Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG140366_COMPLETE FILE - HISTORICAL_20070401
STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /v C�, / L/D 3 � (e DOC TYPE HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE YYYYMMDD State of North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross Jr., Secretary Alan V . Klimek, Director :' il 1. 2O07 Rick Proctor PLT Concrete Services. Inc. 14 Turnaue Road North Carolina 27993 Subject: General Permit No. NCG140000 PLT Concrete Services. lnc. COC NCG140366 Nash County Dear la?r. Proctor: In accordance %vith vour anniication for discharge por•,nit received on Au�iust 7. ?006: and the:, e?`a 7 +'li re''Isions on February 2, 2001. we are fonvardim herewith the subieci ccrtlilcaiY of eovt: aL'e to discharge under the subiect state --NTPDES general permit. This permit is issued pursuan€ to the requirements of North Carolina General Statute 143-21 5.1 and the Memorandum of Agreement between No th Carolina and the US Environmental Protection agency dated May 9, 1994 (or as subsequently amended). t .. If any parts, measurement frequencies, or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, this certificate of coverage shall be Anal and binding. Please take notice that this certificate of coverage is not transferable except after notice to the Division of Water Quality. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. This uerrnit does not affect the legal requirements to obtain other permits which may be reauird by -.the Division of Water Quality or permits required by the Division of Land Resources. Coastal °Area !vlanaUement Act. or any other Federal or Local governmental permit that may be required. if you ria�'P any rnic„inns concerning this normi5 lease contact Ken Pir_l.le at (919) ;-5083 ext. 5S4. cc: - DWQ Raleiah Regional Office DWQ Central Files rStormwater Pe,=*ttin; Unit Files sti'u- 9-011001 Sincerely, Alan W"Klimek, P. E. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 An Equal Opportunity Affirmative Action Employer Telephone 919-733-5083 FAX 919-733-9919 .50% recycled/ 1011. post -consumer paper C&"*Ity az� offc4,-& KO Wa R �53 14 iz��Co6 Hwy► a S J, s ► on-o, S o,- r VVW av-vJ-s -Royv, toll s,�Yuc r C,�.. ? �A/zrlaVto(,s chr' r5'e-S EJ V?, i ovl s) �h` s rs e x� '1 � "Y =e- Caf, aci ow Y1r S E �1 ) 1/a6 �1 svi+UK Ca R el� $� of w�-r a �i s char e Y rri ocorn�✓taiO W sC: J i � f �rtf z(/off,estgh 'ors jv►^. STATE OF NORTH CAROLINA. DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERII1IT NO. NCG140000 CERTIFICATE OF COVERAGE No. NCG140366 STORMWATER AND PROCESS WASTEWATER D1SCH.ARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act. as amended. PLT Concrete Seri ices. Inc. is hereby authorized to construct and operate a process wastewater treatment system, and is hereby authorized to discharge process wastewater and stormwater from a facility located at PLT Concrete Services. Inc. 14564 US 264A Zebulon. North Carolina Nash County to receiving waters designated as Moccasin Creel:, a class C NSW water in the Neuse River Basin in accordance uith the effluent limitations, monitoring requirements, and other conditions set forth in Pans I, II. III. IV, V. and VI of General Permit No. NCG140000 as attached. This certificate of coverage shall become effective April 1, 200T This Certificate of Coveraee shall remain in effect for the duration of the General Permit. Signed this day April 17 2007. Alan W. Klimek, Director Division of Water Quality By Authority° of the Environmental Management Commission „• i.)! I• i 0= ,., - �•--�'.y`-tea C-` rl �p, `I r....�. :` ,\, .,)) r 7�} � I,`k ,I �` \ r�.��- {` f�r i � I :fir • ':.� J ' � ' t ��`•�. !"� TOO l r' S '1- .F.'-•�\� r / V � � C •�'' p 4��� �"J,j J. s�.-ITT"^ �', �i '' !� -,1• '_ 'I \' t;' - �� r !/ �0�-. I E ���9 J �.^ -� / ~�__-^[T:1 mm u g�'� +�ii c:/' f 1' rF�!'�#T __�. �: +. 1�^! �• �k �},'i.�ir---} 1 rs r�.. �, - � � 1r \� ..-�` ���I ��� I.'• I � 'r-� ..f '6 �'�l�t' t 'o i i! \\ � I;.tF _r* \. %' _ � � ; �; -, .+ I'r' y• �. �.4f �r r r� I' .ram _ f .•� �). s` .� .../ r�~ti..•� 4 •C�1� ,1 1'. `.��. �'. 1 ( �. � _ .1. �. •• \-r ��' /r: I V r [L.•7 `c fl f.'S1� �h �'{, ` d ��' h 4) '�;� � ir�y j, t y\ •j�'f{:i 'i•• -I. _�'•t 1 'r� •'\ ..,4. 't. `�-;; i;Ir.Sr t'• i S�'I` f� .l^:C:S tt3 r a' J '.� �,,1�, �p,,rr.� z _ 1<110 WH Nj 1� r� ^���,�' , �¢�':\ , .`� � �:'_��< ` : ,• _ _ '�...-ram•.._ '-/' It .ti i �\ ',`r'f +°4 i �� `;� ' r'1q •L �.i l.r l . 1 , _ \ ,ti, -. • ♦L �' �'r 7�' .� � n ` a •1 .\•i,i '✓ ��_'' _ � i • t4' 4 � .Lf l �, k.L� � r `•. .� r _ !; //� 1 � 1 �ll �� I .`:-"..-ti:• ;i rr i' n _-I Sx i '. 11 �/ - ,.y ...}F i' `\ �:�.., I.I ��4'i d.� LS y '\`��. \ ,may\^ 't�' rir ,. ',` t,'`. •'+ � c:- +� y`.-P.9�' •s ..� rr �r7ip:Ylj �:�., _.� r I (' /�5r � ��.. •'�.t �Y, '•�:' J .}��� S J y t 1 :. �! e' .1 'i� s\- ' j � �'f �_ •, •7 1 , _ '"rf, �� r .j r� ,r , y_� F - .:^� \ 1 i � � (\ � ' `\ #• `1' � I �.� :!r«'• 4 ( ,,.'• f�J r`�.�'Fj f - , _`. -.�_''�`_�1; .f--lY. -- .r' •- � �- ' . _ �t. - jl ,.� - ••k !L.\ ,.:' \. � � .f/•r,.•t'• ' "•c!}) ! .' J `i 9 ! ! � 1. t:t �1.1i•}S n �% r? ; r� �i . 'I.`�r •.�i �. /r _ •C♦, !,-� , 'l.. �1 P _ - r. n,_ /` t�i L- •' ']' r \' `,1,y� ! VIM n ;y �%a r' 1_ 1' 1- i! �.'� ) it �•"I- .: j'Prlt�.e {ti - \`'}`\ rk .l,��.:..!-f"1, •.r l`\mil f. t .�. 1/, �,. 1.JIt-- ..�� 4 �.��' .�. � .�. �r� � I.. �, I f� .'r�. 1- .,.� F ! �^- '�i;..� --� ,,��,-� ,:,.�;:.�.._ �' • - , � r �,'••�..%• � I ll( ., r. � � rti �:i1-•,{ . ! 1 J +` - ,Af �y 't Ir `t � !l ( `•I, rj r yti .•.+' - �• n'L ��: ''•-. .vl — L. �l. � ,.^ ��'= rrri�� I �� f�gr�o� �t�F I' I �`7i� k- ',s�.r'� ... t (..,:r (� , �� ./ irli /� _ �: i tf -1 'f� �'�. _ i-='_:-•.`�\i _ ;-w�yF �'1Ll '! ijil rr�{''r ;Sl.a; t_ r'Til'I ,i, _v'1 � �, .'.-.�-, � _... _ ,r' f yl , 1 !' �,- \`t `• "�.r ♦�` .7 l�r f �� �11i t � �l � 'i '' . `' . }, .' r-.. , . _`��_-. , r 1)r/ :7•�'i � y,V. a •ire e��• h ~`.� '+..: • ` -- •-/'^ � `�`'t'�y .j �t � i/ , 7,..1 :r •• ” -' I / , C'J l 1 ,h.� l 4�z�'a '`�i, -' '�• />;1'fR �t r r /�`r i' -r' �y r t -°'• r=�-,.• - � I'��••�x,::"."'�-r ;'o l•\ �' -,� \��`ir' r- QJ -yt i' ` \' �"•t\ 4� Ili` ✓ �� t 4 �. •l ('l } !',' J_ - �' � /.� •- t '+P�!.r'f a _.i r, ',� ,N �j1`,,. s �aaa .� \�t `;.� �.P� �- � ct ��/Y h�,� r ��.' � - r.9 .� r'/ r., ��. , 3., �,/ I`... g •1. � .._... 'a S"Fr a r iy, I e1 {{ �.� � / aF �,_-..` ^q_�i a•�! • ,I !�_ ....' � . `- air l4 �_ r,�.a � `� y' '�;,� 1 � �.• /%n ."w � ,�, � �� 1°i` !�,._ a '� [. _ ` , r' '\�^�. � ' t �._.. 1 � �. V - I r Tad•• A y i YMi,} �.. �,� � r1rN..1� = i ' � � .- Vr�..�`..ti)'•' .� r4 F -� J ��I,E �:�t'1'-�! } � / ,t yt—,:-�i �, 1 Y � ` Icti:Lh�i�y�t .r:"S �s.f, � �' �.,i � ;G+�,,,�1� dt� - 1 .� .I'11 L ����``:-`::��,\'��.,.�1'',r y'. ',r�{• .w•`,_ ♦ *« .` 4�, �,� j�5 *,�A, 4- r\ r �. ` � ..r �:-�'e�N�,l- _ {,,;.v's,- rn f;, I We�r' �� :',� t-'� �,r� ,.. �. `1\ �;.��fr ,( v �!�,�•\}nn .t �i,1 l':>r`� .� E / j '�:F ;i ���'i'`'>&y �c:k�c# �''f� SAW �__.:rJ i.y, ,r r } i4` • �e j �{ U 1� 1 � � .�hR e:' � /'!w4_ • '�;�ti- _ �.V r r - )a �\. i :.�,r :� 11t �. � ..�\, � :f -' � t _^h�+i I )'�it�r ����•" ��k o. ' � � 'r ..,� l � _� - •� � �_. ��`i wl n. _ 4 cap'. � A'�� � 11r r 3 + �� - �a16tT t-r} i r. 'C '' ° ��� 4 T �' ,.,�, ,, .. � ,i �y' +,-i-;{i +,i l4ti•� s�»y la=, � �.% � 1 fir,€ � ;; �} 4;5' Etn �,�t�1•» >. Ft�..ii -. �t ,i'''I s '>L' �`�`'`y*;�``_- I �+i-�...t4r•�5 ,; `'�J ...\N t,_•i, / .•ram 4.1 .. +,C" ff; r 1 .� i,7����f. OC'Car"�{ �1�+'w"' O 'U �� -� n rr °1 1\ T�� ..•,� � 1 f. ./".-..:��--'�. •5;,,'C :`.; � .!� 4 ,, ;,� d �t i-�.. _ 4.E�{ rA�T�'M:�76iXl-w ..jj��itI���� 3r U �r/ l/ '`.`. i ./\\.. � '� '.� `»_/.' -•._+ ..u..14\ �; _ ii . � ;,J'S'..''4tr ..� :Y9Y, 1 �_�"� t-!f. �L � '� wy11' _1ra" i�ty • I\ J '} 1 f:���, r" f� :1�, :c;5 4' r 1 0 {rt t, # .,w 'i.pyt',' ° a %�.� r._ `-- H`3,v ": 1ti, ' �: r.✓, 'ram � ! r � r '�'�'��ilft` . SC':r R: it ..,, 1 ,r�yi � _ Crcek•� JA ���r�.`;. r i� �nvi '�i`i��'I� � ��4tir �1 � r,, , �F,;t � ,.� r., r..+� ,.r.t if I •= Lr� _.�,--"ts'. #;yr t .t�Flr; ,�j �� 1 Z�•!. ..�:•y, �7 /; "i,:1'- }l.�J ,J ,� �. » _f"'1'7FG 4}:•, �� �� IC. • . n..: e, 3 1 r �.. L-r'.-_ - r �'^t v t--"Y-i�' �i�� '+'-•' �?'� .it`{r '-.t ,f.' �J i (.•..5, .a, �J r � . (" f.,)f1 , �.� Y ,tt 1..�•' '�1�`. „ � ! -\ .;`�lr� s �.-:.t,��` i5•r':�r �: Y � 4 [(J--. "�1 r r�4}, �!'. •:f l.. C : "i, 4Q �� i . •�L I.., � �� :J/ d r `� •^� , Y .., __• .\ Y. f.. [: r iJ�r�> µ gvh `x rr F lc (l � /i � � ,s (4/!f`jl _ � w (., lam.{ { ! �S' 1x ,`^ \ "` i�i d µr •Y �"�: -'saNA :f .Y. r , '•tY '1 //Y'�\\ ��.� . f;:'��\'1 � 'S �� ll '�}/ �•% �-. �- : r'i ^:\ a l µ ``ryry >. ''p 11 {. ,, -,•- ; :`, _' 'i../ g�% _'� •"'. � ��.{I t ` _ �`Z��I• ,�'` �,Jr' I,; ,�' -\•�� , .r .a;j:.L;.� ;�f t. '-JS�'�`� \`• 'r 'Jr .�'�; r r-_!� �s"•-C �� .J �� Jjrf! y,. d.-M-•I,I,i.,j r \, �'k� tip 9 rat, v ••° r' .A��� r 1FV�` \: j�vv:t.l !`y Q./rr.'•,ti.� J = \'-� • t• 1; •yJ 1 0 / `� '�`� T.-.�� _r��\ I.�' il',� — •R ,} I.. I } \ J!^...ti-`'!!_�»J1 ' �" ,,r'. � �� \�-7:5 r`i • \ `,1 ..� �Li [,, ' �,. ��1 � ��r J �`. '� � �: -_ - -yv �% �''-� �ti:�], ���'M f� l 1 1 li f i. /." 1.... i" Jj.^}f YY .-`, r14r��- I ss•�- 1 - _ �\ ..t !r- I f/ , / :._{\� : �,J~ �� %� �<;��1 �' lt'. ;l \ !�f. ,\�Zojt: tL 4�.: Y� � ��ti, ��i W��. I I - '4` � /.���� r.l� ; �, ip ...�.y. �}� \V''- l -�/ Y:'"i ••�<.. �'���1•.� a[\� 'i f d�1a r+'•• rtr• � j�a,E'/{ ik'i' 4t5� v �� -� ..� .,y� � r �� 't I _yEr �y la�a� ,Iv'tr!r '' �r '� � '� •�.l�t:.', I `� + ,� �,.,•�1'i �1.�:11, ;•' ,il,l _`/~° ./ r ' ,r " „�` .. r3 ya / /: ! J. ! -.;•.I ){r p:r �r ! ``rl,'/I , o IIl elf! 1 i _� ''t `. �,� `,A =� `• �r. o i I rJi`.1 ` �1,�'-' .3 �� ~ r `'\r) 1C.'.ti :1`p y�y.it E: \� 4,x� :c` 'F ti iJ� • f0 t /% - /f" 1y.� p�itaa r 5 ��'� i \','S`i�n� .rt A �~ t�' � _-0 �� � w tit t` 1f I ' `.3�' -- p • U_ � I �"- I.t. Z,.� Ire \�?. . �l Sl\�:` -i- ',I � , l f i .f t'y�� �ri it t� �. 1"W V f r i r' -•_, ti ri l i ,rlv,���ti �. \� l/_ �ti ~ II � �- ri a•'W �G h �. r~1 4 r/, -� �`� - + '' 1• ,r �: '�...J�:: _ j:1: `�.' '+ '�... r���� In. tkr- � •.t I I1 kr / �'�j �r \ -��:. Ir r / _ >� l �� ->`�_ �� ��• �'"' �J,I,t�' y�1 °���•�rt��� I� '�''r ;y e'/� F r :��, E,I, .. � / c' _ •J � r 1 `I`• ,/t. 'il• '..�,���.t\•1� /` I'`�\v l^tYl'iM `� ,/f�IIS�M��(�'}tr''''.�' N�/1��+�.T �Y�1�;� }r41+ + ^ �1 '.��1/!�' , '•.r1 �J �y+�l t`f.. ,+�`I ,)31�;�f',_ i1••'1\ 1 ``_�, /f (J/�/'' \ �t'��6 �uf1 IS ;,t,�/, •,1�� , I �`f;•/� �r` �`L,1 'I �'' 1 4 jp ` ., �/ � 'g� �,,C 'ry OT ff 4,'+.'\f�rtx'f �arYf���+',,r1'-.! �Gy F�all�\, "�� .l ! ,ii i 1 ��r •�= f' nr •,ti. '' y`v. `, {l I J:. ryrP�l's�i���'�}�': �'�'/�\tfl '..3 ,:�4 i��..�1 r 4�4 I` i +�}� - �-•- _ •iC f „-I-= ,4.a\��\C f� ,rr•.r.ra, �i a(��*.r#,�j-!� rr. \, 'l °"`-�as : (.— '' "-�}} a .c, >^ ,. . J !' rl.� �`� 1 ,�:1 \�I' •H} � y .��` .,.., '.i,��cl�ii�d �'i \�'�+ � � - `\Cr3 ;t ��+; � �%� I--t�l-� ,i-�/•��.r 1 •} }�� rrC-. I' E%%.�r ';�,�,�������.+�-.`,;���` LEB fl 2 2007 DENR - WATER CAJAUT Wedands & Slwwmal• Bmich ,,•"Q5".CAI? , oe�anea i s1z9 V A OAL $ PLT Concrete Plant Stokes Law Computation �D *so** Middlesex, NC ►l11,1,1+"'' rl The following is a synopsis of the design procedure for the settling analysis for the proposed water quality pond serving the proposed PLT Concrete Plant in Middlesex, NC. There was a sample taken from the Wilson, NC plant of the inflow into the pond located on site. The storm event was less than a 1-Yr. storm event. The sample was analyzed for TSS and the TSS level indicated 63 mg/L. This was inclusive of both the cementitious material and the normal stormwater runoff from the total site. The gradation of Portland Cement was taken from a study by NIST and was used in the analysis. The critical velocity was calculated and then the fractional removal was determined. The amount of suspended solids leaving the settling basin was (1- fractional removal). This volume amount released was then multiplied by the density of Portland Cement. This weight was then summed to determine the mgll leaving the site. The 2 year storm was used. The concept of the 2 year storm was the first flush concept. It was determined that during a 2 yr. event the settling structure was sufficient to reduce 100 mgll concentration to below 30 mgll (See Table 1). This 100 mglL was almost double the concentration of the sample that was taken. Additionally the 2 year storm event at 65 mg1l TSS which is 103% of the concentration of sample was shown to reduce the level of TSS to below 30 mgll (See Table 2). The 10 year storm was used. it was determined that during a 10 yr. event the settling structure was sufficient to reduce 65 mgll TSS, which is 103% of the concentration of original sample, to below 30 mgll (See Table 3). Note that the sample taken was taken from the total site runoff. The sample gradation is taken to be the gradation of Portland Cement. This is quite a significant factor of safety. This factor of safety is due to the fact that the cementitious material probably only makes up a small portion of the sample. This cementitious material is very fine therefore it takes more settling time than does runoff from natural soil conditions. o UPiPRlO��Ej� o (oJA[ul Note that the settling structure is 198% of the size that is required to meet the Neuse Nitrogen requirements for a stormwater wet pond. Note that the settling structure is 273% of the size that is required to meet the NCDENR-DLQ sediment pond to prevent off -site release of sediment from naturally occurring soils. Note that the drum wash area is totally self contained for the 25 yr. storm. Therefore the only cementitious material would come from the small amount contributed by the actual area of wash down for the outside of the truck and from the very limited amount of residual cementitious dust around the batch mixing area. Note that all particles larger than 16 microns will remain inside the settling structure in a 10 yr. storm. All particles smaller than or equal to 16 microns will not settle to the bottom in a settleable solids test (1 hour in an Imhoff Cone)(See Table 4). PLT Concrete Plant Middlesex, NC Table I -Settling Analysis of Cementitious Material -Flow for 2 yr. Storm density water 62.4 Ib/ft` density cement 94 Iblft2 viscosity of water 0.0005981 Ib/ft-sec acceleration of gravity 32.2 Ib/sec2 specimen conc 100 mg/L Overflow Velocity 0.000068 ft/sec Nearly double the lab concentration gee notes Weight o %<= Residual Particle % Particle Particle Settling Fractional Fractional Suspended Size Size Size Weight Diameter Velocity Removal Overflow Solids micron mg sec mg 1 4.7 4.7 4.7 3.2810E-06 1.0174E-06 0.0150 0.9850 4.6297 1.5 2.6 7.3 2.6 4.9215E-06 2.2892E-06 0.0331 0.9663 2.5125 2 4.8 12.1 4.8 6.5620E-06 4.0698E-06 0.0598 0.9402 4.5127 3 5.6 17.7 5.6 9.8430E-06 9.1570E-06 0.1347 0.8653 4.8459 4 4.6 22.3 4.6 1.3124E-05 1.6279E-05 0.2394 0.7606 3.4988 6 7.6 29.9 7.6 1.9686E-05 3.6628E-05 0.5386 0.4614 3.5063 8 6 35.9 6 2.6248E-05 6.5116E-05 0.9576 0.0424 0.2545 12 10.5 46.4 10.5 3.9372E-05 1.4651 E-04 2.1546 0.0000 0.0000 16 8.2 54.6 8.2 5.2496E-05 2.6046E-04 3.8304 0.0000 0.0000 24 13.8 68.4 13.8 7.8744E-05 5.8605E-04 8.6183 0.0000 0.0000 32 10.3 78.7 10.3 1.0499E-04 1.0419E-03 15.3215 0.0000 0.0000 48 12.4 91.1 12.4 1.5749E-04 2.3442E-03 34.4733 0.0000 0.0000 64 5.2 96.3 5.2 2.0998E-04 4.1674E-03 61.2858 0.0000 0.0000 96 2.8 99.11 2.8 3.1498E-04 9.3767E-03 137.8931 0.0000 0.0000 128 0.4 99.51 0.4 4.1997E-04 1.6670E-02 245.1434 0.00001 0.0000 128 0.5 1001 0.5 4.1997E-04 1.6670E-02 245.1434 0.00001 0.0000 Total mg/L 23.7603 PLT Concrete Plant Middlesex, NC Table 2 -Settling Analysis of Cementitious Material -Flow for 2 yr. Storm density water density cement viscosity of water acceleration of gravity specimen cons Overflow Velocity 62.4 Ib/ft'- 94 I b/ft2 0.0005981 I b/ft-sec 32.2 lb/sec? 65 mg/L 0.000068 ft/sec Approximately 115% of the lab concentration see notes Fr Weight o %<= Residual Particle % Particle Particle Settling Fractional Fractional Suspended Size Size Size Weight Diameter Velocity Removal Overflow Solids micron mg sec mg 1 4.7 4.7 3.055 3.2810E-06 1.0174E-06 0.0150 0.9850 3,0093 1.5 2.6 7.3 1.69 4.9215E-06 2.2892E-06 0.0337 0.9663 1.6331 2 4.8 12.1 3.12 6.5620E-06 4.0698E-06 0.0598 0.9402 2.9333 3 5.6 17.7 3.64 9.8430E-06 9.1570E-06 0.1347 0.8653 3.1498 4 4.6 22.3 2.99 1.3124E-05 1.6279E-05 0.2394 0.7606 2.2742 6 7.6 29.9 4.94 1.9686E-05 3.6628E-05 0.5386 0.4614 2.2791 8 6 35.9 3.9 2.6248E-05 6.5116E-05 0.9576 0.0424 0.1654 12 10.5 46.4 6,825 3.9372E-05 1.4651E-04 2.1546 0.0000 0.0000 16 8.2 54.6 5.33 5.2496E-05 2.6046E-04 3.8304i 0.0000 0.0000 24 13.8 68.4 8.97 7.8744E-05 5.8605E-04 8.6183 0.0000 0.0000 32 10.3 78.7 6.695 1,0499E-04 1.0419E-03 15.3215 0.0000 0.0000 48 12.4 91.1 8.06 1.5749E-04 2.3442E-03 34.4733 0.0000 0,0000 64 5.2 96.3 3.38 2.0998E-04 4.1674E-03 61.2858 0.0000 0.0000 96 2.8 99.1 1.82 3.1498E-04 9.3767E-03 137.8931 0.0000 0.0000 128 0.4 99.5 6.26 4.1997E-04 1.6670E-02 245.1434 0.0000 0.0000 128 0.5 100 0.325 4.1997E-04 1.6670E-02 245.14341 0.0000 0.0000 Total mg/L 15.4442 PLT Concrete Plant Middlesex, NC Table 3 -Settling Analysis of Cementitious Material -Flow for 10 yr. Stone water ty cement sity of water eration of gravity men cone flow Velocity 62.4 Ib/ft 94 1b/ft2 0.0005981 Ib/ft-sec 32.2 lb/sec? 65 mg/L 0.000414 ft/sec `** Approximately 115% of the lab concentration "'*see notes Weight o %<= Residual Particle % Particle Particle Settling Fractional Fractional Suspended Size Size Size Weight Diameter Velocity Removal Overflow Solids macron mg sec mg 1 4.7 4.7 3.055 3.2810E-06 1.0174E-06 0.0025 0.9975 3.0475 1.5 2.6 7.3 1.69 4.9215E-06 2.2892E-06 0.0055 0.9945 1.6807 2 4.8 12.1 3.12 6.5620E-06 4.0698E-06 0.0098 0.9902 3.0893 3 5.6 17.7 3.64 9.8430E-06 9.1570E-06 0.0221 0.9779 3.5595 4 4.6 22.3 2.99 1.3124E-05 1.6279E-05 0.0393 0.9607 2.8724 6 7.6 29.9 4.94 1.9686E-05 3.6628E-05 0.0885 0.9115 4.5029 8 6 35.9 3.9 2.6248E-05 6.5116E-05 0.1573 0.8427 3.2866 12 10.5 46,41 6.825 3.9372E-05 1.4651 E-04 0.3539 0.6461 4.4097 16 8.2 54.6 5.33 5.2496E-05 2.6046E-04 0.6291 0.3709 1.9767 24 13.8 68.4 8.97 7.8744E-05 5.8605E-04 1.4156 0.0000 0.0000 32 10.3 78.7 6.695 1.0499E-04 1.0419E-03 2.5166 0.0000 0.0000 48 12.4 91.1 8.06 1.5749E-04 2.3442E-03 5.6623 0.0000 0.0000 64 5.21 96.3 3.38 2.0998E-04 4.1674E-03 10.0663 0.0000 0.0000 96 2.8 99.1 1.82 3.1498E-04 9.3767E-03 22.6491 0.0000 0.0000 128 0.41 99.5 0.26 4.1997E-04 1.6670E-02 40.2651 0.0000 0.0000 128 0.51 1001 0.325 4.1997E-04 1.6670E-02 40.26511 0.00001 0.0000 Total mglL 28.4253 PLT Concrete Plant Middlesex, NC Table 4 -Settling Analysis of Cementitious Material -Flow for 10 yr. Storm Settleable Solids Settling Posdive Particle Settling Depth Per Means Size Velocity Hour Settled 13" micron sec (inches) 1 1.0174E-06 4.3953E-02 -1.2956E+01 1.5 2.2892E-06 9.8895E-02 -1.2901 E+01 2 4.0698E-06 1.7581 E-01 -1.2824E+01 3 9.1570E-06 3.9558E-01 -1.2604E+01 4 1.6279E-05 7.0326E-01 -1.2297E+01 6 3.6628E-05 1.5823E+00 -1.1418E+01 8 6.5116E-05 2.8130E+00 -1.0187E+01 12 1.4651 E-04 6.3293E+00 -6.6707E+00 16 2.6046E-04 1.1252E+01 -1.7479E+00 24 5.8605E-04 2.5317E+01 1.2317E+01 32 1.0419E-03 4.5008E+01 3.2008E+01 48 2.3442E-03 1.0127E+02 8.8269E+01 64 4.1674E-03 1.8003E+02 1.6703E+02 96 9.3767E-03 4.0507E+02 3.9207E+02 128 1.6670E-02 7.2013E+02 7.0713E+02 128 1.6670E-02 7.2013E+02 7.0713E+02 HERRING-SUTTON & ASSOCIATES, P.A. 2201 NASH ST. NW WILSON, NORTH CAROLINA 2789E (252) 291-8887 JOB F T <Z-ct3u(_(JN_ ?,_A %) SHEET NO. or CALCULATED BY DATE CHECKED BY DATE SCALE S -rL =� r,-t ,q. JC L l- L VA tfC.L0GtT�f L2T(rp Wt7W G v rv-r I Al uo v s �S E rJ Li A'i r a,v ,:r 4. u L F L O W T �'��� a? f{ 3 4, So cfs IO YC4:k& STolpr -> MAY CL.C- i/pt tdN = Z !p, cj(c 4, 40 0 0 Gef ff,.1sec =7 PC -At' 0(fQfAeV(� C 6"1 lNUbu > ,_5601PN.614 rAI'4o } ()LU(, FG64, Vim. 3114 Z. r Z I � '�'') Tj_.l 6• fU0q-(4- fLlsec n oorw u�r x� JOB P(- T [. c1"c.'C u-TC- L C3 u c u,✓ Lf�n.'T HERRING-SUTTON & ASSOCIATES, P.A. SHEET NO. 2201 NASH ST. NW WILSON, NORTH CAROLINA 27896 (252) 291-8887 - OF CALCULATED 8Y DATE CHECKED BY SCALE DATE HERRING-SUTTON & ASSOCIATES, P.A. 2201 NASH ST. NW WILSON, NORTH CAROLINA 27896 (252) 291-8887 JOB p&'T CoNc.lL&�—' e-5-- ( 7GtLl UGU SHEET NO. OF CALCULATED BY DATE CHECKED BY DATE SCALE toc)K A-T P��T 4� �R�� SC/J�MC'.✓� Rc=MovgL A3P[:�T - Gv2-(Z_G i P.L-Quotu,g r s �e� Crs a{ Q1, PC FC.O(J 14 -� Z-T PE7C1 SLF r¢RL A ?(Los (;c-T Lit A IN ) 3 ! 1 ¢ ! -!T pel-k ' Z(. .41 - (Zc QU%R.FrD sA` (2-C.. ¢') c-Fs)C#-3._,r�-) f. ll, `-1 S s&� ll, �!S_ 3r v SG OIM C yr TKAf C=Qv�,�[r0 r,pti n n�xw rT �m REPORT of ANALYSIS RON SUTTON HERRING-SUTTON AND ASSOCIAT 2201 NASH ST NW WILSON NC 27896 CS Microbac Laboratories, Inc. SOUTHERN TESTING do RESEARCH DIVISION 3809 AIRPORT DRIVE, NW WILSON, NC 27896-8649 (252) 237-4175 (252) 237-9341 (fax) www.southerntes fing.com SAMPLE No.: R0075-001 1 AB07862 Date Reported: Thursday, December 28, 2006 Phone / Fax: 252-291-88871252-291-5900 P. O.: Client Sample Marks: PLT CONCRETE PLANT WO#4510A STW INFLUENT Sample Collection Date: 12/23/2006 8:30:00 AM I Matrix: STW Lab Submittal Date: 12/27/2006 9:25:00 AM f Classification: E CAT No. ANALYSES METHOD ANALYZED by PQL RESULT UNIT EW-040-01 Solids: Total Suspended EPA 160.2 12/27/2006 PEB 5 63 mg1L. Sample Comments: n and f%pr6 by: is kin ant ager, Analytical Sciences Department Page 1 of 1 Admin 12/28/2006 11:56:36 AM Wilson Division - NCO0120 Certification: Drinking Water #37708 Wastewater #21 (-G) Greensboro Division - NCO01754 Certification: Drinking Water #37795 Wastewater #637 Chemical and Microbiological Analysis: Environmental • Agrochemical • Foods • Pharmaceuticals Microbac Laboratories Inc. Southern Testing & Research Division 3809 Airport []rive, Wilson; NC 27896 Phone: 252-237-4)176,.." %Fax: 252-237-9341 9 CHAIN OF. CUSTODY and Analyses Request • - Lab .Use Only. 1, Rush Approval By: Date/Time: 1 Dept: 0 �igin�l Report To: L } - V� �� I-'� �4(,v i� i1 _ �K �fZ11 ✓4oic� r155Criu�23 4`' idress: j ?V v� : 5� } ( {J f Sc Contact Person: ` 1 �e Accl, # Trans ort: ' Q1 S tit`r 4 Uv� �, �/ ! lrl Rec'd on Ice? Tem Res. Cl. pH: Phone # �j 2 S z 2 -1 — �S '7. (❑ Yes 1 No voice Address: Fax # 2 T i SAMPLING CHARGES:' S J cl B C� ITime:____Milea�ce:_ ___ Other.-_—_—__.._ rmpMd By: Q 4 t K 1 i Project ID: Analyses �t Anal ses Requested rquested Turnaround Time F U lj S U! t �` ®anal (2 weeks) 0 Rush (3-5 days) ' y��~ s(b "* Ld Emergency Rush (ASAP) ' FO # STRL QUOTE # 0`� O� HOC` �yDC ADDITIONAL CHARGES WILL APPLY `c C oC CALL FOR APPROVAL Client Requested Due Date: em Start End Comp Grab Sample GOZ` �y0 Qom # Dataffime Date/Time Type.. Description/Sample Marks -'" --'.o- / ---------------------- ---------------------- -------------------- --------------------- -------- r------- Rf LINOUISHED BY DATEMME RECE a D BY DATEMME NOTES: /--------- p 2 3 Field Res. CL.: Field Conductivity: Field Temp: Field pH: Field D.O.: IS DATA TO BE USED FOR REGULATORY COMPLIANCE PURPOSES? YES NO IF YES, WHICH REGULATORY AGENCY: "See Reverse for Codes SAM001.01 (1/06) STRL COPY Herring -Sutton & ASSOCIATES - P.A. ENGINEERS • SURVEYORS • PLANNERS January 31, 2007 Stormwater Permitting Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 $m Attention: Bethany Georgoulias Subject: PLT Concrete Services -Middlesex Plant Nash Countya Dear Mr. Ms: Georgoulias: We are in receipt of you e-mail requesting additional information regarding our previous submittal for this ready mix facility. The enclosed three sets (3) of revised plans address both the comments in you aforementioned email as well as those we discussed by telephone. Based upon our conversations we have elected to include a discharge as a feature of our water quality pond which will be subject to discharge limits for wastewater from ready mix facilities. The outlet structure for the pond will handle beyond the 25 year storm without utilizing the emergency spillway. One foot of free board is provided above the 100-yr storm level in the pond. This water quality pond as designed will achieve approximately 80% removal of total suspended solids. Copies of the pond storm routings as well as Stoke's law calculations are included with this submittal. As previously discussed the discharge from the load check area flows into a baffled sediment basin via a concrete flume. Downstream of the load check area with have place an asphalt diversion to direct flow towards the sediment basin for the load check area and prevent it from flowing down the drive to old US 264. This basin has been designed to achieve approximately 85% removal of TSS prior to discharge. The discharge from this BMP flows into the forbay of the water quality pond. As previously discussed, the stormwater flow from sand and aggregate stockpile areas flows into the water quality pond. The solids generate from these two material areas will be treated in the pond prior to discharge. 2201 Nosh Street NW Wilson, North Carolina 27896 • (252) 291-8887 • Fax (252) 291-5900 Included with this submittal are detailed calculations pertaining to the drum wash facility along with sketches. As previously state this is a non -discharge recycle system which relies on evaporation to remove water from the system. We have provided sufficient storage within the facility to handle the 25-yr storm event. If there is a discharge from this structure it will discharge into the water quality pond for treatment prior to discharge from the site. trust that upon review of the above you will be able to proceed with issuance of a storm water permit for this facility. If you should have any questions or need additional information, please feel free to call me. Respectfully, Herring -Sutton and Associates, P.A. Ronnie L. Sutton, P.E. Cc: Ricky Proctor, Manger PLT Concrete Services NCG140366 November 14, 2006 B. Georgoulias PLT Concrete Services, Inc. (Zebulon)—General Permit and ATC Review rev. 11 /15/06 Summary This facility subnutted a Notice of Intent to be covered under General Permit NCG140000 (Ready- il,hv Cont-mte). The stormwater and wastewater discharge drains to Moccasin Creek (Class C-NSW), in the Neuse River Basin. This facility is located in Nash County, handled by the Raleigh Regional Office. Application review a) The permit application has been signed and sufficiently completed. Yes. b) The SIC code accurately describes this facility's activities and is covered by this general permit. SIC 3273 (Ready -Mixed Concrete). c) Does the facility propose a new or expanding wastewater discharge to ORW waters (not allowed), or waters upstream of ORW (special limits may apply)? No. d) Does this facility have other permits? Yes—NCGO1 (Construction S/W permit) e) Hazardous Waste Activities? No. f) DLR Mining Permit status requested: N/A. g) DEH approval? N/A. h) Erosion/Sedimentation Plan Approval (for NCG14 or NCG02 ATC)? Yes. i) Regional Office input requested: 11/14�/2006 (RRO contact 1\I. Nisely): --.0 ROVA Qmy`� RO Approval received: ? �6l Cz/lwo( to elcgoc�ii�C j) Is an ACC. Required? Yes. See Review below. �' J k) Application approved? ? 1) Special Notes: None. ATC Review Lip i ed Site Plan and Calculalions. Aggregate pile runoff appears to drain to stormwater pond. Will these be sprayed down, and if so, where does that water go? If it does drain to the stormwater pond,400ks•likr-sn,.._ mass- and a [Not taken into account for either the 1� pond or recycle system]. Se�phon�elogs�.�; {+ ^! Where are die vehicles washed down? There is a wash stand at the entrance (south end) of the property, as well as a conveyance and concrete wash sediment pit leading from there to NCG140366 November 14, 2006 B. Georgoulias the stormwater detention pond ... does vehicle wash down water drain to there? See phone logs. • No detailed drawings supplied for the recycle system. What are the dimensions of the cells, and what drainage area to the system is accounted for? Where's the hydrograph for this system (referenced in the cales)? Also, calculations do not take into account aggregate pile irrigation or vehicle wash down ... will these activities' runoff be routed there? See phone logs. • ***Big issue: Claining "dry infiltration pond" will empty water through enfiltration (assumed 0.9 in/hr rate); however, this pond is being installed along the length of nearly 4 acres of wetlands ... which are 1-3' hz,gherin elevation than the base of the proposed pond. Won't the assumed infiltration rate be compromised? Potential to drain the wetlands and not have any esfArration at all at times with the water gradient that will be created? Should provide information to support enfiltration assumptions in this situation. See phone logs. Also 6iW Co uC rn .. Phone logs Left message with R. Sutton with Herring -Sutton & Associates P.A. ( 252.291.8887) on 11 /15/06. Items discussed: ✓ Here ✓ Here ✓ Here ✓ Here 7/96, L/vzVe� 4—o c5k� 6,-j_cA_4—o v, 4-o �' / ' L� 7 �' /1�D/ G •' ��s/¢�'7 P�3' /.S /s c �� JI�J q � ,� c a r� n a f ���a/ Co�ru�r1 was � J��ruc� �QYMa% �S/9n �Zr2Re� �� so ryrrc�- in �� , �s T�ea� af�'po i 4 / //k�j E s,A?%yl� GD/I� 4e�-1"n9 ?%P �i �y c.-� lra�r�z� �a CONCRETE SERVICES, INC. August 3, 2006 Mr. Ken Pickle N.C.D.E.N.R. Division of Water Quality 1617 Mail Service Center Raleiah, N.C. 27699-1617 Re: Stormwater Permitting New Concrete Plant Zebulon, N.C. Dear Ken, LAUG n 7 DENR - Vbrit. e n QUALITY Vfttlands & Stormwater pram First of all, 1'd like to again thank you for your assistance and understanding recently, during the pennitting process of our plant in Selma, N.C. I'm happy to say that we opened for business this past Monday and things are starting to look good for us there. The site looks great and I hope you'll come for a visit in the near future. Enclosed you will find the required paperwork and documents for another new concrete plant that we are planning to open near Zebulon, N.C. I have included three (3) copies of all the necessary information and 1 hope you find everything is in order and meets your requirements. As I told you during our telephone conversation on Thursday, we mailed a renewal notice and fees for our Wilson plant just last week and the check includes the $80.00 fee for this new permit application. It should have been two separate checks and I apologize for any confusion. I talked with Fran in your office and explained this to her and told her that I would make you aware of this situation. I have included a copy of our check and her fax transmittal for you to verify this with Fran. Upon review of this package, if you find anything further that's needed, please give myself or our engineer, Ron Sutton a call at anytime. 1 have listed our contact numbers below. Thanks for your attention and consideration regarding our request and I hope to hear from you soon. Sincerely. PLT Concrete Services Inc. Rick Proctor General Manager Rick Proctor Office- 252-293-0500 Cell- 252-205-3337 Ron Sutton Office- 252-291-8887 Cell- 252-230-0709 3214 Turnage Road - Wilson, North Carolina 27893 - Office 252-293-0500 - Fax 252-293-0838 Division of Water Quality / Surface Water Protection NC®ENR National Pollutant Discharge Elimination System Namn C + — CP' —E- Oe :y,virtpunExl ..D Nwi - RESOURCES NCG140000 NOTICE OF INTENT FOR AGENCY USE ONLY Date Received Year Da Cenilicate of covcra e CLGLI4 Check 0 Anwunl Puma Assigned to National Pollutant Discharge Elimination System application for coverage under General Permit NCG140000: STORMWATER AND PROCESS WASTEWATER DISCHARGES associated with activities classified as: SIC (Standard Industrial Classification) Code - 3273 Ready Mixed Concrete For new plant sites that will discharge or recycle process wastewater (even if commingled with stormwater): This NOI is also an APPLICATION FOR Authorization to Construct (ATC) wastewater treatment facilities. ATC requests must be submitted at least 90 days prior to construction'. For existing plant sites discharging or recycling process wastewater (even if commingled with stormwater): This NOI is also an APPLICATION FOR Authorization to continue to operate wastewater treatment facilities in place. Construction, modification, or installation of any new treatment components at an existing site requires an ATC. Treatment facilities used to treat or recycle process wastewater (including stormwater BNLP structures treating process wastewater flows commingled with stormwater) require an ATC prior to construction per 15A NCAC 2H .0138. The authorization to construct or continue to operate will be issued at the same time as the Certificate of Coverage (COC) for the NCG14 pen -nit. Design of treatment facilities must comply with requirements of 15A NCAC 21-1 .0138 & .0139. Construction of wastewater treatment facilities (this includes recycle systems) at new or existing plant sites requires submission of three (3) sets of plans and specifications signed and sealed by a Professional Engineer (P.E.) or qualified staff' along with this application. A copy of the design calculations should be included. Please see questions 14 & 15. For questions, please contact the DWQ Regional Office for your area. (See page 5) (Please print or type) 1) Mailing address of owner/operator Name ! i C-- Street Address U City �wtlhtop State IV. C • ZIP Code Telephone No. sa 453. O ro O Fax: a sa a g- 2) Location of facility producing discharge: Facility Name Facility Contact Street Address City County Telephone No, Page 1 of 5 Fax. - 'As per 15A NCAC 2H .0106 Unless treatment facilities are designed, constructed, and put into operation by employees internal to the company who are qualified to perform such work for their respective companies in accordance with General Statutes, 139C-25 (7), plans and specifications must be signed and sealed by a P.E. SWU-229-101905 Last revised 10/1912005 NCG140000 N.O.I. 3) Physical location information: Please provide a narrative description of how to get to the facility (use street names, state road numbers, and distance and direction from a roadway interseption). Nklgl oZ - C.. 2X1 I uAt _Nwq _31 . —t• R . I -- (A copy of a county map or USGS quad sheet with facility clearly located on the ma is a required part of this application.) 4) LatitudeM" 0114- $3aeN ongitude7VAQ rN. -SJ'SQ deg, min, sec) 5) This NPDES Permit Application applies to which of the following: VNew or Proposed Facility Date operation is to begin Oct 16 QOO6 ❑ Existing 6) Standard Industrial Classification: Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial activity at this facility SIC Code: 2 a q 3 7) Provide a brief description of the types of industrial activities and products produced at this facility: (Include a site diagram showing the process areas present at this facility.) Mlylen okj-- j( X 8) Discharge points / Receiving waters: How many discharge points (1ditches, pipes,, channels, etc.) convey stormwater and/or wastewater from the property? AIGA .i u Oc S q l • (Now . w Q yet% — What is the name of the body or bo ies of w t r (creek, stream,Aver, lake, etc.) that the facility stormwate and/or wastewater discharges end up in? M 0CA s/W ( Aee-IC-, CM�5 C" /� 6(AJ /��.(.W—&&Y If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). Receiving water classification (if known):_ Note: Discharge of process wastewater to receiving waters classified as WS-11 to WS-V or SA must be approved by the N.C. Dept. of Environmental Health. If DEH does not approve, coverage under NCG140000 cannot be granted. No new discharges of process wastewater are permitted in receiving waters classified as WS-I or freshwater ORW. 9) Does this.facility have any other NPDES permits? No If yes, list the permit numbers for all current NPDES permits for this facility: N0010ooa 10) Does this facility have any Non -Discharge permits (ex: recycle permits)? XNo ❑ Yes If yes, list the permit numbers for all current Non -Discharge permits for this facility: 11) Does this facility employ any best management practices for stormwater control? ❑ No Yes n If yes, please briefly describe: C" t"% U Page 2 of 5 SWU-229-101905 Last revised 10119/2005 ' - 1 - , S � NCG140000 N.O.I. 12) Does this facility have a Stormwater Pollution Prevention Plan? No � !u p C�', { Garr 0PW DAO—) ❑ Yes If yes, when was it implemented? 13) Are vehicle maintenance activities occurring or planned at this facility? ❑ No Yes C mill CIL UIDA-M CPkq, Wastewater Treatment Design Information 14) Are discharges occurring or planned from any of the following process wastewater generating activities? Vehicle and equipment cleaning ❑ Yes $ No P-;s Wetting of raw material stockpiles ❑ Yes No fM r�q Mixing drum cleaning ❑ Yes No J If yes to any of the above, please describe the type of process used to treat and/or recycle the process wastewater. For a sufficient application, you must provide design specifics (e.g., design volume, retention time, surface area, etc.) and calculations to demonstrate compliance with permit effluent limits (pH — 6-9 SU, Total Suspended Solids (TSS) — 30 mg/I, and Settleable Solids (SS) — 5 ml/t.) [Use separate sheet(s)]. If all these discharges are recycled, please refer to Question 15. For plants that recycle and/or discharge process wastewater: When applying for this permit, you are also applying for an authorization to construct (new treatment facilities) or authorization to continue to operate (existing treatment facilities) as part of the NOI. . For new sites, you must submit three (3) sets of design plans and specifications with this application and provide supporting calculations that predict compliance of final discharge with permit limits. For existing sites, applicants should submit three (3) sets of plans and specs for facilities as -built and provide as many design details as possible, or submit a detailed diagram of treatment systems in place that includes information such as tank volumes, dimensions, retention time, piping, settling basin details, etc. Please note: If new treatment_ systems_are _planned for an existing_site, an ATC will be required prior to construction of those facilities. Plans/specs/calculations prepared by a P.E. and the request for an ATC may be submitted with this NOI, or separately at a later date. DWQ may request the status of your plans for requesting an ATC upon issuance of the COC. 15) Does the facility use or plan to use a recycle system? Vo Y es DkOM WArh Qua— -Inc(W N If yes, what size storm event is the system designed to hold before overflowing? (for example, 10-yr, 24-hr) Q,5— year, 24-hr rainfall event For a recycle system (regardless of when it overflows), please provide plans, calculations, and design specifics (e.g., throughput assumptions/water balance, design volume, retention time, surface area, amount of freeboard in design storm event, etc.). [Use separate sheet(s)]. WalFor a sufficient application, the information must demonstrate compliance of final discharge with permit effluent limits (pH — 6-9 SU, Total Suspended Solids (TSS) — 30 mg/l, and Settleable Solids (SS) — 5 ml/l), or must demonstrate that the recycle system has sufficient capacity to contain runoff from a 25-year, 24-hr rainfall event plus one foot of freeboard under design operating conditions. Page 3 of 5 SWU-229-101905 Last revised 1011912005 11 NCG140000 N.O.I. 16) Are wastewater treatment facilities (including recycle systems) planned in the 100-year flood plain? XNo ❑ Yes If so, include information to demonstrate protection from flooding. (Minimum design requirements for treatment works include protection from the 100-year flood, per 15A NCAC 2H .0219.) 17) Hazardous Waste: a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? No ❑ Yes b) Is this facility a Small Quantity Generator (less than 1000 kg, of hazardous waste generated per month) of hazardous waste? XNo ❑ Yes c) Is this facility a Large Quantity Generator (1000 kg, or more of hazardous waste generated per month) of hazardous waste? X No ❑ Yes d) If you answered yes to questions b. or c., please provide the following information: Type(s) of waste: N How is material stored: 111 Where is material stored: N How many disposal shipments per year:_ Name of transport 1 disposal vendor: Vendor address: 18) Certification: UA North Carolina General Statute 143-215.6 B(i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document riled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete,, and accurate. /��—� Printed N��me of Person SiqI� ing: rl CL PW `—i `� L Title: It PNPif�Alti lvll3,iUl'�G�P.2� of Applicant) i. - -. Notice of Intent must be accompanied by a check or money order for $80.00 made payable to: NCDENR Page 4 of 5 SWU-229-101905 Last revised 10/1912005 F ADDENDUM TO PLT CONCRETE SERVICES NOTICE OF INTENT STORMWATER PERMIT APPLICATION MIDDLESEX CONCRETE PLANT PLT Concrete Services' Middlesex batch mix concrete plant is located on a 27 acre tract of land on the north side of U.S. 264 Alternate between Zebulon and Middlesex within Nash County. The site has been designed to direct all on -site stormwater flow directly connected to the batch mix plant operation into a dry infiltration pond by either sheet flow or through grass lines swales. Also off -site flow from above the site is being diverted around the site by use of diversion s a es 9d storm drainage pipe. This off -site flow is not being directed to the dry ��✓ L� /infiltratii n pond. Also on the west side of the project we have an approximate 3 tacre-area that will be used for stockpiling topsoil, select backfrll and demolition "'�7 7 concrete .The area to the west of the batch mix concrete plant has its flow directed to a permanent sediment basins where the stormwater flow from the stockpiling operation is directed into a permanent sediment basin designed with silt fence baffles to improve the settlement capability of the sediment basin. We do not anticipate the need for ph control at this facility. However, on a monthly basis the ph will be checked and corrective measure taken by introduction of ph balancing chemicals by a manual method. To protect the dry detention pond we have set the emergency spillway elevation 1.0 feet above the 25-year storm outflow stage level in accordance with State rules and regulations for non -discharge facilities. Secondly we are providing 6 inches of free broad above the 100 year storm outflow elevation. Also please note the we chose not to factor into our pond discharge the effects of evaporation. This is a factor of safety that has been built into the non -discharge capability of the dry detention pond. Also in addition to the stormwater detention pond we propose to construct a drum wash facility on the site. At this location on a daily basis all ready mix concrete trucks will have their drums washed out. The facility has been designed to allow for 10 gallons per day per concrete truck to washing out the drum. The remainder of the drum wash water will come from the drum wash storage of previously washed water which has both settle and been filtered in the drum wash. The evaporation rate of water is equal to twice the potable water introduced into the system. As shown in the design calculations the facility has sufficient storage to W• handle the 25 year storm and a negative water cycle volume. Technically there ,��� �? should be no discharge from this facility, however if there is it will flow into the a6A ��' non -discharge dry detention pond. With the sheet flow characteristics of this di. This drum wash facility is technically a recycle system, with no discharge off of the site. A review of the Erosion Control plan for the batch mix concrete plant demonstrates the site has been designed to drain all on -site stormwater from the plant operation into the dry infiltration pond and that there is no discharge from this facility in the 25 year storm event. Secondly, we have provided for 1.0 feet of free board above the 25-year storm state level. Since there is no stormwater discharge in the 25 year storm event and no recycling facility it is our opinion under State rules and regulations that a State Stormwater Permit is not needed to operate this facility. JOB HERRING-SUTTON & ASSOCIATES, P.A. SHEET NO. --. � OF 2201 NASH ST. NW CALCULATED BY S DATE al v WILSON, NORTH CAROLINA 27896 (252) 29I-8887 CHECKED BY 1" ` DATE SCALE y 17- f'+C-C—, Pnk�GA IG O. ems-. { Cam► E-Pk� �Q2 T [ • V CAS �1'7_ "($000� _ �}533 Av-,jw erg., T;'4 A P.) , '-s &em e �IL "�/7 tly - s C3 OA far •�• d a Z <. 3 crfopl Y7 W L J�At + 01-Q Q C�n�a c�] ( , )S� - HERRING-SUTTON & ASSOCIATES, P.A. 2201 NASH ST. NW WILSON, NORTH CAROLINA 27896 (252) 29I-8887 JOB SHEET NO. -- CALCULATED BY DATE CHECKED BY DATE SCALE DD T-LW &s-y 15- V(Qz- c =- S� Z� -f- z�rt mac_ -s� o_'15- t m glik-(/ pmp t �f < 4 - ;j Re: PLT in Zebulon - wetlands issue Subject: Re: PLT in Zebulon - wetlands issue From: Myrl Nisely <myrt.nisely@ncmai1.net> Date: Wed, 15 Nov 2006 16:28:21 -0500 To: Bethany Georgoulias<Bethany.Georgoulias@ncmail.net> Wow! Yes, get with Ron ASAP, because these people tend to move fast! Looking forward to the package. Myrl Bethany Georgoulias wrote: Myrl, Just another heads up_ I looked at the application for this site a little more carefully today and have several questions for PLT's consultant, Ron Sutton. One of the biggest is that they are proposing to build their stormwater detention pond right along the edge of about 4 acres of wetlands. The bottom of the pond is also 1 to 3 feet lower than the elevation of some of those wetlands...which raises these issues: (1) will they drain the wetlands, and (2) can they really rely on exfiltration to prevent discharge from that pond in this arrangement? The package is on its way to you, so you'll see what I mean. I'm not sure if they've broken ground on that pond out there or not, but I think this is potentially a big issue. I've phoned Ron and left a message that I wanted to discuss some things about the application, so I'll keep you posted when he's been in touch. Thanks, BG Myrl A. Nisely <°))))>< Environmental Chemist Il NC DENR - Div. Water Quality Raleigh Regional Office 1628 Mail Service Center Raleigh, NC 27699--1628 Telephone: (919) 791-4200 or x4255 Fax: (919) 571-4718 myrl.nisely@ncmail.net 1 of 1 i I11 snnnti 4 111) PIM PLT Plant in Zebulon, Application No. NCG 140366 Subject: PLT Plant in Zebulon, Application No. NCG140366 From: Bethany Georgoulias<Bethany.Georgoulias@ncmail.net> Date: Fri, 17 Nov 2006 17:24:35 -0500 To: rlspe@earthlink.net CC: Ken Pickle <ken.pickle@ncmail.net>, Ron Boone <ron.boone@ncmai1.net> Ron, I've summarized the items below that we will require additional information on in order to continue review of this permit application. Most of the items we discussed on the phone today; however, there are a few questions about the recycle system we didn't have a chance to go over. I've included a few follow-up questions, as well. Could you please address the following:, -You confirmed that the load check area, where vehicles are washed down, will drain to the stormwater pond. Note that this will introduce wastewater into the stormwater detention pond. Were any assumptions about the amount of daily wash water from this operation accounted for in pond's holding capacity, or will the amount be incidental? Please provide information to support any assumptions. (For example, while this probably won't be taking place during a rain event, is there the chance for any accumulation prior to a rain event?) -You confirmed that runoff from stockpile irrigation will also flow into the the stormwater pond (and clarified that the permanent diversion Swale on the grading plan will ensure it doesn't bypass the pond). This will also introduce wastewater into the stormwater pond. Again, were any assumptions about the amount of water from this operation on a daily basis accounted for in the pond's holding capacity? -As we discussed, the largest issue of concern is the nearly four acres of wetland adjacent to the proposed stormwater pond. Several portions of this wetland are above the elevation of the bottom of the pond. How will their proximity affect the assumed exfiltration rate of 0.9 in/hr (based on soil type only), and how will the wetlands be affected by the installation of this pond? Please provide information to support any assumptions. How are you sure that the exfiltration rate will not be compromised by this arrangement? -No detailed drawings were provided for the recycle system. What are the dimensions of the holding cells, and what is the total drainage area to the system? (The calculations reference a hydrograph, but I only found hydrograph runs for the stormwater basin in the application package). `ease provide the requested—inform-tion_b.y December 20, 200'6. In the event that I'm out (I'm scheduled to go on maternity leave sometime around the Christmas holidays, but it could be sooner), please contact Ken Pickle to let him know you have submitted the information. If you have any questions, please let me know. Regards, Bethany Georgoulias Bethany Georgoulias Environmental Engineer NC DENR DWQ Stormwater Permitting Unit (919) 733-5083, ext. 529 bethany.georgoulias@ncmail.net I of I 11/17/2006 5:24 PM Herring -Sutton & ASSOCIATES • P.A. ENGINEERS • SURVEYORS • PLANNERS December 14, 2006 Stormwater Permitting Unit �w1 Division of Water Quality I�1 1617 Mail Service Center n Raleigh, North Carolina 27699-1617 a' i a o Attention: Bethany Georgoulias Subject: PLT Concrete Services -Middlesex Plant Il�A Nash County � Dear Ms. Georgoulias: Your office currently has under review the construction plans for the above subject batch mix concrete plant. As we have previously discussed we are changing our design on the proposed facility from a non -discharge pond to a discharge water quality pond -with PH monitoring and chemical feed for PH adjustment. Also the water quality pond will be designed to achieve the required TSS limits for batch mix concrete plants. This morning in a telephone conversation we discussed the possibility of PLT Concrete beginning construction on the facility at its own risk. The construction would be limited to the plant equipment, office building, garagelstorage building. No work would commence on the drum wash facility or the monitoring and chemical feed system for the water quality pond. Based on this discussion it is my understanding that we can proceed with this level of construction at PLT's risk. If the above is not correct please advise in writing to this letter with clarifications as soon as possible because we plan to begin footing construction next week. I thank you in advance for your assistance with this matter. Respectfully HerrjRg-Sutton and Associates, P.A. ie L. Sutton, P.E. Cc: Ricky Proctor, Manger PLT Concrete Services 2201 Nash Street NW • Wilson, North Carolina 27896 • (252) 291-8887 • Fax (252) 291-5900 Re: Update on PLT in Zebulon Subject: Re: Update on PLT in Zebulon From: Bethany Georgoulias<Bethany.Georgoulias@ncmail.net> Date: Fri, 15 Dec 2006 10:21:14 -0500 To: Ron Boone <ron.boone@ncmail.net> CC: Mike Horan <mike.horan@ncmail.net>, Ken Pickle <ken.pickle@ncmail.net>, danny smith <Danny.Smith@ncmail.net>, Shelton Sullivan <Shelton.Sullivan@ncmail.net>, thad.valentine@ncmail.net Ron, Thanks for the full update and diligence in visiting this site/meeting with the parties involved, and for coordinating with Mike on the wetlands issues. As far as the E&SC Plan violations go, I'm pretty sure LQ handles those. Danny or Shelton (I .think he's out today) can give more guidance on that if necessary, and if you need help with NOV. We'll have to review the design when resubmitted to ensure the TSS and settleable solids limits can be met. With an appropriate pH adjustment system, that parameter shouldn't be an issue. I will send you whatever I receive when it comes in. Ken Pickle is "on standby" and will likely have a big role in the review process (Ron Sutton knows to contact him should I be out when he resubmits), but I'll do what I can before I leave since this is up there on my priority project list. Thanks, BG Ron Boone wrote: Hi All, I visited the site again on Wednesday morning and spoke with Ron Sutton, Rick Proctor (General Manager) and Ronnie Lamm (Construction Project Superintendent). It is PLT Construction that is doing the construction and is responsible for current violations of NCG01 and sediment entering the wetlands. Mike and I have discussed this issue. We plan to issue an NOV for these violations right now and then keep a close eye on them. They were not doing any of the required monitoring. They claimed that they had a rain guage at the top of the site that we just didn't see. No matter though, they're still getting a NOV. They have three layers of silt fence protecting the wetland. The amount of silt between the layers greatly reduces the fences capacity and if they don't clean it out before the next rain, I'm almost certain they'll have more blow out. I have informed them of the need to clean out between the silt fence and will remind them in the NOV. But Mike and I have agreed that we don't want them to clean out the wetland with equipment ... do more harm than good. The sediment in the wetland is wide spread and thin. They'll need to determine how much wetland is affected and then set up another layer of silt fence inside the wetland to contain the sediment that's already there and then straw the area. As far as the S & EC plan ... their site has changed considerably from the original plan. Thad may want to make another visit to the site. Both Mike and I have reminded them of the need to have the revised plan reapproved. They have at least two new basins not shown on the current S & EC plan. Who's responsible for addressing this violation with them; SW or LQ? I can address it in my NOV but I think LQ should probably step in. 1 of - 1/16/2007 12:37 PM Re:. Update on PLT in Zebulon As far as being a discharge facility adjacent to the wetland...I see no problem with it. They'll have to comply with NCG14. The pH monitoring system will need to be able to provide proper adjustment before release but 6-9 shouldn't be hard to achieve and shouldn't be a problem for the wetland. As far as solids are concerned ... of course most of the solids in their wastewater will be very silty and may not readily settle without some assistance. I'm not sure if requiring a coagulant feed would be the proper way to go though ... we may be getting more complicated than we want to be at a concrete plant. They'll defintely have to monitor it carefully...and of course we'll have to monitor them closely as well. Much will depend on the design of the pond. Bethany, I did tell them on Wednesday that I didn't think there was any restriction on them building the plant, everything but the components related to handling and/or treating the wastewater that is. I have no objection to it. I'll try to stop by out there often and unannouced during the construction process to see how it's going. I'll wait for further design documentation from them, via you, before issuing a staff report to you on their request for the NCG14. Let me know if you have any further ?s for me. Regards, Ron -----Original Message ----- From: Bethany Georgoulias [mailto:Bethany.Georgoulias@ncmail.net] Sent: Thursday, December 14, 2006 4:13 PM To: Mike Horan Cc: Ken Pickle; Ron Boone; danny smith; Shelton Sullivan; thad.valentine@ncmail.net Subject: Re: Update on PLT in Zebulon FYI The letter from Ron Sutton. From our permitting and authorization to construct standpoint, the proposed construction is allowable before receiving an NCG14 permit. However, if any of you have objections based on sedimentation issues outstanding, they should be communicated ASAP. [Mike, I'm not sure I've got Thad's e-mail correct. Is he in the Raleigh Region? If so, could you make sure he gets a copy of this?] Thanks, BG Mike Horan wrote: We and I have talked to the owner as well as Ron Sutton of Herring and Sutton. I told them that they were in violation of wetland standard violation as well as NCGO1 condition violation. I have not written the NOV yet. Thad Valentine of Land Quality is the'lead man for this site as far as the S &'E plan is concerned. I have had dealings with Herring and Sutton throughout this year just to let you know. Bethany Georgoulias wrote: Okay - is that being handled? I'm worried my confirmation that they can begin construction on the plant itself without an ATC for treatment systems will be misconstrued as an "okay" in spite of NCG01 2 of 1/16/2007 12:37 PM Re: Update on PLT in Zebulon and/or wetlands violations (which it isn't). Is the region addressing the violations, and/or have you or Ron Boone spoken to the owner or engineer about it? Thanks, BG Mike Horan wrote: They have allowed sediment to enter the wetlands. They have failed on some of the condtions of NCG010000 permit. A violation needs to be sent out. They actually had an approved S & E plan but have made some modifications to it. So, it is my understanding that they have not received approval for the modified S & E plan. Bethany Georgoulias wrote: Ron, I just spoke with Ron Sutton, who asked about what construction was allowed before they receive their NCG14 permit and ATC. I confirmed that they could begin building the actual plant, as long as there was nothing there to cause runoff of wastewater during a rainfall event that would have no treatment system to go to. He verified there would be no raw or aggregate materials on site, so this would not mean any operation prior to receiving a permit either. I explained the authorization to construct applies to the wastewater treatment systems only --in this case the recycle system and the pond that they have decided to redesign as a discharging system. Mr. Sutton said as they construct, they will need the pond for sedimentation purposes, but I pointed that should they find design modifications necessary during the ATC process to meet permit limits,.they will be held accountable for making those modifications before operation. He's going to send a letter "confirming our conversation," so I wanted to be sure and send you my take on it. Incidentally, we are still dealing with a discharge very near to wetlands. Are there any other concerns at the region's level about that we need to raise before he gets further into this? Or are we okay from that standpoint as long as permit conditions and limts are met? Thanks, BG Bethany Georgoulias Environmental Engineer NC DENR DWQ Stormwater Permitting Unit (919) 733-5083, ext. 529 bethany.georgoulias@ncmail.net 3 of4 1/16/2007 12:37 PM STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY FAX (919)733-9612 To: Don Perry, Herring -Sutton Fax: (252) 291-5900 From: Ken Pickle, Stormwater Permitting Unit, Date: January 16, 2007 Division of Water Quality Phone: (919) 733-5083 ext. 584 Pages: 4 E-mail: Ken.pickle@ncmai1.net Urgent For review Please comment Per your request FYI, no action - Please recycle Subject: Settling calculations Don, See attached three pages. Please contact me with any questions. Note that . I'm providing these to you as public information which you requested. I cannot represent that this is a DWQ work product, or that DWQ has satisfied itself as to the accuracy of the calculations or sufficiency of the methods utilized. In our conversation today you indicated your general understanding of these constraints on the information that we're providing. 916 Ken ■ PLT CONCRETE SERVICES MIDDLESEX PLANT NOA WATER QUALITY POND DESIGN COMPUTATIONS January 29, 2007 PREPARED BY: HERRING-SUTTON & ASSOCIATES, PA 2201 NASH STREET NW WILSON, NORTH CAROLINA PLT CONCRETE MIDDLESEX PLANT WATER QUALITY POND DESIGN COMPUTATIONS I. DRAINAGE BASIN DATA • AREA: 18.0 ACRES • SOILS: NASON LOAM • USE: READY MIX CONCRETE PLANT II. POND DESIGN CRITERIA • SCS METHOD • HYDRAULIC SOIL TYPE:C • PREDEVELOPMENT RUNOFF CURVE NUMBER (CN): 65 (WOODED) • 5.0 FEET PERMANENT STORAGE IN POND • 85% POLLUNTANT REMOVAL EFFICIENCY • EMERGENCY SPILLWAY WILL PASS 100-YR STORM • SITE IMPERVIOUS PERCENT. 60% SA/DA RATIO: 1.66 • SURFACE AREA REQ'D: SA/DA x DA x 43560 SF/100 1.66 x 18.0 X 43560 SF/100 • SURFACE AREA REQ'D: 15,031 SF • SURFACE AREA AVAILABLE AT PERMANENT POOL :31,415 SF • THEREFORE MINIMUM SURFACE AREA REQ'D MET • POST DEVELOPMENT CN:87 • FIRST FLUSH RUN-OFF VOLUME= (RAINFALL) ( RV)( DA) • RV= 0.05+0.009(1) RV= 0.05+0.009(60) = 0.59 FIRST FLUSH VOLUME = (1"/12)(0.59)(18 AC)(43560 SF/AC) FIRST FLUSH VOLUME = 38,551 CF • VOLUME FIRST INCH OF RAINFALL: 38,551 CF • STORAGE VOLUME PROVIDED: 94,442 CF ( BELOW PRINCIPAL SPILLWAY OR OUTLET STRUCTURE • THEREFORE MINIMUM STORAGE VOLUME REQ'D MET III. POND DATA • POND INVERT 202.0 • RISER INVERT 206.50 • RISER TOP 209.70 • PERMANENT POOL 207.00 • EMERGENCY SPILLWAY 211.70 • TOP OF POND 213.40 IV, RISER BARREL STRUCTURE • 4.0 FT x 4.0 FT ID CONC. BLOCK RISER • 24' DIAMETER RCP BARREL • 1-4" AND 1-12" DIAMETER DRAW DOWN PIPES AT ELEVATION TO MAINTAIN PERMANENT POOL ELEVATION AND PROVIDE A 2-4 DAY DRAW DOWN PERIOD V. DESIGN DATA FOR INFLOW HYDROGRAPHS • ASSUME TYPE II STORM • 2-YR 1 DAY PERCIPITATION: 3.8 INCHES • 10-YR 1 DAY PERCIPITATION: 5.8 INCHES • 25-YR 1 DAY PERCIPITATION: 6.8 INCHES • 100-YR 1 DAY PERCIPITATION: 8.5 INCHES • CN: 87 (POST DEVELOPMENT) • BASIN SLOPE: 3.50 • HYDRAULIC LENGTH: 800 FT SHAPE FACTOR: 484 • Tc FACTOR: LAG VI. PREDEVELOPMENT INFLOW HYDROGRAPH Qp SUMMARY ■ 2-YR: 16.02 CFS VII. POST -DEVELOPMENT OUTFLOW HYDROGRAPH Qp SUMMARY ■ 2-YR: 4.50 - CFS ■ 10-YR: 26.47 CFS ■ 25-YR: 30.23 CFS 0 100-YR 91.13 CFS Pond Report Hydraflow Hydrographs by inteliscAre Monday, Jan 29 2007, 10:32 AM Pond No. 1 - WQPD A Pond Data Pond storage is based on known contour areas. Average end area method used. Stage 1 Storage Table Stage (ft) Elevation (ft) 0.00 207.00 1.00 208.00 2.00 209.00 3,00 210.00 4.00 211.00 5.00 212.00 6.00 213.00 Contour area (sgft) Inct. Storage (tuft) 31,451 0 33,962 32,707 36,530 35,246 39,154 37,842 41,835 40,495 44,573 43,204 47,356 45,970 Total storage (cult) 0 32,707 67,953 - 105,795 146,289 189,493 235,463 Culvert 1 Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 24.00 4.00 12.00 0.00 Cast Len (ft) = 16.00 40.00 0.00 0.00 Span (in) = 24.00 4.00 1200 0.00 Crest El. (ft) = 209.70 211.70 0.00 0.00 No. Barrels = 1 1 1 0 Weir Coed. = 3.33 260 0,00 0.00 Invert El. (ft) = 206.50 207.00 208.00 0.00 Weir Type = Riser Broad - - Length (ft) = 60.00 1.00 1.00 0,00 Multistage = Yes No No No Slope (%) = 0.10 0.10 0.10 0.00 N Value = .013 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 Multistage = nla Yes Yes No Exfiltration = 0.000 h4ir (Contour) Ta!Wer Elev. = 0.00 ft N&W CukwbUrifioe ouftws have been analyzed under inlet and ouW wnhd. Stage 1 Storage I Discharge Table Stage Storage Elevation Clv A Ctv B Clv C Civ D Wr A Wr B Wr C Wr D Exfil Total ft cult it cis Cfs cis cis cis cis cfs cis cis cis 0.00 0 207.00 0.00 0.00 0.00 - 0.00 0.00 -- - - 0.00 0.10 3,271 207.10 0.71 0.02 0.00 - 0.00 0.00 - - - 0.02 0.20 6,541 207.20 0.71 0.08 0.00 -- 0.00 0.00 - - - 0.08 0.30 9,812 207.30 0.71 0.15 0.00 - 0.00 0.00 - -- --- 0.15 0.40 13,083 207,40 0.71 0.20 0.00 - 0.00 0.00 - - - 0.20 0.50 16,353 207.50 0.71 0.24 0.00 - 0.00 0.00 - -- - 0.24 0.60 19,624 207.60 0.71 0.28 0.00 - 0.00 0.00 - - - 0.28 0.70 22,895 207.70 0.71 0.31 0.00 - 0.00 0.00 - - - 0.31 0.80 26,165 207.80 0.71 0.33 0.00 - 0.00 0.00 -- - - 0.33 0.90 29,436 207.90 0.71 0.36 0.00 -- 0.00 0.00 --- --- -- 0.36 1.00 32,707 208.00 0.71 0.38 0.00 - 0.00 0.00 - - - 0.38 1.10 36,231 208.10 0.71 0.41 0.04 - 0.00 0.00 - --- -- 0.45 1.20 39,756 208.20 0.71 0.43 0.18 - 0.00 0.00 - - - 0.60 1.30 43,280 208.30 0.64 0.45 0.37 - 0.00 0.00 - - - 0.82 1.40 46,805 208.40 1.14 0.47 0.65 - 0.00 0.00 - - - 1.11 1.50 50,330 208.50 1.44 0.47 0.96 - 0.00 0.00 - - - 1.43 1.60 53,854 208.60 1.79 0.46 1.30 - 0.00 0.00 --- - -- 1.76 1.70 57,379 208.70 2.16 0.46 1.69 - 0.00 0.00 --- --- - 2,15 1.80 60,903 208.80 2.52 0.45 2.05 0.00 0.00 2.60 1.90 J 64,428 208.90 2.87 0.45 2.41 _ 0.00 _ 0.00 _ 2.66 2.00 67,953 209.00 3.16 0.45 2.67 - 0.00 0.00 --- - -- 3.12 2.10 71,737 209.10 3.40 0.45 2.93 - 0.00 0.00 - - - 3.38 220 75,521 209.20 3.63 0.45 3.16 - 0.00 0.00 - - - 3,61 2,30 79.305 209.30 3.63 0.45 3.38 - 0.00 0.00 - - - 3.83 2.40 83,o89 209.40 4.04 0.44 3.59 - 0.00 0.00 - - - 4.03 2.50 86,874 209.50 4.20 0.42 3.78 - 0.00 0.00 - - - 4.20 2.60 90,658 209,60 4.39 0.44 3.95 - 0.00 0.00 - - - 4.39 2.70 94,442 209.70 4.58 0.46 4.12 -- 0.00 0.00 - - - 4.58 2.80 98,226 209.80 6.33 0.46 4.17 --- 1.69 0.00 - -- - 6.32 2.90 102,010 209.90 9.29 0.45 4.07 - 4.77 0.00 - - - 9.28 3.00 105,795 210.00 12-90 0.41 3.73 - 8.75 0.00 - - - 12.90 Continues on next page..- W WQPD-A Stage 1 Storage 1 Discharge Table Stage Storage Elevation Clv A Clv 0 Clv C Clv D Wr A Wr B Wr C Wr D Exfil Total It Cult It CfS Cfs Cts Cis Cfs CfS Cfs Cfs CfS CfS 3.10 109,844 210.10 16.88 0.34 3.06 - 13.48 0.00 - - - 16.88 3.20 113,893 210.20 20.02 0.25 2.23 - 17.54 0.00 - - - 20.02 3,30 117,943 210.30 21.46 0.20 1.84 - 19.40 0.00 - -- --- 21.45 3.40 121,992 210.40 22.52 0,17 1.57 - 20.76 0.00 -- - - 22,51 3.50 126,042 210.50 23.39 0.15 1.37 - 21.87 0.00 - - - 23.39 3.60 130,091 210.60 24.16 0,13 1.21 - 22.81 0.00 --- - - 24.15 3.70 134,141 210.70 24.86 0.12 1.09 - 23.64 0.00 - - - 24.85 3.80 138,190 210.80 25.50 0.11 0.98 --- 24.41 0.00 - - - 25.50 3.90 142,240 210.90 26.12 0.10 0.90 - 25.12 0.00 - - -- 26.12 4.00 146,289 211.00 26.70 0.09 0.83 - 25.78 0.00 - - -- 26,70 4.10 150,609 211.10 27.26 0.08 0.76 - 26.39 0.00 - - - 27.24 4.20 154,930 211.20 27.80 0.08 0,71 - 77.00 0.00 - - - 27,79 4.30 159,250 211.30 28.33 0.07 0.67 - 27.58 0.00 - - - 28.32 4.40 163,571 211.40 28.85 0.07 0.63 - 28.11 0.00 - -- - 28.81 4.50 167,891 211.50 29.35 0,07 0.59 - 28.66 0.00 - - - 29.31 4.60 172,211 211.60 29.84 0.06 0.56 - 29.20 0.00 - - - 29,82 4.70 176,532 211.70 30.32 0.06 0.53 -- 29.68 0.00 - - - 30.27 4.80 180,852 211.80 30.80 0.06 0.51 - 30.21 3.29 - - - 34.06 4.90 185,173 211.90 31.26 0.05 0.48 - 30.68 9.31 --- - - 40.53 5,00 189,493 212.00 31.72 0.05 0.46 - 31.17 17.09 - - --- 48.77 5.10 194,090 212.10 32.17 0.05 0.44 - 31.65 26.31 - - - 58.45 5.20 198,687 212.20 32.61 0.05 0.42 - 32.06 36.77 --- - -- 69,31 5.30 203,284 21Z30 33.05 0.05 0.41 - 32.55 48,34 - -- -- 81.34 5.40 207,881 212.40 33.44 0.04 0.39 -- 32.90 60.91 - - - 94.25 5.50 212,478 212.50 33.79 0.04 0.38 - 33.26 74.42 - - --- 108.10 5.60 217,C 75 212.60 34.13 0.04 0.36 - 33.62 88.80 --- --- -- 122.83 5.70 221,672 212.70 34.46 0.04 0.35 -- 34.02 104.01 - - - 138.41 5.80 226,269 212.80 34.79 0.04 0.34 --- 34.32 119.99 - - - 154.69 5.90 230,866 212.90 35,12 0.04 0.33 - 34.68 136.72 - - - 171.76 6.00 235,463 213.00 35.45 0.04 0.32 --- 35.02 154.15 - - - 189.53 ...End Pond Report r� Hydraflow liydrographs by WelisoNe Monday, Jan 29 2007, 11:26 AM Pond No. 1 - WQPD-A Pond Data Pond storage is based on known Contour areas. Average end area method used. Stage i Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (cuff) 0,00 207.00 31,451 0 0 1.00 208.00 33,962 32,707 32,707 2.00 209.00 36,530 35,246 67,953 3.00 210.00 39,154 37,842 105,795 4.00 211.00 41,835 40,495 146,289 5.00 212.00 44,573 43,204 189,493 6.00 213.00 47,366 45,970 235,463 Culvert 1 Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 24.00 4.00 12.00 0.00 Crest Len (ft) = 16.00 40.00 0.00 0.00 Span (in) = 24.00 4.00 12.00 0.00 Crest EL (ft) = 209.70 211.70 0.00 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 2.60 0.00 0.00 Invert El. (ft) = 206.50 207.00 208,00 0.00 Weir Type - Riser Broad - - Length (ft) = 60.00 1.00 , 1.00 0.00 Multi -Stage = Yes No No No Slope (%) = 0,10 0.10 0.10 0,00 N-Value = .013 .013 .013 .000 Orif. Coelf. = 0.60 0.60 0.60 0.00 Mufti -Stage = n1a Yes Yes No ExTiltration = 0.000 in/hr (Contour) Taiiwater Bev. = 0.00 ft Nome: CukwVOrirroe oudloN have been anatyzed under inlet and outlet control. Stage (ft) 6.00 5.00 4.00 3.00 2.00 1.00 0 00 Stage / Storage 0 50,000 100,000 Storage Stage (ft) 6.00 5.00 4.00 3.00 2.00 1.00 000 150,000 200,000 250,000 Storage (cult) Pond Report W Hydrailow Hydrographs by Intelisolve Monday, Jan 29 2007, 11:27 AM Pond No. 1 - WQPD,A Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (tuft) 0.00 207,00 31,451 0 0 1.00 208.00 33,962 32,707 32,707 2,00 209.00 36,530 35,246 57,953 3.00 210.00 39,154 37,842 105,795 4.00 211.00 41.835 40,495 146,289 5,00 212.00 44,513 43,204 189,493 6,00 213.00 47,366 45,970 235,463 Culvert / Orifice Structures [A] [B] [C] [D] Rise (fin) = 24.00 4.00 12.00 0.00 Span (in) = 24.00 4.00 12.00 0.00 No. Barrels = 1 1 1 0 Invert El. (ft) = 206.50 207.00 208.00 0.00 Length (ft) = 60.00 1.00 1.00 0,00 Slope (%) = 0.10 0.10 0.10 0.00 N-Value = .013 .013 .013 .000 OdL Coetf. = 0.60 0.60 0.60 0.00 Multistage = n/a Yes Yes No Stage (R) 6.00 5.00 4.00 3.00 zoo 1.00 0 00 o 00 Weir Structures [A] [Bl [C] [D] Crest Len (ft) = 16.00 40.00 0.00 0.00 Crest El. (ft) = 209.70 211.70 0.00 0.00 Weir Coef. . = 3.33 2.60 0.00 0.00 Weir Type = Riser Broad --- - Mutd-stage = Yes No No No Exfiitrafm = 0.000 in/hr (Contour) Tailwater Elev. = 0.00 ft Now Cuh Uonfxe ou f ms have bean analyzed under inlet and outlet contd. Stage / Discharge stage (ft) 20,00 40.00 60.00 80.00 Total Q 6.00 5.00 4.00 3.00 2.00 1.00 0.00 100.00 120.00 140.00 160.00 180.00 200.00 Discharge (cfs) L - - A 1 _ _ I -- Hydrograph Report Hydraflow Hydrographs by fntelisoNe Monday, Jan 29 2007, 11.14 AM Hyd. No. 3 2-100 YR PREDEVELOPMENT INFLOW Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 2 yrs = 18.00 ac = 3.5 % = LAG = 3.80 in = 24 hrs Hydrograph Discharge Table Time -- Outflow Time -- Outflow (min cfs) (min cfs) 694 0.00 1204 0.50 709 1.44 1219 0.49 724 14.69 1234 0.48 739 10.14 1249 0.48 754 3.72 1264 0,48 769 2.63 1279 0.47 784 2.17 1294 0.47 799 1.87 1309 0.47 814 1.67 1324 0.46 829 1.49 1339 0.46 844 1.34 1354 0.45 859 1.22 1369 0.45 874 1.16 1384 0.45 889 1.12 1399 0.44 904 1.07 1414 0.44 919 1.01 1429 0.44 934 0.96 1444 0.41 949 0.91 1459 0.13 964 0.85 979 0.81 994 0.79 ...End 1009 0.77 1024 0.75 1039 0.73 1054 0.71 1069 0.69 1084 0.67 1099 0.65 1114 0.63 1129 0.61 1144 0.59 1159 0.57 1174 0.55 1189 0.53 Peak discharge = 16.02 cfs Time interval = 1 min Curve number = 65 Hydraulic length = 800 ft Time of cone. (Tc) = 21.7 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 60,333 cult ( Printed values ar 0% of Op. Prim interval = 15) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Jan 29 2007, 11:14 AM Hyd. No. 3 2-100 YR PREDEVELOPMENT INFLOW Hydrograph type = SCS Runoff Peak discharge = 16.02 cfs Storm frequency = 2 yrs Time interval = 1 min Drainage area = 18.000 ac Curve number = 65 Basin Slope = 3.5 % Hydraulic length = 800 ft Tc method = LAG Time of conc. (Tc) = 21.68 min Total precip. = 3.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 18.00 15.00 12.00 Mlli 7 6.00 3.00 0. 00 -�.. 0 3 5 w•— Hyd No. 3 2-100 YR PREDEVELOPMENT INFLOW Hyd. No. 3 -- 2 Yr i Hydrograph Volume = 60,333 cult Q (cfs) 18.00 15.00 12.00 M 3.00 0.00 10 13 15 18 20 23 25 Time (hrs) Hydrograph Report Hydrafiow Hydrographs by IntelisoNe Monday, .fan 29 2007, 11:2 AM Hyd. No. 1 25-100 YR POST DEVELOPMENT INFLOW Hydrograph type = SCS Runoff Peak discharge = 66.51 cfs Storm frequency = 2 yrs Time interval = 1 min Drainage area = 18.00 ac Curve number = 87 Basin Slope = 3.5 % Hydraulic length = 800 ft Tc method = LAG Time of conc. (Tc) = 11.2 min Total precip. = 3.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Discharge Table Time -- Outflow Time -- Outflow Time -- Outflow (min cfs) (min cfs) (min cfs) 367 0.01 877 2.09 1387 0.73 382 0.04 892 1.98 1402 0.73 397 0.07 907 1.88 1417 0.72 412 0.10 922 1.77 1432 0.71 427 0.13 937 1.66 1447 0.41 442 0.17 952 1.56 457 0.20 967 1.45 472 0.24 982 1.41 ... End 487 0.28 997 1.37 502 0.34 1012 1.33 517 0.42 1027 1,29 532 0.51 1042 1.25 547 0.60 1057 1.22 562 0.67 1072 1.18 577 0.73 1087 1.14 592 0.86 1102 1.10 607 1.03 1117 1.06 622 1.26 1132 1.02 637 1.54 1147 0,98 652 1.95 1162 0.94 667 2.46 1177 0.91 682 3.45 1192 0,87 697 6.33 1207 0.83 712 35.84 1222 0.82 727 37.84 1237 0.81 742 8.86 1252 0.80 757 5.70 1267 0.80 772 4.55 1282 0,79 787 3.81 1297 0.78 802 3.34 1312 0.77 817 2.93 1327 0.76 832 2.61 1342 0.76 847 2.32 1357 0.75 862 2.19 1372 0.74 Hydrograph Volume = 163,199 cult ( Printed vakm - 0% of Qp• Print intaml = 15) Hydrograph Plot Hydrafiow Hydrographs by lntelisolve Monday, Jan 29 2007, 10:26 AM Hyd. No. 1 25-100 YR POST DEVELOPMENT INFLOW Hydrograph type = SCS Runoff Peak discharge = 66.51 cfs Storm frequency = 2 yrs Time interval = 1 min Drainage area = 18.000 ac Curve number = 87 Basin Slope = 3.5 % Hydraulic length = 800 ft �. Tc method = LAG Time of conc. (Tc) = 11.23 min Total precip. = 3.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 Hydrograph volume = 163,199 cuft 25-100 YR POST DEVELOPMENT INFLOW Q (cfs) Hyd. No. 1 -- 2 Yr Q (ems) 70.00 70.00 60.00 60,00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 5 7 9 12 14 16 19 21 23 26 Hyd No. 1 Time (hrs) Hydrograph Report Hydrafiow Hydrographs by Intelisolve Monday, Jan 29 2007, 11:2 AM Hyd. No. 2 25-100 YR ROUTING Hydrograph type = Reservoir Storm frequency = 2 yrs Inflow hyd. No. = 1 Max. Elevation = 209.66 ft ■ storage Indication method used. Hydrograph Discharge Table Peak discharge Time interval Reservoir name Max. Storage = 4.50 cfs = 1 min = WQPD-A = 92,984 cuff Outflow hydrograph volume = 149,332 tuft ( Printed values - o% of Qp Rint inberal =15) Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Wil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 420 0.12 207.01 0.04 0.00 ----- ----- ----- -- -- - -- 0.00 435 0.15 207.01 0.07 0.00 ----- ---- ----- ----- ----- ----- --- 0.00 450 0.19 207.01 0.10 0.00 -- --- -- --- ----_ ____ ___ 0.00 465 0.22 207.02 0.14 0.00 ---- ---- ----- ----- ----- ----- ----- 0.00 480 0.26 207.03 0.18 0.01 - - -- ---- ----- ----- ----- 0.01 495 0.31 207.03 0.24 0.01 ----- ---- ----- - - -- ---- 0.01 510 0.38 207.04 0.30 0.01 - - ----- ----- ----- -- ---- 0.01 525 0.47 207.05 0.38 0.01 --- -- - ---- ----- ----- ----- 0.01 540 0.56 207.07 0.48 0.02 0.02 555 0.64 207.08 0.59 0.02 -- - --- ----_ ----- ----- ----- 0.02 570 0.70 207.10 0.71 0.02 - ----- - - --- ----- ----- 0.02 585 0.79 207.12 0.71 0.04 ----- ----- ---- ----- ---- - --- 0.04 600 0.95 207.14 0.71 0.05 ---- ---- - - ----- ----- ----- 0.05 615 1.15 207.17 0.71 0.07 ----- ----- ----- --- - - - 0.07 630 1.40 207.20 0.71 0.09 - - ----- ----- ---- ----- ---- 0.09 645 1.74 207.24 0.71 0.11 ----- ---- ----- --- - ---- ----- 0.11 660 2.20 207.29 0.71 0.15 --- ---- ----- ----- --- -- --- 0.15 675 2.94 207.36 0.71 0.18 -- - -- ----- ----- ----- ----- 0.18 690 4.09 207.45 0.71 0.22 ----- ----- ----- -- - - --- 0.22 705 17.12 207.67 0.71 0.30 - - ----- ---- ----- ---- - 0.30 720 66.51 << 208.70 2.16 0.46 1.70 ----- -- ----_ ----- ----- ----- 2.15 735 11.27 209.52 4.24 0.42 3.82 ----- ----- --- - --- ----- 4.24 750 7.09 209.63 4.45 0.44 4.00 - 0.00 4.44 765 4.92 209.66 4.50 0.45 4.05 ----- 0.00 ----- ---- ----- ---- 4.50 780 4.14 209.66 4.50 0.45 4.05 ----- 0.00 ---- - - -- 4.50 795 3.53 209.64 4.47 0.45 4.02 - 0.00 --- ----- ----- - 4.47 810 3.12 209.62 4.42 0.44 3.98 ----- 0.00 --- - ----- ----- ----- 4.42 825 2.75 209.58 4.36 0.44 3.92 --- ----- ----- ----- -- -- 4.35 840 2.45 209.54 4.28 0.43 3.85 - - ----- _---- ----- ----- 4.28 855 2.24 209.50 4.19 0.42 3.77 ----- ----- - -- ----- ----- 4.19 870 2.13 209.45 4.12 0.43 3.68 4.11 885 2.03 209.40 4.04 0.44 3.59 - - ----- ----- -- ----- 4.03 900 1.92 209.35 3.94 0.45 3.49 ----- -- - ---- _-- ----- ----- 3.94 915 1.82 209.31 3.85 0,45 3.39 3.84 930 1.71 209.26 3.75 0.45 3.29 - -- ----- ----- ----- ----- 3.74 945 1.61 209.21 3.65 0.45 3.18 ----- ----_ ---- _---- ----- ----- 3.63 960 1.50 209.16 3.54 0.45 3.07 - ----- ----- ----- --- - 3.52 975 1.42 209.11 3.43 0.45 2.96 ---- -- ----- ----_ ----- ----- 3.41 Continues on next page... 25-I00YR ROUTING Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D ExftI Outflow (min) cfs ft cfs cfs Cfs Cfs Cfs Cfs Cfs Cfs Cfs Cfs 990 1.39 209,07 3.32 0.45 2.85 --_-- ---- -_ _- ____ __� 3.29 1005 1.35 209.02 3.21 0.45 2.73 -- -- ----- ----- --- ----- 3.18 1020 1.31 208.98 3.09 0.45 2.62 ----- ----- ---- ----- ----- -- 3.07 1035 1.27 208.93 2.96 0.45 2.50 ----- ---- -- ----- --- ---- 2.95 1050 1.23 208.89 2.84 0.45 2.39 ---- - ----- ----- -- --- 2.84 1065 1.19 208.85 2.70 0.45 2.24 ---- ___ ___ _- ___ _-- 2.69 1080 1.16 208.82 2.57 0.45 2.11 ---- - ----- ----- - ----- 2.56 1095 1.12 208.78 2.45 0.45 1.98 - ----- ----- - ----- - 244 1110 1.08 208.75 2.33 0.45 1.86 ----- _---- _ __ ___ ___ ___ 2.32 1125 1.04 208.72 2.22 0.46 1.75 ---- ----- ----- --- ----- ---- 2.21 1140 1.00 208.69 2.11 0.46 1.65 ----- ----- ---- ----- ----- -- 2.10 1155 0.96 208.66 2.02 0,46 1.54 ----- ---- ---- ----- -- ----- 2.00 1170 0.92 208.64 1.92 0.46 1.44 - ---- - - ----- ---- 1.90 1185 0.89 208.61 1.83 0.46 1.35 ----- ----- ----- ---- ----- - 1.81 1200 0.85 208.59 1.75 0.46 1.26 ----- -- --- ----- -__ _____ 1.73 1215 0.82 208.57 1.67 0.46 1.19 --- ----- ----- -- ----- ----- 1.65 1230 0.81 208.55 1.60 0.46 1.12 ----- ----- - ----- ----- - 1.59 1245 0.81 208.53 1.53 0.47 1.06 1.52 1260 0.80 208.51 1.47 0.47 1.00 ----- ---- ----- -- ----- -- 1.46 1275 0.79 208.49 1.42 0.47 0.94 ----- ----- - ----- --- --- 1.41 1290 0.78 208.48 1.37 0.47 0.89 -- --- ----- ---- --- ----_ 1.36 1305 0.78 208.46 1.33 0.47 0.85 ----- ----- --- ----- ----- -- 1.32 1320 0.77 208.45 1.29 0.47 0.81 ----- - ----- ---- -- . ---_- 1.27 1335 0.76 208.44 1.26 0.47 0.77 --- ----- ----- - ----- --- - 1.23 1350 0.75 208.43 1.22 0.47 0.73 - ----- - --- - ----- 1.20 1365 0.75 208.42 1.19 0.47 0.69 ----- ----- ----- --- ----- ---- 1.16 1380 0.74 208.41 1.16 0.47 0.66 ----- --- ---- ---- ---- --- 1.13 1395 0.73 208.40 1.13 0.47 0.63 ----- - -- ---- ----- ----- --- 1.10 1410 0.72 208.39 1.10 0.46 0.61 ---- ---- ---- --- - ----- 1.07 1425 0.72 208.38 1.08 0.46 0.58 ----- ----- ---- ---- ----- ----- 1.05 1440 0.71 208.37 1.05 0.46 0.56 - ---- ----- --- -- ----- 1.02 1455 0.04 208.35 1.00 0.46 0.52 ---- ----- ----- -- ----- ----- 0.98 1470 0.00 208.33 0.93 0.45 0.45 ---- --_- - ----- ----- -- 0.91 1485 0.00 208.31 0.86 0.45 0.39 ---- ----- ----- -- ----- ----- 0.84 1500 0.00 208.29 0.82 0.44 0.35 0.79 1515 0.00 208.27 0.80 0.44 0.31 ----- --- ----- ----- ----- -- 0.75 1530 OAO 208.25 0.77 0.44 0.27 ---- ----- ---- - ----- ----- 0.71 1545 0.00 208.23 0.75 0.43 0.24 ----- -- - ----- ----- --- 0.67 1560 0.00 208.21 0.73 0.43 0.21 ----- ---- ----- _---- -_--- -- 0.63 1575 0.00 208.20 0.71 0.43 0.18 ----- ----- ----_ ----- --- ----- 0.60 1590 0.00 208.18 0.71 0.42 0.16 ----- ----- -- --- ----- ----- 0.58 1605 0.00 208.17 0.71 0.42 0.14 ----- - ----- ----- ----- --- 0.56 1620 0.00 208.15 0.71 0.42 0.12 - ---- ----- --- - ---- --- 0.53 1635 0.00 208.14 0.71 0.41 0,10 ---- ----- ---- -- - ---- 0.51 1650 0.00 208.13 0.71 0,41 0.08 ----- -- ---- _---- ---- ----- 0.49 1665 0.00 208.12 0.71 0.41 0.07 --- ----- ----- ----_ ----- -- 0.47 1680 0.00 208.10 0.71 0.41 0.05 -- ----- ---- ---- - ---- 0.46 1695 0.00 208.09 0.71 0.40 0.04 ----- -- __-- ----- ----- ---- 0.45 1710 0.00 208.08 0.71 0.40 0.04 --- ----- ----- ----- -_--- - 0.44 1725 0.00 208.07 0.71 0.40 0.03 ----- -- - - - ---- 0.43 1740 0.00 208.06 0.71 0.40 0.03 ----- --- ----- ----- ---- ---- 0.42 Continues on next page... 25-100 YR ROUTING Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B CIv C Clv D Wr A Wr B Wr C Wr D EMI Outflow (min) cfs ft cfs cfs cfs Cfs cfs Cfs Cfs Cfs Cfs cfs 1755 0.00 208.05 0.71 0.39 0.02 - --- -- -- ----- ----- 0.42 1770 0.00 208.04 0.71 0.39 0.02 ----- ----- ----- ----- ----- --- 0.41 1785 0.00 208.03 0.71 0.39 0.01 ----- ---- ----- ----- ---- ----- 0.40 1800 0.00 208.02 0.71 0.39 0.01 --- ----- ----- ----- ----- ---- 0.40 1815 0.00 208.01 0.71 0.39 0.00 ----- ~--- ----- ----- ---- - 0.39 1830 0.00 208.00 0.71 0.38 ----- ----- --- ----- ----- ---- ----- 0.38 1845 0.00 207.99 0.71 0.38 - -- ----- -- ---- ----_ -- 0.38 1860 0.00 207.98 0.71 0.38 ----- ---- ----- ----- ----- -- ---- 0.38 1875 0.00 207.97 0.71 0.38 ----- ---- ----- ----- --- ----- ----- 0.38 1890 0.00 207.96 0.71 0.37 ----- ----- ----- ----- ----- ----- -- 0.37 1905 0.00 207.95 0.71 0.37 ---- ----- - ----- -- -- ----- 0.37 1920 0.00 207.94 0.71 0.37 --- - ----- - ---- ----- ----- 0.37 1935 0.00 207.93 0.71 0.37 ----- ----- ----- ---- ----- - --~ 0.37 1950 0.00 207.92 0.71 0.36 ----- ---- - ---- - ---- ~--- D.36 1965 0.00 207.91 0.71 0.36 -- ----_ ----- ---- - ----- --- 0.36 1980 0.00 207.90 0.71 0.36 ----- ~- -~_ _�_ ____ -_-- ----- 0.36 1995 0.00 207.89 0.71 0.36 ----- ----- - ----- --- -- ----- 0.36 2010 0.00 207.88 0.71 0.35 ---- - ----- --- ---- --- ---- 0.35 2025 0.00 207.87 0.71 0.35 ----- ----- -- ----- -- --- ~-~ 0.35 2040 0.00 207.86 0.71 0.35 -- - ----- - ----- ----- ---- 0.35 2055 0.00 207.85 0.71 0.35 ----- ---- ----- ----- ----- ---- ----- 0.35 2070 0.00 207.84 0.71 0.34 --- --- ----- - ----- ----_ ___ 0.34 2085 0.00 207.83 0.71 0.34 ---- ----- ----- ----- ----- ---- -`-- 0.34 2100 0.00 207.82 0.71 0.34 ----- -- -- ---- - ----- ----- 0.34 2115 0.00 207.81 0.71 0.34 --- - ----- - ~~- --- Q.34 2130 0.00 207.80 0.71 0.33 ---- - ----- ----- ----- ---- -- 0.33 2145 0.00 207.79 0.71 0.33 ----- --- - ----- -- ----- ----- 0.33 2160 0.00 207.78 0.71 0.33 -- - ----- ----- ----- ----- ---- -- 0.33 2175 0.00 207.77 0.71 0.33 -- ----- - ----- --- - -~~ 0.33 2190 0.00 207.76 0.71 0.32 ---- - ----- - ----- ----- ----- 0.32 2205 0.00 207.76 0.71 0.32 ---- ----- -- ----- ---- - ----- 0.32 2220 0.00 207.75 0.71 0.32 ----- - --- ----- - ---- ----- 0.32 2235 0.00 207.74 0.71 0.32 ----- ----- --- --- ----- ----- -- 0.32 2250 0.00 207.73 0.71 0.31 ----- ----- ----- ---- ---- --- ---~ 0.31 2265 0.00 207.72 0.71 0.31 ----- ----- - ----- - ----- -~ 0.31 2280 0.00 207.71 0.71 0.31 --- - - --_-- -- ----- ~--- ----- 0.31 2295 0.00 207.70 0.71 0.31 ----- --- - ----- - ----- ----- 0.31 2310 0.00 207.69 0.71 0.31 - - - - ---- ----- ----- 0.31 2325 0.00 207.69 0.71 0.30 0.30 2340 0.00 207.68 0.71 0.30 ----- ~--- ____ -~ ____ __-- ---.- 0.30 2355 0.00 207.67 0.71 0.30 ----- -- -- ----- -- ----- ----- 0.30 2370 0.00 207.66 0.71 0.30 ----- ---- ----- -- ----- ----- ---- 0.30 2385 0.00 207.65 0.71 0.29 - - ----- ----- -- -~-- - --- 0.29 2400 0.00 207.65 0.71 0.29 ----- ----- - ----- - ----- ----- 0.29 2415 0.00 207.64 0.71 0.29 ----- - ----- -- ----_ ---- ----- 0.29 2430 0.00 207.63 0.71 0.29 ----_ ---- -_- ----- ----- ----- ----- 0.29 2445 0.00 207.62 0.71 0.28 ----- ---- ----- ----- - ----- ----- 0.28 2460 0.00 207.61 0.71 0.28 0.28 2475 0.00 207.61 0.71 0.28 --- ----- ----- ----- ---- --- - -- 0.28 2490 0.00 207.60 0.71 0.28 ----- ----- - ---- ----- - ---- 0.28 2505 0.00 207.59 0.71 0.27 ----- --- ----- ----- --- ----- --- 0.27 Continues on next page... 25-100 YR ROUTING Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Civ C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (min) Cfs ft Cfs cfs cfs cfs cfs Cfs cfs Cfs cfs cis 2520 0.00 207.58 0.71 0.27 ---- ----- ----_ _ __ W__ ___ - 0.27 2535 0.00 207.58 0.71 0.27 ----- - --- ----- _---- ---- ---- 0.27 2550 0.00 207.57 0.71 0.27 ---- ---- ----- --- ---- ---- ----- 0.27 2565 0.00 207.56 0.71 0.26 ----- -- ---- ----- ----- ----- ---- 0.26 2580 0.00 207.55 0.71 0.26 --- -- -_--- - - --- ----- 0.26 2595 0.00 207.55 0.71 0.26 ---- ----- ----- ----- ----- -- ----- 0.26 2610 0.00 207.54 0.71 0.26 ----- - -- ----- --- --- - 0.26 2625 0.00 207.53 0.71 0.25 - ----- ----- - - - ----- 0.25 2640 0.00 207.53 0.71 0.25 ----- ----- ----- ----- ----- ----- ----- 0.25 2655 0.00 207.52 0.71 0.25 ----- - --- ----- --- ----- --- 0.25 2670 0.00 207.51 0.71 0.25 - ----- ----- - - --- - ----- 0.25 2685 0.00 207.51 0.71 0.24 ----- ----- ----- ----- ----- - ----- 0.24 2700 0.00 207.50 0.71 0.24 ----- - - ----- - ----- - 0.24 2715 0.00 207.49 0.71 0.24 - ---- - - ---- -- ---- 0.24 2730 0.00 207.49 0.71 0.24 ---- ---- 0.24 2745 0.00 207.48 0.71 0.23 ---- -- ----- --- --- ---- ---- 0.23 2760 0.00 207.47 0.71 0.23 - ----- ----- ----- ----- ---_- ---- 0.23 2775 0.00 207.47 0.71 0.23 ---- ----- -- ---- ----- ----- ----- 0.23 2790 0.00 207.46 0.71 0.23 - ---- ---- - ----- - ----- 0.23 2805 0.00 207.45 0.71 0.22 - ----- ----- - ----- --- ----- 0.22 2820 0.00 207.45 0.71 0.22 ---- - --- ----- - ----- -- 0.22 2835 0.00 207.44 0.71 0.22 ----- ----- ----- ----- ----- ----- ----- 0.22 2850 0.00 207.44 0.71 0.22 ----- - - ----- -- ---- - 0.22 2865 0.00 207.43 0.71 0.21 - ----- ----- ---- ____ ____ _w 0.21 2880 0.00 207.42 0.71 0.21 - - ----- - - --- --- 0.21 ... End W Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 2 25-100 YR ROUTING Hydrograph type = Reservoir Storm frequency = 2 yrs Inflow hyd. No. = 1 Reservoir name = WQPD-A Storage Indication method used. Q WS) 70-00 60.00 50.00 40.00 30.00 20.00 10.00 25-100 YR ROUTING Hyd. No. 2 -- 2 Yr Monday, Jan 29 2007, 10:26 AM Peak discharge = 4.50 cfs Time interval = 1 min Max. Elevation = 209.66 ft Max. Storage = 92,984 cult Hydrograph Volume=149.332 tuft Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 5 10 15 19 24 29 34 39 44 48 Time (hrs) Hyd No. 2 Hyd No. 1 Hydrograph Report HydraOow Hydrographs by lntelis(*e Noonday, Jan 29 2007, 11:2 AM Hyd. No. 1 25-100 YR POST DEVELOPMENT INFLOW Hydrograph type = SCS Runoff Peak discharge = 114.19 cfs Storm frequency = 10 yrs Time interval = 1 min Drainage area = 18.00 ac Curve number = 87 Basin Slope = 3.5 % Hydraulic length = 800 ft Tc method = !AG Time of cone. (Te) = 11.2 min Total precip. = 5.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (min cfs) (min cfs) Time -- Outflow (min cfs) 267 0.01 777 7.03 1287 1.26 282 0.06 792 5.92 1302 1.25 297 0.11 807 5.22 1317 1.23 312 0.16 822 4.58 1332 1.22 327 0.21 837 4.08 1347 1.21 342 0.26 852 3.68 1362 1.20 357 0.32 867 3.50 1377 1.18 372 0.38 882 3.33 1392 1.17 387 0.44 897 3.15 1407 1.16 402 0.50 912 2.98 1422 1.15 417 0.57 927 2.81 1437 1.13 432 0.63 942 2.63 1452 0.21 447 0.70 957 2.46 462 0.77 972 2.31 477 0.83 987 2.25 ...End 492 0.93 1002 2.19 507 1.09 1017 2.12 522 1.26 1032 2.06 537 1.45 1047 2.00 552 1.62 1062 1.94 567 1.70 1077 1.87 582 1.84 1092 1.81 597 2,14 1107 1.75 612 2.51 1122 1.69 627 2.99 1137 1.62 642 3.59 1152 1.56 657 4.42 1167 1.50 672 5.61 1182 1.43 687 7.64 1197 1.37 702 22.96 1212 1.32 717 102.96 1227 1.31 732 27.65 1242 1.30 747 12.78 1257 1.28 762 8,42 1272 1.27 Hydrograph Volume = 287,713 cult ( Pnrdod values >a 0%of 4p. Prird interval= 15) Hydrograph Plot di Hydratlow Hydrographs by IntelisoNe Monday, Jan 29 2007, 10:26 AM Hyd. No. 1 25-100 YR POST DEVELOPMENT INFLOW Hydrograph type = SCS Runoff Peak discharge = 114.19 cfs Storm frequency = 10 yrs Time interval = 1 min Drainage area = 18.000 ac Curve number = 87 Basin Slope = 3.5 % Hydraulic length = 800 ft Tc method = LAG Time of cons. (Tc) = 11.23 min Total precip. = 5.80 in Distribution = Type it Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 287,713 cult 25-100 YR POST DEVELOPMENT INFLOW Q (Gfs) Hyd. No. 1 — 10 Yr Q WS) 120.00 120,00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 ) I I Lj 0.00 0 2 5 7 9 12 14 16 19 21 23 26 Hyd No. 1 Time (hrs) -�-�- Hydrograph Report M M Hydraflow Hydrograph. by Intelisohre Monday, .fan 29 2W7, 11:2 AM Hyd. No. 2 25-100 YR ROUTING Hydrograph type = Reservoir Peak discharge = 26.47 cfs Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 1 Reservoir name = WQPD-A Max. Elevation = 210.96 ft Max. Storage = 144,684 cult Storage Indication method used. Outflow hydrograph volume = 272,817 tuft Hydrograph Discharge Table (Flrin YwLes -0%ofOp. fh'"""teng'-'5' Time Inflow Elevation CIv A CIv B CIv C CIv D Wr A Wr B Wr C Wr D EA1 Outflow (min) cfs ft cfs cfs cfs ds cfs cfs cfs cfs cfs cfs 330 0.22 207.01 0.09 0.00 ----- - - -- - - - 0.00 345 0.28 207.02 0.14 0.00 ----- - ---- ----- ---- ---- ----- 0.00 360 0,33 207.03 0.20 0.01 --- ----- ----- ----- ----- ----- ----- 0.01 375 0.39 207.04 0.27 0.01 ----- ----- -_--- ----- --- ----- ---- 0.01 390 0.45 207.05 0.35 0.01 ----- ----- ----- ----- ---- ----- ----- 0.01 405 0.52 207,06 0.44 0.01 -- -- -- -- --- -_ ----- _--- 0.01 420 0.58 207.08 0.54 0.02 ----_ ----- --- ----- ----- - --- ----- 0.02 435 0.65 207.09 0.66 0.02 --- -- ---- ----- ----- ----- ----- 0.02 450 0.71 207.11 0.71 0.03 ----- ----- --- --- ---- ---- -- 0.03 465 0.78 207.13 0.71 0.04 --- ----- _--- - ----- ----- ----- 0.04 480 0.85 207.15 0.71 0.05 --- - - - - -- - 0.05 495 0.96 207.17 0.71 0.07 ----_ ----- ----- ----- ----- ----- ----- 0.07 510 1.12 207.20 0.71 0.08 - - - --- -- ---- ---- 0.08 525 1.30 207.23 0.71 0.11 ----- ---- ----- - - - - -- 0.11 540 1.49 207.27 0.71 0.13 ----- ----- ----- ----- ----- ----- ----- 0.13 555 1.64 207.31 0.71 0.16 --- -- -- - -- - - 0.16 570 1.72 207.35 0.71 0.18 ----- ----- ----- _---- ----- ----- ----- 0.18 585 1.90 207.39 0.71 0.20 ----- ----- ----- ----- ----- ----- ----- 0.20 600 2.21 207.44 0.71 0.22 --- - ----- --- - - - - 0.22 615 2.60 207.50 0.71 0.24 ----- ----- ----- ---- - ---- ---- 0.24 630 3.09 207.57 0.71 0,27 ----- ----- ----- ----- ----- ----- ----- 0.27 645 3.74 207.66 0.71 0.29 0.29 660 4.59 207.76 0.71 0.32 ---- ----- ----- - - ----- ----- 0.32 675 5.98 207.90 0.71 0.36 -- - - ---- ---- ---- ---- 0.36 690 8.07 208.07 0.71 0.40 0.03 ----- ---- ---- ---- ----- ----- 0.43 705 32.11 208.46 1.30 0.47 0.82 ----- ----- ----- ----- ----- ----- 1.29 720 114.19 << 210.09 16.54 0.35 3.12 - 13.07 - --- -- ---- 16.54 735 18.67 210.94 26.37 0.10 0.87 ----- 25.40 ----_ ----- ___ __ __ 26.37 750 11,67 210.70 24.83 0.12 1.09 ---- 23.61 ---- ----- ----- ----- 24.82 765 8.07 210.38 22.31 0,18 1.63 --- 20.49 ---- --- -- --- 22.30 780 6.78 210.10 16.83 0.34 3.07 ---- 13.42 - ----- ----- ---- 16.83 795 5.77 209.94 10.61 0.44 3.94 ----- 6.23 ----- ----- ---- ---- 10.61 810 5.08 209.85 7.84 0.46 4.12 --- 3.26 7.84 825 4.48 209.80 6.29 0.46 4.17 ----- 1.65 ---- ----- ----- ---- 6.29 840 3.99 209.76 5.58 0.46 4.15 ---- 0.97 ----- ---- ---- ----- 5.58 855 3.64 209.72 4.97 0.46 4.13 --- 0.38 ----- - --- ---- ---- 4.97 870 3.46 209.69 4.57 0.46 4.11 ---- 0.00 - -- - - 4.57 885 3.29 209.67 4.52 0.45 4.06 ----- 0.00 ----- ---- ----- ---- 4.51 Continues on next page... 25-100 YR ROUTING Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B CIv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft Cfs Cfs Cfs Cfs Cfs cfs Cfs Cfs Cfs cfs 900 3.12 209.64 4.46 0.45 4.01 ----- 0.00 -- ----- ---- ---- 4.46 915 2.95 209.60 4.40 0.44 3.96 ----- 0.00 ---- ----- --- ---- 4.40 930 2.77 209.57 4.33 0.43 3.89 ----- ----- _____ _____ ____ 4.33 945 2.60 209.53 4.26 0.43 3.83 ----- ----- ---- ----- --- ----- 4.25 960 2.42 209.49 4.18 0.42 3.76 ----- --- - ----- --- --- 4.18 975 2.30 209.45 4.11 0.43 3.67 -- ---- ----- -- ----- -- 4.11 J 990 2.24 209.40 4.04 0.44 3.59 ----- --- - ----- -- --- 4.04 1005 2.17 209.36 3.96 0.45 3.51 ----- -- ---- -- ----- -- 3.95 1020 2.11 209.32 3.87 0.45 3.42 ---- ----- ---- ----- ----- ----- 3.87 1035 2.05 209.28 3.79 0.45 3.33 ----- ----- ---- ----- ---- ----- 3.78 1050 1.99 209.24 3.70 0.45 3.24 ----- -- ----- --- ----- -- 3.69 1065 1.92 209.20 3.62 0.45 3.15 3.60 1080 1.86 209.16 3.53 0.45 3.06 ----- - ----- -- --- ---- 3.51 1095 1.80 209.12 3.44 0.45 2.97 --- --- ----- -- ----- -_- 3.42 1110 1.74 209.08 3.35 0.45 2.88 3.32 1125 1.67 209,04 3.26 0.45 2.78 ----- ---_ ----- ---- ----- -- 3.23 1140 1.61 209.01 3.16 0.45 2.69 --- ----- -- - --- ----- _---_ 3,13 1155 1.55 208.97 3.06 0.45 2.59 ----- --- ----- ----- --- ----- 3•04 1170 1.48 208.93 2.95 0.45 2.49 - --- ----- - ----- - 2•94 1185 1.42 208.89 2.84 0.45 2.39 ---- ----- - --- ---- --- 2.84 1200 1.36 208.86 2.72 0.45 2.26 ----- - ----- ----- ----- ----- 2.71 1215 1.32 208.82 2.60 0.45 2.14 ----- ---- --- ---_ - ----- 2.59 1230 1.31 208.79 2.49 0.45 2.03 ----- --- ---- --- ----- -- 2.48 1245 1.29 208.76 2.39 0.45 1.92 -- ----- ---- ----- ----- ---- 2.38 1260 1.28 208.74 2.29 0.46 1.82 ----- - ----- --- --- ----- 2.28 1275 1.27 208.71 2.20 0.46 1.74 -- --- ---- -- ----- - 2.19 1290 1.26 208.69 2.12 0.46 1.65 ----- ----- -_ ----- --- ----- 2.11 1305 1.24 208.67 2.04 0.46 1.57 ----- ----- ---- ---- - ----- 2.03 1320 1.23 208.65 1.97 0.46 1.50 ---- - --- --- - ----- ----- 1.96 1335 1.22 208.63 1.91 0.46 1.43 -- ---- ---- ---- ----- -- 1.89 1350 1.21 208.62 1.85 0.46 1.36 ----- -- ---- -_- ---- ----_ 1.83 1365 1.19 208.60 1.79 0.46 1.30 -- -- ----- -- ----- - 1.77 1380 1.18 208.59 1.74 0.46 1.26 ---- ----- - ---- ----- ----- 1.72 1395 1.17 208.57 1.70 0.46 1.21 ---- ----- ----- ----- ----- --- 1.68 1410 1.16 208.56 1.65 0.46 1.17 - ---- - ---- --- ----- 1.63 1425 1.14 208.55 1.61 0.46 1.13 ----- -- ----- ----- - ----- 1.59 1440 1.13 208.54 1.57 0.46 1.09 ----- ---- ----- - ----- -- 1.56 1455 0.06 208.51 1.49 0.47 1.01 -- ----- -- ---- ----- -- 1.48 1470 0.00 208.48 1.37 0.47 0.90 ----- --._ _____ ___ __-- 1.36 1485 0.00 208.45 1.28 0.47 0.79 ----- ----- --- ---- ----- ---- 1.26 1500 0.00 208.41 1,19 0.47 0.69 ---- ----- ---- ---- ----- ----- 1.16 1515 0.00 208.39 1,10 0.46 0.61 ---- --- --- ----- ----- ---- 1.07 ■ 1530 0.00 208.36 1.02 0.46 0.53 ---- ----- - ---- ----- - 0.99 1545 0.00 208.34 0.95 0.45 0.47 - ----- ---- ----- --- --- 0.92 1560 0.00 208.31 0.88 0.45 0.41 ---- --- ----_ ---- ---- ----- 0.86 1575 0.00 208.29 0.83 0.45 0.36 ---- ---- -- ----- ----- ---' 0.80 1590 0.00 208.27 0.80 0.44 0.32 ---- ----- ----- ----- ----- ----- 0.76 1605 0.00 208.25 0.78 0.44 0.28 ----- --- ---_ ---- ----_ ----- 0.72 1620 0.00 208.23 0.75 0.43 0.25 --- ----- - --- ----- -- 0.68 1635 0.00 208.22 0.73 0.43 0.21 ----- - --- ----- ----- ----- 0.64 1650 0.00 208.20 0.71 0,43 0.18 0.61 Continues on next page... 25-100 YR ROUTING M Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D ExfiI Outflow (min) cfs ft cfs Cfs cis efs Cfs Cfs Cfs Cfs Cfs Cfs 1665 0.00 208.19 0.71 0.42 0.16 - ----- ----- -- ---- ----- 0.58 1680 0.00 208.17 0.71 0.42 0.14 ----- - - - ----- - o.56 1695 0.00 208.16 0.71 0.42 0.12 --- ---__ ___ _____ __- ____ 0.54 1710 0.00 208.14 0.71 0.42 0.10 ---- ----- ---- - ----- -- -- 0.52 1725 0.00 208.13 0.71 0.41 0.09 ----- -- ---- ----- ---- -- 0.50 1740 0.00 208.12 0.71 0.41 0.07 - ----- ----- ----- ___ ___ 0.48 1755 0.00 208.11 0.71 0.41 0.05 ----- - - ---- ----- -- 0.46 1770 0.00 208.10 0.71 0.40 0.04 ----- - ----- ----- - ---- 0.45 1785 0.00 208.08 0.71 0.40 0.04 -- ----- ----- -- ----- ----- 0.44 1800 0.00 208.07 0.71 0.40 0.03 ---- --- ----- ----- --- ----- 0.43 1815 0.00 208.06 0.71 0.40 0.03 -- ----- ---- -- ----- ----- 0.42 1830 0.00 208.05 0.71 0.39 0.02 ----- ----- - ----- ----- -- 0.42 1845 0.00 208.04 0.71 0.39 0.02 --- - ----_ ----- - ---- 0.41 1860 0.00 208.03 0.71 0.39 0.01 -- - ----- - ---- ----- 0.40 1875 0.00 208.02 0.71 0.39 0.01 ----- ---- - ----- ----_ --- 0.40 1890 0.00 208.01 0.71 0.39 0.00 ---- ---- ----- ----- ---- ---- 0.39 1905 0.00 208.00 0.71 0.38 0.00 - ----- ----_ - ----- ----- 0.38 1920 0.00 207.99 0.71 0.38 --- ----- ----- -- ----- ----- -- 0.38 1935 0.00 207.98 0.71 0.38 --- - ----- ----- - ----- --- 0.38 1950 0.00 207.97 0.71 0.38 ---- ---- -- - - ----- ----- - 0.38 1965 0.00 207.96 0.71 0.37 ---- - ----- ----- ----- - ----- 0.37 1980 0.00 207.95 0.71 0.37 -- ---- ----- -- -- - ----- ----- 0.37 1995 0.00 207.94 0.71 0.37 ---- ----- ---- --- ----- ----- -- 0.37 2010 0.00 207.93 0.71 0.37 0.37 2025 0.00 207.92 0.71 0.36 ---- ----- - - ----- --- - 0.36 2040 0.00 207.91 0.71 0.36 ----- -- ---- ----- ----- -- - 0.36 2055 0.00 207.90 0.71 0.36 -- ----- ----- ---- --- - ----- 0.36 2070 0.00 207.89 0.71 0.36 ----- -- ---- ----- ----- ----- --- 0.36 2085 0.00 207.88 0.71 0.35 --- ---- ----- ----- --- ----- ~- 0.35 2100 0.00 207.87 0.71 0.35 0.35 2115 0.00 207.86 0.71 0.35 ----- - - -- ----- - ---- ----- 0.35 2130 0.00 207.85 0.71 0.35 --- - -- ---- ----- ---- ----- ---- 0.35 2145 0.00 207.84 0.71 0.34 ----- ---- ---- -- - ----- -- 0.34 2160 0.00 207.83 0.71 0.34 ---- -- ----- ----- ---- ----- ----- 0.34 2175 0.00 207.82 0.71 0.34 - ----- ----- --- -- ---- ----- 0•34 2190 0.00 207.81 0.71 0.34 -__ _____ _^ __._ _-_ --- 0.34 2205 0.00 207.80 0.71 0.34 --- ---- ----- ---- -- ----- ----- 0.34 2220 0.00 207.79 0.71 0.33 - - ----- - - - -- - 0.33 2235 0.00 207.78 0.71 0.33 ----- ----- - ----- ----- --- ----- 0.33 2250 0.00 207.78 0.71 0.33 ----- - -- ---- ----- ----- ----- ----- 0.33 2265 0.00 207.77 0.71 0.33 ---- - ----- ---- - ----- ----- 0.33 2280 0.00 207.76 0.71 0.32 ----- ----- ----- --- ----- ----- --- 0.32 2295 0.00 207.75 0.71 0.32 ----- -- - - ---- -- ---- - 0.32 2310 0.00 207.74 0.71 0.32 --- - ---- ---- --- ----- ----- 0.32 2325 0.00 207.73 0.71 0.32 ----- ----- --_-- -- - ----- ----_ -- 0.32 2340 0.00 207.72 0.71 0.31 ----- ----- ----- ----- ---- -- ---- 0.31 2355 0.00 207.71 0.71 0.31 --- ---- ---- ---- ----- ----- ----- 0.31 2370 0.00 207.71 0.71 0.31 ----- - ----- ----- ----- ----- ---- 0.31 2385 0.00 207.70 0.71 0.31 ---- - - ----- -- - ---- 0.31 2400 0.00 207.69 0.71 0.30 --- -- ----- ----- - ----- ---- 0.30 2415 0.00 207.68 0.71 0.30 ----- ---- ----- -- ----- ----- ----- 0.30 Continues on next page... 25-100 YR ROUTING Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft Cfs Cfs Cfs Cfs Cfs Cfs Cfs Cfs Cfs Cfs 2430 0.00 207.67 0.71 0.30 ---- -- --- ----- ----- - --- ----- 0.30 2445 0.00 207.66 0.71 0.30 - ---- - - - - ----- 0.30 2460 0.00 207.66 0.71 0.29 ----- - -_-- --_- --_-- -- ---- 0.29 2475 0.00 207.65 0.71 0.29 --- ----- --- ---- ---- ---- ---- 0.29 2490 0.00 207.64 0.71 0.29 ----- - - --- ---- -- --- 0.29 2505 0.00 207.63 0.71 0.29 - - ----- ----- ----- ----- ----- ----- 0.29 2520 0.00 207.62 0.71 0.28 - - - - -- ----- - 0.28 2535 0.00 207.62 0.71 0.28 ----- - - - ---- - --- 0.28 2550 0.00 207.61 0.71 0.28 ---- ----_ ----_ ----- ----- ----- ---- 0.28 2565 0.00 207.60 0.71 0.28 - ----- -- - --- ---- --- 0.28 2580 0.00 207.59 0.71 0.27 - - ---- ----- ----- --- ----- 0.27 2595 0.00 207.59 0.71 0.27 0.27 2610 0.00 207.58 0.71 0.27 - - - - - ----- - 0.27 2625 0.00 207.57 0.71 0.27 ---- - - ----- ---- ---- ---- 0.27 2640 0.00 207.56 0.71 0.26 ----- ----- ---- - ----- - ----- 0.26 2655 0.00 207.56 0.71 0.26 0.26 2670 0.00 207.55 0.71 0.26 - ----- ----- - ----- ----- ---- 0.26 2685 0.00 207.54 0.71 0.26 --- - - ---- - ----- - 0.26 2700 0.00 207.53 0.71 0.25 _--- ----- - ----- - - - 0.25 2715 0.00 207.53 0.71 0.25 - --- - - ----- - ----- 0.25 2730 0.00 207.52 0.71 0.25 -- --_-_ ----- - ---- ----- ---- 0.25 2745 0.00 207.51 0.71 0.25 -- - ----- - ----- ----- - 0.25 2760 0.00 207.51 0.71 0.25 ----- - - ----- -- - ----- 0.25 2775 0.00 207.50 0.71 0.24 ---- ----- ---- ---- ----- ---_ -- ._ 0.24 2790 0.00 207.49 0.71 0.24 ----- - - ----- - - ---- 0.24 2805 0.00 207.49 0.71 0.24 - ---- - - ----- --- - 0.24 2820 0.00 207.48 0.71 0.24 0.24 2835 0.00 207.47 0.71 0.23 -- --_- ----- - _---- ----- - 0.23 2850 0.00 207.47 0.71 0.23 -- ---- ----- ----_ -_ _-_ ___ 0.23 2865 0.00 207.46 0.71 0.23 - ----- - ----- ----- ----- ----- 0.23 2880 0.00 207.46 0.71 0.23 - ---- - ---- - - -- 0.23 ... End M Hydrograph Plot w Hydraflow Hydrographs by IntelisoNe Monday, Jan 29 2007, 10:26 AM Hyd. No. 2 25-100 YR ROUTING Hydrograph type = Reservoir Peak discharge = 26.47 cfs Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 1 Max. Elevation = 210.96 ft Reservoir name = WQPD-A Max. Storage = 144,684 cuft Storage Indication method used. Hydrograph Volume = 272,817 cult 25-100 YR ROUTING Q (cfs) Hyd. No. 2 -- 10 Yr Q (cfs) 120 00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 4 9 13 17 22 26 30 35 39 43 48 Time (hts) - Hyd No. 2 Hyd No. 1 Hydrograph Report Hydraflow Hydrographs by Inte[isotm Monday, Jan 29 2007, 11:2 AM Hyd. No. 1 25-100 YR POST DEVELOPMENT INFLOW Hydrograph type = SCS Runoff Peak discharge = 137.95 cfs Storm frequency = 25 yrs Time interval = 1 min Drainage area = 18.00 ac Curve number = 87 Basin Slope = 3.5 % Hydraulic length = 800 ft Tc method = LAG Time of conc. (Tc) = 11.2 min Total precip. = 6.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (min cfs) (min cfs) Time -- Outflow (min cfs) 234 0.01 744 16.59 1254 1.53 249 0.07 759 10.64 1269 1.51 264 0.12 774 8.69 1284 1.50 279 0.18 789 7.26 1299 1.48 294 0.25 804 6.38 1314 1.47 309 0.31 819 5.59 1329 1.45 324 0.38 834 4.98 1344 1.44 339 0.45 849 4.44 1359 1.42 354 0.52 864 4.21 1374 1.41 369 0.60 879 4.00 1389 1.39 384 0.67 894 3.79 1404 1.38 399 0.75 909 3.59 1419 1.36 414 0.83 924 3.38 1434 1.35 429 0.91 939 3,17 1449 0.53 444 0.99 954 2.96 459 1.07 969 2.77 474 1.16 984 2.69 ...End 489 1,26 999 2.61 504 1.46 1014 2.54 519 1.68 1029 2.46 534 1.92 1044 2.39 549 2.15 1059 2.32 564 2.25 1074 2.24 579 2.37 1089 2.17 594 2.73 1104 2.09 609 3.17 1119 2.02 624 3.75 1134 1.94 639 4.43 1149 1.87 654 5.43 1164 1.79 669 6.70 1179 1.72 684 9.09 1194 1.64 699 19.64 1209 1.58 714 96.67 1224 1.56 729 55.92 1239 1.54 Hydrograph Volume = 351,565 cuPt (Printed values a- 0% ad Op. Port intxral = 15) Hydrograph Plot ■ Hydraflow Hydrographs by InteEisoke Monday, Jan 29 2007, 10:26 AM Hyd. No. 1 25-100 YR POST DEVELOPMENT INFLOW Hydrograph type = SCS Runoff Peak discharge = 137.95 cfs Storm frequency = 25 yrs Time interval = 1 min Drainage area = 18.000 ac Curve number = 87 Basin Slope = 3.5 % Hydraulic length = 800 ft Tc method = LAG Time of conc. (Tc) = 11.23 min Total precip. = 6.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 351,565 tuft 25-100 YR POST DEVELOPMENT INFLOW Q (cfs) Hyd. No. 1 -- 25 Yr Q (cfs) 140.00 140.00 120.00 120.00 100.00 100,00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 0 2 5 7 9 12 14 16 19 21 23 26 Hyd No. 1 time (hrs) �- W Hydrograph Report Hydraflow Hydrographs by Intetisolve Monday, Jan 29 2007, 11:2 AM Hyd. No. 2 25-100 YR ROUTING Hydrograph type = Reservoir Storm frequency = 25 yrs Inflow hyd. No. = 1 Max. Elevation = 211.69 ft Storage Indication method used. Hydrograph Discharge Table Peak discharge Time interval Reservoir name Max. Storage = 30.23 cfs = 1 min = WQPD-A = 176,118 tuft Outflow hydrograph volume = 336,295 tuft ( Prinmd values - 0% of Op. Print intetval = 15) Time Inflow Elevation Clv A Clv B Ctv C Clv D Wr A Wr B Wr C Wr D ExfiI Outflow (min) Cfs ft cfs Cfs Cfs cfs Cfs cfs cfs Cfs Cfs cfs 300 0.27 207.02 0.12 0.00 - - - ---_- - ---- - 0.00 a 315 0.34 207.02 0.18 0.01 ---- --- --- - ---- ----- ----- 0.01 330 0.41 207.03 0.25 0,01 ---_ ----- ----- ----- ----- ----- ----- 0.01 345 0.48 207.05 0.33 0.01 ----- - --_ ---- --- ----- ----- ----- 0.01 360 0.55 207.06 0.43 0.01 ----- ---- ----- ----- ----- ----- ----- 0.01 375 0.63 207.08 0.54 0.02 ---- --- - --- - -- -- 0.02 390 0.70 207.09 0.67 0.02 ----- ----- ----- --- ----- ---- ----- 0.02 405 0.78 207.11 0.71 0.03 - ----- - ----- - - ----- 0.03 420 0.86 207.14 0.71 0.04 ----- -- ---- -- ----- -- - 0.04 435 0.94 207.16 0.71 0.06 ----- ----- ----- ----- --_-- ----- ----- 0.06 450 1.03 207.18 0.71 0.07 -- ----- ----- _--- ---- ^_ ___ 0.07 465 1.11 207.21 0.71 0.09 ----- ----- ----- --- --_-- ----- -- 0.09 480 1.19 207.24 0.71 0.11 - ----- - ----- - -- ----- 0.11 495 1.33 207.27 0.71 0.13 ---- - ---- - ----- -- ---- 0.13 510 1.54 207.31 0.71 0.16 ----- ----- ----- ---- ----- --- ----- 0.16 525 1.77 207.35 0.71 0.18 -- - - -- - ----- --- --- 0.18 540 2.02 207.39 0.71 0.20 ----- ----- --- ----- ----- ----- ---- 0.20 555 2.20 207.45 0.71 0.22 ----- ----- --- ----- - ----- ----- 0.22 570 2.28 207.50 0.71 0.24 ----- - ----- -- ----- ---- - 0.24 585 2.50 207.56 0.71 0,26 ----- - ----- - ----- ----- ----- 0.26 600 2.90 207.63 0.71 0.28 ---- ----- ----- ----- --_ ----- ----- 0.28 615 3.39 207.71 0.71 0.31 --- --- ----- ---- ----- --- ---- 0.31 630 4.00 207.80 0.71 0.33 ----- ----- ----- ---- ----- ----- ---- 0.33 645 4.81 207.91 0.71 0.36 ----- ----- - ----- -- ----- ----- 0.36 660 5.86 208.04 0.71 0.39 0.02 - ----- - ----- -- ----- 0.41 675 7.57 208.20 0.71 0.43 0.17 ---- ----- ----- ----- ----- - 0.60 690 10.14 208.40 1.15 0.47 0.65 ___-_ - - --_-- -- ----- ----- 1.12 705 39.75 208.85 2.71 0.45 2.25 -- ----- -_-- ----- ---- ---- 2.70 720 137.95 << 210.68 24.70 0.12 1.12 ----- 23.45 24.69 735 22.34 211.68 30.21 0.06 0.54 ----- 29.57 0.00 -- ----- ----- 30.16 750 13.93 211.42 28.95 0.07 0.62 --- 28.23 ---- ----- ---- --- 28.91 765 9.63 211.07 27.11 0.09 0.78 ---- 26.22 - -- ----_ ---- 27.09 780 8.08 210,70 24.83 0.12 1.09 ----- 23.61 ----- ----- --- ----- 24.82 795 6.88 210.34 21.88 0.19 1.74 ----- 19.95 ----- ----- ---- ---- 21.88 810 6.05 210.06 15.26 0.37 3.33 ----- 11.55 ----- -- ----- ----- 15.26 825 5.34 209.91 9.67 0.45 4.03 ---- 5.19 - ----- ----- ---- 9.67 840 4.74 209.83 7.28 0.46 4.14 2.68 ---- ----- ---- ----_ 7.28 855 4.33 209.78 6.04 0.46 4.17 ---- 1.41 ----- ----- ----- ----- 6,04 Continues on next page... 25100 YR ROUTING Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv 0 Wr A Wr B Wr C Wr D E>fil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 870 4.12 209.75 5.42 0.46 4.15 ---- 0.81 - ---- ----- --- 5.42 885 3.92 209.72 4.94 0.46 4.13 - 0.35 ----- ----- ----- --- 4.94 900 3.71 209.70 4.57 0.46 4.12 ----- 0.00 _--- ----- ---- ----- 4.57 915 3.50 209.68 4.53 0.45 4.08 ---- 0.00 ----- ----- ----- ----- 4.53 930 3.29 209.65 4.48 0.45 4.03 ----- 0.00 ----- _--- - ----- 4.48 945 3.09 209.62 4.43 0.44 3.98 ----- 0.00 --- ----- ---- ---- 4.43 960 2.88 209.59 4.37 0.44 3.93 - - ----- - ----- - 4.36 975 2.73 209.55 4.29 0.43 3.86 - ----- ----- ----- - ----- 4.29 990 2.66 209.51 4.22 0.42 3.80 ----- ---- ---- -- ----- ----- 4.22 1005 2.58 209.48 4.16 0.43 3.73 - - ----- ----- --- - ---- 4.16 1020 2.51 209.44 4.10 0.44 3.66 ---_ ----- ---- _--- - ----- 4.09 1035 2.43 209.40 4.04 0.44 3.59 ----- ----- - --- ----- ----- 4.03 1050 2.36 209.36 3.96 0.45 3.51 ----- - ----- ---- - ----- 3.95 1065 2.29 209.32 3.88 0.45 3.43 ----- ----- - -- - --- 3.88 1080 2.21 209.29 3.81 0.45 3.35 - --- ----- ----- ---- ---- 3.80 1095 2.14 209.25 3.73 0.45 3.27 ----- ----- -- -- ----- --- 3.72 1110 2.06 209.21 3.65 0.45 3.19 ----- - ----- ----- ----_ ---- 3.64 1125 1.99 209.17 3.57 0.45 3.10 --- ----- ----- ---- --- ---- 3.55 1140 1.91 209.14 3.48 0.45 3.01 ----- - -- - ---- ----- ---- 3.46 1155 1.84 209.10 3.40 0.45 2.93 -- - ---- ----- - -- 3.38 1170 1.76 209.06 3.31 0.45 2.84 ----- ----- ----- -- ---- ----- 3.28 1185 1.69 209.03 3.22 0.45 2.74 -- -- - ---- ----- ----- ---- 3.19 1200 1.61 208.99 3.12 0.45 2.65 -- ----- ----- --__- -- ----- 3.10 1215 1.56 208.95 3.02 0.45 2.55 ----_ ----- -- --- ----- ----- 3.00 1230 1.55 208.92 2.92 0.45 2.46 - - ----- - - - 2.91 1245 1.53 208.88 2.81 0.45 2.36 ---- - ----- - --- ---- 2.81 1260 1.52 208.85 2.70 0.45 2.24 ----- ---- - ----- ---- ---- 2.69 1275 1.51 208.82 2.60 0.45 2.14 - ----- ----- ---- --- ----- 2.59 1290 1.49 208.80 2.51 0.45 2.04 2.50 1305 1.48 208.77 2.42 0.45 1.95 ----- --- ---- ---- ----- - 2.41 1320 1.46 208.75 2.34 0.45 1.87 ---- -- ----- - ---- ----- 2.32 1335 1.45 208.73 2.26 0.46 1.79 ----- ----- -- ----- ----- --- 2.25 1350 1.43 208.71 2.19 0.46 1.72 ----- -- ----_ ---- --- ----- 2.18 1365 1.42 208.69 2.12 0.46 1.65 ----- ----- ----- - ---- ----- 2.11 1380 1.40 208.67 2.06 0.46 1.59 ----- - - ----- ----- - 2.04 1395 1.39 208.66 2.00 0.46 1.52 ----- ----- ----- ____-- ----- 1.98 1410 1.37 208.64 1.95 0.46 1.47 ----- ---- - ----- ---- 1.93 1425 1.36 208.63 1.90 0.46 1.41 ---- --- ---- ----- ----_ ---- 1.88 1440 1.34 208.62 1.85 0.46 1.37 ----- ----- ----- ----- ---- ----- 1.83 1455 0.07 208.59 1.75 0.46 1.27 ----- ----- - --- ----- -- 1.73 1470 0.00 208.55 1.60 0.46 1.12 ----- -- --- ----- - --- 1.59 1485 0.00 208.51 1.47 0.47 0.99 --- ----- ----- ----- ----- --- 1 A6 1500 0.00 208.47 1.36 0.47 0.88 ----- ----- --- ---- ----- ----- 1.34 1515 0.00 208.44 1.26 0.47 0.77 ----- -- ---- ----- --- ---- 1.24 1530 0.00 208.41 1.17 0.47 0.67 ---- ----- - ---- ----- ----- 1.14 1545 0.00 208.38 1.09 0.46 0.59 --- ----- ----- - ----- ----- 1.06 1560 0.00 208.36 1.01 0.46 0.52 ----- --- - ---- -_--- - 0.98 1575 0.00 208.33 0.94 0.45 0.46 ----- ----- ----- ----- ---- ----- 0.91 1590 0.00 208.31 0.87 0.45 0.40 ----- ----- ---- ----- ---- --_-- 0.84 1605 0.00 208.29 0.83 0.44 0.35 ---- -_ ---- ----- ---- --- 0.79 1620 0.00 208.27 0.80 0.44 0.31 ---- ----_ ----- ---- ---- ----- 0.75 Continues on next page... 25-100 YR ROUTING M Hydrograph Discharge Table Time Inflow Elevation Clv A Clv 8 Clv C Clv D Wr A Wr 8 Wr C Wr D Exfil Outflow (min) cfs ft Cfs Cfs Cfs Cfs Cfs Cfs Cfs Cfs cfs cfs 1635 0.00 208.25 0.77 0.44 0.27 --- - - ----- ----- -- 0.71 1650 0.00 208.23 0.75 0.43 0.24 - --- ---- ---- --- ---- 0.67 1665 0.00 208.22 0.73 0.43 0.21 ----- ----- ----- ---- ----- ----- 0.64 1680 0.00 208.20 0.71 0.43 0.18 -- -- --- ----- - ----- 0.60 1695 0.00 208.18 0.71 0.42 0.16 ----- ----- - -- ---- ---- 0.58 1710 0.00 208.17 0.71 0.42 0.14 - - -- ----- ----- --- 0.56 1725 0.00 208.16 0.71 0.42 0.12 ---- ----- ----_ - ----- _---- 0.54 1740 0.00 208.14 0.71 0.41 0.10 - - -- -- ----- - 0.52 1755 0.00 208.13 0.71 0.41 0.0$ - ---- ----- ----- ---- ----- 0.50 1770 0.00 208.12 0.71 0.41 0.07 0.48 1785 0.00 208.11 0.71 0.41 0.05 - - ---- -- ----- ----- 0.46 1800 0.00 208.09 0.71 0.40 0.04 ----- ----- ---- - ---- ---- 0.45 1815 0.00 208.08 0.71 0.40 0.04 - - ----- ---- - ----- 0.44 1830 0.00 208.07 0.71 0.40 0.03 - - ---- - - --- 0.43 1845 0.00 208.06 0.71 0.40 0.03 ----- -- ----- ----- ----- ----- 0.42 1860 0.00 208.05 0.71 0.39 0.02 - --_-- ----- ---- ---- ---- 0.42 1875 0.00 208.04 0.71 0.39 0.02 ----- ----- ----- -- ----- ----- 0.41 1890 0.00 208.03 0.71 0.39 0.01 ----- - ----- - - --- -__ 0.40 1905 0.00 208.02 0.71 0.39 0.01 ---- - ----- - ---- ----- 0.40 1920 0.00 208.01 0.71 0.39 0.00 - -- - - - - 0.39 1935 0.00 208.00 0.71 0.38 ----- - ---- ___ _-_ _-_ 0.38 1950 0.00 207.99 0.71 0.38 ----- ----- --- -- - -- ----- --- 0.38 1965 0.00 207.98 0.71 0.38 ----- - ----- ---- --- -- - 0.38 1980 0.00 207.97 0.71 0.38 --- - ----- - ---- - ---- 0.38 1995 0.00 207.96 0.71 0.37 ----- - ---- ----- ---- -- ----- 0.37 2010 0.00 207.95 0.71 0.37 - - ----- ---- - ---- ----- 0.37 2025 0.00 207.94 0.71 0.37 -- ----- -- ----- -- ----- -- 0.37 2040 0.00 207.93 0.71 0.37 ---- - - ----- - --- ----- 0.37 2055 0.00 207.92 0.71 0.36 - ----- ----- --- - --- ----- ---- 0.36 2070 0.00 207.91 0.71 0.36 - ----- -_ ----- ---- ----- ----- 0.36 2085 0.00 207.90 0.71 0.36 ---- -_ - ----- - W---- ----- 0.36 2100 0.00 207.89 0.71 0.36 - - ---- - ---- ----- - 0•36 2115 0.00 207.88 0.71 0.35 ----- ----- - ----- ----- ---- --_-- 0.35 2130 0.00 207.87 0.71 0.35 - - ---- -- _---- ----_ ---- 0.35 2145 0.00 207.86 0.71 0.35 - ----- ---- _--_- - ----- --- 0.35 2160 0.00 207.85 0.71 0.35 ----- -- --- ----- ---- ---- ----- 0.35 2175 0.00 207.84 0.71 0.34 --- - - - ----- ----- - 0•34 2190 0.00 207.83 0.71 0.34 ----- ---- ----- ----- ----_ ----- ----- 0.34 2205 0.00 207.82 0.71 0.34 ----- ----- ----- ----_ ----- ----- ----- 0.34 22-20 0.00 207.81 0.71 0.34 __-_ ----- ----- __- --- __-_ -_-- 0.34 2235 0.00 207.80 0.71 0.33 ---- ----- -- --- ----- --- --- 0.33 2250 0.00 207.79 0.71 0.33 ----- ---- -_--- ----- ----- -- ----- 0.33 2265 0.00 207.78 0.71 0.33 ----- --- ----- ----- - ----- ----- 0.33 2280 0.00 207.77 0.71 0.33 --- ----- -- - ----- --_- -- 0.33 2295 0.00 207.76 0.71 0.32 ---- ----- ----- ----- ----- ----- ---_ 0.32 2310 0.00 207.76 0.71 0.32 -- - ----- - -- __._ -__ 0.32 2325 0.00 207.75 0.71 0.32 ----- ----- -- ----- ----- ----- - 0.32 2340 0.00 207.74 0.71 0.32 ----- -- ---- ----- ----- ---- _---- 0.32 2355 0.00 207.73 0.71 0.31 - ----- - - --- ----- ----- 0.31 2370 0.00 207.72 0.71 0.31 ----- -- -- ---- ----- ----- ----- - 0.31 2385 0.00 207.71 0.71 0.31 ----- -- ----- ----- ----- -- ----- 0.31 Continues on next page... 25-100 YR ROUTING Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 2400 0.00 207.70 0.71 0.31 ---- ----- ----- -- ---- --- --- 0.31 2415 0.00 207.70 0.71 0.31 ----- - - ----- ----- ----- ----- 0.31 2430 0.00 207.69 0.71 0.30 ---- ----- ---_- ----- ----- ----- ----- 0.30 2445 0.00 207.68 0.71 0.30 ---- ---- -- ----- ---- ----- ----- 0.30 2460 0.00 207.67 0.71 0.30 --- - -- ----- --- ---- - 0.30 2475 0.00 207.66 0.71 0.30 - --- ----- ---- --- ----- _-_ -_ 0.30 2490 0.00 207.65 0.71 0.29 ----- ----- ----- ----- ----- --_ --- 0.29 2505 0.00 207.65 0.71 0.29 ----- - - ----- ---- ----- - 0.29 2520 0.00 207.64 0.71 0.29 --- ----- ----- --- ---- - ----- 0.29 2535 0.00 207.63 0.71 0.29 ----- ---- ---- ----- ----- ----- --- 0.29 2550 0.00 207.62 0.71 0.28 - ---- ---- - -- - ---- 0.28 2565 0.00 207.61 0.71 0.28 ---- ----- ----- ----- ----- ----- ----- 0.28 2580 0.00 207.61 0.71 0.28 ---- - - ----- --- --- - 0.28 2595 0.00 207.60 0.71 0.28 -- ---- --- - ----- -- ----- 0.28 2610 0.00 207.59 0.71 0.27 ----- ----_ __.__ - _-_ _____ _____ 0.27 2625 0.00 207.58 0.71 0.27 ----- --- ---- ---- --- ---- --- 0.27 2640 0.00 207.58 0.71 0.27 --- ----_ ----- - ----- --- - 0.27 2655 0.00 207.57 0.71 0.27 ---- ----- ----- ----- ----- -- ----- 0.27 2670 0.00 207.56 0.71 0.26 - -- ---- - -- -- -- 0.26 2685 0.00 207.56 0.71 0.26 ---- ---- ----- ----- ---- --- ---- 0.26 2700 0.00 207.55 0.71 0.26 ----- - --- - ----- ----- ----- ---- 0.26 2715 0.00 207.54 0.71 0.26 ----- ----- ----- ---- ----- ---- ----- 0.26 2730 0.00 207.53 0.71 0.25 ----- _---- -- ---- ----- ---- ----- 0.25 2745 0.00 207.53 0.71 0.25 --- - ----- - --- ---- --- 0.25 2760 0.00 207.52 0.71 0.25 --- ----- ----- ----- ----- ----- ----- 0.25 2775 0.00 207.51 0.71 0.25 ----- - - ----- - ----- - 0.25 2790 0.00 207.51 0.71 0.24 - ----- ----- -- ----- - ----_ 0.24 2805 0.00 207.50 0.71 0.24 ----- - ----- --- --- ---- - 0.24 2820 0.00 207.49 0.71 0.24 - ----- ----- ---- ----- ---- ---- 0.24 2835 0.00 207.49 0.71 0.24 ----- ----- ---- --- ----- ----- ---- 0.24 2850 0.00 207.48 0.71 0.23 ----- --- - ----- - ---- ---- 0.23 2865 0.00 207.47 0.71 0.23 - --- - - ---- ----- - 0.23 2880 0.00 207.47 0.71 0.23 ----- _____ _-- _____ 0.23 ... End Hydrograph Plot Hydraflow Hydrographs by IntelisoNe Monday, Jan 29 2007, 10:26 AM Hyd. No. 2 25-100 YR ROUTING Hydrograph type = Reservoir Peak discharge = 30.23 cfs Storm frequency = 25 yrs Time interval = 1 min Inflow hyd. No. = 1 Max. Elevation = 211.69 ft Reservoir name = WQPD-A Max. Storage = 176,118 cult Storage Indication method used. 0 25-100 YR ROUTING Hydrograph Volume = 336,2% cuff Q (cfs) Hyd. No. 2 — 25 Yr Q (cfs) 140.00 140.00 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20,00 0.00 0.00 0 4 8 12 16 20 24 28 32 36 40 44 Time (hrs) — Hyd No. 2 — Hyd No. 1 Hydrograph Report Hydraflow Hydrographs by Inte(isolve Monday, Jan 29 2007, 11:2 AM Hyd. No. 1 25-100 YR POST DEVELOPMENT INFLOW Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 100 yrs = 18.00 ac = 3.5 % = LAG = 8.50 in = 24 hrs Hydrograph Discharge Table Peak discharge = 178.08 cfs Time interval = 1 min Curve number = 87 Hydraulic length = 800 ft Time of conc. (Tc) = 11.2 min Distribution = Type II Shape factor = 484 Time -- Outflow Time -- Outflow Time -- Outflow (min cfs) (min cfs) (min cfs) 195 0.02 705 52.76 1215 1.98 210 0.10 720 178.08 << 1230 1.96 225 0.17 735 28.52 1245 1.94 240 0.25 750 17.76 1260 1.92 255 0,33 765 12.26 1275 1.90 270 0.41 780 10.29 1290 1.89 285 0.50 795 8.75 1305 1.87 300 0.59 810 7.70 1320 1.85 315 0.68 825 6.78 1335 1.83 330 0.78 840 6.03 1350 1.81 345 0.88 855 5.50 1365 1.79 360 0.98 870 5.23 1380 1.77 375 1.08 885 4.97 1395 1.75 390 1.18 900 4.71 1410 1.73 405 1.29 915 4.44 1425 1.72 420 1.39 930 4.18 1440 1.70 435 1.50 945 3.91 1455 0.09 450 1.61 960 3.65 465 1.71 975 3.46 480 1.82 990 3.37 ...End 495 2.01 1005 3.27 510 2.31 1020 3.18 525 2.63 1035 3.08 540 2.96 1050 2.99 555 3.19 1065 2.90 570 3.29 1080 2.80 585 3.58 1095 2.71 600 4.11 1110 2.61 615 4.77 1125 2.52 630 5.58 1140 2.42 645 6.66 1155 2.33 660 8.05 1170 2.23 675 10.31 1185 2.14 690 13.68 1200 2.04 Hydrograph Volume = 461,370 tuft (Prinw vakms - 0% d Op. Print iftwMl = 15) Hydrograph Plot w Hydratlow Hydrographs by Infelisolve Monday, Jan 29 2007, 10:26 AM Hyd. No. 1 25-100 YR POST DEVELOPMENT INFLOW Hydrograph type = SCS Runoff Peak discharge = 178.08 cfs Storm frequency = 100 yrs Time interval = 1 min Drainage area = 18.000 ac Curve number = 87 Basin Slope = 3.5 % Hydraulic length = 800 ft Tc method = LAG Time of conc. (Tc) = 11.23 min Total precip. = 8.50 in Distribution = Type 11 Storm duration = 24 hrs Shape factor = 484 Q WS) 180.00 150.00 120.00 90.00 60.00 30.00 0.00 0.0 2.3 - Hyd No. 1 25-100 YR POST DEVELOPMENT INFLOW Hyd. No. 1 -- 100 Yr 4.7 7.0 Hydrograph Volume = 461,370 cult Q (cfs) 180.00 150.00 120.00 90.00 60.00 IM1n ---r i - 1 -1 1 1- 0.00 9.3 11.7 14.0 16.3 18.7 21.0 23.3 Time (hrs) Hydrograph Report Hydratlow Hydrographs by Inteiisolve Monday, Jan 29 2007, 11:2 AM Hyd. No. 2 25-100 YR ROUTING Hydrograph type = Reservoir Peak discharge = 91.13 cfs Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 1 Reservoir name = WQPD-A Max. Elevation = 212.38 ft Max. Storage = 206,771 cuft Storage Indication method used. Outflow trorograph volume = 445,554 cuR Hydrograph Discharge Table ( Printed values >= 0% of Op. Pant interval = 15) Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D EXHI Outflow (min) cfs ft Cfs Cfs Cfs ds Cfs as ds cfs ds ds 285 0.50 207.04 0.29 0.01 ----- - - ----- _--- --- - 0.01 300 0.59 207.06 0.39 0.01 - --- ----- - -- - ----- 0.01 315 0.68 207.07 0.52 0.02 ----- ----- ----- ----- ----- ----- ---- 0.02 330 0.78 207.09 0.65 0.02 ----- --- ---- ----- --- ----- -- 0.02 345 0.88 207.11 0.71 0.03 - ---- ----- --- --- - ---- 0.03 360 0.98 207.14 0.71 0.05 ----- ----- ----- ----- ----- ---- ----- 0.05 375 1.08 207.17 0.71 0.06 - ----- -- - -- - --- 0.06 390 1.18 207.19 0.71 0.08 ----- ----- ----- ---- ----- ----- ----- 0.08 405 1.29 207.23 0.71 0.10 ----- - -- ----- - ---- - 0.10 420 1,39 207.26 0.71 0.13 - ----- ----- - ----- ----- ----- 0.13 435 1.50 207.30 0.71 0.15 ---- ----- ----- ----- ----- _--- ----- 0.15 450 1.61 207.33 0.71 0.17 ----- - ----- ---- 0.17 465 1.71 207.38 0.71 0.19 ----- ---- ----- ----- ----- - -- ---- 0.19 480 1.82 207,42 0.71 0.21 ----- ----- - ----- - - - 0.21 495 2.01 207.46 0.71 0.23 - --- ----- ---- ----- --- ----- 0.23 510 2.31 207.52 0.71 0.25 ----- ----- ---- ---- ----- ----- ---- 0.25 525 2.63 207.58 0.71 0.27 ----- --- ----- ---- ---- ----- - 0.27 540 2.96 207.65 0.71 0.29 ----- ----_ ---- ----- ---- ----- ----- 0.29 555 3.19 207.72 0.71 0.31 ---- - - - - ----- - 0.31 570 3.29 207.80 0.71 0.34 - -- - - --- ---- --- 0.34 585 3.58 207.89 0.71 0.36 ----- ----- ----_ _____ _____ ____- ____ 0.36 600 4.11 207.98 0.71 0.38 -- -- ----- - ----- ---- --- 0.38 615 4.77 208.09 0.71 0.40 0,04 ----- ----- ----- ----- ----- ----- 0.44 630 5.58 208.21 0.72 0.43 0.19 ----- - ----- -- -- ----- 0.62 645 6.66 208.34 0.97 0.46 0.49 ---- -- - ---- ----- - 0.94 660 8.05 208.50 1.43 0.47 0.96 - --- ----- ---- ---- 1.43 675 10.31 208.68 2.10 0.46 1.63 ----- ----- ---- ----_ _---- ---- 2.09 690 13.68 208.93 2.94 0.45 2.48 ----- --- -- -- ----- - 2.93 705 52.76 209.47 4.15 0.43 3.72 -- ----- --- ---- ----- _--- 4.14 720 178.08 << 211.60 29.85 0.06 0.56 ----- 29,20 0.00 ----- ----- --- 29.82 735 28.52 212.12 32.26 0.05 0.44 ----- 31.74 28.62 ----- ---- ---- 60.85 750 17.76 211,73 30.45 0.06 0.52 ---- 29.82 0.89 ---- ----- -- 31.30 765 12.26 211.41 28.89 0.07 0.62 ----- 28.16 ---- ---- ----- ----- 28.85 780 10.29 211.06 27.04 0.09 0.79 ----- 26.15 ----- - ---- ----- 27.02 795 8.75 210.70 24.83 0.12 1.09 ----- 23.62 - ----- - - 24.83 810 7.70 210.36 22.06 0.19 1.69 -- 20.18 ----- ----- ----- ---- 22.05 825 6.78 210.08 16.13 0.35 3.19 --- 12.59 ----- ----- --- ----- 16.13 840 6.03 209.93 10.44 0.44 3.96 ----- 6.04 ---- ----_ --- ---- 10.44 Continues on next page... 25-100 YR ROUTING Hydrograph Discharge Table Time Inflow Elevation Civ A CIv B Clv C Civ D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs Cfs cfs cfs Cfs Cfs cfs cfs Cfs 855 5.50 209.85 7.92 0.46 4.12 --- 3.35 - - --- ----- 7.92 870 5.23 209.81 6.62 0.46 4.16 ---- 2.00 -- ----- ----- ----- 6.62 885 4.97 209.78 6.02 0.46 4.16 ---- 1.39 ----- ----- ----- ----- 6.02 900 4.71 209.76 5.61 0.46 4.15 --- 1.00 --- --- --_-- --_-- 5.61 915 4.44 209.74 5.26 0.46 4.14 ----- 0.66 ----- ----- ----- ---- 5.26 930 4.18 209.72 4.93 0.46 4.13 ----- 0.34 - ----- -- ---- 4.93 945 3.91 209.70 4.63 0.46 4.12 ----- 0.05 -- ---- ----- ---- 4.63 960 3.65 209.68 4.55 0.45 4.09 ----- 0.00 ----- ----- ----- --- 4.55 975 3.46 209.66 4.50 0.45 4.05 -- 0.00 ----- ---- ---- ----- 4.50 990 3.37 209.64 4.46 0.45 4.01 ----- 0.00 ----- ----- ----- ---- 4.46 1005 3.27 209.61 4.41 0.44 3.97 --- 0.00 ----- ----_ --- ----- 4.41 1020 3.18 209.58 4.36 0.44 3.92 --- ----- - --- ----- ---_ 4.35 1035 3.08 209.55 4.30 0.43 3.87 ----- ---- --- - --- ----- ----- 4.30 1050 2.99 209.52 4.24 0.42 3.82 ----- ---- ---- ----- ----- -- 4.24 1065 2.90 209.49 4.19 0.42 3.76 -- - --- ----- -- --- ----- 4.19 1080 2.80 209.46 4.14 0.43 3.71 ----- ---- ----- ----- ----- --- 4.13 1095 2.71 209.43 4.09 0.44 3.64 -- - ----- -- - ---- 4.08 1110 2.61 209.40 4.03 0.44 3.58 ----- ----- - ----- ---- ----- 4.03 1125 2.52 209.36 3.96 0.45 3.51 - -- -- - - --- ----_ 3.96 1140 2.42 209.33 3.89 0.45 3.44 --- ----- - ----- ----- - -- 3.89 1155 2.33 209.29 3.82 0.45 3.37 ---- - - ----_ - - ----- 3.82 1170 2.23 209.26 3.75 0.45 3.29 ---- ----- -- ----- ----- _--- 3.74 1185 2.14 209.22 3.67 0.45 3.21 ----- ---- ---- ----- ----- ---- 3.66 1200 2.04 209.19 3.59 0.45 3.13 - - ----- - ----- ---- 3.58 1215 1.98 209.15 3.51 0.45 3.04 ----- ----- ---- -- - --- -- 3.49 1230 1.96 209.11 3.43 0.45 2.96 - - ----- ---- - ----- 3.41 1245 1.94 209.08 3.35 0.45 2.88 ----- ----- - ----- ---- ----- 3.32 1260 1.92 209.05 3.27 0.45 2.80 ----- --_-- ----- ----- ----_ ----- 3.24 1275 1.90 209.02 3.19 0.45 2.72 ----- -- ---- ----_ - ----- 3.16 1290 1.89 208.99 3.11 0.45 2.64 - ----- --- --- ----- ----- 3.09 1305 1.87 208.96 3.03 0.45 2.56 ----- - -- ----- -- -- 3.01 1320 1.85 208.93 2.95 0.45 2.49 - - ----- - -- ----- 2.94 1335 1.83 208.90 2.87 0.45 2.42 ---- ----- -- --_-- ----- ----- 2.87 1350 1.81 208.88 2.78 0.45 2.33 ----- -_ _____ ___- _-_ __-- 2.78 1365 1.79 208.85 2.70 0.45 2.24 - --- ----- - --- ----- 2.69 1380 1.77 208.83 2.62 0.45 2.16 ---- ---- - ----- ---- ---_- 2.61 1395 1.75 208.81 2.55 0.45 2.09 ----- _--- ----- ----- -- - 2.54 1410 1.73 208.79 2.48 0.45 2.02 ---- - ----- - - ---- 2.47 1425 1.72 208.77 2.42 0.45 1.95 ---- ----- -- -- - ----- ----- 2.40 1440 1.70 208.75 2.35 0.45 1.89 ---- ---- ----- --- ---- ---_- 2.34 1455 0.09 208.72 2.23 0.46 1.76 - ----- - ----- ---- ----- 2.22 1470 0.00 208.67 2.03 0.46 1.56 ----- ----- ----- ----_ ----- ---_- 2.01 1485 0.00 208.62 1.85 0.46 1.37 ---- - ----- -- - --- 1.83 1500 0.00 208.57 1.69 0.46 1.21 - ----- -- - ----- ----- 1.67 r 1515 0.00 208.53 1.55 0.47 1.07 ----- ----- ----- ----- ----- ----- 1.53 1530 0.00 208.49 1.42 0.47 0.94 ---- -- ----- --- -- --- 1.41 1545 0.00 208.46 1.32 0.47 0.83 - --- - ----- ----_ ----- 1.30 1560 0.00 208.43 1.22 0.47 0.73 ----- ----- ----- ----- ----- ----- 1.20 1575 0.00 208.40 1.14 0.47 0.64 - - ----- - - -- 1.11 1590 0.00 208.37 1.06 0.46 0.56 --- --- - --- ---- ----- 1.03 1605 0.00 208.35 0.98 0.46 0.50 ----- ----- ----- ----- ----- __--- 0.95 Continues on next page... 25-100 YR ROUTING Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Civ D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft ds Cfs Cfs Cfs Cfs Cfs Cfs Cfs Cfs cfs 1620 0.00 208.32 0.91 0.45 0.43 ----- -- -- ----- ----- ----- -- 0.88 1635 0.00 208.30 0.84 0.45 0.37 - - ----- - -- -- 0.82 1650 0.00 208.28 0.82 0.44 0.33 ----- ----- --- --- ----- ----- 0.78 1665 0.00 208.26 0.79 0.44 0.30 -- --- ----- ----- ---- ---- 0.73 1680 0.00 208.24 0.76 0.44 0.26 -- --- --- ---- ---- ----- 0.70 1695 0.00 208.23 0.74 0.43 0.23 0.66 1710 0.00 208.21 0.72 0.43 0.19 ----- ----- -- -- ----- -- 0.62 1725 0.00 208.19 0.71 0.43 0.17 - - ----- ----- -- -- - 0.59 1740 0.00 208.18 0.71 0.42 0.15 0.57 1755 0.00 208.16 0.71 0.42 0.13 ----- ----- -- ----- ----- --- 0.55 1770 0.00 208.15 0.71 0.42 0.11 ----- ----- ---- ----- ----- -- 0.53 1785 0.00 208.14 0.71 0.41 0.09 -- - ----- --- -_ ----- 0.51 1800 0.00 208.12 0.71 0.41 0.08 ----- ----- ---- ----- ----- - 0.49 1815 0.00 208.11 0.71 0.41 0.06 ----- --- ----- ----- - ---- 0.47 1830 0.00 208.10 0.71 0.41 0.04 --- ---- - -_-- ----- ----- 0.45 1845 0.00 208.09 0.71 0.40 0.04 ---- ---- ----- ----- ----- ---- 0.44 1860 0.00 208.08 0.71 0.40 0.03 - ---- - - ----- ---- 0.44 1875 0.00 208.07 0.71 0.40 0.03 ----- ----- ----- ----- ----- ---- 0.43 1890 0.00 208.06 0.71 0.40 0.02 - -- - ----- --- - ---- 0.42 1905 0.00 208.05 0.71 0.39 0.02 - ----- -- -- ----- ----- 0.41 1920 0.00 208.03 0.71 0.39 0.02 ----- ----- ---- ----- ----- ---- 0.41 1935 0.00 208.02 0.71 0.39 0.01 - -- -- - ----- ---- 0.40 1950 0.00 208.01 0.71 0.39 0.01 ----- ---- ---- ----- ----- - - 0.39 1965 0.00 208.00 0.71 0.38 0.00 ----- --- ----- ----- -- ----- 0.39 1980 0.00 207.99 0.71 0.38 -- - ---- - -- ----- ---- 0.38 1995 0.00 207.98 0.71 0.38 ---- -- ----- ---- ---- ----- - 0.38 2010 0.00 207.97 0.71 0.38 --- ----- -- ---- ---- - ----- 0.38 2025 0.00 207.96 0.71 0.37 - ----- ----- ----- ----- ----- ----- 0.37 2040 0.00 207.95 0.71 0.37 ----- ----- ----- ----- ----- --- -- 0.37 2055 0.00 207.94 0.71 0.37 ----- ---- - ----- - ----_ --- 0.37 2070 0.00 207.93 0.71 0.37 ---- ----- ----- ----- ----- ---- - 0.37 2085 0.00 207.92 0.71 0.37 ---_ ---- - ----- - - ----- 0.37 2100 0.00 207.91 0.71 0.36 --- -- ----- - --_-- ----- ----- 0.36 2115 0.00 207.90 0.71 0.36 ----- ----- - ----- ----- --- ---- 0.36 2130 0.00 207.89 0.71 0.36 ----- --- ----- ----- --- --- ----- 0.36 2145 0.00 207.88 0.71 0.36 ---- ---- ----- -- ----- ----- ----- 0.36 2160 0.00 207.87 0.71 0.35 ---- ----- - ----- --- - --- --- 0.35 2175 0.00 207.86 0.71 0.35 ----- -- ---_- ----- -- -_- ----- 0.35 2190 0.00 207.85 0.71 0.35 --- ---- ----- ----- ----- ----- ---_ 0.35 2205 0.00 207.84 0.71 0.35 - - ----- - - ----- ----- ---- --- 0.35 2220 0.00 207.83 0.71 0.34 ----- --- --- ----- -- --- ----- 0.34 2235 0.00 207.83 0.71 0.34 ----- - ----- -- ----- ----- ----- 0.34 2250 0.00 207.82 0.71 0.34 ----- ----- - ---- ---- - ---- 0.34 2265 0.00 207.81 0.71 0.34 ----- - ----- -- -- ----- ----- 0.34 2280 0.00 207.80 0.71 0.33 - ----- ----- ---_ ----- ----- ----- 0.33 2295 0.00 207.79 0.71 0.33 ----- ----- -- ----- -- --- ----- 0.33 2310 0.00 207.78 0.71 0.33 ----- -- ----- -- --- ----- ----- 0.33 2325 0.00 207.77 0.71 0.33 ---- ----_ ---- - --_ _-_ _-_ _ 0.33 2340 0.00 207.76 0.71 0.32 ---- ----- ---- ----- --- ----_ --- 0.32 2355 0.00 207.75 0.71 0.32 ----- --- - ----- ----- - ----- 0.32 2370 0.00 207.74 0.71 0.32 -- ----- ----- --- -- ----- ----- 0.32 Continues on next page... 25-100 YR ROUTING Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D E>fil Outflow (min) cfs ft Cfs Cfs Cfs Cfs cfs Cfs Cis Cfs Cfs Cfs 2385 0.00 207.73 0.71 0.32 - _____ -___ - --- - - 0.32 2400 0.00 207.73 0.71 0.31 ----- ---- --- ----- ----- --- ----- 0.31 2415 0.00 207.72 0.71 0.31 --- -- - ---- --- - - ----- 0.31 2430 0.00 207.71 0.71 0.31 ---- ---__ ----- - ---- -- ----- 0.31 2445 0.00 207.70 0.71 0.31 ----- ----- ----- ----- ----_ --- ----- 0.31 2460 0.00 207.69 0.71 0.30 - - - ---- ---- ----- --- 0.30 2475 0.00 207.68 0.71 0.30 - ----- ----- -- - ----- --- 0.30 2490 0.00 207.68 0.71 0.30 - ----- ----- ----- ----- - ----- 0.30 2505 0.00 207.67 0.71 0.30 ----- -- -- ----- ----_ _____ ____ 0.30 2520 0.00 207.66 0.71 0.29 ----- ----- --- ----- ----- ----- ----- 0.29 2535 0.00 207.65 0.71 0.29 - - ---- ----- -- ----- ---- 0.29 2550 0.00 207.84 0.71 0.29 ----- ----- -- - ---- - ----- 0.29 2565 0.00 207.64 0.71 0.29 --- - -- ----- - ----- - 0.29 2580 0.00 207.63 0.71 0.28 - ----- ----- - ---- -- -- 0.28 2595 0.00 207.62 0.71 0.28 0.28 2610 0.00 207.61 0.71 0.28 ----- ---- --- ----- ----- ----- ---- 0.28 2625 0.00 207.60 0.71 0.28 -- ----- ----- -_ ____ _- 0.28 2640 0.00 207.60 0.71 0.28 ----- -__ _____ _____ _-_ _ _. _____ 0.28 2655 0.00 207.59 0.71 0.27 -- - --- - -- ----- -- 0.27 2670 0.00 207.58 0.71 0.27 -- ----- ----- - ---- - ---- 0.27 2685 0.00 207.57 0.71 0.27 --- ----- - ----- _---_ ----- ----- 0.27 2700 0.00 207.57 0.71 0.27 ---- -- ---- - --- ----- -- 0.27 2715 0.00 207.56 0.71 0.26 --- ----_ -_ ._ _____ ____ 0.26 2730 0.00 207.55 0.71 0.26 - ----- - --- ----- ----- ----- 0.26 2745 0.00 207.55 0.71 0.26 ---- ---- ----- ----- ----- - ----- 0.26 2760 0.00 207.54 0.71 0.26 ----- ----- - ----- ----- - ----- 0.26 2775 0.00 207.53 0.71 0.25 -- -- ----- - - --- - 0.25 2790 0.00 207.52 0.71 0.25 ----- ----- ----- _- -_-_ _- 0.25 2805 0.00 207.52 0.71 0.25 ---- ----- - ----- --- --- ----- 0.25 2820 0.00 207.51 0.71 0.25 -- - ----- - ----- - - 0.25 2835 0.00 207.50 0.71 0.24 --__ - - - ----- ----- ----- 0.24 2850 0.00 207.50 0.71 0.24 ----- --- ---- ----- - ----- -- 0.24 2865 0.00 207.49 0.71 0.24 - ----- -__- -- ----- -- ---- 0.24 2880 0.00 207.48 0.71 0.24 ----- ----- -- ----_ ---- ----- ----- 0.24 ...End M Hydrograph Plot W Hydrartow Hydrograph. by Intelisoive Monday, Jan 29 2007, 10:26 AM Hyd. No. 2 25-100 YR ROUTING Hydrograph type = Reservoir Peak discharge = 91.13 cfs Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 1 Max. Elevation = 212.38 ft Reservoir name = WQPD-A Max. Storage = 206,771 cuft Storage Indication method used. Hydrograph Volume = 445,554 cult 25-100 YR ROUTING Q WS) Hyd. No. 2 -- 100 Yr Q (cfs) 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 0.00 0 3 5 8 11 13 16 19 21 24 27 29 Hyd No. 2 Hyd No. 1 Time (hrs) rLS��U l:/ L5 "WWAT-ER 'eftnds d, Stowmmminr el....n4 PLT CONCRETE SERVICES NASH COUNTY PLANT MIDDLESEX, NC SEDIMENT BASIN DESIGN CALCULATIONS JANUARY 29, 2007 PREPARED BY: HERRING-SUTTON A ASSOCIATES, PA 2201 NASH STREET NORTHWEST WILSON, NORTH CAROLINA MAIF,vi RO ED r HERRING-SUTTON & ASSOCIATES, P.A. 2201 NASH ST. NW WILSON, NORTH CAROLINA 27896 (252) 291-8887 .2V crs L OR ►� arc 2 4 cps c JOB SHEET NO. r OF CALCULATED BY�'� DATE CHECKED BY DATE SCALE i n PAM W_.T 2A7 r HERRING-SUTTON & ASSOCIATES, P.A. 2201 NASH ST. NW WILSON, NORTH CAROLINA 27896 (252) 291-8887 S L&JP htxt #4A0%k R.S Q '%N ,Oe 7r"'C vc. 1---.?- AvtlD' SHEET NO. �s OF , 1 CALCULATED BY L ` DATE /49 627 CHECKED BY DATE SCALE (� F•�(t-1� q to F (p - Imo. L.. �.} ' G.+ � 7,Ti.TZ z'Trlko ' - n.o3 n MMI K:T 967 S HERRING-SUTTON & ASSOCIATES, P.A. 2201 NASH ST. NW WILSON, NORTH CAROLINA 27896 (252) 291-8887 roa PL.7- CLi JT�Q SHEET NO. OF CALCULATED By "r DATE CHECKED BY SCALE �o Diu- N CQ 0 1 1� C 1 f DATE HERRING-SUTTON & ASSOCIATES, P.A. 2201 NASH ST. NW WILSON, NORTH CAROLINA 27896 (252) 291-8887 qQ 4 w G .Io ='S -z &4OV7 JOB SHEET NO. OF � DATE 40 CALCULATED BY CHECKED BY DATE SCALE (P IZ4.. � M_z t..4 iTGCfiP,-�C . t* J HERRING-SUTTON & ASSOCIATES, P.A. 2201 NASH ST. NW WILSON, NORTH CAROLINA 27896 (252) 291-8887 JOB SHEET NO. _ - OF CALCULATED BY /`� `� DATE s CHECKED BY DATE SCALE 0 ko 1 14 L U$ } 1, 3 t 1�4^311rc- V 0 w1z Z,.� C -F S'TD arc_ VJL . TLP q 'b S—� uw c t_ VSE 71� 11.,� 2Eslam � L f " �z./ter /►c 50� AC `L Y /f &- r.r i ^4-,.kA h G V`T'1Y]] HERRING-SUTTON & ASSOCIATES, P.A. 2201 NASH ST. NW WILSON, NORTH CAROLINA 27896 (252) 291-8887 C JOB J C k +'-en SHEET NO. OF �S CALCULATED BY. DATE / I Pf 7 CHECKED BY DATE SCALE 1-f- tv,r� is rT-- lo-�: L> z. for nit CL4ws t. r �sv .. mrw rr 9n7 RATIONAL FORMULA: GIVEN DATA: COMPUTATIONS: ENERGY DISSIPATOR # 1 PROJECT:PLT CONCRETE NASH COUNTY. Q=CIA C= 0.6 1 (IRMR.) (10YR.)= 5.7 A (ACRES)` 3 Q (10)(CFS) = 10.188 Q (10)(CFS)= 10.188 S (%) = 0.77 RCP(DIA.)(iN.) = 15 n (P,pE)= 0.023 Q (FALL) (CFS)= 3.213 V (FULL) (FPS)= 2,618 Q (10) /Q (FULL)= 3.17 C= HELP V o (FPS) = #VALUE+ ZONE = 3 APRON LENGTH = 10 FT. APRON WIDTH = 3.75 FT. STONE TYPE = CLASS 1 STONE DEPTH = 21 1N. SEE TABLE 8 SEE FIGURE 8.03 SEE TABLE 10.1 SEE FIGURE 5 SEE FIGURE 20 C*V(FULL) SEE FIGURE 1 SEE FIGURE 2 SEE FIGURE 2 SEE FIGURE 3 sofls Practice Standards and Specifications SKIMMER ORIFICE DIAMETER In order to streamline the orifice sizing procedure, Figure 6.64b, may be used. This design chart assumes the designer knows or has determined the sedimentation basin's water storage volume in cubic feet and the desired dewatering time (in days) for the basin under consideration. The skimmer orifice size (in inches) can be.read by entering Figure 6.64b from the x-axis with the basin's water storage volume (in cubic feet), moving vertically to the line that represents the basin's desired dewatering time (in days), then moving to the left to the y-axis. �U Figure 6.64b Skimmer orifice diameter as a function of the basin volume and basin dewatering time. 0.25 lot .5 2 3 5 7 10 0.1 �Ww<mnIll� mssff/lff imw gulf mmmmlliil�- ��11_101; 11111 ME NUN���%rl��aii� �1��11111 MONIffl�fl���1����iill�l I�.Al�.� .R� PAN »rr��rrr_ �r�� ��.�i rris������������wnwt.�■ AW, a NA Pli Irk %�l•s!3■!S 11111101i���■■It■■��l•■■■■■■! WAIN I1 _ 0.5 day A I ■. III ■oll Ill days f ,-�ays 10 days 1000 10000 100000 1000000 DESIGN EXAMPLE Example: The design professional in charge of designing the sedimentation basin for a 10-acre construction site desires to use a skimmer to control dewatering of a sedimentation basin. The sedimentation basin for a I0-acre disturbed area requires a water storage volume of 18,000 cubic feet. The desired dewatering time is 1-3 days. Solution: Using the water storage volume of 18,000 cubic feet and the 1-3 day dewatering time on Figure 6.64b, a 2-inch orifice diameter is required. (Adapted from Proper Sizing of the Control Orifice for the Faircloth Skimmer:' Pennsylvania State University Department of Agricultural and Biological Engineering Fact Sheet ##252.) Rey-. 6106 6.64.3 HERRING-SUTTON & ASSOCIATES, P.A. 2201 NASH ST. NW WILSON, NORTH CAROLINA 27896 (252) 291-8887 JOB 7k7 CJ� C V F*, +�.S Pic SHEET NO. 9 OF CALCULATED BYC..A DATE 0 CHECKED BY SCALE DATE L� 5. 7 1 64 (� Z Grs n Par"If.T X7 HERRING-SUTTON & ASSOCIATES, P.A. 2201 NASH ST. NW WILSON, NORTH CAROLINA 27896 (252) 291-8887 SHEET NO. 1 D OF CALCULATEDBY &.�`l _ _ _ DATE -11F 407 CHECKED BY DATE SCALE V"�) L C� p ; lNu'-1 ��� ov-- x v.-71 t'- ,Z,,7VNr- n-- Z_ G-- 7)s sTu:j -T-4A., iPct r..j Lrc _ ''�t�..�-.�1�.� P' & Vam.. kl� ?" 191 C I L w M„` ?t.' .'a G L ' k�vvs� �3. �lc QL,w -.;- (C-4 - c' n PRM IM 907 HERRING-SUTTON & ASSOCIATES, P.A. 2201 NASH ST. NW WILSON, NORTH CAROLINA 27896 (252) 291-8887 G t� Q , 4�rf� ca G p ( , CV-- Q—r��_ Lf,Z cff-s JOB C rYl SHEET NO. OF CALCULATED BY ' 1 �� DATE CHECKED BY SCALE C)F_�s a —ay-,) cac DATE F4 l n -5 .227.; �2� 7r Z2Y s n PRnn[rT 207 HERRING-SUTTON & ASSOCIATES, P.A. 2201 NASH ST. NW WILSON, NORTH CAROLINA 27896 (252) 291-8887 JOB _ U +�,T2!S2 SHEET NO. OF CALCULATED BY DATE CHECKED BY DATE SCALE V3sx�l ci. __ N L. S M'Ptiw� Al. FLU 41wrj"'J t-M k lam►\�'t •_ 3. � \/� LV � L �� fit. a� ,TSB Z. «�x L� � lrr OWZ._ r `�3"c_�6t_Yi.= ,4'f- 9077Vr+, 6-_ L HERRING-SUTTON & ASSOCIATES, P.A. 2201 NASH ST. NW WILSON, NORTH CAROLINA 27896 (252) 291-8887 �y �'ZLLW c "�e s L= JOB _ 4�_ .1 c Ct-I c- • SHEET NO. - -- OF I �+ CALCULATED BY �`'� DATE Q CHECKED BY DATE SCALE h OOlYI� IM M'/ RATIONAL FORMULA: GIVEN DATA: COMPUTATIONS: ENERGY DISSIPATOR # 2 PROJECT:PLT CONCRETE NASH COUNTY Q=CIA C= 0.6 SEE TABLE 8 I (IN./HR.) (10YR.) = 5.7 SEE FIGURE 8.03 A (ACRES)— 0.75 Q (10)(CFS) - 2.547 Q (10)(CFS)= 2.547 S(%)= 0.83 RCP(DIA)(IN.) = 12 In (PIPE)= 0.023 SEE TABLE 10.1 Q (FULL) (CFS)= 1.840 SEE FIGURE 5 V (FULL) (FPS)= . 2.342 Q (10) /Q (FULL)= 1.38 C= HELP SEE FIGURE 20 V o (FPS) = #VALUE! C`V(FULL) ZONE = 2 SEE FIGURE 1 APRON LENGTH = 6 FT. SEE FIGURE 2 APRON WIDTH = 3 FT, STONE TYPE = CLASS B SEE FIGURE 2 STONE DEPTH = 22 IN, SEE FIGURE 3 Practice Standards and Specifications Figure 6.64b Skimmer orifice diameter as a function of the basin volume and basin dewatering time. 0.25 `t, .5 1 2 3 5 10 SKIMMER ORIFICE DIAMETER In order to streamline the orifice sizing procedure, Figure 6.64b, may be used. This design chart assumes the designer knows or has determined the sedimentation basin's water storage volume in cubic feet and the desired dewatering time (in days) for the basin under consideration. The skimmer orifice size (in inches) can be read by entering Figure 6.64b from the x-axis with the basin's water storage volume (in cubic feet), moving vertically to the line that represents the basin's desired dewatering time (in days), then moving to the left to the y-axis. �■■■■■11��.■���11:r���'i■�Ill _■■�PiI i0o . P4!0.R10!101d il� %�l�lail� �!■■11111 ����'.i�l��'���l��;S�■Illll� r PWAAF-AS ��� %lii���iE�■�����iE■��■��=MEMOIR �%�0■1 - _ fll �■■■� ire days 10 days DESIGN EXAMPLE Example: The design professional in charge of designing the sedimentation basin for a 10-acre construction site desires to use a skimmer to control dewatering of a sedimentation basin. The sedimentation basin for a 10-acre disturbed area requires a water storage volume of 18,000 cubic feet. The desired dewatering time is 1-3 days. Solution: Using the water storage volume of 18,000 cubic feet and the 1-3 day dewatering time on Figure 6.64b, a 2-inch orifice diameter is required. (Adapted from Proper Sizing of the Control Orifice for the Faircloth Skimmer. Pennsylvania State University Department of Agricultural and Biological Engineering Fact Sheet ##252.) Rev. 6/06 6.64.3 Practice Standards and Specifications Figure 6.64b Skimmer orifice diameter as a function of the basin volume and basin dewatering time. 0.25 .5 01 SKIMMER ORIFICE DIAMETER In order to streamline the orifice sizing procedure, Figure 6.64b, may be used. This design chart assumes the designer knows or has determined the sedimentation basin's water storage volume in cubic feet and the desired dewatering time (in days) for the basin under consideration. The skimmer orifice size (in inches) can be read by entering Figure 6.64b from the x-axis with the basin's water storage volume (in cubic feet), moving vertically to the tine that represents the basin's desired dewatering time (in days), then moving to the left to the y-axis. Pin VERB-, ii���!■■II�II 0.��a'ii110'M5Mpg ���IIS�■111111 ��l��.OWN� -���. Wes► Jl��-�����■������■rr.r pr 1•ea►aIi1�■ME■■■111�■■■■■■11 ���9!■t...----■■■..,t_==t■■911 ��■Il2 days 3 ..ys 0 7 days fly days i days 1000 10000 DESIGN EXAMPLE 100000 1000000 Example: The design professional in charge of designing the sedimentation basin for a 10-acre construction site desires to use a skimmer to control dewatering of a sedimentation basin. The sedimentation basin for a 10-acre disturbed area requires a water storage volume of 18,000 cubic feet. The desired dewatering time is 1-3 days. Solution: Using the water storage volume of 18,000 cubic feet and the 1-3 day dewatering time on Figure 6.64b, a 2-inch orifice diameter is required. (Adapted from Proper Sizing of the Control Orifice for the Faircloth Skimmer. Pennsylvania State University Department of Agricultural and Biological Engineering Fact Sheet ##252.) Rev. 6/06 6.64.3 m� , L u•� o PLT CONCRETE SERVIC S NASH COUNTY PLANT MIDDLESEX, NC DRUM WASH BASIN DESIGN CALCULATIONS �fp -Its �� Cv/�Lo f c°� ke art, p[, t✓ JANUARY 31, 2007 PREPARED BY: HERRING-SUTTON & ASSOCIATES, PA 2201 NASH STREET NORTHWEST W6LSON, NORTH CAROLING RI AMON d D.um wasp ^490 �IO� HERRING-SUTTON & ASSOCIATES, P.A. 2101-A Nash Street North WILSON, NORTH CAROLINA 27896 (252) 291-8887 JOB ��� Ir.' `• �, L/ SHEET NO. OF CALCULATED BY C DATE CHECKED BY DATE SCALE %ci SkAQ�E.. ert--A 3 X 'l #- t � x 30 Jr Z s: X �° _ `1 Bs� s �. � o � 26"m - tTw-� ate. Na - 1 rL c� � eG� � bPr� c t 87tirCrc.4 1�o ti_ w SL[. w Pcct Sit., wA,�, H C o C-7�►� s (14cir- = W GLL. W �_llk_la — cry P-e u r- 4 _ .7 Eti �m,� x ��� t 1�11C 411 Ev P�P ktt or 1qe.;C,` sr Va 14t.,� � P� � �tit�+c r��;�.� � �.cl•�1 S� X ®v�5 f'r( a i 617 a. Gvrlsif 6�s�S n PRM)r;TP07 HERRING-SUTTON & ASSOCIATES, P.A. 2101-A Nash Street North WILSON, NORTH CAROLINA 27896 (252) 291-8887 JOB --p —1 CrC-c— . 1r \�<J� SHEET NO. OF r CALCULATED BY nktl DATE / ��/ CHECKED BY DATE SCALE Tom' •T�. w �t�. l� �.� '� "�� C X � aC 22q.SO-ZZ-(-,IX --!r ZZT.Cp - ZZ�rSc +-3 o 'Al pa tiS K•31 ?X ��-t- 2 IgLl+ Q%-tCac) c fN\,t S-lbC-f g Vo 9-41, 0 ci k gib`'/'> L4Z3%.) cr sTu `7 L( L� 0 4-tN� V�A_ W TWv DiaG n PRODUCT 207 J 03 43.00' Y x TW 230.0 0 TW 230.0 Sri TC 224.5 15.0' 1-A'XO.5' J o 3 SCREEN WINDOW - Y 1-0 F THK WALL 1 TC 228.33 4--- — N � 1.0' X0, 5' 1.0'X0.5' SCREEN W NDOW SCREEN o WINDOW a n 30.0, 1.0' 1.O'X0.5' LTHK WALL SCREEN TC 224,5 WINDOW 1.O'X0.5' SCREEN w WINDOW a o � J ' 28.0' J a 03 Y TC 229.5 TC 228,33 TW 230.0 • TW 230.0 75.0' PLAN VIEW 2-1.0'X0.5' 4-1,0'X0.5' SCREEN WINDOW SCREEN WINDOW INV 2128.33�� INV 228.33 2�' zag-4 Z TC 230.0 LEL 228.33 - ----- ---- --- - - ---- 3�-1 TC 229.5 TC 224,5 SIDE VIEW NOTE: ALL WALLS 1.0' RE-INFORCED CONC. W/ WATER STOP E 20J\,4` i� \,4 #L L�'� •` `ilvg\r51 3kU4' �A._!f 31 �lN-d,g 2%; /� G? r: �1. F �;t9 £� SHEET 3 OF 8 DRUM WASH BASIN Scale: 1"= 20' Date: JANUARY 2007 Herring —Sutton & Associates, P.A. Engineers — Surveyors —Planners 2201 Nash Street NW Tel. (252) 291-8887 Wilson. NC 27896 Fax 252 291-5900 Hydrograph ra h Plot Hydraflow Hydrographs by lntelWve Thursday. Feb 1 2007, 3:49 PM Hyd. No. 1 DRUM WASH BASIN Hydrograph type = SCS Runoff Peak discharge = 1.86 cfs Storm frequency = 25 yrs Time interval = 1 min Drainage area = 0.180 ac Curve number = 98 Basin Slope = 1.0 % Hydraulic length = 100 ft Tc method = LAG Time of conc. (Tc) = 2.39 min Total precip. = 6.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (efs) 2.00 1.00 DRUM WASH BASIN Hyd. No. 1 -- 25 Yr Hydrograph Volume = 4,019 tuft Q (cfs) 2.00 1.00 0.00 0.00 0.0 1.8 3.7 5.5 7.3 9.2 11.0 12.8 14.7 16.5 18.3 20.2 Time (hrs) Hyd No. 1 Hydrograph Report �5'16 �-& . 5 Hydraflow Hydrographs by Intelisolve Hyd. No. I DRUM WASH BASIN Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 25 yrs = 0.18 ac = 1.0 % = LAG = 6.80 in = 24 hrs. Thursday, Feb 1 2007, 3:49 PM Peak discharge = 1.86 cfs Time interval = 1 min Curve number = 98 Hydraulic length = 100 ft Time of conc. (Tc) = 2.4 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 4,019 cult Hydrograph Discharge Table ("'md ya'uft - I% of Op. Nnt `"ts" I = 5) Time -- Outflow Time -- Outflow Time -- Outflow Time -- Outflow (min cfs) (min cfs) (min cfs) (min cfs) 351 0.02 521 0.03 691 0.14 861 0.04 356 0.02 526 0.03 696 0.33 866 0.04 361 0.02 531 0.03 701 0.55 871 0.04 366 0.02 536 0.03 706 0.79 876 0.04 371 0.02 541 0.04 711 1.35 881 0.04 376 0.02 546 0.04 716 1.82 886 0.04 381 0.02 551 0.04 721 0.50 891 0.04 386 0.02 556 0.04 726 0.21 896 0.04 391 0.02 561 0.04 731 0.19 901 0.03 396 0.02 566 0.04 736 0.17 906 0.03 401 0.02 571 0.04 741 0.15 911 0.03 406 0.02 576 0.04 746 0.13 916 0.03 411 0.02 581 0.04 751 0.10 921 0.03 416 0.02 586 0.04 756 0.10 926 0.03 421 0.02 591 0.04 761 0.09 931 0.03 426 0.02 596 0.04 766 0.09 936 0.03 431 0.02 601 0.05 771 0.08 941 0.03 436 0.02 606 0.05 776 0.08 946 0.03 441 0.02 611 0.05 781 0.07 951 0.03 446 0.02 616 0.05 786 0.07 956 0.03 451 0.02 621 0.05 791 0.07 961 0.03 456 0.02 626 0.06 796 0.06 966 0.03 461 0.02 631 0.06 801 0.06 971 0.03 466 0.02 636 0.06 806 0.06 976 0.03 471 0.02 641 0.07 811 0.05 981 0.03 476 0.02 646 0.07 816 0.05 986 0.03 481 0.02 651 0.07 821 0.05 991 0.03 486 0.03 656 0.08 826 0.05 996 0.02 491 0.03 661 0.08 831 0.05 1001 0.02 496 0,03 666 0.09 836 0.05 1006 0.02 501 0.03 671 0.10 841 0.04 1011 0.02 506 ' 0.03 675 0.11 846 0.04 1016 0.02 511 0.03 681 0.12 851 0.04 1021 0.02 516 0.03 686 0.13 856 0.04 1026 0.02 Continues on next page... 6 V7-1Y 6 DRUM WASH BASIN Hydrograph Discharge Table Time -- Outflow (min cfs) 1031 0.02 1036 0.02 1041 0.02 1046 0.02 1051 0.02 1056 0.02 1061 0.02 1066 0.02 1071 0.02 1076 0.02 1081 0.02 1086 0.02 1091 0.02 1096 0.02 1101 0.02 1106 0.02 1111 0.02 1116 0.02 1121 0.02 1126 0.02 ... End