Loading...
HomeMy WebLinkAboutNCG140364_COMPLETE FILE - HISTORICAL_20170511PERMIT NO. /v 0i& I y 0 Ap ! DOC TYPE C)� HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ �O I % 6 2 ) YYYYMMDD �1 11 NC Division of Energy, Mineral and Land Resources NPDES Stormwater Permit Contacts Summary NC DEMLR has the following contact information in our Permit Database for your permit as of 3127/2017. Permit Number: NCG140364 Permit Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Name: Thomas Concrete of Carolina Inc Monroe Plant Facility Addressi: 2931 Bravo PI. RECEIVED Facility Address2: MAY City, State & Zip: Monroe, NO 28110 ONmer Information Details: h r ''�`' MI15T:submit a,G7r�ange,of/Ya►n%Owile�ip�io,�rm. 'too DEMLR,ka,m�kera�y��hanges,toth�s�O�+��rna�rifvrmahrin �" '�''�:� �., E �•� '����.�..'.y�°����'HScea,PRrsoellanaousFor�ins�ath rtal:ncdeni:o� web Ir n des-sitarmwater�r��:� -� s ����T��,�� Owner Name: Thomas Concrete Qf Carolina Inc Owner Type: Non -Government Owner Type Group: Organization Owner Affiliation: Jeff Sanders Title: VP1GM Addressi: EPQU 790105 Address2: City, State &Zip: Work Phone: Email Address: Contact Name Title Address Fax: Z04-3 HNI Phone ism Email Faces il11 ,Co6 as P.ersoni$)b Contact -Name Title Address Pboo faz Email Darrell Myers VP Production PO Box 790105, Charlotte, NC 28206 704-333-0390 704-335-8784 Contact Name Title Address Phone E@A Email Darrell Myers I po Box 790105 Charlotte, NO 28206 704-333-0390 Contact Name /Title AM= Phone EAX Email 2500 Cumberland Pkwy Suite 200 Atlanta, GA 30339 770-431-3300. 3/27/2017 Page 186 Qf N 61.ssv �jo�0/ y�nv��571y ff� Sv✓��. �� �,a�ua o� �'p A Division of Energy, Mineral, and Land Resources Land Quality Section / Stormwater Program %•n National Pollutant Discharge Elimination System (NPDES) Energy, Mineral & PERMIT OWNER AFFILIATION DESIGNATION FORM Land Resources ENVIAGNMEtfrAL OUAUTY (Individual Legally Responsible for Permit) Use this form if there has been: FOR AGENCY USE ONLY Date Received Year Month Da NO CHANGE in facility ownership or facility name, but the individual who is legally responsible for the permit has changed. If the name of the facility has changed, or if the ownership of the facility has changed, do NOT use this form. Instead, you must rill out a Name -Ownership Change Form and submit the completed form with all required documentation. What does "legally responsible individual" mean? The person is either: • the responsible corporate officer (for a corporation); • the principle executive officer or ranking elected official (for a municipality, state, federal or other public agency); • the general partner or proprietor (for a partnership or sole proprietorship); • or, the duly authorized representative of one of the above. 1) Enter the permit number for which this change in Legally Responsible Individual ("Owner Affiliation') applies: Individual Permit (or) Certificate of Coverage N I C I S I I I I I N I C I G q 2) Facility Information: Facility name: ezwexc4c J Alta. J.- Nl &e., PL&J Company/Owner Organization: c, 43 M Facility address. e Address /VCR City State Zip To find the current legally responsible person associated with your permit, go to this website: http: //deg.nc. gov/about/divisions/energy-mineral-land-resources/energy-mineral-land-permits/stonnwater-program and run the Permit Contact Summary Report. 3) OLD OWNER AFFILIATION that should be removed: Previous legally responsible individual: First MI Last 4) NEW OWNER AFFILIATION (legally responsible for the permit): Person legally responsible for this permit: G sr4't.✓1 First MI Last Page 1 of 2 S WU-OWNERAFFILL23March2017 na NPDES Stormwater Permit OWNER AFFILATION DESIGNATION Form t (if no Facility Name/Ownership Change) ` Title :7_4 ©Jd S Mailing A dress 1i 6 G/ Z � City State Zip Telephone E-mail Address 70 3 55. 5� 7 5151 Fax Number 5) Reason for this change: �mployce or management change A result of ❑ Inappropriate or incorrect designation before ❑ Other If other please explain: The certification below must be completed and signed by the permit holder. PER/MITTEE�CJ?ERTIFICATION: I, fT • z < f* l , attest that this application for this change in Owner Affiliation (person legally responsible for the permit) has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this form are not completed, this change may not be processed. Uri Signattre Date PLEASE SEND THE COMPLETED FORM TO: Division of Energy, Mineral, and Land Resources Stormwater Program 1612 Mail Service Center Raleigh, North Carolina 27699-1612 For more information or staff contacts, please call (919) 707-9220 or visit the website at: ht!p://de Page 2 of 2 S W U-OWNERAFFIIL23Mar2017 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. January 25, 2008 Mr. Darrell Myers Thomas Concrete of Carolina, Inc. PO Box 790105 Charlotte, NC 28206 Subject: General Permit No. NCG 140000 Thomas Concrete COC No. NCG 140364 Union County Dear Mr. Myers: v V 0 In accordance with your application for a discharge permit received on October 5, 2006, we are forwarding herewith the subject certificate of coverage (COC) to discharge under the subject state — NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated May 9, 1994 (or as subsequently amended): Please take notice that this certificate of coverage is not transferable except after notice to the Division of Water Quality. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other pen -nits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other federal or local governmental permit that may be required. An Authorization to Construct treatment facilities .has been issued concurrently with this COC. The Mooresville Regional Office, telephone number (704) 663-1699, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an in -place inspection can be rnade. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5.00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a_ certification must be received from a professional engineer certifying that the Permitted facility has been installed in accordance with the NPDES Permit, the associated Authorization to Construct, and the approved plans and specifications. Please mail the certification (attached) to the Storinwater Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. No hCarolina aN Mllf lorth Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699 i617 Phone (919) 733-5083 Customer Service )tercet: www.newaterouality.org Location: 512 N. Salsbury St. Raleigh,NC 27604 F:ix (919) 733-9612 1-877-623-6748 An Equal Opportunk/Atirmative Action Employer- 50% Recyc!ea?t0% Post Consumer Papar w Mr. Darrell Myers f* Thomas Concrete of Carolina, Inc. NCG 140364 January 25, 2008 Engineer's Certification kCOC No. NCG140.364 I, - � iJ , as a duly registered Professional Engineer in the State of North olina, having been authorized to obsery periodical) < weekly, full time) the construction of the project, 1ROA44 for the Project Name Location Permittee hereby state that, to the best of my abilities, due care and diligence was used in.the observation of the following installations: Construction of a process -vvasteivater recycle system at the 1'homas Concrete Ready P is site. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Date Registration No. 14883 Mail this Certification to: Stormwater Permitting Unit NC Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 �.i STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE No. NCG140364 STORMWATER AND PROCESS WATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Thomas Concrete of Carolina, Inc. is hereby authorized to discharge stormwater from a facility located at Thomas Concrete Broome Street Monroe Union County to receiving waters designated as Richardson Creek, a class C water in the Yadkin Pee -Dee River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1,11, 1II, N, V, and VI of General Permit No. NCG140000 as attached. This certificate of coverage shall become effective January 25, 7008. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 251h day of January, 2008. for Coleen H. Sullins., Director Division of Water Quality By the Authority of the Environmental Management Commission NCG140364 Map Scale 1:24,000 Thomas Concrete of Carolina, Inc. Thomas Concrete Latitude: 34" 59' 38" N Longitude: 800 30' 14" W Receiving Stream: Richardson -Creek Stream Class: C Sub -basin: 03-07-14 (Yadkin Fee -Dee River Basin) Facility Location Michael F. Easley, Governor William G. Ross Jr,, Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality. January 25, 2008 Mr. Darrell Myers Thomas Concrete of Carolina, Inc. PO Box 790105 Charlotte, NC 28206 Subject: General Permit No. NCG140000 Thomas Concrete COC No. NCG140364 Union County Dear Mr. Myers: In accordance with your application for a discharge permit received on October 5, 2006, we are forwarding herewith the subject certificate of coverage (COC) to discharge under the subject state — NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated May 9, 1994 (or as subsequently amended). Please take notice that this certificate of coverage is not transferable except after notice to the Division of Water Quality. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other federal or local governmental permit that may be required. An Authorization to Construct treatment facilities has been issued concurrently with this COC. The Mooresville Regional Office, telephone number (704) 663-1699, shall be notified at Ieast forty-eight (48) hours in advance of operation of the installed facilities so that an in -place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility,A__ certification must be received'-ff6iri a -professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, the associated Authorization to Construct, and the approved plans and specifications. Please mail the certification (attached) to the Stormwater Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. 1V��`hcarolina NattrrallJ North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-5083 Customer Service Internet: www.newater uali '.or Location: 512 N. Salisbury St. Raleigh, NC 27604 Fax (919) 733-9612 1-877-623-6748 An Equal OpporlunitylAffirmative Action Employer — 50% Recycledl0% Pest Consumer Paper Mr. Darrell Myers Thomas Concrete of Carolina, Inc. NCG 140364 - January 25, 2008 Please note that any future construction, installation, or modification of wastewater treatment facilities (including process wastewater recycle systems) will require an Authorization to Construct (ATC) prior to construction per 15A NCAC 2H .0 13 8 & .0139. You must submit, in triplicate, plans/specifications and design calculations, stamped and sealed by a professional engineer, with a letter requesting an ATC to the Stormwater Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617.1 One (1) set of approved plans and specifications is being forwarded to you. The Permittee shall maintain a copy of the approved plans and specifications on file for the life of the facility. If you have any questions concerning this permit or Authorization to Construct, If you have any questions concerning this permit, please contact Robert Patterson at telephone number (919) 733-5083 ext. 360. Sincerely, A� ie-" &- for Coleen H. Sullins cc: Mooresville Regional Office Central Files Stormwater Permitting Unit Files enclosure Mr. Darrell Myers Thomas Concrete of Carolina, Inc. NCG 140364 January 25, 2008 Engineer's Certification (COC No. NCG140364) I, _ _ _ __, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, Project Name Location for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in .the observation of the following installations: • Construction of a process wastewater recycle system at the 'Fhomas Concrete Ready Mix site. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Date Registration No. Mail this Certification to: Stormwater Permitting Unit NC Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCGI40000 CERTIFICATE OF COVERAGE No. NCG140364 STORMWATER AND PROCESS WATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Thomas Concrete of Carolina, tnc. is hereby authorized to discharge stormwater from a facility located at Thomas Concrete Broome Street Monroe Union County to receiving waters designated as Richardson Creek, a class C water in the Yadkin Pee -Dee River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, IV, V, and VI of General Permit No. NCG140000 as attached. This certificate of coverage shall become effective January 25, 2008. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this 25`h day of January, 2008. for Coleen H. Sullins., Director Division of Water Quality By the Authority of the Environmental Management Commission NCG140364 N w S Map Scale 1:24,000 (2, IM k 4dw M&MM'd MNWAk 0 Thomas Concrete'' Thomas Concrete of Carolina,, Inc. Thomas Concrete Latitude: 341 59' 38" N Longitude: 800 30' 14" W Receiving Stream: Richardson -Creek Stream Class: C Sub -basin: 03-07-14 (Yadkin Pee -Dee River Basin) N111211WHIrw", Facility Location Thomas Concrete Monroe A Subject: Thomas Concrete Monroe From: "Matt Weiss" <MWeiss@nee-pa.com> Date: Thu, 14 Sep 2006 13:01:12 -0400 To: "Ken Pickle" <ken.pickle@ncmail.net> CC: <dmyers@thomasconcrete.com> Ken, I wanted to see if you have had time to review the most recent submittal for Thomas Concrete. I was anticipating a phone call or email last week with your comments. Again, the most recent submittal sent, I have re -graded the site to minimize the amount of storm/wastewater entering the settlement pit. From the calculations I have performed, the settlement pit/detention pond will hold the 25 yr. storm without discharge. Please review the plan as soon as you have time and let me know if I need to change/add anything to the plan. If necessary, I can take a day and come meet with you at your office. Thanks again for you time with this project. Matt Weiss NorthEast Engineering, PA 37 Union Street, S Suite D P.O. Box 931 Concord, NC 28026-0931 O 704-788-6372 F 704-786-4750 C 704-202-3011 www.nee-pa.com 1 of 1 9/20/2006 9:13 AM Aug 17 2006 10:52 P.01 Northeast Engineering, P.A. 37 S Union St, Suite D P.Q. Box 931 Concord, North Carolina 29026-0931 Phone: 704-788-NEPA (6372) Fax 704-786-4750 www.nee-pa.com NORTHEAST ENGINEERING Qua/lry engineering with old friends arid, familiar faces. To: Ken Pickle Company or Department: NCDENR Fax Number: 1-919-733-9612 Sent By: Matt Weiss Date- 08/17/06 Nurnbcr of Pages Including Cover Shtct i0 (Contact sender if al k pages are not rcccived) Thomas Concrete Cakes. The infbrms�ori in this message pony be privikdcd wd canf1dcn&1 and protected from diwoua . Ityou have received this cQm nemicadon in error, p1we notify us immediskWy. Y NORTHEAST ENGINEERING Quality engineering with eld friends and familiar faces. LETTER OF TRANSMITTAL To: Ken Pickle NCDENR We are sending you: Northeast Engineering, P.A. 37 S Union St, Suite D P.O. Box 931 Concord, North Carolina 28026-0931 Phone: 704-788-NEPA (6372)—" Fax 704-786-4750 sp! www.nee-pa.com U Z G z� t� 11 • - r.' 4 i J, Date: 8/21 /2006 Attention: Re: Copies Date Description 1 8/21/06 Revised plans, Thomas Concrete Monroe 1 8/21/06 Cales ❑ For Approval ❑ As Requested ❑� For Review and Comment ❑ For Your Use ❑ other Remarks: am resubmitting the revised plans showing the new drainage area for the storm and wastewater that will be diverted to the settling pit. Attached are calculations based on the 25year, 24 hour storm. I have noted the areas of importance in the calculations with regard to the reuse detention pond holding the design storm. Please call when you have questions, or need clarification. Thanks in advance for your help. Matt Weiss Copy To: Signed: If enclosures are not as noted above, please contact us immediatley. Sep 21 2006 15:25 P.01 Northeast Enginwxiag. PA 37 9 Union St, Suite D P.O. Box 931 Concord, North Carollna 28026-0931 Phone; 704-788-NEPA (6372) Fax 704-7864750 Www.rsee-paCom NORTHEAST ENGINEERING Qaallry ehgineerfxg wllh old friends and farnlkdr faces. To: Ken Pickle Company or Department: NCDENR Few Number: 1-919-733rW2— Sent By: Matt Weiss Date: 09/20/06 Number of Pages Including Cover Shcct 9 (Contact sender if all papas are not received) Cc Ufa+ Kcru I have made the grade changes as we discussed yesterday. With regsrd to the batch plant wastewater, Thomas would like to gravity flow this to the settlement pit. I wM go over this with them today. However. I would like you to look at the revised calca. New Rouse pond size MX30'X 12.5'. I could not reduce the depth with the requirament of i' freeboard and assu,mintg an iuiital water depth of 2' (1,680 eu.8., 12,600gal.). Assuming 1' of depth in the serilcment pit is based ou 10 trucks washing out per day at 150 gallons each (1.500 gal). I ft storage in settlement pit - +/-3,713 gallons. I full bay=+/-3.442 gallons As discussed, we will set a 50yr. weir at the same elevation as the invert $nm the scvJcment pit. I am meeting with Thomas Concrete today to go over the revisions/additions Please call if you have any questions. Thanks Matt The lnfom won In rhit mewge invy be pdvileaed and eon6drnatl and pmteered from diRcIcaurs ll you have rcocivod tW- oommuniexi on in error, pLcue aoaly ue immc&"y Hydrograph Return Period Recap Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 SCS Runoff ----- 0.77 1.86 2.67 ------ Post 2 Reservoir 1 0.03 ----- 1.71 2.47 ------ Settlement Pit 3 Reservoir 2 0.00 ------ 0.00 0.00 ---- Reuse Proj. file: Revised System 9_20_06.gpw Wednesday, Oct 4 2006, 9:28 AM Hydraflow Hydrographs by Intelisolve Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to I peak (min) Volume (tuft) Inflow hyd(s) !Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 SCS Runoff 0.77 5 720 2,069 — --- Post 2 Reservoir 0.03 5 850 582 1 3.01 1,496 Settlement Pit 3 Reservoir 0.00 5 0 0 2 0.69 582 Reuse Revised System 9_20_06.gpw Return Period: 2 Year Wednesday, Oct 4 2006, 9:28 AM Hydraflow Hydrographs by Intelisolve Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 SCS Runoff 1,86 5 720 5,157 --- Post 2 Reservoir 1.71 5 725 3,671 1 3.25 1,815 Settlement Pit 3 Reservoir 0.00 5 0 0 2 4,37 3,671 Reuse Revised System 9_20_06.gpw Return Period: 10 Year Wednesday, Oct 4 2006, 9:28 AM Hydraflow Hydrographs by Intelisolve Hydrograph Summary Report 4 Hyd. No. Hydrograph type (origin) Peak flow (cis) Time interval (min) Time to peak (min) Volume (tuft) Inflow hyd(s) Maximum elevation (ft) Maximum storage (tuft) Hydrograph description 1 SCS Runoff 2.67 5 • 720 7,550 — — ---- Post 2 Reservoir 2.47 5 720 6,064 1 3.32 1,909 Settlement Pit 3 Reservoir 0.00 5 0 0 2 7.22 6,064 Reuse Revised System 9_20_06.gpw Return Peri d: 25 Year Wednesday, Oct 4 2006, 9:28 AM Hydraflow Hydrographs by Intelisolve Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Post Hydrograph type = SCS Runoff Storm frequency = 2 yrs. Drainage area = 0.480 ac Basin Slope = 1.0 % Tc method = LAG Total precip. = 2.20 in Storm duration = 24 hrs. Q (cfs) 1.00 0,90 0.80 0.70 0.60 0.5D 0.40 0.30 - 0.20 0.10 000 0 3 Hyd No. 1 Wednesday, Oct 4 2006, 9:24 AM Peak discharge = 0.77 cfs Time interval = 5 min Curve number = 90 Hydraulic length = 287 ft Time of conc. (Tc) = 8.23 min Distribution = Type it Shape factor = 484 Hydrograph Volume = 2,069 cult Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0,30 0.20 0.10 0.00 5 8 10 13 15 18 20 23 25 Time (hrs) Post Hyd_ No. 1 -- 2 Yr Hydrograph Plot E Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Post Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 0.480 ac Basin Slope = 1.0 % Tc method = LAG Total precip. = 4.25 in Storm duration = 24 hrs Q (cfs) 2.00 1.00 Post Hyd. No. 1 — 10 Yr Wednesday, Oct 4 2006, 9:24 AM Peak discharge = 1.86 cfs Time interval = 5 min Curve number = 90 Hydraulic length = 287 ft Time of conc. (Tc) = 8.23 min Distribution = Type 11 Shape factor = 484 Hydrograph Volume = 5,157 cult _00 1 P---._1 1 ! 1 1 -- 0 3 5 8 10 13 15 18 20 23 s Hyd No. 1 Q (cfs) 2.00 1.00 ,1 0.00 25 Time (hrs) Hydrograph Plot 3 Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Post Hydrograph type = SCS Runoff Storm frequency = 25 yrs O �,� _ -Z)q 3 Drainage area = 0.480 ac -- 1 _ A Basin Slope = 1.0 % .+C)) � Tc method = LAG , Total precip. = 5.77 in Storm duration = 24 hrs Q (cfs) 3.00 2.00 1.00 0.00 -1 0 Post Hyd. No. 1 -- 25 Yr Wednesday, Oct 4 2006, 9:24 AM Peak discharge = 2.67 cfs Time interval = 5 min Curve number = 90 Hydraulic length = 287 ft Time of conc. (Tc) = 8.23 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 7,550 cult 3 5 8 10 13 15 18 20 23 Hyd No_ 1 Q (cfs) 3.00 2,00 1.00 1 0.00 25 Time (hrs) Pond Report Hydraftow Hydrographs by intelisolve Wednesday, Oct 4 2006, 9:36 AM Pond No. 1 - ettlement Pit Pond Data Pond storage is based on known contour areas. Average end area method used. Stage 1 Storage Table �F-L Stage (ft) Elevation (ft) �r Contour area (sgft) Incr. Storage (cult) Total storage (cuft) 00 0.00 0.00 00 0 0 .i 1,00 1.00 01 1 1 2.00 2.00 900 451 451 3.00 3.00 1,170 1,035 1.486 S�yt� 4.00 4.00 1,440 1,305 <29i Culvert 1 Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 2.00 2.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 3.00 3.00 0,00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Red Rect - - Length (ft) = 0.00 0.00 0.00 0.00 Multistage = No No No No Slope (%) = 0.00 0.00 0.00 0.00 N-Value = .013 .013 .013 .000 orif. Coeff. = 0.60 0.60 0.60 0.00 Multistage = nla No No No ExfiItration = 0.000 inlhr (Contour) Tailwater Elev. = 0.00 ft Stage (ft) 4.00 3.00 2.00 1.00 0 00 Stage 1 Discharge Note: CutoerMnrtoe Du f a" have been analyzed urder inlet and outlet mntrol Stage (ft) 4.00 3,00 2.00 1,00 0.00 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14,00 Total Q Discharge (cfs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Oct 4 2006, 9:36 AM Hyd. No. 2 Settlement Pit Hydrograph type = Reservoir Peak discharge = 0.03 cfs Storm frequency = 2 yrs Time interval = 5 min Inflow hyd. No. = 1 Max. Elevation = 3.01 ft Reservoir name = Settlement Pit Max. Storage = 1,496 cuft Storage Indication method used. Hydrograph Volume = 582 cult Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0 00 0 3 Hyd No. 2 5 8 10 - Hyd No. 1 Settlement Pit Hyd. No. 2 — 2 Yr Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0,10 n Oo 13 15 18 20 23 25 Time (hrs) Hydrograph Plot Hydrallow Hydrographs by IntelisoNe Hyd. No. 2 Settlement Pit Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 1 Reservoir name = Settlement Pit Storage Indication method used. Q (cfs) 2.00 1.00 M Settlement Pit Hyd. No. 2 — 10 Yr 3 5 8 10 Hyd No. 2 Hyd No. 1 Wednesday, Oct 4 2006, 9:36 AM Peak discharge Time interval Max. Elevation Max. Storage = 1.71 cfs =5min = 3.25 ft = 1,815 tuft Hydrograph Volume = 3,671 cult 13 15 18 20 23 Q (cfs) 2.00 1.00 �--A 0.00 25 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Settlement Pit Hydrograph type = Reservoir Storm frequency = 25 yrs Inflow hyd. No. = 1 Reservoir name = Settlement Pit Storage Indication method used. Q (cfs) 3.00 2.00 1.00 0.00 -L 0 Wednesday, Oct 4 2006, 9:36 AM Peak discharge = 2.47 cfs Time interval = 5 min Elevation = 3.32 ft Max. Storage = 1,909 cu Hydrograph Volume = 6,064 tuft Settlement Pit Hyd. No. 2 — 25 Yr 3 5 8 10 13 15 18 20 23 Hyd No. 2 Hyd No. 1 Q (cfs) 3.00 2.00 1.00 0.00 25 Time (hrs) Pond Report Hydrafiow Hydrographs by Intelisolve Wednesday, Oct 4 2006, 9:31 AM Pond No. 2 - Reuse Pond Pond Data Bottom LxW = 30.0 x 28.0 ft Side slope = 0.0:1 Bottom elev. = 0.00 ft Depth = 12.50 ft Stage 1 Storage Table �L Stage (ft) Elevation (ft) Contour area (sqk) Incr. Storage (tuft) Total storage (tuft) 750.00 0.00 840 0 0 0.63 0.63 840 525 525 1.25 1.25 840 525 1,050 1.88 1.88 840 525 1,575 2.50 2.50 840 525 2,100 3.13 3.13 840 525 2,625 3.75 3,75 840 525 3,150 4.38 4.38 840 525 3,675 5.00 5.00 840 525 4,200 5.63 5.63 840 525 4,725 6.25 6.25 840 525 5,250 6.88 6.88 840 525 5,775 7.50 7.50 840 525 6,300 8.13 8.13 840 525 6,825 8.75 8.75 840 525 7,350 9.38 9.38 840 525 7,875 10.00 10.00 840 525 8,400 10.63 10.63 840 525 8,925 11.25 11.25 840 525 9,450 11,88 �OS�r 12.50 11.88 12.50 840 840 525 525 975 00 - t 2-y�c� y 13 7 24 t -roT4(� Culvert 1 Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] ED] Rise (in) = 0.00 0.00 0.00 0,00 Crest Len (ft) = 2.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. ft - 0.00 0.00 _ 0.00 No. Barrels = 0 0 0 0 Welr Coeff. = 3.33 3.33 3.33 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Rect -- - --- Length (ft) = 0.00 0.00 0,00 0.00 Multistage = No No No No Slope (%) = 0.00 0.00 0.00 0.00 N-Value = .000 .000 .000 .000 Orif_ Coeff. = 0.00 0.00 0.00 0.00 Multistage = n/a No No No Exfiltration = 0.000 irdhr (Wet area) Tailwater Elev. = 0.00 ft Note: Cuh*n* fiice outflows have been enaNzed under inlet and outlet control. Stage (ft) Stage 1 Discharge Stage (ft) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 0.00 2.00 4.00 6.00 8.00 Total Q 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 Discharge (cfs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Oct 4 2006, 9:31 AM Hyd. No. 3 Reuse Hydrograph type = Reservoir Peak discharge = 0.00 cfs Storm frequency = 2 yrs Time interval = 5 min Inflow hyd. No. = 2 Max. Elevation = 0.69 ft Reservoir name = Reuse Pond Max. Storage = 582 cult Storage Indication method used. Hydrograph Volume = 0 cuft Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0 00 0 24 Hyd No. 3 48 73 97 - Hyd No. 2 Reuse Hyd. No. 3 — 2 Yr Q (cfs) 0.1❑ 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0,02 0.01 0.00 121 145 169 193 218 242 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 3 Reuse Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 2 Reservoir name = Reuse Pond Storage Indication method used. Q (cfs) 2.00 1.00 0.00 -i 0 24 Hyd No. 3 48 Reuse Hyd. No. 3 -- 10 Yr 73 97 - Hyd No. 2 Wednesday, Oct 4 2006, 9:31 AM Peak discharge Time interval Max. Elevation Max. Storage = 0.00 cfs =5min = 4.37 ft = 3,671 cult Hydrograph Volume = 0 tuft 121 145 169 193 218 Q (cfs) 2.00 1.00 - 1 0.00 242 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Oct 4 2006, 9:31 AM Hyd. No. 3 Reuse Hydrograph type = Reservoir Peak discharge = 0.00 cfs Storm frequency = 25 yrs Time interval = 5 min Inflow hyd. No. = 2 Max. Elevation = 7.22 ft Reservoir name = Reuse Pond Max. Storage = 6,064 cult Storage Indication method used. Q (cfs) 3.00 2M 1.00 rayfiral Reuse Hyd. No. 3 -- 25 Yr Hydrograph Volume = 0 tuft Q (cfs) 3.00 2.00 1.00 �!1 0 24 48 73 97 121 145 169 193 218 242 Time (hrs) Hyd No. 3 Hyd No. 2 Reuse Poijd agc Tap of pond Eicv.12.50 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00 �i 92; ,) C4"" -LIB WairB - Eicv. 0.00 S e cti mi HTti (25 yr) (10 yr) (2 yr) Schematic only, Not for construction. Hydraflow Hydrographs Pond Draw I Project: Revised System 9 20 06.gpw I Wednesday, Oct 4 2006, 9:34 AM f1 A n n I e S `�i n- 1- r vn �C ? c �1 l �a �- f- T c -� C vi► P Grew - Erosion Control Materials Desim Sd tw— Ver.4.1 • Channel l74-f 00FM1 AM COMPUTED BY: I' HYDRAULIC RESULTS Dmharge Peak Flow Velo*(hnl AreafsgRl I Hydaulic NwrW fefal Period Radpmfftl DeOhVtl al 24.0 1 0-02 1 aug I 0.04 0.06 UNER RLSULTS LSaran 0 IAfidlh .1.00 f! Not to Scale Reach Material Tsve PFrate Y T SoType MW ting's fi Perm v&de Shear Stress (pd) Calmed Safety Shear Stress Facto RemAs St Pattern fn V D Straight Concrete f1016 NIA 0A2 NIA LE P12 NORTH AMERICAN GREEN EROSION CONTROL MATERIALS DESIGN SOFTWARE VERSION 4.1 NORTH AMERICAN GREEN CHANNEL PROTECTION - ENGLISHIS.I. USER SPECIFIED CHANNEL LINING BACK-UP COMPUTATIONS PROJECT NAME: THOMAS CONCRETE BATCH PLAN PROJECT NO.: COMPUTED BY: DATE: 10/4/2006 FROM STATION/REACH: TO STATION/REACH: DRAINAGE AREA: DESIGN FREQUENCY: ***************************************************************************** INPUT PARAMETERS Channel Discharge : A cfs (.00 m^31s) Peak Flow Period : 24 hours Channel Slope :0.005 ft/ft (0.005 mlm) Channel Bottom Width : 1.0 ft (.30 m) Left Side Slope 8:1 Right Side Slope 8:1 Channel Lining : Concrete Permi. Shear(Tp):99.00 psf (4740.1 Pa) CALCULATIONS Intial Depth Estimate = 0.16*(0.1 1(0.005"0.5))^0.375 = 0.18 ft (.06 m) Final Channel Depth (after 10 iterations) = .06 ft (0.02 m) Flow Area = (1.0 * 0.1)+(0.5 *0.06A2 * (8.0+8.0)) = 0.1 sf (0.0 m^2) Wet Per. =1.0 +(0.1 %(8.0^2)+1)^.5 +((8.0^2)+1)^.5)) = 1.9 ft (0.6 m) Hydraulic Radius = (0.1 1 1.9) = 0.0 ft (0.0 m) Channel Velocity=(1.48610.016)*(0.0^0.667)*(0.005A.5) = 0.8 fps (0.2 m/s) Channel Effective Manning's Roughness = 0.016 Calculated Shear (Td) = 62.4 * 0.06 * 0.005 = 0.02 psf (0.9 Pa) Safety Factor = (TpITd) = (99.0010.02) = 5444.53 NORTHEAST ENGINEERING Qualify engineering with old friends and familiar faces. LETTER OF TRANSMITTAL To: Ken Pickle NCDENR We are sendine you: Northeast Engineering, P.A. 37 S Union St, Suite D P.O. Box 931 Concord, North Carolina 28026-0931 Phone: 704-788-N E P Fax 704-786-1750 j? fj�� www.nee-pa.com L5[f Date: Attention: Re: 10/412006 OCT 0 5 ?_006 Copies Date Description 2 10/4/06 Revised plan for Thomas Concrete 1 10/4/06 Rcvised storm calcs 1 10/4/06 Application and $80 check For Approval ❑ As Requested Remarks: ❑ For Review and Comment ❑ For Your Use ❑ other If enclosures are not as noted above, please contact us immediatley. .� t ,. i h�� �� ' S {• f J r. CITY OF MONROE STANDARD SPECIFICATIONS AND DETAIL NIANUAL 07.06 EROSION CONTROL FORIMS AND CHECKLISTS 07.06.01 EROSION CONTROL FINANCIAL RESPONSIBILITY FORM No person may initiate any land -disturbing activity as defined in Chapter 138 of the N-Ionree City Code prior to completion of this form, and an applicable and acceptable erosion and sedimentation control plan has been approved by the City of Monroe Ensineering Department. (Please type or print) Part I l . Name of Proj ect J—Th G i'>'1 4 S CC 1tC /L„ f L 2. Address where land disturbing activity will take place %VCrr kk s"j 3. Approximate date disturbing activity will commence �4 n7m C r .ZG�G 4. Purpose of development (residential, commercial, industrial, etc.) 5. Total acreage of land to be disturbed or uncovered_. 6_ Amount of fee enclosed (fee will be the amount of current policies per acre multiplied by the total number of acres or any part of an acre from number S. i.e. 7_28 acres equals 8 acres.) 47j'—'Q 7 8 9 10 Agent to contact should sediment control issues arise during land disturbing activity Name JLl (f l AA Y r S' Phone '7 Landowner(s) of Record (useblankblank page to list additional owners) Name��krcr� OF [.a�telr^a.� 2nc_ Name Mailing Address 1WW Mlvs` Mailinb Address ,a,ef6f1 e . Al c .Z bAo lam_ Street Address 376/,M !:�._ w C Phone 0-3!2 0 Stref;t Address Phone Fax 705�- 13s- 8794 _ Fax Indicate Book and Page where deed of the property where land disturbing activity will take place is recorded (use blank page to list additional owners) .Book Book Page Page Tax Map Parcel Number where land disturbing activity will take place 07-13 Permits, Checklists, and Farms n, CITY OF MONROE STANDARD SPECIFICATIONS AND DETAIL MANUAL Part 11 Person(s) or firm(s) who are financially responsible for this land disturbing activity (use blank page to list additional owners) Name ric Q,06na :L, C- Name Mailing Address _ �Dx g���.s Mailing Address (� ,�c1o7Tc A/C__ - Street Address 3?0 l A- /.Ar," S4 �G N C- M 10 Phone 20q - - 03 9 D Fax 'ID �- 37r- F4 87 _.. -- Street Address Phone 2. if the Financially Responsible Party is not a resident of North Carolina, give name and address of a North Carolina Agent Name of Registered Agent Mailing Address Street Address Phone Fax The above information is true and correct to the best of my knowledge and belief and was provided by me under oath. I agree to provide corrected information should there be any change in the information provided herein. (This form must be signed by the financially responsible person if an individual or his attorney in fact, or if not an individual, by an officer, director, partner, or registered agent with authority to execute instruments for the financially responsible person) Type or Print Name Signature Title f!t Date Q I�LI mac: C� a Notary Public of the County of �% , state of North Carolina, hereby certify that �Z� c� appeared personally before e this day and being duly swam acknowledged that the above form was exec ed by him. Witness my hand and notarial seal, this � day of , J— 6.0 SEAL &2 (Notary) N[y commission expires 07-14 Permits, Checklists, and Forms Division 07 Re: Thomas Monroe Subject: Re: Thomas Monroe From: Ken Pickle <ken.pick] e@ncmai].net> Date: Fri, 03 Nov 2006 07:48:08 -0500 To: Matt Weiss <MWeiss@nee-pa.com> BCC: Bethany Georgoutias<bethany.georgoulias@ncmai1.net>, aisha Lau <aisha.lau@ncmail.net>, Bradley Bennett <Bradley.Bennett@ncmail.net>, Myr] Nisely <myr].nisely@ncmail,net> Hi Matt, We've entered the Thomas Concrete - Monroe submittal into our database as of October 5, 2006, but I haven't started my review, yet. I expect to start at the end of next week. If the submittal is complete, my review will only take a day. So, if the submittal is ok, Thomas should have a permit sometime the week of November 13 - 17. I know it seems we're awfully slow in processing the Thomas submittal. Our unit is working to improve our turn around times, and I am especially concerned with the ready -mixed concrete submittals. Unfortunately, on occasions in the recent past we have exceeded the 90-day turn around required of us in North Carolina's rules at 15A NCAC 2H .0112(a). And there are still some other applications on my desk for which I won't be able to make the required turn around. But we are attempting to expedite the ready -mixed concrete submittals, including yours for Thomas. I appreciate your patience and the fact that your inquiries into the status of the Thomas submittal have been very professional. Thanks, Ken Matt Weiss wrote: Any comments, questions? Thanks Matt NorthEast Engineering, PA 37 Union Street, S. Suite n P.O. Box 931 Concord, NC 28026-0931 O 704-788-6372 F 704-786--4750 C 704-202-3011 www.nee-pa.com 1 of 1 11/3/2006 7:49 AM RE: Thomas Subject: RE: Thomas From: "Matt Weiss" <MWeiss@nee-pa.com> Date: Mon, 25 Sep 2006 08:28:39 -0400 To: "Ken Pickle" <ken.pickle@ncmaiLnet> Yes, that is it. It doesn't include talcs for the ditch from the batch plant, however that should be very straight forward and only add to the drainage area a little. Please let me know if you have any comments. Thanks for all your time and help with this project. Matt -----Origznal Message ------ From: Ken Pickle [mailto:ken.pickle@ncmail.net] Sent: Monday, September 25, 2006 8:26 AM To: Matt Weiss Subject: Re: Thomas Matt, I've got a 9 page fax received at 3:25, 9/21/06, including a transmittal page and 8 pages that appear to be print outs from a hydraulics calculational program. Correct? I'll try to look at them today, and pass on my comments, if any. Ken Matt Weiss wrote: Did you receive the revised talcs? If not, I can try to resend, or just overnight a new plan with the revised talcs. Please email or call when you get a minute. Thanks Matt NorthEast Engineering, PA 37 Union Street, S Suite D P.O. Box 931 Concord, NC 28026-0931 0 704-788-6372 F 704-786-4750 C 704-202-3011 www.nee-pa.com l of 1 9/25/2006 9:02 AM