Loading...
HomeMy WebLinkAboutNCG140451_MONITORING INFO_20190206STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT N0. /v DOC TYPE [I HISTORICAL FILE MONITORING REPORTS DOC DATE ❑ ��� � �a�� YYYYMMDD V 30 36 STORMWATER DISChARGE OUTFALL (SDO) - ANNUAL SUMMARY DATA MONITORING REPORT (DMR) Calendar Year °f Individual NPDES Permit No. NCSUUUIIUU or Certificate of Coverage (COC) No. NCG i❑F41 D❑©®F This monitoring report summary of the calendar year should be kept on file on -site with the facility SPPP. Facility Name: EACK MICX C JUCFE — PLAWr County: FRAIJ UN _ . ` Phone Number: 9c 14 j514o- ?0-77 Total no. of SDOs monitored I Outfall No. CEO Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No [1f Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ No [+� If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ Other ❑ Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No T( RECEIVED FEB 0 B Z019 ;.;E N_MAL FILES LWR SECTION Parameter, (units) Total inches Date Sample Collected, mm/d•lyy.:.-' 5'fR i- kY `� �{- 'v �4.. [ks ..,} �,3r iF T�.�r_�.;�yhy�, 4"�.t 'iy.� -.'t"s: t«afi1.T ;Sr?4 it�l•• yr['.� r'{',,i.s �i-. iw�.:: yY�r,-�t3N-'"'; '- r� Jr-7".r';L.fG:. i ',�'�'' �y ry'1� �' r�l,,} l�# (..+lam. rx�.]`�, y ,i: 't4 �.x:.'h..���•�.1 "+,� X`A7/ �tJI /�1�4i1�/��' © FFi iTF Z rA SW U-264-Generic-13Dec2012 I certifAUWce�e} penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance wan system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines Signature Date I imprisonment for knowing violations." For questions, contact your local Regional Office: DWO Regional Office Contact Information: WSHEVIOLI:E REGIONAL OFFICE FAYETTEVILLE.REGIONAL OFFICE MOORESVII:LEREGIONAE.OFFICE 225 Green Street 610 East Center Avenue/Suite 301 2090 US Highway 70 Swannanoa, NC 28778 Systel Building Suite 714 Mooresville, NC 28115 (828) 296-4500 Fayetteville, NC 28301-5043 (704) 663-1699 (910) 433-3300 RALEIGH REGIONAL OFFICE WASHINGT0N REGIONAL•OFFICE WILMINGTON REGIONAUOFFICE 943 Washington Square Mall 127 Cardinal Drive Extension 3800 Barrett Drive Raleigh, NC 27609 Washington, NC 27889 Wilmington, NC 28405-2845 (919) 791-4200 (252) 946-6481 (910) 796-7215 ,WINSTON-SALEM^REGIONAL OFFICE CENTRAL OFFICE 1617 Mail Service Center 585 Waughtown Street To'reservepriQlecl.: Winston-Salem, NC 27107 Raleigh, NC 27699-1617 'rr and.enhanoe t�. (336) 771-5000 (919) 807-6300 N0111);Cai6 M's`�valer. � SW U-264-Generic-13Dec2012 �- STORMWATER DISCrYARGE OUTFALL (SDO) ANNUAL SUMMARY DATA MONITORING REPORT (DMR) Calendar Year Individual NPDES Permit No. NCS❑ ❑ ❑❑ or Certificate of Coverage (COC) No. NCGD ❑D ®[] This monitoring report summary of the calendar year should be kept on file on -site with the facility SPPP. Facility Name: 641�' t6C4 County: Fi xw,('L;a Phone Number: ( ) .76— �W7 Total no. of SDOs monitored Outfall No. !W Is this outfall currently in Tier 2 (monitored monthly)? Yes ❑ No [( Was this outfall ever in Tier 2 (monitored monthly) during the past year? Yes ❑ Nov If this outfall was in Tier 2 last year, why was monthly monitoring discontinued? Enough consecutive samples below benchmarks to decrease frequency ❑ Received approval from DWQ to reduce monitoring frequency ❑ RECEIVED Other ❑ , FEB 2 z 2018 Was this SDO monitored because of vehicle maintenance activities? Yes ❑ No �J e►VTRAj C„ Lull iW P1i+_ +tea SW U-264-Generic-1 Mec2012 I certify,'uhder penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance wiih a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines andjsonment for knowing violations." Signature Date For questions, contact your local Regional Office: DWQ Regional Office Contact Information: ASHEVIL'L'E REGIONAL OFFICE FAYETI'EVILLE REGIONAL OFFICE MUORESV,1LLE,REGIONAL• OFFICE_ 225 Green Street 610 East Center Avenue/Suite 301 2090 US Highway 70 Swannanoa, NC 28778 Systel Building Suite 714 Mooresville, NC 28115 (828) 296-4500 Fayetteville, NC 28301-5043 (704) 663-1699 (910) 433-3300 RALEIGHkREGIONALAFFICE WASHINGTON,REGI.ONALOFFICE sWII:MINGTONREGIONAL OFFICE 943 Washington Square Mall 127 Cardinal Drive Extension 3800 Barrett Drive Raleigh, NC 27609 Washington, NC 27889 Wilmington, NC 28405-2845 (919) 791-4200 (252) 946-6481 (910) 796-7215 WINSTON SALEM,REGIONAL,OFFICE CENTRAL OFFICE 1617 Mail Service Center { Raleigh, NC 27699-1617�;Vl 585 Waughtown Street Winston-Salem, NC 27107 �To' reserve�pmtect:f. f and erihaixae " (336) 771-5000 (919) 807-6300 rthCam►inas tivater: SW U-264-Generic-13Dec2012 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 07 4 " 5 L SAMPLE COLLECTION YEAR: �/ 7 FACILITY NAME: 6-4-6"1,6 fib_ C0ZVETE- + 1&4W T SAMPLE QUARTER: ❑Jul -Sept Oct -Dec []Jan -March []April -June PERSON COLLECTING SAMPLES: COUNTY: CERTIFIED LABORATORY: Lab # kkcPHCINE NO. r Lab # IAl Q �ADDiRTO LISTSERVE? ❑YES ❑NO EMAIL: LIMIT VIOLATIONS? YES ❑ NO ❑ DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ❑Other Part A: Wastewater Monitoring Requirements D+JIJ;, $CDQPTIONAL INFO: INFORHAT!ON PROCESSING UNIT Outfall No. Date Sample Collected" (mm/dd/yr) Type of Wastewater (VE, RM, MD)z pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using method 1664A SGT-NEM6 (mg/L) Discharge Duration (minutes) Total Flow (gallons/day)'- - - - 6-93,4 303,5 53 (15)6 - - 1 If wastewater systems have not discharged in this quarter -- report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. ° pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date:7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 i . %� � 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VNIA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that here are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."/// Z2 Permittee) Permit Date:7/1/2010-06/30/2015 / 2 zlir (13latey Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140451 SAMPLE COLLECTION YEAR: 2017 FACILITY NAME: EAGLE ROCK CONCRETE-FRANKLIN P4 SAMPLE QUARTER: ®Jul -Sept []Oct -Dec []Jan -March ❑April -June PERSON COLLECTING SAMPLES: N/A CERTIFIED LABORATORY: Lab # Lab # LIMIT VIOLATIONS? YES ❑ NO ❑ Part A: Wastewater Monitoring Reouirements COUNTY: PHONE NO. (�� ADD TO LISTSERVE? ❑YES ❑NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW OPTIONAL INFO: ❑PNA ❑Trout []Other Outfall No. Date Sample Collected, (mm/dd/yr) Type of Wastewater (VE, RM, MD)= pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-HEM, (mg/L) Duration (minutes) Total Flow (gallons/day), - - - 5-93A 303•' S3 (15)1 - NO DISCHARGE tan Kr V t_ t u r •- -T n R 7Q17 rF �1TRAL FILL-f 1 If wastewater systems have not discharged in this quarter —report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. ,if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. S pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE-) WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for ga ering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am ayva�re th there i3r nificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 77 .s% of 10/2/2017 (Date) Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 SL FACILITY NAME: ek1AIT5 D1,&91- _ PERSON COLLECTING SAMPLES: CERTIFIED LABORATORY: Lab # Lab # LIMIT VIOLATIONS? YES ❑ NO ❑ RECEIVED Part A: Wastewater Monitoring Requirements Il it 1 A 7nl7 SAMPLE COLLECTION YEAR: GD/ / SAMPLE QUARTER:Jul Sept ❑Oct -Dec ❑Jan -March R/April-June COUNTY: n `% PHONE NO. ADD TO LISTSERVE? ❑YES ❑NO EMAIL: DISCHARGING TO CLASS: [_]SA ❑HQW ❑PNA []Trout ❑Other OPTIONAL INFO: Date Sample Collected, .. Type of Wastewater C!1 (VE, RM, IVIDy D Total Suspended Solids Settleable Solids using method 1664A SGT-HEM6 Discharge Duration Total FlowTPH (gallons/day)7 i�lfr1i�17!/�ITI���'(�il ' `�1�`�►T/.RLJi !�Ilri" 1, ' U9111U Ji E RIM PAS iN111111 E ��Li �►%'l�i����lliri��►.�ll��iJ1���1"�Il�`ti!�/1 ��'�t'1 ` � � � �►�iiR�tiz'i�Il�i�ITi 3 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 'if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. PH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 j Last Revised 07/13/11 Page 1 of 2 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." i A// (Signature Permit Date:7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 U) Y �0 0 a0� SITE PLANS FOR NQ FRANKLIN COUNTY, NORTH CAROLINA VICINITY MAP NOVEMBER 29,2016 1"= 2 000' INDEX OF SHEETS 0 SHEET NO. SHEET TITLE C0.0 COVER C1.0 EXISTING CONDITIONS o �' SITE C2.0 OVERALL SITE PLAN -' SITE C2.1 DETAILED SITE PLAN J C3.0 GRADING, SEDIMENTATION, AND EROSION CONTROL PLAN C4.0 LANDSCAPE PLAN C5.0 STORMWATER MANAGEMENT PLAN D I C6.0 STORMWATER SCM DESIGN & DETAILS C7.0 EROSION CONTROL DETAILS o �o C7.1 EROSION CONTROL & SITE DETAILS N GRAPHIC SCALE = 200 0 100 200 400 v NOW / -D OO 1 inch = 200 Ft.� D � � p W E D � LEGEND 1 ~ EXISTING PROPOSED L ' �` FIRE HYDRANT SUMMARY INFORMATION -., Co PP POWER POLE " -� �" o IPS IRON PIPE SET DEVELOPMENT NAME: EAGLE ROCK CONCRETE PLANT � ` � o IPF IRON PIPE FOUND LOCATION: 2095 U.S. 1 FRANKLINTON, NC o CALCULATED POINT EXISTING SITE ACREAGE: 67.78 AC WATER VALVE EXISTING PIN: 1854-13-7647 ►� CATCH BASIN NEW LOT ACREAGE: 8.96 AC SANITARY MANHOLE PARCEL: 006026 BLOW OFF VALVE p PROJECT BOUNDARY LINE ZONING: H-I ADJACENT PROPERTY LINE PROPOSED USE: CONCRETE PLANT 1 / — — — RIGHT OF WAY DENUDED AREA: 4.29 AC OVERHEAD ELECTRIC LINE E IMPERVIOUS SURFACE AREA: 1.93 AC SANITARY SEWER LINE Ss a % OF IMPERVIOUS SURFACE: 22% STORM DRAINAGE LINE w } RIVER BASIN: TAR-PAMLICO WATER LINEMAJOR CONTOUR LINE WATERSHED AREA: N/A MINOR CONTOUR LINE W ! �,•(],�N C,gRO///.,� .. .. .. .� W .. WETLAND Q, �� O` ea.soeaee C/ % .r .r i .r .► .r PERSON TO CONTACT REGARDING STAFF COMMENTS OR QUESTIONS: tiye '" ® SEAL N RYAN FISHER, P.E. 3975 �a N WITHERSRAVENEL KNOW WHAT'S BELOW. `FNc1NE 131 S WILMINGTON STREET RALEIGH, NC 27601 CALL BEFORE YOU DIG. %rqN S F �s '�aq/! (o z TELEPHONE: (919) 469-3340 FAX: (919) 467-6008 ffisher@Wthersravenel.com NOTES: S 1. PER FEMA FIRM MAP N0.372018440K, DATED APRIL 16, 2013, THERE ARE NO SPECIAL PREPARED BY: DEVELOPER/OWNER N FLOOD HAZARD AREAS ON SITE. m 2. TOPOGRAPHY FROM AERIAL SURVEY DATED APRIL 13, 2016 PREFORMED BY EAGLE ROCK CONCRETE, LLC GEODATA CORPORATION, ZEBULON, NC. 0 3. PROPERTY LINE, EASEMENTS, AND RIGHT-OF-WAYS WERE RECEIVED FROM 8310 BAN DFORD WAY SURVEYING SOLUTIONS, YOUNGSVILLE, NC ON 9/27/2016. WITHERSRAVENEL WithersRavenet RALEIGH, NC 27615 ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OF THIS INFORMATION AND IS USED FOR REFERENCE ONLY IN CREATING THE NEW LOT SHOWN IN THESE PLANS. Engineers I Planners PHONE: (919) 781-3744 4. CONTRACTOR MUST NOTIFY ONE -CALL CENTER, INC. (NC ONE -CALL) (1-800-632-4949) EMAIL: ADAM@EAGLEROCKCONCRETE.COM AT LEAST 48 HOURS PRIOR TO THE START OF EXCAVATION OR TRENCHING TO HAVE ! ALL UNDERGROUND UTILITIES LOCATED. 131 f2 S Wilmington Street Raleigh, NC 276011 t: 919.469.33401 license #: C-0832 1 www.withersravenel.com 5. ALL REQUIRED IMPROVEMENTS SHALL CONFORM TO FRANKLIN COUNTY'S AND THE ATTN: ADAM LOFTI N STATE'S STANDARDS. CD W 6. EXISTING DRIVEWAY ON U.S. HIGHWAY 1 TO BE USED FOR ACCESS. NEW DRIVEWAY rD PERMIT TO BE ACQUIRED FOR THIS USE. i 0 7. NO STREAMS EXIST WITHIN 50' OF THE PROPERTY LINES. 1 r m Y 8ol,*U6 My 5W N/F MARTIN MARIETTA MATERIALS INC. D.B. 988, PG. 3 PIN# 1844-85-5201 ZONING: HI N/F JAMES T MOSS JR $ SUSAN C. MOSS D.B.1020, PG. 994 PIN# 1844-94-5638 ZONING: HI Y N1F S T WOOTEN CORPORATION D.B.1233, PG.601 PIN# 1854-15-0149 ZONING: HI LVUISt KtLLY MA 1 I HtVVb LR-t t5 I A I t PIN# 1854-22-9263 ZONING: GB t GRAPHIC SCALE 100 0 50 100 200 1 inch =100 Ft. 8c) ! map ¢ to+o � JE C I > co c0 v U L LA Cl) Ci O. 10 01 W 10 i�N u • � z s Y Y C o c N r Cl) C ...� Z Q u U J -c i.. O � J..7 ro W z W � J W .t.J L7 U o �C u LL! Z .c o =� U LL- V z z LD to p x Z w 0 U lob No. 02160479.00 Drawn BVY KSF/RG Date 11/29/2016 Designer R5 ��111tlIllr/rrr CAROB/ ` 20 e �FESS/ 0 2 - Q SEAL 3975 GIN� ygN S Revisions Sheet No. C1'0 - i - � 1. •r ti �. 7r .. : - �-.-..r.� .... > ' r t � r., 1 �. j� - _ - -.� 4. LL N/F JAMES T MOSS JR & SUSAN C. MOSS D3.1020, PG. 994 PIN# 18444 4 38 ZONING: HI USE:QUARRY N/F MARTIN MARIETTA MATERIAI D.B. 988, PG. 3 PIN# 1844-85-5201 ZONING: HI USE:QUARRY N/F JAMES T MOSS JR 6 SUSAN C. A D.B.1020, PG. 994 PIN# 1844-94-5638 ZONING: HI USE:QUARRY GRAPHIC SCALE 100 0 50 100 200 1 inch =100 ft. N/F S T WOOTEN CORPORATION D.B. 1233, PG. 601 PIN# 1854-15-0149 ZONING: HI USE: ASPHALT & CONCRETE PLANT N/F S T WOOTEN CORPORATION D.B.1582, PG. 264 PIN# 1854-143995 ZONING: HI ' 1 inch =100 ft. ruru ru tA u) i ry J W C Z L- ,C <[ ro U U --� -� o �- L- IX W O z W J W � JJ c (i U o Q u w z .C: o -� U ro u- w F- V) Z J Q Q J Q� CL W Q Job No. Drawn B 02160479.00 yRSF/RGC Date Designer 11/29/2016 RSF Revisions R°O� 2 SEAL 39756 -V E �o � 1NE�,S�`\� N S F�11 �q /"011 i i i „ t � �1 // Sheet No. C2,0 -- 504PIG Mop io sw j�ox�l�b MafII SW Q10 SEDIMENT BASIN DESIGN Porous Baffle Area Chart Total Basin Inlet Zone First Chamber Second Chamber Drainage Storage Volume Basin # Surface Area (sf) Baffle Area #1 (sf I Baffle Area #2 (sf) Baffle Area #3 (sf) Outlet Zone (sf) 9 Area (ac) Denuded Area Req'd (cf) (1800 cf/ac Surface Area Req'd Length Width Depth Storage Volume Surface Area Weir Length Weir Length (35% of Total) (25% of Total) (25% of Total) (15% of Total) Basin # Basin Type (Da) (ac) (Du) Denuded Acre) (st) (Q10)(435 sf/cfs) (ft) (ft) (ft) Provided (cfI Provided (sf) Req'd (ft) " Provided (ft) SB #1 4,284 1,499 1,071 1,071 643 1 1 Skimmer 1 4.40 1 3.12 1 5616 4169 1 84 51 3 12852 4284 9.04 10 Note: l' of freeboard is provided for basin (4.0' Total max depth). Cleanout Basin when 1/2 full. Surface Area Required based on Q10 flows (C=0.30; Tc=5min; 110=7.26 in/hr) " Weir length based on Q10 flows (C=0.30; Tc=5min; 110=7.26 in/hr) Filter Basin Skimmer Orifice Calculations RIP RAP DISSIPATER PAD Orifice Equation Q=Cd*A*(2gh)^(112) LENGTH =16' I WIDTH AT FES = 6' WIDTH AT END OF APRON =18' SB #1 r - RIP RAP CLASS =1 Variables Constants 1 FES100 I D50 =10•-- r '' DMAX =15' j I f , F Limus OF DISTURBANCE' Basin Volume: 5,616 cf g = 32.2 ft/s2 }`;tI ; I f`f %, / BETWEEN SILT FENCE AND Head: 0.25 ft Cd= 0.59 ( d r f< I r f f , I V f ' . j , ATTACH SKIMMER TO s f' TREE PROTECTION FENCING (TYP) Draw down time: 72 hrs 259200 sec =;�{ r I ;' DRAWDOWN PIPE DURING' CONSTRUCTION f> Orifice Area = 0.00915 sf 1.317922 sq_ in 3' SKIMMER W/ Orifice Diameter = 1.30 in E f \ \ 5.ORIFICEi` f f %J•• 430��`�`' \ I �--� �-- --- --,, ►1 Orifice Radius = 0.6 in 1 - s � , USE 3-INCH DIAMETER SKIMMER WITH 1.254NCH ORIFICE J , / NORTH DITCH DRAINAGE AREA:1.38 ACRES I Q10: 5.03 CFS ` 1 1UDI V10 WI UNREINFORCED F` RIP RAP LINED TEMPORARY ROCK VEGETATION: FPS h I 1 I ,f OUTLET CHANNEL CHECK DAM (TYP.) SHEAR STRESS:1.82 LBSISF I CLASS B RIP RAP I 447.59� -- - -1 BAFFLES (TYP.) 18" MIN. THICKNESS ! FOREBAY TO BE INSTALLED AT / CONVERSION OF SEDIMENT BASIN (TYP. OF BOTH FOREBAYS) I I 447.83 RIP RAP LINED N OUTLET CHANNEL I CLASS B RIP RAP 18' MIN. THICKNESS- r.i NPDES STABILIZATION CHART `, ; Kf1 i Site Area Stabilization Stabilization Time Frame Description Time Frame Exceptions Perimeter dikes, swales, 7 Days None ditches and slopes High Quality Water (HQW) 7 Days None Zones If slopes are 19 or less in Slopes steeper than 3:1 7 Days length and are not steeper than 2:1, 14 days are allowed. Slopes 3:1 or flatter 14 Days 7-Days for slopes greater than 50 feet in length All other areas with slopes None (except for perimeters flatter than 4:1 14 Days and HQW Zones) It / WEST DITCH !' J r fr#tj t i C.I j: . �_ i (DRAINAGE AREA: 3.26 ACRES v f f� lt f FI f ,'f Q70: t 1.86 CFS _ Y � � � V10 W! P300 MATTING 5.56 FPS �S� 1 11�r1.-•� SHEAR STRESS: 8.77 LBS/SF PROVIDE APPROX.100 LF OF _ j- , ' TENSAR P300 REINFORCED TURF MATTING IN HATCHED AREA ASS I EXISTING TREELINE (TYP.) I ' /A I r` `TEMPORARY ROCK � CHECK DAM (TYP.) DENUDED AREA: 4.29 ACRESfl, , ` l PERMANENT j \ I DITCH aw-) 1 Iv f :'TR EE PROTECTION a FENCING 1 DETAILED GRADING PLAN TW: 450.00 BW: 448.11 TW: 456.00 BW: 448.50 NEW PROPERTY BOUNDARY EROSION CONTROL NARRATIVE THIS PROPOSED PROJECT CONSISTS OF CLEARING AND GRADING ACTIVITIES ASSOCIATED WITH THE CONSTRUCTION OF A CONCRETE PLANT. ACCESS TO THIS SITE WILL BE PROVIDED BY AN EXISTING DRIVEWAY OFF OF US HIGHWAY 1. A TEMPORARY GRAVEL CONSTRUCTION ENTRANCE WILL BE PROVIDED OFF OF THE EXISTING DIRT PATH IN THE LOCATION SHOWN AND WILL BE - INSTALLED PER THE STATES SPECIFICATIONS. THE EXISTING TOPOGRAPHIC NATURE OF THIS SITE IS GENERALLY LEVEL TO WITH GREATER ELEVATION RELIEF AS YOU MOVE AWAY FROM THE PROPOSED CONCRETE PLANT AREA. THE DRAINAGE PATTERNS OF THE SITE CONVEY RUNOFF TO THE EAST AND WEST BASED ON EXISTING _ TOPOGRAPHY. THE PROPOSED GRADING PLAN WILL MAINTAIN THESE DRAINAGE PATTERNS. THE PROPOSED EROSION CONTROL AND STORMWATER MEASURES AT THE CONCRETE PLANT SITE WILL CONVEY STORMWATER TO ONE (1) STORMWATER CONTROL MEASURE (SC" WET POND - - - LOCATED IN THE NORTHWEST CORNER OF THE NEW PARCEL. THE SCM WILL OUTLET TO AN EXISTING DRAINAGE FEATURE THAT CONVEYS RUNOFF TO AN EXISTING STREAM. SEDIMENTATION AND EROSION CONTROL WILL BE MAINTAINED ON THIS PROPERTY BY UTILIZING A TEMPORARY CONSTRUCTION ENTRANCE, SILT FENCING, TREE PROTECTION FENCING, DIVERSION DITCHES, ROCK CHECK DAMS AND A RISER SKIMMER SEDIMENT BASIN. CONSTRUCTION SEQUENCE: 1. INSTALL CONSTRUCTION ENTRANCE IN LOCATION SHOWN. 2. INSTALL SILT FENCE BELOW SCM #1. 3. INSTALL RISER, BARREL, AND FLARED END SECTION OF THE SKIMMER BASIN. ATTACH SKIMMER TO DRAWDOWN DEVICE AND EXCAVATE SEDIMENT BASIN PER THE APPROVED PLANS. INSTALL BAFFLES. 4. INSTALL TEMPORARY DIVERSIONS, SILT FENCING, OR OTHER MEASURES AS SHOWN ON THE APPROVED PLAN. CLEAR ONLY AS NECESSARY TO INSTALL THESE MEASURES. 5. CALL FOR ON SITE INSPECTION BY NCDEQ AND OBTAIN CERTIFICATE OF COMPLIANCE. 6. BEGIN CLEARING AND GRUBBING. MAINTAIN DEVICES AS NEEDED. 7. ROUGH GRADE SITE. 8. MAINTAIN EROSION CONTROL DEVICES AS SITE IS BROUGHT TO FINISHED GRADE. 9. BEGIN CONSTRUCTION OF CONCRETE PLANT AND STABILIZE SITE AREAS THAT ARE AT FINISHED GRADE. 10. WHEN CONSTRUCTION IS COMPLETE AND ALL AREAS ARE STABILIZED COMPLETELY, CALL FOR INSPECTION BY NCDEQ. 11. IF SITE IS APPROVED, CONVERT TEMPORARY DIVERSIONS TO PERMANENT, REMOVE SILT FENCING, CONVERT SEDIMENT BASIN TO SCM WET POND AND INSTALL VELOCITY DISSIPATER AT FLARED END SECTION. 12. WHEN VEGETATION HAS BECOME ESTABLISHED, CALL FOR FINAL SITE INSPECTION BY NCDEQ. 13. OBTAIN CERTIFICATE OF COMPLETION. GRADING AND EROSION CONTROL NOTES 1. CONTRACTOR SHALL CONSTRUCT DIVERSION DITCHES AS NECESSARY TO ENSURE ALL SEDIMENT IS DIRECTED INTO EROSION CONTROL DEVICES. 2. CONTRACTOR SHALL VERIFY LOCATION OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. LOCATION OF EXISTING UTILITIES SHOWN ON PLANS IS BASED ON BEST AVAILABLE INFORMATION BUT CAN BE CONSIDERED ONLY AS APPROXIMATE. 3. CONTRACTOR SHALL ENSURE GRADING OPERATION IS CONDUCTED IN A MANNER THAT DOES NOT ALLOW ANY SEDIMENT INTO CREEKS. 4. CONTRACTOR SHALL PROVIDE RIP RAP LINED TAIL DITCHES AT THE STORM DRAINAGE PIPE DISCHARGE POINTS AS REQUIRED TO ENSURE POSITIVE DRAINAGE. 5. SEDIMENT BASINS SHALL BE KEPT OUT OF WETLAND AREAS. 6. A PRECONSTRUCTION MEETING MAY BE REQUIRED FOR THIS CONSTRUCTION. 7. PERMANENT GROUND COVER SHALL BE ESTABLISHED PER THE STABILIZATION REQUIREMENTS IN THE TABLE LOCATED ON THIS SHEET. 8. TOPSOIL SHALL BE WASTED OFFSITE OR IN FILL AREAS AS SHOWN. IF AN OFFSITE STOCKPILE IS USED, IT MUST BE PERMITTED. 9. US HIGHWAY 1 SHALL BE KEPT CLEAN AT ALL TIMES, 10. THE PROJECT WILL MEET ALL REQUIREMENTS RELATIVE TO BEST MANAGEMENT PRACTICES AND ENGINEERED STORMWATER CONTROL STRUCTURES AS OUTLINED IN NCDEQ EROSION CONTROL MANUAL. 11, CUT AND FILL SLOPES 2:1 OR GREATER SHALL BE STABILIZED WITH PERMANENT SLOPE RETENTION DEVICES OR A SUITABLE COMBINATION OF PLANTINGS AND RETENTION DEVICES. SLOPES GREATER THAN 3:1 SHALL NOT BE STABILIZED WITH TURF GRASS BUT MUST BE STABILIZED WITH VEGETATION THAT REQUIRES MINIMAL MAINTENANCE. WEEPING LOVE GRASS, RED FESCUE, OR OTHER APPROVED VARIETY. 12. THE ESTABLISHMENT OF PERMANENT GROUND COVER WILL BE ESTABLISHED IN 15 WORKING DAYS OR 90 CALENDAR DAYS, wtIICH EVER IS FIRST. 13. ALL REQUIREMENTS OF THE NPDES PERMITS SHALL BE MET. GRAPHIC SCALE 50 p 25 50 100 1 inch = 50 ft. i PROVIDE POSITIVE DRAINAGE AWAY FROM RAMP 7W: 450.00 UP �-BW:448.27 TW: 456,00 BW: 44925 449.38 449.28 449.08 449.49 PROVIDE ADA-ACCESSIBLE ROUTE TO BUILDING ENTRANCE AND FROM BUILDING EXIT MAXIMUM 2% CROSS -SLOPE / 5% RUNNING SLOPE ALONG 449.35-- ADA-ACCESSIBLE PATHWAY 449.45 AAQ Al, TO/FROM BUILDING NEW 40' ACCESS EASEMENT FOR CONCRETE PLANT PROPERTY GRAPHIC SCALE 20 0 10 20 40 1 inch = 20 Ft. NO IMPROVEMENTS PROPOSED TO EXISTING ACCESS ROAD I ®11 �■ 1 ro C Z 0 Q U U -� s O C �.., IL Uj Z L1.1 L U J..) U<U 0 U w Z ._ o -� U C ro IL r Z 00 J Z Z0 W U Z Z Q O �( W t!I - � aJ V = Z_ L1J Z V Job No. Drawn BYY 02150479.00 RSF/RGC z Date Designer � 11/29l2016 RSF 0 `���rr�rrrrrrii �2 ���` CAR o _ =o �0FESS/ ... e2 , - _ SEAL _ CO _ o ^ 03975 Sheet No. 1 C3,0 60x--A� lay MAP i�, sW r I 1415 -`I"' , n, 420- �Lkill L_L—i IL L L L L L �F. L L LLLLLLL—, `LLLLLLL1'_ L L L ["*\L L L L LL—L_I LL_LL_I L— L— �._L—L_L r ♦+ + L L'L- L L I L L L_ 1 L + + + '11 LLLLLL_L_L LI LL'-LLL' + + + TI LLIL_L'L_L1L'L_ + + + + L__�_!LrL L_ fz � - f + + + L L_ L_ L L_ L I L_j + + "�,-'J' z LLLLLLI I LLL1 L L L_ L Ll' + r .I LLLI LL' I-' + + -L,LLL' LLLLLL\LLLLLLI 1 LEIl TING CATCHMENT 2 LLLLLLLLI-- + + + X S L L LLL—LLLLLL— + I L L L LI__ I L L L L L L L__ i (—/ EXISTING -�- r� LLL_LLLL'L__L_LLLLLL—L I/ CATCHMENT 3 L_ L + + LLLLLL'L—LLLLL 1 L 1 L-LLLLLI LLLLL11 + L_L_LLLLLLLLLLLL_1 Lj++ + -y,f !-,-,!__ L L_ L LJ L L_ L_ L L L L L L I t r' + + + �., LLLLLL'i I I LI LLLL_L— 1-f`zLLL LLLLLLL11 �- L I + + LLLLLL—L + + LL11 LLLLL' + + + I LLLL[—Lll + + LL_`_L'I+ +++ ♦- + EXISTING CATCHMENT 1 / A+ Iiiiii =1.99 AC % PRE -DEVELOPMENT DRAINAGE MAP 411111 i ♦ — _ CATCHMENT 1 TO _ OFFSITE = 1.05 ACNilNil � 1 ` ! t t � POST -DEVELOPMENT DRAINAGE MAP GRAPHIC SCALE 50 0 25 50 100 1 inch = 50 Ft. 0 >_/ u w c aj m C i N L_ N 3 W N 00 4 v C (U o CM M v 0: 10 �aA a Y W 0 N u t -v v U) c E 1 F ro z �C EC u U --� OC 0C W o z W a J W � .� c V U o Q U W z ._ O U ro LL Z Q � J w n- a Z �w � w � V OQ F' z N Q Job No. Drawn Byy 02160479.00 RSF/RGC Date Designer 11/29/2016 RSF -\N� _ eQ _ SEAL 9756 - / I Revisions Sheet No. C5,0 I}r-f j mqj3 'SW 0 \S�Tp \ TP Tf' - - --- - �'TP -TP /�Q TP ` \ TREE PROTECTION SF FENCE (IYP.) TP SF SF7p - - - - -- -- - - - _ - - SILT FENCE (TYP.) _ TP SF P TP SF SF _ (Y SF M SF { SILT FENCE � OUTLET (TYR) SF EMERGENCY SPILLWAY W/ RIP RAP ARMORING 1 o I i N I d ( o a IM v N 4" DIP FOREBAY a a N FOREBAY DRAIN @ 0% INV: 421.00 I a I } 1 I I 10:1 LITTORAL SHELF 421.00 TO I I 422.00; SEE LANDSCAPE PLAN I ti FOR REQUIRED PLANTINGS I ° I I OUTLET DISSIPATER PAD SEE I I ° ° DETAILS FOR SIZING I � i I a � I ° i Q { I� 24' RCP S100 RISER 8.6 X 8.5' ANTI -SEEP COLLAR, SEE DETAIL THIS SHEET, INSTALLATION AND TESTING TO BE 10.0' OBSERVED BY GEOTECHNICAL ENGINEER I � / I cn 421 422 \ �--`- - - - - - - - - - - - -.ice 423 \ 42S 424 ~ AZE 4' DIP FOREBAY 42� DRAIN @ 0% y INV: 42100 '\ FOREBAY N ! � 3:1 N ~y i + GRAPHIC SCALE 10 0 5 10 20 I ' 1 inch =10 ft. N 4' DIP DRAWDOWN PIPE WET POND NORMAL POOL EL: 422.50 TOP OF DAM: 425.00 BOTTOM OF POND: 417.00 INV: 421.00 417 418 419 INV: 421.00 420 STORMWATER WET POND - SCM 1 6" SLAB (TYP) RISER CREST: 424.0(Y (T 6" THROAT 4' ORIFICE PIPE INV: 421.50" 4" EMERGENCY DRAIN INV: 417.00' SOUTH A Al EAST NORTH 'DRAWDOWN PIPE TO TURN UP V INSIDE STRUCTURE TO ESTABLISH PERMANENT POOL (SEE DETAIL BELOW) RISER #1 DETAILS NTS 6" SLAB HANDWHEEL TO EXTEND 1' ABOVE SLAB TOP 424.00' RISER CREST 6' THROAT -- OPEN END 4" PVC 422.50' PERMANENT POOL I. I" DIA. ORIFICE HOLE DRILLED IN 4• PVC CAP 4" NRS GATE VALVE 4' DIP EMERGENCY OUTLET TO 421.50 EXTEND TO BOTTOM OF BASIN (TEMPORARY SKIMMER ATTACHMENT FOR EROSION CONTROL) 417.00' 4" PVC CAP �-A PAVEDINVERT 24" OUTLET INV: 415.00 MANHOLE STEPS (SEE NCDOT 840.66) PLACE STEM SUPPORTS AT 3 FROM BASE DRAWDOWN PIPE UPTURNED 1' TO ESTABLISH NORMAL POOL TO BE SECURED TO RISER 3000 PSI REINFORCE CONCRETE COLLAR WITH 2-LAYERS #4 REBAR AROUND PIPE (SEE DETAIL SHEET 5.1) 'O-RING' GASKETED CLASS III RCP INV. OUT: 415.00' `� r+ lr 4.00' `' L 8.00, SCM (RISER & DRAWDOWN DEVICE DETAIL NTS SCM #1- STORMWATER WET POND PROFILE 3"MIN #4 REBAR 430 r 430 12" MIN ALL SIDES o RING' CLASS III RCP 4' X 4' RISER SEE STORMWATER SCM NOTES: ' TABLE THIS SHEET 1. PRIOR TO CONSTRUCTION, ANY DISCREPANCIES IN THE PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER FOR ! I FROM INFORMATION �� PFgOPOSEb GRADE RESOLUTION. �� ---- i 10 WIDE TOP OF DAM: 425.00 �_ 2. CONTRACTOR SHALL VERIFY ALL UTILITIES AND PIPE INVERTS PRIOR TO CONSTRUCTION. MODIFICATIONS TO PROPOSED INVERTS SHALL BE I 425 ; .„ - - 100 YR WSE: 494.51 _. _ _.._._ .-_.__ _ _.__w__.. 425 _v�_ BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER FOR RESOLUTION. ; I 3. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL STANDARDS AND SPECIFICATIONS. L_j __l�� 10:1 LITTORAL SHELF 421.00 TO 422.00 4. GEOTECHNICAL ENGINEER SHALL EVALUATE SOILS FOR SUITABILITY OF DAM CONSTRUCTION AND SLOPE STABILITY. PROFESSIONAL I r CERTIFICATION OF EMBANKMENT CONSTRUCTION IS REQUIRED FOR AS -BUILT CERTIFICATION. _ ` FOREBAY ; 5. DAM TO BE CONSTRUCTED PER THE FOLLOWING SPECIFICATIONS UNLESS SUPERSEDED BY GEOTECNICAL ENGINEER'S RECOMMENDATIONS: ROOTS AND OTHER WOODY VEGETATION OR ORGANIC NOTE: INSTALL VERTICAL DOWELS IN FOUNDATION I 420 i EXISTING GRADE I 420 5.1. BORROW MATERIALS FOR USE AS EMBANKMENT FILL SHALL BE FREE OF ORGANICS, DEBRIS. MATERIALS SHALL CONSIST OF SOILS WHICH CLASSIFY AS SC; 5M, CL, CL�H AND ML IN ACCORDANCE WITH THE UNIFIED CONCRETE AS HOLDING BARS FOR CONCRETE CLASSIFICATION SYSTEM OR AS APPROVED BY THE GEOTECHNICAL ENGINEER WITH A MAXIMUM PARTICLE SIZE SHALL OF 3' OR LESS IN COLLAR REBAR. SCM# 1 DESIGN DATA N } 4" DIP FOREBAY BRAIN PIPE (INv.421) 3 MEAN DIAMETER. ` 52. FILL SHALL BE PLACED IN 8' (MAXIMUM) LIFTS UNDER THE SUPERVISION OF THE GEOTECHNICAL ENGINEER. FILL SHALL BE BROUGHT UP BY 1 3 BENCHING INTO THE EXISTING SLOPE. THE MAXIMUM HEIGHT OF 2FT SHALL BE USED FOR EACH BENCH LIFT TAKING CARE TO REMOVE ROOT CONCRETE COLLAR DETAIL DIMENSIONS ELEV. l STRUCTURES AS THE FILL PROCEEDS. SURFACE OF EACH LIFT SHALL BE SCARIFIED PRIOR TO PLACEMENT OF THE NEXT LIFT IN ORDER TO x g EFFECTIVELY TIE THE FILL LIFTS TOGETHER. N.T.S. BOTTOM 417.00 "� uj 5.3. ALL COMPACTION SHALL BE TESTED BY THE SAND CONE METHOD (ASTM D-1566) OR NUCLEAR METHOD AT A RATE OF AT LEAST ONE TEST ' 4 PIP BOTTOM DRAIN f PER 5,000 SF PER ONE FOOT OF COMPACTED FILL THICKNESS IN GENERAL AREA FILLS AND ONE TEST PER 50 LINEAL FEET PER LIFT ALONG 100 YR WSE 424.53 415 : °1• (ATTACH SKIMMER WHILE i 415 THE BARREL. THE MINIMUM COMPACTION SHOULD BE 95% OF THE MAXIMUM STANDARD PROCTOR DENSITY (ASTM D4588) AT MOISTURE CONTENTS VARYING FROM 2 PERCENT BELOW TO 3 PERCENT ABOVE OPTIMUM MOISTURE CONTENT TO WITHIN 3FT OF THE FINAL GRADE. #4 REBAR TOP OF DAM 10 FT. 425.00 _._._- -____ _ ._ .. -_-. _. _ __._,. �5 - @ Sl;khtsfdNCTiONiNGRS SEDIMENT BASIN) ___._..F_ ..r_._.v_.. wa_______a ? 6. DURING CONSTRUCTION, THE SCM IS TO BE USED AS AN EROSION CONTROL DEVICE THE FOREBAY WILL NOT BE REQUIRED WHILE SCM IS ACTING Al2" O.C. EACH WAY 1/2' PREFORMED JOINT FILLER,12' NORMAL POOL 4,215 SQ.FT. 422.50 ? �GQ p2 tia z WIDE 65' O-RING RCP OUTLET PIPE i AS AN EROSION CONTROL DEVICE. DRAWDOWN ORIFICE * 1.1" 421.50 WITH ANTI -SEEP COLLAR 7. ALL PERMANENT STRUCTURES (I.E. RISER BOX, OUTLET PIPES, CONCRETE CRADLES, SPILLWAY FILTER, ETC.) ARE TO BE INSTALLED WITH THE " ORIFICE 4" 422.50 f SEE DETAIL THIS SLEET i INITIAL DAM CONSTRUCTION. RISER CREST ELEVATION 4' ID x 4' ID RCP BOX 424.00 CONTRACTOR TO ENSURE POSITIVE ; 4101 DRAINAGE FROM OUTLET PIPE 410 8. CONTRACTOR TO PROVIDE SHOP DRAWINGS TO THE DESIGN ENGINEER FOR REVIEW AND APPROVAL PRIOR TO ORDERING STRUCTURES. I ..- EMERGENCY DRAWDOWN 4" DIP 417.00 9. ONCE THE SITE HAS BEEN STABILIZED, CONTRACTOR SHALL OBTAIN APPROVAL BY EROSION CONTROL INSPECTOR IN ORDER TO REMOVE EROSION CONTROL DEVICES. f •' OUTLET PIPE INVERT UP OUTLET PIPE INVERT DOWN 65 LF 24" RCP CG 6.15% 415.00 411.00 �' `r o N c�v �* �* co j o N ( o j rn N N I `r N �*1 10. ONCE ALL SEDIMENT AND EROSION CONTROL DEVICES HAVE BEEN REMOVED, THE BMP SHALL BE CONVERTED TO A PERMANENT BMP. 1-4," "DRAWDOWN PIPE TO TURN UP V INSIDE STRUCTURE TO ESTABLISH 9+50 10+00 10+50 - 11 +00 11 +50 - 12+00 12+50 10.1. ALL SEDIMENT SHALL BE REMOVED AND DISPOSED OF PROPERLY. ELEVATION PERMANENT POOL 10.2. FOREBAY AND VEGETATED SHELF SHALL BE CONSTRUCTED PER THIS PLAN. 10.3. VEGETATED SHELF SHALL BE PLANTED PER PLANT SCHEDULE ON LANDSCAPE PLAN SHEET. SECTION SEE BMP SECTION FOR SIZING DATA SCALE. 10A. FINAL CERTIFICATION OF THE SCM BY A PROFESSIONAL ENGINEER IS REQUIRED. 2000 pSF MIN. BEARING CAPACITY BENEATH COLLAR 1 " = 40' HORIZ. TYPICAL ANTI -SEEP COLLAR 1" = 4' VERT. PIPE LAYING MUST PROVIDE A PIPE JOINT WITHIN 4' OF RISER WALL FOR ARTICULATION AT RISER �i E E u C s33 3 t/1 ni' 3 �✓ N 00 ro 0 ro v � ar m 0 M p. vo 01 rn W 0 r� Co r" N L1 s .N m p V) C o 10 _ A'A'F �N Cl) T-1 F ro C Z ° U V0 W O z W W J., V U o Q U W Z •C: o -� V C ro ILL Job No. Drawn B 02160474.00 �SF/RGC Date 11/29/2016 Designer RSF CARO ``\��rrttrrrr+rii,/ ,, , o °PFESS/ '-. ! � ,Q SEAL 9 =_ _ 0 3975 e a° Q1CiNE `- Revisions Sheet No. C6,0 N.T.S. so f i �•� lug 151 .. f�i�;� _