Loading...
HomeMy WebLinkAboutNCG140218_MONITORING INFO_20190204STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. Iv lq�J DOC TYPE ❑HISTORICAL FILE C� MONITORING REPORTS DOC DATE ❑ � �� -/ � d� WYYMMDD ANNUAL SUMMARY DISCHARGE MONITORING REPORT (DMR) —WASTEWATER SUBMIT TO CENTRAL OFFICE* General Permit No. NCG140000 Calendar Year 2018 *Report ALL WASTEWATER monitoring data on this form (include "No Flow"P'No Discharge" and -Limit Violations) from the previous calendar year to the DEQ by MARCH .1 h ear. Certificate of Coverage No. NCG14 0❑ z❑0® Facility Name: Thomas Concrete - Durham Plant County: Durham Phone Number: (919 Certified Laboratory ESC 460-5317 FE$ 0 4 Zo19 CENTRAL FILES. UAN �, r' n Total no. o� OtaEtfa�PAbnitored 1 Lab # ENV 375 Lab # Wastewater (WW) Discharge Outfall No. 001 Does this outfall discharge WW to SA waters? Yes ❑ No ❑✓ Does this outfall discharge WW to SB or PNA waters? Yes ❑ No �✓ Does this outfall discharge WW to HQW or ORW waters? Yes ❑ No {[-] If so, what is the 7Q10 flow rate? or Tidally influenced waters, 7Q10 not available ❑ Does this outfall discharge WW to Trout (Tr) designated waters? Yes ❑ No 0 Were there any limit violations in the calendar year? Yes ✓l No ❑ Outfall No. 001 Daily Flow Rate, cfs pH, SU TSS, mgll • SS., mill if applicable Non -Polar O&G (EPA Method 1664 (SGT-HEM)), mgll Effluent ' Limitations Daily Maximum HOW orORW 0 50% of 7Q10 Indlca[a NO FLOW if applicable freshwater 6.0-9.0 saltwater p- V 8 . . . Standard 34 HOW 20 HOW l ORPWao• Tr, or A 10Date Haw, Dgw, SA, S9,PNA,orany Trout 5 No Limit Samples above Benchmark subject to Tiered Responses 15 Sample Collected, moldd/yr-r �.. .� Ail`:: 117: J�At '. �z��5__�,`- Y s_' w.� _� ':ter �. 2/26118 11,28 55.70 NIA. <1.16 6/30118 NO DISCHARGE Q2 7130118 12,14 144 NIA Not Sampled 10/11/18 13.11 98.8 NIA Not Sampled Permit Date 811/2017 — 6/30/2022 Last Revised 8-22-2017 Certificate of Coverage No. NCG14 FoJ ]Q® CERTIFICATION I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." [Required by 40 CFR §122.22] . Signature XL Date= ` Mail Annual Summary Wastewater DMR to the NCDEQ Central Office: Note the address is correct - Central Files is housed in DWR (not DEM,R) N.C. Department of Environmental Quality (DEQ) Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Central Files Telephone (919) 807-6300 Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at: (919) 707-9220 Permit Date 8/1/2017 -- 6/30/2022 Last Revised 8-22-2017 .1 Water Resources Environmental Quality RECEIVE® APR 17 2018 CENTRAL FILES DWR SECTION April 6, 2018 CERTIFIED MAIL 0 7017 2680 0000 2219 3738 RETURN RECEIPT REQUESTED Brian Westfall, Plant Manager Thomas Concrete of Carolina, Inc. 2722 Angier Avenue Durham, NC 27703 Dear Mr. Westfall: ROY COOPER Governor MICHAEL S. REGAN Secretart, LINDA CULPEPPER Interim Director pl1 -eNe0IDE%TIDW� ppR 1.310b Water lesser ton Ivcc'-fy aa-i � Subject: Notice of Violation -Notice of Intent to Enforce NOV-2018-SS-0010 Stream Standard Violations Durham County On January 11, 2018, Charlotte Dawn 'kyith the City of Durham Stormwater and GIS Services Division reported concerns of a discharge of wastewater from a storniwater detention pond at Thomas Concrete resulting in pH values between`9-and l 1 in nearby streams. Jeremiah Dow and Thomas McKinney from the Raleigh Regional Office (RRO) of the Division of Water Resources (DWR) assisted by Charlotte Dawn with the City of Durham conducted an inspection at the above referenced site. The investigated areas were three (3) storm,,eater outfalls and unnamed tributaries to Third Fork Creek which is classified as Class WS-V. Nutrient Sensitive Waters (NSW) in the Jordan Lake Watershed within the Cape Fear River Basin. The following observations were noted during the site inspection (See Attachment 1 for sampling location map): The stormwater retention pond was discharging (Outfall 18468) and had a pH value of 12.32 s.u. and specific conductance of (SpC) of 3,723 inicrosiemens/centimeter (uS/cm). The outfall was sampled for hardness and total dissolved solids (TDS) and returned values of 780 mg/l for hardness and 1,050 mg/1 for TDS. o Outfall 108260 (sampling location Tf C-2; see map) had a pH value of 12.10 SAL, SpC of 1,089 mS/cm, hardness of 280 mg/l, and TDS of 398 mg/l. The stormwater discharge reaches surface waters approximately 1,100 feet southwest across Hwy. 147 at Outfall 69014 (sampling location TFC-3, see map). The pH here was 9.97 s.u., SpC was 528.8 uS/cln, hardness was 140 mg/l, and TDS was 338 mg/l. Nothing Compares.__ State of North Carolina j Environmental Quality I water Resources J Raleigh Regional Office 1628 Mail service Center I Raleigh, North Carolina 27699-1528 919 791-4200 r ,... F :u, t.m ziAw;.s� ai ,,.. �..' N r# .h'., ~�' �w�"'d.G t��.A'f ` ' - c�,. a _r�dr t '•.` r rLr:. =e.. i,'- �$ o -, �s' , A T : ; • The furthest downstream sampling location (TFC-4) returned a pH value of 8.96 s.u., SpC of 580 uS/cm, hardness of 160 mg/l, and TDS of 347 in-Cl/ l. Two control streams, labeled TFC-UTI and TFC-UT2, were sampled for field parameters only and returned pH values of 8.45 s.u. and 8.48 s.u. and SpC of 1,123 uSlcm and 903 uSlcm respectively. • A thick precipitate was coating substrate in the stream and the rocks at the outfall locations. A City of Durham Stormwater and GIS Services Division file review revealed the following violations and penalties: -On December 6, 2016 the City of Durham issued a notice of violation (NOV) to Thomas Concrete for illicit discharge of concrete pond wastewater. -On July 11, 2017 the City of Durham issued a second NOV for illicit discharge noting that "no progress was observed in the required cleanup of concrete wastes in the drainage system downstream of the Thomas Concrete property." -On August 25, 2017 the City of Durham issued a penalty assessment of $1,750.00 to Thomas Concrete for the above violations, and on August 25, 2017 an additional penalty assessment of $3,500.00 was issued. A RRO-DWR file review revealed the following violation: -On January 24, 2017 RRO-DWR issued a notice of violation — notice of intent to enforce for violation of state water quality standards for pH (1 SA NCAC 02B .0211(3)(g)). -Thomas Concrete was required to respond to the above referenced NOV, but failed to do so. The site visits, sample results and file review revealed the following violations: Item I. Stream- Standards- Title 15A North Carolina Administrative Code 02B .0211 (3)(g) states that "pl-l: shall be normal for the waters in the area, which generally shall range between 6.0 and 9.0 except that swamp waters may have a pH as low as 4.3 if it is the result of natural conditions;" • Results from sample location labeled TFC-3 confirm a pH stream standard violation with a pFl of 9.97 SAL Item IL Stream Standards -Hardness Title 15A North Carolina Administrative Code 02B .0218 (3)(1) states that "Total hardness: not greater than 100 mg/l as calcium carbonate;" • Results from sample locations labeled TFC-3 and TFC-4 confirm hardness stream standard violations with hardness values of 140 mg/1 at TFC-3 and 160 mgll at TFC-4. Requested Response: You are requested to immediately address each of the beloiv items in writing within 30 days of receipt of this letter. 1. Describe the work that has been done to the settling ponds/stormwater ponds since December, 2016. 2. Specifically, detail what housekeeping measures are in place to prevent wastewater from the site from causing surface water pl-1 and hardness standard violations. 1 r °s u,sT .'� U4, 4�5� t Y .5, s�.�A�:b+".,1rnr- Ia �, rJ .� -rt` ti r '.•.�+;i,»T-•..r.�—..«---�.y-.. _S 3. Explain how wastewater that exceeds pH of 9.0 and hardness of 100 mg/l will be prevented from discharging from the facility to nearby surface waters. 4. Describe who you have contacted with the Division of Energy, Mining, and Land Resources (DEMLR) regarding compliance with your Stormwater/Process Wastewater permit (NCG 140218) and the discharge of water with pH levels exceeding 9.0 s.u. and hardness exceeding 100 mg/l. Detail how you will come into full compliance with the requirements of DEMLR. 5. Please provide stormwater pond monitoring results from January 1, 2016 to the present date and describe the location of the sampling point(s). Please submit required materials to: Jeremiah Dow Division of Water Resources 3800 Barrett Drive 1628 Mail Service Center Raleigh, NC 27699 This office requires that the violations, as detailed above, be abated immediately and properly resolved. Environmental damage and violations of North Carolina Administrative Codes have been documented for the subject site as stated above. Your efforts to undertake activities to bring the subject site back into compliance is not an admission, rather it is an action that must be taken in order to begin to resolve ongoing environmental issues. These violations and any future violations are subject to a eivil penalty assessment of up to $25,000.00 per day for each violation. Your response to this letter will be considered with any civil penalty action recommendation. Should you have any questions regarding these matters, please contact Jeremiah Dow at (919) 791-4257 or via email at jeremiah.dowancdenr.gov. Sic�ely, ✓� Danny Smith Water Quality Regional Operations Raleigh Regional Office Attachment 1 —Map Attachment 2 — NC DWR Laboratory Results cc: DWQ RRO file copy Central Files RRO DEMLR Charlotte Dawn, City of Durham Stornnvater & GIS Services, 101 City Hall Plaza, Durham, NC 27701 Alan Wessel, President, Thomas Concrete of Carolina, Inc., 2500 Cumberland Pkwy., Ste, 200, Atlanta; GA 30339 Legend: `- Map provided by NCDEQ Division of Water Resources - Sampled for Hardness & TDS Q Thomas Concrete - Field Parameters Only 0 Locations are approximate and are provided for reference only TFC-1 (Outfall 18468) ~ _— 1 47 "J pl1:12.32 SpC: 3,723 uSlent Hardness: 780 tng/l TFC-2 (Outfall 108260) TDS: 1,050mg/I plL 12.10 SpC: 1,089 uS/ctn Hardness: 280 mg/l TDS: 398 mg/l Durham Technical - N ST% o -- �' L�WSo - Community Crotl� ► "r,=c-3 (otru'adl 69014) 7 p11: 9.97 s.u.* 7 1 SpC: 528.8 uSlcan 'I'I C-U`I'I ! �Hardness: 140 mg/l * �� pFI:B.=15 J�� -�. ., TDS: 338 mgjl SpC: 1,123 tiSkin Z ` r-� "ITC-4 (Outrtl!) r p11: 8.96 a,V SpC: 580.1 uS/cm `Q ` hardness: 160 tng/l T[)ti: 347 ntgl] ITC-UT2 p 11: 9.48 SpC: 903 uS/cnt 7 Third Fora: Creek - WS-V, NSW L�� Sur{ace Water Standards: .0 Total llardness: 100 mg/l (NCAC 02B'.0218 (3)(1) Total Dissolved Solids: 500 tng/l (NCAC 0211 .0218 (3)(g) p11: Between 6.0 and 9.0 (NCAC 0213 .021 1 (3)(g) * Red text indicates a surface water standard violation Z l .n,v \ \1 IV \a ,l I %/ O AC46646 North Carolina Division of Water Resources Water Sciences Section Laboratory Results YLoc. Descr.: THIRD FORK CREEK, DURHAM County: Durham Collector: J DOW VisitlD Region: RRO Report To RRO Location ID: TFC-1 River Basin CPF01 Collect Date: 0112512018 Priority COMPLIANCE Emergency Collect Time: 10'30 Sample Matrix: SURFACEWATER COC YeslNo Yes Sample Depth Loc. Type: ' RivedStream Final Report Sample 10 AC46646 PO Number d Date Received: 0112612018 Time Received: 13,:10 Labworks LoginlD MSWIFT Deliverf Method Hand Delivered Final Report Date: 3113119 Report Print Date: 0311312018 If this report is labeled preliminary report, the results have not been validated. Do not use for Regulatory purposes. Result/ Method Analysi s CAS # Anal to Name PQL t Qualifier Units Reference Date Validated by LAS Sample temperature at receipt by lab 1.3 'C 1126I18 PGAUTHIER WET Total Dissolved Solids in liquid 12 1050 mg1L SM 2544 0-1927 1126I18 CGREEN ... _... MET --- Hardness by Titration 1.0 780 mg1L SM 234OC-1997 27118 ESTAFFORDI 4 HISS Chemistry Laboratory» 1623 Polail Service Center, Raleigh, NC 27699-1623 (919) 733.3908 "Nat Detected" or "Ll" does not indicate the sample is anaiyte free but that the analyte is not detected at or above the PQL. Page 1 of 1 AC46647 North Carolina Division of Water Resources Water Sciences Section Laboratory Results Loc. Descc: County: Region: River Basln Emergency COC Yes/No THIRD FORK CREEK—DURHAM Durham Collector: J DOW VisltlD RRO Report To RRO Location ID: TFC-2 CPF01 Collect Date: 0112512018 Priority COMPLIANCE Collect Time: 11_00 Sample Matrix: SURFACEWATER Yes Sample Depth Loc. Type. River/Stream Sample ID: AC46647 PO Number # Date Received: 0112512018 Time Received: 13__10 Labworks LoginlD MSWIFT Delivery IUethod Hand Delivered Final Report {Date: 3113118 Report Print Date: 0311312018 r-inal meporE If this report is labeled preliminary report, the results have not been validated. Do not use for Regulatory purposes. Result/ Method Analysis CAS # Analyte Name PQL Qualifier Units Reference Date Validated by LAB Sample temperature at receipt by lab 1.3 C 1126r18 PGAUTHIER WET Total Dissolved Solids in liquid 12 398 mg1L Sib1 2540 C-1997 1/26118 CGREEN MET Hardness by Titration 1.0 280 mgfL SN1 2340C-1997 2f7115 ESTAFFORD1 WSS Chemistry Laboratory» 1623 Mail Service Center, Raleigh, NC 27699-1623 (919) 733-3906 Not Detected" or "U" does not indicate the sample is analyte free but that the analyte is not detected at or above the PQL, Page 9 of 1 0 AC4r548 Loc. Descr.: County: Region: River Basin Emergency COC Yes/No North Carolina Division of Water Resources Water Sciences Section Laboratory Results THIRD FORK CREEK, DURHAM Durham Collector: J DOW VisltlD RRO Report To RRO Location ID: TFC-3 CPF01 Collect Date: 01/2512018 Priority COMPLIANCE Collect Time: 11_35 Sample Matrix: SURFACEWATER Yes Sample Depth Loc. Type: RiverlStream Sample tD: AC46648 PO Number # Date Received: 01/2512018 Time Received: 13;10 Labworks LoginlD MSWIFT Delivery Method Hand Delivered Final Report Date: 3113118 Report Print Date: 03113I2018 f _inal mepofL If this report is labeled preliminary report, the results have not been validated. Do not use for Regulatory purposes. Result/ Method Analysis CAS # Analyte Name POL Qualifier Lal Reference Date Validated by LAB Sample temperature at receipt by lab 1.3 °C 1120118 PGAUTHIER WET Total Dissolved Solids in liquid 12 338 mg1L SM 2540 C-1997 V26118 CGREEN MET Hardness by Titration 1.0 140 mg1L SM 2340C-1997 2f7118 FSTAFFCRDI WSS Chemistry Laboratory>> 1623 Mail Service Center, Raleigh, NC 27699.1623 (919) 733-3908 "Not Detected" or "U" does not indicate the sample is analyte free but that the analyte is rot detected at or above the POL. Page 1 of 1 AC46649 North Carolina Qiyision of Water Resources Water Seiences Section Laboratory Results Loc. Descr.: THIRD FORK CREEK DURHAM County: Durham Collector: J DOW NAsitlD Region: RRO Report To RRO Location ID: TFC-4 River Basin CPF I Collect Date: 01125f2018 Priority COMPLIANCE Emergency Collect Time: 122:27 Sample Matrbr SURFACEWATER COC Yes/No Yes Sample Depth Loc. Type: River/Stream Sample ID: AC46649 PO Number # Date Received: 01125l2018 Time Received: 13_10 Labworks LaginlD MSWIFT Delivery Method Hand Delivered Final Report Date: 3113113 Report Print Date: 0311312018 rinal meporL If this report is labeled preliminary report, the results have not been validated. Do not use for Regulatory purposes. Result/ Units --Method Analysis GAS # Analyte Name PQL Qualifier Reference Date Validated by LAS Sample temperature at receipt by lab 1.3 C V26118 PGAUTHIER WET Total Dissolved Solids in liquid 12 347 mglL SM 2540 C-1997 1126/18 CGREFN MET Hardness by Titration 1.0 160 mg1L SM 2340C-1997 2f7118 ESTAFFORDI WSS Chemistry Laboratory>> 1623 Mail Service Center, Raleigh, NC 27699.1623 (919) 733.3908 "Plot Detected" or "U" does not indicate the sample is analyse free but that the analyte is not detected at or above the PQL. Page 1 of 1 n t ANNUAL SUMMARY DISCHARGE MONITORING REPORT (DMR) —STORMWATER SUBMIT TO CENTRAL OFFICE* General Permit No. NCG140000 Calendar Year 2017 *Report ALL STORMWATER monitoring data on this form (include "No Flow'T'No Discharge" and Benchmark Exceedances) from the previous calendar year to the DEQ by MARCH 1 of each year. Certificate of Coverage No. NCG140218 RECEIVED Facility Name: Thomas Concrete of Carolina — Durham Plant FE9 2 0 2013 County: Durham CENTRAL FILES Phone Number: (919) 598-0456 Total no. of SDOs monitored' li{SECTIO�I Certified Laboratory ESC Lab # ENV 375 Lab # Stormwater Discharge Outfall (SDO) No. 001 VMA Outfall? Yes ® No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ® No ❑ Was this outfall ever in Tier 2 during the past year? Yes ® No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ Other ❑ Outfall No. Total Rainfall, inches Total Suspended Solids TSS { ]� m 11 pH, SU Non -polar O&G (EPA Method 1664 SGT-HEM { ]�� mgll (VMA} If applicable New Motor Oil Usage (gallmo.) If applicable Stormwater Benchmarks l Indicate appikable icable N Circle Benchmark 100150 6.0-9.0 15 a55 gallmo. average requires TSS and Non -polar O&G monitoring Date Sample Collected, molddl r Willi 1i 01/31/17 NO FLOW 02/02/17 NO FLOW 03/31 /17 1.25 125 11.66 04/30/17 NO FLOW 05/31/17 NO FLOW 06/30/17 NO FLOW 07/31/17 NO FLOW 08/31/17 NO FLOW 09/30/17 NO FLOW 10/31/17 NO FLOW 11/30/17 NO FLOW 12/31/17 NO FLOW Permit Date 8/1/2017 — 6/3012022 Last Revised 8-22-2015 Certificate of Coverage No. NCG 140218 Additional Outfall Attachment (make copies as needed for additional outfalls) Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ Other ❑ Outfall No. Total Rainfall, inches Total Suspended Solids (TSS), mg/1 pH, SU Non -polar O&G (EPA Method 1664 SGT-HEM ,, ( mgll (VMA) 11 appiicable New Motor Oil Usage (galimo.) Napplicable Stormwater Benchmarks lndlcara NO FL01Ni( applicable hmark Circle Benctt 1 aOjJ� 6.0-�.4 1 $ �55 g allma. average requires T55 and Non -polar 6&G monitoring Date Sample Collected, molddl r Permit Date 8/1/2017 — 6/30/2022 Last Revised 8-22-2015 Certificate of Coverage No. NCG140218 Additional Outfall Attachment (make copies as needed for additional outfalls) Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ Other ❑ Outfall No. Total Rainfall, inches Total Sus ended p Solids {TSS), mg/1 p H, 5U Non -polar O&G (EPA Method 1664 (SGT-HEM)), mgll (VMA) New Motor Oil Usage (gallmo.) 5formwater Benchmarks Indicate NO FLOW li applicable Circle Benchmark 1 5v 1UU150 6. U_9. V .� � �55 g allmo. average requires TSS and Non -polar O&G monitoring Date Sample Collected, molddl r Permit Date 8/1/2017 — 6/30/2022 Last Revised 8-22-2015 Certificate of Coverage No. NCG140218 CERTIFICATION "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Required by 40 CFR 6122.227 Signs Date Mail Annual Summary Stormwater DMR to the NCDEQ Central Office: Note the address is correct - Central Files is housed in DWR (not DEMLR) N.C. Department of Environmental Quality (DEQ) Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Central Files Telephone (919) 807-6300 Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at: (919) 707-9220 Permit Date 8/1/2017 - 6/30/2022 Last Revised 8-22-2015 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL. PERMIT NO. NC6140000 CERTIFICATE OF COVERAGE NO. NCG140218 SAMPLE COLLECTION YEAR: 2017 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant SAMPLING PERIOD: ❑ July -December ® January -June PERSON COLLECTING SAMPLES Kevin Kelt COUNTY Durham CERTIFIED LABORATORY ESC Lab # ENV 375 PHONE NO. (704) 853-9437 Lab # ADD TO LISTSERVE? ❑YES ❑NO EMAIL: OPTIONAL INFO: April Monitoring event DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other, Part A: Stormwater Monitoring Requirements Outfall No. Date Sample Collected (ma/dd/yr OR NO FLOW)' pH (Standard Units) TSS (mg/L) Event Duration (minutes] Total 4 Rainfall {in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier Z 2 Sampling - - 6-9 100 ' - - - 001 NO FLOW Click here to enter text. Click here to enter text. Click here to enter text. y 38 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part 6: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr]1 PH (Standard Units) TPH using method 1664A5GT-NfM (mg/L) Total Suspended Solids (mg/L) Event duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month] In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling 6-9 15 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample for at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." c a"Z z4u,- 'LG7i 4/30/2017 (Signature of Permittee) V (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 3 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 SAMPLE COLLECTION YEAR: 2017 FACILITY NAME: _Thomas Concrete of Carolina- Durham Plant SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ®Jan -March PERSON COLLECTING SAMPLES: Kevin Kelt COUNTY: Durham CERTIFIED LABORATORY:ESC Lab # N j5 IVEPHONE NO. (_704 _) 853-9437 _ February 2017_Lab # nn , ,y ADD TO LISTSERVE? DYES ®NO EMAIL: LIMIT VIOLATIONS? YES ® NO ❑ i a ,01 /DISCHARGING TO CLASS: [:]SA ❑HQW ❑PNA ❑Trout ®Other Part A: Wastewater Monitoring Requirements CENTRAL FILDOPTIONAL INFO: DWR SECTION ❑April -tune Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater z (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using I method 1664A SGT-HEM (mg/L) Discharge Duration (minutes) Total Flow � (gallons/day) - - 6-93,4 303'5 53 (15), - - 001 3/31/2017 VE, RM 11.2 57.1 <0.033 Total Flow: 5,990 gpd 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 ° pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 1SA NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. eased on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." • Permit Date:7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 (Signature of Permittee) 3/31/2017 (Date) Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 3 of 2 NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this farm, please visit. hU:I/portal,ncdenrsorLy/web/lr/ni2de-s-stormwater/ Permit No.: N/�/_/_/_/_/_/_/_/ or Certificate of Coverage No.: Facility Name: Thomas Concrete of Carolina -Durham Plant County: Durham Phone No. (704) 853-9437 Inspector: Kevin Kelt Date of Inspection: 3 31 2017 Time of Inspection: 1436 Total Event Precipitation (inches): 1.25" Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) M Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) Pagel of 2 5WU-242, Last modified 7/31/2013 1. Outfall Description: Outfall No. 01 Structure (pipe, ditch, etc.) Weir Outlet Receiving Stream: Third F rk Creek Branch Describe the industrial activities that occur within the outfall drainage area: Bulk storage of raw materials vehicle transport, wastewater treatment. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: light yellow tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): very slight odor 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe pH: 11.66 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 7/31/2013 I ` STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 SAMPLE COLLECTION YEAR: 2017 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant SAMPLING PERIOD: El July -December ® January -June PERSON COLLECTING SAMPLES Kevin Kett COUNTY Durham CERTIFIED LABORATORY ESC Lab # ENV 375 PHONE NO. (704) 853-9437 Lab # ADD TO LISTSERVE? ❑YES ❑NO EMAIL: OPTIONAL INFO: March Monitoring event DISCHARGING TO CLASS: [:]SA ❑HQW []RNA ❑Trout ®Other Part A: Stormwater Monitoring Requirements Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH {Standard Units) TSS (mg/L) Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Samplingz - - 6-9 100 , - - 001 3/31/2017 11,66 125 60 1.25 y 37 r: � C 11 ,ad"iV1.- APR 17 201/ rs1ro/%j Ci r y SCC710N ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. ' If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. a TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part 8: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)1 pH (standard Units) TPH using method 1664ASGT-FIEM ( mg/ } L Total Suspended Solids L (mg/ } Event Duration (minutes) ( Total a Rainfall (in) ( New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n' # of Months in Tier 2 Sampling2 6-9 15 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one cor)v of this DMR (includine all "No Flow" & "No Dischame" rer)orts) within 30 days of receiot of samrfle for at end of monitorine Deriod in case of "No Flow") to: Division of Water Quality Attw DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Vgnature of Permittee) Permit Date: 7/1/2011-60/30/2015 3/31/2017 (Date) Last Revised 7/13/11 Page 2 of 2 'GiAA A NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out this form, please visit: j up;//portal.ncdenr.org/we Ir/nodes-stormwater/ Permit No.: N/C/Y/_/_/_/�/ _/_/ or Certificate of Coverage No.: Facility Name: Thomas Concrete of Carolina -Durham Plant County: Durham Phone No. [704) 853-9437 Inspector: Kevin Kelt Date of Inspection: 3/31/2017 Time of Inspection: 1436 Total Event Precipitation (inches): 1.25" Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: �'"iuza C���447,/ (Signature of Permittee or Designee) Page 1 of 2 5WU-242, Last modified 7/31/2013 1. outfall Description: Outfall No. 01 Structure (pipe, ditch, etc.) Weir Outlet Receiving Stream: Third Fork Creek branch Describe the industrial activities that occur within the outfall drainage area: Bulk storage of raw materials, vehicle transport, wastewater treatment. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: light yellow tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): ver.y slight odor 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 2 0 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe pH: 11.66 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 5wU-242, Last modified 7/31/2013 Aroa NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out this form, please visit. htto://portalmcdennore/web/lr/nodes-stormwater/ Permit No.: N/C/_/_/_/_/_/_/_/ or Certificate of Coverage No.: Facility Name: Thomas Concrete of Carolina -Durham Plant County: Durham Phone No. (704) 853-9437 Inspector: Kevin Kelt Date of Inspection: 3 31 2 17 Time of Inspection: 1436 Total Event Precipitation (inches): 1.25" Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) Pagel of 2 SWU-242, Last modified 7/31/2013 1. Outfall Description: Outfall No. 01 Structure (pipe, ditch, etc.) Weir Outlet Receiving Stream: Third Fork Creek Branch Describe the industrial activities that occur within the outfall drainage area: Bulk storage of raw materials, vehicle transport, wastewater treatment. Z. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: light yellow tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): very sight odor 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy. 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe pH: Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 5WU-242, Last modified 7/31/2013 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375� Lab # OPTIONAL INFO: February Monitoring event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2017 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Durham PHONE NO. (919) 598-0456 ADD TO LISTSERVE? ❑YES ❑NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH (Standard Units} T55 (mg/L) Event Duration (minutes} Total Rainfall° (in} In Tier 2 Monthly Monitoring? (y/n} # of Months in Tier 2 Sampling2 - - 6-9 100 . - - - - 001 NO FLOW y 36 - ^- L_ ! MAR 2 1. 201; 1NR S _ ' " ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 T55 benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/yr) pH (standard Units) TPH using method I664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a liainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) #i of Months in Tier 2 Samplingz 6-9 15 2.100 ' - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one cape of this DMR tincluding all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample for at end of monitorine period in case of "No Flow"} to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware there 'ficant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 2G%/ 2/28/2017 (Signature of Permittee) Permit Date:7/1/2011-60/30/2015 (Date) Last Revised 7/13/11 Page 3 of 2 r� Water Resources ENVIRONMENTAL QUALITY Certified Mail #701=4 3490 0001 8821 1474 Return Receipt Requested Brian Westfall, Plant Manager Thomas Concrete 2722 Angier Ave Durham, NC 27703 Dear Mr. Westfall: ROY COOPER Govemor MICHAEL S. REGAN Se croary S. JAY ZIMMERMAN 9srector January 24, 2017 RECEIVED JAN 2 7 .Zu17 CENTRAL FILES DWR SECTION Notice of Violation -Notice of Intent to Enforce Case No: NOV-2017-PC-0006 Illegal Discharge of Stormwater/Removal of Use Thomas Concrete NPDES Permit No. NCG 1402 t 8 Durham County On November 29, 2016, Jonathan Baker and Charlotte Dawn with Durham County Stormwater and GIS services reported concerns regarding the discharge wastewater from a stormwater detention pond at Thomas Concrete (2722 Angier Ave, Durham). They also reported that a follow-up inspection in November 2016 revealed that the problem had not been corrected and that pH at the outfall was 13.2 s.u. and specific conductance was 1778 ins/cm. On December 19, 2016, Danny Smith and Ray Milosh with the Raleigh Regional Office (RRO) of the Division of Water Resources (DWR) and staff from Durham County' Stormwater and GIS services conducted a joint site visit. The following observations were noted during the site inspection: + The stormwater retention pond had evidence of recent work. The water level in the pond was below the overflow pipe. • Water was seen exiting from the outlet of the overflow pipe, indicating that the overflow pipe had a leak. • There was an inflatable bladder at the outlet of the overflow pipe that was not holding back the water. • The pH of the water exiting the pipe was 13.6 and the specific conductance (SpC) was 866 ms/cm. A thick orange/tan precipitate was seen covering the streambed and rocks in the streambed. (see photograph 1). Division of Water Resources, Raleigh Regional Office, Water Quality Operations Section http://ponal.ncdenr.org/webhvq/aps 1628 Mail Service Center. Raleigh. NC 27699-1628 Phone: (919) 791-4200 Location: 3800 Barrett Drive. Raleigh, NC 27609 Fax: (919) 788-7159 i • The pH of the water exiting the culvert under the railroad tracks approximately 200 feet downstream Of the outfall was 10.06 and the SpC was 318 mslcm. A thick orange/tan precipitate was covering the streambed and rocks. (see photograph 2) Photograph 2. Water exiting culvert under the railroad tracks about 200 feet downstream of the outfall from Thomas Concrete. Note orange/tan precipitate covering streambed and stones. 1- Photograph 3. Water exiting culvert under 1-lwy 147 approximately 800 feet downstream of Thomas Concrete. Note precipitate on streambed and rocks. The pH of the streamwater exiting a pipe under Hwy 147 approximately 800 feet downstream of the outfall was 9.6 s.u. and the SpC was 363 mslcm. (see photograph 3). An orange/tan W precipitate was covering some parts of the streambed and rocks. Photograph 3, depicted above, is an unnamed tributary to Third Fork Creek, Class WS-V Nutrient Sensitive Waters (NSW) in the Cape Fear River Basin. The site inspection and sample results revealed the following violations of North Carolina General Statutes, North Carolina Administrative Codes, and NPDES permit conditions (NC0049662) which state following: NCGS 143-215.1 a 6 "Activities for Which Permits Required. — No person shall do any of the following things or carry out any of the following activities unless that person has received a permit from the Commission and has complied with all conditions set forth in that permit. (6) cause or permit any waste, directly or indirectly, to be discharged to or in any manner intermixed with the waters of the State in violation of the water quality standards applicable to the assigned classifications or in violation of any effluent standards or limitations established for any point source, unless allowed as a condition of any permit, special order or other appropriate instrument issued or entered into by the Commission under the provisions of this Article." 15 A NCAC 02B .0211 14 pH: shall be normal for the waters in the area, which range between 6.0 and 9.0 except that swamp waters may have a pH as low as 4.3 if it is the result of natural conditions; Requested Response This office requests that you respond to this letter in writing within 30 days of receipt of this Notice. Your response should be sent to this office at the letterhead address. Your response should address the following items: l . Please describe the work that has been done to the settling ponds/stormwater ponds during this past year (2016). This account should include all settling ponds/stormwater ponds effluent monitoring, maintenance, and residuals removal and depths of solids. 2. Specifically, detail what housekeeping measures are in place to prevent wastewater from the site from causing surface water pH standard violations. 3. Please explain how wastewater that exceeds pH of 9.0 s.u. will be prevented from discharging from the facility. Describe who you have contacted with the Division of Energy Mining and Land Resources regarding compliance with your Stormwater/Process Wastewater permit (NCG 140000) and the discharge of water with pFl elevated beyond 9.0 s.u. 4. Detail how you have come into full compliance with the requirements of the Division of Energy Mining and Land Resources. 5. Please provide stormwater pond monitoring results from January 1 2015 to the present date and describe the location of the sampling point(s). Environmental damage and violations of North Carolina Administrative Codes have been documented for the subject site as stated above. Your efforts to undertake activities to bring the subject site back into compliance is not an admission, rather it is an action that must be taken in order to begin to resolve ongoing environmental issues. These violations and any future violations are subject to a civil penalty assessment of up to a maximum of 525,000.00 per day for each violation. Your response to this correspondence will be considered in any civil penalty assessment process that may occur. Should you have any questions regarding these matters, please contact Ray Milosh at (919) 791-4240. Siincerely, r Danny Smith, � 2pervisor Water Quality Regional Operations Surface Water Protection Section cc: RRO DWR Files Central Files John Holley — RRO DEMLR Bradley Bennett — Stormwater Permitting Unit PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: _Thomas Concrete of Carolina- Durham Plant PERSON COLLECTING SAMPLES: Susan Bostian CERTIFIED LABQRATORY:_ESC Lab # ENV375_ March 2016 Lab # LIMIT VIOLATIONS? YES ® NO ❑ Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ®Jan -March COUNTY: Durham PHONE NO. (_919 _)598-0456 ADD TO LISTSERVE? ❑YES ®NO EMAIL: ❑April -June DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other. OPTIONAL INFO: Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater (VE, RM, MD)� pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-HEMS (mg/L) Duration (minutes) Total Flow , (gallons/day) - - - 6-93.4 303s 53 (15)6 - - 001 NO DISCHARGE Total Flow: 4,790 gpd RECEE NED MAY 1 Z016 CENTim FILES 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. Permit Date:7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 s TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: ^ Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 1:YaIII& (Signature of Permittee) Permit Date:7/1/2010-06/30/2015 4/30/2016 (Date) Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE N0. NCG140218 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: July Monitoring event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Durham PHONE NO. (919) 598-0456 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: [:]SA ❑HQW ❑PNA ❑Trout ®Other, Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH (Standard Units) TSS (mg/L) Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier z 2 Sampling - - 6-9 100 . - - - - 001 NO FLOW y 29 Rl=r.F=I\/Fr AUG 19 Loll" CE NTRAL FILES © VR SECTION 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 T5S benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr) pH (Standard Units) TPH using method 1664ASGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) tt of Months in Tier 2 Sampling2 6-9 15 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQCentraI Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." ,-)aim, 2Gt"/ 8/16/2016 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 3 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: August Monitoring event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Durham PHONE NO. (919) 598-0456 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA [-]Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH (;Standard Units) TSS (mg/L) Event Duration (minutes) Total Rainfall a (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Samplingz - - 6-4 300 ' - - - 001 NO FLOW _— y 30 i CENTR kL HL -" i1V`!!t Z: ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. ' If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TS5 benchmark values are 100 mg/l, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr]1 pH {Standard Units} TPH using method 1664A SGT-HEM {mg/L} Total Suspended Solids (mg/L) Event Duration {minutes} Total , Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (Y/n) # of Months in Tier 2 z Sampling 6-9 15 100 HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO 12 HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample for at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 9/12/2016 (Signature of Permittee) &I (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 3 of 2 S PROCESS WASTEWATER -- Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: _Thomas Concrete of Carolina- Durham Plant PERSON COLLECTING SAMPLES: Susan Bostian CERTIFIED LABORATORY: ES Lab # ENV375 Q4 Lab # LIMIT VIOLATIONS? YES ® NO ❑ Part A: Wastewater Monitorine Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLE QUARTER: ❑Jul -Sept ®Oct -Dec Dian -March ❑April -June COUNTY: Durham PHONE NO. (_919 _)598-0456 ADD TO LISTSERVE? [—]YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other OPTIONAL INFO: Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater � (VE, RM, MID)' pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-HEM6 (mg/L) Duration (minutes) Total Flow (gallons/day)' - - - 6-93'4 303's 53 (15), - - 001 NO DISCHARGE Total Flow: 4,790gpd -7f r - t N k F;HL F i •+r�� -Y eN L! . v v � 1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. s TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO. - Division of Water Quality Attn. DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 (Signature of Permittee) 12/31/2016 (Date) Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 3 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: _Thomas Concrete of Carolina- Durham Plant PERSON COLLECTING SAMPLES: Susan Bostian CERTIFIED LABORATORY:_ESC Lab # ENV375_ September 2016 Lab # LIMIT VIOLATIONS? YES ® NO ❑ Part A: Wastewater Monitorine Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLE QUARTER: ®Jul -Sept ❑Oct -Dec ❑Jan -March ❑April -June COUNTY: Durham PHONE NO. (_919 _) 598-0456 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA []Trout ®Other OPTIONAL INFO: Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater (VE, RM, MD)' pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-HEMS (mg/L) Duration (minutes) Total Flow � (gallons/day) - - - 6-93'° 303 s S3 (15)S - 001 NO DISCHARGE Total Flow: 4,790 gpd is \.✓ L..1 V�.•• r 17 CE JTRAL FILLb Ov IR JCL iQ- N 1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 " pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE-) WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 (Signature of Permit Date:7/1/2010-06/30/2015 9/30/2016 (Date) Last Revised 07/13/11 Page 3 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: _Thomas Concrete of Carolina- Durham Plant PERSON COLLECTING SAMPLES: Susan Bostian CERTIFIED LABORATORY: ESC Lab # ENV375 June 2016 Lab # LIMIT VIOLATIONS? YES ® NO ❑ Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ❑Jan -March COUNTY: Durham PHONE NO. (_919 _)598-0456 ADD TO LISTSERVE? DYES ®NO EMAIL: ®April -June DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other OPTIONAL INFO: Outfall No. Date Sample Collected (mm/dd/yr) Type of Wastewater (VERMMD} z , , pH [standard} Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using method 1664A 6 5G /L)T-HEM Img/L} Discharge Duration (minutes) Total Flow 7 (gallons/day} - - - 6-93'4 303'S 53- 001 NO DISCHARGE Total Flow: 4,790 gpd C'FA1T ?Ai � FS DVVR SECTION 1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Permit Date:7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 jSignature of Permittee) 6/30/2016 (Date) Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 3 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 SAMPLE COLLECTION YEAR: 2016 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant SAMPLING PERIOD: ® July -December ❑ January -June PERSON COLLECTING SAMPLES Kevin Kelt COUNTY Durham CERTIFIED LABORATORY ESC Lab # ENV 375 PHONE NO. (919) 598-0456 Lab # ADD TO LISTSERVE? DYES ®NO EMAIL: OPTIONAL INFO: November Monitoring event DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA [—]Trout ®Other Part A: Stormwater Monitoring Requirements Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 PH an (Standard Units) TSS (mg/L) Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling x - 6-9 100 , - - - - 001 NO FLOW y 33 CFNTW I Ell Eq DWR S. =CTION ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are SO mg/l. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/yr) pH (standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 6-9 15 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are significa penalties for submjtting false information, including the possibility of fines and imprisonment for knowing violations." ,:ya-m, 4 G?i/ 12/15/2016 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 3 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG 140218 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375� Lab # OPTIONAL INFO: March Monitoring event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Durham PHONE NO. (919) 598-0456 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout RECEIVED APR l I Z016 CENTRAL FILES DWR SECTION ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH (standard Units) TSS (mg/L) Event Duration (minutes) Total 4 Rainfall {in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling - - 6-92 1002, - - - - 001 No Discharge y 25 ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are SO mg/I. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/yr) pH (Standard Units) TPH using method 1664A SGT--HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 6-92 15 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Qriainal and one coov of this DMR (includina all "No Flow" & "No Discharae" reports) within 30 days of receipt of samDle for at end of monitoring Deriod in case of "No Flow" to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are signif' ant penalties for sgbmitting false information, including the possibility of fines and imprisonment for knowing violations." ,5a-ii'& _ 2� �. , 4/4/2016 (Signature of Permittee) v (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT No. NC6140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: April Monitoring event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Durham PHONE NO. (919) 598-0456 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other, Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH (Standard Units] TSS (mg/L) Event Duration (minutes] Total a Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling - - 6-92 1002,3 - - - - 001 No Discharge y 26 ECERIED CENTRAL FILES 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/yr) PH (Standard Units) TPH using method 1664A 5GT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) #a! of Months in Tier 2 Sampling2 6-9 15 100 , - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION?' ;: 'YES. ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR'fincludine all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are si 1:5"Hl (Signature of Permittee) penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 5/31/2016 (Date) Permit Date. 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 .;r STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14O218 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375� Lab # OPTIONAL INFO: June Monitoring event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 dM 11 SAMPLING PERIOD: ❑ July -December ® January -June is COUNTY Durham PHONE NO. (919) S98-0456 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: []SA ❑HQW ❑PNA❑s Trout ®Other rr� Outfall No. Date Sample Collected (mo/dd/yr OR NO FL0W)1 PH (Standard Units) TSS (mg/L� Event Duration (minutes) Total a Rainfall (in) In Tier 2 Monthly��r' I'r# Monitoring? iY/�" of Months in Tier 2 2 Sampling - 6-9 100 . - - - - 001 6/28/2016 11.35 58.8 120 1.165 y 28 C. r1 9ifED 9 Z016 - FILES CTIOR, ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr}i PH {Standard Units} TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier Z Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling 6-9 15 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one coov of this DMR (includine all "No Flow" & "No DischarPe" reports) within 30 days�of receipt of sample (or at end of monitorine period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." {Signature of Permittee} Permit Date: 7/1/2011-60/30/2015 7/13/2016 (Date) Last Revised 7/13/11 Page 2 of 2 AG"A NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out this form, please visit: Permit No.: N/C/_/�/_/`/_/_/_/ or Certificate of Coverage No.: Facility Name: Thomas Concrete of Carolina -Durham Plant County: Durham Phone No. (919) 598-0456 Inspector: Kevin Kelt Date of Inspection: 06/28/2016 Time of Inspection: 1425 Total Event Precipitation (inches): _1.165" Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Pe or Designee) Page 1 of 2 SM-242, Last modified 7/31/2013 1. Outfall Description: Outfall No. 01 Structure (pipe, ditch, etc.) Weir Outlet Receiving Stream: Third Fork Creek Branch Describe the industrial activities that occur within the outfall drainage area: Bulk storage of raw materials, vehicle transport, wastewater treatment. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: very light brown / ellow tint _ 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinct odor _ 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No S. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe pH: 11.35 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 5wU-242, Last modified 7/31/2013 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 R9:(/7 a:[V CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375Y Lab # OPTIONAL INFO: May Monitoring event Part A: Stormwater Monitoring Requirements K �Li T 4 2016 SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ❑ July -December Z January-June1'�N I RAL FILE; COUNTY Durham /f fJWR $CiI4N PHONE NO. (919) 598-0456 ADD TO LISTSERVE? DYES ®NO EMAIL: �V/ DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other Outfafl No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH (Standard Units) TSS (mg/L) Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier z 2 Sampling - - 6-9 001 No Discharge y 27 41� I If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. outfall No, Date Sample Collected (mo/dd/yrjl pH (Standard Units) TPH using method 1664A SGT HEM (mg/L) Total Suspended Solids (mg/c) Event Duration (minutes) Total a Rainfall (in) New Motor oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n} ii of Months in Tier 2 2 Sampling 6-9 15 100 , - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR (including all "No Flow" & "No Discharee" reports) within 30 days of receiot of samole (or at end of monitoring oeriod in case of "No Flow') to: Division of Water quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are s pificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." cJ �ci'►7� 2 C.ri 6/7/2016 (Signature of Permittee) 61 (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 3 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE N0. NCG140218 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: Febrparq Monitoring event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Durham PHONE NO. (919) 598-0456 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: []SA ❑HQW ❑PNA []Trout ®Other. Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH (standard Units) TSS (mg/L) Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier : 2 Sampling - - 6-4 100 , - - - - 001 No Discharge y 23 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr}� PH (standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration {minutes} Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? {y/n} # of Months in Tier 2 2 Sampling 6-9 15 100 , - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one coov of this DMR (includine all "No Flow" & "No Discharee" reports) within 30 days of receipt of sample for at end of monitorine period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are suZnificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Uz 2/29/2016 (Signature of Permittee) (Date) Permit Date:7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 SAMPLE COLLECTION YEAR: 2016 FACILITY -NAME: Thomas Concrete of Carolina -Durham Plant SAMPLING PERIOD: ❑ July -December ® January -June PERSON COLLECTING SAMPLES Kevin Kelt COUNTY Durham CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: February Monitoring event Part A: Stormwater Monitoring Requirements PHONE NO. (919) 598-0456 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: []SA ❑HQW ❑PNA []Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW) PH (Standard Units) TSS (mg/Lj Event Duration (minutes) Total a Ra infall (in) In Tier 2 Monthly Monitoring.? (y/n) # of Months in Tier z 2 Sampling - - 6-9 100 . - - - - 001 No Discharge y 24 ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > SS gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)' pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfalla (in) New Motor Oil Usage (gal/month) In InTier# 2 Tier Monthly Monitoring? (y/n) of Months in Tier 2 Samplingz 6-9 15 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one eorw of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware tk there are ' nificant p alties r submitting false information, including the possibility of fines and imprisonment for knowing violations." 3/31/2016 (Signature of Permittee) 11, (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14O218 FACILITY NAME: _Thomas Concrete of Carolina- Durham Plant PERSON COLLECTING SAMPLES: Kevin Kelt CERTIFIED LABORATORY:_ESC Lab ## ENV375 December 2015_Lab ## LIMIT VIOLATIONS? YES ® NO ❑ Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLE QUARTER: ❑Jul -Sept ®Oct -Dec ❑Jan-MarcF COUNTY: Durham PHONE NO. (_919 _)598-0456 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: [_]SA ❑HQW ❑PNA ❑Trout OPTIONAL INFO: ❑April -June ®Other Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater z (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-HEM" " (mg/L) Duration (minutes) Total Flow (gallons/day)7 - - - 6-93,4 303,5 53- 001 12/17/15 VE, RM 10.02 219 <0.033 45 Total Flow: 4,790 gpd 1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saitwaters. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters,10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VIVA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW" "NO DISCHARGE" WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." �5a4wi (Signature of Permittee) Permit Date:7/1/2010-06/30/2015 1/31/2016 (Date) Last Revised 07/13/11 Page 2 of 2 ST0RMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14O218 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: December Monitoring event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Durham PHONE NO. (919) 598-0456 ADD TO LISTSERVE? OYES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FL0W)' pH [Standard Units] TSS (mg/L) Event Duration (minutes] Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Samplingz - - 6-9 100 ' - - - - 001 12/17/15 10.02 219.0 45 1.25 y 22 MAR ,-r y R ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Nj .�, F11.E5 ECT10N Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)1 PH (Standard Units } TPH using method I664A SGT-HEM m [ g/L) Total Suspended Solids m ( g/L) Event Duration minutes (minutes) Total a Rainfall in ( } New Motor Oil Usage al month (g / } In Tier 2 Monthly Monitoring? (y/n) tt of Months in Tier 2 Sam lin Z p g 6-9 15 2 100 ' - - - - t� HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (includine all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitorinp, period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) 1/31/2016 (Date) Permit Date:7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report x _ ` GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: _Thomas Concrete of Carolina- Durham Plant PERSON COLLECTING SAMPLES: Susan Bastian CERTIFIED LABORATORY:_ESC Lab # ENV375_ August 2015 Lab # LIMIT VIOLATIONS? YES ®NO ❑ Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLE QUARTER: ®Jul -Sept ❑Oct -Dec Dian -march COUNTY: Durham PHONE NO. (_919 _) 598-0456 ADD TO LISTSERVE? DYES ®NO EMAIL: ❑April -June= �1112 moc DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA [—]Trout ®Other OPTIONAL INFO: Outfall Na. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater (VE, RM, MD)' pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-NFMs (+erg/L) Duration (minutes) Total Flow 7 (gallons/day) - - - 6-93.4 303.5 53 (15)6 - - 001 NO DISCHARGE Total Flow: 4,790 gpd flUFT 0 10i�1 D FILh two I 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. Permit Date:7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Proia"', wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, rout instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 907-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date:7/1/2010-06/30/2015 10/30/2015 (Date) Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE N0. NCG140218 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: November Monitoring event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Durham PHONE NO. (919) 598-0456 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: []SA ❑HQW ❑PNA ❑Trout MMUME ®Other-s" Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH (Standard Units} TSS (mg/L) Event Duration {minutes] Total n Rainfall {in} In Tier 2 Monthly Monitoring? {y/n} # of Months in Tier 2 Sampling2 - - 6-9 100 '3 - - - - 001 11/09/15 9.75 51.6 45 1.25 y 21 1I —TkLJ LZ I I L_ JAN 0 4 .016 • i� r u v i -� mAIR a r- inN 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. "For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. M= —44 Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr}1 pH (Standard Units) TPH using method I664A 5GT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall° (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n' # of Months in Tier 2 2 Sampling 6-9 15 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files ' 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED. "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that therpKe significant pe ltties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 12/28/2015 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: _Thomas Concrete of Carolina- Durham Plant PERSON COLLECTING SAMPLES: Kevin Kelt CERTIFIED LAI30RATORY:_ESC Lab # ENV375. Lab h LIMIT VIOLATIONS? YES ® NO ❑ Part A: Wastewater Monitoring Requirements M "I SAMPLE COLLECTION YEAR: 2015 SAMPLE QUARTER: []Jul -Sept ®Oct -Dec ❑Jan -March ❑April -June Ii COUNTY: Durham C+3 PHONE NO. (_919 _) 598-0456 ADD TO LISTSERVE? ❑YES ®NO EMAIL: w 01 DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA []Trout ®Other =111111C OPTIONAL INFO: Outfall No. Date Sample 3 Collected (mm/dd/yr) Type of Wastewater (VE, RM, MD)z pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664R SGT NEA4' (mg/L) Duration (minutes) Total Flow (gallons/day) - - - 6-93,4 103,5 S3 (15)6 - - 001 11/09/15 VE, RM 9.75 51.6 c0.003 Total Flow: 4,790 gpd REGEVtu JAI 0 ,E LCfr + I .n ��- r 1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. ° pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 rng/L for all other water classifications. e Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing uinlatinne " .G a (Signature of Permittee) Permit Date:7/1/2010-06/30/2015 12/28/2015 (Date) Last Revised 07/13/11 Page 2 of 2 LA-2 L--1 e PROCESS WASTEWATER -- Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: _Thomas Concrete of Carolina- Durham Plant PERSON COLLECTING SAMPLES: Kevin Kelt CERTIFIED LABORATORY: ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES ®NO ❑ Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLE QUARTER: []Jul -Sept ®Oct -Dec ❑Jan -March ❑April -June COUNTY: Durham PHONE NO. (_919 _)598-0456 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: []SA ❑HQW ❑PNA []Trout ®Other OPTIONAL INFO: Outfall No. Date Sample i Collected (mm/dd/yr) Type of Wastewater 2 (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A 5GT-HEM' (mg/L) Duration (minutes) Total Flow (gallons/day), - - - 6-93'' 303's 53 (15)r, - - 001 10/28/15 VE, RM 9.04 49.3 <0.033 _ Total Flow: 4,790 gpd ME E j"� 1� 0 4 2116 1 M t I VML FTL v ES iwl 1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 COD a MOC 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT_ OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date:7/1/2010-06/30/2015 12/28/2015 (Date) Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: October Monitoring event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Durham PHONE NO. (919) 598-0456 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HOW ❑PNA ❑Trout ®Other, Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH [Standard Units) TSS (mg/L) Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier z 2 Sampling - - 6-92 100 ,3 - - - - 001 10/28/15 9.04 49.3 45 0.46 y 20 .A NTRAI FII-Fc; U NR SECTION 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/i. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 a"" r� �1 C`3 co ti Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sam Sample p Collected (mo/dd/yr}1 pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids {mg/L} Event Duration (minutes) Total Rainfall° {in} New Motor Oil usage (gal/month) In Tier 2 Monthly Monitoring? (Y/n) if of Months in Tier 2 Z Sampling 6-9 15 100 ' - - - - - HAS YOUR FACILITY HAD a OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Cn C-!:; Mail Original and one copv of this DMR (includine all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period LAJ in case of "No Flow") to: L.- Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that they are significant pe allties)for submitting false information, including the possibility of fines and imprisonment for knowing violations." �" 12/28/2015 (Signature of Permittee) Permit Date:7/1/2011-60/30/2015 {Date} Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERA! PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: September Monitoring event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Durham PHONE NO. (919) 598-0456 ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: []SA ❑HQW ❑PNA ❑Trout ®Other * �0 Tier a49C Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH {Standard Units) TSS (mg/L) Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in 2 SamplingZ - - 6-92 1002,3 001 9/25/15 9.14 28.8 45 0.125 y 19 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part'sr Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample p Collected (mo/dd/yr)1 pH (Standard Units) TPH using method 1664A SGT HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall° (in) New Motor oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling 6-92 15 1002' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQCentral Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware teat there are signifi �ntp�e},n�a-llties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 10/30/2015 (Signature of Permittee) {Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE N0. NCG140218 SAMPLE COLLECTION YEAR: 2015 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant SAMPLING PERIOD: ❑ July -December ® January -June PERSON COLLECTING SAMPLES Susan Bostian COUNTY Durham CERTIFIED LABORATORY ESC Lab # ENV 375 PHONE NO. (919) 598-0456 Lab # ADD TO LISTSERVE? []YES ®NO EMAIL: OPTIONAL INFO: June Monitoring event DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other, Part A: Stormwater Monitoring Requirements Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH (Standard Units} TSS (mg/L) Event Duration (minutes} Total 4 Rainfall (in} In Tier 2 Monthly Monitoring? (y/n) #of Months in Tier 2 Sampling' - - 6-92 1002,3 - - - - 001' No Discharge y 16 U CENTRAL FILES DWR S 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)1 pH (Standard Units) TPH using method 1554ASGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (Y/n) # of Months in Tier 2 Sampling2 6-92 152 1002.3 HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail OriEinal and one coDv of this DMR fincludine all "No Flow" & "No Discharee" reports) within 30 days of receipt of samDle for at end of monitorine period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware tha #here are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 7/31/2015 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: _Thomas Concrete of Carolina- Durham Plant PERSON COLLECTING SAMPLES: Susan Bastian CERTIFIED LABORATORY:_ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES ® NO ❑ Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ❑Jan-MarcF COUNTY: Durham PHONE NO. (_919 _)S98-0456 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: []SA ❑HQW ❑PNA ❑Trout OPTIONAL INFO: ®April -June COD ®Other —94 Outfall No. Date Sample Collected (mm/dd/yr) Type of Wastewater (VE, RM, MD)' pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using method 1664A SGT-HEM6 (mg/L) Discharge Duration (minutes) Total Flow (gallons/day)' - - - 6-93,4 303.5 53 (15)6 - - 001 No Discharge VE, RM _ Total Flow: 4,790 gpd R AUG 0 CENTRAL UVVK SECTI N 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. " pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. Permit Date:7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 s TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. ' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing (Signature of Permittee) Permit Date:7/1/2010-05/30/2015 7/31/2015 (Date) Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: August Monitoring event Part A: Stormwater Monitoring Requirements RECEIVED SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ® July -December ❑ January -June SAP 7 �UI`J COUNTY Durham CENTRAL FILES PHONE NO. (919) 598-0456 DWR SECTION ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: []SA ❑HQW ❑PNA ❑Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH (Standard Units) TSS (mg/L} Event Duration (minutes) Total Rainfall A (in) In Tier 2 Monthly Monitoring? (Y/n) # of Months in Tier 2 Sampling� - - 6-9 100 , - - - - 001 No Discharge y 18 1 if "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range {for pH}, you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. ° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. f• Outfall Date Sample No. Collected {mo/dd/yr)1 pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total n Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? [y/n) # of Months in Tier 2 z Sampling 6-9 15 100 , - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR(including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." C. (Signature of Permittee) 9/9/2015 (Date) Permit Date:7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 W PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: _Thomas Concrete of Carolina- Durham Plant PERSON COLLECTING SAMPLES: Susan Bostian CERTIFIED LABORATORY: ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES ® NO ❑ Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLE QUARTER: ®Jul -Sept ❑Oct -Dec COUNTY. Durham PHONE NO. (_919 _) 598-0456 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW OPTIONAL INFO: ❑Jan -March ❑PNA []Trout ❑April -Jun 1V ®Other Outfall No. Date Sample Collected' (mm/dd/yr) Type of Wastewater (VE, RM, MD)' pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using method 1664A SGT HEM' (mg/L) Discharge Duration (minutes) Total Flow 7 (gallons/day) - - - 6-93'4 303,5 53 (15)6 - - 001 7/23/15 VE, RM 9.78 75.5 <0.033 Total Flow: 4,790 gpd - n.; FILES 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 _ 4 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 PT-uLess wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW" "NO DISCHARGE" WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality _ Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." moo,,,.. S C . GQ (Signature of Permittee) Permit Date:7/1/2010-06/30/2015 10/30/2015 (Date) Last Revised 07/13/11 Page 2 of 2 STORIVIWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: July Monitoring event Part A: Stormwater Monitoring Requirements RECEIVED SAMPLE COLLECTION YEAR: 2015 SEP 17 2015 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Durham CENTRAL FILES PHONE NO. (919) 598-0456 DWR SECTION ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' PH (Standard Units} TSS (mg/L) Event Duration {minutes) Total 4 Rainfall {in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Samplingz - - 6-9 100 ' - - - - 001 7/23/15 9.78 75.5 45 0.875" y 17 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. :10— w J Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. ' Outfall No. Date Sample Collected 1 (mo/dd/yr) pH (Standard Units) TPH using method 1664ASGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 5ampling2 6-9 15 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copv of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample for at end of monitorine period in case of "No Flow_") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware that�ther�e} are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 9/9/2015 (Signature of Permittee) 'j (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 Ir A� ';L NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out thisform, please visit: httpJlnortal..ncdenr.org/web/Ir/npdes-stormwater/ Permit No.: N/C/_/_/_/_/_/_/_/ or Certificate of Coverage No.: Facility Name: Thomas Concrete of Carolina -Durham Plant County: Durham Phone No. (919) 598-0456 Inspector: Susan Bostian Date of Inspection: 07 23 15 Time of Inspection: 12SO Total Event Precipitation (inches). _.875"— Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Des gnee) SWU-242, Last modified 7/31/2013 Page 1 of 2 1. Outfall Description: Outfall No. 01 Structure (pipe, ditch, etc.) Weir Outlet Receiving Stream: Third Fork Creek Branc Describe the industrial activities that occur within the outfall drainage area: Bulk storage of raw materials, vehicle transport, wastewater treatment; 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: _murky white/clear 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinct odor 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe pH: 9.78 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 7/31/2013 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant PERSON COLLECTING SAMPLES Susan Bostian CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: April Monitoring event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Durham PHONE NO. (919) 598-0456 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: []SA ❑HQW ❑PNA []Trout ®Other Outfafl No. Date Sample Collected (mo/dd/yr OR NO FLOW)t PH (Standard Units) TS5 (mg/L) Event Duration (minutes} Total Rainfall , (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 - 6-91 1002,3 - - - 001 No Discharge y 14 ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample ( Co/ected i pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall a (in) New Motor oil Usage (gal/month) In Tier 2 Monthly Mo itor ng? ti of Months in Tier 2 5ampling2 6-92 152 1002,3 HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coot/ of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample for at end of monitorine period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware tha ere are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." c , G o- 6/8/2015 (Signature of Permittee) v (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report _ x4 GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 SAMPLE COLLECTION YEAR: 2015 FACILITY NAME: _Thomas Concrete of Carolina- Durham Plant SAMPLE QUARTER: []Jul -Sept ❑Oct -Dec ®Jan -March ❑April -June PERSON COLLECTING SAMPLES: Susan Bostian COUNTY: Durham CERTIFIED LABORATORY: Lab # ENV37S Lab # LIMIT VIOLATIONS? YES ® NO ❑ Part A: Wastewater Monitoring Requirements PHONE NO. (_919 _)598-0456 mn� ADD TO LISTSERVE? []YES ®NO EMAIL: r- DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other "i OPTIONAL INFO: Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater z RMMD) (VE, , pH {standard} Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using method 1664A 6 SG 1L) {mg/L} Discharge Duration (minutes) Total Flow 7 (gallons/dayj - - - 6-93'4 303s 53 (15)6 - - 001 No Discharge VE, RM Total Flow: 4,790 gpd 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. ° pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. Permit Date:7/1/2010-06/30/2015 Last Revised 07/13/11 -C r* GENIC Page 1 of 2 s TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Processwastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VIVA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing j5fgnature of Permit Date:7/1/2010-06/30/2015 3/31/2015 (Date) Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE N0. NCG140218 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant PERSON COLLECTING SAMPLES Susan Bostian CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: January Monitoring event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Durham PHONE NO. (919) 598-0456 ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH (Standard Units) TSS (mg/L) Event Duration (minutes) Total Rainfall4 (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Samplingx - - 6-9 100- 001 No Discharge y 11 REGENtu CENTI tAi I If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TS5 benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. C7 Mac Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sampie Collected {mo/dd/yr)1 pH (standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Z Sampling 6-9 15 100, - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one coov of this DMR fincludine all "No Flow" & "No Discharee" reports) within 30 days of receipt of sample for at end of monitorine period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am_aAare that there/�'er signifisapt penalt),Rsor submittA false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) 3/31/2015 (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant PERSON COLLECTING SAMPLES Susan Bostian CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: February Monitoring event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Durham PHONE NO. (919) 598-0456 ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH (Standard Units} TSS (mg/L) Event Duration (minutes} Total A Rainfall {in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier z 2 Sampling - - 6-9 100 , - - - - 001 No Discharge y 12 2 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "No DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are SO mg/I. °For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfal! Na. Date Sample Collected 1 {mo/dd/yr) PH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfalla (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly (y/n) Monitoring? # of Months in Tier 2 2 Sampling 6-9 15 100 , - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE CUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES [:]NON HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR (including all "No How" & "No Discharge" reoorts) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am,aYyare that thefe are significanyRenalties fW su4mitting false information, including the possibility of fines and imprisonment for knowing violations." V\ (Signature of Per 3/31/2015 (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE N0. NCG140218 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant PERSON COLLECTING SAMPLES Susan Bostian CERTIFIED LABORATORY ESC Lab # ENV 375_ OPTIONAL INFO: March Monitoring event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Durham PHONE NO. (919) 598-0456 ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA E]HQW ❑PNA ❑Trout ®Other, Outfall No, Date Sample Collected (mo/dd/yr OR NO FLOW); pH {Standard Units) TS5 (mg/L) Event Duration (minutes] Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) #f of Months in Tier 2 SamplingZ - - 6-9 100 . - - - 001 No Discharge y 13 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. a TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr}1 pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall4 (in) New Motor Oil Usage (gal/month) 1n Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling 6-9 15 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES [:]NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample for at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the inform ati n, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that ther�re signi�ant poa�gs for subTitting Ise information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) 3/31/2015 (Date) Permit Date. 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCC3140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant PERSON COLLECTING SAMPLES Susan Bostian CERTIFIED LABORATORY ESC Lab # ENV 375� Lab # OPTIONAL INFO: September Monitoring event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2014 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Durham PHONE NO. (919) 598-0456 ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout [:]Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FL0W)1 pH (Standard Units) TS5 (mg/L) Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier z 2 Sampling - - 6-9 ,002.3 - - - - 001 09/08/2014 8,56 7.400 45 1 y 7 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period"above z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. W LAW Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)1 pH Standard Units) TPH using method 1664A SGT HFM (mg/i_} Total Suspended Solids (mg/L} Event Duration (minutes} Total a Rainfall (in) New Motor Oil Usage (gal/month} In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling 6-9 15 100 , - - - - - •Y ( HAS�YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO sPHAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one coov of this DMR fincludine all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that thhj9 e are si nificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." `1--Olj_C G -� 12/29/2014 (Signature of Permittee) Permit Date:7/l/2011-60/30/2015 (Date) Last Revised 7/13/11 Page 2 of 2 Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this fonn, please visit: httn:/th2o.enr.state.nc.us/su/Forms Documents.htm#miscforms 1 4 0 2 1 8 Permit No.: NICI I_I I 1_I I 1 or Certificate of Coverage No.: NIC/GI 1_I_I_I 1 I Facility Name: Thomas Concrete of Carolina- Durham Plant County: Durham Phone No. (919) 5 9 8- 0 4 5 6 Inspector: Susan Bostian Date of Inspection: Time of Inspection: 1445 Total Event Precipitation (inches): 0.75 Was this a Representative Storm Event? (See information below) ® Yes ❑ No Please check your permit to verify if Qualitative Monitoring must be performed during a representative stonn event (requirements vary). A "Representative Storm Event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) 1. Outfall Description: Outfall No. 01 Structure (pipe, ditch, etc.) Weir Outlet Receiving Stream: Third Fork Creek Branch Describe the industrial activities that occur within the outfall drainage area: Bulk Storage of raw materials and petroleum, wastewater treatment 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: clear 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinctive odor Page l of 2 SWU-242-112608 4. Clarity: Choose the number which best describes the clarity of the discharge, where I is clear and 5 is very cloudy: (1 } 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 0 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: O2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe pH (field -measured). 9.6 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242-112608 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: _Thomas Concrete of Carolina- Durham Plant PERSON COLLECTING SAMPLES: Susan Bostian CERTIFIED LABORATORY: ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES ® NO ❑ Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2014 SAMPLE QUARTER: ❑Jul -Sept ®Oct -Dec ❑Jan -March COUNTY: Durham PHONE NO. (..919 _)598-0456 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout OPTIONAL INFO: []April -June []Other, Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater (VE, RM, MD}z pH (standard} Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using method 1664A S (mg/L}g/L)R6 Discharge Duration (minutes) Total Flow (gallons/day)' - I - - 6-93'4 303's 53 (15)6 - 001 12/15/14 VE, RM 9.6 56.0 < 0.033 45 Total Flow: 4,790 gpd 1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. a Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 31f an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. if the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED. "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing 'Jiniatinnc " �c�'A e . G (Signature of Permittee) Permit Date'. 7/1/2010-06/30/2015 12/29/2014 (Date) Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant PERSON COLLECTING SAMPLES Susan Bostian CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: December Monitoring event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2014 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Durham PHONE NO. (919) 598-0456 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout []Other. Outfall No. Date Sample Collected (mo/dd/yr OR NO FL0W)' PH (Standard Units) TS5 (mg/L) Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling - - 6-9 100 ' - - - - 001 12/15/2014 9.60 56.0 30 0.75 y 10 i If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Qutfall No. Date Sample Collected 1 (mo/dd/yr) pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) tf of Months in Tier 2 Sampling 6-92 15 1002' - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one conv of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of ""No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED. "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that ther� significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. 12/29/2014 (Signature of Permittee) Permit Date: 7/1/2011-60/30/2015 (Date) Last Revised 7/13/11 Page 2 of 2 Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit: httn://h2o.enr.state.nc.us/su/Forms_Documents.htm#miscforms 1 4 0 2 1 8 Permit No.: N/CI_I_I 1 l l l l or Certificate of Coverage No.: N/C/GI I_l_l_l_I / Facility Name: Thomas Concrete of Carolina- Durham Plant County: Durham Phone No. (919) 5 9 8- 0 4 5 6 Inspector: Susan Bostian Date of Inspection: 0 9 / 8 / 14 Time of Inspection: 1000 Total Event Precipitation (inches): 1.00 Was this a Representative Storm Event? (See information below) ® Yes ❑ No Please check your permit to verify if Qualitative Monitoring must be performed during a representative storm event (requirements vary). A "Representative Storm Event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours Q days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) 1. Outfall Description: Outfall No. Q1 Structure (pipe, ditch, etc.) Weir Outlet Receiving Stream: Third Fork Creek Branch Describe the industrial activities that occur within the outfall drainage area: Bulk Storage of raw materials and petroleum, wastewater treatment 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: clear 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinctive odor Page 1 of 2 S W U-242-1 l 2608 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: O2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where I is no solids and 5 is the surface covered with floating solids: O 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: (D 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No S. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe pH (field -measured): 8.56 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242-112608 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140347 FACILITY NAME: _Thomas Concrete of Carolina- Fuquay Varina Plant PERSON COLLECTING SAMPLES: Susan Bostian CERTIFIED LABORATORY:_ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2014 SAMPLE QUARTER: ❑Jul -Sept ®Oct -Dec COUNTY: Harnett PHONE NO. (_919 _)557-3144 ADD TO LISTSERVE? ❑YES ®NO EMAIL: ❑Jan -March ❑April -June DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout ❑Other OPTIONAL INFO: Outfall No. Date Sample Collected (mm/dd/yr) Type of Wastewater z (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-HEM6 (mg/L) Duration (minutes) Total Flow (gallons/day)' - - - 6-93.4 303,5 53 (15)6 - 01 NO DISCHARGE 1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date:7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. if the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW "NO DISCHARGE-) WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD_ IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date: 7/1/2010-06/30/2015 12/29/2014 (Date) Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14140418 FACILITY NAME: _Thomas Concrete of Carolina- Knightdale Plant PERSON COLLECTING SAMPLES: Click here to enter text. CERTIFIED LABORATORY:_ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2014 SAMPLE QUARTER: ❑Jul -Sept ®Oct -Dec COUNTY: Harnett PHONE NO. (_919 _)557-3144 ADD TO LISTSERVE? OYES ®NO EMAIL:_ Dian -March ❑April -June DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout ❑Other OPTIONAL INFO: Outfall No. Date Sample i Collected (mm/dd/yr) Type of Wastewater (VE, RM, MD)' pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A 5GT-HEM' (mg/L) Duration (minutes) Total Flow , {gallons/dayj - - - 6-93,4 303,5 53 (15)6 - - 01 NO DISCHARGE 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 V an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 e Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing vinintinnc " GP, (Signature of Permittee) Permit Date-. 7/1/2010-06/30/2015 12/29/2014 ( Date) Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: _Thomas Concrete of Carolina- Durham Plant PERSON COLLECTING SAMPLES: Susan Bostian CERTIFIED LABORATORY:_ESC Lab # ENV375_ Lab # LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2014 SAMPLE QUARTER: ®Jul -Sept ❑Oct -Dec ❑Jan -March ❑April -June COUNTY: Durham PHONE NO. (_919 _) 598-0456 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout ❑Other OPTIONAL INFO: Outfall Na. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater (VE, RM, MD)' pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-HEM' (mg/L) Duration (minutes) Total Flow , (gallons/day) - - - 6-93.4 30315 53 (15)6 001, 07/22/14 VE, RM 8.97 19 <0.033 45 Total Flow: 4,790 gpd Vttu EA r F LE N If wastewater systems have not discharged in this quarter — report "No Flow' or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 023 .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware tha ere are signific penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations �7 / 9/15/2014 (Signature of Permittee) (Date) Permit Date: 7/1/2010-06/30/2015 L Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant PERSON COLLECTING SAMPLES Susan Bostian CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: August Monitoring event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2014 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Durham PHONE NO. (919) 598-0456 ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout ❑Other Outfall No. Date Sample Collected (mo/dd/yr OR i NO FLOW) pH (Standard Units) TSS m �g/L) Event Duration (minutes) Total a Rainfall (in) In Tier 2 Monthly Monitoring. (y/n) # of Months in Tier 2 2 Sampling - - 6-9 100- 001 NO DISCHARGE y 6 rn tam SEP,16 ?014 QZKITC DWR SECTIoN 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. °for each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected {mo/dd/yrjl pH (Standard Units) TPH using method 1664A 5GT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall' (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? {y/n} d of Months in Tier 2 i Sampling 6-9 215 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one coov of this DMR {including all "No Flow" & "No Discharee" reports) within 30 days of receipt of sample for at end of monitorinp, period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly respo ible for gather' g he information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aw t#et there are sl icantIti for ubmi g f irse information, including the possibility of fines and imprisonment for knowing violations." A-4 9/15/2014 )Signature of Permittee} (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant PERSON COLLECTING SAMPLES Susan Bostian CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: July Monitoring event_ Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2014 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Durham PHONE NO. (919) 598-0456 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ®SA ❑HCZW ❑PNA ❑Trout ❑Other, Outfall No. Date Sample Collected (ma/dd/yr OR NO FLOW)1 pH (Standard Units} T55 [mg/L} Event Duration (minutes) Total a Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier x 2 Sampling - - 6-9 100 ' - - - - 001 07/22/2014 8.84 19 45 0.25 y 5 RtULIVED FILES SEISTION 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/l. ° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)1 pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall° (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Samplingz 6-9 15 100 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED. "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly res nsible for gath g the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I a e t at there are ' nific>iat-penal ies r submiyting fplse information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) 9/15/2014 (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit: litty://h2o.enr.st ite.iic.iis/su/Forms Dociinients.htni#ntiscfornis 1 4 0 2 1 8 Permit No.: iNICI—/ 1�1�1 1 1_I or Certificate of Coverage No.: NIC/GI_I_I 1 I l 1 Facility Name: Thomas Concrete of Carolina- Durham Plant County: Durham Phone No. (919) 5 98 - 04 56 Inspector: Susan Bostian Date of Inspection: 0 7 / 2 2f 14 Time of Inspection: 1425 Total Event Precipitation (inches): 0.25 Was this a Representative Storm Event? (See information below) ® Yes ❑ No Please check your permit to verify if Qualitative Monitoring must be performed during a representative storm event (requirements vary). A "Representative Storm Event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) 1. Outfall Description: Outfall No. 01 Structure (pipe, ditch, etc.) Weir Outlet Receiving Stream: Third Fork Creek Branch Describe the industrial activities that occur within the outfall drainage area: Bulk Storage of raw materials and iDetroleum, wastewater treatment 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: _ Tii qht tan tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinctive odor Page I of 2 S WU-242-112608 r 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 O 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: O 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where I is no solids and 5 is extremely muddy: O2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No S. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe pH (field -measured) . 8.84 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242-1 12608 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO..NCG140218 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant PERSON COLLECTING SAMPLES Phillip Jones CERTIFIED LABORATORY ESC Lab # ENV 375 Lab # OPTIONAL INFO: May Monitoring event Part A: Stormwater Monitoring Requirements RECEIVED JAL o l 2014 SAMPLE COLLECTION YEAR: 2014 SAMPLING PERIOD: ❑ July -December ® January -June CENTRAL FILEr- COUNTY Durham DVVQIBOC PHONE NO. (919) 598-0456 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout ❑Other Outfall No. Date Sample Collected Imo/dd/yr OR NO FLOW)1 pH (Standard Units) TSS (mg/L) Event Duration (minutes) Total a Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling - - 6-9 100 '11 - - - 001 NO DISCHARGE y 2 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. a TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. "For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date:7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 9 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month -- averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/yr) pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a RainfalE (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 6-9 15 1002,3 - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Ori21nai and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample for at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQCentral Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. i am_g are that th fte are �ignifican;.;a?naltles for�ubr*tting false information, including the possibility of fines and imprisonment for knowing violations." re of Permittee) Permit Date: 7/1/2011-60/30/2015 6/30/2014 (Date) Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM RECEIVED GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant PERSON COLLECTING SAMPLES Phillip Jones CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: April Monitoring event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2014 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Durham PHONE NO. (919) 598-0456 ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA JUL 07 Z014 CEDWQIBOIGES ❑Trout ❑Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' PH (Standard Units) TSS (mg/L) Event Duration (minutes) Total Rainfall d (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Samplingz - - 6-9 100 , - - - - 001 NO DISCHARGE y 2 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. ° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part 9: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month -- averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)1 PH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier Z Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling 6-9 15 100 ' - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinai and one coot/ of this DMR (includine all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample for at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFIC4TION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that %here are signifiyant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date:7/1/2011-60/30/2015 6/30/2014 (Date) Last Revised 7/13/11 Page 2 of 2 PR 0 -9 2014 ��+ ware 1 QSANLST WA[ITy Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit: hitp://h2o.enr.state.nc.us/su/Forms Documents. htm#miscforms Permit No.: N/C/_/ 1 l�l / l _I or Certificate of Coverage No.: N/C/GI 1/ 4/ 0/ 2i Facility Name: Thomas Concrete of Carolina-- Durham Plant County: Durham Phone No. (919) 5 9 8 - 04 5 6 Inspector: Susan Bostian Date of Inspection: 0 3 f 2 5 f 14 Time of Inspection: 1445 Total Event Precipitation (inches): 0.10 Was this a Representative Storm Event? (See information below) ® Yes ❑ No Please check your permit to verify if Qualitative Monitoring must be performed during a representative storm event (requirements vary). A "Representative Storm Event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. By this signature I certify that this report is accurate and complete to the best of my knowledge: �Snn, a F ,C"'Ito (Signature of Permittee or Designee) 1. Outfall Description: Outfall No. 01 Structure (pipe, ditch, etc.) Weir Outlet Receiving Stream: Third Fork Creek Branch Describe the industrial activities that occur within the outfall drainage area: Bulk Storage of raw materials and petroleum, wastewater treatment 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Light Green 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinctive odor Page 1 of 2 SWOT-242-112608 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: O2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: O2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwatcr discharge, where 1 is no solids and 5 is extremely muddy: lO 2 3 4 5 7. Is there any foam in the stormwater discharge? es No S. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe pH (field -measured) : 10.40 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition maybe indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SM(U-242-112608 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG1,40218 FACILITY NAME: Thomas Concrete of Carolina -Durham Plant PERSON COLLECTING SAMPLES Susan Bostian CERTIFIED LABORATORY ESC lab # ENV 375_ Lab # OPTIONAL INFO: Part A: Stormwater MonitorinR Requirements SAMPLE COLLECTION YEAR: 2014 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Durham PHONE NO. (919) 599-0456 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA [-]Trout []Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH (Standard Units TSS (mg/L) Event Duration [minutes} Total Rainfall' (in) In Tier 2 Monthly y Monitoring? (y/n) # of Months In Tier 2 Sampling' - 6-92 1002.1 - - - - 001 03/25/14 10.30 13 60 0.10 y 3 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HOW, Trout, and RNA waters where they are 50 mg/l. "For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part 8: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)l pH (Standard Units) TPH using method 1564A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall o (In) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling' 6-9' 1s' 1002•3 - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES [:]NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR Uncludins all "No Flow" & "No Discharee" reoorts) within 30 days of receipt of samole (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS cERTIFICATION FOR ANY INFORMATION REPORTED: "i certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that tPere are significant penalt s for syyb�mitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 r THOMAS 4(t>THE CONCRETE SPECIALISTS - ISO 9001 A. 14001 CERTIFIED 2500 Cumberland Pkwy. Suite 200 Atlanta, Ga 30339 770.431.3300 Mr. Butler, Please accept this signature authorization: Sam Crawford, (Raleigh Division's Technical Services Director, and Environmental Management Representative) has been authorized by Thomas Concrete Industries, Inc. to sign all documents submitted by us, or our environmental representative (Dunkleee & Dunham), to the North Carolina Department of Environment, and Natural Resources (NCDENR). Should you have any questions regarding this, please contact Allen Burch (TCI Environmental Manager) at 404.391.0693. IBest Regards, Bill Davis COO, Thomas Concrete Industries, Inc. 2500 Cumberland Pkwy, N,E., Suite 200 Atlanta, Ga. 30339