT FLOW FROM THE EXISTING 48" STORM
PIPE AND TWO 24" STORM PIPES INTO NEW STORM DRAIN SYSTEM.
PHASE 1 B
12. INSTALL SILT FENCE AND SILT FENCE STONE OUTLET AT NEW ENERGY DISSIPATOR.
13. CLEAR AREA FOR TEMPORARY SEDIMENT TRAP #1, TEMPORARY SEDIMENT TRAP #2,
AND TEMPORARY SKIMMER TRAP #1.
14. CONSTRUCT TEMPORARY SEDIMENT TRAP #1, TEMPORARY SEDIMENT TRAP #2, AND
TEMPORARY SKIMMER TRAP #1. INSTALL BAFFLES AND SKIMMER IN TEMPORARY
SKIMMER TRAP #1.
15. CONSTRUCT TEMPORARY DIVERSIONS TO TEMPORARY SEDIMENT TRAP #1,
TEMPORARY SEDIMENT TRAP #2, AND TEMPORARY SKIMMER TRAP #1.
16. CLEAR AREA FOR SKIMMER BASIN #1.
17. CONSTRUCT SKIMMER BASIN #1, INSTALL BAFFLES AND SKIMMER.
18. CONSTRUCT TEMPORARY DIVERSIONS TO SKIMMER BASIN #1.
19. STABILIZE TEMPORARY MEASURES, SUCH AS BERMS AND SEDIMENT TRAPS W/TEMP
SEEDING AND/OR EXCELSIOR MATTING WITHIN 7 DAYS OF INSTALLATION.
20. ALL EROSION CONTROL DEVICES SHALL BE MAINTAINED THROUGHOUT THE LIFE OF
CONSTRUCTION FOR THEIR INTENDED PURPOSE. SHOULD DEVICES FAIL OR BECOME
INEFFECTIVE AT TRAPPING SEDIMENT, THEY SHALL BE REPLACED WITH NEW
MATERIALS AS DEEMED NECESSARY BY THE INSPECTOR.
21. INSTALL REMAINING ROCK CHECKS AT LOCATIONS SHOWN ON THE PLANS.
22. CLEAR REMAINDER OF SITE.
PHASE 2
23. BEGIN ROUGH GRADING FOR TRAILER LOT, EMPLOYEE PARKING LOT, AND DRIVES.
24. INSTALL STORM DRAINAGE AS GRADING PROGRESSES.
25. INSTALL INLET PROTECTION AND ENERGY DISSIPATORS AS STORM DRAINAGE
CONSTRUCTION PROGRESSES.
26. INSTALL TEMPORARY SEDIMENT TRAP #3 AND EXCAVATED SEDIMENT PIT #1 AS
ROUGH GRADING PERMITS.
27. FINE GRADE PROPOSED DRIVES AND PARKING LOTS.
28. PLACE STONE ON PROPOSED DRIVES AND PARKING LOTS AND PAVE.
29. INSTALL TEMPORARY OR PERMANENT SEEDING ON ALL DISTURBED AREAS IN
ACCORDANCE TO THE GROUND STABILIZATION CHART ON PLANS.
30. ONCE TRAILER PARKING LOT AND EMPLOYEE PARKING LOT IS COMPLETED, PERFORM
FULL DEPTH RECLAMATION OF EXISTING PAVEMENT.
31. ONCE GROUND STABILIZATION IS ESTABLISHED CLOSE SEDIMENT TRAPS AND BASINS
BY REMOVING ALL ACCUMULTATED SEDIMENT AND BAFFLES. REMOVE SKIMMER
FROM RISER IN SKIMMER BASIN AND INSTALL PERMANENT STONE BAFFLE. DISPOSE
OF ALL SEDIMENT ACCORDING TO NCDEQ REQUIREMENTS.
32. STABILIZE ANY AREAS DISTURBED BY REMOVAL OF DEVICES IMMEDIATELY.
MAINTENANCE SCHEDULE
1. IN GENERAL, ALL EROSION AND SEDIMENT CONTROL MEASURES WILL
BE CHECKED DAILY AND AFTER EACH SIGNIFICANT RAINFALL BY THE
INSPECTOR OR HIS DESIGNATED REPRESENTATIVE. ANY DEFICIENCIES
SHALL BE REPAIRED BY THE CLOSE OF DAY. MAINTENANCE SHALL
CONTINUE THROUGHOUT THE LENGTH OF THE PROJECT.
2. SILT REMOVAL AND SEDIMENT CLEAN -OUT FROM EROSION AND
SEDIMENT CONTROL ITEMS SHALL BE PERFORMED IN ACCORDANCE
WITH THE FOLLOWING:
SILT FENCES AND DROP INLET PROTECTION WILL BE CHECKED
REGULARLY AND WILL BE CLEANED OUT WHEN THE CAPACITY, HEIGHT
OR DEPTH HAS BEEN REDUCED BY 50%.
3. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND IS
MAINTAINED. AREAS SHALL BE FERTILIZED AND
RE -SEEDED AS NEEDED.
4. STREETS SHALL BE KEPT CLEAN OF MUD AND SILT. PERIODIC
CLEANING OF STREETS SHALL BE PERFORMED.
5. OVERLAND DRAINAGE SHALL NOT CONTAMINATE ROADWAY PAVEMENT SURF ACES.
6. THE E&SC INSPECTOR SHALL HAVE THE AUTHORITY TO ADD OR DELETE EROSION AND
SEDIMENT CONTROLS AS NEEDED IN THE FIELD AS CONDITIONS WARRANT. IN ADDITION, NO
EROSION AND SEDIMENT CONTROL MEASURES MAY BE REMOVED WITHOUT PRIOR
APPROVAL OF THE INSPECTOR.
GENERAL EROSION AND SEDIMENT CONTROL NOTES
1. EXCESS EXCAVATION DISPOSED OF OFF SITE SHALL BE DISPOSED OF IN ACCORDANCE
WITH NCDEQ STANDARDS.
2. EROSION AND SEDIMENT CONTROLS SHALL REMAIN UNTIL THE
DISTURBED AREA IS STABILIZED AND SHALL BE MAINTAINED SO THAT SEDIMENT CARRYING
RUNOFF FROM THE SITE WILL NOT ENTER STORM DRAINAGE FACILITIES
3, IN THE EVENT A CONTRACTOR DUMPS, DISCHARGES OR SPILLS ANY OIL OR CHEMICAL
THAT REACHES, OR HAS THE POTENTIAL TO REACH, A WATERWAY, THE CONTRACTOR SHALL
IMMEDIATELY NOTIFY ALL APPROPRIATE JURISDICTIONAL STATE, FEDERAL. AND CITY
AGENCIES AND SHALL TAKE IMMEDIATE ACTIONS FOR CONTAINMENT AND REMOVAL OF THE
OIL OR CHEMICAL.
4. CONTRACTOR WILL BE REQUIRED TO MAINTAIN THE SELF -INSPECTION FORMS AND MUST
BE AVALIABLE ON SITE. INSPECTIONS MUST BE MADE DURING THE PROJECT AFTER EACH
PHASE OF THE PROJECT, AND THE INSPECTION SHALL BE DOCUMENTED IN WRITING. THIS
SELF -INSPECTION WILL BE PERFORMED IN ADDITION TO THE NPDES SELF -MONITORING
REPORT REQUIRED BY THE NCDEQ GENERAL PERMIT. CONTRACTOR WILL ALSO BE
2
WELCOME BETHESDA RD
LAKE DR S 1 TE
OMER ST
O LANIER DR
COURTNEY LN
KEARNS DR
WALTER LN
VICINITY MAP
N TS
SHEET INDEX
0 C1.0
SITE NOTES, LEGENDS, AND SHEET INDEX
0 C1.1
OVERALL EXISTING CONDITIONS & DEMOLITION PLAN
C1.2
OVERALL SITE PLAN
C1.3
ENLARGED SITE PLAN
C1.4
GRADING & DRAINAGE PLAN
C1.5
PHASE 1A EROSION CONTROL PLAN
0 C1.6
PHASE 113 EROSION CONTROL PLAN
0 C1.7
PHASE 2 EROSION CONTROL PLAN
C1.8
STORM POND & STORM LANDSCAPE PLAN & DETAILS
C2.0
SITE & DRAINAGE DETAILS
C2.1
EROSION CONTROL DETAILS
C2.2
EROSION CONTROL DETAILS
NOTE
THERE ARE NO BUILDING ADDITIONS OR ALTERATIONS TO THE
EXISTING BUILDINGS PROPOSED.
3 4
SITE DATA
1. PROPERTY OWNER
MATCOR METAL FABRICATION, INC.
C/O BRAZOS TAX GROUP, LLC
P. O. BOX 729
WELCOME, NC 27374
2. DEVELOPER
MATCOR METAL FABRICATION, INC.
835 SALEM ROAD
WELCOME, NC 27374
3. PARCEL ID
11312CO000102
1131200000102
4. PIN
6728-04-83-6666
6728-04-92-2624
5. REFERENCES
DB 1930 PG. 1728
6. ADDRESS
835 SALEM ROAD
WELCOME, NORTH CAROLINA
7. ZONING DISTRICT
HI AND O/1
8. LAND USE:
EXISTING: MANUFACTURING
PROPOSED: MANUFACTURING
9. TRACT SIZE = 32.11 ACRES TOTAL
PARCEL NO 11 312CO0001 02 = 6.7 ACRES +/-
PARCEL NO 1131200000102 = 25.41 ACRES +/-
EXISTING BUA = 8.57 ACRES
PR POS D B A = 1.87 A RES 5.82°0)
TOTAL BUA = 10.07 ACRES (31.36%) 2 DISTURBED AREA = 3.66 ACRES (11.40%)
10. DENSITY CALCULATION
(TOTAL BUA - EXISTING BUA)/(TOTAL SITE AREA - EXISTING BUA)
(10.07 AC - 8.57 AC)/(32.11 AC - 8.57 AC) = 0.0637
Density = 6.37%
NOTES
1. GEOMETRIC AND TOPOGRAPHIC DATA FROM SURVEY BY SACKS SURVEYING AND MAPPING, PC, 3308-B
EDGEFIELD ROAD, GREENSBORO, NC 27409 DATED NOVEMBER 9, 2017.
2. THIS PROPERTY DOES NOT LIE WITHIN THE 100-YEAR OR OTHER SPECIAL HAZARD FLOOD ZONE PER
COMMUNITYPANEL 3710672800J, EFFECTIVE MARCH 16, 2009.
3. THE PROPERTY IS NOT LOCATED WITHIN A DESIGNATED WATER SUPPLY WATERSHED.
ZONING DATA (HI AND 0/1)
ITEM
---------------------------------------
MIN. LOT SIZE
MIN. LOT WIDTH
MAX. LOT COVERAGE
MIN. SETBACKS
FRONT/STREET
SIDE (NORTH)
SIDE(SOUTH)
REAR
MAX. BLDG. HGT.
REQUIRED HI REQUIRED 0/1 ACTUAL
80,000
30,000 SF
1,398,712 SF
125 FT
125 FT
2,465 FT
40%
50%
31.36%
50 FT
30 FT
10 FT (EXISTING)
20 FT
10 FT
N/A
20 FT
10 FT
847 FT
25 FT
25 FT
0 FT
E
125 FT
35 FT
FT
PARKING SPACES REQUIRED
MANUFACTURING 149 06
HANDICAP SPACES 5 2
TOTAL PROVIDED 206
EMPLOYEE COUNT PER SHIFT
FIRST SHIFT 194 EMPLOYEES
SECOND SHIFT 104 EMPLOYEES
THIRD SHIFT 55 EMPLOYEES
TOTAL LARGEST TWO SHIFTS = 298 EMPLOYEES
MANUFACTURING - 1 SPACE/2 EMPLOYEES ON THE LARGETS TWO SHIFTS COMBINED
298 EMPLOYEES/2 = 149 SPACES REQUIRED
PROPOSED LEGEND
MANHOLE
HYDRANT
WATER METER
•
WATER VALVE
A
CLEANOUT
INLET
■
TEE
I
90' BEND
I-
45° BEND
GUARDRAIL
-
STORM PIPE
WATER LINE
W W
10" FIRE LINE
10 F 10 F
4" FIRE LINE
4 F 4 F
SAN. SEWER LINE
EROSION
CONTROL LEGEND
TEMPORARY SILT FENCE
SF
TEMPORARY DIVERSION BERM
TD
PERMANENT EARTH BERM
PEB
TEMPORARY SLOPE DRAIN
TSD
PD
PERMANENT DIVERSION
C
■
I LIMITS OF DISTRUBANCE
MATTING MATERIAL
o
00
0
TEMPORARY CONSTRUCTION ENTRANCE
TEMPORARY INLET PROTECTION
dP(b
TEMPORARY ROCK CHECK DAM
C& TEMPORARY SILT FENCE STONE OUTLET
PIPE OUTLET EROSION CONTROL DEVICE
DOUGHNUT INLET/OUTLET PROTECTION
PAVEMENT HATCHING LEGEND
HEAVY DUTY PAVEMENT
CONCRETE
ea
GRAVEL
REINFORCED CONCRETE
�! d•• •a •• fJ4
Ground Stabilization*
Site Area Description
Stabilization
Stabilization Time Frame
Time Frame
Exceptions
Perimeter Dikes, Swales,
7 Days
None
Ditches and Slopes
High Quality Water (HQW)
7 Days
None
Zones
If Slopes are 10' or Less in
Slopes Steeper than 3:1
7 Days
Length and are Not Steeper
than 2: 1, 14 Days are
Allowed
Slopes 3:1 or Flatter
14 Days
7 Days for Slopes Greater
than 50 Feet in Length
All Other Areas with
14 Days
None (Except for Perimeter
Slopes Flatter than 4:1
and HQW Zones)
*"Extensions of time may be approved by the permitting authority
based on weather or other site specific conditions that make
compliance impractible" (Section 11.B(2Xb))
Self Inspection report for Land Disturbing Activity as Required by NCGS 113A-54.1
Phase of Approved Erosion
Signature (Landowner, Financially
& Sedimentation Control
Date
Responsible Party or Agent)
Plan
Installation of Erosion
Control Devices and
Seeding
Fill and Slopes Completed
(Fine Grades Established)
Stabilization of Building Pad
and Parking Areas
Final Grades Achieved,
Obtained Building c/o
Vegetation Established;
Removal of Erosion Control
Measures
Closing of Permit; Final
Inspection
0
F3
triaddesigwroup
Architecture I Engineering I Interior Design
Triad Design Group, P.C.
4807-C Koger Boulevard
Greensboro, NC 27407
Telephone 336-218-8282
Facsimile 336-218-8010
www.triad-designgroup.com
NC Architecture Reg. 50709
NC Engineering Lic. C-1108
DECEMBER 19, 2019
PROFESSIONAL OF RECORD:
L. ALLAN HILL, P.E.
U
z
Lu
70
(a
0
co
�
C)
w
0
N
0
CQ
z
G
Ln
E
LLJ
OO
0
U
�
1 11-04-19 NCDEQ COMMENTS
Mk Date Description
Revisions
SITE NOTES,
LEGENDS, & SHEET
INDEX
Date: AUGUST, 2019
Drawn: Check: LAH
Job Number: 17-042
Sheet:
Como