Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG240016_COMPLETE FILE - HISTORICAL_20190417
STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. DOC TYPE HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ YYYYMMDD aceAnalytical wwwpacelabs cam April 17, 2019 Darren Steinhilber Mecklenburg County Solid Waste 2145 Suttle Ave Charlotte, NC 28208 RE: Project: COMPOST CENTRAL 1 Pace Project No.: 92424883 Pace Analytical Services, LLC 9800 Kincey Ave. Suite 100 Huntersville, NC 28078 (704)875-9092 Dear Darren Steinhilber: Enclosed are the analytical results for sample(s) received by the laboratory on April 10, 2019. The results relate only to the samples included in this report. Results reported herein conform to the most current, applicable TNIINELAC standards and the laboratory's Quality Assurance Manual, where applicable, unless otherwise noted in the body of the report. If you have any questions concerning this report, please feel free to contact me. Sincerely, Matthew Brainard matthew.brainard@pacelabs.com (704)875-9092 Project Manager Enclosures cc: Khaliem Adams, Meclenburg County Solid Waste REPORT OF LABORATORY ANALYSIS This report shall not he reproduced, except in full, without the written consent of Pace Analytical Services, LLC. Page 1 of 17 acmnalytical o ww.pacelabs.mn Project: COMPOST CENTRAL 1 Pace Project No.: 92424883 Pace Analytical Services, LLC 9800 Kincey Ave. Suite 100 Huntersvi0e, NC 28078 (704)875-9092 Charlotte Certification IDS 9800 Kincey Ave. Ste 100, Huntersville, NC 28078 Lou isia na/N E LAP Certification # LA170028 North Carolina Drinking Water Certification #: 37706 North Carolina Field Services Certification #: 5342 North Carolina Wastewater Certification #: 12 Asheville Certification IDS 2225 Riverside Drive, Asheville, NC 28804 Florida/NELAP Certification #: E87648 Massachusetts Certification #: M-NC030 North Carolina Drinking Water Certification #: 37712 CERTIFICATIONS South Carolina Certification #: 99006001 Florida/NELAP Certification #: E87627 Kentucky UST Certification #: 84 Virginia/VELAP Certification #: 460221 North Carolina Wastewater Certification #: 40 South Carolina Certification #: 99030001 Virginia/VELAP Certification #: 460222 REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC. Page 2 of 17 lacieAnalyfical" www.pamiabs.com SAMPLE ANALYTE COUNT Pace Analytical Services, LLC 9800 Kincey Ave. Suite 100 Huntersville, NC 2a078 (704)875-9092 Project: Face Project No.: COMPOST CENTRAL 1 92424883 Analytes Lab ID Sample ID Method Analysts Reported Laboratory 92424BB3001 OUTFALL 2 EPA 1664B JMS 1 PASI-C EPA200.7 Rev 4.4 1994 SH1 3 PASI-A SM 922213-2006 KDF 1 PASI-C SM 254OD-2011 MJP 1 PASI-A TKN+NO3+NO2 Calculation EWS 1 PASI-A EPA 351.2 Rev 2.0 1993 MFO 1 PASI-A EPA 353.2 Rev 2.0 1993 MFO 1 PASI-A EPA 365.1 Rev 2.0 1993 KDF1 1 PASI-A SM 5220D-2011 GC 1 PASI-A REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC. Page 3 of 17 acmnalXical www.pacelabs.com ANALYTICAL RESULTS Pace Analytical Services, LLC 9900 Kincey Ave. Suite 100 Huntersville, NC 28078 (704)875-9092 Project: COMPOST CENTRAL 1 Pace Project No.: 92424883 Sample: OUTFALL 2 Lab ID: 92424883001 Collected: 04/10/19 14:37 Received: 04/10/19 15:07 Matrix: Water Parameters Results Units Report Limit DF Prepared Analyzed CAS No. Qual 1664 SGT-HEM, TPH Analytical Method: EPA 1664B Total Petroleum Hydrocarbons ND mg1L 4.8 1 04/11/19 06:09 200.7 MET ICP Analytical Method: EPA 200.7 Rev 4.4 1994 Preparation Method: EPA 200.7 Rev 4.4 1994 Copper ND mglL 0.0050 1 04/15/19 15:09 04/16/19 03:44 7440-50-8 Lead ND mglL 0.0050 1 04/15/19 15:09 04116/1903:44 7439-92-1 Zinc ND mg1L 0.010 1 04/15/19 15:09 04/16/19 03:44 7440-66-6 BC MB10 9222D Fecal Coliform CHT Analytical Method: SM 9222D-2006 Preparation Method: SM 9222D-2006 Fecal Coliforms 1500 CFU1100 mL 1.0 1 04/10/19 16:15 04/11/19 17:55 D6,u2 2540D Total Suspended Solids Analytical Method: SM 2540D-2011 Total Suspended Solids 33.6 mglL 5.0 1 04/16119 11:33 Total Nitrogen Calculation Analytical Method: TKN+NO3+NO2 Calculation Total Nitrogen 2.0 mg1L 0.52 1 04/16/19 09:39 351.2 Total Kjeldahl Nitrogen Analytical Method: EPA 351.2 Rev 2.0 1993 Preparation Method: EPA 351.2 Rev 2.0 1993 Nitrogen, Kjeldahl, Total 11.7 mglL 0.50 1 04/12/19 21:59 04143/19 06:01 7727-37-9 353.2 Nitrogen, N021NO3 Ares. Analytical Method: EPA 353.2 Rev 2.0 1993 Nitrogen, NO2 plus NO3 0.28 mg1L 0.040 1 04/16/19 02:16 365.1 Phosphorus, Total Analytical Method: EPA 365.1 Rev 2.0 1993 Preparation Method: EPA 365.1 Rev 2.0 1993 Phosphorus 0.47 mglL 0.050 1 04/12/19 07:25 04/12/19 10:19 7723-14-0 M1 5220D COD Analytical Method: SM 5220D-2011 Preparation Method: SM 5220D-2011 Chemical Oxygen Demand 60.6 mglL 25.0 1 04/15/19 22:59 04/16/19 15:43 t REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 04117/2019 06:34 AM without the written consent of Pace Analytical Services, LLC. Page 4 of 17 aceAnalytical mnr.paoefabs.cam Project: COMPOST CENTRAL 1 Pace Project No.: 92424883 QC Batch: 468882 QC Batch Method: EPA 1664E Associated Lab Samples: 92424883001 METHOD BLANK: 2545541 Associated Lab Samples: 92424883001 Parameter Units Total Petroleum Hydrocarbons mg/L LABORATORY CONTROL SAMPLE: 2545542 Parameter Units Total Petroleum Hydrocarbons mg/L MATRIX SPIKE SAMPLE: 2545543 Parameter Units Total Petroleum Hydrocarbons mg1L QUALITY CONTROL DATA Analysis Method: EPA 1664B Analysis Description: 1664 SGT-HEM, TPH Matrix: Water Blank Reporting Result Limit Analyzed Qualifiers ND 4.8 04/11/19 06:07 Spike LCS LCS Cone. Result % Rec 19.2 21.2 110 92424521001 Spike MS Result Cone. Result ND 19.2 19.7 Pace Analytical Services, LLC 9800 Kincey Ave. Suite 100 Huntersville, NC 28078 (704)875-9092 % Rec Limits Qualifiers 64-132 MS % Rec % Rec Limits Qualifiers 102 64-132 Results presented on this page are In the units Indicated by the "Units" column except where an alternate unit Is presented to the right of the result. REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 04/17/2019 06:34 AM without the written consent of Pace Analytical Services, LLC. Page 5 of 17 laoAnalyfical www.pacelabs.com QUALITY CONTROL DATA Project: COMPOST CENTRAL 1 Pace Project No.: 92424883 QC Batch: 469374 Analysis Method: EPA 200.7 Rev4.4 1994 OC Batch Method: EPA 200.7 Rev 4.4 1994 Analysis Description: 200.7 MET Associated Lab Samples: 92424883001 METHOD BLANK: 2549007 Matrix: Water Associated Lab Samples: 92424883001 Blank Reporting Parameter Units Result Limit Analyzed Qualifiers Copper mg1L ND 0.0050 04/16/19 02:23 Lead mg1L ND 0.0050 04/16/19 02:23 Zinc mg/L ND 0.010 04/1611910:02 BC Pace Analytical Services, LLC 9800 KinceyAve. Suite 100 Huntersville, NC 28078 (704)875-9092 LABORATORY CONTROL SAMPLE: 2549008 Spike LCS LCS % Rec Parameter Units Conc. Result % Rec Limits Qualifiers Copper mglL 0.5 0.49 98 85-115 Lead mglL 0.5 0.49 98 85-115 Zinc mglL 0.5 0.51 102 85-115 MATRIX SPIKE & MATRIX SPIKE DUPLICATE: 2549009 2549010 MS MSD 92424685003 Spike Spike MS MSD MS MSD % Rec Parameter Units Result Conc. Conc. Result Result % Rec % Rec Limits RPD Qual Copper mglL 64.7 0.5 0.5 0.57 0.57 101 101 70-130 0 ug1L Lead mglL ND 0.5 0.5 0.50 0,50 99 98 70-130 0 Zinc mglL 92.4 0.5 0.5 0.61 0.61 104 103 70-130 0 ug1L MATRIX SPIKE & MATRIX SPIKE DUPLICATE: 2549011 2549012 MS MSD 92424790001 Spike Spike MS MSD MS MSD % Rec Parameter Units Result Conc. Conc. Result Result % Rec % Rec Limits RPD Qual Copper mglL 2.8J 0.5 0.5 0.50 0.48 98 96 70-130 2 uglL Lead mglL ND 0.5 0.5 0.49 0.48 98 96 70-130 1 Zinc mglL 166 0.5 0.5 0.68 0.67 103 101 70-130 1 uglL Results presented on this page are In the units indicated by the "Units" column except where an alternate unit is presented to the right of the result. REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in Full, Date: 04/17/2019 06:34 AM without the written consent of Pace Analytical Services, LLC. Page 6 of 17 (�55'cie Analytical W*Wpaceiabs com Project: COMPOST CENTRAL 1 Pace Project No.: 92424883 QC Batch: 468599 QC Batch Method: SM 922213-2006 Associated Lab Samples: 92424883001 METHOD BLANK: 2545182 Associated Lab Samples: 92424883001 Parameter Units Fecal Coliforms CFU1100 mL SAMPLE DUPLICATE: 2545183 Parameter Units Fecal Coliforms CFUI100 mL QUALITY CONTROL DATA Analysis Method: SM 9222D-2006 Analysis Description: 9222D Fecal Coliform(MF) - CHT Matrix: Water Blank Reporting Result Limit Analyzed Qualifiers ND 1.0 04/1111917:55 92424883001 Dup Result Result 1500 600 RPD Qualifiers 86 D6,u2 Pace Analytical Services, LLC 9800 Kincey Ave. Suite 100 Huntersville, NC 28078 (704)875-9092 Results presented on this page are in the units indicated by the "Units" column except where an alternate unit is presented to the right of the result. REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in f0, Date: 04/17/2019 06:34 AM without the written consent of Pate Analytical Services, 1-LC. Page 7 of 17 Iac ( eAnalytical w,vw.pacelabscom QUALITY CONTROL DATA Project: COMPOST CENTRAL 1 Pace Project No.: 92424883 QC Batch: 469602 Analysis Method: SM 254OD-2011 QC Batch Method: SM 2540D-2011 Analysis Description: 2540D Total Suspended Solids Associated Lab Samples: 92424883001 METHOD BLANK: 2550057 Matrix: Water Associated Lab Samples: 92424883001 Blank Reporting Parameter Units Result Limit Analyzed Qualifiers Total Suspended Solids mg/L ND 2.5 04/16/19 11;28 Pace Analytical Services, LLC 9600 Kincey Ave. Suite 100 Huntersville, NO 2807E (704)875-9092 LABORATORY CONTROL SAMPLE: 2550058 Spike LCS LCS % Rec Parameter Units Conc. Result % Rec Limits Qualifiers Total Suspended Solids mg1L 250 256 102 90-110 SAMPLE DUPLICATE: 2550059 92424696002 Dup Parameter Units Result Result RPD Qualifiers Total Suspended Solids mg/L 11.0 12.0 9 D6 SAMPLE DUPLICATE: 2550060 92425004001 Dup Parameter Units Result Result RPD Qualifiers Total Suspended Solids mg/L 5310 5390 1 Results presented on this gage are in the units indicated by the "Units" column except where an alternate unit Is presented to the right of the result. REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 04117/2019 06:34 AM without the written consent of Pace Analytical Services, LLC, Page 8 of 17 aceAnalytical mrw.pacefabs.cvm Project: COMPOST CENTRAL 1 Pace Project No.: 92424883 QC Batch: 469051 QC Batch Method: EPA 351.2 Rev 2.0 1993 Associated Lab Samples: 92424883001 METHOD BLANK: 2547413 Associated Lab Samples: 92424883001 Parameter Units Nitrogen, Kjeldahl, Total mg1L QUALITY CONTROL DATA Analysis Method: EPA 351.2 Rev 2.0 1993 Analysis Description: 351.2 TKN Matrix: Water Blank Reporting Result Limit Analyzed Qualifiers ND 0,50 04/13/19 05:53 Pate Analytical Services, LLC 9800 KinceyAve. Suite 100 Huntersville, NC 28078 (704)875-9092 LABORATORY CONTROL SAMPLE: 2547414 Spike LCS LCS % Rec Parameter Units Conc. Result % Rec Limits Qualifiers Nitrogen, Kjeldahl, Total mg/L 10 10.1 101 90-110 MATRIX SPIKE & MATRIX SPIKE DUPLICATE: 2547415 2547416 MS MSD 92425093001 Spike Spike MS MSD, MS MSD % Rec Parameter Units Result Conc. Conc. Result Result % Rec % Rec Limits RPD Qual Nitrogen, Kjeldahl, Total mg1L ND 10 10 10.3 10.3 98 98 90-110 0 MATRIX SPIKE & MATRIX SPIKE DUPLICATE: 2547417 2547418 MS MSD 92425093002 Spike Spike MS MSD MS MSD % Rec Parameter Units Result Conc. Conc. Result Result % Rec % Rec Limits RPD Qual Nitrogen, Kjeldahl, Total mglL ND 10 10 10.8 10 105 97 90-110 8 Results presented on this page are in the units indicated by the "Units" column except where an alternate unit Is presented to the right of the result. REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 04/17/2019 06:34 AM without the written consent of Pace Analytical Services, LLC, Page 9 of 17 dD acMnaVical w,vw.pacelab&mn Project: COMPOST CENTRAL 1 Pace Project No.: 92424883 QC Batch: 469527 QC Batch Method: EPA 353.2 Rev 2.0 1993 Associated Lab Samples: 92424883001 METHOD BLANK: 2549801 Associated Lab Samples: 92424883001 Parameter Units Nitrogen, NO2 plus NO3 mg/L QUALITY CONTROL DATA Analysis Method: EPA 353.2 Rev2.0 1993 Analysis Description: 353.2 Nitrate + Nitrite, preserved Matrix: Water Blank Reporting Result Limit Analyzed Qualifiers ND 0.040 04/16/19 02:02 Pace Analytical Services, LLC 9800 Kincey Ave. Suite 100 Huntersville, NC 28078 (704)875-9092 LABORATORY CONTROL SAMPLE: 2549802 Spike LCS LCS % Rec Parameter Units Conc. Result % Rec Limits Qualifiers Nitrogen, NO2 plus NO3 mg/L 2.5 2.5 101 90-110 MATRIX SPIKE & MATRIX SPIKE DUPLICATE: 2549803 2549804 MS MSD 92425319001 Spike Spike MS MSD MS MSD % Rec Parameter Units Result Conc. Conc. Result Result % Rec % Rec Limits RPD Qual Nitrogen, NO2 plus NO3 mg1L 0.090 2.5 2.5 2.8 2.7 107 103 75-125 3 Results presented on this page are in the units indicated by the "Units" column except where an alternate unit is presented to the right of the result. REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 04/17/2019 06:34 AM without the written consent of Pace Analytical Services, LLC. Page 10 of 17 acmnalytical wwwpacelabscorn Project: COMPOST CENTRAL 1 Pace Project No.: 92424883 QC Batch: 468767 QC Batch Method: EPA 365.1 Rev 2.0 1993 Associated Lab Samples: 92424883001 METHOD BLANK: 2545936 Associated Lab Samples: 92424883001 Parameter Units Phosphorus mglL QUALITY CONTROL DATA Analysis Method: EPA 365.1 Rev 2.0 1993 Analysis Description: 365.1 Phosphorus, Total Matrix: Water Blank Reporting Result Limit Analyzed Qualifiers ND 0.050 0411211910:13 Pace Analytical Services, LLC 9800 Kincey Ave. Suite 100 Huntersville, NC 28078 (704)875-9092 LABORATORY CONTROL SAMPLE: 2545937 Spike LCS LCS % Rec Parameter Units Cone. Result % Rec Limits Qualifiers Phosphorus mg1L 2.5 2.6 103 90-110 MATRIX SPIKE & MATRIX SPIKE DUPLICATE: 2545938 2545939 MS MSD 92424844001 Spike Spike MS MSD MS MSD % Rec Parameter Units Result Cone. Cone. Result Result % Rec % Rec Limits RPD Qual Phosphorus mg/L 12 2.5 2,5 4A 4.1 115 116 90-110 0 M1 MATRIX SPIKE & MATRIX SPIKE DUPLICATE: 2545940 2545941 MS MSD 92424883001 Spike Spike MS MSD MS MSD % Rec Parameter Units Result Cone. Conc. Result Result % Rec % Rec Limits RPD Qual Phosphorus mg1L 0.47 2.5 2.5 3.5 3.2 119 111 90-110 6 M1 Results presented on this page are In the units indicated by the "Units" column except where an alternate unit Is presented to the right of the result. REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 04/17/2019 06:34 AM without the written consent of Pace Analytical Services, LLC. Page 11 of 17 aceAnalyticaI wwwpaoslab=m Project: COMPOST CENTRAL 1 Pace Project No.: 92424883 QC Batch: 469514 QC Batch Method: SM 5220D-2011 Associated Lab Samples: 92424883001 METHOD BLANK: 2549766 Associated Lab Samples: 92424883001 Parameter Units Chemical Oxygen Demand mg/L QUALITY CONTROL DATA Analysis Method: SM 5220D-2011 Analysis Description: 5220D COD Matrix: Water Blank Reporting Result Limit Analyzed Qualifiers ND 25.0 04116/1915:39 Pace Analytical Services, LLC 9800 Kincey Ave. Suite 100 Huntersville, NC 28078 (704)875-9092 LABORATORY CONTROL SAMPLE: 2549767 Spike LCS LCS % Rec Parameter Units Conc. Result % Rec Limits Qualifiers Chemical Oxygen Demand mg/L 750 786 105 90-110 MATRIX SPIKE & MATRIX SPIKE DUPLICATE: 2549768 2549769 MS MSD 92424599001 Spike Spike MS MSD MS MSD % Rec Parameter Units Result Conc. Conc. Result Result % Rec % Rec Limits RPD Qual Chemical Oxygen Demand mg/L 125 100 100 210 205 85 80 90-110 2 M1 MATRIX SPIKE & MATRIX SPIKE DUPLICATE: 2549770 2549771 MS MSD 92424360002 Spike Spike MS MSD MS MSD % Rec Parameter Units Result Conc. Conc. Result Result % Rec % Rec Limits RPD Qual Chemical Oxygen Demand mg/L 859 100 100 951 963 92 103 90-110 1 Results presented on this page are In the units indicated by the "Units" column except where an alternate unit Is presented to the right of the result. REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 04/1712019 06:34 AM without the written consent of Pace Analytical Services, LLC. Page 12 of 17 Pace Analytical Services, LLC ® 9800 Kinsey Ave. Suite 100 (�55'neMalXical Huntersville, NC 2807E .5 (704)875-9092 QUALIFIERS Project: COMPOST CENTRAL 1 Pace Project No.: 92424883 DEFINITIONS DF - Dilution Factor, if reported, represents the factor applied to the reported data due to dilution of the sample aliquot. ND - Not Detected at or above adjusted reporting limit. TNTC - Too Numerous To Count J - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. MDL -Adjusted Method Detection Limit. POL - Practical Quantitation Limit. RL - Reporting Limit - The lowest concentration value that meets project requirements for quantitative data with known precision and bias for a specific analyte in a specific matrix. S - Surrogate 1,2-Diphenylhydrazine decomposes to and cannot be separated from Azobenzene using Method 8270. The result for each analyte is a combined concentration. Consistent with EPA guidelines, unrounded data are displayed and have been used to calculate % recovery and RPD values. LCS(D) - Laboratory Control Sample (Duplicate) MS(D) - Matrix Spike (Duplicate) DUP - Sample Duplicate RPD - Relative Percent Difference NC - Not Calculable. SG - Silica Gel - Clean -Up U - Indicates the compound was analyzed for, but not detected. Acid preservation may not be appropriate for 2 Chloroethylvinyl ether. A separate vial preserved to a pH of 4-5 is recommended in SW846 Chapter 4 for the analysis of Acrotein and Acrylonitrile by EPA Method 8260. N-Nitrosodiphenylamine decomposes and cannot be separated from Diphenylamine using Method 8270. The result reported for each analyte is a combined concentration. Pace Analytical is TNI accredited. Contact your Pace PM for the current list of accredited analytes. TNI - The NELAC Institute. LABORATORIES PASI-A Pace Analytical Services -Asheville PASI-C Pace Analytical Services - Charlotte ANALYTE QUALIFIERS BC The same analyte was detected in an associated blank at a concentration above 1/2 the reporting limit but below the laboratory reporting limit. D6 The precision between the sample and sample duplicate exceeded laboratory control limits. M1 Matrix spike recovery exceeded QC limits. Batch accepted based on laboratory control sample (LCS) recovery. u2 Colonies are too numerous to count. Actual result may be greater than reported. REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, Date: 04/1712019 06:34 AM without the written consent of Pace Analytical Services, LLC. Page 13 of 17 Pace Analytical Services, LLC aceAnalytical ® 9800 Kincey Ave. Suite 100 Huntersville, NC 28078 www.pwWabs-com (704)875-9092 QUALITY CONTROL DATA CROSS REFERENCE TABLE Project: COMPOST CENTRAL 1 Pace Project No.: 92424883 Analytical Lab ID Sample ID QC Batch Method QC Batch Analytical Method Batch 92424883001 OUTFALL 2 EPA 16648 468682 92424883001 OUTFALL 2 EPA 200.7 Rev 4.4 1994 469374 EPA200.7 Rev 4.4 1994 469464 92424883001 OUTFALL 2 SM 922213-2006 468599 SM 9222D-2006 468600 92424883001 OUTFALL 2 SM 2540D-2011 469602 92424883001 OUTFALL 2 TKN+NO3+NO2 469579 Calculation 92424883001 OUTFALL 2 EPA 351.2 Rev 2.0 1993 469051 EPA 351.2 Rev 2.0 1993 469236 92424883001 OUTFALL 2 EPA 353.2 Rev 2.0 1993 469527 92424883001 OUTFALL 2 EPA 365.1 Rev 2.0 1993 468767 EPA 365.1 Rev 2.0 1993 468998 92424883001 OUTFALL 2 SM 5220D-2011 469514 SM 522OD-2011 469704 Date: 04/17/2019 06:34 AM REPORT OF LABORATORY ANALYSIS This report shall not be reproduced, except in full, without the written consent of Pace Analytical Services, LLC. Page 14 of 17 $kwcar Issuing Authority: Pace Carolinas Quality.( laboratory receiving samples: Ashevilk Q Edeno Greenwood Huntersvi l Raleigh(] MechaniccualleJ`_1— . �y �3 _ Client Name: I ;JY1fO `/24_ 2" Project 'tourler: ❑Fed Fx ❑UPS ❑USPS ❑Client ����� �� ❑ Commercial [face ❑Other: 9242 4BB3`. Custody Seal Present? ❑Yes @§14 Seals Intact? ❑Yes 016 Datel.InidalsPerson UansiningContents: (�/rJ !l Packing Material: []Bubble Wrap []Bubble Bags ❑None S& Other Biological Tissue Frozen? ThWhomet�isstte�er:. ❑Yes []NO eA RGun10: 92TO48 Type of ice: et ❑Blue []None Cooler Temp (c). . Correction Factor: Add/Subtract (°C) 0.0 � • �� Temp should be above #reezing to 6'C Cooler Temp Cant cEed ('C): —i:- ❑samples out of temp criteria. Samples on ice, cooling process has begun USDA Regulated 50$ (tV/A, water sample) Did samples origiQate its a goafantine zone within the United States: CA, NY, a; SC icheck maps]? old sampfes originate from a foreign souice lint onally. Fly,,, t , t�.1.,�t.e Hawaii and Puetta Rlcol? I�Yes 1'1 a Comments/ohere ancy: Chain of cuttady Present? Yes EINo ❑NJA 1. 5arnples Aiiwed within Hold Time? �f Yes No ❑NIA 2. Short Hold Time Analysis (572 hr.)? [jYes XNa ©N/A 3. Rush Tom Around Time Requested? ❑Yes - No ❑N/A. 4. SufficientYoldme? _ Yes NO []N/A S. Correct Containers Used? -Pace Contaii ers Used? R�eS 04es []No No ❑NIA [INIA 5. Containers Intact? E]6S ❑No ONIA 7. Ofssolved analysis: Samples Field Filtered? []Yes []NO J9N/A 8. 5ample-L3heJs Match CC)C? -Includes Date/Time/ID/Analysis Matrix: aes []NO QN/A 9. Headspace in VOA Vials (>S- mrn 7 LJYes No 01 Trip Blank Present? Trfp Blank Custody Seals Present? []Yes ❑Yes ❑No ❑No qq/A IA 11. COMMENTSfSAMPLE DISCREPANCY Lot ID ofspIt containers: CLIENT NOTIFICATION/RESOLUTION Person contacted: Project Manager SCURF Review: Project Manager SRF Reulew: Date/Tlme: Feld Data Required? []Yes []NO Date: ( L ( 2 Date: / —i { 2 1 Page 15 of 17 rt C rn 0 M A v 2 ' a x 0 "ate i T ,n C N o m v � M n � O o a � o. � p n � tti M f9 3 tD v 4 F tA. w ' s � 6 M a �o ' G S l 9 0 ZL� 2 BP4U-12S mL Plastic Unpreserved (NIA} (Cl-) BP3U-250 ml. Plastic Unpreserved INN SP2U-5DO mL Plastic Unpreserved INJA) APlastic BP1U-1 liter Unpreserved INIA) BP45.125 mL Plastic HZS04 (pH c 21 (Cl-) 133N-250 mL plastic HNO3 (pH < 2) BP4Z-12S ml. PlasticZN Acetate & NaOH (>9) 13P4C-12S mL Plastic NaOH (pH > 12) (Cl-) WGFU-Wide-mouthed Glass jar Unpreserved AG1U-1 liter Amber Unpreserved (N/A) (CI-) ZF AG1H-1 liter Amber HCI (pH -c 2) AG3U-250 mLAmber Unpreserved (N/A) (CI-) AG1S•1 liter Amber HZSO4 (pH < 2) AG35-250 mL Amber H2SO4 (pH < 2) wG3AIDG3A)-250 ml. Amber NH4CI (N/A)(CI-) DGSH-40 mL VOA HCi (NJA) VGST-40 mL VOA Na2S2O3 (NIA) VG9ll-00 mL'VOA t7no DG9P-4D mL VOA H3PO4INIA) VOAK IS vials per kit)-5035 Wt (NIA) VJGK (3 Vials per klt)--VPHJGas kit IN/A) SP5T-125 rtiL $terlle Plastic IN/A—lab) SPZT-250 mLSterile Plastic (NIA —lab) ] PM-250 mL Plastic (N112)25O4 (9.3.9.7) AGOU-100 mL Amber Unpreserved vials (N/A) VSGU-20 mi Scintillation vials (NIA) DG9t1-40 mL Amber Unpreserved vlais (N/A) M IAl f{p (j Cag =. z v o �n 2 � D d jC T on .+ 0. TCl yr Cl @ O n y -w y0 O R Sr eY % YL. CL =+; pl m CO y 0 O .v O% b to -ns 0 r o. m � obi A O 0 6i T n � D r- 0 0 woa- m a U CHAIN -OF -CUSTODY I Analytical c�...... tea! The Chain -of -Custody isa LEGAL DOCUMENT. All :relevant f Section A Section B Section C Required Cticnt Information: Required Project Information: Invoice Ialormalion: Request Document fiolds must be completed accurately. Page,. 1 OE I 1 Company= Meckenbmq County Solid Waste Report To: Khahem Adams Attention: Addressi 2145 Suttlu Aw. Copy To'. Company Name: Charlotte, NC 28208 Address: , Req.jWOry Agency ,I Email: khalinm adams(( me6;IenburgeouMyne.gov Purchase Ordcr M _ Pace Quote: I Phone. (880)314-3856 Fax Project Name: Compost Central 1 Pace Project Manager: mntlhew,bminr rditracelabs.Com. - Stato I Location- Requastad Due Dale; Projr_ct p; Pace ProLla tt: 32D7-1 NC i ' Requested Anal sis Piltem (YIN), ' -- •' - - WTRix CODE DImMM Water OW Wale WT wnr. w,r.. wW P,Odu P SAMPLE ID au. of One Character per box, wlw• wr• lA•Z, D•9 f , •t -Olhrr OT SamPla Id. mace be> unique i..�,.• sr: - w ,t $ �_ w •� P+TDITCTlIr COLLECTED .. O u rn i7 Preservatives START END �� z O 7' z V z z O -z" m L o O Cr. w r- m LL c c z O n n w ry _ O Z y m 8 m a' ��� r-'t i E C( /i DATE TIME Y Z 3 i 6 r. 7 •_9, i .-'10 •� ..11 I 12• ADDITIONAL COMMENTS '' r`: ' i� } RELINQUISHED BY! AFFILIATION _.RELI' � r •• -.r' .. ,-• r. -. 1 ACCEPTED 8Y. r". n4, `.: Nd AFFILIATION . r'� ' .K' 1. DATE. r i y-7lMEp it yy;; TgAMPLE CONDITIONS t �' N.r. �'iy SAMPLER NAME AND,S(GNATURE' - �:'^a s ;_� PRINT Name of SAMPLER: - 1'� 1 Pl'1 L, SIGNATURE at SAMPLER: Jam^ / � i/ I rr S;k. �',�,i; '= "';,f =•', c w C @ r m yz�. ,, o a_ r ry ra i• a .. �y 'c r C DATE Signed,. - Q K.-r"a. Environmental Quality Stormwater Discharge 4utfall (SD4) Qualitative Monitoring Report For guidance on filling out this form, please visit https://deq.nc.,ov/about/divisions/ener I,-mineral-land- resources/enerfzy-mineral-Iand-permits/stormwater-permits/nudes-ind ustrial-swgtab-4 Permit No.: NIC11; Facility Name: ) County: Inspector: Date of Inspection: Time of Inspection: Total Event Precipitation (inches)-. l.! " Y� — All pert -nits require qualitative monitoring to be performed during a "measurable storm event." A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DEML,R Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) IE. Out1'all,�escription: ,�� �e�/� Outfall No. Structure (pipe, ditch, etc.): % Receiving Stream: Describe the industrial activities that occur within the outfall drainage area: Page I of 2 5 W IJ-242, Last modified 07/2 8/20 t 7 2. Color: Describe the color of th discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: l"t P a,,r 3. Odor: Describe,,apy distit odors that the discharge may have (i.e.. smells strongly of oil. weak chlorine odor, etc.): 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 b. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where l is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? O Yes & N, 8. Is there an oil sheen in the stormwater discharge? OYes QN' 9. is there evidence of erosion or deposition at the outfall? O Yes t0. Other Obvious Indicators of Stormwater Pollution: �.J List and describe O 0 ��'� T-0(6 C O f s Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 07128l2017 Facility Name I Sample Location Sample Time pH Date Device Used to Sample Mecklenburg County Compost Central Outfall 2 1430 7.37 4/10/2019 Horiba pH-110 meter Pickle, Ken From: Pickle, Ken Sent: Tuesday, January 19, 2016 1:31 PM To: Bennett, Bradley Subject: RE: stormwater discharge into a WS-IV VA Thanks, Bradley Ken Pickle (�/j/Ytst Stormwater Program Specialist#,{ ` DEMLR Stormwater Permitting Program Department of Environmental Quality oc S` 919 807 6376 office ��J ken. oickle@ncdenr.aov � 1612 Mail Service Center, Raleigh, NC 27699-1612j` 512 N. Salisbury St, Raleigh, NC 27604 Nothing Compares CC. qA0019 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Bennett, Bradley Sent: Thursday, January 14, 2016 3:26 PM To: Godreau, Jessica <jessica.godreau@ncdenr.gov>; Pickle, Ken <ken.pickle@ncdenr.gov>; Midgette, Robert <robert.midgette@ncdenr.gov> Cc: Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov> Subject: RE: stormwater discharge into a WS-IV Thanks Jessica. Ken is out until next Tuesday, we will coordinate something after he returns. Bradley Bennett Stormwater Permitting Program NC Division of Energy, Mineral and Land Resources 1612 Mail Service Center Raleigh, NC 27699-1612 Phone: (919) 807-6378 Fax: (919) 807-6494 Email: brad ley. bennett@ncdenr.gov Web: http:llportal.ncdenr.o[gtweb/Ir/storrnwater Email correspondence to and from this address may be subject to public records laws From: Godreau, Jessica Sent: Thursday, January 14, 2016 3:24 PM To: Pickle, Ken <ken.pickle@ncdenr.Rov>; Midgette, Robert <robert.midRette@ncdenr.gov> Cc: Bennett, Bradley <bradley.bennett@ncdenr.Rov>; Georgoulias, Bethany<bethany.georpouliasCc@ncdenr.gov> Subject: RE: stormwater discharge into a WS-IV So I'm thinking given the details we are good for you to proceed with permit issuance. Please advise if additional input is needed and when the general permit conversations need to happen. Thanks Jessica ,?e-s.sicac Jessica C Godreau Chief, Public Water Supply Section Division of Water Resources Department of Environmental Quality 919 707 9078 office 919 707 9100 main number Jessica.Godreau0ncdenr.aov 1634 Mail Service Center Raleigh NC 27699-1634 512 N Salisbury St, Raleigh, NC 27604 Nothing Compares Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Pickle, Ken Sent: Monday, January 11, 2016 5:31 PM To: Midgette, Robert <robert.midgette@ncdenr.gov> Cc: Godreau, Jessica <iessica.godreau@ncdenr.gov>; Bennett, Bradley <bradley.bennett@ncdenr.gov>; Georgoulias, Bethany<bethany.Beorgoulias@ncdenr.Bov> Subject: RE: stormwater discharge into a WS-IV Hi Bob, Thanks for following up. Unfortunately, I'll be out of town Wed — Mon, so it looks like we won't get to chat soon. I propose that we skip a review meeting with you all on this one facility, but I'm open to contradiction. I'm considering these factors forjust the specific permit application in hand now. Compost Central will discharge to Gum Branch, a WS-IV water. • The facility in question will be discharging a stormwater, as defined by NC General Statute, not a wastewater. • Our General Permit for composters requires quarterly stormwater monitoring for TSS, COD, Fecal, TN, TP, Cu, Pb, Zn, and pH with benchmark values in place to trigger the permittee's response to high values. Generally the folks at Mecklenburg County Solid Waste have been pretty good environmental citizens as far as our program is concerned. • The site stormwater flow will be rainfall driven, meaning that the receiving water will also be responding to the rainfall, and will not be at low flow (like 7Q10 for example) but something higher. The facility is proposing a substantial detention pond (nominally 500' x 200') which presumably will provide treatment better than that provided at the original site, which had no comparable stormwater treatment practices. My other consideration concerns your eventual review of the General Permit for composters when it comes up for renewal in 3Q2016. At that time we would appreciate your review similar to the review you provided for our General Permit for mining discharges. I had hoped to use the current application in hand to perhaps start that conversation with you all, but I think we can postpone that until closer to the time that we are actively working on the renewal of the General Permit. Ken Ken Pickle Stormwater Program Specialist DEMLR Stormwater Permitting Program Department of Environmental Quality 919 807 6376 office ken.pickle@ncdenr.gov 1612 Mail Service Center, Raleigh, NC 27699-1612 512 N. Salisbury St, Raleigh, NC 27604 Nothing Compares---, Email correspondence to and from this address is subject to the North Carolina Public Records taw and may be disclosed to third parties. From: Midgette, Robert Sent: Monday, January 11, 2016 4:54 PM To: Pickle, Ken <kenpickle@ncdenr.gov> Subject: RE: stormwater discharge into a WS-IV Ken, FYI, my understanding is that Jessica will not be back to work until Wednesday 1/13. R.W. (Bob) Midgette, P.E. Operations Branch Head Public Water Supply Section Department of Environmental Quality 919 707 9088 office 919 707 9100 main number Robert. Midqette(cDncdenr.aov 1634 Mail Service Center Raleigh, North Carolina 27699 Nothing Compares--, . mc_ Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Pickle, Ken Sent: Tuesday, January 05, 2016 11:38 AM To: Godreau, Jessica <iessica.godreau@ncdenr.gov>; Midgette, Robert <robert.midgette@ncde,nr.eov> Cc: Georgoulias, Bethany <bethanv.georgoulias@ncdenr.gov>; Bennett, Bradley <bradlev.bennett@ncdenr.Rov> Subject: RE: stormwater discharge into a WS-IV Hello Jessica, Can we meet instead at 9:00 Tuesday, Jan 12 in your office? Ken Ken Pickle Stormwater Program Specialist DEMLR Stormwater Permitting Program Department of Environmental Quality 919 807 6376 office ken.pickle@ncdenr.gov 1612 Mail Service Center, Raleigh, NC 27699-1612 512 N. Salisbury St, Raleigh, NC 27604 Nothing Compares Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: Pickle, Ken Sent: Tuesday, December 22, 2015 8:53 AM To: Godreau, Jessica <jessica.godreau@ncdenr.gov>; Midgette, Robert <robert.mid ette ncdenr. ov> Cc: Georgoulias, Bethany <bethanv.georgoulias@ncdenr.pov>; Bennett, Bradley <bradley.bennett@ncdenr.gov> Subject: RE: Stormwater discharge into a WS-IV Terrific, thanks. My only known conflict now is with a doctor's appointment on Monday morning. Otherwise I'm available all week 1/4/2016—1/8/2016. How about Tuesday, 1/5/2016 at 9:00, your office? Ken Pickle Stormwater Program Specialist DEMLR Stormwater Permitting Program Department of Environmental Quality 919 807 6376 office ken. pickleCd)ncdenr.gov 1612 Mail Service Center, Raleigh, NC 27699-1612 512 N. Salisbury St, Raleigh, NC 27604 Nothing Compares,.._ Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Godreau, Jessica Sent: Wednesday, December 16, 2015 9:39 AM To: Pickle, Ken <ken.pickle @ncdenr.gov>; Midgette, Robert <robert.midP—ette@ncdenr.gov> Cc: Georgoulias, Bethany<bethany.peorgoulias@ncdenr.gov>; Bennett, Bradley <bradley.bennettPncdenr.Rov> Subject: RE: stormwater discharge into a WS-IV How about the first week of January? .9ebstca Jessica C Godreau Chief, Public Water Supply Section Division of Water Resources Department of Environmental Quality 919 707 9078 office 919 707 9100 main number Jessica. Godreau ncdenr. ov 1634 Mail Service Center Raleigh NC 27699-1634 512 N Salisbury St, Raleigh, NC 27604 Nothing Compares -,-,- Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Pickle, Ken Sent: Thursday, December 10, 2015 4:51 PM To: Godreau, Jessica <Oessica. odreau ncdenr. ov>; Midgette, Robert <robert.mid ette ncdenr. ov> Cc: Georgoulias, Bethany <bet-hanv.peorgoulias@ncdenr.gov>; Bennett, Bradley <bradle .bennett ncdenr. ov> Subject: stormwater discharge into a WS-IV Hi Jessica, Hi Bob, When we coordinated on the PWS review for the Stormwater Permitting Program mining General Permit NCG02 we mentioned that there are two other stormwater General Permits that also authorize wastewater discharges, NCG14 for ready -mix concrete, and NCG24 for composting operations. (Both of which are up for renewal in 2016, and for which we would like again to talk about an expedited process between our Sections.) I'd like to make you aware of a permit application in house now from a proposed compost site, in order to see how you would like to treat it. I'd like to meet with you face to face if it is convenient for vou, but for vour background, here are the elements of our concern with this one: • Mecklenburg County has applied for authorization to discharge under our General Permit NCG24 for composting activities. Similar to the mining permit, NCG24 authorizes both wastewater and stormwater discharges. This site will be the new Compost Central, replacing the current Compost Central located six miles south and adjacent to the airport, and currently discharging into Coffey Creek. Old Compost Central will be shut down. The new facility will be Charlotte/Mecklenburg's main composting facility, the largest yard waste site in the state. Yard waste sites are classified as Type 1 facilities by our brothers and sisters in the Div. of Waste Management. • The discharge will be into Gum Branch, a WSAV water that goes to Long Creek and then to Lake Wylie in the Catawba River Basin. • Your review of our intent to issue a permit authorizing a wastewater discharge is required by rule. • However, in this case the aspect that we want to be clear with you on is that all discharges from a DWM Type 1 composter (a yard waste composter) have been deemed to be stormwaters by SL 2012-200. So, our permit will have to regulate these discharges in accordance with just the stormwater provisions of NCG24. • And so, by one perspective, why am I bothering you with this? Since you are not required to review our permits for stormwater discharges. It's more along the lines of full disclosure and effective coordination between our programs. • While it is generally true that discharges from a compost site are rainfall -driven, that's not the same as assuming that the untreated runoff will be relatively innocuous, like some might assume for most stormwaters. Untreated stormwater runoff from compost facilities varies wildly wrt pollutant concentrations. There is no reliable generalized characterization available for compost site runoff. Under very bad circumstances untreated runoff can be comparable to raw sewage for many pollutants. • Our permit NCG24 requires quarterly sampling and has numerical benchmarks intended to control the pollutant content in stormwater discharges. We have benchmark values for TSS, COD, fecal, TN, TP, Cu, Pb, Zn, and pH. The exceedance of a benchmark kicks the permittee into a Tiered response action structure, with increasing management attention and actions required as the Tiers escalate to Tier 1, Tier 2, Tier 3. • The applicant has provided a partial site plan showing a rather sizable forebay and wet detention pond (nominally 500' x 200' out to out, and 10' deep) including forebay. A pretty substantial wet pond in most contexts. Maybe in this context, too. So, the stormwater discharge will not be untreated. That's enough background I think. Is either one of you available to discuss this Friday or Monday or Tuesday? I'll be glad to pop up to the 13t' floor. Again, what I'm interested in is being sure that our programs are in sync on this unusual set of circumstances. Thanks, Ken Ken Pickle Stormwater Program Specialist DEMI_R Stormwater Permitting Program Department of Environmental Quality 919 807 6376 office ken. pickle@ncdenr.aov 1612 Mail Service Center, Raleigh, NC 27699-1612 512 N. Salisbury St, Raleigh, NC 27604 Ki. Nothing Compares--,, "c'- Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. KWA A7A NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor Mr. Darren Steinhilber Mecklenburg County 700 North Tryon Street Charlotte, NC 28202 Dear Mr. Steinhilber: John E. Skvarla, III Secretary July 14, 2014 Subject: General Permit No. NCG240000 Compost Central COC NCG240016 NCS000382 (Rescinded) Mecklenburg County In accordance with your application. for an NPDES stormwater discharge permit received on June 2, 2014, we are forwarding herewith the subject certificate of coverage to discharge under the subject state — NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). Based on your representation in the permit application that Compost Central is a Type 1 compost facility, the provisions of the recently enacted Session Law 2012-200 pertain to the facility. Consistent with the provisions of SL 2012-200, DWQ will permit all the composting discharges from your Type 1 facility under the stormwater discharge provisions of the permit, and the General Permit requirements related to process wastewater discharges do not apply to the composting discharges from your Type 1 facility. During our telephone discussions, your staff indicated the facilities operation has changed to processing only materials that qualify for the Type I designation; therefore. upon the issuance of this permit, your individual permit NCS000382 has been rescinded and is no longer required. This permit does not affect the legal requirements to obtain other that may be required by the Division of Energy Mineral & Land Resources, or any other federal, state, or local governmental agency. Please note that this certificate of coverage is not transferable except upon the specific action of the Division of Energy Mineral & Land Resources. Division of Energy, Mineral, and Land Resources Energy Section - Geological Survey Section - Land Quality Section 1612 Mail Service Center, Raleigh, North Carolina 27699-1612.919-707-92001 FAX: 919-715-8801 512 North Salisbury Street, Raleigh, North Carolina 27604 • Internet: http:llportal.ncdenr,org/webllr/ An Equal Opportunity l Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper If you have any questions concerning this permit, please contact Ken Pickle at telephone number (919) 807-6376, or at ken.pickle@ncdenr.gov. Sincerely, l""'"V for Tracy E. Davis, P.E. cc: Mooresville Regional Office Central Files Stormwater Permitting Program Files Enclosures Certificate of Coverage NCG240016 Copy of General Permit NCG2400000, permittee only 4; Quarterly stormwater monitoring forms, permittee only 4, Visual monitoring forms, permittee only i CCY r9rC4 217ie r STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY MINERAL & LAND RESOURCES CERTIFICATE OF COVERAGE No. NCG240016: authorizing SURFACE WATER DISCHARGES under the National Pollutant Discharge Elimination System (NPDES) program. In compliance with the provision of North Carolina General Statute 143-215.1 as amended by North Carolina Session Law 2012-200, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Mecklenburg County is hereby authorized to discharge from a Type I composting facility (as defined in 15A NCAC 13B .1400) located at Compost Central 5631 West Boulevard Charlotte Mecklenburg County to receiving waters designated as Coffey Creek, a class C, water in the Catawba River Basin. Pursuant to the provisions of Session Law 2012-200, a Type 1 composting facility is not required to have a NPDES permit for discharge of process wastewater. Notwithstanding any contrary provisions in the General Permit, all discharges of stormwater, including stormwater which comes into direct contact with or results from the production or use of any raw material, intermediate product, finished product, byproduct, or waste product are authorized which comply with the-stormwater pollution management requirements, monitoring requirements, reporting requirements, and other conditions set forth in Part 1, Part II A - D, Part IV, Part V, Part VI, and Part VII of General Permit No. NCG240000. In accordance with the provisions of Session Law 2012-200, the process wastewater management requirements do not apply to the composting discharges from this Type 1 facility, and all composting operation discharges are authorized when the facility complies only with the stormwater provisions of the General Permit. To the extent any provisions may be read to impose the process wastewater standards in the General Permit to discharges from the permittee's facility, the provisions are suspended and do not apply. This Certificate of Coverage is an enforceable part of General Permit NCG240000, and shall become effective for the permittee on July 14, 2014, This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day, July 14, 2014. ,tie for Tracy E. Davis, P.E., Director Division of Energy Mineral & Land Resources By the Authority of the Environmental Management Commission Wade, Larry From: Khan, Zahid Sent: Thursday, July 10, 2014 1:10 PM To: Wade, Larry Cc: Schweiber, Erich Subject: RE: NCG240016 Compost Central La rry, We do not have any objection for rescinding this permit and issuance of new permit. Erich inspected the site and the inspection reports are in BIMS. Thanks Zahid From: Wade, Larry Sent: Wednesday, 3une 25, 2014 2:01 PM To: Khan, Zahid Subject: NCG240016 Compost Central Hello Zahid, Please review the attached NOI and let me know if you have any concerns issuing a permit for this facility. This is an existing permit operating on NCS000382 that will be rescinded as a result of issuing the new permit. I am sending you a site plan through interoffice mail. If you need additional information, please let me know. Thanks, Larry W. Wade PE Telephone: (919) 807-6375 Fax: (919) 807-6494 Stormwater Permitting Program North Carolina Department of Environment & Natural Resources Division of Energy Mineral and Land Resources 1612 Mail Service Physical Address - 512 N. Salisbury St. Room 9425 Raleigh, NC 27699-1612 Raleigh, NC 27604 ************************This is a government E-mail address**************************** *********E-mails sent and received from this address can be disclosed to third parties************ M EC KLENB U RG COUNTY Land Use and Environmental Services Agency Solid Waste Services May 29, 2014 TO: Ken Pickle, Environmental Engineer, NCDENR/DEMLR Stormwater Permitting Program FROM: Darren J. Steinhilber, P.E., Project Manager Mecklenburg County Solid Waste Services SUBJECT: NOI — NPDES General Permit NCG240000 Compost Central, 5631 West Blvd., Charlotte, NC il Please find included for your review two (2) copies of the Notice of Intent (NOI) for the Mecklenburg County Compost Central facility, located at 5631 West Blvd, in Charlotte, NC, to be covered under the National Pollutant Discharge Elimination System (NPDES) General Permit NCG240000. This package should include two (2) copies of the following: - Completed and signed application (one original and one copy) - Location Map (USGS quad sheet) - Operation and Maintenance Manual for Compost Central - Site Plan and Topographic Map - Operations Site Plan A check for $100 will be sent under separate cover. kA LJ S'r P tzfi-<Sl If have any questions or require additional information, please contact me at (704) 336-4447, PEOPLE • PRIDE • PROGRESS • PARTNERSHIPS 700 North Tryon Street • Charlotte, North Carolina 28202 • (704) 432-1753 Fax (704) 336-4314 www.wipeotitwaste.com NCG240000 N.O.I. 20) Does this facility have any other NPDES permits? X No ❑ Yes If Yes, list them: 21) Does this facility have any Non -Discharge permits (ex: recycle permits)? X No ❑ Yes If Yes, list them: 22) Does this facility have a Division of Waste Management permit? ❑ No X Yes If Yes, Permit number(s): L0_42 23) Hazardous Waste: a) is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? XNo [I Yes b) is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of hazardous waste7 X No ❑ Yes c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of hazardous waste? X No ❑ Yes d) Type(s) of waste: How is material stored? NA Where Is material stored? How many disposal shipments per year? Name of transport / disposal vendor: Vendor, address: ' Final ChnAlist i� This application will be returned as Incomplete unless all of the following items have been Included: ❑ One check for $100 made payable to NCDENR. ❑ One original and one copy of this completed and signed application. ❑ Two copies of the most recent Annual Report to the Secretary of State showing the current legal name. ❑ Two copies of the site plan. ❑ Two site location maps (county map or IISGS quad sheet) with the location of the facility clearly marked. Page 5 of 6 SWLLNCG24 NOI-12082011 F, 'NCG240000 N.O.I. NE 24) Certification: North Carolina General Statute 143-215.6 B(I) provides that: Any parson who knowingly makes any false statement, representation, or certification In any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule Implementing this Article. or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article: or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the (Environmental Managementl Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars (S10,000). I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: Title: (Please note federal rule signatory requfrements at 40CFRI22.22) (Signature of Applicant) (Date Signed) PNotice of Intent must be accompanied by a check or money order for $100.00 made payable to NCDENR Mail the entire package to: Stormwater Permitting Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Note The submission of this document does not guarantee the Issuance of an NPDES permit. For questions, please contact the DWG Central Office or Regional Office for your area. DWQ Regional Office Contact Information Asheville..........., (828) 296-4500 Fayetteville ........ (910) 433-3300 Mooresville ........ Raleigh ............. (704) 663-1699 (919) 7914200 Washington......... (252) 946-6481 Wilmington.......... (910) 796-7215 Winston-Salem... (336) 771-5000 Central Office..... (919) 807-6300 RECEIVED SUN 16 2414 RECEIVED MAY 1 a 7014 DENR-LAND QUALITY STORMWATFR PERMITTINGPage 6 of 6 SW U-NCG24NOI-12082011 XT. Division of Water Quality 1 Surface Water Protection ACDENR National Pollutant Diseliarge Elimination System Ermr+aa T -0 AItiiL PE RCE5 NCG240000 NOTICE OF INTENT Amount National Pollutant Discharge Elimination System application for coverage under General Permit NCG240000 for STORMWATER AND PROCESS WASTEWATER DISCHARGES associated with activities classified as: SIC Code (Standard Industrial Classification Code) 2875 Compost facilities, and like activities. For questions, please contact the DWQ Central Office or Regional Office for your area. (See page 6) 1) Mailing address of ownerloperator (official address to which all permit correspondence will be mailed): (Please print or type all entries in this application form.) Legal Owner Name Mecklenburg County (Please attach the most recent Annual Report to the NC Secretary of State showing the current legal name.) Street Address 700 North Tryon Street City Charlotte State NC ^ ZIP Code 28202 Telephone No. 704-336-4447 Email Darren .Stein hilberOmecklenburgcountync.gov Alternate Contact Name Joseph S. Hack Email (if different) Joe.Hack@meeklenburcicountync.gov Alternate Contact Telephone (if different) _ (704) 336-6513 2) Location of facility producing discharge: Facility Name Compost Central Facility Contact Jon Bivins, Maintenance and Operations Supervisor Street Address 5631 West Blvd City Charlotte State NC_ ZIP Code 28208 County Mecklenburg Telephone No. 704-588-9092 Email Jon. Bivins(aZmecklenburgcountync.gov 3) Physical location information: Please provide narrative directions to the facility (use street names, state road numbers, and distance and direction from a roadway intersection). 1-85, Take Exit 33, Left onto Billy Graham Parkway, Go 2.4 Miles Turn Left onto West Blvd. Go 2.0 Miles, Facilitv is on left. (A copy of a county map or USGS quad sheet with the facility clearly Located on the map is a required art 1 0tI �y��� 4) Latitud6 35° 11' 38.80 N Longitude 800 57' 01.16 W (deg, min, s iJ V g, 5) This NPDES Permit Application applies to the following (check appropriate box): r ❑ New or Proposed Facility Date operation is to begin X Existing Facility DWQ Permit # NCS000382 DLEj -_WATER QUALITY L 6) Consulting Engineer's (or other qualified design staff's) application information: Consulting Engineer: NIA Consulting Firm: NIA Mailing Address: NIA City: NIA State: NIA Zip Code: Phone: ( ) Fax. ( ) (Optional) Staple Business Card Here: Email: NIA Page 1 of 6 SWU-NCG24NO1712082011 NCG240000 N.O.I. 7) Provide the 4 digit SIC Code that describes the primary industrial activity at this facility: SIC Code: 2 8 7 5 8) Provide a brief description of the types of industrial activities and products produced at this facility, including•the DWIVI compost facility classification: Type I Compost Facility. Raw materials consist of yard waste and similar vegetative materials, including leaves, limbs, grass, and land clearing debris. Products include compost, mulch, and vegetative supplemental boiler fuel Receiving waters 9) Discharge points I Receiving waters: Number of discharge points (ditches, pipes, channels, etc.) that convey stormwater and/or process wastewater off the property: Stormwater only: Process wastewater only: Both commingled: _2 What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the stormwater and/or process wastewater discharges first enter? Coffey Creek Receiving water classification(s), if known: Class C If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). NIA Will this facility discharae to: Shellfishing waters (Classified SA)? ❑ Yes X No Trout waters (Classified Tr)? ❑ Yes X No High Quality Waters (Classified HQW)? ❑ Yes X No Outstanding Resource Waters (Classified ORW)? ❑-Yes X No Primary Nursery Area waters (Classified PNA)? ❑ Yes X No Nutrient Sensitive Waters (Classified NSW)? ❑ Yes X No Water Supply Watershed Waters (Classified WS I — WS V)? ❑ Yes X No 'Zero -flow' streams (as described in 15A NCAC 213 .0206)? ❑ Yes X No Note: Discharge of process wastewater to receiving waters classified as public water supply WS-II to WS-V must be approved by the Public Water Supply Section of the Division of Water Resources. If DWR does not approve, coverage under NCG240000 cannot be granted. No new discharges of process wastewater are permitted in receiving waters classified as WS-1 or freshwater ORW. Similarly, the Division of Environmental Health Shellfish Sanitation Program must a rove_pracess wastewater discharges to SA (shellfish) waters. 10) Does the facility use any of the following on site? NIA ❑ Liquid, granular, or other materials added for their concentrated phosphorus compounds content? ❑ Liquid, granular, or other materials added for their concentrated nitrogen compounds content? Page 2 of 6 5W U-NC G 24 N OI-12082011 r. 1 ' NCG240000 N.O.I. Process wastewater (Process wastewaters are defined in Part Il Section E of the General Permit text.) 11) Will your facility discharge process wastewaters to surface waters? ❑ Yes X No 12) Are wastewater treatment facilities planned within the 100-year flood plain? ❑ Yes X No 13) Consideration of alternatives to surface water discharge for process wastewaters a) Land Surface or Subsurface Disposal System (e.g., spray irrigation): i) Is a land surface or subsurface disposal technologically feasible (possible)?.......... ❑ Yes ❑ No Why or Why not? NIA ii) Is a land surface or subsurface disposal system feasible to implement?* ................❑ Yes ❑ No Why or Why not? N/A iii) What is the feasibility of employing a subsurface or land surface discharge as compared to a direct discharge to surface waters?* NIA b) Connection to a Municipal or Regional Sewer Collection System: i) Are there existing sewer lines within a one -mile radius? ..................................... ❑ Yes X No (1) If Yes, will the wastewater treatment plant (WWTP) accept the discharge? ....... ❑ Yes ❑ (a) If No, please attach a letter documenting that the WWTP will not accept the discharge. (b) If Yes, is it feasible to connect to the WWTP? Why or why not?* c) Closed -loop Recycle System meeting the design requirements of 15A NCAC 2T .1000: No i) Are you already proposing a closed -loop recycle system (CLRS)? ............................. El Yes X No (1) If Yes, contact DWQ's Aquifer Protection Section's Land Application Unit for permitting alternatives. (2) If No, is this option'technotogically feasible (possible)? Why or why not?* NA (3) If No, is it feasible to build a CLRS on your site? Why or why not?* (4) What is the feasibility of building a CLRS compared to direct surface water discharge?* Page 3 of 6 SW U-NC G24N OI-12082011 a. NCG240000 N.O.I. d) Direct Discharge to Surface Waters: Is discharge to surface waters the most environmentally sound YKA alternative of all reasonably cost-effective options being considered?* ....... ....................... X Yes Cl No i) If No, you may not be eligible for coverage under NCG240000,- please contact DWQ's Stormwater Permitting Unit for guidance. ii) If No, contact DWQ's Land Application Unit to determine alternative permitting requirements. KLII *Per NC rules at 15A NCAC 2H .0105(c)(2). You maybe asked to provide further information to support your answers to these questions after the initial review. Feasibility should consider initial and recurring costs. Process wastewater treatment system performance You are applying for coverage under NCG240000 which enforces process wastewater effluent limitations on the pollutants BOD, TSS, pH, and fecal coliform. Except as specifically provided in the General Permit text, or DWQ compliance schedule, any exceedances of the process wastewater effluent limitations are a violation of the terms and conditions of the permit, and may be the basis for DWQ enforcement action. Also please note: NC rule 15A NCAC 2H .0139 requires that wastewater treatment system design be accomplished by a North Carolina Professional Engineer. Stormwater 14) Does this facility employ any best management practices for stormwater control? ❑ No X Yes If Yes, please describe briefly: All petroleum -based materials stored under cover. Rock filters installed to capture suspended solids. Natural vegetative buffers 15) Does this facility have a Stormwater Pollution Prevention Plan? ❑ No X Yes If Yes, when was it implemented? 2000 16) Are vehicle maintenance activities (VMA) occurring or planned at this facility? ❑ No XYes Other required inform atiom other permitting 17) A complete application must include two 24"x36" site plans drawn to scale with the following information: bar scale, north arrow, property lines, topographic contour lines, fence lines, roads, paved areas, location of the various composting activities with identifying labels, site buildings, surface water drainage features and wetlands, wells, stormwater and wastewater conveyances, process wastewater treatment facilities, stormwater BMPs, location of discharge points for both stormwater and process wastewater discharges, delineation of drainage divides between the various subdrainage areas feeding each discharge point, delineation of the 100-yr floodplain if present, and a notation of the water quality classification of the receiving water that site waters eventually discharge to. 18) A complete application must include: A general and brief narrative description of the compost manufacturing sequence at the applicant's site, the general feedstocks, the determination of whether the site's final product qualifies as 'finished compost' as referenced in the General Permit text (NCG240000) and as determined by the DWM permitting process, identification of the stormwater BMPs employed, and the general nature of the wastewater treatment system utilized to meet process wastewater discharge limits. 19) Is the facility the subject of any current NCDENR Notice of Violation, consent order, compliance schedule, or other enforcement action? XNo❑Yes If Yes, provide a brief explanation: Page 4of6 SWU-NCG24NOI-12082011 NCG240000 N•O•I. 20) Does this facility have any other NPDES permits? X No ❑ Yes If Yes, list them: _ 21) Does this facility have any Non -Discharge permits (ex: recycle permits)? XNo❑Yes If Yes, list them: 22) Does this facility have a Division of Waste Management permit? ❑ No X Yes If Yes, Permit number(s): 60-12 Compost Central 23) Hazardous Waste: a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? X No ❑ Yes b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of hazardous waste? X No ❑ Yes c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of hazardous waste? d) X No ❑ Yes Type(s) of waste: How is material stored? NA Where is material stored? How many disposal shipments per year? Name of transport / disposal vendor: Vendor address: Final Checklist This application will be returned as incomplete unless all of the following items have been included: ❑ One check for $100 made payable to NCDENR. ❑ One original and one copy of this completed and signed application. ❑ Two copies of the most recent Annual Report to the`Secretary of State showing the current legal name. ❑ Two copies of the site plan. ❑ Two site location maps (county map or USGS quad sheet) with the location of the facility clearly marked. Page 5 of 6 SWU-NCG24NOI-I2082011 y NCG240000 N.O.I. 24) Certification: r North Carolina General Statute 143-215.6 B(I) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). I hereby request coverage under the referenced General Permit. i understand that coverage under this permit will constitute the perrnit-requirements for the discharge(s) and is enforceable in the same manner as an individual permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: Joseph S. Mack _ Title: Senior Project Manager (Please note federal rule signatory requirements at 40CFR122.22) WAI (Signat e ejXpWWtY (D e Sig ed) �Notice � ntent must be accompanied by a check or money order for $100.00 made payable to NCDENR Mail the entire package to: Stormwater Permitting Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Note The submission of this document does not guarantee the issuance of an NPDES permit. For questions, please contact the DWQ Central Office or Regional Office for your area. DWQ Regional Office Contact Information Asheville............ (828) 296-4500 Fayetteville ........ (910) 433-3300 Mooresville ........ (704) 663-1699 Raleigh ............. (919) 791-4200 Washington......... (252) 946-6481 Wilmington.......... (910) 796-7215 Winston-Salem... (336) 771-5000 Central Office ..... (919) 807-6300 Page 6 of 6 SVVU-NCG24NOI-12082011 SECTION C: LOCATION MAP Permit No. NCS000382 Part I Page 2 of 2 Mecklenburg County Operation and Maintenance Manual for Compost Central Permit # 60-1 2 Updated January 31, 2011 Operation & Maintenance Manual Mecklenburg County Compost Central Permit # 60-12 Table of Contents GeneralInfonnation........................................................................................ 3 Quality Assurance Plan................................................................................... 4 Inspection of Incoming Material.................................................................... 4 Material Preparation....................................................................................... 4 Cornposting Process........................................................................................ S Final Product .............. ... S .................................................................................. Reporting and Record Keeping...................................................................... 6 ContingencyPlan............................................................................................ 7 Equipment Breakdown ............ 7 Non -conforming Waste................................................................................... 7 FireContingency................................................................... •.................... 7 Vectorsand Odors.......................................................................................... 7 Appendix A - .1406 ....... OPERATIONAL REQUIREMENTS FOR SOLID WASTE COMPOST FACILITIES Mecklenburg County — Compost Central Operations and Maintenance Manual Revised January 31, 2011 General Information Mecklenburg County's compost facility, Compost Central, is located on 86 acres ]eased from the City of Charlotte, Charlotte/Douglas International Airport. The land is located within the limits of the City of Charlotte. An additional portion of the land is used for a full service, staffed recycling center. The land is situated across West Boulevard from the end of one of the airport runways. Compost Central's operating area consists of approximately 33 acres,. The facility receives approximately t00,000 tons of yard waste and clearing debris and produces over 14,000 cubic yards of compost and an additional 200,000 cubic yards of mulch which is sold to citizens, landscape contractors, and as boiler fuel. There are currently two scales at Compost Central. All customers disposing of material and customers purchasing products must cross the scale at the scalehouse. All incoming material is weighed .with the exception of pick-up and automobile traffic. These customers are charged by the size of vehicle and their weight is based upon historical data. Material being sold (compost, mulch, nuggets, and etc.) are sold on a per cubic yard basis. In addition, material sent out as boiler fuel in tractor trailers is tracked on a per load basis (100 cubic yards per load). Mecklenburg County —Compost Central Operations and Maintenance Manual Revised January 31, 2011 Quality Assurance Plan Inspection of Incoming Material 1. The cashier initially performs visual screening of incoming material at the time it is being weighed. The inspection is to insure that no municipal solid waste, recyclables, household hazardous waste, treated wood, dirt or other contaminants are in the load. 2. if any of these items are detected at this time, the customer is directed to dispose of the materials in an approved disposal facility. 3. The heavy equipment operators perform the second and primary screening on the tipping pad. These operators inspect the material both at the time of tipping as well as immediately before the material is placed into the tub grinders to ensure that material type as well as size are appropriate to be processed by the grinders. 4. Should any non -conforming waste be detected by the operators during grinding operations, the waste is loaded into a 40-yard open top container located on site, which when full is removed from the site to be disposed properly. Material Preparation 1. After inspection, the material is ground in the tub grinders using a 2" x5" screen for sizing. 2. The ground material is then removed from the processing area and placed into windrows for composting. 3. Upon placement of the material into windrows, moisture requirements are determined by performing a squeeze test of the material: a. A handful of material is gathered and squeezed in one hand. b. If the material does not stay in a ball, but falls apart after squeezing it, the moisture is probably below 50%. c. If the material stays in a ball and little or no moisture drips from the ball, then this is interpreted as 50%-60% moisture — the optimum moisture content. d. If water is dripping from the ball of material, then moisture content is most likely above 65%. 4. Natural rainfall usually provides enough water to keep the moisture content of the material at optimum conditions. In the event of a low rainfall period, a water truck is available to provide additional water to maintain optimal moisture content of the windrows. 4 Mecklenburg County — Compost Central Operations and Maintenance Manual Revised January 31, 2011 5. In normal operations, high nitrogen yard wastes are incorporated into windrows as soon as possible to minimize odors. All yard waste, including green waste (grass clippings), is processed through the tub grinder within twenty-four hours of being received. The grinding process gives the material its initial charge of oxygen for its aerobic decomposition. The material is then incorporated into windrows within seventy-two (72) hours if space is available or is sent out as boiler fuel. 6. During the high green waste season (spring) incoming materials have enough woody waste content that the processed material can be sold as boiler fuel. Composting Process Generally, the windrowed material is turned as needed using a Backhus windrow turner. This is necessary so that the temperature of the material remains at or above 55°C (131 °F). In addition, windrow turning keeps the process aerobic, which minimizes odor problems. 2. Throughout the composting process the material is monitored qualitatively for moisture content and aesthetics. 3. Temperatures of the windrows are typically measured at least once a week at three equally spaced distances along each windrow. The temperature is measured with a four -foot analog thermometer fully inserted toward the cross -sectional center of the windrow. The indicator needle is allowed to stabilize (typically one minute), and the reading is recorded. Final Product l . The compost material is turned regularly until the internal temperature falls below 55 °C. 2. Upon reaching the desirable temperature the material is screened at three -eighths (3/8) inch to remove any non -conforming waste that may have been missed during the original screening. 3. The material passing the 3/8-inch screen is placed in a curing pile separate from the rest of the facility for approximately one month and is then ready for distribution. 4. The material not passing the 3/8-inch screen is re -screened at 1-inch. 5. The material passing the 1-inch screen is sold as mulch. 6. The material not passing the 1-inch screen is sold as boiler fuel. 5 Mecklenburg County —Compost Central Operations and Maintenance Manual Revised January 31, 2011 Reporting and Record keeping An annual report, covering the period from July 1 to June 30, will be submitted to the North Carolina Department of Environment and Natural Resources (NCDENR) by August 1 for the prior year. The annual report shall contain the information as contained in Section 1408 of the North Carolina Solid Waste Management Rules. Note: Monitoring; records are maintained for five years and are available for inspection by division personnel. Records include daily quantity of processed material, temperature data, quantity and source of material received, and the quantity and type of material removed for the use or disposal by product classification and the market or permitted disposal facility. Mecklenburg County-- Compost Central Operations and Maintenance Manual Revised January 31, 2011 Contingency Plan Equipment Breakdown All equipment has at least one backup with the exception of the Backhus windrow turner. The concern that all pieces of a specific kind of equipment are out of service for any period of time is minimal. 2. If the Backhus windrow turner is out of service for a period of time a unit will be rented. Non -conforming Waste 1. All waste is screened as described in the Quality Assurance Plan. Non -conforming waste is not excepted at the facility. 2. Should non -conforming waste be received at the tipping area, any contaminants are immediately loaded back onto the vehicle from which it came. 3. Should any non -conforming waste be detected by the operators during grinding operations, the waste is loaded into a 40-yard open top container located on site, which when full is removed from the site to be disposed properly. Fire Contingency The local Fire Department station has been made aware of Compost Central and the nature of its operation. 2. Threat of fire is minimized by not allowing stock piles to age over four weeks and by keeping its volume to a minimum. 3. A water truck is located at the facility for immediate action should a fire breakout. Regardless of the size of a fire the Fire Department would be notified. Vectors and Odors Vectors are rarely a problem for yard waste (Type I) composting facilities and have never been an issue at Compost Central. 2. The timely manner in which yard waste is ground and placed into windrows assists in the prevention of vectors. 3. Odor is minimized by the timely manner in which yard waste is ground and placed into windrows. In addition, the windrows are turned weekly to insure the composting process is aerobic. 7 Appendix A Compliance with Rine .1406 SOLID WASTE COMPOST FACILITY OPERATIONAL REQUIREMENTS SUBMITTAL Company Name: Mecklenburg County Site Name: Compost Central Site Address: 5631 West Boulevard, Charlotte, North Carolina 28208 Current Permit Number: 60-12 .1406 OPERATIONAL REQUIREMENTS FOR SOLID WASTE COMPOST FACILITIES Any person who maintains or operates a solid waste compost facility shall maintain and operate the site to conform with the following practices: (1) Plan and Permit Requirements (1)(A) Construction plans and conditions of permit shall be followed • and (1)(B) A copy of the permit, plans, and operational reports shall be maintained on site at all tinres. Conditions of the operating permit are followed at all times and a copy of the permit, plans, and operational reports are maintained on site at all times. (2) Adequate erosion control measures shall be practiced to prevent on -site erosion and to control the movement ofsoil or contaminants from the site. All primary processing areas are located on asphalt or concrete. The perimeter of the site is completely vegetated to prevent erosion. In addition, the windrows are formed perpendicular to the slope of the pavement to minimize sheet pow. (3) Surface water shall be diverted from the operational, compost curing, and storage areas. A Swale exists upgradient of the composting pad to minimize surface water run-off onto the site. (4) Leachate shall be contained on site treated to meet the standards of the off site disposal method. Windows are constructed perpendicular to the slope of the pad, allowing the composting material to absorb the majority of the rainwater. Rain that falls directly on the windrows is absorbed into the windrows and does not run-off. The windrows are generally turned when it is raining in order to incorporate the moisture throughout the windrow. Vegetative buffers and rock check dams are used in the low-lying areas of the composting pads to filter any stormwater runoff prior to leaving the site. (S)Access and Security Requirements: (S)(A)Large sites shall be secured by means of gates, chains, berms, fences, or other security measures demonstrated to provide equivalent protection approved by the Division, to prevent unauthorized entry. An eight -foot chain link perimeter fence secures the site and entry is through security gates, which are locked after hours. (S)(B) An operator shall be on duty at the site at all times while the facility is open for public use to ensure compliance with operational requirements and access to such facilities shall be controlled. An operator is on duty at all times the facility is open for public use. December 20, 2005 Revised January 31, 2011 Mecklenburg County Compost Central Permit # 60-12 Page 2 of 4 .1406 Continued (S)(C) The access road to the site shall be of all-weather construction and maintained in good condition. The entire site is constructed with asphalt and concrete to provide all weather access. (6)A site shall only accept those solid wastes that it is permitted to receive. This site will accept only Type 1 yard waste and woody waste, which includes leaves, limbs, grass, and land clearing debris. (7) Safety Requirements (7)(A) Open burning of solid waste is prohibited. Open burning of anything is prohibited on site. (7)(B) Equipment shall be provided to control accidental fires and arrangements made with the local fire protection agency to imniediately provide free -fighting services when needed. All pieces of equipment include a fire extinguisher. A water truck is on site at all times to provide fire fighting capabilities. The City of Charlotte fire department is also available to provide immediate fire fighting services. (7)(C) Personnel training shall be provided to insure that all employees are trained in site specific safety, remedial, and corrective action procedures. Staff will receive the training required. (8) Sign Requirements: (8)(A) Signs providing information on waste that can be received, dumping procedures, the hours during which the site is open for public use the permit number and other pertinent information shall be posted at the site entrance. (8)(B) Traffic signs/markers shall be provided as necessary to promote an orderly traffic pattern to and from the discharge area and to maintain efficient operating conditions. (8)(C) Signs shall be posted stating that no hazardous waste, asbestos containing waste, or medical waste can be received at the site. Signage includes hours of operation, materials accepted, fees, permit number, emergency contact information, traffic routing, "No Hazardous Waste" signage, "No Asbestos Containing Waste" signage, and "No Medical Waste" signage. (9) Monitoring Requirements: (9)(A) Specified monitoring and reporting requirements shall be met. (9)(B) The temperature of all compost produced shall be monitored sufficiently to ensure that the pathogen reduction criteria is met. Temperatures of the windrows are typically measured at least once a week at three equally spaced distances along each windrow. The temperature is measured with a four -foot long analog thermometer fully inserted toward the cross -sectional center of the windrow. The indicator needle is allowed to stabilize (typically one minute), and the reading is recorded. Annual reporting is submitted by August 1 of each year. December 20, 2005 Revised January 3 I, 2011 Mecklenburg County Compost Central Permit # 60-12 Page 3 of 4 .1406 Continued (10) Compost processed at Type 1 facilities shall be maintained at or above 55 degrees Celsius for 3 days and aerated to maintain elevated temperatures, Temperature measurements collected at least once a week will ensure that compost is maintained at or above 55°C (131°F) for at least three (3) days. The windrows are aerated as needed using a Backhus compost turner to ensure elevated temperatures are being maintained. (11) Types 2, 3 and 4 facilities shall maintain the compost process at a temperature above 40 degrees Celsius (104 degrees F) for 14 days or longer and the average temperature for that time shall be higher than 45 degrees Celsius (113 degrees F) or, Types 2, 3 and 4 facilities shall meet the vector attraction reduction requirements in 40 CFR 503.33(b)(4) or (7). Requirements of 40 CFR 503.33(b)(4) and (7) are hereby incorporated by reference, including any subsequent amendments or additions. As this facility is a Type I facility, this section does not apply (12) The composting process shall qualify, as a process to f a-ther reduce pathogens for all Type 3 and Type 4 facilities. The following are acceptable »rethods: (12)(A) The windrow composting method in which the following requirements apply: Aerobic conditions shall be maintained during the compost process. A temperature of 131 degrees F (55 degrees Celsius) or greater shall be maintained in the windrow for at least 15 days. During the high temperature period, the windrow shall be turned at least five times. (12)(B) The static aerated pile composting method, in which the following requirements apply: Aerobic conditions shall be maintained during the compost process. The temperature of the compost pile shall be maintained at 131 degrees F (55 degrees Celsius) or greater for at least three days. (12)(C) The within -vessel composting method, in which the temperature in the compost piles shall be maintained at a minimal temperature of 131 degrees F (55 degrees Celsius) for at least three days. As this facility is a Type I facility, this section does not apply. (13) Nitrogen bearing wastes shall be incorporated as necessary to minimize odor and the migration of nutrients. In normal operations, high nitrogen yard wastes are incorporated into windrows as soon as possible to minimize odors. All yard waste, including green waste (grass clippings), is processed through the tub grinder within seventy- two (72) hours of being received. The grinding process gives the material its initial charge of oxygen for its aerobic decomposition. The material is then incorporated into windrows within forty-eight (48) hours if space is available or sent out as boiler Iuei within seventy- two (72) hours. (14) Miscellaneous Requirements: (14)(A) The finished compost shall meet the classification and distribution requirements outlined in Rule .1407 of this Section. The finished compost meets the classification of "Produced at Type I Facility". (14)(B)The quality of the final product shall determine the allowable uses as outlined in Rule .1407 of this Section. The finished compost has an "Unrestricted Application and Distribution" grade. December 20, 2005 Revised January 31, 2011 Mecklenburg County Compost Central Permit # 60-12 Page 4 of 4 .1406 Continued (14)(C) The final product shall be approved by the Solid iFaste Section as outlined in Rule .1407 Subparagraph (6)(b) of this Section. The final product will be approved by the Solid Waste Section. (14)(C)(i) Non-compostable solid waste and unacceptable compost shall be disposed in a solid waste management facilitypermitted to receive the particular type of waste under 15A NCAC 13B. Should any non-compostable materials be detected by frontline staff during operations, the materials are loaded into a 40-yard open -top container located on site, which when full is removed from the site to be disposed in a proper solid waste management facility. Once the compost has reached maturity, the material is screened at 3/8 inch to remove any non -conforming waste that may have been missed during the original screening. The material not passing the 3/8-inch screen is re -screened at 1-inch. The material passing the 1-inch screen is sold as mulch. The material not passing the 1-inch screen is sold as boiler fuel. (14)(C)(ii)The anzount of compost stored at the facility shall not exceed the designed storage capacity. The amount of compost stored at the facility will not exceed the design storage capacity. December 20, 2005 Revised January 31, 2011 Appendix A Compliance with Rule .1406 Mecklenburg County — Compost Central Operations and Maintenance Manual Revised January 31, 2011 Contingency Plan Equipment Breakdown 1. All equipment has at least one backup with the exception of the Backhus windrow turner. The concern that all pieces of a specific kind of equipment are out of service for any period of time is minimal. 2. If the Backhus windrow turner is out of service for a period of time a unit will be rented. Non -conforming Waste 1. All waste is screened as described in the Quality Assurance Plan. Non -conforming waste is not excepted at the facility. 2. Should non -conforming waste be received at the tipping area, any contaminants are immediately loaded back onto the vehicle from which it came. 3. Should any non -conforming waste be detected by the operators during grinding operations, the waste is loaded into a 40-yard open top container located on site, which when full is removed from the site to be disposed properly. Fire Contingency 1. The local Fire Department station has been made aware of Compost Central and the nature of its operation. 2. Threat of fire is minimized by not allowing stock piles to age over four weeks and by keeping its volume to a minimum. 3. A water truck is located at the facility for immediate action should a fire breakout. Regardless of the size of a fire the Fire Department would be notified. Vectors and Odors 1. Vectors are rarely a problem for yard waste (Type I) composting facilities and have never been an issue at Compost Central. 2. The timely manner in which yard waste is ground and placed into windrows assists in the prevention of vectors. 3. Odor is minimized by the timely manner in which yard waste is ground and placed into windrows. In addition, the windrows are turned weekly to insure the composting process is aerobic. 7 Mecklenburg County— Compost Central Operations and Maintenance Manual Revised January 31, 2011 Reporting and Record keeping An annual report, covering the period from July i to June 30, will be submitted to the North Carolina Department of Environment and Natural Resources (NCDENR) by August 1 for the prior year. The annual report shall contain the information as contained in Section 1408 of the North Carolina Solid Waste Management Rules. Note. Monitoring records are maintained for five years and are available for inspection by division personnel. Records include daily quantity of processed material, temperature data, quantity and source of material received, and the quantity and type of material reproved for the use or disposal by product classification and the market or permitted disposal facility. 6 Mecklenburg County — Compost Central Operations and Maintenance Manual Revised January 31, 2011 In normal operations, high nitrogen yard wastes are incorporated into windrows as soon as possible to minimize odors. All yard waste, including green waste (grass clippings), is processed through the tub grinder within twenty-four hours of being received. The grinding process gives the material its initial charge of oxygen for its aerobic decomposition. The material is then incorporated into windrows within seventy-two (72) hours if space is available or is sent out as boiler fuel. 6. During the high green waste season (spring) incoming materials have enough woody waste content that the processed material can be sold as boiler fuel. Composting Process 1. Generally, the windrowed material is turned as needed using a Backhus windrow turner. This is necessary so that the temperature of the material remains at or above 55°C (131 °F). In addition, windrow turning keeps the process aerobic, which minimizes odor problems. 2. Throughout the composting process the material is monitored qualitatively for moisture content and aesthetics. 3. Temperatures of the windrows are typically measured at least once a week at three equally spaced distances along each windrow. The temperature is measured with a four -foot analog thermometer fully inserted toward the cross -sectional center of the windrow. The indicator needle is allowed to stabilize (typically one minute), and the reading is recorded. Final Product The compost material is turned regularly until the internal temperature falls below 55 °C. 2. Upon reaching the desirable temperature the material is screened at three -eighths (3/8) inch to remove any non -conforming waste that may have been missed during the original screening. The material passing the 3/8-inch screen is placed in a curing pile separate from the rest of the facility for approximately one month and is then ready for distribution. 4. The material not passing the 3/8-inch screen is re -screened at 1-inch. 5. The material passing the 1-inch screen is sold as mulch. 6. The material not passing the 1-inch screen is sold as boiler fuel. Mecklenburg County -- Compost Central Operations and Maintenance Manual Revised January 31, 2011 General Information Mecklenburg County's compost facility, Compost Central, is located on 86 acres leased from the City of Charlotte, Charlotte/Douglas International Airport. The land is located within the limits of the City of Charlotte. An additional portion of the land is used for a full service, staffed recycling center. The land is situated across West Boulevard from the end of one of the airport runways. Compost Central's operating area consists of approximately 33 acres,. The facility receives approximately 100,000 tons of yard waste and clearing debris and produces over 14,000 cubic yards of compost and an additional 200,000 cubic yards of mulch which is sold to citizens, landscape contractors, and as boiler fuel. There are currently two scales at Compost Central. All customers disposing of material and customers purchasing products must cross the scale at the scalehouse. All incoming material is weighed with the exception of pick-up and automobile traffic. These customers are charged by the size of vehicle and their weight is based upon historical data. Material being sold (compost, mulch, nuggets, and etc.) are sold on a per cubic yard basis. In addition, material sent out as boiler fuel in tractor trailers is tracked on a per load basis (100 cubic yards per load). Mecklenburg County — Compost Central Operations and Maintenance Manual Devised January 31, 2011 Quality Assurance Plan Inspection of Incoming Material 1. The cashier initially performs visual screening of incoming material at the time it is being weighed. The inspection is to insure that no municipal solid waste, recyclables, household hazardous waste, treated wood, dirt or other contaminants are in the load. 2. If any of these items are detected at this time, the customer is directed to dispose of the materials in an approved disposal facility. 3. The heavy equipment operators perform the second and primary screening on the tipping pad. These operators inspect the material both at the time of tipping as well as immediately before the material is placed into the tub grinders to ensure that material type as well as size are appropriate to be processed by the grinders. 4. Should any non -conforming waste be detected by the operators during grinding operations, the waste is loaded into a 40-yard open top container located on site, which when full is removed from the site to be disposed properly. Material Preparation I. After inspection, the material is ground in the tub grinders using a 2" x5" screen for sizing. 2. The ground material is then removed from the processing area and placed into windrows for composting. 3. Upon placement of the material into windrows, moisture requirements are determined by performing a squeeze test of the material: a. A handful of material is gathered and squeezed in one hand. b. If the material does not stay in a ball, but falls apart after squeezing it, the moisture is probably below 50%. c. If the material stays in a ball and little or no moisture drips from the ball, then this is interpreted as 50%-60% moisture — the optimum moisture content. d. If water is dripping from the ball of material, then moisture content is most likely above 65%. 4. Natural rainfall usually provides enough water to keep the moisture content of the material at optimum conditions. In the event of a low rainfall period, a water truck is available to provide additional water to maintain optimal moisture content of the windrows. 4 Mecklenburg County Compost Central Permit 9 60-12 Page 3 of 4 .1406 Continued (10) Compost processed at Type 1 facilities shall be maintained at or above 55 degrees Celsius for 3 days and aerated to maintain elevated temperatures. Temperature measurements collected at least once a week will ensure that compost is maintained at or above 55°C (131°F) for at least three (3) days. The windrows are aerated as needed using a Backhus compost tamer to ensure elevated temperatures are being maintained. (11) Types 2, 3 and 4 facilities shall maintain the compost process at a temperature above 40 degrees Celsius (104 degrees F) for 14 days or longer and the average temperature for that time shall be higher than 45 degrees Celsius (113 degrees F) or, Types 2, 3 and 4 facilities shall meet the vector attraction reduction requirements in 40 CFR 503.33(b)(4) or (7). Requirements of 40 CFR 503.33(b)(4) and (7) are hereby incorporated by reference, including any subsequent amendments or additions. As this facility is a Type I facility, this section does not apply (12) The composting process shall qualify as a process to farther reduce pathogens for all Type 3 and Type 4 facilities. The following are acceptable methods: (12)(A) The windrow composting method, in which the following requirements apply: Aerobic conditions shall be maintained during the compost process. A temperature of 131 degrees F (55 degrees Celsius) or greater shall be maintained in the windrow for at least 15 days. During the high temperature period, the windrow shall be turned at least five times. (12)(B) The static aerated pile composting method, in which the following requirements apply: Aerobic conditions shall be maintained during the compost process. The temperature of the compost pile shall be maintained at 131 degrees F (55 degrees Celsius) orgreater for at least three days. (12)(C) The within -vessel composting method, in which the temperature in the compost piles shall be maintained at a minimal temperature of 131 degrees F (55 degrees Celsius) far at least three days. As this facility is a Type I facility, this section does not apply. (13) Nitrogen bearing wastes shall be incorporated as necessary to minimize odor and the migration of nutrients. In normal operations, high nitrogen yard wastes are incorporated into windrows as soon as possible to minimize odors. All yard waste, including green waste (grass clippings), is processed through the tub grinder within seventy- two (72) hours of being received. The grinding process gives the material its initial charge of oxygen for its aerobic decomposition. The material is then incorporated into windrows within forty-eight (48) hours if space is available or sent out as boiler fuel within seventy- two (72) hours. (14) Miscellaneous Requirements: (14)(A) The fnished compost shall meet the classification and distribution requirements outlined in Rule .1407 of this Section. The finished compost meets the classification of "Produced at Type I Facility". (14)(B)The quality of the final product shall determine the allowable uses as outlined in Rule .1407 of this Section. The finished compost has an "Unrestricted Application and Distribution" grade. December 20, 2005 Revised January 31, 2011 Mecklenburg County Compost Central Permit # 60-12 Page 4 of 4 .1406 Continued (14)(C) The final product shall be approved by the Solid Waste Section as outlined in Role .1407 Subparagraph (6)(b) of this Section. The final product will be approved by the Solid Waste Section. (14)(C)(i) Nan-compostable solid waste and unacceptable compost shall be disposed in a solid waste nzanagenient facility pej•fnitted to receive the particular type of waste under 15A NCAC 13B. Should any non-compostable materials be detected by frontline staff during operations, the materials are loaded into a 40-yard open -top container located on site, which when full is removed from the site to be disposed in a proper solid waste management facility. Once the compost has reached maturity, the material is screened at 318 inch to remove any non -conforming waste that may have been missed during the original screening. The material not passing the 3/8-inch screen is re -screened at 1-inch. The material passing the 1-inch screen is sold as mulch. The material not passing the 1-inch screen is sold as boiler fuel. (14)(C)(ii)The amount of compost stored at the facility shall not exceed the designed storage capacity. The amount of compost stored at the facility will not exceed the design storage capacity. December 20, 2005 Revised January3 l , 2011 Mecklenburg County Compost Central Permit # 60-12 Page 2 of 4 1406 Continued (5)(C) The access road to the site shall be of all-weather construction and maintained in good condition. The entire site is constructed with asphalt and concrete to provide all weather access. (6)A site shall only accept those solid wastes that it is permitted to receive. This site will accept only Type I yard waste and woody waste, which includes leaves, limbs, grass, and land clearing debris. (7) Safety Requirements (7)(A) Open burning ofsolid waste is prohibited. Open burning of anything is prohibited on site. (7)(B) Equipment shall be provided to control accidental fires and arrangements wade with the local fire protection agency to immediately provide fire fighting services when needed. All pieces of equipment include a fire extinguisher. A water truck is on site at all times to provide fire fighting capabilities. The City of Charlotte fire department is also available to provide immediate fire fighting services. (7)(C) Personnel training shall be provided to insure that all employees tyre trained in site specific safety, remedial, and corrective action procedures. Staff will receive the training required. (8) Sign Requirements: (8)(A) Signs providing information on waste that can be received, duinping procedures, the hours during which the site is open for public use, the permit number and other pertinent information shall be posted at the site entrance. (8)(B) Traffic signshnarkers shall be provided as necessary to promote an orderly traffic pattern to and from the discharge area and to maintain efficient operating conditions. (8)(C) Signs shall be posted stating that no hazardous waste, asbestos containing waste, or medical waste can be received at the site. Signage includes hours of operation, materials accepted, fees, permit number, emergency contact information, traffic routing, "No Hazardous Waste" signage, "No Asbestos Containing Waste" signage, and "No Medical Waste" signage. (9) Monitoring Requirements: (9)(A) Specified monitoring and reporting requirements shall be met. (9)(B) The temperature of all compost produced shall be monitored sufficiently to ensure that the pathogen reduction criteria is met. Temperatures of the windrows are typically measured at least once a week at three equally spaced distances along each windrow. The temperature is measured with a four -foot long analog thermometer fully inserted toward the cross -sectional center of the windrow. The indicator needle is allowed to stabilize (typically one ininute), and the reading is recorded. Annual reporting is submitted by August I of each year. December 20, 2005 Revised January 31, 2011 SOLID WASTE COMPOST FACILITY OPERATIONAL REQUIREMENTS SUBMITTAL Company Name: Mecklenburg County Site Name: Compost Central Site Address: 5631 West Boulevard, Charlotte, North Carolina 28208 Current Permit Number: 60-12 .1406 OPERATIONAL REQUIREMENTS FOR SOLID WASTE COMPOST FACILITIES Any person ivho maintains or operates a solid waste compost facility shall maintain and operate the site to conform with the following practices: (1) Plan and Permit Requirements (1)(A) Construction plans and conditions ofpermit shall be followed; and (1)(B) A copy of the permit, plans, and operational reports shall be maintained on site at all times. Conditions of the operating permit are followed at all times and a copy of the permit, plans, and operational reports are maintained on site at all times. (2) Adequate erosion control measures shall be practiced to prevent on -site erosion and to control the movenrent ofsoil or contaminants from the site. All primary processing areas are located on asphalt or concrete. The perimeter of the site is completely vegetated to prevent erosion. In addition, the windrows are formed perpendicular to the slope of the pavement to minimize sheet flow. (3) Surface water shall be diverted fi-om the operational, compost curing, and storage areas. A swale exists upgradient of the composting pad to minimize surface water run-off onto the site. (4) Leachate shall be contained on site treated to meet the standards of the off -site disposal method. Windows are constructed perpendicular to the slope of the pad, allowing the composting material to absorb the majority of the rainwater. Rain that falls directly on the windrows is absorbed into the windrows and does not run-off. The windrows are generally turned when it is raining in order to incorporate the moisture throughout the windrow. Vegetative buffers and rock check dams are used in the low-lying areas of the composting pads to filter any stormwater runoff prior to leaving the site. (5)Access and Security Requirements: (S)(A)Lauge sites shall be secured by means of gates, chains, beans, fences, or other security measures demonstrated to provide equivalent protection approved by the Division, to prevent unauthorized entry. An eight -foot chain link perimeter fence secures the site and entry is through security gates, which are locked after hours. (5)(B) An operator shall be on duty at the site at all tines while the facility is open for public use to ensure compliance with operational requirements and access to such facilities shall be controlled. An operator is on duty at all times the facility is open for public use. December 20, 2005 Revised January 31, 2011 Mecklenburg County Operation and Maintenance Manual for Compost Central Permit # 60-12 Updated January 31, 2011 Operation & Maintenance Manual Mecklenburg County Compost Central Permit # 60-12 Table of Contents GeneralInformation........................................................................................ 3 Quality Assurance Plan................................................................................... 4 Inspection of Incoming Material ............................ MaterialPreparation....................................................................................... 4 CompostingProcess........................................................................................ 5 FinalProduct.............................................................................:..................... 5 Reporting and Record Keeping...................................................................... 6 Contingency Plan ................................................. Equipment Breakdown................................................................................... 7 Non -conforming Waste .................... 7 ............................................................... FireContingency............................................................................................. 7 Vectorsand Odors.......................................................................................... 7 Appendix A - .1406 ....... OPERATIONAL REQUIREMENTS FOR SOLID WASTE COMPOST FACILITIES v 40 5 3 10011, 1:0 5 3 10 798 9i: 00 2 2 L00 580 6Oul SECTION C: LOCATION MAP Permit No. NCS000382 Part 1 Page 2 of 2