Loading...
HomeMy WebLinkAboutNCG140198_COMPLETE FILE - HISTORICAL_20140415STORMWATER DIVISION CODING SHEET RESCISSIONS PERMIT NO. DOC TYPE ❑COMPLETE FILE -HISTORICAL DATE OF RESCISSION ❑ �UIy, ���i I� YYYYMMDD ter. RECEIVED APR 15 2014 CENTRAL FILES DWQlBOG STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE No. NCG140198 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Concrete Supply Co., LLC is hereby authorized to discharge process wastewater and stormwater from a facility located at Concrete Supply Co. — Pineville Plant 9745 Old Nations Ford Rd Charlotte Mecklenburg County to receiving waters designated as Kings Branch, a class C water in the Catawba River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, II1, 1V, V, and VI of General Permit No. NCG140000 as attached. This certificate of coverage shall become effective April 14, 2014, This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day April 14, 2014 P for Tracy E. Davis, P.E., Director Division of Energy, Mineral, and Land Resources By the Authority of the Environmental Management Commission ADivision of Water Quality / Surface Water Protection National Pollutant Discharge Elimination System NCDENR NO""" .oN ,k4F�°' PERMIT NAMEIOWNERSHIP CHANGE FORM [NNgpNwlNf wN0 NYV14, f�40UAG[.8 FOR AGENCY USE ONLY Date Received Year Moth Day 1. Please enter the permit number for which the change is requested. NPDES Permit (or) Certificate of Coverage N C S O N I C 10 1 1 14 101 1 19 18 II. Permit status urior to requested change. a. Permit issued to (company name): CEMEX Construction Materials Atlantic, LLC b. Person legally responsible for permit: Larry McSwain_ �u c. Facility name (discharge): d. Facility address: First MI Last VP/GM Carolinas Title 101 Young Court Permit Holder Mailing Address Greenville SC 29615 City State Zip (864) 605-9877 (864) 605-9869 Phone Fax CEMEX -- Pineville 9745 Old Nations Ford Rd Address Charlotte NC 28273 City State Zip e. Facility contact person: Johnny M Tapia (803) 327-2494 First / Ml / Last Phone Ill. Please provide the following for the requested change (revised permit). a. Request for change is a result of: ® Change in ownership of the facility ® Name change of the facility or owner If other please explain: b. Permit issued to (company name): c. Person legally responsible for permit �c�[Aod14p OCT 1 7 2013 d. Facility name (discharge): e. Facility address: Concrete Supply Co., LLC Henry Batten First Na Last President Title P.O. Box 5247 Permit Holder Mailing Address Charlotte NC 28299 City State Zip (704) 372-2930 Henry.Batten@ConcreteSupplyCo.com Phone E-mail Address Pineville 9745 Old Nations Ford Rd Address Charlotte NC 28273 City State Zip f. Facility contact person: Johnie Alexander First Ml Last Johnie.Alexander@ConcreteSupplyCo. (704) 372-2930 com _ NPDES PERMIT NAME/OWNERSHIP CHANGE FORM Page 2 of 2 IV. Permit contact information (if different from the person legally responsible for the permit) Permit contact: Johnie Alexander First MI Ust Environmental Manager Title P.O Box 5247 Mailing Address Charlotte NC 28299 City State Zip (704) 372-2930 Johnie.Alexander@concretesupplyco.com Phone E-mail Address V. Will the permitted facility continue to conduct the same industrial activities conducted prior to this ownership or name change? x Yes ❑ No (please explain) VI Required Items: THIS APPLICATION WILL BE RETURNED UNPROCESSED IF ITEMS ARE INCOMPLETE OR MISSING: X This completed application is required for both name change and/or ownership change requests. X Legal documentation of the transfer of ownership (such as relevant pages of a contract deed, or a bill of sale) is ree uired for an ownership change request. Articles of incorporation are not sufficient for an ownership change. The certifications below must be completed and signed by both the permit holder prior to the change, and the new applicant in the case of an ownership change request. For a name change request, the signed Applicant's Certification is sufficient. PERMITTEE CERTIFICATION (Permit holder prior to ownership change): I, Larry McSwain, attest that this application for a name/ownership change has been reviewed and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting information is not included, this application package will be returned as incomplete. Signature Date APPLICANT CERTIFICATION I, Henry Batten, attest that this application for a name/ownership change has been reviewed and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting information is not included, this application package will be returned as incomplete. Signature Date PLEASE SEND THE COMPLETE APPLICATION PACKAGE TO: Division of Water Quality Surface Water Protection Section 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Revised 712008 NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Governor Mr. Johnie Alexander Concrete Supply Co., LLC P.O. Box 5247 Charlotte, NC 28299 Dear Mr. Alexander: John E. Skvarla, Ili Secretary April 14, 2014 Subject: NPDES General Permit NCG140000 Certificates of Coverage -Multiple Concrete Supply Co., LLC Formerly CEMEX Construction Materials Atlantic, LLC Counties - Multiple Division personnel received your request to revise your stormwater permit Certificates of Coverage to accurately reflect your new company and/or facility name. Please find enclosed the revised Certificates of Coverage for the 17 facilities that changed ownership from CEMEX Construction Materials Atlantic, LLC to Concrete Supply Co., LLC. The terms and conditions contained in the General Permit remain unchanged and in full effect. These revised Certificates of Coverage are issued under the requirements of North Carolina General Statutes 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S. Environmental Protection Agency. If you have any questions or need further information, please contact the Stormwater Permitting Program at (919) 807-6300. Sincerely, ORIGINAL. SIGNS® M KEN PICKLE for Tracy E. Davis, P.E., CPM, Director Division of Energy, Mineral and Land Resources cc: Mooresville RO, Z. Khan Winston-Salem RO, M. Gantt Fayetteville RO, B. Cole Asheville RO, L. Herbert Raleigh RO, J. Holley Division of Energy, Mineral, and Land Resources Energy Section - Geological Survey Section • Land Quality Section 1612 Mail Service Center, Raleigh, North Carolina 27699-1612.919.707-92001 FAX: 919-715-8801 512 North Salisbury Street, Raleigh, North Carolina 27604 • Internet: http://portal.flcdenr.org/webAr/ An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper Deborah Reese, DEMLR Budget Office -- please update billing info Stormwater Permitting Program Files Central Files Mecklenburg County DEP, Water Quality, 700 N. Tryon Street, Charlotte, NC 28202 Wake County Environmental Services, Attn: Eric Green, P.O. Box 550, Raleigh, NC 27602