Loading...
HomeMy WebLinkAboutNCC193350_ESC Approval Submitted_20200102 1 ROY COOPER Governor MICHAEL S.REGAN Secretary S.DANIEL SMITH NORTH CAROLINA Director Environmental Quality December 17, 2019 LETTER OF APPROVAL WITH MODIFICATIONS United Renewable Energy, LLC ATTN: Ms.Amber Penland 5895 Shiloh Road #104 Alpharetta, GA 30005 RE: Project Name: HOT SPRINGS MICROGRID Acres Approved: 15.77 Project ID: MADIS 2020-002 County: Madison City: Hot Springs Address: 180 S.Andrews Ave River Basin: French Broad Stream Classification: French Broad - B Submitted By: Mr. Rance Brady Date Received by LQS: December 16, 2019 Plan Type: Institutional Dear Ms. Penland: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this Letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page.This plan approval shall expire three (3) years following the date of approval, if no land- disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above-named project. The NOI form may be accessed at deg'nc.govJNCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas(@ncdenr.gov or Paul Clark at Paul.clark(@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. QIE North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Asheville Regional Office 1 2090 U.S.Highway 70 1 Swannanoa,North Carolina 28778 NORrKcwa�a u.,�m�taa � — �� 828,296.4500 Letter of Approval with Modifications United Renewable Energy, LLC December 17, 2019 Page 2 of 3 Title 15A NCAC 4B.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-S1 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land- disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee.You are requested to file an amended form if there is any change in the information included on the form. In addition,it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, r lMelissa J. Kin , E Assistant Re i al Engine Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NPDES N.CG01 Fact Sheet ec: Mr. Rance Brady rancePseisolarpros.com Mr.Jonathan Nicolosi jnicolosi@u-renew.com Letter of Approval with Modifications United Renewable Energy, LLC December 17, 2019 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: HOT SPRINGS MICROGRID Project ID: MADIS 2020-002 County: Madison 1. Prior to any disturbance at this site,the Certificate of Coverage for NCG01 Construction Stormwater General Permit must have been received. {NCG01 Construction Stormwater General Permit} 2. All surface waters must be protected from sediment-laden runoff with adequate erosion sediment control devices and an adequate buffer. {G.S. 113A-57}{15A NCAC 04B .0106}{15A NCAC 04B .0109}{15A NCAC 04B .0125} 3. All details should as shown in the NC Erosion and Sediment Control Planning and Design Manual - 2013 (e.g. baffles equally spaced in basin; compost sock/wattle installation). {G.S. 113A-57}{15A NCAC 04B .0106} 4. Limits of disturbance must include all disturbance to include the access road and the outlet structures of the basin. {G.S. 113A-57}{15A NCAC 04B .0106} 5. Final close-out approval from NCDEQ/ARO inspector must be received prior to removal of erosion sedimenti control devices. {G.S. 113A-57}{15A NCAC 0.4B .0106} M CD Wood Wood = Mot 'e, C c `-+ =• CDCD Z O fD ¢ � v In AD ~• o �;' e rCD y n D [D ModeAI It o 0o CD Owe Go" CD CD MM CD Owe eD CD � � �"� i"'! ri-r+ ��GREATS, O AK _ q`O� eD V l� � yv rT7 fD r 47 CD o CDCD �d 0 CD p0 � � Mode � Ommi w �• O • vs' CD A I G N C Wood �... 1p rpow 0 4m �, '� al000d �, � � ¢ � - CD 0 Oee,, �