Loading...
HomeMy WebLinkAboutNCG140413_COMPLETE FILE - HISTORICAL_20140411STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. Iv C& (y Q �I DOC TYPE .� HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ Jul y YYYYMMDD ATA NC®ENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor Mr. Johnie Alexander Concrete Supply Co., LLC P.O. Box 5247 Charlotte, NC 28299 Dear Mr. Alexander: John E. Skvarla, III Secretary April 11, 2014 Subject: NPDES General Permit NCG 140000 Certificates of Coverage —See attached list Concrete Supply Co., LLC Formerly Concrete Supply Co. Counties - Multiple Division personnel received your request to revise your stormwater permit Certificates of Coverage to accurately reflect your new company and/or facility name. Please find enclosed the revised Certificates of Coverage for the 17 facilities that changed ownership from Concrete Supply Co to Concrete Supply Co., LLC. The terms and conditions contained in the General Permit remain unchanged and in full effect. These revised Certificates of Coverage are issued under the requirements of North Carolina General Statutes 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency. If you have any questions or need further information, please contact the Stormwater Permitting Program at (919) 807-6300. Sincerely, ORIGINAL SIGNED B) KEN PICKLE for Tracy E. Davis, P.E., CPM, Director Division of Energy, Mineral and Land Resources cc: Mooresville RO, Z. Khan; Winston-Salem RO, M. Gantt (NCG140358) Stormwater Permitting Program Files Deborah Reese, DEMLR Budget Office — please update billing info Central Files Mecklenburg County DEP, Water Quality, 700 N. Tryon Street, Charlotte, NC 28202 Division of Energy, Mineral, and Land Resources Energy Section • Geological Survey Section • Land Quality Section 1612 Mail Service Center, Raleigh, North Carolina 27699-1612.919-707-9200 I FAX: 919-715-8801 512 North Salisbury Street, Raleigh, North Carolina 27604 • Internet: http://portal,ncdenr.00twc� ebllr/ An Equal Opportunity !Affirmative Action Employer — 50% Recycled 110% Past Consumer Paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE No. NCG140413 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Concrete Supply Co., LLC i09!!!;e9a a 7� tiV- ant/ X'Qp is hereby authorized to discharAgptormwater #rom alacilrty located at *IA11¢. Concrete Supply Co. — Kings Mountain Plant 110 Holiday Inn Drive Kings Mountain Cleveland County to receiving waters designated as unnamed tributary to Kings Creek, a class C water in the Broad River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, IV, V, and VI of General Permit No. NCG140000 as attached. This certificate of coverage shall become effective April 11, 2014, This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day April 11, 2014 for Tracy E. Davis, P.E., Director Division of Energy, Mineral, and Land Resources By the Authority of the Environmental Management Commission CONCRETE SUPPLY CO. PLANT PERMITS Expirm NORTH PLANT Water: NCG140041 6/30/2016 ,,3823 Raleigh Street Charlotte, NC 28206 Mecklenburg County Plant Manager - Nathan Hall 704-353-2025 SOUTH PLANT ✓400 Minuet Lane Charlotte, NC 2B210 Mecklenburg County Batcher - Mark Landers 704-309-4434 WEST PLANT (IDLE) 3030 West Trade Street Charlotte, NC 28208 Mecklenburg County Batcher - Mark Landers 704-309-4434 MATTHEWS PLANT �440 Seaboard Drive Matthews, NC 28104-5073 Union County Plant Manager - Tim Williams 704-201-1779 CROFT PLANT �6528 Lakeview Road ✓ Croft, NC 28213 Mecklenburg County Plant Manager - Russel Shepherd 704-309-4371 MONROE PLANT 1109 N. Sutherland., Monroe, NC 28110 Union County Plant Manager - Tim Williams 704-201-1779 ARROWOOD PLANT J 12148 Nations Ford Road Charlotte, NC 2B210 Plant Manager - Reed Annas 704-309-4368 Water: NCG140043 6/30/2016 Water: NCG140054 6/30/2016 Water: NCG140039 6/30/2016 Water: NCG140053 6/30/2016 Water: NCG140241 6/30/2016 y Water: NCG140246 6/30/2016 / , l CONCRETE SUPPLY CO. PLANT PERMITS EX ires: MOORESVILLE PLANT ` 123 Haney Way Water: NCG140335 6/30/2016 ,/Mooresville, NC 28115 Iredell County Plant Manager - Russel Shepherd 704-799-9301 ALBEMAP-LE PLANT 116 Aquadale Rd. Albemarle, NC 28001 Stanly County Leadman - Tim Eatman 704-982-9888 CONCORD PLANT 470 McGill Avenue, N.W. ,Concord, NC 28027 Leadman - Walt Brown Cabarrus County 704-377-6027 KANNAPOLIS PLANT (IDLE) '461 Linda Avenue {annapolis, NC 28081 •Rowan County Plant Manager - Marcus King 980-253-0156 SALISBURY PLANT 1833 Jake Alexander Blvd. P. O. Box 1045 Salisbury, NC 28144 Rowan County Leadman - Mike Roach 704-636-1642 MOCKSVILLE PLANT 215 Industrial Mocksville, NC 27028 Davie County Plant Manager - Marcus King 980-253-0156 I Water: NCG140013 6/30/2016 Water: NCG140040 6/30/2016 i Water: 14CG140044 6/30/2016 Water: NCG140049 6/30/20164 WaterrJ�NCG14_}0238 6/30/2016 y Ct�C.fr.�+�e� :Y�[1!}R. tJGlrlY•D358 . CONCRETE SUPPLY CO. PLANT PERAUTS Expires GASTONIA PLANT 201 N. Hartman Rd. Water: NCG140051 6/30/2016 Dallas, NC 28052 „ Leadman - Gus Segura 704-309-5010 KINGS MOUNTAIN PLANT 110 Holiday Inn Dr. vKings Mountain, NC 28086 Cleveland County Leadman - Gus Segura 704--309-5010 SHELBY PLANT 200 West Graham St. Shelby, NC 28150 Cleveland County Batcher - Danny Bridges 704-4b7-8466 LINCOLNTON PLANT 831 . Madison St. Lincolnton, NC 28092 Lincoln County Leadman - Robert Richard 704-735-7384 i Water: NCG140413 6/30/2016 Water: NCG140050 6/30/2016 J Water: NCG140046 6/30/2016 'f✓ CONGAEiE'. suP�rr. October 11, 2013 Re: Name/Ownership change Mr. Ken Pickle NCDENR/DEMLR Stormwater Permitting Program 1612 Mail Service Center Raleigh, NC 27699-1617 Dear Mr. Pickle, 6��c re�e E Lqp� (6- C ,,,Crr Stepp Ca . 4 b C I am writing to inform you that the plants operated under Concrete Supply Co will be operated under Concrete Supply Co., LLC effective September 23, 2013. The new Tax I.D. (If needed) is 46-2026923. The operation, management, and contacts will be exactly the same as preciously under Concrete Supply Co. Attached is a list of the affected sites with C.O,C numbers. If you have any further questions, please contact Johnie Alexander @ 704-372-2930. Regard Johnie Alexander Environmental Manager Concrete Supply Company Co., LLC R EXECUTION VERSION ASSET AND CAPITAL CONTRIBUTION AGREEMENT THIS ASSET AND CAPITAL CONTRIBUTION AGREEMENT (this "Agreement") is made and entered into this Yday of September, 2013, by and among Concrete Supply Co., allorth Carolina corporation ("CSC"), CEMEX Construction Materials Atlantic, LLC, a Delaware limited liability company ("CEMEX"), and Conmex Joint Venture, LLC, a North Carolina limited liability company (the "Company"). W-I-T-N-E-S-S-E-T-H : WHEREAS, CSC is currently the sole member of the Company; and WHEREAS, CSC and CEMEX have agreed to each make an asset and capital contribution (the "Contribution") to the Company pursuant to terms contained herein; and WHEREAS, subsequent to the Contribution, the Company will own and operate the CSC Assets and the CEMEX Assets, both of which terms are defined below, in connection with the business of producing and selling ready -mix concrete; NOW, THEREFORE, in consideration of the mutual promises, covenants and agreements contained herein, the receipt, adequacy and sufficiency of which are hereby acknowledged, CSC, CEMEX and the Company hereby agree as follows: ARTICLE I TRANSFER OF ASSETS 1.1 Assets To Be Contributed By CSC. Subject to the terms hereinafter set forth, CSC hereby transfers, conveys, assigns and delivers, and agrees to cause each of its Affiliates (as defined herein) to transfer, convey, assign and deliver, to the Company those assets or leasehold interests in leased assets described on Schedule 1.1(a) which are currently owned or leased by CSC or any of its Affiliates and used or intended for use primarily in the production, sale and distribution of ready -mix concrete in North Carolinaand South Carolina, or which are being utilized or operated by CSC or any of its Affiliates primarily at its ready -mix concrete business locations in North Carolina and South Carolina (the "CSC Assets"), and the business associated with said assets (the "CSC Business"). The CSC Assets include, without limitation, (i) the owned real property contributed by CSC set forth on Schedule 1.1(a)(i) (the "CSC Owned Real Property"), (ii) the leased real property contributed by CSC set forth on Schedule 1.1(a)(ii) (the "CSC Leased Real Property"), and (iii) the insurance policies contributed by CSC set forth on Schedule 1.1(a)(iii) (the "CSC Insurance Policies'). The CSC Owned Real Property and CSC Leased Real Property are referred to collectively sometimes herein as the "CSC Real Proaertv." Notwithstanding the foregoing, the assets, properties and rights described on Schedule 1.1(b) (the "Retained CSC Assets"), including, without limitation, the owned real property listed on Schedule 1.1(b)(i) (the "Retained CSC Owned Real Property") and the leased real property listed on Schedule 1.1(b)(ii) (the "Retained CSC Leased Real Pro a "), shall not be transferred, conveyed, assigned or delivered to the Company under this Agreement. 1/2436371.18 IN WITNESS WHEREOF, thisAgreementexecuted on the day ant year first above written. CONCRETE SUPPLY CO. By: IL--. e— - Nam Its: i CEMEX CONSTRUCTION MATERIALS ATLANTIC, LLC By:..._. Name: Its: CONMEX JOINT VENTURE, LLC By: IM: Mevk-w F 5.9: above written. IN WITNESS WHEREOF, this Agreement executed on the day and year first CONCRETE SUPPLY CO. BY Name: Its: CEMEX CONSTRUCTION MATERIALS ATLANTInLBy: Name: w lti�1.t ry o Its: art OC1-1, CONMEX JOINT VENTURE, LLC By: Name: Its: t/2435371.18 59 Johnie Alexander From: Pickle, Ken <ken.pickle@ncdenr.gov> Sent: Saturday, October 12, 2013 11:14 AM To: Johnie Alexander Cc: Bennett, Bradley; Georgoullas, Bethany Subject: RE: JV SW Change AttachmerttS: NPDES-Name-Owner-Change-20120423-DWQ-SPU.doc Hi Johnie, Yes, this letter is fine, it's all we need in a transmittal letter. So, the package to us would be this transmittal letter, a few pages from the Joint Venture agreement previously reviewed, our Name/Ownership form, and the referenced list of facilities with each one's_COC number noted. I've attached our Name/Ownership Change form and I have stepped through it trying to see how little effort you might be able to invest in it. See attached for my idea on minimum required input. This form will go to an admin person to key into the database, and although the form is repetitive to a pretty large degree compared to the communications that you and I have had, I still think the form serves to reduce our time invested in revising our database to record the transfer. Ken Ken Pickle Environmental Engineer NCDENR I DEMLR I Stormwater Permitting Program 1612 Mail Service Center, Raleigh, NC 27699-1612 S12 N. Salisbury St, Raleigh, NC 27604 Phone: (919)807-6376 Fax: (919)807-6494 Email: ken pickle* ncdenr_go_v Website: http://portal.ncdenr.org/web/ir/stormwater ** Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulations.** From: Johnie Alexander f maiIto: job nie.alexander@concretesuoplyco.com] Sent: Friday, October 11, 2013 2:12 PM To: Pickle, Ken Subject: JV SW Change Ken, will this work as far as the letter is concerned, I did not attach the plants. Johnie Johnie Alexander, LEED GA Environmental Manager Concrete Supply Co. Office: 704-372-2930 Cell: 704-309-8738 Please consider the environment before printing this e-mail Division of Water Quality / Surface Water Protection r National Pollutant Discharge Elimination System NCDENK "°""'°"'"DNArun"Fbmc r PERMIT NAME/OWNERSHIP CHANGE FORM Er�virioHH[xr u+o NRvnn� R[s°ukces FOR AGENCY USE ONLY Date Received Year Munth Dey L Please enter the permit number for which the change is requested. NPDES Permit (or) Certificate of Coverage N C S 0 N C 10 II. Permit status priior to requested change. Numerous COC, See Attachment a. Permit issued to (company name): Concrete Supply Co. b. Person legally responsible for permit: _ Henry Batten First MI Last President Title P.O, Box 5247 Permit Holder Mailing Address Charlotte NC 28299 city state Zip (704) 372-2930 (704) 334-8650 Phone Fax c. Facility name (discharge): Numerous Facilities, Sec Attachment d. Facility address: Numerous Address Numerous NC City State Zip c. Facility contact person: Johnie Alexander (704) 372-2930 First / MI / Lust Phone III. Please provide the following for the requested change (revised permit). a. Request for change is a result of: ® Change in ownership of the facility ❑ Name change of the facility or owner If other please explain: Joint Venture effectively establishing change in ownership. b. Permit issued to (company name): Concrete_ Supply Co., LLC c. Person legally responsible for permit: Henry Batten First Ml _ T Last President Title F.O. Box 5247 Permit Holder Mailing Address Charlotte NC 28299 city State Zip (704) 372-2930 Henry.BattenpConcreteSupplyCo.com Phone E-mail Address d. Facility name (discharge): Unchanged e. Facility address: Unchanged Address City State Zip f. Facility contact person: Unchanged First MY Last Phone E-mail Address NPDES PERMIT NAME/OWNERSHIP CHANGE FORM Page 2 of 2 W. Permit contact information (if different from the person legally responsible for the permit) Permit contact: T J4, h irfl t7(� j First MI Last �nc1; res l ;" �c✓Z i� 1 /t?�;z. /� Title d V1 %% Mailing Address City State Zip ,� 7 �'i � � ��� '� `i 7l: .��n rL,• I7� [ h-'�<'� �}%Cai Rtr�� ��; +"���. G Phone E-mail Address V. Will the permitted facility continue to conduct the same industrial activities conducted prior to this ownership or name change? ® Yes - i'u 6, -) �, ❑ No (please explain) Required Items: THIS APPLICATION WILL BE RETURNED UNPROCESSED IF ITEMS VL ARE INCOMPLETE OR MISSING: ❑ This completed application is required for both name change and/or ownership change requests. ® Legal documentation of the transfer of ownership (such as relevant pages of a contract deed, or a bill of sale) is required for an ownership change request. Articles of incorporation are not sufficient for an ownership change. The certifications below must be completed and signed by both the permit holder prior to the change, and the new applicant in the case of an ownership change request. For a name change request, the signed Applicant's Certification is sufficient. PERMITTEE CERTIFICATION (Permit holder prior to ownership change): 1, , attest that this application for a name/ownership change has been reviewed and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting information is not included, this application package will be returned as incomplete. Signature APPLICANT CERTIFICATION Date I, Henry Batten, attest that this application for a name/ownership change has been reviewed and is accurate and complete to the best of my.knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information is not included, this application package will be returned as incomplete. lL 1 ~' 10/11/13 Signature Date PLEASE SEND THE COMPLETE APPLICATION PACKAGE TO: Division of Water Quality Surface Water Protection Section 1617 Mail Service Center Raleigh, North Carolina 27699-1617 NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director October 7, 2011 Mr. Henry Batten, President Concrete Supply Co P.O. Box 5247 Charlotte, NC 28299 Subject: General Permit No. NCG 140000 Dee Freeman Secretary Concrete Supply Co — Kings Mountain Plant COC NCG 140413 Cleveland County Dear Mr. Batten: In accordance with your application for a discharge permit received on October 3, 2011, we are forwarding herewith the subject certificate of coverage (COC) to discharge under the subject state — NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated October 15, 2007 (or as subsequently amended). Please take notice that this certificate of coverage is not transferable except after notice to the Division of Water Quality. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other federal or local governmental permit that may be required. An Authorization to Construct treatment facilities has been issued concurrently with this COC. The Mooresville Regional Office shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an in -place inspection can be made. Such notification to the regional supervisor shall be made either in writing or by phone during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, the associated Authorization to Construct, and the approved plans and specifications. Please mail the Wetlands and Storm .�vater Branch 1617 Mail Service C::nter, Ralegh, North Carotin ,a 2769P617 Ln :ation: 512 N. SO,;bUry St 'taleigh, North Carolina 27=:)4 Phow 919-807-61 31 FAX: 9IM07-6494 S CustamerS-vice: 1.877.623-'_743 Iniernet: www.ncwaterquality.c,,y An Equal Opporlunily�. Affirmative action Employe; No fihCarolina Aatmrallt Mr. Henry Batten Concrete Supply Co, Concrete Supply Co — Kings Mountain Plant NCG140413 October 7, 2011 certification (attached) to the Stormwater Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. Please note that any future construction, installation, or modification of wastewater treatment facilities (including process wastewater recycle systems) will require an Authorization to Construct (ATC) prior to construction per 1 SA NCAC 21-I .0138 & .0139. You must submit, in triplicate, plans/specifications and design calculations, stamped and sealed by a professional engineer, with a letter requesting an ATC to the Stormwater Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617.] One (1) set of approved plans and specifications is being forwarded to you. The Permittee shall maintain a copy of the approved plans and specifications on file for the life of the facility. If you have any questions concerning this permit or Authorization to Construct, please contact Jennifer Jones at telephone number (919) 807-6379. Sincerely, OPJGINAL SIGNED M KEN PIC for ColeenIE Sullins CC.' Mooresville Regional Office, Rob Krebs, Samar Bou-Ghazale Central Files Stormwater Permitting Unit Files Mr. C. Pakala, P.E., (electronic copy) enclosure Mr. Henry Batten Concrete Supply Co, Concrete Supply Co — Kings Mountain Plant NCG 140413 October 7, 2011 certification (attached) to the Stormwater Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. Please note that any future construction, installation, or modification of wastewater treatment facilities (including process wastewater recycle systems) will require an Authorization to Construct (ATC) prior to construction per 15A NCAC 2H .0138 & .0139. You must submit, in triplicate, plans/specifications and design calculations, stamped and sealed by a professional engineer, with a letter requesting an ATC to the Stormwater Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617.] One (1) set of approved plans and specifications is being forwarded to you. The Permitee shall maintain a copy of the approved plans and specifications on file for the life of the facility. If you have any questions concerning this permit or Authorization to Construct, please contact Jennifer .tones at telephone number (919) 807-6379. Sincerely, ORIGINAL. SIGNED KEN PICK for Coleen Sullins cc: Mooresville Regional Office, Rob Krebs, Samar Bou-Ghazale Central Files Stormwater Permitting Unit Files Mr. C. Pakala, P.E., (electronic copy) enclosure STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE No. NCG140413 STORMWATER PROCESS WATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-21 5.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Concrete Supply Co. is hereby authorized to discharge stormwater and to construct and operate a process wastewater treatment system, and is hereby authorized to discharge process wastewater from a facility located at: Concrete Supply Co — Kings Mountain Plant 10 Holiday Inn Drive Kings Mountain Cleveland County to receiving waters designated as a UT to Kings Creek, a class C water in the Broad River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, 11, III, IV, V, and VI of General Permit No. NCG140000 as attached. This certificate of coverage shall become effective October 7, 2011. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day October 7, 2011. pR1G1NAti-Ply B� fuj• Coleen 1-1. Sullins, Director Division of Water Quality By the Authority of the Environmental Management Commission Mr. Henry Batten Concrete Supply Co, Concrete Supply Co — Kings Mountain Plant NCc 140413 October 7. 2011 Engineer's Certification (COC No. NCG140413) I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, fir the Project Marne LocaGron Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following installations: • Consttruction of a process wastewater recycle system at the Concrete Supply Co -- Kings Mountain Plant site. I certify that the construction of the above referenced project ,vas observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Date Registration No. Mail this Certification to: Stormwater Permitting Unit NC Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 A 4 - j '11, 47 qk, yr-z -.7 4�, A f' % 4 -': gf 21 r; - W 7a Tr Ns . A, A., 94 0.1 4 �. NJ V LI 7 1,9 �t .. ....... .. t Concrete Supply - Kings Mountain Plant 1VT! VT1 fir, i X�kx-:, 1 sr tit, 7W 1 0 NCG140413 N w E S. Map Scale 1:2f,,0102 J0 f V111 I Li Y"W IN Ui �jj I -j a Concrete Supply Co Concrete Supply - Kings Mountain Plani Kings Mountain,, NC Latitude: 350 13' 34" N Longitude: 811 20' 17" W County: Cleveland Receiving Stream: UT ',.o Kings Creek Stream Clals: C Sub-ba!Jn: 03-08-05 (Ljrnad P.iver Basin') Facility Location 0 September 29, 2011 Ms. Jennifer Jones, Environmental Engineer II NC DENR — Stormwater Permitting Unit 1617 Mail Service Center Raleigh, North Carolina 27669-1617 Re: Permit Application for Authorization -to -Construct (A to C) a Proposed Process / Stormwater Recycling System for Kings Mountain Concrete Plant Concrete Supply — Kings Mountain Plant 110 Holiday Inn Dr. Kings Mountain, Cleveland County, North Carolina 28086 CPEES Proiect No. 1129-002 NPDES General Permit No.: NCG140000 Certificate of Coverage: Not issued yet Dear Ms. Jones: Concrete Supply is pleased to resubmit the attached Authorization -to -Construct (A to C) permit request report along with construction drawings for the Proposed Process / Stormwater Recycling System for Concrete Supply — Kings Mountain Concrete Plant located in Kings Mountain, North Carolina as your comments. The A to C Report includes: • NEW NC DENR NPDES General Permit Application NCG140000; • Check for $100 made payable to NC DENR; • Site map showing the delineation of drainage area contributing to the process wastewater; • Site layout map showing the proposed location of the process / stormwater recycling system; • 10 yr 24-hr stormwater runoff calculations; • Detailed design, construction drawings along with construction specifications for the proposed process and stormwater recycling system; • Site Location Map; Concrete Supply sincerely appreciates your cooperation and progress of this project. Please call me at 704-309-8738 or Mr. Chuck Pakala of CP) ES at 704-541-4042 if you have any questions or comments on this permit request. Respectfully submitted, Johnie Alexander Environmental Manager Attachments: A to C Permit Application Package ly=1i_ [f I � r i'_. .�44��1� .�i!1 �'. � _ .e 1 �1. a'i� it i i • 11 { .Cis 1: 'I� � i`. .` > :�� . \ i'' :r'�� "1' �t rt. !�• � .�i"'i ,. i • �_!,5' ir. Sri`; �.•i� � +1 ''iJ �' .'fi'. _b I' �Ti'!r. � ,.y,y., �.. i 1 ' ' i . i'.•� E il; S ' ' � �: i r < ' �� �_ >. ,. �, ,r! .. ,r'• i ,� � ilir'f3 r�, ,.. �E't. .rl;y I;+':� ` � It' . I � . 1 I '{.�{I tip '! . .� (T' .{M �. r� ,; �', t_ _ � f, �, � �! .'r 1, L;,�� �, � r . .! ' � i .. � � Sri r� i •� '� � .iir' � �' � i E� � .fir. :I'J ;�ri r "II � r � � �'I� �I,?. 3'I �. 11..'ri ,r'' � ',�'�7,-;�i, •ri� �., , � - .1' � , ,i .� rr, i r' .tit � ' :f" Permit Application for Authorization to Construct (A to Q a Process I Stormwater Recycling system NPDES General Permit No.: NCG140000 Certificate of Coverage: Not Issued Yet Prepared for: Concrete Sur pyCy- Xings N ouyr tain Plant 110 Holiday Inn Dr. Kings Mountain, Cleveland County, North Carolina 28086 CPEES Project No. 1129-002 September 29, 2011 Prepared by: Chalam Pakala Engineering and Environmental Solutions 10017 Allyson Park Dr., Charlotte, North Carolina 28277 Tel (704) 541-4042 / Fax: (704) 541-4043 Email: cvpakala(@carolina.rr.com ... >, �. - • .;.., � - �- �� .Jr�':jr rl, 'r_ .I.i;� 'li il.. ,I � ( ;ili���I � .��� � ,�+'l�l'� R}�ir��J - -1• Permit Application for Authorization to Construct (A to Q a Process /Stormwater Recycling system Concrete Supply— Kings Mountain Plant Kings Mountain, North Carolina NPDES General Permit No.: NCG140000 Certificate of Coverage: Not issued yet TABLE OF CONTENTS 1.0 FACILITY DESCRIPTION..............................................................................................1 2.0 FACILITY OPERATIONS................................................................................................1 3.0 PROCESS WASHWATER CALCULATIONS..............................................................2 4.0 STORMWATER RUNOFF CALCULATIONS FOR A 10 YEAR AND 24-HR RAIN EVENT.......................................................................................................................................3 5.0 STORMWATER / PROCESS WASHWATER RECYCLE SYSTEM DESIGN AND CONSTRUCTIONDETAILS.................................................................................................4 6.0 TSS, SS and pH CONCENTRATION IN THE WASHWATER EFFLUENT ............5 7.0 WATER BALANCE CALCULATIONS..........................................................................8 8.0 A to C CONSTRUCTION PERMIT APPLICATION....................................................8 TABLES Table 1: Runoff Volume Calculations for a 10 yr, 24-hr Storm Event & TSS, SS and pH Calculations for the Washwater Effluent FIGURES Figure 1: Site Location Map Figure 2: Aerial View of Surrounding Properties around the Kings Mountain Plant Figure 3: Site Layout Map - Proposed Location of Process Washwater 1 Stormwater Recycle System Figure 4: Process Washwater and Stormwater Recycle System Construction Details ATTACHMENTS Attachment A: Runoff Volume and Weir Design Calculations with Backup Attachment B: NC DENR — Division of Water Quality Stream Classification Table for Cleveland County Attachment C: Stokes Law for Particle Settling & Other Literature CP Engineering and Environmental Solutions i A to C Permit Application Tel: (704) 541-4042 Concrete Supply - Kings Mountain Email: cv akala carolina.rr.com 110 Holiday Inn Dr., Project No. 1129-002 Kings Mountain, NC 28086 0 �t tl�� r.� �• 1 - Y Jr' v s .. '�I:a A.i i ..+! � fir, Ri, a `fJ 4 . i•+ •s ,�•i t ':.. .-... i �' S,! h''� ��i � t7a .a .. ) ! 11 �,` �: t !i ���v�.:�_� _�F' o)tJr •r!! +rfr h {f !� ..... ................. a ,........... .. . .. .......,.... S+. `f��F.. tJ,J f. t ..'!,•X / '�7 ? ? k; f �1 . •r •r %P � to � � � If.'t, i. - , •, . � , it � .� .I'. � 1 �' � .I � t:�l: k 6 1 1- .trr,diJ �'�J.iltj'1„ .-rrJ' 7p� .'rfk�,�.' 'a' 3 + /!',1! � �•'�( Jik'.7t'1 .try � � [r fl rr .� � •'✓..� '�i "Ti;l r•. r;'1', 'J!G;r#; ._ r - , Permit Application for Authorization to Construct (A to Q a Process I Stormwater Recycling System Concrete Supply— Kings Mountain Plant Kings Mountain, North Carolina NPDES General Permit No.: NCG140000 Certificate of Coverage: Not Yet Issued 1.0 FACILITY DESCRIPTION Concrete Supply -Kings Mountain Plant located at 110 Holiday Inn Dr., Kings Mountain, Cleveland County, North Carolina, is a dry batch ready mix concrete plant for commercial supply. The primary Standard Industrial Classification (SIC Code) for the facility is 3273 (Ready Mixed Concrete). The approximate location of the facility on a US Geological Survey Map is provided on Fi ure 1. The geographic site location can also be given as 35' 13' 33.6" North Latitude and 81 20' 16.2" West Longitude. The subject facility is surrounded by commercial, quarry mining and residential areas and stormwater from the facility drains to couple of Industrial Waste Ponds located southwest of the property. The stormwater from Industrial Waste Ponds flows to Kings Creek and eventually to Broad River. The details of surrounding properties are displayed on an Aerial Map, Figure 2, attached with this report. The Kings Mountain Plant occupies approximately 4.11 acres of land. However, approximately 0.63 acres of area will be used in the stormwater drainage calculations for washwater/recycle operations. Stormwater from this property flows to the Industrial Ponds and from the Industrial Ponds to Kings Creek located on the southwest property, Figure I . The stormwater from Kings Creek flows to Broad River located south of the site. Based on my review with NC Division of Water Quality web site, it is our understanding that the Kings Creek is classified as Class C (see attached table obtained from NC DENR — Division of Water Quality Section web site for details -Attachment B). The stormwater from the facility is carried to the Industrial Ponds via swales and sheet flow. The Kings Mountain Plant will consist of an office trailer, a ready mix concrete mobile plant, two cement pigs (storage containers), water tanks, storage areas for stone and sand, and a concrete truck drum wash area. Kings Mountain Plant will have approximately 8 to 12 trucks and operates 10 hrs/day, 5 days/wk and 30 to 50 wks/year, depending upon the weather and business conditions. 2.0 FACILITY OPERATIONS The facility operations will include: a dry batch concrete mobile plant, cement storage pigs, sand and stone storage areas with limited water sprinkler system (taken into process water consideration) and a truck washing area. CP Engineering and Environmental Solutions i A to C Permit Application Tel: (704) 541-4042 Concrete Supply - Kings Mountain Email: c.Mkalancarolina.rr.com I10 Holiday Inn Dr., Project No. 1129-002 Kings Mountain, NC 28086 ik r, �� r( � r:( _ �• 'i`�"t! ',. .t..?r,. i,,r, S �J, r , 'I� '1",I i(filr t. w .fr. it „r.ri a !: r '•I . 'i .t' f,•J"i{ f,; ', ., ., I:t•F' , '(t 'ia� -''- I' � ,'��, ? ,Ei+ •; i], al �,�..' -' ,, r J a td� ', ft, . ;,,r, ,fit ]'.Clt,_G _ '. rf:rfi . r ' i ••. ]'.J, tl "a, r. ? ram.". :E,i; fr` t' �,{.' . • , 'i t'rl.:T � ]..,� i �i' 1, '`1!� t Based on the request from the user, typical operations from this plant include: loading the sand, gravel, and cement into a weigh scale which drops the dry mix into cement trucks as a dry batch concrete mix. The loaded cement truck with concrete mix will be brought to a truck washing area for a surficial wash before it goes out for the delivery. Occasionally, any left over concrete in the concrete drum will be either used in making blocks or washed of at the plant in a truck washing bay. Thus, process water will be generated at the plant for either recycling or disposal. Based on our understanding of the facility operations, wash chemicals are located near the wash pit area to collect any potential spills from these storage vessels. The oil storage tank was kept far away from the pits and necessary secondary containment shall be placed to prevent the migration of potential spills from the tank reaching the pits. Therefore, CPEES believe no oily water or stormwater contaminated with chemicals will be released to the environment from the facility. The facility has not applied for a NPDES General Permit (NCG140000) in the past and therefore, applying now to obtain the NPDES permit and be complaint with the State Division of Water Quality regulation. To meet the NPDES General Stormwater Permit requirements, a Stormwater Pollution Prevention Plan (SWPP Plan) with Best Management Practices for potential stormwater pollutant sources shall be prepared and implemented at the site. All truck drums and drum chutes will be washed at the end of the day before parked for good. Therefore, the locations where process washwater will be generated at the plant are: • Surficial cleaning of the drum before leaving the site, • Cement drum washing if left -over concrete is brought back to the plant; • Drum and drum chutes cleaning at the end of the day; and • General stormwater from the plant area and the stone storage bay. 3.0 PROCESS WASHWATER CALCULATIONS Based on our discussions with the Kings Mountain Plant Manager, it is our understanding that approximately 10 to 40 batches per day will be completed in the summer time and 10 batches per day will be completed in the winter time using 12 trucks. Approximately 5 to 10 gals of water will be used for surficial washing of the truck per batch. Approximately 5 to 10 gals of water will be used to wash drum chutes per truck per day at the end of the day. Approximately 200 gals per day per drum will be used to wash at the end of the day. CP Engineering and Environmental Solutions 2 A to C Permit Application Tel: (704) 541-4042 Concrete Supply - Kings Mountain Email: cvnakala(a�caroling. rr.com 110 Holiday Inn Dr., Project No. 1129-002 Kings Mountain, NC 28086 1 .rr r_ � �wwn�r�au.�, a-.� -r.a � .-r .�..y, w. ..r •re .�' r � w.� .� _i • a- �r r uw.rnr a-, u � � -rw '. ! {' .. - I .�, 1 i!lY ' I i{•r 11 S'' j''r 12 F , I:3 ,nLjr !ir. [..Jj .�1 i'',• 1 -" I(/ ' 'Y 'Ij � ,' 'lr.f .'U'I I, rat ! ,t,. - 3', ,. `I r.• •{fit, 1 s :I ! U F'I' [.1 (I:'i Jil)I4 1 •. ` � r,-�j,: ,Irs, , _ )1"� ;; it �,q r' - .!' - fjlli.t�F! `I,S.: !' 1 it- � ,3'�,{ Ir! r �•,7G. . � !! .� ," � 1 r 'Y, ,� ,Yf �'i r�jr. (; fl "I' t [�Y�' [ , , r, I ,1 1• i r1, .... ' r Jr • l,,' t ��: '.� • tl �,Il, ��5f .i,.! �. }![ 11: , 'I rl !� . �i'1 � . 'll!rl,, "S;i•„1 1!1 'j,: jll '{l ii Y 3 r ! li �i'i' 11`,i `['.�JII + •°�7 �l' { 7 � It {. + .. r , �I !'• k. '{ :! , t ( •!' !Ire! •{(I 'I -i, ./ 1,"' 111- ilf', , . { r ,, .�! '11� j,• r!1 i, '., ,1 lol. Ylj. 1,IJ1 17, �'+, 'f:ilY I lu S; j•-I� Is 'ft •'1, l +. 1 . 1 ,.f •, �.. 1'! •,• . t - i r 1/ r '), .•1' 'JJ rI•I" /.- ' ,'r r .. , FY } 1 - .i !- .I. 1. ,:1 :r."r '-- ' ;I '� �,:I�'.. J:II' I, �! � l.,r ,'r I .. I'. •r r,, ?f1! 1'✓� [ Ilr. 'lr� l .. I' I 1 ,tl. I. l' r irr 1, .1 +1. ,F, •I, ,F ( '1'-.li,jr !1' 111.. � !r,', ,l, t, j. .. 'f .i i '• . !J,. �s ,1 �(. ,� 1 r, •S. 1�1 ,� .'1,' ,r ,'f Ir 1 1 Description of Operation Unit Total # Trucks worst -case trucks 12 # Batches per day using 12 trucks worst -case scenario -summer time Batches 40 Surficial cleaning 10gals/batch 400 Chute cleaning at the end of the day 10gals/truck 120 Drum cleaning at the end of the day 200gals/truck 2,400 Leftover concrete washing from the drum 5 batches Total(gals/day) 2,920 4.0 STORMWATER RUNOFF CALCULATIONS FOR A 10 YEAR AND 24-HR RAIN EVENT According NC DENR-Division of Water Quality NPDES General Stormwater Permit requirements, wastewater treatment per 15A NCAC 2H .0203 and all wastewater discharges must meet a total suspended solids (TSS) limit of 30 mg/l, a settleable solids (SS) limit of 5 mg/l, and pH between 6-9 SU or must demonstrate that the recycle system has sufficient capacity to contain 10-year, 24-hr rainfall event plus one foot of freeboard under the design operating conditions. To obtain an economic and workable solution to the proposed recycling system design, the truck washing operations and process washwater generating points are all brought to one location to reduce the drainage area for 10-yr, 24-hr calculations. Approximately 27,443 sq ft or 0.63 acres of area including the small area for gravel washing is expected to contribute to the process washwater from the facility (Figure 3). All washing operations beyond this designated area are prohibited at the facility and the drivers will be trained to adhere to this new policy for meeting the Stormwater regulations. CPEES has performed stormwater calculations for a 10-yr, 24-hr rain event for 0.63 acres and approximately 7,707 cubic feet (cft) of runoff capacity is required to hold the designed rain event. The runoff volume and weir design calculations are provided in Attachment A. Please note, during a rain event, no plant operations will be conducted. Therefore, no washwater is accounted for in the proposed recycle system design when 10-yr, 24-hr rain event for stormwater is considered. CP Engineering and Environmental Solutions 3 A to C Permit Application Tel: (704) 541-4042 Concrete Supply - Kings Mountain Email: cvnakala(alcarolina.rr.com 110 Holiday Inn Dr., Project No. 1129-002 Kings Mountain, NC 28086 -_ _ - - ._.. •}il'!! P' Ili(fl 'rt1 k Irrl� I �• •' � 'I _ r+ .s ,,- yr ,� .. a .. r``'•. \rll. ,ll J' 1. al 1' , ll{�'a.+ l� �!, r,�'l, ', --,i ,11':.1. 111 i k� 1 •f' ,_',iil -l. - , ,� rlJ' If .1 ,� Itl•1€r,'r 'fit :: �t' i. . .�'I!', .'R 1J'i• Ifrfl�', 1,'l+ { ' rl 1_V ,' I - / � .F', '!+' ..,.(f,•r;' � `II. r_IV I (!1 '' + +"CI � +' �. i!'J ' r h, 1� ,r ,,. ril �: i' I i + , rf' .. i',J( I,i( I,'1 11 .I, .f,+l,il 1�1, k .+'•- . IA: I; , , ,; I' , . �I, - lf. F, ., .� I 1 °' �Il , r. r+• ,? 1 � :l � ..'t�•1 'E[' ' I�'J rJI I'. ',.:1 Jr r ,tf+l (a l .(-E71-`. ' f. _I(3'_•�. _:? i;! ,r' �'lil '..I rl /jr.+.. I J ii+ t+, �I �f , , •rl + , �" .. I Jl .i' ' .... I ,Its. 1�i.. •1. .i`1!I 5.0 STORMWATER / PROCESS WASHWATER RECYCLE SYSTEM DESIGN AND CONSTRUCTION DETAILS The proposed recycle system is designed to capture all process washwater and stormwater from a 10-yr, 24-hr rainfall event from the subject plant wash areas. The recycle system is designed to hold entire runoff amount from the designed storm event. The approximate drainage area involved in the process washwaterlstormwater is estimated to be 0.63 acres (Figure 3). The 10 year, 24-hr runoff volume from this drainage area is estimated to be 7.707�-' cft. A recycle system designed for the estimated runoff is a four pit system (3 pits + 1 truck wash pit) with a drying bed for the waste materials removed from the pit (Figure 3). _The -total volume of Pit #3•was designed to be sufficient to hold the entire 10 year, 24-hr run off volume. The process washwater/stormwater held in truck wash pit and Pit #1 and Pit #2 would be additional storage beyond the designed storm event capacity. Please note Concrete Supply strives very hard to control and mitigate migration of any contaminated stormwater from the facility to the waters of US. Appropriate slopeslberms/walls are proposed to isolate the 0.63 acres of drainage area for the washwater/stormwater recycling operations (Figure 3). Of all the four pits in the recycling system, three are sloped at the entrance in order for a front-end loader to go into the pit for a periodic cleanup. However, a berm or a_slope away from the pit entrance is placed in front of the pits (Pit # Land #2) in order to divert the wastewater entry into these pits. The third pit is a rectangular pit (Pit #3) and no washwater/process water will enter this pit from the drainage area. The cross -sectional and construction details of these pits are shown on Figure 4. CPEES designed a pit sludge storage area next to the truck washing operations in order to control stormwater flow that is in contact with the pit sludge. The slopes of the truck washing operations and the pit sludge storage area are directed toward the truck wash pit of the four pit recycling system in order to control and mitigate migration of stormwater contamination from the washing operations. The location of the recycling system along with stormwater flow directions and wash areas are displayed on Figure 3. The construction details for the recycling system are displayed on Figure 4. The 10 year, 24-hr stormwater runoff calculations are provided in Table 1 of this report. A sump pump with a switch will be provided to pump water from Pit #3 and may be from Pit 42, as required, either to the plant or to the truck washing operations. This would help empty the Pit #3 and #2 to accommodate any possible rain event. CP Engineering and Environmental Solutions 4 A to C Permit Application Tel: (704) 541-4042 Concrete Supply - Kings Mountain Email: ypakala a,carolina.rr.com 110 Holiday Inn Dr., Project No. 1129-002 Kings Mountain, NC 28086 �: i, !rr>. :1' 'r' r; rr - ,tl� F ' '1 � .. f; ,t ' , � „I 1 • t �I �' i �}''?.: ' 'i� � . . �+��,?I : }',. ll•' .{I. lr I t -I. f 1 11�� �" ��+ t 1 .. ',.. I'• I '. ., t,,'1.1; '}, 1r ,! I' �' i- . I' I' �' ..+ u'I 1 I , ]J,f { . /'II 111� �i II.1ri , � � 1' .. � ' � , • • I �� .. , • �''1 u( rilr I. 'I•. FI 1„r I, � ?. .,, .. .. / + �_I, II! .r. I. 11'I .. i - � _r• .1 ,t rs. � JI .: {: ,Y 'fl�l. .. �• I 1 1 .:�. rE1 • . IF . �11 i . ,i• ( ,.• �I I.I .1. ,1• . •1(1' ., , . 'SI I'. 1 / 1' IS. rtil 1 � ! ' '- J Iti I' •ii ••- 1 I I1 Ifr �:.',? ' 1. ,1'i�a • ., ,[:. 11 f . :� , 'Il !• I ,r I' i 'l.' ' 11.. ' li �{t`'If .il: 1 i ', +,. .ijJ: �jl: _ • 4 1'- � + }'� r ,. :f. 'rl I'. , , r� .. ''�. .1 lr �• • r 1 l a f, ,•1 '1J i •IJ, i r`tf, 1 •�. -'(11, I'. I '•J '. I. f' . � rf'r , 6.0 TSS, SS and pH CONCENTRATION IN THE WASHWATER EFFLUENT The calculations provided in the following paragraphs assume the following conservative assumptions. i. Particles are spheres (no consideration for flaky particles) ii. Reynolds Number < 0.3 — Laminar flow iii. Hydration effect on the particle settling is not considered iv. No agglomeration/compaction is considered in the settling v. Particles are discretely settling vi. The concrete that runs into the pits are already hydrated and certain bonding has taken place between the particles and the diameters of the particles have changed. Therefore, discrete particle settling of a fresh cement Particle Size Distribution is a very very conservative estimate a 0- Vh L VC Q Z sludge layer path of smallest consistently settled particle 9 Please note the notation given in the above picture is not the same as described in the following text but the concepts are the same jj Particies settling: The settling velocity could be calculated using the Stokes Law. t g(ft )Dz ft Z p' Pz ( lb Settling Velocity: vS f secz (sec) lb 1$µ ft - sec i. Gravity, g=32.2 ft/secz ii. Diameter of Particle, D l . Cement, D=4.92.5ft [NOTE: This is equal to 15 microns. (1 micron=3.28e-6 ft).] 2. Note: Can consult ASTM Study on Particle Size Distribution for Portland Cement (2004 NIST Publication) for average PSD for this material. iii. Density of Settling Material, P1=200 Ib/ft3 iv. Density of Water, P2=62.4 Ib/ft3 (1000kg/m3) v. Viscosity of water, µ=5.98* 10-4 lb/ft-sec (0.00089 pa.$) (this is temperature - dependent so you may see slightly different values in applications) CP Engineering and Environmental Solutions 5 A to C Permit Application Tel: (704) 541-4042 Concrete Supply - Kings Mountain Email: cvpakakCa carolina.rr.com I10 Holiday Inn Dr., Project No. 1129-002 Kings Mountain, NC 28086 I 11 I I •' 1, . , III ' I . . t k � f .'J r - 1 1 r 1 Ei :' 1 I ' I 1 • I .!1. 1!� • 1 ' .. �' � r .!, 1 I , .i_ / tf, � I 1' 'il, 'li � ;, 11 •/•l i�tt.�i 'C1 1 .I. i, � t I +, +. �i ; •'' .1, f' r . u , it � fi �' Utri,)J1" m (J t) Settling Time: t,�lrle (sec) = dsclff l vt sec i. Settling Depth, d_,1& ' Average depth of the settling basin for the design (ft) Settling velocities are calculated for various sizes of cement particles (fresh cement) and are tabulated in Section of the calculations sheet. The Stokes Law Explanation and Settling Chamber design principles are provided in Attachment C. 2) Non -rain Amounts Calculations. We estimate approximately 25 to 40 batches would be produced per day at the proposed site. The lowest number of batches per day produced is estimated to be in the winter season. Once the truck is loaded, the truck goes through a surfacial cleaning before heads out to the delivery. No concrete is washed in the surfacial cleaning and only dust would be rinsed off. At the end of the day, the drum and the concrete chute would be cleaned before keeping the vehicle in the yard for the next day usage. Concrete Supply is very particular no to waste the returned concrete and wash in the pits. If any concrete is brought back from the site, it would be used for aiming cement blocks for reuse. Therefore, the left over concrete going into the pit system would be very minimal. The washwater generated is called non -rain water and it would combined with storm event flow to designate as Q combined and used in the detention time calculations. The calculation worksheet presented in the attachment is very self explanatory. 3) Detention Time/Critical Velocity: In a plug flow situation Qin =Qout. Volume& s i n (ft 3 ) V ( a. tl),,,.,ion (sec) = 1 3 F1owThrough& sin(see) f-1 i. Volume of the Basin: The engineer must size the settling basin so that the detention time is greater than the settling time. b. Critical velocity (Vc)= H/Detention time of the basin V C. = QenmbinM/Surface Area of the basin d• Qcombined = Q10 + non -rain amount (washwater) 4) Particle Settling and Removal All particles having settling velocity > the critical velocity will be removed where they enter, but the particles having velocity Vs < Vc will be removed in the proportion Vs/Vc. A mass CP Engineering and Environmental Solutions 6 A to C Permit Application Tel: (704) 541-4042 Concrete Supply - Kings Mountain Email: c_pakala acarolina.rr.com 110 Holiday Inn Dr., Project No. 1129-002 Kings Mountain, NC 28086 0 ;� I1''_ .r..t .I ,. ,', , f' 1, 1• I� r � � r .;:1..r , II, ..' .`., 1 r . „r• _ I ')'r. ,�I 11 1. '� .� r � i I' .i r r.. i' - -'t 'lJ 'f: _, i' "_I., j. li,. .. ' .. ♦♦. �_ .I i . 1. e'I�.'"1f�Fir• '/l Il .',Ir 1, , �, i.I' �)�. 1,. r .1 i� ,', � 'ff ,� .r �•(,, � rl r '. .- .E1ir J-.. •1 i'. r �,li;', -� � .'1� ' � -I VI r• ,�: , r , ,� � .: �_'f1 , , „i• . �r . : !ir I .:r ' f.r. , j (-.,, . raft, ,r_, , , 1 , n I r , , .r r ! +J_. ), • {r 1. Fil%� _ ii•11 11.'• �' . .rf3. ryJl� ' I r i 111 � � rJll..k 1�.� ' 1•J I, .. , li -!'l,Jr .. J -i r '''li' i'i_11,'7i i' �'r. " `i. �: ii' I' ,J� iEiC�fi 1.. 1 { •"rr �.��; f. •11 'Ji 'f f'f'' rG• 1 • 1�4 �I, � �, 5• 1�' II'"� lI �• ..r •'Irr jt r ' �� sl, ,r ,I;r I' It I' , 1 i. �' •.11, . 11' ,' !'.II. �IIJ,.I •I J 'rt1�=:... :I� ,�1S .'k'�i' . � - l !I. 'rJ Tr: II 'I � ,1'. i JI I r �l �'/ 1/' 'f I'. 1r.r1 �.�•. ��I Jt�,I I r1i 1 ' fraction obtained in the literature is used to calculate the fraction of mass removed at each basin. Based on the calculations, particle size 1 to 24 microns are estimated to be retained in the final pit and rest of the particles would be removed in all the three pits combined. Approximately 76.77% mass fraction is left in the pit #3. 5) TSS and SS Calculations To calculate the TSS concentration in the Pit #3 effluent we have to made some assumptions. Concrete supply had decided not to allow their drivers to bring any unused concrete to the plant. If for any reason concrete is returned, the returned concrete would be used to make the blocks and thus save the concrete and lessen the contamination in the pits. Therefore, the left over concrete in the chute and the drum would be very minimal on a daily basis. V In addition, the mass fraction calculated in the TSS calculations is further reduced going from Pit # 1 to Pit #2 and from Pit #2 to Pit #3 based on the assumption that the concrete going into the pits is not fresh cement powder but already hydrated and it had enough time to settle in these pits. !Q yH Calculations in the Pit #3 Effluent pH is a measure of acidity or caustic nature of the any liquid. A simple, working definition of pH is pH = - log[H+], where [H+] is the hydrogen ion molarity. To obtain the hydrogen ion molarity from the pH, remember that a logarithm of a number is really just the exponent when that number is written as a power of ten. The definition of pH solved for hydrogen ion molarity is then [H+] = 10-pH. For example, the molarity of hydrogen ions in a pH 5 solution is 10-5 M. We assume the washwater from concrete truck to be a pH of 14 and in the rain water to be a pH of 5. Though sometimes, the rain water pH could vary from 3 to 5 depending upon the area of the rain fall. Once you know the Hydrogen molarity, a mass balance is taken for the washwater volume and the corresponding [H] molarity and the rain water volume and the corresponding rain water [H] molarity divided by the total combined volume to get the combined [H] molarity. Once we know the final [H] molarity, pH could be calculated by using the definition of pH. Also, at the site an Erosion and Sediment Control (E&SC) basin for a 10yr and 24 hr storm event would be constructed as a part of E&SC Plan submitted to the Land Quality. This proposed sediment basin receives water from a bigger area (2.71 acres) and therefore would be diluting it further in this area. In addition, the water from the E&SC basin would be travelling several hundreds of yards before reaching another pond. Therefore, pH would not be an issue at this site. CP Engineering and Environmental Solutions 7 A to CPermit Application Tel: (704) 541-4042 Concrete Supply - Kings Mountain Email: gMkalancarolina.rr.com 110 Holiday Inn Dr„ Project No. 1129-002 Kings Mountain, NC 28086 ., �: ! ' )) 1. i. � ' ' ..,� � � er•' . . )i„ . . i'. _ .I 1' � ' t � i+ - ' !i 'tea a_.i i. �' I `ti � � f �. � . +� �.,tt' +'., , �,'J.II'�J�, ••I ''�a-; t'y� c" i , � .� ' 1tt �'I " _� .. : :1� { 'i� ' '( I +' i .t .'-•1 ,� � 1' I ''!'�Irr I I,rt _fls i � .`�i • 'll f� ' `� _ r , ., i rfi r. I, .y Ji�. � � , � . + 4 . i. i V +II• /f , -1 I+I 11 i r ` }, r! �� '1r, .,(, .� ;it �! f / I i �, nj si. lal la f.) ..! !• +� t ..,'+ "i. �.t... .�3 r ' � '-ir '�•. i, ,f), 1, 1'. _ + ,'I''r, .i '+ t� � � I. I', f .� _lit rii i +i �� � .. � .lr r+ it � •,f . '! f iy�'.. � , J'I l� i i�f .It, S Ir• fig 'Fi'r,. [,• +`� 11-" - � ,_ ',•t �, �,'r'; 1 ,.f r �. .+,,F- (i� .'`!1 './'J!r � � ,- -.I' , r. , � ,� .1 + � ! Ji,li }. , �r-. i 1 .�� ��Slr � .r � � � 1 I 'a li 1�i1. r ,i" '7 � , ',< ' , . '1 ' ' 'atlj ,• r+I�r ' +�, . , . t , 7.0 WATER BALANCE CALCULATIONS The total flow from I Oyr storm event is calculated to be 7,707 eft or 57,647 gallons. Typically, the facility operates 40 batches per day and 250 gallons of water per batch (25 gal/yard and 10 yards per batch). Total water used in the plant per day is approximately 10,000 gals. Please note the likelihood of having a Q 10 storm would be greater in summer than in the winter. Therefore, the approximate average time for the pit water to be recycled in the plant equals to 6.3 or 7 days. Table 1 shows the calculations for the pit water recycle/water balance at the plant. 8.0 A to C CONSTRUCTION PERMIT APPLICATION Based on our consultants' discussions with the State DWQ, it is our understanding that we need to file a NCG 140000 Notice of Intent (NO[) Form to obtain A to C Permit to construct the proposed process washwater 1 stormwater recycle system at the Kings Mountain Plant. A copy of the new NCG 140000 NOI is attached with the A to C Report for an approval. CP Engineering and Environmental Solutions S A to C Permit Application Tel: (704) 541-4042 Concrete Supply - Kings Mountain Email: cvnakalana carolina.rr.com 110 Holiday Inn Dr., Project No. 1129-002 Kings Mountain, NC 28086 _t r' 1 I � { I• ir... ! tS Gi''., }i ( f. iPrt,, 1!!r „r IF [,� �"'.e� ,'r,' •'1r'• :Jit.., rr,. '�I s' � s rrt'r • i' "'I.. � �le,'7I1�;il11 ..,r tir I'/.: 1 {' •I �'( r 'r r71 � (11 t /(j f _'. ii+r''ir {� �3rLl1Jl� j�> i.,�., ,i I7 I. .'a lE:, 'il�. .r�,1 .�r', ;r, .�s,+r. r�• ... r, �t,, .�I i� �+ .r_ I, ,.� �r,�fr s��i F+',i rf' r rl r e• iy l'.iI • 1 r, I �.tr. rr•'1, E I;! f .I` iS4 �.; !, �l' ! ,.'14 _11'1- m a PS Directions to 110 Holiday Inn Dr, Kings Mountain, NC Goo,gle 28086 195 mi - about 3 hours 29 mins Save trees. Go green! r. Download Google Maps on your phoneatgoogle.comlgmrn o North Carolina Water Resources 512 North Salisbury Street, Raleigh, NC 27604-1187 - (919) 733-4064 1. Head southwest on N Salisbury St toward W Lane St go 0.2 mi total 0.2 mi 2. Take the 1st right onto W Lane St go 0.2 mi 10 About 2 mins total 0.4 mi 3. Turn left onto N Dawson St go 1.5 mi About 3 mins total 2.0 mi 4. Continue straight onto S Saunders St go 0.6 mi total 2.6 mi 5. Turn right to merge onto 1-40 W toward Into N ' go 4.9 mi About 6 mins total 7.5 mi 6. Take exit 293 for 1-40IUS-64 WIUS-1 toward Raleigh/Sanford/Wake Forest go 0.2 mi total 7.7 mi 7. Keep left at the fork to continue toward US-1 SIUS-64 W go 0.3 mi total &0 mi 8. Take exit 293A for US-1 SIUS-64 W toward Sanford/Asheboro go 0.3 mi total 8.3 mi 9. Keep left at the fork to continue toward US-1 SIUS-64 W go 0.3 mi total 8.6 mi % Keep left at the fork, follow signs for US-1 SIUS-64 WlApexlSanfordlAsheboro and merge onto US-1 SIUS-64 W go 3.2 mi About 3 mins total 11.8 mi 11. Take exit 98B to merge onto US-64 W toward Pittsboro/Asheboro go 37.8 mi 64 About 41 mins total 49.6 mi 12. Turn right to merge onto US-421 N go 26.0 mi �21 , About 27 mins total 75.6 mi 13. Merge onto 1-85 S via the ramp to Winston - SalemlCharlotte go 119 mi • About 2 hours 2 mins total 194 mi 14. Take exit 8 for N Carolina 161 toward Kings Mountain go 0.3 mi total 195 mi 15. Turn right onto N Carolina 161 NlYork Rd go 335 ft lc� 4 total 195 mi 16. Take the 1 st left go 69 ft About 1 min total 195 mi 17. Turn left onto Holiday Inn Dr go 194 ft Destination will be on the right total 195 mi 110 Holiday Inn Dr, Kings Mountain, NC 28086 i These directions are for planning purposes only. You may find that construction projects, traffic, weather, or other events may cause conditions to differ from the map results, and you should plan your route accordingly. You must obey all signs or notices regarding your route. Map data 02011 Google Directions weren't right? Please find your route on meps.gDogle.com and cJick"Report eproblem" at the bottom left 9 TABLES Table 1: Runoff Volume Calculations for a 10-yr, 24-hr Storm Event TSS, SS and pH Calculations for the Washwater Effluent TABLE I CONCRETE SUPPLY LCINCS MOUNTAIN - NORTH CAROLiL�I9 Size of a Concrete Recycling System for Process Washwated Stbrmwater for a Ready Mix Concrete Plant e for a 10yr, 24hr Runoff Volume = Use SCS Peak Discharge linage Area = 0.63 alas or 27,443 sq ft. vation e: 4 ft (Obtained from the site topo map) Igth = 27711 (Obtained from the site topo map) 3 min (8.03a) Ipe a 1.4% 85 (8.03b) Infall = 4.9 inche3 (Ref Fig 8,03j) 10yr-24hr stone event Infall Intensity (Average Asheville and Charlotte) = 8.25 infir (8.03f and 8.03g) noff Depth - 3.37 inches (Table 8,03c) Runoff Volume = Drainage Area x Runoff Depth 7,707 au ft. sign Recycle pits to hold = 7,707 cu it CIA %. = 3.15 Peak rate of runoff in cubic feet per second (cfs) C = 0.8 Runoff Coefficient 0,3 - 10 Yr, 24hr Discharge = Average intensity of Rainfall in inchea/hr for a storm duration- i = 6.25 fire of concentration (in/hr) A = 0.63 Drainage area (acres) e for V*ir for 010 = 3.0 L H 32 0, 3.15 L = 2.5 Length of the weir (ft) H = 1 Height of the weir (ft) y flow 3.15 < 3.75 crs Calculated discharge from the weir ngth of the weir - 2.5 ft mber of Pita 3 pactty of pits Pits 1 and 2 Each (flat Area Volume) L a 30 ft W = 14 ft AREA/Ptt a 2,940 cubic feet. D= 7 ft or 5880 cubic feet. (Two pits) Pits 1 and 2 Each (Slope Area Volume) L = 30 ft W = 14 ft AREA/pit = 1,470 cubic feet. D = 7 ft or 2940 cubic feet. (Two pits Pits 3 (FI Arent nAreat Volume) - — —i a_- —60—ft - W or 14 ft AREAIptt = 8,400 cubic feet. D p-10--ft or 8,400 cubic feet. (One pit) Pits 3 (Slope Area Volume) L a 0 ft W = 0 ft AREAfpit = 0 D = 0 ft 0 cubic feet. (One pit) Total Pit Volume (CFT) _ / 8,40 cubic le!) > 7,767 cubic feet or { 62,832 gab // > 57,647 b kTER BALANCE ANALYSIS R-M. # of batches per day 25 40 batches Md. Mrs .25 barrshn Water per cubic yard 25 gals srannw Mna.4e batches gals of water per batch (10 yards per batch) 250 The Akelemod of imi a l" 24hr alarm avant in hwmrn.r Ia Gals of water recycled in the plant 6,250 10,000 V.ow Msn In M. whtr and Vw+bro. Air W aaWWW In 6.3 drp gals ;. a reafonabla aftm W. # of days the water reused in the plant are = 10.1 6.3 days AVG 0 of Days water recycled In the plant = 8.2 days Chalam Fakals, PE CP Enonewing Td: 704-541-4042 CKES Pralad No. 1129-M i .. 1. r .. ., e • — � s, :3 . -�� Jl1, TABLE I CONCRETE SUPPLY KINGS MOUNTAIN - NORTH CAROLINA 1) ESTIMATE PARTICLE SETTLING VELOCITY CALCULATIONS -'PROCEDURE FOWALL PARTICLES ANALYZED rticle Settiling Velocity = V Variables Units Particles are spherical 9 (P. - P,,w Vp = Particle sestbliing velocity fUsec Hydration of cement has no impact on the settling Pa 18 N g = Acceleration due to gravity ftfsec? Laminar flow d = Average diameter of cement particle ft Reynolds Numbner a0.3 N = Density of cement IbhY Discrete Settling- no agglomerationlflocculation pw = Density of water IbIW p = Viscosity of Water Ibtft.sec mPie calculation of a Particle settling veloclty 0 = 32 fVsecF d = 15 micron 1 micron = 3.28084E-06 ft Po = 200 Ibtfe Pw = 62 Ible N= 5.981E-04lbtft.sec VP = 0.000996737 fUsec Chatam Pakala. PE CP Engineering Tel; 704541-4042 CPEES Project Na. 11294)02 -- �� �� -.� - �-, � .. � _V f — .i _ _ �� ��� �; �� - - ; ; ..� ` �. I —, � ' .i , _ ' � « } _ �� �J � s, �! ) � I 1 . - � 1 r , � �� i 7 � ...� � - � ' 1 Fir r - � .� _ c -,. _ � . `; � � � �" s —. i '� 1 �� , «, 'a '3 ,. ,, t 5 V 1 4 TABLE l CONCRETE SUPPLY KINGS MOUNTAIN - NORTH CAROLINA 2) NON -RAIN AMOUNTS CALCULATIONS. TOTAL FLOW FROM THE SITE NO -RAIN SITUATIONS fiber of trucks used at the plant (10 to 12) lies produced at the Plant = work day = luction per batch = luction capacity of the Plant = 12 . (worst case) 40 batches 1per day (Summer) Winter would be lesser 10 hrs 10 cy/batch ( range is 8 to 12 cy/batch) 400 cy/day pated Truck Wash Arrangements vial cleaning 10 galfbatch (No sediment) water used for all the batches/day = 400 galstday (No sediment) I cleaning 10 galAUuck (1 wash end of the day) water used for all the trucks/day = 120 gals/day cleaning 200 gal/truck (1 wash end of the day) water used for all the drums/day = 2400 galstday water used for washing purposes/day = 2920 gals 1 gal = 0.133681 ft3 or 7.30 gal/cy or 390.3ti ft3 Irmination of Q for non -rain production (Q,) crate production ratelday = hwater production/day = work day = Flow rate = Chalam Pakala, PE CP Engineerinp Tel: 704-541 4042 CPEES Project No. 1129-002 400 cy/day 390.35 ft3 10 hrs 1 hr = 3600 sec 0,010843 cfs 0 err 1 ,.�;¢1• _'Ar'tt L r d TABLE CONCRETE SUPPLY KING,(MOUNTAIN - NORTH CAROLINA 3) DETERMINATION OF DETENTION TIME AND CRITICAL SEnt] NO VELOCITY, IN THE PITS Sin for a 10 yr, 21-hr Runoff Volume Use SCS Peak Dhchimge Drainage Ara& r 0.63acea or 27,443 sgft. Rainfall Intensity (Average Asheville and Charfolta) 6.25 )nMr (Sr" and 8.03g) Runoff Depth r 3,37 indaes (TBble 8.03c) RunvR Volume Drainage Area x Runoff Depth 7,707 cu ft. Design for pits to hold n 7.707 cu ft. 010 -10 Yr, 244w Discharge CIA 010r 3.15 Peak rate of runoff in cutAc feet per seoonc! (cfs) or 11340 dtlhr C = 0.8 Runoff Coefficient Average intensity of Rainfall in Inchea8ufor a storm duration -time of I = 6.25 concentration A - 0.63 ' Drainagearse DaferminaUon of O for non -rain production (Onr) Concrete production ratefday r 400 cylday Washwater productfonfday r 300.34852 ft3 Avg work day r 10 hre Avg Flow rate r 0A10W ds 0 peak Combined (ds) 3.151 (115ds + 0.011cta) (Stamm event+ non rain water or process water) Size for Weir for Q,o = Ow L H' 3.0 L H Broad Crested Vfir Coefficient (Cw) = 3.0 Q10= 3A61 L = 2.5 Length of the weir (ft) H = 1 Height of the weir (ft) Qn, flow 3.161 < 3.75 Gs Calculated discharge from tlta weir Number of Pea 3 Plug Saw Assumption In the basin. Therefore, Oki • Qout NOTE In udew mn dWth Pea no rent. The erhn era A* plaits a rd. 1n wdmV. Critical Velocity (Va) in (Slsec) r 010 (ds)rSurfaos Area of the Bastn (III) Dalenaon time 4sec) - Voume of the basin (ftSYQ1((ds) n drr- MAW a.a W'• Lrk* fWtydbdrp• Pert - z5 a pa drr- GM 1U x 14ft fM. 7R f01 L• eoa LML- 573a &.4n A--SM-7 S1 Mw 1rgl .141 W. 140, W. Won, (WLg6.charq Point - 250 p aYn- GM 5.). 1411(YM. 7a(0) L. 602 L-WL • 5751 eu4w Arm- SM.25ft r.* lrWW. Id W- 14A ~ Lrgth IY4Libkhrea pant- OR pr er- not Rl x 1 at(s.t x A Q) L- e0a L-WL- oa 6Yrk-Ana•1MR■1rR W. iaa C1akn PW.6. PE cr r qk--q T.Y. 704 414042 CPEEa Rep W 113MM e �, ._ } _ �. 1 � _ - _ . _ .__ - - � . a a �_ i s ti �� � - :. �. r 1 ' � - •f � .. V ; - I ,l � � ' - 1 y ! .� 1 f t� - ... �� � .. .l � � �. i •. • � 4 Y. �' � � 1 _ r- � 1 �- � 1 � i i 4 TABLE CONCRETE SUPPLY KINGS MOUNTAIN - NORTH CAROLINA 4) DETMMINATION OF CRITICAL SETMINO VELOCITY IN THE PITS. r Orrin SI37strldrt7m d Paraed e.11a.1t w Pardele 8H2W6 V-bCMv (Vp) (1Yem) Cd1cal BsUft v lolly (Vcr) (fV9eci %r. Capalred W f d raw 1N7vod fie. - MefractimTo a the nad bosin errr'o Dlsmeta. (mlemns) Sim Diablbution y' Mass Fraction Common for a -a" Vp> Vcr Cd 1 Cd 2 Cd 3 Cd 4 Col 5 Cd a Cd 7 Col a Cd 9 Cd 4 x Cde Cd 10 (Cd 4-W9 rail 1 4.7% 4.7% 0.190 326064E-00 4.430E-00 3.927E-03 0.001 0,0002 0.1590 Yes 1.5 2-0% 7,3% 0,155 4.92126E-0B 0907E-0B 3.927E-03 0.003 0.0004 OAW Yes 2 4.9% 12.1% 0.140 0.56160E-06 1.772E-OS 3.927E-03 0.00S 0.0005 0.13" Yee 3 $-0% 17,7% 0,125 9.87252E-06 3.967E-OS 3-927E-03 O.OtO 0,0013 0-1237 Ys 4 4.0% 22.3% OJOO 1.31234E-05 7.066E-06 3.927E-03 0.018 0.0016 0.09a2 Yes 6 7,6% 29.9% 0-080 1.98650E-0S 1.595E-04 3.927E-03 0.041 0.DO24 0.0570 Yea a 6,0% 35.9% 0.055 2.02467E-0S 2.535E-04 3.927E-03 0072 0-0040 00510 Yes 12 10.5% 46.4% 0.050 3.93701E-05 9.379E-04 3.927E-03 0.162 0.0061 0.D419 Yea 16 82% 5411% Ono 524034E-05 1.134E-03 3927E-03 0.289 0.0116 24 13.8% 8.4% D.0 7,67402E-O 2.552E-03 0.650 OA162 32 tO.3% 78.7% D.635 7.D4957E-04 4.53E-03 3.927E-03 >7 0.0350 48 t2.4% 91.1% D920 1.5740E04 1.021E-02 3927E433 >7 0.02DO 64 5.2% 0.3% 0.018 2.D9974E-04 t.BISE-02 3.927E-03 n1 0.0175 mp. 98 2.8% 99.1% D.015 314961E-04 4.06E-02 3927E-0 s1 O91so 120 Oa% 09.5% 0.002 4.19NBE-04 7.25E-02 3.927E-03 r1 0.0020 -128 0.5% 100.0% OA00 06 1.000 0 orr a2 OreW BGa 174trihutlo.l d Fettlard Cert�11 Dim pow ONO Par&-" S'U'hV Vslocft (VPI Imesc) Cddcd 8etdit V�aY � On-) 1lra Capalnd in am ratio (VpNc+) Mass Foc6.. Remevad 81aas Fraction Rrlri7sd To the next haa. (YMI Diameter (microns) Stse Distribution Mass Fraction CdW1ao./M smaw Cd 1 Cd 2 Cd 3 C:u 4 Cd 5 Cd a Cd 7 Cd a Cd a (Cd4%Cd8) Cd 10 (Cd4-Cola)) Col 11 t 4.7% 4.1% 0.150 3.20004E-09 4.430E-0B 2.871E-03 0,002 0.0003 0.1506 Yes 1.5 2.6% 7.3% 0.155 492128E-06 9,967E-0a 2641E-03 0,004 O9o06 0.1540 Yee 2 4.8% 12.1% 0.139 0,56100E-0a 1.172E-05 2.641E-03 COW 0.0009 0.1354 Yee 3 5.6% mm 0.124 9,84252E-0a 3.987E-0S 2641E-03 0,015 0.7f019 0.1219 Yea 4 4.0% 22•3% 0.0W 1.31234E-05 7.0710E-05 2.841E-03 0,027 0.0029 0.0956 Yes 0 7.4% 29.9% 0.058 1.88650E-05 1.305E-04 2541E-03 0460 0.0035 0.0641 Yd a 6.0% 35.9% 0.051 2.62467E-0S 2.035E-0M 2.811E-03 0.1D7 0.0055 0.0455 Yes 12 10.5% 46.4% 0.042 3,93701E-05 7E-0 2847E-03 042 0012548% oe . 0020 4a 1E A2 .072 00.0031012a YYa0 2la4 12% 7.97402E-05 2.552E-M 2.611E-03 O.DB6 0.0085 0.0003 Yea 0.863 1 D.048 0.017 Or.W Kira Oiaaidribn d PodWM Cant 710 Parade BwMhtg Vebcity fYPI {Meec) Cd&A 5&MhV YelOcaY lYut OYBae) Kra C%ftmd W that raao nPfVcr) = fraction Rdlnvrd Ilea FIMCWP Ro ace To the naat bosh)) CYIN) Dlan7eter (microns) Sim Dlttdbution %< Mass Fraction ce11me1a11or a� wI Cd2 Cd2 Cd4 Cols Cab Ca Cda we Cd4XCole W10 Cd4•Ce19 Cd 11 1 4.7% 43% 0.1596 328084E-09 4AME-09 1.552E-03 0.003 0,0005 0,1591 Ym 13 2A% 7316 O.lUO 1 4.92126E-08 0,967E-06 1.552E 0006 0-0010 0,1530 Ya 2 4.5% 12.1% 0.1381 6,56188E-08 1,772E-05 1.552E-07 Dail O.OM 0.1380 Yes 3 56% 17.T% 0.1219 9,61252E-08 3.9717E-05 1.552E-03 0.ON D.DMI D.1167 Yea 4 4.6% 22.3% 0.0956 1.31234E-05 7,086E-0S 1-552E-03 0,046 0.D044 0.D912 Va 6 7.6% 29.9% 0.0541 1.90850E-05 1.595E-04 1.552E-03 D303 0.0056 D.D455 Yea a 0.0% 352% 0.0455 2,62187E-05 2-835E-04 1.552E-03 0183 0.9003 Oa372 Yw 12 10.5% 48.4% 0.0318 3,93701E-05 8,379E-04 I_552E-03 0A11 D.D731 0D18T Yea 19 82% 54.6% 00102 524934E-0S 1.134E-03 1.552E-03 9.731 001t9 0.0044 Yas 24 13.8% d0.4% 0.0003 7 e7an! 9 x57FJ�M1 1.552E-03 a1 n nevrM1 n nevn u., Vile aUN-O.)dr lop 9 * 32 8lm-' d- Cd56 0.* 62 We p - 5.01 E-04 EiKsee 1 n17cd1- 3.26064E-00 a %f r a QIA Q. 0 amlibhed Mom A+ Sufap Nu 82 (LxW) COW- PaW .. PE CPS T.r 70445414042 CPEES A°Id r 11W= �,. �, ,. t ._.� t ��.� � -. - .� ,.. ,,., -- ,. _ _ - ,. � � -' 4 l � � # - � _ � L ' F ' � • � 1 •1 - ' � � r I ._ _. � � P ! r . i �. - - �� � �,V ...I•� , i �. - . � � ' �-� �� _ 'r _ _. . _ � � � _► � .. �s - _. � � .,.. .�� .. � �. i a � S �� i, � _ - - _ .. •- _ .. � � f ' ti � � � f5' �t Q + � TABLE I CONCRETE SUPPLY KINGS MOUNTAIN - NORTH CAROLINA TSS CALCULATIONS # of trucks at the site a 12 Avg. capacity of a single concrete truck (batch of concrete) = 10 (cubic yards - cyd) # of batches lday 40 batches Total capacity of the plant = 400 cyd Wash of concrete on the drum for each batch Oust a dust on the drum) 0.001 cyd Concrete left In the drum per truck at the end of the day a 0A 0 cyd Concrete left In the chute per truck at the end of the day = 0.02 cyd Wash of concrete on the drumlday = 0.04 cyd (40 batches x 0.001cylbetch) Concrete wash from all trucks at the and of the day = 1.20 cyd (12 trucks x 0.Icyttruck) Concrete wash from all trucks chutes at the end of the day a 014 cyd (12 trucks x 0.02 cyt ruck) Total Concrete washediday = 1.48 cyd Weight of concrete per CYD = 465 Ibslcyd Mass on concrete contained In the washwater Sul HIS Wt of cement In the CYD of concrete = 11.63% % PIT 03 Particles left In the pit (microns) 1 through 24 microns Mass fraction leaving Pit 03 0.768 wdwt % of particles screend from Pit 41 to Pit #2 is 50% and Pit 82 to Pit #3 Is 50% 0.192 WVWt Assumptlon:Due to hydration, particle Mass of suspended cement In the washwater = 15.3e1 Ibs shape and density effects, we guess estimate a 50% reduction from each Ph Volume of water below the weir In Pit #3 A 62,832 gal going into the other pit Anticipated effluent TSS concentration In Pit #3 a 0.0W2 lb/gal Anticipated effluent TSS concentration in Pit #3 = 29.30 mgfL Maximum Allowable TSS by NC DENR = 30 mg1L Note; 1 mg1L = 8.3454E-06 IWgal SETTLEABLE SOLIDS (SSI CALCULATIONS These solids will settle to the bottom of the coneshaped container In a 60 min period Theoritleal Settling times for Particles to settle 6" and 1"for Settleable Solids Test Size of particles (microns) Settling Velocity (fusee) 8" Settling Time (hours) 1" Seating Time (hours) 1 4.430E-06 31.352 6-225 1.5 9.967E-06 13.934 2.322 2 1.772E-05 T&M 1.306 3 3.987E-05 3.484 0.581 4 7.088E-05 1.960 0.327 6 1.695E-04 0.871 0.145 8 2.83SE-04 0.490 0.082 Note: Settleable solids will be removed from Basin #1, #2 and #3 and therfore, no settleable solids would be present in the effluent discharge from the pits = 0 mglL Chalam Pak" PE CP Engineering Tel: 704-5414042 CPEES Pmjeet No. 11294)02 �ly TABLE I CONCRETE SUPPLY KINGS MOUNTAIN - NORTH CAROLINA 5)'DETERMINATION OF THEORETICAL CONCENTRATION OF PH IN THE EFFLUENT FOR THE DESIGN STORM nH MASS BALANCE CALCULATIONS Anticipated Truck Wash Arrangements Batches produced at the Plant = 40 batches /per day (Summer) Winter would be lesser Number of trucks used at the plant (10 to 12) 12 (worst case) Surfacial cleaning 10 gallbatch (No sediment) Total water used for all the batches/day = 400 galslday (No sediment) Chute cleaning 10 gal/truck (1 wash end of the day) Total water used for all the trucks/day = 120 gals/day Drum cleaning 200 galltruck (1 wash end of the day) Total water used for all the drums/day = 2400 galsiday Total water used for washing purposestday = 2920 gals 1 gal = 0.133681 ft3 Assume Pit #1 and Pit 02 were full of washwatsr before the rain = 8820 Cft or 65974 gals PH of Wastlweter o 14 units pH - -bg [HI or [HI - 10"-pH unit # Molarity of H- concentration or 1.0000E-14 10yr-24hr Volume of flow - 7707 cft 1 ctt - 7.480 gals 10yr-24hr Volume of flow a or 57648 gals PH of Rain Water - 5 units Molarity of H- concentration or 1.0000E-05 Mass Balance of pH at the end of rain event = Wol of Pita #1 & 02 x Molarlty of FM In Washwater+ 10vr-24hr storm volume x Molarity of rM In the rain wateri (Volume of Pit #1 and 02 Washwater + Volume of 10yr-24 hr Rain) Molartty of [H] of the effluent = PH of the effluent = 4.8833E-06 5.3313 unite Nate: pH of washwater would be neutralized based on the rain pH. Some rain events could have a pH of 3 or 4 units and further. the discharge from Pit #3 would go to another detention pond (using 10yr-24 hr storm event) oonsbixied at the site for the Erosion & Sediment Control Plan. Also, the water from the E&S Basin will travel several hundreds of yards on the ground as a sheet now before d reaches industrial ponds located on the site before going into the waters of US. Therefore, no pH adjustment is needed for this site. Chalam Pakale, PE CP Enl$neenrg Tat: 704-Ul-4042 CPEES Project No. 1129-002 . ..�,4 i +4•. _. � al _r �� I'<i '" �r.. d . � �. � . r ..�5', i . � rf � .F �Y it ... I•" � CF � .lirF 'L r• 1' .� .F �.)F I TABLE CONCRETE SUPPLY I IN Size of a Ccncrata Recycling System for Process Washwatod Storrinwater for a Ready Mix Concrete Plant e for a 10yr, 24-hr Runoff Volume Linage Area = vation = Igth a a ,na a In Intensity (Average Asheville and Charlotte) a Depth a Runoff Volume a Racycle pits to hold a Q10 -10 Yr, 24-hr Discharge = for Weir for Q 10 = flaw Use SCS Peak Discharge 0.63 acres or 27,443 sq ft. 4 ft (Obtained from the site topo map) 277 ft (Obtained from the site topo map) 3 min (8.03a) 1.4% 85 (8.03b) 4.9 inches (Ref Fig 8.03j) 10yr-24hr storm event 6.25 hvhr (8,03f and 8.03g) 3.37 inches (Table 8.03c) Drainage Area x Runoff Depth 7,707 Cu ft. 7,707 cu ft. CIA 01e a 3.15 Peak rate of runoff in cubic feet per second (cfs) C = 0.8 Runoff Coefficient Average intensity of Rainfall in incheslhr for a storm duration- i = 6.25 time of concentration (inthr) A = 0.63 Drainage area (acres) 3.0 L H 3rz Q2s = 3.15 L = 2.5 Length of the weir (ft) H = 1 Height of the weir (ft) 3.15 < 3.75 ds Calculated discharge from the weir Length of the weir 2.5 ft Number of Pita 3 Capacity of pits Pita 1 and 2 Each (Flat Area Volume) L a 30 ft W a 14 ft AREAIptt = 2,940 cubic feat. Da 7 ft or 5880 cubic feet. (Two pits) Pits 1 and 2 Each (Slope Area Volume) L a 30 ft W = 14 ft AREAIpit a 1,470 cubic feet. Da 7 ft or 2940 cubic feet. (Two pits) Pits 3 (Flat Area Volume) L = 60 ft W a 14 ft AREJUpit = 8,400 cubic foot. D a 10 ft or 8,400 cubic feet. (One pit) Pita 3 (Slope Area Volume) L = 0 ft W = 0 ft AREAIpft - 0 00 0 ft 0 cubic feet. (One pit) Total Pit Volume (CFT) = 8,400 cubic feet > 7,707 cubic feet or 62,832 gale > 67,647 gals WATER BALANCE ANALYSIS R-9. # of batches per day 25 40 batches Y*r, daa .2s bawds Water per cubic yard 25 gals summer bme .40 batdras gals of water per batch (10 yards per batch) 250 The o►.lyh—dofh.Wq.IO,,24h,,ham.,, 1inwm,,,e<a Gals of water recycled in the plant 6,250 10,000 gals prMW 9raf In da Mlnfer and lherehwe, Fit RT empbtq In 45.3 days a. renaneble e.tlmrt.. # of days the water reused in the plant are = 10.1 6.3 days AVG 0 ofDays s water recy sled In the plant a 8.2 days Ch.Iam Pakahs, PE CP EnglneerN Tel; 704- 41-4042 WEE9 Rejed No. 1 f 29-M2 TABLE I CONCRETE SUPPLY KINGS MOUNTAIN - NORTH CAROLINA 1) ESTIMATE PARTICLE SETTLING VELOCITY CALCULATIONS - PROCEDURE FOR ALL PARTICLES ANALYZED rticle Settiling Velocity = V Assumotions: VariatAe Units Particles are spherical 9 {p. - pw)d' Vp = Particle sesttiling velocity ft/sec Hydration of cement has no impact on the settling Vp m lop g = Acoelaration due to gravity ftlsec' Laminar flow d = Average diameter of cement particle ft Reynolds Numbner <0.3 p, = Density of cement lb& Discrete Settling- no agglomerationiflocculation p„ = Density of water Ulf u = Viscosity of Water Iblit.sec mpte calculation of a particle nettling veloclri g = 32 fusee d = 15 micron 1 micron = 3.28084E-06 ft P = 200 lb/ft' Pw = 62 IbW p= 5.981E-04lblft.sec VP = 0.000996737 IUSeC Chalam PaMIS, PE CP Engineering Tel: 704541-4042 CPEES Proied No. 11204)02 E3 TABLE I CONCRETE SUPPLY KINGS MOUNTAIN - NORTH CAROLINA " 2) NON -RAIN AMOUNTS CALCULATIONS TOTAL FLOW FROM THE SITE NO -RAIN SITUATIONS Number of trucks used at the plant (10 to 12) 12 (worst case) Batches produced at the Plant = 40 batches /per day (Summer) Winter would be lesser Avg work day = 10 hrs Production per batch = 10 cylbatch ( range is 8 to 12 cy/batch) Production capacity of the Plant = 400 cy/day Anticipated Truck Wash Arrangements Surfaaal Cleaning 10 gallbatch (No sediment) Total water used for all the batches/day = 400 galslday (No sediment) Chute cleaning 10 galit uck (1 wash end of the day) Total water used for all the trucks/day = 120 gais/day Drum Leaning 200 gaVtruck (1 wash end of the day) Total water used for all the drums/day = 2400 gals/day 1 water used for washing purposesiday = or or irmination of 0 for non -rain production (Q,) Crete production rate/day = hwater productionlday = work day = Flow rate = Chalam Pakals, PE CP Engineering Tel:704-541-4042 CPEES Pn*O No. 1129-002 2920 gals 7.30 gaVcy 390.3b ft3 400 cy/day 390.35 V 10 hrs 0,010843 cfs 1 gal = 0.133681 43 1 hr = 3600 sec r- -. r _ .. y ` a rr - r. _� � r• q � _ � ep �. c. ��. ' � � i I+ �<, • _ r �� � ... �r + N .. _ � :7 a .. �� .. l � � , F' + _ :l .w _ � r • �� � � ,7 �� -_ - �" - � � '. 1 .w T _ ;. s n � L , yr. .. � i � J _ � _ � � J � - _ 4 i TABLE I CONCRETESUPPLY KINGS HQ!j=iN - NORTH CAROLINA 3) OETERMINATION OF DETENTION 71111E AND CRITICAL SETTLING VELOCITY IN THE PITS � L Size for a 10 yr, 2"r Runoff Volume - Use SCS Peak Discharge Drainage Area - 0.63 acres or 27,413 sq f . Rainfall hKens" (Average Asheville and Charlotte) = 6.25 Wbr (8 031 and 8.03g) Runoff Depth - 3.37 Inches (Table 8.03c) Runoff Volume = Drainage Area x Runoff Depth 7,707 Du ft. Design for pKs to told - 7,707 cu fl. 010 - 10 Yr, 24-hr Discharge = CIA 010 - 3.19 Peak rate of runoff in cubic feet per second (crs) or 11340 dtmr C = 0,8 Ruwff Coarmoant. Average Intensity of RainfaA in indlesfhr for a storm duration -time of i = 6.25 concentration A = 0.63 Drainage area Determination of Q for non -min production (Oar) Concrete production ratdday - 400 cy/day Wastr~productionfday- 390.34852 ff3 Avg work day - 10 hire Avg Flow we - 0.010943 dB Q peak Combined (cfs) - 3.161 (3.15cfs + 0.011 ds) (Stormm event + non rain water or process water) Size for WWI- for Q10 = Ow L H 3" 3.0 L H 2rz Broad Crested VMr Coefficierri (Cw) = 3.0 010 = 3.161 L = 2.5 Length of fhe weir {A) H = 1 Height of the weir (ft) Q,oflow 3.161 < 3.75 ds Calculated discharge from the weir Number or Pits 3 Pt g ftew Assumption In the basin. Therefore, Otn - Gout NOTE: InwfO, . diiplehft-66. Thrw.Rcare Hypisys WlnadrC. Crbmi Velocity (Vat, in (f fsec) - 010 (d3ySurface Area of the Basin 4114 Detention time (see) - Volume of the basin (II3kQ10(ds) 1 d-y- 9E400s Wow L=,pe1 im-xiiduw part • 25 a Pr dim. am IUr l4afW) x71t(0) L- Bea L.WL- 57Sa Buhp Ar-- m4.2.6f1(.* hnplh)• 142 W- 142 W W Lrbm ramp. Pi. - 25 R pa dwn- am(y■ 14a CM- A(0) L- to L.V& msh Swb. A--80a.2.91f-4Ir Woh)w 142 W. 14a ~ Lwath NYL.".0-P Pnht - D a p4 am- aMW 141t iWl:7aCO) L• so L-VA - so a S.rb k- - Wh 142 W • 14 f1 Chico P h h. PE CP e* -,iv Y-L 704d414042 OPEESP,q N. 112MM f . F- ;� .• , .� r+ �� � � L i �� -_ � r �. _ . � " S FF .` �- E _ � ' .' � e .. , - � � 1 _ �. - - � -'- � _.. __.__._.w.__... _- --__.� � _.�� .�_' _ ._a ___ _ -.-.�- - -'---�-- ��. TABLE I CONCRETE SUPPLY KINGS MOUNTAIN • NORTN CAROLINA 4j DETERMINATION OF CRITICAL SETTLING VELOCITY IN THE PITS O!T N Qrai'1 Bba D4b'16utkn d Padwrd Crtanrt UWr. 0 ParUck 6eefYlq %N cft 0" OV-) Cd§cM S*UMV Wtocb 117cr1 twowl %r- Cspalred„ OW rob Np+ Wsa F Ra11neW a"d R Ft ilen rnaYrad To the ned basks (YOY) DitmeteY (micnxw) Shs Distribution %< as FractIOn Codibon for "Cov Cd 1 Cd 2 Cd 3 Cal 4 Cd 5 Cd 9 Cd 7 Cd a Co10 Cd4x Cde Cd 10 Cd4-WO Cull 1 4.7% 4.7% 0.160 328084E-08 4.430E-08 3.927E-03 O.00t D.00D2 0.1596 Yes 1.6 2.6% 7.3% 0.155 4,92126E-08 9-987E-06 3.927E-03 0.003 000D4 0.1 S46 Yes 2 4.8% 12.1% 0.140 6.58156E-05 1.772E-05 3.927E-03 ODDS O.D006 0.1394 Yes 3 56% 17.7% 0.125 9.84252E-06 3.907E-05 3.927E-03 0.010 0.0013 O.t237 Yes 4 4.6% 22.3% OAD0 1.31234E-0S 7.068E-05 3.927E413 0.016 0.0018 D.0952 Yes 6 76% 294% now 198115015445 1,595E-04 3927E-03 0.641 0.0024 O.D576 Yes 6 6.0% 35.9% 0.055 2.62467E-05 2.635E-01 3.927E-03 0.072 Dom 0,0510 Yes 12 t0.5% 464% 0-050 3.93701E-05 8.379E-04 3.927E-03 0.162 0.0081 0,0410 Yea 18 8.2% 54.6% D.04D 524934E-0 1.134E-03 3.927E03 0289 0.0115 0,0264 Yea 24 13.8% 86.4% OA25 7.67402E-03 2.S52E-03 3.927E-03 0650 0.0762 0,0083 Yea 32 10.3% 73.1% D.035 164987E-04 4.536E-03 3927E-03 >t 0,0350 0,0000 No 4a 12.4% 91.1% 0020 1.57486E-04 t021 E02 3927E-03 >I DAM 0,0000 No 64 52% 98.3% D.Ofe 2.011974E04 1.615E-02 3.927E-03 >I D,0115 000OO No 98 18% 99.1% 0.015 3.14981E-04 4.063E-02 3.927E-03 a1 D,0150 0,0000 N0 128 04% 99.5% 0.002 4.19946E-04 7.258E-02 3.927E-03 >1 O.OD20 0.0000 No >728 0.5% 100.0% 0.000 a.0000 0.0000 1.000 0.1361 0.6634 'Off lh OraY7 6ka OtWibadon d f>ortMrd Canlatrt � Paedcla OwMinp Vabctr NO IO+..cI Cdaeal MMIbV VA" Nat Ov I 1Ir- Cap4uad In till ratio NP'wcrl MMs� WR rnffb d To dre'rd Faati (YM) Diallwtar (microns) Size Distribution Mass Fraction CO1aear �` W.vcr CO 1 Ca 2 W 3 Col 4 Cd 5 Cd a Cd 7 Cole Cd 9 {Cd4xrct al in CdCd (Cd4•Cd 9) r t 1 4.7% 4.T% 0.160 326064E-05 4.430E-06 2.641E-03 0.002 0.0003 D.1596 Yes 1.5 28% 7,3% 0.155 4.92126E-06 9.967E-06 2.641E-03 0-004 000D8 0.1540 Yea 2 4.8% 12.1% 0.130 5.56165E-06 1.772E-0S 2.541E-03 0.DD7 0.0009 0.1364 Yes 3 5.6% 17.7% 0,124 9.61252E-06 3.907E-05 2641E-03 0.015 00019 0.1219 Yes 4 4.6% 22.3% 0.095 1.31234E-05 7.086E-05 2.641E-03 0,027 0.0026 0.0966 Yea 6 7.0% 4.91% O.OS6 1.98550E-05 1.595E-04 2.841E-03 0,050 0.0035 0.0541 Yea 5 6.0% 35.9% 0.05t 262467E-d5 2.635E-04 2.641E-03 CAN 0.0055 0.0455 Yaa 12 10.5% 46.4% 0.042 393701E-05 6,379E-04 2641 Ek1 0242 4.0101 0.0315 Yea 16 8.2% 54.6% 0.025 F 524934E-05 1.134E-03 2.541E-03 0429 0.0122 0.. 162 Yes 24 13.8% 66.4% 0909 7.67402E-0S 2.552Ed1 2641E-03 0,ON 0.0069 0.0003 Yee 0.W3 0.046 1,, 0.617 PfT M3 Particle Ssffl t9 CrMlcal 6sWYq xr• Captured In To fhs nnn GraYt Sim OisL141ttlon of ParSnrd Gnrnt Oisrlabr Yaloctly (vp) YdocdY NO e1d retb Mass Fraction Mass Fraction tsar (fast) (M-) ) IV~ Rrrarad RartmhrW (Y110 Diameter Site Mass CorAmm ar (microns) Distribution %'< Fraction p>v4vo Cd 1 Cd 2 CG13 Cd 4 W 5 Cd a W 7 Cd a GO19 Cd 10 Cd 11 Cd4x Cda Cd4-Coll)) 1 4,T% 4.7% 0.1598 32MUE-00 4A3E-0 1.5E,. 22�31591 Yet 1.5 26% 73% OAMO 4.92128E-0 9.9 13 0.00to 0.1530 Yea 2 4,8% 12.1% 0.13M 6.5618aE-W 1.772E-05 1.552E-03 Do"- O.D016 0.13" Yea 3 13.6% 17.7% 0.1219 a a4357C-0a I j aa7F4k5 I 1,552E-03 n A78 a a03t I n t 157 Ves 6 QO% SS.9% 0.0455 2.62467E-0S 2.635E-04 F.552E-03 O.t83 0.D063 0.0372 Yes 12 10.5% 48.4% 0.03t8 3937016415 8.379E-04 1.552E-03 0A11 0,0131 09167 I Yes to 02% S4.5% 0.0162 524DUE-05 1AUE-M 1.552E-03 0731 0.0110 000" Yes 24 13.8% 86.4% 1 0.0003 1074117E-05 1 2657E.d1 1.552E-03 >7 ao0a3 aa00a Nn lop 9 • 32 Naec' a- Col sn Q- 20D"1 P- - 62 wO V• S.M11-041b61.sec 1 micron - 3.26061E-05 5 11er • C1A 0• 0 combined 537sec A - Surface Area 82 axwr Clam Pw, w, PE CP Er ra I'd 134441-40t2 CPEES Rgrd Nn 1129002 TABLE I CONCRETE SUPPLY KINGS MOUNTAIN - NORTH CAROLINA TSS CALCULATIONS * of trucks at the site a 12 Avg. capacity of a single concrete truck (batch of concrete) n 10 (cubic yards - cyd) #ofbatcheslday 40 batches Total capacity of the plant = 400 cyd Wash of concrete on the drum for each batch Oust a dust on the drum) 0.001 cyd Concrete left In the drum per truck at the end of the day = 0.10 cyd Concrete left in the chute per truck at the end of the day = 0.02 cyd Wash of concrete on the drum/day a 0.04 cyd (40 batches x 0.001cylbalch) Concrete wash from all trucks at the end of the day = 1.20 cyd (12 trucks x 0.1cyltruck) Concrete wash from all trucks chutes at the and of the day = 0.24 cyd (12 trucks x 0.02 cyAruck) Total Concrete washedlday = 1.48 cyd Weight of concrete per CYD = 465 Ibalcyd Mass on concrete contained In the washwater 688.2 Ibs Wt of cement In the CYD of concrete = 11.63% % PIT 03 Particles left in the pit (microns) 1 through 24 microns Mass fraction leaving Pk 03 0.768 w0wt % of particles screend from Pit 01 to Pit #2 Is 50% and Pit fit to Pit #3 Is 50% 0.192 w0wt AssumptlonDue to hydration, particle Mass of suspended cement In the waahwater a 15.361 lbs shape and density effects, we guess estimate a 50% reduction from each p# Volume of water below the weir In Pit #3 = 62,832 gal going into the other pit Anticipated effluent TSS concentration in Pit 03 = 0.0002 lb/gal Anticipated effluent TSS concentration in Pit #3 = 29.30 mg7L Maximum Allowable TSS by NC DENR = 30 mg1L Note: 1 mgll_ - 8.3454E-06 lblgal SEMEABLE SOLIDS (SS) CALCULATIONS These solids will settle to the bottom of the coneshaped container In a 60 min period Theoritical Settltna times for Particles to settle 6'.and V for Settles le Solids Test Size of particles (microns) Settling Velocity ifusec) 6" Settling Time (hours) V Settling Time (hours) 1 4.430E-06 31.352 5.225 1.5 9.967E-06 13.934 2.322 2 1.772E-05 7.838 1.306 3 3.987E-06 3•484 0.581 4 7.088E-05 1.960 0.327 6 1.595E-04 0.871 0.145 6 2.835E-04 0.490 0.062 Note: Settleable solids will be removed from Basin 91, 02 and 83 and therfore, no settleable solids would be present in the effluent discharge from the pits = 0 mg1L Chalam Pakala, PE CP Engineering Tel: 704-541-4042 CPEES Project No. 1129-002 t _ n i ILI tc ! i1ccE '! 1 t. r f t.. r st. E h 1 t-"i.74 •saf{1, .,.ti: <L'��. t' ! 1• 1 "� 1 - - 9 TABLE I CONCRETE SUPPLY KINGS MOUNTAIN - NORTH CAROLINA 5) DETERMINATION OF THEORETICAL CONCENTRATION. OF PH IN THE EFFLIIENT,FOR THE DESIGN STORM PH MASS BALANCE CALCULATIONS Anticipated Truck Wash Arrangements Batches produced at the Plant = 40 batches /per day (Summer) Winter would be lesser Number of trucks used at the plant (10 to 12) 12 (worst case) Surfacial cleaning 10 gaubatch (No sediment) Total water used for all the batches/day = 400 galstday (No sediment) Chute cleaning 10 galltruck (1 wash end of the day) Total water used for all the truckstday = 120 gals/day Drum cleaning 200 gal/truck (i wash end of the day) Total water used for all the drums/day = 2400 gaWday Total water used for washing purposeslday = 2920 gals 1 gal = 0.133681 M Assume Pit #1 and Pit #2 were full of washwater before the rein = 8820 Cfl or 65974 gals PH of Washwater = 14 units pH = -log [H) or [1-11 = 101-pH unit # Molarity of H- concenbvbon or 1.0000E-14 10yr-24hr Volume of flow = 7707 Cft 1 dt = 7.480 gals 10yr-24hr Volume of flow = or 578489815 PH of Rain Water a 5 units Molarlty of H- concentration or 1.0000E-05 Mass Balance of PH at the end of rain event a (Vol of Pits fit & 02 x Molarity of IM in Washwaler + 10vr-24 hr storm volume x Molarft of rKI In the rain water) (Volume of Pit tit and #2 Washwater+ Volume of 10yr-24 hr Rain) Molarity of"of the effluent a PH of the effluent e 4.0633E-0B 5.3313 units Notes PH of wasnwater would he neutralized based on the rain pH. Some rain events could Have a pH of 3 or 4 units and further, the discharge from Pk B3 would go to another detention pond (using 1 Dyr-24 hr storm event) constructed at the site for the Erasion & Sediment Control Plan. Also, the water from the E&S basin will travel several hundreds of yards on the ground as a sheet flow before it reaches industrial ponds located on the she before going into the waters of US. Therefore, no pH adjustment Is needed for this ske. Chalam Pakala, PE CP Er9neering Tel: 704-5414042 CPEES Project No. 1129-002 FIGURES Figure is Site Location Map Figure 2: Aerial View of Surrounding Properties around the Kings Mountain Plant Figure 3: Site Layout Map - Proposed Process Washwater 1 Stormwater Recycle System Figure 4: Process Washwater and Stormwater Recycle System Construction Details Map Name: Unknown Map Center: 035° 13' 32.41" N 081 ° 20' 15.23" W Print Date: 08/14/11 Horizontal Datum: NAD27 rc A •T•ss Z O ! )) - 1 f /ram ity' u ails rr mEar o Mn ... IN gyp O _ s • •' \` 25 ° ° 0 + + _ 0 - i 1 a LJ x� lid udtri3l. Pond i- '• �y 1 l •l' ro o n t p1 'tom., © r i•� i 6 o ,++t:- 6 1 /ji 2312 Is a .�) �' .� r •s�� 6 3 r �I :. i o J/ •r4 �o � i i 0 — - Dedination �— Ff � �C " Q/ O CCC GN 6. MN .89" 9° W W n n 1' 0.00" W 081 ° 20' 0.00" W 081 ° 20' 0.00" W 081- 19' 0.00" W 081 ° SCALE 1:24000 0 1000 20DO YARDS SITE LOCATION MAP CONCRETE SUPPLY -KINGS MOUNTAIN PLANT FIGURE 1 JOB NO. 1129-002 iA--•-- -�- •--- _� 1 �.C�""'T •fir ,, I t 1� 1 � i 1• { 1 1 1 1 I 1 I Ii A � I ] . ,. fir_ Y.Y t f• rj ! •. � ".� '. , , _ r b � i � � `•� "lei bV._;Y1� ' ;�•rC � r (� �% `ti ,rr`, � '. i. � +� �!r; *� � � f:oiz4i• 1� J Jt FA ry Vnn r 1� IAnrtln i.li:Jlr.(1U etri 85' + 10S e -Y -• p ` 85 bw C-/'— srA" A LPIAA ll * f Division of Water Quality /Surface Water Protection NC'�DENR National Pollutant Discharge Elimination System NO - .,,I.y.. -- D.- M ENVIR m- ma NRURA RESOURCES NCG 140000 NOTICE OF INTENT FOR AGENCY USE ONLY Date Received Year Month Day Certificate o£Covera ge Cheek # Amount Permit Assigned to National Pollutant Discharge Elimination System application for coverage under General Permit NCG 140000: STORMWATER AND PROCESS WASTEWATER DISCHARGES associated with activities classified as: SIC (Standard Industrial Classification) Code: 3273 and like activities - Ready Mixed Concrete Treatment facilities used to treat or recycle process wastewater that discharge to surface waters require an ATC prior to construction per 15A NCAC 2H .0138. The Authorization to Construct or Operate may be applied for, and subsequently issued at the -same time as the Certificate of Coverage (COC) for the NCG14 permit, Design of treatment facilities must comply with requirements of 15A NCAC 2H .0138 &t .0139. For new plant sites that will discharge process wastewater (even if commingled with stormwater): This NO1 may also be an APPLICATION FOR Authorization to Construct (ATC) wastewater treatment facilities. ATC requests must be submitted at least 90 days prior to construction'. For existin plant sites discharging process wastewater (even if commingled with stormwater): This NOI may also be an APPLICATION FOR Authorization to Operate wastewater treatment facilities. Construction, modification, or installation of any new treatment components at an existing site requires an ATC. If your facility discharges wastewater to surface water, construction or operation of wastewater treatment facilities at new or existing sites requires submission of three (3) sets of plans and specifications, signed and sealed by a Professional Engineer (P.E.) or qualified staff2 along with this application. A copy of the design calculations should be included. Please see questions 10-17 for more details. For questions, please contact the DWQ Regional Office for your area. (See page 6) (Please print or type) 1) Mailing address of ownerloperator (address to which all permit correspondence will be mailed): Owner Name Street Address City Telephone No. CONCRETE SUPPLY CO P.O. BOX 5247 CHARLOTTE 704-372-2930 X 2071 2) Location of facility producing discharge: Facility Name Facility Contact Street Address City County Telephone No. State NC ZIP Code 28299 CONCRETE SUPPLY CO — KINGS MOUNTAIN PLANT Fax: 704-334-8650 MR. JOHNIE ALEXANDER, ENVIRONMENTAL MANAGER 110 HOLIDAY INN DR. KINGS MOUNTAIN_ CLEVELAND State NC ZIP Code 28086 704-372-2930 X 2071 1 704-309-0134 (MARK) Fax: 704-334-8650 r As per 15A NCAC 2H .0106 2 Unless treatment facilities are designed, constructed, and put into operation by employees internal to the company who are qualified to perform such work for their respective companies it, accordance with General Statutes, 89C-25 (7), plans and specifcationi must be signed and sealed by a P.E. Page 1 rf 7 SVV.1-229-0. 122011 WA �� e i Division of Water Quality / Surface Water Protection �� RCDENRNational Pollutant Discharge Elimination System tk— C.w+a — C7c�M OF EW.FK *.LW PO N ll NCG140000 NOTICE OF INTENT FOR AGENCY USE ONLY Fate Received Year Month Da Certificate of Covera e Check # Amount Permit Assipried to National Pollutant Discharge Elimination System application for coverage under General Pen -nit NCG140000: STORMWATER AND PROCESS WASTEWATER DISCHARGES associated with activities classified as: SIC (Standard Industrial Classification) Code: 3273 and like activities - Ready Mixed Concrete Treatment facilities used to treat or recycle process wastewater that discharge to surface waters require an ATC prior to construction per 15A NCAC 2H.0138. The Authorization to Construct or Operate may be applied for, and subsequently issued at the same time as the Certificate of Coverage (COC) for the NCG 14 permit. Design of treatment facilities must comply with requirements of 15A NCAC 2H .0138 & .0139. For new plant sites that will discharge process wastewater (even if commingled with stormwater): This NOI may also be an APPLICATION FOR Authorization to Construct (ATC) wastewater treatment facilities. ATC requests must be submitted at least 90 days prior to construction'. For eKistingr plant sites discharging process wastewater (even if commingled with stormwater): This NOI may also be an APPLICA77ON FOR Authorization to Operate wastewater treatment facilities. Construction, modification, or installation of any new treatment components at an existing site requires an ATC. If your facility discharges wastewater to surface water, construction or operation of wastewater treatment facilities at new or existing sites requires submission of three (3) sets of plans and specifications, signed and sealed by a Professional Engineer (P.E.) or qualified staff along with this application. A copy of the design calculations should be included. Please see questions 10-17 for more details. For questions, please contact the DWQ Regional Office for your area. (See page 6) (Please print or type) 1) Mailing address of ownerloperator (address to which all permit correspondence will be mailed): Owner Name Street Address City Telephone No. CONCRETE SUPPLY, INC P.O. BOX 5247 CHARLOTTE State NC 704-372-2930 X 2071 2) Location of facility producing discharge: Facility Name Facility Contact Street Address City County Telephone No. CONCRETE SUPPLY — KINGS MOUNTAIN PLANT ZIP Code 28299_ Fax: 704-334-8650 MR. JOHNIE ALEXANDER, ENVIRONMENTAL MANAGER 110 HOLIDAY INN DR. KINGS MOUNTAIN_ CLEVELAND 704-372-2930 X 2071 State NC ZIP Code 28086 1704-309-0134 (MARK) Fax: 704-334-8650 t As per 15A NCAC 2H .0106 2 Unless treatment facilities are designed, constructed, and put into operation by employees internal to the company who are qualified to perform such work for their respective companies in accordance with General statutes, 89C-25 (7), plans and specifications must be signed and sealed by a P.E. Page 1 of 7 S WU-22M7122011 NCG140000 N.O.I. 3) Physical location information: Please provide narrative directions to the facility (use street names, state road numbers, and distance and direction from a roadway intersection). SEE ATTACHED DIRECTIONS (A copy of a county map or USGS quad sheet with tacaity clearly located on the map is a required part of this application.) 4) Latitude 35° 13' 33.6" Longitude -810 20' 16.2" (deg, min, sec) 5) This NPDES Permit Application applies to the following (check all that apply): 6) X New or Proposed Facility Date operation is to begin ❑ Existing Facility X Application for ATC Permit # ❑ Application for ATO Consulting Engineer's (or outer qualified design staff's) application information: Consulting Engineer: _CHALAM PAKALA Consulting Firm: _CP ENGINEERING AND ENVIRONMENTAL (Optional) Staple Business Card Here: SOLUTIONS Mailing Address: _10017 ALLYSON PARK DR City: _CHARLOTTE State: _NC Zip Code: _28277 Phone: (704__) 541-4042 Fax: L704_ _541-4043 Email:—cvpakala@carolina.rr.com 7) Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial activity at this facility: SIC Code: 3 2 7 3 8) Provide a brief description of the types of industrial activities and products produced at this facility: (Attach a site diagram showing the process areas present at this facility.) DRY CONCRETE BATCH OPERATIONS. PLANT PRODUCES CONCRETE FOR COMMERCIAL USE Stormwater Discharge, Wastewater Treatment & Discharge and Permffting informadon 9) Discharge points 1 Receiving waters: Number of discharge points (ditches, pipes, channels, etc.) that convey stormwater and/or wastewater from the property: Stormwater-only_ Wastewater -only. Wastewater Commingled with Stom7water _001 What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility stormwater and/or wastewater discharges end up in? INDUSTRIAL PONDS TO KINGS CREEK (FIGURE 1) Receiving water classification(s), if known: CLASS C (SEE ATTACHED WATER QUALITY CLASSIFICATION SHEETS) If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). NIA Will this facility discharge wastewaterto SA (Shellfishing) waters? ❑ Yes X No Note: Discharge of process wastewater to receiving waters classified as WS-II to WS-V or SA must be approved by the N.C. Dept. of Environmental Health. If DEH does not approve, coverage under NCG140000 cannot be granted. No new discharges of process wastewater are permitted in receiving waters classified as WS-I or freshwater ORW. Page 2 of 7 SWU-229.07122011 NCG140000 N.O.I. Wastewater: 10) What types of wastewater does your facility generate or discharge? Type of Authorized Wastewater Generate Discharge Sent to WW Treatment System Vehicle and equipment cleaning E X X X Wetting of raw material stock files RM X X X Mixing drum cleaning (MD) X X X Further explanation, if necessary: A FOUR PIT SYSTEM IS PROPOSED TO RECYCLE THE WASHWATER BACK INTO THE PLANT 11) Will your facility spray -down or actively wet aggregate piles? ❑ No X Yes 12) Does the facility use any of the following on site? ❑ Phosphorus -containing Detergents X Brighteners ❑ Other Cleaning Agents X Non -Phosphorus -containing Detergents ❑ Other: 13) Are wastewater treatment facilities planned in the 100-year flood plain? X No []Yes If yes, include information to demonstrate protection from flooding. (Minimum design requirements for treatment works include protection from the 100-year flood, per 15A NCAC 2H .0219.) 14) Does your facility use or plan to use a recycle system, or recycle components in your treatment system? X Yes ❑ No If yes, what size storm event is the system designed to hold before overflowing? (for example, 10-yr, 24-hr) 10 year, 244hr rainfall event 'Ka 15) Will your facility build a closed400p recycle system that meets design requirements in 15A NCAC 02T .1000 and hold your facilities' worfring volume'? ❑ Yes X No Will your facility discharge wastewater to surface waters? X Yes ❑ No If the facility's treatment system meets the design requirements of 15A NCACO2T .1000 (including holding the 25-year, 24-hour storm plus one foot of freeboard), holds the working volume of your site, and does not discharge wastewater to surface waters, you may not be required to obtain an NPDES permit for wastewater discharges. If you believe this is the case, please contact DWQ's Aquifer Protection Section Land Application Unit Central Office Supervisor or staff (1636 Mail Service Center, Raleigh, NC 27699-1636) for more information on obtaining the necessary permits or approvals. If you will discharge wastewater or stormwater to surface waters, please continue to apply for a permit to discharge associated with ready -mixed concrete or like operations under NCG140000- For further questions, please contact DWQ's Stormwater Permitting Unit Staff. Also see questions 16 and 17. 3 See DWQ's Aquifer Protection Section Land Application Unit's water Balance Calculation Policy for more information, on DWQ LAU's website WpiJ/Portalncdenr.orfflwebAw/apstlau/policies for more information. Page 3 of 7 SWU-22M7122011 NCG140000 N.O.I. 16) A wastewater treatment alternatives review is required by 15A NCAC 2H.0105 (c)(2) for any new or expanding water pollution control facility's discharge in North Carolina. You may attach additional sheets. a) What wastewaters were considered for this alternatives review? X VE X RM X MD b) Connection to a Municipal or Regional Sewer Collection System: i) Are there existing sewer lines within a one -mile radius? ..................................... X Yes ❑ No (1) If Yes, will the wastewater treatment plant (WVVrP) accept the wastewater? .... ❑ Yes X No (a) If No, please attach a letter documenting that the WWTP will not accept the wastewater. (b) If Yes, is it feasible to connect to the WWTP? Why or why not?* c) Closed400p Recycle System (must meet design requirements of 15A NCAC 2T .1000): i) Are you already proposing a dosed -loop recycle system (CLRS)? See question 15... ❑ Yes X No (1) If Yes, contact DWQ's Aquifer Protection Section's Land Application Unit (see question 15) (2) If No, is this option technologically feasible (possible)? Why or why not?*DUE TO SPACE CONSTRAINTS FOR HOLDING 25YR 24 HR STORM EVENT AND TIME CONSTRAINTS (3) If No, is it feasible to build a CLRS on your site? Why or why not?* DUE TO SPACE CONSTRAINTS FOR HOLDING 25YR 24 HR STORM EVENT AND TIME CONSTRAINTS (4) What is the feasibility of building a CLRS compared to direct surface water discharge?* NOT FEASIBLE DUE TO SPACE CONSTRAINTS FOR HOLDING 25YR 24 HR STORM EVENT AND TIME CONSTRAINTS d) Surface or Subsurface Disposal System (e.g., spray irrigation): i) Is a surface or subsurface disposal technologically feasible (possible)? .................... El Yes X No Why or Why not? NOT ENOUGH AREA TO SPRAY ii) Is a surface or subsurface disposal system feasible to implement?* ....... I ......... .......... ❑ Yes X No Why or Why not? TERRAIN NOT CONDUCIVE FOR SPARY IRRIGATION AND ALSO NOT ENOUGH AREA iii) What is the feasibility of employing a subsurface or surface discharge as compared to a direct discharge to surface waters?* TERRAIN IS NOT SUITABLE e) Direct Discharge to Surface Waters: Is discharge to surface waters the most environmentally sound alternative of all reasonably cost-effective options of the wastewaters being considered?*...X Yes ❑ No i) If No, contact DWQ's Land Application Unit to determine permitting requirements (See Question 14). Page 4 of 7 S WU-229-07122011 NCG140000 N.O.I. 1P f) If this review included all wastewater discharge types, would excluding some types (e.g. raw stockpile wetting) make any of the above non -discharge options feasible? .............. ❑ Yes X No ' You may be asked to provide further information to support your answers to these questions after the initial review. Feasibility should take into account initial and recurring costs. noes your plant alscnarge process wastewater to surface waters! A Yes LJ No When applying for this permit, you may also concurrently apply for an Authorization to Construct (ATC) (for new treatment facilities) or Authorization to Operate (ATO) (for existing treatment facilities), or you may apply at a later date. However, an ATC from DWQ's Stormwater Permitting Unit is required to be obtained prior to construction of wastewater treatment facilities that discharge to surface waters. ATCIATO application information is as follows: For new sites, you must submit three (3) sets of design plans and specifications with this application (signed, sealed and stamped by a Professional Engineer (P.E.) or qualified staff) and provide supporting calculations that predict compliance of final discharge with permit limits. A copy of the design calculations should be included. For existing sites, applicants must submit three (3) sets of plans, specs for facilities as-builts (signed, sealed and stamped by a Professional Engineer (P.E.) or qualified stall¢). Provide as many design details as possible. A copy of the design calculations should be included. Applications for ATC or ATOs shall include (Attach separate sheet(s)): • A detailed diagram of treatment systems in place, including design specifics such as: o tank volumes o dimensions o retention time o surface are o working volume o piping o settling basin details o any other pertinent design information. • Water balance equations for treatment systems and holding ponds (inputs, outputs, rates). • Rainwater use in mix (rate and volumes), if applicable. • Calculations to demonstrate compliance with permit effluent limits (pH — 6-9 SU, Total Suspended Solids (TSS) -- 30 mgA, and Settleable Solids (SS) — 5 m1A). Stormwater: 18) Does this facility employ any best management practices for Stormwater control? ❑ No X Yes If yes, please briefly describe: BERMS AND SECONDARY CONTAINMENT DIKES. ALSO ROUTING THE STORMWATER FLOE TOWARDS THE PITS 19) Does this facility have a Stormwater Pollution Prevention Plan? ❑ No X Yes If yes, when was it implemented? SEPTEMBER 2011 4 Unless treatment facilities are designed, constructed, and put into operation by employees internal to the company who are qualified to perform such work for their respective companies in accordance with General Statutes, 89G-25 (7), plans and specifications must be signed and sealed by a P,E. 5 Unless treatment facilities are designed, constructed, and put into operation by employees internal to the company who are qualified to perform such work for their respective companies in accordance with General Statutes, 89G25 (7), plans and specifications must be signed and sealed by a P.E. SWU-229-07122011 Page 5 of 7 NCG140000 N.O.I. 20) Are vehicle maintenance activities (VMA) occurring or planned at this facility? X No ❑ Yes If yes, does your VMA area discharge into your wastewater treatment device? ❑ No ❑ Yes Other/Permittincr: 21) Does this facility have any other NPDES permits? X No ❑ Yes If yes, list the permit numbers for all current NPDES permits for this facility: 22) Does this facility have any Non -Discharge permits (ex: recycle permits)? X No ❑ Yes If yes, list the permit numbers for all current Non -Discharge permits for this facility: 23) Does this facility have a Division of Land Resources Erosion & Sedimentation Control (E&SC) Permit? ❑ No X Yes If yes, list the permit numbers for all current E&SC permits for this facility: 24) Hazardous Waste: a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? X No ❑ Yes b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of hazardous waste? X No ❑ Yes c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of hazardous waste? X No ❑ Yes d) Type(s) of waste: How is material stored: Where is material stored: How many disposal shipments per year: Name of transport 1 disposal vendor_ Vendor address: Final Checklist This application will be returned as incomplete unless all of the following items have been included: X Check for $100 made payable to NCDENR. X This completed application and all supporting documentation (including design details, water balance equations, and calculations for treatment systems) — see Question 17. I V' X If an Erosion & Sedimentation Control (E&SC) Plan is required from Division of Land Resources (DLR) Aor local designee: documentation verifying applicant has developed and submitted that Plan to the governing agency (required per 15A NCAC 02H .0138). X For new sites (or sites that will install new treatment facilities): Three (3) copies of plans and specificationsFaL, for wastewater treatment facilities (including recycle system components), signed and sealed by a Professional Engineer or qualified staff meeting requirements of G.S. 89C-25 (7) — see Question 17. 'VI14A ❑ For existing sites: three (3) copies of plans and specifications for wastewater treatment facilities (including recycle system components) as built, stamped and sealed by a Professional Engineer, or (only if plans not available) a detailed diagram of treatment systems in place that includes information such as tank volumes, dimensions, retention time, piping, settling basin details, etc. — see Question 17. Page 6 of 7 S WU-229-07122011 NCG140000 N.O.I. X A site map showing, at a minimum, (existing or proposed): (a) outline of drainage areas, (b) stormwater/wastewater treatment structures, (c) location of stormwater/wastewater outfalls (corresponding to which drainage areas), (d) runoff conveyance structures, (e) areas where materials are stored, (f) impervious areas, and (g) site property lines. X A county map or USGS quad sheet with location of facility clearly marked. 25) Certification: North Carolina General Statute M-215.6 B(i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material tact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental Management] Commission implementing this ArWe shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). I hereby request coverage under the referenced General Permit. 1 understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: MR. HENRY BATTEN Title: PRESIDENT Applicant) -Z .it (Date Signed) Notice of Intent must be accompanied by a check or money order for $100.00 made payable to: NCDIENR Mail the entire package to: Stormwater Permitting Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 276W1617 Note The submission of this document does not guarantee the issuance of an NPDES permit. Page 7 of 7 SVVU-229-07122011 NCG140000 N.O.I. X A site map showing, at a minimum, (existing or proposed): (a) outline of drainage areas, (b) stormwater/wastewater treatment structures, (c) location of stormwaterlwastewater outfalls (corresponding to which drainage areas), (d) runoff conveyance structures, (e) areas where materials are stored, (9 impervious areas, and (g) site property lines. X A county map or USGS quad sheet with location of facility dearly marked. 25) Certification: North Carolina General Statute 143-215.6 B(i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. i certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: MR. HENRY BA Title: PRESIDENT (Signp ure Applicant) -Z ,it (Date Signed) Notice of Intent must be accompanied by a check or money order for $100.00 made payable to: NCDENR Mail the entire package to: Stormwater Permitting Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-161 7 Note The submission of this document does not guarantee the issuance of an NPOES permit. Page 7 of 7 S WU-229-07122011 S 85053' 15"E 269.59, NC HWY 161 YORK RD NOTES: "-ilt� w V" 1 + ELEV. 695.7 ELEV: 693.01 TV (TOP OF BERM) \ � REVISIONS: Pit MARTIN MARIETTA MATERIALS INC. 1140-1 + ELEV: - 702.64 'anc6 Hi9 her t , \ 1 s � / �0 ~ �i 9 �O OUTFALL - 001 ELEV: 688.46 (TOP OF BERM) G RAVE L SCALE: A :-f 70 .08 30 \ s Truck 4i 1r d S l V ?;3 0 \. 3p10 p„ Uri 1 "-20' INITIALS 4 O m \ \ s G80 3•• 991, �S Sand ELEV: 704.50 Pump to Batch Plant on 2'X2' Concrete Pedestal ELEV: 704.78 Stone round Concrete � PAVEMENT � \ + ELEV: � 703.38 4*00 + G VE 699J3 fi Area to be used for the Pit Design 0.63 Acres DROP INLET GRATE ELEV: 702.43 INV. ELEV: 700.28 h \ fie✓ \ 4) SRO R /• � TY h � ASS � o� �O \ N � LEGEND 'Val�, a c; ����„s�ts uired�yt;rs�t::_ )rtNoithCarolirs+is IRON PIN SET s require t tat the gloirfr.w r system designer during cansttuUticl;ci)t y;conformity with +3 UNMARKED POINT r�iti SpuC C2t dy t 62itCi i4iifh '"? �o Ctrvts ate` � 't -,� ;j + SPOT ELEVATION `��,s,or , _ ® DROP INLET FE VAULT ® PVC STUB OUTLINE OF RIP RAP BERM 19807 £ 11 ELEV.- (TOP � ��-- � ��� ��y ���•`����� � � 692.92 BERM) Tit: CPEES is not responsible for structural design of pit walls, steel reinforcement details and foundations. DRAWING TITLE: SITE LAYOUT MAP - PROPOSED LOCATION OF WASHWATER/STORMWATER RECYCLE SYSTEM DATE PROJECT: CONCRETE SUPPLE' PROJECT NO PREPARED BY: CVP 08/20/ 11 DRAWN BY: CAD 08/20/ 11 CHECKED BY: CVP 08/20/ 11 APPROVED BY: CVP 08/20/ 11 FILE NAME: 110 HOLIDAY INN DRIVE v 1 129-002 KINGS MOUNTAIN,11i.C. REV. NO.: REV. DATE: CHALAM PAKALA ENGIN!!E-ER�NG AND 2 09/29/11 ENVIRONMENTAL SOLUTIONS DRAWING NO.: A Cost -Effective Solution Provider for Manufacturing Industries DRAWING 3 10017 ALLYSON PARK DR. TEL (704) 541-4042 CHARLOTTE, NORTH CAROUNA 28277 FAX (704) 541-4043 1 zo M .T NOTES: 1 Y2" DIA. PIPE HANDRAIL POSTS ANCHORED INTO CONCRETE 8'-0" SECTION A -A NO SCALE SECTION 8-8 NO SCALE 8'-0" #4 0 12" O.C. EACH WAY (TYRO SECTION C-C NO SCALE #4 @ 12" O.C. EACH WAY (TYP) #4 @ 12- O.C. EACH WAY (TYP) 2.5' X 1.0' SUMP PUMP--_ 2' X 2' CONCRETE PEDESTAL *NOTE: CPEES Is not responsible for structural design of pit walls, steel reinforcement details and foundations. REVISIONS: 00 (7' DEEP + 1' FREEBOARD) #4 BARS @ 12" O/C HORIZONT, #5 BARS @ 18' O/C VERTICAL- 12" - 14" REINFORCED CONCRETE WALL (4000 PSI) 6" CONCRETE SLAB 4" NO. 57 WASHED STONE-\ *NOTE: OWNER/CONTRACTOR MAY USE PRECAST CONCRETE BLOCKS FOR WALL CONSTRUCTION, WHICH WILL BE SEALED M TO PROVIDE WATERTIGHT CONDITION WATERPROOF JOINT SEALANT O F- all=ll=lh11=11=11-II".n.-1�= �11=11=llall=11=11 II II=11= 11 11=11=11=II=11=11=11=II=11`- 11.=II=.11=11=11aII: II .:II=11 ��-11=11=11=11=11=11=11:=11= -11- 11=11=11-11=11-I I_I-11=11=11=Ii�11=11= �11=11=II-II-11:=11' 'II=II=11all=II=11=. 11=.II=11=II=.11- 11-1f=11=11=1i�.11=11v '71=11=11=II=11= 11=11=11=11=11=11=❑=11=11=11=' Ot VVHLL OCU I IVIV CONSTRUCTION NOTES: SCALE= NTS #4 BARS (3) 12"')4 EXTERIOR PERIMETER WAL `- GROUND -\ 00 2.5' 4.5' !IOR FOOTING SECTION 1-1 SCALE= NTS 6" CONCRETE SLAB 4" NO. 57 WASHED STONE #4 BARS (4) 1. BOTTOM SLAB TO BE REINFORCED WITH 6" W 10 X 10 WWF. 2. COLD JOINTS IN WALL TO HAVE KEYWAY WITH 18" #4 LAP BAR. 3. SLAB AND INTERIOR WALLS TO BE SEALED WITH CONCRETE WATERPROOFING. 4. CONCRETE FOUNDATIONS AND R'=INFORCEMENT ARE THE RESPONSIBILITY OF THE OWNER(S). ADDITIONAL NOTES: 1. COMPACTION OF SOIL 7-0 95% STD PROCTOR MAX DRY DENSITY. 2. CONCRETE 4,000 P.S.I. COMPRESSIVE STRENGTH @28 DAYS 3. REBAR GRADE 60 4. CONSTRUCTION QUALITY CONTROL TESTING TO INCLUDE SUBGRADE DENSITY TESTING, PROCF ROLLING OF SUBGRADE, SLAB REINFORCEMENT INSPECTION, CONCRETE THICKNESS MEASUREMENT, AND CONCRETE STRENGTH TESTING. 1 ALL TEST RESULTS ANC JUDGEMENT IS THE RESPONCIBILITY OF THE OWNER. 00 (7' DEEP + V FREEBOARD) 5. HAND RAIL DESIGN AND INSTALLATION IS THE RESPONSIBILITY OF THE OWNER. 6. SUMP PUMP, PIPING AND ELECTRICAL WORK FOR SUMP PUMP IS THE RESPONSIBILITY OF THE OWNER. 7. ALL WALLS ARE REINFORCED AND CONCRETE POURED 8. POND LEAK TESTING IS THE RESPONSIBILITY OF THE OWNER. 9. ALL BOUNDARIES OF CONSTRUCTION ACTIVITY/DISTURBED AREAS SHALL BE PROTECTED WITH SILT FENCE AS SHOWN ON SILT FENCE CONSTRUCTION DETAILS. 10. CPEES TAKES NO RESPONSIBILITY FOR STRUCTURAL DESIGN OF PIT WALLS AND FOUNDATIONS. SCALE: NONE (1 O' DEEP + 1' FREEBOARD) ISOMETRIC VIEW NO SCALE NOTE: PIT NO. 3 HAS NO SLOPED AREA. INITIALS I DATE PREPARED BY: CVP 08/20/ 11 DRAWN BY: CAD 08/20/ 11 CHECKED BY: CVP 08/20/ 11 APPROVED BY: CVP 08/20/ 11 FILE NAME: 12 GAUGE 4' X4" OR 2" X4' WELDED WIRE HOOKED NOTES: I TOTAL DRAINAGE AREA FLOWING TO SILT NNTO PREFORMED CHANNELS ON METAL POSTS, OR FASTENED FENCE MAY NOT EXCEED 1 ACRE. TO CEDAR OR WOOD POSTS W/ NO.8 STAPLES. 21 SILT FENCES SHOULD NOT BE USED AT PIPE OUTLETS OR IN AREAS OF CONCENTRATED FLOW (CREEKS, DITCHLINES, SWALES ETC.) ULTAVIOLET RESISTANT (BLACK) MIRIFI FABRIC -OR EQUIVALENT SECURED TO WIRE W/METAL CLIPS OR WIRE AT 8' OFF CENTER. y Q L MAX. SEDIMENT STORAGE LEVEL REMOVE go SEDIMENT WHEN THIS LEVEL IS REACHED OR AS DIPECTED BY CONVERSION INSPECTOR. _ - _ SHEET DRAINAGE (ONLY) S`LT FENGE 1�Zc 3+1z (FH t till` T NATURAL GRADE TO INCREASE STORAGE — CAPACITY AND PROLONG THE LIFE OF THE SILT FENCE, IT IS GENERALLY — ADVISABLE TO DIG A SEDIMENT PIT IN FRONT OF YOUR SILT FENCE WHENEVER POSSIBLE. CARRY APPROX. 1OF FABRIC INTO TRENCH, COVER W/SOIL & TAMP BACKFILL CARRY 0.5' OF WIRE INTO TRENCH. METAL, CEDAR OR 4- X4" TREATED WOOD POSTS AT 10' O.C. MAX. CEDAR & WOOD POSTS SHOULD BE 3' DEEP MIN. p, SEp,MEN SILT FENCE SILT FENCE DETAIL A �e� r. 9 �� Q x + rn`st Documenttl. SCALE= NX3StrUGtlor x ;v ',h these documents is rA tTed by t�3 tul t!w�tr I s )it. North Carolina rulw'rsqui"� S1Eai i1`08 5tu±•",v:;' +astern designer with thy IBC Divisio.) w G tvr tll*e ty �V' r'21 N Up SEAL 19607 •.� � .�1�t V" Q� DRAWING TITLE: PROCESS WASHWATER/STORMWATER RECYCLE SYSTEM CONSTRUCTION DETAILS PROJECT.' CONCRETE SUPPLY 110 HOLIDAY INN DRIVE KINGS MOUNTAIN, N.C. CHALAM PAKALA ENGINEERING AND ENVIRU"NMENTAL SOLUTIONS A Cost -Effective Solution Provider for Manufacturing Industries 10017 ALLYSON PARK DR. TEL (704) 541-4042 CHARLOTTE, NORTH CAROLINfi 28277 FAX (704) 541-4043 PROJECT NO.: 111.29-002 REV. NO.: REV. DATE: 2 09/29/ 11 DRAWING NO.: DRAWING 4 7 Attachment A Runoff Volume and Weir Design Calculations with Backup TABLE 1 CONCRETE SUPPLY KINGS MOUNTAIN - NORTH CAROLINA Size of a Concrete Recycling System for Process Washwaterl Stormwater for a Ready INIx Concrete Plant Size for a 10yr, 24-hr Runoff Volume = Use SCS Peak Discharge Drainage Area = 0.63 areas or 27,443 sq fL Elevation 4 ft (Obtained from the site topo map) Length a 277 ft (Obtained from the site topo map) Tc = 3 min (8.03a) Slope a 1.4% CN 85 (8.03b) Rainfall = 4.9 inches (Ref Fig 0,031) 10yr-24hr storm event Rainfall intensity (Average Asheville and Charlotte) v 6.25 irvhr (8.03f and 8.03g) Runoff Depth - 3.37 inches (Table 8.03c) Runoff Volume a Drainage Area x Runoff Depth 7,707 cu ft. Design Recycle pits to hold = 7,707 cu ft. CIA Q10 = 3.15 Peak rate of runoff in cubic feet per second (cfs) C = 0.8 Runoff Coefficient Q,a -10 Yr, 24-hr Discharge = Average intensity of Rainfall in incheslhr for a storm duration- i = 6.25 time of concentration (inlhr) A = 0.63 Drainage area (acres) Size for Weir for 01p = 3.0 L H M 0, = 3.15 L = 2.5 Length of the weir (ft) H = 1 Height of the weir (ft) 010 flow 3,15 < 3,75 cis Calculated discharge from the weir Length of the weir = 2.6 ft Number of Pits 3 Capacity of pits Pits i and 2 Each (Flat Area Volume) L a 30 ft Wa 14 ft AREAfplt= 2,940 cubic feet. D= 7 ft or 5880 cubic feet. (Two pits) Pits 1 and 2 Each (Slope Area Volume) L a 30 ft W a 14 ft AREAfplt a 1,470 cubic feet. D= 7 " or 2940 cubic feet. (Two pits) Pits 3 (Flat Area Volume) L = 60 ft W = 14 ft AREAlpit- 8,400 cubic feet. 0. 10 ft or 8,400 cubic feet. (One pit) Pits 3 (Slope Area Volume) L = 0 ft W a 0 ft AREAIpit - 0 D a 0 ft 0 cubic feet. (One pit) Total Pit Volume (CFT) a 8,400 cubic feet > 7,707 cubic feet or 62,832 gas > 67,647 gals WATER BALANCE ANALYSIS rwq. A of batches per day 25 40 batches wart- drne - 2s b*Wow Water per cubic yard 25 gals sumrnaW*-40bW&ma gals of water per batch (10 yards per batch) 250 Th• 9kelyhond Of h-v g a 10yt 24h,.WM wm M a" r— i. Gels of water recycled in the plant 6.250 10,000 gale greater than in the winter and therefore, Pft i13 empfing In 0 3 days as ra-W bW *.Wnke- s of days the water reused in the plant are = 10.1 6.3 days AVG fl of Days water recycled in the plant = 8.2 days Chat.. ftad. P6 CP Engmad% Tel: 7"14M CPEES Prapa No 112SM C d � - c 3 _ - P n if, tz Y J G _ n i C � C •4 r' _ c - r • O 0 H (ft) rnn E Note: Use nomograph Tc for natural basins with well-defined channels, for overland flow on bare earth, and for mowed -grass roadside channels. For overland flow, grassed surfaces, multiply Tc by 2. For overland flow, concrete or asphalt surfaces, multiply Tc by IDA For concrete channels, multiply Tc by 0.2. Figure 8.03a Time of ooncentration of small drainage basins. Tc(min) zoo 100 50 10 5 1 8.03.4 0 Table 8.03b Runoff Curve Numbers (CN) Hydrologic Solt Group A B C D Land Use/Cover Cultivated land without conservation 72 81 88 91 with conservation 62 71 78 81 Pasture land poor condition 68 79 86 89 fair condition 49 69 79 84 good condition 39 61 74 80 Meadow good condition 30 58 71 78 Wood or forest land Thin stand - poor cover, no mulch 45 66 77 83 Good stand - good cover 25 55 70 77 Open spaces, lawns, parks, golf courses, cemeteries, etc. good condition: grass cover on 75% or more of the area 39 61 74 80 fair condition: grass cover on 50 to 75% of the area 49 -fig 79 84 Commercial and business areas (85%impervious) 89 92 94 95 Industrial districts (72% lm)ervious) 81 88 91 93 Residential:' Development completed and vegetation established Average lot size Average % Impervious 1/8 acre or less 65 77 85 90 92 1 M acre 38 61 75 83 87 1 /3 acre 30 57 72 81 86 1 /2 acre 25 54 70 80 85 1 acre 20 51 68 79 84 2 acre 15 47 66 77 81 Paved parking lots, roofs, driveways, etc. 98 98 98 98 Streets and roads paved with curbs and storm sewers 98 98 98 98 gravel 76 85 89 91 dirt 72 82 87 89 Newly graded area 81 89 93 95 Residential: Development underway and no vegetation Lot sizes of 1/4 acre 88 93 95 97 Lot sizes of 1/2 acre 85 91 94 96 Lot sizes of 1 acre 82 90 93 95 Lot sizes of 2 acres 81 89 92 94 'Curve numbers are corrputed assuming the runoff from the house and driveway is directed toward the street. source: USDA-SCS 8.03.10 Ii. IM Appendices Table 8.03c Runoff Depth b. Determine runoff depth (in inches) from the curve number and rainfall depth using Table 8.03c. Rainfall Curve Number (CN) (inches) 60 65 70 75 80 85 90 95 1.0 0.00 0.00 0.00 0.03 0.08 0.17 0.32 6.56 1.2 0.00 0.00 0.03 0.07 0.15 0.28 0.46 0.74 1.4 0.00 0.02 0.06 0.13 0.24 0.39 0.61 0.92 1.6 0.01 0.05 0.11 0.20 0.34 0.52 0.76 '1.11 1.8 0.03 0.09 0.17 0.29 0." 0.65 0.93 1.30 2.0 0.06 0.14 0.24 0.38 0.56 0.80 1.09 1.48 2.5 0.17 0.30 0.46 0.65 0.89 1.18 1.53 1.97 3.0 0.33 0.51 0.72 0.96 1.25 1.59 1.98 2.44 4.0 0.76 1.03 1.33 1.67 2.04 2.46 2.92 3.42 6.0 1.30 1.65 2.04 2.45 2.89 3.37 3.88 4.41 6.0 1.92 2.35 2.80 3.28 3.78 4.31 4.85 5.40 7.0 2.60 3.10 3.62 4.15 4.69 6.26 5.82 6.40 8.0 3.33 3.90 4.47 5.04 5.62 6.22 6.81 :7.39 9.0 4.10 4.72 5.34 5.95 6.57 7.19 7.79 8.39 10.0 4.90 5.57 6.23 6.88 7.52 8.16 8.78 .9.39 11.0 5.722 6.44 7.13 7.82 8.48 9.14 9.77 10.39 12.0 . 6.56 7.32 8.05 8.76 9.45 10.12 10.76 11.39 To obtain runoff depths for CN's and other rainfall amounts not shown in this table, use an arithmetic interpolation. The volume of runoff from the site can be calculated by multiplying the area of the site by the runoff depth. Step 4. Determine the peak rate of runoff for the design storm by adjusting ng for watershed shape as follows: a. Determine an "equivalent drainage area" from the hydraulic length of the watershed using Figure 8.03n. Hydraulic length is the length of the flow path from the most remote point in the watershed to the point of discharge. b. Determine the discharge (cfslinch of runoff) for the equivalent drainage area from Figure 8.03o through 8.03q: Figure 8.03o - for average watershed slopes 0-3% Figure 8.03p - for average watershed slopes 3-7% Figure 8.03q - for average watershed slopes 8-50% Calculate the peak discharge, 01, of the equivalent watershed by multi- plying equivalent watershed area by runoff from Table 8.03c in Step A 8.03.17 0 5 10 20 40 60 2 3 4 6 8 12 18 24 Minutes Hours Duration Figure 8.03f Rainfall Intensity duration Curves —Asheville. r 5 t0 20 Minutes Figure 8.03g Rainfall Intensity duration curves --Charlotte. a.� 40 60 2 3 4 6 8 12 18 24 Hours Duration Appendices 8.03.7 h c a� 25-year t day precipitation (inches) x N SaI.In man m a 25 sa rs Iao c. RAINFALL DATA MAP ti 6 5 5.5 6 5.5 6 6.5 ! , �, 1i ••,� l ' STO.IS oOCnn6H s.5do 'Oft-ALIES ..r.. �am.. ./i I GIAKII rtan,wgpr' i. _ r-- �' �r 1 r� ram+ •YOOaM i 1 . �. Yfl —� M\Twdp Mufaw Ofw/C. �.A CIYIYW I � TRiOr .� � 11[-- _ our trg STft 7 6 6.5- m Ole OOIYri 7 \ iN 8 8 ml Attachment B NC DENR --- Division of Water Quality Stream Classification Table for Cleveland County Name of Stream Description Curr. Class Date Basin Stream Index # Persimmon Creek From source to Muddy C 09/01/74 Broad 9-53-6-2 Fork Little Persimmon From source to C 09/01/74 Broad 9-53-6-2-1 Creek Persimmon Creek Potts Creek From source to Muddy C 09/01/74 Broad 9-53-6-3 (Pilot Branch) Fork Roberts Branch From source to Dam at B 03/01/63 Broad 9-53-7-(1) (Does Lake) Joes Lake Roberts Branch From Dam at Joes Lake C 03/01/63 Broad 9-53-7-(2) to Buffalo Creek Beason Creek From source to Buffalo C 09/01/74 Broad 9-53-8 Creek Long Branch From source to Beason C 09/01/74 Broad 9-53-8-1 Creek Wolf Branch From source to Long C 09/01/74 Broad 9-53-8-1-1 Branch Jakes Branch From source to Buffalo C 03/01/63 Broad 9-53-9 Creek Kings Creek OC 09/O1/74 Broad 9-59 From source to North Carolina -South Carolina state Line Sipe Creek (City From source to Kings C 08/03/92 Broad 9-54-1 Lake) Creek Unnamed From source to Dam at B;HQW 08/01/00 Broad 9-54-1-(1) Tributary at Lake Montonia Lake Montonia (Lake Montonia) Unnamed From Dam at Lake C 09/01/74 Broad 9-54-1-(2) Tributary at Montonia to City Lake, Lake Montonia Sipe Creek Davidson Creek From source to Kings C 08/03/92 Broad 9-54-2 (Davidson Lake) Creek Dixon Branch From source to North C 09/01/74 Broad 9-54-3 Carolina -South Carolina State Line Clark Fork From source to North C 08/03/92 Broad 9-54-4 Carolina -South Carolina State Line Page 7 of 7 2011-08-13 07:13:50 2) Meeting Effluent Limits: In some cases, engineers must show that they will meet the effluent TSS and settleable solids benchmarks. Generally, if they can meet the settleable solids benchmark, then they can meet the TSS benchmark. One method of showing this is using Particle Settling Calculations Using Stokes Law: z t ft t )D2 ft P— P f f secI ' z gr t3 a. Settling Velocity: vs sec 18µ !b ft — sec i. Gravity, g=32.2 ft/sec2 ii. Diameter of Particle, D 1. Cement, D=4.92"5ft [NOTE. This is equal to 15 microns. (1 micron=3.28e-6 ft).] 2. 15 microns may be representative of "settleable solids" (but this is an arguable point). If a particle size distribution is provided, check to see the relative volumes of particle sizes that are expected. 15 microns may be too low for mining. Or, you could use another value for d to represent "settleable solids" as you see fit. 3. Note: Can consult ASTM Study on Particle Size Distribution for Portland Cement (2004 NIST Publication) for average PSD for this material. Although calculations may give an average size for this particle, certain percentages of the particles are larger and smaller. iii. Density of Settling Material, P, 1. Cement, P1=94 Iblft {or 1510kg/m3) Possible correction: this may be bulk density of dry material (?). Specific gravity of Portland cement = 3.15, so density of particle more like 3.15(62.4) = 197 Iblft3 (3160 kg/m3). However, note that using a lower density results in a more conservative estimate of settling time, so may be okay. iv. Density of Water, P2=62.4 lb/ft' (1000kg/m3) v. Viscosity of water, µ=5.98* 10-4 lb/ft-sec (0.00089 pa.$) (this is temperature -dependent so you may see slightly different values in applications) { b. Settling Time: t (sec) = dselde settle ft vs sec i. Settling Depth, dam„ ie= Average depth of the settling basin for the design (ft) c. Detention Time: tDeren,run(sec) = VolumeBa sin(ft3 ) 3 FlowThroughBasin ft sec i, volume of the Basin: The engineer must size the settling basin so that the detention time is greater than the settling time. ii. Flow through the basin: This is the volume of water that drains from the site to the settling basin during a "big" (undefined in the permit) storm �i ,y'�11�- ['' L' .+�' rS! t,� I •r'IfJ� r,.irll r r r .!,-,. J ,r �r . .r . f 'S.' • 1, � •�, I l ,� " is "'[� 1 , �• 1. rc. a I�1 I �' '"IJ ';: •III! _',:�fr,:.+ �. Sri• r.. .rlr'1 �� f .,�I- ., 'I � _ _ r r �' .n.�, I. �•' � riJ' , �i �F � ; � rt','r li' ! "r t ,�' ,' !J'll r'i' .'1L f ,. •t .ia! �l. f' F71!J I.' L 11: i 1 (t :,!�; ,.i',3% .' ,'r ,'{ • it lf,lt1 Ii (rri. Ir .'r It, Ir, 1.. + i . r+31.r€ IJ Ile 1 1 [I . , , .'Fer. r. , I!, plus any wastewater that is being generated. If there are a series of settling ponds, this analysis is more rigorous. Generally, calculate the peak flow: _inhr min t )(— A� ft 2Qr�e�x(ALIsec C (hr)(60rnin)(60sec 12in ) a. Rational Coefficient, C= (0.90*%Impervious)+Cp(1- %Impervious) (unitless) . i. Where Cp is the Pervious Coefficient (specific for the soil type where the water is draining from), Cp=: 1. Type A Soil: 0.20 2. Type B Soil: 0.25 3. Type C Soil: 0.30 4. Type D Soil: 0.35 ii. Or, use tabulated values for C: 1. Inclined Roof. C=1.0 2. Parking Lot: C=0.9 3. Residential: C=0.5 4. Park: C=0.25 5. If the site is mostly impervious, C=0. 9. (Note: This is an area where the engineer could really reduce the peak flow — watch the Rational Coefficient because if they choose C=0.5, which is a representative or residential lots, then the peak flow will be essentially half of the C=0.9 value. If the engineer under estimates peak flow (which is when the most water will leave the settling basin), then the Stokes Law approach may not be valid in determining whether or not the particles settle out. b. Drainage Area, A: Drainage to the basin(s) c. Intensity, 1: Found using the design storm and the time of concentration: i. Design storm: This is undefined in our permit, but we try to encourage the 10-year, 24-hr storm if possible. ii. Time of concentration: L3 0.385 H� iii. t� = 12$ min 1. L=Hydraulic length in feet (longest distance water will travel to the settling basin) 2. H=Change in elevation along L in feet iv. Example intensity calculation using these variables and data from the precipitation data , r .I 1 , 7 's• server for the city in question, bttl2://hdsc.nws.noaa.gov/hdsc/i3fds/: City of Lenoir Precipitation Froquency Esdmates(Inchesl qRP 5 IE1 LS 30 60 L'0 3 6 L" 24 48 4 7 - 10 20 30 45 60 (wars► min min mhi mlv min mtr► hr hr hr lu- hr day da y day day day day day 1 0.36 958 0.72 0.99 123 144 16 2 25 298 3.58 4.041 468 5.37 7.16 8.87 IL2 133 0.43 0.69 0.86 119 149 175 L9 24 3 162 4.32 4.87 5.6 6.4 8.48 VA 131 SS 5 0.51 0.81 103 146 188 2.22 2.4 3 37 459 5.44 6.05 6,83 7,7 n 12 14.9 175 10 1 0.571 091 -116 167 2,31 2,6 29 34 4.3 5.36 6.31 6,97 7.78 8.68 112 13,2 16.11 29 25 U51 104 132 1951 2.61 3.151 3.4 4.21 51 6.41 7.51 8.23 9.06 997 12.3 14.8 f1.8 20,7 50 0.71 L14 144 2,17 2.94 361 39 48 5.7 7.28 647 923 11. 11 14 15,9 14 22. 100 0.79 124 156 24 33 41 45 54 6.4 8.16 9.46 11.1 1l 0 15.3 U 20.1 234 200 0.84 134 169 2.63 3.68 4.62 5.1 6.1 7.1 9.09 11.5 113 1]. l3 16.5 3.1 213 24.6 $80 0,93 147 185 2.94 4.22 54 6 7.1 8. 114 119 12.7 13.4 14.3 2.1 19.5 227 262 1000 l 157 197 3.2 4.67 6,05 6.7 8 9.9 114 13 33.8 14,5 15.3 19.4 30.5 23.7 273 Tc=15 min Design Storm=10 years Depth=1.16 filches Intensity= 1. 161nches/ 15min*60min/hr=4.6in/hr d. Particles will settle out if the settling time is less than the detention time. This is a fairly basic way of calculating this. You may also see calculations involving the critical velocity, etc. These are more advanced ways of determining if sediment will re -mobilize. The method presented here is a good basic review method. 3) Estimates of related variables from past submissions: a. Wash water produced (no recycle): 15 gal/yd3 cement produced b. Batch plant daily capacity: 2,000 yd3 c. Dump truck bed wash out: 130 lb concrete for each 10-yd3 load, or 13 Ib/yd3 of load. 4) Containing Design Storm: In some cases, engineers must show that they will be able to contain the design storm (See Appendix F for city -specific data). The BMP manual uses Schueler's Simple Method. This is an alternate method. Do not composite curve numbers (do not area -weight them) in the following calculations: a. Runoff Volume: Secondary containment may have to control a certain design storm plus the wastewater. The design storm volume that they must contain is found from the following calculations: b. Curve Number, CN: This is specific to soil type and land use. Typically, for mining and ready mix, engineers should use a high CN. Others are presented here so that we will be aware of when engineers are under -estimating runoff. Cover Type A Type 8 TyptC T peD Parking Lot/Roof 98 98 98 98 Park/ Golf Course 39 61 74 80 Commercial 89 92 94 95 Industrial 81 88 91 93 Residential 61 1 75 83 87 Part I deals with quantities of water used and discharged through domestic, industrial, and agricultural use; physical, chemical, and biological characteristics of water and their significance; and global impacts of water quality. Analytical methods for use in water quality modeling and the analysis of treatment processes are developed in Part II. The funda- mental modeling principles developed in Part II are applied to streams, estuaries, lakes, reser- voirs, and groundwater systems in Part III. Physical, chemical, and biological methods of water quality modification are treated in Part IV. The book progresses in a logical fashion from the characterization of water quality, to the significance of the various contaminants, to the methods used to describe changes in water quality in the environment, to water and wastewater treatment. Nonconventional methods of treatment such as air stripping for volatile organics and batch -activated sludge are also included. Because of the need for creative solutions to water quality management problems based on scientific principles, fundamental relationships and phenomena are stressed throughout the text. Numerous worked examples are used to illustrate the application of the principles presented. The book is self-contained; all needed coefficients and data are given in tables, diagrams, and eight appendixes. The focus of this book and succeeding books in this series is on water quality man- agemeni issues that are central to the civil engineering profession, that is, subjects that have been, and will continue to be, of impor- tance to society and the primary responsibility of civil engineers. The succeeding two books in the series, FUNDAMENTALS OF WATER AND WASTEWATER TREATMENT and HYDRAULICS OF WATER QUALITY MANAGEMENT SYSTEMS focus on engineer- ing design for water quality management. CHARACTERISTICS ■ MODELING ■ MODIFICATION George Tchobanoglous Edward D. Schroeder UNIVERSITY OF CAUFORNIA AT DAVIS t- vV ADDISON-WESLEY PUBLISHING COMPANY Reading, Massachusetts ■ Menlo Park, California Don Mills. Ontario • Wokingham, England ■ Amsterdam ■ Sydney Singapore a Tokyo ■ Mexico City ■ BogotS Santiago ■ San Juan n enters at all depths, All particles having a settling velocity greater than v,c will be removed, no matter where they enter, but particles having a velocity v, < 0, will be removed in the proportion v,/v,,. Thus the critical settling velocity becomes a useful design parameter. Manipulating v,, in terms of other variables results in the overflow rate (OFR), Q/A,. H H _ Q —Q v" s bN a {�/Q FF — A, (12.29) where v, critical settling velocity, m/s H — tank depth, m B„=hydraulic detention time, s Q — volumetric flow rate, mr/s W —tank width, m L o tank length, m A, = surface area, m2 The development of the relationship defined by Eq. (12.29) for the three common types of sedimentation tanks used for water and wastewater treatment is given in Fig. 12.16. Typical overflow rates used in practice are given in Table 12.3. The relationship between overflow rates and removal efficiency is illustrated TABLE 12.3 Typical 0trart9ow Ratan Used for the Design of Sedimentation Tails in water and Waster ater Treattnent Plants TYPE OF OVERFLOW RATE, m/d OPERATION Range Typical. Cq Water treatment Alum coagulation Turbidity removal '40-60 48 Color removal 35-45 40 Lime softening Low magnesium 60-110 g0 High magnesium 50-90 65 Wastewater treatment Primary treatment Primary only 30-60 40 Primary with waste activated sludge return 22-40 30 Secondary treatment Activated sludge - 'The typical value is based on average plant lion•; for peak now use twice the typical value IL F i S�yygJTATION 499 PHYSICAL Tl2EwTMtidT l�lETlSpp� t4.7 AGA in Example 12.5. it is important to remember that the overflow rate is a particle settling velocity, not a fluid velocity. if E%AMPLE 12.5 �W ANALYSIS OF DISCRETE PARTICLE SETTLING A suspension of particles having an average density of 1400 kg/e is to a be treated in a tank designed for an overflow rate,of 25 m3/m2 • d.•For the particle size distribution given, determine the fraction F, removed. EFFECTIVE DIAMETER, mm 0.010 0.015 b.020 0.025 0.030 0.035 0.040 0.045 MASS FRACTION 0.10 0.20 0.25 0.15 0.05 0,15 0.05 0.05 SOLUTION: 1. Apply Eq. (12.27) to determine the particle velocity for each size and use the overflow rate to determine the fraction removed in each group. 4 (9,81)(400)d➢ Co(1000) s 2.29(L' I1t/xm/s CD11! 25 MI/tn - d = 2.99 x 10" m/s °SC 86,400 s/d Porticlq diamwur, d,.mm FIGURE 12.17.UsPos rtion for examo, When NR > 0.3 the problem must be solved by trial and error. For this problem the values of NR are all less than 0.3. so Eq. (12.29) can be used. STOKES' I AW MASS MASS d� MASS VELOCITY. r„ FRACTION FRACTION FRACTION m/s NA REMOVED REMAINING Wm 0.010 0.10 2,18 x 10-1 2.21 x 10-4 0.075 0.008 0.092 0.015 0.20 4,90 x 10-1 7.41 x 10-4 0.169 0.034 0.166 0.020 0.25 8,72 x 10-s 1,71 x 10-' 0.301 0.075 0.175 0,025 0.15 13.62 x 10- 3.4 x 10-3 0.471 0.071 0.079 0.030 0.05 19.62 x 10-s 5.8 x 10-} 0.678 0.034 0.016 0.035 0:15 26.71 x 10-5 9.4 x 10-3 0,923 0,138 0.012 0.040 0.05 34.88 x 10-1 1.4 x 10-2 0.205 0.050 0.000 0,045 0.05 44.15 x 10-5 2.0 x 10-2 1.526 0.050 0.000 Total 1.00 0.460 0.540 2. Plot the influent and efilucnt particle size distribution. The distributions are plotted in Fig. 12.17. As shown there. the particle size distributions for the influent and effluent are quite -`' different. Practical Sedimentation Systems The ideal sedimentation systems described above have a number of major differences from actual systems. First, the assumption that particles do not interact is incorrect; in fact, several types of interaction occur. Second, flow patterns in real work tanks cause considerable deviation from the ideal conditions. PaMde Interaction Three types of interaction occur: (1) flocculation in which particles collide and adhere and panicle growth results; (2) fluidic. in which panicles are so close together that flow is restricted and the particles move as a block; and (3) mechanical, in which particles physically interact, particularly in a compressive mode, water is squeezed out of the"' flocs, and particle volume may decrease (Fig. 12,18). These three types of interaction result in three classes of sedimentation (Types 11, III, and IV) other than discrete and are often referred to by class or as flocculant, hindered, and compression (or thickening), respectively, Flocculant set- tling occurs only when chemical or biological flocs form in the system. This commonly occurs in water treatment plants. Mineral suspensions and primary sedimentation in wastewater treatment plants are best characterized as discrete -particle sedimentation systems. Jones, Jennifer From: Bou-ghazale, Samar Sent: Friday, October 07, 2011 2:30 PM To: Jones, Jennifer Subject: RE: New DRAFT calcs for your review Hi Jennifer, We offer no objections for issuing the stormwater permit for Concrete Supply -Kings Mountain Plant. Thanks, Samar From: Jones, Jennifer Sent: Friday, October 07, 2011 12:03 PM To: Bou-ghazale, Samar Subject: FW: New DRAFT calcs for your review Here are the draft — the submitted are very very similar... But actually — I just talked to Ken and he said you DON'T need to approve them. So look over them if you like, but if you think its ok the review I have done, then let me know. Thanks! Jen Jennifer Jones Environmental Engineer NCDENR I DWQ I Stormwater Permitting Unit 1617 Mail Service Center, Raleigh, NC 27699-1617 S12 N. Salisbury St, Raleigh, NC 27604 Phone: (919) 807-6379 Fax: (919) 807-6494 Email: jennifer.iones@ncdenr.gov Website: http://portal.ncdenr,org/web/wq/ws/su ** Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulations.** From: Chalam Pakala Emailto:cvpakala@carolina,rr.coml Sent: Tuesday, September 27, 2011 1:50 AM To: Pickle, Ken; Jones, Jennifer Subject: New DRAFT talcs for your review Hello Jennifer/Ken, Attached please see the calculations for TSS, SS and pH for Concrete Supply at Kings Mountain. Ken and I talked yesterday and we had some observations on the previous approved talcs. Please review and let us discuss my calcs and see if we can come to a reasonable agreement on the approval of this project. I will be in my office today and, tomorrow to discuss. Thanks for all your help in advance. Best Regards Chuck Pakala CP Engineering and Environmental Solutions Tel: 704-541-4042 Fax: 704-541-4043 Cell: 704-756-7451 Jones, Jennifer From: Jones, Jennifer Sent: Friday, September 16, 2011 3:27 PM To: cvpakala@carolina.rr.com Cc: Jones, Jennifer; Bennett, Bradley; johnie.alexander@concretesupplyco.com; Georgoulias, Bethany; Pickle, Ken Subject: FW: NCG140413 - Concrete Supply Company, Kings Mountain Attachments: Stokes Law guidance.docx Hi Chuck, Please see email below. I input your email in wrong the first time, Thank you and have a good weekend, Jennifer Jones Environmental Engineer NCDENR ) DWQ I Stormwater Permitting Unit 1617 Mail Service Center, Raleigh, NC 27699-1617 512 N. Salisbury St, Raleigh, NC 27604 Phone: (919) 807-6379 Fax: (919) 807-6494 Email: jennifer.jones@ncdenr.�ov Website: http://portal.ncdenr.org/web/wq/ws/su ** Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulations.** From: Jones, Jennifer Sent: Friday, September 16, 2011 3:11 PM To: cvpackala@carolina.rr.com Cc: johnie.alexander@concretesupplyco.com; Bennett, Bradley; Pickle, Ken; Georgoulias, Bethany; Jones, Jennifer Subject: NCG140413 - Concrete Supply Company, Kings Mountain Hi Chuck, I left you a message but I wanted to follow up with an email because I am not in the office on Mondays (I currently work 30 hours/week). I had several things I wanted to speak to you about this application, I've already spoken to Mr. Alexander about them because I owed him a phone call back. Ken Pickle here and I spoke about this and agreed on the following points: This site drains 0.96 ac to pits 1,2 and 3. It is sized to hold the 25-yr/24 hour storm, but only in the case when all 3 cells are empty. The issue is that there does not appear to be any mechanism of emptying the volume of either cells 1 or 2, so when 1 & 2 fill up (and it appears they will eventually) they will keep the water in them for the most part, and the cell volume will not be available to hold the 25-yr/24 hour storm. The only available volume will be the 3`d cell (8,400 W). We believe this will hold < 1 year storm (actually < 1-year/24-hour storm), therefore your cells will discharge, on average, more frequently than ix/year. We would not consider this a non -discharging system. r 7" You have shown the sizing of the cells based on the total depth (8' or 10'). However, the weirs in these cells will draw the water down and keep the water level constant at 6.5' and 8.5', respectively. Therefore you will have less volume available in the cells than what you have calculated. Additionally, if these cells were to fill up to the 8' depth as shown, they would also need to have an additional 1' of freeboard. Please submit calculations based on the correct depth of the treatment cells. In part 3, page 2 you state that the plant will be making 25-40 batches in the winter and 25 batches in the summer. The method of using the wash water will be by use in the mix. However, you plan the water use time based on 40-50 batches/day. A more conservative approach would be to use the winter batch time (25 batches), which would be approximately 22 days. I don't think we feel that >3 weeks is a reasonable amount of time for a facility to take to pump down the treatment system to free up the volume for the next storm, because it is likely that another storm may also happen during that time period. Additionally, if cell 3 only draws down, that cell volume should be used -- not the entire treatment system. 4. You have not submitted the most current NO1 that was available 7/12/2011: http://portal.ncdenr.org/c/document library/get file?uuid=349f3c6a-d1c1-4aad-8991- 322968c33844&groupld=38364. Please fill this out and submit this information. One alternative you could explore would be to pump or drawn down cells 1 and 2 so the volume is available to store the 25-yr/24-hr storm, or you could create a larger overflow pit to hold the largest storms. However, IF YOU DO create a treatment system that will hold the 25yr/24-hr storm (or larger) and will not discharge to surface waters (and one which will pump down in a reasonable amount of time) — we cannot permit your facility as a wastewater treatment and discharge system under the NPDES regulations, because you won't be discharging to surface waters. However, it is my understanding that you will need some type of permit to build o wastewater treatment system, therefore I believe you will need to go to the land application unit to get approval for your treatment system. That is my understanding of the wastewater treatment system rules. (Bradley, Bethany, Ken — please correct me if I am wrong). If you decide against holding/using the 25-yr/24-hr storm (essentially never discharging), you can show that your treatment system will discharge water that will meet the permit limits. One method is to use Stokes Law to show that you will meet permit limits, and add a pH meter to your treatment system. I haveattached some guidance we use to review plants' discharges to meet limits using Stokes Law. Additionally , I want to stress that if you have a permit to discharge, but your system does not discharge because you are recycling water back into your mix and sufficient volume is available to hold most rain events, your facility will not creed to monitor for any quarters that do not have wastewater discharges — because there will be no wastewater discharges. You simply have to fill out a form for that facility that says "no discharge" and submit it. One easy way to do this would be to make copies that say "no discharge" for each facility, and then fill out the year and quarter, and sign it each time. Please give me a call on Tuesday — I will be out of the office on Monday. Thank you and have a good weekend. I look forward to speaking with you on Tuesday. Thanks, Jennifer Jennifer Jones Environmental Engineer NCDENR I DWCt I Stormwater Permitting Unit 1617 Mail Service Center, Raleigh, NC 27699-1617 512 N. Salisbury St, Raleigh, NC 27604 Phone: (919) 807-6379 Fax: (919) 807-6494 Email: iennifer.iones_@ncdenr.gov Website: http://portal.ncdenr.org/webLwg/ws/su ** Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulations.** Gs I'ABLEI CONCRE'I'F: Sul'rLY ICINGS .V1DhN•1 llN — NORTH_('AROLI,\'A Ize for a 10yr, 24-hr Runoff Volume = Use SCS Peak Discharge rainage Area = 0.63 ar or 27,443 sq ft. levation = 4 ft " (Obtained from the site topo map) ength n 277 ft ' (Obtained from the site topo map) c = 3 min ' (8,03a) lope = 1.4%' N (Fi ainfall = �4.9=0�h.�S(Ref Fig 8.03j)ainfall Intensity (Average Asheville and Charlotte) _ (8.03f and 8.039 unoff Depth = / 3.37 Inch (Table 6.03c) Runoff Volume = Dr�alna6e Area x 1 Runoff Depth � G) I� 7,707 cu ft.. / 1 V esign Recycle pits to hold = 7,707 cu ft. CIA Q. = 3,15' Peak rate of runoff in cubic feet per second (cfs) C = 0,8 Runoff Coefficient Q70 - 10 Yr, 24-hr Discharge = Average intensity of Rainfall in incheslhr for a stone duration- i = I.25 ` Ume of concentration (inlhr) A = 0.63 • Drainage area (acres) Size for Weir for Q 1g = 3.0 L Hil'S 025 = 3.15 J x L = 2.5 Length of the weir (ft)r H = 1 " Height of the weir (ft) 010 now 3.15 < 3.7 cfs Calculated discharge from the weir itJ.J��y Length of the weir= tl ft� Number of Pits 1 3 Capacity of pits Pits 1 and 2 Each (Flat Area Volume) L = 30 , ft W = 14 -ft AREAIpit = 2,440 cubic feet_ �. D= 7 �ft or 5880 cubic feet TWO pits) Pits 1 and 2 Each (Slope Area Volume) L as 30 ft W = 14 ft AREA/pit = 1,470 cubic feet, ' D= 7 ft or 2940 cuUcfeet, (Two pits) Pits 3 (Flat Area Volume) L = 60 ft ^i W. 14 ft AREAfpit= 8,400 cubic feet D= 10 ft Pits 3 (Slope Area Volume) L = 0 ft /or 13A00 cubic feet (One pit W = D= 0 ft 0 ft AREA/pit = 0 0 V t� cubic feet (One pit) Total Pit Volume (CFT) = 8,400 cubic feet / 71707 cu, is feet or 62,832 gals /� 57,647 gals WATER BALANCE ANALYSIS mange #ofbatches per day 25 40 batches Wpbrbme=25balc[hei Water per yard 25 — gas summer time = 40 batches gals of water per batch (10 yards per batch) 250' The kkelyhood olh—irg a 10yr a41hremrm.—Lnneeo,nmer,. C-its of water recycled in the plant - 6,250 10.000 greater Ihs— the venter and th,,-fore, P, a3 will be emptied in gals 6.3 days Is a reasonable esume # of days the water reused in the plant are = 10. 6.3- days AVG # of Dava water recycled in the plant = 8.2 days Chelan :'eka!a. PE Cis Chp e-i Tel. 7{ 541-4142 CPErS props :ao Z'',,-002 J 7 I TABLE I CONCRETE Sl1PPIN KINGS NIOUNTAIN -,,NOR"I'H CAROLINA irticle,Settiling Velocity = V Assumptions: Variables Units Particles are spherical !1/ g (p. - pw)d2 VP = Particle sesttiling velocity ft)sec Hydration of cement has no impact on the settling Vp = 18 p g = Accelaration due to gravity ft/secz Laminar flow d = Average diameter of cement particle ft Reynolds Numbner <0.3 pc = Density of� i Iblftz Discrete Settling- no agglomaration/flocculation �N =. Density of water Iblftz p = Viscosity of Water Iblft.sec Ilculate settling velociri )V 9 = 32 ftlsec2 I d = 15 micron 1 micron = 3.28084E-06 ft 200-Iblft2��p� p = 62-Iblfi2 5.981E --Oar rfl`ec VP = -0.00 90 96737 fVsec -TENTION TIME CALCULATIONS (USED WITH SETTLING VELOCITY TO DETERMINE CAPTURE EFFICIENCY FOR ALL PARTICLES) umber of trucks used at the plant (10 to 12) 12 ' atches produced at the Plant = 40 batches Ipe day dg work day = 10 hrs• . -oduction per batch = 10 cylbatch ,oduction capacity of the Plant = 400 cylday r 11�01N4 4I Anticipated Truck Wash Arrangements ~ Surfacial cleaning 1.0-galfbatch — Total water used for all the batches/day = 400 gaWday V Chute cleaning C/�10 gafftruck_' d Total water used for all the trucks/day = L120-ga .!/ Drum cleaning r� 200galltruck ./ Total water used for att the drumstday = 2400 gaalslnday✓ r pj Total water used for washing purposeslday = 2920 gals , 1 gal = or 7J0 galley r (worst case) (Summer) Winter would be lesser l— ( range is 8 to 12 cylbatch) � 46 XI' 10�ll (No sediment) IV+ (No sediment) (1 wash end of the day) (1 wash end of the day) (1 wash end of the day) (1 wash end of the day) 0.1�3t3681 ft3 ! j s or 390.35 ft3 ti I• �'0 �I 1 % :rmination of Q for non -rain production (ar) Crete production rate/day = t ------- .. 1/` 400 cylday hwater p-oductionlday = L10.0 .35_h3\ work day = 10 hrs. Flow rate = 43 cfs halam f 4ala, PE ' a Engir-renng Tel, 704-`41-al)42 CPl No ; ;29-002 Z� Zd ittip 4 XV-1 - �Oi o JR1, 1 hr = 3600.sec AAA 2-0 TABLE CONCRt.rEsli KINGS MOUNTAIN - NORTH CAROLINA Size for a 10 yr, 24-tir Runoff Volume = Use SCS Peak Discharge Drainage Area + 0,63 Re— or 27,443 sq ft. Rainfall Intensity (Average Asheville and ChaAOtte} = 6 25 inrhr (8.03f and 8 03g) Runoff Depth - 3.37 inches (Table 8 03c) Runoff Volume + Drainage Area, Runoff Depth 7,707 cu n- Design for pica to holtl • 7,707 cu ft. 010 - 10 Yr, 24-hr Discharge + CiA Q10 = 3.16 Peak rate of runoff in cubic feel per second (cfs) or 11340 cfVhr C = 0.8 Runoff Coefficient Average intensity 01 Rainfall in inchesfht for a storm duration -time of i = 6.25 concentration A= 063 _ Drainage area Determination of Q for non -rain production (Onr) Concrete production ratefday Washwater productioniday = Avg work day - Avg Flaw rate Q peak Combined (cfa) _ Size for Weir for Q,o = Cw, L H —�-�400 cylday 390,34852 ft3 — rs �3 OAt0843 c 3.15cfs+ 0.01 lefs) (Stormm event + non rain water or process cutter) &IB 3 0 L H s". Broad Crested Weir Coefficient 1 = 30 C10= 3101 L = 2, 5 f Length of the weir (ft) H = I ­.�eight of the weir (ft) 3,161 < 3.75 cfa'Calcuiated discharge from the weir 3 .I Detwtrrne the depth of Bow Duet the weir -J H+ (QnC; L)" Critical Vei fpt pedicfe capture H Detendon Time bove the weir R da Wsec Pit 1 0.562 0.016 4.0290E-r14 Pit 2 0.562 0,032 r ) 2.0145E-04 Pit 3 0.562 T07 ' 1 0318E-04 Chalem Pakela. PE ,;c Ergineenno 11, 104E4, 4042 L �c ITS ,'. ^a NR 112D= Plug flow Assumption in the basin, Therefore. On a Oput NOrE', 1n veemr,set.m, saps rue ro ror .TM 5urtece tree o,5y Wers .role in fettling onlicsl Velopry (Vcr) In INsec) - 0I0 (cfsy5urtace Area ofthe Basin I112) Detenton time (sec) - Volume of the beds (ft3jlQ7(1cfs) 1 ar • Oe400 eec were Lengln (wLl�cma�e pggyr�. �/ 2 5 n .. eY dim ' B07(i� 7i14R "-T� TR[OI La L-m •. 575n yij ,s Semi,, 4.ee-WR,25n iv .nphln t_M W. 1�1 ` wnr Lengu, (Wlyai.wrpe poeR. \ `^s n �. re den• ROR(L)r 141(W,71JD) L• MR , L.W. 8.. Wes'• epR3.5n (u.n x Zh). 14R W 57 5 ft 1411 ' / you L.Ne, IWlydiechetge p,mt • OR ppt A • MR (L), 1411 lwl • iR (D) L • LAY. Suhoe W.a • MR, 141 W . 601 90 a 14 ft i 14 9 1 M TA1311L I CONCRIE I'F SUPPLY KINGS MOUNTAIN - NORTH CAROLINA TSS CALCULATIONS # of trucks at the site = 12 Avg, capacity of a single concrete truck (batch of concrete) = 10 (cubic yards - cyd) # of batches lday - - - - - 40 batches Total capacity of the plant 400 cyd Wash of concrete on the drum for each hatch {just a dust on the drum) -_ 0:001 cyd - Concrete left in the drum per truck at the end of the day = -r —gj 0.1011 cyd Concrete left in the chute per truck at the end of the day = 0 02) cyd — Wash of concrete on the drum/day = 0,04 r 1-" cyd (40 batches x 0.001ry/batch) Concrete wash from all trucks at the and of the day = 1.20 r" cyd (12 trucks x 0.1cyltruck) Concrete wash from all trucks chutes at the end of the day = 0.24 9 cyd (12 trucks x 0.02 cyltruck) Total Concrete washedlday = 1,48 .+ cyd Weight of concrete per CYD = 465 Ibslcyd Mass on concrete contained in the washwater 688.2 Ibs a/ Wt of cement in the CYO of concrete = 11.63% % PIT 03 Particles left In the pit (microns) T 1 throng C") icrons ' Mass fraction_ leaving Pit #3 �_ 0.76f ^� wtlwt %of particles screend from Pit # it #2is 50°h'andPit #2 to Pit i!3'is 50°k 0,192 �- wtlwt Assumption:Due to hydration. particle Mass of suspe den d cerrantAn,he washy; for =— 15.361 Ibs shape and density effects, we guess -- ✓ estimate a reduction from each pit Volume of water below the weir in Pit #3 = - _ --- _ _ 62,632 gal going into the other pit Anticipated effluent TSS concentration in Pit #3 = . 0.0002--/�/''' a Iblgal Anticipated effluent TSS concentration in Pit #3 =� 29.30 mg1L Maximum Allowable TSS by NC DENR = 30. mg1L Note: 1 mg1L = 6.3454E-06 Iblgal SETTLEABLE SOLIDS (SS) CALCULATIONS \ These solids will settle to the bottom of the coneshaped container in a 60 min period - Theorilical Settling times for Particles to settle 6" and 1" forSettleableSolids Test. Size of particles (microns) Settling Velocity (f/sec) 6" Settling Time (hours) 1" Settling Time (hours) 1 4.430E-06 31,352 5.225 C 1.5 9.967E-06 13.934 2.322 2 1.772E-06 7.838 1.306 3 3.987E-05 3.484 0.581 4 ,088E-06 1.960 0.327 6 5E-04 ;2.�8351E 0.871 0.145 8 -04 0.490 0.082 Note: Settleable solids will be removed from Basin #1, #2 and #3 and therSore, no settleable solids would be present in the effluent discharge from the pits = 0 mg1L a Chal: n Pakalr PE CP Eiyineeriw Tel: 704-541-� A2 CPEES Project No i 129 i `2 TABLE I CONCREff SUPPLY KINGS NIOLI,N'1'AIN - NORTiI CAROLINA 5� DETERMINATION, OF THEORETICAL CO�NCENTRATION.OF P.H IN, THE EFFLUENTnFbR THE DESIGN STOW .: H MASS BALANCE CALCULATIONS Anticipated Truck Wash Arrangements Batches produced at the Plant = 40 batches /per day (Summer) Winter would be lesser Number of trucks used at the plant (10 to 12) 12 (worst case) Surfacial cleaning 10 gallbatch (No sediment) Total water used for all the batchestday = 400 gals/day (No sediment) Chute cleaning 10 galltruck (1 wash end of the day) Total water used for all the truckslday = 120 galslday (1 wash end of the day) Drum cleaning 200 gal/truck (1 wash end of the day) Total water used for aH the drumslday = 2400 galslday (1 wash end of the day) Total water used for washing purposes/day = 2920 gals 1 gal = 0.133681 ft3 Assume Pit #1 and Pit #2 were full of washwater before the rain = 8820 cft or 65974 gals PH of Washwater = 14 units pH = -log (H) or (HI = 10"-pH unit # Molarity of H• concentration or 1.0000E-14 10yr-24hr Volume of flow= 7707 cft 1 cft = 7.480 gels 10yr-24hr Volume of Flow= or 57648 gals PH of Rain Water= 5 units Motarity of H- concentration of 1:0000E-05 Mass Balance of pH at the end of rain event = . IVol of Pits #f &.#2 x Molarity of iH1 in Washwater + 10yr-24 hr storm volume x Molarity of fHl in the rain water)- - (Volume of Pit #1 and #2 Washwater + Volume of 10yr-24 hr Rain) Molarity of [H] of the effluent = 4,6633E-06 PH of the effluent = 5.3313 units Note: pH of washwater would be neutralized based on the rain pH. Some rain events could have a pH of 3 or 4 units and further, the discharge from Pit #3 would go 10 another detention pond (using 10yr-24 hr storm event) constructed at the site for the Erosion & Sediment Control Plan. Also, the water from the E&S Basin will travel several hundreds of yards on the ground as a sheet flow before it reaches industriai ponds located on the site before going into the waters of US. Therefore, no pH ad)uslmenl is needed for this site. Chalem i akaW P ' CP Engir,ennp Tel, 704-541-414,' CPEES Projecf No 11'19�0T TABLE C.UN'CRE'EE S11PPI.Y KIN C% N11EV'EAIN - V(1R M CARMAN a1 Particle 9 Wi,g Critical UWmg xr • Capwmd M... To a1. nest CraM Sift df trlaualln of Pwaene C.mMI OV 1*, YNPWty NO VNticlty (Vcr} In Sha[ r.tlo Mats F7acaan Fraction basin Ihetl iNucl (N6ecl (VPNcr) Removed AI -.d (YRII .motel Sire nsl Dlatributlo0 FracSlan toll Cd2 W3 W4 C.,5 Coe CW7 Cole cola Col tO Co111 1 47% A7% 0160 326084E48 4430E-08 4029E.04 Doll 0.0018 01582 Y.. 1.5 20% 73% 0155 492128E-06 9967E-06 4029E-0d, 0025 00038 01512 Y. 2 A8% 121% 01A0 658188E-06 1.772E-05 4029E-04 0044 00082 0.1338 Y.. 3 50% 17.7% 0125 9.61252E-08 3987E-05 4029E-04 0099 0012- 01120 Y.. 4 A6% 223% 0100 1.31234E-05 7066E-05 4028E-0d 0.176 0C176 0082, Yea 6 76% 299% 0000 196850E-05 1595E-04 4029E.04 0396 oc237 00353 Yes 6 6 0% 35 9% 0 055 262467E-05 2 635E-04 4 029E-04 0 704 00307 00163 Y.. 12 105% 466% 0050 393101 E-05 g. 8970E-044.MEJ04+1.__ 00500 00000-4 1�8 `82%`"-- 546% 0040 524934E-05 1.13417Z 4029E-04 I +1 00400 00000 No 24 138% 684% 0025 767A02E-05 2.552E-03 4029E-04 r1 00250 00000 No 32 103% 767% 0015 104987E-04 4538E-03 4029E-04 .1 00350 00000 No 48 124% 91.1% 0020 1.57460E-04 1021E-02 4029E-04 >1 00200 00000 No 54 52% 963% 0018 200974E-04 1615E-02 4029E4 +1 OC175 cW00 Na 98 20% 991% 0015 314961E-04 4063E-02 4029E-0d +1 Oc150 00tldl No 126 04% 995% 0002 4 t9948EA4 7.258E-02 4029E44 .I 00020 00000 No +128 05% 1000% now 00000 a0000 1-000 0.3087 06909 e2 dam.br Para de 5.101n9 Cdac.5e1a1n9 Ar•C.PNne Mu. Fraction To tll. next Grald 81H dalrlb,aral of PeMAdd Cement VN4 tv TYPI V...:, Ivcrl In tlu1 r.tl. r' Fraction basin 11.a0 (ltnfc] IN6rc1 (VPN.,) R.- d Rrm.11xa (YM) .meter Sire Ma.. won.) Alairlbutlan Fr.cllon CN I CW 2 Col 3 Cc14 CN S CO a Cei 7 Gal 6 W 9 Col 13 GI 11 1 47% A 7% 0158 3 26084E-08 4 430E-06 2 OIAE-OA 0 022 0.0005 a I mb Y.. 1.5 26% 73% a1$1 492128E-06 9957E-06 2.014E-04 aD49 00075 01437 Y4. 2 48% 121% 0134 636168E-06 1.772E-0S 2014E-04 0088 00118 0.1221 Yes 3 56% 17.7% 0113 984252E-08 3987E-05 201AE404 a188 0D223 0C903 Yea d .8% 223% 0082 131234E-05 ioBSE-05 2014E-0d 0352 002M 0004 Yet 6 76% 299% 0036 196650E-05 1.595E-04 2014E-04 0792 0007 0OD70 Y.. 6 80% 359% 0.010 2B2467E-05 2ME-04 2014E-04 .1 0D163 00000 Yea 0691 D,119 0.572 /3 WI m PVNooi Cdt-i Tr w Capn4rro Maas F-.- Maf. Toth. next Grain Sim 01atr1b,aen of Portl.ne C.m.nl YNOWty p/P} y NO VNoclry [Ycrl y (VC00 In the[ r.tlo Fraction b..ln IM.11 B {Nucl INB.cI (VWvcr) R.mov,4 R-1-d IYmI .meter Six, M' 4 Maaa icr0nal ❑I.trib.. Fraction Co11 W2 Cal3 W14 CN5 Wa OW C.I4 Gal9 :ol 13 W1I 1 47% 47% 01548 326084FZ6 4430E-08 I032E414 0043 00066 D14RI Y-- 1 5 26% 73% 0.1437 a92126EAS 99137E-08 1032E-04 0.097 00139 01298 Yea 2 40% 12,1% D1221 858166E-05 1.772E-05 1032E-04 0173 00210 0.1011 Y.. 3 56% 177% 00907 9.54252E-06 3967E-05 1032E-04 0306 00349 CC554 Y.. 4 A e% 22.3% 0.053a 1.31234E-05 7 086E-05 1 032E-04 0 597 0 0367 00167 Yr. 5 75% 299% 00076 198650E-05 1.595E-04 1.032E-04 1 0D076 c0000 Ye. 05716 0.1205 0.4512 Gear• P, W1•. FE �:P ErgaM1q CPf E.'ir-..•1 rb 111PP02 /YP• O1,, 3a1 ra P 9 • 32 Nscx d• Co140 P� • 203 iHa 62 IWIl' V• 59BI E{)41E10 sec 1 rtwon a 3 28064E 438 0 Ken, its page shows the her engineer's talcs ethodolonv_ �:�i;� �.I +fit i, �, �� : } {�+�yri��: � � y � ;�i�il�{�^,;"!k?r +91�,. r ,�k.r 'I •.i�r{ ,' 1 �t � 4��+'i 1 h rr 9 i 11 1 t y^" l�I Y I� �D i t Y y -f ♦ r !! F.I t_ C( !I F _ y L iy, ! � � ,1 0.,. e� ��I�:� �l+,r �l�, f, �' �I '�+J��'�5. ,j�l 3s �i � ��'h�k s��lF, c ,`4 r.�'r,i "' 3� �i7t, r •'y�. .:+i f r 1 r r -'�•u ' !q�r' `�' >..�0. �.��$�:,:4S sn` + h ° u.+ � ,�� 0. owl aly : � u • l �tk�� ' � � C h k �' ��� `` .1 �. k Z::Ly1h sk �` &r � " +�, h. r � I P I�� V� pis 1 r •I F � r�'. I z � � �* `•' • � f b, �` `i'`'� ,(�, � .� 4µ 1 's, Ik.l` l I lur s s J� F d� f k�uL s � ° �t' +�� � `� � r ii � � t.3" k "�,� 1➢ l Wq ,:r �'� yt �.�r �;ly� 1 �, I��{`1• �* � 1 -rl k�' t , "R�• '. ' ' + Ali "E'".. "Jet. VY' r � ''n MA I., a S �' �#•, I�� `� r I � �;� � :� � �� bi •' s � � � II j,t �w ' llfl� � {� 1�. i 'aii �: � � a f r h +, js N�4, � f 1 a,:•::s.• iy, t� � #s r * 4 ra .. irk �w r a , �• w', k�' r e. �, k(M' �' +fFd+'� � � u. rt I.. �£�"ts' _ rfy„[y`±�[__� w''s�fr}k;, •c'V-`�'�` - ���'�'I a !: � S� }' j' i `n •` a J e. j"'�lya^�R,FF""� ., � i s - } i � - ii S . J) fly vl J } ,t� I�,r 3 .,w- � v fy�: t •o�F'4i 14 _ �_Ai _f.i' '':C I. a rJ; Y ;Ply,r� rfi s � / '. • •1 v . ttV f � v�k i,� 11 1 �•' S' .3J1 T- tY, '_'� r Ssr ;i lJll { 1r � �� '� t �7�;1�iyk'. � ,�• k � 3�,,tifnti- ' +n. J if { It{a� ;I. �. °I '� _ 1 r � • � "� * 1' � i! t ; � Il t ] k n � '}.• a . { s ,�� �� �a. •{ f c r 1. F�I i'+ r e .��� + 5�,�a ®r, ce. j err .•>� +. � � � +, A I i'' Ip 1 r 5. ' cpi'�-a i„c rih�t� 3 r� Es „i.._:L��,`, �} •, r �'� � � +l+• �" .:f v �I a .., +-�' R ��i 1' a ` �:,ir �, +y �q._ i •r� i k - r'!j� 11."F-� e E r - .f� Ery !•r° � ° � t I 4t1.� � . 11 �-!, !i' ^� t� i1 y' 4 if I� 5 �a - + flY »,tl Sr rt,} ,.�a _.� IR � �� ���'�" � k P% I � J i!�il !,�! �t. k r�� I � ��� ��. � � �s� �14 ', 1, _-- 0 p 04 0p 0 ` li''` �' j 0 Is — — F I. i 4 '.�. ( q x Y 1 I� z — qIl l �+I h 1 �` � F rj r 1 i (� i � ,! � r "a• �5 . : 's � — '� _ ....�._._. - - 4r p Kai I �� I �� �� ! r:f •� sy 6 y Y ' i � ��' rI"��y'�' +l', q�j � 1 ��y �� "q) �t i� �'�� fy� � °,.'f - t 3 I _ a Y 448 I PHYSICAL-TREA in Example 12.5. It is important to remember that the overflow rate is a' particle settling velocity, not a fluid velocity. EXAMPLE 12.5 ANALYSIS OF DISCRETE PARTICLE SETTUNO A suspension of particles having an average density of 1400 kg/m' is'to' be treated in' a tank designed for an overflow rate'of 25 m'/m'- • d.-Fpr' j the particle size distribution given, determine the fraction F, removed '.'4 EFFECTIVE ' DIAMETER, MASS - mM pRMASS Are 0.010 0.10 0.015 0.20 0.020 0.25 =y 0.02.5 0,15 0,05 0.030 0.035v.15 zsva 0.040 0.05 v 0.045 SOLUTION: velocity for each size and' 1. Apply.Eq. (12.27) to determine the particle determine the fraction removed 'in- each use - the overflow rate to group. 4 (9.81)(400)dp 3 C,(1000) d = 2.29( ° m/s'<. CA 25 m3md = 2.89 X 10 `' m/9 i-6 400 s/d o.a' a fl.7 0 fiGURE 12.17 0.02 6.03 O.Oa . 0.05 Influent and. 801Ue^t distribution -for Exarn 12 Panicle diomerer, dp, mm .- Wii�i_ll 2.7SEDIMENTATION 499 when NR > 0.3 the problem must be solved by trial and error. For this problem the values of NR are all less than 0.3. so Eq. (12.28) can be used. _ STOKES' LAW 4LASS MASS MASS VELOCITY, r , FRACTION FRACTION FRACTION m/s NA r,/i",- REMOVED REMAININ(i 0.10 2.18 x Io-s 2:21 x 10-- 0.075 O.Utlx 0•092 0.0 15 0.20 4.90 x 10-' 7.41 x 10-, 0.169 0.034 0.166 0,015 0.25 8.72 x 10-' 1,71 x 10-' 0.301 0.075 0.175 0,025 0.15 13.62 X 10-5 3.4, X 10-' 0.471 0.071 0.079 0,030 0.05 19.62 X 10-s 5.8 X10-; 0.678 0,034 0.016 0.035 0.15 26.71 x 10-5 9.4 x10-' 0.923 0.138 0.012 0.040 0.05 34.88 x 10-5 1.4 x 10-'- 0.2 05 0,050 0.000 r 0.045 0.05 44.15 X 10-5 2.0 X 10-2 1.526 0.050 0.000 k3,^= Total 1.00 0.460 0,540 2. Plot the influent and effluent particle size distribution. The distributions are plotted in Fig. 12.17. As shown there, the particle size distributions for the influent and effluent are quite ' different. Practical Sedimentation Systems The ideal sedimentation systems described above have a number of major differences from actual systems. First, the assumption that particles do „ not interact is incorrect; in fact, several types of interaction occur. Second, flow patterns in real work tanks cause considerable deviation from the ideal conditions. Particle Interaction Three types of interaction occur: (1) flocculation in which particles collide and adhere and particle ,growth results; (2) fluidic, in which particles are so close together that flow is restricted and the particles move as a block; and (3) mechanical, in which particles physically interact, particularly in a compressive mode. water is squeezed out of the flocs, and particle volume may decrease (Fig. 12.18). These three types of interaction result in three classes of sedimentation (Types II, III, and IV) Other than discrete and are often referred to by class or as flocculant, hindered, and compression (or thickening), respectively. Floceulcanr ser- rk occurs�nl} when chemicrt or�t`ologicaTf of es of rm en dFe system. This commonly occurs in water treatment plants. Mineral suspensions and primary sedimentation in wastewater treatment plants are best characterized as discrete -particle sedimentation systems. ov a0Q I �.e -0 I I ewgz � I >° E a u d y a E c E ald E w F l E Y au T a talul i sl= - l{I �ale _ x w O� m C 9 I _t e > xf0 � I � 6 II 11 II II auoz Ialul d '! tion enters at all depths. All particles having a settling velocity greater ' than t, will be removed, no matter where they enter, but particles having a velocity 0. ¢ U,r will be removed in the proportion or/v,,.. Thus the critical settling velocity becomes a useful design parameter. Manipulating v in terms of other variables results in the overflow rate (OFl2). H H Q Q Bra /Q L _ A4 (12.29) where :• . U,,. =critical settling velocity, m/s H = tank depth, m 8,f =hydraulic detention time, s Q = volumetric flow rate, m}/s • W � tank width, m `o L = tank length, m A, =surface area, m' The development of the relationship defined by Eq. (12.29) for the three =` common types of sedimentation tanks used for water and wastewater treatment is given in Fig. 12.16. oE Typical overflow rates used in practice are given in Table 12.3. The c - N j� ' relationship between overflow rates and removal efficiency is illustrated $ v c .; : B a ;:G TABLE 12.3 Typical Overflow hates Used for the design of Sedimentation Tanks in Water and Wastewater Treatment Plants g e4 TYPE OF OVERFLOW RATE. m/d o ' OPERATION Range Typical' A water treatment c E Alum cn oagulatio $ Turbidity removal '40-60 48 Color removal 35-45 lime >ortcning 40 N o Low rnagnesiun' 60-1LU 80 [sigh magnesium .— G 50-90 65 Wastewater treatment a Primary treatment b 17 -' Primary only 30-60 40 Primary with waste activated sludge return 32_40 30 Secondary Ireaement M Activated sludge c+ (excluding extended aeration) 16-32 ?4 uj Activated sludge 5 a (rollowing extended aeration) 10-24 16 Trickling filter C 16-30 24 'The t}pical N-alue is based on average plant flow; For peak flow use twice the apical value. .i� NOTES: PIPE HANDRAIL -- P05TS ANCHORED INTOCONCRETE I Y:' DIA. PIPE HANDRAIL POSTS ANCHORED INTO CONCRETE SECTION A -A NO SCALE SECTION B-B NO SCALE 2-5'X 1.0 SUMP 2' X 2' CONCRETE PEDE SECTION C-C NO SCALE 'HOLE' CFkES a rat rrsprn9delw ssru Mal t0Eu0n tt pR waLY a!!eI rnNw[smenr Kialls aM fo�w,6xgF¢ REVISIONS: 2.5'X IAOPENIT�G T I LIT P I'FREEBOARDI 10'----- -�---1 R4 @ 12' O.C. EACH WAY 1 TYPI 0 0 12' O.C. EACH WAY ITYPI SCALE: is 17'DEEP+ 1'FREEBOARDI 110' DEEP 4 I' FREEBOARDI 04 BARS @ tZ' 'C HCRIZI JTP 05 8ARS ®16 I/C VU4TX1f 12"- 14" REINFORCER CONCRETE'VAL1 (4000 PS:j — — 6' L nNCRETE SI AB-� 4-NO. 57 WASHED STONE -NOTE: OWCJER/CONTRACTOR MAY USE PRECAST CONCRETE BE OCKS FC>R WAIL CONSTRUCT ION. WHICH WILL BE SEALED ^+ TO PROVIDE WATERTIGHT CONDITION — ti a NO SCALE NOTE. P7r NO. 3 HAS NO SLOPED AREA NONE INITIALS I DATE PREPARED BY: CVP 08120111 DRAWN BY: CAD 08/20/11 CHECKED BY: CVP 08/20/11 APPROVED BY: 11 CVP 08/20/11 FILE NAME: XXX S --AIATERPROOF t:,'CTEMIOIT IOINTSEALANT PERIM•=TER :. WALe a- CONCRETE SLAB D GROUNI' O I- VN0. 57 WP •HW STONE m 'D m ti 2.S' 44 BARS i41 '--" 3. N4 BARS 13? 4.5- I1VTERIOR SLAB EXTERIOR F007ING & WALL SECTION SECTION 1-7 SCALE= NTS SCALE= NTS CONSTRUCTION NOTES: 1, BOTTOM SLAB TO BE REINFORCED WITH 6' W 10 x 10 WwF. 2. COLD JOINTS IN WALL TO HAVE KEYWAY WRH 18- +4 LAP BAR. 3. SLAB AND-INTER*R WALLS TO BE SEALED WITH CONCRETE WATERPROOFING. 4. CONCRETE FOUNDATIONS AND REINFORCEMENT ARE THE RESPONSIBILITY OF THE OWNER(S). ADDITIONAL NOTES: 1. COMPACTION OF SOX TO 95X STD PROCTOR MAX Wr DENSITY. 2. CONCRETE 4.000 P,SA COMPRESSIVE STRENGTH 028 D4YS 3. REBAR GRADE 60 4. CONSTRUC77ON QUALITY CONTROL TES77NG TO INCLUDE SUBGRADE DENSITY TESTING, PROOF ROLLING OF SUBGR4.OE, SLAB REINFORCEMENT WNSPECDON, CONCRETE THICKNESS MEASUREMEM, AND CONCRETE STRENGTH TESTING. ALL TEST RESULTS AND JUDGEMENT IS THE RESPONCIBTLITY OF THE OWNER. S. HAND RAIL DESIGN AND INSTALLATION IS THE RESPONS+BIL7TY OF THE OWNER. 6- SUMP PUMP, PIPING AND ELECTRICAL WORK FOR SUMP PUMP IS THE RESPONSIBILITY OF THE OWNER. 7. ALL WALLS ARE REINFORCED AND CONCRETE POURED B. POND LEAK TESTING IS THE RESPONSWBILIIY OF THE OWNER. 9. ALL BOUNDARIES OF CONSTRUCTION ACTMTY/DISTPJRBE0 AREAS SHALL BE PROTECTED WITH SILT FENCE AS SHOWN ON SILT FENCE CONSTRUC77ON DETAILS, 70. CPEES TAKES NO RESPONSIBILITY FOR STRUCTURAL DESIGN OF PIT WALLS ANO FOUNDATIONS. tr GAUGEA'X4'ORE'Xd'WELDEDWREHCXMED NOTES: II TOTAL ORAWAGEAREA FLO TOSR-t TOMEFORMEDCMANNELTON METALI TS.ORFASTENED FENCE MAT NOT lICEFD IACAF. TO [f DM OP WOOD POSTS W/ NO. R STAPLES. 21 SILT FENCES 1MOULD NOT y5E0 Ai RPE OUTLETS O4 W AREwS Of [ON[ENTRATFD FTbW 1[REFXi, DOCHUNES, SWwIFS -CA ULTAVIOEET RE311TAM IRLACXI MIRIII FAlRIC EOUIVALENT SECURED TO WIRE W/METAL _Y 11� [LIlS OR 1WRC wT r [RT CETlrER. ETAM. SEDIMENT STORAGE LEVEL AEMOVF fi pL E' USM WHEN THIS LEVEL C aEA[HEO EMAS nYIEETEn BY CONVFRLOry INsrenDR, 511-T FEIyCE STET DRAINAGE (ONLY] FOW [1FH I YTi —.—._._._._ 1 SYO(EP NATURAE GRADE TO INCREASE ITORAGE SEOtMCTfi I Cw CRY AND PROLONG THE UFFOF _fII_III_I�_I ME SR.I FENCE R IS GENERALLY AONSABLE TO DIG A SFDIMEM RR IN FROM Of YOUR SILT FENCE I_ WHENEVER POSSIBIF. [ARRT wPPROs. >' OE FAFRIIC INFO IPENCN, II— - CaW/spLLrwAIRuc�F'RL SILT FENCE CARRT O-S'OF WRE INTO TIICJY[M. METALCEDARORV 4'TREATEDWOODP25TSAT 10 O.C. MAIL [SOAR L WOOD POSTS SHCMJID DE 3' DEEP MIN SILT FENCE DETAIL SCALE= N.T.S. DRAWING TITLE: PROCESS WAS HWATE R/STORMWATE R RECYCLE SYSTEM CONSTRUCTION DETAILS PROJECT: CONCRETE SUPPLY PROJECTNO.: i 10 HOLIDAY INN DRIVE 1 129-002 KINGS MOUNTAIN, N.C. REV. NO.: REV. DATE: CHALAM PAKALA ENGINEERING AND 1 08/20/1 ENVIRONMENTAL SOLUTIONS DRAWING NO.: A Cost -Effective Solution Provider for Manufacturing Industries DRAWING 10017 ALLYSON PARK DR, TEL 17041 541-4042 CHARLOTTE, NORTH CAROLINA 28277 FAX (704) 541-4043 NOTES: FA O ELEV:_ 693.01 (TOP OF BERM) REVISIONS: R5`53'i5"E269 ;9• MARTIN MARIETTA MATERIALS INC /~1 Y6 t ' �+ O� OUTFALL - 001 ELEV: 688.46 ITOP OF BERM) s G8 so. 196..9 NC HWY 1 b I YORK RD O r IT a Z Z D m w C m Area to be used for the Pit Design 0.63 Acres DROP INLET GRATE ELEV: 702.43 INV. ELEV: 700.28 1 � 4 Ro LEGEND O IRON PIN SET UNMARKED POINT f SPOT ELEVATION ® DROP INLET ® VAULT _ N-70 PVC STUB 33000 �2 2 �� _ V---------------- OUTLINE OF RIP RAP BERM ELEV: (TOP O 692.928ERM) SCALE: DRAWING TITLE: " =20' SITE LAYOUT MAP - PROPOSED LOCATION OF WASHWATER/STORMWATER RECYCLE SYSI INITIALS DATE PROJECT: CONCRETE SUPPLY PROJECTNO.: 1 10 HOLIDAY INN DRIVE i 129-002 LUNGS MOUNTAIN, N.C. REV. NO.: REV. DATE: CHALAM PAKALA ENGINEERING AND 1 08/20/11 ENVIRONMENTAL SOLUTIONS DRAWING NO.; A Cost -Effective Sofution Provider for Manuracturing Industries FILENAME: DRAWING 3 XXX 10017 ALLYSON PARK DR. TEL (704) 541-4042 CHARLOTTE, NORTH CAROLINA 28217 FAX 1704) 541-4043 PREPARED BY: CVP 013/20/11 DRAWN BY: CAD 08/20/11 CHECKED BY: CVP 013/20/11 APPROVED BY: CVP 08/20/11 n N W�16: FORK RD _TIT AH ' VIGNITY MAP N.T.S. CONSTRUCTION UNITS (TTP,) *ss oO o FO F� O 0 bSINGLE ROM SILT FENCE (TYP.) • a ter} MARTIN MARIETTA �L MATERIALS INC. JV 1140-1411�J��`� ` r✓ -� h\ 1� � � , ELEV: 702.64 705--� ► - PIT DRAINAGE AREA _►' O96 C z ■ ' GRAVEL' o �.1e11b \ 1 1� \ 4�, L..STIN. GRADE CONTOUR -� - PROPOI GRACE 'F TOUR UNITS OF DISTURBANCE TELAPWR Rv POROUS BAFFLES -SF-Y--SST- - TEL"ARY SILT FENCE r - - DIVEMON CHANNEL salmi / � ELEV : �i,lliF / 704.78 ELEV: �\ 1 704.08 704.50 / � E EV: O \" 0 IfUnderground Concrete Pipe DIVERSION ` \ 4"'rrN••��eniy]'[a�.sOrth Franul ! _�- f CHANNEL `,, .� .\ • FA' - A4r�A? L �.. - �� --J►`�-"r PAVEMENT .Pit Entrances Higher than T! - h` Pit T, VVO� � r•"'�,,,.� �'�. � ELEV: 703.38 CIF ELEV:___H a 693.01 (TOP OF m BERM) a O b R G PUMP LOCATION \ as a o � - ��, •� ,� SCDIuENT TRW\ GF IMAGE AREA x.n Ace EZEV� \ I GRAVEL 699.73' - ._(�. ]/ I• ®` I \ T CONSRUCTON ENTRANCE S9ANCE \\ r OUTFALL-001 ELEV: 688.46 (TOP OF BERM) EIO$EIHG ��\ - POND r -� PONDC 4 69 CHANNEL •`` r� SEDIMENT 1 2. 1 I / (4 DRANAGE AREA 291 AC sPRLwAr ILe7.D TOP. 6BS0 \ I 159 \ I BOTTOM: 665.0 \ ��caEANDUT: Bes,o \ / N,133000, 19 , \- - ylGUF ROM 1T FENCE (TIP.) 7-Dq• \EONSTRUCTON LIMITS (TIP.) \ I \\ I ELEV: (TOP C 692.92 BERM) NQiE: SEDIMFNI 1RAP WAS DCSKMQD FOR 2.71 AC pRMNA(� AREA OFCAINACE FROM REMNNING AREAS SFIEET FLOWS ACROSS EnSnrlc 51.BIUDED cRTAIND, uMlrs aF DISTURBANCE NARRATIVE: ME PRPECT CONSISTS BF THE CONSTRUCTION AF BATCH CONCRETE PLANT. PROPOSED CONSTRUCTION OF EROSION CONTROL MEASURE WAL PREVENT SEDIMENT FROM LEAVING THE STE. ME SITE TO BE DEVELOPED ISAPPROXIMATELY 41T ACRES NTH A PROPOSED DISTURBED AREA Of }_ZS ACRES THE STE IS ROLUNG TOPOGRAPHY {SLOPES RANGING FROM 3% TO 7Z) W1H SOUS ON STE BEING OLASSFIED AS: U.B UWHARRIE HYDROLOGIC CROUP B ANY DINER SOILS LEAVING OR ENTERING ME STE WILL NEED TO BE TO OR FROM A SIZE WTH AN APPROVED EROSION AND SEDIMENT CONTROL PLAN. YHE SCOPE or NORK WLL MCLADE IMsTAuuIlm OF EROSOAI CONTROL MEASURES. OEARwG AND GRUMNG. CCMSTRUCnm OF TRUCK WASH AND PIT. ALL AREAS DETERMINED By AUAD. THE PROPERTY N5 IN ZONE ?^ PER FERIA PANEL NUMBER 3710350400A KINGS CREEK (BROAD RIVER BASIN)15 THE RECFUNNG HATER, CLASS AND WOEX NUMBER: C 9-54 N5 SO bO I (IN FEET) I INCH - 33 FEET 1) CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING APPROPRIATE PARTIES AND ASSURING THAT EKIPnNG AnunES ARE LOCATED PRIOR TO CALL ULOCO BEGINNING CGM51RUCnDN, BEFORE YOU DIG 2) CONTRACTOR IS RESHOT FOR PACING BARRICADES USING FLAGMEN. ETC. AS NECESSARY TO INSURE SAFETY TO THE PUBLIC- 3). ALL PAWMENT CUES, CONCRETE OR ASPHALT, ARE TO BE BERL ACED ACCORDNG TO STANDARDS OF THE NORM CAROLINA AEPARTMENT OF TRAMSPDRTATION. N). SHORING ALL BE ACCORDING TO OSHA TRENCHING I-9OD-&A2-4949 STANDARDS PART 1926 SUBPAAI P, ON AS AVOID UTILITY DAMAGE MIENDED. DROP INLET GRATE ELEV: 702.43 INV. ELEV; 700.28 : � f �BJFC'TPROp Finn, �cCFSSR O'y0 MAINTENANCE PLAN: THE FOLLONNC MAINTENANCE PLAN SHALL BE FOLLOWED UNTIL THE SHE M COMPLETELY STABILIZED AFTER CONSTRUCTION. DURING COISTR%X`0ON THE CONTRACTOR SH µL BE RESPONSIBLE FOR INSPECTION AND MAINTENANCE OF ALL "ON AND SEDIMENT CONTROL STRUCnURES L ALL EROSION CONTROL MEASURES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLONNG ANY RARFALL PRODUCING RUNORF AND AT LEAST ONCE EVERY REEK. ANY NEEDED REPAIRS SHALL BE MADE MM MEDIATELT 50 THAT ALL EROSION CONTROL EASURES ARE YMNTAIRED AS OESIGYD. 2. ALL SEEDED AREAS WLL BE FERIEZED, RESEEDED AS NECESSARI, AND 141 IN ACCORDANCE W TH THE SEEDING SPEryFlCAT10NS IN ORDER TO MMNTAN A DENSE KCETADK COVER. 3. SEDIMENT DEPOSITS SHALL BE REMOVED FROM SEDIMENT FENCE AFTER EACH STORM EVENT OR SElXMENT FENCE SHOULD BE REPLACED. THEY MUST BE REMOVED MIEN DEPOSTS REACH APPROXIMATELY HALF THE HEIGHT OF ME BARBER. ANY SEDIMENT DEPOSITS REMMMNC IN PLACE AMR THE SEDIMENT FENCE IS REMOVED SHALL BE DRESSED t0 CONFORM 70 THE EXISTING GRADE. PREPARED .WTI SZWED. 4. GROUND COVER SNALL BE ESTABLISHED ON EXPOSED ROPES NIMIM 21 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRACING: PERMANENT GROUND COVER FOR AI DIS:M" AREAS VAMN 15 WORKING DAYS DR 90 CALENDAR DAYS {WHICHEVER IS SHORTER) FOLLOWING COMPLETION Or CONSTRUCTON OR DEVELOPMENT. S ADUITIONAI MEASURES TO CONTROL FROSON AND SEDIMENT MAY BE RECIAIREL} BY MCDENR, CONSTRUCTION SEQUENCE: I. OBTAIN PLAN APPROVAL AND PERMITS PRIOR t0 BEGINNING MORK ARID SCHEDULE PFECONSTRUCTICN NEED H G. 2. FLAC THE WORK LIMITS TO PREVENT UNNECESSARY CLEARING AND STRIPPING. I INSTALL CONSTRUCTION ENTRANCE 4. RCBLAD EXISTING SEDIMENT TRAP TO CAI SHORN ON PLAN- UNTIL TRAP t5 INSTALLED NO FURTHER LAND DSTURBANCE IS to TAKE PATE S, NOTE: CCNIRACTDR TO TAKE DUE CARE NOT TO EXCEED FLAGGITO LIMITS OF DISTURBANCE My VARIANCES FROM APPROVED FLANS MILL REOUIRE SUBMITTAL OF SED REVIPLANS ID MCDENR AND SUBSEWFNr KPPRo,A BEFORE PROCEEDING WM ME WORK, IL INSTALL SLT FENCE IN LOCATII SHOWN, 7. CONSTRUCT PT FOR RATER REUSE, III No EROSION CONTROL MEAGIRLES NLL BE REVOWD LNTH THE APNEAS DRAINING TO SLIGH MEASURES HAVE BEEN TOTALLY STABILIZED AND PERMISSIOY RECEIVED NCDENR L MOM A REPRESENIATIVE ON THEAND OUAUTY SECTPON. EROSION CONTROL NOTES; 1. ON -SITE BURIAL PIT LOCAnDNs MUST BE DOCyFR?ITED ON HNAL PLAT. 2. GRADING EROSION CDNTRd PI AY Ij�Nd-APdN nF THE STATE FNrATIrN tr..Twe I Aw AND a v1BrCr ro A DtlL ]- CON TW Al10N 6 THE BEST PONY Or EROSION LOPES CONTROL THE AN E FAR GRADED SLOPES SHALL BE NO GREATER E co ERE ANGLER AT CLAY BE RELINED BY WGLTDEVI COVER DR OTHER . IN MY ERASION SLGRTTOL DEVICES OR SMIUCTURES. IN ANY EVENT. SLOPES I-CTr EXPOSED m r E Or r GRADING, BE DAYS OF PLANTED EnON EI ARE PHAg ff GTH TEMPORARY BE PLANTED OR ROUND SE PROVIDED WITH IE TRUE U S PERMANENT GROUND RESTRAIN LR, DEVICES, OR STRUCTURES SUFNCIE S TO RE e n s MUST, ME ANGLE FOR GRADED SLOPES AND LEES Must BE DEMONSTRATED TO BE STABLE. STABLE K THE OONOInON WERE 114E SOH UT MEC A ITSCA ORNGiNAL CCNFIR1RAlld1, NTH OR MMWT MECHANICµ CONSTRAINTS .- ADDI MEASURES TD CONTROL EROSION AND SEDIMENT MAY BE TREOAIRED BY A REPRESENTATIVE OF NtOFHR. 5. MAXIMUM GRADED ROPES ARE 2:1. NE// STEEPER PLANES MAST BE USED ON NON GEOTEING ACTINTES, PLANS SMALL S SEALED BY A A DTECIH L SURFACE ENGINEER FOR SLOP[ STABILITY AND FlNA1 SIRTACE s1E WdEnpN- 6, THE ACKWAPER SHALL MAIN TAN EACH STREAM, CREEK. OR BsHAu Bi CHANNEL 1N HE CHNNEL UNOBSTRUCTED STATE AND SHALL REMOVE FROM NIL CHANNEL AND BANKS OF ENE SCREAM AL.L DEWS. LOGS. TIMBER, JUNK AfiD OTHER ACIIRO. TURNS ]. ALL ROW FRDM PERMANENT / TEMPORARY DITCHES SHOULD BE DIRECTED TOWARDS SEDIYIENi TRAPS AND/OR BASINS UNTIL STE IS COMPLETELY STABILUZED. B. ALL SLOPES STEEPER THAN II SHALL HAW EROSION CONTROL MAT EWIVALENT TO NORM AMERICAN GREEM S75, 9- DE -WATERING OF THE WORK AREA DIRECTLY INTO A STREAM, CREEK. WETLAND. ETC. IS PROHIBITED, 10. DEMOUTION MATERIAL HAULUD FROM ME STE MUST BE 019-OWD OF AT A PERMITTED FACILITY. H. NcoEFR MAST INSPECT SITE PRIOR TO REMOVAL OF SEDIMENTATION CONTROL MEASURES. l2. PROVW NOTICE TO NCDFIIR PRIOR TO INITIATION OF LAND -DISTURBING ACTTArT. I& EROSION CONTROL PLAN APPROI CERnFlCATE WLL BE OISPLA:YEU AND A COPY OF THE APPROVED EROSION CONTROL RAN MUST BE AVAILABLE GJSTE. 14. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE NM THE NC EROSION AND SEDIMENT CORTRO PLANNING AND DESIGN MANUAL DRAFT IJU License R F -Utsy1 U } z d w Z d zz i- U) Z a Z w Z2 O L~Ll a � 2 ==z 0 Uo_ C7 O'Y z:U Y BY DPTE REVISM]N 2 .awc A�r�11CW4ENT5 REHSED PER IHCDENR • WAI I ADDED DIVERSION CH-MEL :III t,ATF F,it :, yMnN Wv; lA: G CKLDFY. CEP mLE EROSION CONTROL 8 SEDIMENT PLAN SHEET C-1.0 TEMPORARY SEEDING FOR WARM AND COOL SEASON EARLY SUMMER SEASON STEEP SLOPES SEE iXTURE 40 LBS/ACRE OF GERM" MILLET BD LB5/ACRE OF TALL FESUE 120 L95/ACRE RYE (GRAIN) 80 01 TALL FESUE MAY 1 - AUGUST 15 wlII, 125 - O—e by 30 SEEDING REFERMIZE IF GROWTH IS NOT FULLY ADEQUATE. BETWEEN DECEMBER 30 - FEBRUARY 15. ADD DATES 50 LBS/ACRE OF ANNUAL KOBE tESPEDEZA. APPLY /000 LBS/ACRE STRAW OR APPLY 40M LBS/ACRE STRAW OR EQUIVALENT HYDRGSEEDING. EQUIVALENT H DNuS£EONO. SEEDNO APPLY LIME AND FERTIUZER PER SOIL TESTS, OR APPLY TIME AND FERTILIZER PER $OIL TESTS, OR AMENDMENTS 2000 LBS/ACRE LIMESTONE AND 750 LBS/ACRE 2000 LBS/ACRE LIMESTONE AND 750 LEI10-10-10 FERTILIZER, 10-10-10 FERTILIZER, SEEDING SCHEDULE (SEASONAL) (FROM CRY OF CHARLOTTE LOUD DEVELOPMENT STANDARDS) GENTLE SLOPES STEEP SLOPES SEEDING uixTURE N LBS/ACRE OF TALI FESUE TOD LBS/ACRE TALL FESCUE )O LB5/ACRE SERCEA LESPEDEZA (UNSCAYFIED AFTER AUGUST 15) 10 LBS/ACAS KGRE LESPENZA FALL, AWLST 73 - OCFOBER 15 FALL AUGUST 25 - OCTOBER 15 LATE W,NTER PTBRIURY IS APTR 15 LATE wwTER, fEBRLWh IS APRL 1S SEEDING TO EXTEND SPRING SEEDING INTO DUNE. ADD TO EXTEND SPRING SEEDING INTO JUNE. ADO 15 DATES 15 LBS/ACRE HULLED RERMuONJFASS LBS/ACRE HULLED 9FRMuDA GRASS OTERSEEDING OF KOBE LESPEDEZA OVER OVERSUOPIC OF KOBE LESPEOEZA DAEA AIL -SEEDED TAIL FESCLC IS VERY ETFECTNE. FALL-SEECCD TALL FESCUE IS VER, EFFECTIVE, SEEDNG APPLY LINE AND FER110ZER PER SOIL TESTS. OR APPLY LINE AND FERTILIZER PER 50L TESTS. ON AMENDMENTS Am LBS/ACRE LIMESTONE AND 1000 LB5/ACRE ABOO LBS/ACRE LIMESTONE AND IWO LBS/ACRE 10-10_10 FCRTUIER. 10-10-I0 FERTILIZER. NOTE 1 GROUND COVER. PROTECTWE COVER MUST BE ESTABLISHED ON ALL DISTURBED AREAS WFNIk 21 CALENDAR DAYS AFTER LAND DISTURBEC ACT IS COMRLI'TEO ON HAS TEuPONARNI CEASE NOTE2 GRADED SLOPES AND FILLS PROTECTIVE COVER MUST BE ESTABLISHED ON ALL GRADED SLOPES AND TILLS WITHIN 21 CALENDAR PAYS AFTER A PHASE OF GRADING 15 COMPLETED OR HAS TEMPORARILY CEASED - SEEDING SCHEDULE (FRDM CITY OF CHARLOT7L LAND DEVELOPMENT 5TANDARI 1. THE BAFFLE MATERIAL NEEDS TO BE SELTIRE AT THE BOTTOM AMC SIDES USING STAPLES OR BY TRENCHING AS FOR SILT FENCE. 2. MOST OF THE SEDIMENT AKLL ACCVMLLATE IN THE FIRST BAY. 50 TINS SHOULD BE READLT ACCESSIBLE FOR M ANTENANCE. 3.1 SLOPES SUGGESTED AT ALL nowNTRY POINTS FOR EOUIPMENT ACCESS. 3, POROUS BAFFLES ARE REQUIRED ON ALL BASINS ANO TRAPS PER LATEST EDIRCN OF NCOENR EROSION CONTROL MANUAL. SUPPORT ROPE TO CARE TO PREVENT SAGGNG STAKE TO SUPPORT PARE r SUPPORT POST, 2i / INTO BOTTOM OR SIDE 1111-1111ml OUTLET ZONE 15x OF SURFACE AREA SECOND CHAMBER 25X OF SURFACE AREA FIRST CHAMBER 25X OF SURFACE AREA INLET ZONE 35% OF SURFACE AREA CON FIBER MESH OR SIULAR MATERIAL. STAPLED OR TRENCHED INTO BOTTOM OR SIDE. POROUS BAFFLES DETAIL hSh. `GRAVEL PIO Tp BE 12'M SB' AND 6' THICK MINIMUM DIN FILTER FABRIC STABILIZATION MA1. 2. TURNNG RADIUS SUFFICIENT TO ACCOMMODATE LARGO TRUCKS 15 TO BE PROVIDED. S- ENTRANCE(S} SHOULD BE LOCATED TO PRO.ADE FOR YAK u UTILRY BY ALL CONSTRUCTION VEHICLES l MM51 BE MAINTAINED IN A CONDITION WHICH CALL PREVENT TRACKING OR DIRECT FLOW OF MU0 ONTO STRC ETS, PERIODIC TOP DRESSNG WTH STONE WILL BE NECESSARY, KEEP SOME NAHM 5. ANY MATERAL WHICH STILL MAKES IT ONTO THE ROAD MUST BE CLEANED UP IMMEDIATELY. 6. WHEN NECESSART. WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTENNG WBI.0 STREETS. WHEN WASHING S REOII N SHALL BE DONE ON AN AREA STABLJZED MTN CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN 2. APPLICABLE AT ALL POINTS OF INORESS a EGRESS UNTIL WE 5 STM ZED, FREQUENT CHECKS OF THE DEVICE TWO TIMELY NAINTENMACC MUST BE 11IOnDED- 6" PKT ,y ! 6 2'-3" CCARS5EE ACcGIEGATE � GEOTEEOtINµCl.CT UTO WO . 4 SooX TEMPORARY CONSTRUCTION ENTRANCE STEEL POST I VARIABLE AS DIRECTED BY THE ENGINEER 1 FILTER FABRIC NONE. FILTER- �45� FABRIC,. VrAHCHoR SKIRT - �. — TENANCE NOTES. GENERAL NOTES- 1. FILTER BARRIERS SHALL BE 4HSPECTEO BY ME F✓MNCIALLY RESPONSIBLE 1. FILTER FABRIC FENCE SHALL RE A MINIMUM OF 32' N PARLAY OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEASI WIDTH AND SHALL MOVE A MINIMUM OF 6 LINE PORES GAILY WRING PROLONGED RAINFALL, ANY REPAIRS NEEDED SNAIL BE 12' STAY SPACING MADEIMMEDIATELY. 2. rgvEN FILTER FABRIC BE USED WHERE SILT FENCE 15 2- SHOULD ME FABRIC DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE TO REM— FOR A PERM OF MORE THAN 30 DAYS - END AIL INMI OF THE E:PECTED USAGE LIFE AND THE BARRIER STILL 6 3 STEEL POSTS SNBE 5'-0' HEIGHT D BE OF NECESSARY, THE FABRIC SHALL BE REPLACED PRDMPTLY- 3. SE DMENT DEPOSTS SHOULD BE REMOVED AFTER EACH STORM EVENT OR THE SELF-FAXZ EVER ANGLE STEEL ttPE. SILT FENCE SHOULD BE REPLACED. THEY MUST BE REMOVED WHEN A. BURY SKIRT WITH COMPACTED SOIL. DEPOSITS REACH APPROX. WALE THE HEIGHT OF THE DARNER, ANY 5. TURN SILT FENCE UP SLOPE AT ENDS. SEDIMENT DEPOSITS REMAKING IN PLACE AFTER THE SILT FENCE 5 6- WIDEN FABRIC IS USED WITH WIRE MESH S' CENTEREO REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, POSTS MAY BE USE, PREPARED AND SEEDED TEMPORARY SILT FENCE GENERAL NOTES: 1, GRASS -LINED TO BE 5 LB/1000 FIT TAIL FESCUE- 2- TEMPORARY STRAW WITH NET LNING REQUIRED. ]. RP RAP -LINED TO BE CLASS B LTNED WITH WOVEN GEOTEMS. I FT 1 3 DIVERSION CHANNEL 12' M.ry OF NCDOT /7 OR /5T WASHED STONE CROSS —SECTIONS i l600 Ol FT / A[id -TITS � � ry �Kf ;4 4 4 ! 15IHIM 7 FILTER FABRIC PLAN VIEW DESIGN SETTLED TOP ,l• L.LI. E6-FOR S ETTLEMTTLEUE HT NOTE: ~"S- L>,lo' IN. a ? L I�" 1%T.i PLEASE REFER TD NC f SCPDM SECTION f [� Y- I"' EMERGENCv BT-PASS 6" BELOW SETTLED TDP DF DAM /660 FOR ADOI TONAL ~`q!� DESIGN SIREOFlCATIONS REGARDING TEMPORARY SEDIAHENI TRAPS. I GROUND FILTER FABRICNATURAL I XI �Y---HID oETRAP mGNAncN Il" GT E" EV. I �REA� I DIM ,S I AN Tr GEL ?IT 6ASON EICv. Sl-1 10' 6520 4,232 SF 45'.92' 6w.5 656.0 665.0 SEDIMENT TRAP DRAFT INC License # F-0891 NOI BY DATE I REVL910F. 1 1 A/ITX11 TA=C TLD ELEVA TONS IN —ACT. WM. IM16: µ1.II GRAwHRT, JA_ OE6FO h. fiB TIT'LE F:iOSION CONTROL & L --DIMEP TT DETAILS SHEET i AUG 2 3 2011 � A - WATER QUAIR 1Vf iLAbf05 AND STMM1rPATM 9RAWi August 22, 2011 Re: Expedite Kings Mountain Authorization to Construct Permit Application Stormwater Permitting Division NCDENR - Bureau of Water Quality Dear Ken Pickle, I am writing to request an expedited review of this Authorization to Construct permit application, for the Kings Mountain Ready -Mix site. There are outstanding customer projects and increased capital expenditures that are accruing during the course of construction that require this site to be operational as soon as possible to prevent further complications with -in our operations. If you have any, please call me at 704-372-2930. Thank you for your assistance with this review, Re ards, Joh ' Alexander Environmental Manager Concrete Supply Company � o eke szi I " - ) i� 7%j+ Y'o 0 /% ?4 1 Cp I '1_ 9 1 -- Q'f)+ 14 OCCr, " Q, 1 Q511'3 C -Vco-,5�-z ) ( -S -e ) I-- S- vw.Yv i PIC., wLv #~Svv (� �a A VA- � orJ�n� J ` -)" --trv . "40 t �'i f�o1 _2 �� .��� - h" v II, c.,� --------------------------- W� cry " At 'A J E-mail correspondence to and from this address may be subject to the North Carolina Public Records Lan and may be disclosed to third parties. i �" ���rzl�s�- z/.1 � � �� _ �. ;--_ 9'05 L - �.- _ --ram+ _ v ��=- _ � �~ �� ,tea �.; 1 .ti_�_ �� �� I ���'y �r f � p� �- �'— o� � � � p�"'* ®e August 22, 2011 Mr. Ken Pickle, Environmental Engineer H NC DENR — Stormwater Permitting Unit 1617 Mail Service Center Raleigh, North Carolina 27669-1617 kP=@mWMJ AUG 2 3 2011 VENR- WATER QUAUTY , WETLANDS AND M MryATER BFUW X Re: Permit Application for Authorization -to -Construct (A to C) a Proposed Process / Stormwater Recycling System for Kings Mountain Concrete Plant Concrete Supply — Kings Mountain Plant 110 Holiday Inn Dr. Kings Mountain, Cleveland County, North Carolina 28086 CPEES Proiect No. 1129-002 NPDES General Permit No.: NCG140000 Certificate of Coverage: Not issued yet Dear Mr- Pickle: Concrete Supply is pleased to submit the attached Authorization -to -Construct (A to Q permit request report along with construction drawings for the Proposed Process / Stormwater Recycling System for Concrete Supply — Kings Mountain Concrete Plant located in Kings Mountain, North Carolina. The A to C Report includes: • NC DENR NPDES General Permit Application NCG140000; • Check for $100 made payable to NC DENR; • Site map showing the delineation of drainage area contributing to the process wastewater; • Site layout map showing the proposed location of the process / stormwater recycling system; • 25 yr 24-hr stormwater runoff calculations; • Detailed design, construction drawings along with construction specifications for the proposed process and stormwater recycling system; • Site Location Map; Concrete Supply sincerely appreciates your cooperation and progress of this project. Please cal I me at 704-309-8738 or Mr. Chuck Pakala ofCPEES at 704-541-4042 if you have any questions or comments on this permit request. Res ectf ill sub ' ed, hnie Al xander Environmental Manager Attachments: A to C Permit Application Package . I !j 111 1 1 " f , "- ( ; 1 4, irT . : lo. rj 14 'r;7n-rT I I j i f 1(' TA -it , - . i , , 'trill. 1 , 1, '" 1 1, 1 - ".j . 1 kit Permit Application for Authorization to Construct (A to C) a Process /Stormwater Recycling System NPDES General Permit No.: NCG140000 Certificate of Coverage: Not Issued Yet Prepared for: Concrete Supply- .7Cings Nountain Plant 110 Holiday Inn Dr. Kings Mountain, Cleveland County, North Carolina 28086 N CARO �Ftiss�NO�-s P SEAL 19807 0 a� CPEES Project No.1129-002 August 22, 2011 Prepared by: Chalam_Pakala Engineering and Environmental Solutions 10017 Allyson Park Dr., Charlotte, North Carolina 28277 Tel (704) 541-4042 / Fax: (704) 541-4043 Email: cvpakala@carolina.n.com $l,,zl11 f �_ `t .- � � � �� � .y�, M •- yl � M r• �� { � _ �w f4� _, M� l 7 �ry � � o . . -..� � �. w � h• 4.1 \. _� �' ti l'� ♦. . s. '�' � A iAI � r .1 _ • `� o `+ Z. _ � e � I �� , Permit Application for Authorization to Construct (A to Q a Process / Stormwater Recycling System Concrete Supply— Kings Mountain Plant Kings Mountain, North Carolina NPDES General Permit No.: NCG140000 Certificate of Coverage: Not issued yet TABLE OF CONTENTS 1.0 FACILITY DESCRIPTION..............................................................................................1 2.0 FACILITY OPERATIONS................................................................................I...............1 3.0 PROCESS WASHWATER CALCULATIONS...............................................................2 4.0 STORMWATER RUNOFF CALCULATIONS FOR A 25 YEAR AND 24-HR RAIN EVENT....................................................................................................................................... 3 5.0 STORMWATER / PROCESS WASHWATER RECYCLE SYSTEM DESIGN AND CONSTRUCTION DETAILS.................................................................................................4 6.0 WATER BALANCE CALCULATIONS..........................................................................5 7.0 A to C CONSTRUCTION PERMIT APPLICATION....................................................5 TABLES Table 1: Runoff Volume Calculations for a 25 yr, 24-hr Storm Event FIGURES Figure 1: Site Location Map Figure 2: Aerial View of Surrounding Properties around the Kings Mountain Plant Figure 3: Site Layout Map - Proposed Location of Process Washwater / Stormwater Recycle System Figure 4: Process Washwater and Stormwater Recycle System Construction Details ATTACHMENTS Attachment A: Runoff Volume and Weir Design Calculations with Backup Attachment B: NC DENR — Division of Water Quality Stream Classification Table for Cleveland County CP Engineering and Environmental Solutions i A to C Permit Application Tel: (704) 541-4042 Concrete Supply - Kings Mountain Email: crpakalaAcarolina.rr.com 110 Holiday Inn Dr., i.�, k74,l. 1S 'l�'•: S. .[' - ..�, 1\ ., + 15. �! - 4, 1�'.5...'S1'1�]lr•li' _ �(' 1'.�lS�3Crt'•. +.� f.+ ." � ,y�,.:�fl€•� �1� h.�i�i',3 ttiy'}:`iil ,Jsa..�.li {, �f��GE �, '+ � .3' !�.b `F .jS'I,,f- ;! ►'.. i� l jar iil•i;[: �+Er +� $ _ E�,`'3 ::1 i, i. :f+ •'y;j %I /it 'i"ilifl Ali•J.1.-.Y. 0{�'•l.l r� ri `� t� ( l:i.�%E:. j.l. ti%!1 ����j'.�!�+ Ali• ' :.: ,, ',' �.'r. � .l+it: ,,. �. � ..'•C' i`_ `11�- rlE.�'.5 �'• •'.�:..''S(^,[. •lr.:.`! (• .. �jf;.lf,l+ ' 't!l�.. w �'�' .( [�l(r �'4 . `.1!f�1•. _ .'tt F,, Ell �i..iit `;`f.ti'{ f' j>����•� •�fii. -: �j E_ k.1�. 4 + 4F: • r : f • ;'a r: #lr,`17110-.1- ! !'. ••! !. w .',1�1}-fp....... ....,..,.. .... ... .. ......,. ....... . •j•�C //4'. Tr .r R� �i i}`AqJj .1 s+�a0 ,.xs �� i, ri ,y ,3 ��•! St 10 . ...... r... .... .. �. r. ,.. ... ....... .. .• ..+ . .. �J ./A11 �fqq����� �... .I.J.'4iJ. i�4`. aa5 �4�� y ... .. • r. • .... s.. .• a... ... ..�..a..i ...... ........y.. -.. .. •... .... ....1��, .... 'j•!s �...i.'.+� �.lS ".�,4� h;.TP�.i.4:P .. �i .�f`�i.{. `�'.L=. S ��•:,..� i;,:1�5� �...�1 i�.�� i�J..4'::��� V i-�4 iP ......................... ... ............... ...., .,............... ,,........, ... t '�J;# �r.Y���: 3'.. :°. J.i.�.'�� '! ��4+1i _.. �. `i`��k. ° iz 1.���s.;r+ g�.�''b'a _� �.��' f }�� ���-''��. �-!-!.��.{ ��!•��1 .. .... .... ........ <......... . .......... ..... I� JJTgg' g'A n• .'aI �: f '' ..8�:�(+:.\,€: ,sl,fli]���.s; �:N SGJ.i�I,' �+J.k'.ii..s•➢ i:S '�:�+.t i Permit Application for Authorization to Construct (A to Q a Process /Stormwater Recycling System Concrete Supply-- Kings Mountain Plant Kings Mountain, North Carolina NPDES General Permit No.: NCG140000 Certificate of Coverage: Not Yet Issued 1.0 FACILITY DESCRIPTION Concrete Supply -Kings Mountain Plant located at 110 Holiday Inn Dr., Kings Mountain, Cleveland County, North Carolina, is a dry batch ready mix concrete plant for commercial supply. The primary Standard Industrial Classification (SIC Code) for the facility is 3273 (Ready Mixed Concrete). The approximate location of the facility on a US Geological Survey Map is provided on Figure 1. The geographic site location can also be given as 350 13' 33.6" North Latitude and 810 20' 16.2" West Longitude. The subject facility is surrounded by commercial, quarry mining and residential areas and stormwater from the facility drains to couple of Industrial Waste Ponds located southwest of the property. The stormwater from Industrial Waste Ponds flows to Kings Creek and eventually to Broad River. The details of surrounding properties are displayed on an Aerial Map, Figure 2, attached with this report. The Kings Mountain Plant occupies approximately 4.1 I -acres of land. However, approximately 096 acres of area will be. used in the stormwater drainage calculations for washwater/recycle operations. Stormwater from this property flows to the Industrial Ponds and from the Industrial Ponds to Kings Creek located on the southwest property, Figure 1. The stormwater-from Kings Creek flows to Broad River located south of_the.site. Based on my review with NC Division of Water Quality web site, it is our understanding that the Kings Creek is classified as Class C (see attached table obtained from NC DENR — Division of Water Quality Section web site for details -Attachment B). The stormwater from the facility is carried to the Industrial Ponds via swales and sheet flow. The Kings Mountain Plant will consist of an office trailer, a ready mix concrete mobile plant, two cement pigs (storage containers), water tanks, storage areas for stone and sand, and a concrete truck drum wash area. Kings Mountain Plant will have approximately 8 to 12 trucks and operates 10 hrs/day, 5 days/wk and 30 to 50 wks/year, depending upon the weather and business conditions. 2.0 FACILITY OPERATIONS The facility operations will include: a dry batch concrete mobile plant, cement storage pigs, sand and stone storage areas with limited water sprinkler system (taken into process -water consideration) and a truck washing area. CP Engineering and Environmental Solutions ] A to C Permit Application Tel: (704) 541-4042 Concrete Supply - Kings Mountain Email: cvpakala(a�carolina.rr.com 110Holiday Inn Dr, j '2 d dl..,.j" r" I q - 1114 1. .)I"", L) -,f i, fx I 1. 31 If; I ,r, jo I tv j I, ;r 10 -' q.1 III, w i i 'ilie. . ...... —I e0rj�_j,: r Lri-b 0l[ el'-- jir -vit[. +jvr r ,fit 0' It! e Based on the request from the user, typical operations from this plant include: loading the sand, gravel, and cement into a weigh scale which drops the dry mix into cement trucks as a dry batch concrete mix. The loaded cement truck with concrete mix will be brought to a truck washing area for a surf cial wash before it goes out for the delivery. Occasionally, any left over concrete in the concrete drum will be either used in making blocks or washed of at the plant in a truck washing bay Thus; process water will be generated at the plant for either r�luhg or d'si posal. Based on our understanding of the facility operations, wash chemicals are located near the- wash pit area to collect any potential spills from these storage vessels. The oil storage tank was kept far away from the pits and necessary secondary containment shall be placed to prevent the migration of potential spills from the tank reaching the -pits. Therefore, CPEES believe no oily water or stormwater contaminated with chemicals will be released to the environment from the facility. The facility has not applied for a NPDES General Permit (NCG140000) in the past and therefore, applying now to obtain the NPDES permit and be complaint with the State Division of Water Quality regulation. To meet the NPDES General Stormwater Permit requirements, a Stormwater Pollution Prevention Plan (SWPP Plan) with Best Management Practices for potential stormwater pollutant sources shall be prepared and implemented at the site. All truck drums and drum chutes will be washed at the end of the day before'parked for good. Therefore, the -locations where process washwater will be generated at the plant are: • Surficial cleaning of the drum before leaving the site, • Cement drum washing if left -over concrete is brought back to the plant; • Drum and drum chutes cleaning at the end of the day; and • General stormwater from the plant area and the stone storage bay. 3.0 PROCESS WAS1 WATER CALCULATIONS Based on our discussions with the Kings Mountain Plant Manager, it is our understanding that approximately 25 to 40 batches per day will be completed in the summer time and 25 batches per day will be completed in the winter time using 10 trucks. Approximately 5 to 10 gals of water will be used for surficial washing of the truck per batch. Approximately 5 to 10 gals of water will be used to wash drum chutes per truck per day at the end of the day. Approximately 200 gals per day per drum will be used to wash at the end of the day. CP Engineering and Environmental Solutions 2 A to C Permit Application Tel: (704) 541-4042 Concrete Supply - Kings Mountain Email: cvpakala(@carolina.rr.com 110 Holiday Inn Dr., Uzi via �V, W -no t, py! Zw. Ojos( sl 0 1 . FL, -I t I I or) Lupp Ant f34i I Iry Q F -fit: J, I"I .1j. 171-1% M;t: 5,11 `1�11 III` n •M APV f C. oil Ar T pHiq Oi /W-) C1 41 li•,i It)! .5 f vi 311 e, u4j I_ 1 jl[1,4f A rK obi - I Own A r i aw.mn wly",'). -Ii o"4;'jol b,.% 1; rpmrsi : PON . nwh LE'.. wN i ILA J 'lM MY& Or In; .41r,, 1 it Ju im i wK NP i.imi if- W W Wo , i. . n t - i if S ,yI­7,. l: Irl.*. j. 10T! q Al al., ,r) Description of Operation Unit Total q # Trucks worst -case trucks 12 # Batches per day using 12 trucks worst -case scenario -summer time Batches 40 > Surficial cleaning 10 als/batch 400 Chute cleanin at the end of the day 10 galsttruck 120 Drum cleaning at the end of the da 150 gals/truck '�' ; 1,800 -77 Leftover concrete washing from the drum 5 batches 200 gaWbatch 1,000 Total(gals/day) 3,320 4.0 STORMWATER RUNOFF CALCULATIONS FOR A 25 YEAR AND 24-HR RAIN EVENT According NC DENR-Division of Water Quality NPDES General Stormwater Permit requirements, recycle systems are considered wastewater treatment per 15A NCAC 2H .0203 and all wastewater discharges must meet a total suspended solids (TSS) limit of 30 mg/l, a _ settleable solids (SS) limit of 5 ml/l, and pH between 6-9 SU or must demonstrate that the recycle system has sufficient capacity to contain 25 year; 24-hr rainfall event plus one foot of freeboard under the design operating conditions. To obtain an economic and workable solution to the proposed recycling system design, the truck washing operations and process washwater generating points are all brought to one location to reduce the drainage area for 25-yr, 24-hr calculations. Approximately-41,818 sq ft or 0.96 acres of area including the small`area for gravel washing is expected to contribute to the process washwater from the facility (Figure 3). All washing.operations-beyond-this designated area are prohibited at the facility and the drivers will be trained to adhere to this new policy for meeting the Stormwater regulations. CPEES has performed stormwater calculations for a 25-yr, 24-hr rain event for 0.96 acres and approximately 18,330 cubic feet (eft) of runoff capacity is required to hold the designed rain event. The runoff volume and weir design calculations are provided in Attachment A. Please note, during a rain event, no plant operations will be conducted. Therefore, no washwater is accounted for in the proposed recycle system design when 25-yr, 24-hr rain event for stormwater is considered. CP Engineering and Environmental Solutions 3 A to C Permit Application Tel: (704) 541-4042 Concrete Supply - Kings Mountain Email: cmakalana carolina.rr.com 110 Holiday Inn Dr., , - - � 1 t. _ — —r r r•, 1 _ v � .. - t •i`J rG .' I , � 2dk:�:1 . i -- _ ... _._ �'��fi�;'.. --... -. "�.—f-'.:1•-i .r . i -� :t. r'.i. ra':il si- i i �i�ji' .� Jr.r' �Cri -C•h' .r',�: ir,-t . i • t E''tt-oi�M"lt't:_ .fli .r. bJI'd _ l• , i.) r?'l::f3'?i " {�'8lrivt Cy� r .r'.'{i 1� i t i�• 2,77 3>ir L ,, ..:;. i; .�.. Tom= .. V G. — V_,j A&f � ult �VVI r�/bN`t5`� d VY YY 5 .� '` iFr. f'i flit"' f+•' . F � .r, , �'+C•r it jr r. tr'. ?If i ..i �; ig' e1 •. fig/, ., ll,';,i. I� ` ' �� � L �l '� Y' • —'" f r` f' i , ,J':rlGs r(i�i �fj T•y. r ' 'i+� .C-' •Y'_'- f - �Jr .-1j. '.f ..'t r f..'1 'JLai �1 r ...iii, I.- _!i .. r . �'I ,YJ''.! J. ' {'# .i _. .i�..:F j'1 .. r. 'Jk'lY'�3- 'U fipp(.!;' rt�. t:i/� -1 i,lt• �.il:� ...0 t, °i�Jt1 _`iir`.'^,(rt•r'! _�:' . //'" 1 - 4, r 1 '1 -} 1'.i%rl Yt F4.l ' L.aLr:tE'.'J+ ".i li l..I``'.. 1' t .:j r'• .� ..� •� f' . tl. l+s'�. I.. �!•I• lii,.i it 1 1, i=: rJ`+ I. $IQJi ,• rnr , , T 'tii'f';.. !'. '. 'rltlj i ,; }: ,jj.[E i '1','i`i< ; �1LWT ,.�. J+� �?J•Iar�'.r i i:T�F'�:) FF_ r1. i/ •.i`.. '{�.� 'ii.i 'il�. ' .,,, -rJ): .}4'i�'rJ #!,'. 3�' ..i� ):J?1?i �:�l:itr.li f`1Y. �#�. �� .. .�1�: i.. �r S)�•.. rl € •-...t c !'� ."1:E-i.f• J7 i J,. .fr'i, ft.jii .�S-�� �:w3 �• ffr f .E� `Sl fr F J'` r} i` .. .� I' ' .r II _'ii; .iJ .. 5�f..�'ri� 3i1.(� ..: J'. �+'. r 1� !., �'� iil_i .'I 1='. �: .�• •*?'{ if uJib. ff ri-.Jsf1 /,i! i lY`. J i fE� . it/: !"ii ,ii, :� >'., ': }3. '' .�'�. rl �r v•i1.: s}. )1�1:';J"J Ir' s)t:' !i' f '1! .��<]} i'�fl 3 �.1� ti:�� , i' , .r l•i'7l +.� i f l� V'r 14. .J li?1 " 1, r?'1?„i'f �'it f,. JaI�H)�-� 14 �rl.,If.J:r►"f kff? ,+rr? r;5�',1 a,.il. 5.0 STORMWATER / PROCESS WASHWATER RECYCLE SYSTEM DESIGN AND CONSTRUCTION DETAILS The proposed recycle system is designed to capture all process washwater and stormwater from a 25-yr, 24-hr rainfall event from the subject plant wash areas. The recycle system is designed to hold entire runoff amount from the designed storm event. The approximate drainage area involved in the process washwater/stormwater is estimated to be 0.96-acres (Figure 3). The 25 year, 24-hr runoff volume from this drainage area is estimated to be 18,330 eft. A recycle system designed for the estimated runoff is a four pit system (3 pits + 1 truck ...r. wash pit) with a drying bed for the waste materials removed from the pit _(Figure 3}; The total volume of all the main 3 pits (Pit # 1 through. Pit #3) were designed. to be sufficient to hold the entire 25 year, 24-hr off volume. The process washwater/stormwater held in truck wash, pit would'bi additional storage beyond the designed storm event capacity. Please note / Concrete Supply strives very hard to control and mitigate migration of any contaminated stormwater from the facility to the waters of US. Appropriate slopesiberms/walls are proposed to isolate the 0.96 acres of drainage area for the washwater/stormwater recycling operations (Figure 3). Of all the four pits in the recycling system, three are sloped at the entrance in order for a front- end loader to go.into-the-pit-fora periodic -cleanup. However, a berm or a slope away from the pit entrance is placed in front of the_pits-(Pit.#_ 1_and #2) in order to divert the washwater entry_ into these pits. The third pit is a rectangular pit (Pit #3) and no washwater/process watef will enter this pit from the drainage area., The cross -sectional and construction details of these pits are shown on Figure 4. CPEES designed a pit sludge storage area next to the truck washing operations in order to control stormwater flow that is in contact with the pit sludge. The slopes of the truck washing operations and the pit sludge storage area are directed toward the truck wash pit of the four pit recycling system in order to control and mitigate migration of stormwater contamination from the washing operations. The location of the recycling system along with stormwater flow directions and wash areas are displayed on Figure 3. The construction details for the recycling system are displayed on Figure 4. The 25 year, 24-hr stormwater runoff calculations are provided in Table 1 of this report. A sump pump with a switch will be provided to pump water from Pit #3, as required, either to the plant or to the truckwashing operations. This would help empty the Pit #3 to accommodate any possible rain event. CP Engineering and Enwronmental Solutions 4 A to C Permit Application Tel: (704) 541-4042 Concrete Supply - Kings Mountain Email: cvpakalaQcarolina.rr.com 110 Holidav Inn Dr., ILA 11, i t rf: , �.'I'�i.}! t,, �{r �i_r f1.13°. .. 'I�(11JJ � Ii,E .. I Lz r•t ' I >`. r.t''!., !�;? {r; fr 1 11 J ] r 'j j!, f];lJ tt- f{'.'12 iY .'CJ}i..',7'f: 'l 43•ti ((•li f.7 :'-] �.." f'I,' � };r• + �. r "{, (ziJ {7r3 _! . ...:f E'.. JJ ]i?) J. �' 1!, r, 't .I! .3 r I}S;^ri�t�i Ir •�' '1;J 1.3li:ii -rt. ., . iri :J .+ _'-:'J•i:':! i � t' Olt r�!?•. : r."'i .ii •a� ..I. I n ii .. l.. "� 4,t� t7L :'�r]•tp]r a 'r, r=.- '1C •.iCr i t ,:'iti" r!},I..j' r ,•,.i.4 :},ir• fi�i!"3, j'•,:zr'[� Jig tJl t Y' . j _ Y a r, .l 1,' •'lf', rri �fr' ,T•./: 'it :f i2 :r .': ;+. tl r•!r.• ,]{: .il � rjfl �' a "r 'Jr,', ., 'ref}{ Iji>r{urr ,,5. .t�.r nr. } .1'1 ! l ��J'r ��-fir if i�i. e�. i,: Jt,' �:'i, %' ii,1 (} ira o F'w kY.r ji!..! !Yi n}Ti .1• r {+Ifi 1.: 1 ".:� r'. r'! -ri `•r, itl:, + �.�ili? 1_i i�.Jr d.� tsii.� -,If. ir' . i.=,f.#'rtr�i .J,; i i r[ Wit.! '.. t r .. :.i,' ,!}i. !' r �: • 11! f 1r .� }�}�. iJ:. � i e ! � 'G! •Ji, "!'• , . 'i' - l�:z'j [/: 7 L .41.'J 10 !P!', }! , :-11• v! ;i i. t `i :, i �r r t. rL' u jlr '1. :z r E , fldtJli I l r a j!.!T rill, rf't. t, �;i}: 'f• .,. ! ! •i it i, [JT, j (1��11 i!� j:1}jri�a •1 - a i t,. '� �i!L'=', ii... j! z_',}".," .r,tErr Ei ;t-f Jtr r'r r i " Il .t.J,' ;r. j` •j' r( f r•(,�! I ri••= �,} fi , 1�' 1, r,ii • .r J ,'1(',,.. i.,: ' �.r 1,{ll,l�l i,j .'(•rr� L! /Y In � r� .,ri. .1I0I'.:� `li_F' ;l fir/.�rE,` 1 i i (: ;C' : � li_i�t �"•i .:{,�:T:,:i .! �.i Ir'r _311, Et. ly r; I ( I 2'11; z i J : r'r i 1'." } t'. 'S 1 `t• i. f'Y.'. z• r�> i}{: {., '!. i ! , j. Fl1F i, r3t1 , '`J`ii' _Yi. t-r 11�(!f �r �L liS: '' l.i� [ S .ifIi'. ��' �A"r„ '.t,}?.>} rr r- ,-J,'; EIJ ly +.",.3; ,1 _f. .., 1-f1'"n r.-, i�r•r i•� I llrFf:' �.f r 'TJ i� #J'{1 t 1 r C',JC- i ,'. 3'• !Jri U t'I''£.' i,•r J^< ,iJt:.l, ;; ,r!!G vl•",' ,l i 1, I{, iJaf .# :7. i F,'ii.ol..[trr f,) �3r' iP + I,f .'"Jfr•i 1,: ['r.E(! :i''. '"]II zf,,- kt; F}. ,•ff, r+..-.Iz Jr171 �?'J, Ir}J" �!], •: r- ' 1' ': - i J ! rlr ]' rl r�i. ' . s 'I }� C, L ,r. ' .ry '�i.J'. f. �,a:,t' �'. +' +� ', t `G ri+ }�'>. ..r�t' • * �"'s.�4 'r'•a .+ ��;.:+ .9 i'�. r` i .IH• 1 6.0 WATER BALANCE CALCULATIONS The total flow from 25yr storm event is calculated to be 18,330 cft or 137,109 gallons. Typically, the facility operates 40 to 50 batches per day and 250 gallons of water per batch (10 gal/yard and 25 yards per batch). Total water used in the plant per day is approximately 10,000 to 12,500 gals. Therefore, the approximate average time for the pit water to be recycled in the plant equals to 12.4 days. Table 1 shows the calculations for the pit water recycle/water balance at the plant. 7.0 A to C CONSTRUCTION PERMIT APPLICATION Based on our consultants' discussions with the State DWQ, it is our understanding that we need to file a NCG 140000 Notice of Intent (NOI) Form to obtain A to C Permit to construct the proposed process washwater /-stormwater recycle system at the Kings Mountain Plant. A copy of the NCG 140000 NOI is attached with the A to C Report for an approval. - ® Lr (11 CP Engineering and Environmental Solutions 5 A to C Permit Application Tel: (704) 541-4042 Concrete Supply - Kings Mountain Email: cr pakala(&carolina, rr. com 110 Holiday Inn Dr., 'tT s;!- Oj14 1 ';-1. "'1 J1 il; 4"r); 1,.,. jilt '10 olu , V /f o xt r it u - ' 'Lis -1 , --rl, i, lct- 'I -e I H Yrar I Month I My I Division of Water Quality / Surface Water Protection NCDEN-R National Pollutant Discharge Elimination System, liz�wC�na NCG140000 NOTICE OF INTENT National Pollutant Discharge Elimination System application for coverage under General Permit NCG 140000: to STORMWATER AND PROCESS WASTEWATER DISCHARGES associated with activities classified as: SIC (Standard Industrial Classification) Code - 3273 Ready Mixed Concrete For new plant sites that will discharge or recycle process wastewater (even If commingled with stormwater): This NOI is also an APPLICATION FOR Authorization to Construct (ATC) wastewater treatment facilities. ATC requests must be submitted at least 90 days prior to construction'. For existing plant sites discharging or recycling process wastewater (even if commingled with stormwater): This NOI Is also an APPLICATION FOR Authorization to continue to opperate wastewater treatment facilities In place. Construction, modification, or Installation of any new treatment components at an existing site requires an ATC. Treatment facilities used to treat or recycle process wastewater (including stormwater BMP structures treating process wastewater flows commingled with stormwater) require an ATC prior to construction per 15A NCAC 2H .0138. The authorization to construct or continue to operate will be issued at the same time as the Certificate of Coverage (COC) for the NCG14 permit. Design of treatment facilities must comply with requirements of 15A NCAC 2H .0138 & .0139. Construction of wastewater treatment facilities (this Includes recycle systems) at new or existing plant sites requires submission of three (3) sets of plans and specifications signed and sealed by a Professional Engineer (P.E.) or qualified staff along with this application. A copy of the design calculations should be Included. Please see questions 14 & 15. For questions, please contact the DINO Regional Office for your area. (See page 5) (Please print or type) 1) Mailing address of owner/operator address to which all permit correspondence will be mailed): Name Street Address City Telephone No. MR. JOHNIE ALEXANDER, ENVIRONMENTAL MANAGER P.O. BOX 5247 CHARLOTTE 704-372-2930 X 2071 2) Location of facility producing discharge: Facility Name Facility Contact Street Address City County Telephone No. State NC ZIP Code 28299 Fax: 704-334-8650 CONCRETE SUPPLY - KINGS MOUNTAIN PLANT MR. JOHNIE ALEXANDER, ENVIRONMENTAL MANAGER 110 HOLIDAY INN DR.. KINGS MOUNTAIN CLEVELAND State NC ZIP Code 28086 704-309-8738 / 704-309-0134 (Mark) Fax: 704-334-8650 'As per 15A NCAC 2H .0106 Page 1 of 5 2Unless treatment facilities are designed, constructed, and put into operation by employees internal to the company who are qualified to perform such work for their respective companies in accordance with General Statutes, 89C-25 (7), plans and specifications must be signed and sealed by a P.E. -T1 "i1h COW -1c 1-jel -^, 13 - Y4 C n .7" i 1"n-0 "'a'zfl N"'- I-, r, I L, i - rj,. i- t•,' : , F.' as"ISN'T ad, 1311 m-151 7cM1 : �ms � 10La'! '1':r41Iq 1"VIMjn vi3ruf4wutlhil A'A" AC0444 kN MLaiO'i n r7— laore 1. Amm W 0 1j"t umuOi..Jr1--rf 44 ill )f4i0Ummmoni3AV rwlot' n0fT -m-11 J; ;&wu . r. P&A it KA) K YSA All 'I, v V!' i'1 bn 4 Z I A b! r not now -Ou L 1 3.,— ';:su7ut-g" -'I 1115 j, !AQ QUQ I 5!1� >1 402 TTT 12MUZ Q) %14f 1: JAW: 19 14M Yal JAI so sab-1 -1170 �j "i! NCG140000 N.O.l. 3) Physical location information: Please provide a narrative description of how to get to the facility (use street names state road numbers, and distance and direction from a roadway intersection). SEE ATTACHED DIRECTIONS (A copy of a county map or USGS quad sheet with facility clearly located on the map is a required part of this application.) 4) Latitude 35 13' 33.6" Longitude -81 20' 16.2" (deg, min, sec) 5) This NPDES Permit Application applies to which of the following: ® New or Proposed Facility Date operation is to begin ❑ Existing 6) Standard Industrial Classification: Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial activity at this facility SIC Code: 3 2 7 3 7) Provide a brief description of the types of Industrial activities and products produced at this facility: (Include a site diagram showing the process areas present at this facility.) DRY CONCEEIE BATCH OPERATIONS. PLANT PRODUCES CONCRETE FOR COMMERCIAL USE 8) Discharge points I Receiving waters: How many discharge points (ditches, pipes, channels, etc.) convey stormwater and/or wastewater from the property? ONE (OUTFALL-001) What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility stormwater and/or wastewater discharges end up in? INDUSTRIAL PONDS TO KINGS CREEK (SEE FIGURE 1) If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). NIA Receiving water classification (If known): CLASS C (SEE ATTACHED WATER QUALITY CLAMFICATION SHEETS) Note: Discharge of process wastewater to receiving waters classified as WS-II to WS-V or SA must be approved by the N.C. Dept. of Environmental Health. If DEH does not approve, coverage under NCG140000 cannot be granted. No new discharges of process wastewater are permitted in receiving waters classified as WS-I or freshwater ORW. 9) Does this facility have any other NPDES permits? 0 No ❑ Yes If yes, list the permit numbers for all current NPDES permits for this facility: 10) Does this facility have any Non -Discharge permits (ex: recycle permits)? 0 No ❑ Yes If yes, list the permit numbers for all current Non -Discharge permits for this facility: 11) Does this facility employ any best management practices for stormwater control? ❑ No 0 Yes If yes, please briefly describe: BERMS AROUND THE STONE AND SAND STORAGE AREAS,_ PLANS TO RECYCLE WASHWATER 16me, '7ro7 r.r ;uvqqj- -q (T 4iUt f) r; 5;" T!, r I ncN j k, OL TL J 4t Ofi 71 T �,don_ A it t 2 V ;>M, ,In "It "It V J1 C13 f S t', elf re4, f OS E 1,4 "j, NCG140000 N.0.1. 12) Does this facility have a Stormwater Pollution Prevention Plan? ❑ No ® Yes If yes, when was it implemented? SEPTEMBER 2011 13) Are vehicle maintenance activities occurring or planned at this facility? m No ❑ Yes Wastewater Treatment Design Information 14) Are discharges occurring or planned from any of the following process wastewater generating activities? Vehicle and equipment cleaning m Yes ❑ No Wetting of raw material stockpiles m Yes ❑ No Mixing drum cleaning 17 Yes ❑ No If yes to any of the above, please describe the type of process used to treat and/or recycle the process wastewater. For a sufficient application, you must provide design specifics (e.g., design volume, retention time, surface area, etc.) and calculations to demonstrate compliance with permit effluent limits (pH - 6-9 SU, Total Suspended Solids (TSS) - 30 mg/l, and Settleable Solids (SS) -- 5 mVl.) [Use separate sheet(s)]. If all these discharges are recycled, please refer to Question 15. For plants that recycle and/or discharge Process wastewater. When applying for this permit, you are also applying for an authorization to construct (new treatment facilities) or authorization to continue to operate (existing treatment' facilities) as part of the NOI. For new sites. you must submit three (3) sets of design plans and specifications with this application an.4 provide supporting calculations that predict compliance of final discharge with permit limits. For existing sites. applicants should submit three (3) sets of plans and specs for facilities as -built and provide as many design details as possible, or submit a detailed diagram of treatment systems In place that Includes Information such as tank volumes, dimensions, retention time, piping, settling basin details, etc. Please note: If new treatment systems are Planned for an existing site, an ATC will be required prior to construction of those facilities. Planalspecs/calculations prepared by a P.E. and the request for an ATC may be submitted with this NOI, or separately at a later date. DWO may request the status of your plans for requesting an ATC upon Issuance of the COC. 1 S) Does the facility use or plan to use a recycle system? ❑ No ® Yes If yes, what size storm event is the system designed to hold before overflowing? (for example, 10-yr, 24-hr) 25 year, 24-hr rainfall event For a recycle system (regardless of when it overflows , please provide plans, calculations, and design specifics (e.g., throughput assumptions/water balance, design volume, retention time, surface area, amount of freeboard in design storm event, etc.). [Use separate sheet(s)). For a sufficient application, the information must demonstrate compliance of final discharge with permit effluent limits (pH - 6-9 SU, Total Suspended Solids (TSS) - 30 mg/I, and Settleable Solids (SS) - 5 mVl), or must demonstrate that the recycle system has sufficient capacity to contain runoff from a 25-year, 24-hr rainfall event plus one foot of freeboard under design operating conditions. 0-L 1,C' G". f .!IJ: F" .I li. 41.,-i I i JIL C. C, T` qG,- wj , L j , :,L .' '. ! - , ?, -.#-, ' - I", 6 A � J, !? is r ei A ol: ' ki C:trZIC; J61, le ,I r)) () -)t-a - ,:,- 'i'- --:1 ! - 1-n, f,}' bj:+it j.o -j i i. I.- 14,,Io 101'.* LM, J :Cis 111 51 z -w% lak cot!'L— U .1%j E :<:S 131. ot, w-i". "v:;-,j%ttt 1r)j m-. - 1,1a1,uiv i'Ali' V: �0. �A ZV'. 11 C 1 Z,ial 167 tj. I., T) Jjt\ 3" ,ok t '1 r, 4,r J%`A�4. t- r, c Ell --i,i -t _CI, J1 L L :. C, •41 % X 1, JO 44 jk. g1j, Li (1;-. its nt-c , wit OIL 1) 1 o" T'n to'l c �)Lo �C7,—e -IT' 1,: PX- '0�. ePl- 3:-USI M, fil z) 'Ile J tAG'A -1;., OU f NCG140000 N.O.I. 16) Are wastewater treatment facilities (including recycle systems) planned In the 100-year flood plain? m No ❑ Yes If so, include information to demonstrate protection from flooding. (Minimum design requirements for treatment works include protection from the 100-year flood, per 15A NCAC 2H .0219.) 17) Hazardous Waste: a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? 0 No ❑ Yes b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of hazardous waste? 0 No ❑ Yes c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of hazardous waste? m No ❑ Yes d) if you answered yes to questions b. or c., please provide the following information: Type(s) of waste: How is material stored: _ Where is material stored: How many disposal shipments per year: Name of transport / disposal vendor: Vendor address: 18) Certification: North Carolina General Statute 143-215.6 B(i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: MR. HENRY BATTEN Title: PRESIDENT 0 of Applicant) a ZZ r/ I (Date Signed) Notice of Intent must be accompanied by a check or money order for $100.00 made payable to: NCDENR 0 C `vff i .3 isq , 1w ew IC i,n . J.3,1, C;;I' Z. 0', %1,` L 1 L), jr -11 1 ;WnWIS ,J YA M i Q A WQ M 1W 1) YN OLL A. PC is YK; M Of A U Ar em Z_ on, or n in w i EGA r w-p- p A Ovj, sy rwo 1 x0l n C'i I i]. ri 3� Oj r%T j-j -Tj J 051 JA _r F, jA XR pV. _W,, C. ft' "tt'V U. na-, V mos A 7 4 1 001 M IL J -j, .ft -ti iro. F , 14 i,;') f_ r � 1 j,F,,j Z,' , .-. -E, -.. '-1 -, ,: 1 1-1 �4- t ,I ic;jd�- ;r ur :, •,e, wy w nN g-mmar v, 2w i %j why, rw i i ad W q i,m lt;13 V" n, nem' tun ri. % —0: N r, 1 Oqol: env .� , * yn"n wn -1 ;,, 2` -COY! e .1 -A&t q e. p, WE r , i_I1 i7 '14 1,­710 ,-- Ve. :7,11 , . -v-:'i J-va -3E i­K W SOOK NCG140000 N.O.I. Final Checklist This application will be returned as incomplete unless all of the following Items have been Included: 0 Check for $100 made payable to NCDENR. m This completed application and all supporting documentation (including design details and calculations for treatment systems). ❑ If an Erosion & Sedimentation Control (E&SC) Plan is required from Division of Land Resources (DLR) or local designee: documentation verifying applicant has developed and submitted that Plan to the governing agency (required per 15A NCAC 02H .0138). NOT REQUIRED 0 For new sites (or sites that will Install new treatment facilities): Three (3) copies of plans and specifications for wastewater treatment facilities (including recycle systems), signed and sealed by a Professional Engineer or qualified staff meeting requirements of G.S. 89C-25 (7). SEE ATTACHED ❑ For existing sites: three (3) copies of plans and specifications for wastewater treatment facilities (including recycle systems) as built, stamped and sealed by a Professional Engineer, or (only if plans not available) a detailed diagram of treatment systems in place that includes information such as tank volumes, dimensions, retention time, piping, settling basin details, etc. NIA ® A site map showing, at a minimum, (existing or proposed): (a) outline of drainage areas, (b) stormwaterlwastewater treatment structures, (c) location of stormwaterlwastewater outfalls (corresponding to which drainage areas), (d) runoff conveyance structures, (e) areas where materials are stored, (f) impervious areas, and (g) site property lines. la A county map or USGS quad sheet with location of facility clearly marked. ,Matltlte qn0� pBCkage toy �Stormwater Permitting Unit, Q.Widn offWWaier Ouafityf (317_Mail Service Center �RBieigh—North Caroliria 27699-1fi 7 Note The submission of this document does not guarantee the issuance of an NPDES permit. For questions, please contact the DWQ Regional Office for your area. DWQ Regional Office Contact Information: Asheville Office ...... (828) 296-4500 Fayetteville Office... (910) 433-3300 Mooresville Office ... (704) 663-1.699 Raleigh Office ........ (919) 791-4200 Washington Office ...(252) 946-6481 Wilmington Office ... (910) 796-7215 Winston-Salem ...... (336) 771-5000 Central Office .........(919) 807-6300 Ul: CN fit ilk -:,?" .,, - f-4 j q C r.lJ t' jf� 0 L iA !Z 'N-5 P L j.L, J t 1 (4: S 1 6 i,:j '41 itil U-- C-I C; -4 C, ZW' f li:L '411, -'k�jl C V L I.Ji J-10 C,;* j- "'biq ?"L.f .*AS S' W, L J -j j 1 �i! (j." 1{ui.l TV— L Z! �f 'T I .1j f4k, 106 Qfj, �MKJJ .-PV 5j7jf:, "*0 t's rR Ll r 1j, 1J,, PC r: irk ,,;j;3pr Lj j,, !,�",r 1 1! 1. J: L I-sit.IG f� D� G %J, I a u i;.:,I; kZt" *-;u Google maps Directions to 110 Holiday Inn Or, Kings Mountain, NC 28096 195 mi - about 3 hours 29 mina Save trees. Go green! .�~. Download Google Maps on your phone at google.comlgmm 0 p,N North Carolina Water Resources 512 North Salisbury Street, Raleigh, NC 27604-1187 - (919) 733-4064 1. Head southwest on N Salisbury St toward W Lane St rp2. Take the 1 st right onto W Lane St About 2 mins 14 3. Turnleft onto N Dawson St About 3 mins 4. Continue straight onto S Saunders St 5. Turn right to merge onto 1-40 W toward 1-440 N About 6 mins 6. Take exit 293 for 1-401US-64 WIUS-1 toward RateighlSanford/Wake Forest 7. Keep left at the fork to continue toward US-1 SIUS-64 W 8. Take exit 293A for US-1 SIUS-64 W toward Sanford/Asheboro 41 9. Keep left at the fork to continue toward US-1 SIUS-64 W 10. Keep left at the fork, follow signs for US-1 SIUS-64 WlApexlSanfordlAsheboro and merge onto US-1 SIUS-64 W About 3 mins �4 11. Take exit 98B to merge onto US- 4 W toward Pittsboro/Asheboro About 41 mins 42i 12. Turn right to merge onto US-421 N About 27 mins ® 13, Merge onto 1-85 S via the ramp to Winston - SalernlChadotte About 2 hours 2 mins 14. Take exit 8 for N Carolina 161 toward Kings Mountain lt� 15. Turn right onto N Carolina 161 NIYork Rd 16, Take the 1 st left About i min 17. Turn left onto Holiday Inn Or Destination will be on the right (GN 110 Holiday Inn Dr, Kings Mountain, NC 28086 go 0.2 mi total 0.2 mi go 0.2 mi total 0.4 mi go 1.5 mi total 2.0 mi go 0.6 mi total 2.6 mi go 4.9 mi total 7.5 mi go 0.2 mi total 7.7 mi go 0.3 mi total 8.0 mi go 0.3 mi total 8.3 mi go 0.3 mi total 8.6 mi go 3.2 mi total 11.8 mi go 37.8 mi total 49.6 mi go 26.0 mi total 75.6 mi go 119 mi total 194 mi go 0.3 mi total 195 mi go 335 It total. 195 mi go69ft total 195 mi go 194 It total 195 mi These directions are for planning purposes only. You may find that construction projects, traffic, weather, or other events may cause conditions to differ from the map results, and you should plan your route accordingly. You must obey all signs or notices regarding your route. Map data C2011 Google Directions weren't right? Please find your route on irnaps.google.00m and dick "Report aproblem" at the bottom left. L G.... 'A1 I.,L Ii_, :I'. .'3 is -J' ' T J]. _ . Ir-'7.L:" - r ri .:J '_r1l,l � '�F' •Y � 1= Lris. t;l"19 ���' 7 �. ri I{I- z It , �.., .j. I.ti sia n : rL ] +V I L� gi_ .i C'r G:.,n G -U(.L' iy � � • , l:'tf �� . , ^Lrf � :G:': �h� aG49`: W � " �. 1`j�'::TT ,� nt -:CL [P': F; •�',.h:: -0»�''Ltiffsj,�C ��►�' �t . GI �:ji,ilt,fhl j•:I,i' 1! �: � .x - � • r o ='•r �I� ! -J 1: i fir. nr ^0.:jj rf,�:..'1. ;•s w9j•'ITin ?l Ur 't .,• r , .l'3:i Lt !'(i. .i.� � �%�I 'i?�-• 1 ��. il�r , .3i- •.`•{. ✓�: • �}.� '! i 4_ �Ijk 1 ` .e j� �Fe i_ J1114. L....Ltw,•l, T f:,r�.[ is ��S'�S..r•.a.. 6 'j ♦ C, i i}ft•.,r�IRu-; �f: I.:r3 �in,�,��>; �..� '�L �.,,I,I� :+y0'y,! �;�; y;.'„- I TABLE I CONCRETE SUPPLY KINGS MOILIN 'AIN - NORTH CAROLINA _ Size of a Concrete Recycling System for;Proces`s Washwaterl Stdrmwater for a Ready Mix Concrete Plant, - y y- I for a 26 yr, 24-hr Runoff Volume = cage Area = ation = th Tc = Slope = CN Rainfall = Rainfall Intensity (Average Asheville and Charlotte) _ Runoff Depth = Runoff Volume = Design Recycle pits to hold = 025 - 26 Yr, 24-hr Discharge = for Weir for 02s = 025flow Length of the weir = Number of Pits Capacity of pits Pits 1 and 2 Each (Flat Area Volume) I— 1 Pits 1 and 2 Each (Slope Area Volume) Pits 3 (Flat Area Volume) Pits 3 (Slope Area Volume) Total Pit Volume (CFT) = Use SCS Peak Discharge 0.96 acres or 41,818 sq ft. 4 ft (Obtained from the site topo map) 277 ft (Obtained from the site topo map) t 3 min / 1.4% f • 85'� (8.03b) 5.75, ihch� . (Ref Fig 8.03k) 7, in/hr. ,� (8.03f and 8.039) �14" `5.26-in h s: ` (Table 8,03c) Drainage Area x Runoff Depth - 18,330 cu ft., ` ✓/ 8,330- cu fL CiA "t-%s = 6.376 Peak rate of runoff in cubic feet per second ✓ C - 0.8 Runoff Coefficient Average intensity of Rainfall in incheslhr for a storm duration -time i = 7 of concentration A = 0.96 Drainage area 3.0LH� 02s = 5.376 L = 2 Length of the weir (ft) H = 1.5 Height of the weir (ft) 5,376 < 10.125 cfs Calculated discharge from the weir It • 0? 2 - 3 L = 30 3 ft W = 14,, ft AREA/pit = D = (8), ft or L = 30 ft W = 14 ft AREA/pit = D= Ca ft or L = 60 ft W = ft AREA/pit = D= bilo ft or L= 0 ft W = 0 It AREA/pit D= 0 It BALANCE ANALYSIS Range # of batches per day 40 50 batches Water per yard 25_ gals gals of water per batch (10 yards per batch) 250 Gals of water recycled in the plant, _- 10,00� 12. 500 gals # of days the water feused in the plant is = 13.8 11.1 gals AVG # of Days water recycled in the plant = 12A days Chalam Pakala, PE CP Engineering Tel: 704-541-4042 CPEES Pr*l t No. 1129-M 3,360 cubic feet 6720 cubic feet. (iwo pits) 1,680 cubic feet f _ 3360 cubic feet (TWO pits) 8,400 cubic feet -� 8.400 cubic feet (Two pits) 1 0 1 0 cubicfeet (TWoplts) feet > 18,330 cubic feet v � � _B,_480 cubic B 230 ah'f� > —137109 aY Is J L FIGURES Figure 1: Site Location Map Figure 2: Aerial View of Surrounding Properties around the Kings Mountain Plant Figure 3: Site Layout Map - Proposed Process Washwater / Stormwater Recycle System Figure 4: Process Washwater and Stormwater Recycle System Construction Details Irap Name: Unknown Map Center: 035° 13' 32.41" N 081 ° 20' 15.23" W rint Date: 08/14/11 Horizontal Datum: NAD27 •� lid° -x S!e rw$_.` O � j 1 �. 1D9 „ST�'ff• k_n .... '' i O ? � •T r t ImAI° tI �'S Y+ i ill+ r s ar _ o I!r v`L/C...:��:• iOn . JqT �Q f = *Oun in ifar • M S ' O IN O 94 �� \• •tip '* o o AP c ram/ Y $N Al PLA Mo •J i + r: r! j»ppp�7f(!/ i � s�IrR s ri �� r/1 gcfl ,O �%(p�� p ///J •ate f A 'I.r j {�2-31-2w � r/ ` J, � •s+ � 8, //'"\� "3 ra �' :d ^. � p tl. � � � cn F ..�/ r -�f, "'� �y • �"• -- �ye�l � h; ',�~t �• r •�� ��1 is rry I'm 61i r cN 0.1 s° w 1' MN 6.89° W 0.00^ w 08 V 20' 0.00° w 081 ° 20' 0.0011 w 081 ° 19, 0-00" W 0811, SCALE 1:24000 0 1000 2000 YARDS SITE LOCATION MAP CONCRETE SUPPLY -KINGS MOUNTAIN PLANT FIGURE 1 JOB NO. 1129-002 {' 4' f r �I 11r J S� 1 4 { 7_J; I. ? ' 'F ' �-r' - - -. � ; -. F-+-. ,'i --; � � i : -1 - ^, •� r- t't • -•t t" ri;.;71 ,[ i �r i I i t .': ;° y ! ,{ li ',i-' v'L`,rt'ui__ a- ,' 't'y1.tr. r� �• :,� �t'"S 't` k � r ;'4 ';��`�1 �1�r + �•F � � t. 1 f _ �+r` i3t - �i> �f I� �3 i» �� • yi r vS � �s�! F, .' ��'�� ,,� � .+•r,d,f �fi� '•• ���•."� i S •" 4to ♦ +.J� / •.�. 7Y. ��. i, ^r � '1� '� � ' )�s "r� .'ti , .yP �r i _ .q � �Y; a }_ t} t:•C�"�_ riot` t� •;�. ,r*y!! '��/; 7ri' if"al� �.{��. <� {+P p r �'` +•y' r - ,T`r �`��'��."- r �j} �_� � ri,��jrri��lllb 1"/�t d�'r�'r6"�:��Irl� }�r'��r. '��}g"r-� ,r1`-• -S,t- I f +. /. Sri S. 1•t� r _ ,� 1�-s,r•�i •1 •, l ° yry{�-�` ' ,�+, !�'Y �x ytr �,.� 4 r. �ti, ����` �°' I�r \ t /' =1 _�` / .:� +}- f.P '�4}/!;. •'Fr <'r.,i''•rf�X`Y1 'l�r'�•�*a, '.,. ',� ;�✓~. �}x l,if"j�4.��+ / , '� - r i• ) �.. _. rs a �' ..r,w h�'-i.`�I� �at 7 ftFr(•1S {. Jri l/3; �' r'Y•!y ! 1r i., �rl '��"' '-•-• yl Yi, + ter),. •r� rt r sa'+�' ,T.� Z g�,�.� ,F.: «.{{{ -ti TJ � , { ; �.. 1�. 1 .e .i z rl�r t ?� ti r 5i '_� i `'�' , + ,.{7 'r�'• - 'Fr r v.il' �f r l�tYi •"„! P!', it 1 • t� ti {, �r i 1 �Y r jr• *Sa( ar �f� � q f •. ,,!? . = J , !/ft +-, s•' '." - } �'' .•. r fx.•i ' f.3e j�V +�} �pJ r• ' r " J. Fite � �.i.,�J• v iF r f1� r �i.r 7 + 'P , •s, l'r� � �� n• '' Sr,'i 1�.� wr r - l �! ' '�. ,�r3 r• � � \ • �1 1 r N -a- :� ��,•� S ",`1.'a�'!j'J '• •wE »,sr�.r �� �^ � -r •.��'�f'' _ 1,'.! } 1 ;SjY r� "r'kr�?I 1 �'I C. y� .. y rr• it -T 1 f j''�ilf>.." .y •� 3X • i.i i '✓'jJl . 1. � i � !..r 1 �•�,f� ar �..�R >`� (' � j , �r, � , � �� ^� � ��►+l+�+b��. �`f� MRt V.ctol Wo r J - .�'�'`'i � T: e r ��',� 4z��9r',�F_� � � - �,•��! r F� + •-}�E1i I"` ` t 2 ti Y ��� r- � ���r,lll r �'.�� raf 1'.'fa 1 '?�*r}'-t'ii ._ '��., i � �t3 � •� �,`s:'"1" ,,„ •� it �;;.� , ' � _ • =(�e -fir` �„ »R ' _ 1�`._ _ eAt +.•*-+�:f f F!wfic"'�r, � #' }�j _ �'.' . .xa 4. � r - ( , vr^- r''�1� r7 ys. # r! 1e�7 .'�.% F, •r��9��s�T!t � ' •, _ �h4atillnl REVISIONS: CAq©l Fe8S/o SEAL 19807 V. R1=4') SCALE: 1 " 20' INITIALS I DATE PREPARED BY: CVP 08/20/ 1 1 DRAWN BY: CAD 08/20/ 1 1 CHECKED BY: CVP 08/20/ 1 1 APPROVED BY: CVP 08/20/ 1 1 �SITE� ,rea to be used for the Pit Design 0.96 Acres 'V: 7 02". . 28 :S is not responsible for structural design of pit walls, steel reinforcement details and foundations. DRAWING TITLE: SITE LAYOUT MAP - PROPOSED LOCATION CF WASHWATER/STORMWATER RECYCLE SYST PROJECT: CONCRETE SUPPLY 110 HOLIDAY INN DRIVE DINGS MOUNTAIN, N.C. a : L A,h j I `f7 r 1%� � "t ur- A 1' "� I� i N- ', ���. fir' J �i� � �� a �l _. �tr l' Jl`--i4 L it � � E N I S 4�� �I��. � ii \ If�f �4o s � s u k, j M1 iti E i .4 � �C'�' '� � � � a 11 'tom � � !'y � � ; `"� �T �a Ll— Y A Cost -Effective Solution � y� Provider for Manufacturing _ � Industries PROJECT NO.: 1 129-002 r .• DRAWING NO.: REV. DATE: FILE NAME: 10017 ALLYSON PARK DR. TEL (704) 541-4042 CHARLOTTE, NORTH CAROLINA 28277 FAX (704) 541-4043 . NOTES: I W DIA. PPE HANDRAIL -- POSTS ANCHORED INTO CONCRETE 8+- • 1- 0 M-IF�6 6 ... 301 r X 1.V WEIR �� ��C�� ► isms 44 ®1 r O.C. EACH WAY (TYP) 301 04 Q 1r O.C. EACH WAY (TYP) SECTION B-B NO SCALE S-W 1 E4 ! 12" O.C. EACH WAY (TYP) SECTION C-C NO SCALE NOTE; CKES Im nvt nrWon Ne for ouckmW d.dqn al pt wak ftW o Odmoamwrt dWaft and taxWobwa. REVISIONS: x x 1.S WEIt X X 1.S OPENING 1-7 04 0 it O.C. EACH WAY (TYP) 11114 0 1r O.C. EACH WAY (TYP) ISOMETRIC VIEW NO SCALE NOTE. PIT NO. 3 HAS NO SLOPE? AREA. SCALE: NONE ,WOMRao, INITIALSCA 19�07 it DATE ff mmz��� i mrm r- i. . APPROVED FILE NAME: 12j -1j 4" F: 04 BARS 01r OIIC HORIZONTAL -.:I 06 BARS 01S" OC VERTICAL WATERPROOF EXTERIOR 1r - IC REINFORCED j JOINT SEALANT PERIMETER CONCRETE WALL i ., . W ` b W CONCRETE SLAB (4000 PSI) p GROUND t 43 NO 57 WASHED STONE OrCONCRETE SLAB ,; F NO.67 WASHED STONE *NOTE- 011AINEWCONTRACTOR MAY USE PRECAST CONCRETE BLOCKS FOR WALE. •rf+o;� v ' QONgTRUCTIONl, WHICH WILL BE SEALEDH ,, r TO PROVIDE WATERTrafff CONDITION .�` `.. .. .t `- 4.S 04 BARS (4) 3. #4 BARS (3) INTERIOR SLAB EXTER OR F OTING fit WALL SECTION SECTION 1-1 SCALE= NTS SCALE- NTS CONSTRUCTION NOTES: 1. BOTTOM SLAB TO BE REINFORCED WITH 6" W 10 X 10 WWF. 2. GOLD JOINTS IN WALL TO HAVE KEYWAY WITH 18" #4 LAP BAR. 3. SLAB AND INTERIOR WALLS TO BE SEALED WITH CONCRETE WATERPROORNG. 4. CONCRETE FOUNDATIONS AND REINFORCEMENT ARE THE RESPONSIBILITY OF THE OWNER(S). ADDITIONAL NOTES. 1. COMPACTION OF SOIL TO 95% STD PROCTOR MAX DRY DENSITY. 2. CONCRETE 4,000 P.S.I. COMPRESSIVE STRENGTH 028 DAYS 3. RESAR GRADE 60 4. CONSTRUCTION QUALITY CONTROL TESTING TO INCLUDE SUBGRADE DENSITY TESTING, PROOF ROLLING OF SUBGRADE, SLAB REINFORCEMENT INSPECTION, CONCRETE THICKNESS MEASUREMENT, AND CONCRETE STRENGTH TESTING. ALL TEST RESULTS AND JUDGEMENT IS THE RESPONCISILITY OF THE OWNER. 5. HAND RAIL DESIGN AND INSTALLATION IS THE RESPONSIBILITY OF THE OWNER. 6. SUMP PUMP, PIPING AND ELECTRICAL WORK FOR SUMP PUMP IS THE RESPONSIBILITY OF THE OWNER. 7. ALL WALLS ARE REINFORCED AND CONCRETE POURED S. POND LEAK TESTING IS THE RESPONSIBILITY OF THE OWNER. 9. ALL BOUNDARIES OF CONSTRUCTION ACTIVITYIDISTURSED AREAS SHALL BE PROTECTED WITH SILT FENCE AS SHOWN ON SILT FENCE CONSTRUCTION DETAILS, 10. CPEES TAKES NO RESPONSIB)LITY FOR STRUCTURAL DESIGN OF PIT WALLS AND FOUNDATIONS. 12QW MCX4'ORrXA"W®.DWWWHDOIWD NOTE& 1)TOTAL DRADUMAREA FLOWING TOGL.T PREKNIIIED CHANNErd ON WTAL POI:T$.OR FASTEN FENCE MXY NOT E)OCEFD 1 ACRE. TO CEDAR OR WOOD POUM VW NO.8 WAFILM& ?) OL.T 0 SHOULD NOT BE USED AT INPE OU'TWO OR IN ATE;A3 OF CONCENTRATED FLOW {LEEKS. DMCtL*= SVIfALtrR1 EM) ULTAVIOLlT RESISTAdiT (LLACiCjl�LRl1 EAdiIC EQUIVALENT SECURED TO WRIT VANKrAL CLpB OR WTiRE AT S' OFF CEii 6 O MAX SEOWNT STCRAOR LEWE,- NT WHEN THIS L %11L 10 FWAOHIOD _ORASDIRWI SY0010 RsNON OF H O ti t1 s ' ' gtdRl''�., NAVA& ORADT: TO NCREAeE BTORAIOE CAmnIYAM p"°LQNs'M LFE cF TT+ ftTF o=ffNf3E emaLY ADVISAAI.E TO DR;AOIMENT PIT I I IN FF10W OF YORG. ILT FENCE WHENEAR POSSRR.F INTO WMNM C�vwoL& MW MACW%L - CJIRRY as of VMRE INTO'TTiENC1L PETAL, CEDAR OR P XP TREATED VFDOD POM AT 1w = &%x CEDAR A WOOD POS'P8 SHOULD SE 3 DW MN. SILT FENCE SILT FENCE DETAIL SCALE= N.T.S. DRAWING TITLE: PROCESS WASHWATER/STORMWATEP RECYCLE SYSTEM CONSTRUCTION DETAILS PROJECT: CONCRETE SUPPLY PROJECT NO.: 110 HOLIDAY INN DRIVE KINGS MOUNTAIN, N.C. CHALAM PAKALA ENGINEERING AND ENVIRONt'v!ENTAL SOLUTIO"S A Cost -Effective Solution Provider for Manufacturing InduBbies 10017 ALLY30N PARK DR. TEL (704) 541-4042 CHARLOTTE, NORTH CAROLINA 28277 FAX (704) 541-4043 1129-002 REV. NO.: REV. DATE: 1 08/20/11 DRAWING NO.: Attachment A Runoff Volume and Weir Design Calculations with Backup TABLE I CONCRETE SUPPLY KINGS MOUNTAIN - NORTH CAROLIINA Size of a Concrete Recycling System for Process:Washwaterl Stormwater for a Ready Mix Concrete Plant - Size for a 26 yr, 24fir Runoff Volume = Use SCS Peak Discharge Drainage Area = 0.% acres or 41,818 sq ft. Elevation = 4 ft (Obtained from the site topo map) Length = 277 ft (Obtained from the site topo map) Tc = 3 min (8.03a) Slope = 1.4% CN 85 (8.03b) Rainfall = 5.75 inches (Ref Fig 8.03k) Rainfall Intensity (Average Asheville and Charlotte) = 7 Mir (8.03f and 8.03g) Runoff Depth = 5,26 incites (fable 8.03c) Runoff Volume = Drainage Area x Runoff Depth 18,330 cu ft. Design Recycle pits to hold = 18,330 cu ft, CiA Q25 = 5.378 Peak rate of runoff in cubic feet per second C = 0.8 Runoff Coefficient Q25 - 26 Yr, 24-hr Discharge = Average intensity of Rainfall in inchesfhr for a storm duration -time i = 7 of concentration A = 0.96 ' Drainage area Size for Weir for Q25 = 3.0 L H' 02s = 5.376 L = 2 Length of the weir (ft) H = 1.5 _ Height of the weir (ft) 025 flow 5.376 < 10.125 cfs Calculated discharge from the weir Length of the weir = 1 _ ft Number of Pits 3 Capacity of pits Pits 1 and 2 Each (Flat Area Volume) L = 30 - ft W = 14 ft AREA/pit = 3,360'-cubic feat D= 8 ft or 6720 cubic feet (Two pits) Pits 1 and 2 Each (Slope Area Volume) L = 30 ft. �! t li W = 14 ft AREA! P tt = 1,660 cubic feet D = 8 ft 5o Y, or 3360 cubic feet (Two pits) Pits 3 (Flat Area Volume) L = 60 ft W = 14 . ft AREapit = 8,400 cubic feet D= 10 ft or 8,400 cubic feat (TWO pits) Pits 3 (Slope Area Volume) L = 0 ft W = 0 ft AREAfpit = 0 D = 0 ft 0 cubic feet. (Two pits) Total Pit Volume (CFT) = 18,480 cubic feet > 18,330 cubic feet or 138,230 gals > 137,109 Sals WATER BALANCE ANALYSIS Rape # of batches per day 40 50 batches Water per yard 25 gals gals of water per batch (10 yards per batch) 250 Gals of water recycled in the plant 10,000 12,5W gals # of days the water reused in the plant is = 13.8 11.1 gals AVG # of Da s water recycled in the plant = 12.4 da Chalon Pab4. PE CP Erpmenng Tel: 704.541-4042 CPEES Pr*d No. 1120-002 8 N H (ft) cnn m L O L O E z E 'X tC Note: Use nomograph Tc for natural basins with well-defined channels, for overland flow on bare earth, and for mowed -grass roadside channels. For overland flow, grassed surfaces, multiply Tc by 2. For overland flow, concrete or asphalt surfaces, multiply Tc by 0.4. For concrete channels, multiply Tc by 0.2; Figure 8.03a Time of concentration of small drainage basins. Tc(min) zoo 100 10 1 8.03.4 I r, 'k -Lit, ti to l A b-... i a �J Table 8.03b Runoff Curve Numbers (CN) Hydrologic Soil Group A B C D Land Ilse/Cover Cultivated land without conservation 72 81 with conservation 62 71 Pasture land poor condition 68 79 fair condition 49 69 good condition 39 61 Meadow good condition 30 58 Wood or forest land Thin stand - poor cover, no mulch 45 66 Good stand - good cover 25 55 Open spaces, lawns, parks, golf courses, cemeteries, etc. good condition: grass cover on 75% or more of the area 39 61 fair condition: grass cover on 5o to 75% of the area 49 69 Commercial and business areas (85%impervious) 89 92 Industrial districts (72% impervious) 81 88 Residential:' Development completed and vegetation established Average lot size Average % Impervious 1/8 acre or less 65 77 85 1 /4 acre 38 61 75 1 /3 acre 30 57 72 112 acre 25 54 70 1 acre 20 51 fib 2 acre 15 47 66 Paved parking lots, roofs, driveways, etc. 98 98 Streets and roads paved with curbs and storm sewers 98 98 gravel 76 85 dirt 72 82 Newly graded area 81 89 Residential: Development underway and no vegetation Lot sizes of 1/4 acre 88 93 Lot sizes of 1/2 acre 85 91 Lot sizes of 1 acre 82 90 Lot sizes of 2 acres 81 89 88 91 78 81 86 89 79 84 74 80 71 78 77 83 70 77 74 80 79 84 94 95 91 93 90 92 83 87 81 86 80 85 79 84 77 81 98 98 98 98 89 91 87 89 93 95 95 97 94 96 93 95 92 94 'Curve numbers are computed assuming the runoff from the house and driveway is directed toward the street. sourcd: USDA-SCS 8.03.i0 Rev. 12M I "FIE cowT waxoTA a an 11 L 7r' CC., 41 Ma 0 - -C 'Aq L I c. vi n. I to fe '0' Appendices Table 8.03c Runoff Depth L� b. Determine runoff depth (in inches) from the curve number and rainfall depth using Table 8.03c. Rainfall Curve Number (CN) (inches) 60 65 70 75 80 85• 90 95 1.0 0.00 0.00 0.00 0.03 0.08 0.17 0.32 0.56 1.2 0.00 0.00 0.03 0.07 0.15 0.28 0.46 0.74 1.4 0.00 0.02 0.06 0.13 0.24 0.39 0.61 0.92 1.6 0.01 0.05 0.11 0.20 0.34 0.52 0.76 1.11 1.8 0.03 0.09 0.17 0.29 0.44 0.65 0.93 1.30 2.0 0.06 0.14 0.24 0.38 0.56 0.80 1.09 1.48 2.5 0.17 0.30 0.46 0.65 0.89 1.18 1.53 1.97 3.0 0.33 0.51 0.72 0.96 1.25 1.59 1.98 2.44 4.0 0.76 1.03 1.33 1.67 2.04 2.46 2.92 3.42 5.0 1.30 1.65 2.04 2.45 2.89 3.37 3.88 4.41 6.0 1.92 2.35 2.80 3.28 3.78' 4131�> 4.85 5.40 7.0 2.60 - 3.10 3.62 4.15 4.69 . Z5267 5.82 6.40 8A` 3.33 3.90 4.47 5.04 5.62 6.22 6.81 7.39 9.0 4.10 4.72 5.34 5.95 6.57 7.19 7.79 8.39 10.0 4.90 5.57 6.23 6.88 7.52 8.16 8.78 9.39 11.0 5.72 6.44 7.13 7.82 8.48 9.14 9.77 10.39 12.0 6.56 7.32 8.05 8.76 9.45 10.12 10.76 11.39 1 To obtain runoff depths for CN's and other rainfall amounts not shown in this table, use an arithmetic interpolation. The volume of runoff from the site can be calculated by multiplying the area of the site by the runoff depth. Step 4. Determine the peak rate of runoff for the design storm by adjusting for watershed shape as follows: - a. Determine an "equivalent drainage area" from the hydraulic length of the watershed using Figure 8.03n. Hydraulic length is the length of the flow path from the mostI'remote point in the watershed to the point of discharge. b. Determine the discharge (cfsrmch of runoff) for the equivalent drainage area from Figure 8.03o through 8.03q: Figure 8.03o - for. average watershed slopes 0-3% Figure 8.03p - forl average watershed slopes 3-7% Figure 8.03q - for average watershed slopes 8-50% Calculate the peak discharge, 01, of the equivalent watershed by multi- plying equivalent watershed area by runoff from Table 8.03c in Step 3b. 8.03.17 rn tj '11, Ts ~JfT f :I-f P, GY z cl jo irl 'It, ,:-,Ilo --j T 1,;.j I e."ej' 44 o"Y 1 ri . ir Appendices 4 S 5 r0 20 40 60 2 3 4 6 8 12 18 24 Minutes Hours Duration Figure 8.031 Rainfall intensity duration curves Asheville. 0,; r) 5 10 20 40 60 2 3 4 6 8 12 18 24 Minutes Hours Duration Figure 6.03g Rainfall intensity duration curves --Charlotte. '11i 8.03.7 c 12 4 A in 46 tv vc. v Yf 0o m o w W c A m 25-year 1 day precipitation (inches) o w >r N Sde In on" `CD CD 25 50 75 lw w 1 a a RAINFALL DATA MAP ti a� a 5 5.56 5.5 6 6.5 y ! '�•y� STOX(S TEpCNINON! • SW+ WlRR[w D 4 � 4 Ol 1• Owli FOR° �, 'A/NYL1 / -� C e41T1[ 5 5}}}►►► �S �CYhM iIL i OIYI ~ `-1 '-�r (u'� :r— � �As %e WIVE \1 OFWOSON' �_ `� \ 1 g ` i- , Ne O[,W[L• /rs WR. 1 "1�F11 CNITHAV WA ,/. ' \ rnl SO ��• .�-� l 1 eV R( 1 .[IM.N I S VD WI•N _�• iii /�'' - ./!O sTo« I� (wroal oc Q $� S w,wpO 4-VTN[• 0� •, tee `` NN WVDE O.5 ,' WN w ' �Ie `. STANI � � l NIRN(Tr J MMTN[ 11 �1 �\• 6 _ rY!• III, CoAve Y aNl + 1 V.~ f'Y �r '�O &A I / b L/JONES 8 \^ / 7 -- UMION 1 .MSONKN SCOT E/.4J� Y eVRiN LAND�•�� 0 ice' r \ GRT[RET 6 6.5 /) \ C�.�. aN M EEOr r 1 % r[Notr 8.5 eoaYw us � ` Nr 7 1 1 ° sntr r �f'.• R d � rr 1 C' .. 1 � �*� . S R � �� �(�� xi � f'j - t �t� I �; A � - .� I ,/ �'�'` � ( r�r' R y � r _ �h _ , f ` .�f c. I �t � _ _.. �e � tip i. r � � � � • _ C !"� � I � /Y` � T ',.� ' �I 1 �'R� \ =i i !.�• y � k � � r �,' r/ �: 1 � u r �,k ' ^e L J YR� ?/ �( �� ; 1 .}. � � � 7". R. d` /r .y� �f F i�' �. ` q {,... i �� .+ ,� ,j� � j' � i i y�. � M1�f � i +_ _.'/ � Y Attachment B NC DENR — Division of Water Quality Stream Classification Table for Cleveland County Name of Stream Description Curr. Class Date Basin Stream Index # Persimmon Creek From source to Muddy C 09/01/74 Broad 9-53-6-2 Fork the Persimmon From source to C 09/01/74 Broad 9-53-6-2-1 reek Persimmon Creek Potts Creek From source to Muddy C 09/01/74 Broad 9-53-6-3 (Pilot Branch) Fork Roberts Branch From source to Dam at B 03/01/63 Broad 9-53-7-(1) (Joes Lake) Joes Lake Roberts Branch From Dam at Joes Lake C 03/01/63 Broad 9-53-7-(2) to Buffalo Creek Beason Creek From source to Buffalo C 09/01/74 Broad 9-53-8 Creek Long Branch From source to Beason C 09/01/74 Broad 9-53-8-1 Creek Wolf Branch From source to Long C 09/01/74 Broad 9-53-8-1-1 Branch Jakes Branch From source to Buffalo C 03/01/63 Broad 9-53-9 Creek Kings Creek From source to North 0 09/01/79 Broad 9-59 Carolina -South Carolina State Line Site Creek (City From source to Kings C 08/03/92 Broad 9-54-1 Lake) Creek Unnamed From source to Dam at B;HQW 08/01/00 Broad 9-54-1-(1) Tributary at Lake Montonia Lake Montonia eLake Montonia) Unnamed From Dam at Lake C 09/01/74 Broad 9-54-1-(2) Tributary at Montonia to City Lake, Lake Montonia Sipe Creek Davidson Creek From source to Kings C O8/03/92 Broad 9-54--2 (Davidson Lake) Creek Dixon Branch From source to North C 09/01/74 Broad 9-54-3 Carolina -South Carolina State Line Clark Fork From source to North C 08/03/92 Broad 9-54-4 Carolina -South Carolina State Line Page 7 of 7 2011-08-13 07:13:50 VENDOR: 67040 CHECK: 0000102153 DATE: 8/ 19/2011 REMIT TO: NCDENR-Div of Water Ouality COMMENT: ©© 8/19/2011 f 0000224996 100.001 0.00 1 100.00 100.00 Concrete Supply Co Concrete Supply Co. Fifth Third Bank No.' 0000102153 3823 Ralei h'Street �' 6. � � O 3 g I �� NorthHCarolina, Cfiarlotte NC28206 s0 , .g 66 73 5 1 DATE AMOUNT 8/19/2011 ''**�"* "' ***100.00 a -.PAY One hundred and'xx / 100'Daliars _ 9* a4 s AN 70 THE, -'ORDER- :OF NCDENR-Div of Water ( uaiity. . 1617 Mail Service Center eigh, NC 2764 1617g� �� }. ; r " AUTHORIZED SIGNATURE September 29, 2611 Ms. Jennifer Jones, Environmental Engineer II NC DENR — Stormwater Permitting Unit 161.7 Mail. Service Center Raleigh, North Carolina 27669-1617 Re: Permit Application for Authorization -to -Construct (A to C) a Proposed Process / Stormwater Recycling System for Kings Mountain Concrete Plant Concrete Supply — Kings Mountain Plant 110 Holiday Inn Dr, Kings Mountain, Cleveland County, North Carolina 28086 CPEES Project No. 1129-002 NPDES General Permit No.: NCG140000 Certificate of Coverage: Not issued yet Dear Ms. Jones: Concrete Supply is pleased to resubmit the attached Authorization -to -Construct (A to C) permit © request report along with construction drawings for the Proposed Process / Stormwater Recycling System for Concrete Supply -- Kings Mountain Concrete Plant located in Kings Mountain, North Carolina as your comments. The A to C Report includes: + NEW NC DENR NPDES General Permit Application NCG 140000; • Check for $100 made payable to NC DENR; • Site map showing the delineation of drainage area contributing to the process wastewater; • Site layout map showing the proposed location of the process / stormwater recycling system; • 10 yr 24-hr stormwater runoff calculations; • Detailed design, construction drawings along with construction specifications for the proposed process and stormwater recycling system; • Site Location Map; Concrete Supply sincerely appreciates your cooperation and progress of this project. Please call me at 704-309-8738 or Mr. Chuck Pakala of CPEES at 704-541-4042 if you have any questions or comments on this permit request. Respectfully submitted, Johnie Alexander Environmental Manager fs Attachments: A to C Permit Application Package Permit Application for Authorization to Construct (A to Q a Process /Stormwater Recycling System NPDES General Permit No.: NCG140000 Certificate of Coverage: Not issued Yet Prepared for: Concrete Supply- Xings Nountain Plant 110 Holiday Inn Dr. -Kings�Mountain, Cleveland•County, North -Carolina 28086. CPEES Project No. 1129-002 September 29, 2011 Prepared by: Chalam Pakala Engineering and Environmental Solutions 10017 Allyson Park Dr., Charlotte, North Carolina 28277 Tel.(704) 541-4042 / Fax: (704) 5414043 Email: cv akala carolina.mcom �4 y i . t' ' J ' � � f' �ti i'<<F; � �, i i� � �„ � _ � 1 _ 1 � � ... J Permit Application for Authorization to Construct (A to C) a Process I Storrnwa¢ter Recycling system Concrete Supply— Kings Mountain Plant Kings Mountain, North Carolina NPDES General Permit No.: NCG140000 Certificate of Coverage: Not issued yet TABLE OF CONTENTS 1.0 FACILITY DESCRIPTION..............................................................................................1 2.0 FACILITY OPERATIONS................................................................................................1 3.0 PROCESS WASHWATER CALCULATIONS..............................................................2 4.0 STORMWATER RUNOFF CALCULATIONS FOR A 10 YEAR AND 24-HR RAIN EVENT....................................................................................................................................... 3 SA STORMWATER I PROCESS WASHWATER RECYCLE SYSTEM DESIGN AND CONSTRUCTION DETAILS.................................................................................................4 6.0 TSS, SS and pH CONCENTRATION IN THE WASHWATER EFFLUENT ............5 7.0 WATER BALANCE CALCULATIONS..........................................................................8 8.0 A to C CONSTRUCTION PERMIT APPLICATION....................................................8 TABLES Table 1: Runoff Volume Calculations for a 10 yr, 24-hr Storm Event & TSS, SS and pH Calculations for the Washwater Effluent FIGURES Figure 1: Site Location Map Figure 2: Aerial View of Surrounding Properties around the Kings Mountain Plant Figure 3: Site Layout Map - Proposed Location of Process Washwater / Stormwater Recycle System Figure 4: Process Washwater and Stormwater Recycle System Construction Details ATTACHMENTS Attachment A: Runoff Volume and Weir Design Calculations with Backup Attachment B: NC DENR -- Division of Water Quality Stream Classification Table for Cleveland County Attachment C: Stokes Law for Particle Settling & Other Literature CP Engineering and Environmental Solutions i A to C Permit Application Tel: (704) 541-4042 Concrete Supply - Kings Mountain Email: cvnakala@carolina.rr.com I10 Holiday Inn Dr., Project No. 1129-002 Kings Mountain, NC 28086 ►�.`,� �� ?�titi�i iYr,i?i.f�t --N":( y!i� `it`_r :.iffl ..iaM.{) e1, 0^1.�*1 ' .... .,,. ....... , ....... ....• • • ... ....... . a •.ri., ••,•,r.. . , . • . •... . •........• .. • . .••. r.i .. •.... ...r .. •.•. •r. .�i' itt A"'E. i�i{ '� 4'r` �E ........ ... ..... .......... ... -.. ...•�a +�6�� r �r� fP. r Si� i �',�#1 +'�i s►, '�.�.a�r. .. t'. i i ,1i rit. r. `. i ! _�..5 y ' :'�✓1 `ri ` s.` #fry i):t' 1►.r ., i ✓' .. V '�y ii 4f a Fii rO .,y". �'('F• • . `, o t. #�� l.'+. � �, � .`� 'l`P. � (+ .l�' � r h+ a '+1 's"1'hI !h .I � :'L JAI+, � rt` �• _I 'i t[1 �{' :a"t iPi ' !If �, `sil' j i i(i+t. �h P, �,+•.. ,� .. 'h, 1 e.' fl i'i . irF.:: it � e'P ��' l;'!L?�,�' � l'1`a1G`�f? 'L'.1'�`ii� !: i'If) .I: i1�.1'I is .r�`�� . •-! •_ � .f. 1.�',:'��� '1• -�l'.'' � .-E. �1 _.{',. -i.;/ '�e 'i[.. J`77i! ',.. P ;1�r1 .f , j'!'., e,)+,� .� 'ii - i., L �' '+i/ . k L +I: _", •�i' i.: .� �� ir. If C1 -�i �+ � +il J� it !'�i�[' 1:1i.rt% Permit Application ,for A uthorization to Construct (A to Q a Process /Stormwater recycling System Concrete Supply— Kings Mountain Plant Kio s Mountain North Carolina NPDES General Permit No.: NCG140000 Certificate of Coverage: Not Yet Issued 1.0- FACILITY DESCRIPTION Concrete Supply -Kings Mountain Plant located at 110 Holiday Inn Dr., Kings Mountain, Cleveland County, North Carolina, is a dry batch ready mix concrete plant for commercial supply. The primary Standard Industrial Classification (SIC Code) for the facility is 3273 (Ready Mixed Concrete). The approximate location of the facility on a US Geological Survey Map is provided on Figure 1. The geographic site location can also be given as 350 13' 33.6" North Latitude and 810 20' 16.2" West Longitude. The subject facility is surrounded by commercial, quarry mining and residential areas and storrnwater from the facility drains to couple of Industrial Waste Ponds located southwest of the property. The stormwater from Industrial Waste Ponds flows to Kings Creek and eventually to Broad River. The details of surrounding properties are displayed on an Aerial Map, Figure 2, attached with this report. The Kings Mountain Plant occupies approximately 4.11 acres of land. However, approximately 0.63 acres of area will be used in the stormwater drainage calculations for washwater/recycle operations. Stormwater from this property flows to the Industrial Ponds and from the Industrial Ponds to Kings Creek located on the southwest property, Figure l . The stormwater from Kings Creek flows to Broad River located south of the site. Based on my review with NC Division of Water Quality web site, it is our understanding that the Kings Creek is classified as Class C (see attached table obtained from NC DENR — Division of Water Quality Section web site for details -Attachment B). The stormwater from the facility is carried to the Industrial Ponds via swales and sheet flow. The Kings Mountain Plant will consist of an office trailer, a ready mix concrete mobile plant, two cement pigs (storage containers), water tanks, storage areas for stone and sand, and a concrete truck drum wash area. Kings Mountain Plant will have approximately 8 to 12 trucks and operates 10 hrs/day, 5 days/wk and 30 to 50 wks/year, depending upon the weather and business conditions. 2.0 FACILITY OPERATIONS The facility operations will include: a dry batch concrete mobile plant, cement storage pigs, sand and stone.storage_areas with limited water.sprinkler.system .(taken into.process water_ consideration) and a truck washing area. CP Engineering and Environmental Solutions i A to C Permit Application Tel: (704) 541-4042 Concrete Supply - Kings Mountain Email: cipakala@carolina.rr.com 110 Holiday Inn Dr., Project No. 1129-002 Kings Mountain, AIC 2808.6 r ..:V1 L. Jul .41 . e I r IJ 1 J: Ur, f I Based on the request from the user, typical operations from this plant include: loading the sand, gravel, and cement into a weigh scale which drops the dry mix into cement trucks as a dry batch concrete mix. The loaded cement truck with concrete mix will be brought to a truck washing area for a surficial wash before it goes out for the delivery. Occasionally, any left over concrete in the concrete drum will be either used in making blocks or washed of at the plant in a truck washing bay. Thus, process water will be generated at the plant for either recycling or disposal. Based on our understanding of the facility operations, wash chemicals are located near the wash pit area to collect any potential spills from these storage vessels. The oil storage tank was kept far away from the pits and necessary secondary containment shall be placed to prevent the migration of potential spills from the tank reaching the pits. Therefore, CPEES believe no oily water or stormwater contaminated with chemicals will be released to the environment from the facility. The facility has not applied for a NPDES General Permit (NCG140000) in the past and therefore, applying now to obtain the NPDES permit and be complaint with the State Division of Water Quality regulation. To meet the NPDES General Stormwater Permit requirements, a Stormwater Pollution Prevention Plan (SWPP Plan) with Best Management Practices for potential stormwater pollutant sources shall be prepared and implemented at the site. All truck drums and drum chutes will be washed at the end of the day before parked for good. Therefore, the locations where process washwater will be generated at the plant are: • Surficial cleaning of the drum before leaving the site, • Cement drum washing if left -over concrete is brought back to the plant; • Drum and drum chutes cleaning at the end of the day; and • General stormwater from the plant area and the stone storage bay. _3.0 PROCESS WASHWATER CALCULATIONS Based on our discussions with the Kings Mountain Plant Manager, it is our understanding that approximately 10 to 40 batches per day will be completed in the summer time and 10 batches per day will be completed in the winter time using 12 trucks. Approximately 5 to 10 gals of water will be used for surficial washing of the truck per batch. Approximately 5 to 10 gals of water will be used to wash drum chutes per truck per day at the end of the day. Approximately 200 gals -per -day per -drum -will be used -to -wash at-the.end of the -day. CP Engineering and Environmental Solutions 2 A to C Permit Application Tel: (704) 541-4042 Concrete Supply - Kings Mountain Email: cvpakala(a_,carolina.rr.com 110 Holiday Inn Dr., Project No. 1124-002 Kings Mountain, NC 28W vb J, r, d- .4 1 It -'a 1 '14 V f i T J4 j jrl ;j YL A, tn tl1' irk ;I Jt Description of Operation Unit Total # Trucks worst -case trucks 12 # Batches per day using 12 trucks worst -case scenario -summer time Batches 40 Surficial cleaning 10gals/batch 400 Chute cleaning at the end of the day 10 galshruck 120 Drum cleaning at the end of the day_200gals/truck 2,400 Leftover concrete washing from the drum 5 batches Total als/da 2,920 4.0 STORMWATER RUNOFF CALCULATIONS FOR A 10 YEAR AND 24-HR RAIN EVENT According NC DENR-Division of Water Quality NPDES General Stormwater Permit requirements, wastewater treatment per 15A NCAC 2H .0203 and all wastewater discharges must meet a total suspended solids (TSS) limit of 30 mg/l, a settleable solids (SS) limit of 5 mg/l, and pH between 6-9 SU or must demonstrate that the recycle system has sufficient capacity to contain 10-year, 24-hr rainfall event plus one foot of freeboard under the design operating conditions. To obtain an economic and workable solution to the proposed recycling system design, the truck washing operations and process washwater generating points are all brought to one location to reduce the drainage area for 10-yr, 24-hr calculations. Approximately 27,443 sq ft or 0.63 acres of area including the small area for gravel washing is expected to contribute to the process washwater from the facility (Figure 3). All washing operations beyond this designated area are prohibited at the facility and the drivers will be trained to adhere to this new policy for meeting the Stormwater regulations. CPEES has performed stormwater calculations for a 10-yr, 24-hr rain event for 0.63 acres and approximately 7,707 cubic feet (cft) of runoff capacity is required to hold the designed rain event. The runoff volume and weir design. calcWations.are.provided.in Attachment -A. Please note, during a rain event, no plant operations will be conducted. Therefore, no washwater is accounted for in the proposed recycle system design when 10-yr, 24-hr rain event for stormwater is considered. CP Engineering and Environmental Solutions 3 A to C Permit Application Tel: (704) 541-4042 Concrete Supply - Kings Mountain Email: cv akala a carolina.rr,com I10 Holiday Inn Dr., Project Xo, 1129-002 Kings Mountain NC 28086 or r (1 a _ ,�__..-- ..'i.;t--:—-r; - —-- - �>la 4 itl �.'F•1'.a`irJ'k[;; {{ (f i' k � j " •. � s' ', i . 37r,? ':�. y, y. � „ � `. "VJ Si .1' - �« ' f 1 r. ;: :t.,ri ��• r1F. .�, i• ,.> 1L f'• _ . f�•l" ' .I .." -�.. I.L}T ' _,1 . '��� .,J' [{J {J1:. 1."1' .a l: sJ i.i :.ir l' .l..l'. : � - / k'. r: !• .! .. 1'. •f .. /� Y. il'.`� � i':J ' i :5....,kl =''r , .;' sl'r i•i`�_ � '..rf f.a .I w �! -.[ i i e , .. %} 1::<<... ,'i• .`T �.•:'.:k 1' .,.'�Ij ._ + -.I' rr i• � _' , 'X fi:�l 4i L r. }-.; � ' � :' si'_.. � - ,! _ , j - C._yi,,�r_. a:i �l'}�:'... ��'fn ._.. 'Ei !S .1'. '�SZf, If �y( ,3Ji• f}1 !".1-I rl 'ji'. �.ir' ai !si 'E' ..� a ': , n:fs � _ .�! '1' 'rr.'j'r� r I .. .� .',{. ��'. ,: 1I'• ' . . .k+. .+il li !�/� r- ,. '[f li:,ll. J �! - . . 'E ` . . 'fl' 1•., " �• ' .: :�� ')} ��f.:.". si • iris: �`rf +r,c,,='.:..1 _ .. r>:' :!� _ Ijili1•. ` ' .'ii�pk'i. 4•_,'r .:ij. -`!� .. 't . as JI"ill-','1 v1[1'. IE �� � • s , .. Jfsf+ n� i' 71., l�.r, rC[.. �� .J �.I '�'i3 :Tri)Je 1'.°•,:.-5st,'1 l r .•+ ? :�:. 1� >�. r.'=�. :11'. i' a.r' i , -vJj! , ,�iil. �• '! �t 1�'r' 1':i,. a - i ' 1. • � " .• r. - : :..�i ' .. kI; ..�.1 '� ei'P•T3}T'pr� � I'.: Jf ...'Y ,�, 'r �'. ! 'f i rll ��.. :l.�s '.: 11 _ 1''EE: i 1 ,ls', . �'E . :i1,�{1'fr. 'rf'li; is .'' � •ilx.' a I.E . 4r1''+.lS.��'[ ti;'! 5.0 STORMWATER / PROCESS WASHWATER RECYCLE SYSTEM DESIGN AND CONSTRUCTION DETAILS The proposed recycle system is designed to capture all process washwater and stormwater from a 10-yr, 24-hr rainfall event from the subject plant wash areas. The recycle system is designed to hold entire runoff amount from the designed storm event. The approximate drainage area involved in the process washwater/stormwater is estimated to be 0.63 acres (Figure 3). The 10 year, 24-hr runoff volume from this drainage area is estimated to be 7.707 cft. A recycle system designed for the estimated runoff is a four pit system (3 pits + 1 truck wash pit) with a drying bed for the waste materials removed from the pit (Figure 3). The total volume of Pit #3 was designed to be sufficient to hold the entire 10 year, 24-hr run off volume. The process washwater/stormwater held in truck wash pit and Pit #1 and Pit #2 would be additional storage beyond the designed storm event capacity. PIease note Concrete Supply strives very hard to control and mitigate migration of any contaminated stormwater from the facility to the waters of US. Appropriate slopes/berms/walls are proposed to isolate the 0.63 acres of drainage area for the washwater/stormwater recycling operations (Figure 3). Of all the four pits in the recycling system, three are sloped at the entrance in order for a front- end loader to go into the pit for a periodic cleanup. However, a berm or a slope away from the pit entrance is placed in front of the pits (Pit # 1 and 42) in order to divert the washwater entry into .these.pits. The.third.pit is.a rectangular.pit.(Pit.#3).and no washwater/process water will enter this pit from the drainage area. The cross -sectional and construction details of these pits are shown on Figure 4. CPEES designed a pit sludge storage area next to the truck washing operations in order to control stormwater flow that is in contact with the pit sludge. The slopes of the truck washing operations and the pit sludge storage area are directed toward the truck wash pit of the four pit recycling system in order to control and mitigate migration of stormwater contamination from the washing operations. The location of the recycling system along with stormwater flow directions and wash areas are displayed on Figure 3. The construction details for the recycling system are displayed on Figure 4. The 10 year, 24-hr stormwater runoff calculations are provided in Table 1 of this report. A sump pump with a switch will be provided to pump water from Pit #3 and may be from Pit #2, as required, either to the plant or to the truck washing operations. This would help empty the Pit #3 and #2 to accommodate any possible rain event. CP Engineering and Environmental Solutions 4 A to C Permit Application Tel: (704) 541-4042 Concrete Supply - Kings Mountain Email: ciTakalaacarolina.rr.com I10 Holiday Inn Dr., Project No. 1129-002 Kings Mountain, NC 28086 1 r i!" e t I •,.. �.. !- f '�'l f .fr. .� "? 1 .j.+l/' � I' . + t � . r a,,,,r:,, .,I 'rt"fir �. !.t7 I,, If .�ICa�J ;(r• lJe.•r. .J; ,. r. r - f1 '�'I. I ' ' „ '1` .' t-, ,.+ s.'j i r., i�.A'f liJ; '� 's iE' l•'! ,•+r•Iii+,rr_EIr.'i.,�i�.Tiil',:i -'',' !1;.�^ .-.rt. � ;. rr,-.[1, -•� .! Ulf r Y I 'r. •r (.r. iL. Ct "• ' t' ; r.: t! 3i1, +r, t , •�. ,' ,� .. ; iE It, ... '! 1� ',r e.M.;t. - •`•. to I'' r '!. ; 1. i7,• r t', •''•' •�'r' �. .. � ;'' �a{,.. " i ,r� Ur'..'1.1tiF , ." • t 'r„' 4� " . � •: +. ,.t , : 1. rr r � •.i � • '+' i1:i •' r� lr i t r '� ' ' •I r. _"+':L-+ �', i� � s't .�1 i 1'.. 1: ,�:Y I.ir .. '�' .1 `t' ,�}", .Y`r i_ �F .. :'. r:-IBC itl -r{,i[r [- '• [. Y t 'l� t(�#.. (: s -.tlt ;_r , 'i . ..:I r�'-.It.i' ,t r,1 [ � f; .'.,J''+= �; '.i�IJ!}1 - '' ' •' '' .. [ !!(1";' f (: riry 3rl.ri? llti .- IiLIN j *i�J, +iC. ;IY )i:; 1 r �' . ''t I �1- .. ���-I +. ,.,Is1' .14 °.s,:� t, • 1.,: t� ': ; (�.j 'r '.flr' t'• � !t€ 1'.. �i !J . i ,F•:•�ltt; .'f rrr• ,,-, �', .t;:,.t r '.�' ! :, .. A"!tr r;f"? r� F2: ki!'S �i _, u_ ,i' 6.0 TSS, SS and pH CONCENTRATION IN THE WASHWATER EFFLUENT The calculations provided in the following paragraphs assume the following conservative assumptions. i. Particles are spheres (no consideration for flaky particles) ii. Reynolds Number < 0.3 — Laminar flow iii. Hydration effect on the particle settling is not considered iv. No agglomeration/compaction is considered in the settling v. Particles are discretely settling vi. The concrete that runs into the pits are already hydrated and certain bonding has taken place between the particles and the diameters of the particles have changed. Therefore, discrete particle settling of a fresh cement Particle Size Distribution is a very very conservative estimate T L Q. Z VC sludge layer Vh path of smallest consistently settled particle x Please note the notation given in the above picture is not the same as described in the following text but the concepts are the same Particles. settling: The settling velocity. could be calculated using the Stokes Law. ft z ftz Ib ft g sect D 1 P, — Pz ft3 Settling Velocity: v, sec T 18lb �t ft — sec i. Gravity, g=32.2 ft/sec2 ii. Diameter of Particle, D 1. Cement, D=4.92 5ft [NOTE: This is equal to 15 microns. (1 micron=3.28e-6 ft)] 2. Note: Can consult ASTM Study on Particle Size Distribution for Portland Cement (2004 N1ST Publication) for average PSD for this material. iii. Density of Settling Material, P1=200 lb/f 3 iv. Density of Water, P2=62.4 lb/ft3 (1000kg/m3) v. Viscosity of water, µ=5.98*10-4 lb/ft-sec (0.00089 pa.$) (this is temperature - dependent so you may see slightly different values in applications) CP Engineering and Environmental Solutions 5 A to C Permit Application Tel: (704) 541-4042 Concrete Supply - Kings Mountain Email: cypakalaacarolina.rr.com 110 Holiday Inn Dr., .Project.No..11.29-002 Kings Mountain, NC28086 Y :r'�,i1 ,!i<`? -'.� ;• 6 tr isFi`" '`�` .,�'r.°� +..F 'J S 1{r,I. J i r•i�rN,lli„: � , �. �'!I.";«l' _li':I! a1� rir �,.i S.'l �i�, r, •� ,. i JS'_.:l';: ., .- _ ', �i.`�5 .((f1 .E /f1 iT` .',F 1'IY•_,! i� .•L<',c: F' C'. r,.'J`'ii .[f rr;+t .'r. -'li i .I i. `''r:. {:r ;f.r'(tFlli�'-+`•� I�j��'t-_rrs;.i. ,:, ,•;' .r: T�� „ _. [': �` e` f: �J3 .L `,r , , r; ♦ii f' .r ,. 'l l �,l,l ei :�t ,�irrlSJ? '{[ � iy' .ii�T '! �'•_,].. i1,. } 'r, .' !'r1:, r • ,. :.Fi ,�i;f r'� i .'.,. :.; •,f 'ni,l'}1 t�(ir 7'1i1 'J '14 . z�ti ,f, 1{'. „ ra T ' yJ t E Y .M � t , , t, . '[i �. 7 - .i. la.' 1 '. , ! .. 'ir ,i .+ t . •, Sea°- , . a... 1.. �rf� T •.i' l... ' 'E.. .� .•,'fL �. +_ r' I' ,. .f. L .i �.., :f I ` 1 1 Y.4 1 o -:A ' t' '11 }''lr i .fFi- �ii Y •. It, {. laEr''..'4 f .,!S I •�. .i r: ;�jfllr.l .if1 1 .rtf� Y� _ +• f .-.r � . f- rI .ja.": �!7 , r L :,1rl'i,L F'r,. .'I11'- r. •'i: .': �r . :F.r fH' I f�.. 1„, Settling Time: tseffte (sec) = dsetfte(Jt) vs(sec� i. Settling Depth, dam= Average depth of the settling basin for the design (ft) Settling velocities are calculated for various sizes of cement particles (fresh cement) and are tabulated in Section of the calculations sheet. The Stokes Law Explanation and Settling Chamber design principles are provided in Attachment C. 2) Non -rain Amounts Calculations. We estimate approximately 25 to 40 batches would be produced per day at the proposed site. The lowest number of batches per day produced is estimated to be in the winter season. Once the truck is loaded, the truck goes through a surfacial cleaning before heads out to the delivery. No concrete is washed in the surfacial cleaning and only dust would be rinsed off. At the end of the day, the drum and the concrete chute would be cleaned before keeping the vehicle in the yard for the next day usage. Concrete Supply is very particular no to waste the returned concrete and wash in the pits. If any concrete is brought back from the site, it would be used for aiming cement blocks for reuse. Therefore, the left over concrete going into the pit system would be very minimal. The washwater generated is called non -rain water and it would combined with storm event flow to designate as Q combined and used in the detention time calculations. The calculation worksheet presented in the attachment is very self explanatory. 3) Detention Time/Critical Veloc_i_ty: In a plug flow situation Qin =Qout. Yol umeBa sin(ft 3 ) a. tDeterfrion {sec) = s Flow ThroughBa sin ft sec i. Volume of the Basin: The engineer must size the settling basin so that the detention time is greater than the settling time. b. Critical velocity (Vc)= H/Detention time of the basin C. = Qcambin�d/Surface Area of the basin d- Qr mbined " Qlo + non -rain amount (washwater) 4) Particle Settling and Removal All particles having settling velocity > the critical velocity will be removed where they enter, but the particles having velocity Vs < Vc will be removed in the proportion Vs/Vc. A mass CP Engineering and Environmental Solutions 6 A to C Permit Application Tel: (704) 541-4042 Concrete Supply - Kings Mountain Email: cc pakala(a7carolina.rr.com 110 Holiday Inn Dr., Project No. 1129-002 Kings Mountain, NC 28086 t .• ri 5 •.. I •yl�r'f..r 11 �'sir'r� � ± i flt .:T�, ft•' .fiJ +' 111� ?''l, f1: .'#. , i.' ''r' -"I' T .r' . ... S: .:� ;,,i r'f 1 ff I oaI it el 'I ,): 't. . .' i �'. }.`S. . .. _ . `.1: ')i ,. 1'.±, , r { _ .'�r r. ' 'I,.i •'� i, . i,'i r'.. . '�'r '1, i .-., ', �)1 _ , i'r'_ .. S .t, r� s y; �± :1.''; V�I.\r ,i.r •� � 1 .'�'' } .:,:�,���.. _ � � ,€ iS'�1: f I' -Pj, . tl.' 3t1, .t� :! %i .'F fy , _ � .•i f' 1', °1"i '1 �}�' .,+i. f� .- '; _:;!,' a .3r ` - F 1 o � ., .I- ! e , rJ: ..'� i CI_ vow `_rum St3. ,. i:_ eP i;_, t'_' .'I 'i' 'i 7 .'tjl l� f,L• 1'31. f "+ 'i '{�, tl�' „ i .. i'T 4h ri Y ' '.Si .. { ,,+ a •+,.k ,.y , ki: _ ?. •_r _f r� "' ,•(,Ihoi,Sr} 1'. €r �_ {'... 't ,I. '1 e f .: ;lf ,+. I; ,.,�, fraction obtained in the literature is used to calculate the fraction of mass removed at each basin. Based on the calculations, particle size 1 to 24 microns are estimated to be retained in the final pit and rest of the particles would be removed in all the three pits combined. Approximately 76.77% mass fraction is left in the pit 93. 5) TSS and SS Calculations To calculate the TSS concentration in the Pit 43 effluent we have to made some assumptions. Concrete supply had decided not to allow their drivers to bring any unused concrete to the plant. If for any reason concrete is returned, the returned concrete would be used to make the blocks and thus save the concrete and lessen the contamination in the pits. Therefore, the left over concrete in the chute and the drum would be very minimal on a daily basis. In addition, the mass fraction calculated in the TSS calculations is further reduced going from Pit 41 to Pit #2 and from Pit #2 to Pit #3 based on the assumption that the concrete going into the pits is not fresh cement powder but already hydrated and it had enough time to settle in these pits. 0 pH Calculations in the Pit #3 Effluent pH is a measure of acidity or caustic nature of the any liquid. A simple, working definition of pH is pH = - log[H+], where [H+] is the hydrogen ion molarity. To obtain the hydrogen ion molarity from the pH, remember that a logarithm of a number is really just the exponent when that number is written as a power of ten. The definition of pH solved for hydrogen ion molarity is then [H+] = 10-pH. For example, the molarity of hydrogen ions in a pH 5 solution is 10-5 M. We assume the washwater from concrete truck to be a pH of 14 and in the rain water to be a pH of 5. Though sometimes, the rain water pH could vary from 3 to 5 depending upon the area of the rain fall. Once you know_the Hydrogen.molarity,.a mass_balance is taken for.the wastewater volume and the corresponding [H] molarity and the rain water volume and the corresponding rain water [H] molarity divided by the total combined volume to get the combined [H] molarity. Once we know the final [H] molarity, pH could be calculated by using the definition of pH. Also, at the site an Erosion and Sediment Control (E&SC) basin for a 10yr and 24 hr storm event would be constructed as a part of E&SC Plan submitted to the Land Quality. This proposed sediment basin receives water from a bigger area (2.71 acres) and therefore would be diluting it further_ in_this.area..In.addition,.the water from.the E&SC basin would. be -travelling several hundreds of yards before reaching another pond. Therefore, pH would not be an issue at this site. CP Engineering and Environmental Solutions 7 A to C Permit Application Tel: (704) 541-4042 Concrete Supply - Kings Mountain Email. cWka1a(@)caro1ina.rr.com 110 Holiday Inn Dr., Project No. 1129-002 Kings Mountain,.NC 28086 .,. artl ,'r7"r, '!�'7, .`Ls1 _. :�i� ;°. .ifs 1. �)f }i�'+ 7' -f! 7 r•r- rif - , +r .11 - '�:�' +-. , `! +r _. '' !• 11r! ,'r s, ,',. i.11l.7 f� .C•r - 'i. t!. •, i ,4 ., �flta s .. i"- ..I .'(,•' .lr, ( r1' ... 11 ,s ., __ _ '1LT.'' � .1 1., ,'�f �, '� �f:,, ; ",.. r r, „• I I r r: l+ '0Y, 1J' 'il; f` iiEs; { f tt tfL r . _1f 3_ J • i �3!AIiI :.±r� rl'; 'f� ij. f. •. J. I' } /' ! ,.J+ i P".r;r E13"; jsif i:flicr t•.,S s','; �; i i s I�r. ,IS'r !' 1. D y , ljr" . Ij 111t :,`.'13 yl .,;+. .. , ,', ,i `..'.1 r,.1{SI_1'• ,I. �l; � C '.. , ;ftrf' �.,J ' . i_�iit1" F f'. �'� r , �_' ,1r���j -. ' l j' iJr I►. 11' , .,1,, _ ,+':i .. •1' ,tf�f.i� y.l ,. '+Il, Jj+:l. `i: ,,. i:,,'� if;, }' +-r' �' y :'! V, 1 It''_5 ,,, �,J r. ,!" r !, 1{.•. 1.�1 ! FJ,.rF..i11�r!I lr`1.' t [.l.lCli I }!!`?.+( ! f1! �ir` 1 l'• 1:_ .('II;7i t I jai;''+i7ir I 1:'r'1� ' .'1w't '• .i.' i. !ftLf,�.a.'� .'1. .1' sl', U' r 'r- r�r't- i1�Lf�IJ + 7. _ r i .i1i , 3 ) t _r1 (. - i" 'jl. : 7.1 tt :i . 'L ;• l �,3r i :If r!•+j.f: +�+ ,"�� i �f)F,t (! � i t I � � _' .I� �,•+`_. Ir:il I!'r,(`' :' .! Cr I'�.rf�,, jJr. .+CMi i r �.. +! 1'•'�. ,Li °•,i1, ':E l: 'ri{ '3• .1+ ..rlf (1 :l W; ri y,'" •mot.;.' �' '.�,.!j e r Ytr�, +r:UJ 1,:1 t-•� . -`• ' :i"l�Lti7t��' l If :y kf..rfr f.r ',!• i .. , r- .',.r., .1}. if., !! .fir ' .rT, MC14-Ti .il,f r,fi 11T�r 1,�FlC.�JS . 11�! ';''tcJ �r r• ,r •1. •- .{.,' L .:f,1 jl .. �11:t+.1!'lE(3{fli iS t{ i�: Iiir. .•�:11i(" i - :! 4irr•f 1 r1P'r=.C1' •• 'i"r'!I , - i. '7 :+!': r�r,'.f1.. -;r r I I.'i€tr. r:! �i;7}', `rj' '' g�. + •; ,- 1� j 11 f.:'�! tl.l�' ;�. , r '� "•Lf: . .7"' ;''',. ,+ ? `I:(i s11? j.tJt t. �+, ,:1^rs: tl=-e�I.:' .iF� fic i.+.%'I t`7,jJf a.}. fi '.c .. 'tl+' 4 {t ,, ".'f l f ..I '.,' yf •'� =- 1 '. Gl i' "1L'" .-,'4J,1j tT r; 1_1. _.' 11C 1.J" I 1' ; I� _ ..1i1'1'"'; ![f (t, : +` .. rf.'� +sf;y rt? f.', ., ,, ,1�' �: "� - , 1' (t}:' • . { ._i •r 'T' ,'e• ! 7.0 WATER BALANCE CALCULATIONS The total flow from l0yr storm event is calculated to be 7,707 cft or 57,647 gallons. Typically, the facility operates 40 batches per day and 250 gallons of water per batch (25 gal/yard and 10 yards per batch). Total water used in the plant per day is approximately 10,000 gals. Please note the likelihood of having a Q10 storm would be greater in summer than in the winter. Therefore, the approximate average time for the pit water to be recycled in the plant equals to 6.3 or 7 days. Table 1 shows the calculations for the pit water recycle/water balance at the plant. 8.0-A, to-C CONSTRUCTION PERMIT APPLICATION Based on our consultants' discussions with the State DWQ, it is our understanding that we need to file a NCG 140000 Notice of Intent (NOI) Form to obtain A to C Permit to construct the proposed process washwater / stormwater recycle system at the Kings Mountain Plant. A copy of the new NCG 140000 NOI is attached -with the A to C Report for an approval. CP Engineering and Environmental Solutions 8 A to C Permit Application Tel: (704) 541-4042 Concrete Supply - Kings Mountain Email: cv akala(a�carolina.rr.com 110 Holiday Inn Dr., Project No. 1129-002 Kings Mountain, NC 28086 V i r I r . - C , , , I , 1. - I 'y ;!1' , , ' ; fill, '-' t *' .I r r a � ��' , r�, .�.�.Y s. ,.�� .s �i•� i_i ,�St, .a i�'�'K r� ; y r _.�,: �" '= k,� r .r � 4. G.jL 'f. nQ1f�L �I� 35. i L'.,�r -� �M �� f�r�✓��4' _ •-s, Lk 1` /�gf �,: Division of Water Quality / Surface Water Protection NC®ENR National Pollutant Discharge Elimination System N-- Ca .. Oewn —T OF rJ+`�AONMEM — Nc , RESd ces NCG 140000 NOTICE OF INTENT Check 0 National Pollutant Discharge Elimination System application for coverage under General Permit NCG140000: STORMWATER AND PROCESS WASTEWATER DISCHARGES associated with activities classified as: SIC (Standard Industrial Classification) Code: 3273 and like activities - Ready Mixed Concrete Treatment facilities used to treat or recycle process wastewater that discharge to surface waters require an ATC prior to construction per 15A NCAC 2H .0938. The Authorization to Construct or Operate may be applied for, and subsequently issued at the same time as the Certificate of Coverage (COC) for the NCG14 permit. Design of treatment facilities must comply with requirements of 15A NCAC 2H .0138 & .0139. For new plant sites that will discharge process wastewater (even if commingled with stormwater): This NOI may also bean APPLICATION FOR Authorization to Construct {ATC} wastewater treatment facilities. ATC requests must be submitted at least 90 days prior to construction'. For existing plant sites discharging process wastewater (even if commingled with stormwater): This NOI may also be an APPLICATION FOR Authorization to Operate wastewater treatment facilities. Construction, modification, or installation of any new treatment components at an existing site requires an ATC. If your facility discharges wastewater to surface water, construction or operation of wastewater treatment facilities at new or existing sites requires submission of three (3) sets of plans and specifications, signed and sealed by a Professional Engineer (P.E.) or qualified staff2 along with this application. A copy of the design calculations should be included. Please see questions 10-17 for more details. For questions, please contact the DWQ Regional Office for your area. (See page 6) (Please print or type) 1) Mailing address of owner/operator (address to which all permit correspondence will be mailedl: Owner Name Street Address City Telephone No. CONCRETE SUPPLY CO P.O. BOX 5247 CHARLOTTE 704-372-2930 X 2071 2) Location of facility producing discharge: Facility Name Facility Contact Street Address City County Telephone No. State NC CONCRETE SUPPLY CO — KINGS MOUNTAIN PLANT ZIP Code 28299_ Fax: 704-334-8650 MR. JOHNIE ALEXANDER, ENVIRONMENTAL MANAGER 110 HOLIDAY INN DR. KINGS MOUNTAIN State NC ZIP Code 28086 CLEVELAND 704-372-2930 X 2071 1 704-309-0134 (MARK) Fax: 704-334-8650 r As per 15A NCAC 2H .0106 ` Unless treatment facilities are designed, constructed, and put into operation by employees internal to the company who are qualified to perform such, work for their respective companies in accordance w.lh General Statutes, 89C-25 (7), plans and specifications must be signed' and sealed by a P.E. P-ige 1 -.1 7 SUIT 1-229-07122011 ALT7011i;WA MW 0 • Division of Water Quality / Surface Water Protection ��� NCDENRNational Pollutant Discharge Elimination System �ih C.vw� �a. D o f� wig K a r NCG140000 NOTICE OF INTENT FOR AGENCY USE ONLY Date Received Year Wrah Da Certificate of Coversize Check # Amount Permit Assimed to National Pollutant Discharge Elimination System application for coverage under General Permit NCG140000: STORMWATER AND PROCESS WASTEWATER DISCHARGES associated with activities classified as: SIC (Standard Industrial Classification) Code: 3273 and like activities - Ready Mixed Concrete Treatment facilities used to treat or recycle process wastewater that discharge to surface waters require an ATC prior to construction per 15A NCAC 2H.0138. The Authorization to Constructor Operate may be applied for, and subsequently issued at the same time as the Certificate of Coverage (COC) for the NCG 14 permit. Design of treatment facilities must comply with requirements of 15A NCAC 2H .0138 & .0139. For new plant sites that will discharge process wastewater (even if commingled with stormwater): This NOI may also be an APPLICATION FOR Authorization to Construct (ATC) wastewater treatment facilities. ATC requests must be submitted at least 90 days prior to construction'. For existing plant sites discharging process wastewater (even if commingled with stormwater): This NOI may also be an APPLICATION FOR Authorization to Operate wastewater treatment facilities. Construction, modification, or installation of any new treatment components at an existing site requires an ATC. If your facility discharges wastewater to surface water, construction or operation of wastewater treatment facilities at new or existing sites requires submission of three (3) sets of plans and specifications, signed and sealed by a Professional Engineer (P.E.) or qualified staff along with this application. A copy of the design calculations should be included. Please see questions 10-17 for more details_ For questions, please contact the DWQ Region! Office for your area. (See page 6) (Please print or type) 1) Mailing address of ownerloperator address to which all permit correspondence will be mailed): Owner Name Street Address City Telephone No. CONCRETE SUPPLY, INC P.O_ BOX 5247 CHARLOTTE 704-372-2930 X 2071 2) Location of facility producing discharge: Facility Name Facility Contact Street Address City County Telephone No. State NC ZIP Code 28299_ Fax: 704-334-8650 CONCRETE SUPPLY — KINGS MOUNTAIN PLANT MR. JOHNIE ALEXANDER, ENVIRONMENTAL MANAGER 110 HOLIDAY INN DR. KINGS MOUNTAIN_ CLEVELAND 704-372-2930 X 2071 Stage NC ZIP Code 28086 l 704-309-0134 (MARK) Fax: 704-334-8650 t As per 15A NCAC 2H .0106 2 Unless treatment facilities are designed, constructed, and put into operation by employees internal to the company who are qualified to perform such work for their respective companies in accordance with General Statutes, 89C-25 (7). plans and specifications must be signed and sealed by a P.E. Page 1 of 7 SWU-229-07122011 NCG 140000 N.4.1. 3) Physical location information: Please provide narrative directions to the facility (use street names, state road numbers, and distance and direction from a roadway intersection). SEE ATTACHED DIRECTIONS (A copy of a county map or t1SGS quad sheet with taca4 ck mrty bo tad on the map is a required part of this appkation.) 4) Latitude 35' 13' 33.6" Longitude -810 20' 162" (deg, rain, sec) 5) This NPDES Permit Application applies to the following (check all that apply): X New or Proposed Facility Date operation is to begin ❑ Existing Facility X Application for ATC Permit # ❑ Application for ATO 6) Consulting Engineer's (or other qualified design staffs) application information: Consulting Engineer: TCHALAM Consulting Firm: _CP ENGINEERING AND ENVIRONMENTAL SOLUTIONS Mailing Address: _100V ALLYSON PARK City: _CHA State: NC Phone: (704__) 541-4042 Email: _cvpakalaQcarolina.rr.com Zip Code: �28277. Fax: L704_ _541-4043_ (Optional) Staple Business Card Here: 7) Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial activity at this facility: SIC Code: 3 2 7 3 8) Provide a brief description of the types of industrial activities and products produced at this facility: (Attach a site diagram showing the process areas present at this facility.) DRY CONCRETE BATCH OPERATIONS. PLANT PRODUCES CONCRETE FOR COMMERCIAL USE Stormwater Discharge. Wastewater Treatment & Discharge and Permitting Information 9) Discharge points / Receiving waters: Number of discharge points (ditches, pipes, channels, etc.) that convey stormwater and/or wastewater from the property: Stormwater-only.- Wastewater -only: Wastewater Commingled with Stonnwater _001 What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility stormwater and/or wastewater discharges end up in? INDUSTRIAL PONDS TO KINGS CREEK (FIGURE 1) Receiving water classification(s), if known: CLASS C (SEE ATTACHED WATER QUALITY CLASSIFICATION SHEETS) If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). WA Will this facility discharge wastewater to SA (Shellfishing) waters? ❑ Yes X No Note, Discharge of process wastewater to receiving waters classified as WS41 to WS-V or SA must be approved by the N.C. Dept. of Environmental Health. If DEH does not approve, coverage under NCGI40000 cannot be granted. No new discharges of process wastewater are permitted in receiving waters classified as WS4 or freshwater ORW. Page 2 of 7 SWU-22"7122011 NCG140000 N.O.I. Wastewater. 10) What types of wastewater does your facility generate or discharge? Type of Authorized Wastewater Generate Discharge Sent to WW Treatment System Vehicle and equipment cleaning X X X Wettinu of raw material stockpiles RM X X X Mixing drum cleaning (MD) X X X Further explanation, if necessary: A FOUR PIT SYSTEM IS PROPOSED TO RECYCLE THE WASHWATER BACK INTO THE PLANT 11) Will your facility spray -down or actively wet aggregate piles? ❑ No X Yes 12) Does the facility use any of the following on site? ❑ Phosphorus -containing Detergents X Brighteners ❑ Other Cleaning Agents X Non -Phosphorus -containing Detergents ❑ Other: 13) Are wastewater treatment facilities planned in the 100 year flood plain? X No ❑ Yes If yes, include information to demonstrate protection from flooding. (Minimum design requirements for treatment works include protection from the 100-year flood, per 15A NCAC 2H .0219.) 14) Does your facility use or plan to use a recycle system, or recycle components in your treatment system? X Yes ❑ No If yes, what size storm event is the system designed to hold before overflowing? (for example, 10-yr, 24-hr) 10 year, 244hr rainfall event 15) Will your facility build a closed -loop recycle system that meets design requirements in 15A NCAC 02T W-1 .1000 and hold your facilities' working volumes? ❑ Yes X No Will your facility discharge wastewater to surface waters? X Yes ❑ No If the facility's treatment system meets the design requirements of 15A NCACO2T .1000 including holding the 25-year, 24-hour storm plus one foot of freeboard), holds the working volume of your site, and does not discharge wastewater to surface waters, you may not be required to obtain an NPDES permit for wastewater discharges_ if you believe this is the case, please contact DWQ's Aquifer Protection Section Land Application Unit Central Office Supervisor or staff (1636 Mail Service Center, Raleigh, NC 27699-1636) for more information on obtaining the necessary permits or approvals_ If you will discharge wastewater or stormwater to surface waters, please continue to apply for a permit to discharge associated with ready -mixed concrete or like operations under NCG140000. For further questions, please contact DWQ's Stormwater Permitting Unit Staff. Also see questions 16 and 17 3 See DWQ's Aquifer Protection Section Land Application Unit's Water Balance Calculation Policy for more information, on DWQ LAU's website http://portal.nodenr.org/mMM/aps4autpoliciesfor more information_ Page 3 of 7 SWU-22"7122011 NCG 140000 N.O.I. 16) A wastewater treatment alternatives review is required by 15A NCAC 21-1.0105 (c)(2) for any new or expanding water pollution control facility's discharge in North Carolina. You may attach additional sheets. a) What wastewaters were considered for this altematives review? X VE X RM X MD b) Connection to a Municipal or Regional Sewer Collection System: i) Are there existing sewer lines within a one -mile radius? ..................................... X Yes ❑ No (1) If Yes, will the wastewater treatment plant (WWTP) accept the wastewater? .... ❑ Yes X No (a) If No, please attach a letter documenting that the WWTP will not accept the wastewater. (b) If Yes, is it feasible to connect to the WWTP? Why or why not?* c) Closed400p Recycle System (must meet design requirements of 15A NCAC 2T .1000): i) Are you already proposing a closed -loop recycle system (CLRS)? See question 15_.. ❑ Yes X No (1) If Yes, contact DWQ's Aquifer Protection Section's Land Application Unit (see question 15) (2) If No, is this option technologically feasible (possible)? Why or why not?*DUE TO SPACE CONSTRAINTS FOR HOLDING 25YR 24 HR STORM EVENT AND TIME CONSTRAINTS (3) If No, is it feasible to build a CLRS on your site? Why or why not?* DUE TO SPACE CONSTRAINTS FOR HOLDING 25YR 24 HR STORM EVENT AND TIME CONSTRAINTS (4) What is the feasibility of building a CLRS compared to direct surface water discharge?* NOT FEASIBLE DUE TO SPACE CONSTRAINTS FOR HOLDING 25YR 24 HR STORM EVENT AND TIME CONSTRAINTS d) Surface or Subsurface Disposal System (e.g., spray irrigation): i) Is a surface or subsurface disposal technologically feasible (possible)? .................... El Yes X No Why or Why not? NOT ENOUGH AREA TO SPRAY ii) Is a surface or subsurface disposal system feasible to implement?* ...........................❑ Yes X No Why or Why not? TERRAIN NOT CONDUCIVE FOR SPARY IRRIGATION AND ALSO NOT ENOUGH AREA iii) What is the feasibility of employing a subsurface or surface discharge as compared to a direct discharge to surface waters?* TERRAIN IS NOT SUITABLE e) Direct Discharge to Surface Waters: Is discharge to surface waters the most environmentally sound afternative of all reasonably cost-effective options of the wastewaters being considered?* ... X Yes ❑ No i) If No, contact DWQ's Land Application Unit to determine permitting requirements (See Question 14). Page 4 of 7 SWU-229-07122011 NCG140000 N.O.f. W-1 f) If this review included all wastewater discharge types, would excluding some types (e.g. raw stockpile wetting) make any of the above non -discharge options feasible? ............ 1. ❑ Yes X No ' You may be asked to provide further information to support your answers to these questions after the initial review. Feasibility should take into account initial and recurring costs. 0 Does your plant discharge process wastewater to surface waters? A Yes U No When applying for this permit, you may also concurrendy apply for an Authorization to Construct (ATC) (for new treatment facilities) or Authorization to Operate (ATO) (for existing treatment facilities), or you may apply at a later date. However, an ATC from DWQ's Stormwater Permitting Unit is required to be obtained prior to construction of wastewater treatment facilities that discharge to surface waters. ATC/ATO application information is as follows: For new sites, you must submit three (3) sets of design plans and specifications with this application (signed, sealed and stamped by a Professional Engineer (P.E.) or qualified staff) and provide supporting calculations that predict compliance of final discharge with permit limits. A copy of the design calculations should be included. For existing sites, applicants must submit three (3) sets of plans, specs for facilities as -bunts (signed, sealed and stamped by a Professional Engineer (P.E.) or qualified staff). Provide as many design details as possible. A copy of the design calculations should be included_ Applications for ATC or ATOs shall include (Attach separate sheet(s)): • A detailed diagram of treatment systems in place, including design specifics such as: o tank volumes o dimensions o retention time o surface are o working volume o piping o settling basin details o any other pertinent design information. • Water balance equations for treatment systems and holding ponds (inputs, outputs, rates). • Rainwater use in mix (rate and volumes), if applicable. • Calculations to demonstrate compliance with permit effluent limits (pH — 6-9 SU, Total Suspended Solids (TSS) — 30 mgA, and Settleable Solids (SS) — 5 mbl). Stormwater: 18) Does this facility employ any best management practices for Stormwater control? ❑ No X Yes If yes, please briefly describe: BERMS AND SECONDARY CONTAINMENT DIKES. ALSO ROUTING THE STORMWATER FLOE TOWARDS THE PITS 19) Does this facility have a Stomrwater Pollution Prevention Plan? ❑ No X Yes It yes, when was it implemented? SEPTEMBER 2011 4 Unless treatment facilities are designed, constructed, and put into operation by employees internal to the company who are qualified to Perform such work for their respective companies in accordance with General Statutes, 89C-25 (7), plans and specifications must be signed and sealed by a P.E_ 5 Unless treatment facilities are designed, constructed, and put into operation by employees internal to the company who are qualified to perform such work for their respective companies in accordance with General Statutes, 89G25 (7), plans and specifications must be signed and sealed by a P.E_ SWU-229-07122011 Page 5 of 7 NCG140000 N.O.J. 20) Are vehicle maintenance activities (VMA) occurring or planned at this facility? X No ❑ Yes If yes, does your VMA area discharge into your wastewater treatment device? ❑ No ❑ Yes Other/Permittin : 21) Does this facility have any other NPDES permits? X No ❑ Yes If yes, list the permit numbers for all current NPDES permits for this facility: 22) Does this facility have any Non -Discharge permits (ex: recycle permits)? X No ❑ Yes If yes, list the permit numbers for all current Non -Discharge permits for this facility: 23) Does this facility have a Division of Land Resources Erosion & Sedimentation Control (E&SC) Permit? ❑ No X Yes If yes, list the permit numbers for all current E&SC permits for this facility: 24) Hazardous Waste: a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? X No ❑ Yes b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of hazardous waste? X No ❑ Yes c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of hazardous waste? X No ❑ Yes d) Type(s) of waste: How is material stored: Where is material stored: How many disposal shipments per year Name of transport / disposal vendor: Vendor address: Final Checklist This application will be returned as incomplete unless all of the following items have been included: X Check for $100 made payable to NCDENR. X This completed application and all supporting documentation (including design details, water balance equations, and calculations for treatment systems) — see Question 17. �'- X If an Erosion & Sedimentation Control (E&SC) Plan is required from Division of Land Resources (DLR) or local designee: documentation verifying applicant has developed and submitted that Plan to the governing agency (required per 15A NCAC 02H .0138). KJ X For new sites (or sites that will install new treatment facilities): Three (3) copies of plans and specifications for wastewater treatment facilities (including recycle system components), signed and sealed by a Professional Engineer or qualified staff meeting requirements of G.S. 89C-25 (7) — see Question 17. 1P ❑ For existing sites: three (3) copies of plans and specifications for wastewater treatment facilities (including recycle system components) as bui stamped and sealed by a Professional Engineer, or (only if plans not available) a detailed diagram of treatment systems in place that includes information such as tank volumes, dimensions, retention time, piping, settling basin details, etc. — see Question 17. Page 6 of 7 5vw-229-07122011 NCG140000 N.O.I. X A site map showing, at a minimum, (existing or proposed): (a) outline of drainage areas, (b) stormwatedwastewater treatment structures, (c) location of stormwater/wastewater outfalls (corresponding to which drainage areas), (d) runoff conveyance structures, (e) areas where materials are stored, (1) impervious areas, and (g) site property lines. X A county map or USGS quad sheet wilh location of facility dearly marked. 25) Certification: North Carolina General Statute 143-215.6 S(? provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under #his Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a nilemakdng proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dailars ($10,000). I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharges) and is enforceable in the same manner as an individual permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: MR. HENRY BATTEN, Title: PRESIDENT i2. ; Applicant) ze 11 (Date Signed) Notice of Intent must be accompanied by a check or money order for $100.00 made payable to: NCDENR Mail the entire package to: Stormwater Permitting Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Note The submission of this document does not guarantee the issuance of an NPDES permit. Page 7 of 7 SWU-229-07122011 Goode maps Directions to 110 Holiday Inn Dr, Kings Mountain, NC 28086 195 mi - about 3 hours 29 mins Save trees. Go gm*ni Download Google Maps on your phone atgoogle.com/gmm 4 North Carolina Wafter Resources f 512 North Salisbury Street, Raleigh, NC 27604-1187 - (919) 733-4064 1. Head southwest on N Salisbury St toward W Lane St 2. Take the 1st right onto W Lane St About 2 mins 3. Turn left onto N Dawson St About 3 mins 4. Continue straight onto S Saunders St 5. Turn right to merge onto 1-40 W toward 1-440 N ' About 6 mins 6. Take exit 293 for 14401US-64 WIUSA toward RaleighlSanfordANake Forest 41 7. Keep left at the fork to continue toward US-1 SIUS- 4 W 8. Take exit 293A for US-1 SIUS-64 W toward Sanford/Asheboro 9. Keep left at the fork to continue toward US-1 SIUS-64 W 10. Keep left at the fork, follow signs for US-1 SIUS-64 W/ApexlSanfordlAsheboro and merge onto US-1 SIUS- 4 W About 3 mins 11. Take exit 98B to merge onto US-64 W toward PhtsborolAsheboro fi4 About 41 mins 12. Tum right to merge onto US-421 N �21 About 27 mins 13. Merge onto I-85 S via the ramp to Winston - SalemlCharlotte About 2 hours 2 mins 14. Take exit 8 for N Carolina 161 toward Kings Mountain 1U 15. Turn right onto N Carolina 161 NlYork Rd 16. Take the 1st left About 1 min 17. Turn left onto Holiday Inn Or Destination will be on the right 110 Holiday Inn Dr, Kings Mountain, NC 28086 go 0.2 mi total 0.2 mi go 0.2 mi total 0.4 mi go 1.5 mi total 2.0 mi go 0.6 mi total 2.6 mi go 4.9 mi total 7.5 mi go 0.2 mi total 7.7 mi go 0.3 mi total 8.0 mi go 0.3 mi total 8.3 mi go 0.3 mi total 8.6 mi go 3.2 mi total 11.8 mi go 37.8 mi total49.6 mi go 26.0 mi total 75.6 mi go 119 mi total 194 mi go 0.3 mi total 195 mi go 335 ft total 195 mi go 69 ft total 195 mi go194ft total 195 mi These directions are for planning purposes only. You may find that construction projects, traffic, weather, or other events may cause conditions to differ from the map results, and you should plan your route accordingly. You must obey all signs or notices regarding your route. Map data 02011 Google Directions weren't right? Please find your route on map3.g2Mle.00m and dick "Report aproblem' at the bottom left MON J. IT lj•_ I. - WON 4b nor a 10 TABLES Table 1: Runoff Volume Calculations for a 10-yr, 24-hr Storm Event TSS, SS and pH Calculations for the Washwater Effluent ti. �}. .� q.: ..; 1v; :�., .\. r �I�� 'j ,Idr� .,64 `. i. C„S�. .- _ ���ti ,';j �.�f •j .5 �� ���.� K�.;� ��, �r� 1 .3 A r `f $���'1�.4���•_} '�rd,,.�ri, � '�1 s <. t:.:i;7Jfat .���� }i'�[� �%�:� :r�� ; �: TABLE CONCRETE SUPPLY KINGS MOUNTAIN - NORTH CAF10LI A Size of a Concrete Recycling System for Process Wasttwated Stonnwater for a Ready Mix Concrete Plant e for a 10yr, 24-hr Runoff Volume tinge Area vation nth. ine = 1= I Intensity (Average Asheville and Charlotte) Depth = Runoff Volume Recycle pits to hold - Clio -10 Yr, 24hr Discharge - for Weir for 010 = Raw Use SCS Peak Discharge 0.63 acres or 27,443 sq ft. 4 ft (Obtained from the site topo map) 277 ft (Obtained from the site topo map) 3 min (8.03a) 1.4% 85 (8.03b) 4.9 inches (Ref Fig 8.03j) 10yr-24hr storm event 6.25 htw (8.03f and 8.03g) 3,37 inches (Table 8.03c) Drainage Area x Runoff Depth 7,707 cu It. 7,707 cu ft. CIA Q,e - 3.16 Peak rate of runoff in cubic feet per second (cfs) C = 0.8 Runoff Coefficient Average intensity of Rainfall in inches/hr for a storm duration- i = 6,25 time of concentration (in1hr) A = 0.63 Drainage area (acres) 3.0LHM 025 = 3,15 L = 2.5 Length of the weir (ft) H = 1 Height of the weir (ft) 3,15 < 3.75 cfs Calculated discharge from the weir Length of the weir - 2.5 ft Number of Pits 3 Capacity of pits Pits 1 and 2 Each (Fiat Area Volume) L - 30 ft W . 14 It AREAlplt - 2,940 cubic feet. D= 7 It or 5880 Cubic feet. (Two pits) Pits 1 and 2 Each (Slope Area Volume) L = 30 ft W = 14 ft AREA/pit = 1,470 artiic feet. D= 7 ft or 2940 Wait feet (Two pits) Pits 3 (Flat Area Volume) L - 60 ft W = 14 ft AREA1ptt = 8,400 aRk feel D- 10 It OF 8,400 albic feet (One pit) Pits 3 (Slope Area Volume) L = 0 ft W = 0 ft AREA/pit= 0 D = 0 ft 0 atbic teat (One pit) Total PR Volume (CFT) = 8,400 cubic feet > 7,707 aIDic feet or SZ832 gals > 57,647 gals WATER BALANCE ANALYSIS RNW # of batches per day 25 40 belches w.ew d" - 26 beb&K Water per cubic yard 25 gals e— d, - 40 bakh. gals of water per batch (f 0 yards per batch) 250 The rkeWmd o1 haww e I en 24hr storm event in wu Gals of water recycled in the plant 6,250 10,000 gals Qea w thm in !,e WnW and owawe, Pb •3 emp" in 6-3 do" e. rese=ble # of days the water reused in the plant are = 10.1 6.3 days AVG # of Days water recycled in the plant = 8.2 days Gale. Pe#da, PE CP EnffwsYq tel: 7t74-541 -40/2 CPEES Prcjea Nc. 1i29-M TABLE I CONCRETE SUPPLY KINGS MOUNTAIN - NORTH CAROLINA 1) ESTIMATE PARTICLE SETTLING VELOCITY CALCULATIONS - PROCEDURE FOR ALL PARTICLES ANALYZED rticle Settiling Velocity = V Assumdonsb Varipbf Units Particles are spherical g (P. - FQC? Vp = Particle sesttiling velocity ft/sec Hydration of cement has no impact on the settling Vp. 18 li g = Accelaration due to gravity ft/see Laminar flow d = Average diameter of cement particle ft Reynolds Numbner c0.3 p� = Density of cement The Discrete Settling- no agglomeration/flocculation p,,,, = Density of water We N = Viscosity of Water Ib/ft.sec ml)le calculation of a »article settling veloctri 9 = 32 fl/see d = 15 micron 1 micron = 3.28084E-06 ft ik = 200 Ibt t' Pw = 62 [be N= 5.981E-04lb1ft.sec VP = 0,000996737 ft/sec Chelam Pekele, PE CP Engineering Tel: 704541-4042 CPEES Project No. 11294002 I I TABLE 1 CONCRETE SUPPLY KINGS MOUNTAIN - NORTH CAROLINA 2) NON -RAIN AMOUNTS CALCULATIONS FLOW FROM THE SITE NO -RAIN SITUATIONS lber of trucks used at the plant (10 to 12) 12 (worst case) tees produced at the Plant = 40 batches /per day (Summer) Winter would be lesser work day = 10 hrs luction per hatch = 10 cy/batch ( range is 8 to 12 cy/batch) luction capacity of the Plant = 400 cy/day Jpated Truck Wash Arrangements acial cleaning 10 gal/batch (No sediment) it water used for all the batches/day = 400 gals/day (No sediment) le cleaning 10 gal/truck (1 wash end of the day) it water used for all the truckstday = 120 gals/day n cleaning 200 gautruck (i wash end of the day) i water used for all the drums/day = 2400 gals/day .I water used for washing purposes/day = 2920 gals 1 gal = 0.133681 0 or 7.30 gaVcy or 390.3t: ft3 rrmination of Q for non -rain production (Q,) Crete production rate/day = 400 cy/day hwater production/day = 390.35 R3 work day = 10 hrs 1 hr = 3600 sec Flow rate = 0.010843 cis Chalam Pakala, PE CP Engineering Tel: 704-541-4042 CPEES Project No. 1129 002 : - I : i " 1. TABLE CONCRLTE SUPPLY NORTWCAROLiNA 3) DETERMINATION OF DETENTION TIME AND CRITICAL SmumlO VELOCITY IN THE PITS Slav for a 10 yr, 24.Irr Runoff Volume Use SCS Peak Discharge Drainage Ana - 0.63 acres or 27,443 sq ft. Rainfall hitenslty (Average AshwAtle and Charlotte) = 6.25 irallr (B ON and 8.03g) - Runoff Depth - 3.37 Iecfres (Table 8.03c) Runoff Volume Drainage Area x Runoff Depth 7,707 Chi ft. Design for pits to hold • 7,707 cu fL 4310. 10 Yr, 24-hr Discharge CIA 010 - 3.15 Peak rate of runoff in cubic feet per second (ds) or 11340 dUhr C = 0.8 Runoff Coefficiem Average intensity of Rainfall in indieMtt for a storm durabontime of i = 6.25 concentration A = 0.63 Drainage area Determination of 0 for non -rain production (Onr) Concrete production raWday 400 cylday WashwwW producdordday = 320.34852 ft3 Avg work day - 10 his Avg Flow rite - 0.010843 da 0 peak Combined (efs) = 3.161 PA 5ds - 0,01 Ids) (Stom7m event - non rain water or process water) Size for Vftr for 0,e = Ow L H 3.0 L H Broad Crested Weir Coefficient (Cw) = 3.0 010= 3,161 L = 2.6 Length of the weir (11) H = 1 Height of the weir (ft) O,a now 3.161 < 3.75 ds Calculated discharge from ft weir Number of Pits 3 Mug aor Assumppon in inns basal. Therefore. Q] i - flout NOTE In.2m 40 xdepe,Iw.rPM. Tr. eulo—"plgt•IOIe M�0. C Beal Veroray (Va) In (Wsec) • 910 (HsySurhoe Area of the Basin (e2) Defemion lime (Sec) = Voaune of the basin (113y010(ds) 1 dey- aw see ~ Wvlh Mtydlddrae P'" • z5 f pt din- ra(U• 10(W). 71 f01 L- 60t LaA'L • 57.5 t rp.re. te. • r1ou25A II -'a W • 1{e Peded• BEa 14x11R rAix lA rO) L• cot L,V& 67.51 Sure= A • ®1-22 (ww l CO x 1M W • 142 W-0 L-n*0&yd-d. ywt+ 01 pldw• ma(L1. 111 tY15.7a;01 L• Wt L-WL• ®t Sur% eA—ak.let w- 141 e1.Ie. ral.le PE CPrgm- . Ter 7WUI4W Offs Prci.cl N. 11291002 TABLE CONCRETESUPYLY KINGS MOUNTAIN. NORTH CAROLTNA 4) DETERMINATION OF CRITICAL SETTLING VELOCITY IN THE PITS Ore1n Biro O1aYih11Bor1 of Poellend fwrrrt °( Pf S"Inp veleclq (VP) (16aao) Chace' 8em:y Vw-Ity MO ltlis«I L - C"a"' d in But ratio (V� Ynt Fraction Removed flue Fraction R.m.rna To au -d eeafn IYn+I Diameter (microns) Sine DisWbutfon % Mass Fractkm Caldtau,/ar '� wa>va CO 1 C4.12 Cd 3 W 4 Cd 5 Col a Ca17 col a Cd w Cd $ �� la la OW 11 1 41% 4.7% 0.160 3.2$0$4E-W 4.430E-0a 3.927E-03 O.W7 ODOM 0.1596 Yn t.5 2.0% 7.3% 0.156 4,92126E-8 9.987E-416 3927E-03 0003 0.0004 0.15" Yee 2 4.8% 12.1% 0.140 6.56168E-06 1.772E-05 3.927E-03 0.005 0.0006 0.1394 Yea 3 5.5% 11.7% 0.125 9.84252E-06 3.987E-0S 3.927E-03 0.010 0.0013 0.123T Yes 4 4.5% 22.3% 0100 1.31234E-05 7.088E-05 3.927E4x! 0.010 0,0016 00962 Yes 8 7.5% 29.9% 0.060 1.96830E-05 1.595EA4 3.927E-3 0.041 0.0024 0.0576 Yea 8 6.0% 359% C-.= 2.62467E-05 2335E-04 3927E-03 0.072 0.0040 0.051D Yea 12 10.5% 46.4% 0.050 3,93701E-OS 0.379E-04 3.927E-03 0.182 0.0061 0.0419 Yea 16 8.2% 54.9% 0040 324934E-5 1.134E-0S 3.927E-03 0.2" 0.0116 0.0204 Yes 24 138% 664% 0325 767402E-05 25sm-m 3927E-03 0.650 0.0068 Ym 32 10.3% 7a.7% 0.03.5 1.04957E-04 4,536E-03 3927E-03 >I 0.0000 No 48 12.4% 91.1% 0-020 1.5T480E04 1.021E-02 3.927E-M >t 00000 No 52% 963% 0018 239974E-01 1415b-2 3927E-03 >1 O.ODW No 2.4% 991% 0015 3.149ti1E--04 4.Oa3E-M 3.927E-M >1 MO3T- 0.0000 No OA% 09.5% 0002 4.19946L--W 7.255E-02 3.9M-03 >7 00000 No 0.5% Iwo% DO.WW 0A&U °rain Bin Dim9ndion of Portlral Cam-nt Dion~ PeftkM Bat8Y1g ruc* " CAOuI aalWlg �T (ve+F %r - CapOvd M Na! ratlo (Valve) Yea Frac-w1 IRsaa Fractlo„basAp Rr1laYtad To Yu next (YIN) MN) Diameter (micMns) Sim Distiltution %< Mau Fradlon CCt1016on far 'at" vp > vcr Cal l 007 cd 3 Cd 4 Cal caf a Cd 7 Cd 6 (Ca CCI Cd a) 10 C411 10C.9) Cd 11 1 4,7% 4.7% 0.160 3.28094E-08 4430E.W 2.841E-03 0.002 1 00003 0.1596 Yea 1.6 2.6% T3% 0.155 4.92126E-08 9.987E-09 2-941E-03 0.004 0.00M 0.1540 Yu 2 44% 12.1% 0.139 85818SE-M 1.772E-05 2.641E-03 0.007 0.0009 0.1354 Yp 3 S.a% 17,7% 0.124 9,84252E.p8 3,987E-05 2.641E-02 0015 00012 0.1219 Yoe 4 4.6% 22.3% 9.096 t.31234E-05 7.088E-05 2.641EfiM 0.02T 0.0029 0.0956 Y. 6 7.6% 29.9% 0.058 1.96950E-0s 1.595E-0I 2.641E-0 0.060 O.W35 03641 Yea a 60% 35.9% 0.051 262467E-05 2335E434 2.641E-3 0-10T 0.0055 00455 Ya 12 10,5% 4d4% 0.042 3937D1E45 9.379E-04 2.&ItE-03 0242 O010t M0316 Yet 18 a2% 54.8% 0.029 524934E-05 1.134E-03 2.841E-03 0429 0.0122 0.0162 Yp 24 134% 68.4% 0.D09 7.87402E-0S 2-552E-03 2941E-01 01188 00065 0bDD3 Yes MOO 0.048 0.617 pMkle 8-eiky CrW" S*nU p ar- ImO and it To &A next Or-Y, &fad 04atrltuDon a1 Porttwl0 Ca411ant °( ` Velocky w velacty (VCO om rub Nne Ftactfon M-aa Fr-ttie4l bawn (m- 4 (1tSeo) NWV-) Ren,o.rd Ru11en1ed (,rm Diameter Sim Mass rtlonlor (mImns) OlstdbuHan y'4 Fractkm %rp>v Cd1 Cd2 Cd] Cda Cd5 Cola Cd7 Cda Cd9 Cd 10 CAI 11 (Cd 4 x Cd 8) 1Cd 4-Cd 9) 13 2.8% 7.3x 0.1340 /.92iz6E-06 9.967E-06 1.552E-03 0.008 0.W10 0.1530 Yea 2 4.5% 12.1% 0.13a4 686186E-06 1.772E-05 1.552E-0.i 0.011 O.W78 0.1369 Yea 3 5,6% 17.7% 7E 0.1219 a lurocm 19a.a5 1.552E-03 at14a 0 m1, a,167 Yee a B,D% 35.9% 0.0455 2.62487E-0S 2.835E-04 1.552E-03 D.1 os 00083 0.0372 Yes 12 10,5% 46.4% 04316 3,93701E-0S 8.379E-474 1652E-03 O.N1 D.0131 0-0147 Yes 18 02% 1 54.6% 0.0162 s2443aEa5 1.131E-03 1.552E-03 0.131 0.D719 0.00" Yea 24 13.6% 68.4% 0.0063 ] 56]F.n'tt 1.552E-03 >t own BMW No vP- afa-p-Id' 1s p 0 • 32 f (sec' d- Cal Se 14 - 200 lb*' P6 - 62 "1 v - 5.991 E434 16,'a.sea f n*m - 326084E-06 a Va. QIA Q- O combined rMW A . SLvt l Anse a2 (L . V4 Cho- Pd.", PE CP F pk." Tat 704641400 CPEE$ Prod N. tIZD.= TABLE I CONCRETE SUPPLY KINGS MOUNTAIN - NORTH CAROLINA TAS C&C— ll-ATIONS # of trucks at the site - 12 Avg. capacity of a single concrete truck (batch of concrete) = 10 (cubic yards - cyd) # of batches May 40 batches Total capacity of the plant = 40D cyd Wash of concrete on the drum for each batch Oust a dust on the drum) 0.001 cyd Concrete left in the drum per truck at the and of the day = 0.10 cyd Concrete left In the chute per truck at the end of the day = 0.02 cyd Wash of concrete an the drumfdary - 0.04 cyd (40 batches x 0.001cylbatch) Concrete wash from all trucks at the and of the day = 7.20 cyd (12 trucks x 0.1cy/truck) Concrete wash from all trucks chutes at the and of the day 0.24 cyd (12 trucks x 0.02 cy/truck) Total Concrete washedlday = 1.46 cyd Weight of concrete per CYD a 465 Ibs/cyd Hass on concrete contained In the veashwater 688.2 lbs Wt of cement in the CYO of concrete = 11.63% % PIT 93 Particles left In the pit (microns) 1 through 24 microns Mass I.actlon leaving Pit 03 0,768 wthvt % of particles scrsend from Pit #1 to Pit 02 Is 50% and Pit 02 to Pit #3 Is 50% 0.192 wtlwt Aswmptlon:Due to hydration, particle Mass of suspended cement In the washwater - 15.361 Ibs shape and density effects, we guess estimate a 50% reduction from each pit Volume of water below the weir In Pit #3 = 62,83I gal going into the other pit Anticipated effluent TSS concentration in Pit #3 0.0002 lblgal Anticipated effluent TSS concentration [n Pit #3 a 29,30 mgfL Maximum Allowable TSS by NC DENR a 30 mg1L Note: 1 mgfL = 5.3454E-06 lb/gal E4BLE SOLIE)§ 4§§1 CALCULATIQtj These solids will settle In, the bottom of the coneshaped container In a 60 min period TheorldcalSetding times for Particles to settle $"_and 1" for Settleabl__Rollds Test St m of particles (microns) Settling Velocity (ftlaecj 6" Settling Time (hours) 1" Settling Time (hours) 1 4.430E-05 31.352 5125 1.5 8.967E-06 13.934 2.322 2 1.772E-05 7.638 1.306 3 3.987E-06 3.484 0.581 4 7.088E-05 1•960 0.327 6 1.695E-04 0.871 0.145 8 2.835E-04 0.490 0.082 Note: Settleable solids will be removed from Basin 01, #2 and 03 and therfore, no settleable solids would be present in the effluent discharge from the pits a 0 mg/L Chalam Pakala, PE CP Engineering Tel: 704541-4D42 CPEES Project No. 11294)02 l' • f. ...- J... yL-4 •' 1[+ F .. �. -r -: JJ: 'f•r• 1`�. s J. .�. f-'S:,d-- - _ ., .ut11 r[,t, � r TABLE I CONCRETE SUPPLY KINGS MOUNTAIN - NORTH CAROLINA 5] DETERMINATION OF THEORETICAL CONCENTRATION OF PH IN THE EFFLUENT FOR THE DESIGN STORM aH MASS BALANCE CALCULATIONS Anticipated Truck Wash Arrangements Batches produced at the Plant = 40 batches /per day (Summer) Wrnter would be lesser Number of tracks used at the plant (10 to 12) 12 (worst case) Surfacial cleaning 10 gal/batch (No sediment) Total water used for all the batches/day = 400 gaWday (No sediment) Chute cleaning 10 gatitruck (1 wash end of the day) Total water used for all the trucks/day = 120 galstday Drum cleaning 200 gaVtruck (1 wash end of the day) Total water used for all the drums/day = 2400 gaWday Total water used for washing purposes/day = 2920 gals 1 gal = 0.133681 ft3 Assume Pit #1 and Pk #2 were full of washwater before the rain = 8820 cft or 65974 gals PH of Washwater = 14 units pH = aog [l-I] or ]HI = 101-PH unit # Motarity of H. concentration or 1.0000E-14 10yr-24hr Volume of flow = 7707 eft 1 c1t = 7.480 gals 10yr-24hr volume of flow = or 57648 gala PH of Rain Water 5 units Molarity of H- concentration or 1.0000E-05 Maas Balance of pH at the and of rain event - (Vol 2f Pita 01 & #2 x MofadN gJ MI In Was hwaW + hr storm volume x MolaftIn the rain water) (Volume of Pit #1 and 92 Washwater+ Volume of 10yr-24 hr Rain) Molarhy of"of the effluent = PH of the effluent - 4.6633E46 5.3313 units Note: pH of washwater would be neutralized based on the rain pH. Some rain events could have a pH at 3 or 4 units and further, the discharge from Pit p3 would go to another detention pond (using 10yr-24 hr storm event) constructed at the site for the Erosion & Sediment Control Plan. Also, the water from the E&S Basin will travel several hundreds of yards on the ground as a sheet now before it reaches industrial ponds located on the site before going into the waters of US. Therefore, no pH adjustment is needed for this site. Chalam Pakala, PE CP Engineering Tel: 704541-4042 CPEES Projea No. 1129-002 . � � .r 1, .. r ,�, .. .�� �i-" —'V : ref .- � �4 � ' r _ �� � � . �. � ... � ' .t, � r _ _ - r a .-_ r �. _ �'.. .. ' '• .r,' � 'r ` r ,., i �._) . F •. ' i� .. .,, • - �'�'j_ _. _ � _ _'. ._ _. _ .. r � 1 fd .rr'J ` .. .. i ' � � ,t. s �, � .. i - r �. _ FIGURES Figure l: Site Location Map Figure 2: Aerial View of Surrounding Properties around the Kings Mountain Plant Figure 3:. Site- Layout Map - Proposed Process Washwater ! Stormwater Recycle System Figure 4: Process Washwater and Stormwater Recycle System Construction Details `�.'+. ���. c.'��.��s r':.�:� ��i'iai �^l'j•�.�5•SF� .Y.� �rA�. �: 1���G. �k � a . ?I 7S ._}�-", ;i A . ��'�:y .�•.l'��h''.p r' ��._ �, a3. rid' �. _ b : � '�'�.i '. P._ y 'r'. .'�' , t�t•t" 7~_ti ;,_�k �`, ��i'.. .' .a . . Yr �7'+ �`.i yG�i i'��'�i�.. �'�? :`'_i� 4;,t .. .�; �, Map Name: Unknown Map Center: 035' 13' 32.41" N 081 ° 20' 15.23" W Print Date: 08/14/11 Horizontal Datum: NAD27 _�. ' z J2�•7''r J �� �; •RK Cc T ,elf �` sue[ __-,r it ` ••� • ry�� Z } f -+ dl aattlf:tl�e'� Z o�+I' 'v i t 3 r m t . tiY� '� all. i' r Itr v la 1 � VJ M o ova r . �. R'�ttt111t Lj o y •-r ) Va rr�" k�*"f a7 ; F f F Z /F •�• ''�+.. Pam' • Y' '•/j• t m Avol Declination �.` r �� ! y •. Z MN fi.89° W 1' 0.00" W 081' 20' 0.00" W 081' 20' 0.00" W 081° 19' 0.00" W OB1" 1 SCALE 1:24000 SITE LOCATION MAP CONCRETE SUPPLY -KINGS MOUNTAIN 0 1000 2000 PLANT VARNR r[`{` rir'�r rrfr inn ►ir. ann_^nn 1 i ( � , I � � _ a , �k � � � 45 ' � � I i � t i ' , 1 ` `' ' � ' . S� 1 � I � �j .� � .— -� � I � I� _ ;� a •i r `- it —' i ' -. I '. — I �. � � f k � { 1 i 11 • $ � ' � i s � i f t, _ � 1 � i i � �� , '� .� +_�' � ,. _ ' _ _ ,. 1 k� ' _ � � ' �� '. i• .� ' k -� ( F (tom ~ =7 . •n i via, ;a TZ-oZi It " T A}1tN�41ni ti \vim r _ , '� ' _ - y 'r 0��•✓:��r� Jj- .� � ,�f�'W ' ... r � - jam• , - L • . - �•-� �.lt�Y rTM fit?: � -�) �M1� Ipli•4 T ` )ua . - r. _ • •) � � � �• ,� ��, • �r -1 � L� ••_M�y • � r 'fir i;., 1� :-a , � _. r-� � - 1 �t .1 -� tr; r �� �J �. �J try }✓ 4. f� ti� ,ji w V J --, ii +:. .� r�. J` ;: •�. f TABLE I CONCRETE SUPPLY KINGS MOUNTAIN - NORTH CAROLINA Size of a Concrete Recycling System for Process Washwater/ Stormivater for a Ready Mix Concrete Plant Size for a 10yr, 24- hr Runoff Volume = Use SCS Peak Discharge Drainage Area = 0.63 awns or 27,443 sq ft- Elevation = 4 e (Obtained from the site topo map) Length = 277 ft (Obtained from the site topo map) Tc a 3 min (8.03a) Slope = 1.4% CN 85 (8.03b) Rainfall = 4.9 inches (Ref Fig 8.03j) 10yr-24hr storm event Rainfall Intensity (Average Asheville and Charlotte) = 6.25 iNhr (8.03f and 8.03g) Runoff Depth = 3.37 inches (Table 8.03c) Runoff Volume = Drainage Area x Runoff Depth 7,707 cu fL Design Recycle pits to hold = 7,707 ou ft- CIA (lie' 3.15 Peak rate of runoff in cubic feet per second (ds) C = 0.8 Runoff Coefficient Q10 -10 Yr, 24- hr Discharge = Average intensity of Rainfall In inchesRtr for a storm durabon- i = 6.25 time of concentration (inlhr) A = 0.63 Drainage area (acres) Size for Weir for 0+0= 3.0 L H 3n 0, = 3.15 L - 2.5 Length of the weir (ft) H = 1 Height of the weir (ft) +o now 3.15 < 3.75 cfs Calculated discharge from the weir Length of the weir - 2.5 ft Number of Pits 3 apacity of pits Pits 1 and 2 Each (Flat Area Volume) L a 30 It W e, 14 it AREAIplt= 2,640 cubic feet. DC 7 ft or 5880 cubic feet. (Two pits) Pits 1 and 2 Each (Slope Area Volume) L - 30 ft W a 14 ft AREA/pit= 1,470 cubic feet. D = 7 it or 2940 cubic feet. (Two pits) Pits 3 (Fiat Area Volume) L = 60 ft W a 14 ft AREAIplt a 8,400 cubic feet. Da 10 ft or 8.400 cubic feet. (One pit) Pita 3 (Slope Area Volume) L = 0 It W = 0 ft AREAIpit - 0 D = 0 ft 0 cubic feet. (One pit) Total Pit Volume (CFT) = 8,400 cubic feet > 7,707 CUbiCteet or 62,832 gals > 67,647 Is ATER BALANCE ANALYSIS # of batches per day 25 40 batches wr4er t m - 23 bato&m Water per cubic yard 25 gals stench bore -40 bgOnw gals of water per hatch (10 yards per batch) 250 The rkeV*W of hawk* a lour 24hrawn even in sun o is Gals of water recycled in the plant 6,250 10,000 gals greater than in the winter and rhererore. P* o3 empire in 6 3 day+ e a rewenade ea rn4e. # of days the water reused in the plant are = 10.1 6.3 days AVG # of Days water recycled in the plant = 8.2 days ChWarn Pakara. PE CP Erq-e&r Q Tet 704-54+-4742 CPEESProject No. ii2i;W2 0 .r m 0 m 0 M cp c 0 Q 0 r 0 E m U) 0 0 2 H (ft) rAA m a ca 0 t c m 0' E Note: Use nomograph Tc for natural basins with well-defined channels, for overland flow on Mare earth, and for mowed -grass roadside channels. For overland flow, grassed surfaces, multiply Tc by 2. For overland flow, concrete or asphalt surfaces, multiply Tc by 0.4. For concrete channels, multiply Tc by 0.2. Figure 8.03a Time of concentration of small drainage basins. Tc(min) 200 100 SO 10 5 1 8.03.4 Table 8.0.3b Runoff Curve Numbers (CN) Hydrologic Soil Group A 8 C D Land Use/Cover Cultivated land without conservation 72 81 88 91 with conservation 62 71 78 81 Pasture land poor condition 68 79 86 89 fair condition 49 69 79 84 good condition 39 61 74 80 Meadow good condition 30 58 71 78 Wood or forest land Thin stand - poor cover, no mulch 45 66 77 83 Good stand - good cover 25 55 70 77 Open spaces, lawns, parks, golf courses, cemeteries, etc. good condition: grass cover on 75% or more of the area 39 61 74 80 fair condition: grass cover on 50 to 75% of the area 49 - 69 79 84 Commercial and business areas (85%impervious) 89 92 94 95 Industrial districts (72% impervious) 81 88 91 93 Residential:' Development completed and vegetation established Average lot size Average % Impervious 1 /8 acre or less 65 77 85 90 92 114 acre 38 61 75 83 87 1 /3 acre 30 57 72 81 86 1 /2 acre 25 54 70 80 85 1 acre 20 51 68 79 84 2 acre 15 47 66 77 81 Paved parking lots, roofs, driveways, etc. 98 98 98 98 Streets and roads paved with curbs and storm sewers 98 98 98 98 gravel 76 85 89 91 dirt 72 82 87 89 Newly graded area 81 89 93 95 Residential: Development underway and no vegetation Lot sizes of 1/4 acre 88 93 95 97 Lot sizes of 12 acre 85 91 94 96 Lot sizes of 1 acre 82 90 93 95 Lot sizes of 2 acres 81 89 92 94 'Curve numbers are computed assuming the runoff fromthe house and driveway is directed toward the street. source: USDA-SCS 8.03.10 Rev. UM Appendices Table 8.03c Runoff Depth u b. Determine runoff depth (in inches) from the curve number and rainfall depth using Table 8.03c. Rainfall Curve Number (CN) (Inches) 60 65 70 75 80 85 90 95 1.0 0.00 0.00 0.00 0.03 0.08 0.17 0.32 0.56 1.2 0.00 0.00 0.03 0.07 0.15 0.28 0.46 0.74 1.4 0.00 0.02 0.06 0.13 0.24 0.39 0.61 0.92 1.6 0.01 0.05 0.11 0.20 0.34 0.52 0.76 1.11 1.8 0.03 0.09 0.17 0.29 0.44 0.65 0.93 1.30 2.0 0.06 0.14 0.24 0.38 0.56 0.80 1.09 1.48 2.5 0.17 0.30 0.46 0.65 0.89 1.18 1.53 1.97 3.0 0.33 0.51 0.72 0.96 1.25 1.59 1.98 2.44 4.0 0.76 1.03 1.33 1.67 2.04 2.46 2.92 3.42 5.0 1.30 1.65 2.04 2.45 2.89 3.37 3.88 4.41 6.0 1.92 2.35 2.80 3.28 3.78 4.31 4.85 5.40 7.0 2.60 3.10 3.62 4.15 4.69 5.26 5.82 6.40 8.0 3.33 3.90 4.47 5.04 5.62 6.22 6.81 7.39 9.0 4.10 4.72 5.34 5.95 6.57 7.19 7.79 8.39 10.0 4.90 5.57 6.23 6.88 7.52 8:16 8.78 9.39 11.0 5.72 6.44 7.13 7.82 8.48 9.14 9.77 10.39 12.0 _ 6.56 7.32 8.05 8.76 9.45 10.12 10.76 11.39 To obtain runoff depths for CN's and other rainfall amounts not shown in this table, use an arithmetic Interpolation. The volume of runoff from the site can be calculated by multiplying the area of the site by the runoff depth. Step 4. Determine the peak rate of runoff for the design storm by adjusting for watershed shape as follows: a. Determine an "equivalent drainage area" from the hydraulic length of the watershed using Figure 8.03n. Hydraulic length is the length of the flow path from the most remote point in the watershed to the point of discharge. b. Determine the discharge (cfs/irtch of runoff) for the equivalent drainage area from Figure 8.03o through 8.03q: Figure 8.03o - for average watershed slopes 0-3% Figure 8.03p - for average watershed slopes 3-7% Figure 8.03q - for average watershed slopes 8-50% Calculate the peak discharge, 01. of the equivalent watershed by multi- plying equivalent watershed area by runoff from Table 8.03c in Step 3b. 8.03.11 20 15 10 a 0 6 r`n 4 m t c� c 2 .N c m l 0.8 `c 0.6 Q 0.4 W, 0'.1 L 5 10 20 40 60 Minutes Figure 8.03f Rainfall Intensity duration curves —Asheville. 20 15 IC e 6 0 L 4 m r 2 a m 0.8 w 0.6 c is 0.4 tL 0.2 0.I 1 s Duration 2 3 4 6 8 12 18 24 Hours 5 10 20 40 60 2 3 4 6 8 12 18 24 Minutes Hours Duration Figure 8.03g Rainfall intensity duration curves—Cha►tow. Appendices 8.03.7 71 In c a CO C Ca 7r Ca N ry i a m a a J 28-year 1 day precipitation (inches) 5eoh M man a 25 LSD 75 taa RAINFALL DATA MAP 6 8 8 85 0 Attachment B NC DENR — Division of Water Quality Stream Classification Table for Cleveland County Name of Stream Description Curr. Class Date Basin Stream Index # Persimmon Creek From source to Muddy C 09/01/74 Broad 9-53-6-2 Fork Little Persimmon From source to C 09/01/74 Broad 9-53-6-2-1 Creek Persimmon Creek Potts Creek From source to Muddy C 09/01/74 Broad 9-53-6-3 (Pilot Branch) Fork Roberts Branch From source to Dam at B 03/01/63 Broad 9-53-7-(1) (Joes Lake) Joes Lake Roberts Branch From Dam at Joes Lake C 03/01/63 Broad 9-53-7-(2) to Buffalo Creek Beason Creek From source to Buffalo C 09/01/74 Broad 9-53-8 Creek Long Branch From source to Beason C 09/01/74 Broad 9-53-8-1 Creek Wolf Branch From source to Long C 09/01/74 Broad 9-53-8-1-1 Branch Jakes Branch From source to Buffalo C 03/01/63 Broad 9-53-9 Creek Kings Creek source to North 09/01/74 Broadarolina-South [From arolina State Line Sipe Creek (City From source to Kings C 08/03/92 Broad 9-54-1 Lake) Creek Unnamed From source to Dam at B;HQW 08/01/00 Broad 9-54-1-(1) Tributary at Lake Montonia Lake Montonia (Lake Montonia) Unnamed From Dam at Lake C 09/01/74 Broad 9-54-1-(2) Tributary at Montonia to City Lake, Lake Montonia Sipe Creek Davidson Creek From source to Kings C 08/03/92 Broad 9-54-2 (Davidson Lake) Creek Dixon Branch From source to North C 09/01/74 Broad 9-54-3 Carolina -South Carolina State Line Clark Fork From source to North C 08/03/92 Broad 9-54-4 Carolina -South Carolina State Line Page 7 of 7 2011-08-13 07:13:50 2) Meeting Effluent Limits: In some cases, engineers must show that they will meet the effluent TSS and settleable solids benchmarks. Generally, if they can meet the settleable solids benchmark, then they can meet the TSS benchmark. One method of showing this is using Particle Settling Calculations Using Stokes Law: (—zt'—)D2tgsec2 (L'�)(P — P f3 sec a. Settling Velocity: vs �' � _ 1 ' 2 18µ lb ft -- sec i. Gravity, g=32.2 ft/sec2 ii. Diameter of Particle, D 1. Cement, D=4.92 Sft [NOTE: This is equal to 15 microns. (1 micron=3.28e-6 ft).] 2. 15 microns may be representative of "settleable solids" (but this is an arguable point). If a particle size distribution is provided, check to see the relative volumes of particle sizes that are expected. 15 microns may be too low for mining. Or, you could use another value for d to represent "settleable solids" as you -see fit. 3. Note: Can consult ASTM Study on Particle Size Distribution for Portland Cement (2004 NIST Publication) for average PSD for this material. Although calculations may give an average size for this particle, certain percentages of the particles are larger and smaller. iii. Density of Settling Material, P, 1. Cement, Pr=94 lb/ft (or 1510kg/m3) Possible correction: this may be bulk density of dry material (?). Specific gravity of Portland cement = 3.15, so density of particle more like 3.15(62.4) = 197 1013 (3160 kg/m3). However, note that using a lower density results in a more conservative estimate of settling time, so may be okay. iv. Density of Water, P2=62.4 lb/ft' (I 000kg/m3) v. Viscosity of water, li=5.98* 10-4 lb/ft-sec (0.00089 pa.$) (this is temperature -dependent so you may see slightly different values in applications) b. Settling Time: t (sec) = d se"11 (ft ) serrle ft vs(sec) i. Settling Depth, dam= Average depth of the settling basin for the design (ft) c. Detention Time: t YolumeBa sin( ft 3 ) �re1Y,a„ (sec} = 3 Flow ThroughBa sin f-t sec i. Volume of the Basin: The engineer must size the settling basin so that the detention time is greater than the settling time. 1 :!. �. \•�` i)- i' n. r 1. ! „t5 .1, �.41. . r .. l{r'i{r t' f' ti. 1i.. '�t':1, rr ;:1.: !' • -'I r ' .. ';r'i. ,lam �) ... ! _ r I=� i' + F ! r.€: ),. ' "'+' !" r ��; •h f . +. _ . mil.•• :; • � .. 5f si•1;• :�J _ .i.i J '.f r i' . =.Jf' '•i'•fJ I�i •l,V -1 rr' 1.1 , .'� �' : ": •r slrr, 1/J t r �J +( �_ •+ .I,+i1:: J�rJfi ._ ., �t r - I.jr .r]+ � ' ._ I r . 1'l3 J - •1 -r,, ,•+k r I:.j: , 1-1r r' r I 'J�tSi r �) liL'i, r. ",4 .7:' "ij ., ~rj .f. . jr+ J k'• '' — ` . �!' ill .� t '�.�. r'% 1.•. ' 1 +ri, I'+ r:r' ,• IL ii. Flow through the basin: This is the volume of water that drains from the site to the settling basin during a "big" (undefined in the permit) storm plus any wastewater that is being generated. If there are a series of settling ponds, this analysis is more rigorous. Generally, calculate the peak -flow: in hr min t z 1•Peak(Ail = C I �-)( { A t Q sec hr 60 min 60 sec 12in a. Rational Coefficient, C= (0.90*%Impervious)+Cp(1- %almpervious) (unitless) . i. Where Cp is the Pervious Coefficient (specific for the soil type where the water is draining from), Cp=: 1. Type A Soil: 0.20 2. Type 8-Soil: 0.25 3. Type C Soil: 0.30 4. Type D Soil: 0.35 ii. Or, use tabulated values for C: I. Inclined Roof: C=1.0 2. Parking Lot: C= 0.9 3. Residential: C=0.5 4. Park: C=0.25 5. If the site is mostly impervious, C=O.9. (Note: This is an area where the engineer could really reduce the peak flow — watch the Rational Coefficient because if they choose C=O.5, which is a representative or residential lots, then the peak flow will be essentially half of the C=0.9 value. If the engineer under estimates peak flow (which is when the most water will leave the settling basin), then the Stokes Law approach may not be valid in determining whether or not the particles settle out. b. Drainage Area, A: Drainage to the basin(s) c. Intensity, 1: Found using the design storm and the time of concentration: i. Design storm: This is undefined in our permit, but we try to.encourage -the 10-year, 24-hr storm if possible. ii. Time of concentration: L3 0,395 C H) iii. t� = 128 min 1. L=Hydraulic length in feet (longest distance water will travel to the settling basin) ' . �i+' �+, I rl .�i i' fl-'��1:�,. T:.i7 .. i ,� .i .r, '{ �t�_• •rli 7 ..li{'.1sJlu ' r ...l?r{.1.. .��•;•,. .i .J',i;!Is -; r:• %j*' •f'� .py=: ,i., :Srl' :1'.:.' • . 1 r ICJ' �I > .I .IJ = �,. •+I J'!1 i .•1ji r fl �I r.;'E ri ri �, . , .II r j -i i„• .IET `r �; .I I Il.tl I 5 I !Ir l,.'r•� •11� ��. .• .\_ •{ •i le` .1 rJ !_ }i 1 .� • I 'w' r1 :� 1, 1 f r; 0 2. H=Change in elevation along L in feet iv. Example intensity calculation using these variables and data from the precipitation data server for the city in question, http:///hdsc.nws.noaa.gov/hdsc/pfds City of Lenoir Preci itatlon F quencyEstinnuates(inches) ART 5 10 M 30 60 1-'0 3 6 12 24 49 4 7 10 20 30 45 60 +cars !n mm mm miu nm mm hr hr br hr hr & y day da da day day da 1 0.36 058 0.72 0.99 L23 144 L6 2 15 248 3.58 4.04 4.69 5.37 7.16 8.871 112 i3.3 2 0.43 0.69 0.96 19 L49 175 0 24 3 361 4.32 4.87 5.6 6.4 8.48 MA 131 15.5 5 0.51 081 103 146 L89 2.22 2.4 3 3.T 4.59 5.44 6.05 6.83 7.7 U 0 148 17.5 10 1 0.571 0.91 1161 L671 2.181 26 221 34 4.31 5.36 6.3 q 6.971 773 8.68 U2 13.2 16.1 18.9 25 0,65 L04 132 195 2.6 3.15 34 4,2 .5.4 6.42 7.51 8.231 9.06 9.97 12.8 14.8 178 20.7 50 0.71 1 W 144 217 2.94 361 39 4.8 5.7 7.28 8.47 9.23 10.1 iq 14 15.9 9 22. 100 0.78 L24 156 2.4 33 4.1 45 5.4 6.4 8.16 PA 11.2 ll B 15.3 U 20-1 23.4 200 0.94 134 169 2.63 3-69 4.62 5,1 6.1 7A 909 13.5 113 12.1 13 ]6-5 18.1 213 246 500 0.93 147 L85 2.94 4.22 5Ai 6 7.1 .1 U,4 IL9 12.7 13.4 14.3 18-1 95 227 2Q2 1000 1 11 157 197 3-21 4.671 6.05 6.3 8 8.9 114 13 13.8 145 15.3 9.4 20.5 237 27.3 Tc=15 min Design Storm=10 years Depth=1.16 inches Intensig5 1.16inches/ 15 min*60min/hr=4.6inlhr d. Particles will settle out if the settling time is less than the detention time. This is a fairly basic way of calculating this. You may also see calculations involving the critical velocity, etc. These are more advanced ways of determining if sediment will re -mobilize. The method presented here is a good basic review method. 3) Estimates of related variables from past submissions: a. Wash water produced (no recycle): 15 gal/yd3 cement produced b. Batch plant daily capacity: 2,000 yd3 c. Dump truck bed wash out: 130 lb concrete for each 10-yd3 load, or 13 lb/yd3 of load. 4) Containing Design Storm: 1n some cases, engineers must show that they will be able to contain the design storm (See Appendix F for city -specific data). The BMP manual uses Schueler's Simple Method. This is an alternate method. Do not composite curve numbers (do not area -weight them) in the following calculations: a. Runoff Volume: Secondary -containment may have tocontrola certain design storm plus the wastewater. The design storm volume that they must contain is found from the following calculations: b. Curve Number, CN: This is specific to soil type and land use. Typically, for mining and ready mix, engineers should use a high CN. Others are presented here so that we will be aware of when engineers are under -estimating runoff. Cover Type A Type B Type C Type D Parking Lot/Roof 98 98 98 98 Park/ Golf 39 61 74 80 rlr '.I...JlE % It f to .!f' —' � 1, ..- lll� ..P,r' -fl �, .I. .. ji .,-,' ' : � 'Ir 'r .I "IJ {iJ• .,.�. �1 , i•" r -- 11' .}�:.. (YJ I ' i!•' '}i r't- Y l:i�!r �� a• ems.-. I,�.r� ri:: 1}i • ''i`:I'• :JI I,+.—' ;.I!<:t�: 1 '�, ;�� i?.+ '!r.'"' l�tP. ! J f �� :Ir{' , r •'rl,:f+ 7I1. ' ty,ly'iCl+ �', f' E•ia i� or. 'Jli'1Ji. 'i';,'. �Y.p rf:.il' ,". Or 1 Jr ' :k,;+:. } �E1• if , � I rJr ! I T Cover Type A Type B Type C Type D Course Commercial 89 92 94 95 Industrial 81 88 91 93 Residential 61 75 83 87 1000 c. Ultimate Soil Storage: S = CN — 10 inches d. Precipitation: P = (inches), http://hdsc.nws.noaa.gov/hdsc/pfds/ for the city in question at the design storm of interest (for instance, I0-year, 24-hour storm) (P — 0.2S)2 ft inches e. Runoff depth, QRu...,*, Q (P + 0.8S) f. Drainage Area in the Watershed, A,,,az,rh,,d: ft� g. Runoff Volume, QRtmo8dM."'(ft3/sec) = QRunoff ilopth (ft)*Awausshed ( ) E t � r 11 Part I deals with quantities of water used and discharged through domestic, industrial, and agricultural use; physical, chemical, and biological characteristics of water and their significance; and global impacts of water quality. Analytical methods for use in water quality modeling and the analysis of treatment processes are developed in Bart If. The funda- mental modeling principles developed in Part 11 are applied to streams, estuaries, lakes, reser- voirs, and groundwater systems in Part Ill. Physical, chemical, and biological methods of water quality modification are treated in Part IV. The book progresses in a logical fashion from the characterization of water quality, to the significance of the various contaminants, to the methods used to describe changes in water quality in the environment, to water and wastewater treatment. Nonoonventional methods of treatment such as air stripping for volatile organics and batch -activated sludge are also included. Because of the need for creative solutions to water quality management problems based on scientific principles, fundamental relationships and phenomena are stressed throughout the text. Numerous worked examples are used to illustrate the application of the principles presented. The book is self-contained; all needed coefficients and data are given in tables, diagrams, and eight appendixes. The focus of this book and succeeding books in this series is on water quality man- agement issues that are central to the civil engineering profession, that is, subjects that have been, and will continue to be, of impor- tance to society and the primary responsibility of civil engineers. The succeeding two books in the series, FUNDAMENTALS OF WATER AND WASTEWATER TREATMENT and HYDRAULICS OF WATER QUALITY MANAGEMENT SYSTEMS focus on engineer- ing design for water quality management. George Tchobanoglous Edward D. Schroeder UNIVERSITY OF CAUFORNIA AT DAVIS vv ADDISON-WESLEY PUBLISHING COMPANY Reading, Massachusetts a Menlo Park, California Don Mills, Ontario • Wokingham, England ■ Amsterdam Singapore w Tokyo • Mexico City ■ Bogota Santiago ■ San Juan Sydney �I M i a' 8 Oil 4 k k !! B Y II II k k i ` ' a � s Q tion enters at all depths. All particles having a settling velocity greater than v, will be removed, no matter where they enter, but particles having a velocity u, a V, will be removed in the proportion v,/v,,. Thus the critical settling velocity becomes a useful design parameter, Manipulating v,, in terms of other variables results in the overflow rate (OFR), Q/A,. H Q u:�—He d aQ BIt i�/Q WL A, (12.29) where u,r - critical settling velocity, m/s H — tank depth, m BN - hydraulic detention time, s Q - volumetric flow rate, m'/s W • tank width, m G — tank length, m A, -surface area, m2 0 The development of the relationship defined by Eq. (12.29) for the three N common types of sedimentation tanks used for water and wastewater treatment is given in Fig. 12.16. Typical overflow rates used in practice are given in Table 123. The relationship between overflow rates and removal efficiency is illustrated TABLE 12.3 Typical Overflow Rates Used for the Owen of Sedlmentedlae Tanks In Water and Wastewaler Tmattneat Plants a TYPE OF OVERFLOW RATE m/d y OPERATION Range Typical' Water vemawnl Alum coagulation Turbidity removal •40-60 48 Color removal 35-45 40 Lithe softening Low magnesium 60-110 80 High magnesium 50-90 65 Wastewater treatment Primary treatment Primary only 30-60 40 Primary with waste activated sludge return 22-40 30 Secondary VC31ment Activated sludge w (excluding extended aeration) 1b-32 24 Activated sludge ( following extended aeration) 10-24 16 (9 W Trickling filter 16-30 24 "The typical value is based on average plant flow; for peak flow use twice the typical value. i ' 4 F AOA PHYSICAL TREATMENT in Example 12.5. It is important to remember that the overflow rate is a particle settling velocity, not a fluid velocity. ExAMPLE 12.5_ ANALYSIS OF DISCRETE PARTICLE SETTLING A suspension of particles having an average density of 1400 kg/m3 is to be treated in a tank designed for an overflow rate'of 25 m3/m2 • d.Tor the particle size distribution given, determine the fraction F, removed.' EFFECTIVE DIAMETER. MASS MM FRACTION 0,010 0.10 0,015 0.20 b.= 0.25 0,025 0.15 0.030 0,05 0.035 0.15 0.040 US 0 045 0.05 SOLUTION 1. Apply Eq. (12.27) to determine the particle velocity For each n and i use the overflow rate to determine the fraction removed t each group. 4 (9.81)(400)dp t'r s 3 Ca(1000) 2.291 � I r d ji/7 m/s ll D! 25 m3 m2 • d a 2.89 X 10" m/s °"' 0 66,400 s/d 0.3 0.2 li 0. pankle diomNu, d,, mm FIGURE 12.17 Sint Influent and epflumo PdA d&tributian For fxm+�P1e 11.5 ' CITATION 4" i2.i SED� When NR > 0.3 the problem must be solved by trial and error. For this problem the values of Nit are all less than 0.3, so Eq. (12.28) can be used. STOKES' LAW MASS MASS d� MASS VELOCITY. r„ FRACTION FRACTION ss�m FRACTION m/s Nit v,/v_ REMOVED REMAINING 0.010 0.10 2.18 x 10'3 2.21 X 10-4 0.075 0.008 0.092 0.015 0.20 4.90 x 10-5 7.41 X 10`4 0.169 0.034 0.166 0,020 0.25 8.72 X 10-3 1.71 x 10-3 0.301 0.075 0.175 0.025 0.15 13.62 X 10" ° 3.4 X 10-3 0.471 0.071 0,079 0.030 0.05 19.62 X 10-s 5.8 X 10'3 0.678 0.034 0.016 0.035 0,15 26.71 X 10-5 9.4 X 10`3 0.923 0.138 0.012 0.040 0.05 34.88 X 10's 1.4 X 10-3 0,205 0,050 0.000 0.045 0.05 44.15 x 10- S 2.0 x 10- 2 1.526 0.050 0.000 Total 1.00 0.460 0.540 2. Plot the influent and efflucnt particle size distribution. The distributions are plotted in Fig. 12.17. As shown there, the particle size distributions for the influent and effluent are quite different. Practical Sedimentation Systems The ideal sedimentation systems described above have a number of major differences from actual systems. First, the assumption that particles do not interact is incorrect; in fact, several types of interaction occur. Second, flow patterns in real work tanks cause considerable deviation from the ideal conditions. Parflde Interaction "Three types of interaction occur: (1) flocculation in which particles collide and adhere and particle growth results; (2) fluidic, in which particles are so close together that flow is restricted and the particles move as a block; and (3) mechanical, in which particles physically interact, particularly in a compressivc mode. water is squeezed out of the' flocs, and particle volume may decrease (Fig. 12.18). These three types of interaction result in three classes of sedimentation (Types II. 111. and IV) other than discrete and are often referred to by class or as flocculant, hindered, and compression (or thickening), respectively, Flocculanr set - fling occurs only when chemical or biological flocs form in the system. This commonly occurs in water treatment plants. Mineral suspensions and primary sedimentation in wastewater treatment plants are best characterized as discrete -particle sedimentation systems.