HomeMy WebLinkAboutNCG140095_MONITORING INFO_20190509STORMWATER DIVISION CODING SHEET
NCG PERMITS
PERMIT NO.
ILIO0 qr 3
DOC TYPE ❑HISTORICAL FILE
8'MONITORING REPORTS
DOC DATE p oPl�f � o'SD j
YYYYMMDD
a
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT NO. NCG140000
1 QTR
` 0 Orig - State
0 Copy - State
0 Copy - Plant
0 Copy - File
REC
CERTIFICATE OF COVERAGE NO. NCG14 0 0 9 5 F:f1rPn
SAMPLE"COLLECTION YEAR: 2019
FACILITY NAME: Chandler Concrete Company DURHAM Pith 603 MAY 0 SAMPLE QUARTER: ®Jan -March ❑Aprll-June ❑Jul -Sept ❑Oct -Dec
PERSON COLLECTING SAMPLES: D, BRAME COUNTY: DURHAM
CEN1 ru\i Cii r-n
CERTIFIED LABORATORY:PACE ANALYTICAL Lab #37738 Q1tti�R EP-HONE-N0. ( 336) 226-1181
ADD"TO LISTSERVE? -]YES ®NO EMAIL:
LIMIT VIOLATIONS? YES ❑ NO ® DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other: WS-IV NSW
OPTIONAL INFO -
PartA: Wastewater Monitoring Requirements
Outfall No.
Date Sample
Collected 1
(mm/dd/yr)
Type of Wastewater
(VF. RM, MD) Z
pH
{standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
Non -Polar
Oil & Grease
using method
16645GT-NEM6
(mg/L)
Discharge
Duration
(minutes)
Total Flow
7
(gallons/day)
-
-
6-93.4
303.5
53
(15)6
-
-
1
1/24/19
VE RM MD
7.8
ND
N/A
N/A
140
N/A
2
1/24/19
VE
7.8
ND
N/A
N/A
140
N/A
Discharge was result of rain event. - SW comingles with Process Water
If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more
than one type if the waste -stream is commingled.
'if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DEMLR RO staff notifies you to
continue monitoring.
pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.S S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
`' Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to
benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees
who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DEMLR. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the
discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flow report on a case -by -case basis.
Permit Date: 8/1/2017-06/30/2022 Last Revised 07/27/17
Pagel of 2
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END
OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: —
Division of Water Resources
Attn: DWR Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that
qualified personnel properly gather and evaluate the inforrimation submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are
significant penalties for submittin Ise information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee) (Da )
Permit Date: 8/1/2017-06/30/2022 Last Revised 07/27/17
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG14 0 0 9 5
FACILITY NAME: Chandler Concrete Company - DURHAM Plt# 603
PERSON COLLECTING SAMPLES: D. BRAME pp
CERTIFIED LABORATORY:PACE ANALYTICAL Lab #3773RECE .En
LIMIT VIOLATIONS? YES ❑ NO ® JAN 2 3 2019
CENTRAL ill
Part A: Wastewater Monitoring Requirements ❑1h1G cic rl.,,,
4 QTR
/ Orig — State
0
Copy — State
0
Copy — Plant
0
Copy - File
SAMPLE COLLECTION YEAR: 2028
SAMPLE QUARTER: ❑Jan -March ❑April -June ❑Jul -Sept ®Oct -Dec
COUNTY: DURHAM
PHONE NO. (336) 226-1181
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA DHOW ❑PNA ❑Trout ®Other: WS-IV NSW
OPTIONAL INFO:
Outfall No.
Date Sample
1
Collected
(mm/dd/yr}
Type of Wastewater
2
(VE, RM, MD)
pH
(standard}
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
Non -Polar
Oil &Grease
using method
16645GT-HEM6
(mg/L)
Discharge
Duration
{minutes]
Total Flaw
gallons/day]
-
-
-
6-93,4
303,5
53
(15)6
-
-
1
10/25/18
VE RM MD
8.7
ND
N/A
N/A
180+
N/A
2
10/25/18
VE
8.7
ND
N/A
N/A
180+
N/A
Discharge
was result of rain event. - SW comingles with Process Water
' If wastewater systems have not discharged in this quarter —report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
z Report the abbreviation for the type of Authorized Wastewater Discharges here: vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM}, Mixing Drum Cleanout (MD). Report more
than one type if the waste -stream is commingled.
'if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DFMLR RO staff notifies you to
continue monitoring.
" pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
S TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
( Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to
benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50%of the Summer 70.10 Flow as per 15A NCAC 02B .0224. Permittees
who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DEMLR. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the
discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flow report on a case -by -case basis.
Permit Date: 8/1/2017-06/30/2022 Last Revised 07/27/17
Page 1 of 2
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO _DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END
OF MONITORING PERIOD IN CASE OF "NO FLOW"] TO:
Division of Water Resources
Attm DWR Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919)807-6379
YOU MUSTSIGN THIS CERTIFICATION FORANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that
qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are
significant penalties fops ubmitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of
Permit Date: 8/1/2017-06/30/2022
/!/:
Z7
(Date]
Last Revised 07/27/17
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report 0 Copy state
GENERAL PERMIT NO. NCG140000 0 Copy - Plant
0 Copy - File
3QTR
CERTIFICATE OF COVERAGE NO. NCG14 0 0 9 5 SAMPLE COLLECTION YEAR: 2018
FACILITY NAME: Chandler Concrete Com an DURHAM Plt# 603 SAMPLE QUARTER: [_]Jan -March ❑April -June ®Jul -Sept ❑Oct -Dec
PERSON COLLECTING SAMPLES: D. BRAME CC�� COUNTY: DURHAM
CERTIFIED LABORATORY:PACEANALYTICAL Lab #37738��jjT"CC .' INEDPHONE NO. (336) 226-1181
ADD TO LIST5ERVE? ❑YES ®NO EMAIL:
LIMIT VIOLATIONS? YES [:]NO ® NOV 0 6 2018 DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other: WS-IV NSW
Part A: Wastewater Monitoring Requirements
FILE
S OPTIONAL INFO:
Outfall No.
Date Sample
Collected'
{mm/dd/yr}
Type of Wastewater
(VE, RM, MD)z
pH
(standard)
Total Suspended
Solids
{I
Settleable
Solids
(mL/L)
Non -Polar
Oil & Grease
using method
16645GT-NEMe
(nI
Discharge
Duration
(minutes)
Total Flow
,
(gallons/day)
-
-
6-93,4
303,5
53
(15}6
-
1
9/17/18
VE RM MD
8.6
6.9
N/A
N/A
120+
N/A
2
9/17/18
VE
8.6
ND
N/A
N/A
-120+
N/A
Discharge was result of rain event. - 5W comingles with Process Water
` If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more
than one type if the waste -stream is commingled.
'If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DEMLR RO staff notifies you to
continue monitoring.
a pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
s TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
` Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to
benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A 102E .0224. Permittees
who discharge wastewater to HQW waters shall obtain a Summer 70,10 flow and report this information to DEMLR. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the
discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flow report on a case -by -case basis.
Permit Date: 8/1/2017-06/30/2022 Last Revised 07/27/17
Page 1 of 2
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW" "NO DISCHARGE" WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR AT END
OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Resources
Attn: DWR Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919)807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that
qualified personnel properly gather and evafuate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are
significant penalties for sy4tting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
Permit Date: 8/1/2017-06/30/2022
--1a z !
(D e)
Last Revised 07/27/17
Page 2 of 2
tate
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report 0 Copy -State
GENERAL PERMIT NO. NCG140000 0 Copy — Plant
2 QTR 0 Copy - File
CERTIFICATE OF COVERAGE NO. NC614 0 0 9 5 SAMPLE COLLECTION YEAR: 2018
FACILITY NAME: Chandler Concrete Company DURHAM Plt# 603 SAMPLE QUARTER: []Jan -March ®April -June []Jul -Sept []Oct -Dec
PERSON COLLECTING SAMPLES: D. WOODS COUNTY: DURHAM
CERTIFIED LABORATORY:PACE ANALYTICAL Lab #37738 PHONE NO. (336) 226-1181
RECE IVFA�DD TO LISTSERVE? []YES ®NO EMAIL:
LIMIT VIOLATIONS? YES ❑ NO ® DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other: WS-IV NSW
AUG 0 3 2016PTIONAL INFO:
Part A: Wastewater Monitoring Requirements Cnirr ; A , — __
1�DWR 4 "
5EC71 ON
Non -Polar
Date Sample
Type of Wastewater
pH
Total Suspended
Settleable
Oil & Grease
Discharge
Total Flow
Outfall No.
Collected'
{VE, RM, MD) 2
(standard}
Solids
Solids
using method
Duration
{gallons/dayj '
(mm/dd/yr)
(mg/L)
(mL/L)
16645GT-NFM6
{minutes}
(mg/L)
-
-
6-93,4
303,5
53
(15)6
-
1
5/29/18
VE R M MD
7.4
ND
N/A
_N/A
480+
N/A
2
5/29/18
VE
7.4
ND
N/A
N/A
480+
N/A
Discharge was result of rain event. - SW comingles with Process Water
' If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
z Report the abbreviation for the type of Authorized Wastewater Discharges here: vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more
than one type if the waste -stream is commingled.
'if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DEMLR RO staff notifies you to
continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
s TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to
benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall beset to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224, Permittees
who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DEMLR. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the
discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flow report on a case -by -case basis.
Permit Date: 8/1/2017-06/30/2022 Last Revised 07/27/17
Page 1 of 2
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END
OF MONITORING PERIOD IN CASE OF "NO FLOW") T0:
Division of Water Resources
Attn: DWR Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and ail attachments were prepared under my direction or supervision in accordance with a system designed to assure that
qualified personnel properly gather and evaluate the information submitted. Based on my inquiryof the person or persons who manage the system, or those persons directly
responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are
significant penalties for submitt' fal e information, including the possibility of fines and imprisonment for knowing violations."
4 �
(Signat re of Permittee) (D e)
Permit Date: 8/1/2017-06/30/2022 Last Revised 07/27/17
Page 2 of 2
Qrig - State
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report 0 Copy - State
GENERAL PERMIT NO. NCG140000 0 Copy — Plant
0 Copy - File
1 QTR
CERTIFICATE OF COVERAGE NO. NCG14 0 0 9 5 SAMPLE COLLECTION YEAR: 2018
FACILITY NAME: Chandler Concrete Company DURHAM Plt# 603 SAMPLE QUARTER: ®Jan -March ❑April -June ❑Jul -Sept ❑Oct -Dec
PERSON COLLECTING SAMPLES: D. WOODS r- COUNTY: DURHAM
CERTIFIED LABORATORY:PACE ANALYTICAL Lab #37738 REPHONEL.,��++ EIVE ADD TONIOSTSERVE?76 11$1
❑YES ®NO EMAIL:
LIMIT VIOLATIONS? YES ❑ NO ® APR 3 0 2018 DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other: WS-IV NSW
Part A: Wastewater Monitoring Requirements
CENT r-,A, FI LE„ $ OPTIONAL INFO:
DWR
0utfall No.
Date Sample
Collected 1
(mm/dd/yr)
Type of Wastewater
(VE, RM, MD} z
pH
(standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
Non-Polar
Oil & Grease
using method
16645GT-HEM6
(mg/L)
Discharge
Duration
(minutes)
Total Flow
(gallons/days
-
-
6-93,4
303,5
53
(15)6
-
-
1
03/01/18
VE RM MD
8.3
ND
N/A
N/A
300
N/A
2
03/01/18
VE
8.3
ND
N/A
N/A
300
N/A
Discharge was result of rain event. - SW comingles with Process Water
' if wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more
than one type if the waste -stream is commingled.
'If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DEMLR RO staff notifies you to
continue monitoring.
° pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
s TS5 limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to
benchmarks and provisions of Part IV, Section A, including the Tiered Response Action"
' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees
who discharge wastewater to HQW waters shall obtain a Summer YQ10 flow and report this information to DEMLR. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the
discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flow report on a case -by -case basis.
Permit Date: 8/1/2017-06/30/2022 Last Revised 07/27/17
Page 1 of 2
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLER AT END
OF MONITORING PERIOD IN CASE OF "NO FLOW" TO:
Division of Water Resources
Attn: DWR Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 907-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that
qualified personnel properly gather and evaluate the information submitted. Based on my inqu}ry of the person or persons who manage the system, or those persons directly
responsible for gathering t information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are
significant penalties.f�mitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
Permit Date:S/1/2017-06/30/2022
4 // -, /-,�.
(D te) /
Last Revised 07/27/17
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG14 0 0 9 5
FACILITY NAME: Chandler Concrete Company -_ DURHAM Plt# 603
PERSON COLLECTING SAMPLES: D. WOODS
RECEIVED
CERTIFIED LABORATORY:PACE ANALYTICAL Lab #37738
FEB 0 5 2013
LIMIT VIOLATIONS? YES ❑ NON
CENTRAL FILES
DWR SECTION
Part A: Wastewater Monitoring Requirements
4 QTR
C4�Odg - State
0 Copy - State
0 Copy = Winston
0 Copy -'Plant
0 Copy - File
SAMPLE COLLECTION YEAR: '
SAMPLE QUARTER: ❑Jan -March ❑April -June ❑Jul -Sept ®Oct -Dec
COUNTY: DURHAM
PHONE NO. (336) 226-1181
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ❑HOW ❑PNA ❑Trout ®Other: WS-IV NSW
OPTIONAL INFO:
Qutfall No.
Date Sample
Collected'
(mm/dd/yr)
Type of Wastewater
(VE, RM, MD)
pH
(standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
Non -Polar
Oil &Grease
using method
16645GT-HEM6
(mg/L)
Discharge
Duration
(minutes)
Total /d'
gallons/daay)
6-93.4
303's
53
(15)6
-
1
12/20/17
VE -RM MD
8.1
ND
N A
- N/A -
50
N/A
2
12/20/17
VE
8.8
ND
N/A-
N/A
65
N/A
Discharge was result of rain event. - SW comingles with Process Water
1 If wastewater systems have not discharged in this quarter — report "No Flow" or " No Discharge" here. Please make sure to mark the sample quarter above.
z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more
than one type if the waste -stream is commingled.
'If an effluent limit is exceeded tw+ce in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DEMLR RO staff notifiesyou to
continue monitoring,
pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
' TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to
benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50%of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees
who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DEMLR. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the
discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flaw report on a case -by -case basis.
Permit Date: 8/l/2017-06/30/2022 Last Revised 07/27/17
Page 1 of 2
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW" "NO DISCHARGE" WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR AT END
OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: -
Division of Water Resources
Attn: DWR Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUSTSIGN THIS CERTIFICATION FORANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that
qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the,person or persons who_, manage the system, or those persons directly
responsible forgathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are
significant pen�os submitting false information, including the possibility of fines and imprisonment for knowingwiolations." - w
(Signature of Permittee) (Date)
Permit Date: 8/1/2017-06/30/2022 Last Revised 07/27/17 -
Page 2 of 2
`PROCESS WASTEWATER —'Qua rterly'Discharge Monitoring Report
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG14 0 0 9 5
FACILITY NAME: Chandler Concrete Com an - DURHAM Pit# 603 _
PERSON COLLECTING SAMPLES: WOODS EG -E I VED
CERTIFIED LABORATORY:Pace Analytical Lab #633 NOV 4 2 2017
LIMIT VIOLATIONS? YES ❑ NO ® CENTRAL. FILES
DVVR SECTION
Part A: Wastewater Monitoring Requirements
3QTR
Orig,— State
0
Copy — State
0
Copy = Winston
0
Copy — Plant
0
Copy - File
SAMPLE COLLECTION YEAR: 2017
SAMPLE QUARTER: []Jan -March []April -June ®Jul -Sept ❑Oct -Dec'
COUNTY: DURHAM
PHONE NO. [ 336] 226-1181
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other: WS-IV NSW
OPTIONAL INFO:
Outfall No.
Date Sample
1
Collected
(mm/dd/yr)
Type of Wastewater
2
(VE, RM, MD)
pH
(standard)
TotalSuspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
Non -Polar
Oil &Grease
using method
1664SGT--HEM6
(mg/L)
Discharge
Duration
(minutes)
Total Flow
(gallons/day}
-
-
-
6-93.4
303,5
53
(15)6
-
-
1
9/11/17
VE RM MD
7.5
ND
N/A
N/A
180
N/A
2
9/11/17
VE
7.5
ND
N/A
N/A
180
N/A
Discharge
was result of rain event. - SW comingles with Process Water
If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more
than one type if the waste -stream is commingled.
'If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DEMLR RO staff notifies you to
continue monitoring.
pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
s TSS limits are 20 mg/Lfor wastewater discharges to HQW waters,10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
e Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to
benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees
who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DEMLR. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the
discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flow report on a case -by -case basis.
Permit Date: 8/1/2017-06/30/2022 Last Revised 07/27/17
Page 1 of 2
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY. (INCLUDING ALL "NO FLOW",. -NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR AT END
'OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: — - -- - -
Division of Water Resources
Attn: DWR Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919),807-6379
1
YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that
qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are
significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." �- {
- d
(SignatureofPermittee) (Dat )
Permit Date: 8/1/2017-06/30/2022
Last Revised 07/27/17
Page 2 of 2
ate
\0 gsPROCESS WASTEWATER - Quarter) Discharge MonitoringReport Copy —tate
GENERAL PERMIT NO. NCG140000 0 Copy —Plant
0 Copy - File
CERTIFICATE OF COVERAGE NO. NCG14 0 0 9 5 SAMPLE COLLECTION YEAR: 2017
FACILITY NAME: Chandler Concrete -Company Durham Plt. 603 SAMPLE QUARTER: ❑Jul -Sept —]Oct Dian -March ❑April -June
PERSON COLLECTING SAMPLES: Daryl Woods COUNTY: Durham
CERTIFIED LABORATORY:Pace Analytical Lab #633ppO98 - 3180
RECEIVEPHONE
TO LISTSERVE?OYES ®NO EMAIL:
LIMIT VIOLATIONS? YES ❑ NO ® JUL 2 4 2011 DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other:
Part A: Wastewater Monitoring Requirements
CENTRAL FILES OPTIONAL INFO:
DWR SECTION
Outfall No.
Date Sample
1
Collected
(mm/dd/yr)
Type of Wastewater
(VE, RM, MD)Z
pH
(standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH usingDischarge
method 1664A
SGT-HFM6
(mg/L)
Duration
(minutes)
Total Flow
[gallons/day]'
-
-
-
6-93A
303.5
53
(15)6
-
-
1
NQD
VE RM MD
-
-
-
N/A
-
-
2
NQD
VE
-
-
-
N/A
-
-
- SW comingles with Process Water
1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
° pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 1 of 2
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality +
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly response a for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that tbe' a are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations."
rl4--
(Sign;Ztuof Permittee) (date)
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 2 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING
GENERAL PERMIT NO. NCG140000
4q o�Rs
CERTIFICATE OF COVERAGE NO. N
FACILITY NAME: Chandler Concrete Company, Inc. - Durham #603
PERSON COLLECTING SAMPLES: Daryl Woods RECEIVED
CERTIFIED LABORATORY:Pace Anal tical Lab #633 APR 2 4 2017
OPTIONAL INFO:
CENTRAL FILES
OWR SECTION
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR:2017
SAMPLING PERIOD: ❑ July -December
COUNTY Durham
FORM
Orig -State
0 Copy - State
0 Copy - Plant
0 Copy - File
® January -June
PHONE NO. (336) 226 - 1181
ADD TO LfSTSERVE? DYES ®NO EMAIL: _
DISCHARGING TO CLASS: [:]SA❑HQW ❑PNA —]Trout ®OtherWS-V.
NSW
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)1
pH
(Standard Units)
TSS
(mg/L)
Event
Duration
(minutes)
Total 4
Rainfall
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in
z
Tier 2 Sampling
-
-
6-92
1002,3
-
-
-
-
1
03/27/17
7.8
ND
60
.25
N
N/A
2
03/27/17
7.8
ND
60
.25
N
N/A
Discharge due to storm event/PW commingles with SW
SW and PW samples share same outfall
1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I.
4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
P
Collected
{mo/dd/yr}1
pH
{Standard
Units}
TPH using method
1664A SGT-HEM
{mg/L}
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
Rainfall,
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monitoring?
(y/n}
If of Months
in Tier 2
Z
Sampling
6-92
15
1002,
-
-
-
-
-
Testing Not Required — No vehicle maintenance performed on site
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES [:]NON
HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail Original and one copy of this DMR (including all "No Flow" & "No Discharize" reports) within 30 days of receipt of samole (or at end of monitorine period
in case of "No Flow"} to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons direct esponsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete
am aware that are si Wcant penalties for submitting false information, including the possibility of fines nd imprisonment for knowing violations."
; /
(Signature of Permittee) { ate)
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG14 0 0 9 5
FACILITY NAME: Chandler Concrete Company - Durham Pit. 603
PERSON COLLECTING SAMPLES: Daryl Woods CERTIFIED LABORATORY:Pace Analytical Lab # ECoEIVED
LIMIT VIOLATIONS? YES ❑ NO ® APR 2 4 2017
CENTRAL FILES
DWR SECTION
Part A: Wastewater Monitoring Requirements
A' Orig —State
0
Copy — State
0
Copy — Plant
0
Copy - File
SAMPLE COLLECTION YEAR: 2017
SAMPLE QUARTER: ❑Jul -Sept []Oct -Dec ®Jan -March ❑April -June
COUNTY: Durham
PHONE NO. (919) 598 - 3180
ADD TO LISTSERVE? []YES ®NO EMAIL:
DISCHARGING TO CLASS: [:]SA ®HQW ❑PNA ❑Trout ❑Other:
OPTIONAL INFO:
Outfall No.
Date Sample
1
Collected
(mm/dd/yr)
Type of Wastewater
z
(VE, RM, MD)
pH
(standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH usingDischarge
method 1664A
6
SGT-g
/L)
(mgL)
Duration
(minutes)
Total Flow
7
(gallons/day]
-
-
-
6-93'4
303,5
53
(15)6
-
-
1
3/27/17
VE RM MD
7.8
ND
ND
N/A
60
240
2
3/27/17
VE
7.8
ND
ND
N/A
60
240
Discharge was result of rain event. - SW comingles with Process Water
1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 1 of 2
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919)807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED.
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly resp0ns' le for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that t re are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations."
�z 1
(Signature of Permittee) ( (ate)
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE NO. NCG14 0 0 9 5
FACILITY NAME: Chandler Concrete Company ._ Durham _Pit. 603
PERSON COLLECTING SAMPLES: No Flow CERTIFIED LABORATORY:Pace Analytical Lab JWCEIVED
LIMIT VIOLATIONS? YES [:]NO ® FEB 4 7 Z017
CENTRAL FILES
DWR SECTION
Part A: Wastewater Monitoring Requirements
Orig — State
0 Copy — State
0 Copy — Plant
0 Copy - File
SAMPLE COLLECTION YEAR: 2017
SAMPLE QUARTER: ❑Jul -Sept ®Ott -Dec ❑Jan -March ❑April -June
COUNTY: Durham
PHONE NO. (919) 598 - 3180
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: [:]SA ®HQW ❑PNA ❑Trout ❑Other:
OPTIONAL INFO:
Outfall No.
Date Sample
1
Collected
(mm/dd/yr)
Type of Wastewater
z
(VE, RM, MD)
pH
(standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH usingDischarge
method 1664A
SGT-HEM6
(mg/L)
Duration
(minutes)
Total Flow
(gallons/day),
-
-
-
6-93,4
303,5
53
(15),
-
-
1
NO FLOW
VE RM MD
N/A
2
NO FLOW
VE
N/A
No Discharge this Period -
1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
° pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VIVA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC.0213 .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
Permit Date: 7/1/2010-06/30/2015
Last Revised 07/13/11
Page 1 of 2
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware th there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations."
% Z
{Signature of Permit a (pate)
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE NO. NCG14 0 0 9 5 �`
FACILITY NAME: Chandler Concrete Company - D 610
F)
PERSON COLLECTING SAMPLES: Anthony Warash �AOV 0 4 206
CERTIFIED LABORATORY:Pace Analytical Lab ##633
CENTRRI. FILES
LIMIT VIOLATIONS? YES ❑ NO ® owR SECTION
Part A: Wastewater Monitoring Requirements
irk
SAMPLE COLLECTION YEAR�.�
Orig - State
0 Copy - State
0 Copy - Plant
0 Copy - File
SAMPLE QUARTER: ®Jul -Sept ❑Oct -Dec Dian -March ®April -June
COUNTY: Durham
PHONE NO. (919) 598 - 3180
ADD TO LISTSERVE? DYES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other:
OPTIONAL INFO:
Date Sample
1
Type of Wastewater
pH
Total Suspended
Settleable
TPH using
method 1664A
Discharge
Total Flow
Outfall No.
Collect
(VE, RM, MD)
(standard)
Solids
Solids
SGT-HEM"
Duration
7
(gallons/day)
(m yr)
(mg/L)
(mL/L)
(mg/L)
minutes)
-
-
-
�_VE
6-93.4
303,5
53
(15)6
-
-
1
9/27/16
RM MD
7.8
ND
ND
N/A
so
75
2
9/27/16
VE
8.1
ND
ND
N/A
30
45
!
n
h'IU
u .
d 1'
��,II fr�,��q
W l:`tYJ 11�
No Qualifying Discharge observed this Period - *No Qualifying Discharge V
ly
' If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 1 of 2
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW" "NO DISCHARGE" WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW" TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware tF�t there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations." � p�
(Signature of
Permit Date:7/1/2010-06/30/2015
Last Revised 07/13/11
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE NO. NCG14 0 0 9 5
FACILITY NAME: Chandler Concrete Company - Durham Pit, 603
PERSON COLLECTING SAMPLES: Anthony Warash
CERTIFIED LABORATORY:Pace Analytical Lab #633
LIMIT VIOLATIONS? YES LINO ® .
Part A: Wastewater Monitoring Requirements
�]i
SAMPLE COLLECTION YEAR:2W
Orig - State
0 Copy - State
0 Copy - Plant
0 Copy - File
SAMPLE QUARTER: ❑Ju ept ®Oct -Dec ❑Jan -March ❑April -June
COUNTY: Durham
PHONE NO. (919) 598 - 3180
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other:
OPTIONAL INFO:
Date Sample
Type of Wastewater
pH
Total Suspended
Settleable
TPH using
method 1664A
Discharge
Total Flow
Outfall No.
Collected'
z
(VE, RM, MD)
(standard}
Solids
Solids
SGT
Duration
7
(gallons/day}
(mm/dd/yr)
(mg/L)
(mL/L)
/L)
(mg/L)
(minutes)
-
-
-
6-93,4
303,5
53
(15)6
-
-
1
NO FLOW
VE RM MD
N/A
D E074
2
NO FLOW
VE
N/A
. .
r_vL_
FEB .0
ri R c;z
No Qualifying Discharge observed this Period
-
I If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
Permit Date: 7/1/2010-06/30/2015
Last Revised 07/13/11
V EED
2016
FILES
'TION
Page 1 of 2
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT, OF SAMPLE (OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919)807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly respo i$ble for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete..1 am aware t a I 'ere are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations." / A
re of Permittee)
Permit Date: 7/1/2010-06/30/2015
ZV/51
(te)
Last Revised 07/13/11
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG14 0 0 9 5
FACILITY NAME: Chandler Concrete _Company -_Durham Pit. 603
PERSON COLLECTING SAMPLES: Anthony Warash
CERTIFIED LABORATORY:Pace Analytical Lab #CER V ED
LIMIT VIOLATIONS? YES ❑ NO ® NOV 0 2 2015
CENTRAL FILES
DWR SECTION
Part A: Wastewater Monitoring Requirements
0 Orig - State
Copy - State
0 Copy - Plant
0 Copy - File
SAMPLE COLLECTION YEAR:-294-6--
SAMPLE QUARTER: ®Jul -Sept ❑Oct -Dec [_]Jan -March ❑April -June
COUNTY: Durham
PHONE NO. (919) 598 - 3180 �a
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: [:]SA ®HQW ❑PNA ❑Trout ❑Other:
OPTIONAL INFO:
Outfall No.
Date Sample
Collected'
(mm/dd/yr)
Type of Wastewater
2
(VE, RM, MD}
pH
{standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
{mL/L}
TPH using
method 1664A
6
S
(mg/L) HEM
Discharge
Duration
(minutes)
Total Flow
7
{gallons/day}
-
-
-
6-93'4
303,5
53
(15)6
-
-
1
08/31/15
VE RM MD
6.9
ND
ND
N/A
120
200
2
08/31/15
VE
7.2
ND
ND
N/A
120
210
Discharge was result of rain event. - SW comingles with Process Water
1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 1 of 2
c�
C
MC-0
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
a�
d
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware there are significapt penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations."
(Signature of Perm
Permit Date:7/1/2010-06/30/2015
11-1/ 1 e %S
(D. e)/
Last Revised 07/13/11
Page 2 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING F
GENERAL PERMIT NO. NCG140000
G_ Doq 5 - COfCC4-
CERTIFICATE OF COVERAGE NO. NCG14 0 0 8 9
FACILITY NAME: Chandler Concrete Company, Inc. - Durham #606
PERSON COLLECTING SAMPLES: Anthony Warash CERTIFIED LABORATORY:Pace Analytical Lab #633 REC V E,
OPTIONAL INFO: NUV 02 Z015
CENTRAL FILES
Part A: Stormwater Monitoring Requirements nIAIP gFrT1nn1
SAMPLE COLLECTION YEAR:2015
SAMPLING PERIOD: ❑ July -December
COUNTY Durham
PHONE NO. (336) 226 - 1181
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ❑HQW
NSW
® January -June
0 Orig - State
0 Copy - State
0 Copy - Plant
0 Copy - File
❑PNA ❑Trout ®OtherWS-V,
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)'
pH
[Standard Units)
TSS
(mg/Lj
Event
Duration
{minutes]
Total 4
Rainfall
[in)
In Tier 2
Monthly
�
Monitoring.
(y/n)
# of Months in
2
Tier 2 Sampling
-
6-92
1002,
-
-
-
-
1
8/31/15
7.4
ND
45
.40
N
N/A
Discharge due to storm event/PW commingles with SW
SW and PW samples share same outfall
' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l.
"For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected
{mo/dd/yr}1
pH
(Standard
Units)
TPH using method
1664A SGT-HEM
(mg/L)
Total Suspended
Solids
{mg/L}
Event
Duration
(minutes)
Total
a
Rainfall
(in)
New Motor Oil
Usage
(gal/month)
in Tier 2 Monthly
Monitoring?
(y/n]
# of Months
in Tier 2
z
Sampling
6-9
15
1002,3
-
-
-
-
-
Testing Not Required — No vehicle maintenance performed on site
x•
HAS YOGaR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO
HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail Orieinal and one copv of this DMR (including all "No Flow" & "No Dischame" reports) within 30 days of receipt of sample for at end of monitorine period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directl sponsible for 'athering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete
am aware thatr be re sii is nt p alties for submitting false information, including the possibility of fin a d imprisonment for knowing violations."
�"
(Signature of Permittee] (Date)
Permit Date: 7/1/2011-60/30/201S Last Revised 7/13/11
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG14 0 0 9 5
FACILITY NAME: Chandler Concrete Company - Durham Pit. 603
PERSON COLLECTING SAMPLES: Anthony Warash
CERTIFIED LABORATORY:Pace Analylical Lab #633 RECEIVED
LIMIT VIOLATIONS? YES ❑ NO ® JUL 31 2015
CENTRAL FILES
Part A: Wastewater Monitoring Requirements DWR SECTION
0 Orig — State
0 Copy - State
0 Copy - Plant
0 Copy - File
SAMPLE COLLECTION YEAR: 2015
SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec Dan -March ®April -June
COUNTY: Durham
PHONE NO. (919) 598 - 3180
ADD TO LISTSERVE? [-]YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA []Trout ❑Other:
OPTIONAL INFO:
Outfall No.
Date Sample
Collected
(mm/dd/yrj
Type of Wastewater
(VE, RM, MD)z
pH
(standard)
Total Suspended
Solids
(mg/L]
Settleable
Solids
(mL/L]
TPH usingDischarge
method 1664A
SGT-HEM"
(mg/L)
Duration
{minutes)
Total Flow
(gallons/day),
-
-
-
6-93,4
303,5
53
(15),
-
-
1
6/2/15
VE RM MD
7.8
ND
ND
N/A
90
186
2
6/2/15
VE
8.1
ND
ND
N/A
110
170
Discharge was result of rain event. - SW comingles with Process Water
1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 1 of 2
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW" "NO DISCHARGE" WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware th t re ar significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
vinln4innc " � �� n �}
re of
Permit Date:7/1/2010-06/30/2015
(Date)
Last Revised 07/13/11
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE NO. NCG 14 0 0 9 5
FACILITY NAME: Chandler Concrete Company - Durham Pit. 603
PERSON COLLECTING SAMPLES: Anthony_Warash
CERTIFIED LABORATORY:Pace Analytical Lab #633
LIMIT VIOLATIONS? YES ❑ NO
Part A: Wastewater Monitoring Requirements
Ko
Orig - State
Copy - State
0 Copy - Plant
0 Copy - File
SAMPLE COLLECTION YEAR: 2015
SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ®Jan -March ❑April -June
COUNTY: Durham
PHONE NO. (919) 598 - 3180
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other:
OPTIONAL INFO:
Outfall No.
Date Sample
i
Collected
(mm/dd/yr)
Type of Wastewater
(VE, RM, MD)z
pH
(standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH usingDischarge
method 1664A
SGT-HEM6
(mg/L)
Duration
(minutes)
Total Flow
gallons/day)7
-
-
-
6-93,4
303,5
53
(15)6
-
-
1
NO FLOW
VE RM MD
N/A
2
NO FLOW
VE
N/A
Ll
No Qualifying Discharge observed this Period
-46
1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample q
2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material StockpilE
Cleanout (MD). Report more than one type if the waste -stream is commingled.
311 an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring far that parameter for six months, unlc» uvV.A F%L-J JLO+I
notifies you to continue monitoring.
pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TS5 limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
Permit Date: 7/1/2010-06/30/2015
Last Revised 07/13/11
RL
Page 1 of 2
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: '
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that ere are signifi nt penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations."
re of Permittee)
Permit Date:7/1/2010-06/30/2015
7 !I
(Date
Last Revised 07/13/11
Page 2 of 2
PROCESS WASTEWATER -- Quarterly Discharge Monitoring Report
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG14 0 0 9 5
FACILITY NAME: Chandler Concrete Company - Durham Plt. 603
PERSON COLLECTING SAMPLES: Anthony Warash
CERTIFIED LABORATORY:Pace Analytical Lab #633
LIMIT VIOLATIONS? YES []NON
Part A: Wastewater Monitoring Requirements
0 Orig — State
/
/0
Copy — State
Copy — Plant
0
Copy - File
SAMPLE COLLECTION YEAR: 2015
SAMPLE QUARTER: []Jul -Sept ❑Oct -Dec ®Jan -March ❑April -June
COUNTY:.Durham
PHONE NO. (919) 598 - 3180
ADD TO LISTSERVE? DYES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other:
OPTIONAL INFO:
Outfall No.
Date Sample
collected'
(mm/dd/yr)
Type of Wastewater
(VE, RM, MD)Z
pH
(standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH usingDischarge
method 1664A
SGT-HEM'
(mg/L)
Duration
(minutes)
Total Flow
(gallons/day)
-
-
_
6-93.4
303.5
53
(15)6
-
-
1
NO FLOW
VE RM MD
N/A
2
NO FLOW
VE
N/A
No Qualifying Discharge observed this Period
-
1 If wastewater systems have not discharged in this quarter -- report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
s TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to SO% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 1 of 2
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW" "NO DISCHARGE" WITHIN 30 DAYS OF RECEIPT OF SAMPLE
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that ere are signifint penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations."
ature of Permittee}
Permit Date:7/1/2010-06/30/2015
7 /f
(D to
Last Revised 07/13/11
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE NO. NCG 14 0 0 9 5
FACILITY NAME: Chandler Concrete Company - Durham Pit. 603
PERSON COLLECTING SAMPLES: Anthony Warash DECEIVED
CERTIFIED LABORATORY:PacePace Anal�ical Lab #633 f"
LIMIT VIOLATIONS? YES EJNOZ MAR 12 2015
CENTRAL FILES
DWR SECTION
Part A: Wastewater Monitoring Requirements
0 Orig - State
0 Copy - State
0 Copy - Plant
0 Copy - File
SAMPLE COLLECTION YEAR: 2015
SAMPLE QUARTER: ®Jul -Sept ❑Oct -Dec ❑Jan -March ❑April -June
COUNTY: Durham
PRONE NO. (919) 598 - 3180
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout _]Other:
OPTIONAL INFO:
Outfall No.
Date Sample
x
Collected
(mm/dd/yr)
Type of Wastewater
z
(VERMMD)
, ,
pH
(standard}
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH usingDischarge
method 1664A
6
SG
(mg/T-HEML)
[mg/L}
Duration
[minutes]
Total Flow
7
(gallons/day}
-
-
-
6-93.4
303,s
53
(15)5
-
-
1
09/08/14
VE RM MD
7.6
ND
ND
N/A
90
180
2
09/08/14
VE
7.4
ND
ND
N/A
90
24S
Discharge was result of rain event. - SW comingles with Process Water
1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" mere. Please make sure to mark the sample quarter above.
2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 1SA
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
Permit Date: 7/1/2010-06/30/2015
Last Revised 07/13/11
Page 1 of 2
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Centrai Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
•-"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaivate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the inf rmation, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware th th re significant pens ies for submitting false information, including the possibility of fines and imprisonment for knowing
violations."
ature of Permittee)
Permit Date: 7/1/2011-6/30/2016
/d n
(Date)
Last Revised 07/27/14
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT NO. NCG140000
Orig - State
0 Copy - State
0 Copy - Plant
0 Copy - File
CERTIFICATE OF COVERAGE NO. NCG14 0 0 9 5 SAMPLE COLLECTION YEAR: 2015
FACILITY NAME: Chandler Concrete Company - Durham Pit. 603 SAMPLE QUARTER: ❑Jul -Sept ®Oct -Dec ❑Jan -March ❑April -June
PERSON COLLECTING SAMPLES: Anthony_Warash COUNTY: Durham
CERTIFIED LABORATORY:Pace Analytical Lab i#633 PHONE NO. (919) 598 - 3180
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
LIMIT VIOLATIONS? YES ❑ NO ® RECEFIV80)ISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other:
FEe 0 3 2015 OPTIONAL INFO:
Part A: Wastewater Monitoring Requirements CENTRAL Ell rz
Outfall No.
Date Sample
1
Collected
(mm/dd/yr)
Type of Wastewater
(VE, RM, MD)Z
JVVN SECTION
pH
[standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH using
method 1664A
SGT-HEM6
(mg/L)
Discharge
Duration
(minutes)
Total Flow
,
{gallons/day)
-
-
-
6-93,4
303,5
53
(15)6
-
-
1
NO FLOW
VE RM MD
N/A
2
NO FLOW
VE
N/A
No Qualifying Discharge observed this Period
-
1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to SO% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 1 of 2
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsib or gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am awar t th are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations." %I A
re of Permittee)
Permit Date:7/1/2010-06/30/2015
//_1J.T
ate
Last Revised 07/13/11
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE NO. NCG14 0 0 9 5
FACILITY NAME: Chandler Concrete Company - Durham Pit. 603
PERSON COLLECTING SAMPLES:
CERTIFIED LABORATORY:Pace Analytical Lab #633
LIMIT VIOLATIONS? YES ❑ NO ® RECEIVED
A%W 1 2014
Part A: Wastewater Monitoring Requirements r+GA1T92ei Ctt r-C
Orig -State
0 Copy - State
0 Copy - Plant
0 Copy - File
SAMPLE COLLECTION YEAR: 2013-2014
SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ❑Jan -March ®April -June
COUNTY: Durham
PHONE NO. (919) 598 - 3180
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: [_]SA ®HQW ❑PNA ❑Trout ❑Other:
OPTIONAL INFO:
Outfall No.
Date Sample
1
Collected
(mm/dd/yr)
D
Type of Wastewater
z
(VE, RM, MD}
BOG
pH
[standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH using
method 1664A
6
5GT-HEM
fmg/�}
Discharge
Duration
(minutes)
Total Flow
7
gallons/day]
-
-
-
6-93'4
303'5
53
(15)6
-
-
1
NO FLOW
VE RM MD
-
-
-
N/A
-
-
2
NO FLOW
VE
-
-
-
N/A
-
-
No Qualifying Discharge observed this Period
-
1 If wastewater systems have not discharged in this quarter - report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3 If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VIVA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. if the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
Permit Date: 7/1/2010-06/30/2015
Last Revised 07/13/11
Page 1 of 2
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW" "NO DISCHARGE" WITHIN 30 DAYS OF RECEIPT OF SAMPLE OR
AT END OF MONITORING_ PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware
� that re are significant p nalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations."
(Signature of Permittee)
Permit Date: 7/1/2010-06/30/2015
Z
( te)
Last Revised 07/13/11
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE NO. NCG14-0 0 9 5
FACILITY NAME: Chandler Concrete Company - Durham Pit. 603
PERSON COLLECTING SAMPLES: Anthony Warash / Danny Brame
CERTIFIED LABORATORY:Pace Anafyticai Lab #633
LIMIT VIOLATIONS? YES [:]NON
Part A: Wastewater Monitoring Requirements
Orig -State
0 Copy - State
0 Copy- Flant
0 Copy - File
SAMPLE COLLECTION YEAR: 2013-2014
SAMPLE QUARTER: []Jul -Sept ❑Oct -Dec ®Jan -March ❑April -June
COUNTY: Durham
PHONE NO.1 919) 598 - 3180
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other:
OPTIONAL INFO:
Outfall No.
Date Sample
Collected'
(mm/dd/yr)
Type of Wastewater
IVE, RM, MD}
PH
(standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH usingDischarge
method 1664A
SGT-HEIW
(mg/L)
Duration
(minutes)
Total Flow
(gallons/dayf
-
-
-
6-93"4
30s s
53
(15}6
-
-
1
3/17/14
VE RM MD
7.9 '
ND
ND
N/A
70
590
2
12/9/13
VE
7.6
ND
ND
N/A
70
640
Q?4
If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample,quartter above.
ImlReport the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockplles•(RM),�Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled. %Wcw
If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
s TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
s Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 1 of 2
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED.
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to
assure that qualified personnel properly gather and evaluate the Information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly respo Bible for gathering the Information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware,th here are sipp�icant penalties for submitting false information, Including the possibility of fines and imprisonment for knowing
violations." ��
of
Permit Date: 7/1/2010-06/30/2015
. -�- /;;z.; :e-
(Da )
Last Revised 07/13/11
Page 2 of 2