Loading...
HomeMy WebLinkAbout20061347 Ver 1_Triage Comments_20060825DWQ# ~~ ~- r ~it-f' ~ Date ~~~~_ Who Reviewed: ~ ~ ~, Plan Detail7ncomplete _ ^ Please provide a location map for the project. ^ Please show all stream impacts including ali fill slopes, dissipaters, and bank stabilization on the site plan. ^ Please show ail wetland impacts including fill slopes on the site plan. ^ Please indicate all buffer impacts on the situ plan. ^ Please indicato proposed lot layout as overlays on the site plan. ^ Please indicate the location of tha protected buffers as .overlays oa the situ plan. ^ Please locate all isolated or non-isolated wetlands, streams and other waters of the State as overlays on the site plan. '~ Please provide cross section details showing the provisions for aquatic life passage. ^ Please locate any planned~sewer lines on the silo plan. ^ Please provide the location of any proposed stormwater management practices as required 1iy GC ^ Please provide detail for the stormwater management practices as required by GC ^ Please specify the percent of project imperviousness area based on the estimated built-out conditions: Please indicate all stormwat ~outfalla on the sits plan. Please indicate the diffuse flow provision measuros on tho site plan. ^ Please indicate whether or not the proposed impacts already been conducted. Avoidance.and/or Minimization Not Provided ^ ~ Tho labeled as on the plans dons not appear to be necessary. Please eliminate the . or provide additional information as to why it is necessary for this project. , ^ This Office believes that the labeled on the plans as .Please revise the plans to avoid the impacts. ^. This Office believes-that the .labeled on the plans as . Please revise the plans to minimize the impacts. can be moved, or reconfigured to avoid the impacts to the can be moved or reconfigured to minimize the impacts to'the ^ The stonnwater discharges at the location on the plans labeled will not provide diffuse flow through the buffer because . Please revise the plans and provido calculations to show that diffuse flow will be .achieved through the entire buffer. If it is not possiblo to achievo diffuse flow through. the entire buffer then it may be necessary to provide stormwater management practices that remove nutrients bcforo the stormwater can be discharged through the. buffer. _ ~ . Other ^ . Tho application fee was insufficient because over 150 feet of stream and/or over 1 acre of wetland'impacts wero requested. Please provide $ . -This additional fee must be received before your application caa be reviewed. . ^ Please complete Section(s) on theapplication. - ~ - ^ Please provide a signed copy of the application. ^ Please provide .copies of the application, . copies of the site pleas and other supporting information: _ ^ ~ Please submit electronic CAD files showing ,via: email to ian.mcmillanQncmail.net and CD;• Mitigation ^ of compensatory mitigation is required for this projbct.' Please provide a compensatory mitigation plea. The plan must conform to the requirements in 15 A NCAC 2Ii .0500-and must be appropriate to the type of impacts proposed. ^ Please indicato which 404 Permit the USACE would use to authorize this project. Y ~ ~~~~~;~s ~;n~ Q,ve•6,vP V ..n 1 ro r~ y~ ~~r~ ~~ , ~,, `r~ A~~si,~., ~.k~,,,~u