HomeMy WebLinkAboutNCC193290_ESC Approval Submitted_20191227 DEVELOPMENT PLAN
TowN of, CARY REVIEW
N{JR' EiCAROLIAR ToWll of Cary
316 N.Academy St.I Cary,NC 27513
P:(919)469-4046
dre@townofcary.org
July 31,2019
Hanna Investments, LLC
101 SW Cary Parkway 140
Cary, NC 27511
RE: Development Review Committee Approval of CPS Clinic
Project Number: Town of Cary Project Number: 18-DP-0737
Property Real Estate ID Number(s): 94226
407379
The Town of Cary Development Review Committee is pleased to inform you that your plan is approved,effective 31 Jul 2019.
SCOPEOFWORKAPPROVED: Construction of a 5,213sf medical one storyoffice and accompanying infrastructure.
DURATION AND EJECT OFAPPROVAL
Substantial Progress by31 Jul2021
In accordance with Section 3.9.2(K)of the Land Development Ordinance(LDO),this approval shall become null and void if the applicantfails to make
substantial progress on the site prior to the date noted above,or ekended date if approved bythe Town of Cary in accordance with all applicable
requirements of the LDO.(Refer to LDO Chapter 12 for definition of substantial progress)
Construction Completed by31 Jul2024
In no case shall this plan or parts of this plan be valid if not completed as approved prior to the date noted above.If a plan is deemed to no longer be valid,
the owner or applicant will be required to resubmitfor approval a plan that meets current development ordinances unless otherwise noted in this
Ordinance.
No change(s)maybe made to the above-referenced development plan unless approved bythe Town of Cary.
SITE DEVELOPMENT PROCEDURES AND NOTES
Before any work may begin on this project,all fees included in the attached Statement of Fees must be paid concurrent with submitting the following items to the
Development Services Department located on the first floor of the Cary Town Hall:
• Three(3)complete 24"x 36"sets of the signed approved plans
• One(1)complete 11"x 17"set of the signed approved plans
• One(1)copyof this Approval Letter,including the Statement of Fees
• Town of Cary Environmental(Land Disturbance/Grading)Permit Application,including:
Financial Responsibilityform
■ Certificate of Insurance
■ Copy of Statement of Fees and receipt(even if$0)
• Al fees indicated in the attached Statement of Fees should be remitted through the Development Services Department.Please have the Statement of Fees
and the project HTE number(s)available when paying to ensure that the fees are receipted correctly Failure to do so may result in delays to processing
times for related applications and permits,and may also result in the Town initiating appropriate enforcement action in accordance with Chapter 11 of the
LDO.Such action may include,but is not limited to,issuance of civil penalties and/or withholding issuance of building and occupancy permits.
ASoil and Erosion Certificate of Compliance must be obtained from Town of CaryStormwater Wriagement prior to issuance of any building permits.
Notify Town of Cary Infrastructure Field Services at(919)462-3832 or(919)469-4036 to arrange a pre-construction meeting when construction is about to
commence.
• Afinal version("as built')of this plan set shall be provided to the Town at the conclusion of development,and prior to the final site inspection.This final set shall
include all revisions,Minor Alterations,field changes,and other modifications to the original approval so that the site inspector has the most accurate plans
Created with idtPlans Review CPS Clinic
7/31/19
possible to perform their inspection.
ADDITIONAL APPROVALS REQLAR®
Constructing and/or occupying buildings or other structures
• Abuilding permit issued by the Town of Cary is required prior to commencing the construction,alteration,repair or removal of a building or structure,or part
thereof,including interior and/or e)deriorwork.
• Abuilding permit is required prior to a change in the use or occupancy of anye)asting building,or part thereof,regardless of work(interior or e)derior)to be
performed on the building.
• Al required building permit and developmentfees will be due prior to the issuance of a building permit.For questions about building permits,inspections
or fees,contact Development Services at(919)469-4046.
• No Certificate of occupancy or Certificate of Compliance maybe issued until all on-site and off-site improvements have been completed unless otherwise
approved by the Town of Cary.
• Signs
o Signage is a separate application and approval process and has not been reviewed or approved as part of this development plan.Asign permit must be
obtained prior to erecting any permanent or time-limited sign(s)on the property.For information about sign requirements and application process,contact
Development Services at(919)469-4046.
For any questions about this development plan approval,please contact Development Services at(919)469-4046 or email dregownofcaryorg.
We thank you for choosing the Town of Cary!
Sincerely,
TOWN ofCARY
Cc: Infrastructure Field Services
Inspections and Permits
File