Loading...
HomeMy WebLinkAboutNCG140163_MONITORING INFO_20180305STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. DOC TYPE ❑HISTORICAL FILE $MONITORING REPORTS DOC DATE ❑ � �� D � � � 5 YYYYMMDD STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /V DOC TYPE ❑HISTORICAL FILE eMONITORING REPORTS DOC DATE ❑ 2(S) (V a (9 p YYYYMMDD ANNUAL SUMMARY DISCHARGE MONITORING - REPORT (DMR) — STORMWATER SUBMIT TO CENTRAL OFFICE* General Permit No. NCG140000 Calendar Year 2017 *Report ALL STORMWATER monitoring data on this form (include "No Flow'?'No Discharge" and Benchmark Exceedances) from the previous calendar year to the DEQ by MARCH 1 of each year. Certificate of Coverage No. NCG 140163 Facility Name: Southern Concrete Materials — East Plant County: Union Phone Number: (828 253-6421 Total no. of SDOs monitored 1 Certified Laboratory ETA Lab # 600 Lab # Stormwater Discharge Outfall (SDO) No. 1 VMA Outfall? Yes ❑ No Is this outfall currently in Tier 2 for any parameter? Yes ❑ No Was this outfall ever in Tier 2 during the past year? Yes ❑ No ZJ _ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? r� �l� �1� _ n Yes, enough consecutive samples below benchmarks to decrease frequency ❑ MAR 0 5 lu ld Yes, received approval from DEMLR to reduce monitoring frequency ❑ CENTRAL FELL; Other ❑ DV`JR 5rr-r-l>,,, Outfall No. - Total Rainfall, inches Total Suspended Solids TSS , (} m !/ I pH, 5U Non -polar O&G (EPA Method 1664 ( })� mgll (VMA} SGT-HEM !f applicable New Motor Oil Usage (gallmo.) xappllcable Stormwater Benchmarks lndlcare NO FLOW If applicable Circle Benchmark 1 Or1150 V 6.0-9. (} 15 �55 g alfmo. average requires TSS and Non -polar O&G monitoring Date Sample Collected,MMM molddl r 06/30/2017 No flow 12/31/2017 No flow - Permit Date 811/2017 — 6130/2022 Last Revised 8-22-2015 Certificate of Coverage No. NCG 14 0M©Q CERTIFICATION "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." [Required by 40 CFR § 122.22) Signature Date 2,1)-6%/ Mail Annual Summary Stormwater DMR to the NCDEQ Central Office: Note the address is correct — Central Files is housed in DWR (not DEMLR) N.C. Department of Environmental Quality (DEQ) Division of Water Resources _ Attn: DWR Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Central Files Telephone (919) 807-6300 Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at: (919) 707-9220 Permit Date 81112017 — 6130/2022 Last Revised 8-22-2015 ,5TORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM ' GENERAL PERMIT�NO. NCG140000 RECEIVED CERTIFICATE OF COVERAGE NO. NCG140163 FACILITY NAME: _Southern Concrete Materials -East Plant PERSON COLLECTING SAMPLES _Jeff Lamm CERTIFIED LABORATORY ETS Lab # 600 Lab # AUG 3 1 ZPSAMPLE COLLECTION YEAR: _2016 ter, i-.OAE t:1;5AMPLING PERIOD: ® July -December ❑ January -June OPTIONAL INFO' vwa.mmn%3 irn i w -.Lmia. L_j-�m L-jn%Avv Part A: Stormwater Monitoring Requirements [_] RNA ❑Trout ®Other Outfall No. Date Sample Collected {mo/dd/yr OR NO FLOW)' pH {Standard Units} T55 {mg/L} Event Duration {minutes} Total a Rainfall {in} In Tier 2 Monthly Monitoring? {y/n} # of Months in Tier 2 Sampling' - - 642 1002.3 - - - - 1 $-10-16 8.1 33 60 0.1 N N/A /r r I. � � L E T � 1 if "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the Genera! Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. s T55 benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I. °For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-64/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month -- averaged over a calendar year. - Outfall No. � Date Sample Collected (mo/dd/yr}1 pH (standard Units) TPH using method 1664ASGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall a (in) New Motor Oil Usage (gal/month) in Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling 2 6-92 152 1002,3 - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR (including all "No Flow" & "No Discharize" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure.that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are signifiMnt penaltie,§ for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) 8/24/2016 (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140163 SAMPLE COLLECTION YEAR: _2016 FACILITY NAME: _Southern Concrete Materials -East Plant SAMPLING PERIOD: ❑ July -December ® January -June PERSON COLLECTING SAMPLES _Jeff Lamm COUNTY Union CERTIFIED LABORATORY ETS Lab # 600 PHONE NO. (_} Lab # ADD TO LISTSERVE? ❑YES ❑NO EMAIL: OPTIONAL INFO: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other Part A: Stormwater Monitoring Requirements Outfall No. Date Sample Collected (ma/dd/yr OR NO FLOW)' pH (Standard Units] TSS (mg/L) Event Duration (minutes] Total n Rainfall (in] In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Samplingz - - 6-92 1002.3 - - 1 1-15-2016 -8.76 -7.8 480- 0.9- no- PR TT 2016 DWR SE 'TI ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. _ OutfaII No. Date Sample Collected (rho/dd/yr)l PH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfalla (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 6-92 152 1002,3 - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitorine period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am awareAhat therplre significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Permittee) 2/1/2016 (Date) Permit Date:7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 -WORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT No. NCG140000 D CERTIFICATE OF COVERAGE NO. NCG140163., FACILITY NAME: _Southern Concrete Materials -East Plant_ PERSON COLLECTING SAMPLES _Jeff Lamm CERTIFIED LABORATORY ETS Lab # _600 Lab # OPTIONAL INFO: Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ❑ July -December ® January -June - COUNTY Union — PHONE NO. ( ) ADD TO LISTSERVE? ❑YES ❑NO EMAIL: DISCHARGING TO CLASS: []SA ❑HQW ❑PNA ❑Trout ®Other_ Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH (Standard Units} TS5 (mg/L) Event Duration {minutes} Total Rainfall a (in} In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 - 6-92 1001,3 - - - - 1 1-15-2016 -8.76 -7.8 480- 0.9- no- RECEIVED- FEB 08 2016 , ,_ �% ILA DWR SECTION 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I. "For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: ,Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall Na. Date Sample Collected 1 (mo/dd/yr) PH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall' (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n} # of Months in Tier 2 Sampling2 6-92 152 1002,1 - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES []NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail OrlEinal and one coov of this DMR (includine all "No Flow" & "No Discharee" reports) within 30 days of receipt of sample for at end of monitoring period in case of "No Flow" to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware_1hat therg,gre significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signatdra'dt Permittee) 2/1/2016 (Date) Permit Date:7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 U L id FACILITY NAME: OA PERSON COLLECTING SAMPLES �-..� CERTIFIED LABORATORY s--r .S Lab # Lab # OPTIONAL INFO: Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION Y FR: (� SAMPLING PERIOD: July -December ❑ January -June COUNTY t,ln • Q-n PHONE NO. (�j ADD TO LISTSERVE? ❑YES []NO EMAIL: DISCHARGING TO CLASS: []SA ❑HQW ❑PNA ❑Trout ❑Other, Outfall No. Date Sample Collected (mo/dd/yr OR NO FL0W)' pHEvent (Standard Units} TSS (mg/L) Duration {minutes) Total Rainfall' {in} In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Samplingz - - 6-92 1002,1 1 o MtULIVED FILES 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. = If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. l Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall-ti rNo. Date Sample Collected (mo/dd/yr)' PH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall' (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? {y/n} # of Months in Tier 2 Sampling 2 6-92 15Z 1001,3 - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitorine period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware t �tthere yaregnificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." l �. (Signatur o ermittee) (Dade) Permit Date: 7/l/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 3) . b __� 1 FACILITY NAME: 'i_ A Y i n 4r, c I PERSON COLLECTING SAMPLES �. CERTIFIED LABORATORY F_�L . S Lab # Lab # OPTIONAL INFO: Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: _ �-j SAMPLING PERIOD: ❑ July -December January -June COUNTY 1/� h PHONE NO. ( ) ADD TO LISTSERVE? DYES ❑NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ❑Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' O pH (Standard Units) TSS (mg/L) Event Duration (minutes) Total Rainfall o (in) In Tier 2 Monthly Monitoring? n # of Months in Tier 2 Sampling2 - 6-9z - - l'- d - y1002,3 / , r- J /� 11 b / Ll Al +Y RAL cT10 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/l. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B ~Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. :;. Outfan.. No. �._Date sample Collected (mo/dd/yr) pH (Standard Units) TPH using method 1664A5GT-NFM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall a (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling' 6-92 1s' 1002,3 HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Original and one copv of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that ere are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature o Pe ' tee) (D e) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 - STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO.UNCG14_ . FACILITY NAME:_-L'J'Affn PERSON COLLECTING SAMPLES TQ CERTIFIED LABORATORY m Lab # 9 L Lab # OPTIONAL INFO: Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION Y AR: - U ) / SAMPLING PERIOD: [July -December ❑ January -dune COUNTY Vn . 4 r PHONE NO. ( ) ADD TO LISTSERVE? ❑YES NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ZOther_ Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH {Standard Units} TSS {mg/L} Event I Duration {minutes} Total Rainfall' {in} In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling' - 6-92 1002.3 ' - - - - 1 R C CENTRA ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I. "For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. IVED 5 2015 . FILES CT}ON Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)1 pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall , (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling 2 6-92 1S2 1002.1 HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (includine all "No Flow" & "No Discharee" reports) within 30 days of receipt of sample (or at end of monitorine period in case of "No Flow" to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are signAcant pena4ies for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 _:—, STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE No.ttNCG14 6 I b 3 FACILITY NAME: �. h 4.4 n C d-- e ? k PERSON COLLECTING SAMPLES rr)-r— CERTIFIED LABORATORY F T .S Lab # Lab # OPTIONAL INFO: Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: J } SAMPLINGERIOD: ❑ July -December January -June COUNTY y1 1lr- PHONE NO. ( ) ADD TO LISTSERVE? []YES ❑NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout 00ther Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH [Standard Units) TS5 [mg/L] Event Duration [minutes] Total Rainfall c [in) In Tier 2 Monthly Monitoring? . (y/n) ## of Months in Tier 2 Sampling2 - - 6-92 1002.3 % 6 o IfY t—GH V — WA LtN I RAL FILES mi­e. i4V 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. "For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. 19 Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)1 PH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspend Solids (mg/L) Event Duration (minutes) Total Rainfall a (in) New Motor Oil Usage (gal/month) In Tier 2ed Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 6-92 15, 1002,3 HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Original and one conv of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that here are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of a ttee) (D te) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2