Loading...
HomeMy WebLinkAbout20191758 Ver 1_Application Attachments_20191231Water ResourcesENTAL QUALITY A. Owner/Applicant Information For instructions on how to fill out this form, see the Buffer Authorization Application Help Document posted on DWR's 401 & Buffer page. Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. A. Owner/Applicant Information General Information Primary Contact Email: * Is this project a public transportation project? * pcwilliams2@ncdot.gov Rease list the contact person's enail for questions or payrrent on this project if needed. r Yes r No Who is submitting the application?* r- Owner rJ Applicant other than Owner r- Agent Check all that apply Is there an agent working on this application r Yes but not submitting it?* r No 1. Property Owner Information: la. Name on Recorded Deed:* 1b. Responsible Party: 1c. Mailing Address:* 1d. Telephone:* (252)482-1861 NCDOT Right -of -Way SR 1159 Flat Swamp Road in Martin County Paul Williams (for Corporations) Street Address 113 Airport Dr. Address Line 2 City State / Frovince / Region Edenton NC Fbstal / Zip Code Country 27932 USA 2. Applicant's Information (if different from owner): 2a. Name:* Paul Williams le. Email Address:* pcWlliams2@ncdot.gov 2b. Company Affiliation: NC Department of Transportation 2c. Mailing Address:* 2d. Telephone:* 2e. Email Address:* Street Address 113 Airport Dr. Address Line 2 aty Edenton Fbstal / Zip Code 27932 (252)482-1861 pcWlliams2@ncdot.gov State / Frovince / Fbgion NC Country USA If the applicant is not the property owner, in addition to providing the Agent's information, select Applicant other than Owner' above, enter the applicant's information, and attach an authorization granting the applicant owner approval. B. Project Information and Prior Project History B. Project Information and Prior Project History 1. Project Information u la. Name of Project:* Bridge 71 Replacement Project in Martin County (Subdivision, facility, or establishment narre) If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1b. Is this a publicly -funded transportation project?* r Yes r No 1c. TIP# 17BP.1.R.86 1d. Subdivision Name: n/a le. Nearest Robersonville Municipality: 1f. Property Size: 1.00 acres 1g. County (or Counties) where the project is located:* Martin 1h. Property ID# Date of Purchase Tax RN or Parcel id 1 i. Deed Information Type of Book Book# Page# Deed Map =F 1j. Attach a copy of the recorded map that indicates when the lot was last platted. Click the upload button or drag and drop files here to attach docurrent R7F only 1k. How would you like to provide the Latitude and Longitude information?* f Address Lookup r Manually Latitude * 35.815905 Longitude *-77.264146 11. Is the project located in any of North Carolina's twenty coastal counties? r Yes r No Coastal Management information can be found at: About Coastal Management • Staff Listing o Coastal County Lookup 2. Surface Waters 2a. Name of the nearest body of water to proposed project:* Flat Swamp Link to Soil Surveys for North Carolina Counties. (Please see instructions in the Help Document to determine the most recent published version.) 2b. Water Quality Classification of nearest receiving water:* C; Sw, NSW 2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:* 100 (linear feet only) 3. Project Description: 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Project area consist of NCDOT Martin County SR 1159 and Bridge #71. The adjacent property use is a mix of agricultural and timber. 3b. Attach an 8'/2 x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site. Click the upload button or drag and drop files here to attach docunent B-4577_QuadMap.pdf 2.66MB FDF only Link to TOPO Map lookup: https://viewer.nationalmap.gov/basic/ 3c. Attach an 8 % x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site. Click the upload button or drag and drop files here to attach docunent Soil_Map.pdf RDF only 622.51 KB Link to Soil Surveys for North Carolina Counties. (Please see instructions in the Help Document to determine the most recent published version.) 4. Proposed Activity Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used:* The existing 52' L X25' W 3-span bridge will be removed and replaced with the proposed 70' L X 33' W single span concrete cored slab bridge. The project will result in no impacts to jurisdictional wetlands or streams. This work will be accomplished using cranes, track excavators,backhoes, and dump trucks. Attach a site plan as applicable to the project: Click the upload button or drag and drop files here to attach docurrent 17BP.1.R.86_Permit Drawings_07302019.pdf 1.21MB 17BP.1.R.86_Permit Drawings_Buffer_07302019.pdf 779.68KB RDF only ** Below is a link with instructions on what you will need to show on your site plan. http://edocs.deq. nc.gov/WaterResou rces/0/doc/402224/Page l .aspx 5. Jurisdictional Determinations 5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project (including all prior phases) in the past?* h h r Yes r No 6. Project History 6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?* r Yes r No 7. Future Project Plans .............. ............... .............. ............... 7a. Is this project a phased project?* r Yes r No C. Proposed Impacts Inventory C. Proposed Impacts Inventory ^, ...........................................................................................................................................................................................................................................................................................................................................................................................................................................................................................-........... Buffer Impacts 1a. Project is in which protected Basin?* r Neuse River Basin (15A NCAC 02B.0233) f Catawba River Basin (15A NCAC 02B.0243) r Randleman Lake Watershed (15A NCAC 02B.0250) r Tar -Pamlico River Basin (15A NCAC 02B.0259) r Jordan Lake Watershed (15A NCAC 02B.0267) r Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 0213.0607) You can find which river basin you live in at the link below. http://wmw.eenorthcarolina.org/riverbasins-gis-map.asp 1c. Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. Please note: if the impact you list below requires mitigation choose "allow w/ mitigation" under impact type. Site# -Reason Stream Name Buffer Impact* Impact Type *IF Zone 1 Zone 2 Bridge Flat Swamp Permanent Allowable 1,219. 0.00 K/hp label (e.g. Road (P) 00 Square Crossing 1) Perm orTerrp Square Feet Feet Road Crossing Flat Swamp Permanent Allowable 887.00 1,209. fvhp label (e.g. Fbad (P) Square 00 Crossing 1) Perm orTerrp Feet Square Feet Total Zone 1 Impacts: 2,106.00 Total Zone 2 Impacts: 1,209.00 Total Buffer Impacts: 3,315.00 Comments: Buffer impacts depicted on attached document 17BP.1.R.86_Permit Drawing s_Buffer_07302019 D. Impact Justification and Mitigation D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project.* Bridge replacement will stay on the existing alignment and traffic will be detoured around the site by using an offsite detour. This will reduce temporary impacts to open waters by not utilizing an on -site detour and keeping the road open. Impacts to jurisdictional wetlands and streams have been avoided. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. NCDOT BMP's will be followed during bridge removal/installation and erosion control devices will be installed to prevent sediment loss from the project site. E. Diffuse Flow Plan E. Diffuse Flow Plan All buffer impacts & high ground impacts require diffuse flow or other form of stormwater treatment. If the project is subject to a state implemented riparian buffer program, upload a plan that fully documents howdiffuse flowwill be maintained. All stormwater control measures (SCMs) must be designed in accordance with the NC Stormwater Design Manual. Associated supplement forms and other documentation must be provided. For a list of options to meet the diffuse flow requirements, click here. la. What type of SCM are you providing?* I- Level Spreader r% Vegetated Conveyance (lower SHWT) r Wetland Swale (higher SHWT) r Proposed project will not create concentrated stormwater flow through the buffer r Other SCM that removed minimum of 30% nitrogen 1 c. Diffuse Flow Documentation* (lick the upload button or drag and drop files here to attach docurrent 17BP.1.R.86_Permit Drawings_Buffer_07302019.pdf 779.68KB FOF only F. Supplementary Information F. Supplementary Information Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? r Yes r No Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? r Yes f• No 2b. Is this an after -the -fact buffer authorization application? r Yes r No G. Additional Information ^ Please upload any additional information you would like the Division to consider during application review. Additional Attachments: Click the upload button or drag and drop files here to attach docurrent FDF only Additional Comments: Met onsite with Kyle Barnes, US Corps of Engineers, on 11/1/2019 to verify project would not impact adjacent wetlands. G. Sign and Submit G. Sign and Submitt ^ By digitally signing below, I certifythat: o I have given true, accurate, and complete information on this form; o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act') o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the application form." Print Name:* Paul Collins Williams, Jr. Signature * C:'?W/4:-dI , 411r1-,,. Cam. Submission Date: 12/30/2019 (Auto populated field)