HomeMy WebLinkAboutNCG140198_COMPLETE FILE - HISTORICAL_20140415STORMWATER DIVISION CODING SHEET
RESCISSIONS
PERMIT NO.
DOC TYPE
❑COMPLETE FILE -HISTORICAL
DATE OF
RESCISSION
❑ �UIy, ���i I�
YYYYMMDD
ter.
RECEIVED
APR 15 2014
CENTRAL FILES
DWQlBOG
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE No. NCG140198
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended,
Concrete Supply Co., LLC
is hereby authorized to discharge process wastewater and stormwater from a facility located at
Concrete Supply Co. — Pineville Plant
9745 Old Nations Ford Rd
Charlotte
Mecklenburg County
to receiving waters designated as Kings Branch, a class C water in the Catawba River Basin, in
accordance with the effluent limitations, monitoring requirements, and other conditions set forth
in Parts I, II, II1, 1V, V, and VI of General Permit No. NCG140000 as attached.
This certificate of coverage shall become effective April 14, 2014,
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day April 14, 2014
P
for Tracy E. Davis, P.E., Director
Division of Energy, Mineral, and Land Resources
By the Authority of the Environmental Management Commission
ADivision of Water Quality / Surface Water Protection
National Pollutant Discharge Elimination System
NCDENR
NO""" .oN ,k4F�°' PERMIT NAMEIOWNERSHIP CHANGE FORM
[NNgpNwlNf wN0 NYV14, f�40UAG[.8
FOR AGENCY USE ONLY
Date Received
Year
Moth
Day
1. Please enter the permit number for which the change is requested.
NPDES Permit (or) Certificate of Coverage
N C S O N I C 10 1 1 14 101 1 19 18
II. Permit status urior to requested change.
a. Permit issued to (company name): CEMEX Construction Materials Atlantic, LLC
b. Person legally responsible for permit: Larry McSwain_ �u
c. Facility name (discharge):
d. Facility address:
First MI Last
VP/GM Carolinas
Title
101 Young Court
Permit Holder Mailing Address
Greenville SC 29615
City State Zip
(864) 605-9877 (864) 605-9869
Phone Fax
CEMEX -- Pineville
9745 Old Nations Ford Rd
Address
Charlotte NC 28273
City State Zip
e. Facility contact person: Johnny M Tapia (803) 327-2494
First / Ml / Last
Phone
Ill. Please provide the following for the requested change (revised permit).
a. Request for change is a result of: ® Change in ownership of the facility
® Name change of the facility or owner
If other please explain:
b. Permit issued to (company name):
c. Person legally responsible for permit
�c�[Aod14p
OCT 1 7 2013
d. Facility name (discharge):
e. Facility address:
Concrete Supply Co., LLC
Henry Batten
First Na Last
President
Title
P.O. Box 5247
Permit Holder Mailing Address
Charlotte NC 28299
City State Zip
(704) 372-2930 Henry.Batten@ConcreteSupplyCo.com
Phone E-mail Address
Pineville
9745 Old Nations Ford Rd
Address
Charlotte NC 28273
City State Zip
f. Facility contact person: Johnie Alexander
First Ml Last
Johnie.Alexander@ConcreteSupplyCo.
(704) 372-2930 com _
NPDES PERMIT NAME/OWNERSHIP CHANGE FORM
Page 2 of 2
IV. Permit contact information (if different from the person legally responsible for the permit)
Permit contact: Johnie Alexander
First MI Ust
Environmental Manager
Title
P.O Box 5247
Mailing Address
Charlotte NC 28299
City State Zip
(704) 372-2930 Johnie.Alexander@concretesupplyco.com
Phone E-mail Address
V. Will the permitted facility continue to conduct the same industrial activities conducted prior to
this ownership or name change?
x Yes
❑ No (please explain)
VI Required Items: THIS APPLICATION WILL BE RETURNED UNPROCESSED IF ITEMS
ARE INCOMPLETE OR MISSING:
X This completed application is required for both name change and/or ownership change requests.
X Legal documentation of the transfer of ownership (such as relevant pages of a contract deed, or
a bill of sale) is ree uired for an ownership change request. Articles of incorporation are not
sufficient for an ownership change.
The certifications below must be completed and signed by both the permit holder prior to the change, and the
new applicant in the case of an ownership change request. For a name change request, the signed Applicant's
Certification is sufficient.
PERMITTEE CERTIFICATION (Permit holder prior to ownership change):
I, Larry McSwain, attest that this application for a name/ownership change has been reviewed and is accurate
and complete to the best of my knowledge. I understand that if all required parts of this application are not
completed and that if all required supporting information is not included, this application package will be
returned as incomplete.
Signature Date
APPLICANT CERTIFICATION
I, Henry Batten, attest that this application for a name/ownership change has been reviewed and is accurate
and complete to the best of my knowledge. 1 understand that if all required parts of this application are not
completed and that if all required supporting information is not included, this application package will be
returned as incomplete.
Signature Date
PLEASE SEND THE COMPLETE APPLICATION PACKAGE TO:
Division of Water Quality
Surface Water Protection Section
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
Revised 712008
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
Mr. Johnie Alexander
Concrete Supply Co., LLC
P.O. Box 5247
Charlotte, NC 28299
Dear Mr. Alexander:
John E. Skvarla, Ili
Secretary
April 14, 2014
Subject: NPDES General Permit NCG140000
Certificates of Coverage -Multiple
Concrete Supply Co., LLC
Formerly CEMEX Construction Materials Atlantic, LLC
Counties - Multiple
Division personnel received your request to revise your stormwater permit Certificates of Coverage
to accurately reflect your new company and/or facility name.
Please find enclosed the revised Certificates of Coverage for the 17 facilities that changed
ownership from CEMEX Construction Materials Atlantic, LLC to Concrete Supply Co., LLC. The
terms and conditions contained in the General Permit remain unchanged and in full effect. These
revised Certificates of Coverage are issued under the requirements of North Carolina General
Statutes 143-215.1 and the Memorandum of Agreement between North Carolina and the U.S.
Environmental Protection Agency.
If you have any questions or need further information, please contact the Stormwater Permitting
Program at (919) 807-6300.
Sincerely,
ORIGINAL. SIGNS® M
KEN PICKLE
for Tracy E. Davis, P.E., CPM, Director
Division of Energy, Mineral and Land Resources
cc: Mooresville RO, Z. Khan
Winston-Salem RO, M. Gantt
Fayetteville RO, B. Cole
Asheville RO, L. Herbert
Raleigh RO, J. Holley
Division of Energy, Mineral, and Land Resources
Energy Section - Geological Survey Section • Land Quality Section
1612 Mail Service Center, Raleigh, North Carolina 27699-1612.919.707-92001 FAX: 919-715-8801
512 North Salisbury Street, Raleigh, North Carolina 27604 • Internet: http://portal.flcdenr.org/webAr/
An Equal Opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper
Deborah Reese, DEMLR Budget Office -- please update billing info
Stormwater Permitting Program Files
Central Files
Mecklenburg County DEP, Water Quality, 700 N. Tryon Street, Charlotte, NC 28202
Wake County Environmental Services, Attn: Eric Green, P.O. Box 550, Raleigh, NC 27602