Loading...
HomeMy WebLinkAbout20170694 Ver 2_PJD_20191223PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PJD: June 25, 2017 B. NAME AND ADDRESS OF PERSON REQUESTING PJD: Pulte Homes Company, LLC Attn: Chris Raughley 1225 Crescent Green Dr., suite 250 Cary, NC 27518 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: CESAW-RG-R, Stonewood subdivision, SAW-2017-01306 PROJECT LOCATION(S) AND BACKGROUND INFORMATION: The project site is approximately 213 acres bordered to the west by Purfoy Rd. and to the east by NC Hwy 55, near the town of Fuquav Varina, Wake County, North Carolina. Aquatic resources on site flow to Neills Creek in the Neuse River basin, identified by PINS 0675141029, 0675232939, 0675230880, 0665849465, and 0665746312. Please see the attached table and map entitled "Figure 3-Sketch Mad' dated 2/16/17 for approximate size and locations of aquatic resources on site. (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: North Carolina County/parish/borough: Wake City: Fuquav Varina Center coordinates of site (lat/long in degree decimal format): Lat.: 35.54770 Long.:-78.76130 Universal Transverse Mercator: Name of nearest waterbody: Neills Creek D. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ® Office (Desk) Determination. Date: June 25, 2017 ❑ Field Determination. Date(s): March 3, 2016 TABLE OF AQUATIC RESOURCES IN REVIEWAREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION. Site Number Latitude (decimal degrees) Longitude (decimal degrees) Estimated amount of aquatic resources in review area (acreage and linear feet, if applicable Type of aquatic resources (i_e., wetland vs. non- wetland waters) Geographic authority to which the aquatic resource -may be" subject (i.e., S ection 4D4 or Section 10/404 A 35.548634 -78.766354 2.625 LF Stream Sactwn 4D4 B 35.551339 -78.762046 812 LF Stream Section4D4 C 35.550258 -73.759485 473 LF Stream Section404 D 35.548559 -78.763090 972 LF Stream Section404 E 35.546571 -78.765099 604 LF Stream Section404 F 35.544450 -78.763200 91 LF Stream Section404 G 35.547531 -78.770447 983 LF Stream Section4D4 H 35.547299 -73.774776 528 LF Stream Section4D4 W 1 35.546841 -78.774413 3.48 Acres Watland Section 404 W2 35.547097 -78.770476 2.69 Acres Wetland Section 404 W 3 35.54871; -78.76a802 8.96 Acres Wetland Section 404 W4 35.55492S -78.762663 0.11 Acres Watland Section 404 W 5 35.550774 -78.760156 0.42 Acres Watland Section 404 W6 35.54M99 -78.763762 0.04 Acres Wetland Section 404 �V7 35.5488Q5 -78.763216 0.09 Acres Wetland Section 404 WS 35.548534 -78_761746 0.72 Acres Wetland Section 404 4'4 35.547061 -78.763711 0.26 Acres Wetland Section 404 w 10 35. 546799 -78.764.412 0.01 Acres Watland W11 35.546527 -78.765806 0.03Acres �,;' etlany. non404 w 12 35.54448v -78.762682 0.56 Acres Wetland Section 404 W 13 35.544527 -78.761743 0.24 Acres Wetland Section 404 W 14 35.545212 -78.760957 0.27 Acres Wetland Section 404 Food 1 35.545181 -78.762442 4.50 Acres 1}ood Section 404 Fond ` 35.548463 -78.760961 2.31 Acres 1}oad Section 404 Food 3 35.545967 -78.760408 230 Acres Po=d Section 404 1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2) In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWT) or other general permit verification requiring "pre- construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items should be included in subject file. Appropriately reference sources below where indicated for all checked items: ® Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Map: "Figure 3-Sketch Map" dated 2/16/17 ® Data sheets prepared/submitted by or on behalf of the PJD requestor. ® Office concurs with data sheets/delineation report. ❑ Office does not concurwith data sheets/delineation report. Rationale: ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ® U.S. Geological Survey Hydrologic Atlas: Simsuite NHD dataset ® USGS NHD data. ❑ USGS 8 and 12 digit HUC maps. ® U.S. Geological Survey map(s). Cite scale & quad name: Fuquay Varina Quad ® Natural Resources Conservation Service Soil Survey. Citation: Wake County 1970, sheet 102 ® National wetlands inventory map(s). Cite name: ❑ State/local wetland inventory map(s): ® FEMA/FIRM maps: ❑ 100-year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929) ® Photographs: ®Aerial (Name & Date): undated or ❑Other (Name & Date): ❑ Previous determination(s). File no. and date of response letter: ❑ Other information (please specify): IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later iurisdictional determinations.signed by /� LASTINGERJA LDASTINGERJAMES.C.1363642400 MES.C.136364 2400 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA, cn=LASTI NG ERJAM ES.C.136364240 0 Date: 2017.06.26 10:21:46-04'00' Signature and date of Regulatory staff member completing PJD Signature and date of person requesting PJD (REQUIRED, unless obtaining the signature is impracticable)' 1 Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action. NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: Pulte Home Company, LLC Chris Rau hle File Number: SAW-2017-01306 Date: June 25, 2017 Attached is: See Section below ❑ INITIAL PROFFERED PERMIT Standard Permit or Letter ofpermission) A ❑ PROFFERED PERMIT (Standard Permit or Letter of permission) B ❑ PERMIT DENIAL C ❑ APPROVED JURISDICTIONAL DETERMINATION D ® PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPenuits.asi) or Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division, Mr. Jason Steele, Administrative Appeal Review Officer Raleigh Regulatory Field Office CESAD-PDO Attn: James Lastinger, Regulatory Project Manager U.S. Army Corps of Engineers, South Atlantic Division 3331 Heritage Trade Dr., suite 105 60 Forsyth Street, Room 1OM15 Wake Forest, NC 27587 Atlanta, Georgia 30303-8801 919-554-4884 ext 32 Phone: 404 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunit to participate in all site investi ations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: James Lastinger, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137