Loading...
HomeMy WebLinkAbout20191760 Ver 1_C-5621_Permit Drawings_20191217_20191230l lighway North Carolina Department of Transportation k 5to�Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.06; Released June 2016) FOR NCDOT PROJECTS WBS Element: 50146.3.1 TIP No.: C-5621 County(ies): Mecklenburg Page 1 of 1 General Project Information WBS Element: 50146.3.1 ITIP Number: C-5621 Project Type: Roadway Widening Date: 9/30/2019 NCDOT Contact: Sean Epperson, PE Contractor / Designer: IRichard L. Bollinger, PE Address: 716 West Main Street Albemarle, NC 28001 Address: 8521 Six Forks Road Suite 400 Raleigh, NC 27615 Phone: 704-983-4400 Phone: 919-926-4105 Email: smepperson@ncdot.gov Email: richard.bollin er rsandh.com City/Town: Cornelius County(ies): Mecklenburg River Basin(s): Catawba I ICAMA County? I No Wetlands within Project Limits? No Project Description Project Length (lin. miles or feet): 0.177 mi Surrounding Land Use: I Residential, Commercial Proposed Project Existing Site Project Built -Upon Area (ac.) 8.7 ac. 5.7 ac. Typical Cross Section Description: Headed East on Catawba Avenue, along -L-, there is a 12-15' lane, followed by two, 12- 15' right turn lanes, 2' curb and gutter, a 04' plant strip and a 10' multi -use path. Headed west there are two, 12-15' lanes, followed by a 12-15' right turn lane, 2' curb and gutter, a 4' plant strip and a 5' sidewalk. Headed North on US 21, along -Y1A-, there are two, 12' lanes, 2' curb and gutter, a 7' plant strip and a 13' multi -use path. Headed South on -Y1A there are two, 12' lanes, followed by a 0-12' right turn lane, a 7' plant strip and a 13' multi- use path. -Y1 B- headed North has a 12' lane, 2' curb and gutter, followed by a 7' plant strip and a 13' multi -use path. Headed South along -Y1B-, there is a 12' lane, followed by another 0-12' lane, a 7' plant strip and a 13' multi -use path. The existing roadway has two, 1 V lanes in each direction, with 2' curb and gutter and a 0-5' sidewalk along the roadway. Annual Avg Daily Traffic (veh/hr/day): Design/Future: 45,517 Year: 2040 Existing: 26,000 Year: 2015 General Project Narrative: (Description of Minimization of Water Quality Impacts) This is a roadway widening project with dual roundabouts North and South of SR 5544 (Catawba Ave) and US 21 intersection in Cornelius. There are three impact sites along the project where permanent and temporary surface water impacts will occur. Site 1 impacts occur at a 42" RCP and headwall. Site 2 impacts occur at a channel relocation and a rip rap outlet. Site 3 impacts occur at a channel relocation. Dissapator pads are used to reduce water velocities entering streams within the project. NCDOT will attempt to avoid and minimize impacts to streams to the greatest extent practicable during project design. Waterbody Information Surface Water Body (1): Unnamed Tributar, to Catawba River NCDWR Stream Index No.: 11-(75) NCDWR Surface Water Classification for Water Body Primary Classification: Water Supply IV (W S-IV) Class B Supplemental Classification: Other Stream Classification: Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: N/A Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body-7 No I Deck Drains Discharge Over Buffer? INo Dissipator Pads Provided in Buffer? INo Deck Drains Discharge Over Water Body? INo (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify iL. n the General Project Narrative) (If yes, provide justification in the General Project Narrative) I c 71 I E L a I T S kD Ln V) c EL .3 0 0 c N E C O c W 00- orL, CD o; o 6" (V LL W �Y o=� / �LY4 V V i p 77 P P I� 77 L d .�� z A I =r I� VICINITY MAP N T s BEGIN TIP PROJECT C-5621 -L- STA.11 + 30.00 STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS MECKLENBURG COUNTY co� LOCATION: DUAL ROUNDABOUTS NORTH AND SOUTH OF SR 5544 (CA TAWBA AVE.) AND US 21INTERSECTION IN CORNELIUS A TYPE OF WORK: GRADING, DRAINAGE, PAVING, AND SIGNALS WETLAND AND SURFACE WATER IMPACTS PERMIT �i 5 SITE 1 TO I-77 BEGIN CONSTRUCTION-- -L- STA.10 + 75.23 SITE 2A M �p SITE 213 V GRAPHIC SCALES DESIGN DATA 50 25 0 50 100 ADT 2015 = 26,000 ADT 2040 = 45,517 K = 10 % PLANS D = 60 % 50 25 0 50 100 T - 4 % y V = 40 MPH PROFILE (HORIZONTAL) PSI * TTST = 1 DUAL 3 O10 5 0 10 20 FUNC CLASS = LOCAL 3 REGIONAL TIER PROFILE (VERTICAL) I .. To ` N� lis %j END TIP PRO ECT C-5621 %l -L- STA. 20 + 65.00 = SITE 3 PTAM PRDIRCP RwEazw68 N0. C-5621 BIPA18 PRO/.NQ F.A.PROl.N> DRRGIUPTON 50146.1.Fl WA PE 50146.2.1 WA P W, UTILITY 50146.3.1 CMS-0021020 CONST. PERMIT DRAWING I SHEET 1 OF 9 00(V oN zz THERE IS CONTROL OF ACCESS ON THIS PROJECT. THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF THE TOWN OF CORNELIUS. * EXISTING SIGNAL DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II. PROJECT LENGTH LENGTH ROADWAY TIP PROJECT C-5621 = 0.177 MILES TOTAL LENGTH TIP PROJECT C-5621 = 0.177 MILES -L- USED TO CALCULATE PROJECT LENGTH. PREPARED IN THE OFFICE OF: 8521 SIX FORKS ROAD, SUITE 400 RALEIGH, NC 27615 RS1 NC FIRM LICENSE No: F-0493 FOR THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION 2018 STANDARD SPECIFICATIONS JENNIFER FARING, PE PROJECT ENGINEER RIGHT OF WAY DATE: JUNE 26, 2019 SEAN KORTOVICH, PE PROJECT DESIGN ENGINEER LETTING DATE: JUNE 16, 2020 SEAN EPPERSON, PE NCDOT CONTACT HYDRAULICS ENGINEER ROADWAY DESIGN ENGINEER P.E. DETAIL A SPECIAL LATERAL BASE DITCH (Nato Srale) Fill Ground 3. Slope d D Geae.nle B Min. D= 2.5 Ft. Ft. B= 1.0 Ft. Type f Liner= 249 TONS CL B Rip -Rap 438 SY Geot-tile 3� � ISF /j Bus FROM -YIA- STA. 14+50 TO STA. 16+42 LT DETAIL B SPECIAL LATERAL 'V' DITCH � 1 Not ro Srolel \ Ground 3p pt Slope \ Min. D= 3.0 Ft. FROM -RAI- STA.10+62 TO STA.11+00 LT \\ \\°4 FROM -Y1B- STA. 11+21 TO STA. 12+70 LT FROM -Y1B- STA. 15+00 TO STA. 16+29 LT FROM -YIA- STA 14+50 TO STA 14+97 RT \ MATCH T O SHEET 4 SPECIAL LATERAL V DITCH a SEE DETAIL B V _ I I AA S7.A. r...:: / 74+ CO 4 a 24" RCP JI \\ R 15" RCP -III EST 2 TON CL B RIP RAP R CB-F EST 7 SY ��EEppTEXTILE B-G JALIES E, CALDWELL TOR COMPANY SPECIAL LATERAL V DITCH a ) // SEE DETAIL C % I) ' / / a SPECIAL LATERAL SE DITCH SEE DETAIL A / T yA D.*ATTS,ET AL D 24" RCP -III z DETAIL'V \� SPECIAL 0 LATERAL 'V' DITCH IN to Srolel w Fin / 15" � Natural '�\ Slopc / Groaa Z'C D / G°at,rtile Min. D- 2.5 Ft. Type of Liner- CL B Rip -Rap EST 5 TON CL B RIP RAP — ElT 1 SY GEOTEJ�TTIL Mox. d= 2.1 R. DIXOry MOTOR COMPNY FROM -RAI- STA.11+00 TO STA. 11+62 LT / (104 TONS CL B; 184 SY GEOTEXTILE) FROM -YIA- 15+50 TO STA. 16+34 RT (44 TONS CL B; 76 SY GEOTEXTILE) DETAIL D SITE STANDARD 'V' DITCH (Nolto Scale) Neural 1 Natural round CO D \01 Ground Min. D= 1 Ft. \ -RAI- STA. 11+27 TO 11+30 LT �y� Pz)esr �\_ ,. 7ZZ�/, /FAKE NORMAN HOTEL, INC. °/ 2 / d Gov'! GJ 24" RCP -III 24" RCP -III ST / C TON OF CORNELIUS / m I T PUE PUE PUE PUE — PUE E 15" RCP I I ROBERT SREREL B G / TEMP SURFACE 2 / WATER IMPACTS I It E B- / 15" RCP -III IDE N L. BROOKS \\ \k / 15" RCP -III -F CI 1S 3p RCp\\ CNC M I " R B- s. CB-E \ Cq\ / HW� E SPECIAL LATERAL Oyz"N'0 \JJ . M / / 24' RC I/ L \IT SEE DETAIL<B� 36" RCP -III k\ PPq / 15" RCP I I / 30, RCP-)!/ / /,r// EST 11 TON CL B RIP RAP SURFACE WATER IMPACTS\ //� / \ ST 2E, 8 SY GEOTEXTILE • % III QT = C CRYSTAL D.FORNEY���� � STAN D V DITCH SEE DETAIL 2 F,/ �THSTEMPORARY SURFACE � f-III 36' RCP -III / / // WATER IMPACTS B-G TUJ SPRINGS SP C ECIA LATE L V DITCI{ KTE 2lJ SEE DETAIL C 'QCp� // Soaw/ FESm��'� o "1laDA"INSET B = 24" RCP -III Ri`p PROJECT REFERENCE NO. SHEET NO. C-5621 6 W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER �, DI / SURFACE WATER IMPACTS / \ C J44 , SSPECpIIAL LATE V DITCH 5EEme'o k VARY DL�AWAIL B ti� BS b 4Q SLOAN + lryrAE pro DELIIFA1/OBLEY. C Err CC b GP � ISBD RC SpL V DITCH MR TO SEEsee\GREYR C N L. HO#ARp, ET AL ERIC L. FORNEY. ET AL / ����� SEE INSET B FOR *LLG�g ASf$OOO AR4ETTA IIII,CATHCART ** IMPACTS BEYOND \ \ ROADWAY PROJECT LIMITS TO*4 OF CUHr�... DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED RS&H NC FIRM LICENSE No: F-0493 ISBD PEGGY RIVENS N PERMIT DRAWING 'J SHEET 4 OF 9 0 3 ti CIY Srq. TO ,"7 6 40 SURFACE WATER IMPACTS ®DENOTES IMPACTS IN SURFACE WATER ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER FROM -Y1 DETAIL A SPECIAL LATERAL BASE DITCH (Naito Srnle) Natural ?:) \ Fill Ground 3Slope d D Geote.nle B Min. D= 2.5 Ft. Max.d= 1.7 Ft. B= 1.0 Ft. Type f Liner= 249 TONS CL B Rip -Rap 438 SY Geot-til. z O w K 3� � ISF /J Lis ROM FROM -YIA- STA. 14+50 TO STA. 16+42 LT DETAIL B SPECIAL LATERAL 'V' DITCH � ( Not ro Srolel � N°Nr°I \ °t Fill 3 ,�� Ground D 3p of Slope \ � ��V Min. D= 3.0 H. FROM -RA1- STA.10+62 TO STA.11+00 LT \\\\ \\�0N FROM -Y1B- STA. 11+21 TO STA. 12+70 LT FROM -Y1B- STA. 15+00 TO STA. 16+29 LT O FROM -YIA- STA. 14+50 TO STA. 14+97 RT DETAIL C SPECIAL LATERAL 'V' DITCH (Not to Srolel // Fill Groun Z') D d G°°t.rtil. Mi, D- 2.5 Ft. / EST 5 TON CL B RIP RAP — Type of Liner- CL B Rip-R°p M... d= 2.1 R. ElT 1 SY III TEJ�TTIL (IXOry MOTOR COMP NY FROM -RAI- STA.11+00 TO STA. 11+62 LT (104 TONS CL B; 184 SY GEOTEXTILE) / FROM -YIA- 15+50 TO STA. 16+34 RT / (44 TONS CL B; 76 SY GEOTEXTILE) DETAIL D SITE STANDARD 'V' DITCH (Nolto Scale) N°turol 1 Notura1 round )0 D \0\ Ground Ir Min. D= 1 It -RAI- STA.11+27 TO 11+30 LT \ P—=�) esr //--\_ ,. AKE NORI(IAN HOTEL. W. rm ETCH TO SHEET ET 1 SPECIAL LATERAL V DITCH r Aq SEE DETAIL B _ _ ST/q. 1 ,I + CO 24" RCP II Ir�li, 1 " RCP III CB-F. ' II I��` EST TOE CL B P� d1 EST 7 Y TEXTILE \\ S E. CALDWELL OR COMPANY SPECIAL LATERAL V DITCH \\ SEE DETAIL C 24' RCP -III 24" RCP -III 24" RCP -III 30" u- 0 C ;I �v a ECIAL LATERAL / SE DITCH r SE DETAIL A HW D. *ATTS. ET AL I — ISFO TOWN OF CORNELIUS - UE PUE PUE PUE � ROBE NERD _ TEMPORARY SURFACE WATER IMPACTS -37, D IL[ WO esr 1-I o `SURFACE WATER _CRYSTAL D.FOI j SEE i RCP -I I ��, T C /SEECIAL ILTEE L V DITCF{ , RCP- �" - /SURFACE WATER IMPACTS SPE ppppL LATE DITCH L 4.. RY AFJAIL m , \ a ✓FRAY SLO\ 5 \ DITCH C ERIC L. FORNEY. ET AL ARIiIIETTA IIII.CATHCART PROJECT REFERENCE NO. SHEET NO. C-5621 6 W SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER T OF Cunt... DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED RS&H NC FIRM LICENSE No: F-0493 ISBD PEGGY RIVENS N Asa/- h _ 1 —y PERMIT DRAWING jco 'J SHEET 5 OF 9 0 Z cly 3 16 0 Is r'SURFACE WATER I PACTS ST TO ' CL B RIP RAP\ S 28 S GEOTEXTILE R S�TEMPORARY� S RFACE WATER IMPAC S CGS ITE 2B HARD GRAHAM / SDI \ \ esr 0 h �O MB. TON L. HO#ARD. E T AL \ SEE INSET B FOR ** IMPACTS BEYOND ROADWAY PROJECT LIMITS ili�u7� Ir I I � INSET B 3 ®DENOTES IMPACTS IN SURFACE WATER ®DENOTES TEMPORARY IMPACTS IN SURFACE WATER WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 -Y7- 11+79 RT 42" RCP and HW < 0.01 26 2A -Y1 A- 17+44 to -Y1 B- 12+49 LT/RT Channel Relocation 0.05 < 0.01 397 16 2B -Y1 B- 18+27 LT Rip Rap Outlet < 0.01 < 0.01 12 10 3 -RA1- 11+30 LT Channel Relocation 0.01 92 TOTALS": 0.06 < 0.01 527 26 0 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb