Loading...
HomeMy WebLinkAboutNCG140266_MONITORING INFO_20190204i STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. v 0010 (p DOC TYPE ❑HISTORICAL FILE C� MONITORING REPORTS DOC DATE ❑ YYYYMMDD ANNUAL SUMMARY DISCHARGE MONITORING REPORT (DMR) — WASTEWATER SUBMIT TO CENTRAL OFFICE General Permit No. NCG140000 Calendar Year 2018 'Report ALL WASTEWATER monitoring data on this form (include 'No FloWP'No Discharge" and Limit Violations) from the previous calendar year to the DEQ by MARCH i of each year. Certificate of Coverage No. NCG14 ®Q©© Facility Name: Thomas Concrete- Morrisville Plant RECEIVE County: Wake FEB 0 4 2019 Phone Number: (919 ) 460-5317 Tots! noeoLjho�t�al�s motored_ Certified Laboratory ESC Lab # ENV375 DWR SECTION Lab # Wastewater (WW) Discharge Outfall No. 002 Does this outfall discharge WW to SA waters? Yes ❑ No ❑✓ Does this outfall discharge WW to SB or PNA waters? Yes ❑ No ❑✓ Does this outfall discharge WW to HQW or ORW waters? Yes ❑ No 0 If so, what is the 7Q10 flow rate? or Tidally influenced waters, 7Q10 not available ❑ Does this outfall discharge WW to Trout (Tr) designated waters? Yes ❑ No ❑✓ Were there any limit violations in the calendar year? Yes ✓❑ No ❑ Outfall No. 002 Daily Flow Rate, cfs pH, SU TSS, mgll SS, mill if applicable Non -Polar O&G (EPA Method 1664 (SGT-HEM)), mgll Effluent Limitations Daily Maximum HQW or ORW 50% of 7Q10 Indicate NO FLOW if eppficable freshwater 6.0-9.0 saltwater 6.8-$ 5 V v Standard 30 HOW 20 - HOW ! ORW Tr, or PNA 10 HQW, ORW, SA, sB,PNA, orany Trout 5 - No Limit Samples above Benchmark - subject to Tiered Responses 15 Date Sample Collected, m dl r old �p I r gEL tv i i' ' T t.. 3/31/18 NO DISCHARGE 01 4124118 NO DISCHARGE Q2 9/30/18 NO DISCHARGE Q3 10/11/18 11.42 45.20 NIA NIA Permit Date 81112017 — 6/30/2022 Last Revised 6-22-2017 Certificate of Coverage No. NCG14 EOq© Additional Outfall Attachment (make copies as needed for additional outfalls) Wastewater (WW) Discharge Outfall No. 003 Does this outfall discharge WW to SA waters? Yes ❑ No 0 Does this outfall discharge WW to SIB or PNA waters? Yes ❑ No ❑� Does this outfall discharge WW to HQW or ORW waters? Yes ❑ No ❑✓ If so, what is the 7Q1 D flow rate? or Tidally influenced waters, 7Q10 not available ❑ Does this outfall discharge WW to Trout (Tr) designated waters? Yes ❑ No El Were there any limit violations in the calendar year? Yes ✓❑ No ❑ Outfall No. 0D3 Daily Flow Rate, cfs pH, SU • TSS, mgll SS, mlii ff applicable Non -Polar O&G (EPA Method 1664 (SGT-HEM)), mgil Effluent Limitations Daily Maximum o OW or ORW 50 % of 7Q10 Indicate NO FLOW if applicable freshwater 6.0-9.0 saltwater V. V-13 $ V Standard 30 HOW 20 HOW 1 ORW M Tr, or PNA 10 HOW, ORW. SA, SB, PNA, or any Trout 5 No Limit Samples above Benchmark subject to Tiered Responses 1 5 Date Collected,11 mo/ddi r r r a - l x :ri M i �`i'$ '4 i5 1✓ Y1 i .2 �� _ �� r^` ✓ k a �Jii 1tr 7+y,f �L_i�:� ti R'-'2 �S4i- f 1 � - �7� �S.t 3•' F'Ft _�3' 1��,_�_.�.1"�'r:3�= YSample ��A� r x, i%e•'y '�+4�bf }} , ak`� �Pe.f wq �y` s 3,y "`_h �4 i ? .vim-� •" ` .semis, 6130118 N0 DISCHARGE SEMI ANNUAL 1 10/11/18 12.09 66,20 NIA NIA Permit Date 811/2017 — 6/30/2022 Last Revised 8-22-2017 Certificate of Coverage No. NCG14 10-10®© CERTIFICATION "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. i am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." [Required by 40 CFR § 122.24 Signature NC-. Date Mail Annual Summary Wastewater DMR to the NCDEQ Central Office: Note the address is correct — Central Files is housed in D WR (not DEMLR) N.C. Department of Environmental Quality (DEQ) Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Central Files Telephone (919) 807-6300 Questions? Contact DEMLR Stormwater Permitting Staff In the Central Office at: (919) 707-9220 Permit Date 811 /2017 — 613012022 Last Revised 8-22-2017 ANNUAL SUMMARY DISCHARGE MONITORING } REPORT (DMR) — STORMWATER SUBMIT TO CENTRAL OFFICE* General Permit No. NCG140000 Calendar Year 2018 *Report ALL STORMWATER monitoring data on this form (include "No Flow"rNo Discharge" and Benchmark Exceedances) from the previous calendar year to the DEQ by MARCH 1 of each year. Certificate of Coverage No. NCG 140266 RECep v.,7.�- f Facility Name: Thomas Concrete of Carolina — Morrisville Plant FEB 0 County: Wake zQi� Phone Number: (919) 460-5317 Total no. of SDOs monitr�ti_�L F1LFo Certified Laboratory ESC Lab # ENV 375 t JECTIO� Lab # Stormwater Discharge Outfall (SDO) No. 001 VMA Outfall? Yes ❑ No N Is this outfall currently in Tier 2 for any parameter? Yes ❑ No N Was this outfall ever in Tier 2 during the past year? Yes ❑ No N If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ Other ❑ Outfall No. Total Rainfall, inches Total Suspended Solids TSS , ( ) m 1l pH, SU Non -polar O&G (EPA Method 1664 (SGT-HEM)), mgll (VMA) it appicable New Motor Oil Usage (gallmo.) !/applicable Stormwater Benchmarks Indicate NO FLOW it applicable circle Benchmark 100150 6.0`9.0 15 >55 g allmn. average requires TSS and Nan-potaf= monitoring Date Sample Collected molddl r 02/26/18 0.09 9.33 8.56 NIA NIA -10111/18 3.18 6.46 6.71 NIA NIA Permit Date 811/2017 -- 6/30/2022 Last Revised 8-22-2015 j Certificate of Coverage No. NCG 140266 Additional Outfall Attachment (make copies as needed for additional outfalis) r Stormwater Discharge Outfall (SDO) No. No. 002 VMA Outfall? Yes ® No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ® No ❑ Was this outfall ever in Tier 2 during the past year? Yes ® No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ Other ❑ Outfall No. Total Rainfall, inches Total Suspended Solids (TSS), m /l pH, SU Non -polar O&G (EPA Method 1664 m(SG7-HEM)), g/I (VMA) Napplicable New Motor Oil Usage (gallmo.) 7fapWficable S torm wa ter Benchmarks lndJcase NO FLOW it applicable Circla senchrnwh 100/50 6.0-9.0 15 ?55 gallmo. average requires T55 and Hon-polarO&G monitoring Date Sample Collected, moldd! r =. f . s 4 y S, 01/30/18 NO FLOW 02/28/18 NO FLOW 03/31/18 NO FLOW 04/24/18 0.85 132 9.84 <1.16 >55 05/31/18 NO FLOW 06/30/18 NO FLOW 07/31/18 NO FLOW 08/31/18 NO FLOW 09/30/18 NO FLOW 10/11/18 3.18 45.2 11.42 0.00 >55 11/30/18 NO FLOW 12/14/18 0.15 328 12.16 0.00 >55 Permit Date 81112017 — 6/30/2022 Last Revised 8-22-2015 9 Certificate of Coverage No. NCG140266 Additional Outfall Attachment (make copies as needed for additional outfalls) Stormwater Discharge Outfall (SDO) No. No. 003 VMA Outfall? Yes ❑ No Is this outfall currently in Tier 2 for any parameter? Yes ® No ❑ Was this outfall ever in Tier 2 during the past year? Yes ® No ❑ if this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ Other . ❑ Outfall No. Total Rainfall, inches Total Suspended p Solids (TSS), m 11 p H, SU Non -polar O&G Method 1664 SGT-HEM)), mgll (VMA) }}, New Motor Oil Usage (gallmo.) Stormwater Benchmarks IndicateNO ROW if applicable Circle Benchmark 100150 60-90 .. 15 >55 g a!lmo. average requires T55 and Non polar OSG monitoring Date Sample Collected, molddl r j. - 01/31/18 NO FLOW 02/28/18 NO FLOW 03/24/18 0.91 159 7.96 NIA NIA 04/24/18 0.85 137 9.55 NIA NIA 05/31/18 NO FLOW 06/30/18 NO FLOW 07/31/18 NO FLOW 08/31/18 NO FLOW 09/30/18 NO FLOW 10/11/18 3.18 66.2 12.09 NIA NIA 11/30/18 NO FLOW 12/14/18 0.15 282 12.09 NIA NIA Permit Date 8/112017 — 6/30/2022 Last Revised 8-22-2015 Certificate of Coverage No. NCG140266 CERTIFICATION " I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." £Required by 40 CFR §122.221 Signature Date \ - Mail Annual Summary Stonmwater DMR to the NCDEQ Central Office: (Vote the address is correct — Central Files is housed In DWR (not DEMLR) N.C. Department of Environmental Quality (DEQ) Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Central Files Telephone (919) 807-6300 Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at: (919) 707-9220 Permit Date 811/2017 — 6130/2022 Last Revised 8-22-2015 ANNUAL SUMMARY DISCHARGE MONITORING REPORT (DMR) — STORMWATER SUBMIT TO CENTRAL OFFICE* General Permit No. NCG140000 Calendar Year 2017 `Report ALL STORMWATER monitoring data on this form (include "No Flow"1"No Discharge" and Benchmark Exceedances) from the previous calendar year to the DEQ by MARCH 1 of each year. Certificate of Coverage No. NCG 140266 E�'t= Facility Name: Thomas Concrete of Carolina — Morrisville Plant FEB 2 0 201B County: Wake CENTRAL FILES Phone Number: (919) 460-5317 Total no. of SDOs monitored 3 DN1R SECTION Certified Laboratory ESC Lab # ENV 375 Lab # Stormwater Discharge Outfall (SDO) No. 001 VMA Outfall? Yes ® No ❑ Is this outfall currently in Tier 2 for any parameter? Yes'❑ No Was this outfall ever in Tier 2 during the past year? Yes ❑ No If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ Other ❑ Outfall No. Total Rainfall, inches Total Suspended Solids TSS), ( mg/1 pH, SU Non -polar O&G (EPA Method 1664 SGT-HEM ( )?� mg/1 (VMA) If applicable New Motor Oil Usage (gal/mo.) NaRAlicable Stormwater Benchmarks Indicate NO FLOW H applicable Circle Benchmark 100150 6.0-9.0 15 >55 g allmo. average requires Ts5 and Non -polar o&Gmonitoring Date Sample Collected, mo/ddl r MMM 01 /20117 16.8 02/28/17 NO FLOW 03/31/17 1.26 0.8 6.09 04/30/17 NO FLOW 05/31/17 NO FLOW 06/30/17 NO FLOW 07/31/17 NO FLOW 08/31/17 NO FLOW 09/30/17 NO FLOW 10/31/17 NO FLOW 11/30/17 NO FLOW 12/31/17 NO FLOW Permit Date 8/1/2017 — 6/30/2022 Last Revised 8-22-2015 Certificate of Coverage No. NCG140266 Additbnal Outfall Attachment (make copies as needed for additional outfalls) Sto nawater Discharge Outfall (SDO) No. No. 002 VMA Outfall? Yes ® No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ® No ❑ Was this outfall ever in Tier 2 during the past year? Yes ® No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ Other ❑ Outfall No. Total Rainfall, inches Total Suspended Solids TSSy ( r� m lI pH, SU Non -polar O&G (EPA Method 1664 SGT-HEM ( )}� mgll {VMA} Napplicable New Motor Oil Usage (gallmo.) Happllcable Stormwater Benchmarks Indicate NO FLO1Nil applicable Circle Benchmark 1 Of►150 V 6.0-9.0 15 >55 gallmo. average requires T55 and Non polar O&G monitoring Date Sample Collected, molddl r MMM 01 /20/17 216.0 02/28/17 NO FLOW 03/31/17 NO FLOW 04/30/17 NO FLOW 05/31/17 NO FLOW 06/30/17 NO FLOW 07/31/17 NO FLOW 08/31/17 NO FLOW 09/30/17 NO FLOW 10/31/17 NO FLOW 11/30/17 NO FLOW 12/31/17 NO FLOW Permit Date 8/112017 — 6/30/2022 Last Revised 8-22-2015 Certificate of Coverage No. NCG 140266 Additional Outfall Attachment (make copies as needed for additional outfalls) Stormwater Discharge Outfall (SDO) No. No. 003 VMA Outfall? Yes ® No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ® No ❑ Was this outfall ever in Tier 2 during the past year? Yes ® No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ Other ❑ Outfall No. Total Rainfall, inches Total Suspended Solids (TSS), mg/1 pH, SU Non -polar O&G {EPA Method 1664 (SGT-HEM)), mgll (VMA) New Motor Oil Usage {gallmo.) Stormwater Benchmarks Indicate NO FLOWN applicable Circle Benchmark 104150 60-90 .. 15 >55 gallmo. average requires T55 and Non -polar O&G monitoring Date Sample Collected,mmm molddl r 01 /20/17 279.0 02/28/17 NO FLOW 03/31/17 NO FLOW 04/30/17 NO FLOW 05/31/17 NO FLOW 06/30/17 NO FLOW 07/31/17 NO FLOW 08/31/17 NO FLOW 09/30/17 NO FLOW 10/31/17 NO FLOW 11/30/17 NO FLOW 12/31/17 NO FLOW Permit Date 811/2017 — 6/30/2022 Last Revised 8-22-2015 Certificate of Coverage No. NCG140266 CERTIFICATION "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Requirprl by 40 r:FR 8199 997 Signs Date Mail Annual Summary Stormwater DMR to the NCDEQ Central Office: Note the address is correct — Central Files is housed in DWR (not DEMLR) N.C. Department of Environmental Quality (DEQ) Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Central Files Telephone (919) 807-6300 Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at: (919) 707-9220 Permit Date 8/1/2017 -- 6/30/2022 Last Revised 8-22-2015 STORMIMATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 FACILITY NAME: Thomas Concrete of Carolina -Morrisville Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: April Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2017 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (704) 853-9437 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other, Outfall No. Date Sample I Collected {mo/dd/yr OR NO FLOW)1 pH (Standard Units) T55 {mg/L) Event Duration (minutes) Total a Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling - - 6-9 100 , - - - - 001 NO FLOW Click here to enter text. Click here to enter text. NA 002 NO FLOW y 28 003 NO FLOW y 28 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfail No. Date Sample Collected (mo/dd/yr)1 pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (Y/n) # of Months in Tier 2 z Sampling 6-9 15 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES [:)NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coin of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 4G�'i 4/30/2017 (Signature of Permittee) (Date) Permit Date:7/1/2011-60/30/2015 Last Revised 7/13/11 Page 3 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 FACILITY NAME: _Thomas Concrete of Carolina- Morrisville Plant PERSON COLLECTING SAMPLES: Kevin Kelt CERTIFIED LABORATORY: ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? Y>S ❑ NO Part A: Wastewater Monitorine Requirements SAMPLE COLLECTION YEAR: 2017 SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ®Jan -March ❑April -June COUNTY: Wake PHONE NO. (704) 853-9437 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: [:]SA ❑HQW ❑PNA ❑Trout ®Other OPTIONAL INFO: Qutfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater z (VE, RM, MD} pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-HENf (mg/L) Duration (minutes) Total Flow {gallons/day}, - - - 6-93.4 303.5 53 001 No discharge) 002 No discharge 003 No discharge r L r TRAL F 1 6ECTION 1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge' here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW_") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED. - "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 3/31/2017 Permit Date:7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 SAMPLE COLLECTION YEAR: 2017 FACILITY NAME: Thomas Concrete of Carolina -Morrisville Plant SAMPLING PERIOD: ❑ July -December ® January -June PERSON COLLECTING SAMPLES Kevin Kelt COUNTY Wake CERTIFIED LABORATORY ESC Lab # ENV 375 PHONE NO. (704) 853-9437 Lab # ADD TO LISTSERVE? DYES ®NO EMAIL: OPTIONAL INFO: March Monitoring Event DISCHARGING TO CLASS: []SA ❑HQW ❑PNA ❑Trout ®Other Part A: Stormwater Monitoring Requirements Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 PH (Standard Units) TSS (mg/L} Event Duration (minutes) Total a Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier z 2 Sampling - - 6-9- 001 3/31/2017 6.09 0.8 60 1.25 n NA 002 NO FLOW y 27 003 NO FLOW y 27 CNTRAL FILE rvv L lOr If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected i (mo/dd/yr) pH (Standard Units) TPH using method 1664ASGT--HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly . Monitoring? (y/n) # of Months in Tier 2 Sampling2 6-9 15 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge" reoorts) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED, "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware that there are sisignificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 1:5alkvuan3/31/2017 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 J Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit: http://h2o.enr.state.nc.us/sufForms_Documents.htm#miscforms Permit No.: NICI_I I I I 1 I I or Certificate of Coverage No.: NICIG/ 1l_41_01_29� FacilitvName: Thomas Concrete of Carolina- Morrisville Plant County: Wake Phone No. (7 0 4) 8 5 3 - 94 3 7 Inspector: Kevin Kelt Date of inspection: 3 / 31 / 2 017 Time of Inspection: 1500 Total Event Precipitation (inches): 1.25" Was this a Representative Storm Event? (See information below) ® Yes ❑ No Please check your permit to verify if Qualitative Monitoring must be performed during a representative storm event (requirements vary). A "Representative Storm Event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. By this signature, I certify that this report is accurate/and complete to the best of my knowledge: (Signature of Permittee or Designee) 1. Outfall Description: Outfall No. 01 Structure (pipe, ditch, etc.) Pipe Receiving Stream: Unnamed tributary to Crabtree Creek Describe the industrial activities that occur within the outfall drainage area: Bulk Storage of raw materials (cement,aggregates, chemical admixtures) and petroleum 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: clear 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinctive odor Page 1 of 2 5 WU-242-112608 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: Ol 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: �Jl 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 0 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes i�lo 9. is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe pH (field -measured) : 6.09 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242-112608 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 FACILITY NAME: Thomas Concrete of Carolina -Morrisville Plant PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: February Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2017 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919) 460-5317 ADD TO LISTSERVE? EYES ®NO EMAIL: DISCHARGING TO CLASS: ESA ❑HCjW ❑PNA ❑Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH (standard Units) TSS (mg/L) Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling - - 6-9 100 ' - - 001 NO FLOW n NA 002 NO FLOW y 26 003 NO FLOW y 26 r IUN ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. s TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yrj1 pH (Standard Units} TPH using method 1664A SGT HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall a (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n} # of Months in Tier 2 Z Sampling 6-9 15 100 , - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES [:]NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR fincludina all "No Flow" & "No Discharae" reports) within 30 days of receiot of sample for at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date: 7/1/2011-60/30/2015 2/28/2017 (Date) Last Revised 7/13/11 Page 3 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 FACILITY NAME: Thomas Concrete of Carolina -Morrisville Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ OPTIONAL INFO: October Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Wake PHONE NO. (919) 460-5317 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 PH (Standard units) TSS (mg/L) Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling - - 6-9 100 ' - - - 001 NO FLOW n NA 002 NO FLOW y 22 003 NO FLOW REC-PRIED y 22 ( ZAL FILES DWR SECTION If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 if a value is in excess of the benchmark, or outside the benchmark range (for PH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part 8: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample P Collected 1 (mo/dd/yr) pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall° (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 z Sampling 6-9 15 100 , - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." c�Clsi')fii 2Gli 11/15/2016 (Signature of Permittee) (Date) Permit Date:7/i/2011-60/30/2015 Last Revised 7/13/11 Page 3 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 FACILITY NAME: _Thomas Concrete of Carolina- Morrisville Plant PERSON COLLECTING SAMPLES: Kevin Kelt CERTIFIED LABORATORY: ESC Lab # ENV375 Q4 Lab # LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLE QUARTER: ❑Jul -Sept ®Oct -Dec Dian -march COUNTY: Wake PHONE NO. (_919 —)460-5317 ADD TO LISTSERVE? DYES ®NO EMAIL: ❑April -June DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other, OPTIONAL INFO: Outfall No. Date Sample Collected (mm/dd/yr) Type of Wastewater Z (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-HEM6 (mg/L) Duration (minutes) Total Flow (gallons/day)7 - - - 6-93,4 303s 53 (15)6 - - 001 No discharge 002 No discharge 003 No discharger L_L_+ k,- CE=P iTRAL FILE S //-j, /ll PZ�j o7 R SEC 1u 4f 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 s TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but'instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE IOR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW" TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 12/31/2016 Permit Date:7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 SAMPLE COLLECTION YEAR: 2016 FACILITY NAME: _Thomas Concrete of Carolina- Morrisville Plant SAMPLE QUARTER: ®Jul -Sept ❑Oct -Dec Dian -March ❑April -June PERSON COLLECTING SAMPLES: Kevin Kelt COUNTY: Wake CERTIFIED LABORATORY: ESC Lab # ENV375 PHONE NO. (_919 _) 460-5317 Q3 Lab # ADD TO LISTSERVE? []YES ®NO EMAIL: LIMIT VIOLATIONS? YES ❑ NO DISCHARGING TO CLASS: [:]SA ❑HQW ❑PNA ❑Trout ®Other OPTIONAL INFO: Part A: Wastewater Monitoring Requirements Outfall No. Date Sample Collected' (mm/dd/yr) Type of Wastewater (VE, RM, MD)' pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-HEM' (mg/L) Duration (minutes) Total Flow � (gallons/day} - - 6-93.4 303.5 53 (15)6 - 001 No discharge Opt No discharge ;� 1 0D3 No discharge tnr clrf' nN ' If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cieanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 9/30/2016 Permit Date:7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 FACILITY NAME: Thomas Concrete of Carolina -Morrisville Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: August Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Wake PHONE NO. (919) 460-5317 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other, Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW}1 pH (Standard Units TSS (mg/L) Event Duration (minutes} Total Rainfall 4 (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Samplingz - - 6-9 100 ' - - - 001 NO FLOW rnCr !� n NA 002 NO FLOW y 20 003 NO FLOW SIL y 20 ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to markthesample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)1 pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Samplingz 6-9 15 loo ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware that there are s�nificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." ,5a4x, (Signature of Permittee) 6 Permit Date; 7/1/2011-60/30/2015 9/12/2016 (Date) Last Revised 7/13/11 Page 3 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 FACILITY NAME: Thomas Concrete of Carolina -Morrisville Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: July Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Wake PHONE NO. (919) 460-5317 ADD TO LISTSERVE? []YES. ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 PH (Standard Units) TSS (mg/L} Event Duration (minutes) Total a Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling - - 6-9 100 , - - - - 001 NO FLOW n NA 002 NO FLOW y 19 003 NO FLOW - -� y 19 LUib iT i` C ©WR 3 =CTION If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range, 3 TS5 benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/yr) PH (Standard Units) TPH using method Ib64A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 6-9 152 100 , - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one coov of this DMR (includine all "No Flow" & "No Discharee" reports) within 30 days of receipt of sample for at end of monitorine ceriod in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date:7/1/2011-60/30/2015 8/16/2016 (Date) Last Revised 7/13/11 Page 3 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14O266 FACILITY NAME: Thomas Concrete of Carolina -Morrisville Plant PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375� Lab # OPTIONAL INFO: June Monitoring Event Part A: Stormwater Monitoring Requirements MONITORING FORM pit SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919) 460-5317 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA []Trout ®Other Outfall No. Date Sample Collected {mo/dd/yr OR NO FLOW)i pH (Standard Units) TSS {mg/L) Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling - - 6-9 300 ' 001 6/28/2016 7.24 3.79 120 1.25 n NA•-- 002 6/28/2016 11.33 24.2 120 1.25 y j18 003 6/28/2016 11.46 205 120 1.25 y 18 ED I ' Il3F� Ul-N I HAL FILES w ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/yr) pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total n Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 6-9 is HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? R YES ❑ NO HAVE YOU CONTACTED THE REGION? YES [:]NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receiot of sample for at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (SignaflVe of Permittee) V PermTDate: 7/1/2011-60/30/2015 7/13/2016 (Date) Last Revised 7/13/11 Page 2 of 2 Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit: http:Hh2o.enr.state.ne.us/su/Forms�Documents.htm#miscforms Permit No.: N/C/ I_I_I_/_I_I / or Certificate of Coverage No.: NICIG/_ll_4l_01_21`_� � Facility Name: Thomas Concrete of Carolina- Morrisville Plant County: Wake Phone No. (919) 4 6 0 - 3 517 Inspector: Kevin Kelt Date of Inspection: 6 / 2 8 / 2 016 Time of Inspection: 1530 Total Event Precipitation (inches): 1.25" Was this a Representative Storm Event? (See information below) ® Yes ❑ No Please check your permit to verify if Qualitative Monitoring must be performed during a representative storm event (requirements vary). A "Representative Storm Event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) ,JUL 19 2016 I. Outfall Description: CENTRAL FILES DWR ECTION Outfall No. 01 Structure (pipe, ditch, etc.) _ Pipe Receiving Stream: Unnamed tributary to Crabtree Creek Describe the industrial activities that occur within the outfall drainage area: Bulk Storage of raw materials (cement,aggregates, chemical admixtures) and petroleum Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: clear 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinctive odor Page 1 of 2 SWU-242-112608 J+ f -4. Clarity: Choose the number which best describes the clarity of the discharge, where I is clear and 5 is very cloudy: O 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where I is no solids and 5 is the surface covered with floating solids: 01 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: lO 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution. List and describe pH (field -measured): 7.24 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition maybe indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 S W U-242-1 12608 Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit: h :/lh2o.enr.state.nc.us/su/Forms Documents.htm#miseforms Permit No.: N/CI I_I_hCvi l I I I or Certificate of Coverage No.: N/C/G/ 1I 4l0l_21_9_ I Facility Name: Thomas oncrete of Carolina- Morrislle Pla_nt County: wake Phone No. (919) 4 6 0 - 3 517 Inspector: Kevin Kelt Date of Inspection: 6/28/2016 Time of Inspection: 1520 Total Event Precipitation (inches); 1 . 2 5 " Was this a Representative Storm Event? (See information below) ® Yes ❑ No Please check your permit to verify if Qualitative Monitoring must be performed during a representative storm event (requirements vary). A "Representative Storm Event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. By this signature, I certify that this report is accurate and complete to the best of my knowledge: law, (Signature of Permittee or Designee) 1. Outfall Description: Outfall No. 02 Structure (pipe, ditch, etc.) Pipe Receiving Stream: Unnamed tributary to Crabtree Creek Describe the industrial activities that occur within the outfall drainage area: Bulk Storage of raw materials (cement,aggregates, chemical admixtures) and petroleum 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: clear, light yellow tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinctive odor Page 1 of 2 11 5 WU-242-112608 4. Clarity: Choose the number which best describes the clarity of the discharge, where I is clear and 5 is very cloudy: O 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where I is no solids and 5 is the surface covered with floating solids: O2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: lO 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes N@ 8. Is there an oil sheen in the stormwater discharge? Yes Q 9. Is there evidence of erosion or deposition at the outfall? 'e No 10. Other Obvious Indicators of Storm water Pollution: List and describe pH (field measured) : 11.33 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 bf 2 5 WU-242- l 12608 Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit: bu://h2o.enr.state.nc.ustsu/Forms Documents. htm#miscforms Permit No.: NICI_I_I_IJI or Certificate of Coverage No.: NICIGI_11_41_01�21_Cy Facility Name: Thomas Concrete of Carolina- Morrisville Plant County: Wake Phone No. (919) 4 6 0 - 3 517 Inspector: Kevin Kelt Date of Inspection: 6 / 2 8 / 2 016 Time of Inspection: 1530 Total Event Precipitation (inches): 1.25" Was this a Representative Storm Event? (See information below) ® Yes ❑ No Please check your permit to verify if Qualitative Monitoring must be performed during a representative storm event (requirements vary). A "Representative Storm Event' is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. By this signature, I certify that this report is accurate and complete to the best of my knowledge: RECEIVED (Signature ofPermittee or Di ignee) JUL 19 20% I. Outfall Description: CENTRAL FILES )WR S-ECTiON Outfall No. 01 Structure (pipe, ditch, etc.) Pipe Receiving Stream: Unnamed tributary to Crabtree Creek Describe the industrial activities that occur within the outfall drainage area: Bulk Storage of raw materials (cemen.t,aggregates, chemical admixtures) and petroleum 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: clear 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinctive odor Page 1 of 2 SWU-242-112608 E 4. Clarity: Choose the number which best describes the clarity of the discharge, where I is clear and 5 is very cloudy: OI 2 3 4 5 5. Floating Solids. Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: OI 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: (D 2 3 4 5 7. is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe pH (field -measured): 7.24 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242-112608 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 FACILITY NAME: Thomas Concrete of Carolina -Morrisville Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375Y Lab # OPTIONAL INFO: May Monitoring Event Part A: Stormwater Monitoring Requirements RECEIVED SAMPLE COLLECTION YEAR: 2016 JUN 14 Z 016- SAMPLING PERIOD: ❑ July -December ® January-JutWENTRAL FILE COUNTY Wake DWR SECTION PHONE NO. (919) 460-5317 ! f ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQWO PNA [—]Trot'"®Other_ Outfall No. Date Sample Collected [mo/dd/yr OR NO FLOW)1 PH (Standard Units) TSS (mg/L) Event Duration (minutes) Total a Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) ifi of'Months in Tier 2 2 Sampling - - 6-9 100 ' - - - - 001 No Discharge n NA 002 No Discharge y 17 003 No Discharge y 17 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/l. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/yr) pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rain#all (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 6-9 15 100 , - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitories period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of Fines and imprisonment for knowing violations." "JCcd92i 2Qi 6/7/2016 (Signature of Permittee) (Date) Permit Date:7/1/2011-60/30/2015 Last Revised 7/13/11 Page 3 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 SAMPLE COLLECTION YEAR: 2015 FACILITY NAME: Thomas Concrete of Carolina -Morrisville Plant SAMPLING PERIOD: ® July -December ❑ January -June PERSON COLLECTING SAMPLES Susan Bostian CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: December Monitoring Event Part A: Stormwater Monitoring Requirements COUNTY W PHONE NO. (919) 460-5317 ADD TO LISTSERVE? []YES. ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH (Standard Units) TSS (mg/L] Event Duration (minutes) Total Rainfa114 (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 - - 6-9 100 ' - - - - 001 12/17/15 6.27 5.28 60 1.25 n NA 002 12/17/15 10.31 111 60 1.25 y 12 003 12/17/15 8.61 75.3 60 1.25 y 12 RECEIVEP CEt ITRAL F.I'L S UV K .7Cv 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. ° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/l/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yrjl pH (Standard Units] TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall° (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/nj ft of Months in Tier 2 5amp{ing2 6-9 15 100 , - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receir)t of sample (or at end of monitorine period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date: 7/1/2011-60/30/2015 1/31/2016 (Date) Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG1.40266 FACILITY NAME: Thomas Concrete of Carolina -Morrisville Plant PERSON COLLECTING SAMPLES CERTIFIED LABORATORY Kevin Kelt ESC Lab # ENV 375_ Lab # OPTIONAL INFO: April Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919) 460-5317 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: [—]SA ❑HQW ❑PNA ❑Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH [Standard Units) TSS (mg/L) Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier z 2 Sampling - - 6-9 100 '3 - - - - 001 No Discharge n NA 002 No Discharge RECEINI y 16 003 No Discharge y 16 MAY CENTRAL FILES L)VVK SEC I ION CENTF AL FILES 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfail here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. ° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/yr) pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfalla (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling, 6-9 15 r HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NON - l REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this OMR (including all "No Flow" & "No Discharge" reports) within 30 days of receiot of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) 5/31/2016 (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 FACILITY NAME: _Thomas Concrete of Carolina- Morrisville Plant PERSON COLLECTING SAMPLES: Kevin Kelt CERTIFIED LABORATORY: ESC Lab # ENV375_ Lab # LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLE QUARTER: []Jul -Sept ❑Ott -Dec ®Jan -March ❑April -June COUNTY: Wake PHONE NO. (_919_)460-5317 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other OPTIONAL INFO: Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater 2 (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-HEAe (mg/L) Duration (minutes) Total Flow , (gallons/day) - - - 6-93,4 30a.s 53 (15)6 - 001 No discharge 002 No dischargeIVED 003 No discharge DW 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters,10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 s Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW" "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." ,:5a4N, (Signature of Permittee) Permit Date:7/1/2010-06/30/2015 4/30/2016 (Date) Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 FACILITY NAME: Thomas Concrete of Carolina -Morrisville Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375� Lab # OPTIONAL INFO: March Monitoring Event Part A: Stormwater Monitoring Requirements RECEIVED SAMPLE COLLECTION YEAR: 2016 APR I I zU16 SAMPLING PERIOD: ❑ July -December ® Januarpfit TRAL FILES COUNTY Wake DWR SECT10N PHONE NO. (919) 460-5317 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other Outfall Na. Date Sample Collected (mo/dd/yr OR NO FLOW)t pH (Standard Units) TSS (mg/L) Event Duration (minutes) Total Rainfall 4 (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Samplingz - - 6-92 1002,3 - - - - 001 No Discharge n NA 002 No Discharge y 15 003 No Discharge y 15 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/l. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)l pH (Standard Units ) TPH using method 1664A 5GT-HEM m /L { g ) Total Suspended Solids m L ( g/) Event Duration minutes (minutes) Total a Rainfall n (i) New Motor Oil Usage al month (g / ) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sam lin P g2 6-9 15 1002, - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDEN CES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of samDle (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are significant naIties for submittiPg false information, including the possibility of fines and imprisonment for knowing violations." 4/4/2016 (Signature of Permittee) Ll (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 FACILITY NAME: Thomas Concrete of Carolina -Morrisville Plant PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375� Lab # OPTIONAL INFO: February Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919) 460-5317 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)I pH {Standard Units) TSS (mg/L) Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier Z 2 Sampling - - 6-9 100 , - - - - 001 No Discharge n NA 002 No Discharge y 14 003 No Discharge y 14 r 'GENEU CENTRAL FILES ION ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I. "For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfail No. Date Sample Collected (mo/dd/yr)l pH (Standard Units) TPH using method 1664A SGT HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 6-9 15 100 • - - - - 5 • HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Qrieinal and one copv of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring, period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED. "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date:7/1/2011-60/30/2015 3/31/2016 (Date) Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO, NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 FACILITY NAME: Thomas Concrete of Carolina -Morrisville Plant PERSON COLLECTING SAMPLES Susan Bostian CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: January Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919) 460-5317 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: [_]SA ❑HQW ❑PNA ❑Trout ®Other Outf all Na. Date Sample Collected (mo/dd/yr OR NO FLOW)I pH (Standard Units) TS5 (mg/L) Event urat Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier Z 2 Sampling - - 6-9 1002' - - - - 001 1/15/16 7.98 2.60 60 .5 n NA 002 1/15/16 11.53 106 60 .5 y 13 003 1/15/16 10.86 47.3 60 .5 y 13 ELV_I ENTRAL FILE otUTIUN If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/yr) pH (standard Units) TPH using method I664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 6-9 15 100 , - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one coov of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted, Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date:7/1/2011-60/30/2015 2/29/2016 (Date) Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 FACILITY NAME: Thomas Concrete of Carolina -Morrisville Plant_ PERSON COLLECTING SAMPLES Susan Bastian CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: November Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Wake PHONE NO. (919) 460-5317 ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout RECEIVED JAN 0 4 2016 CENTRAL FILES DWR SECTION ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH (Standard Units) TS5 (mg/L) Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? n (y/ ) # of Months in Tier Z 2 Sampling - - 6-9 100 ' - 001 11/09/15 6.90 4.3 60 1.25 y 11 002 11/09/15 10.03 78.8 60 1.25 y 11 003 11/09/15 8.99 19.6 60 1.25 y 11 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit, Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. IWOM-1 Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B. Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected [mo/dd/yr)' pH (standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) in Tier 2 Monthly Monitoring? [y/n) # of Months in Tier 2 Sampling ' 6-4 15 100 , - - - - - r HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that the�e are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 12/28/2015 (Signature of Permittee) (Date) Permit Date: 7/l/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 �_A STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 FACILITY NAME: Thomas Concrete of Carolina -Morrisville Plant_ PERSON COLLECTING SAMPLES Susan Bostian CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: October Monitoring Event Part A: Stormwater Monitorine Reauirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Wake PHONE NO. (919) 460-5317 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW RECEIVED JAN 0 4 2016 CENTRAL FILES ©WR SECTION ❑PNA ❑Trout ®Other, Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)t pH (Standard Units) T55 (mg/L) Event Duration (minutes) Total a Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling - - 6-9 100 ' - - - - 001 10/28/15 7.41 13.6 60 0.46 y 10 002 10/28/15 10.52 32.9 60 0.46 y 10 003 10/28/15 9.24 107 60 0.46 y 10 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. "For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. "Mo =tg+C Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)1 pH (Standard Units) TPH using method I664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Samplingz 6-9 15 100 ' - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copv of this DMR f includine all "No Flow' & "No Discharee" reports) within 30 days of receipt of sample (or at end of monitorine period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 12/28/2015 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 PROCESS WASTEWATER -- Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 SAMPLE COLLECTION YEAR: 2015 FACILITY NAME: _Thomas Concrete of Carolina- Morrisville Plant SAMPLE QUARTER: ❑Jul -Sept ®Oct -Dec []Jan -March PERSON COLLECTING SAMPLES: Susan Bastian COUNTY., Wake CERTIFIED LABORATORY:_ESC Lab # ENV375_ Lab # LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitorins Requirements PHONE NO. (_919 _) 460-5317 ADD TO LISTSERVE? DYES ®NO EMAIL.: ❑April -June cp 00 �� DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other, OPTIONAL INFO: Outfall No. Date Sample Collected (mm/dd/yrj Type of Wastewater z (VE, RM, MDj pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-HEM' (mg/Lj Duration (minutes) Total Flow (gallons/day) - - - 6-93'4 303's 53 (15)6 - - 001 No discharge E! F, 002 No discharge 003 No discharge JAN 0 4 MID AIL �jV�I GE—,, i 1 . 1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. S TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date:7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE') WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date:7/1/2010-06/30/2015 12/28/2015 (Date) Fast Revised 07/13/11 Page 2 of 2 I _=: STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 FACILITY NAME: Thomas Concrete of Carolina -Morrisville Plant_ PERSON COLLECTING SAMPLES Susan Bostian CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL iNFO: September Monitoring Event Part A: Stormwater Monitoring Reauirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ® July -December COUNTY Wake PHONE NO. (919) 460-5317 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑ January -June ❑PNA [—]Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH (Standard Units) TSS (mg/L} Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier z 2 Sampling - - 6-92 ,002.3 - - - - 001 9/25/15 10.4 3 45 0.875 y 9 002 9/25/15 9.3 21.4 45 0.875 y 9 003 9/25/15 9.3 20.1 45 0.875 y 9 NIOW 1 A nnm r r yMlu FILES 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge, MOM MMi rl'-ft r9pt COD Permit Date:7/1/2011-50/30/2015 Last Revised 7/13/11 Page 1 of 2 Part,+3: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month —averaged over a calendar year. QutfaEl No. Date Sample Collected (mo/dd/yrJl pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfalla (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (Y/nJ # of Months in Tier 2 2 Sampling 6-9 152 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that theraare significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 10/30/2015 (Signature of PermitteeJ (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2of2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 FACILITY NAME: _Thomas Concrete of Carolina- Morrisville Plant PERSON COLLECTING SAMPLES: Susan Bostian CERTIFIED LABORATORY: ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLE QUARTER: ®Jul -Sept []Oct -Dec ❑Jan -March COUNTY: Wake PHONE NO. (_919 _)460-5317 ADD TO LISTSERVE? OYES ®NO EMAIL: ■r" ENO• ❑April-Jy .me, DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA []Trout ®Other, OPTIONAL INFO: Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater z (VE, RM, MD} pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-NE) (mg/L Duration (minutes) Total Flow 7 (gallons/day) - - - 6-93'4 303.s 53 (15)6 - - 001 No discharge '* , 002 No discharge 003 No discharge ►I niS CENTRAI. FILES 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. s TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 a Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, bt` instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. if the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violatinns_" (Signature of Permittee) Permit Date:7/1/2010-06/30/2015 10/30/2015 (Date) Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM FILE COPY CERTIFICATE OF COVERAGE NO. NCG140266 GENERAL PERMIT NO. NCG140000 FACILITY NAME: Thomas Concrete of Carolina -Morrisville Plant_ PERSON COLLECTING SAMPLES Susan Bostian CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: July Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ® July -December ❑ January -June SEP 17 2015 COUNTY Wake CENTRAL FILETS PHONE NO. (919) 460-5317 DWR SECTION ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: []SA ❑HQW ❑PNA ❑Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH [Standard Units) TSS (mg/L) Event Duration (minutes) Total a Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling - - 6-9 100 , - - - - 001 7/23/15 8.38 29.9 1.375" y 7 002 No Discharge y 7 003 7/23/15 9.33 196 1.375" y 7 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. ° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 -Pet B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr�l pH (Standard Units} TPH using method 1664A SGT--HEM {mg/L} Total Suspended Solids {mg/L} Event Duration {minutes} Total a Rainfall {in} New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? {y/n} # of Months in Tier 2 z Sampling 6-9 15 100 , - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑.NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one conv of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of samole for at end of monitoring period in case of "No Flow"} to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete, am aware that there significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 9/9/2015 (Signature of Permittee) (Date) Permit Hate: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 RECEIVED CERTIFICATE OF COVERAGE NO. NCG14O266 SAMPLE COLLECTION YEAR: 2015 SEP 17 2015 FACILITY NAME: Thomas Concrete of Carolina -Morrisville Plant SAMPLING PERIOD: ® July -December ❑ January -June PERSON COLLECTING SAMPLES Susan Bostian COUNTY Wake CENTRAL FILES CERTIFIED LABORATORY ESC Lab # ENV 375_ PHONE NO. (919) 460-5317 DWR SECTION Lab # ADD TO LISTSERVE? []YES ®NO EMAIL: OPTIONAL INFO: August Monitoring Event DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA [-]Trout ®Other Part A: Stormwater Monitoring Requirements Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH [Standard Units} TSS (mg/L) Event Duration (minutes] Total a Rainfall in (' } In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier z 2 Sampling - - 6-9 100 ' - - - - 001 No Discharge y 8 002 No Discharge y 8 003 No Discharge y 8 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. * Outfall No. Date Sample Collected (mo/dd/yr)1 pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 SamplingZ 6-9 15 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES [:]NON REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one coov of this DMR f includine all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware that thwe ar�gnificant en�; or submitting false information, including the possibility of fines and imprisonment for knowing violations." 9/9/201S (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit: Permit No.: NICI_l_I l 1_I_l / or Certificate of Coverage No. Facility Name: Thomas Concrete of Carolina- Morr County: Wake Phone No. (919) 4 6 0 - 3 517 Inspector: Kevin Kelt Date of Inspection: 0 7 - 2 3 -15 Time of Inspection: 1145 Total Event Precipitation (inches): 1.375" 11 4/ Ol 2t`_� 7 _e Plant Was this a Representative Storm Event? (See information below) 0 Yes ❑ No Please check your permit to verify if Qualitative Monitoring must be performed during a representative storm event (requirements vary). A "Representative Storm Event" is a storm event that measures greater than 0,1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. By this signature, I certify that this report is accurate and complete to the best of my knowledge: C. (Signature of Permittee or Designee) 1. Outfall Description: Outfall No. 03 Structure (pipe, ditch, etc.) Pipe Receiving Stream: Unnamed tributary to Crabtree Creek Describe the industrial activities that occur within the outfall drainage area: Bulk Storage of raw materials (cement,aggregates, chemical admixtures) and petroleum 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: clear 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinctive odor Page 1 of S W U-242- l 12608 4. Clarity: Choose the number which best describes the clarity of the discharge, where I is clear and 5 is very cloudy: l `.J 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 O 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: Ol 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes N� 8. Is there an oil sheen in the stormwater discharge? Yes 9. Is there evidence of erosion or deposition at the outfall? Yes Vol 10. Other Obvious Indicators of Stormwater Pollution: List and describe pH ( field measured) : 8.38 some plant matter in water. Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242-1 12608 Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit: hip://h2o.enr_state.nc.us/su/Forms Documents. htm#m isc forms Permit No.: NICI_I l�l hl I I or Certificate of Coverage No.: NIC/Gl_1/ 4I 0I_2I_6I_� Facility Name: Thomas Concrete of Carolina- Morrisville Plant County: Wake Phone No. (919) 4 6 0 - 3 517 Inspector: Kevin Kelt Date of Inspection. 0 7 / 2 3 / 15 Time of Inspection: 1140 Total Event Precipitation (inches): 1. 375" Was this a Representative Storm Event? (See information below) 0 Yes ❑ No Please check your permit to verify if Qualitative Monitoring must be performed during a representative storm event (requirements vary). A "Representative Storm Event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. By this signature, 1 certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or 1. Outfall Description: Outfall No. 01 Structure (pipe, ditch, etc.) Pipe Receiving Stream: Unnamed tributary to Crabtree Creek Describe the industrial activities that occur within the outfall drainage area: Bulk Storage of raw materials (cement,aggregates, chemical admixtures) and petroleum 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: light yellow 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinctive odor Page 1 of 2 S WU-242-1 12608 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: Ol 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: O 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: lO 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes 1Va 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe pH (field -measured) : 9.33 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242-112608 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 SAMPLE COLLECTION YEAR: 2015 FACILITY NAME: Thomas Concrete of Carolina -Morrisville Plant SAMPLING PERIOD: ❑ July -December ® January -June PERSON COLLECTING SAMPLES Susan Bostian COUNTY Wake CERTIFIED LABORATORY ESC Lab # ENV 375 PHONE NO. (919) 460-5317 Lab # ADD TO LISTSERVE? []YES ®NO EMAIL: OPTIONAL INFO: May Monitoring Event DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other, Part A: Stormwater Monitoring Requirements Outfall No. Date Sample Collected (mo/dd/yr OR NO FL0W)1 PH (Standard Units) TSS (mg/L) Event Duration (minutes) Total Rainfall a (in) In Tier 2 Monthly Monitoring? (vin ) # of Months in Tier 2 Sampling2 6-91 1001.3 - - - - 001 No Discharge y 5 002 No Discharge y 5 003 No Discharge y 5 lI ]� INFp R SEA ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z if a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. "For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)' pH (Standard Units) TPH using method 16S4ASGT--HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall a (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling' 6-9' 15' 1001,3 HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitorine Deriod in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." C, (Signature of Permittee) 6/8/2015 (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 FACILITY NAME: _Thomas Concrete of Carolina- Morrisville Plant PERSON COLLECTING SAMPLES: Susan Bostian CERTIFIED LABORATORY: ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 201S SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ®Jan -March ❑April -June COUNTY: Wake PHONE NO. (_919 _) 460-5317 ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other, OPTIONAL INFO: Outfall No. Date Sample x Collected (mm/dd/yr) Type of Wastewater z {VE, RM, MD) pH {standard] Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A 6 SGT HEM {mg/L) Duration (minutes) Total Flow , {gallons/day] - - - 6-93.4 303,5 53 (15)6 - - 001 No discharge 002 No discharge 003 No discharge 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain d`,-mer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 3/31/2015 (Signature of Permittee) (Date) Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 RECEIVED CERTIFICATE OF COVERAGE NO. NCG140266 FACILITY NAME: _Thomas Concrete of Carolina- Morrisville Plant PERSON COLLECTING SAMPLES: Susan Bostian CERTIFIED LABORATORY: ESC Lab ## ENV375_ Lab #t LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements AUG 0 7 ?0i5 SAMPLE COLLECTION YEAR: 2015 CENTRAL FILES SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ❑Jan -Marc% FtNTR-94%e COUNTY: Wake PHONE NO. (_919 _) 460-5317 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: []SA ❑HQW ❑PNA []Trout ®Other, OPTIONAL INFO: Outfall No. Date Sample Collected 1 (mm/dd/yr) Type of Wastewater (VE, RM, MD)Z pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A 5GT-HEM6 (mg/L) Duration (minutes) Total Flow (gallons/day)' 6-93,4 303,5 53 (15)6 - 001 No discharge 002 No discharge 003 No discharge 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 31f an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VIVA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can'be measured continuously or calculated. flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 028 .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWCL and the DWQ Regional Office may require an annual flow report on a case-6y-case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR SAT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: _ rDivision of Water Quality ` '%, ttn: DWQ Central Files M1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST 51GN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel property gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations_" (Signature of Permittee) Permit Date:7/1/2010-06/30/2015 7/31/2015 (Date) Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFACC (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 FACILITY NAME: Thomas Concrete of Carolina -Morrisville Plant_ PERSON COLLECTING SAMPLES Susan Bostian CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: June Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919) 460-5317 ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: []SA ❑HQW ❑PNA RECEIVED JUN 17 2015 CENTRAL. FILES DWR SECTION ❑Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' PH (Standard Units] TSS (mg/L) Event Duration (minutes) Total Rainfall' {in] In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling' - - 6-9z 1002" - - _ - 001 6/2/2015 7.05 7.2 30 0.15 y 6 002 6/2/2015 8.75 42.8 30 0.15 y 6 003 6/2/2015 8.95 61.6 30 0.15 y 6 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. a TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. ° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 M" �t C�3 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)l pH (Standard Units) TPH using method 166�4A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall a (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling' 6-9 15' 1002,3 HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one copv of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow') to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am awareJ�at there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." C, (Signature of Permittee) Permit Date:7/1/2011-60/30/2015 6/10/2015 (Date) Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 FACILITY NAME: . Thomas Concrete of Carolina -Morrisville Plant PERSON COLLECTING SAMPLES Susan Bostian CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: January Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919) 460-5317 ADD TO LISTSERVE? OYES ®NO EMAIL: DISCHARGING TO CLASS: [_]SA ❑HQW ❑PNA ❑Trout ®Other Outfall No. Date Sample Collected ( mo/dd/yr OR NO FLOW)1 PH (Standard Units) TSS (mg/L) Event Duration (minutes) Total A Rainfall (in) in Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling - - 6-9 100 ' - - - - 001 No Discharge y 2 002 No Discharge y 2 003 No Discharge y 2 ;ENTRAL FILES 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or Outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. C.2 MNC Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. • Outfall No. Date Sample Collected (mo/dd/yr) pH (Standard units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) i# of Months in Tier 2 Sampling2 6-9 15 100 , - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR(including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are gnifica�t- enalties for u> mitting false information, including the possibility of fines and imprisonment for knowing violations. (Signature of Permittee) 3/31/2015 (Date) Permit Date:7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE N0. NCG140266 FACILITY NAME: Thomas Concrete of Carolina -Morrisville Plant PERSON COLLECTING SAMPLES Susan Bostian CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: February Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919) 460-5317 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: []SA ❑HQW ❑PNA ❑Trout ®Other, Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH [Standard Units} TSS (mg/L) Event Duration (minutes} Total 4 Rainfall (in} In Tier 2 Monthly � Monitoring. (y/n) # of Months in Tier 2 2 Sampling - - 6-9 100 , - - - - 001 No Discharge y 3 002 No Discharge y 3 003 No Discharge y 3 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. • Outfall No. Date Sample Collected (mo/dd/yrjl pH (Standard Units) TPH using method 1664A SGT-HEM {mg/I.) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfalla (in) New Motor Oil Usage (gal/month) Monthly Monitoring? [Y/n) q of Months in Tier 2 2 Sampling 6-9 15 100 , - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including_ all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that the&e are sign ficant p, hies for submittinpnfalse information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) 3/31/2015 (Date) Permit Date:7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 FACILITY NAME: Thomas Concrete of Carolina -Morrisville Plant PERSON COLLECTING SAMPLES Susan Bostian CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: March Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919) 460-5317 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other, Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH (Standard Units) TSS (mg/L) Event on Duration ti (minutes] Total 4 ana i R llf (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier z 2 Sampling - - 6-9 100 ' - - - - 001 03/05/15 6.95 16 45 0.5 y 4 002 03/05/15 11.20 110 45 0.5 y 4 003 03/05/15 8.40 130 45 0.5 y 4 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. • outfall No. Date Sample Collected (ma/dd/yr}' pH (Standard Units) TPH using method T 1664A SGNEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? {y/n' # of Months in Tier 2 Z Sampling 6-9 15 100 , - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES []NON REGIONAL OFFICE CONTACT NAME: Mail Original and one copv of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that the si nificant alties for submit 'ng false information, including the possibility of fines and imprisonment for knowing violations. 3/31/2015 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit: http://l12o.enr.state.nc.us/su/Forms_ Documents.htm#miscforms Permit No.: NICI I hl I l�l�l or Certificate of Coverage No.: N/C/G/-1/-4/_0/-4__i Facility Name: Thomas Concrete of Carolina— Morrisville Plant County: Wake Phone No. (919) 4 60— 3517 Inspector: Susan Bostian Date of Inspection: 0 3 / 0 5 / 15 Time of Inspection: 1545 Total Event Precipitation (inches): 0.5 Was this a Representative Storm Event? (See information below) ® Yes ❑ No Please check your permit to verify if Qualitative Monitoring must be performed during a representative storm event (requirements vary). A "Representative Storm Event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) 1. Outfali Description: OutfalI No. 01 Structure (pipe. ditch, etc.) Pipe Receiving Stream: Unnamed tributary to Crabtree Creek Describe the industrial activities that occur within the outfali drainage area: Bulk Storage of raw materials (cement,aggregates, chemical admixtures) and petroleum 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light. medium, dark) as descriptors: clear 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinctive odor Page 1 of 2 S W U-242-112608 4. Clarity: Choose the number which best describes the clarity of the discharge, where I is clear and 5 is very cloudy: 0 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of Floating solids in the stormwater discharge, where I is no solids and 5 is the surface covered with floating solids: OI 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge; where I is no solids and 5 is extremely muddy: O 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes �o 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe PH (field -measured): 6.95 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition maybe indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 0 W U-Z42-1 12608 Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit: hitp://h2o.enr.state.nc.us/su/Fornis Documents.htm#miscforms Permit No.: NICI—I_I_I_l_I_I_I or Certificate of Coverage No.: NICIGI 11_41_01���_ 1 Facilitv Name: Thomas Concrete of Carolina— Morrisville Plant_ County: Wake Phone No. (919) 460--3517 Inspector: Susan Bostian Date of Inspection: 0 3 / 0 5 / 15 Time of Inspection: 1545 Total Event Precipitation (inches): 0.5 Was this a Representative Storm Event? (See information below) 0 Yes ❑ No Please check your permit to verify if Qualitative Monitoring must be performed during a representative storm event (requirements vary). A "Representative Storm Event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Perinittee or Designee) I. Outfall Desci-iption: Outfall No. 02 Structure (pipe, ditch, etc.) _ Pipe Receiving Stream: Unnamed tributary to Crabtree Creek Describe the industrial activities that occur within the outfall drainage area: Bulk Storage of raw materials (cement,aggregates, chemical admixtures) and petroleum 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: slight tan tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinctive odor Page 1 of 2 S W U-242-112608 4. Clarity: Choose the number which best describes the clarity of the discharge, where I is clear and 5 is very cloudy: 1 2O 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where i is no solids and 5 is the surface covered with floating solids: lO 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where I is no solids and 5 is extremely muddy: 1 02 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe PH (field -measured): 11.20 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242-112608 Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit: htt ://h2o.enr.slate.nc.us/su/Forms Doc uments.htm#miscforms Permit No.: N/C/_I_I_I_I_I /_I or Certificate of Coverage No.: NICIGI_ll_4l0/_ 2 6 7 Fac i I ity N ame: Thomas Concrete of Carolina— Morrisville Pla_nt County: • Wake Phone No. (919) 460-3517 Inspector: Susan Bostian Date of Inspection: 0 3 — 0 5 —15 Time of Inspection: 1545 Total Event Precipitation (inches): 0.5 Was this a Representative Storm Event? (See information below) 0 Yes ❑ No Please check your permit to verify if Qualitative Monitoring must be performed during a representative storm event (requirements vary). A "Representative Storm Event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single stone event may contain up to 10 consecutive hours of no precipitation. By this signature, 1 certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) 1. Outfall Description: Outfall No. 03 Structure (pipe, ditch, etc.) Pipe Receiving Stream: Unnamed tributary to Crabtree Creek Describe the industrial activities that occur within the outfall drainage area: Bulk Storage of raw materials (cement,aggregates, chemical admixtures) and petroleum 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Liqht Brown 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinctive odor Pagel of 2 S WU-242-1 126os 4. Clarity: Choose the number which best describes the clarity of the discharge; where I is clear and 5 is very cloudy: 1 0 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where I is no solids and 5 is the surface covered with floating solids: 1O 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where I is no solids and 5 is extremely muddy: 1 2O 3 4 5 7. Is there any foam in the stormwater discharge? Yes N� 8. Is there an oil sheen in the stormwater discharge? Yes 9. Is there evidence of erosion or deposition at the outfall? 'e No 10. Other Obvious Indicators of Stormwater Pollution: List and describe pH (field measured) : 8.40 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242-1 12608 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE N0. NCG14O266 FACILITY NAME: _Thomas Concrete of Carolina- Morrisville Plant PERSON COLLECTING SAMPLES: Susan Bostian CERTIFIED LABORATORY:_ESC Lab i# ENV375 Lab ## LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2014 SAMPLE QUARTER: ❑Jul -Sept ®Oct -Dec ❑Jan -March COUNTY: Wake PHONE NO. (_919 _)460-5317 ADD TO LISTSERVE7 OYES ®NO EMAIL: ❑April -June DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout ❑Other OPTIONAL INFO: Outfail No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater (VE, RM, MD)' pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-HEM" (mg/L) Duration (minutes) Total Flow � (gallons/day) ' - 6-93,4 303.s 53 (15)6 - - 001 No discharge RECEIVED 002 No discharge 003 No discharge JAN 0 , M 1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge' here. Please make sure to mark the sample quarter above. a Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 W 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW" "NO DISCHARGE" WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: r-buz ..,Division of Water Quality at:.' _"Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 507-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing (Signature of Permittee) Permit Date: 7/1/2010-06/30/2015 12/29/2014 ( Date) Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 FACILITY NAME: Thomas Concrete of Carolina -Morrisville Plant_ PERSON COLLECTING SAMPLES Susan Bostian CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2014 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Wake PHONE NO. (919) 460-5317 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA []Trout I� ❑Other Outfall No. Date Sample Collected {mo /dd/yr OR NO FLOW)' PH {Standard Units} TSS [mg/L} Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier z 2 Sampling - - 6-9 100 .3 - - - - 001 12/15/14 7.06 1.4 60 0.6 y 1 002 12/15/14 9.97 85 60 0.6 y 1 003 12/15/14 9.43 230 60 0.6 y 1 n 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. "For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. .fCF V ED 09 2015 FRAL FILES i SECTION Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall r s No. Date Sample Collected (mo/dd/yr)1 pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling 6-9 15 1002, - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one conv of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample for at end of monitorinp- period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and ail attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that the are significant (Signature of Permittee) Permit Date:7/1/2011-60/30/2015 for submitting false information, including the possibility of fines and imprisonment for knowing violations." � A 12/29/2014 (Date) Last Revised 7/13/11 Page 2 of 2 Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit: httu://h2o.enr.state.nc.us/su/Forms Documents. htm#mi_scforms Permit No.: NICI_I l I I I I I or Certificate of Coverage No.: NICIGI_11_41_ 01 2l 9_� Facility Name: Tf om—as Concrete of Carolina- Morrisville Plant County: Wake Phone No. (919) 4 6 0 - 3 517 Inspector: Susan Bostian Date of Inspection: 12 -15 -14 Time of Inspection: 1343 Total Event Precipitation (inches): 0.6 Was this a Representative Storm Event? (See information below) ® Yes ❑ No Please check your permit to verify if Qualitative Monitoring must be performed during a representative storm event (requirements vary). A "Representative Storm Event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. By this signature, I certify that this report is accurate and complete to the best of my knowledge: C. Goa (Signature of Permittee or Designee) 1. Outfall Description: Outfall No. 03 Structure (pipe, ditch, etc.) Pipe Receiving Stream: _ Unnamed tributary to Crabtree Creek Describe the industrial activities that occur within the outfall drainage area: Bulk Storage of raw materials (cement,aggregates, chemical admixtures) and petroleum 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Light Brown 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinctive odor Page 1 of 2 S WU-242-112608 4. Clarity: Choose the number which best describes the clarity of the discharge, where I is clear and 5 is very cloudy: 2O 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 0 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where I is no solids and 5 is extremely muddy: 1 2O 3 4 5 7. Is there any foam in the stormwater discharge? Yes N� 8. Is there an oil sheen in the stormwater discharge? Yes 9. Is there evidence of erosion or deposition at the outfall? 'e No 10. Other Obvious Indicators of Stormwater Pollution: List and describe pH (field measured) : 9.43 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. T Page 2 of 2 i SWU-242-1 12609 CERTIFICATE OF COVERAGE NO. NCG200342 FACILITY NAME C&C Scrap Iron & Metal_ PERSON COLLECTING SAMPLES Shan Conner CERTIFIED LABORATORY TestAmerica COUNTY Clevela PHONE NO. (_704_)_739-8053 Part A: Specific Monitoring Requirements STORMWATER DISCHARGE OUTFALL (SDO) GENERAL PERMIT NO. NC6200000 DISCHARGE MONITORING REPORT(DMR) Lab # _ 387 Lab # Mail original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 SAMPLES COLLECTED DURING CALENDAR YEAR: 2014 (This monitoring report is ducat the Division later than 30 days from the date the facility receives the sampling results from the laboratorpr)Olw Outfall No. Date Sample Collected mo/dd/ yr Total Rainfall inches 00530 00340 00556 00400 01113 01119 00980 01114 01094 Total Suspended Solids m /I Chemical Oxygen Demand m /I Oil & Grease m /I pH Sm. Cadmium' mg/1 Copper' m /I Iron' m /I Lead2 m g/I Zinc' m /I Benchmark' - - 100 120 30 6.0 -- 9.0 0.001 0.007 N/A 0.03 0.067 001 11/17/14 0.63 4180 1350 21.0 8.21 0.034 6.78 150 3.13 8.40 002 11/17/14 0.63 4610 970 11.7 8.42 0.042 8.24 126 3.22 10.0 ' If a value is in excess of the benchmark, or outside the benchmark range (for phi), you must implement the Tier l or Tier 2 responses in the General Permit. 2 Total recoverable. Oidj, complete Part B if Nris frrcilitp uses more Ntarr 55 gallmis of crew motor oil per moiah. Part B: Vehicle Maintenance Activity Monitorinp_ Requirements Outfall No. Date Sample Collected mo/dd/ r Total Rainfall inches New Motor Oil Usage al/month 00530 00400 00556 Total Suspended Solids m /I pH s.u. Oil & Crease m /I Benchmark] - - - 100 6.0 — 9.0 30 RECEIVED JAN 0 S Y' CENTRAL FILES DWR SECTION YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify. under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the systeni, or those persons directly responsible 11or gathering the information, the information submitted is, to the best of my knowledge and belief. true, accurate, and complete. lam aware that there arc significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature f Permittee) (Date) - NCG200000 DMR Form SWU-256 Page 1 of I STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 IRECEIVED CERTIFICATE OF COVERAGE NO. NCGI4 0 4 ` 5 FACILITY NAME: _446tic ?AC& cac&I?F LL+[+ PERSON COLLECTING SAMPLES P. CERTIFIED LABORATORY Lab if Jkl Lab # OPTIONAL INFO: Part A: Stormwater Monitorine Reauirements SAMPLE COLLECTION YEAR: SAMPLING PERIOD: July -December ❑ January -June CEN COUNTY A DW PHONE NO. ( W7 ADD TO L15T5ERVE? ❑YES KNO EMAIL: DISCHARGING TO CLASS: []SA ❑HQW ❑PNA []Trout ❑Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)t pH (Standard Units) T55 (mg/L) Event Duration (minutes) Total a Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 - - 6-9z 1002,3 - _ - 1 20 .63 i { ' If "NO FLOW" or "NO DISCHARGE, Fnter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark,values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. N2020a TRAL FILES R SECTION I Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month -- averaged over•a calendar year. Outfall No. Date Sample Collected {mo/dd/yr}1 pH {standard Units} TPH using method 1664A SGT-HEM {mg/L} Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? {y/n) # of Months in Tier 2 2 Sampling 6-92 Ise 1002,3 - - - i HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES []NOR HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Original and one copv of this DMR (includins all "No Flow" & "No Discharge" reoortsl within 30 days of receiot of samole for at end of monitorine ueriod in case of "No Flaw") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those per s directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am awa th t there are 4niflicant penalties for suhmitting false information, including the possibility of fines and imprisonment for knowing violations." (Sig Lure f Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 RECEIVED ED NOV 0 7 2014 CENTRAL, FILES DWR SECTION PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 FACILITY NAME: _Thomas Concrete of Carolina- Morrisville Plant PERSON COLLECTING SAMPLES: Susan aostlan CERTIFIED LARORATORY:_ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES []NO Part A; Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: _2014 SAMPLE QUARTER: ®Jul -Sept ❑Oct -Dec QJan-March COUNTY:- Wake PHONE NO. L919�J 460-5317 ADD TO LISTSERVE? AYES ®NO EMAIL: DISCHARGING TO CLASS: ®SA ❑HQW [jPNA []Trout []Other OPTIONAL INFO: QApril-June Outfall No, Date Sample Collected` (mm/dd/yr) Type of Wastewater IVE, RM, MD) PH (standard) Total Suspended Solids (mg/L) Settleable Solids (mt/L) TPH using method 1664A SGT-HEM' (mg/L Discharge Duration (minutes) Total Flow 7 (gallons/day) 6-9"' 3W-' 5' 115), 001 No discharge 002 No discharge 003 No discharge ' If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 'if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. `pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saitwaters. s TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 e Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VIVA areas. TPH does not have a limit for wastewater, but instead Is subject to benchmarks and provisions of Part IV, Section A, Including the Tiered Response Action. ' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall beset to 50%of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE"LWITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OE "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807.6379 Y0U MUST S1GN TN1S CERTiFICATION_FORANY fNFORMA7iON REPORTED; "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am away at there are signl nt penaltiebmitting false information, including the possibility of fines and Imprisonment for knowing tion."^J E r 11/4/2014 (Signature of Permittee) (Date) Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 T RECEIVED 014 Stormwater Discharge Outfall (SDO) CENTRAL FILES Qualitative Monitoring Report DWQIBOG For guidance on filling out this form, please visit: http://h2o.enr.state.nc.ustsu/Forms Documents.htm#miscforms Permit No.: N/C/_I 1 1 I I l_I or Certificate vcate of Coverage No.:' N/C/G/ 1l 4I_ 0I Facility Name: Thomas Concrete of Carolina— Morrisille Plant County: Wa ke Phone No. (919) 4 6 0 — 3 517 Inspector: Susan Sostian Date of Inspection: 0 4 / 3 0 / 14 Time of Inspection: 1435 Total Event Precipitation (inches): 1.12 Was this a Representative Storm Event? (See information below) ® Yes ❑ No Please check your permit to verify if Qualitative Monitoring must be performed during a representative storm event (requirements vary). A "Representative Storm Event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0. i inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) i. Outfall Description: Outfall No. 01 Structure (pipe, ditch, etc.) Pipe Receiving Stream: Unnamed tributary to Crabtree Creek Describe the industrial activities that occur within the outfall drainage area: Bulk Storage of raw materials (cement,ag2regates, chemical admixtures) and petroleum 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: light yellow orange/light tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinctive odor SWU-242-112608 Pagel of 2 i 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 O 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: O 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where I is no solids and 5 is extremely muddy: I O 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes i�lo 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious indicators of Stormwater Pollution: List and describe pH (field -measured) : 7.05 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition maybe indicative of pollutant exposure. These conditions warrant further investigation. SWU-242-112608 Page 2 of 2 Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit: http://h2o.enr.state.nc.us/su/Forms Documents.htm#miscforms Permit No.: NICI_I I_I l_I l_I or Certificate of Coverage No.: N/C/G/ 1/_`l/_ 0/�_ 7_ 3 Facility Name: Thomas Concrete of Carolina— Morrisville Plan_t County: Wa ke Phone No. (9 19) 4 6 0 — 3 517 Inspector: Susan Bostian Date of Inspection: 0 4 / 3 0 / 14 Time of Inspection: 1440 Total Event Precipitation (inches): 1.12 Was this a Representative Storm Event? (See information below) ® Yes ❑ No Please check your permit to verify if Qualitative Monitoring must be performed during a representative storm event (req ui rements; vary). A "Representative Storm Event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) I. Outfall Description: Outfall No, 02 Structure (pipe, ditch, etc.) Pipe Receiving Stream: Unnamed tributary to Crabtree -Creek Describe the industrial activities that occur within the outfall drainage area: Bulk Storage of raw materials (cement,aggregates, chemical admixtures) and petroleum 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: very clear 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinctive odor Page I of 2 SWU-242-112668 4. Clarity: Choose the number which best describes the clarity of the discharge, where t is clear and 5 is very cloudy: O 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where I is no solids and 5 is the surface covered with floating solids: O2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: O 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe PH (field -measured): 11.63 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosionldeposition maybe indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242-112608 Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit: http://h2o.enr.state.nc.us/su/Forms Documents. htm#miscforms Permit No.: N/C/ / l_I / l_l_I or Certificate of Coverage No.: N/C/G/ 1/_4/�'_ 2 §� I Facility Name: Thomas Concrete of Carolina- Morrisville Pla_nt County: Wa ke Phone No. (919) 4 6 0 - 3 517 Inspector: Susan Bostian Date of Inspection: 0 4 - 3 0 -14 Time of inspection: 1450 Total Event Precipitation (inches): 1.12 Was this a Representative Storm Event? (See information below) ® Yes ❑ No Please check your permit to verify if Qualitative Monitoring must be performed during a representative storm event (requirements vary). A "Representative Storm Event" is a storm event that measures greater than 0.1 inches of rainfal l and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain"up to 10 consecutive hours of no precipitation. By this signature, 1 certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) 1. Outfall Description: Outfall No. 03 Structure (pipe, ditch, etc.) Pipe_ Receiving Stream: Unnamed tributary to Crabtree Creek _^ Describe the industrial activities that occur within the outfall drainage area: Bulk Storage of raw materials (cement,_aggregates,_ chemical admixtures) and petroleum 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Light Brown 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.). No distinctive odor Page I of 2 SWU-242-112608 4. Clarity: Choose the number which best describes the clarity of the discharge, where I is clear and 5 is very cloudy: 1 O 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: O2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 0 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes 9 8. Is there an oil sheen in the stormwater discharge? Yes 9. Is there evidence of erosion or deposition at the outfall? Yes 9 10. Other Obvious Indicators of Stormwater Pollution: List and describe pH ( field measured) : 6.90 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition maybe indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of SWU-242-112608 i STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 RECEIVED CERTIFICATE OF COVERAGE NO. NCG140266 SAMPLE COLLECTION YEAR: 2014 JUL 07 '1014 FACILITY NAME: Thomas Concrete of Carolina -Morrisville Plant SAMPLING PERIOD: ❑ July -December ® January -June CENTRAL E}LE$ PERSON COLLECTING SAMPLES Susan Bostlan COUNTY Wake DWO/BOG CERTIFIED LABORATORY ESC Lab # ENV 375 PHONE NO. (919) 460-5317 Lab # ADD TO LISTSERVE? ❑YES ®NO EMAIL: OPTIONAL INFO: DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout ❑Other Part A: Stormwater Monitoring Requirements Outfall No. Date Sample Collected (mo/dd/yr OR NO FL0W)1 pH (Standard Units) TSS (mg/L) Event Duration (minutes) Total A Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Z Tier 2 Sampling - - 6-9 100 ' - - - - 001 04/30/14 7.05 7.6 180 1.12 n 002 04/30/14 11.63 64 180 1.12 n 003 04/30/14 8.90 260 18D 1.12 n If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above, z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 ;r - — Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)1 PH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (Y/n) #f of Months in Tier 2 Z Sampling 6-9 2 15 300 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reportsl within 30 days of receipt of sample (or at end of monitoring Deriod in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there ie significar}E-*enalties for Wbmitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date: 7/1/2011-60/30/2015 6/27/2014 (Date) Last Revised 7/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO NCG140266 FACILITY NAME: _Thomas Concrete of Carolina- Morrisville Plant PERSON COLLECTING SAMPLES: Click here to enter text. CERTIFIED LABORATORY: ESC Lab # ENV375_ Lab # LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Reauirements SAMPLE COLLECTION YEAR: 2014 SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ®Jan -March COUNTY: Wake PHONE NO. (_919 _) 460-5317 ADD TO L€STSERVE? DYES ®NO EMAIL: ❑April -June DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout ❑Other OPTIONAL INFO: Outfall No. Date Sample Collected' (mm/dd/yr) Type of Wastewater (VE, RM, MD)2 PH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using method 1664A SGT-HEIW (mg/L) Discharge Duration (minutes) Total Flow (gallons/day)' - - - 6_93,4 303,5 53 (15)6 - - 001 No discharge M kY 0 9, 2014 4C1 � i i�hlL r'fL.CJ A rVVLil L7VV 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge' here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-9.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/l/2010-06/30/201S Last Revised 07/13/11 Page 1 of 2 5 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. ' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Energy, Mineral and Land Resources Attn: DWQ Central Files 1612 Mail Servioe Center Raleigh, North Carolina 27699-1612 (919) 807-6379 YOU MUST SIGN_THIS CERTIFIG4TION FOR ANY INFORMATION REPORTED. "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on my Inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing (Signature of Permittee) Permit Date: 7/1/2010-06/30/2015 (Date) Last Revised 07/13/11 Page 2 of 2 AM PROCESS WASTEWATER -- Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 FACILITY NAME: _Thomas Concrete of Carolina- Morrisville Plant PERSON COLLECTING SAMPLES: Susan Bastian CERTIFIED LABORATORY: ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitorina Reauirements RECEIVED JUL 0 7 ?0i4 CENTRAL FILE.` DWOlBOG SAMPLE COLLECTION YEAR: 2014 SAMPLE QUARTER: ❑Jul -Sept []Oct -Dec []Jan -March COUNTY: Wake PHONE NO. (_919 `) 460-5317 ADD TO LISTSERVE? []YES ®NO EMAIL: ®April -June DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout ❑Other OPTIONAL INFO: Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater (VE, RM, MD)' pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-HEM' (mg/L) Duration (minutes) Total Flow , (gallons/day) - 6-93,4 303,5 53 (15)6 - - 001 No discharge 002 No discharge 003 No discharge if wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge' here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwater$. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUASUMMARY INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date: 7/1/2010-06/30/2015 6/30/2014 (Date) Last Revised 07/13/11 Page 2 of 2