Loading...
HomeMy WebLinkAbout20171292 Ver 1_Initial Credit Release (SAW-2017-01465)_20191223Strickland, Bev From: Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil> Sent: Monday, December 23, 2019 3:38 PM To: Bradley Breslow Cc: Haupt, Mac; Davis, Erin B; Byron Hamstead (byron_hamstead@fws.gov); Bowers, Todd; Munzer, Olivia; Wilson, Travis W.; Tugwell, Todd J CIV USARMY CESAW (US); Kim Browning; Jones, M Scott (Scott) CIV USARMY CESAW (USA); Crumbley, Tyler A CIV USARMY CESAW (USA); McLendon, C S CIV USARMY CESAW (USA) Subject: [External] RES Yadkin 01 Umbrella Mitigation Bank Initial Credit Release for the Compass Point Mitigation Site (SAW-2017-01465) Attachments: SAW-2017-01465_RESYadkin01 UMB-CompassPoint_InitialCreditRelease_ 23Dec2019.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> Brad, Please find attached the Initial Credit Release letters for the RES Yadkin 01 Umbrella Mitigation Bank: Compass Point Mitigation Site (SAW-2017-01465). As requested, 15% credit is being released for satisfying the initial release requirements pursuant to the Mitigation Banking Instrument (UMBI) entitled, Agreement to Establish the RES Yadkin 01 Umbrella Mitigation Bank, signed by USACE on November 25, 2019, and the Compass Point Final Mitigation Plan, dated August 2019. In accordance with the plan, 624.20 stream mitigation units (SMU's) are now available for the Compass Point Mitigation Site. Feel free to contact me with any questions. This electronic copy is your official Department of the Army Notification. Regards, Steve Kichefski Regulatory Project Manager U.S. Army Corps of Engineers Wilmington District, Asheville Field Office 151 Patton Avenue, Suite 208 Asheville, NC 28801 (828)-271-7980 Ext. 4234 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 to complete the survey online. DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 151 PATTON AVENUE ROOM 208 ASHEVILLE, NORTH CAROLINA 28801-5006 December 23, 2019 Regulatory Division Re: Initial Credit Release of the RES Yadkin 01 Umbrella Mitigation Banking Instrument and Compass Point Mitigation Site; SAW-2017-01465 Mr. Brad Breslow Resource Environmental Solutions 302 Jefferson Street, Suite 110 Raleigh, North Carolina 27605 Dear Mr. Breslow: This correspondence is in reference to the Compass Point Mitigation Site, part of the RES RES Yadkin 01 Umbrella Mitigation Bank, located west of Pulliam Road, approximately 4.5 miles northeast of Booneville, in Yadkin County, North Carolina. The 16.5-acre project presents 5,304 linear feet (LF) of stream restoration and enhancement generating 4,130 Cool Stream Mitigation Units (SMU) along three unnamed tributaries that drain directly to the Yadkin River in the Upper Yadkin Watershed of the Upper Pee Dee River Basin (03040101). The purpose of this letter is to confirm the initial release of credits for this mitigation site. Pursuant to the Mitigation Banking Instrument (UMBI) entitled, Agreement to Establish the RES Yadkin 01 Umbrella Mitigation Bank, approved December 4, 2019; and the site -specific Compass Point Final Mitigation Plan dated August 2019, fifteen percent (15%) of the mitigation site's total restoration and enhancement credits shall be available for sale immediately upon completion of all the following: a. Execution of the MBI by the Sponsor, the Corps, and other agencies eligible for membership in the IRT who chose to execute the agreement. b. Approval of the Final Mitigation Plan. c. The mitigation site must be secured. d. Delivery of the executed financial assurance documents as described in Section IX of the UMBI and Section 13, page 45 of the Compass Point Final Mitigation Plan, dated August 2019 and approved December 2019. e. Recordation of the Corps -approved site protection mechanism described in Section X of the UMBI, and Appendix C of the Compass Point Final Mitigation Plan, dated August 2019 and approved December 2019, including a title opinion covering the property. f. Issuance of the 404-permit authorization for site construction. By copy of this correspondence, we confirm that you have satisfied the above requirements for initial release for all parcels within the bank; and 624.20 SMU's constituting 15% of the mitigation site's total restoration and enhancement credits are now available for sale. The site does not include any preservation credits. Compass Point Initial Credit Release SMU Type t Site Total Release % SMU Release Restoration/Enhancement 1 4,161.00 15% 624.20 Thank you for your time and cooperation. If you have any questions, please contact Steve Kichefski at (828) 271-7980 extension 4234. Sincerely, KICHEFSKI.STEVEN.L.13 Digitally signed by for KICHEFSKI.STEVEN.L.1386908539 86908539 Date:2019.12.23 15:36:21-05-00- Scott Jones, Chief Asheville and Charlotte Regulatory Field Offices Electronic Copies Furnished: Todd Bowers — USEPA Mac Haupt — NCDWR Erin Davis — NCDWR Byron Hamstead — USFWS Olivia Munzer — NCWRC Todd Tugwell — USACE Kim Browning — USACE Scott Jones - USACE