Loading...
HomeMy WebLinkAboutNCG140362_COMPLETE FILE - HISTORICAL_20080924STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /V Ci�i Iqd31/C;? DOC TYPE HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE p avbq via YYYYMMDD Michael F. Easley, Governor William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources September 24, 2008 Rick Proctor, General Manager PLT Concrete Services, Inc. 3214 Turnage Road Wilson, North Carolina 27893 Subject: Compliance Evaluation Inspection PLT Concrete Services - Selma NPDES Stormwater Permit NCG140362 Johnston County Dear Mr. Proctor: c.J"J Coleen H. Sullins, Director gyysiap of Water Quality I conducted the stormwater compliance evaluation inspection on August 21, 2009 with the assistance of Bill Anderson. Please find attached with this letter the Basin Wide Infonnation Management System (BIMS) checklist. Below is a list of findings and recommendations developed from the inspection. 1. The current permit was issued and became effective January 16, 2008. The General Permit NCG140000 will expire 07/31/2009. There is no requirement to submit a new Notice of Intent or renewal request unless directed by the Division of Water Quality. The facility consists of an infiltration basin, a five -chamber drum wash recycle system, drainage ditches, and a water detention pond designed to hold a 25-year, 24-hour rainfall event. The facility is designed to not discharge any process wastewater water. There has been no discharge from the facility. Fuel and admixture tanks have secondary containment with locked gate valves. Water is visually inspected before discharge. All excess water on the property is routed to the grass swells located on each side of the property. Water in the swells is discharged to the water detention pond. The pond was approximately one - quarter full. Excess concrete is poured into blocks or poured onto the ground. A large area between the pond and the wash out bays is covered with stacks of broken concrete slabs. This combined with the poured concrete on the ground has increased the amount of impervious surface area, which may increase stormwater flow and cause the detention pond to overflow. 4. The water detention pond is constructed with an overflow pipe and emergency spill way. Analytical monitoring is not required if the water detention pond discharges as a result of a 10-year — 24 hour precipitation event. The Stormwater Pollution Prevention Plan (SPPP) was reviewed. The SPPP is well written and meet all requirements with the exception of implementing and documenting annual employee training on proper spill response and cleanup procedures and preventative measures. Site inspection was conducted 04/30/2007 and 11/13/2007. Inspection of all containment areas was last completed on 04/30/2008. Non-stormwater discharge inspection was completed 05/31/2008. There was one significant spill noted on 04/16/2007. I would like to thank Bill Anderson for his time and assistance with this inspection. If you have any questions about this letter or the inspection, please call me at 919.791.4261. Sincerely, f�dl._42107 Much Hayes Environmental Specialist Cc: Central Files Stormwater Permitting Unit RRQ files North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Phone (919) 791.4200 Customer Service Internet: www.ncwaTc.rqLiality.org 1628 Mail Service Center Raleigh, NC 27699-1628 FAX (919) 788.72 59 1-877.623.6748 An Equal Opportunity/Affirmative Action Empioyer— 50% Recycled110% Post Consumer Paper AhCaro]ina Ql&-C // 02,; Permit: NCG140362 SOC: County: Johnston Region: Raleigh Compliance Inspection Report Effective:01/16108 Expiration: 07/31/09 Effective: Expiration: Owner: PI-T Concrete Services Incorporated Facility: PLT Concrete Services, Inc. 3073 W Oak St Selma NC 27576 Contact Person: Rick Proctor Title: Phone: 252-293-0500 Directions to Facility: 1-95 South to Highway 70 Exit. Turn right at the top of the ramp. Go 1.25 miles. Merge right on Highway 70 ByPass. Go 1.5 miles. Turn r�ght on Cjk StTet. Site is .75 miles on the right. System assi ications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): 24 hour contact name Rick Proctor Phone: 252-293-0500 On -site representative Bill Anderson Phone: 919-965-3884 Related Permits: Inspection Date: 08/18/2008 Entry Time:e12:00 PM Exit Time: 12:35PMr �� Primary Inspector: Mitchell S Hayes / V�/ii,'� +� �1 Phofie: 919-791-4200 Secondary Inspector(s): Reason for Inspection. Routine Inspection Type: Stormwater Permit Inspection Type: Ready Mix Concrete Stormwater/Wastewater Discharge COC Facility Status: ■ Compliant ❑ Not Compliant Question Areas: 0 Storm Water (See attachment summary) Page: 1 Permit: NCG140362 Owner -Facility: PLT Concrete Services Incorporated Inspection Date: 08/18/2008 Inspection Type: Stormwater Reason for Visit: Routine Inspection Summary: Facility consists of an infiltration basin, a five -chamber drum wash recycle system, drainage ditches, and a water detention pond designed to hold a 25 year, 24-hour rainfall event. The facility is designed to not discharge any process wastewater water. There has been no discharge from the facility. There are no analytical or qualitative reports to review. A copy of the permit was available during the inspection. The Stormwater Pollution Prevention Plan has been implemented and contains all permit requirements with the exception of implementing and documenting annual employee training on proper spill response and cleanup procedures and preventative measures. Site inspection was completed 04/30/2007 and 11/13/2007. Inspection of all containment areas was last completed 04/30/2008. Nan-stormwater discharge inspection was completed 5/31/2008. There was one significant spill noted on 04/16/2007. Diesel fuel tanks, and chemical tanks had secondary containment with locked gate valves. Water is visually inspected before discharge. All excess water on the property is routed to the grass swells located on each side of the property. Water in the swells is discharged to a water detention pond designed to hold a 25 year, 24-hour rainfall event. The pond was approximately one -quarter full. Excess concrete is poured into blocks or poured onto the ground. A large area between the pond and the wash out bays is convered with stacks of broken concrete slabs. This increased area of impervious surface may increase stormwater flow and cause the detention pond to overflow. At the time of inspection, there was no indication of discharge off the property. Page: 2 Permit: NCG140362 Owner - Facility: PLT Concrete Services Incorporated Inspection Date: 08/18/2008 Inspection Type: Stormwater Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment:. New plant manager was unaware of providing and documenting employee training. Permit and Outfails # Is a copy of the Permit and the Certificate of Coverage available at the site? Yes No NA NE ■n❑p # Were all outfalls observed during the inspection? ❑ ❑ ■ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ■ ❑ # Has the facility evaluated all illicit (non Stormwater) discharges? ■ ❑ ❑ ❑ Comment: This is a non -discharge concrete plant. There are no discharge outfalls. No analytical or qualitative sampling is required. Page: 3 Lo�oF wArFRQG A sI Mr. Rick Proctor PLT Concrete Services, 3214 Turnage Road Wilson, North Carolina Dear Mr. Proctor: Inc. 27893 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality January 16, 2008 Subject: General Permit No. NCG140000 PLT Concrete Services - Selma COC No. NCG140362 Johnston County In accordance with your application for a discharge permit received on July 16, 2006, we are forwarding herewith the subject certificate of coverage (COC) to discharge under the subject state — NPDES general permit. I apologize for the lengthy delay on my desk. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection Agency dated May 9, 1994 (or as subsequently amended). Please take notice that the attached certificate of coverage is not transferable except by action of the Division of Water Quality. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. Coverage under this permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other federal or local governmental permit that may be required. This letter is also an Authorization to Construct recycle and infiltration treatment facilities. We are aware that the infiltration basin has already been constructed per earlier agreement. Please contact the Raleigh Regional Office, telephone number (919) 791-4200, at least forty-eight (48) hours in advance of operation of the recycle system. If the recycle system has also already been installed, please contact them this month so that an in -place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Please submit a certification from the designing professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct, and the approved plans and specifications. Please mail the certification (attached) to the Stormwater Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. Please note that any future construction, installation, or modification of wastewater treatment facilities (including process wastewater recycle systems) will require an Authorization to Construct (ATC) prior to construction per 15A NCAC 2H .0138 & .0139.. You must submit, in triplicate, plans/specifications and design calculations, stamped and sealed by a professional engineer, with a letter requesting an ATC to the Stormwater Perm ittinV" hCarolina Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617.] Alatura/!y North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-5083 Customer Service . Internet, www,newaterqualitv.org Location: 512 N. Salisbury St. Raleigh, NC 27604 Fax (919) 733-9612 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer- 50% Recydedl10% Post Consumer Paper Mr. Rick Proctor Page 2 of 3 January 16, 2008 Please note that a condition of issuance of coverage under this permit was your agreement to sample all discharges quarterly for fecal coliform. Given the design basis and configuration of your control facilities, it is likely that you will not have a discharge every quarter. In the event that a calendar quarter passes without a discharge, please submit a monitoring report with the notation, "No discharge this quarter", or words to that effect. We still want to receive the monitoring report, even if you have not been able to take a sample. One (1) set of approved plans and specifications is being forwarded to you. You are required to maintain a copy of the approved plans and specifications on file for the life of the facility. If you have any questions concerning this permit or Authorization to Construct, please contact Ken Pickle at telephone number (919) 733-5083 ext. 584. Sincerely, d-j /2� for Coleen H. Sullins Enclosures: Engineer's Certification ATC package cc: Ron Sutton, Sutton -Herring, 2201 Nash St. NW, Wilson, NC 27896, letter only Raleigh Regional Office, Myrl Nisely, ATC package DWQ Central Files, letter only Stormwater_Permitting Unit File NCG140362, ATC.package� Mr. Rick Proctor Page 3 of 3 January 16, 2008 Engineer's Certification (COC No. NCG140362) I, , as a duly registered' Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, Project Name Location for the Permittee, hereby state that to the best of my abilities, due care and diligence was used in the observation of the following installations: • Construction of an infiltration basin, a five -chamber drum wash recycle system, drainage ditches, and other related incidental features, all in the configuration and locations shown on the approved plans and specifications. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Date istration No. Mail this Certification to: Stormwater Permitting Unit NC Division of Water quality 1617 Mail Service Center Raleigh, NC 27699-1617 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE No. NCG140362 STORMWATER AND PROCESS WASTEWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, PLT Concrete Services, Inc. is hereby authorized to operate a process wastewater.treatment system, and is hereby authorized to discharge process wastewater and stormwater from a facility located at PLT Concrete Services, Inc. 3073 West Oak Street Selma, North Carolina Johnston County to receiving waters designated as unnamed tributary to Mill Creek (Selma), a class WS-IV NSW water in the Neuse River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, lI, III, IV, V, and VI of General Permit No. NCG 140000 as attached. This certificate of coverage shall become effective January 16, 2008. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day January 16, 2008. Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission S/ �� •� /. 1, ,;( _ < <_- - -__ ��--Vf,) ;__71003 iy r.. �� .�F o'� 1 !•r /�� L ��• `•a 1' ;i � � t�1,t./`�'_" { f� fr 'F�� �a`•c �(�,��'�J�r � � iS�/ '- l•' ` AI - f 1 f �•-..... �• �' r,- �4V �;-` f~ �S`t � i F� � - ^v - ti. •,ale / � i %' � = f �_ �+,1 � } .. '�� IB•i• 7i�� j / 1 ',. `�"" '•'`.Y5 \, ��� S i � 1 '7 l 1 - � "t 'a - ��'-`1,}1ti r { � �•�- E\t j i`•°aa � "���,�' 1' l�aa•�}a �/•E J !rf i I r% `l�s t `�%f� ) � �! j J •'i .-Vlt1l (d �\ � t - \ tk `• �4•J•*„aS\ J L_`i^�� i„! ,' `CR%! `�._ ^6/ /`r/ '!`` _r Y ,. f:f' `t t' 1 i 1 i q ,) 1 ?• \� �r r 1��r %% as '+1+ �' 1 _ I `_�1_ � - 48D, 1 L J .1 �1•, ti l,,rt• r `, 1 .\ Jr ;.<:: v ��i� �01-�J ,� i 1, !�`L''''f c ; '""j` f1 tk. _ - r. `� \..� �, � ! r1/� .1. 1 } 19n1, i •-�%% f' f':f'�i F�l•���/ '�}.'�. �e%� r. / ��I ���� •-'��� / f 1 S !. ti �_ ,, ,`�,tY , `• '`. s � fir` l� i \� _ w•�i.,•`• et'' - `a /1+ 'vv �•a rt��- ,� • /-.✓ �.. - �"P' l i > �( ' ( \ / N�'6J////'a 5 f t . - ry // c;Q�/% J.,?1 - C.,:�•'""- T' _ ;� ''� " ;. .� � . �-'_�q. ;_� •: � ,T �/� tip i ��.a�—�- ��% r rfr`� 1'. \ '� <.' � i�� c-r+ J c'J3.�_ - _� •�' ` • \ � .� � o: (\�r„ ' �j• ��•"' -� '.ate"'^+• j^^. •✓/�E �_ �r�s --. ' f f-"^ 193�4p .. \._/ v � �,,4�, °� '! fF •'Gravel �''��y \ � ( �-•.' -� fJ `� �r _�°�• �. t `v� # ,�1 i, Jri�A�4z' , �! y,.a.:r'�\Pits•.• �-!r :. it ..-r.y� N� 1.' �.•� L !`rison'l(nit,��` % �r1 (_�(, so J .�' Sand anG GravcE •��Jl _ • y'()[�7'`♦` �, .\ J --pits .�% � � � \�t��I��"".� /J/� 1r \1 � � —.. yet k _l �� �� a•�' .S*• � ,��' , JJ�_✓ '\ rfr -�� ;,y .- � � �.,� J '- � �i ry�'� O� `���i�� � __ `y�,',},�`rf :l '.7 so •r'�`�1 •'r'��tlS iifl`� �l�i. �� r�1! : �\ �� i�^ _, � .}�.�� / Sal2.arge Site�N.1 Df9h186�� ` 1 f'" rl _ 1�(/�{ n 1 j! i �;/•f ��'J �-{ f` �\ ' •• `��: - ° u_ing . �e �► ��-l> �r� r- _i ' `.✓1.�. ��.ir !F t : :6• �j � �, � (�1�0'�3 50/ . t • � �e�110" / ^ ,_.i � �?• _ 1(F ��{�z � .. ,r1 t# f t /.Sri r^, ° v � �%° y9 /?ice • t � •� s j .; ! ; f �t,y i anon • .� \. 166 ; 00 ',° � 1 ! �1�` r j - . rl ( {t I �r r' ""i � r �^-M. `�vJ J'� �a �� � �'•\\ ��. �j_✓�_ N. op •� ••� \`+ ^� � r`- _r Kf r`�[f � �' V �i ai- �-r. �-S � •� �'�• 1..--__ r Jr "r� t . ` I'�. t L r , J JJ/ i �i ` l �f i\ i � r ti - s ( �. % ^� ' i•+•� :'�*. / �.� \i ' t� \,S,{ S'' �.: ♦ '� \./ 1 ,J , /`/• �'. �• �� \ '•Y. A' DiSPOSai Ji• \t 1990� F� i[.-,. i+ OLD - I` l' •La• f!+*areiao»ll �t � -cam � - ..cr• .r — . -� � : _.�_,,,_ 1 �,� : r : , • r- 15 777 _may�1��3/"1� 'fib � ,f e a_' t �+ J I\ �,'_•' q �•. �.,.... •.. SJ vmemorial (f / �• ` 1 -�F 1S0 ` it `i�.q - 4 0� }- •<.i i` •� s� Nl \\�\ ti.Radio owe \ iL 'f�G aver} .:� a Selm,��l�r. . / ' {wMPMI • �*�� { 1 l Prt:-` %! - ,,!Memorial Garcf S, ` •�`: t� Fa"ffi • ,c/ \:mil /?�o- f�... ` ``r �i r w^, �c=== ji - ' u ; - "� Ca•.. n _ �" Substation ' 1`' Sri ��.. ! � '/ -•cr, �~`'-r�F/j �'"� � •�� .{. -_-.-.._ _aaa_a + ..J� r 1 I11031 �� �'\�� r( \\�!� f ,:t �`J n--, .l 1 i, \ •.lil}• -y •,�70w ihea r ' r P 7' i �A �a'- j ! \� LV? 3 B=-'dl I`-cu . ✓ �0 Copyright (C) 1998. Maptech, Inc Markers Name: Discharge Site - NCG140362 Short Name: Dschrg Coordinates: 035' 33' 15.92" N, 0780 18' 49.40" W Comment: PLT Concrete Services, subbasin 03-04-02, Neuse River Basin, Johnston County, unnamed tributary to Mill Creek (at Selma) to Neuse River, class WS-IV NSW, USGS quad E25SE � Herring -Sutton ASSOCIATES P.A. ENGINEERS • SURVEYORS • PLANNERS July 6, 2006 Stormwater Permitting Unit ✓ Division of Water Quality ✓ 1617 Mail Service Center Raleigh, North Carolina 27699-1617 ' Subject: Notice of Intent PLT Concrete Services -Selma Plant ✓ Johnston County Gentlemen: 71241,06 RECEIVED JUL 1 6 Z006 BY: Ce Enclosed for your review and approval is a completed "Notice of Intent" for the operation of a Ready Mix Concrete Plant to be located in Selma, North Carolina. Along with this application is the permit fee in the amount of $80.00 and the supporting documentation setforth in the permit application. If during the review of this application you should have any questions, please feel free to call me at 252-291-8887. Respectfully submitted, He ing Sutton and Associates, P.A. inie L. Sutton. P. Cc: Rick Proctor 2201 Nash Street NW • Wilson, North Carolina 27896 - (252) 291-8887 • Fox (252) 291-5900 ADivision of Water Quality / Surface Water Protection NCDENR. National Pollutant Discharge Elimination System Me�IM 4bwa �K`. O. Gw11W,.ArR .+y IMI.rwL R[lo,wZ. NCG140000 NOTICE OF INTENT National Pollutant Discharge Elimination System application for coverage under General Permit NC G 140000: STORMWATER AND PROCESS WASTEWATER DISCHARGES associated with activities Classified as: SIC (standard Industrial Classification) Code - 3273 Ready Mixed Concrete For new plant sites that wilt discharge or recycle process wastewater (even M commingled with stormwatar): This NOi is also an APPLICATION FOR Ai,iftdution to Construct (ATC) wastewater treatment facilities. ATC requests must be submitted at least 90 days prior to construction'. X For g plant sites discharging or recycling process wastewater (even if comrningfed with stormwater): This NOI Is also an APPLICATION FOR Authorization to gonfinue to owate wastewater treatment facilities in place. Construction, modification, or installation of any new treatment components at an existing site requires an ATC. Treatment facilities used to treat or recycle process wastewater (including stormwater BMP Structures treating process wastewater flows commingled with storrwater) require an ATC prior to construction per 15A NCAC 2H .013 8. The authorization to construct or continue to operate will be issued at the same time as the Certificate of Coverage (COC) for the NCG14 permit. Design of treatment facilities must comply with requirements of 15A NCAC 2H .0138 &..0139. Construction of wastewater treatment facilities (tins includes recycle systems) at new 4i existing plant sites requires submission of three (3) sets of plans and specifications signed and sealed by a Professional Enginoer (P.E.) of qualified statf along with this application. A copy of the design calculations should Ire Included. Please see questions U & 15. �2 �C . vnJs-/V a.� A rc WFFor questions, please contact the DWQ Regional Office for your area. (See page 5) ✓ (Please print or type) 1/1) Mailing address of ownerloperator (addrjLss to which all permit corre>trrondence will be malledj: Name PLT Concrete Services, Inc, Street Address 3 214 _Turnage Road City �aLi1S 011� State LVCZIP Code 27894 y Telephone No. 2252) M-0500 Fax: 252 2 9 3 — 0 8 3 8 /2) Location of facility producing discharge: Facility Name PLT Con Facility Contact Street Address City State —NCZIP Coda _27 S 1S County Jolinstpn Telephone No. N / A Fax; NN / AA Page t of 5 'rw per 15A NCAC 2H .0106 'unless treatment fa BWs era designed, eonsituded, end put into operation by ampioyvos Wernel tv the conWny who are quaHlled to perform such work for their respective companies in accordance with General Stetutes, 89C-25 (7). plans and specifications must be signed and sealed by a P.E. SWU-229-101905 Last revised I OilW2005 9� � in nc ccr✓ldd�Yc� RECEIVED D Nil /80d 1 6C JUL $ 200 B NCG140000 N.0.1. ,/3) Physical location information: Please provide a narrative description of how to gel to the facility (use street names, state road numbers, and distance and direction from a roadway intersection). I— 9 5 S to Hwy 70 Exit, T. P_ at top of ramp, Go 1.25 mi. Merge Rt. on Hwy 70 by alit.. ra on (A copy of a county map or USGS quad sheet with raca;ry outrty rotated on the trap Is a regdrad part of this applice0on.) 0 a k S t . , site i s sec 4 sec .75 mi. on Rt. :�5dp-g33mi n"I 5LLOhgitude7Rdpg1 $min deg, min, sec} ✓ 4) Latltude }/ S) This NPDES Permit Application applies to which of the following: Date operation is to begin _7 129 IR New or Proposed Facility 0 Existing I/ 6) Standard Industrial Classification: Provide the 4 dlgit Standard Industrial -Classification Code (SIC Code) that describes the primary industrial activity at this facility SIC Code: 3 2 7 3 7) Provide a brief description of the typos of industrial activities and products produced at this facility: (include a site diagram showing the process areas present 0 this facility.) Ready —mixed concrete produce Truck Mix 8) Discharge points 1 Receiving waters: How many discharge points (ditches, pipes. channels, etc.) convey stormwatef and/or wastewater from the property? None in 25 year Storm Event What is the name of the body or bodies of water (creek, stream, river, take, etc.) that the facility stormwater and/or wastewater discharges end up in? It the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system.(e.g. City of Raleigh municipal storm sewer). NIA Receiving water classification (if known)-Wq—TNZ Note: Discharge of process wttstowater to racefving waters classified as WS41 to w5-V or SA must be approved by the I.C. Dept. of Environmental Health. If DEFT does not approve, coverage under NCG140000 cannot be granted. No now discharges of process wastewater are permitted in receiving waters classified as WS-I or freshwater ORW. v 9) Does thiafacility have any other NPDES permits? 0 No x1Yes (Sanitary Sewer extension for domestic waste only) It yes, fist the permit numbers for all current NPDES permits for this facility. WQ 0 0 3 01 1 7 10) Does this facility have any Non -Discharge permits (ex: recycle permits)? El No ❑ Yes If yes, list the permit numbers for all current Non -Discharge permits for this facility: 11) Does this facillty employ any hest management practices for storntwater control? 0 No Yes If yes, please briefly describe: Stormwater Detention Po d, a p _ u _ rrrnn i t ring _schedule that will ,he. utlinPr7 i n a_ stnrglwat-P.�: hors,—anrt aadrum wash down facility. Page 2 of 5 5WU-229.101905 Las( revises 10/19=05 RECEIVED JUL 1 6 2006 BY: 7 NCG140000 N.O.I. 12) Does this facility have a Stormwater Pollutlon Prevention Plan? 7 ER No (In place before open date} El Yes If yes, when was it implemented? 13) Are vehicle maintenance activities occurring or planned at this facility? ❑ Na QYes (Minor Repairs only) WANI water TreatmwLftsigh Information 14) Are discharges occurring or planned from any of the following process wastewater generating activities? Vehicle and equipment cleaning ❑ Yes V No v Wetting of raw material stockpiles ❑ Yes X] No Mixing drum cleaning ❑ Yes :E:No It yes to any of the above. please describe the type of process used to treat and/or recycle the process wastewater. For a sufficient application, you must provide design specks (e.g., design volume, retention time, surface area, etc.) and calculations to demonstrate compliance with permit effluent limits (pH - 6-9 SU, Total Suspended Solids (TSS) - 30 mgll, and Settleable Solids (SS) - 5 mill.) [Use separate sheet(s)]. If ag these discharges are recycled, please refer to Question 15. r- ---� For plants that recycle and/or discharge£gss wastewater When applying for this permit you are also applying for an authorization to construct (new treatment facilities) or authorization to continue to operate (existing treatment facilities) as part of the NOT. For am__sftes you most submit three (3) sots of design plans and specifications with this application and provide supporting calculations that predict compliance of final discharge with permit limits. For existtna sifes. applicants should submit three (3) sets of plans and specs for facilities as -built and provide as many design dotafts as possible, or submit a detailed diagram of treatment systems in place that includes Information such as tank volumes, dimensions, retsntion time, piping, settling basin details, etc, Please note: tLtrew treatment systems are planned for $a,existlnrr site, an ATC wt be required prior to construction of those facilities. Plans/specs/calculations prepared by a P.E. and the request for an ATC may be submitted with this NOI, or separately at a later date. DWQ may reauest the status of Your plans for reauestinrl an ATC upon issuance of the COC. ✓ 15) Does the facility use or plan to use a recycle system? ❑ No ® Yes Drum wash down facility If yes, what size storm event is the system designed to hold before overflowing? (for example, 10-yr, 24-hr) 2 E;— year, 24-hr rainfall event For a recycle system (raaardless of en it averflows), please provide plans, calculations, and design specifics (e.g., throughput assumptions/water balance, design volume, retention time, surface area, amount of freeboard in design storm event, etc.). [Use separate sheet(s)]. IRFor a sufficient application, the information must demonstrate compliance of final discharge with permit effluent limits (pH - 6-9 SU, Total Suspended Solids (TSS) - 30 mgil, and Settleable Solids (SS) - 5 mt/i), or must demonstrate that the recycle system has sufficient capacity to contain runoff from a 25-year, 24-hr rainfall event plus one foot of freeboard under design operating conditions. Page 3 of 5 SWU-224401905 lasirevksed 10312005 RECEIVED JUL i 6 2006 BY NCG'I40000 N.O.I. v 16) Are wastewater treatment faellittes (Including recycle systems) planned in the 100-year flood plain? 12 No ❑ Yes If so, include information to demonstrate protection from flooding. (Minimum design requirements for treatment works include protection from the 100•year flood, per 15A NCAC 2H ,0219.) 17) Hazardous Waste: a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? .9 No ❑ Yes b) is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of hazardous waste? In No ❑ Yes c) Is this facility a large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of hazardous waste? IQ No ❑ Yes d) if you answered yes to questions b. or c., please provide the following information: Type(s) of waste: N / A How is material stored: N / A _ Where is material stored: N1 A How many disposal shipments per year. N / A Name of transport / disposal vendor: N / A Vendor address: N/A - ✓ 18) Certification: North Carolina General Statuite 143-215.6 g(i) provides that. Any person who knowingly makes any false statement. representation, or cartificstion in any appiiccatk n. record, report, plan. or other document filed or required to be malntalnad under tMs Puiicte or a rule Implementing this Article; or who knowingly makes a false statement of a malarial fact in a Tulemaking procoading or contested case under oafs Arlicia; or who falsiffes, tampers with, or knowingly renders inaccurata any recording or monitoring davlco of method required to be operated w maintained under this Ankle or rvk=s of the [Environmental Managamard) Commission irnpiernwtng ills Article shall be guilty of a Class 2 misdemeanor which may include a [tne rwt to exceed tcn thousand dottars (S1o,000), I hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharges) and is enfofceable in the same manner as an individual permit. I certify that I am familiar with the information contained in this application and that to the best of my knowlddga and belief such information is true, complete, and accurate. ick 141 Notice of Intent must be accompanied by a check or money order for $00.00 made payable to: NCDENR Page 4 of 5 SwU-229.101905 Last revlsao ttfh912M L RECEIVED 2006 &� NCO140DOO N.o.l, Anal Checklist This application will be returned as Incomplete unless all of the following items have been included: IR Check for $80 made payable to NCDENR. E� This completed application and all supporting documentation (including design details and calculations for treatment systems). If an Erosion 3 Sedimentation Control (E$SC) Plan is required from Division of Land Resources (DLR) IQ or local designee: documentation verifying applicant has developed and submitted that Plan to the governing agency (required per 15A NCAC 02H .0138). © For now sites (or sites that will install new treatment facilities): Three (3) copies of plans and specifications for wastewater treatment facilities (including recycle systems), signed and sealed by a Professional Engineer or qualified staff meeting requirements of G.S. 89C-25 (7). ❑ For existing sites: three (3) copies of plans and speclfications for wastewater treatment facilities (including recycle systems) as built, stamped and sealed by a Professional Engineer, or (only If plans not available) a detailed diagram of treatment systems in place that includes information such as tank volumes, dimensions, retention time, piping, settling basin details, etc. ® A site map showing, at a minimum, (existing or proposed): (a) outline of drainage areas, (b) stormwaterlwastewater treatment structures, (c) location of stormwaterfwastewater outfalls (corresponding to which drainage areas), (d) runoff conveyance structures, (e) areas where materials are stored, (f) impervious areas, and (9) site property lines. Ej A county map or USGS quad sheet with location of facility clearly marked. Mail the entire package to: Stormwater Permitting Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Note The submission of this document does not guarantee the issuance of an NPDES permit, For questions, please contact' the DWO Regional Office for your area. QWQ Regional office Contact Information: Asheville Office ...... (828) 296ASOO Fayetteville Office ... (910) 486-1541 Mooresville Office ... (704) 663-1699 Raleigh Office ........ (919) 791-4200 Washington Office ...(252) 946-6481 Wilmington Office ... (910) 796-7215 Winston-Salem ...... (336) 771-4600 Central Office ......... (919) 733-5083 Page 5 of 5 SWU•229401905 Last revised 1011WM5 RECEIVED JUL 1 6 2006 SY:B w RECEIVED 0 0.1 0.2 0.3 0.4 0.5 mi JUL. 1 6 200Map Center is UTM 17 743493E 3937872N (WG584/NAD83) Selma quadrangle M=-9.031 gy; Projection is UTM Zone 17 NAD83 Datum G=1.563 httpJHwww.topozone.com/pn'nt.asp?z= 17&n=3937871.99946688&e=743493.000148304&s=4.., 4/27/2006 ADDENDUM TO PLT CONCRETE SERVICES' NOTICE OF INTENT STORMWATER PERMIT APPLICATION SELMA CONCRETE PLANT PLT Concrete Services' Selma batch mix concrete plant is located on a 6.0 acre tract of land on the south side of Oak Street (S.R. 1929) in the Town of Selma. The site has been designed to direct all on -site stormwater flow to the rear of the property by either sheet flow or through a system of grass lined drainage swales on the east and west perimeter sides of the site. At the rear of the property a _stormwater detention pond is proposed that has a maximum surface area of 0.51 , acres that all onsite stormwater flow witUow mto._A ached and.ma� y p rt%of this Addendum are the design and outing calculations for the detention pond. no This detention pond is designed to be a n-disc arge facility dunng the 25-yr. - 24 hour storm event. Stormwater will leave the detention pond through both exfiltration and evaporation. However, for the purpose of the detention pond's outing calculations we have chosen to only utilize exfiltration as a source of '? stormwater flow leaving the detention pond. We have allocated an exfiltration �rLo►y�47� ��"�% " rate o 0.86 inlhr based upon onsite permeability test performed by 7 GeoTechnologies, Inc. of Raleigh at the projected bottom of pond elevation. As indicated by the stormwater routing in the 25-yr storm, the detention pond will be a non -discharge facility. To protect the pond we have proposed an emergency spillway at elevation 1D0:9— 19 to allow those storm events in excess of the 25-yr intensity to safely be ,BS discharged without damaging the detention pond. As part of our design calculatians_we_alsa_provided_a 1.00=yr_storm_couting_for_review. Also please note that we chose not to factor into our pond discharge the effects of evaporation. evzP� I Note etreP is This is a safety factor that is built into the non -discharge capability of the �asf { �ond Surf detention ond. Also in addition to the stormwater detention pond we propose to construct a drum Qawash facility on the site. At this location on a daily basis all ready mix concrete trucks have their drums washed out. Design calculations have been provided` documenting that this facility is also a non -discharge facility in a 25-yr storm. The detention capabilities of this facility have not been taken into account when computing the ability of the detention pond to provide sufficient storage for the 25-yr storm event. A review of the "Grading, Storm Drainage and Erosion Control Plan" for the batch mixed concrete plant demonstrates that the site has been designed to drain to the proposed detention pond and that there are no other discharge points on the site. RECEIVED JUL 1 6 2006 BY: W w . ..: IJ. ��.: Yr ` _I ._ '1 -i �I .. '" a+.• . a �J.� il� J ' .` .. J J _i.1 �. rlr- -J ' _ + 'r -4 �. ._ � - 'r .. �,j �,r V.:1 {I �f .,! l I _ •4 ' .: i 3:_J• r. .. ': !. r;'r� i - ?, • 1 11 -.' ._ .. ._ _ '�' _. "• j -- r• s�l': i~ `, - r� ;' �;__. .. �. .. J�. .�.' � ice' .. ol i r� Mate of North Carolina f Department of Environment and Natural Resources A4a Raleigh Regional Office Michael F. Easley, Governor NCDEiTR William G. Bill Ross Secrets �/ NORTH C P.ROLINA DEPARTMENT OF { ) 1 • J ENVIRONMENT AND !NATURAL RESOURCES DIVISION OF LAND RESOURCES LETTER OF APPROVAL April 28, 2006 RECEIVED JUL 1 6 Z006 PLT Concrete Services BY: 3214 Turnage Road Wilson, NC 27893 ATTN: Greg Turnage RE: Project Name: PLT Concrete Services Selma Plant County: Johnston Submitted by: Herring -Sutton & Associates, P.A. Date Received: 4/27/06 Date Processing Initiated: 4/27/06 Watershed: Neuse #1/03-04-02 New Submittal (X) Revised ( ) Dear Mr. Turnage: This office has reviewed the subject Erosion and Sedimentation Control Plan. We find the plan to be acceptable and hereby issue this letter of approval. If any modifications, performance reservations, or recommendations are applicable, a list is enclosed and is incorporated as a part of this letter of approval. The enclosed Certificate of Approval should be posted at the job site. In addition, it should be noted that this plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, in accordance with Title 15A, North Carolina Administrative Code (NCAC) 413.0029. If any modifications are not incorporated into the plan and implemented in the field, the site will be in violation of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute (NCGS), 113A-61.1). 15A NCAC 413.0018(a) requires that a copy of the approved plan be on file at the job site. Also, this letter gives the notice required by NCGS 113A-61.1(a) concerning our right to perform periodic inspections to ensure compliance with the approved plan. North Carolina's sedimentation pollution control program is performance oriented, requiring protection of the natural resources and adjoining properties. If at any time during this project it is determined that the Erosion and Sedimentation Control Plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (NCGS 113A-51 through 66), this office may require revisions in the plan and its implementation to ensure compliance with the Act. 1628 Mail Service Center, Raleigh, NC 27699-1628 Telephone (919)571-4700 FAX (919)571-4718 An Equal Opportunity Affirmative Action Employer 50% recycled110% post -consumer paper Mr. Turnage April 28, 2006 Page 2 Acceptance and approval of this EIVED JUL 16 Z006 your compliance with applicable federal and state water quality laws, regulations and rules. This could include the Division of Water Quality under stormwater or other specific water quality standards, and the U.S. Army Corps of Engineers under Article 404 jurisdiction. Our approval does not supersede any other required permit or approval. BY: Pr ' Ian is conditioned upon Since this project disturbs one or more acres, one such approval relates to the stormwater that will discharge from your project. This runoff is permitted pursuant to the National Pollutant Discharge Elimination System (NPDES) administered in North Carolina by the Division of Water Quality (DWQ). Attached is the General Stormwater NPDES Permit, NCG010000, as revised October 1, 2001, covering your activity. You are responsible for complying with the General Permit requirements and are subject to enforcement by DWQ for any,violations of the General Permit. Due to the location of this project, it should be noted that a rule to protect and maintain existing buffers along watercourses in the Neuse River Basin became effective on July 22, 1997. The Neuse River Riparian Area Protection and Maintenance Rule (15A NCAC 2B .0233) applies to all perennial and intermittent streams, lakes, ponds and estuaries in the Neuse River Basin with existing vegetation on the adjacent land or "riparian area", In riparian areas with existing vegetation in the first 30 feet directly adjacent to the stream, the rule prohibits land disturbance or new development within the first 30 feet of land next to the water (the remaining 20 feet of the total buffer must be revegetated upon completion of any proposed land -disturbing activity). In riparian areas with existing vegetation that is less than 30 feet wide, the rule prohibits land disturbance or new development within the area that contains the existing vegetation (but not the entire 50 foot riparian area). For more information about this riparian area rule, please contact the Division of Water Quality's Wetland/401 Unit at 919-733-1786, or a Division of Water Quality representative at this regional office. Please note that this approval is based in part on the accuracy of the information provided concerning financial responsibility. You are requested to file an amended Financial Responsibility Form if any changes become necessary. In addition, it would be helpful if you would notify this office when the proposed land -disturbing activity covered by this plan is initiated. Your cooperation is appreciated and we look forward to working with you on this project. If there are any questions, please do not hesitate to contact this office. Sincerely, mad arawneh Asst. Regional Engineer Land Quality Section Raleigh Regional Office AA cc: Mr. Ronny Sutton, Herring -Sutton & Associates, P.A. Division of Water Quality PLAN REVIEW COMMENTS RECEIVED JUL 16 2006 BY., 45.0 pop PROJECT NAME: PLT Concrete DATE RECEIVED: 4/27/06 Services Selma Plant REVIEWED BY: AA LOCATION: JOHNS-2006-109 New Submittal (X) Revised () Approved (X) Disapproved {) Reasons for Disapproval O Modifications (X) Performance Reservations O Use fabric or filter layer under the riprap for the emergency spillway RECOMMENDATIONS AND/OR COMMENTS: HERRING-SUTTON & ASSOCIATES, P.A. . 2201 NASH ST. NW WILSON, NORTH CAROLINA 27896 (252) 291-8887 JOB &`e- \ SHEET NO. OF �] CALCULATED BY "-�' 1 DATE CHECKED BY DATE SCALE '�tyy41411111 f I f I!!!!!!� SS10r .. • l : ✓ S�v — - z.� Yc.. - S AL - of _ 10180 FN�,N���: •C) AflfiJilllk1444y ` L I �4-0 97 --Fen-& l�lo , TCt�1Cs w.. p � 1 I Avg . VI; % .9vOP 'S ,► -�[ �1r c"�\w►� , C (,� �' �C.$�DA�{S �c t t" ° Clow r� Vv 4OUA �M Cr•(a�t�»--s R-,C``.FTVED JUL 1 6 2006 F9 D PRODUCT207 HERRING-SUTTON & ASSOCIATES, P.A. 2201 NASH ST. NW WILSON, NORTH CAROLINA 27896 (252) 291-8887 oz rc% e JOB SHEETNO. OF - CALCULATED BYE, DATE CHECKED BY DATE SCALE 41 O 9 eveP z �> A �sf&6/ram Gti�t` ��or�t� 461W4e.- - /7e va_/o/af d,7, ConS/D4.� 7L�atrain%/� i5 Ai/�� a/l �DnrTr�6uf�Ap Su/Td S 6 ove/o, RECEIVED JUL 1 6 Z006 BY: D PP )nl rT M7 Hydrograph Plot HydraFlow Hydrographs by Intelisolve Thursday, Jul 6 2406, 2:15 PM Hyd. No. 1 POST DEVELOPMENT PEAK FLOW Hydrograph type = SCS Runoff Peak discharge = 1.90 cfs Storm frequency = 25 yrs Time interval = 1 min Drainage area = 0.184 ac Curve number = 98 Basin Slope = 1.0 % Hydraulic length = 80 ft Tc method = LAG Time of conc. (Tc) = 2.00 min Total precip. = 6.80 in Distribution = Type 11 Storm duration = 24 hrs Shape factor = 484 Q (cfs) 2.0+ 1.00 0.00 -L 0.0 Hydrograph Volume = 4,108 cult POST DEVELOPMENT PEAK FLOW Hyd. No. 1 — 25 Yr 1.8 3.7 5.5 7.3 9.2 11.0 12.8 14.7 16.5 18.3 Hyd No. 1 Q (efs) 2.00 1.00 T!" 0.00 20.2 Time (hrs) RECEIVED Jul. 16 Z,005 BY: Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cis) Time interval (min) Time to peak (min) Volume (cam) inflow hyd(s) Maximum elevation (ft) Maximum storage (Cuft) Hydrograph description 1 SCS Runoff 1.90 1 715 4,108 — ---- POST DEVELOPMENT PEAK FLOW R.EC EIZTED JUL 1 6 2006 BY: PLT Concrete Drum Wash.gpw Return Period: 25 Year Thursday, Jul 6 2006, 215 PM PLT CONCRETE SERVICES SELMA PLANT DETENTION POND DESIGN CALCULATIONS wN1„C to R il,,,,����� �p184 1111!!li1111111111 April 26, 2006 PREPARED BY: HERRING-SUTTON & ASSOCIATES, PA 2201 NASH STREET NORTHWEST WILSON, NORTH CAROLINA m nerm.� PLT CONCRETE SERVICES SELMA PLANT WATER QUALITY POND DESIGN COMPUTATIONS I. DRAINAGE BASIN DATA • AREA: 6.00 ACRES ✓ / • SOILS: NORFOLK SANDY LOAM t� Gdairn /k� sa �� �� CIS,D 4- s� . • USE: READY MIX CONCRETE PLANT II. POND DESIGN CRITERIA • SCS METHOD ✓- • HYDRAULIC SOILTYPE: B ✓�a�rm /'�'-J���s� �. G1S��45 •--RRE-A€VE--6APMEN -RUNOFF-CURVE-NUMBER'(CN)"`701�'-'plho ca��5 • 0 FEET PERMANENT STORAGE IN POND X�F•�--85 %-P_ L hJRT'AfTER_ IIOVANEFFICfiEi Y • EMERGENCY SPILLWAY WILL PASS 100-YR STORM ✓� SITE IMPERVIOUS PERCENT: 50% -- fro hlq,17 --Y-'> co, SC1-vo//,.,o le_s7 • SURFACE AREA-REQ.D�SALDA,x_DA.xz43560=SF/100- 6' - ' d `�k00 x 6r0"Xk43560,SF11 OUJ - l' $ ` `Si7RFACE�AREWREQ'D-_-522` *-SF ? • %-SCfiRFA6E-ARE` AVAILABLE A= ~� TK-REEGRE-NMIMWsuRFKCE AREA REQ'D"MET i S f • `POST DEVELOPMENT CN: 88 f` z L t� a @+- II. POND DATAs�- • POND INVERT 94.00 l oll&a l s a 76 • EMERGENCY SPILLWAY 100.90 • TOP OF POND 102.00 Z V. DESIGN DATA FOR INFLOW H70GRAPHS ASSUME TYPE II STORM � j . 25-YR 1 DAY PERCIPITATION: 6.8 INCHES A- . 100-YR 1 DAY PERCIPITATION: 8.5 INCHES t✓ •, --CN: 88 (POST -DEVELOPMENT) 60, BASIN SLOPE: 1.0% • HYDRAULIC LENGTH: 900 FT n� Y,9 RECEIVED JUL 1 6 2006 BY: I • SHAPE FACTOR: 484 • Tc FACTOR: LAG PREDEVELOPMENT INFLOW HYDROGRAPH Qp SUMMARY i POST -DEVELOPMENT OUTFLOW HYDROGRAPH Qp SUMMARY SPILLWAY) sul „moo ho /a!, d s./? " c6sr =� 755 � vv�._ 4-0-Lo 5 7 RECEIVED JUL 16 zoos BY: GeoTe .-po g es, lnc April 18, 2006 Ron Sutton HERRING SUTTON & ASSOCIATES 2201 Nash Street North Wilson, NC 27896 Re: Permeability Testing Proposed Selma Pond Selma, North Carolina GeoTechnologies Project No. 1-06-0522-EA Gentlemen: 3200 Wellington Court, Suite G Raleigh, North Carolina 27615 919-954-1514 Fax 919-954-1428 . GeoTechnologies, Inc. has completed laboratory permeability testing for the proposed pond which will be constructed off of Hwy-70 in Selma, North Carolina. Two undisturbed samples were obtained from test pits completed on the site with a backhoe. The undisturbed samples were then returned to our office for laboratory testing. CDu�c� 6e Alb,4, The first sample consisted of a t layey sa n ob rainedm a depth 6�4.5 to 5 feet below grade. That sample yielded a permeability .33XIOJcm/sec. A second sample was obtained from a depth of 5.5 feet. That material of tan slightly s—i ty sand with a measured permeability GeoTechnologies, Inc. appreciates the opportunity to be of service on this phase of the project. Please contact us if you have any questions concerning this letter or if we may be of additional service on this or other projects. Sincerely, 1 GeoTechnologies, Inc. Z` 2i Q�O • � EAL Dam L. Israel, P.E. 14319 NC Registration No. 14311.Alo`4.4 DL-Ilpr-ebh/lam / 060522eadoc J I� xio"3CM 54r- Geotechnical 2cnd Construction Materials Testing Services RECEIVED JUL 1 6 2006 .BY- GeoTechnologies, Inc. Job Number: 17-Apr- Soil Description: PERMEABILITY TEST Job Name: Selma Concrete Plant Sample I.D. 1 Depth: Tan Clayey Sand SAMPLE DATA Type Remolded N Undisturbed O Length Diameter Area Volume Wet Mass Dry Mass TEST DATA Inches 4.750 2.850 6.379 30.302 1.996 1.6858 cm. 12.065 7.239 41.157 496.563 905.36 grams 764.7 grams 4.5-5.0 Standard Proctor (ASTM D-698) Maximum Dry Density Ibs/cu.ft. Opt. Moisture Content % Compaction % Actual Moisture Content 18.4 % Wet Density 113.8 lbs./cu.ft. Dry Density 96.1 Ibs_/cu.ft. lnitia! S ua ua ration 65.9 % Final Saturation 100.0 % Initial -Void Ratio 0.75 Porosity 43.0 % Specific Gravity 2.7 apparent L = 12.07 cm. length of sample hi = inflow burette A = 41.157 sq.cm, area of sample ho = outflow burette a = 0.852 sq.cm. area of burettes t = time h1 = head loss across'specimen at t1 h2 = head loss across specimen at t2 ti t2 hot hit h1 hot hi2 h2 0 30 94.9 1.4 93.5 88.4 7.8 80.6 0 30 88.4 7.8 80.6 82.9 13.3 69.6 0 30 80.4 13.2 67.2 75.4 18.2 57.2 ASTM D 5084 k = ((aaL/(At(a*a)))*ln(h11h2) Percent Deviation NOTE: 1 k = 6.18E-04 2.39% 5 PSI Confining Pressure 2 k = 6.11 E-04 3.53% 1 PSI Driving Head 3 k = 6.71 E-04 5.93% Average kW 6.33E-04 cmisec IRECEI 7ED JUL 1 6 2006 w. GeoTechnologies, Inc. PERMEABILITY TEST Job Number: Job Name: Selma Concrete Plant 17-Apr-06 Sample I.D. - - -2 Y Depth: • 5' Soil Description: Tan Slightly Silty Sand SAMPLE DATA Type Remolded N Undisturbed O Inches cm. Length 4.302 10.928 Diameter 2.855 7.250 Area 6.400 41.287 Volume 27.532 451.177 Wet Mass 1.784 809.16 grams Dry Mass 1.6396 743.7 grams TEST DATA Standard Proctor (ASTM D-698) Maximum Dry Density Ibs/cu.ft. Opt. Moisture Content % Compaction % Actual Moisture Content 8.8 % Wet Density 112.0 lbs./cu.ft. Dry Density ---� 1002.9 lbs./cu.ft. Initial Saturation 37.120%1:. (--Final Saturation 100. Initial Void Ratio 0.64 Porosity 38.9 % Specific Gravity 2.7 apparent L = 10.93 cm. length of sample hi = inflow burette A = 41.287 sq.cm. area of sample ho = outflow burette a = 0.852 sq.cm. area of burettes t = time h1 = head loss across specimen at t1 h2 = head loss across specimen at t2 t1 t2 hot hit h1 ho2 hit h2 0 30 94.3 1.5 92.8 80.3 15.4 64.9 0 30 94.8 1.1 93.7 77.7 18.3 59.4 0 30 93.5 1.3 92.2 77.9 16.6 61.3 ASTM D 5084 k = ((aaLI(At(a+a)))'*In(h11h2) Percent Deviation NOTE: 1 k = 1.34E-03 12.18% 5 PSI Confining Pressure 2 k = 1.71E-03 11,94% 1 PSI Driving Head 3 k = 1.53E-03 0.24% Average k= 1.53E-03 cm/sec RE:CEI VED JUL 1 6 2006 BY: Hydrograph Report Hydraflow Hydrographs by (ntelisolve Wednesday, Apr 26 2W6, 5:36 PM Hyd. No. 2 POST DEVELOPMENT INFLOW Hydrograph type = SCS Runoff Peak discharge = 33.07 cfs Storm frequency = 25 yrs Time interval = 1 min - Drainage area = 6.00 ac Curve number = 88 Basin Slope = 1.0 % Hydraulic length = 900 ft Tc method = LAG Time of conc. (Tc) = 22.2 min Total precip. = 6.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 116,547 cult Hydrograph Discharge Table (Printed values>=1%of Op. printinteval=5) Time -- Outflow Time -- Outflow Time -- Outflow Time -- Outflow (min cfs) (min cfs) (min cfs) (min cfs) 438 0.33 608 0.99 778 3.02 948 1.03 443 0.34 613 1.04 783 2.82 953 1.01 448 0.35 618 1.10 788 2.66 958 0.99 453 0.36 623 1.16 793 2.51 963 0.96 458 0.37 628 1.22 798 2.38 968 0.94 463 0.38 633 1.29 803 2.27 973 0.92 468 0.39 638 1.36 808 2.17 978 0.91 473 0.39 643 1.44 813 2.08 983 0.90 478 0.40 648 1.53 818 1.99 988 0.89 483 0.41 653 1.63 823 1.90 993 0.88 488 0.42 658 1.74 828 1.83 998 0.87 493 0.44 663 1.86 833 1.75 1003 0.86 498 0.45 668 1.99 838 1.69 1008 0.85 503 0.47 673 2.14 843 1.62 1013 r0.84 ' 508 0.49 678 2.34 848 1.56 1018 . =0.84 513 0.52 683 2.57 853 1.50 �,5.� 1023 . 0.83 518 0.54 688 2.82 858 1.46 1028 0.82 523 0.57 693 3.13 863 1.42 1033 0.81 528 0.59 698 3.89 868 1.40 1038 0.80 533 0.62 703 5.71 873 1.37 1043 0.80 538 0.65 708 9.23 878 1.35 1048 .;r 0. 9,;:, 543 0.67 713 15.24 883 1.33 1053 0; 8,"t ' F' 548 0.70 718 24.01 888 1.30 1058 0.77 553 0.72 723 893 1.28 1063 0.76 558 0.74 72 32.69 898 1.26 1068 0.75 563 0.76 3 27.07 903 1.24 1073 0.75 568 0.77 738 19.97 908 1.21 1078 0.74 573 0.78 743 13.43 913 1.19 1083 0.73 578 0.79 748 8.20 918 1.17 1088 0.72 583 0.81 753 5.50 923 1.15 1093 0.71 588 0.83 758 4.65 928 1.12 1098 0.71 593 0.87 763 4.06 933 1.10 1103 0.70 598 0.90 768 3.60 938 1.08 1108 0,69 603 0.95 773 3.26 943 1.06 1113 0.68 RECEIVED JUL 1 6 2006 BY: Continues on next page... �r� POST DEVELOPMENT INFLOW Hydrograph Discharge Table Time -- Outflow Time -- Outflow (min cfs) (min cfs) 1118 0.67 1373 0.46 1123 0.67 1378 0.46 1128 0.66 1383 0.46 1133 0.65 1388 0.46 1138 0.64 1393 0.46 1143 0.63 1398 0.45 1148 0.62 1403 0.45 1153 0.62 1408 0.45 1158 0.61 1413 0.45 1163 0.60 1418 0.45 1168 0.59 1423 0.45 1173 0.58 1428 0.44 1178 0.58 1433 0.44 1183 0.57 1438 0.44 1188 0.56 1443 0.43 1193 0.55 1448 0.38 1198 0.54 1203 0.53 1208 0.53 ...End 1213 0.52 1218 0.52 1223 0.51 1228 0.51 1233 0.51 1238 0.51 1243 0.50 1248 0.50 1253 0.50 1258 0.50 1263 0.50 1268 0.50 1273 0.49 1278 0.49 1283 0.49 1288 0.49 1293 0.49 1298 0.49 1303 0.48 1308 0.48 1313 0.48 1318 0.48 1323 0.48 1328 0.48 1333 0.48 1338 0.47 1343 0.47 1348 0.47 1353 0.47 1358 0.47 1363 0.47 1368 0.46 RECEIVED JUL 1 6 2006 BY: Hydrograph Plot Hydraflow Hydrographs try IntelisoNe Wednesday, Apr 26 2006, 5:35 PM Hyd. No. 2 POST DEVELOPMENT INFLOW Hydrograph type = SCS Runoff Peak discharge = 33.07 cfs Storm frequency = 25 yrs Time interval = 1 min Drainage area = 6.000 ac Curve number = 88 Basin Slope = 1.0 % Hydraulic length = 900 ft Tc method = LAG Time of conc. (Tc) = 22.23 min Total precip. = 6.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q WS) 35.00 30.00 25.00 20.00 15,00 10.00 5.00 0.00 Hydrograph Volume = 116,547 cult POST DEVELOPMENT INFLOW Hyd. No_ 2 — 25 Yr Q (Cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 ` 0.00 0 2 5 7 9 l ` 12 T 14 16 19 21 23 26 Time (hrs) RECEIVED JUL 1 6 Z006 BY: Hyd No. 2 Hydro -graph Report Hydrallow Hydrographs by IrdelisoNe Hyd. No. 2 POST DEVELOPMENT INFLOW Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip_ Storm duration �SGS-R off - 100 yTs = 6.00 ac 1.0 % = LAG = 8.50 in = 24 hrs Hydrograph Discharge Table Wednesday, Apr 26 2006. 5:36 PUl Peak discharge = 42.66 cfs Time interval = 1 min Curve number = 88 Hydraulic length = 900 ft Time of conc. (Tc) = 22.2 min Distribution = Type 11 Shape factor = 484 Hydrograph Volume = 152,340 cult ( Printed values >= 196 of Op. print interval = 5) Time -- Outflow Time -- Outflow Time -- Outflow Time -- Outflow (min cfs) (min cfs) (min cfs) (min cfs) 400 0.43 570 1.10 740 22.10 910 1.53 405 0.44 575 1.12 745 14.19 915 1.50 410 0.45 580 1.13 750 8.61 920 1.47 415 0.46 585 1.16 755 6.45 925 1.44 420 0.47 590 1.19 760 60 930 1.41 425 0.48 595 1.24 765 4.90 935 1.38 430 0.50 600 1,29 770 4.39 940 1.35 435 0.51 605 1.35 775 4.01 945 1.32 440 0.52 610 1.42 780 3.73 950 1.30 445 0.53 615 1.48 785 3.50 955 1.27 450 0.54 620 1.56 790 3.30 960 1.24 455 0.56 625 1.64 795 3.12 965 1.21 460 0.57 630 1.73 800 2.96 970 1.18 465 0.58 635 1.82 805 2.83 975 1.16 470 0.59 640 1.92 810 '•�.70 980 1.14 475 0.60 645 2.03 815 2.59 985 1.13 480 0.61 650 2.16 820 2.48 990 1.12 485 0.63 655 2.29 825 2.37 995 1.10 490 0.64 660 2.44 830 2.28 1000 1.09 495 0.66 665 2.60 835 2.19 1005 1.08 500 0.68 670 2.78 840 2.10 1010 1.07 505 0.71 675 3.00 845 2.02 1015 1.06 510 0.74 680 3.28 850 1.95 1020 1,05 515 0.78 685 3.59 855 1,88 1025 1.04 520 0.81 690 3.94 860 1.83 1030 1.03 525 0.84 695 4.49 865 11.79 1035 1.02 530 0.88 700 5.93 870 1.76 1040 1.01 535 0.92 705(42 12 875 1.73 1045 1.00 540 0.95 710.85 880 1.70 1050 0.99 545 0.99 715.25 885 1 _S7 1055 0.98 550 1.02 720.55 890 1.64 1060 0.97 555 1.05 725.30 895 1.61 1065 0,96 560 1.07 730.87 900 1.58 1070 0.95 565 1.09 735.06 905 1.55 1075 0.94 continues on next page... RE C EI V D J U_L,- 6 2006 POST QEVtLOPMENT INFLOW Hydrograph Discharge Table Time -- Outflow (min cfs) 1080 1085 1090 1095 1100 1105 1110 1115 1120 1125 1130 1135 1140 1145 1150 1155 1160 1165 1170 1175 1180 1185 1190 1195 1200 1205 1210 1215 1220 1225 1230 1235 1240 1245 1250 1255 1260 1265 1270 1275 1280 1285 1290 1295 1300 1305 1310 1315 1320 1325 1330 0.93 0.92 0.91 0.90 0.89 0.88 0.87 0.86 0.85 0.84 0.83 0.82 0.81 0.80 0.79 0.78 0.76 0.75 0.74 0.73 0.72 0.71 0.70 0.69 0.68 0.67 0.66 0.66 0.65 0.65 0.64 0.64 0.64 0.64 0.63 0.63 0.63 0.63 0.63 0.62 0.62 0.62 0.62 0.62 0.61 0.61 0.61 0.61 0.61 0.60 0.60 Time -- Outflow (min cfs) 1335 1340 1345 1350 1355 1360 1365 1370 1375 1380 1385 1390 1395 1400 1405 1410 1415 1420 1425 1430 1435 1440 1445 1450 ... End 0.60 0.60 0.60 0.59 0.59 0.59 0.59 0.58 0.58 0.58 0.58 0.58 0.57 0.57 0.57 0.57 0.57 0.56 0.56 0.56 0.56 0.56 0.52 0.44 FECIVED] 6 2006 Y: Hydrograph Plot Hydraflow Hydrographs by fntelisolve Hyd. No. 2 POST DEVELOPMENT INFLOW Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 6.000 ac Basin Slope = 1.0 % Tc method = LAG Total precip. = 8.50 in Storm duration = 24 hrs 40.00 30.00 20.00 10.00 n on 0 2 5 --- Hyd No. 2 Wednesday, Apr 26 2006, 5:35 PM Peak discharge = 42.66 cfs Time interval = 1 min Curve number = 88 Hydraulic length = 900 ft Time of conc. (Tc) = 22.23 min Distribution = Type 11 Shape factor = 484 POST DEVELOPMENT INFLOW Hyd. No. 2 — 100 Yr 7 9 12 14 16 19 Hydrograph Volume = 152,340 cutt Q (cfs) 50.00 40.00 30.00 20.00 10.00 ran81 21 23 26 Time (hrs) RECEIVED BY Hydrograph Report Hydraflow Hydrographs by Intelisolve Wednesday, Apr 26 2006, 5:36 PM Hyd. No. 3 2YR-100YR ROUTING Hydrograph type = Reservoir Peak discharge = 0.49 cfs Storm frequency = 25 yrs Time interval = 1 min Inflow hyd. No. = 2 Reservoir name = WQP#1 Max. Elevation = 100.85 ft Max. Storage = 93,217 cuft Storage Indication method used_ Outflow hydrograph volume = 60,469 tuft Hydrograph Discharge Table (Pr4ded vWuL-. '%ofQp_ Pdrd kftoW =5) Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 295 0.10 94.03 ---- ----- -- --_- -- -- ---- ---- 0.005 0.01 300 0.10 94.03 -- - ---- - --- -- ---- ----- 0.006 0.01 305 0.11 94.03 --- --- ----- ----- ---- ----- - -- 0.007 0.01 310 0.12 94.04 ----- ----- ----- ----- ----- ----- ----- ----- 0.007 0.01 315 0.12 94.04 --- ---- --- ---- ----- ----- ---- ----- 0.008 0.01 320 0.13 94.05 ----- ---- ----- ----- ----- --- - ----- ----- 0,009 0.01 325 0.14 94.05 ---- -- -- _-- -- -- --- ----- 0.010 0.01 330 0.15 94.06 - ----- ---- ---- ----- ----- --- ----- 0.011 0.01 335 0.16 94.06 ---- ---- --- ---- ---- ---- - --- 0.012 0.01 340 0.16 94.07 ----- ----- ----- ----- ----- ----- ----- ----- 0.013 0.01 345 0.17 94.07 ----- ---- ----- ----- ----- ----- ----- ----- 0,015 0.01 350 0.18 94.0$ ----- -__- --- ___-- __-- _-_-- ----- ----- 0.016 0.02 355 0.19 94.08 ----- ----- ----- ----- ---- ----- -- --- 0.017 0.02 360 0.20 94.09 --- - -- -- - -- -- ---- 0.018 0.02 365 0.20 94.10 -- -- --- --- - ---- ----- ----- 0.020 0.02 370 0.21 94.11 ----- ----- ----- ----- ----- ----- --- ----- 0.021 0.02 375 0.22 94.11 ----- ---- --- ----- ---- --- ----- ----- 0.023 0.02 380 0.23 94.12 ----- ----- ----- ----- ----- ----- ----- ----- 0.024 0.02 385 0.24 94.13 --- ---- ---- ----- -- ----- -- -- 0.026 0.03 390 0.25 94.14 ----- -- -- --- -- - ---- ---- 0.028 0.03 395 0.26 94.15 ---- - ---- ---- -- - -- ---- ---- 0.029 0.03 400 0.26 94.15 0.031 0.03 405 0.27 94.16 ---- ----- ----- ----- --- ----- --- --- 0.033 0,03 410 0.28 94.17 ----- ____ __- -_^ -_- ___-- __- __-- 0.035 0.03 415 0.29 94.18 ---- --- --- -- ---- ----- ----- ----- 0.037 0.04 420 0.30 94.19 -- -- --- --- --- -- ---- --- 0,039 0.04 425 0.31 94.20 - ----- ---- - --- --- - - 0.041 0.04 430 0.32 94,21 ----- ----- ----- ----- ----- ----- ----- ----- 0.043 0.04 435 0.33 94.22 ---- ---- ---- ----- ----- -- ---- ----- 0.045 0.04 440 0.33 94.23 -- ----- ----- ----- ----- ---- ---- ---- 0.047 0.05 445 0.34 94.25 ----- ----- ---- -- --- ----- ----- ----- 0.049 0.05 450 0.35 94.26 ----- ---- ---- ---- ---- --- ----- ----- 0.052 0.05 455 0.36 94.27 - --- --- ----- ---- - - -- 0.054 0.05 460 0.37 94.28 ----- ----- ----- ----- ----- ---- ----- ---- 0.056 0.06 465 0.38 94.29 --- ----- ---- ----- ----- --_-- ----- ----- 0.059 0.06 470 0.39 94.30 ----- ----- ----- ----- ----- ----- ----- 0.061 0.06 475 0.40 94.32 -- ---- ---- ---- -- --- -- - - 0.064 0.06 480 0.41 94.33 ---- ----- -- --- - ---- ---- ----- 0.067 0.07 RECEIVED JUL I G 2006 Continues on next page... 2YR-100YR ROUTING Hydrograph Discharge Table Time Inflow Elevation CIv A Civ B CIv C Clv D Wr A Wr B Wr C Wr D EA1 Outflow (min) cfs ft cfs cfs cfs cfs Cfs cfs cfs Cfs cfs cfs 485 0.42 94.34 -- ----- -_--- ----- ----- ----- ----- ----- 0.069 0.07 490 0.43 94.36 ----- --- ----- ---- -- - --- -- ----- 0.072 0.07 495 0.44 94.37 ---- --- ----- -- -- -- - ----- 0.075 0.07 500 0.46 94.39 ----- ----- ----- ----- ----- ----- ----- ----- 0.078 0.08 505 0.48 94.40 ----- ---- ----- ----- ----- ----- ----- ----- 0.081 0.08 510 0.50 94.42 ----- ----- ----- --- ---- --_-- ----_ _---- 0.084 0.08 515 0.53 94.43 ---- -- --- ---- -- ----- - -- ----- 0.087 0.09 520 0.55 94.45 ----- ---- ---- ----- ----- ----- ---- ----- 0.091 0.09 525 0.58 94.47 - -- --- --- _- -- -- --- 0.094 0.09 530 0.60 94.49 ----- ----- ---- ----- ---- ----- ---- ---- 0.098 0.10 535 0.63 94.51 ----- ----- ----- ----- ----- ----- ----- ----- 0.102 0.10 540 0.66 94.53 ----- ----- ----- ----- ----- ---- ----- ----_ 0.106 0.11 545 0.68 94.55 - ---- ---- ----- ---- ----- ----- ----- 0.111 0.11 550 0.71 94.57 -- -- ---- -- -- ---- ---- ---- 0.115 0.12 555 0.73 94.59 -- --- --- -- ---- -- -- --- -- 0.120 0.12 560 0.75 94.62 ----- ----- ----- ----- ----- ----- ----- ----- 0.125 0.12 565 0.76 94.64 --- ---- ----- ---- -- --- ---- ---- 0.129 0.13 570 0.77 94.67 ---- ----- ----- ---- ----- ----- ----- ----- 0.134 0.13 575 0.78 94.69 --- --- _-_-- ----- ---- ---- ----- ---- 0-139 0.14 580 0.80 94.72 -- -- - -- - --- - - -- 0.144 0.14 585 0.82 94.74 - ----- ---- - --- ----- ----- ----- 0.149 0.15 590 0.84 94.77 ----- ----- ----- ----- ----- ----- ----- ----- 0.155 0.15 595 0.88 94.79 ----- ----- ----- ---- ----- ---- --- ----- 0.160 0.16 600 0.92 94.82 ----- ----- ----- ----- ----- ----- ----- ---- 0.166 0.17 605 0.96 94.85 -- -- ---- ---- -- ---- -- -- 0.172 0.17 610 1.01 94.88 --- -- --- ----- --- --- ---- --- 0.178 0.18 615 1.06 94.92 - -- --- ---- - ----- - --- - 0.185 0.18 620 1.12 94.95 ----- ----- ----- --- ---- ---- ----- ----- 0.192 0.19 625 1.18 94.99 ----- ----- ----- ----- ---- ----- ----- --- 0.199 0.20 630 1.25 95.02 --- --- ----- ----- ----- ----- --- ----- 0.202 0.20 635 1.32 95.05 ----- --- ----- -- -- --- -- --- 0.204 0.20 640 1.39 95.09 ---- - --- - - --- ---- -- --- 0.205 0.21 645 1.48 95.13 ---- ---- ----- --- ----- - - ----- 0.207 0.21 650 1.57 95.17 ---- ----- ---- ----- ---- ----- ----- ---_- 0.209 0.21 655 1.68 95.21 --- ---- ---- --- --- --- - ---- ---- 0.211 0.21 660 1.79 95.26 ----- ---_- --_-- ----- ----- ----- ----- ----- 0.213 0.21 665 1.91 95.31 --- -- ---- ----- -- ---- -- -- 0.215 0.21 670 2.05 95.37 -- --- --- --- -- --- ---- --- 0.217 0.22 675 2.22 95.43 --- - ---- ---- --- ----- ---- --- 0.220 0.22 680 2.42 95.49 ----- --- ----- ----- ----- ----- ----- ----- 0.223 0.22 685 2.67 95.56 --_-- ---- ----_ ----- ---- ---- ----- ----- 0.226 0.23 690 2.93 95.64 ----- _---- ----- --- ----- ----- ----- ----- 0.229 0.23 695 3.35 95.73 -- -- --- ----- ----- ---- -- ----- 0.233 0.23 700 4.45 95-84 ----- --- ---- ---- --- --- ---- -- 0.238 0.24 705 6.88 96.01 --- - - - ---- --=-- ----- ----- 0.245 0-24 710 11.28 96.23 ---- ---- _ --- ----- 0.255 0.26 715 18.57 96.61 ----- ---- ---- ----- ----- ---- ----- ---- 0.273 0.27 720 27.41 97.17 ----- ----- ----- ----- ---- ----- ----- ----- 0.299 0.30 725 32.77 97.83 ----- - ----- ----- -- ----- ----- ---- 0.330 0.33 730 30.99 98.47 --- -- -- -- ----- ----- ---- ----- 0.361 0.36 735 24.20 99.00 ---- ---- ----- --- ---- - -- - 0.387 0.39 RECEIVED Continues on next page... JUL 16 2006 Bv• 2YR-100YR'ROUTING Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (min) Cfs ft" cfs cfs Cfs cfs cfs cfs cfs cfs Cfs cfs 740 17.26 99.34 ----- ----- ----- ---- ----- ---- ---- ----- 0.405 0.41 745 11.12 99.57 --- ----- ----- ----- ---- ----- ----- ----- 0.417 0.42 750 6.76 99.71 -- --- --- -- -- -- -- --- 0.424 0.42 755 5.07 99.80 ----- ----- ----- ----- ----- ----- ----- ----- 0.429 0.43 760 4.40 99.87 ----- ----- ----- ----- ----- ----- ----- ----- 0.433 0.43 765 3.86 99.93 ----- ----- ----- ---- ----- ----- ----- ----- 0.436 0.44 770 3.45 99.99 ----- ----- ----- ----- ---- ----- ---- ----- 0.439 0.44 775 3.16 100.03 -- ---- --- ----- --- ---- ---- ---- 0.441 0.44 780 2.93 100.07 ---- - -- -- - -- -- --- 0.443 0.44 785 2.76 100.10 ----- ----- ----- ----- ---- ----- ----- ----- 0.445 0.45 790 2.60 100.14 --- ----- ----- ----- ---- ----- ----- ---- 0.447 0.45 795 2.46 100.17 ---- --- ----- --- ---- ---- ----- ---- 0.449 0.45 800 2.34 100.20 ----- ----- --- ----- ----- ----- - --- _---- 0.450 0.45 805 2.23 100.2-2 -- ---- -- --- ---- ---- --- ---- 0.452 0.45 810 2.13 100.25 --- -- --- -- -- -- ---- -- 0.453 0.45 815 2.04 100.27 ----- ----- ----- ---- --__ ___ -- ----- 0.455 0.45 820 1.95 100.30 ----- ----- ---- --- ----- ---- ----- ----- 0.456 0.46 825 1.87 100.32 ---- ----- ---- ---- ----- ----- ----- ----- 0.457 0.46 830 1.80 100.34 --- ----- ---- ----- ----- - - --- ----- 0.458 0.46 835 1.73 100.36 -- -- - --- -- ---- ----- --- - 0.459 0.46 840 1.66 100.38 --- ---- ----- --- --- --- - -- 0.460 0.46 845 1.59 100.39 ---- ----- ----- ----- ----- ----- ----- ----- 0.461 0.46 850 1.54 100.41 ----- ----- ---- ---- --- -- ---- ----- 0.462 0.46 855 1.49 100.43 ----- ----- ----- ----- ---- ----- ----- ----- 0.463 0.46 860 1.44 100.44 -- -- -- ---- --- ---- ----- ----- 0.464 0.46 865 1.41 100.46 -- --- --- ---- --- -- -- -- 0.464 0.46 870 1.39 100.47 ---- ---- ----- ---- --- ---- --- ---- 0.465 0.47 875 1.36 100.48 ----_ _- - w_ __-- _-_._ ___ ___-- 0.466 0.47 880 1.34 100.50 ----- ----- ----- ---- ----- ----- ----- ---- 0.467 0.47 885 1.32 100.51 ----- ----- ----- ----- ----- ----- --_-- _--- 0.467 0.47 890 1.29 100.52 ---- -- --- -- -- --- ----- ---- 0.468 0.47 895 1.27 100.53 --- ----- ---- -- -- --- - ---- ---- 0.469 0.47 900 1.25 100.55 ----- --- ----- ---- ---- ---- --- --- 0.469 0.47 905 1.23 100.56 ----- -- --___ ___ __- ___-- ___-- __-- 0.470 0.47 910 1.20 100.57 ---- ----- ----- ---- ----- ----- ----- ---- 0.471 0.47 915 1.18 100.58 ----- ---- ----- ----- ----- ----- ----- ----- 0.471 0.47 920 1.16 100.59 - ---- -- ----- --- ----- -- -- 0.472 0.47 925 1.14 100.60 ---- -- ----- --- ----- ---- ---- --- 0.472 0.47 930 1.11 100.61 ----- ---- ---- ---- -- ----- ---- ----- 0.473 0.47 935 1.09 100.62 ----- ---- ----- ---- ----- ---- ----- ----- 0.473 0.47 940 1.07 100.63 --- ---- ---- ---- ---- ----- ---- ----- 0.474 0.47 945 1.05 100.64 ---- --- ----- ----- ----- --- ----- ----- 0.474 0.47 950 1.02 100.64 ----- --- -- ----- ---- ----- ---- ---- 0.475 0.47 955 1.00 100.65 ---- ----- ----- ---- ---- -- -- -- 0.475 0.48 960 0.98 100.66 -- ---- --- ----- ----- ---- --- ---- 0.476 0.48 965 0.96 100.67 - -- ----- _---- ---- --- ----- ----- ----- 0.476 0.48 970 0.93 100.67 ---- -- ----- ----- ----- ----- ----- ----- 0.476 0.48 975 0.92 100.68 0.477 0.48 980 0.90 100.69 ---- ----- ---- ----- ---- ----- ----- ----- 0.477 0.48 985 0.89 100.69 ----- -- -- -_ -- ----- ----- 0.477 0.48 990 0.88 100.70 --- --- ----- ----- --- -- --- -- 0.478 0.48 F��VE C EI V ED Continues on next page... JUL 1 6 2006 : 2Yfi-100YR ROUTING Hydrograph Discharge Table Time Inflow Elevation Clv A CIv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Ou#flow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 995 0.87 100.71 --- -- ---- --- -- --- ----- - --- 0.478 0.48 1000 0.87 100.71 ---- --- --- ---- -- -- --- -- 0.478 0.48 1005 0.86 100.72 --- ----- ----- ----- ----- ----- ----- ----- 0.479 0.48 1010 0.85 100.72 ----- -_--- ----- ----- ----- ----- ----- ----- 0.479 0.48 1015 0.84 100.73 ---- ----- ----- ----- ----- ---- ----- ---- 0.479 0.48 1020 0.83 100.73 --- - ----- ----- ----- ----- ----- ----- ----- 0.480 0.48 1025 0.82 100.74 -- -- ---- --- -- ---- --- --- 0.480 0.48 1030 0.82 100.74 ----- ---- ---- --__ -- ----- ---- - - 0.480 0.48 1035 0.81 100.75 --- ---- ---- --- ---- ----- ---- ----- 0.480 0.48 1040 0.80 100.75 ---- ---- ----- _--- ----- ----- ----- ----- 0.481 0.48 1045 0.79 100.76 ----- _---- ----- ----- ----- ----- ----- ----- 0.481 0.48 1050 0.78 100.76 ---- ----- ----- ----- ----- ----- ----- ----- 0.481 0.48 1055 0.78 100.77 --- -- --- -- - -- --- -- - 0.481 0.48 1060 0.77 100.77 --- -- ---- ---- --- -- --- ----- 0.482 0.48 1065 0.76 100.78 -- ---- ---- -- -- --- ---- ----- 0.482 0.48 1070 0.75 100.78 ---- ----- ----- --_- - --_ ----- ----- ----- 0.482 0.48 1075 0.74 100.78 ----- ----- ----- ----- ---- --- ----- ---- 0.482 0.48 1080 0.74 100.79 ---- ----- ----- ----- ----- ----- ----- ----- 0.483 0.48 1085 0.73 100.79 ---- ---- --- -- ---- -- -- --- 0.483 0.48 1090 0.72 100.79 --- - ---- ----- ---- ---- ----- --- 0.483 0.48 1095 0.71 100.80 - -- -- - - -- -- ----- 0.483 0.48 1100 0.70 100.80 ----- ----- ----- ----- ----- ----- ----- ----- 0.483 0.48 1105 0.69 100.80 --- -_-- ----- ---- ----- ----- ----- ----- 0.483 0.48 1110 0.69 100.81 ----- ----- ----- ---- _--- ----- ----- ----- 0.484 0.48 1115 0.68 100.83 0.484 0.48 1120 0.67 100.81 --- -- --- - --- --- ---- ---- 0.484 0.48 1125 0.66 100.82 ----- ---- ---- --- --- - -- - 0.484 0.48 1130 0.65 100.82 ---- ---- --- ----- ----- ----- ----- ----- 0.484 0.48 1135 0.65 100.82 ---- ----- ---- ----- --- ----- ---- ----- 0.484 0.48 1140 0.64 100.82 ----- ----- ----- ----- ----- ----- ----- ---- 0.485 0.48 1145 0.63 100.83 ---- ----- ----- ---- ---- ----- ----- --- 0.485 0.48 1150 0.62 100.83 - - - - - --- ---- ----- 0.485 0.48 1155 0.61 100.83 --- --- ---- -- -- -- -- --- 0.485 0.48 1160 0.61 100.83 ----- ----- ----- ----- ---- ----- ----- ----- 0.485 0.48 1165 0.60 100.83 --- ---- ---- ----- ---_ ----- ----- ----- 0.485 0.49 1170 0.59 100.84 --- ----- ---- ----- --- ----- ----- ----- 0.485 0.49 1175 0.58 100.84 ----- --- ----- ----- ---- - ----- --- 0.485 0.49 1180 0.57 100.84 0.485 0.49 1185 0.56 100.84 - -- -- -- --- -- ---- ---- 0.485 0.49 1190 0.56 100.84 ----- ----- ----- ----- ---- ----- ----- ----- 0.485 0.49 1195 0.55 100.84 0.485 0.49 1200 0.54 100.84 --- ----- ---- ---- ----_ ----- ---- ----- 0.486 0.49 1205 0.53 100.84 ---- ---- ---- ---- ----- -- -- ---- 0.486 0.49 1210 0.52 100.84 - --- ---- ---- ----- ----- ----- - 0.486 0.49 1215 0.52 100.84 ---- _--- -- -- -- --- --- ---- 0.486 0.49 1220 0.51 100.84 ---- ----- ----- ----- ----- --- ----- ---- 0.486 0.49 1225 0.51 100.84 ----- ----- ----- ----- ----- ----- ----- ----- 0.486 0.49 1230 0.51 100.85 ----- ----- ----- ----- ----- ----- ----- ----- 0.486 0.49 1235 0.51 100.85 0.486 0.49 1240 0.51 100.85 ----- --- ----- ---_ ----- -- - ----- 0.486 0.49 1245 0.50 100.85 ----- ----- ----- ----- ----- ---- ---- ----- 0.486 0.49 RECEIV ED Continues on next page... JUL 16 006 BY: ZiR.400YWROUTING Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 1250 0.50 100.85 --- ----- ----- ---- -- --- - --- 0.486 0.49 1255 0.50 100.85 -- ---- ----- ---- ----- ----- ---- -- 0.486 0.49 1260 0.50 100.85 ---- -- - ---- - -- ----- ---- 0.486 0.49 1265 0.50 100.85 ---- ----- ---- ----- ----- ----- ----- ----- 0.486 0.49 1270 0.50 100.85 --- ----- ----- ----- ----- ----- ---- ---- 0.486 0.49 1275 0.49 100.85 ---- ----- ---- ----- ---- ----- ----- ----- 0.486 0.49 1280 0.49 100.85 0.486 0.49 1285 0.49 100.85 -- -- - --- --- ----- ----- ----- 0.486 0.49 1290 0.49 100.85 ---- --- --- --- -- --- - - -- 0.486 0.49 1295 0.49 100.85 --- ---- ---- ----- ----- ----- ----- ----- 0.486 0.49 1300 0.49 100.85 << ----- ----- --- ---- -- ---- ----- ---- 0.486 0.49 << 1305 0.48 100.85 ----- ----- ---- ----- --- ----- ---- ---- 0.486 0.49 1310 0.48 100.85 ---- ----- --- ----- ---- ---- ---- ---- 0.486 0.49 1315 0.48 100.85 -- --- -- -- --- -- ---- ----- 0.466 0.49 1320 0.48 100.85 ---- --- ---- -- --- -- - -- 0.486 0.49 1325 0.48 100.85 ----- _____ -_-- 0.486 0.49 1330 0.48 100.85 ---- -_-- -- ---- ---- ---- ----- ---- 0.486 0.49 1335 0.47 100.85 ---- ----- ----- ---- ----- ----- ----- ---= 0.486 0.49 1340 0.47 100.85 ---- ---- --- ----- ----- ----- ----- ----- 0.486 0.49 1345 0.47 100.85 -- --- -- -- -- -- -- ---- 0.486 0.49 1350 0.47 100.85 ---- ---- ---- -- --- -- -- -- 0.486 0.49 1355 0.47 100.85 ---- ---- ---- ----- ----- ----- ----- ----- 0.486 0.49 1360 0.47. 100.85 ---- --- --- --- --- --- --- -- 0.486 0.49 1365 0.46 100.85 ----- ----- ----- ----- ----- ----- ----- ----- 0.486 0.49 1370 0.46 100.85 --- -- ---- --- -- ---- -- --- 0.486 0.49 1375 0.46 100.84 ---- ---- ---- --- ---- --- ---- --- 0.486 0.49 1380 0.46 100.84 --- ---- -- --- --- ---- ----- ----- 0.486 0.49 1385 0.46 100.84 0.486 0.49 1390 0.46 100.84 ----- ----- ----- ----- ----- ----- ----- --- 0.486 0.49 1395 0.46 100.84 ----_ ----_ ----- ---- ----- ----- --- ----- 0.486 0.49 1400 0.45 100.84 ---- -- --- -- --- -- ---- -- 0.486 0.49 1405 0.45 100.84 ---- ---- --- - ---- ----- -- --- 0.486 0.49 1410 0.45 100.84 ----- -- -- --- ---- ----- ----- ---- 0.486 0.49 1415 0.45 100.84 ----- ---- --- --- ----- ---- ---- ---- 0.485 0.49 1420 0.45 100.84 ---- ---- ---- ----- ----- ---- -- -- 0.485 0.49 1425 0.45 100.84 ---- --- ----- ----- ----- ----- ----- ----- 0.485 0.49 1430 0.44 100.84 --- ---- ---- --- - ---- --- ----- 0.485 0.49 1435 0.44 100.84 --- -- - --- -- -- -- - 0.485 0.49 1440 0.44 100.84 ----- --- ---- --- ----- ---- ---- -- 0.485 0.49 1445 0.41 100.84 ---- ----- ----- ----- ----- _---- ---- ---- 0.485 0.49 1450 0.35 100.84 -- --- ---- -- ---- -- -- ----- 0.485 0.49 1455 0.24 100.83 ----- --- --- ----- ---- ----- ----- ----- 0.485 0.49 1460 0.14 100.83 ---- ---- ----- ---- ----- ----- ----- ----- 0.485 0.48 1465 0.07 100.82 ----- ---- ---- --- --- ---- ----- ----- 0.484 0.48 1470 0.02 100.82 - -- -- ---- -- -- -- ---- -- --- 0.484 0.48 1475 0.00 100.81 ----- ----- ---- ----- ----- ---- ----- ---- 0A84 0.48 1480 0.00 100.80 ----- ----- ----- --- -- ----- ----- ----- 0.483 0.48 1485 0.00 100.79 --- -- ----- ----- - - - ----- ----- ----- 0.483 0.48 1490 0.00 100.79 ----- --- --- ----- ----- ----- ----- ---- 0.483 0.48 1495 0.00 100.78 ----- ----- ---- ---- ----- ----- -- -- 0.482 0.48 1500 0.00 100.77 -- -- --- -- - ---- ---- ---- 0.482 0.48 RECEIVED Continues on next page... JUL 1 6 Z006 2i'R-100YR ROUTING Hydrograph Discharge Table Time inflow Elevation Clv A Clv B Clv C Civ D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 1505 0.00 100.77 ----- ----- ----- ----- ----- ----- ---- ----- 0.481 0.48 1510 0.00 100.76 -- ---- -- - --- ----- ---- ----- 0.481 0.48 1515 0.00 100.75 ---- -- --_ ----- --- - -- -- 0.481 0.48 1520 0.00 100.74 ----- ----- ----- ----- ----- ----- ----- ----- 0.480 0.48 1525 0.00 100.74 ----- ----- ----- ----- ----- ----- ----- ----- 0.480 0.48 1530 0.00 100.73 ---- ---- ----- ---- ----- ----- ----- ----- 0.479 0.48 1535 0.00 100.72 0.479 0.48 1540 0.00 100.72 -- --- - --- - ----- --- ---- 0.479 0.48 1545 0.00 100.71 ---- -- ----- ----- -- - --- -- 0.478 0.48 1550 0.00 100.70 ----- ----- ----- ----- ----- ----- ----- ----- 0.478 0.48 1555 0.00 100.69 0.478 0.48 1560 0.00 100.69 ----- ----- ----- ----- ----- --_-- ----- _---- 0.477 0.48 1565 0.00 100.68 ----- ---- ---- ---- ----- ----- ----- ----- 0.477 0.48 1570 0.00 100.67 --- ---- -- --- --- ----- - --- 0.476 0.48 1575 0.00 100.67 --- -- ---- ---- -- -- ----- --- 0.476 0.48 1580 0.00 100.66 ----- ---- ----- ----- ----- ----- ---- ----- 0.476 0.48 1585 0.00 100.65 ----- ----- ---_ ---- -- ---- ----- ---- 0.475 0.48 1590 0.00 100.65 ----- ----- ----- ----- ----- ----- ---- ----- 0.475 0.47 1595 0.00 100.64 ---- - --- --- ---- -- --- --- 0.474 0.47 1600 0.00 100.63 --- ---- _--- ---- -- --- --- ---- 0.474 0.47 1605 0.00 100.62 ---- ---- ---- ----- ---- ---- ----- ---- 0.474 0.47 1610 0.00 100.62 ---- ----- ----- ---- ----- ----- ----- _--- 0.473 0.47 1615 0.00 100.61 ----- ----- ----- ----- ----- ----- ----- ----- 0.473 0.47 1620 0.00 100.60 ----- ---- ---- ----- ---- ----- ----- ----- 0.472 0.47 1625 0.00 100.60 ---- ----- --- ---- -- - ---- ---- 0.472 0.47 1630 0.00 100.59 -- ----- ---- ----- ---- -- ---- ----- 0.472 0.47 1635 0.00 100.58 ----- - -- - --- -- - -- 0.471 0.47 1640 0.00 100.57 ----- ----- ----- ----- ---- ----- ----- ----- 0.471 0.47 1645 0.00 100.57 0.471 0.47 1650 0.00 100.56 ----- ---- ----- ----- ----- ----- ----- ----- 0.470 0.47 1655 0.00 100.55 --- ----- ----- ----- -- ----- ----- ----- 0.470 0.47 1660 0.00 100.55 --- --- --- ----- ---- --- - ---- 0.469 0.47 1665 0.00 100.54 --- --- - -- -- ----- -- - 0.469 0.47 1670 0.00 100.53 ----- ----- ---- ---- ----- ----- ----- ----- 0.469 0.47 1675 0.00 100.53 ---_- --- ----- --- ---- ----- ----- ----- 0.468 0.47 1680 0.00 100.52 ----- ----- ----- ----- ----- ----- ----- ----- 0.468 0.47 1685 0.00 100.51 ----- --- -- --- ---- ---- ----- --- 0.468 0.47 1690 0.00 100.51 ---- ----- ----- --- -- ---- --- ----- 0.467 0.47 1695 0.00 100.50 -- ----- ----- ---- --- --- -- ----- 0.467 0.47 1700 0.00 100.49 ----- -- --_- --- ----- ---- ----- ----- 0.466 0.47 1705 0.00 100.4$ ---- ----- ---- - - ----- ----- ----- ----- 0.466 0.47 1710 0.00 100.48 ----_ ----- ----- ----- ----- ----- ----- ---- 0.466 0.47 1715 0.00 100.47 ----- -- --- ----- ----- ---- ---- --= 0.465 0.47 1720 0.00 100.46 ---- ---- ---- - ---- - --- ---- ---- 0.465 0.46 1725 0.00 100.46 ----- ----- ----- ---- --- ---- ----- ---- 0.465 0.46 1730 0.00 100.45 ---- ----- ----- ----- ----- ----- -- --- 0.464 0.46 1735 0.00 100.44 ---- ----- ----- --- ---- ----- ----- ---- 0.464 0.46 1740 0.00 100.44 ---- ----- ---- ----- - - - ----- ----- ----- 0.463 0.46 1745 0.00 100.43 ----- ----- ---- ----- --- -- --- ---- 0.463 0.46 1750 0.00 100.42 -- - - ----- ----- -- -- - -- 0.463 0.46 1755 0.00 100.42 ---- --- ----- - --- --- ----- ----- 0.462 0.46 R-ECEIVED Continues on next page... JUL 1 6 2006 13Y: 2YR-100YR,ROUTING Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 1760 0.00 100.41 ---- -- --- ---- -- ---- ----- ----- 0.462 0.46 1765 0.00 100.40 ----- ---- ---- ---- ----- ----- -- -- 0A62 0.46 1770 0.00 100.39 ---- ---- ----- ----- --- ----- --- - -- 0.461 0.46 1775 0.00 100.39 ----- ----- ----- ----- ----- ----- ----- ----- 0.461 0.46 1780 0.00 100.38 ----- ----- ----- ----- ----- ----- ----- ----- 0.460 0.46 1785 0.00 100.37 ----- ----- ----- ----- ----- ----- 0.460 0.46 1790 0.00 100.37 ---- -- -- _-- -- ---- --- --- 0.460 0.46 1795 0.00 100.36 ----- ----- ----- ----- ----- -- --- -- 0.459 0.46 1800 0.00 100.35 - --- -- --- --- ---- ----- ---- 0.459 0.46 1805 0.00 100.35 ----- ----- ----- ---- ---- ----- ----- ---- 0.459 0.46 1810 0.00 100.34 ----- _---- ----- ----- ----- ----- ---- ----- 0.458 0.46 1815 0.00 100.33 ---- ----- ----- ----- ----- ----- ----- ----- 0.458 0.46 1820 0.00 100.33 --- -- --- -- ---- --- --- -- 0.457 0.46 1825 0.00 100.32 -- ----- ---- ---- ---- --- --- -- 0.457 0.46 1830 0.00 100.31 ---- ---- ---- ----- ---- ---- ----- ---- 0.457 0.46 1835 0.00 100.31 ---- ----- ----- ----- ----- ----- ---- --- 0.456 0.46 1840 0.00 100.30 ----- ----- ----- ----- ---- ----- ---- ----- 0.456 0.46 1845 0.00 100.29 ----- ----- ----- ----- --_-- ----- ----- ----- 0.456 0.46 1850 0.00 100.29 ----- --- ----- ----- ----- ----- ----- ---- 0.455 0.46 1855 0.00 100.28 ---- ---- --- ---- --- ----- --- ---- 0.455 0.45 1860 0.00 100.27 --- -- --- - - - -- - 0.454 0.45 1865 0.00 100.27 ---- ----- ----- ----- ----- ----- ----- ---- 0.454 0.45 1870 0.00 100.26 -- ---- ---- ---- - ----- --- -- -- 0.454 0.45 1875 0.00 100.25 ----- ----- ----- ----- ----- ----- ----- ---- 0.453 0.45 1880 0.00 100.25 ----- ----- ----- ----- ---- ----- ----- ----- 0.453 0.45 1885 0.00 100.24 -- - -- --- --- -- --- ---- 0.453 0.45 1890 0.00 10023 --- --- ---- -- -- ---- - -- 0.452 0.45 1895 0.00 100.23 ----- ---- ----_ _---- ---- ----- ---- --- 0.452 .0.45 1900 0.00 100.22 ---_ -- ---- ---- ---- ----- -- ---- 0.451 0.45 1905 0.00 100.21 ----- ----- ----- ----- ----- ----- ----- ----- 0.451 0.45 1910 0.00 100.20 --- --- -- ----- ----- --- ---- ---- 0.451 0.45 1915 0.00 100.20 - -- --- -- - -- -- --- 0.450 0.45 1920 0.00 100.19 --- ----- --- --- --- ---- ---- -- -- 0.450 0.45 1925 0.00 100.18 ----- ----- ----- ----- ----- ----- ---- ----- 0.450 0.45 1930 0.00 100.18 --_ 0.449 0.45 1935 0.00 100.17 ----- ----- ----- ----- ----_ --_-- ----- ----- 0.449 0.45 1940 0.00 100.16 ----- ---- ----- --- ---- ----- ---- ---- 0.449 0.45 1945 0.00 100-16 --- -- -- ---- -- - -- 0.448 0.45 1950 0.00 100.15 -- ---- -- - ---- --- ---- --- 0.448 0.45 1955 0.00 100.14 0.447 0.45 1960 0.00 100.14 ----- --- --- ---_ ---- ---_ ---- ---- 0.447 0.45 1965 0.00 100.13 --- -- ----- -- -- ----- ----- ----- 0.447 0.45 1970 0.00 100.12 ---- ----- ----- ---- --- ----- -- -- 0.446 0.45 1975 0.00 100.12 ---- ---- -- ----- -- - ---- -- --- 0.446 0.45 1980 0.00 100.11 -- --- --- - - ---- ----- ---- 0.446 0.45 1985 0.00 100.10 ----- ----- ----- ----- ----- ----- ----- ----- 0.445 0.45 1990 0.00 100.10 ----- _--- ----- ---- ----- ----- ----- ---- 0.445 0.44 1995 0.00 100.09 ----- ----- ----- ----- ----- ----- ----- ----- 0.445 0.44 2000 0.00 100.09 --- ---- ----- - --- _--- ----- --- 0.444 0.44 2005 0.00 100.08 ----- ----- ----- ----- ---- --- --- ---- 0.444 0.44 2010 0.00 100.07 ----- ---- -- ----- ---- ---- ---- - 0.444 0.44 RECEIVED Continues on next page... JUL 1 6 2006 BY: 2YR-lOOYR ROUTING Hydrograph Discharge Table Time Inflow Elevation CIv A CIv B CIv C CIv D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 2015 0.00 100.07 --- ---- ---- ---- - -- -- ----- - --- 0.443 0.44 2020 0.00 100.06 ----- --- ----- ----- ----- ---- -_-- ----- 0.443 0.44 2025 0.00 100.05 ---- -- --- --- --- ---- - --- 0.442 0.44 2030 0.00 100.05 ----- ----- ----- ----- ----- ----- ----- ----- 0.442 0.44 2035 0.00 100.04 ----- ----- ----- ----- ----- _---- ----- ----- 0.442 0.44 2040 0.00 100.03 ----- ----- ----- ----- ----- ----- ----- ----- 0.441 0.44 2045 0.00 100.03 -- ----- ---- ----- ---- - ----- ----- 0.441 0.44 2050 0.00 100.02 ----- ---- ----- --- ----- ---- --- ----- 0.441 0.44 2055 0.00 100.01 ----- -- --- - --- --- - - 0.440 0.44 2060 0.00 100.01 ----- ----- ----- ----- ----- ----- ----- ----- 0.440 0.44 2065 0.00 100.00 ---- ---- ----- ----- ----- ---- ----- ----- 0.440 0.44 2070 0.00 99.99 ----- ----- ----- -_--- ----- --- ----- ---- 0.439 0.44 2075 0.00 99.98 -- ---- --- ---- -- --- ----- ----- 0.439 0.44 2080 0.00 99.98 ---- --- ----- ---- ----- ---- ----- ----- 0.438 0.44 2085 0.00 99.97 ----- --- ----- -- -- --- - -- 0.438 0.44 2090 0.00 99.96 -- ----- ----- ----- ----- ---- ----- ----- 0.438 0.44 2095 0.00 99.96 ----- ----- ----- ----- ----- --- ----- ----- 0.437 0.44 2100 0.00 99.95 ----- ----- ----- ----- ---- ----- ----- ---- 0.437 0.44 2105 0.00 99.94 ----- ----- ----- ----_ ---- -- ---- ---- 0-436 0.44 2110 0.00 99.93 -- - --- -- - --- -- - 0.436 0.44 2115 0.00 99.93 -- ---- --- ----- --- ---- ----- ---- 0.436 0.44 2120 0.00 99.92 ----- -- ----- ---- ----- ----- ----- ---- 0.435 0.44 2125 0.00 99.91 ----- ----- ----- ----- ---- ----- ----- ---- 0.435 0.43 2130 0.00 99.90 ----- ----- ----- ----- ----- --- ----- ----- 0.435 0.43 2135 0.00 99.90 -- --- ---- ---- - ----- --- - 0.434 0.43 2140 0.00 99.89 -- --- -- -- ----- ----- ---- ----- --- 0.434 0.43 2145 0.00 99.88 ---- -- ----- - -- -- --- -- --- 0.433 0.43 2150 0.00 99.87 ----- ---- ---- ---- ---- ----- ----- ----- 0.433 0.43 2155 0.00 99.87 ----- ----- --- ----- ----- ----- ----- ----- 0.433 0.43 2160 0.00 99.86 0.432 0.43 2165 0.00 99.85 -- - ----- --- -- ----- - - 0.432 0.43 2170 0.00 99.85 ---- --- -- _---- ----- ---- ----- ---- 0.432 0.43 2175 0.00 99.84 ----- ----- -- --- --- -- _---- ----- 0.431 0.43 2180 0.00 99.83 ----- ----- ----- ----- ----- ----- ---- ----- 0.431 0.43 2185 0.00 99.82 ----- ---- ---- ----- ----- ----- ----- ----- 0.430 0.43 2190 0.00 99.82 -- ----- -- ----- ----- -- ----- ----- 0.430 0.43 2195 0.00 99.81 ----- --- ----- ----- ----- - ----- ---- 0-430 0.43 2200 0.00 99.80 --- ----- --- --- -- --- -- --- 0.429 0.43 2205 0.00 99.80 ---- - ----- --- ----- -- -- --- 0.429 0.43 2210 0.00 99.79 ----- ----- ----- ----- ----- ---- ----- ----- 0.429 0.43 2215 0.00 99.78 ---- ----- --- ----- ---- ----- --- ----- 0.428 0.43 2220 0.00 99.77 ----- ----- --- ----- ----- ---- ----- ----- 0.428 0.43 2225 0.00 99.77 ---- --- ---- --- -- ----- ----- ---- 0.427 0.43 2230 0.00 99.76 -- ---- ----- -- --- --- -- ----- 0.427 0.43 2235 0.00 99.75 ----- - ----- ----- ----- ---- --- ---- 0.427 0.43 2240 0.00 99.75 ----- ----- ----- ----- ----- ---- ----- ---- 0.426 0.43 2245 0.00 99.74 ---- ----- ----- ---- ----- ---- ----- ----- 0.426 0.43 2250 0.00 99.73 ----- ----- ----- ----- ----- ----- ----- ----- 0.426 0.43 2255 0.00 99.72 ----- ----- ----- ----- ---- ---- --- ---- 0.425 0.43 2260 0.00 99.72 ---- ---- -- ----- ----- -- ----- --- 0.425 0.42 2265 0.00 99.71 -- ----- ----- -- -- ---- ----- -- 0.424 0.42 DECEIVED Continues on next page... JUL 1 6 2006 2YR-1 OOYR" RO UTING Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 2270 0.00 99.70 ----- --- ----- ---- ---- ---- ---- -- 0.424 0.42 2275 0.00 99.70 ---- ----- --- ---- ----- __--- --- ----- 0.424 0.42 2280 0,00 99.69 -- ---- -- - --- ---- ----- ---- 0.423 0.42 2285 0.00 99.68 ----- ----- ----- ----- ----- ----- ----- ----- 0.423 0.42 2290 0.00 99.67 ----- ----- ----- ----- ----- ----- ----- ----- 0,423 0.42 2295 0.00 99.67 ----- ---- ----- ----- ----- ----- ----- ----- 0.422 0.42 2300 0.00 99.66 ----- --- ---- ---- ---- ---- --- --- 0,422 0.42 2305 0.00 99.65 ---- ----- ---- ---- ----- ----- ---- ----- 0.421 0.42 2310 0.00 99.65 - ----- --- - --- ----- ----- -- 0.421 0.42 2315 0.00 99.64 ----- ---- ---- ----- ---- ----- ----- ----- 0.421 0.42 2320 0.00 99.63 0.420 0.42 2325 0.00 99.62 ---- ----- ----- --- ----- ----- -- --- 0.420 0.42 2330 0.00 99.62 ----- ---- ---- ---- ----- ---- -- ---- 0.420 0.42 2335 0.00 99.61 --- ---- -- ---- ---- --- ----- --- 0.419 0.42 2340 0.00 99.60 -- --- -- - --- - -- - 0.419 0.42 2345 0.00 99.60 0.418 0.42 2350 0.00 99.59 __ r ___ ___ _-_ ____ ____ _ ___ -__ 0.418 0.42 2355 0.00 99.58 ----- ---- ----- -_-- ----- ----- ---- ----- 0.418 0.42 2360 0.00 99.58 ----- ----- _---- ----- ----- ---- ----- ----- 0.417 0.42 2365 0.00 99.57 - ----- -- - ---- ----- ---- - 0.417 0.42 2370 0.00 99.56 ---- - --- ---- - - -- ----- --- 0.417 0.42 2375 0.00 99.55 ----- ---- ----- -_--- ----- ----- ----- ----- 0.416 0.42 2380 0.00 99.55 ----- --- ----- ----- ----- ----- ----- ---- 0.416 0.42 2385 0.00 99.54 ---- ----- ----- ----- ----- ----- ----- ----- 0.416 0.42 2390 0.00 99.53 --- ---- --- --- --- -- --- -- 0.415 0.42 2395 0.00 99.53 ----- ---- ---- ---- ---- --- ----- ----- 0.415 0.41 2400 0.00 99.52 ----- -- -- ---- --- --- ---- --- 0.414 0.41 2405 0.00 99.51 ----- ----- ----- ----- --- ----- ---- ---- 0,414 0.41 2410 0.00 99.51 ---- ----- ----- --__ .__ ___ ____ -- 0.414 0.41 2415 0.00 99,50 ----- --- __--- ----- ----- ----- ----- ----- 0.413 0.41 2420 0.00 99.49 - --- ----- --- -- --- --- -- 0.413 0.41 2425 0.00 99.48 ----- ----- ---- ----- ----- --- ---- ----- 0.413 0.41 2430 0.00 99.48 ----- - --- ---- ----- ---- -- --- 0.412 0.41 2435 0.00 99.47 0.412 0.41 2440 0.00 99.46 -- ----- --_-- --- ---- ----- ---- ---- 0.412 0.41 2445 0.00 99.46 ---- ----- ----- ----- ----- ----- ---- ----- 0.411 0.41 2450 0.00 99.45 ---- ---- --- ---- ---- ----- ---- -- 0.411 0.41 2455 0.00 99.44 - ---- - --- --- -- --- ----- -- 0.410 0.41 2460 0.00 99.44 --- ---- ----- ---- ---- -- ---- ----- 0.410 0.41 2465 0.00 99.43 ----- ----- ----- ----- ----- ----- ----- ---- 0.410 0.41 2470 0.00 99.42 ----- -- ---- ----- ----- ----- ---- ----- 0.409 0.41 2475 0.00 99.42 ----- ---_ 0.409 0.41 2480 0.00 99.41 -- ---- ----- ----- ---- ----- ----- ----- 0.409 0.41 2485 0.00 99.40 --- --- ----- ---- --- -- --- ----- 0.408 0.41 2490 0.00 99.39 ---- -- --- -- -- ---- - -- 0.408 0.41 2495 0.00 99.39 ----- ----- ----- ----- ----- ----- --_-- ----- 0.408 0.41 2500 0.00 99.38 ---- ---- ---- ---- ----- ---- --- ---- 0.407 0.41 2505 0.00 99.37 ---- ----- -_--- ---- ---- ----- ---- ---- 0.407 0.41 2510 0.00 99.37 --- ---- ----- ----- ----- ----- ----- ----- 0.407 0.41 2515 0.00 99.36 ----- -- ----- ----- ----- --- ----- ----- 0.406 0.41 2520 0.00 99.35 ----- -- --- - -- - -- - 0,406 0.41 C F,I V ED Continues on next page... JUL 1 6 Z005 BY: 2�R-100YR ROUTING Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 2525 0.00 99.35 0.405 0.41 2530 0.00 99.34 -- ---- - ---- -- - ----- --- 0.405 0.41 2535 0.00 99.33 -- ----- ---- ----- ----- - --- ----- --- 0.405 0.40 2540 0.00 99.33 ---- ----- ----- ----- ----- ----- ----- ----- 0.404 0.40 2545 0.00 99.32 ----- ----- ----- ----- ----- ----- ----- ----- 0.404 0.40 2550 0.00 99.31 ----- ----- ----- ----- ---- ----- ----- ----- 0.404 0.40 2555 0.00 99.31 0.403 0.40 2560 0.00 99.30 -- --- - --- ----- ---- --- ---- 0.403 0.40 2565 0.00 99.29 ---- ----- ----- ---- --- --- ---- ----- 0.403 0.40 2570 0.00 99.29 ----- ----- ----- ----- ----- ----- ---- ----- 0.402 0.40 2575 0.00 99.28 ----- ----- -- ----- ----- ----- ----- ----- 0.402 0.40 2580 0.00 99.27 ---- ----- ----- ----- ----- ----- ----- ----- 0.402 0.40 2585 0.00 99.27 ---- --- ---- --- --- --- ---- ---- 0.401 0.40 2590 0.00 99.26 -- -- -- ---- ----- ---- ----- ---- 0.401 0.40 2595 0.00 99.25 ---- ----- ----- -- ---- ---- ---- ----- 0.400 0.40 2600 0.00 99.25 ----- ----- ----- ----- ---- ----- ----- ---- 0.400 0.40 2605 0.00 99.24 ----- ----- ---- ---- ----- ----- ----- ----- 0.400 0.40 2610 0.00 99.23 ----- ----- ----- ----- ----- ----- ----- ----- 0.399 0.40 2615 0.00 99.23 -- ----- -- ----- ---- ----- ----- ----- 0.399 0.40 2620 0.00 99.22 ---- ----- - -- ---- ----- ----- ----- 0.399 0.40 2625 0.00 99.21 ----- - -- ---- -- -- --- - 0.398 0.40 2630 0.00 99.21 ----- ----- ----- ----- ----- ----- ----- ----- 0.398 0.40 2635 0.00 99.20 ----- ----- ----- ----- ---- ----- ----- ---- 0.398 0.40 2640 0.00 99.19 ---- ---- ---- ----- ----- ----- ----- ----- 0.397 0.40 2645 0.00 99.19 ---- --- ---- ----- ----- -- --- ----- 0.397 0.40 2650 0.00 99.18 ---- -- -- _- --- ---- ---- - 0.397 0.40 2655 0.00 99.17 --- -- -- --- ----- ---- ----- --- 0.396 0.40 2660 0.00 99.17 ----- ----- ----- ----- ----- ---- ---- ----- 0.396 0.40 2665 0.00 99.16 ---- --- ----- ----- ----- ----- ----- ----- 0.396 0.40 2670 0.00 99.15 ----- ----- ---- ----- ----- ----- ----- ----- 0.395 0.40 2675 0.00 99.15 ---- ----- ----- ---- ---- --- -- ----_ 0.395 0.39 2680 0.00 99.14 ----- -- -- -- - ----- ----- - 0.395 0.39 2685 0.00 99.13 ---- -- -- ---- ---- ---- --- --- 0.394 0.39 2690 0.00 99.13 ---- ----- ----- ----- ----- ---- ----- ----- 0.394 0.39 2695 0.00 99.12 ----- --_-- ----- ---- ---- ----- ----- ----- 0.394 0.39 2700 0.00 99.11 ----- ----- --- ---- ----- ----- ----- ----- 0.393 0.39 2705 0.00 99.11 ----- ----- ----- ---- --- -- ---- --- 0.393 0.39 2710 0.00 99.10 ---- ---- ----- ----- ---- -- - ----- 0.392 0.39 2715 0.00 99.09 --- -- --- - -- ---- ---- --- 0-392 0.39 2720 0.00 99.09 ----- ---- ----- ----- ---- ----- ----- ----- 0.392 0.39 2725 0.00 99.08 ----- ----- ----- ----- ----- ----- ---- ----- 0.391 0.39 2730 0.00 99.07 ----- ----- ----- ----- ----- ---- ---- ---- 0.391 0.39 2735 0.00 99.07 0.391 0.39 2740 0.00 99.06 ---- -- ---- ---- --- ---- ---- ----- 0.390 0.39 2745 0.00 99.05 ----- ---- ----- ---- ---- - -- --- --- 0.390 0.39 2750 0.00 99.05 ----- ----- ----- ----- ----- ----- ----- ----- 0.390 0.39 2755 0.00 99.04 ---- ----- ----- ----- -- -- ----- ----- ----- 0.389 0.39 2760 0.00 99.03 ----- ----- ----- ----- ----- ----- ----- ----- 0.389 0.39 2765 0.00 99.03 ----- ----- ---- ----- ----- ---- -- 0.389 0.39 2770 0.00 99.02 ---- --- - -- -- ----- ----- ----- 0.388 0.39 2775 0.00 99.01 ----- ---- - -- ---- --- ---- ----- ---- 0.388 0.39 RECEIVED Continues on next page... JUL 1 6 Z006 BY: ZYR-100YR ROUTING Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B CIv C Civ D Wr A Wr B Wr C Wr D EMI Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs Cfs cfs 2780 0.00 99.01 ----- ----- ---- ----- __-- --- ----- ----- 0.388 0.39 2785 0.00 99.00 - -- ----- -- --- ---- ----- ---- 0.387 0.39 2790 0.00 98.99 ---- -- -- --- --- - -- -- 0.387 0.39 2795 0.00 98.99 ----- ----- ----- ----- ----- ----- ----- ----- 0.387 0.39 2800 0.00 98.98 --- ----- --- ----- ---- ---- ----- ----- 0.386 0.39 2805 0.00 98.97 ---- ----- ---- ----- ----- ---- ----- ----- 0.386 0.39 2810 0.00 98.96 ----- ----- ---- ----- ----- ----- ----- --- 0.386 0.39 2815 0.00 98.96 - ---- ---- -- ---- --- ---- - 0.385 0.39 2820 0.00 98.95 ---- - -- ----- - - ---- --- 0.385 0.38 2825 0.00 98.94 ----- ----- ----- ----- ----- ----- ----- ----- 0.384 0.38 2830 0.00 98.93 -- ----- --- -- ----- --- ---- ----- 0.384 0.38 2835 0.00 98.93 ----- ---- --- ---- ----- -- ----- ----- 0.384 0.38 2840 0.00 98.92 --- --- ----- --- ---- --- --- ----- 0.383 0.38 2845 0.00 98.91 --- ---- -- -- --- -- ----- --- 0.383 0.38 2850 0.00 98.91 -- -- --- --- - --- --- 0-383 0.38 2855 0.00 98.90 ----- ----- ----- ----- ----- ----- ----- ----- 0.382 0.38 2860 0.00 98.89 --- ----- ---- ---- ---- --- ----- ----- 0.382 0.38 2865 0.00 98.88 ----- ----- --- ---- ----- ----- ----- ----- 0.381 0.38 2870 0.00 98.88 0.381 0.38 2875 0.00 98.87 --- - ---- --- --- - -- ----- 0.381 0.38 2880 0.00 98.86 --- ---- ----- -- --- ----- -- ---- 0.380 0.38 ... End RECEIVED Jul. 1 6 2005 I3Y: Ponca. Report Hydratlow Hydrographs by Intelisolve Wednesday, Apr 26 2006, 5:36 PM Pond No. 1 - WQP#1 al / 4435<6 ' Pond Data �� ����� .� J( (� p Pond storage is based on known contour areas. Average end area method used. / Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuff) Total storage (tuft) 0.00 94.00 6,951 0 0 1.00 95.00 8,706 7,629 7,829 2.00 96.00 10,561 9, 634 17,462 3,00 97.00 12,578 11.570 29 032----> 4.00 98.00 14,575 13,577 42,608 5.00 99.00 16,732 15,654 58,262 6.00 100.00 18,990 17,861 76,123 7.00 101.00 21,348 20,169 9$, 8.00 102.00 23,808 22,578 9.00 103.00 26,367 25,088 15� /O3 0 QO G7 Culvert 1 Orifice Structures Weir Structures [A] [131 [C] [D] [A] iBl [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (n) = 20.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 100.90 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 2.60 3.33 0.00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Broad - - - Length (ft) = 0.00 0.00 0.00 0.00 Muiti-Stage = No No No No Slope (%) = 0.00 0.00 0.00 0.00 N Value = .013 .013 .000 _000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multi -Stage = n a No No No ExEsltration = 1.000 it>ltlr (Contour) TaiWater Elev. = 0.00 ft Note: CLhvrtK)dFce oultlows have been analyzed under inlet and outlet oonW. Stage ! Storage 1 Discharge Table Stage Storage Elevation Chr A Clv 8 Clv C Clv D Wr A Wr B Wr C Wr D Exfiil Total ft tuft ft Cfs cfs cfs cfs cfs cfs cis cis cfs cts 0.00 0 94.00 - - - - 0-00 --- -- - 0.000 0.00 0.10 783 94.10 - - - - 0.00 - - --- 0.020 0.02 0.20 1,566 94.20 - - - - 0.00 -- - - 0.040 0.04 0.30 2,349 94.30 - - - - 0.00 -- - - 0.060 0,06 0.40 3,131 94.40 - - - - 0.00 - - - 0.081 0.08 0.50 3,914 94.50 - - -- - 0.00 - - - 0.101 0.10 0.60 4,697 94.60 --- - - --- 0.00 - --- - 0.121 0.12 0.70 5,480 94.70 --- - - -- 0.00 - - --- 0,141 0.14 0.80 6,263 94.80 - --- - - 0.00 - - - 0.161 oA 6 0,90 7,046 94.90 - - - - 0.00 - --- - 0.181 0.18 1.00 7,829 95.00 --- - --- -- 0.00 - - - 0.202 0.20 1.10 8,792 95Ao - -- - - 0.00 - - - 0206 0.21 1.20 9,755 95.20 - - - - 0.00 - -- - 0.210 0.21 1.30 10,719 95.30 --- -- - - 0.00 - - - 0214 0.21 1.40 11,682 95,40 --- --- - -- 0.00 - -- -- 0.219 0.22 1.50 12,645 95.50 - - - - 0.00 - - --- 0.223 0.22 1.60 13.609 95.60 - - - - 0.00 -- - - 0.227 0.23 1.70 14,572 95.70 --- --- - -- 0.00 - - - - 0.232 0.23 1.80 15,535 95.80 - - - - 0.00 - - -- 0.236 024 1:90 16,499 95.90 - - - - 0.00 - - - 0.240 0.24 2.00 17,462 96.00 --- - - --- 0.00 - --- - 0.244 0.24 2.10 18,619 96.10 - - - - o_Qo - - -- 0.249 0.25 2.20 19,776 96.20 --- --- - -- 0.00 --- - - 0.254 0.26 2.30 20,933 96.30 --- --- --- -- 0.00 - --- -- 0.258 0.26 2.40 22,090 96.40 - - - - 0.00 - - --- o.263 0.26 250 23,247 96.50 - - - - 0.00 --- - - 0.268 0.27 2.60 24,404 96.60 - - - - 0.00 - - - 0,272 0,27 2.70 25.561 96.70 -- --- - -- 0.00 - - - 0.277 0,28 7JULR-ECEEIVEDContinues on next page... 16 2006 wQP#1 Stage / Storage / Discharge Table stage storage Elevation clv A CN B CIv C Clv D wr A wr B wr C wr D fs total cfs It cull ft cfs cfs cfs cis cis cfs C tfs cfs cfs 2,80 26,718 96.80 - - - - 0.00 - -- -- 0.282 0.286 0.28 0.29 2.90 27,875 96.90 --- - -- - 0.00 - 0.00 -- - - - - 0.291 0.29 3.00 29,032 97.00 - - - - 0.00 - - -- 0.296 0.30 3,10 30,389 97.10 --- --- --- - 0.00 - - - 0.300 0.30 3.20 31,747 97.20 - - - --- 0.00 -- - - 0.305 0.31 3.30 33,104 97.30 - - - - 0.00 - - - 0.310 0.31 3.40 34,462 97.40 -- - -- - 0.00 - - - 0.314 0.31 3.50 35,820 97.50 - - - --- 0.00 --- -- - 0.319 0.32 3.60 37,177 97.60 - - - - 0.00 - - - 0.324 0.32 3.70 38,535 97.70 --- --- --- - 0.00 - - - 0.328 0.33 3.80 39,893 97.80 - - - --- 0.00 - - - 0.333 0-33 3.90 41,260 97.90 - - - - 0.00 - --- -- 0.337 0.34 4.00 42,608 98,00 --- --- --- - 0.00 - - - 0.342 0.34 4.10 44,173 98.10 - - - --- 0.00 --- -- -- 0,347 0.35 4.20 45,739 98.20 -- -- -- - 0.00 - --- -- 0.352 0.35 4.30 47,304 98.30 - --- --- - 0.00 - - - 0.357 0.36 4.40 48,869 98.40 - - - --- 0.00 -- - - 0.362 0.36 4,50 50,435 98.50 - - - - 0.00 - --- -- 0.367 0,37 4.60 52,000 98.60 --- - - - 0.00 - - - 0.372 0.37 4.70 53,565 98.70 - - - --- 0.00 --- - -- 0.377 0.38 4.80 55,131 98.80 - -- --- - 0.00 - --- --- 0.382 0.38 4.90 56,696 98.90 - - - - 0.00 - - - 0.387 0.39 5.00 58,262 99.00 - - - -- 0.00 --- --- --- 0.393 0.39 5.10 60,048 99.10 --- --- --- - 0.00 - - - 0.398 0.40 5.20 61,834 99.20 - - - --- 0.00 - - - 0.403 0.40 5.30 63,620 99.30 - - - - 0.00 - --- --- 0.40B 0.41 5.40 65,406 99.40 -- - - - 0.00 - - - 0.413 0.41 5.50 67,192 99.50 - - - --- 0.00 - - - 0.419 0.42 5.60 68,978 99.60 -- -- --- - 0.00 - -- -- 0.424 0.42 5.70 70,764 99.70 - - - - 0.00 - - - 0.429 0.43 5.80 72,550 99,80 -- -- - - 0.00 - - _ --- 0.434 0.43 5.90 74,336 99.90 - -- - - - 0.00 - - - 0.440 0.44 6.00 76,123 100.00 - - - --- 0.00 - - - 0.445 0,45 6.10 78,139 100.10 - -- - - 0.00 -- - - 0.450 0.45 6.20 60,156 100.20 --- - -- - 0.00 - - - 0.456 0.46 6.30 82,173 100.30 - - - -- 0.00 - - - 0.461 0.46 6.40 64,190 100.40 -- --- - - 0.00 -- - - 0.467 0.47 6.50 86,207 100.50 - - -- - 0.00 - - - 0.472 0.47 6.60 88.224 100.60 - - - --- 0,00 - - - 0.478 0.48 6.70 90,241 100.70 - -- -- - 0.00 --- --- --- 0.483 0.48 6.80 92,258 100.80 -- - - 0.00 - - - 0.489 0.49 6.90 94,275 100.90 - - - -- 1.64 - -- - 0- 94 2.14 7.00 96,292 101.00 -- - - - 4.65 - --- -- 0.500 5.15 7.10 98.549 101.10 -- - - - 8.54 - 0.506 9.05 7.20 100,807 10120 - - - -- 13.15 - - - 0.511 13.67 7.30 103,065 101.30 - --- - -- 18.38 - - --- 0,517 18.90 7.40 105,323 101.40 - - - - 24.17 - - - 0.523 24.69 7.50 107,581 101.50 - - - -- 30.45 - - - 0.528 30.98 7.60 109,838 101.60 - --- --- - 37.21 --- --- -- 0.534 37.74 7,70 112,096 101.70 --- - -- - 44.40 - - - 0.540 44.94 7.80 114,354 101.80 - - - -- 52.00 - - - 0.545 52.54 7.90 116,612 101.90 - - - -- 59.99 - - - 0.551 60.54 8.00 118,870 102.00 - --- - - 68.36 - -- - 0.557 68.91 8,10 121,378 102.10 --- - - - 77.08 - - - 0.563 77.64 8.20 123,887 102.20 --- - - -- 86.14 - - - 0.569 86.71 8.30 126,396 102.30 - - - --- 95,53 0.575 96.10 8.40 128,905 102.40 - - --- - 10524 --- - - 0.581 105.82 8.50 131,413 102.50 --- - - - 115.26 - -- - 0.587 115.85 8.60 133,922 102.60 - --- --- -- 125.58 - - --- 0.593 126.17 8.70 136,431 102.70 --- --- --- - 136.18 - - - 0.5% 136.78 8.80 138,940 10280 -- - - - 147.08 - - - 0.604 147.68 8.90 141,448 102.90 - - - --- 158.25 - - - 0.610 158.86 9.00 143,957 103.00 - --- --- -- ... End rBY: ECEIVED JUL 1 6 2006 Hydrograph Plot Hydraflow Hydrographs by Intelisotve Wednesday, Apr 26 2006. 5:49 PM Hyd. No. 3 2YR-100YR ROUTING Hydrograph type = Reservoir Peak discharge = 0.49 cfs Storm frequency = 25 yrs Time interval = 1 min Inflow hyd. No. = 2 Max. Elevation = 100.85 ft Reservoir name = WQP#1 Max. Storage = 93,217 cult Storage Indication mettsod used. Hydrograph volume = 60.469 cuts Q (cfs) 35.00 30.00 25.00 15.00 10.00 5.00 2YR-100YR ROUTING Hyd. No. 3 -- 25 Yr Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0.00 0 5 10 15 19 24 29 34 39 44 48 Hyd No. 3 --- Hyd No. 2 Time (hrs) JULr= —'VED 1 6 2006 rY: Hydrograph Report Hydrafiow Hydrographs by Inteli, o Wednesday, Apr 26 2006, 5:36 PM Hyd. No. 3 2YR-100YR ROUTING Hydrograph type = Reservoir Peak discharge = 4.17 cfs Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 2 Reservoir name = WQP#1 Max. Elevation = 101.07 ft Max. Storage = 97,817 tuft Storage Indication method used. Outflow hydrograph volume = 95j 6B cult Hydrograph Discharge Table (Prkftd' -1%or4p. PfirAk*ww=5) Time Inflow Elevation Clv A CIv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 365 0.35 94.21 --- - --- ----- -- ----- ----- ---- ---- 0.042 0.04 370 0.36 94.22 --- ---- ---- -- -- -- -- --- 0.044 0.04 375 0.37 94.23 - ----- ---- -- - ---- --- --- ----- 0.047 0.05 380 0.38 94.24 ----- _---- ----- ----- ----- -_-- ----- ----- 0.049 0.05 385 0.39 94.26 ----- ----- ----- ----- ---- ---- ---- ----- 0.052 0.05 390 0.40 94.27 ----- ----- ----- ---_. ____ ___ __-_ -_ 0.055 0.05 395 0.42 94.28 - --- --- ---- --- -- --- --- 0.057 0.06 400 0.43 94.30 ----- ---- ---- -- --- - ---- ---- -- 0.060 0.06 405 0.44 94.31 ----- --- ----- ----- ----- ----- ----- ---- 0.063 0.06 410 0.45 94.33 ----- ----- ----- ----- ----- ----- ----- ----- 0.066 0.07 415 0.46 94.34 ----- ----- ----- ----- ----- ----- ---- ----- 0.069 0.07 420 0.47 94.36 ----- _---- ----- ----- ---- -_-- ----- --- 0.072 0.07 425 0.48 94.37 ----- ----- ----- ---- -- ----- ----- ---- 0.075 0.08 430 0.50 94.39 -- ---- -- -- --- -- -- --- 0.078 0.08 435 0.51 94.40 --- ----- ----- -- ---- ----- ----- ---- 0.082 0.08 440 0.52 94.42 ----- --- ----- ----- ----- ----- ----- ----- 0.085 0.08 445 0.53 94.44 ----- -- ----- ----- ---- ---- ----- ----- 0.088 0.09 450 0.54 94.46 ----- ----- ----- ---- ----- ----- ----- ---- 0.092 0.09 455 0.56 94.47 ----- ----- ----- ----- ----- ---- _---- ----- 0.095 0.10 460 0.57 94,49 ---- -- ---- ---- ----- --- - --- --- 0.099 0.10 465 0.58 94.51 -- -- -- --- --- -- -- - 0.102 0.10 470 0.59 94.53 - --- ----- ----- ----- ----- ----- ----- ----- 0.106 0,11 475 0.60 94.55 ----- ----- ----- --- ---- ----- ----- ----- 0.110 0.11 480 0.61 94,56 0.114 0.11 485 0.63 94.58 ----- --- ----- ---- ----- - -- ---- ---- 0.118 0.12 490 0.64 94.60 ---- ----- --- - --- ----- ---- ---- ----- 0.122 0.12 495 0.66 94.62 - -- ---- -- --- -- -- - -- 0.126 0.13 500 0.68 94.64 0.130 0.13 505 0.71 94.67 ----- ----- ----- ----- ----- ----_ --_-- ----- 0.134 0.13 510 0.74 94.69 0.139 0.14 515 0.78 94.71 ----- -- ----- ----- -- ---- ---- --- 0.144 0.14 520 0.81 94.74 ----- ---- ----- ----- ----- ---- ---- ----- 0.149 0.15 525 0.84 94.76 ----- --- --- -- ---- -- ---- ---- 0.154 0.15 530 0.88 94.79 ----- _-_-- ----- ----- ----- ---- -_--- ----- 0,159 0.16 535 0.92 94.82 ---- ----- ----- ---_ __-_ ___ ___-- ----- 0.165 0.16 540 0.95 94.85 ----- ----_ --_ ----- ----- ---- ----- ----- 0.171 0.17 545 0.99 94.88 -- -- ---- -- ----- ---- ---- -- 0.177 0.18 550 1.02 94.91 --- -- ----- ---- --- --- --- --- 0,183 0.18 RECEIVED antinues an next page... JUL 1 6 2006 BY: ZY'R' 100YR,ROUTING Hydrograph Discharge Table Time Inflow Elevation Clv A CIv B CIv C CIv D Wr A Wr B Wr C Wr D Exf l Outflow (min) cfs ft cfs cfs cfs cfs cis cfs cfs cfs cfs cfs 555 1.05 94.94 ---- ----- ----- ----- _---- -_--- ---- ----- 0.190 0.19 560 1.07 94.98 0.197 0.20 565 1.09 95.01 -- --- ---- ---- -- -- - -- 0.202 0.20 570 1.10 95.04 ----- ----- ----- ----- ----- ----- --- - ----- 0.203 0.20 575 1.12 95.06 ---- ----- ---_- ----- ----- ----- ----- ----- 0.204 0.20 580 1.13 95.09 ----- ---- ----- ----- ---- ----- ---- ----- 0.206 0.21 585 1.16 95.12 ---- ---- ----- ----- ----- ---- ----- 0.207 0.21 590 1.19 95.15 ---- ----- ----- -- ----- ----- ----- ----- 0208 0.21 595 1.24 95.18 -- - --- -- -- --- -- ---- 0.209 0.21 600 1.29 95.22 ----- ----- --- - ----- ----- ----- ----- ----- 0.211 0.21 605 1.35 95.25 0.212 0.21 610 1.42 95.29 --- ---- ---- ---- --- ---- _-- ---- 0.214 0.21 615 1.48 95.33 ---- ---- ----- ----- ----- ----- ----- ---- 0.216 0.22 620 1.56 95.37 --- ----- ---- --- ----- ----- ----- ---- 0.217 0.22 625 1.64 95.41 -- -- -- --- -- -- - ---- 0.219 0.22 630 1.73 95.46 ----- ----- ----- ----- ----- ----- ----- ----- 0.221 0.22 635 1.82 95.50 ----- ----- ----- ----- ----- ----- ----- ----- 0.223 0.22 640 1.92 95.55 ---- ----- ----- ----- --- ----- ---- ----- 0.225 0.23 645 2.03 95.61 -- ----- -- ----- ----- ---- ---- -- 0.228 0.23 650 2.16 95.67 ---- ---- ---- -- ---- ----- ----- ----- 0.230 0.23 655 2.29 95.73 --- - -- - - - - --- 0.233 0.23 660 2.44 95.80 ----- ----- ----- ----- ----- ----- ----- ----_ 0.236 0.24 665 2.60 95.87 ----- --- ---- ---- ---- -- -- ---- 0.239 0.24 670 2.78 95.94 ----- ----- _____ 0.242 0.24 675 3.00 96.02 --- -- -- - -- --- - ---- 0.245 0.25 680 3.28 96.10 --- ---- ----- --- ----- -- ---- --- 0.249 0.25 685 3.59 96.18 ----- ---- ---- ---- --- ---- ---- ----- 0.253 0.25 690 3.94 96.27 ----- _---- ----- ----- ---- ----- ----- ---- 0.257 0.26 695 4.49 96.37 ----- ----- ----- ----- ----- ----- ----- ----- 0.262 0.26 700 5.93 96.50 ----- --__ ----- ----- ---- ----- ---- ----- 0.268 0.27 705 9.12 96.68 --- - -- -- --- -- -- --- 0.276 0.28 710 14.85 96.98 -- ---- ---- --- ----- --- --- -- 0.290 0.29 715 24.25 97.40 ----- ---- -- ---- --- ---- ---- ----- 0.310 0.31 720 35.55 98.05 ----- ----- --- ----- ----- -_--- ---- ----- 0.340 0.34 725 42.30 98.80 0.377 0.38 730 39.87 99.52 --- ----- ----- --- --- ----- ---- ----- 0.414 0.41 735 31.06 100.10 ---- -- --- ----- -- -- ----- 0.445 0.44 740 22.10 100.49 ---- ---- ----- --- ---- ---- --- -- 0.466 0.47 745 14.19 100.75 -- ---- ----- - -- ----- ----- - 0.480 0.48 750 8.61 100.91 ----- _---- •---- ----- 0.09 ----- ----- ----- 0.489 0.57 755 6.45 100.99 ----- _---- --- ----- 1.54 ----- ---- ---- 0.494 2.03 760 5.60 101.04 ----- ----- ----- ---- 2.79 ----_ ----- ----- 0.496 3.29 765 4.90 101.06 ----- ----- ----- ----- 3.42 ----- ----- ----- 0.498 3.92 770 4.39 101.07 --- -- --- ---- 3.65 ---- ---- ----- 0.498 4.15 775 4.01 101.07 -- -- ---- ---- 3.66 -- --- ---- 0.498 4.16 780 3.73. 101.06 ----- ----- ----- ---- 3.56 ----- ----- ----- 0.498 4.06 785 3.50 101.06 ---- ----- ---- _---- 3.41 ----- --- ----- 0.498 3.91 790 3.30 101.05 ----- ----- -- --- 3.24 ----- ----- ----- 0.497 3.74 795 3.12 101.05 - -- ---- ----- -- 3.06 ----- ----- ---- 0.497 3.56 800 2.96 101.04 ----- ----- ----- ---- 2.89 ----- ---- ----- 0.497 3.39 805 2.83 101.04 --- -- - ---- 2.73 --- - - 0.496 3.22 "_EC EIvED Continues on next page... JUL x 6 2006 BY: 2Y9-100YR ROUTING Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (min) Cfs ft cfs cfs cfs Cfs cfs cfs cfs cfs Cfs Cfs 810 2.70 101.03 --- --- ---- ----- 2.58 ----- ----- ----- 0.496 3.07 815 2.59 101.03 ----- ---- --- ----- 2.43 --- ----- ----- 0.496 2.93 820 2.48 .101.02 -- ----- ----- --- 2.30 -- -- - 0.495 2.80 825 2.37 101.02 ----- ----- ----- ----- 2.18 ----- ----- -- -- 0.495 2.67 830 2.28 101.01 ----- ----_ --- ----- 2.06 ---- ---- 0.495 2.56 835 2.19 101.01 ----- ----- ----- 1.95 ----- ----- ---- 0.495 2.45 840 2.10 101.01 ----- -- -- ----- 1.85 --- ----- - 0.495 2.35 845 2.02 101.00 ----- ---- ---- ---- 1.76 --- - - 0.494 2.25 850 1.95 101.00 --- ----- ---- -- 1.67 ----- ---- ---- 0.494 2.16 855 1.88 101.00 ----- ---- --- ----- 1.61 ---- ----- ----- 0.494 2.10 860 1.83 100.99 ---- ----- ----- ----- 1.55 ----- ----- ----- 0.494 2.05 865 1.79 100.99 ---- ----- ----- ----- 1.50 ----- ----- ----- 0.494 .2.00 870 1.76 100.99 - --- ---- --- ----- 1.45 -- -- 0.494 1.95 875 1.73 100.99 ---- ---- ---- ---- 1.41 -- -- --- -- 0.493 1.90 880 1.70 100.98 --- ---- --- -- 1.37 ---- ----- ----- 0.493 1.86 885 1.67 100.98 ----- ----- ----- ----- 1.33 ----- ----- ----- 0.493 1.82 890 1.64 100.9$ ----- ----- ----- -__- 1.29 ----- ----- ----- 0.493 1.79 895 1.61 100.9$ ---- ----- ----- 1.26 -- ----- ----- ----- 0.493 1.75 900 1.58 100.97 ----- --- ---- --- 1.22 --- ---- ---- 0.493 1.72 905 1.55 100.97 --- --- --- --- 1.19 ----- ----- ----- 0.493 1.68 910 1.53 100.97 -- -- -- ---- 1.16 - - --- 0.493 1.65 915 1.50 100.97 ----- ----- ---- -- -- 1.13 ----- ----- ----- 0.492 1.62 920 1.47 100.97 ----- ----- ----- ----- 1.10 ----- ----- 0.492 1.59 925 1.44 100.97 --- ---- ----- ----- 1.07 -- ----- --- - 0.492 1.56 930 1.41 100.96 --- ----- ----- ---- 1.04 ----- ----- ----_ 0.492 1.53 935 1.38 100.96 --- -- - - 1.01 -- --- ---- 0.492 1.50 940 1.35 100.96 --- ---- ---- ----- 0.98 - ---- -- 0.492 1.47 945 1.32 100.96 ----- ----- ----- 0.95 ----- ----- ----- 0.492 1.44 950 1.30 100.96 --- ----- --- ----- 0.92 ---- -- 0.492 1.41 955 1.27 100.95 ---- ---- ----- ----- 0.89 ----- ----- ----- 0.492 1.38 960 1.24 100.95 ---- -- --- ---- 0.86 ----- -- ----- 0.492 1.36 965 1.21 100.95 - ---- -- ----- 0.84 -- -- - 0.491 1.33 970 1.18 100.95 ----- ---- --- --- 0.81 ---- ---- ----- 0.491 1.30 975 1.16 100.95 ----- ----- ----- ---- 0.78 ----- ---- ----- 0.491 1.27 980 1.14 100.95 ----- ---- --- ----- 0.75 --- ----- ---- 0.491 1.24 985 1.13 100.94 0.73 ---- ---- ---- 0.491 122 990 1.12 100.94 ---- ---- ----- -- 0.71 ---- ----- ----- 0.491 1.20 995 1.10 100.94 ----- -- --- ----- 0•69 ---- -- ----- 0.491 1.18 1000 1.09 100.94 -- -- -- ----- 0.67 - ---- - 0.491 0.491 1.16 1.15 1005 1.08 100.94 ----- ----- ----- ---- 0.66 0.64 ----- ----- ----- ----- ---- ----- 0.491 1.13 1010 1.07 100.94 ----- ----- ----- ----- 0.63 ----- ----- ----- 0.491 1.12 1015 1.06 100.94 ----- ---- --- ----- 0.61 -- ---- --- 0.491 1.10 1020 1.05 100.94 --- ---- ---- ----- 0.60 ----- ----- - 0.491 1.09 1025 1.04 100.94 ----- ---- ----- ---- 0.59 - -- ----- 0.491 1.08 1030 1.03 100.94 ----- ---- ----- -- 0.58 ----- ----- ----- 0.491 1.07 1035 1.02 100.94 ----- ----- ----- ----- 0.57 ----- ~--- ----- 0.491 1.06 1040 1.01 100.93 ----- ----- ----- ---- 0.56 ----- ---- ----- 0.491 1.05 1045 1.00 100.93 ----- ----- ---- ----- 0•55 -- ---- ---- 0.491 1.04 1050 0.99 100.93 --- ---- ---- ----- 0.53 ----- ----- ----- 0.490 1.03 1055 0.98 100.93 --- ----- ---- ---- 0.52 - --- --- 0.490 1.01 1060 0.97 100.93 ---- --- ---- -- RECEIVE ntinues on next page... JUL 1 6 Z006 Y: 2Y.R'100YR ROUTING Hydrograph Discharge Table Time Inflow Elevation Clv A Civ B Clv C CIv D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs Cfs cfs cfs cfs cfs cfs 1065 0.96 100.93 --- --_-- ---_ ____ 0,51 ----- ----- ---- 0.490 1.00 1070 0,95 100.93 --- -- ----- -- 0.50 -- ---- ----- 0.490 0.99 1075 0.94 100.93 --- --_ ---- ---- 0.49 ---- ---- --- 0.490 0.98 1080 0.93 100.93 ----- ----- ----- ----- 0.48 ----- ----- ----- 0.490 0.97 1085 0.92 100.93 . ----- ----- ----- ---- 0.47 ----- ----- ----- 0.490 0.96 1090 0.91 100.93 --- ---- ----- ---- 0.46 ----- ----- ----- 0,490 0.95 1095 0.90 100.93 ----- ----- ---_ ---- 0.45 ---- ----- - 0.490 0.94 1100 0.89 100.93 - ---- ---- ---- 0.44 ----- --- --- 0.490 0.490 0.93 0.92 1105 0.88 100.93 -- -- ---- ---- 0.43 0.42 -- ----- - ----- ----- ----- 0.490 0.91 1110 0.87 100.93 ----- ----- ----- ----- 0.41 ----- --- ---_ 0.490 0.90 1115 0.86 100.92 ---- ---- ----- ---- 0.40 ----- ----- ----- 0.490 0.89 1120 0.85 100.92 ----- ----- ----- ----- 0.39 ----- ----- --- 0.490 0.88 1125 0.84 100.92 ---- -- ---- ---- 0.38 -- --- ---- 0.490 0.87 1130 0.83 100.92 --- -- ----- ---- 0.37 -- - -' --- 0.490 0.86 1135 0.82 100.92 --- ---- ---- --- ---- 0.36 ----- ----- ---- 0.490 0.85 1140 0.81 100.92 ----- ----- ----- 0.35 ----- ---- ----- 0.490 0.84 1145 0.80 100.92 ---- ----_ ----- ----- 0.34 ----- ----- ----- 0.490 0.83 1150 0.79 100.92 ----- ----- ----- ---- 0.33 ----- ----- ---- 0.490 0.82 1155 0.78 100.92 --- --- ----- ---- 0.32 -- -- ---- 0.490 0.81 1160 0.76 100.92 ---- ---- --- ---- 0.31 ---- - - --- 0.490 0.80 1165 0.75 100.92 -- ----- -- -- 0.30 ----- ----- ----- 0.490 0.79 1170 0.74 100.92 ---- ----- ----- ----- 0.29 ----- ---- ----- 0.490 0.78 1175 0.73 100.92 ----- ----- ----- ----- 0.28 ----- ----- ----- 0.490 0.77 1180 0.72 100.92 ----- ----- _---- ---- 0.27 ---- --- ----- 0.490 0.76 1185 0.71 100.92 ---- ---- _- ---- 0.26 --- ----- --- 0.490 0.74 1190 0.70 100-92 -- -- --- ---- 0.25 ----- ---- ---- 0.490 0.73 1195 0.69 100.91 -- -- ---- -- 0.23 ----- ----- ----- 0.489 0.72 1200 0.68 100.91 ----- ----- ----- ----- 0.22 ----- ----- ----- 0.489 0.71 1205 0.67 100.91 ----- ----- ----- --- 0.21 ----- ----- --- 0.489 0.70 1210 0.66 100.91 --- ---- ----- -- 0.20 --- -- ----- 0.489 0.69 1215 0.66 100.91 ---- ---- ---- ---- 0.20 ---- -- ----- 0.489 0.68 1220 0.65 100.91 ----- ----- -- ---- 0.19 ---- ---- -- 0.489 0.68 1225 0.65 100.91 -- --- -- ---- 0.18 ----- --- ----- 0.489 0.67 1230 0.64 100.91 ----- ----- --- ----_ 0.17 ----- ----- ----- 0.489 0.66 1235 0.64 100.91 ----- ---__ ___-- ---- 0.17 ----- ----- ---- 0.489 0.66 1240 0.64 100.91 ---- ---- -_-- -- 0.16 ---- -- ----- 0.489 0.65 1245 0.64 100.91 ---- ----- --- ----- 0.16 ----- ----- ---- 0.489 0.65 1250 0.63 100.91 ---- ---_ _� ____ 0.16 ----- ----- -- 0.489 0.65 1255 0.63 100.91 --- -- ----- -- 0.15 ----- ---- ----- 0,489 0.64 1260 0.63 100.91 ---- ----- ----- ---- 0.15 ----- ----- ----- 0.489 0.64 1265 0.63 100.91 ----- ----- ----- _---- 0.15 ----- ----_ ---- 0.489 0.64 1270 0.63 100.91 ----- ----- ---- ----- 0.15 ----- ----- ---- 0.489 0.63 1275 0.62 100.91 ---- ---- ----- ---- 0.14 -- --- --- 0.489 0.63 1280 0.62 100.91 ---- --- ----- ---- 0.14 ---- -- ----- 0.489 0.63 1285 0.62 100.91 ----- ----- -- ---- 0.14 ---- ----- ---- 0.489 0.63 1290 0.62 100.91 ----- ----- ----- ---- 0.14 ----- ----- ----- 0,489 0.62 1295 0.62 100.91 ----- ----- ----- ----- 0.13 _---- ----- ----- 0.489 0.62 1300 0,61 100.91 --_ __�_ _____ _.-_ 0.13 ---- ---- ----- 0.489 0.62 1305 1310 0.61 0.61 100.91 100.91 ---- ---- ---- --- ---- -- ----- -- 0.13 ---- ----- -- 0.489 0.62 1315 0.61 100.91 -- --- -- --- 0.13 ---- ----- ---- 0.489 0.62 RECEIVED Continues on next page... JUL 16 zom BY: 2YR 100YR,RbUTING Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft Cfs cfs Cfs Cfs Cfs Cfs Cfs Cfs Cfs cfs 1320 0.61 100.91 ----- ----- ---- _-- 0.12 ----- ---- --- 0.489 0.61 1325 0.60 100.91 ---- ----- ----- ---- 0.12 ---- ----- ----- 0.489 0.61 1330 0.60 100.91 - -- ---- ----- 0.12 - --- ---- 0.489 0.489 0.61 0.61 1335 0.60 100.91 ----- ----- _---- 0.12 0.12 ----- ----- ----- ---- ----- ----- 0.489 0.61 1340 0.60 100.91 ---- ---- --- ----- Q.11 ----- ----' ---- 0.489 0.60 1345 0.60 100.91 ---- ----- ----- --- �_ 0.11 ---- ----- ---- 0.489 0.60 1350 0.59 100.91 ----- ---- ___ Q.11 --- - -- 0.489 0.60 1355 0.59 100.91 -- --- ___ ----- 0.11 ----- --- --- 0.489 0.60 1360 0.59 100.91 ----- ---- -- ---- 0.11 ----- ----- ----- 0.489 0.60 1365 0.59 100.91 ----- ----- ----- ---- ----- 0.10 ----- ----- ----- 0.489 0.59 1370 0.58 100.91 ----- _--- ---- 0.10 ----- ---' --- - 0.489 0.59 1375 0.58 100.91 -- --- -- ----- 0.10 ---- ----- ---- 0.489 0.59 1380 0.58 100.91 -- ---- ---_ --- 0.10 -- ----- ----- 0.489 0.59 1385 0.58 100.91 -- ---- ----- -_--- 0.10 --- -' -- 0.489 0.59 1390 0.58 100.91 - - -- ---- ----- - 0.09 ----- ----- 0A89 0.58 1395 0.57 100.91 ----- ----- ----- --- 0.09 ----- ----- ----- 0.489 0.58 1400 0.57 100.91 ---- ----- _--_ ----- 0.09 ----- ----- ----- 0.489 0.58 1405 0.57 100.91 ----- ---- ---- ----- --- 0.09 --- ----- --- 0.489 0.58 1410 0.57 100.91 --- ----- ----- 0.09 -- -- -- 0.489 0.57 1415 0.57 100.91 --- -- --- ----- 0.08 ----- ---- ---- 0.489 0.57 1420 0.56 100.91 ----- ---- -- -- 0.08 ----- ----- ----- 0.489 0.57 1425 0.56 100.91 ---- ----- ----- ----- 0.08 ----- ----- ----- 0.489 0.57 1430 0.56 100.90 ----- ----- ----- ----- 0.08 ----- ---- ----- 0.489 0.57 1435 0.56 100.90 ----- ----- ---- ----- 0.08 ---- --- -- 0.489 0.56 1440 0.56 100.90 ---- -- --- ---- - 0.07 ---- ----- ----- 0.489 0.56 1445 0.52 100.90 ----- ----- ---- 0_05 -- -- ----- 0.489 0.54 1450 0.44 100.90 - --- ----- ---- 0.02 ----- ----- ----- 0.489 0.50 1455 0.30 100.90 ----- ----- ----- ----- ----- ----- 0.489 0.49 1460 0.18 100.90 ----- ----- ----- ----- ---- ----- _-_-- ----- 0.488 0.49 1465 0.09 100.89 --- ----- ----- ----_ ____ ---- -- 0.488 0.49 1470 0.03 100.89 ----- ----- -- ---- ----- ----- - 0.488 0.49 1475 0.00 100.88 -- ----- 0.487 0.49 1480 0.00 100.87 -- ---- ----- - ---- ---- -- --- -- - -- 0.487 0.49 1485 0.00 100.86 ----- ----- ----- ----- ----- __-- ----- 0.486 0.49 1490 0.00 100.86 ----- --- ----- ---- ----- -__ ----- --- - 0.486 0.49 1495 0.00 100.85 _--- __ __ _ _____ ^_ ----- --- ---- 0.486 0.49 1500 0.00 100.84 ----- ---- ---- ----- ----- ---- ----- - 0.485 0.49 1505 0.00 100.83 --- -- ---- ---- --- ----- ---- ----- -- 0.485 0.48 1510 0.00 100.83 ---- -- -- -- ---- ----- ----- 0.484 0.48 1515 0.00 100.82 ---- ----- ___ _-_- ----- ----- ----- ----- 0.484 0.48 1520 0.00 100.81 ---- ----- ----- ----- ----- ----- ----- --- 0.484 0.48 1525 0.00 100.81 ----- -_-- --- ---- ----- --- ----- 0.483 0.48 1530 0.00 100.80 ----- ----- ----- ----- ---- ---- ---- ----- 0.483 0.48 1535 0.00 100.79 ---- --- ----- _---- ----- --- ----- --- 0.482 0.48 1540 0.00 100.78 ----- --- ---- ---- ---- ----- ----- ----- 0.482 0.48 1545 0.00 100.78 ----- ----- _---- --_-- ---- ----- ---- ---- 0.482 0.48 1550 0.00 100.77 ---- --_-- ----- ----- ----- ----- ----- ----- 0.481 0.48 1555 0.00 100.76 --- ---- ----- ---- ---- ----- ----- ---- 0.481 0.48 1560 0.00 100.76 ----- ----- - --- -- ---- --- ----- 0.480 0.48 1565 0.00 100.75 --- ---- ----- -- -- - -- ---- -- ----- 0.480 0.48 1570 0.00 100.74 -- ---- ----- ----- ---- RECEIVED Continues on next page... JUL 1 6 2006 BY. n'9-100YWROUTING Hydrograph Discharge Table Time Inflow Elevation Clv A CIv B CIv C CIv D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft Cfs Cfs cfs Cfs Cfs Cfs Cfs Cfs Cfs Cfs 1575 0.00 100.73 ---- ----- ----- ---- -- _--- -- - 0.480 0.48 1580 0.00 100.73 -- -- -- ----- ---- ----- --- ---- 0.479 0.48 1585 0.00 100.72 --- --- -- --- ----- -- ----- ~--- 0.479 0.48 1590 0.00 100.71 ---- ----- ----- ----- _---- ----- ----- ---- 0.478 0.48 1595 0.00 100.71 ----- ----- ----- ----- ----- ----- ----- 0.478 0.48 1600 0.00 100.70 ----- ----- -- ----- --_-- ----- ----- - --- 0.478 0.48 1605 0.00 100.69 ---- ---- ----- ---- ---- ~--- - --- 0.477 0.48 1610 0.00 100.68 ---- --- --- ---~ ----- ----- ----_ ---- ~--_ 0.477 ---- 0.477 0.48 0.48 1615 0.00 100.68 ----- --- -- -- ---- - ---- ----- 0.476 0.48 1620 0.00 100.67 ----- ----- ----- ----- ----- ----- -_-__ 0.476 0.48 1625 0.00 100.66 ---- ---_ _ -_ _____ ___ ~~_ �__ ----- ----- 0.475 0.48 1630 0.00 100.66 ----- ----- ----- ---- ----- ---- ----- --~ 0.475 0.48 1635 0.00 100.65 ---- --- ---- --- ---- ----- ---- ---- 0.475 0.47 1640 0.00 100.64 ---- -- -- ---- ---- - ---- 0.474 0.47 1645 0.00 100.64 --- --- --- - -- -- -- ----- ----- 0.474 0.47 1650 0.00 100.63 ----- ----- ----- ----- ----- ---- ----- ----- 0.473 0.47 1655 0.00 100.62 ----- ----- ----- ---- ----- ---- ----- 0.473 0.47 1660 0.00 100.61 ----- ----- ----- --- ---- ---- ----- ----- 0.473 0.47 1665 0.00 100.61 --- --- -- ----- ----- ---- ----- ---- ----- 0.472 0.47 1670 0.00 100.60 ---- ---- -- -- --- -- -- -- 0.472 0.47 1675 0.00 10159 --- ---- ----- -- -- --- ----- 0.472 0.47 1680 0.00 100.59 ---- ----- ---- ----- ----- ----- ~__ _� 0.471 0.47 1685 0.00 100.58 ----- ----- --- -- __.__ _~_ --- ---- 0A71 0.47 1690 0.00 100.57 ----- ----- ----- ----- ---- - ----- 0.470 0.47 1695 0.00 100.56 ----- ----- ---- - ---- _-- --- - 0.470 0.47 1700 0.00 100.56 --- ---- ---- ----- ---- ----- ----- ---- 0.470 0.47 1705 0.00 100.55 -- -- --- ----- ---- --- ---- -- 0.469 0.47 1710 0.00 100.54 ----- ----- ----- --- --- --~_ ----- _---- 0.469 0.47 1715 0.00 100.54 ---- ----- ----- ~--- ----- ----- ----- 0.469 0.47 1720 0.00 100.53 ----- ----- ----- ----- ----- ----- -_ --- 0.468 0.47 1725 0.00 100.52 ----- ---- --- --- _-_ ----- ----- -- 0-468 0.47 1730 0.00 100.52 _- ---- --- ----- ---- ----- ---- ---- 0•467 0.47 1735 0.00 100.51 ---- -- ---- -- ---- --- ----- ----- 0.467 0.47 1740 0.00 100.50 ---- ---- ----- ---- -_-- ---- ----- ----- 0.467 0.47 1745 0.00 100.50 ----- ----- ---- _---- ----- ----- ----- ~--- 0.466 0.47 1750 0.00 100.49 -- ---- ----- -~-- ~--- ----- -- --~- 0.466 0.47 1755 0.00 100.48 --- ---- -- -- -- -~ ----- - 0.465 0.47 1760 0.00 100.47 -- ---- --- ---- - ----- ---~ 0.465 0.47 1765 0.00 100.47 -- --- ---- ---- ---- ----- --- ----- ----- 0.465 0.46 1770 0.00 100.46 ----- ----- ----- ----- ----- ----- ___ __� 0.464 0.46 1775 0.00 100.45 ----- ----- -- --- --- ---_ ----- --- 0.464 0.46 1780 0.00 100.45 ----- ----- ----- ---- ----- --~- ----- - 0.464 0.46 1785 0.00 100.44 --- - ---- ----- ----- --- ----- 0.463 0.46 1790 0.00 100.43 ----- ----- ---- ---- ---- --- -- -- - 0.463 0.46 1795 0.00 100.43 --- --- -- -- -- -- ----- 0.462 0.46 1800 0.00 100.42 ----- _---- __--- ----_ ----- --- ----- --~- 0.462 0.46 1805 0.00 100.41 ----- ----- ----- ~-- ---- ---_ --- --__ _-- 0.462 0.46 1810 0.00 100.41 ----- ----- ---- ~--- ----- ----- 0.461 0.46 1815 0.00 100.40 --- ----- ----- 0.461 0.46 1820 0.00 100.39 --- -- ---- ----- ---- -- --- --- -- 0.461 0.46 1825 0.00 100.38 ---- ----- -- --- -- -- RECEIVED Continues on next page... .JUL 1 6 Z006 r'�T. 2Y}3-100YR ROUTING Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (rain) cfs ft cfs cfs cfs cfs cfs cfs Cfs cfs cfs cfs 1830 0.00 100.38 -- --- ----- ---- --- ----- -- -- -- 0.460 0.46 1835 0.00 100.37 -- - ---- ---- ---- - ---- ----- 0,460 0.46 1840 0.00 100.36 ---- -- -- -- ----- ---- -- -- - 0.459 0.46 1845 0,00 100.36 ----- ----- ----- ----- ----- ----- ----- 0.459 0.46 1850 0.00 100.35 ----- ---- ----- ----- ----- ----- ----- ----- 0.459 0.46 1855 0.00 100.34 ----- ----- ----- ----- ----- ----- ----- ----- 0.458 0.46 1860 0.00 100.34 -- ----- ----- -- -- ---- __--- -- _ 0.458 0.46 1865 0.00 100.33 ---- -- ---- ---- --- -- ---- ---- 0.458 0.46 1870 0.00 100.32 , ---- ----- 0.457 ----- 0,457 0.46 0.46 1875 0.00 100.32 ----- ---- ----- ----- ---- ----- __� ----- 0.456 0.46 1880 0.00 100.31 ----- -- ---- ----- ----_ _____ -- ---- 0.456 0.46 1885 0.00 100.30 ----- ----- _--_ --- ----- ----- ~--- ----- 0.456 0.46 1890 0.00 100.30 -- ---- ---- ---- ---- --- -- - ----- 0.455 0.46 1895 0.00 100.29 ---- - --- ---- --- -- --- - 0.455 0.46 1900 0.00 100.28 ---- ----- ---- - --- ----- ----- ----- 0.455 0.45 1905 0.00 100.28 ----- --- ----- ----- ----- ----- ----- 0.454 0.45 1910 0.00 100.27 ----- ---- --- ----- ----- ----- --- ---- -- 0.454 0.45 1915 0.00 100.26 ----- ----- ----- -- ----- ----- ----- ----- 0.454 0.45 1920 0.00 100.26 ---- - ---- ---- --- - -- 0.453 0.45 1925 0.00 100.25 --- ---- --- -- --- ----- - ----- - - 0.453 0.45 1930 0.00 100.24 - ----- ----- ---- -- ---- ---- ----- 0.452 0.45 1935 0.00 100.24 ----- ---- ----- ----- ----- ---- ----- --- 0.452 0.45 1940 0.00 100.23 ----- ----- ----- --- ----- ----- ___ -�_ 0,452 0.45 1945 0.00 100.22 ---- ----- ----- ---- _-__ ____ -- -- 0.451 0.45 1950 0.00 100.22 ---- ----- ---- -- ---- - ---- --- 0.451 0.45 1955 0.00 100.21 - ---- ---- --- -- --- - ----- --- 0.451 0.45 1960 0.00 100.20 ----- -- -- - --- - ----- 0.450 0.45 1965 0.00 100.20 ----- ----- ----- ----- ----- ----- ----- ----- ----- 0.450 0.45 1970 0.00 100.19 ----- ----- -___ _� _� - __-� __--- ----- 0.450 0.45 1975 0.00 100.18 ----- ----- ----- _ --- ____ -_-- ---- 0.449 0.45 1980 0.00 100.18 ---- -- -- ----- ----- ----- -- -- r 0•449 0.45 1985 0.00 100.17 ----- --- --- -- -- -- ----- - ---- 0.448 0.45 1990 0.00 100.16 -- ----- ----- --- --- --- ----- ---- 0.448 0.45 1995 0.00 100.16 ----- ----- ----- --- ----- ----- _____ -_--- 0.448 0.45 2000 0.00 100.15 --- ----- ----- --- ---- ---__ _--- ----- 0.447 0.45 2005 0.00 100.14 --- ---- ----- ----- ----- - -- - 0.447 0.45 2010 0.00 100.14 ----- ---- -- ----- ---- ----- ---- -" 0.447 0.45 2015 0.00 100.13 ---- --- ----- - --- --- ----- ----- 0.446 0.45 2020 0.00 100.12 ----- ---- ---- -- --- ---- -- -- ----- 0.446 0.45 2025 0.00 100.12 ---- ----- ----- ----- ----- ----- - 0.446 0.45 2030 0.00 100.11 ----- ----- ----- ----- ----- ----- _____ 0.445 0.45 2035 0.00 100.10 ----- ----- ----- -- ---_ _____ ----- ---- 0.445 0.44 2040 0.00 100.10 - --- ---- ---- -- - -' -- 0.444 0.44 2045 0.00 100.09 -- --- - --- -- ---- ---- ---- 0.444 0.44 2050 0.00 100.08 ---- --- ----- --- -- ----- ----- ----- 0.444 0.44 2055 0.00 100.08 ----- ---- ---- ----- ---- ----- 0.443 0.44 2060 0.00 100.07 ----- - -- ----- ---- -__ __-- ----- ---- 0.443 0.44 2065 0.00 100.06 ----- -_--- ----- ---- ----- ----- ----- ----- 0.443 0.44 2070 0.00 100.06 ----- ----- ----- -- --- ----- ---- ---- 0.442 0.44 2075 0.00 100.05 - --- ---- ---- ---- ---- -- 0.442 0.44 2080 0.00 100.04 --- --- - ---- ----- -- -- RECEIVED Continues on next page... JUL 1 6 2006 BY: 2YR-100YF ROUTMG Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 2085 0.00 100.04 -- --- _- ----- ---- --- ----- --- 0.442 0.44 2090 0.00 100.03 ----- ----- --- --- ----- ---- ----- ---- 0.441 0.44 2095 0.00 100.02 ---- --- ----- ----- - ----- ---- ----- 0.441 0.44 2100 0.00 100.02 ----- ----- ---- ----- ----_ ----- ----- ---- 0.440 0.44 2105 0.00 100.01 ----- ----- ----- ----- ----- --- ----- ----- 0.440 0.44 2110 0.00 100.00 ----- ---- ----- ----- ----- ----- ----- ----- 0.440 0.44 2115 0.00 100.00 -- - ---- ----- ----- ---- ----- ---- 0.439 0.44 2120 0.00 99.99 ----- --- ---- -- --- ----- --- ---- 0.439 0.44 2125 0.00 99.98 -- -- - -- - -- - -- 0.439 0.44 2130 0.00 99.97 ----- ----- ----- ----- ----- ----- ----- ----- 0.438 0.44 2135 0,00 99.97 ----- ----- ---- ----- ---- ----- ---- ----- 0.438 0.44 2140 0.00 99.96 ---- -- --- --- ---- ---- ---- --- 0.437 0.44 2145 0.00 99.95 -- ----- ---- ----- -- -- ----- ---- 0.437 0.44 2150 0.00 99.94 ---- ---- ----- -- ----- ---- --- ----- 0.437 0.44 2155 0.00 99.94 --- -- ---- -- --- --- - --- 0.436 0.44 2160 0.00 99.93 ---- ----- ---- ----- ----- ----- ----- ---- 0.436 0.44 2165 0.00 99.92 ----- ----- ----- ----- ----- ---- ----- ----- 0.436 0.44 2170 0.00 99.92 ----- ----- ----- ----- ----- ----- ----- ----- 0.435 0.44 2175 0.00 99.91 ---- ----- ----- ---- ----- ----- ----- ----- 0.435 0.43 2180 0.00 99.90 --- -- ---- --- -- ---- - ---- 0.434 0.43 2185 0.00 99.89 -- ---- -- --- --- - ---- -- 0.434 0.43 2190 0.00 99.89 ----- ----- ----- ----- ----- ---- ----- ----- 0.434 0.43 2195 0.00 99.88 ---- ----- ----- ---- --- ---- ----- ----- 0.433 0.43 2200 0.00 99.87 ----- ----- ----- --- ----- --- ---- ----- 0.433 0.43 2205 0.00 99.86 -- - - - - ---- ---- -- 0.432 0.43 2210 0.00 99.86 - ---- --- ---- --- --- ----- ----- 0.432 0.43 2215 0.00 99.85 ---- ---- ----- - --- -- ---- ----- 0.432 0.43 2220 0.00 99.84 ---- --- - ---- ---- ---- - ----- ----- 0.431 0.43 2225 0.00 99.84 0.431 0.43 2230 0.00 99.83 ----- ----- ----- ----- ----- ----- ----- ----- 0.431 0.43 2235 0.00 99.82 -- ---- -- ---- --- ----- ----- ---- 0.430 0.43 2240 0.00 99.81 - ---- ---- ---- ---- - -- ----- --- 0.430 0.43 2245 0.00 99.81 ---- ---- ---- - - --- -- -- ---- 0.429 0.43 2250 0.00 99.80 ----- --- ----- ----- ----- ----- ----- ----- 0.429 0.43 2255 0.00 99.79 ----- ----- --- _---- --- ---- ----- ----- 0.429 0.43 2260 0.00 99.78 ----- ----- ----- ----- ----- ---- ----- ----- 0.428 0.43 2265 0.00 99.78 --- - -- - -- ---- ---- - 0.428 0.43 2270 0.00 99.77 ---- - --- - - --- ---- ----- ----- --- 0.428 0.43 2275 0.00 99.76 - ----- ---- ----- ---- ---- ---- - 0.427 0.43 2280 0.00 99.76 0.427 0.43 2285 0.00 99.75 --- ---- 0.426 0.43 2290 0.00 99.74 ----- ----- ---- ----- ----- ----- ----- ----- 0.426 0.43 2295 0.00 99.73 ----- ---- ----- ----- ---- --- ----- ----- 0.426 0.43 2300 0.00 99.73 ---- --- ----- - ---- - -- - - - 0.425 0.43 2305 0.00 99.72 - -- -- --- --- ---- --- ----- 0.425 0.42 2310 0.00 99.71 ----- ----- ----- ----- ----- --- ---- ---- 0.425 0.42 2315 0.00 99.71 ----- ----- --- --- ---- ---- ----- ----- 0.424 0.42 2320 0.00 99.70 ----- ---- ---- ----- ----- ----- ----- ----- 0.424 0.42 2325 0.00 99.69 ---- ----- ----- ----- ---- ----- ----- --- 0.423 0.42 2330 0.00 99.68 ----- ----- ---- ----- ---- -- -- ----- 0.423 0.42 2335 0.00 99.68 - - - -- ---- --- ---- ---- 0.423 0.42 7JU CEIVED Continues on next page... L 1 6 Z006 BY: 2YR-100YR'ROUTING Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D EMI Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 2340 0.00 99.67 2345 0.00 99.66 2350 0.00 99.66 2355 0.00 99.65 2360 0.00 99.64 2365 0.00 99.64 2370 0.00 99.63 2375 0.00 99.62 2380 0.00 99.61 2385 0.00 99.61 2390 0.00 99.60 2395 0.00 99.59 2400 0.00 99.59 2405 0.00 99.58 2410 0.00 99.57 2415 0.00 99.56 2420 0.00 99.56 2425 0.00 99.55 2430 0.00 99.54 2435 0.00 99.54 2440 0.00 99.53 2445 0.00 99.52 2450 0.00 99.52 2455 0.00 99.51 2460 0.00 99.50 2465 0.00 99.50 2470 0.00 99.49 2475 0.00 99.48 2480 0.00 99.47 2485 0.00 99.47 2490 0.00 99.46 2495 0.00 99.45 2500 0.00 99.45 2505 0.00 99.44 2510 0.00 99.43 2515 0.00 99.43 2520 0.00 99.42 2525 0.00 99.41 2530 0.00 99.41 2535 0.00 99.40 2540 0.00 99.39 2545 0.00 99.38 2550 ' 0.00 99.38 2555 0.00 99.37 2560 0.00 99.36 2565 0.00 99.36 2570 0.00 99.35 2575 0.00 99.34 2580 0.00 99.34 2585 0.00 99.33 2590 0.00 99.32 RECEIVED JUL 1 6 2006 -Y: ----- ----- ---- ---- 0.422 0.42. -- --- ----- ----- 0.422 0.42 -- - - --- 0.422 0.42 ----- ----- ----- ----- 0.421 0.42 ---- ----- ----- ----- 0.421 0.42 ----- ----- ----- ----- 0.421 0.42 ---- ---- ---- ---- 0.420 0.42 -- -- - --- 0.420 0.42 ---- --- --- -- 0.419 0.42 ----- ----- ----- ----- 0.419 0.42 ---- ---- ---- --- 0.419 0.42 ----- ----- ---- ---- 0.418 0.42 ----- ---- ----- - --- 0.418 0.42 --- -- ----- ---- 0.418 0.42 -- - - -- 0.417 0.42 ----- ----- ----- ----- 0.417 0.42 --- ----- ----- ----- 0.416 0.42 ----- ----- ----- ----- 0.416 0.42 -- --- ---- ----- 0.416 0.42 -- - - - 0.415 0.42 ----- ----- - -- --- 0.415 0.42 --- --- ----- ----- 0.415 0.41 0.414 0.41 ----- ----- ----- ----- 0.414 0.41 --- ---- -- -- 0.414 0.41 ---- -- ---- ---- 0.413 0.41 -- -- - ---- 0.413 0.41 ----- ----- ----- ----- 0.412 0.41 0:412 0.41 --- ----- ----- ----- 0.412 0.41 ----- ---- ---- ----- 0.411 0.41 ---- --- ----- --- 0.411 0.41 -- -- -- ---- 0.411 0.41 ----- ----- ----- ----- 0.410 0.41 _- -- -- ____ 0.410 0.41 --- ---- ---- ---- 0.410 0.41 - ---- - ---- 0.409 0.41 -- -- --- -- 0.409 0.41 --- --- ----- ---- 0.409 0.41 - - ----- --- ----- 0.408 0.41 --- --- --- --- 0.408 0.41 0.407 0.41 - -- --- --- 0.407 0.41 --- ---- ----- ---- 0.407 0.41 -- ---- ---- ---- 0.406 0.41 -- ----- ---- ---- 0.406 0.41 ---- ---- ----- ----- 0.406 0.41 0.405 0.41 ----- ----- --- ----- 0.405 0.40 - -- - -- 0.405 0.40 ---- ---- ----- ----- 0.404 0.40 Continues on next page... ZYR-100YR ROUTING Hydrograph Discharge Table Time Inflow Elevation CIv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (min) Us ft Cfs cfs cfs cfs Cfs Cfs Cfs cfs Cfs Cfs 2595 0.00 99.32 ---- ----- 2600 0.00 99.31 ---- -- 2605 0.00 99.30 --- --- 2610 0.00 99.30 ----- ----- 2615 0.00 99.29 --- --- 2620 0.00 99.28 _--- ----- 2625 0.00 99.28 --- ---- 2630 0.00 99.27 ---- --- 2635 0.00 99.26 --- -- 2640 0.00 99.26 ----- ----- 2645 0.00 99.25 ---- ---- 2650 0.00 99.24 ----- ----- 2655 0.00 99.24 ---- --- 2660 0.00 99.23 --- -- 2665 0.00 99.22 -- -- 2670 0.00 99.22 ---- --_-- 2675 0.00 99.21 _--- -- 2680 0.00 99.20 ----- ----- 2685 0.00 99.20 -- -- 2690 0.00 99.19 -- -- 2695 0.00 99.18 ----- - 2700 0.00 99.18 ---- ----- 2705 0.00 99.17 ----- --- 2710 0.00 99.16 ----- ----- 2715 0.00 99.16 -- ----- 2720 0.00 99.15 ---- --- 2725 0.00 99.14 ----- --- 2730 0.00 99.14 --- ----- 2735 0.00 99.13 ----- -- 2740 0.00 99.12 ---_- ---- 2745 0.00 99.12 -- ---- 2750 0.00 99.11 ---- -- 2755 0.00 99.10 ---- --- 2760 0.00 99.10 ----- ----- 2765 0.00 99.09 ----- -- 2770 0.00 99.08 ---- ---- 2775 0.00 99.08 -- ---- 2780 0.00 99.07 --- ----- 2785 0.00 99.06 ---- -- 2790 0.00 99.06 ---- ----- 2795 0.00 99.05 ----- ----_ 2800 0.00 99.04 ---- --_-- 2805 0.00 99.04 -- -- 2810 0.00 99.03 --- ----- 2815 OAO 99.02 ---- ----- 2820 0.00 99.02 ----- ----- 2825 0.00 99.01 ---- -- 2830 0.00 99.00 ---- ----- 2835 0.00 99.00 --- ---- 2840 0.00 98.99 --- -- 2845 0.00 98.98 - ---- RIECEIVED JUL 1 6 2006 BY: ---- --- 0.404 0.40 ---- --- 0.404 0.40 -- ----- 0.403 0.40 ----- ----- 0.403 0.40 ---- ----- 0.402 0.40 ----- ----- 0.402 0.40 -- -- 0.402 0.40 --- --- 0.401 0.40 ----- ----- 0.401 0.40 ----- ----- 0.401 0.40 0.400 0.40 ----- ----- 0.400 0.40 --- --- 0.400 0.40 ----- ----- 0.399 0.40 -- ---- 0.399 0.40 ----- ----- 0.399 0.40 ----- ---- 0.398 0.40 ----- ----- 0.398 0.40 --- ----- 0.398 0.40 -- -- 0.397 0A0 --- ---- 0.397 0.40 ----- ----- 0.396 0.40 --- -- 0.396 0.40 ----- ----- 0.396 0.40 ----- --_-- 0.395 0.40 -- -- 0.395 0.40 ----- ----- 0.395 0.39 0,394 0.39 ---- --- 0.394 0.39 ----- ----- 0.394 0.39 -- -- 0.393 0.39 ---- --- 0.393 0.39 ----- ----- 0.393 0.39 ----- ----- 0.392 0.39 --- --- 0.392 0.39 ----- ----- 0.392 0.39 --- --- 0.391 0.39 - - 0.391 0.39 ----- --- 0.391 0.39 ---- ----- 0.390 0.39 --- -- 0.390 0.39 --_-- ----- 0.390 0.39 ----- ----- 0.389 0.39 ----- ---- 0.389 0.39 -- -- 0.389 0.39 _---- ---- 0.388 0.39 --- ---- 0,388 0.39 ----- ---- 0.388 0.39 ---_ --- 0.387 0.39 -- ----- 0.387 0.39 ---- ---- 0.386 0.39 Continues on next page... 2YR-100YFZ' ROUTING Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Civ C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs Cfs cfs cfs 2850 0.00 98.98 ---- ---- ----- ---- ----- _--- ----- ----- 0.386 0.39 2855 0.00 98.97 -- ----- ----- --- ----- ----- ----- ----- 0.386 0.39 2860 0.00 98.96 — -- --- -- -- — -- --- 0.385 0.39 2865 0.00 98.95 ----- ----- ----- ----- ----- ----- ----- ----- 0.385 0.38 2870 0.00 98.95 0.385 0.38 2875 0.00 98.94 ----- ----- ----- ----- ----- ----- ----- ----- 0.384 0.38 2880 0.00 98.93 ----- ----- ----- ----- ----- ----- ----- ----- 0.384 0.38 ... End t!-(--- Ej `TV-+ JUL 16 2006 BY: Hydrograph Plot Hydraflow Hydrographs by IntelisoNe Wednesday, Apr 262006. 5,49 PM Hyd. No. 3 2YR-100YR ROUTING Hydrograph type = Reservoir Peak discharge = 4.17 cfs Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 2 Max. Elevation = 101.07 ft Reservoir name = WQP#1 Max. Storage = 97,817 cuft Storage Indication metliod used. Hydrograph Volume = 95,168 cult Q (cfs) 50.00 40.00 K11)f •111 K11114 10.00 o nn 2YR-100YR ROUTING Hyd. No. 3 -- 100 Yr 0 5 10 15 19 24 29 34 39 44 Hyd No. 3 - Hyd No. 2 Q (cfs) 50.00 40.00 30.00 20.00 10.00 48 Time (hrs) JUL 16 2006 PV_ Pond Report Hydraflow Hydrographs by Intelisolve Wednesday, Apr 26 2006, 5:36 PM Pond No. 1 - WQP##1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage 1 Storage Table Stage (ft) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 Elevation (ft) 94.00 95.00 96.00 97.00 98.00 99.00 100.0D 101.00 102.00 103.00 Contour area (sgft) 6,951 8,706 10,561 12,578 14,575 16,732 18,990 21,348 23,808 26,367 Incr. Storage (cult) 0 7,829 9,634 11,570 13,577 15,654 17,861 20,169 22,578 25,088 Total storage (cuff) 0 7,829 17,462 29,032 42,608 58,262 76,123 96,292 118,970 143,957 Culvert/ Orifice Structures Weir Structures [A] [g] [C] [D] [A] [B] [Cl [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len 111) = 20.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 100.90 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 2.60 3.33 0.00 0.00 Invert El. (ft) = 0.00 0.00 0.0D 0.00 Weir Type = Broad - - - Length (ft) = 0.00 0.00 0.00 0.00 MuttiStage = No No No No Slope (%) = 0.00 0.00 0.00 0.00 N Value = .013 .013 _000 .000 Orit Coef(. = 0.60 0.60 0.00 0,00 MuttiStage = rVa No No No Exfiltration = 1.000 inlhr (Contour) TaRwater Elev. = 0.00 ft _ Note: CuKwV0ririoa artflows have been analyzed under inlet and outlet control. Stage ! Storage / Discharge Table Stage Storage Elevation Civ A Clv B Ctv C Clv D Wr A Wr B WrIC Wr D Exfil Total ft Cult ft CIS CIS Cfs CfS CIS Cfs CIS CIS Cf5 Cfs; 0.00 0 94,00 --- --- --- --- 0.00 - --- --- 0.000 0.00 0.10 783 94.10 - - - - 0.00 - - - 0.020 0.02 0.20 1.566 94.20 - - - - 0.00 - - - 0.040 0.04 0.30 2,349 94.30 -- --- - - 0.00 - -- - D.060 0.06 0,40 3,131 94.40 - - - - 0.00 - - --- 0.081 0.08 0.50 3,914 94.50 - - - - 0.00 - - - 0,101 0,10 0.60 4,597 94.60 - --- --- -- 0.00 - --- --- 0.121 0.12 0.70 5,480 94.70 - - --- --- 0.00 - - --- 0.141 0.14 0.80 6,263 94.80 - - - - 0,00 --- - - 0,161 0.16 0.90 7,046 94.90 - - - - 0.00 --- - - 0.181 0,18 1.00 7,829 95.00 --- --- -- - 0.00 --- --- - 0.2o2 0,20 1.10 6,792 95.10 --- --- - --- 0.00 - --- -- 0206 021 1.20 9,755 95.20 - - - - 0.00 - - --. 0.210 0.21 1.30 10,719 95.30 - - - - 0-10 --- - - 0.214 0.21 1.40 11,682 95.40 --- --- --- --- 0,00 - --- --- 0.219 0.22 1.50 12,645 95.50 - - -- - 0.00 - - -- 0.223 0.22 1.60 13,609 95.60 - - - - 0.00 --- - - 0.227 0.23 1.70 14,572 95.70 --- --- - - 0.00 - --- - 0232 0.23 1.80 15,535 95.80 - - -- - 0.00 -- - --- 0.236 0.24 1.90 16,499 95.90 - - - - 0.00 - - - 0.240 0,24 2.00 17,462 96.00 --- --- -- - 0,00 - - - 0.244 0.24 2.10 18,619 96.10 - -- -- - 0.00 - - - 0.249 025 2.20 19,776 96.20 - - - - 0.00 -- - - o.254 0,25 2.30 20,933 96.30 --- --- --- - 0.00 - -- --- 0.258 0.26 2.40 22,090 96.40 - - - - 0.00 -- -- -- 0,263 0.26 2.50 23,247 96.50 - - - - 0.00 --- - - 0.268 0.27 2.60 24,404 96.60 -- --- -- - 0.00 - - 0272 0.27 2.70 25,561 96.70 - - - - -- 0.00 - --- --- 0.277 0.28 . PI C EIV ED ConSnues on next page._. JUL 1 6 2006 �v; V QP#1' 1 Stage 1 Storage 1 Discharge Table Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A WE B Wr C Wr D Cfs fs Total cfs fl cuff ff cfs Cfs cfs cfs cfs Cfs cfs cfs 2.80 26,718 96.80 - --- - - 0.00 -- - - 0.282 0,286 0.28 0.29 2.90 27,875 96.90 -- - - - 0.00 - 0.00 - - --- --- - 0.291 0.29 3.00 29,032 97.00 - --- - - 0.00 - - - 0,296 0.30 3.10 30,389 97.10 -- - - - - 0.00 - - - 0.300 0.30 3.20 31,747 97.20 - - - 0.00 - --- - 0.305 .0.31 3.30 33,104 97.30 - -- - - 0.00 - - -- 0,310 0,31 3,40 34,462 97,40 --- - -- - 0.00 --- - - 0.314 0.31 3,50 35,820 97.50 - - - - 0.00 - - - 0.319 0.32 3.60 37,177 97.60 - -- - - 0.00 - - --- 0.324 0.32 3.70 38,535 97.70 --- - - - 0.00 --- - - 0.328 0.33 3,80 39,893 97.80 - -- - -- - 0,00 - ---- - 0.333 0.33 3.90 41,250 97.90 -- - - 0.00 - - --- 0.337 0.34 4.00 42,608 98.00 --- - --- - 0.00 - - - 0.342 0.34 4.10 44,173 98.10 - - - -- 0.00 -- --- -- 0.347 0,35 4.20 45,739 98.20 - -- - - 0.00 - - --- 0.352 0.35 4.30 47,304 98,30 --- - --- - 0.00 - - - 0.357 0.36 4.40 48,869 98.40 - - - --- 0.00 --- --- - 0.362 0,36 4.50 50,435 98.50 - --- - - - 0.00 - - - 0.367 0.37 4.6D 52,000 98.60 --- - - - 0.00 -- - - 0.372 0.37 4.70 53,565 98.70 - - - - - 0,00 -- --- - 0.377 0.38 4.80 55,131 98.80 - -- - 0.0D - - -- 0.382 0.38 4.90 56,696 98.90 - - - - - 0.00 --- --- - 0.387 0.39 S.DD 58,262 99.00 - --- - -- 0.00 - - -- 0.393 0.39 5.10 60,048 99.10 ---- - - - 0.00 - - - 0.398 0.40 5.20 61,834 99.20 - - - -- - 0.00 --- --- - 0.403 0.40 5.30 63,620 99.30 - --- - - 0.00 - - -- 0,408 0.41 5.40 65,406 99.40 - - - - 0.00 -- ---- - 0.413= 0.41 5.50 67,192 99.50 - - - - -- 0.00 - - - 0.419 0.42 5.60 58,978 99.60 - - - - 0.00 - - - 0,424 0.42 5.70 70,764 99.70 - - - 0.00 --- --- - 0.429 0.43 5.80 72,550 99.80 - --- - - - 0.00 - - - 0.434 0.43 5.90 74,336 99.90 - - - - - - 0.0D - - - 0.440 0,44 6.00 76,123 100.00 - - - 0.00 --- --- - 0.445 0.45 6.10 78,139 100.10 - -- - - 0.00 - - - 0,450 0.45 6.20 80,156 100.20 -- - -- - - 0.00 - - - 0.456 0.46 6.30 82,173 100.30 - - - -- 0,00 --- --- - 0.461 0.46 6.40 84,190 100.40 - - - 0.00 - - - 0.467 0.47 6.50 86,207 100.50 - - -- - - 0.00 - --- - 0.472 0.47 6.60 88,224 100.60 - --- - - 0.00 --- --- - 0.478 0.48 6.70 90,241 100.70 - - - --- 0.00 - - --- 0.483 0.48 6.80 92,258 1 D0.80 --- - -- - 0.00 - - - 0.489 0,49 6.90 94,275 100.90 - - - - 1.64 - - --- 0.494 2.14 7.00 96,292 101.00 - - -- 4.65 - - --- 0,500 5.15 7.10 98,549 101.10 - - -- - 8,54 - -- - 0.506 9.05 7.20 100,807 101.20 - - - -- 13.15 - -- - 0.511 13.67 7.30 103,065 1 D1.30 - --- - - 18.38 - --- - 0.5W 18.90 7.40 105,323 101.40 -- - - - 24,17 --- - - 0.523 24.69 7.50 107,581 101.50 - - - --- 30.45 -- - --- 0.528 30.98 7.60 109,838 101.60 - - -- - 3721 - - --- 0,534 37.74 7.70 112,096 101.70 --- - - - 44.40 - --- - 0.540 44.94 7380 114,354 101.80 --- - - -- 52.00 -- - - 0.545 52.54 7.90 116,612 101.90 - - - --- 59.99 --- - ---- 0.551 60.M 8.00 118,870 102-00 - - - - 68.36 - - - 0.557 68.91 8.10 121,378 102.10 -- - "' - 77.08 - --- - 0.563 77.64 8.20 123,887 102.20 - - - - - - 86.14 --- - - 0.569 86.71 8.30 126,396 102.30 - - - 95.53 - - - 0.575 96.10 8.40 128,905 102.40 - - --- - 105.24 - -- - 0.581 105.82 8.50 131,413 102.50 --- - -- - 115.26 -- --- - 0.587 115.85 8.60 133,922 102.60 - - - - - 125.58 --- - - 0.593 126.17 8.70 136,431 102.70 - - - - 136.18 - - - 0.598 136.78 8.80 138,940 102.80 --- - - - 147.08 - - - 0.604 147.68 8.90 141,448 1D2.90 - -- - - 158.25 -- - - 0.610 158.86 9.00 143,957 103A0 - - - - ...End 7Y: IVED 2006 Ponid Report Hydraflow Hydrographs by Intelisoive Wednesday, Apr 26 2006, 5:51 PM Pond No. 1 - WQP#1 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (it) Elevation (ft) 0.00 94.00 1.00 95.00 2.00 96.00 3.00 97.00 4.00 98.00 5.00 99.00 6.00 100.00 7.00 101.00 8.00 10200 Culvert 1 Orifice Structures [A] [B] Rise (in) = 0.00 0.00 Span (n) = 0.00 0.00 No. Barrels = 0 0 Invert El. (ft) = 0.00 0.00 Length (ft) = 0.00 0,00 Slope (%) = 0.00 0.00 N-Value = .013 .013 Orif. Coeff. = 0.60 0,60 Multistage = n/a No Stage (R) 8.00 6.00 4.00 2.00 0.004 0 . Storage Contour area (sgft) 6,951 8,706 10,561 12,578 14,575 16,732 18,990 21,348 23,W8 [C] 0.00 0,00 0 0.00 0.00 0.00 .000 0.00 No [D] 0.00 0,00 0 0.00 0.00 0.00 .000 0,00 No Incr. Storage (cult) Total storage (tuft) 0 0 7,829 7,829 9,634 17,462 11,570 29,032 13,577 42,608 15,654 58,262 17,861 76,123 20,169 96,292 22,578 118,870 Weir Structures [A] IBl [C] [D] Crest Len (ft) = 20.00 0.00 0,00 0.00 Crest EL (tt) = 100.90 0.00 0.00 0.00 Weir Coeff. = 2.60 3.33 0.00 0.00 Weir Type = Broad --- - -- Multistage = No No No No Exfitl ration = 1.000 iNhr (Contour) Taltwater Elev. = 0.00ft Now cuFierVOMice oudlows have been analyzed under inlet and outlet control. Stage 1 Storage 20,000 40,000 i CEIVED JUL 1 & 2006 DY: 100,000 Stage (ft) 8.00 6.00 4.00 2.00 - 1 0.00 120,000 Storage (tuft) Pond Report - - -- .; Hydraflow Hydrographs by Intefisolve Wednesday, Apr 26 2006, 5:51 PM Pond No. 1 - WQP#1 Pond Data Pond storage is based on known Contour areas. Average end area method used. Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 94.00 6,951 0 0 1.00 95.00 8,706 7,829 7,829 2.00 96.00 10,561 9,634 17,462 3.00 97.00 12,578 11,570 29,032 4.00 98.00 14,575 13,577 42,608 5.00 99.00 16,732 15,654 58,262 6.00 100.00 18,990 17,861 76,123 7.00 101.00 21,348 20,169 96,292 8.00 102.00 23,808 22,578 118,870 Culvert 1 Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 20.00 0.00 0.00 0_00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 100.90 0.00 0.00 0.00 No. f3atrrels = 0 0 0 0 Weir Coeff. = 2.60 3.33 0.00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Broad --- -- - Length (ft) = 0.00 0.00 0.00 0.00 Mufti -Stage = No No No No Slope (%) = 0,00 0.00 0.00 0.00 N-Value = .013 .013 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Mul Stage = nla No No No Ezfiltration = 1.000 in/hf (Cwrtour) Tailwater Elev. = 0.00 ft Note: Cul+erKWice outflows have been analyzed under inlet and outlet oontrol. Stage (ft) 8.00 6.00 4.00 2.00 0.00 ` ' 0.00 6.00 Total 0 12.00 18.00 24.00 Stage I Discharge 30.007CIFEIVED 6 20 66 BY. 54.00 60.00 stae (a) 6.00 6.00 4.00 2.00 J- 0.00 66.00 Discharge (cfs) toI --i-l----- ------------ CPOF (0 EMERGENCY --- Sp�WAy 60, 0 oo TER QUALITY PO10N2.D5 UMMARY 100 DRAINAGE AREA: 6.00 AC POND INVERT: 94,0 • NORMAL POOL: 98.00 PRIMARY97• Sp��_AY ELEV. A 94 TM To ?ONO: 98000 EVERO SPILLWAY ELEV. 10i.85 180 98-00 RCP INV=98.50 INV 18,0 RCP INV 98.0 98 99 1C0 yN EMERGENGY SPILLWAY -SECTION THRU.'.' fi 'A B 001, SWA� - - 101 11 ILALI r. \\c U) GRASS LINED SWALE - SECTION THRU 0 0 LO 4L 0 D, i1-� - L C) SECTION A -A SECTION 0-8 n/ '/v ",/JZ n Herring —Sutton & Associates, P.A. PUF CONCRETE PLANT Engineers -- Surveyors - Planners Pond Details 10 201 Mash stredL Nw Wilson, riorth Carolina MOB (262) 291-88B7 Selma, NC I oh..t Hed at Jul 27 06 03:56p HSA 252-291-5900 p.l 14Herring pSutton associates, p.a. ENGINEERS • SURVEYORS - PLANNERS 2201 Nash Street Northwest, Wilson, NC 27896 PHONE: 252-291-8887, FAX: 252-291-5900, EMAII.: NSA2002Qearthlink.net FAX # (252) 291-5900 FACSIMILE TRANSMITTAL COVER SHEET Date: 7-27-06 Number of Pages: 2 (Including Cover Sheet) To: KEN PICKLE STORMWATER GROUP NCDENR-DWQ Fax Number: 1-919-733-9612 From: RON SUTTON, F.E. Re: PLT CONCRETE SELMA PLANT Time: 5:00 PM Comments: ATTACHED IS A REDUCE COPY OF THE NON -DISCHARGE WATER QUALITY POND THAT SHOW A 1.0 FOOT FREE BOARD ABOVE THE 25-YR STORM LEVEL. PLT temporary solution Subject: PLT temporary solution From: Ken Pickle <ken.pickle@ncmai1.net> Date: Fri, 28 Jul 2006 14:28:17 -0400 To: Myrl Nisely <myrl.nisely@ncmail.net>, rlspe@earthlink.net Myrl, I want to alert you to the status of my permitting process on a submittal from Ron Sutton, for Rick Proctor of PLT, for the new facility in Selma. I've had a discussion with Ron. The elements of it are as follows. a) I can't get Ron's application processed this week, even though I have reviewed the plans and talcs, and I'm confident in them. Rick wants to make concrete on Monday, (I won't have his permit by Monday, either.) b) I think I can accomodate Rick in this way, suggested by Ron Sutton: Rick postpones using the."recycle" feature of his washout cells. I mean, he uses city water, once through, and it overflows his cells into the ditch and into the pond. c) Now when I look at his whole site, I see no discharge of stormwater or wastewater because he has that big pond collecting everything, at least for the short term. He also does not have a functioning recycle system. So, he doesn't need my permit. ('there's no stormwater discharge, there's no wastewater discharge, and there's no funtioning recycle system, at least for the short term.) d) I process his permit application for the future condition that includes the conversion to a functioning recycle system. He gets the permit from me in a couple of weeks. He then re -installs the pump and other necessary hardware to begin a recycle wash operation. All covered under his new permit. e) I have not, "told Rick he can make concrete on Monday." I have however, told Ron Sutton that my reading of our rules is that a site without a discharge, and without a recycle system does not need a permit from us. I'm a little uneasy about it because it is an unusual situation, but if we ever had to choose to accomodate an applicant in a difficult situation, the current circumstances seem to have minimum risks. I mean, we know the PLT system is a good one, and I'm convinced that Ron Sutton has engineered the site thoroughly. Any comments? Contrary opinions? Ken 1 of 1 8/7/2006 2:18 PM 28 06 01:21p HSR 252-291-5900 P - 2 A Herring -Sutton & ASSOCIATES - P.A. ENGINEERS - SURVEYORS - PLANNERS July 28, 2006 Stormwater Permitting Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Attention: Ken Pickle, P.E. Subject: Recycle System Application and Notice of Intent PLT Concrete Services -Selma Plant Johnston County Dear Mr. Pickle: Based upon our telephone conversations on Friday afternoon, July 28, 2006, this letter is to confirm -that PLT Concrete Services as modified its drum wash facility to solely utilize potable water from the Town of Selma in its concrete mix drum cleaning operations. A discharge from this facility will travel by way of newly constructed grass line swales to the newly constructed non -discharge pond. There is sufficient capacity as demonstrated by storm water routings to storage the 25-yr storm without a stormwater discharge_ In addition at the 25-year stormwater storage level there is an additional 1.0 foot of freeboard. Based upon the above, we do not have a recycle system at the facility and we have demonstrated through the Ada submittal of plans and calculations that we do not have no-/ 5 a stormwater discharge in the 25-year storm event. Therefore, under current u o Q„ rules and regulations a stormwater permit is not required for legal operation of the ready mix concrete facility. baS/ s 104+ Cv 1"- 6��acaSS Please consider our current application on file in your office as a request to ;- spy "I n construct a recycle system (drum wash) and please process as appropriate. NG6/¢ CUc I assure you there will be no recycling of wastewater at the facility until the appropriate permit is issued by your office. If you should have any questions concerning the above, please feel free to call. Respectfully klerriatton and Associates, P.A. -inie L. Su Herring,Sutton & ASSOCIATES - P.A. ENGINEERS - SURVEYORS • PLANNERS July 31, 2006 Stormwater Permitting Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 ; Attention: Ken Pickle, P.E. ; Subject: PLT Concrete Services -Selma Plant m Johnston County Dear Mr. Pickle: 4 r: Based upon our telephone conversation on Friday afternoon, July 28, 200 , a approximately 4:15 PM this letter is to confirm our conversation regarding the need for a State Stormwater Permit to operate the PLT Concrete Plant Facility in Selma, North Carolina. Based upon the fact that the facility is designed to be a non -discharge facility in a 25-year storm event and the fact that the facility as proposed to be operated does not have a recycle system, a State Stormwater Permit will not be need to commence operation. If in the future we desire to operate a drum wash recycle system, it will be necessary to obtain a State Stormwater Permit before placing said recycle component of the ready mix concrete facility into operation. Based upon the above it is intention of PLT Concrete Services to place the Selma Facility into operation on Monday July 31, 2006. I would like to thank you and your staff for the assistance you have provided in processing our Notice of Intent and we look forward to a mutually beneficial working relationship in the future. If you should have any questions concerning the above, please feel free to call. ly and Associates, P.A. Annie L. Sutton, P.E. Ricky Proctor, Manger PLT Concrete Services 2201 Nash Street NW • Wilson, North Carolina 27896 • (252) 291-8887 • Fox (252) 291-5900 Re: PLT, Selma Subject: Re: PLT, Selma From: Myrl Nisely <myrl.nisely@ncmail.net> Date: Fri, 13 Oct 2006 09:21:58 -0400 To: Ken Pickle <ken.pick le@ncmail.net> 1. Just fine with me 2. Just fine with me 3. Just fine with me!!! So do you pick me up here, or do I meet you at Arch at about 7:30? Myrl (P.S. does my driving scare you?) Ken Pickle wrote: Hi Myrl, If you have a second, I have three items for you. 1. Given our coordination with each other at the end of July, I assume that RRO is ok with me finally providing a Certificate of Coverage for PLT Concrete Services in Selma. Please let me know if you object, otherwise, I'll take your earlier concurrence with the accomodation we worked out with Rick Proctor and Ron Sutton as indicating that you ultimately had no problem with his plan at the Selma site. 2. I know Selma is the other direction from our visits in Sanford on the 23rd of October, but do you imagine that we would have time to go by and see the PLT site there among all the oil terminals? I'm interested in whether the engineer's key design feature - - that the runoff would infiltrate in those sandy soils in Selma ---is really working out. I would expect to see a totally dry basin, unless they had substantial rain very recent to our visit. 3. I'd like to drive on the 23rd, if you don't mind. s Ken Myrl A. Nisely <9))))>< Environmental Chemist II NC DENR - Div. Water Quality Raleigh Regional Office 1628 Mail Service Center Raleigh, NC 27699-1628 Telephone: (919) 791-4200 or x4255 Fax: (919) 571-4718 myrl.nisely@ncmail.net ><((((Q> 1 of 1 10/19/2006 1:24 PM North Carolina Division of Environmental Health Terry L. Pierce, Director State of North Carolina Michael F. Easley, Governor Department of Environment and Public Water Supply Section Natural Resources Division of Environmental Health Jessica G. Miles, Section Chief William G. Ross, secretary MEMORANDUM TO: Ken Pickle, Stormwater Permitting Unit Q Division of Water Quality FROM: Jessica G. Miles, P.E., C.F.M. � Public Water Supply Section cIZ ` SUBJECT: Draft National Pollutant Discharge %j/�n Q Elimination System Permit NCG140362 PLT Concrete Services (Ready -Mix Concrete Plant)`' a���c Selma, North Carolina Johnston County DATE: October 24, 2006 Reference is made to the above -mentioned Draft National Pollutant Discharge Elimination System Permit. Upon review of this permit application to discharge mixed stormwater and wastewater (concrete truck wash waters) from the subject facility, it appears that no adverse effect on water quality will occur to the existing public water supply intakes. The point of discharge is located less than 5 miles upstream of the water supply intake for the Town of Smithfield (PWSIDNo. 03-51-010). However, we concur with the issuance of this permit provided this facility is operated and maintained properly; the stated effluent limits are met prior to discharge; at leastquarterly monitoring for coliform is conducted; and the discharge does not contravene the designated water quality standards. If we can be of further assistance, please contact Michael L. Douglas, P.E., at 919-791-4200. JGM/MLD Public Water Supply Section One 1634 Mail Service Center, Raleigh, North Carolina 27699-1628 NorthCarolina Telephone 919-791-4200 ♦ Main Fax 919-571-4718 A PW S Fax 919-788-5349 ;W &A711# http://ncdrinkingwater.state.nc.us/ An Equal Opportunity 1 Affirmative Action Employer NORTH CAROETNA DIVISION OF WATER QUA�iTY A7143FIAV �DE�BR SURFACE WATER PROTECTION SECTION �4.... 5TORMWATER PERMiT'iING UNIT October 12, 2006 MEMO VIA FAX, 7 pages TO: Michael Douglas, DEH, RRO, fax 788-5349 FROM: Ken Pickle, Stormwater Permitting Unit, fax (919) (919) 733-5083x584 or ken.pickle@ncmail.net SUBJECT: Review of the discharge location for the following; 733-9612 PLT Concrete Services (ready -mix concrete plant) 3073 West Oak Street Selina, Ndrth Carolina aohnston county Stormwater permit application #NCG140362 RECEIVING WATER: UT to Mills Creek (at Selma).to the Neuse River, WS-IV NSW (stream index 27-40) Please indicate below your agency's position or vlewpoint on the facility fisted above. We cannot Issue the Certificate of Coverage under the general permit without your concurrence. Please return this form at your earliest convenience. Michael, this is a concrete plant located among the bulk oil terminals In Selma. The Facility is proposing to recycle concrete truck wash waters, and to provide an on -site basin to contain the mixed stormwa ter and wastewater resulting From a 25-year, 24-hour storm. This 25-yr design criterion means that there could be a wastewater overflow (discharge) in, For example, a 30-year rain event. But presumably not In a 25-year rain event. Thanks, Ken RESPONSE: This agency has reviewed the NOI and the general permit and determined that the proposed discharge will not be sufficiently close to any existing or known proposed public water supply Intake so as to create an adverse effect on water quality. We concur with the issuance of a Certificate of Coverage under the general permit provided the facility Is operated and maintained properly, the stated effluent limits are met prior to discharge, and the discharge does not contravene the designated water quality standards. Concurs with Issuance, provided the following conditions are met: Opposes the Issuance, based on reasons stated below, or attached: signedL41Z,k,�t7j'l- Date- 1 06 Attachments: NOI with map cc: Stormwater Permitting Unit Flies OCR 3 0 2,046 Re: PWS,:riproval of wastewater discharge V 1� Subject: Re: PWS approval of wastewater discharge From: Michael Douglas <michacl.douglas a ncmail.net> Date: Sat, 18 Nov 2006 00:57:31 -0500 To: Ken Pickle <ken.pickle@ncmail.net> CC: Bradley Bennett <Bradley.Bennett@ncmail.net>, Myrl Nisely <myrl.nisely@ncmaiI-net> Ken The discharge site is within 5 miles of a drinking water supply intake. Any wastewater discharge (sanitary or stonnwater) within this 5 miles of intake is classifed as a potential risk to public health. DEH-PWSS concurs with issuance of the permit with the stated conditions in the October 24, 2006 memo. Michael (Out of the office until 11/27/06) Ken Pickle wrote: Hi Michael, I'm responding to the October 24, 2006 memo from Jessica Miles with conditional approval of a wastewater discharge from a ready -mix concrete facility in Johnston County. I have a problem with the condition attached by DEH (requiring quarterly coliform monitoring), and want to know whether you all feel like you have any freedom to revise your first response to us. We have previously either denied permit coverage (if DEH objects to the discharge) or granted permit coverage (if DEH does not object to the discharge). We in the Stormwater Permitting Unit have never attempted in these exact circumstances to modify or amend the sampling requirements of a General Permit. * 1. Here's the background wrt our program:* a) PLT Concrete Services in Selma submitted a Notice of Intent (NOI) to be covered under our NPDES General Permit NCG 140000, which coverage we regularly provide for qualifying stormwater and wastewater discharges from ready -mixed concrete facilities. We have assigned permit application number NCG140362 to their application. b) In the unlikely event of a wastewater discharge from the facility, such a discharge would enter a UT to Mills Creek (at Selma) to the Neuse River, a WS-IV NSW waterbody. DWQ rules require DEH agreement before we can allow any wastewater discharge under this General Permit. (The General Permit also authorizes the discharge of stormwaters, but that is not relevant to our issue with PLT.) I see your notes on the return memo that the facility is less than 5 miles above the Town of Smithfield intake. I don't know the significance of that specific distance within your program, but I'd like to learn it. *2. Here are the physical facts at the site, which 1 have visited:* a) The facility exists today, and is in production, and is producing wastewater, but is not 1 of 3 11/20/2006 8:37 AM Re: PWS approval of wastewater discharge r� r discharging. (And won't discharge, except in a very large rain, greater than the 25-year event.) b) The process wastewater generated on site does not have a readily apparent source of concentrated coliform contamination. Sanitary wastewaters on site originate from two buildings, a truck maintenance garage, and an office and control building. Submitted site plans show the sanitary wastes from both locations piped to Selma's sanitary sewer system. We do not expect the sanitary wastewaters to mix with the process wastewaters. c) Process wastewaters are largely generated by washing out the excess concrete from inside concrete drum trucks, and from rinsing off the outside of the same trucks. Such a wastewater discharge is limited in our General Permit to: pH 6-4 (the ready -mix wastewater pH can be as high as 10 - 12); TSS of less than or equal to 30 mg/L (TSS can be very high in untreated wastewater, since this is washed out concrete mix. Of course, the bulk of the TSS settles very rapidly in the provided settling chanbers); and settleable solids of 5 ml/L (which for this wastewater acts pretty much the same as TSS). Our General Permit does not limit coliform, because we have not previously considered coliform a likely constituent of the process wastewater. *So, here's the first part of our concern - - we have never before thought that coliform might be present at significant levels in process wastewater from a ready -mixed concrete site.* d) At PLT, Selma, the truck wash out, and the truck rinse off, waters are contained in a system of settling chambers, and the liquid is recycled from the last settling chamber to serve, again and again, as wash out and rinse off water for each day's number of trucks. The recycle system design basis is that the retained inventory volume of wastewater, plus the additional volume of rainfall from a 25-year storm will not overflow the recycle system (the design also incorporates an additional 1' of freeboard in the recycle system settling chambers). All of this means that we can safely expect that there will not be a continuous wastewater discharge. There won't even be a recurring wastewater discharge. We might see a wastewater discharge from a storm greater than the 25-year storm. Meaning that we expect a very infrequent wastewater discharge from the wastewater recycle system. e) Further, downstream of the recycle system is an additional infiltration basin that receives and holds the stormwater runoff from the rest of the site, again, based on no discharge from the 25-year rain evet. Any overflow from the recycle system would flow via an on -site swale into this infiltration basin. In this case, while our permit would be to discharge a wastewater, the discharge would be so infrequent as to make accumulating meaningful monitoring data* *essentially impossible.* So, here's the second part of our concern - - quarterly monitoring on a discharge that we might not see, statistically, except for once every 25 years, when there would be a discharge to monitor.* *3. Here's our additional bureaucratic difficulty:* a) PLT has applied for coverage under our General Permit, which applies in blanket form state wide. We don't re -issue the General Permit for each applicant; instead we issue a Certificate of Coverage to provide new applicants with coverage under the General Permit. The significance is that once our General Permit is issued state wide, we don't have the freedom to modify it. We can't add coliform monitoring to our General Permit, and we have never added monitoring requirements to our individually issued Certificates of Coverage under any General Permit. *So, here's the third part of our concern - - we can't legally add coliform monitoring under the ready -mixed concrete General Permit.* 2 of 3 11/20/2006 8:37 AM Re: PWS,anproval of wastewater discharge b) if DEH must have quarterly coli form monitoring on this infrequent process wastewater discharge, then we in DWQ have some lengthy, labor demanding options available to us other than the General Permit route. But, before we head off in that direction, I'd like to discuss PLT with you. I'm sure DEH had their reasons for the conditional approval, so if we need to come up with a solution that I haven't thought of, let's talk about it. Thanks, Ken (919) 733-5083x584 Michael L. Douglas, P.E. Regional Engineer Public Water Supply Section Raleigh Regional Office Main Number: 919-791-4200 Office Number: 919-791-4297 Fax Number: 919-571-4718 3 of 3 11/20/2006 8:37 AM .. Herring -Sutton St ASSOCIATES • P.A. ENGINEERS • SURVEYORS •PLANNERS December 20, 2006 Stormwater Permitting Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Attention: Ken Pickle, P.E. Subject: PLT Concrete Services -Selma Plant Johnston County Dear Mr. Ken: I appreciated the opportunity to speak with you this morning concerning the Stormwater Permit for the PLT Concrete in Selma. I spoke with Rick Proctor of PLT Concrete and he has no problem .with requirement of a quarterly fecal monitoring requirement for the discharge from the facility. It should be noted that discharges should only occur as the result of an extreme rain event. However we will file a quarterly report and will take a sample if a discharge should occur during the quarter. If no discharges occur during the quarter we will also report this information. I look forward to receiving the permit for this facility prior to year end as discussed by phone. If upon review of this letter you should have any further questions, please feel free to call me. Respectfully and Associates, P.A. Ro nie L. Sutton, P.E. DEC E-1 Cc: Ricky Proctor, Manger PLT Concrete Services oENR - 1NATER QUALITY Wetlands 8 �`'crmwaW Branch ' 2201 Nash Street NW - Wilson, North Carolina 27896 - (252) 291-8887 • Fax (252) 291-5900 r� Herring -Sutton & ASSOCIATES • P.A. ENGINEERS • SURVEYORS • PLANNERS December 4, 2006 `G Cf ►n Stormwater Permitting Unit o U Division of Water Quality UJ L 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Attention: Ken Pickle, P.E. Subject: PLT"Coricrete Services -Selma Plant Johnston County f Dear Mr. Pickle: 1 Recently we discussed by phone the above subject batch mixed concrete plant and its non -discharge stormwater system. At that time you expressed some concerns that the detention pond had some water standing in the bottom several days after a rainfall event. At that point in time there was approximately 12 inches of water standing in the bottom of the pond. As,a. reminder the design. of this facility calls for use of a drum wash facility for washing 'out the:concrete'truck drums with water reclaimed from the wash pit,. which is; piovided with sufficient:storage to contain the 25=yr'storrri. �We'began' use of the batch 'mix facility with this key'component not functioning as designed. We were adding approximately 1000 gallons per day of city water to the drum wash facility instead of using settled water from the pit. This addition of outside water resulted in the drum wash facility discharging to the detention pond. In reviewing the infiltration calculations for the pond the insertion of additional city water results in a daily discharge of water to the pored that was not initially accounted for in the design. It i5 my opinion that this factor has contributed to the storage of water in the:pond that you witnessed. It should be noted that we have experienced a wet fall that has resulted in flooding in a number of areas of Eastern North Carolina. -However this facility has handled all stormwater flow with no discharge. Further it should be noted that we did not include evaporation rates in ..our discharge.calcula#ions for the pond plus there is add itional'storage. in'the:'swale_s along both sides of the facility that were not included -in routing calculations -for: the pored _ 2201 Nash Street NW • Wilson, North Carolina 27896 • (252) 291-8887 • Fax (252) 291-5900 r t _- • •�_i rt .' � 1 -1; y _ � _ � _ 4•� Page 2 of 2 Ken Pickle Letter December 4, 2006 Based upon a review of the above I am comfortable with the original design, with the drum waste facility functioning as designed, as presented to your office for 9pproval. If upon review of this letter you should have any questions, please feel free to call me. Respectfully and Associates, P.A. nie L. Sutton, P.E. Ricky Proctor, Manger PLT Concrete Services -40 ., •�OF \NA1EgQ Michael F. Easley, Governor William G. Ross Jr., Secretary co (W7 r North Carolina Department of Environment and Natural Resources 4 Alan W. Klimek, P.E. Director Division of Water Quality MEMO October 24, 2006 To: KBP Correspondence File, Oct -Nov -Dec 2006 From: Ken Pickle Subject: Site visits with Myrl, 10/23/06 Discussion Myrl and I visited 5 sites yesterday that are permitted, or seeking permits under the NPDES stormwater program. 1. PLT, Selma. This ready -mixed concrete facility has an NOI pending on KBP's desk. The designer included infiltration as a key component of the design. KBP was interested in whether the already existing infiltration basin was effectively infiltrating the waters from the site. Some moderate amount of rain had fallen on Saturday night and Sunday prior to our visit on Monday. I hoped to see a dry pond, or a relatively little bit of water in the basin. In fact, the whole bottom of the basin was covered with 12' — 18" of water, as estimated by Rick Proctor, owner. In response to my misgivings about the design basis (infiltration) brought on by the presence of water, Rick agreed to measure the loss of water (if any) over the next several days and report that to Ken Pickle. We were unclear on the report time, but my impression was that Rick would report on Friday of the same week, or on Monday of the following week. PLT has another ATC/NOI being processed based on the infiltration design concept. My approval of such a design concept will be influenced by the performance of the Selma facility. 2. Atlantic Scrap, Benson(?). Myrl made a brief inspection in response to a fire over the weekend. I was unclear on whether the facility had a point source discharge, whether a stormwater permit was required, and where to take a sample. No action for KBP. 3. Heritage Concrete, Sanford. A ready -mixed concrete site considering upgrading the treatment of wastewater. Myrl wanted us to stop by and talk with them about the requirements for an ATC for the new construction. Here's where I first realized that perhaps portions of the regulated industry did not understand what we mean when we say we want "engineered" drawings. Some, apparently, have not understood our demand for an engineered design as a demand for an accounting of the waters generated on the site. 4. Saiden Technologies, Sanford. An adhesives manufacturer. Discovered a milky emulsion in the drainage feature at the back of the facility. Unknown material. Plant manager could not offer an explanation of the cause or even what the material was. Myrl to follow up with continuing contact with the facility. 5. Lane Construction, Tryon Road and US1, Raleigh. A batch concrete site for road construction. Inspected the two new settling pits for the pavement sawing operation wastewater. The small basin was full of solids. The large basin had a pump suction hose dropped in it and a sediment filter bag in place. The original system seemed choked with solids for most of the settling volume. There was a mystery pump line that appeared to go under the highway from the first small settling pit where the truck wash out first begins treatment. Ken No � hCarolina �Natrrrn!/j North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7058 Customer Service Internet: www.newatergualitv.arg Location: 512 N. Salisbury St. Raleigh, NC 27604 Fax (919) 733-9612 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper Permit review for NCG140362,PLT Concrete Services —Selma plant 1/16/08 — - kbp Conclusion on above review date: Issue permit and letter with conditions. Review notes 1. Submittal parts a. Design plan, design details, design talcs, design narrative by Herring -Sutton & Assoc. submitted 7/16/06. b. Extraneous submittal materials: apology fax for delay in submittal; DLR approval of ESCP; WQ0030117 sewer line permit. c. Submittal sufficient. 2. Given lengthy delay on KBP's desk, construction has already been completed. Suggest we treat as an existing site, not as a non-compliance problem by the permittee for construction without an ATC nor as discharging without a permit (It's a non -discharge design, based on infiltration.) 3. Submittal review: a. Property lines shown? Yes b. Stamped and dated? Yes c. Outfalls located? Yes d. Sufficient topography and detail to show how stormwater and wastewater are generated, directed, conveyed, captured, and treated? Yes e. Features: L Entire site drains to very large infiltration basin with emergency overflow for >25-yr rain plus 1' freeboard. This basin directly receives site stormwater, aggregate drainage, truck rinse, and loading area wash down. ii. Five -bay, 25-yr recycle system for drum wash. Recycle system overflow (from >25-yr event) goes to large infiltration basin. iii. WS-IV NSW receiving water. DEH requires quarterly fecal coliform testing because the system is within 5 miles of a downstream public water supply intake. Determine to include requirement in transmittal letter. Permittee agreeable to fecal monitoring. (It`s likely that there will not be a discharge to monitor in most quarters.) f. Design review: Infiltration is shown to be a viable disposal mechanism by in - situ soils testing at the elevation of the bottom of the basin; talcs use 25-yr rain of 6.8", a reasonable amount for Selma; runoff curve number of 88 (moderately high) is ok; 4. Design permitting basis summary: Under the 25-yr storm there are no wastewater or stormwater discharges from the site. For over the 25-yr storm, and presuming exhaustion of the additional 1' freeboard, the wastewater fraction would be greatly diluted in the pond, and in the stormwater inflow, presuming that the infiltration function has effectively drained the basin to very near the bottom of the 7' deep basin. TSS, Settleable Solids, and pH all very likely diluted to within permit limits, even for a rain > 6.8". Coverage under NCG14 ok. END "� ,�� �ik��' 1■ " � �j' '/�� 4� i is ���r • • .i" �/ - `+ � i ,}� `.fin '��. • + '� .1, �' . - h {� i"'�j ` .ice sty. �;� E i, c��ti �i'. y ,tea ��� � �r-�_t. - I — 1i'.. .. '� �'�.'�.�1 �4* I � •�• �-' � r� 1" I TIN MON wft •w •`. 't's � iJ4,�. i� Y ���rrtr'��fi'�3�� �-' � �i r Y=a� [ _M fir'_. �, h;���"`�`$�,'�'�,. �` •,',;-`s�-'.'� ---.,_��`�_ _ �s t, '� his- y� , �Sr• '� - �- •� AN ti .� -per h' �. �'--^�*• �'i� `�,:'M- ��� �- � +1 ® �11� rK RPM IL }} d r tAc�r--i+i- � r- � � ,♦ ��.- 1 � - 'F � ..� 4 I Johnston County, North Carolina to 6, and chroma of 4 to 8. It is silty clay loam, silty clay, or clay loam. The BC horizon has hue of 5YR to 10YR, value of 4 to 6, and chroma of 4 to 8. It is silt loam or silty clay loam. The C horizon is soft, multicolored saprolite in shades of red, yellow, brown, pink, purple, and white. It is silt loam, loam, silty clay loam, or the channery analogs of those textures. The Cr horizon is a multicolored mixture of hard, platy rock fragments and crushable fragments. The crushable material has a texture of silt loam or silty clay loam. Norfolk Series The Norfolk series consists of very deep, well drained soils on broad interstream divides in the uplands on the Coastal Plain. These soils formed in loamy marine sediments. itaPes range 0 to 6 percent.�Ioam/oosland, Typical pedon o Norf0,to 2 percent slopes-, about 6 miles soenson; about 1,400 feet northwest of the junction of Secondary Roads 1112 and 1105, in a cultivated field (State plane coordinates 2,150,800 feet E., 571,000 feet N.)-. AP-0 to 9 inches; brown (10YR 4/3) loamy sand; weak fine granular structure; very friable; common fine roots; moderately acid-, abrupt wavy boundary. E-9 to 14 inches; light yellowish brown (2.5Y 6/4) loamy sand-, weak fine granular structure; very friable; few very fine roots; moderately acid; clear smooth boundary. Bt1-14 to 26 inches; yellowish brown (10YR 5/6) sandy clay loam; weak medium subangular blocky structure; friable, sticky and slightly plastic; few fine roots; common fine and very fine pores; few faint clay films on faces of peds; strongly acid; gradual smooth boundary. Bt2-26 to 41 inches; yellowish brown (10YR 5/6) sandy clay loam; common medium distinct yellowish red (5YR 5/6) mottles; weak medium subangular blocky structure; friable, sticky and slightly plastic; few very fine roots; common fine and very fine pores; few faint clay films on faces of peds; very strongly acid-, gradual smooth boon a Bt3-41 to 58 inches; yellowish brown (10YR 5/6 sandy clay loam; many medium distinct yellowish red 5YR 5i6 and red (2.5YR 4/6) mottlas; weak medium subangular oc tiructrn'rriable, sticky and slightly plastic; few very fine and medium pores; few faint clay films on faces of peds; very strongly acid; gradual smooth boundary. V Sri s�h� 5 ? JJ-- '� 81 BC-58 tQ__� ,lacft�5, mottt�a yt3tYb1�v1 d-{��F 5L5� an ellowish wn (10YR 5/6) sandy clay loam; weak medium subang' 7u a`r 15TOcky structure" friable, sticky and slightly plastic; few very fine pores; few nodules of plinthite; very strongly acid. The thickness of the solum is more than 60 inches. Reaction is extremely acid to strongly acid throughout, except where the surface layer has been limed. The A horizon has hue of 10YR or 2.5Y, value of 4 or 5, and chroma of 2 to 4. The E horizon has hue of IOYR or 2.5Y, value of 4 to 7, and chroma of 2 to 6. It is loamy sand, sandy loam, or fine sandy loam. The Bt horizon has hue of 7.5YR or 10YR, value of 5 to 8, and chroma of 3 to 8. It is dominantly sandy clay loam. In some pedons it is clay loam below a depth of 40 inches. In the lower part, it has mottles in shades of red, brown, yellow, or gray. In some pedons it has as much as 5 percent firm, brittle nodules of plinthite. The BC horizon has hue of 5YR to 2.5Y, value of 4 to 7, and chroma of 1 to 8, or it is mottled in shades of these colors. It is sandy clay loam, clay loam, sandy clay, or clay. The C horizon has hue of 2.5YR to 5Y, value of 4 to 8, and chroma of 1 to 8, or it is mottled in shades of these colors. Texture ranges from sand to clay. Pacolet Series The Pacolet series consists of very deep, well drained soils on hillslopes on the Piedmont. These soils formed in loamy and clayey material weathered from schist and gneiss. Slopes range from 10 to 25 percent. Typical pedon of Pacolet loam, 10 to 15 percent slopes; about 2 miles north of Wilsons Mill; about 2,450 feet east of the junction of Secondary Roads 1904 and 1903 and 600 feet north of Secondary Road 1904, in a cutover wooded area (State plane coordinates 2,192,600 feet E., 676,700 feet N.): A-0 to 5 inches; dark reddish brown (5YR 3/3) loam; weak medium granular structure; friable, slightly sticky and slightly plastic; about 12 percent quartz pebbles; many fine and medium roots; moderately acid; clear smooth boundary. Bt1-5 to 13 inches; red (2.5YR 4/6) clay; weak medium subangular blocky structure; friable, sticky and plastic; common distinct clay films on faces of peds; few fine and medium roots; about 10 percent quartz pebbles; moderately acid-, clear smooth boundary. Bt2-13 to 25 inches; red (2.5YR 4/6) clay; weak medium subangular blocky structure; friable, sticky and plastic; common distinct clay films on faces of r 156 TABLE 15.--PHYSICAL AND CHEMICAL PROPERTIES OF THE SOILS --Continued Soil Survey Soil name and map symbol I I IDepthl I I i I Clay I I I Hoist Permeability I bulk I 1 density I I I I I xrosion 1 IAvailablel Soil IShrink-swell I factors I Organic I water Ireactionl potential I I I matter ICapacity I I I R I T I I In I Pct I g/cc I In/hr I In/in I PH I I I I Pct NnD-------------- i I 1 0-7 1 10-27 1 I 11.25-1.551 0.6-2.0 f I 10,14-0.2014.5-5.5 I I I 1Low---------- 10.431 I 4 1 1-3 Nason 1 7-241 35-50 11.30-1.601 0.6-2.0 10.12-0.1914.5-5.5 1Moderate-----10.281 1 124-451 10-25 11.25-1.551 0.6-2.0 10.15-0.2014.5-5.5 1Low---------- 10.281 I 145 1 -- ] --- 1 0.0-0.06 1 --- I--- I----------•-__I-_--I I I I NnE--------------1 0-6 1 10-27 I I 11.25-1.551 0.6-2.0 I I 10.14-4.2014.5-5.5 I I f ILow---------- 10.431 I 4 1 1-3 Nason 1 6-361 35-50 11.30-1.601 0.6-2.0 .0.195-5.5 10'0 (Moderate-----10.28f I 136-421 10-25 11.25-1.551 0.6-2.0 2014 .5-5.5 1Low---------- 10.261 1 142 1 --- I --- I 0.0-0.06 ------------- NoA---------------14 I I 2-9 I i 11.55-1. 6.0-20 I 10.06-0.1113.6-5.5 I 1Low---------- 1II 0--.-17-I1I 5 1I .5-2 Norfolk 114- - -.651 0. -2. 10.10-0.1813.6-5.5 (Low ---------- 10.241 1 158-701 20-43 2.20-1.51 0.6-2.0 121 .24 1w101 1 NoB-------------- 1 0-141 2-8 11.55-1.701 6.0-20 ! { 10.06-0.1113.6-5.5 I 1 I ILow---------- 10.171 ! 5 1 .5-2 Norfolk 114-3BI 18-35 11.30-1,651 0.6-2.0 10.10-0.1813.6-5.5 1Low---------- 10.241 1 138-701 20-43 11.20-1.651 0.6-2.0 10.12-0.1813.6-5.5 ILow---------- 10.241 1 170-991 --- I --- I --- I --- I--- f------------- I ---- I I NuA*: I I 1 I I I I I I I Norfolk --------- 1 0-141 2-8 11.55-1.701 6.0-20 10.06-0.11I3.6-5.5 [Low ---------- 10.171 5 1 .5-2 114-581 18-35 11.30-1.651 0.6-2.0 10.10-0.1813.6-5.5 ILow---------- 10.241 1 158-701 20-43 11.20-1.651 0.6-2.0 10.12-0.1813.6-5.5 ILow---------- 10.241 1 Urban land. I I I I I I I I I I 1 I ! I I I I 1 I I I I PaD-------------- 1 0-5 1 8-20 I I 11.00-1.501 2.0-6.0 1 ! 10.08-0.1214.5-6.0 I I I ILow---------- 10.201 I 3 1 .5-2 Pacolet 1 5-251 35-65 11.30-1.501 0.6-2.0 10.12-0.1514.5-6.0 ILow---------- 10.281 1 125-351 15-30 11.20-1.501 0.6-2.0 10.08-0.1514.5-6.0 ILow---------- 10.281 1 135-601 10-25 11.20-1.501 0.6-2.0 10.08-0.1514.5-6.0 ILow---------- 10.261 1 1 1 PaE-------------- 1 0-8 1 8-20_ 1 1 )1.00-1.501 2.0-6.0 1 1 10.08-0.1214.5-6.0 1 ! 1 ILow---------- 10.201 1 3 1 .5-2 Pacolet 1 8-281 35-65 11.30-1.501 0.6-2.0 10.12-0.1514.5-6.0 ILow---------- 10.261 1 128-351 15-30 11,20-1.501 0.6-2.0 10.08-0.1514.5-6.0 ILow---------- 10.281 1 135-601 10-25 11.20-1.501 0.6-2.0 10.08-0.1514.5-6.0 ILow---------- 10.281 1 Pn--------------- i I 1 0-261 5-20 I I 11.20-1.501 2.0-6.0 I I 10.10-0.1614.5-6.5 I I 1 ILow---------- 10.171 I 5 1 2-9 Pantego 126-721 1 18-35 11.30-1.601 0.6-2.0 10.12-0.1814.5-6.5 ILow---------- 10.241 1 Ra--------------- 1 1 0-5 1 5-20 1 1 11.30-1.601 2.0-6.0 1 1 10.10-0.1413.6-6.5 1 1 1 1Low---------- 10.201 1 5 1 1-6 Rains 1 5-441 18-35 11.30-1.601 0.6-2.0 10.11-0.1513.6-5.5 ILow---------- 10.241 1 144-621 18-40 11.30-1.501 0.6-2.0 10.10-0.1513.6-5.5 ILow---------- 10.281 1 162-881 15-45 11.30-1.601 0.6-2.0 10.10-0.1513.6-5.5 ILow---------- 10.281 RbA*� I I I I I I I I I l Rains ----------- 1 0-5 1 5-20 11.30-1.601 2.0-6.0 10.10-0.1413.E-6.5 ILow---------- 10.201 5 1 1-6 1 5-441 18-35 11.30-1.601 0.6-2.0 10.11-0.1513.6-5.5 ILow---------- 10.241 1 144-621 18-40 11.30-1.501 0.6-2.0 10.10-0.1513.6-5.5 ILow---------- 10.281 1 162-801 I 15-45 11.30-1.601 0.6-2.0 10.10-0.1513.6-5.5 ILow---------- 10,281 1 Urban land. I I 1 I I I I I I I I I I I I I I I I RnF-------------- I 0-8 1 5-20 11.30-1.501 2.0-6.0 10.08-0.1214.5-6.5 (Low ---------- 10.241 3 1 .5-2 Rion 1 8-321 18-35 11.40-1.501 0.6-2.0 10.08-0.1514.5-6.5 ILow---------- 10.201 1 132-601 2-20 11.30-1.501 2.0-6.0 10.06-0.1214.5-6.5 ILow---------- 10.201 1 1 1 Ro--------------- 1 0-8 1 10-27 1 1 11.20-1.501 0.6-2.0 1 1 10.14-0.2013.6-5.5 1 1 1 (Low----------10.371 1 4 1 .5-2 Roanoke 1 8-131 20-35 11.20-1.501 <20 10.16-0.1913.6-5.5 1Moderate----- 10.241 1 113-551 35-60 11.-35-1.651 <0.2 10.10-0.1913.6-5.5 1Moderate-----10.241 1 155-601 I 1 5-50 11.20-1.501 I I 0.06-20 10.04-0.1413.6-6.5 I I IModerate-----10.241 I I I I I See footnote at end of table, IL - 110 TA9LZ 1.--TZWZRATURZ AND PRZCIPITATION (Recorded in the period 1962-78 at Smithfield, North Carolina) Soil Survey I I Temperature ! I I Precipitation I I I I 2 years in I 1 12 years in 101 ! I I I I 10 will have-- 1 average I I will have-- I Average I month 1AveragelAveragelAveragal I Inumber oflAveragal I Inumber oflAverage I daily I daily I I Maximum I Minimum I growing I I Less I More Idays withlsnowfall Imaximaslminimml Itemperatureltemperaturel degree I {than--Ithan--10.10 inchl I I I I higher I lower I days* I { I I or more I I I i I than-- I than-- I I I { i I ! t I ! I r I ! I F I Unite I In I Ia f In I In January -----I 53.6 1 30.9 I 42.3 I 77 I 8 I 54 1 3.79 1 2.391 5.041 8 1 0.8 • I lebruary ---- 1 I 56.9 1 I 32.7 1 44.9 I I 1 79 1 13 I 1 51 I 1 4.14 I I 1 2,351 I 5.591 I 7 1 .7 I March ------- 1 I 64.6 1 I 39.4 1 52.0 I I 1 86 1 21 I 1 161 I 1 4.11 I I 1 2.801 I 5.301 I 8 1 .1 I April ------- 1 I 75.4 1 I 47.7 ! 61.5 I I I 92 1 30 I 1 345 I 1 3.38 I I 1 2.651 I 4.791 I 6 1 .0 I May --------- 1 I 82.2 1 ! 56.0 1 69.1 I I 1 97 1 37 ! 1 592 I 1 3.79 I I 1 2.261 I 5.151 I 7 1 .0 I June -------- 1 I I 88.2 1 I 63.3 1 75.7 1 I 1 101 1 I I 48 I 1 771 I I 1 3.74 I I E 1 2.061 I 5.111 I 6 1 .0 July -------- 1 I 90.9 1 I 67.5 1 79.2 1 100 1 53 1 905 1 5.94 I I 1 2.751 I 8.531 I 8 1 .0 I August ------ 1 I $9.6 1 I 66.7 1 78.2 I I 1 99 1 53 l 1 874 I 1 4.64 I E I 2.201 I 6.981 I 7 1 .0 I September---1 I 84.5 1 I 60.1 1 72.4 I I l 96 I 42 I I 672 I 1 4.55 I ! I 2.221 I 6.501 I 6 1 .0 I October ----- 1 I 74.5 1 I 48.4 1 61.5 1 I I 90 I 26 l 1 365 I 1 3.27 I I 1 .981 I 5.111 I 5 1 .0 I November ---- 1 I 65.0 1 I 38.0 1 51.5 I I 1 83 1 i8 I 1 99 I 1 2.84 I I 1 2.421 I 4.001 I 5 1 .0 December ----I I 55.7 1 I 32.1 I I 43.9 1 76 l ! I 11 1 54 I 1 3.42 I 1 1.831 I f 4.711 I 6 1 I .0 I Yearly: I I I I I I I I I I I I I I I I I I I I I I I I Average ---I 73.4 1 48.6 1 61.0 I I 1 --- I --- I I --- I I --- I I I ---i I ---I I --- I --- I Zxtreme---I I --- I ! --- ! --- I I I 102 I 8--- I I I I I I I Total ----- I I I --- ! I ! --- I I --- I I I --- I I I --- I 1 4,943 I I 1 47.81 I I t 1 40.821 I I I 54.521 I I 79 1 I 1.6 * A growing degree day is a unit of heat available for plant growth. It can be calculated by adding the maximum and minimum daily temperatures, dividing the sum by 2, and subtracting the temperature below which growth is minimal for the principal crops in the area (50 degrees 7). z j L A % 'n A" Al 48' Ve. "W -�Xlqoo) A" Gravel % Pills;. ri on'nit. IX .Y and and Gravel sk/ s— Dharge Site N­ TAA, 362 I N�_ K h7i\ M- f✓ m 11RO Z) 4 Jr\ w S., d woW r Ll N 'Disposal 47e Y //10 \-'r Ojil JI s ,z N S Cerm r IRadii) T G ravel T.91ja (WM PM) Omemorial'Gard S- JI, 1 ;f _e . I \, — " - i I." i !lCerrittery) ,Substatio L J: IL rive A T o" Copyright (C) 1998, Maptech, Inc. Markers Name: Discharge Site - NCG140362 Short Name: Dschrg Coordinates: 035' 33' 15.92" N, 078' 18' 49.40" W Comment: Pt_T Concrete Services, subbasin 03-04-02, Neuse River Basin, Johnston County, unnamed tributary to Mill Creek (at Selma) to Neuse River, class WS-IV NSW, USGS quad E25SE q Herring -Sutton & ASSOCIATES - P.A. ENGINEERS - SURVEYORS - PLANNERS February 26, 2008 Stormwater Permitting Unit. NC Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Attention Coleen H. Sullins Subject: PLT Concrete Services Selma, North Carolina Facility Dear Ms: Sullins: §V. 83.E a�ao�a Enclosed for your files is the Engineer's Certification for the recycling facility serving the above subject ready mix concrete plant. The recycling system is in operation and working as intended. Also the non -discharge infiltration pond is working as designed based upon my inspection earlier this month. If upon review of the above you should have any questions, please feel free to call me. Respectfully, Herri - utton and Associates, P.A. Ro' nie L. Sutton, P.E. Cc: Ricky Proctor, PLT Concrete Services 2201 Nash Street NW - Wilson, North Carolina 27896 - (252) 291-8887 - Fax (252) 291-5900 Rick Proctor Page 3 of 3 January 16, 2008 Engineer's Certification {COC No. NCG140362 as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, 7 C41azu'L }c �� , ��1 �•_ >�1.� Project Name Loc Lion for the Permittee, hereby state that to the best of my abilities, due care and diligence was used in the observation of the following installations: Construction of an infiltration basin, a five -chamber drum wash recycle system, drainage ditches, and other related incidental features, all in the configuration and locations shown on the approved plans and specifications. I certify that the construction of the above referenced project was observed to be built within substantialT�Mpliance and intent of the approved plans and specifications. Signature Date . _4el 2G —6 gistration No. �-0 f 'y Mail this Certification to: Stormwater Permitting Unit NC Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Box # /a3 ,OP 23 .5� I ; E M E R G E N Cy SPILLWAY 99. 100 r 101 10 2 p b O O OpOO 000 000000 r. , r 102 000000000000 0�0000 - 0 r WATER QUALITY POND SUMMARY I 00 , 000pp000 r ` 100 DRAINAGE AREA: 6.00 AC. POND INVERT; 94.00 r (0)� 9 9 98 rPRIMARY NORMAL POOL: 98.00 SPILLWAY ELEV. TOP OF POND; r 9 6 INV. INTO POND: 98.00 f EMERG. SPILLWAY ELEV. 4eo:9B- 5 10�. �S - er r r F4 .:. ` 180 RCP INV=98.50 o INV 98.00 18 0 RCP 9495 r r 1� � INV 98.00 197 r� r 98 r 99 100 1.0' THK CLASS "A" STONE - r 101 10 2 -C1 SPILLWAY WIDTH 2V-0" GRASS 3; 1 SLOPE `I �� I � `- BOTTOM ELEV. 100.9 , ENGINEERING FABRIC LINING' r - �{ 1171 � EMERGENG Y SPILL WA Y - SECTION THRU- 0 --" "' _ _ th NOT TO SCALE o� v SWAL r - r o \ ` ` ` \ STRAW NET LINED GRASS I Ili I.3 1 N W do Qxa �Q i r GRASS a N w Ll I / / / o Q GRASS LINED SWALE - SECTION THRU. N NOT TO SCALE J I RECEDED TOP POND ELEV. 102.00 TOP POND ELEV. 102.00 TOP POND ELEV. 102,00 A BOTTOM ELEV, 94.00 -y BOTTOM ELEV. 94,00 / ' "`INC` ffie: P?'°6i'1&StSUTTN ASSMATES P. cwaa"a;.�iCitri"`�t r. A. \ `\ / / / \ \ p C.,stdt,s t �r F t ordanc@ with these documQn s require, by 7 P stol-riwater ;permit. North Caro Ina ,,8s r@q, _ ,lat the stcrmwater system designer l,� t dlarlr� c�-n rtdlt lion; certify oonfri r �} vlth th,, C SECTION A —A SECTION 8—B I rp�JCl� ti4� Y6 z - _ Date— `< ISSUE DATE: �__ NC IOi�,Sl�n c, ��_4 �d., PROD. ENGIN . NOT TO SCALE NOT TO SCALE 20 0 20 40 s 60 P: \05PROJ\4489\4489-Iddt\dwg\4489A- SITE. dwg 5/2/2006 4: 20:00 PM EDT ttvuntti •`� CARp ���E••�°'�9"°=erring—Sutton Revision Date BY Date March 2006 & Associates,P.A. PLT CONCRETE P T SaleMap No. _" - 1$0 = =. Engineers — Surveyors — Planners Selma, NCSheet Pond Details _ , (UNLESS NOTED) 05-4489A %�e'�:"•s�,.-'' 2201 Nash Street NW Wilson, North Carolina 27896 (252) 291-8887 No. 5 of 6 �.r7 • � . . .I' is .'I .1:. -,/. 1--1 Z'.!•f j1- 'jt'.+�1''V - .. .. - - .... .. .. 1. .. .. �. ... .... . SEEDING SCHEDULE SEEDING (PERM.) SEEDING MIXTURE SPECIES RATE(LB/ACRE) TALL FESCUE 120 PENSACOLA BAHIAGRASS 50 SERICEA LESPEDEZA 30 KOBE LESPEDEZA 10 SEEDING NOTES 1. FROM SEPT. 1- MAR. 1 USE UNSCARIFIED SERICEA SEED. 2. ON POORLY DRAINED SITES OMIT SERICEA AND INCREASE KOBE TO 30 LB/ACRE. 3. WHERE A NEAT APPEARANCE IS DESIRED, OMIT SERICEA AND INCREASE KOBE TO 40 LB/ACRE. NURSE PLANTS BETWEEN APR. 15 AND AUG. 15, ADD 10 LB/ACRE GERMAN MILLET OR 15 LB/ACRE SUDANGRASS. PRIOR TO MAY 1 OR AFTER AUG. 15, ADD 25LB/ACRE RYE (GRAIN). SEEDING DATES BEST POSSIBLE EARLY SPRING: FEB. 15- MAR. 20 FEB. 15- ARP, 30 SEPT. 1- SEPT. 30 SEPT, 1- OCT. 31 SOIL AMENDMENTS APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 3,000-5,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE (USE THE LOWER RATE ON SANDY SOILS) AND 1,000 LB/ACRE 1D-10-10 FERTILIZER, APPLY 4,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL. TACKING RATE TO BE 0.10 GALLONS PER SOUARE YARD, A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE IF GROWTH IS LESS THAN FULLY ADEQUATE, REFERTILIZE IN THE SECOND YEAR, ACCORDING TO SOIL TESTS OR TOPDRESS WITH 500 LB/ACRE 10-10-10 FERTILIZER. MOW AS NEEDED WHEN SERICEA IS OMITTED FROM THE MIXTURE, RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. TEMPORARY SEEDING (SUMMER) SEEDING MIXTURE SPECIES RATE(LB/ACRE) GERMAN MILLET 40 IN THE PIEDMONT AND MOUNTAINS, A SMALL -STEMMED SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 LB/ACRE. SEEDING DATES MOUNTAINS- MAY 15- AUG. 15 PIEDMONT- MAY 1- AUG, 15 COASTAL PLAIN- APR. 15- AUG. 15 SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER. APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING OR A MULCH ANCHORING TOOL. TACKING RATE TO BE 0.10 GALLONS PER SQUARE YARD. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL, MAINTENANCE REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTIUZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE LEVEL SPREADER DETAIL TRANSITION TO ,.;�'�• _ 0 GRADE VEGETATED DIVERSION STABILIZED SLOPE J / 'Yr l!i ti -1 t STABLE UNDISTURBEDSyr ��,�� �-�•. rr. OUTLET sir It �r. •ti, 'ir 14 ti 141 AIn �lr� N "r6 r, iL ' it X„ 41, lh iri nth j ,,'�h �,iG •.yq ��: d, VARIABLE MATERIAL STAPLED IN r 6" MIN PLACE jiz�L i t-I 11=1 IE I I I 1 I 1=1 I-. I -I I - 11=1 11= 1 ILIA I I�IIIII�III�III I,IIII�IIIII;IIII�11„1�1-�1I= LEVEL LIP BURIED OF SPREADER 6"MIN DETAIL OF LEVEL SPREADER CROSS SECTION. NOTES: - LEVEL SPREADER IS DESIGNED TO DISPERSE SMALL VOLUMES OF CONCENTRATED FLOW ACROSS STABLE SLOPES. - TO BE NSTALLED PER NCDENR CURRENT STANDARDS AND SPECIFICATIONS, TEMPORARY SEEDING (FALL) SEEDING MIXTURE SPECIES RATE(LB/ACRE) RYE 120 SEEDING DATES MOUNTAINS- AUG. 15- DEC. 15 COASTAL PLAIN AND PIEDMONT- AUG. 15- DEC, 30 SOIL AMENDMENTS FOLLOW SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL UMESTONE AND 1,000 LB/ACRE 10-10-10 FERTILIZER, MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING OR A MULCH ANCHORING TOOL TACKING RATE TO BE 0.10 GALLONS PER SQUARE YARD. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL, MAINTENANCE REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOPORESS WITH 50 LB/ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/ACRE KOBE (PIEDMONT AND COASTAL PLAIN) OR KOREAN (MOUNTAINS) LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. TEMPORARY SEEDING (SUMMER) SEEDING MIXTURE SPECIES RATE(LB/ACRE) RYE (GRAIN) 120 ANNUAL LESPEDEZA (KOBE IN PIEDMONT AND COASTAL PLAIN, KOREAN IN MOUNTAINS 50 OMIT ANNUAL LESPEDEZA WHEN DURATION TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE, SEEDING DATES MOUNTAINS- ABOVE 2500 FT: FEB. 15- MAY 15 BELOW 2500 FT: FEB. 1- MAY 1 PIEDMONT- JAN, 1- MAY 1 COASTAL PLAIN- DEC. 1- APR. 15 SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING OR A MULCH ANCHORING TOOL TACKING RATE TO BE 0.10 GALLONS PER SQUARE YARD. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL, MAINTENANCE REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE, RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. SEEDBED PREPARATION SEEDING (PERM.) SEEDBED PREPARATION PRIOR TO THE SEEDING, THE CONTRACTOR SHALL CUT AND SATISFACTORILY DISPOSE OF WEEDS AND OTHER UNACCEPTABLE GROWTH ON THE AREAS TO BE SEEDED. UNEVEN AND ROUGH AREAS, AND OTHER MINOR IRREGULARITIES WHICH CANNOT BE OBLITERATED BY NORMAL SEEDBED PREPARATION OPERATIONS, SHALL BE SHAPED AND SMOOTHED AS DIRECTED BY THE ENGINEER TO PROVIDE FOR MORE EFFECTIVE SEEDING AND FOR EASE OF SUBSEQUENT MOWING OPERATIONS, THE SOIL SHALL THEN BE SCARIFIED OR OTHERWISE LOOSENED TO A DEPTH OF NOT LESS THAN 5 INCHES EXCEPT AS OTHERWISE PROVIDED BELOW OR OTHERWISE DIRECTED BY THE ENGINEER. CLODS SHALL BE BROKEN AND THE TOP 2 TO 3 INCHES OF SOIL SHALL BE WORKED INTO AN ACCEPTABLE SEEDBED BY THE USE OF SOIL PULVERIZERS, DRAGS, OR HARROWS; OR BY OTHER METHODS APPROVED BY THE ENGINEER, ALL ROCK AND DEBRIS 2 INCHES OR LARGER SHALL BE REMOVED ON CUT CUT OR FILL SLOPES WHICH ARE 3:1 OR FLATTER , MEDIANS, SHOULDERS, AND DITCH SLOPES PRIOR TO THE APPLICATION OF SEED AND FERTIUZER. SEEDBED PREPARATION WITHIN 2 FEET OF THE EDGE OF ANY PAVEMENT SHALL BE LIMITED TO A DEPTH OF 2 TO 3 INCHES. THE PREPARATION OF SEEDBEDS SHALL NOT BE DONE WHEN THE SOIL IS FROZEN, EXTREMELY WET, OR WHEN THE ENGINEER DETERMINES THAT IT IS IN AN OTHERWISE UNFAVORABLE WORKING CONDITION. CHECK DAM FOR EXIST C+Gi #57 WASHED STONE 10" AT .. 2. k EXISTING ASPHALT �t `' , N1 CENTER SECTION A -A STONE SHOULD BE PLACED OVER THE CHANNEL BANKS TO KEEP WATER FROM CUTTING AROUND THE DAM, r• I I / • • I t 1 �I'��! / �' EXISTING ASPHALT A \A CARp4 ''%, .� • . 9% SE • = errin --Sutton & Associates, P.A. ° Engineers - Surveyors - Planners i ' '•�. 2201 Nash Street NW Wilson North Carolina 27896 252 291-8887 TEMPORARY WIRE FENCE INLET PROTECTION 6.52 � TEMPORARY WIRE FENCE AND GRAVEL INLET PROTECTION DEFINITION A SEDIMENT CONTROL BARRIER FORMED AROUND A STORM DRAIN INLET BY THE USE OF WIRE FENCING AND GRAVEL. PURPOSE TO HELP PREVENT SEDIMENT FROM ENTERING STORM DRAINS BEFORE STABILIZING THE CONTRIBUTING WATERSHED. THIS PRACTICE ALLOWS EARLY USE OF THE STORM DRAIN SYSTEM, MAINTENANCE INSPECT THE BARRIER AFTER EACH RAIN AND MAKE REPAIRS AS NEEDED. REMOVE SEDIMENT AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR SUBSEQUENT RAINS. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN ADEQUATELY STABILIZED, REMOVE ALL MATERIALS AND ANY UNSTABLE SEDIMENT, AND EITHER SALVAGE OR DISPOSE OF IT PROPERLY. BRING THE DISTURBED AREA TO PROPER GRADE, THEN SMOOTH AND COMPACT IT. APPROPRIATELY STABILIZE ALL BARE AREAS AROUND THE INLET. STANDARD METAL POSTS 2'-0" IN GROUND GALVANIZED HARDWARD WIRE EXTENDS TO TOP OF BOX PLAI—, CED TO A HEIGHT OF 12"-18" MIN ABOVE TOP OF BOX OUTLET STABILIZATION STRUCTURE 6.41 IIIIIIIIIIII1111C OUTLET STAB, STRUCTURE DEFINITION A STRUCTURE DESIGNED TO CONTROL EROSION AT THE OUTLET OF A CHANNEL OR CONDUIT. PURPOSE TO PREVENT EROSION AT THE: f',jiLET OF A CHANNEL OR CONDUIT BY REDUCING THE VELOCITY OF FLOW AND DISSIPATING THE ENERGY. DESIGN CRITERIA DESIGN PROCEDURES FOR RIPRAP OUTLET STRUCTURES ARE PRESENTED IN APPENDIX 8.06, THE CRITERIA FOR DESIGN OF RIPRAP OUTLETS ARE: CAPACITY--10 YR. PEAK RUNOFF OR THE DESIGN DISCHARGE OF THE WATER CONVEYANCE STRUCTURE, WHICHEVER IS GREATER, TAILWATER DEPTH-- DETERMINE THE DEPTH OF TAILWATER IMMEDIATELY BELOW THE PIPE OUTLET BASEC ON THE DESIGN DISCHARGE PLUS OTHER CONTRIBUTING FLOWS. IF THE TAILWATER DEPTH IS LESS THAN HALF THE DIAMETER OF THE OUTLET PIPE AiND THE RECEIVING STREAM IS SUFFICIENTLY WIDE TO ACCEPT -HE DIVERGENCE OF FLOW, IT IS CLASSED AS A MINIMUM TAILWATER CONDITION, IF THE TAILWATER DEPTH IS GREATER THAN HALF THE PIPE DIAMETER, IT IS CLASSED AS A MAXIMUM TAILWATER CONDITION, PIPES THAT OUTLET 'INTO BROAD FLAT AREAS WITH NO DEFINED CHANNEL MAY BE ASSUMED TO HAVE A MINIMUM TAILWATER CONDITION UNLESS SITE CONDITIONS INDICATE OTHERWISE, APRON SIZE-- THE APRON LENGTH AND WIDTH CAN BE DETERMINED ACCORDING TO THE TAILWATER CONDITION, IF THE WATER CONVEYANCE STRUCTURE DISCHARGES DIRECTLY INTO A WELL-DEFINED CHANNEL, EXTEND THE APRON ACROSS THE CHANI'EL BOTTOM AND UP THE CHANNEL BANKS TO AN ELEVATION OF 0.5 FT, ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS (FIGURE 6,41C). THICKNESS-- MAKE THE MINIMUM THICKNESS OF RIPRAP 1.5 TIMES THE MAXIMUM STONE DIAMETER, STONE QUALITY-- SELECT STONE FOR RIPRAP FROM FIELD STONE OR QUARRY STONE. THE STONE SHOULD BE HARD, ANGULAR, AND HIGHLY WEATHER -RESISTANT. THE SPEC',IC GRAVITY OF THE INDIVIDUAL STONES SHOULD BE AT LEAST 2.5. FILTER --INSTALL A FILTER TO PREVENT SOIL MOVEMENT THROUGH THE OPENINGS IN THE RIPRAP. THE FILTER SHOULD CONSIST OF A GRADED GRAVEL LAYER OR A SYNTHETIC FILTER CLOTH, DESIGN FILTER BLANKETS BY THE METHOD DESCRIBED IN PRACTICE 6,15, RIPRAP. CONSTRUCTION 1. ENSURE THAT THE SUBGRADE FOR THE FILTER AND RIPRAP FOLLOWS THE SPECIFICATIONS REQUIRED LINES AND GRADES SHOWN IN THE PLAN. COMPACT ANY FILL REQUIRED IN THE SUBGRADE TO THE DENSITY OF THE SURROUNDING UNDISTURBED MATERIAL, LOW AREAS IN THE SUBGRADE ON UNDISTURBED SOIL MAY ALSO BE FILLED BY INCREASING THE RIPRAP THICKNESS, 2. THE RIPRAP AND GRAVEL FILTER MUST CONFORM TO THE SPECIFIED GRADING LIMITS SHOWN ON THE PLANS, 3. FILTER CLOTH, WHEN USED, MUST MEET DESIGN REQUIREMENTS AND BE PROPERLY PROTECTED FROM PUNCHING OR TEARING DURING INSTALLATION, REPAIR ANY DAMAGE BY REMOVING THE RIPRAP AND PLACING ANOTHER PIECE OF FILTER CLOTH OVER THE DAMAGED AREA. ALL CONNECTING JOINTS SHOULD OVERLAP A MINIMUM i- 1 FT, IF THE DAMAGE IS EXTENSIVE, REPLACE THE ENTIRE FILTER CLOTH, 4, RIPRAP MAY BE PLACED BY EQUIPMENT, BUT TAKE CARE TO AVOID DAMAGING THE FILTER, 5. THE MINIMUM THICKNESS OF THE RIPRAP SHOULD BE 1.5 TIMES THE MAXIMUM STONE DIAMETER. 6. RIPRAP MAY BE FIELD STONE OR ROUGH QUARRY STONE. IT SHOULD BE HARD, ANGULAR, HIGHLY -WEATHER -RESISTANT AND WELL GRADED. 7. CONSTRUCT THE APRON ON ZERO GRADE WITH NO OVERFALL AT THE END. MAKE THE TOP OF THE RIPRAP AT THE DOWNSTREAM END LEVEL WITH THE RECEIVING AREA OR SLIGHTLY BELOW IT, 8. ENSURE THAT THE APRON IS PROPERLY ALIGNED WITH THE RECEIVING STREAM AND PREFERABLY STRAIGHT THROUGHOUT ITS LENGTH, IF A CURVE IS NEEDED TO FIT SITE CONDITONS, PLACE IT IN THE UPPER SECTION OF THE APRON, 9. IMMEDIATELY AFTER CONSTRUCTION, STABILIZE ALL DISTURBED AREAS WITH VEGETATION (PRACTICES 6.10, TEMPORARY SEEDING, AND 6.11, PERMANENT SEEDING). MAINTENANCE INSPECT RIPRAP OUTLET STRUCTURES AFTER HEAVY RAINS TO SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE OR IF STONES HAVE BEEN DISLODGED, IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. PLT CONCRETE PLANT Selma, NC PLAN La 8 i � d NOTES• SECTION A -A FILTER BLANKET SEE APPROPRIATE SCHEDULE FOR DIMENSIONS 1, LA IS THE LENGTH OF THE RIPRAP APRON, 2• D . 1,5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6" 3. IN WELL-DEFINED EXTEND THE APRON UP THE CHANNEL BANKS TO A ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK WHICH EVER IS LESS, 4, A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. PIPE CULVERT OUTLET PROTECTION FOR DEFINED CHANNEL PIPE DIA. �ARigBLE -� Co RIPRAP TYPICAL CONC. FLARED END SECTION ISOMETRIC VIEW L E0� ,may ,r' r rrf3 � k do =PIPE DIA -».. Lo = APRON LENGTH W - APRON WIDTH 3 X PIPE 0 MIN PUN d = APRON DEPTH I' Lo SLOPE 0 Y FLOW NOTES: d SECTION A -A SEE APPROPRIATE SCHEDULE FOR DIMENSIONS FILTER BLANKET 1. LA IS THE LENGTH OF THE RIPRAP APRON. 2. d - 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THEN 6'. 1 A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION, PIPE OUTLET TO FLAT AREA - NO WELL DEFINED CHANNEL FABRIC DROP INLET PROTECTION (TEMPORARY) .51 TEMP. TEMP. DI PROTECTION DEFINITION A TEMPORARY FABRIC BARRIER PLACED AROUND A DROP INLET PURPOSE TO HELP PREVENT SEDIMENT FROM ENTERING STORM DRAINS DURING CONSTRUCTION OPERATIONS THIS PRACTICE ALLOWS EARLY USE OF STORM DRAIN SYSTEM. THIS PRACTICE MUST NOT BE USED NEAR THE EDGE OF FILL MATERIAL AND MUST NOT DIVERT WATER OVER CUT OR FILL SLOPES, DESIGN CRITERIA ENSURE DRAINAGE AREAS DO NOT EXCEED 1 ACRE PER INLET, KEEP THE MAXIMUM HEIGHT OF FABRIC ABOVE THE CREST OF THE DROP INLET AT 1,5 FT, THIS HEIGHT ALLOWS A SHALLOW TEMPORARY DESILTING POOL TO FORM BEHIND THE FABRIC BUT LIMITS THE PRESSURE AGAINST THE FABRIC IF OVERTOPPING OCCURS, THE SELECTED HEIGHT OF THE TOP OF THE BARRIER SHOULD ALLOW OVERFLOW INTO THE DROP INLET AND NOT LET OVERFLOW BYPASS THE INLET TO UNPROTECTED LOWER AREAS. FOR FABRIC BARRIERS, USE STAKES WITH A MINIMUM LENGTH OF 3 FT, AND SPACE THEM A MAXIMUM OF 3 FT, APART, AND SECURELY DRIVE THEM INTO THE GROUND DRIVE THE STAKES CLOSE TO THE DROP INLET SO THAT OVERFLOW WILL FALL DIRECTLY INTO THE STRUCTURE AND NOT ON UNPROTECTED SOIL. TO ATTACH THE FABRIC, MAKE A FRAME AROUND THE STAKES A MAXIMUM OF 1,5 FT, ABOVE THE TOP OF THE DROP INLET, THIS WILL SERVE AS A STABLE CREST FOR OVERFLOW DURING RAINFALL, ENSURE THAT BOTH FABRIC AND SUPPORTING STAKES ARE ARE SUFFICIENTLY STRONG ENOUGH TO HOLD A 1,5 FT, HEAD OF WATER WITHOUT FAILURE (FIGURE 6.51A). IMPROVED PERFORMANCE AND SEDIMENT STORAGE VOLUME CAN BE OBTAINED BY EXCAVATING THE AREA, CONSTRUCTION 1, AS SYNTHETIC FABRIC USE A PERVIOUS SHEET OF NYLON, POLYESTER, OR ETHYLENE SPECIFICATIONS YARN -- EXTRA STRENGTH (50 LB.\IN. MINIMUM) -- THAT CONTAINS ULTRAVIOLET RAY INHIBITORS AND STABILIZERS. FABRIC SHOULD BE SUFFICIENTLY POROUS TO PROVIDE ADEQUATE DRAINAGE OF THE TEMPORARY SEDIMENT POOL BURLAP MAY BE USED FOR SHORT-TERM APPLICATIONS. IT MUST BE REPLACED EVERY 60 DAYS. 2. OUT FABRIC FROM A CONTINUOUS ROLL TO ELIMINATE JOINTS, 3. FOR STAKES, USE 2X4-INCH WOOD (PREFERRED) OR EQUIVALENT METAL WITH A MINIMUM LENGTH OF 3 FT. 4. SPACE STAKES EVENLY AROUND THE PERIMETER OF THE INLET A MAXIMUM OF 3-FT, APART, AND SECURELY DRIVE THEM INTO THE GROUND, APPROXIMATELY 18 INCHES DEEP, 5. TO PROVIDE NEEDED STABIUTY TO THE INSTALLATION, FRAME WITH 2X4-INCH WOOD STRIPS AROUND THE CREST OF THE OVERFLOW AREA AT A MAXIMUM OF 1.5 FT. ABOVE THE DROP INLET CREST, 6. PLACE THE BOTTOM 12 INCHES OF FABRIC IN A TRENCH AND BACKFILL THE TRENCH WITH AT LEAST 4 INCHES OF CRUSHED STONE OR 12 INCHES OF COMPACTED SOIL, 7, FASTEN FABRIC SECURELY TO THE STAKES AND FRAME. JOINTS MUST BE OVERLAPPED TO THE NEXT STAKE. 8, THE TOP OF THE FRAME AND FABRIC MUST BE WELL BELOW THE GROUND ELEVATION DOWNSLOPE FROM THE DROP INLET TO KEEP RUNOFF FROM BYPASSING THE INLET, IT MAY BE NECESSARY TO BUILD A TEMPORARY DIKE ON THE DOWNSLOPE SIDE OF THE STRUCTURE TO PREVENT BYPASS FLOW, MATERIAL FROM WITHIN THE SEDIMENT POOL MAY BE USED FOR DIKING. MAINTENANCE INSPECT THE BARRIER AFTER EACH RAIN AND MAKE REPAIRS AS NEEDED. REMOVE SEDIMENT FROM THE POOL AREA AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN, TAKE CARE NOT TO DAMAGE OR UNDERCUT THE FABRIC DURING SEDIMENT REMOVAL. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN ADEQUATELY STABILIZED, REMOVE ALL MATERIALS AND ANY UNSTABLE SEDIMENT AND DISPOSE OF THEM PROPERLY. BRING THE DISTURBED AREA TO THE GRADE OF THE DROP INLET AND SMOOTH AND COMPACT IT, APPROPRIATELY STABILIZE ALL BARE AREAS AROUND THE INLET. 2 X 4" WOOD FRAME 1.5' MAX ti z- 3 .--. M!N U U DROP INLET WITH GRATE i -FRAME �- GATHER EXCESS CORNERS METAL STAKE 11 INSTALLATION OF FABRIC AND SUPPORTING FRAME FOR INLET PROTECTION. SILT FENCE MIN. 12 - LIM MIN. BOTTOM �TRAN D 2 -112 go. HIRES NOTES: WIRE SHALL BE MINIMUM OF 32' IN WIDTH AND SHALL r, . HAVE A MINIMUM OF 6 LINE WIRES WITH 12' STAY SPACING, FILTER FABRIC SHALL BE MINIMUM OF 38' IN WIDTH AND SHALL BE FASTENER ADEQUATELY TO WIRE AS DIRECTED BY ENGINEER. STEEL POST SHALL BE A MMIMIM OF B'- 0' IN HEIGHT AN 3" OR MORE IN DIAMETER. RECEIVED STEEL POST SHALL BE A MINIMUM r FILTER FABRIC (� 6 N06 ORPOST AND MORE IN METER. WIRE ABRICISHALLL�BE FILL SLOPE - FASTENED TO WOW POST WITH NOT LESS THEN No. 9 el WIRE STAPLES 1Y2' IN LENGTH. A LINE BY' SILT FENCE MUST BE ANCHORED IN TRENCH WITH THE BACKFILL TAMPED OR IN WASHED STONE, /-GROUND p 0V6ci ,si+:aY'rwBtwr Perrin D Gina ,e- o 0 N ib L8� Cif - UT$0 .� ruction In accordance with these documents I:} �< � flCIATES, P.A. squir by the stormwater permit. Nor„ Carolina 'ui°s FINS LA Sequi`e flha, the stormwater system Josigner inS�t . lUfing c nstructioni certify CON,,"—it`d vit th0 gg d R R nfi en^0 specs, ION err ;s;tt G�:1� Z Date a_ -- y !v: Division Of att r �uaiit:. ISSUE DATE: - --- _ - Rae ,tc^ _ - PROD. ENGINEER: P:\05PROJ\4489\4489-Iddt\dwg\4489A-EROSCONT-DET.dwg 4/28/2006 1:30:36 FV Revision Date BY Date: March 2006 Sedimentation & Scaler Erosion Control No Scale o�- '^�""�. Details III Sheet No. D2 cr �Kav RIPRAP DEFINITION A LAYER OF STONE DESIGNED TO PROTECT AND STABILIZE AREAS SUBJECT TO EROSION. CONSTRUCTION SUBGRADE PREPARATION - PREPARE THE SUBGRADE FOR RIPRAP AND FILTER TO THE SPECIFICATIONS REQUIRED LINES AND GRADES SHOWN ON THE PLANS, COMPACT AND FILL REQUIRED IN PURPOSE TO PROTECT THE SOIL SURFACE FROM EROSIVE FORCES AND/OR IMPROVE STABILITY OF THE SUBGRADE TO A DENSITY APPROXIMATING THAT OF THE SURROUNDING UNDISTURBED SOIL SLOPES THAT ARE SUBJECT TO SEEPAGE OR HAVE POOR SOIL STRUCTURE. MATERIAL OR OVERFILL DEPRESSIONS WITH RIPRAP. REMOVE BRUSH, TREES, STUMPS, AND OTHER OBJECTIONABLE MATERIAL. CUT THE SUBGRADE SUFFICIENTLY DEEP THAT DESIGN CRITERIA GRADATION - RIPRAP SHOULD BE A WELL -GRADED MIXTURE WITH 50% BY WEIGHT THE FINISHED GRADE OF THE RIPRAP WILL BE AT THE ELEVATION OF THE SURROUNDING LARGER THEN THE SPECIFIED DESIGN SIZE. THE DIAMETER OF THE LARGEST STONE SIZE AREA. CHANNELS SHOULD BE EXCAVATED SUFFICIENTLY TO ALLOW PLACEMENT OF THE IN SUCH A MIXTURE SHOULD BE 1.5 TIMES THE DSO SIZE WITH SMALLER SIZES GRADING RIPRAP IN A MANNER SUCH THAT THE FINISHED INSIDE DIMENSIONS AND GRADE OF THE DOWN TO 1 INCH, RIPRAP MEET DESIGN SPECIFICATIONS. THE DESIGNER SHOULD DETERMINE THE RIPRAP SIZE THAT WILL BE STABLE FOR DESIGN SAND AND GRAVEL FILTER BLANKET - PLACE THE FILTER BLANKET IMMEDIATELY AFTER THE GROUND FOUNDATION IS PREPARED, FOR GRAVEL, SPREAD FILTER STONE IN A CONDITIONS, HAVING DETERMINED THE DESIGN STONE SIZE, THE DESIGNER SHOULD UNIFORM LAYER THE SPECIFIED DEPTH. WHERE MORE THAN ONE LAYER OF FILTER SELECT THE SIZE OR SIZES THAT EQUAL OF EXCEED THAT MINIMUM SIZE BASED ON MATERIAL IS USED, SPREAD THE LAYERS WITH MINIMAL MIXING, D, RIPRAP GRADATIONS COMMERCIALLY AVAILABLE IN THE AREA. SYNTHETIC FILTER FABRIC - PLACE THE CLOTH FILTER DIRECTLY ON THE PREPARED THICKNESS - CONSTRUCTION TECHNIQUES, DIMENSIONS OF THE AREA TO BE PROTECTED, FOUNDATION. OVERLAP THE EDGES BY AT LEAST 12 INCHES, AND SPACE ANCHOR PINS SIZE AND GRADATION OF THE RIPRAP, THE FREQUENCY AND DURATION OF FLOW, EVERY 3 FT ALONG THE OVERLAP. BURY THE UPPER AND LOWER ENDS OF THE CLOTH A DIFFICULTY AND COST OF MAINTENANCE, AND CONSEQUENCE OF FAILURE SHOULD BE MINIMUM OF 12 INCHES BELOW GROUND. TAKE CARE NOT TO DAMAGE THE CLOTH WHEN CONSIDERED WHEN DETERMINING THE THICKNESS OF RIPRAP LININGS. THE MINIMUM P RIPRAP. F AMA LACING R I DAMAGE OCCURS REMOVE THE RIPRAP AND REPAIR THE SHEET BY THICKNESS SHOULD BE 1.5 TIMES THE MAXIMUM STONE DIAMETER, BUT IN NO CASE ADDING ANOTHER LAYER OF FILTER MATERIAL WITH A MINIMUM OVERLAP OF 12 INCHES LESS THEN 6 INCHES. AROUND THE DAMAGED AREA. IF EXTENSIVE DAMAGE IS SUSPECTED, REMOVE AND REPLACE THE ENTIRE SHEET. F RIPRAP MAY CONSIST FIELD STONE OR QUARRY QUALITY OF STONE -STONE OR R R CONS S OFQU WHERE LARGE STONES ARE USED OR MACHINE PLACEMENT IS DIFFICULT, A 4 INCH STONE, THE STONE SHOULD BE HARD, ANGULAR, OF SUCH A QUALITY THAT IT WILL NOT LAYER OF FINE GRAVEL OR SAND MAY BE NEEDED TO PROTECT THE FILTER CLOTH. BREAK DOWN ON EXPOSURE TO WATER OR WEATHERING, AND SUITABLE IN ALL OTHER RESPECTS FOR THE PURPOSE INTENDED. THE SPECIFIC GRAVITY OF THE INDIVIDUAL STONE PLACEMENT - PLACEMENT OF RIPRAP SHOULD FOLLOW IMMEDIATELY AFTER STONES SHOULD BE AT LEAST 2.5. PLACEMENT OF THE FILTER. PLACE RIPRAP SO THAT IF FORMS A DENSE, WELL -GRADED MASS OF STONE WITH A MINIMUM OF VOIDS. THE DESIRED DISTRIBUTION OF STONES SIZE OF STONE - THE SIZES OF STONES USED FOR RIPRAP PROTECTION ARE THROUGHOUT THE MASS MAY BE OBTAINED BY SELECTIVE LOADING AT THE QUARRY AND DETERMINED BY PURPOSE AND SPECIFIC SITE CONDITIONS. CONTROLLED DUMPING DURING FINAL PLACEMENT. PLACE RIPRAP TO ITS FULL THICKNESS - SLOPE STABILIZATION - RIPRAP STONE FOR SLOPE STABILIZATION NOT SUBJECT TO IN ONE OPERATION. DO NOT PLACE RIPRAP BY DUMPING THROUGH CHUTES OR OTHER FLOWING WATER OR WAVE ACTION SHOULD BE SIZED FOR STABILITY FOR THE PROPOSED METHODS THAT CAUSE SEGREGATION OF STONE SIZES. TAKE CARE NOT TO DISLODGE GRADE. THE GRADIENT OF THE SLOPE TO BE STABILIZED SHOULD BE LESS THEN THE THE UNDERLYING BASE OF FILTER WHEN PLACING THE STONES, NATURAL ANGLE OF REPOSE OF THE STONE SELECTED. ANGLE OF REPOSE OF RIPRAP THE TOE OF THE RIPRAP SLOPE SHOULD BE KEYED TO A STABLE FOUNDATION AT ITS STONES MAY BE ESTIMATED FROM FIGURE 6.15a. MAINTENANCE BASE AS SHOWN IN FIGURE 6.15b, THE TOE SHOULD BE EXCAVATED TO A DEPTH ABOUT RIPRAP USED FOR SURFACE STABILIZATION OF SLOPES DOES NOT ADD SIGNIFICANT 1.5 TIMES THE DESIGN THICKNESS OF THE RIPRAP AND SHOULD EXTEND HORIZONTALLY RESISTANCE TO SLIDING OR SLOPE FAILURE AND SHOULD NOT BE CONSIDERED A FROM THE SLOPE. RETAINING WALL. THE INHERENT STABILITY OF THE SOIL MUST BE SATISFACTORY BEFORE RIPRAP IS USED FOR SURFACE STABILIZATION. SLOPES APPROACHING 1.5:1 MAY REQUIRE THE FINISHED SLOPE SHOULD BE FREE OF POCKETS OF SMALL STONE OR CLUSTERS OF SPECIAL STABILITY ANALYSIS. LARGE STONES, HAND PLACING MAY BE NECESSARY TO ACHIEVE THE PROPER - OUTLET PROTECTION - DESIGN CRITERIA FOR SIZING STONE AND DETERMINING THE DISTRIBUTION OF STONE SIZES TO PRODUCE A RELATIVELY SMOOTH, UNIFORM SURFACE. DIMENSIONS OF RIPRAP PADS AT CHANNEL OR CONDUIT OUTLETS ARE PRESENTED IN THE FINISHED GRADE OF THE RIPRAP SHOULD BLEND WITH THE SURROUNDING AREA. NO PRACTICE 6.41, OUTLET STABILIZATION STRUCTURE. OVERFALL OF PROTRUSION OF RIPRAP SHOULD BE APPARENT, - CHANNEL STABILIZATION AND STREAMBANK PROTECTION - DESIGN CRITERIA FOR SIZING STONE FOR STABILITY OF CHANNELS ARE CONTAINED IN APPENDIX 8.05. IN GENERAL., ONCE A RIPRAP INSTALLATION HAS BEEN PROPERLY DESIGNED AND INSTALLED IT REQUIRES VERY LITTLE MAINTENANCE. RIPRAP SHOULD BE INSPECTED FILTER BLANKET - A FILTER BLANKET IS A LAYER OF MATERIAL PLACED BETWEEN THE PERIODICALLY FOR SCOUR OR DISLODGED STONES. CONTROL OF WEED AND BRUSH GROWTH MAY BE NEEDED IN SOME LOCATIONS. RIPRAP AND THE UNDERLYING SOIL TO PREVENT SOIL MOVEMENT INTO OR THROUGH THE RIPRAP, A SYNTHETIC FILTER FABRIC MAY BE USED WITH OR IN PLACE OF GRAVEL FILTERS, THE FOLLOWING PARTICLE SIZE RELATIONSHIPS SHOULD EXIST: - FILTER FABRIC COVERING A BASE WITH GRANULAR PARTICLES CONTAINING 50% OR LESS (BY WEIGHT) OF FINE PARTICLES (LESS THEN U.S. STANDARD SIEVE no, 200 (0,074mm)): RIPRAP EROSION CONTROL STONE TABLE 5.150 a des base (mm) NC DOT CLASSES CLASS 1 CLASS 2 CLASS A CLASS B EOS* filter fabric (mm) i OF RIPRAP AND EROSION CONTROL 5 TO 200 LB 25 TO 250 LB 2" TO 5" 5" TO 15" STONE b, TOTAL OPEN AREA OF FILTER SHOULD NOT EXCEED 36% 30% SHALL WEIGH 6OX SHALL WEIGH - FILTER FABRIC COVERING OTHER SOILS: A MINIMUM OF A MINIMUM OF o. EOS IS NO LARGER THEN U.S. STANDARD SIEVE no, 70 (0.21mm) 50 LB EACH 100 LB EACH b, TOTAL OPEN AREA OF FILTER SHOULD NOT EXCEED 10% NO MORE THAN NO MORE THAN 10% TOLERANCE 5" TO 15" •EOS - EQUIVALENT OPENING SIZE COMPARED TO A U,S. STANDARD SIEVE SITE 10% SHALL WEIGH 5% SHALL WEIGH TOP AND BOTTOM LESS THAN 15 LB LESS THEN 50 SIZES NO FILTER FABRIC SHOULD HAVE LESS THAN 4% OPEN AREA OF AN EOS LESS THAN EACH LB EACH U.S. STANDARD SIEVE NO, 100 (0,15mm), THE PERMEABILITY OF THE FABRIC MUST BE GREATER THAN THAT OF THE SOIL THE FABRIC MAY BE MADE OF WOVEN OR NONWOVEN EQUALLY EQUALLY DISTRIBUTED, DISTRIBUTED, MONOFILAMENT YARNS AND SHOULD MEET THE FOLLOWING MINIMUM REQUIREMENTS, NO GRADATION NO GRADATION SPECIFIED SPECIFIED - THICKNESS 20 - 60 MILS. - GRAB STRENGTH 90 - 120 LBS. S01/rtCE: NC At rREGATEs ASSOCIAnQ1 - CONFORM TO ASTM D-1682 OR ASTM D-177, FILTER BLANKETS SHOULD ALWAYS BE PROVIDED WHERE SEEPAGE IS SIGNIFICANT OR WHERE FLOW VELOCITY AND DURATION OF FLOW OR TURBULENCE MAY CAUSE UNDERLYING SOIL PARTICLES TO MOVE THROUGH THE RIPRAP, FIGURE 6.15b RIPRAP SLOPE PROTECTION IA\ FIGURE 6.15c RIPRAP CHANNEL PROTECTION 7 SMOOTHLY FINISHED BLEND CONTACT CR-#$945 AREA — ice-- DESIGN TOP WIDTH TDESIGN `r DEPTH hg3%)9EDJH 6" GRAVEL FDFJH3(E#° FILTER OR FJHG DFG FILTER CLOTH ROCK DAM DETAIL INSTALLATION DIVERT RUNOFF FROM UNDISTURBED AREAS AWAY FROM THE BASIN (REFERENCE PRACTICE 6.20, "TEMPORARY DIVERSIONS"). DELAY CLEARING POND AREA UNTIL DAM IS IN PLACE, EXCAVATE FOUNDATION FOR APRON AND USE IT AS A TEMPORARY SEDIMENT BASIN DURING CONSTRUCTION OF DAM. CLEAR AND GRUB AREA UNDER DAM, REMOVING ALL ROOT MAT AND OTHER OBJECTION- ABLE MATERIAL. GRADE EARTH ABUTMENTS NO STEEPER THAN 1:1. DISPOSE OF MATERIAL IN APPROVED LOCATION. IF CUTOFF TRENCH IS REQUIRED, EXCAVATE AT CENTER LINE OF DAM, EXTENDING ALL THE WAY UP EARTH ABUTMENTS. PROTECTION THE ENTIRE FOUNDATION INCLUDING BOTH EARTH ABUTMENTS FROM PIPING MUST BE COVERED BY FILTER FABRIC, OVERLAP i FT AT ALL JOINTS, UPSTREAM STRIPS OVER DOWNSTREAM STRIP (FIGURE "a") SMOOTH THE FOUNDATION AREA BEFORE PLACING FILTER FABRIC, BE CAREFUL PLACING ROCK ON FABRIC, IT MAY BE HELPFUL TO PLACE A 4-INCH LAYER OF SAND OVER FABRIC BEFORE PLACING ROCK. ROCK ABUTMENT 2' IN. SPILLWAY CREST ELEVATION UPSTREAM 2 3 GRAVEL FACING 1� < �1 1' THICK m ROCKI APRON 1 FILTER FABRIC , 1.5' FIGURE "a" ROCK DAM CROSS SECTION SPILLWAY DETAIL MIN. TOP OF ROCK ABUTMENT 2:1 2' MIN. SLOPE FOUNDATION SPILLWAY FILTER J .o84ti. FABRIC EMBANKMENT CONSTRUCT EMBANKMENT TO DIMENSIONS SHOWN ON PLANS, USE GRAVEL AND POOL WELL -GRADED, HARD, ANGULAR, WEATHER -RESISTANT ROCK. FACING ROCK ABUTMENTS MUST BE AT LEAST 2 FT HIGHER THAN THE SPILLWAY CREST AND AT LEAST 1 FT HIGHER THAN THE DOWNSTREAM FACE OF DAM AT ALL POINTS (FIGURE "b"). DIVERT SEDIMENT -LADEN FLOW TO UPPER END OF BASIN. I ATE AN OUT ELEVATI N WHERE LEVEL APRON SET MARKER STAKE TO INO C CLE O SEDIMENT POOL IS 50% FULL SPILLWAY CREST c STABILIZE ALL DISTURBED AREAS EXCEPT THE LOWER ONE-HALF OF SEDIMENT POOL AS SHOWN IN THE VEGETATION PLAN, ROCK ABUTMENT SAFETY SEDIMENT BASINS THAT IMPOUND WATER ARE HAZARDOUS. BASINS SHOULD BE DEWATERED BETWEEN STORMS. AVOID STEEP FIGURE "b" PLAN VIEW OF ROCK DAM VATH SPILLWAY DETAIL. SLOPES, FENCES WITH WARNING SIGNS MAY BE NECESSARY IF TRESPASSING IS LIKELY. STATE AND LOCAL REQUIREMENTS MUST BE FOLLOWED. TEMPORARY BLOCK AND GRAVEL INLET PROTECTION •••• 6.52 :..: TEMPORARY BLOCK AND GRAVEL INLET PROTECTION DEFINITION A SEDIMENT CONTROL BARRIER FORMED AROUND A STORM DRAIN INLET BY THE USE OF STANDARD CONCRETE BLOCK AND GRAVEL, PURPOSE TO HELP PREVENT SEDIMENT FROM ENTERING STORM DRAINS BEFORE STABILIZING THE CONTRIBUTING WATERSHED, THIS PRACTICE ALLOWS EARLY USE OF THE STORM DRAIN SYSTEM. DESIGN CRITERIA KEEP THE DRAINAGE AREA NO GREATER THEN 1 ACRE UNLESS SITE CONDITIONS ALLOW FOR FREQUENT REMOVAL AND ADEQUATE DISPOSAL OF ACCUMULATED SEDIMENT. KEEP THE HEIGHT OF THE BARRIER AT LEAST 12 INCHES AND NO GREATER THAN 24 INCHES. DO NOT USE MCRTAR. LIMIT THE HEIGHT TO PREVENT EXCESS PONDING AND BYPASS FLOW, RECESS THE FIRST COURSE OF BLOCKS AT LEAST 2 INCHES BELOW THE CREST OPENING OF THE STORM DRAIN FOR LATERAL SUPPORT. SUPPORT SUBSEQUENT COURSES LATERALLY IF NEEDED BY PLACING A 2 x 4-INCH WOOD STUD THROUGH THE BLOCK OPENINGS THAT ARE PERPENDICULAR TO THE BLO-!-" COURSE NEEDING SUPPORT, LAY SOME BLOCKS ON THEIR SIDE IN THE BOTTOM ROW FOR DEWATERING THE POOL (Figure 6.52a). PLACE GRAVEL JUST BELOW THE TOP OF BLOCKS ON SLOPES OF 2:1 OF FLATTER. PLACE HARDWARE CLOTH OF COMPARABLE WIRE MESH WITH 1/2-INCH OPENINGS OVER ALL BLOCK OPENINGS TO HOLD GRAVEL IN PLACE. MAINTENANCE GRAVEL DOUGHNUT --AS AN OPTIONAL DESIGN, THE CONCRETE BLOCKS MAY BE OMITTED AND THE ENTIRE STRUCTURE MADE OF GRAVEL AND STONE. A STRUCTURE MADE ENTIRELY OF STONE IS COMMONL`' CALLED A "GRAVEL DOUGHNUT." IN THIS CASE, KEEP THE STONE SLOPE TOWARD HE INLET ".T 5'I OR FLATTER TO HELP PREVENT STONE FROM BEING WASHED INTO HE DROP INLET (Figure 6.52b). A MINIMUM 1-FT WIDE LEVEL AREA SET 4 INCHES BELOW THE DROP INLET CREST WILL ADD FURTHER PROTECTION AGAINST THE ENTRANCE OF MATERIAL, STONE ON THE SLOPE TOWARD THE INLET SHOULD BE 3 INCHES OR LARGER FOR STABILITY, AND i INCH OR SMALLER ON THE SLOPE AWAY FROM THE INLET TO CONTROL FLOW RATE, WIRE MESH WITH 2-INCH OPENINGS MAY BE PLACED OVER THE DRAIN GRATING BUT MUST BE INSPECTED FREQUENTLY TO AVOID BLOCKAGE BY TRASH. THE TOP ELEVATION OF THE STRUCTURE MUST BE AT LEAST 6 INCHES LOWER THAN THE GROUND ELEVATION COW ISLOPE FROM THE INLET, IT IS IMPORTANT THAT ALL STORM FLOWS PASS OVER THE STRUCTURE AND INTO THE STORM DRAIN AND NOT PAST THE STRUCTURE. TEMPORARY DIKING BELOW THE STRUCTURE MAY BE NECESSARY TO PREVENT BYPASS FLOW. MATERIAL MAY BE EXCAVATED FROM INSIDE THE SEDIMENT POOL FOR THIS PURPOSE. CONCRETE BLOCK DENATERING AIF 0 jW Mr 0 ' .!���� �!� ' •ems �'�`.� �����: SLOPE, WIRE SCREEN TEMPORARY SEDIMENT POOL DEWATERING .. 16" 1 MIN Y IF .: •..�....:......::::. �:::::.. �:::::::::::.e :•.:::. �::::::::.: .......:::.::::::................................ ......................•:.�:.�:::•:•::::::•:::.�:::.r.�:. 2'MAx:r: „EDIMENT ---� FIGURE 6.52a BLOCK AND GRAVEL INLET PROTECTION CONSTRUCTION 1, LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE ON ITS SIDE IN THE BOTTOM ROW TO SPECIFICATIONS ALLOW POOL DRAINAGE, THE FOUNDATION SHOULD BE EXCAVATED AT LEAST 2 INCHES BELOW THE CREST V THE STORM DRAIN. PLACE THE BOTTOM ROW OF BLOCKS AGAINST THE EDGE OF THE STORM DRAIN FOR LATERAL SUPPORT AND TO AVOID WASHOUTS WHEN OVERFLOW OCCURS, IF NEEDED, GIVE LATERAL SUPPORT TO SUBSEQUENT ROWS BY PLACING 2 x 4 WOOD STUDS THROUGH BLOCK OPENINGS. 2. CAREFULLY FIT HARDWARE CLOTH OR COMPARABLE WIRE MESH WITH 1/2-INCH OPENINGS OVER ALL BOCK OPENINGS TO HOLD GRAVEL IN PLACE. 3. USE CLEAN GRAVEL, 3/4- TO 1/2-INCH DIAMETER, PLACED 2 INCHES BELOW THE TOP OF THE BLOCK IN A 2:1 SLOPE OR FLATTER AND SMOOTH IT TO AN EVEN GRADE, DOT #L57 WASHED STONE IS RECOMMENDED. 4. IF ONLY STONE AND GRAVEL ARE USED, KEEP THE SLOPE TOWARD THE INLET NO STEEPER THAN 3:1. LEAVE A MINIMUM 1-FT WIDE LEVEL STONE AREA BETWEEN THE STRUCTURE AND AROUND THE INLET TO PREVENT GRAVEL FROM ENTERING INLET. ON THE SLOPE TOWARD THE INLET, USE STONE 3 INCHES IN DIAMETER OR LARGER. ON THE SLOPE AWAY FROM THE INLET USE 1/2 -;/4-INCH GRAVEL (NCDOT #57 WASHED STONE) AT A MINIMUM THICKNESS OF 1 FT, MAINTENANCE INSPECT THE BARRIER AFTER EACH RAIN AND MAKE REPAIRS AS NEEDED. REMOVE SEGMENT AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR SUBSEQUENT RAINS. WHEN THE (ONTRIBUTING DRAINAGE AREA HAS BEEN ADEQUATELY STABILIZED, REMOVE ALL MATERIALS AND ANY UNSTABLE SOIL, AND EITHER SALVAGE OR DISPOSE OF IT PROPERLY, BRING THE DISTUREED AREA TO PROPER GRADE, THEN SMOOTH AND COMPACT IT, APPROPRIATELY STABILIZE All_ RARE AREAS AROUND THE INLET, TEMPORAR SEDIMENT POOL WIRE MESH \ �(OPTIONAL) \\ :1 SLOPE 1' MIN 2:1 SLOPE 2' MAX x RNr_ GRAVELS �`' •."' TI (1- )IN iIIl 3" STONE FIGURE 6.52) GRAVEL INLET PROTECTION (GRAVEL DONUT) AREAS TO BE DISTURBED (CUT, FILLED, ETC.) P1Ow AREAS TO BE DISTURBED (CUT, FILLED, ETC.) how FILTER BERM DETAIL Ok CLASS I RIP RAP (SEE SECTION THRU BA/SIN BELOW \ Y •mot RavERT PIPE �- 5 i RIP RAP HEADWALL FLOW _ _ i�-j��' 'Y r — — � � r� .L✓ .-j�l � r� SEDIM 1 I 5 WASHED STONE 1' THICK x 3' HIGH MIN ENT STORAGE AREA SEDIMENT STORAGE ZONE r— FLOOD STORAGE ZONE 1' , 2' PIPE INVERT RIP —RAP HEADWALL NATURAL GROUND FLOW \�CLASS RIP-RAP # 5 WASHEDED STONE MAX. SEDIMENT DEPTH (CLEAN OUT POINT) NOTE: DIMENSIONS ARE MINIMUM ACCEPTABLE UNLESS OTHERWISE NOTED FILTER BERM DETAIL CLASS I RIP RAP (SEE SECTION THRU BASIN BELOW ✓Y x w., IN 5 j 'it �� LET / \\ 1.. �,,x �,,;-^_,I•Lr —�—� r _� / 5 WAS STONE V HICK x 3' NIG-I- MIN FILTER BERM-`. SEDIMENT / AR , ( I , I I ` (SEDIMENT 1 IMENSTdAG E AREA STORAGC E Eq —r - - SET D Ow MENT STORAGE ZONE FLOOD STORAGE ZONE 1' , 2' CLASS "I" RIP -RAP - # 5 WASHED STONE M,X. SEDIMENT DEPTH (CLEAN OUT POINT) NOTE; DIMENSIONS ARE MINIMUM ACCETABLE UNLESS OTHERWISE NOTED DROP INLET OnstTl,vt1^rt in accordance with these documents iv reauired t'; the Sio1•mwater permit. NGrth Car: -Ina 3DS `.`isFi4 kB ='r'nStr,.J�19J'1 Certify ConfoItity wit-1 DIF3ns and specl e'iJr r•�r'if� i Trt0�l8C•,�-�:, OnT1;tL✓.�'` -.---- — Date ,,,I NG DIV1s1un s'e"at Quallt" r E1VED JUL1 6 Z006 &.f & -- ISSUE DATE: PROJ. ENGINEER: — S, P.A. P:\05PROJ\4489\4489-Iddt\dwg\44B9A-EROSCONT-DET.dwg 4/28/2006 1:30:36 PM, ' E ,CA?O4�y9,' /0 , "q"��: =Herrin --Sutton & Associates P.A. PLT CONCRETE P T sedimentatim & Revision Date B Date; March 2006 Scale: Mar N'0. S L % = F Engineers — Surveyors —Planners Selma, ITC Erosion Control No Scale ''-,, '•�••'' ,.'2201 Nash Street NW, Wilson, North Carolina 27896 (252 291-8887 Details D3eD Sheet No. of �Ox� 1�25 Alamo ' r / i � . �L!- 5 1. •}�.'; j,, 11 i ' ' /•.