HomeMy WebLinkAboutSW4191202_17-042_C1.0 INDEX_1/2/2020E C Q T T d i i I z 3 I a I e I s I CONSTRUCTION SEQUENCE PHASE 1A 1. OBTAIN PLAN APPROVAL AND GRADING PERMIT. SCHEDULE PRE -CONSTRUCTION MEETING WITH NCDEQ STAFF. 2. OBTAIN CERTIFICATE OF COVERAGE FROM THE NC DEPARTMENT OF ENVIRONMENTAL QUALITY FOR NPDES NCGO1 CONSTRUCTION STORMWATER DISCHARGE PERMIT. 3. MARK CLEARING LIMITS, STREAM BUFFERS, AND WETLANDS PRIOR TO BEGINNING CONSTRUCTION. CALL NCDEQ INSPECTION STAFF FOR INSPECTION OF CLEARING LIMITS. 4. INSTALL GRAVEL CONSTRUCTION ENTRANCE AS SHOWN ON PLANS. 5. INSTALL ROCK CHECK DAM IN SMALL DITCH DOWNHILL TO THE EAST OF THE EXISTING 24" RCP OUTLET. 6. INSTALL SILT FENCE AND SILT FENCE STONE OUTLETS ALONG WEST SIDE OF EXISTING DITCH. 7. CLEAR SITE ONLY AS REQUIRED TO INSTALL PROPOSED PIPE AS SHOWN ON PHASE 1A PLAN. 8. BEGINNING AT THE DOWNSTREAM END, INSTALL PROPOSED 48" STORM PIPE. 9. AS INSTALLATION OF THE 48" PIPE PROGRESSES, INSTALL PROPOSED 24" STORM PIPE. 10. INSTALL ENERGY DISSIPATOR AT OUTLET OF 48" PIPE. 11. CONSTRUCT STORM STRUCTURES AND DIVERT FLOW FROM THE EXISTING 48" STORM PIPE AND TWO 24" STORM PIPES INTO NEW STORM DRAIN SYSTEM. PHASE 1 B 12. INSTALL SILT FENCE AND SILT FENCE STONE OUTLET AT NEW ENERGY DISSIPATOR. 13. CLEAR AREA FOR TEMPORARY SEDIMENT TRAP #1, TEMPORARY SEDIMENT TRAP #2, AND TEMPORARY SKIMMER TRAP #1. 14. CONSTRUCT TEMPORARY SEDIMENT TRAP #1, TEMPORARY SEDIMENT TRAP #2, AND TEMPORARY SKIMMER TRAP #1. INSTALL BAFFLES AND SKIMMER IN TEMPORARY SKIMMER TRAP #1. 15. CONSTRUCT TEMPORARY DIVERSIONS TO TEMPORARY SEDIMENT TRAP #1, TEMPORARY SEDIMENT TRAP #2, AND TEMPORARY SKIMMER TRAP #1. 16. CLEAR AREA FOR SKIMMER BASIN #1. 17. CONSTRUCT SKIMMER BASIN #1, INSTALL BAFFLES AND SKIMMER. 18. CONSTRUCT TEMPORARY DIVERSIONS TO SKIMMER BASIN #1. 19. STABILIZE TEMPORARY MEASURES, SUCH AS BERMS AND SEDIMENT TRAPS W/TEMP SEEDING AND/OR EXCELSIOR MATTING WITHIN 7 DAYS OF INSTALLATION. 20. ALL EROSION CONTROL DEVICES SHALL BE MAINTAINED THROUGHOUT THE LIFE OF CONSTRUCTION FOR THEIR INTENDED PURPOSE. SHOULD DEVICES FAIL OR BECOME INEFFECTIVE AT TRAPPING SEDIMENT, THEY SHALL BE REPLACED WITH NEW MATERIALS AS DEEMED NECESSARY BY THE INSPECTOR. 21. INSTALL REMAINING ROCK CHECKS AT LOCATIONS SHOWN ON THE PLANS. 22. CLEAR REMAINDER OF SITE. PHASE 2 23. BEGIN ROUGH GRADING FOR TRAILER LOT, EMPLOYEE PARKING LOT, AND DRIVES. 24. INSTALL STORM DRAINAGE AS GRADING PROGRESSES. 25. INSTALL INLET PROTECTION AND ENERGY DISSIPATORS AS STORM DRAINAGE CONSTRUCTION PROGRESSES. 26. INSTALL TEMPORARY SEDIMENT TRAP #3 AND EXCAVATED SEDIMENT PIT #1 AS ROUGH GRADING PERMITS. 27. FINE GRADE PROPOSED DRIVES AND PARKING LOTS. 28. PLACE STONE ON PROPOSED DRIVES AND PARKING LOTS AND PAVE. 29. INSTALL TEMPORARY OR PERMANENT SEEDING ON ALL DISTURBED AREAS IN ACCORDANCE TO THE GROUND STABILIZATION CHART ON PLANS. 30. ONCE TRAILER PARKING LOT AND EMPLOYEE PARKING LOT IS COMPLETED, PERFORM FULL DEPTH RECLAMATION OF EXISTING PAVEMENT. 31. ONCE GROUND STABILIZATION IS ESTABLISHED CLOSE SEDIMENT TRAPS AND BASINS BY REMOVING ALL ACCUMULTATED SEDIMENT AND BAFFLES. REMOVE SKIMMER FROM RISER IN SKIMMER BASIN AND INSTALL PERMANENT STONE BAFFLE. DISPOSE OF ALL SEDIMENT ACCORDING TO NCDEQ REQUIREMENTS. 32. STABILIZE ANY AREAS DISTURBED BY REMOVAL OF DEVICES IMMEDIATELY. MAINTENANCE SCHEDULE 1. IN GENERAL, ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CHECKED DAILY AND AFTER EACH SIGNIFICANT RAINFALL BY THE INSPECTOR OR HIS DESIGNATED REPRESENTATIVE. ANY DEFICIENCIES SHALL BE REPAIRED BY THE CLOSE OF DAY. MAINTENANCE SHALL CONTINUE THROUGHOUT THE LENGTH OF THE PROJECT. 2. SILT REMOVAL AND SEDIMENT CLEAN -OUT FROM EROSION AND SEDIMENT CONTROL ITEMS SHALL BE PERFORMED IN ACCORDANCE WITH THE FOLLOWING: SILT FENCES AND DROP INLET PROTECTION WILL BE CHECKED REGULARLY AND WILL BE CLEANED OUT WHEN THE CAPACITY, HEIGHT OR DEPTH HAS BEEN REDUCED BY 50%. 3. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND IS MAINTAINED. AREAS SHALL BE FERTILIZED AND RE -SEEDED AS NEEDED. 4. STREETS SHALL BE KEPT CLEAN OF MUD AND SILT. PERIODIC CLEANING OF STREETS SHALL BE PERFORMED. 5. OVERLAND DRAINAGE SHALL NOT CONTAMINATE ROADWAY PAVEMENT SURF ACES. 6. THE E&SC INSPECTOR SHALL HAVE THE AUTHORITY TO ADD OR DELETE EROSION AND SEDIMENT CONTROLS AS NEEDED IN THE FIELD AS CONDITIONS WARRANT. IN ADDITION, NO EROSION AND SEDIMENT CONTROL MEASURES MAY BE REMOVED WITHOUT PRIOR APPROVAL OF THE INSPECTOR. GENERAL EROSION AND SEDIMENT CONTROL NOTES 1. EXCESS EXCAVATION DISPOSED OF OFF SITE SHALL BE DISPOSED OF IN ACCORDANCE WITH NCDEQ STANDARDS. 2. EROSION AND SEDIMENT CONTROLS SHALL REMAIN UNTIL THE DISTURBED AREA IS STABILIZED AND SHALL BE MAINTAINED SO THAT SEDIMENT CARRYING RUNOFF FROM THE SITE WILL NOT ENTER STORM DRAINAGE FACILITIES 3, IN THE EVENT A CONTRACTOR DUMPS, DISCHARGES OR SPILLS ANY OIL OR CHEMICAL THAT REACHES, OR HAS THE POTENTIAL TO REACH, A WATERWAY, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY ALL APPROPRIATE JURISDICTIONAL STATE, FEDERAL. AND CITY AGENCIES AND SHALL TAKE IMMEDIATE ACTIONS FOR CONTAINMENT AND REMOVAL OF THE OIL OR CHEMICAL. 4. CONTRACTOR WILL BE REQUIRED TO MAINTAIN THE SELF -INSPECTION FORMS AND MUST BE AVALIABLE ON SITE. INSPECTIONS MUST BE MADE DURING THE PROJECT AFTER EACH PHASE OF THE PROJECT, AND THE INSPECTION SHALL BE DOCUMENTED IN WRITING. THIS SELF -INSPECTION WILL BE PERFORMED IN ADDITION TO THE NPDES SELF -MONITORING REPORT REQUIRED BY THE NCDEQ GENERAL PERMIT. CONTRACTOR WILL ALSO BE 2 WELCOME BETHESDA RD LAKE DR S 1 TE OMER ST O LANIER DR COURTNEY LN KEARNS DR WALTER LN VICINITY MAP N TS SHEET INDEX 0 C1.0 SITE NOTES, LEGENDS, AND SHEET INDEX 0 C1.1 OVERALL EXISTING CONDITIONS & DEMOLITION PLAN C1.2 OVERALL SITE PLAN C1.3 ENLARGED SITE PLAN C1.4 GRADING & DRAINAGE PLAN C1.5 PHASE 1A EROSION CONTROL PLAN 0 C1.6 PHASE 113 EROSION CONTROL PLAN 0 C1.7 PHASE 2 EROSION CONTROL PLAN C1.8 STORM POND & STORM LANDSCAPE PLAN & DETAILS C2.0 SITE & DRAINAGE DETAILS C2.1 EROSION CONTROL DETAILS C2.2 EROSION CONTROL DETAILS NOTE THERE ARE NO BUILDING ADDITIONS OR ALTERATIONS TO THE EXISTING BUILDINGS PROPOSED. 3 4 SITE DATA 1. PROPERTY OWNER MATCOR METAL FABRICATION, INC. C/O BRAZOS TAX GROUP, LLC P. O. BOX 729 WELCOME, NC 27374 2. DEVELOPER MATCOR METAL FABRICATION, INC. 835 SALEM ROAD WELCOME, NC 27374 3. PARCEL ID 11312CO000102 1131200000102 4. PIN 6728-04-83-6666 6728-04-92-2624 5. REFERENCES DB 1930 PG. 1728 6. ADDRESS 835 SALEM ROAD WELCOME, NORTH CAROLINA 7. ZONING DISTRICT HI AND O/1 8. LAND USE: EXISTING: MANUFACTURING PROPOSED: MANUFACTURING 9. TRACT SIZE = 32.11 ACRES TOTAL PARCEL NO 11 312CO0001 02 = 6.7 ACRES +/- PARCEL NO 1131200000102 = 25.41 ACRES +/- EXISTING BUA = 8.57 ACRES PR POS D B A = 1.87 A RES 5.82°0) TOTAL BUA = 10.07 ACRES (31.36%) 2 DISTURBED AREA = 3.66 ACRES (11.40%) 10. DENSITY CALCULATION (TOTAL BUA - EXISTING BUA)/(TOTAL SITE AREA - EXISTING BUA) (10.07 AC - 8.57 AC)/(32.11 AC - 8.57 AC) = 0.0637 Density = 6.37% NOTES 1. GEOMETRIC AND TOPOGRAPHIC DATA FROM SURVEY BY SACKS SURVEYING AND MAPPING, PC, 3308-B EDGEFIELD ROAD, GREENSBORO, NC 27409 DATED NOVEMBER 9, 2017. 2. THIS PROPERTY DOES NOT LIE WITHIN THE 100-YEAR OR OTHER SPECIAL HAZARD FLOOD ZONE PER COMMUNITYPANEL 3710672800J, EFFECTIVE MARCH 16, 2009. 3. THE PROPERTY IS NOT LOCATED WITHIN A DESIGNATED WATER SUPPLY WATERSHED. ZONING DATA (HI AND 0/1) ITEM --------------------------------------- MIN. LOT SIZE MIN. LOT WIDTH MAX. LOT COVERAGE MIN. SETBACKS FRONT/STREET SIDE (NORTH) SIDE(SOUTH) REAR MAX. BLDG. HGT. REQUIRED HI REQUIRED 0/1 ACTUAL 80,000 30,000 SF 1,398,712 SF 125 FT 125 FT 2,465 FT 40% 50% 31.36% 50 FT 30 FT 10 FT (EXISTING) 20 FT 10 FT N/A 20 FT 10 FT 847 FT 25 FT 25 FT 0 FT E 125 FT 35 FT FT PARKING SPACES REQUIRED MANUFACTURING 149 06 HANDICAP SPACES 5 2 TOTAL PROVIDED 206 EMPLOYEE COUNT PER SHIFT FIRST SHIFT 194 EMPLOYEES SECOND SHIFT 104 EMPLOYEES THIRD SHIFT 55 EMPLOYEES TOTAL LARGEST TWO SHIFTS = 298 EMPLOYEES MANUFACTURING - 1 SPACE/2 EMPLOYEES ON THE LARGETS TWO SHIFTS COMBINED 298 EMPLOYEES/2 = 149 SPACES REQUIRED PROPOSED LEGEND MANHOLE HYDRANT WATER METER • WATER VALVE A CLEANOUT INLET ■ TEE I 90' BEND I- 45° BEND GUARDRAIL - STORM PIPE WATER LINE W W 10" FIRE LINE 10 F 10 F 4" FIRE LINE 4 F 4 F SAN. SEWER LINE EROSION CONTROL LEGEND TEMPORARY SILT FENCE SF TEMPORARY DIVERSION BERM TD PERMANENT EARTH BERM PEB TEMPORARY SLOPE DRAIN TSD PD PERMANENT DIVERSION C ■ I LIMITS OF DISTRUBANCE MATTING MATERIAL o 00 0 TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY INLET PROTECTION dP(b TEMPORARY ROCK CHECK DAM C& TEMPORARY SILT FENCE STONE OUTLET PIPE OUTLET EROSION CONTROL DEVICE DOUGHNUT INLET/OUTLET PROTECTION PAVEMENT HATCHING LEGEND HEAVY DUTY PAVEMENT CONCRETE ea GRAVEL REINFORCED CONCRETE �! d•• •a •• fJ4 Ground Stabilization* Site Area Description Stabilization Stabilization Time Frame Time Frame Exceptions Perimeter Dikes, Swales, 7 Days None Ditches and Slopes High Quality Water (HQW) 7 Days None Zones If Slopes are 10' or Less in Slopes Steeper than 3:1 7 Days Length and are Not Steeper than 2: 1, 14 Days are Allowed Slopes 3:1 or Flatter 14 Days 7 Days for Slopes Greater than 50 Feet in Length All Other Areas with 14 Days None (Except for Perimeter Slopes Flatter than 4:1 and HQW Zones) *"Extensions of time may be approved by the permitting authority based on weather or other site specific conditions that make compliance impractible" (Section 11.B(2Xb)) Self Inspection report for Land Disturbing Activity as Required by NCGS 113A-54.1 Phase of Approved Erosion Signature (Landowner, Financially & Sedimentation Control Date Responsible Party or Agent) Plan Installation of Erosion Control Devices and Seeding Fill and Slopes Completed (Fine Grades Established) Stabilization of Building Pad and Parking Areas Final Grades Achieved, Obtained Building c/o Vegetation Established; Removal of Erosion Control Measures Closing of Permit; Final Inspection 0 F3 triaddesigwroup Architecture I Engineering I Interior Design Triad Design Group, P.C. 4807-C Koger Boulevard Greensboro, NC 27407 Telephone 336-218-8282 Facsimile 336-218-8010 www.triad-designgroup.com NC Architecture Reg. 50709 NC Engineering Lic. C-1108 DECEMBER 19, 2019 PROFESSIONAL OF RECORD: L. ALLAN HILL, P.E. U z Lu 70 (a 0 co � C) w 0 N 0 CQ z G Ln E LLJ OO 0 U � 1 11-04-19 NCDEQ COMMENTS Mk Date Description Revisions SITE NOTES, LEGENDS, & SHEET INDEX Date: AUGUST, 2019 Drawn: Check: LAH Job Number: 17-042 Sheet: Como