Loading...
HomeMy WebLinkAboutNCG140001_MONITORING INFO_20180220STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /v C& / y ADD l DOC TYPE ❑HISTORICAL FILE O'MONITORING REPORTS DOC DATE p � � ac� v YYYYMMDD ANNUAL SUMMARY DISCHARGE MONITORING REPORT (DMR) — STORMWATER n, SUBMIT TO CENTRAL OFFICE* General Permit No. NCG140000 Calendar Year 2017 *Report ALL STORMWATER monitoring data on this form (include "No FlowT'No Discharge" and Benchmark Exceedances) from the previous calendar year to the DEQ by MARCH 1 of each year. Certificate of Coverage No. NCG 140001 FEB 2 0 2018 Facility Name: Thomas Concrete of Carolina — Raleigh Plant County: Wake CENTRAL FILES DWR SECTION Phone Number: (919) 598-0456 Total no. of SDOs monitored 1 Certified Laboratory ESC Lab # ENV 375 Lab # Stormwater Discharge Outfall (SDO) No. 001 VMA Outfall? Yes ❑ No N Is this outfall currently in Tier 2 for any parameter? Yes N No ❑ Was this outfall ever in Tier 2 during the past year? Yes N No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ Other ❑ Outfall No. Total Rainfall, inches Total Suspended Solids (TSS), mg/1 pH, SU Non -polar O&G (EPA Method 1664 SGT-HEM)), mgll (VMA) If applicable New Motor Oil Usage (gallmo.) !)applicable Stormwater Benchmarks !ndlcate NO FLOW if applicable Circle Benchmark 100150 .0-9 . 60 '� $ >55 galfmo. average requires T55 and Non -polar o&Gmonitoring Date Sample Collected, molddl T "' 01/20/17 1780 02/28/17 NO FLOW 03/31/17 NO FLOW 04/30/17 NO FLOW 05/31/17 NO FLOW 06/30/17 NO FLOW 07/31/17 NO FLOW 08/31/17 NO FLOW 09/30/17 NO FLOW 10/31/17 NO FLOW 11130/17 NO FLOW 12/31/17I NO FLOW Permit Date 8/1/2017 — 6/30/2022 Last Revised 8-22-2015 Certificate of Coverage No. NCG 140001 Additibnal. Outfall Attachment (make copies as needed for additional outfalls) Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ Other ❑ Outfall No. Total Rainfall, inches Total Suspended Solids (TSS), m /I pH, SU Non -polar O&G (EPA Method 1664 SGT-HEM { )?' mgll (VMA) Ifapplicable New Motor Oil Usage (gallmo.) lrapplicable Stormwater Benchmarks lndltate NO FLOW i/ applicable Circle Benchmark +� AOI�O V i 6 0—g.� .� 5 >55 gallmo, average requires T55 and Non -polar O&G monitoring Date Sample Collected, molddl r Permit Date 811/2017 - 6/30/2022 Last Revised 8-22-2015 Certificate of Coverage No. NCG140001 Additional Outfall Attachment (make copies as needed for additional outfalls) Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ Other ❑ Outfall No. Total Rainfall, inches Total Suspended Solids (TSS), mg/1 p SU Non -polar O&G (EPA Method 1664 (SGT-HEM)), mgll (VMA) New Motor Oil Usage (gallmo.) Stormwater Benchmarks Indicate NO FLOW A applicable Circle Benchmark � �O�$O . 60_g Q � � >55 g allmo. average requires T55 and Non -polar 0&G monitoring Date Sample Collected, molddl r Permit Date 81112017 — 6/30/2022 Last Revised 8-22-2015 Certificate of Coverage No. NCG140001 " i certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. 1 am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." W,onUirarl hu do rFP 15999 991 Signa Date Mail Annual Summary Stormwater DMR to the NCDEQ Central Office: Note the address is correct — Central Files is housed in D WR (not DEMLR) N.C. Department of Environmental Quality (DEQ) Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, NC 27699A617 Central Files Telephone (919) 807-6300 Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at: (919) 707-9220 Permit Date 811/2017 — 6/30/2022 Last Revised 8-22-2015 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO.,NCG140001-­� FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: April Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2017 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (704) 853-9437 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA [—]Trout ❑Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' PH [Standard Units TSS (mg/L) Event Duration (minutes) Total Rainfall 4 [in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 SamplingZ - - 6-4 100 ' - - - - 001 NO FLOW y 36 ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. a TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B. Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)1 pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids [mg/L] Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) in Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Z Sampling 6-9 15 1002. - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports} within 30 days of receipt of sample (or at end of monitorins period in case of "No Flow" to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 1:3a uz 4/30/2017 (Signature of Permittee) Permit Date:7/1/2011-60/30/2015 (Date) Last Revised 7/13/11 Page 3 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: Thomas Concrete of Carolina- Raleigh Plant PERSON COLLECTING SAMPLES: Kevin Kelt CERTIFIED LABORATORY:_ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitorine Requirements SAMPLE COLLECTION YEAR: 2017 SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ®tan -March ❑April -June COUNTY: Wake PHONE NO. (_704 r)853-9437 ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: [:]SA ®HQW ❑PNA ❑Trout ❑Other OPTIONAL INFO: Outfall No. Date Sample Collected' (mm/dd/yr) Type of Wastewater 2 (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-HEM' (mg/L) Duration (minutes) Total Flow (gallons/day)' - - - 6-93,4 303.5 _ > iz I ? N (15)6 - 001 No discharge APF 17 2011 V VLV .• 1 If wastewater systems have not discharged in this quarter — report "No Flow' or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. if the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW" "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW"] TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center. Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 3/31/2017 Permit Date:7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCGi140001 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: March Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2017 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (704) 853-9437 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other Outfa[I No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH (Standard Units) TSS (mg/L) Event Duration (minutes) Total Rainfall 4 (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in 2 Tier 2 Sampling - - 6-9 100 ' - - 001 NO FLOW y 35 r—n ��� s� ♦ iLr L V ,.. I D APR 7 7017 tAIP _ ri—rJOKI �•,4 f K� L r"ILt--, If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit, Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr}1 pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/ni # of Months in Tier 2 z Sampling 6-9 15 100 , - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one cor)v of this DMR dincludine all "No Flow" & "No Discharee" reports) within 30 days of receipt of sample (or at end of monitorine period in case of "No Flow"} to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date: 7/1/2011-60/30/2015 3/31/2017 (Date) Last Revised 7/13/11 Page 3 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO.,INCG1400017 SAMPLE COLLECTION YEAR: 2017 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ SAMPLING PERIOD: ❑ July -December ® January -June PERSON COLLECTING SAMPLES Kevin Kelt COUNTY Wake CERTIFIED LABORATORY ESC Lab # ENV 375 PHONE NO. (919) 828-4403 Lab # ADD TO LISTSERVE? ❑YES ®NO EMAIL: OPTIONAL INFO: February Monitoring Event DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other Part A: Stormwater Monitoring Requirements Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 PH {Standard Units) TSS (mg/L) Event Duration (minutes) Total , Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier z 2 Sampling - - 6-9 100 - - - - ODl NO FLOW _ C � _ � �� 34 MAR 2 1 2017 DWR 5. ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. T If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B. Vehicle Maintenance Activity Monitoring Requirements for facilities using a 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/yr) pH (Standard Units ) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling 6-9 15 100 . - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO HAVE YOU CONTACTED THE REGION? YES 0 NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample for at end of monitoring period in case of "No Flow" to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 2Gt'i 2/28/2017 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 3 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: _Thomas Concrete of Carolina- Raleigh Plant PERSON COLLECTING SAMPLES: Susan Bostian CERTIFIED LABORATORY:_ESC Lab # ENV375 Q4 I Lab # LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLE QUARTER: []Jul -Sept ®Oct -Dec ❑Jan -March COUNTY: Wake PHONE NO. (_919 _) 828-4403 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA []Trout OPTIONAL INFO: ❑April -June []Other Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater Z (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT--HEM6 (mg/L) Duration (minutes) Total Flow (gallons/day)7 - - 6-93'4 3035 53 (15), - - 001 No discharge YCw.rVCIJ � 'ION INn � 1 tlll IZ' " 1 U .-Ili Th 1 n u tv>Ir' l% 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. Permit Date:7/l/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 s TSS limits ari!"20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. 1f the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 12/31/2016 Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 PROCESS WASTEWATER —Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: _Thomas Concrete of Carolina- Raleigh Plant PERSON COLLECTING SAMPLES: Susan Bostian CERTIFIED LABORATORY:_ESC Lab # ENV375 Q3 Lab # LIMIT VIOLATIONS? YES ❑ NO Part A. Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLE QUARTER: ®Jul -Sept ❑Oct -Dec ❑Jan -March ❑April -June COUNTY: Wake PHONE NO. (_919 _) 828-4403 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other OPTIONAL INFO: Outfall No. Date Sample Collected' (mm/dd/yr) Type of Wastewater (VE, RM, MD)' pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using method 1664A SGT-HEMc (mg/L) Discharge Duration (minutes) Total Flow � (gallons/day} - - - 6-93A 303'5 53 (15)6 - - 001 No discharge ��i'C11 �i~rti - ._I V t_v JA N 1 2 20 7 U 1111 1 � ff "(n) lT; n 1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 9/30/2016 Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375� Lab # OPTIONAL INFO: August Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Wake PHONE NO. (919) 828-4403 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW) PH (Standard Units) TSS jmg/L) Event Duration (minutes) Total Rainfall a (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in z Tier 2 Sampling - - 6-9 100 , - - - - 001 NO FLOW y 28 c ' 1 Cliib L� n.._ SAL Fit cc, r•VrX :)L-crroni If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. a TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/l. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B. Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No, Date Sample Collected (mo/dd/yr}1 PH (Standard Units TPH using method I664ASGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n} #; of Months in Tier 2 2 Sampling 6-9 1S 100 , - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one coov of this DMR (includine all "No Flow" & "No Discharve" reports) within 30 days of receipt of sample (or at end of monitoriniz period in case of "No Flow" to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 1 a-111; . 2G� 9/12/2016 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 3 of 2 0 . , ,a STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: November Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Wake PHONE NO. (919) 828-4403 ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ®HCfW ❑PNA ❑Trout ❑Other, Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 PH (Standard Units) T55 (mg/L) Event Duration (minutes) Total a Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling - - 6-9 100 , - - - 001 NO FLOW y 31 11 • a� v +�. i V L— 1 .t JAIL 12 20V ITO A I , H 1 R SECTinm 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr]' PH (standard Units) TPH using method I664A SGT-HEM {mg/L} Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? {y/n) # of Months in Tier 2 Z Sampling 6-9 15 100 , - - - - .1 HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NOFJ HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one coov of this DMR fincludina all "No Flow" & "No DischarRe" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") -to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." a4111 Zlri 11/30/2016 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 3 of 2 PROCESS WASTEWATER -- Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: _Thomas Concrete of Carolina- Raleigh Plant PERSON COLLECTING SAMPLES: Susan Bostian CERTIFIED LABORATORY:_ESC Lab # ENV375 June WW Samples Lab # LIMIT VIOLATIONS? YES []NO Part A: Wastewater Monitorine Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec Dian -March ®April -June COUNTY: Wake PHONE NO. (_919 _)828-4403 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other OPTIONAL INFO: Outfali No. Date Sample Collected (mm/dd/yr) Type of Wastewater (VEz , RM, MD] pH (standard] Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A 5G/L) 6 (mg/L) Duration (minutes) Total Flow 7 (gallons/day} - - - 6-93'4 303,5 53 (15)6 - - 001 No discharge ' If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE"} WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 2 of 2 (Signature of Permittee) 6/30/2016 (Date) Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 3 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375` Lab # OPTIONAL INFO: July Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 j SAMPLING PERIOD: ® July -December ❑ January -June// COUNTY Wake v PHONE NO. (919) 828-4403 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: [—]SA ®HQW ❑PNA ❑Trout ❑Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' PH (Standard Units) TSS (mg/L) Event Duration (minutes] Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling - - 6-9 100 2,3- - - - 001 NO FLOW y 27 r-• i r ' L- L AUG 19 J E6 r T D _ R .S f-m ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfali here. Please make sure to mark the sample period above. Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B. Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/yr) pH (Standard Units) TPH using method I664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monthly Monitoring? (y/n) # of Months Tier 2 Sampling2 6-9 15 1002, - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one coov of this DMR (includine all "No Flow" & "No Discharee" reports) within 30 days of receipt of sample (or at end of monitorine period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 0 1 am, � 8/16/2016 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 3 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORINGIORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375 Lab # OPTIONAL INFO: June Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919) 828-4403 ADD TO LISTSERVE? [—]YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA []Trout ❑Other. Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH (Standard Units) TSS (mg/L) Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? n (y/ ) # of Months in Tier 2 2 Sampling - - 6-9 100 ' - - - - 001 6/28/2016 10.88 233 120 1.25 y 27 NE 10 i' ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. N M Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr}' PH (Standard Units) TPH using method 1664A SGT HfM [mg/L] Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 z Sampling 6-9 is 100 , - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one coov of this DMR fincludine all "No Flow" & "No Discharee" reports) within 30 days of receipt of sample for at end of monitorine period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware th�e�e�ificant pe Ities f submittinUZ-g false information, including the possibility of fines and imprisonment for knowing violations." v -mature of Permittee) Permit Date: 7/1/2011-60/30/2015 7/13/2016 (Date) Last Revised 7/13/11 Page 2 of 2 AQ= NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out this form, please visit: hap;.//portal.ncdenr.org/web/Ir/nodes-stormwaterl Permit No.: �I/C/_/_/_/_ /_/�/�/ or Certificate of Coverage No.: Facility Name: Thomas Concrete of Carolina -Raleigh Plant County: Wake Phone No. (919) 828-4403 Inspector: Kevin Kelt Date of Inspection: 06/28/2016 Time of Inspection: 1245 Total Event Precipitation (inches): _1.25" Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) RECEIVED ® Yes ❑ No JUL 19 2016 CENTRAL FILES Please verify whether Qualitative Monitoring ,estl$errf�f�r#d during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office, By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee dYDesignee) Page 1 of 2 SWU-242, Last modified 7/31/2013 F 1. Outfall Description: Outfall No. 01 Structure (pipe, ditch, etc.) Pipe Receiving Stream: Unnamed tributary to Crabtree Creek Describe the industrial activities that occur within the outfall drainage area: Bulk storage of raw materials, vehicle. transport, wastewater treatment. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors:. light brown tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinct odor 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe pH: 10.88 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 7/31/2013 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375� Lab # OPTIONAL INFO: May Monitoring Event Part A: Stormwater Monitoring Requirements xzo SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919) 828-4403 ADD TO LISTSERVE? YES ONO EMAIL: DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other ov— Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)t pH (Standard Units) TSS {mg/L) Event Duration (minutes) Total a Rainfall (in) In Tier 2 Monthly Monitoring (y/n) # of Months in Tier 2 2 Sampling - - 6-9 100 , - - - - 001 No discharge Click here to enter text. Click here to enter text. Click here to enter text. Click here to enter text. y 26 Q +I ,rr•- a r L— UN 14 ZOIe r'FNTRai qjj c.t DWR SECTION 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (far pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/yr) PH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) in Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 6-9 15 300 ' - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR fincludine all "No Flow" & "No Discharge" reoorts) within 30 days of receipt of sample for at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: 1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are siggflcant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." �1 Za4N, (Signature of Permittee) Permit Date: 7/1/2011-60/30/2015 6/7/2016 (Date) Last Revised 7/13/11 Page 3 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 SAMPLE COLLECTION YEAR: 2016 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ SAMPLING PERIOD: ❑ July -December ® January -June PERSON COLLECTING SAMPLES Kevin Kelt COUNTY Wake CERTIFIED LABORATORY ESC Lab # ENV 375 PHONE NO. (919) 828-4403 Lab # ADD TO LISTSERVE? ❑YES ®NO EMAIL: OPTIONAL INFO: April Monitoring Event DISCHARGING TO CLASS: []SA ®HQW ❑PNA ❑Trout []Other Part A: Stormwater Monitoring Requirements Outfall No. Date Sample Collected ( mo/dd/yr OR NO FLOW)1 PH (Standard units) TSS (mg/L) Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling - - 6-92 1002.3 - - - - 001 04/12/16 10.28 255 60 0.85" y 25 y D WR L�Z=CILES N 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit, Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. ° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/yr) pH (Standard Units TPH using method 1664A SGT HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) ) Total a Rainfall in ( ) New Motor Oil Usage {gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling 6-9 15 100 , - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ®NO ❑ HAVE YOU CONTACTED THE REGION? YES []NO[] REGIONAL OFFICE CONTACT NAME: Mail Original and one copv of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitorins period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete, am aware that there are signifi nt penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." �G'rn� 4/26/2016 (Signature of Permittee) V (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: _Thomas Concrete of Carolina- Raleigh Plant PERSON COLLECTING SAMPLES: Susan Bostian CERTIFIED LABORATORY: ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitorine Reauirements SAMPLE COLLECTION YEAR: 2016 SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ®Jan -March ❑April -June COUNTY: Wake PHONE NO. (^919 _) 828-4403 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA []Trout ❑Other OPTIONAL INFO: Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater z (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-HFMG (mg/L) Duration (minutes) Total Flow (gallons/day) - - - 6-93'4 303.5 53 (15)6 - - 001 No discharge MAY 1:4 ;. i!%&1jn none- LEA' 1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. s TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HOW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE(OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality _ Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing Violations." (Signature of Permittee) Permit Date:7/1/2010-06/30/2015 4/30/2016 (Date) Last Revised 07/13/11 Page 2 of 2 RECEIVED OCT 14 206 CENTRAL FILES DWR SECTION STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERM NO. NCG140DDO CERTIFICATE OF COVERAGE NO. NCG140O01 FACJLITY NAME: Thomas Concrete of Caranna-Ralelgh Plant. PERSON COLLECTING SAMPLES Kevin Kett CERTIFIED LABORATORY ESC Lab ff ENV 375_ lab N OPTIONAL INFO: _September Monitoring Evart Part A. Stormwatm Monkorina Reauirements SAMPLE COLLECTION YEAR: W16 SAMPLING PERIOD- ® July-Decanber ❑ January -June COUNTY Wake PHONE NO. (919) 828�403 ADD TO LISTSERVE7 ❑YES ®NO EMAIL - DISCHARGING _ DISCHARGING TO CLASS: []SA ®HQW PNA ❑Trout ❑Other mIIIIINE, , ! , il, �, 0 � " • 000 `tl'NO FLOW or 'NO DISCHARGE, Enter "NO FLOW or 'NO DISCHARGE" for each outfall here. Please make sure to mark the Sample period above. = Ka value Is In excess of the benchmark, or outside the benchmark range (for pH), you must Implement the Tier 1 or Tier 2 responses In the General Permit Per 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. TSS benchmark values are 100 mgp, except when d4chareng to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/i/2011fi0/3012015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Malrtlenance Activity Monitoring Requirements for facllides using > 55 gal of new motor oil/month — averaged over a calendar year. IMMMEMMEMM HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO ED REGIONAL OFFICE CONTACT NAME: Will OrlRinal and one copy of this DMR linclud[nR all "No Flow & "No 01scharite" reports) within 30 days of receipt of sample (or aien . of monftgrinit Period in case of "No Flow") to DNision of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "I certlfy, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qu personnel /o—jjerly gather an ftvaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or thossposilfis directly respon —le6 or gathers t nformatlon, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I pAvTware that there are sl c4 penal tieVar ttrnirtlng false Information, Including the possibility of fines and Imprisonment for knowing violations." 10/31/2026 /� t5wromr—eaf Pemart") (Date) Permit Date:7/1/2011-60/30/2015 Last Revised 7/13111 Page 2 of 2 HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO ED REGIONAL OFFICE CONTACT NAME: Will OrlRinal and one copy of this DMR linclud[nR all "No Flow & "No 01scharite" reports) within 30 days of receipt of sample (or aien . of monftgrinit Period in case of "No Flow") to DNision of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "I certlfy, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qu personnel /o—jjerly gather an ftvaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or thossposilfis directly respon —le6 or gathers t nformatlon, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I pAvTware that there are sl c4 penal tieVar ttrnirtlng false Information, Including the possibility of fines and Imprisonment for knowing violations." 10/31/2026 /� t5wromr—eaf Pemart") (Date) Permit Date:7/1/2011-60/30/2015 Last Revised 7/13111 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCC3140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375 Lab # OPTIONAL INFO: March Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 RECEIVED SAMPLING PERIOD: ❑ July -December ® January-JunAPR 11 ZU)b COUNTY Wake CENTRAL FILES PHONE NO. (919) 828-4403 ^' vR SECTION ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 PH (Standard Units) TS5 (mg/L) Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier Z 2 Sampling - - 6-9 1002. - - - - 001 No Discharge y 24 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 r) Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)1 pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling 6-9 15 1002,3 HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitorine period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date: 7/1/2011-60/30/2015 4/4/2016 (Date) Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG 140001 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: January Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919) 828-4403 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: []SA ®HQW ❑PNA ❑Trout ❑Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 PH (Standard Units) TS5 (mg/L) Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) 4 of Months in Tier Z 2 Sampling - 6-9 100Z' - - - 001 1/15/16 10.61 347 60 0.5" y 22 Reentwo t r" , E - MAR- I a CENTRAL FI S FILES DWR SECTION iL ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/i. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)1 PH (Standard Units) TPH using method 1664A 5G%HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total s Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 6-92 15 100 ' - - - - - r HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are sign' 'cant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 1�7a4ltl 2121 2/29/2016 ,(Signature of Permittee) Permit Date:7/1/2011-60/30/2015 (Date) Last Revised 7/13/11 Page 2 of 2 -a STORMWATER DISCHARGE OUTFAtt (SDO) - Semi -Annual MONITORING FORM CERTIFICATE OF COVERAGE NO. NCG140001 GENERAL PERMIT NO. NCG140000 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ PERSON COLLECTING SAMPLES Kevin Kelt CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: February Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919) 828-4403 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other, Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH {Standard Units) TS5 (mg/L) Event Duration (minutes) Total Rainfall a (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling: - 6-9 100 ' - - - - 001 No Discharge y 23 RE CEIVpn- CENMAL F((. R --QTION 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TS5 benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are SO mg/I. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month —averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/yr) PH (Standard Units) TPH using -method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Samplingz 6-9 152 1002, - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copv of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are si nificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." uz 3/31/2016 15ipature of Permittee) Permit Date:7/1/2011-60/30/2015 (Date) Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ PERSON COLLECTING SAMPLES NA CERTIFIED LABORATORY ESC Lab # ENV 37S— La b # OPTIONAL INFO: _December Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Wake PHONE NO. (919) 828-4403 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA []Trout ❑Other, Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH (Standard Units) TSS (mg/L) Event Duration (minutes) Total Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling - - 6-9 100 ' - - - - 001 12/17/15 9.65 65.0 1.25 y 21 MA . ME J1r_K11rPA1 Pil Fq DWR SECTIO 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I. "For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yrjl pH (Standard Units) TPH using method 1664A SGT HEM {mg/L} Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfallo (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling 6-9 15 100 , - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copv of this DMR {including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware that there are signif' nt penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." �amn 1/31/2016 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ PERSON COLLECTING SAMPLES NA CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: April Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919) 828-4403 ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' PH (Standard Units} TSS (mg/L) Event Duration (minutes} Total Rainfall 4 (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 - - 6-92 1002" - - - - 001 No Discharge y 13 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. ° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)1 pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspend Solids (mg/L) Event Duration (minutes) Total Rainfall a (in) New Motor Oil Usage (gal/month) In Tier 2ed Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling 6-9Z is 1002•3 - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR {including all "No Flow" & "No Discharge" reportsl within 30 days of receipt of sample for at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there f."ignificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 6/8/2015 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ PERSON COLLECTING SAMPLES .. _.. _ _NA CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: _November Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Wake PHONE NO. (919) 828-4403 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout RECEIVED JAN 0 4 2016 CENTRAL FILES DWR SECTION [—]Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)t pH (Standard Units) TSS (mg/L) Event Duration (minutes) Total Rainfall 4 (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in 2 Tier 2 Sampling - - 6-92 100 , 001 11/09/15 9.23 65.0 1.25 y 20 ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. l Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/yr) pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 6-9 15 1002,3 - - - - - r _y � K i HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coon of this DMR (including all "No Flow" & "No Discharge" reoortsi within 30 darts of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFIG4TION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware thathere are significant e�naltiiesjfor submitting false information, including the possibility of fines and imprisonment for knowing violations." 12/28/2015 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7113/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ PERSON COLLECTING SAMPLES NA CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: _October Monitoring Event Part A: Stormwater Monitoring Requirements FORM, SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Wake PHONE NO. (919) 828-4403 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH (Standard Units) TSS (mg/L) Event Duration (minutes) Total Rainfall a (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier z 2 Sampling - - 6-9 21002,3 _ - 001 10/28/15 9.6 196 60 0.46 y 19 tea. r L �,► JAN n k .fir. VLI E 1 � t i If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. "For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. EI V ED ) 4 '1016 4L FILES ECTION Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr}1 pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/! } Event Duration (minutest Total a Rainfall (in] New Motor Oil Usage {gal/month] In Tier 2 Monthly Monitoring? (y/n] # of Months in Tier 2 z Sampling 6-9 15 2 100 ' - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one coov of this DMR (includine all "No Flour' & "No Discharee" reoortsl within 30 days of receipt of sample (or at end of monitorine period in case of "No Flow") to Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system; or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete, it am aw�that there are si nificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Q C . C 1)� 12/2$/2015 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: Thomas Concrete of Carolina- Raleigh Plant PERSON COLLECTING SAMPLES: Susan Bostian CERTIFIED LABORATORY:_ESC, Lab # ENV375 Lab # LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLE QUARTER: [_]Jul -Sept ®Oct -Dec ❑Jan -March COUNTY: Wake PHONE NO. (_919 _) 828-4403 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: [:]SA ®HQW ❑PNA ❑Trout ❑Other OPTIONAL INFO: lm (9�� ❑April -June rU Outfall No. Date Sample Collected' (mm/dd/yr) Type of Wastewater (VE, RM, MD} 2 pH (standard} Total Suspended Solids (mg/L) Settleable Solids (mL 7PH usingDischarge method 1664A (mmg/L)%L) S g/L)1G Duration (minutes) Total Flow 7 gallons/dayj - - - 6-93,4 303.5 53 (15}6 6 Cam= I lc - s 001 No discharge l❑7016 r'tN I RAL F ILES 1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RQ staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 b Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VNIA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. ' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. _MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQCentral Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." � 0"SZ , G Aa (Signature of Permittee) Permit Date:7/1/2010-06/30/2015 12/28/2015 (Date) 0-ne: Loth Last Revised 07/13/11 W&J Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: _Thomas Concrete of Carolina- Raleigh Plant PERSON COLLECTING SAMPLES: Susan Bostian CERTIFIED LABORATORY:_ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLE QUARTER: ®Jul -Sept ❑Oct -Dec ❑Jan -March ❑April -June COUNTY: Wake PHONE NO. (_919 _) 828-4403 ADD TO LISTSERVE? OYES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other, OPTIONAL INFO: Outfall No. Date Sample Collected) (mm/dd/yr) Type of Wastewater z (VE, RM, MD) pit [standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SG g/L) a {m/L} Duration (minutes) Total Flow 7 {gallons/day} - - - 6-93,4 303,5 53 001 No discharge REGEN i Y U 1 TI N 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date:7/1/2010-06/30/2015 Last Revised 07/13/11 —L7 Page 1 of 2 s Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. '-'Frow rateecan be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and 'imprisonment for knowing violations." (Signature of Permittee) Permit Date: 7/1/2010-06/30/2015 10/30/2015 (Date) Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 SAMPLE COLLECTION YEAR: 2015 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ SAMPLING PERIOD: ® July -December ❑ January -June PERSON COLLECTING SAMPLES NA CERTIFIED LABORATORY ESC Lab # ENV 375� Lab # OPTIONAL INFO: _September Monitoring Event Part A: Stormwater Monitoring Requirements COUNTY PHONE NO. (919) 828-4403 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: []SA ®HQW ❑PNA ❑Trout ❑Other. Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH (Standard Units} TSS (mg/L) Event Duration (minutes} Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 - - 6-92 1002,3 - - _ - 001 9/25/15 8.1 87.5 45 0.875 y 18 r— r \lam I Nov 10 20 CENTRAL F:Iil DWR SECTI 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. R; A i= -1, �7 r� 15 s N Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 an-rt s: vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)' pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfalla (in) New Motor Oil Usage [gal/month] In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Samplingz 6-92 152 1002.3 - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (includinp, all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MU5T SIGN TH15 CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that thepe'�re sig ' ica�t pepalties forsubmitting false information, including the possibility of fines and imprisonment for knowing violations." (� , 10/30/2015 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 �� STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ PERSON COLLECTING SAMPLES CERTIFIED LABORATORY NA ESC Lab # ENV 375_ Lab # OPTIONAL INFO: July Monitoring Event Part A: Stormwater Monitoring Requirements RECEIVED SAMPLE COLLECTION YEAR: 2015 SF� ��� SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Wake CENTRAL FILES PHONE NO. (919) 828-4403 DWR SECTION ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: [:]SA ®HQW ❑PNA ❑Trout ❑Other Outfall No. Date Sample Collected (mo/dd/yr OR 1 NO FLOW) pH [standard Units} TSS (mg/L) Event Duration {minutes} Total , Rainfall (in] In Tier 2 Monthly Monitoring.? (y/n) # of Months in Tier 2 2 Sampling - - 6-4 100 ' - - - - 001 7/23/15 8.87 218.0 y 16 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (far pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/i. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Id� U U j Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected {ma/dd/yr}1 pH {Standard Units} TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n} # of Months in Tier 2 z Sampling 6-9 15 100 , - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one coov of this DMR (includine all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring; period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted_ Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware that theta are significant {Signature of Permlttee} nalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." A 9/9/2415 (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 A� NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit: http://pottal,,_ncdenr.orE/web/lrinpdC5-stormwater/ Permit No.: N/C/_/_/�/Y/_/_/_/ or Certificate of Coverage No.: Facility Name: Thomas Concrete of Carolina -Raleigh Plant County: Wake Phone No. (919) 828-4403 Inspector: Susan Bostian Date of Inspection: 23 15 Time of Inspection: 1100 Total Event Precipitation (inches): _1.0". Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) Pagel of 2 SWU-242, Last modified 7/31/2013 1. Outfall Description: Outfall No. 01_ Structure (pipe, ditch, etc.) Pipe Receiving Stream: Unnamed tributary to Crabtree Creek Describe the industrial activities that occur within the outfall drainage area: Bulk storage of raw material v hi 1 transport, wastewater treatment. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: very light brown tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinct odor 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe pH: 8.87 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 7/31/2013 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM T GENERAL PERMIT NO. NCG140000 RECEIVED CERTIFICATE OF COVERAGE NO. NCG140001 SAMPLE COLLECTION YEAR: 2015 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ SAMPLING PERIOD: ® July -December ❑ January -June SEP 17 ?M5 PERSON COLLECTING SAMPLES NA COUNTY Wake CENTRAL FILES CERTIFIED LABORATORY ESC Lab # ENV 375 PHONE NO. (919) 828-4403 DWR SECTION Lab # ADD TO LISTSERVE? []YES ®NO EMAIL: OPTIONAL INFO: August Monitoring Event DISCHARGING TO CLASS: []SA ®HQW ❑PNA ❑Trout [:]Other Part A: Stormwater Monitoring Requirements Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW) PH (Standard Units) TSS (mg/L) Event Duration (minutes) Total a Rainfall (in) In Tier 2 Monthly Monitoring? n # of Months in Tier Z 2 Sampling - - 6-9 100 , - - - - 001 No Discharge y 17 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l. "For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. M Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 .V Part B: ,Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month -- averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/yr) pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall' (in) New Motor Oil Usage (gal/month) In In Tier 2 2 Tier Monitoring? (y/n) # of Months in Tier 2 Sampling2 6-9 15 100 , - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one copy of this DMR fincludina all "No Flow" & "No Discharee" reports) within 30 days of receipt of sample (or at end of monitorine period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." G�l 9/9/2015 (Signature of Permittee)! (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report R5Cr=1 /ED GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: Thomas Concrete of Carolina- Raleigh Plant PERSON COLLECTING SAMPLES: Susan Bastian CERTIFIED LASORATORY:_ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements AUG 0 7 201.5 1__� CENTRAL FILES SAMPLE COLLECTION YEAR: 2015 l7WR SECTION FU9 SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ❑Jan -March ®April -June COUNTY: Wake PHONE NO. (_919 _)828-4403 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: [—]SA ®HQW ❑PNA []Trout ❑Other c� OPTIONAL INFO: Outfall No. Date Sample Collected (mm/dd/yr) Type of Wastewater (VE, RM, MD)2 pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A S {�HLM6 Duration (minutes) Total Flow (gallons/day)' - - - 6-93'4 303,5 53 (15)6 - - 001 No discharge 1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to'benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. ' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A tN AC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot cobtain_a Summer•7Q10;flow for the receiving waters at the discharge location, the permittee shall notify DWQ and the DWQ Regional Office may require an annual flow report on a case-by-case'basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date: 711/2010-06/30/2015 7/31/2015 (Date) Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ PERSON COLLECTING SAMPLES NA CERTIFIED LABORATORY ESC Lab # ENV 375_ # OPTIONAL INFO: June Monitoring Event Part A: Stormwater Monitoring Requirements RECEIVED SAMPLE COLLECTION YEAR: 2015 AUG 0 7 2015 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake CENTRAL FILES PHONE NO. (91.9) 828-4403 DWR SECTION ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: []SA ®HQW ❑PNA [—]Trout ❑Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH (Standard Units) TSS (mg/L) Event Duration (minutes) Total Rainfall 4 (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling' - - 6-9' 1002.3- 001 No Discharge y 15 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I. ° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. ME Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. outfall No. Date Sample C61lected 1 (mo/dd/yr) pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall a (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling= 6_92 152 1002,3 r� i� HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES [:]NON REGIONAL OFFICE CONTACT NAME: Mail Original and one coDv of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of samDle for at end of monitoring period in case of "No Flow") to Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am awa"r t there are siggqicant �penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 7/31/2015 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 .1 171__V PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: Thomas Concrete of Carolina- Raleigh Plant PERSON COLLECTING SAMPLES: Andrew Rodak CERTIFIED LABORATORY: ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ®Jan -March ❑April -June COUNTY: Wake PHONE NO. (_919 _)828-4403 ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other OPTIONAL INFO: Outfall No. Date Sample 1 Collected (mm/dd/yr] Type of Wastewater z (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L] SettleableTPH Solids (mL/L} usingDischarge method 1664A 6 SGT-HEM (mg/L) Duration (minutes} Total Flow (gallons/day.] - - - 6-93.4 303.s 53 (15)6 - - 001 No discharge C NT dR SE rr 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 6 Page 1 of 2 6 Process 4;astewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, h but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow For the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW, "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." _ (Signature of Permittee) Permit Date:7/1/2010-06/30/2015 3/31/2015 (Date) Last Revised 07/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 SAMPLE COLLECTION YEAR: 2015 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ SAMPLING PERIOD: ❑ July -December ® January -June PERSON COLLECTING SAMPLES NA CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: January Monitoring Event Part A: Stormwater Monitoring Requirements COU NTY l In Tier 2 Date Sample Collected pH TS5 DEvent uration 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TS5 benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. ° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part 04 Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample p Collected (mo/dd/yr)1 pH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfalla (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Z Sampling 6-9 15 100 , - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports)_within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am -aware that there$ are OgpificanY-Ptnalties for subhitting false information, including the possibility of fines and imprisonment for knowing violations." tti (Signature of Permittee) 3/31/2015 (Date) Permit Date:7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ PERSON COLLECTING SAMPLES NA CERTIFIED LABORATORY ESC Lab # ENV 375� Lab # OPTIONAL INFO: February Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2015 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919) 828-4403 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)t pH (Standard Units) TSS (mg/L) Event Duration {minutes) Total Rainfall a (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling' - - 6-9 100 , - - - - 001 No Discharge y 11 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. s T5S benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. "For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr}1 PH (Standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfalla (in) New Motor Oil Usage {gat/month} 2 Tier In InTierMonthly Monitoring? (y/n' # of Months in Tier 2 2 Sampling 6-4 15 100 , - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including; all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample for at end of monitorine period in case of "No Flow') to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. aware that theme are significarft nalties foFsubmYtting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) 3/31/2015 (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 SAMPLE COLLECTION YEAR: 2015 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ SAMPLING PERIOD: ❑ Juiy-December ® January -June PERSON COLLECTING SAMPLES NA COUNTY Wake CERTIFIED LABORATORY ESC Lab # ENV 375_ OPTIONAL INFO: Lab # March Monitoring Event Part A: Stormwater Monitoring Requirements PHONE NO. (919) 828-4403 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: [:]SA ®HQW ❑PNA ❑Trout ❑Other Outfall No. Date Sample Collected {mo/dd/yr OR NO FLOW)1 pH (Standard Units) TSS {mg/L} Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier Z 2 Sampling - - 6-9 100, - - - - 001 03-05-2015 10.42 180 45 0.5 y 12 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/l/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/yr) pH (standard Units) TPH using method I1564A SGT HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Samplingz 6-9 15 100 , - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I aTL�iware that t "e are siggificant peValties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) 3/31/2015 (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 As NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidance on filling out this form, please visit: htt ortal.ncdenr. r web Ir n des-stormwater Permit No.: N/C/_/_/_/_/_/_/_/ or Certificate of Coverage No.: Facility Name: Thomas Concrete of Carolina -Raleigh Plant County: Wake Phone No. (919) 828-4403 Inspector: Susan Bostian Date of Inspection: 03 0`. Time of Inspection: 1245 Total Event Precipitation (inches): _0.50_ Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureablestorm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: C_ . ( A0.9 V, (Signature of Permittee or Designee) Pagel of 2 SWU-242, Last modified 7/31/2013 1. Outfall Description: Outfall No. 01 Structure (pipe, ditch, etc.) Pine Receiving Stream: Unnamed tributary to Crabtree Creek Describe the industrial activities that occur within the outfall drainage area: Bulk storage of raw materials, vehicle transport, wastewater treatment. 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: very light brown tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinct odor 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe pH: 10.42 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last modified 7/31/2013 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ PERSON COLLECTING SAMPLES NA CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: December 2014 Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2014 SAMPLING PERIOD: N July -December ❑ January -June COUNTY Wake PHONE NO. (919) 828-4403 ADD TO LISTSERVE? ❑YES ENO EMAIL: DISCHARGING TO CLASS: NSA ❑HQW ❑PNA []Trout [—]Other. Outfal! No. Date Sample Collected (mo/dd/yr OR NO FLOW)' pH (Standard Units) TSS (mg/L) Event Duration (minutes] Total Rainfall (in) In Tier 2 Monthly Monitoring? Wn) # of Months in Tier 2 Samplings - - 6-9 i - _ _ - 001 12-29-2014 9.6 430 45 0.5 y 9 E N I t=.7 n%n R car i ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. `For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/l/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)' PH (Standard Units ) TPH using method 1664A 5GT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total . Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/ni q of Months in Tier 2 Sampling i 6-9 15 1001,- - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one coov of this DMR [includine all "No Flow" & "No Discharee" reports) within 30 days of receipt of sample (or at end of monitorine period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and ail attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the i formation, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. armor ,alw�e that ther re significantIties for su fitting false information, including the passibility of fines and imprisonment for knowing violations." } ri�'1 0 3/10/2015 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 A�� MCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this farm, please visit: r n Permit No.: �I/�/ /�/_/_/_/_/^/ or Certificate of Coverage No.: NV/0j/ 1 /4_/ 0 / Q/ 0/_1 Facility Name: Thomas Concrete„of Carolina -Raleigh Plant County: Wake Phone No. [219) 828-4403 Inspector: Susan Bostian Date of Inspection: 12/29/14 Time of Inspection•. 0900 Total Event Precipitation (inches): _0.50_ Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ® Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: �;". 01 (Signature of Permittee or Designee) Page 1 of 2 5WU-242, last modified 7/31/2013 1. Outfall Description: Outfall No. 01 Structure (pipe, ditch, etc.) Pine Receiving Stream: Unnamed tributary to Crabtree Creek Describe the industrial activities that occur within the outfall drainage area: of raw materials, vehicle transport, wastewater treatment, Bulk storage 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: very light brown tint 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): No distinct odor 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe pH: 9.60 Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SWU-242, Last mndified 7/31/2013 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: _Thomas Concrete of Carolina- Raleigh Plant PERSON COLLECTING SAMPLES: Andrew Rodak CERTIFIED LABORATORY: ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2024 SAMPLE QUARTER: ❑Jul -Sept ®Oct -Dec [_]Jan -March COUNTY: Wake PHONE NO. (_919 _) 828-4403 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout OPTIONAL INFO: ❑Apra' a e []Other, Outfall No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater z RMMD] (VE, , pH (standard] Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A S g/L)96 (mg/L) Duration (minutes) Total Flow 7 (gallons/day] - - 6-93,4 303,5 53 (15), - - 001 No discharge V 'AN 0 n CENTRAL F S CTION 1 If wastewater systems have not discharged in this quarter — report "No Flow' or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/l/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 a Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is 'subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. ' Flow rate cari be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on.a case -by -case basis. a• MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing vinintinnc." (Signature of Permittee) Permit Date:7/1/2010-06/30/2015 12/29/2014 (Date) Last Revised 07/13/11 Page 2 of 2 ��%L RECEIVED NOV 07 2014 CENTRAL FILES DWR SECTION PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 SAMPLE COLLECTION YEAR: _2014 FACILITY NAME: _Thomas Concrete of Carolina- Raleigh Plant SAMPLE QUARTER: ®JUI-Sept Oct -Dec Dan -March April -June PERSON COLLECTING SAMPLES: Susan Bostian COUNTY: Wake CERTIFIED LABORATORY:_ESC Lab N ENV375 PHONE NO. (W919-_,_} 828-4403 Lab# ADD TOLISTSERVE? DYES ®NO EMAIL: LIMIT VIOLATIONS? YES ❑ NO M DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA QTrout ❑Other OPTIONAL INFO: Part A: Wastewater Monitoring Requirements Outfall No. Date Sample Collected' (mm/dd/yr) Type of Wastewater z (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH using method 1669A SGT-HErvT` (mg/L) Discharge Duration (minutes) Total Flow � (gallons/day( 6.93,4 30"' 53 (15), 001 No discharge If wastewater systems have not discharged In this quarter —report "No flow" or "No Discharge" here. Please make sure to mark the sample quarter above. z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD), Report more than one type if the waste -stream is commingled. ° If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. pH limits are 6.9 S.U. for wastewater discharges to freshwaters, and 62-8.5 S.U. for discharges to saltwaters. s TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg1L for all other water Classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 ti 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action, Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall beset to 50% of the Summer 7Q10 Flow as per 1SA NCAC 028.0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this Information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permiuee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case- -case basis. Division of Water Quality Ann: DWQCentfal'Files 1617 Mail Service Center Raleigh, North Carolina (919)807-6379 YOU MUST SIGN THIS CER77FICAIION FQR ANY INFORMATNN REPORTEID. "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my Inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete.. I am aware that there are significant penalties for submitting false information, Including the possibility of fines and Imprisonment for knowing viol �/;y� J�S�F � -\J/ / A✓.1 11/4/2014 (Signature of Peimittee) 0 (Date) Permit Date: 711/2010-06/30/2015 Cast Revised 07/13/11 Page 2 of 2 7 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 SAMPLE COLLECTION YEAR: 2014 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ SAMPLING PERIOD: ® July -December ❑ January -June PERSON COLLECTING SAMPLES NA COUNTY Wake CERTIFIED LABORATORY ESC Lab # ENV 375 PHONE NO. (919) 828-4403 Lab # ADD TO LISTSERVE? ❑YES ®NO EMAIL: OPTIONAL INFO: August 2014 DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout ❑Other Part A: Stormwater Monitoring Requirements Outfall No. Date Sample Collected {me/dd/yr OR NO FLOW)1 PHI (Standard Units) TSS (mg/L) Event Duration (minutes) Total a Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 samplingz - - 6-9 100 ' - - - - 001 No Discharge - y 5 i?EG-ERIED J: NTF7AL FILE iON 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 if a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. A For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr}i pH (Standard Units) TPH using method 1664A 5GT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) #1 of Months in Tier 2 z Sampling 6-9 15 100 2,3 - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly r onsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. a are that there V(�Isignifint enaltie7fFpr submitting false information, including the possibility of fines and imprisonment for knowing violations." 9/15/2014 (Signature of Permittee) (Date) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ PERSON COLLECTING SAMPLES NA CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: July 2014 Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2014 SAMPLING PERIOD: ® July -December ❑ January -June COUNTY Wake PHONE NO. (919) 828-4403 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout ❑Other Outfall No. Date Sample Collected (mo/dd/yr OR 1 NO FLOW) PH (Standard Units) TSS (mg/L) Event Duration {minutes] Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Samplingz - - 5-9 100 ' - - - - 001 No Discharge - - y 4 tr. CENTRAL F ILES SIP 6 DWR 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/l. ° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected {mo/dd/yr}i pH (Standard Units TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfalla {in} New Motor Oil Usage {gal/month} In Tier 2 Monthly Monitoring? (v/n} # of Months in Tier 2 2 Sampling 6-9 is 100 ' - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ®NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail Oripinal and one copv of this DMR (including all "No Flow" & "No Discharee" reports) within 30 days of receipt of sample (or at end of monitorine period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly re onsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. arp•avrrargthat there angnic penaws--fi submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) 9/15/2014 (Date) Permit Date:7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: Thomas Concrete of Carolina- Raleigh Plant PERSON COLLECTING SAMPLES: Andrew Rodak CERTIFIED LABORATORY:_ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements SAMPLE COLLECTION YEAR: 2014 SAMPLE QUARTER: [_]Jul -Sept ❑Oct -Dec Dian -March ®April -June COUNTY: Wake PHONE NO. (_919 _) 828-4403 ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout ❑Other OPTIONAL INFO: Outfall No. Date Sample Collected' (mm/dd/yr) Type of Wastewater ( VE, RM, MD)' pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT-HEM' (mg/L) (minutes) Total Flow 7 (gallons/day ) - - - 6-93.A 3035 53 (15)6 - - 001 No discharge n JUL 11 ES ' If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. ° pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 b Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. if the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE") WITHIN 30 DAYS_ OF RECEIPT OF SAMPLE OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED. N certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. l am aware that there are significant pen ties for submitting false information, including the possibility of fines and imprisonment for knowing violations." w /l I? (Slgnatureof Permittee) Permit Date.,7/1/2010-06/30/2015 6/30/2014 (Date) Last Revised 07/13/11 Page 2 of 2 RECEIVED PROCESS WASTEWATER — Quarterly Discharge Monitoring Report JUL 0 7 2014 GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140218 FACILITY NAME: _Thomas Concrete of Carolina- Durham Plant PERSON COLLECTING SAMPLES: Susan Bostian CERTIFIED LABORATORY: ESC Lab # ENV375 Lab # LIMIT VIOLATIONS? YES ❑ NO Part A: Wastewater Monitoring Requirements CENTRAL FILES DWQ/80G SAMPLE COLLECTION YEAR: 2014 SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec Dian -March COUNTY: Durham PHONE NO. (_919.—) 598-0456 ADD TO LISTSERVE? [—]YES ®NO EMAIL: ®April -June DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout ❑Other OPTIONAL INFO: Outfail No. Date Sample 1 Collected (mm/dd/yr) Type of Wastewater a (VE, RM, MD) pH (standard) Total Suspended Solids (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A S `mlAe Duration (minutes) Total Flow (gallons/day), - - - 6-93,4 303,5 53 (15)6 - 001 NA No Discharge NA NA NA NA ' If wastewater systems have not discharged in this quarter — report "No Flow' or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. " pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TS5 limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA'areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 1SA NCAC 0213 .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR_ AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am ware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." � _ /'1 r (Signature of Permittee) Permit Date:7/1/2010-06/30/2015 6/30/2024 (Date) Last Revised 07/13/11 Page 2 of 2 R STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ PERSON COLLECTING SAMPLES NA CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: May 2014 Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2014 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919) 828-4403 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout ❑Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' PH (standard Units) TSS (mg/L) Event Duration (minutes) Total a Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling� - - 6-9 100 ' - - - - 001 No Discharge - y 3 IfI i t► L FILES 2 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/l. "For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date:7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 9- ..1. Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 5S gal of new motor oil/month -- averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/yr) PH (Standard Units) TPH using method I664A SGT HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total a Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling= 6-9 15 100 , - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mai! Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: 1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons dir tly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I a�llyare that ere are �nificaryt penalties for Submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date: 7/1/2011-60/30/2015 6/30/2014 (Date) Last Revised 7/13/11 Page 2 of 2 STORMWATER DISCHARGE DUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ PERSON COLLECTING SAMPLES Susan Bostian CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: %. 2014 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919).828-4403 ADD TO LISTSERVE? DYES ®NO EMAIL: DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout ❑Other Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)' PH (Standard Units] TS5 (mg/L) Event Duration (minutes) aa Rainfall' infall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling= - 6-92 3002,3 - - - - -001 04/07/14 10.76 89 480 1.42 y 3 r-1r-'P-% V­ A V fl 1. t 114 I KAI LYp V(j ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I. For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. WED 2014 . FILES :OG Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 PartB: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month —averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)j pH (standard Units) TPH using method 1664A SGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall' (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 2 Sampling 6-92 152 1002,3 - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑ HAVE YOU CONTACTED THE REGION? YES []NO REGIONAL OFFICE CONTACT NAME: Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge' reports) within 30 days of receipt of sample for at end of monitoring period in case of "No Flow") to: Division of Energy, Mineral and Land Resources Attn: DWQ Central Files 1612 Mail Service Center Raleigh, North Carolina 27699- 1612 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. mare that theAare significant Wnalties for suhmitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date:7/1/2011-60/30/2015 4/30/2014 (Date) Last Revised 7/13/11 Page 2 of 2 PROCESS WASTEWATER — Quarterly Discharge Monitoring Report GENERAL PERMIT No. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 SAMPLE COLLECTION YEAR: 2014 FACILITY NAME: _Thomas Concrete of Carolina- Raleigh Plant SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ®Jan -March ❑April -June PERSON COLLECTING SAMPLES: Andrew Rodak COUNTY: Wake CERTIFIED LABORATORY:_ESC Lab q ENV375 PHONE NO. (_919 _) 828-4403 Lab # ADD TO LISTSERVE? ❑YES ®NO EMAIL: LIMIT VIOLATIONS? YES []NO ® DISCHARGING TO CLASS: ®SA ❑HQW OPTIONAL INFO: Part A: Wastewater Monitoring Requirements ❑PNA ❑Trout ❑Other Outfall No. Date Sample Collected 1 (mm/dd/yr) Type of Wastewater (VE, RM, MD)2 pH (standard) Total Suspended Solids (mg/L) Settleable Solids [mL/L) TPH usingDischarge method 1664A SGT-HEM6 (mg/L) Duration (minutes) Total Flow (gallons/day)' - - - 6-93.4 303.5 53 (15)6 - - 001 No discharge ' If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. 2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11 Page 1 of 2 2;-7D, 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VIVA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case -by -case basis. MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." /-N i (Signature of Permittee) Permit Date: 7/1/2010-06/30/2015 (date) Last Revised 07/13/11 Page 2 of 2 �,... ENVIRONMENTAL GEOLOGISTS & ENGINEERSDrVfEE 511 KEISLER DRIVE — SUITE 102 if & D ,�N H" OFFICE: NORTH CAROLINA 27518 1 � OFFICE: (919) 858-9898 WW W. DUNCKLEEDUN IiAM.COM LETTER OF TRANSMITTAL To: Central Files, NC DEMLR From: Andrew Rodak Date: March 24, 2014 The following document is attached: ❑ Draft Letter / Report ❑ Laboratory Report ❑ Contract or Change Order For the following action: ❑ For Your Review / Information ❑ As You Requested Comments: Re: Thomas Concrete Durham Plant- NCG 140218 Final Letter 1 Report Certification Forms Other: SW Tier II SDO Rpt Quarterly WW Rat For Your Signature & Return Other: MAILING AD[}RI:sS — PosT Ol7r[('l: Box 639 — CARY, Nom"i i CAR(A.[�'N" A 2 75I2 NORTFI C:AROHNA BOARD OF I \A%T1NF:kS l (1R i NGNrU7RS AND S1)RV[:Y0R5 LICrNsI_ C-3 ii9 No 'il CAROUNA R( Mltl) FOR LICE\1,1NQ UI' C1:0[ (x11S'I'S Lici.Nsr C-261 NC i)[_NR RLGiSTF.RF.D EtVIAs)\\1r:NT:\l. Cti\SUI,TANT,V1)\1131 R 0F106 STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140001 FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ PERSON COLLECTING SAMPLES Andrew Rodak CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2014 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919) 828-4403 ADD TO LISTSERVE? ❑YES ®NO EMAIL: DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA [—]Trout ❑Other Outfall Na. Date Sample Collected (mo/dd/yr OR NO FLOW); pH (Standard Units) TSS (mg/L) Event Duration (minutes) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling: - - 6-92 1002.3 - - - - 001 02/21/14 8.95 14 Click here to enter test. Click here to enter text. y 3 ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 i ° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2 Part e: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected (mo/dd/yr)l pH (Standard Units) TPH using method 1664ASGT-HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total Rainfall a (in) New Motor Oil Usage {gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampline 6-92 152 1002,3 - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO HAVE YOU CONTACTED THE REGION? YES ONO REGIONAL OFFICE CONTACT NAME: Mail Orieinal and one copy of this DMR (includins all "No Flow" & "No Discharse" reoorts) within 30 days of receipt of sample for at end of monitoring oeriod in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I aware that there aAsignificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date: 7/1/2011-60/30/201S (Date) Last Revised 7/13/11 Page 3 of 2 DT 7T�T�-( EE ENVIRONMENTAL GEOLOGISTS & CNGINFERS y lJ 1 V C 511 KEISLER DRIVE — SUITE 102 C RY, NORTH CAROLINA 27518& DUNriTyM OFFICE: (939) 858-9698 WWW 1D LETTER OF TRANSMITTAL To: Central Files From: Andrew Rodak Date: March 24, 2014 The following document is attached: ❑ Draft Letter / Report ❑ Laboratory Report ❑ Contract or Change Order For the following action: ❑ For Your Review / Information ❑ As You Requested Comments: I ❑ Final Letter / Report ❑ Certification Forms ® Other: Monthlv Tier H SDO R12 Quarterly WW Rptt ❑ For Your Signature & Return ❑ Other: Re: Thomas Concrete -Raleigh (West St.) plant-NCG140001 filft2wo MAR32014 014 $�D��rc.RQUkL;�Y MAILING ADDRESS — POST OFFICE Box 6�9 — CARY. NOR'Cl I CAR01,11"'A 27512 �CFf NORTH CAROLINA ROARD OF ENAMINFRS FOR ENGINEERS AND SUR\TYORS I,1('F\SF C:-35S9 NORTH CAROUN a BOARD FUR L1Cr:NSING OF GFOIAK',ISTS LICENSC C.'-261 NC. DEER RT_Gis'rrRFD EM IRO)NMENTAL C.()NSIiLTANT NtjmBFR 00061