HomeMy WebLinkAboutNCG160032_MONITORING INFO_20190104STORMWATER DIV15(ON CODING SHEET
NCG PERMITS
PERMIT NO. Iv CC, / 03 of
UOC TYPE ❑HISTORICAL FILE
MONITORING REPORTS
FDOCDATE p
YYYYMMDD
January 4, 2019
Division of Water Resources
Attn: DWR Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
RE: Discharge Monitoring Report DMR
NCG160032
Harrison Hayesville Asphalt Plant
Hayesville, NC
Clay County
To Whom It May Concern:
Please find accompanying this letter, one original and one copy of the Discharge
Monitoring Report DMR for the above referenced location.
If you have any questions or need more information, please contact me at Harrison
Construction Company Division of APAC Atlantic Inc. P.O. Box 449 Franklin, NC 28744 or
call me at (865)-279-6374.
Sincerely,
Jeffrey Arnette
Environmental Compliance
P.O. Box 449 (28744) • 136 Rock Quarry Road • Franklin, NC 28734 . Tel: 828-524-5455 • Fax: 828-524-9314
A Division of APAC-Atlantic, Inc.
An Equal Opportunity Employer
Semi-annual_Stormwater Discharge Monitoring Report (DMR)
for North Carolina DEMLR General Permit No. NCG160000 - Asphalt
Date submitted I hq
CERTIFICATE OF COVERAGE NO. NCG16,Q Q a L
FACILITYNAME _jj A1'FSV Z'LLE 6S211Au7
COUNTY r,LAq
PERSON COLLECTING SAMPLES ►.i - 7 E
LABORATORY PAr,E Lab Cert. # 40
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR P 0 (t
SAMPLE PERIOD ❑ Jan -June July -Dec
or Monthly'_ (month)
DISCHARGING TO CLASS ❑ORW ❑HQW Trout ❑PNA
Zero -flow []Water Supply ❑SA
Other GGAS-_kAJS— I V__
PLEASE REMEMBER TO SIGN ON THE REVERSE �
❑ No discharge this period?'
Outfail No.
Date Sample
Collected
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Total Suspended Solids
Benchmarks =__>
_
-
100 mg/L or SO mg/L
!
1 Di
12.1
ikGoN-rZV"ZD R5,0EASE
' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must stilt submit this discharge monitoring report with a checkmark here,
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -
numerical format. When results are below the applicable limits, they _must _be reported in the format, "<XX me/L", where XX is the numerical value of the
detection limit, reporting limit, quantitation limit, etc. in mg/L.
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Trer 2, or Tier 3 responses. See General Permit text.
Permit Date: 10/1/2014-9/31/2019 5WU-252, last revised 9/17/2014
Page 1 of 2
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?Z
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
lnches3
Non -polar O&G by EPA
1664 (SGT-HEM)
Total Suspended Solids
Benchmarks
15 mg/L
100 mg/L or SO mg/L
Footnotes from Part A also apply to this Part 8
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ON E OUTFALL? YES ❑ NO ❑
IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BY THE PERMIT? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an origlinal_and one copy of this_DMR, includingall "No Discharge" reports, within 30 day, of receipt of the lob results (or at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Resources
Attn: DWR Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
1 11"l-l/9
(Date)
SWU-252, last revised 9/17/2014
Page 2 of 2
r`
January 8, 2018
Division of Water Resources
Attn- DWR Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
RFr'1=1VF[)
I a 9-xg
G 4 � ■I�IIi fy?� A `
'V
RE: Discharge Monitoring Report DMR
NCG160032
Harrison Hayesville Asphalt Plant
Hayesville, NC
Clay County
To Whom It May Concern:
Please find accompanying this letter, one original and one copy of the Discharge
Monitoring Report DMR for the above referenced location.
If you have any questions or need more information, please contact me at Harrison
Construction Company Division of APAC Atlantic Inc. P.O. Box 449 Franklin, NC 28744 or
call me at (865)-279-6374.
Sincerely,
effrey Arnette
Environmental Compliance
P.O. Box 449 (28744) • 136 Rock Quarry Road . Franklin, NC 28734 + Tel: 828-524-5455 • Fax: 828-524-9314
A Division of APAC-Atlantic, Inc.
An Equal Opportunity Employer
Semi-annual Stormwater Discharge Monitoring Report (DMR)
for North Carolina DEMLR General Permit No. NCG160000 - Asphalt
Date submitted _ i /1$`
CERTIFICATE OF COVERAGE NO. NCG 16Q Q3 a
FACILITY NAME W&14 C SQ-I LLE &Qu At, i
COUNTY CIA-(
PERSON COLLECTING SAMPLES AQMC-rTE
LABORATORY__ pALF— Lab Cert. # 46
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR O 1
SAMPLE PERIOD ❑ Jan -June 9July-Dec
or ❑ Monthly)_ (month)
DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA
Vro-flow ❑Water Supply [:]SA
herCbdiS IAJ S— Ty
PLEASE REMEMBER TO SIGN ON THE REVERSE -i
❑ No discharge this period?Z
Outfall No.
Date Sample
Collected
(mo/dd/yr)
24hour rainfall
amount,
Inches3
Total Suspended Solids
Benchmarks
<20 m or 50 mg/0
001
la lal l-1
Q.,9
12 .2
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -
numerical format. When results are below the applicable limits, they must be reported in the format. "<XX me/L" where XX is the numerical value of the
detection limit, reporting limit, quantitation limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Permit Date: 10/1/2014-9/31/2019 SWU-252, last revised 9/17/2014
Page 1 of 2
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?z
Outfall No.
Date Sample
Collected"
(mo/dd/yr)
24-hour rainfall
amount,
inches'
Non -polar O&G by EPA
1664 (SGT-HEM)
Total Suspended Solids
Benchmarks =__>
_
-
15 mg/L
100 mg/I, or 50 mg/L
Footnotes from Part A also apply to this Part B
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑
IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BY THE PERMIT? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an oriainal and one coov of this DMR, including oil "No Discharae" reports, within 30 do vs of receipt of the lab results (or at end of monitorina Period
in the case of "No Discharae" reports) to:
Division of Water Resources
Attn: DWR Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
" I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel property gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
1/0 1t
(Date)
Permit Datefl� 2014-9/31/2019 SWU-252, last revised 9/17/2014
// Page 2of2
Semi-annual Stormwater Discharge Monitoring Report [DMR]
for North Carolina DEMLR General Permit No. NCG160000 - Asphalt
Date submitted
CERTIFICATE OF COVERAGE NO. NCG16_Q Q 3 a
FACILITY NAME
COUNTY
PERSON COLLECTING SAMPLES _AZMi'r,-TTE
LABORATORY PAGE _ _ Lab Cert. # 4C7
Comments on sample collection or analysis:
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE COLLECTION YEAR _ _� O 1-7
SAMPLE PERIOD ❑ Jan -June July -Dec
or ❑ monthly' month
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
❑ ero-flow ❑Water Supply ❑SA
otherCkA5'S W S— T V
PLEASE REMEMBER TO SIGN ON THE REVERSE 4
❑ No discharge this period?'
Outfall No.
Date Sample
Collected'
(mo/dd/yr)
24-hour rainfall
amount,
Inches
Total Suspended Solids
Benchmarks ==_>
-
-
100 m or 50 mg/L
D I
la 1al 11
12. "7
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Note, Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -
numerical format. When results are below the applicable limits, they must be resorted in the format, "<XX mg/L", where XX is the numerical value ofthe
detection limit, reporting limit, quantitation limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Permit Date: 10/1/2014-9/31/207.9 SWU-252, last revised 9/17/2014
Page 1 of 2
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
❑ No discharge this period?2
Outfall No.
Date Sample
Collected"
(mo/dd/yr)
24-hour rainfall
amount,
Inches3
Non -polar O&G by EPA
1664 (SGT-HEM)
Total Suspended Solids
Benchmarks ===>
-
-
15 mg/L
100 mg/L or 50 mg/L
Footnotes from Part A also apply to this Part B
Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO ❑
IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BY THE PERMIT? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Moil an original and one copy of this DMg including all "No Discharge" re arts within 30 days of receipt of the lab results or at end of monitoring eriod
in the case of "No Discharge" reportsl to:
Division of water Resources
Attn: DWR Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
110 1t
(Date)
Permit Daiefl� 2014-9/31/2019 SWU-252, last revised 9/17/2014
!/ Page 2 of 2