Loading...
HomeMy WebLinkAboutNCG140350_MONITORING INFO_20190204STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. 1v q 0,35 DOC TYPE ❑HISTORICAL FILE ,-R�MONITORING REPORTS DOC DATE YYYYMMDD ANNUAL SUMMARY DISCHARGE MONITORING REPORT DMR —WASTEWATER SUBMIT TO CENTRAL OFFICE* General Permit No. NCG140000 Calendar Year 2018 'Report ALL WASTEWATER monitoring data on this form (include "No Flow'/"No Discharge" and Limit Violations) from the previous calendar vear to the DEQ by MARCH 1 of each year. Certificate of Coverage No. NCG14 Facility Name: Thomas Concrete - Wake Forest Plant r.nt rnty- Wake Phone Number: (919 ) 562-1909 Certified Laboratory ESC CEN l-RAL FBI CTl4Nl al'I Walls monitored 1 Lab #' ENV 375 Lab # Wastewater (WW) Discharge Outfall No. 001 Does this outfall discharge WW to SA waters? Yes ❑ No ❑✓ Does this outfall discharge WW to SB or PNA waters? Yes ❑ No M Does this outfall discharge WW to HOW or ORW waters? Yes ❑ No ✓❑ If so, what is the 7Q10 flow rate? or Tidally influenced waters, 7Q10 not available ❑ Does this outfall discharge WW to Trout jr) designated waters? Yes ❑ No ❑✓ Were there any limit violations in the calendar year? Yes Q No ❑ Outfall No. 001 Daily Flow Rate, cfs pH, SU TSS, mgll SS, mlll If applicable Non -Polar O&G (EPA Method 1664 (SGT-HEM)), mgll Effluent Limitations Gaily Maximum NQW orORW 50% of 7Q10 Indicate NO FLOW if applicable freshwater 6.0-9.0 saltwater 6.8-8.5 Standard 30 HOW 20 HOW l ORW and Tr, or PNA 10 HQW, ORW, SA, SB,PNA. orany Troa, 5 No Limit Samples above Benchmark subject to Tiered Responses 15 Date Sample Collected, molddlyr w �z ` x : 6/30118 NO DISCHARGE SEMIANNUAL 1 10/11/18 10,45 862 NIA NIA Permit Date 8/1/2017 — 6/3012022 Last Revised 8-22-2017 Certificate of Coverage No. N CG 14 ®3❑ 50® CERTIFICATION "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." [Requlred by 40 CFR §122.24 Signature L— vc N o- Date Mail Annual Summary Wastewater DMR to the NCDEQ Central Office: Note the address is correct— Central Files Is housed in DWR (not DEMLR) N.C. Department of Environmental Quality (DEQ) Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Central Files Telephone (919) 807-6300 Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at: (919) 707-9220 Permit Date 811/2017—'6I3012022 Last Revised 8-22-2017 ANNUAL SUMMARY DISCHARGE MONITORING REPORT (DMR) — STORMWATER SUBMIT TO CENTRAL OFFICE* General Permit No. NCG140000 Calendar Year 2018 *Report ALL STORMWATER monitoring data on this form (indude "No Flow "Mo Discharge' and Benchmark Exceedances) from the previous calendar year to the DEQ by MARCH 1 of each year. Certificate of Coverage No. NCG 140350 Facility Name: Thomas Concrete of Carolina — Wake Forest Plant FEB 4 4 2019 County: Wake CENTRAL FILES Phone Number: (919) 562-1909 Total no. of SDOs monitorecptj�R SECTION Certified Laboratory ESC Lab # ENV 375 Lab # Stormwater Discharge Outfall (SDO) No. 001 VMA Outfall? Yes ❑ No Is this outfall currently in Tier 2 for any parameter? Yes ® No ❑ Was this outfall ever in Tier 2 during the past year? Yes ® No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ Other ❑ Outfall No. Total Rainfall, inches Total Suspended Solids { ) TSS, mg/1 pH, SU Non -polar O&G (EPA Method 1664 ( SGT-HEM)) , mgll (VMA) liapplicable New Motor Oil Usage (gallmo.) lrapprrcabfe Stormwa ter Benchmarks Indicate NO FLOW if applicable Circle Benchmark 100150 6.0-9.0 15 }55 gahlmo. average requires 75S and Non -polar O&Gmenitoring Date Sample Collected, moldd! r 01/31/18 NO FLOW 02/28/18 NO FLOW 03/24/18 0.91 114 12.04 N/A NIA 04/24/18 0.85 398 11.09 N/A NIA 05/31/18 NO FLOW 06/30/18 NO FLOW 07/30118 1.49 339 11.51 NIA NIA 08/31/18 NO FLOW 09/30/18 NO FLOW 10/11/18 2.05 862 10.45 NIA NIA 11/30/18 NO FLOW 12/31/18 NO FLOW Permit Date 8/1/2017 — 6/30/2022 Last Revised 8-22-2015 Certificate of Coverage No. NCG140350 CERTIFICATION "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a -system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." [Required by 40 CFR §922,2 Signature Date 1-so-0 Mail Annual Summary Stormwater DMR to the NCDEQ Central Office: Note the address is correct— Central Files is housed in DWR (not DEMLR) N.C. Department of Environmental Quality (DEQ) Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Central Files Telephone (919) 807-6300 Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at: (919) 707-9220 Permit Date $1112017 — 6/30/2022 Last Revised 8-22-2015 ANNUAL SUMMARY DISCHARGE MONITORING REPORT (DMR) —STORMWATER SUBMIT TO CENTRAL OFFICE* General Permit No. NCG140000 Calendar Year 2017 *Report ALL STORMWATER monitoring data on this form (include "No Flow"1"No Discharge" and Benchmark Exceedances) from the previous calendar year to the DEQ by MARCH I7ofeqchiyea�j r- .� Certificate of Coverage No, NCG140350 Facility Name: Thomas Concrete of Carolina - Wake Forest Plant County: Wake Phone Number: (919) 562-1909 Certified Laboratory ESC FEB 2 0 Z018 CENTRAL FILES DWR SECTION Total no. of SDOs monitored 1 Lab # ENV 375 Lab # Stormwater Discharge Outfall (SDO) No. 001 VMA Outfall? Yes ❑ No Is this outfall currently in Tier 2 for any parameter? Yes ® No ❑ Was this outfall ever in Tier 2 during the past year? Yes ® No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ Other ❑ Outfall No. Total Rainfall, inches Total Suspended Solids TSS { }, mg/1 pH, SU Non -polar O&G (EPA Method 1664 SGT-HEM (}� mgll (VMA) !f applicable New Motor Oil Usage (gallmo.) Napplicable Stormwater Benchmarks Indicate NO FLOWif applicable circle Benchmark 1 00150 �7 6.0-9. � 1 $ >s5 g allmo, average requires TSS and Non -polar O&G monitoring Date Sample Collected,MMM moldd/ r 01/20/17 172 02/28/17 NO FLOW 03/31/17 1.25 47.7 11.52 04/30/17 NO FLOW 05/31/17 NO FLOW 06/30/17 NO FLOW 07/31/17 NO FLOW 08/31/17 NO FLOW 09/30/17 NO FLOW 10/31/17 NO FLOW 11/30/17 =NO FLOW 12/31/17 1 NO FLOW Permit Date 8/1/2017 - 6/30/2022 Last Revised 8-22-2015 Certificate of Coverage No. NCG140350 Additional Outfall Attachment (make copies as needed for additional outfalls) Stormwater Discharge Outfall (SDO} No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ Other ❑ Outfall No. Total Rainfall, inches Total Suspended Solids , ( } m II pH, SU Non -polar O&G (EPA Method 1664TSS ( SGT-HEM)? , mg11 (VMA) H applicable New Motor Oil Usage (gallmo.) Happucabre stormwater Benchmarks Indicate NO FLOWN applicable Circle Benchmark 100150 60-90 .. 1 � �a5 g allmo. average requires T55 and Non -polar O&G monitoring Date Sample Collected, molddl r Permit Date 8/1/2017 — 6/30/2022 Last Revised 8-22-2015 Certificate of Coverage No. NCG 140350 Additional Outfall Attachment (make copies as needed for additional outfalls) Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ Other ❑ Outfall No. Total Rainfall, inches Total Sus ended p Solids (TSS), mg/1 p H, SU Non -polar O&G (EPA Method 1664 (SGT-HEM)), mgll (VMA) New Motor Oil Usage (gal/mo.) Stormwater Benchmarks Indicate NO FLOW7I applicable Circle Benchmark 1 OQIrJ� . 6.0-9� '� � �55 gallmo. average requires TSS and Non-polar0&G monitoring Date Sample Collected, molddl r Permit Date 8/112017 — 6/30/2022 Last Revised 8-22-2015 Certificate of Coverage No. NCG 140350 CERTIFICATION "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." [Required by 40 CFR §122,22] Signature Date a Mail Annual Summary Stormwater DMR to the NCDEQ Central Office: Note the address is correct — Central Files is housed in DWR (not DEMLR) N.C. Department of Environmental Quality (DEQ) Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Central Files Telephone (919) 807-6300 Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at: (919) 707-9220 Permit Date 811/2017 — 6/30/2022 Last Revised 8-22-2015 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina -Wake Forest Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: April Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2017 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (704)853-9437 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other, Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH (Standard Units) TSS (mg/L) Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Samplingx - - 6-9 100 , - - - 001 NO FLOW Click here to enter text. Click here to enter text. Click here to enter text. Click here to enter text. y 31 ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)' pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) fi of Months in Tier 2 Sampling2 6-9 15 7.100 2.,3 - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDEN CES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow" to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." CLiwzzez 441;ri 4/30/2017 (Signature of Permittee) 61 (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 3 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring ReporRECEIVED GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina- Wake Forest Plant PERSON COLLECTING SAMPLES: Kevin Kelt CERTIFIED LABORATORY:_ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES ❑ NO ❑ Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2017 APR 17 Z017 CENTRAL FILES DWR SECTION SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ®Jan -March ❑April -June COUNTY: Wake PHONE NO. (_704 _)853-9437 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: []SA ❑HQW ❑PNA ❑Trout ®Other OPTIONAL INFO: Outfall No. Date Sample Collected (mm/dd/yr} Type of Wastewater x (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using method 1664A 6 SGTdiEM (mglL] Discharge Duration (minutes) Total Flow 7 {gallons/day} - - - 6-93.4 303.1 S3- 001 3/31/2017 VE, RM 11.52 47.7 <0.033 60 Total Flow: 350 gpd 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 31f an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TS5 limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 0213.0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUSTSIGN THIS CERTIFICATION FOR ANYINFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 (Signature of Permittee) Permit Date:7/1/2010-06/30/2015 3/31/2017 (Date) Last Revised 07/13/11 Page 3 of 2 AN"AwA NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out thisform, please visit: http://aortal.ncdenr.org/web/Ir/nodes-stormwater/ Permit No.: N/C/_/_/`/_/_/_/�/ or Certificate of Coverage No.: N/C/fx/ 1 /4_/-u 0 Facility Name: Thomas Concrete of Carolina-Wake_Forest Plant County: Wake Phone No. (704). 853-9437 Inspector: Kevin Kelt Date of Inspection:.03131117 Time of Inspection: 1230 Total Event Precipitation (inches): 1.25" Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: -SQ.1�2Gco,� (Signature of Permittee or Designee) Pagel of 2 SWU-242, Last modified 7/31/2013 1. Outfall Description: Outfall No. 01 Structure (pipe, ditch, etc.) Pipe into collection trench Receiving Stream: Unnamed tributary to Neuse River Describe the industrial activities that occur within the outfall drainage area: Bulk storage f raw materials vehicle transport, wastewater treatment. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: clear. very light yellow tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinct odor 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No B. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe pH: 11.52 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 7/31/2013 STORMIMATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina -Wake Forest Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: March Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2017 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (704)853-9437 ADD TO LISTSERVE? [—]YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other, Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH (Standard Units] TS5 (mg/L) Event Duration (minutes) Total 4 Rainfall (in] In Tier 2 Monthly Monitoring? {y/n) # of Months in Tier 2 Samplingz - - 6-9 100 • - - - - 001 3/31/2017 11.52 47.7 60 1.25 y 30 Nin c,)( n }t . ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. ' If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. "For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/yr) PH (standard Units) TPH using method I664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 6-9 15 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one coov of this DMR fincludinx all "No Flow" & "No Discharee" reports] within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that t�he�re�a�re�,significa t penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." ZYa4wW-e"' ? 3/31/2017 (Signature of Permittee) Permit Date:7/1/2011-60/30/2015 (Date) Last Revised 7/13/11 x. Page 2 of 2 r; A�M A A NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit: http./Jportal.ncdenr.ore/web/lr/n des-stormwater/ Permit No.: N/C/T/_/_/_/_/�/_/ or Certificate of Coverage No.: Facility Name: Thomas Concrete of Carolina -Wake Forest Plant County: Wake Phone No. (704) 853-9437 Inspector: Kevin Kelt Date of Inspection: 31 17 Time of Inspection: 1, 230 Total Event Precipitation (inches): 1.25" Was this a 'Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: , ¢7"X ew C��Uz (Signature of Permittee or Designee) Page 1 of 2 SWU-242, Last modified 7/31/2013 1. Outfall Description: Outfall No. 01 Structure (pipe, ditch, etc.) Pipe into collection trench Receiving Stream: Unnamed tributary to Neuse River Describe the industrial activities that occur within the outfall drainage area: Bulk storage of raw materials, vehicle transport, wastewater treatment. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: clear, very light yellow tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinct odor 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe pH: 11.52 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 7/31/2013 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina -Wake Forest Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: February Monitoring Event Part A: Stormwater Monitoring Requirements RECEIVED SAMPLE COLLECTION YEAR: 2017 MAR 2 1 20111 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake CENTRAL FILES PHONE NO. (919)562-1909 DWR SECTION ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other Outfall No, Date Sample Collected {mo/dd/yr OR NO FLOW)1 pH {Standard Units} TSS (mg/L) Event Duration {minutes} Total a Rainfall (in) In Tier 2 Monthly Monitoring? {y/n} # of Months in Tier 2 2 Sampling - - 6-9 100 ' - - - - 001 NO FLOW 29 ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)1 pH (standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling 6-9 15 100 , - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow" to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." C-jawtzze e 4G 2/28/2017 (Signature of Permittee) V (Date) Permit bate: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 3 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 SAMPLE COLLECTION YEAR: 2016 FACILITY NAME: _Thomas Concrete of Carolina- Wake Forest Plant SAMPLE QUARTER: ❑Jul -Sept ®Oct -Dec ❑Jan -March [_]April -June PERSON COLLECTING SAMPLES: Susan Bostian COUNTY: Wake CERTIFIED LABORATORY: ESC Lab # ENV375 Q4 Lab # LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements PHONE NO. (_919 _)562-1909 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA []Trout ®Other OPTIONAL INFO: Outfall No. Date Sample Collected (mm/dd/yr) Type of Wastewater z (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A 5GT-HE1Vl6 (mg/L) Duration (minutes) Total Flow (gallons da Y)7 - - - 6-93,4 303.5 53- 001 NO DISCHARGE o� V� CENT 1 >` L- DWR SECT16W >� �. 1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 ' TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE"] WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 12/31/2016 Permit Date: 7/1/2010-06/30/201SL-' Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 SAMPLE COLLECTION YEAR: 2016 FACILITY NAME: _Thomas Concrete of Carolina- Wake Forest Plant SAMPLE QUARTER: ®Jul -Sept ❑Oct -Dec ❑Jan -March ❑April -June PERSON COLLECTING SAMPLES: Susan Bostian COUNTY: Wake CERTIFIED LABORATORY:_ESC Lab # ENV37S Q3 Lab # LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements PHONE NO. (_919 _) 562-1909 ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other OPTIONAL INFO: Outfall No. Date Sample Collected (mm/dd/yr) Type of Wastewater (VE, RM, MD)' pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A S T-HEM' Duration (minutes) Total Flow , (gallons/day) - - - 6-93.4 303 s 53- 001 NO DISCHARGE AN FS ION Y. 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. ° pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. Permit Date:7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ, If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW" "NO DISCHARGE" WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 9/30/2016 Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 SAMPLE COLLECTION YEAR: 2016 FACILITY NAME: _Thomas Concrete of Carolina- Wake Forest Plant SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ❑Jan -March ®April -June PERSON COLLECTING SAMPLES: Susan Bostian COUNTY: Wake CERTIFIED LABORATORY: ESC Lab # ENV375 PHONE NO. (_919 _)562-1909 June WW Samples Lab # Click ADD TO LISTSERVE? ❑YES ®NO EMAIL: here to enter text. LIMIT VIOLATIONS? YES ❑ NO ❑ Part A: Wastewater Monitoring Requirements DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other OPTIONAL INFO: Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater � (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) 7PH usingDischarge method 1664A S THEM' Duration (minutes) Total Flow (gallons/day)' - - 6-93,4 303, 53 (15)6 - 001 NO DISCHARGE 171 i=r"—r---& cr�� %II_%.'l.:I V C CENT i ZAL FILES UVVN SECTION ' If wastewater systems have not discharged in this quarter —report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 ° pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW" "NO DISCHARGE" WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 (Signature of Permittee) Permit Date:7/1/2010-06/30/2015 6/30/2016 (Date) Last Revised 07/13/11 Page 3 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 SAMPLE COLLECTION YEAR: 2016 FACILITY NAME: _Thomas Concrete of Carolina -Wake Forest Plant SAMPLING PERIOD: ® July -December ❑ January -June PERSON COLLECTING SAMPLES Kevin Kelt COUNTY Wake CERTIFIED LABORATORY ESC Lab # ENV 375 PHONE NO. (919)562-1909 Lab # ADD TO LISTSERVE? ❑YES ®NO EMAIL: OPTIONAL INFO: December Monitoring Event DISCHARGING TO CLASS: USA ❑HQW ❑PNA []Trout ®Other, Part A: Stormwater Monitoring Requirements Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH [Standard Units) TSS [mg/L) Event Duration (minutes) Total a Rainfall (in) In Tier 2 Monthly Monitoring? (Y/n) # of Months in Tier 2 2 Sampling - - 6-9 100- 001 NO FLOW 27 f; Tr NIL 1� /� r� _ _ E -.y I\A` C =NTRAL FILES SECTION ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/l. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)1 pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfalla (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 i Sampling 6-9 15 100 , - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copv of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware that there are significant enalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 1: is ' % 12/31/2016 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 3 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14O35O FACILITY NAME: _Thomas Concrete of Carolina -Wake Forest Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375, Lab # OPTIONAL INFO: August Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Wake PHONE NO. (919)562-1909 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA [-]Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH (Standard Units) TSS (mg/L} Event Duration (minutes) Total a Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) st of Months in Tier 2 2 Sampling - - 6-9 100 ' - - - - 001 NO FLOW Y 23 17�r+1�'ll� ern, . %w—vL_i V L_L-1 SEP 14 2016 DWR SFr.' 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)1 pH (Standard Units) TPH using method 1664ASGT-NJcM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) in Tier 2 Monthly Monitoring? (y/n} # of Months in Tier Z 2 Sampling 6-9 15 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQCentral Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 9/12/2016 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 3 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina- Wake Forest Plant PERSON COLLECTING SAMPLES: Susan Bostian CERTIFIED LABORATORY: ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES ❑ NO ❑ Part A: Wastewater Monitorine Reauirements SAMPLE COLLECTION YEAR: 2016 SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec COUNTY: Wake ®Jan -March ❑April -June PHONE NO. (_919 _) 562-1909 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other OPTIONAL INFO: Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater 2 (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT HEM6 (mg/L) Duration (minutes) Total Flow , (gallons/day) - - - 5-43'4 303.s 53 (15)6 - - 001 NO DISCHARGE RAL Eli -ES N ' If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. ` pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 T5S limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 5 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 1:3aml (Signature of Permittee) Permit Date:7/1/2010-06/30/2015 4/30/2016 (Date) Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina -Wake Forest Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: April Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919)562-1909 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA []Trout ®Other, Outfall No. Date Sample ( Collected mo/dd/yr OR 1 NO FLOW) pH (Standard Units] TSS (mg/L] Event Duration (minutes] Total 4 Rainfall [in) In Tier 2 Monthly Monitoring? (V/n) # of Months in Tier 2 Samplingz - - 6-92 100 , - - - - 001 4/12/16 11.12 384 480 0.49" Y 19 MAY 13 IJ i 0 CE 14TRAL FILES UV TION 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/l. ° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected [mo/dd/yr}1 PH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration [minutes] Total , Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? [y/n] # of Months in Tier 2 z Sampling 6-9 15 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE,REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DN1R (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN T141S CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) 5/31/2016 (Date) Last Revised 7/13/11 Page 2 of 2 Permit Date: 7/1/2011-60/30/2015 RECEIVED gj 19 Z016 CENTRAL FILES DWR SECTION STORMINATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCGI40000 CERTIFICATE OF COVERAGE No. NCG 1403SO FACILITY NAME: _Thomas Concrete of Carolina -Wake Forest Plant PERSON COLLECTING SAMPLES Kevin L(elt CERTIFIED LABORATORY ESC Lob ENV 375_ Lab a OPTIONAL INFO: September Monitoring Event Part A. Stormwater Monitoring Reouirements SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ®luly-0ecomber [] January -June COUNTY Wake PHONE NO. (919)S62-1909 ADD TO LISTSERVE7 OYES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA [-]Trout ®Other ' n -NO FLOW- or "NO DISCHARGE, Enter "NO FLOW' or "NO DISCHARGE' for each outfall here. Please make sure to mark the sample period above. = If a value is In ehrtess of the benchmark, or outside the benchmark range (for pNI, you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly samppng shall be dare until 3 consecutive samples are below the benchmark or within the benchmark range 'TSS bendvnark values are 1W mg/I, except when dlstharglog to ORW, HQW, Trout, and PNA waters where they are 50 mg/i, ' Far each sampled measurablestorm event the total predpitation must be recorded using data from an an -site rain gauge. Permit Date:7/112011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Acthrlty Monhorbw Reoulrements far fadgttes uslne> 55 Rai of new motor nillmanth — averaged ova a calendaryeaf. ri ---------- ---------- ---------- ---------- HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL {INCLUDING VEHICLE MAINTENANCER YES ❑ NO HAVE YOU CONTACTED THE REGION7 YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR (IncludsR all "No Flow' & "No Discharse" reports) within 30 days of recelpt o sample for at end of monitoring period Division of Water Quality Attn: DWQ Central Files 1617 Mall Service Center Raleigh, North Carolina 27699-1617 MUMUST SIGN M-15 CEMICATION FOR ANY IMMINA770NREPORTED, "I certlfy under pe Ity of law, that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to assure th ed personnel pro riy, gather a evaluate the Information submitted. Based on my Inquiry of the person or persons who manage the system, or th ersons directly responsW o gather[ t Information, the Information submitted Is, to the best of my knowledge and belief, true, accurate, and complete. am ne at there are signi(I nt naltles i bmkting false information, Including the possibility of Floes and Imprisonment for knowing violations." i0131/ZU6 gnature of Permittee) (Date) Permit Oate: 7/l/2011-60/30/2015 Last Revised 7113/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina -Wake Forest Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: June Monitoring Event Part A: Stormwater Monitoring Requirements MONITORI G'FORM A SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ❑ July -December ® January -June 0 COUNTY Wake e`e� PHONE NO. (919)562-1909 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 PH {standard Units) TSS (mg/L) Event Duration ura (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling - - 6-9 100 - - - - 001 6/28/2016 10.22 235 120 1.25 Y 21 , f L r �I lit CENTRAL DWR SE If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. ° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. V EU Zolb FILES 'TION Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No, Date Sample Collected 1 (mo/dd/yr) pH (Standard Units) TPH using method 1664A SGT NEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total , Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Samplingz 6-9 15 100 , - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one coov of this DMR [includine all "No Flow" & "No Discharee" reoortsl within 30 days of receipt of sample for at end of monitorine period in case of "No Flow") -to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware that there aLrg significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 7/13/2016 (Si ature of Permittee) i1 Permit Date: 7/1/2011-60/30/2015 (Date) Last Revised 7/13/11 Page 2 of 2 NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out this form, please visit: h /portal.ncdenr.org/web/Ir/nodes-stormwater/ Permit No.: N/C/_/_/_/_/_/_/_/ or Certificate of Coverage No.: Facility Name: Thomas Concrete of Carolina -Wake Forest Plant County: Wake Phone No. L919) 562-1909 Inspector: Kevin Kelt Date of Inspection: 06128/2016 Time of Inspection: 1335 Total Event Precipitation (inches): _1.25" Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No RECEIVED Please verify whether Qualitative Monitoring mjulslt4plr�"ed during a "representative storm event" or "measureable storm event" (requiri�r ua[y.�epRIding on the permit). ,-,VVrC Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of PermittVe or Designee) Page 1 of 2 sWU-242, Last modified 7/31/2013 r I. Outfall Description: Outfall No. 01 Structure (pipe, ditch, etc.) Pipe into collection trench Receiving Stream: Unnamed tributary to Neuse River Describe the industrial activities that occur within the outfall drainage area: Bulk storage of raw materials, vehicle transport, wastewater treatment. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: clear, light brown 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinct Qdor 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe pH: Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 7/31/2013 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 SAMPLE COLLECTION YEAR: 2016 FACILITY NAME: _Thomas Concrete of Carolina -Wake Forest Plant SAMPLING PERIOD: ® July -December ❑ January -June PERSON COLLECTING SAMPLES Kevin Kelt COUNTY Wake CERTIFIED LABORATORY ESC Lab # ENV 375 PHONE NO. (919)562-1909 Lab # ADD TO LISTSERVE? DYES ®NO EMAIL: OPTIONAL INFO: July Monitoring Event DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other Part A: Stormwater Monitoring Requirements Outfall No. Date Sample Collected (mo/dd/yr OR 1 NO FLOW) PH (Standard Units) TSS (mg/L) Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (Y/n) # of Months in Tier z 2 Sampling - - 6-9 100 ' - - - - 001 NO FLOW Y 22 A �1 / V If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 orTier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 T55 benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/yr) pH (standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall' (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 6-9 15 100 , - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copv of this DMR (including all "No Flow" & "No Discharge" reports] within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date: 7/1/2011-60/30/2015 8/16/2016 (Date) Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina -Wake Forest Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 37S_ Lab # OPTIONAL INFO: May Monitoring Event. Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: [] July -December ® January\` u e COUNTY Wake V �� PHONE NO. (919)562-1909 Mono ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA [-]Trout ®Other mal Outfall No. Date Sample Collected � mo/dd/yr OR NO FLOW) pH {Standard Units) TSS (mg/L) Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 SamplingZ - - 6-9 100 ' - - - - 001 5/31/2016 Y 20 REC ,. CENTRE E FILFq DWR S .CTiON 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)1 pH (Standard Units) TPH using method 1654A5GT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 6-9 15 100 , - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR fincludine all "No Flow" & "No Discharge" renortsl within 30 days of receipt of sample for at end of monitoring period in case of "No Flow"1 to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFIC4TION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." �—jQ /w, 6/7/2016 (Signature of Permittee) 61 Date] Permit Date:7/1/2011-60/30/2015 rp Last Revised 7/13/11 Page 3 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina -Wake Forest Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: February Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919)562-1909 ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other, Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW) pH [Standard Units TS5 (mg/L) Event Duration (minutes] Total 4 Rainfall {in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier Z 2 Sampling - - 6-9 100 ' - - - - 001 No Discharge Y 17 MA C.PNTRP L FILES DWR Sj-'_CTION ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. TSS benchmark values are 100 mg/l, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfa[I No. Date Sample Collected (mo/dd/yr)1 pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total n Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Z Sampling 6-9 15 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are si nificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." �a> x, �G�i 3/31/2016 (Signature of Permittee) 61 (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina -Wake Forest Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: January Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919)562-1909 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: []SA ❑HQW ❑PNA ❑Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH [standard Units) TSS (mg/L) Duration Du (minutes) Total Rainfall 4 (in) In Tier 2 Monthly Monitoring? (V/n) # of Months in Tier 2 Samplingz - 6-9 1002' - - - 001 No Discharge Y 16 �NTRA i- L v 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. A For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)' PH (Standard Units) TPH using method 1664A SGT-HEM (mg/!) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) in Tier Z Monthly Monitoring? (y/n) ## of Months in Tier Z SamplingZ 6-9 15 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coot/ of this DMR (includine all "No Flow" & "No Discharge" reoorts) within 30 days of receipt of sample for at end of monitoring period in case of "No Flow"} to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED; "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date: 7/1/2011-60/30/2015 2 /2 9/2016 (Date) Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14035O FACILITY NAME: _Thomas Concrete of Carolina -Wake Forest Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375� Lab # OPTIONAL INFO: March Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919)562-1909 ADD TO LISTSERVE? [—]YES ®NO EMAIL: DISCHARGING TO CLASS: []SA ❑HQW ❑PNA ❑Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FL0W)1 pH (Standard Units) TS5 (mg/L) Event Duration {minutes) Total a Rainfall {in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 - - 6-92 1002.3 - - - - 001 No Discharge Y 18 10 CENT JR SECTI N 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 111�o. Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)' pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall 4 (in) New Motor ail Usage (gal/month) In Tier 2 Monthly Monitoring? torn (V/n) # of Months in Tier 2 Z Sampling 6-9 is 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 dais of receipt of sample for at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date:7/1/2011-60/30/2015 4/4/2016 (Date) Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina -Wake Forest Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: December Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Wake PHONE NO. (919)562-1909 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: [:]SA ❑HQW ❑PNA ❑Trout ®Other, Outfall No. Date Sample Collected (mo/dd/yr OR 1 NO FLOW] pH (Standard Units} TSS m ($/L� Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly 7 Monitoring. (y/n) # of Months in Tier 2 2 Sampling - - 6-9 100 , - - - - 001 No discharge Y 11 MAIFF5T M DWR SECTION 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I, 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)1 pH (Standard Units) TPH using method .1664A 5GT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfalla (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? [Y/n) # of Months in Tier 2 z Sampling 6-9 15 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DM R (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." JG4w., L (Signature of Permittee) Permit Date: 7/1/2011-60/30/2015 1/31/2016 ( Date) Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 SAMPLE COLLECTION YEAR: 2015 FACILITY NAME: _Thomas Concrete of Carolina -Wake Forest Plant SAMPLING PERIOD: ® July -December ❑ January -June PERSON COLLECTING SAMPLES Kevin Kelt COUNTY Wake CERTIFIED LABORATORY ESC Lab # ENV 375 PHONE NO. (919)562-1909 Lab # ADD TO LISTSERVE? []YES ®NO EMAIL: OPTIONAL INFO: October Monitoring Event DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other Part A: Stormwater Monitoring Requirements Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)t pH (standard Units) TSS (mg/L) Event Duration (minutes) Total a Rainfall (in) In Tier 2 Monthly Monitoring) (y/n) # of Months in Tier 2 SamplingZ - - 6-9 100 '- 001 No discharge C W Y 11 JAN 4 4 2016 r1,r.�ra t" W N 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. ° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-50/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)l pH {Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total , Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? {Y/n) # of Months in Tier 2 2 Sampling 6-9 2 115 100 , - - - - - aP- HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copv of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." e. (Signature of Permittee) 12/28/2015 (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 $0, STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina -Wake Forest Plant_ PERSON COLLECTING SAMPLES Andrew Rodak CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: April Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919)562-1909 ADD TO LISTSERVE? ❑YES ®NO EMAIL.: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)i PH [Standard Units) TSS (mg/L) Event Duration (minutes) Total a Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 - - 6-92 1002,3 _ - - 001 No Discharge Y 7 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. a TSS benchmark values are 100 mg/l, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)l pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall a (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) fi of Months in Tier 2 Sampling' 6-9' 15' 10o2,3 - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware tha.tiiere are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 6/8/2015 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina -Wake Forest Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375Y Lab # OPTIONAL INFO: September Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Wake PHONE NO. (919)562-1909 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' PH (Standard Units) TSS (mg/L) Event Duration (minutes) Total a Rainfall (in) In Tier 2 Monthly Monitoring? (Y/n) # of Months in z Tier 2 Sampling - - 6-92 1002,3 - - - - 001 9/25/15 11.64 86.0 0.875 Y 10 /_U,... CENT RAL FILE UW--R SECTION 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. r— rT1 Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. w ' Outfall No. Date Sample Collected {mo/dd/yr)' pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfalla (in) New Motor oil Usage (gal/month) In Tier 2 Monthly Monitorin (Y/n) g' # of Months in Tier 2 SamplingZ 6-92 152 1002,3 - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES []NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one coov of this DMR (includine all "No Flow" & "No Discharee" reoortsl within 30 days of receipt of sample (or at end of monitorine Deriod in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware that therepre-signifint enal s for submitting false information, including the possibility of fines and imprisonment for knowing violations." 10/30/2015 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 • '. STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: —Thomas Concrete of Carolina -Wake Forest Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: July Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Wake PHONE NO. (919)562-1909 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: [:]SA ❑HQW ❑PNA []Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' PH (Standard Units) TSS (mg/L) Event Duration (minutes) Total , Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 - - 6-92 1002,3 - _ - 001 7/23/15 11.87 77.3 1.375" Y 10 r► s NOV 10 2015 CENT. FILES -AL DWR SECTION 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 } Part B:_Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month— averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yrJl PH (Standard Units) TPH using method 1664A SGT--HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? Mo (y/n) # of Months in Tier 2 2 Sampling 6-9 15 1002, - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge reports)_within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that thep-a-,e significant pe�lties jj-1forsubmitting false information, including the possibility of fines and imprisonment for knowing violations." E. `lt""`rJ'E"", 10/30/2015 (Signature of Permittee) jDate) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 r PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCC3140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina- Wake Forest Plant PERSON COLLECTING SAMPLES: Susan Bastian CERTIFIED LABORATORY:_ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES ❑ NO ❑ Part A: Wastewater Monitorine Reauirements SAMPLE COLLECTION YEAR: 2015 SAMPLE QUARTER: ®Jul -Sept ❑Oct -Dec ❑Jan -March COUNTY: Wake PHONE NO. (_919 _) 562-1909 ADD TO LISTSERVE? ❑YES ®NO EMAIL: ❑April -June" e r DISCHARGING TO CLASS: [:]SA❑HQW ❑PNA ❑Trout ®Other C'" OPTIONAL INFO: CTM Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater z (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) method 1664A SGT-HEMG (mg/L) Discharge Duration (minutes) Total Flow {gallons/day} 7 - - 6-93.4 303,5 53 (15)6 - - 001 NO DISCHARGE ED �gy IV ulzI r DWR SECT ON TPH usingAdc 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge' here. Please make sure to mark the sample quarter above. Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date:7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but inst€•ad is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 0213 .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FL_O_W_") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." C . U�, (Signature of Permittee) Permit Date: 7/1/2010-06/30/2015 10/30/2015 (Date) Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring ReportRECEIVED GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO, NCG140350 FACILITY NAME: _Thomas Concrete of Carolina- Wake Forest Plant PERSON COLLECTING SAMPLES: Susan Bostian CERTIFIED LABORATORY:_ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES ❑ NO ❑ Part A: Wastewater Monitoring Requirements AUG 0 7 2015 CENTRAL FILES SAMPLE COLLECTION YEAR: 2015 DWR SECTION SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ❑Jan -March COUNTY: Wake PHONE NO. (_919 _)562-1909 ADD TO LISTSERVE? DYES ®NO EMAIL: ®April -June DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other +*1 OPTIONAL INFO: Outfall No. Date Sample Collected' (mm/dd/yr) Type of Wastewater (VE, RM, MD)2 pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using method 1664A SGT-HEM6 (mg/L) Discharge Duration (minutes) Total Flow (gallons/day)' Q - - - 6-93.4 303,5 53 (15)6 - - 001 NO DISCHARGE f wastewater systems have not discharged in this ouarter— report "No Flow' or "No Discharge" here. Please make sure to mark the sample auarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. ' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a 5ummer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ and the DWQ Regional Office may require an annual flow report on a case -by -case basis. F..;?' 46rjua i' 'Division of Water Quality Attn: DWQ Central Files r1617 Mail Service Center ;,Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." S c. GO,4A, (Signature of Permittee) Permit Date:7/1/2010-06/30/2015 7/31/2015 (Date) Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina -Wake Forest Plant_ PERSON COLLECTING SAMPLES Andrew Rodak CERTIFIED LABORATORY ESC Lab # ENV 375A Lab # OPTIONAL INFO: June Monitoring Event Part A: Stormwater Monitoring Requirements RECEIVED SAMPLE COLLECTION YEAR: 2015 AUG 0 7 2015 SAMPLING PERIOD: ❑ July -December ® January -June ENT COUNTY Wake CEN* L FILES PHONE NO. (919)562-1909 SECTIONDWR ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HCJW ❑PNA [—]Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH (Standard Units} TSS (mg/L) Event Duration (minutes} Total Rainfall 4 (in} In Tier 2 Monthly Monitoring? (V/n) # of Months in Tier 2 Sampling2 - - 6-9z 1002,3 - - - - 001 No Discharge Y 9 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range, 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/l. ^ For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. CMMJ C7 Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)1 PH (Standard Units) TPH using method 1664A SGT NEM {mg/L} Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall a (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling 6.92 152 1002,3 - - - - - r HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample for at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware th"re ar significa penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 7/31/2015 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina -Wake Forest Plant_ PERSON COLLECTING SAMPLES NA CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: January Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919) 828-4403 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: []SA ❑HQW ❑PNA ❑Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH (Standard Units) TSS (mg/L) Event Duration (minutes) Total Rainfal14 (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier Z 2 Sampling - - 6-4 100 , - - - - 001 No Discharge y 4 C EI CEN RAL FILES 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/l. ° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month -- averaged over a calendar year. ' Outfall No. Date Sample Collected (mo/dd/yr)1 pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) h of Months in Tier 2 z Sampling 6-9 15 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submittyig false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) 3/31/2015 (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMIMATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina -Wake Forest Plant PERSON COLLECTING SAMPLES Andrew Rodak CERTIFIED LABORATORY ESC Lab # ENV 375� Lab # OPTIONAL INFO: February Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919)562-1909 ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH (Standard Units) TSS (mg/L) Event Duration (minutes) Total Rainfall 4 (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling' - - 6-9 100 , - - - - 001 No Discharge Y 5 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make Sure to mark the sample period above. Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part 8: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/yr) pH (Standard units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfalla (in) New Motor Oil usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Samplin82 6-9 15 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQCentral Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTER: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are significant alties for submittin false information, including the possibility of fines and imprisonment for knowing violations." 3/31/2015 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina -Wake Forest Plant_ PERSON COLLECTING SAMPLES Andrew Rodak CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: March Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919)562-1909 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR 1 NO FLOW] PH {Standard Units) TSS (mg/L) Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier Z 2 Sampling - - 6-9 100 ' - - - - 001 No Discharge Y 6 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. "For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. ' Outfall No. Date Sample Collected 1 (mo/dd/yr) pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Samplingz 6-9 15 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring aeriod in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are sign i rant penalties for ubmitting false information, including the possibility of fines and imprisonment for knowing violations." S1 3/31/2015 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 SAMPLE COLLECTION YEAR: 2015 FACILITY NAME: _Thomas Concrete of Carolina- Wake Forest Plant SAMPLE QUARTER: ❑Jul -Sept ®Oct -Dec ❑Jan -March []April -June PERSON COLLECTING SAMPLES: Susan Bostian COUNTY: Wake CERTIFIED LABORATORY:_ESC Lab # ENV375 PHONE NO. (_919 _)562-1909 Lab # ADD TO LISTSERVE? ❑YES ®NO EMAIL: LIMIT VIOLATIONS? YES ❑ NO ❑ DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA []Trout ®Other OPTIONAL INFO: Part A: Wastewater Monitoring Requirements Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater (VE, RM, MD)' pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-HEM' (mg/L) (minutes) Total Flow , (gallons/day j - - - 6-93,4 303.5 53 (15)6 - - 001 NO DISCHARGE K T' J I i� A I-r S A t F: iLEe I If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 T5S limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 10" Wm+ romo `7 050 !1114 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. r Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 70,10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW. "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." � A C . G,,k (Signature of Permittee) Permit Hate: 7/1/2010-06/30/2015 12/28/201S (Date) Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina -Wake Forest Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: July Monitoring Event Part A: Stormwater Monitoring Requirements RECEIVED SAMPLE COLLECTION YEAR: 2015 SEP 17 2015 SAMPLING PERIOD: ® July -December ❑ January-JMITRAL FILES COUNTY Wake DWR SECTION PHONE NO. (919)562-1909 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other Outfall No. Date Sample Collected mo/dd/yr OR [ NO FLOW)' pH (standard Units} TS5 (mg/L) Event Duration {minutes) Total a Rainfall {in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier z 2 Sampling - - 6-9 100 , - - - - 001 7/23/15 11.87 77.3 1.375" Y 10 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/i. ° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/l/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B:. VehiclZ Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. date Sample Collected [mo/dd/yr)1 PH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids {mg/L} Event Duration (minutes) Total Rainfalla (in) New Motor Oil Usage {gal/month} 2 Tier In InTier# Monthly Monitoring? {y/n) of Months in Tier 2 z Sampling 6-9 15 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one coov of this DMR (includine all "No Flow" & "No Dischame" reports] within 30 days of receipt of sample for at end of monitoriniz period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am awarPAat there are signjfi�can�t} penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." CA""' t� 9/9/2015 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 ISTORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina -Wake Forest Plant_ PERSON COLLECTING SAMPLES Andrew Rodak CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: August Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Wake PHONE NO. (919)562-1909 ADD TO LISTSERVE? OYES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH (Standard Units) TSS (mg/L) Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (Y/n) # of Months in Tier 2 Sampling' - - 6-9 2100 , - - 001 No Discharge Y 11 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. 5M Z V) m r, n Or zM co cn rn V N O X M 01 M 0 Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)l PH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) If of Months in Tier 2 2 Sampling 6-9 15 2 10D ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports] within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED; "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware thatphere ares gnifica�penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." ,� 9/9/2015 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 f STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina -Wake Forest Plant_ PERSON COLLECTING SAMPLES Andrew Rodak CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: May Monitoring Event Part A: Stormwater Monitoriniz Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919)562-1909 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other, Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 PH (Standard Units) TS5 (mg/L) Event Duration (minutes) Total a Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling' - - 6-92 1002.3 - - 001 No Discharge Y 8 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfail here. Please make sure to mark the sample period above. ' If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicie Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample ( Co/ected i pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall a (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? # of Months in Tier 2 Sampling2 6-91 152 1001" - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coot/ of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there�signifipnt enal�ie1-sforsubmitting false information, including the possibility of fines and imprisonment for knowing violations." 6/8/2015 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 A*A J NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit: http: //portal.ncdenr.org/web/lr/nodes-stormwater/ Permit No.: N/C/_/_/_/_/_/_/_/ or Certificate of Coverage No.:/4_/ a%'3 % 5'/. 0 Facility Name: Thomas Concrete of Carolina -Wake Forest Plant County: Wake Phone No. (919) 562-1909 Inspector: Kevin Kelt Date of Inspection: 07/23115 Time of Inspection: 1430 Total Event Precipitation (inches): 1.375" Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) caw- ■= Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event' is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: C, (Signature of Permittee or Designee) Page 1 of 2 SWU-242, Last modified 7/31/2013 1. Outfall Description: Outfall No. 01 Structure (pipe, ditch, etc.) Pipe into collection trench Receiving Stream: Unnamed tributary to Neuse River Describe the industrial activities that occur within the outfall drainage area: Bulk storage of raw materials, vehicle transport. wastewater treatment. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: clear 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinct odor 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and S is very cloudy: 1 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 5. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10, Other Obvious Indicators of Stormwater Pollution: List and describe pH: 11.87 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 7/31/2013 T PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina- Wake Forest Plant PERSON COLLECTING SAMPLES: Susan Bostian CERTIFIED LABORATORY: ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES F] NO ❑ Part A: Wastewater Monitoring Requirements L co p r SAMPLE COLLECTION YEAR: 2015 SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ®Jan -March COUNTY: Wake PHONE NO. (_919 _) 562-1909 ADD TO LISTSERVE? []YES ®NO EMAIL: ❑April -June DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other OPTIONAL INFO: Outfall No. Date Sample Collected (mm/dd/yr} Type of Wastewater (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using method 1664A SGT Fi L (mg/L) Discharge Duration {minutes} Total Flow {gallons/day} - - - 6-93.4 303.5 53 (15)f, - - 001 NO DISCHARGE 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but irntead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 0213 .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE AT END OF MONITORING PERIOD IN CASE OF "NO FLOW"] TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." A (Signature of Permittee) Permit Date:7/1/2010-06/30/2015 3/31/2015 (Date) Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina- Wake Forest Plant PERSON COLLECTING SAMPLES: Susan Bostian CERTIFIED LABORATORY: ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES ❑ NO ❑ Part A: Wastewater Monitorine Reauirements SAMPLE COLLECTION YEAR: 2014 SAMPLE QUARTER: ❑Jul -Sept ®Oct -Dec ❑Jan -March COUNTY: Wake PHONE NO. (_919 _)562-1909 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout ❑Other OPTIONAL INFO: Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater z (VE, RM, MD} pH (standard} Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A 6 SGT NE) (mg/L Duration (minutes) Total Flow 7 (gallons/day) - - 6-93,4 303.5 53 (15)6 - - 001 NO DISCHARGE 2015 GENT Itts 2 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HOW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 :11110- ❑April-June C.2 W .j ww+ LAM e Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot { . ,obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date: 7/1/2010-OG/30/2015 12/29/2014 (Date) Last Revised 07/13/11 Page 2 of 2 W STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL. PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE; NO. NCG140350 FACILITY NAME: Thomas Concrete of Carolina -Wake Forest Plant_ PERSON COLLECTING SAMPLES Andrew Rodak CERTIFIED LABORATORY ESC Lab # ENV 375� Lab # OPTIONAL INFO: Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2014 SAMPLING PERIOD: ® July -December ❑ January June COUNTY Wake PHONE NO. (919)562-1909 ADD TO LISTSERVE? [-]YES ®NO EMAIL: DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout ❑Other, Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH (Standard Units) T55 (mg/t) Event Duration (minutes) Total Rainfall' (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling - 6-9 100 - - - 001 09/24/14 9.42 280 480 1.82 N 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 ..1 I Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr]f pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (rng/L) Event Duration (minutes) Total Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling 6-9 15 1002.3- - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Original and one cony of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU 41UST SIGN THIS CERTIFIC4TION FOR ANY INFORMATION REPORTED. "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am�y�tdre that there a significant pe Ities for submitting false information, including the possibility of fines and imprisonment for knowing violations." 9/- (Signature of Permittee)' ( te) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 1� PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina- Wake Forest Plant PERSON COLLECTING SAMPLES: Susan Bostlan CERTIFIED LABORATORY:_ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES ❑ NO ❑ Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2014 SAMPLE QUARTER: ®Jul -Sept ❑Oct -Dec ❑Jan -March COUNTY: Wake PHONE NO. (,_- 919 --_-_)562-1909 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA []Trout OPTIONAL INFO: ❑April -June ❑Other Outfall No. Date Sample Collected' (mm/dd/yr) Type of Wastewater (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using method 1664A SGT HEIW (mg/L) Discharge Duration (minutes) Total Flow (gallons/day)' - - - 6-91a 30"' 53 (15)s - - 001 09/24/14 VE, RM 9.42 280 0.40 180 9,800 gpd ' If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 31f an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to contlnue monitoring, pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. S T55 limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 e Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 028.0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY_ (INCLUDING ALL "NO FLOW", -NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that quallfied personnel properly gather and evaluate the information submitted. Based on my Inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submltting false Information, Including the possibility of fines and imprisonment for knowing violations." A /I (Signature of Permittee) Permit Date: 7/1/2010-06/30/2015 9/30/2014 (Date) Last Revised 07/13/11 Page 2 of 2 NCDEN R OCT 0 3 204 Stormwater Discharge Outfall (SDO) CENrRk fil Qualitative Monitoring Report DWR SECT/OtV Forguidance on filling out this form, please visit htWV-/=rtal.ncdenr.org/web11r/nodes-storm water( Permit No.: �1/�/_/_/�/_/_/_/_ _/ or Certificate of Coverage No.: 13 /�./.Q Facility Name: Thomas -Concrete of Carolina -Wake Forest Plant County: Wake Phone No.562-1202 Inspector: Andrew Rodai� Date of Inspection: 09124114 Time of Inspection: 14 O _ Total Event Precipitation (inches): _ 1.82 Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event" However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this r Tort is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) Page 1 of 2 1. Outfall Description: Outfall No. 01 Structure (pipe, ditch, etc.) P1pe,into collection trench Receiving Stream: Unnamed tributary to Neuse River Describe the industrial activities that occur within the outfall drainage area: Bulk storage of raw matefials. Vehicle trsno , ;,_,yvaste, ter eatment. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Greyish brown, medium tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): _ No -distinct odor_ 4. Clarity. Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe pH: 9,42 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further Investigation. Page 2 of 2 PROCESS WASTEWATER -- Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina- Wake Forest Plant PERSON COLLECTING SAMPLES: Susan Bostian CERTIFIED LABORATORY: ESC Lab # ENV37S Lab # LIMIT VIOLATIONS? YES ❑ NO ❑ Part A: Wastewater Monitoring~ Requirements SAMPLE COLLECTION YEAR: 2014 SAMPLE QUARTER: [_]Jul -Sept ❑Oct -Dec ❑Jan -March COUNTY: Wake PHONE NO. (_919 _) 562-1909 ADD TO LISTSERVE? []YES ®NO EMAIL: ®April -June DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout ❑Other OPTIONAL INFO: Outfall No. Date Sample Collected' (mm/dd/yr) Type of Wastewater z (VE, RM, MD} pH {standard} Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using method IGG4A SGT-WE) (mg/L Discharge Duration (minutes) Total Flow 7 (gallons/day} - - - 6-93,4 - 303'5 53 (15)s - - 001 NO DISCHARGE 7tj L FILES DWFr SECTION 1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring, 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date:7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 028 .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING_ ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that tlopre are significant penalties for subtpitting false information, including the possibility of fines and imprisonment for knowing (Signature of Permittee) Permit Date:7/1/2010-06/30/2015 9/15/2014 (Date) Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: Thomas Concrete of Carolina -Wake Forest Plant_ PERSON COLLECTING SAMPLES Susan Bostian CERTIFIED LABORATORY ESC Lab # ENV 375� Lab # OPTIONAL INFO: Part A: 5tormwater Monitorins Requirements SAMPLE COLLECTION YEAR: 2014 SAMPLING PERIOD: [] July -December ® January -June COUNTY Wake PHONE NO. (919)562-1909 ADD TO LISTSERVEi' ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ®SA ❑HQW []PNA []Trout ❑Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' PH (Standard Units) TSS (mg/L) Event Duration (minutes) Total / Rainfall (in) In Tler 2 Monthly Monitoring? (y/n) # of Months In Tier 2 Sampling' - - 6-92 1002_1 - - - - 001 04/07/14 10.68 65 480 1.42 N MAY C:FNTI DVS ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. a TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/l. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 EIVED 0 2 Z014 'AL FILES TBOG Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oll/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)l PH (Standard Units) TPH using method 1664ASGT-NEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) A of Months in Tier 2 Sampling2 6-92 152 1002.3 - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Original and one coDv of this DMR iincludine all "No Flow" & "No Discharee" reports) within 30 days of receipt of sample for at end of monitoring Deriod in case of "No Flow") to: Division of Energy, Mineral and Land Resources Attn: DWQ Central Files 1612 Mail Service Center Raleigh, North Carolina 27699-A 612 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete, gm.aerare that ther are significant enalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." o�-2 01�A (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140350 FACILITY NAME: _Thomas Concrete of Carolina- Wake Forest Plant PERSON COLLECTING SAMPLES: Andrew Rodak CERTIFIED LABORATORY:_ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES ❑ NO ❑ Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2014 SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ®Jain -March COUNTY: Wake PHONE NO. (_919 _) 562-1909 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout OPTIONAL INFO: ❑April -June ❑Other, Outfall No. Date Sample Collected = (mm/dd/yr) Type of Wastewater (VE, RM, MD)2 pH (standard) Total Suspended SvHds (mg/L) Settleable Solids (mL/L) TPH using method 1664A SGT HEIW (mg/L) Discharge Duration (minutes) Total Flow (gallons/day)' _ 6_93.4 3o3.5 S3 (15)6 - - 001 NO DISCHARGE Click here to enter text. Click mere to enter text. MAY I, M i_Ctrll.,t�3 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge' here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 'If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring forth at parameter for six months, unless DWQ RO staff notifies you to continue monitoring. pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. s TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. if the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Energy, Mineral and Land Resources Attn: DWQ Central Files 1612 Mail Service Center Raleigh, North Carolina 27699-1612 (919) 807-6379 YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 (Signature of Permittee) c-/- 2 9- 2o�Y (Date) Permit Date; 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 3 of 2