ANNUAL SUMMARY DISCHARGE MONITORING
REPORT (DMR) — STORMWATER
n, SUBMIT TO CENTRAL OFFICE*
General Permit No. NCG140000
Calendar Year 2017
*Report ALL STORMWATER monitoring data on this form (include "No FlowT'No Discharge" and Benchmark
Exceedances) from the previous calendar year to the DEQ by MARCH 1 of each year.
Certificate of Coverage No. NCG 140001
FEB 2 0 2018
Facility Name: Thomas Concrete of Carolina — Raleigh Plant
County: Wake CENTRAL FILES
DWR SECTION
Phone Number: (919) 598-0456 Total no. of SDOs monitored 1
Certified Laboratory ESC Lab # ENV 375
Lab #
Stormwater Discharge Outfall (SDO) No. 001 VMA Outfall? Yes ❑ No N
Is this outfall currently in Tier 2 for any parameter? Yes N No ❑
Was this outfall ever in Tier 2 during the past year? Yes N No ❑
If this outfall was in Tier 2 last year, was monthly monitoring discontinued?
Yes, enough consecutive samples below benchmarks to decrease frequency ❑
Yes, received approval from DEMLR to reduce monitoring frequency ❑
Other ❑
Outfall No.
Total Rainfall,
inches
Total
Suspended
Solids (TSS),
mg/1
pH,
SU
Non -polar O&G
(EPA Method
1664 SGT-HEM)),
mgll (VMA)
If applicable
New Motor Oil
Usage (gallmo.)
!)applicable
Stormwater
Benchmarks
!ndlcate NO FLOW if
applicable
Circle Benchmark
100150
.0-9 .
60
'� $
>55 galfmo. average requires T55 and
Non -polar o&Gmonitoring
Date Sample
Collected,
molddl
T "'
01/20/17
1780
02/28/17
NO FLOW
03/31/17
NO FLOW
04/30/17
NO FLOW
05/31/17
NO FLOW
06/30/17
NO FLOW
07/31/17
NO FLOW
08/31/17
NO FLOW
09/30/17
NO FLOW
10/31/17
NO FLOW
11130/17
NO FLOW
12/31/17I
NO FLOW
Permit Date 8/1/2017 — 6/30/2022
Last Revised 8-22-2015
Certificate of Coverage No. NCG 140001
Additibnal. Outfall Attachment (make copies as needed for additional outfalls)
Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑
Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑
Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑
If this outfall was in Tier 2 last year, was monthly monitoring discontinued?
Yes, enough consecutive samples below benchmarks to decrease frequency ❑
Yes, received approval from DEMLR to reduce monitoring frequency ❑
Other ❑
Outfall No.
Total Rainfall,
inches
Total
Suspended
Solids (TSS),
m /I
pH,
SU
Non -polar O&G
(EPA Method
1664 SGT-HEM
{ )?'
mgll (VMA)
Ifapplicable
New Motor Oil
Usage (gallmo.)
lrapplicable
Stormwater
Benchmarks
lndltate NO FLOW i/
applicable
Circle Benchmark
+� AOI�O
V i
6 0—g.�
.� 5
>55 gallmo, average requires T55 and
Non -polar O&G monitoring
Date Sample
Collected,
molddl r
Permit Date 811/2017 - 6/30/2022
Last Revised 8-22-2015
Certificate of Coverage No. NCG140001
Additional Outfall Attachment (make copies as needed for additional outfalls)
Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑
Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑
Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑
If this outfall was in Tier 2 last year, was monthly monitoring discontinued?
Yes, enough consecutive samples below benchmarks to decrease frequency ❑
Yes, received approval from DEMLR to reduce monitoring frequency ❑
Other ❑
Outfall No.
Total Rainfall,
inches
Total
Suspended
Solids (TSS),
mg/1
p
SU
Non -polar O&G
(EPA Method
1664 (SGT-HEM)),
mgll (VMA)
New Motor Oil
Usage (gallmo.)
Stormwater
Benchmarks
Indicate NO FLOW A
applicable
Circle Benchmark
� �O�$O
.
60_g Q
� �
>55 g allmo. average requires T55 and
Non -polar 0&G monitoring
Date Sample
Collected,
molddl r
Permit Date 81112017 — 6/30/2022
Last Revised 8-22-2015
Certificate of Coverage No. NCG140001
" i certify, under penalty of law, that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and
evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my
knowledge and belief, true, accurate, and complete. 1 am aware that there are significant penalties for
submitting false information, including the possibility of fines and imprisonment for knowing violations."
W,onUirarl hu do rFP 15999 991
Signa
Date
Mail Annual Summary Stormwater DMR to the NCDEQ Central Office:
Note the address is correct — Central Files is housed in D WR (not DEMLR)
N.C. Department of Environmental Quality (DEQ)
Division of Water Resources
Attn: DWR Central Files
1617 Mail Service Center
Raleigh, NC 27699A617
Central Files Telephone (919) 807-6300
Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at:
(919) 707-9220
Permit Date 811/2017 — 6/30/2022
Last Revised 8-22-2015
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO.,NCG140001-�
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_
PERSON COLLECTING SAMPLES Kevin Kelt
CERTIFIED LABORATORY ESC Lab # ENV 375_
Lab #
OPTIONAL INFO: April Monitoring Event
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2017
SAMPLING PERIOD: ❑ July -December ® January -June
COUNTY Wake
PHONE NO. (704) 853-9437
ADD TO LISTSERVE? []YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA
[—]Trout ❑Other
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)'
PH
[Standard
Units
TSS
(mg/L)
Event
Duration
(minutes)
Total
Rainfall 4
[in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in Tier
2 SamplingZ
-
-
6-4
100 '
-
-
-
-
001
NO FLOW
y
36
' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
a TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B. Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected
(mo/dd/yr)1
pH
(Standard
Units)
TPH using method
1664A SGT-HEM
(mg/L)
Total Suspended
Solids
[mg/L]
Event
Duration
(minutes)
Total
a
Rainfall
(in)
New Motor Oil
Usage
(gal/month)
in Tier 2
Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
Z
Sampling
6-9
15
1002.
-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports} within 30 days of receipt of sample (or at end of monitorins period
in case of "No Flow" to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
1:3a uz 4/30/2017
(Signature of Permittee)
Permit Date:7/1/2011-60/30/2015
(Date)
Last Revised 7/13/11
Page 3 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: Thomas Concrete of Carolina- Raleigh Plant
PERSON COLLECTING SAMPLES: Kevin Kelt
CERTIFIED LABORATORY:_ESC Lab # ENV375
Lab #
LIMIT VIOLATIONS? YES ❑ NO
Part A: Wastewater Monitorine Requirements
SAMPLE COLLECTION YEAR: 2017
SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ®tan -March ❑April -June
COUNTY: Wake
PHONE NO. (_704 r)853-9437
ADD TO LISTSERVE? DYES ®NO EMAIL:
DISCHARGING TO CLASS: [:]SA ®HQW ❑PNA ❑Trout ❑Other
OPTIONAL INFO:
Outfall No.
Date Sample
Collected'
(mm/dd/yr)
Type of Wastewater
2
(VE, RM, MD)
pH
(standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH usingDischarge
method 1664A
SGT-HEM'
(mg/L)
Duration
(minutes)
Total Flow
(gallons/day)'
-
-
-
6-93,4
303.5 _
> iz I ? N
(15)6
-
001
No discharge
APF
17 2011
V
VLV .•
1 If wastewater systems have not discharged in this quarter — report "No Flow' or "No Discharge" here. Please make sure to mark the sample quarter above.
2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 1 of 2
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. if the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW" "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW"] TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center.
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations."
3/31/2017
Permit Date:7/1/2010-06/30/2015
Last Revised 07/13/11
Page 2 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCGi140001
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_
PERSON COLLECTING SAMPLES Kevin Kelt
CERTIFIED LABORATORY ESC Lab # ENV 375_
Lab #
OPTIONAL INFO: March Monitoring Event
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2017
SAMPLING PERIOD: ❑ July -December ® January -June
COUNTY Wake
PHONE NO. (704) 853-9437
ADD TO LISTSERVE? []YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout
❑Other
Outfa[I No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)1
pH
(Standard
Units)
TSS
(mg/L)
Event
Duration
(minutes)
Total
Rainfall 4
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in 2 Tier
2 Sampling
-
-
6-9
100 '
-
-
001
NO FLOW
y
35
r—n
��� s�
♦ iLr L
V
,.. I D
APR
7 7017
tAIP _
ri—rJOKI
�•,4 f K�
L r"ILt--,
If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit, Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected
(mo/dd/yr}1
pH
(Standard
Units)
TPH using method
1664A SGT-HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
a
Rainfall
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monitoring?
(y/ni
# of Months
in Tier 2
z
Sampling
6-9
15
100 ,
-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Orieinal and one cor)v of this DMR dincludine all "No Flow" & "No Discharee" reports) within 30 days of receipt of sample (or at end of monitorine period
in case of "No Flow"} to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
Permit Date: 7/1/2011-60/30/2015
3/31/2017
(Date)
Last Revised 7/13/11
Page 3 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO.,INCG1400017 SAMPLE COLLECTION YEAR: 2017
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ SAMPLING PERIOD: ❑ July -December ® January -June
PERSON COLLECTING SAMPLES Kevin Kelt COUNTY Wake
CERTIFIED LABORATORY ESC Lab # ENV 375 PHONE NO. (919) 828-4403
Lab # ADD TO LISTSERVE? ❑YES ®NO EMAIL:
OPTIONAL INFO: February Monitoring Event DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other
Part A: Stormwater Monitoring Requirements
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)1
PH
{Standard
Units)
TSS
(mg/L)
Event
Duration
(minutes)
Total
,
Rainfall
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in Tier
z
2 Sampling
-
-
6-9
100
-
-
-
-
ODl
NO FLOW
_ C �
_ � ��
34
MAR 2
1 2017
DWR 5.
' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
T If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B. Vehicle Maintenance Activity Monitoring Requirements for facilities using a 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected 1
(mo/dd/yr)
pH
(Standard
Units )
TPH using method
1664A SGT-HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
a
Rainfall
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
Sampling
6-9
15
100 .
-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO
HAVE YOU CONTACTED THE REGION? YES 0 NO
REGIONAL OFFICE CONTACT NAME:
Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample for at end of monitoring period
in case of "No Flow" to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
2Gt'i 2/28/2017
(Signature of Permittee) (Date)
Permit Date: 7/1/2011-60/30/2015
Last Revised 7/13/11
Page 3 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: _Thomas Concrete of Carolina- Raleigh Plant
PERSON COLLECTING SAMPLES: Susan Bostian
CERTIFIED LABORATORY:_ESC Lab # ENV375
Q4 I Lab #
LIMIT VIOLATIONS? YES ❑ NO
Part A: Wastewater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2016
SAMPLE QUARTER: []Jul -Sept ®Oct -Dec ❑Jan -March
COUNTY: Wake
PHONE NO. (_919 _) 828-4403
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA []Trout
OPTIONAL INFO:
❑April -June
[]Other
Outfall No.
Date Sample
1
Collected
(mm/dd/yr)
Type of Wastewater
Z
(VE, RM, MD)
pH
(standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH usingDischarge
method 1664A
SGT--HEM6
(mg/L)
Duration
(minutes)
Total Flow
(gallons/day)7
-
-
6-93'4
3035
53
(15),
-
-
001
No discharge
YCw.rVCIJ
� 'ION
INn �
1 tlll
IZ'
" 1
U .-Ili Th
1 n
u tv>Ir'
l%
1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
Permit Date:7/l/2010-06/30/2015
Last Revised 07/13/11
Page 1 of 2
s TSS limits ari!"20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. 1f the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919)807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations."
12/31/2016
Permit Date: 7/1/2010-06/30/2015
Last Revised 07/13/11
Page 2 of 2
PROCESS WASTEWATER —Quarterly Discharge Monitoring Report
GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: _Thomas Concrete of Carolina- Raleigh Plant
PERSON COLLECTING SAMPLES: Susan Bostian
CERTIFIED LABORATORY:_ESC Lab # ENV375
Q3 Lab #
LIMIT VIOLATIONS? YES ❑ NO
Part A. Wastewater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2016
SAMPLE QUARTER: ®Jul -Sept ❑Oct -Dec ❑Jan -March ❑April -June
COUNTY: Wake
PHONE NO. (_919 _) 828-4403
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other
OPTIONAL INFO:
Outfall No.
Date Sample
Collected'
(mm/dd/yr)
Type of Wastewater
(VE, RM, MD)'
pH
(standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH using
method 1664A
SGT-HEMc
(mg/L)
Discharge
Duration
(minutes)
Total Flow
�
(gallons/day}
-
-
-
6-93A
303'5
53
(15)6
-
-
001
No discharge
��i'C11 �i~rti
- ._I V t_v
JA N 1 2 20
7
U 1111
1 � ff "(n) lT;
n
1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 1 of 2
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919)807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations."
9/30/2016
Permit Date: 7/1/2010-06/30/2015
Last Revised 07/13/11
Page 2 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_
PERSON COLLECTING SAMPLES Kevin Kelt
CERTIFIED LABORATORY ESC Lab # ENV 375�
Lab #
OPTIONAL INFO: August Monitoring Event
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2016
SAMPLING PERIOD: ® July -December ❑ January -June
COUNTY Wake
PHONE NO. (919) 828-4403
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout
❑Other
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)
PH
(Standard
Units)
TSS
jmg/L)
Event
Duration
(minutes)
Total
Rainfall a
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in z Tier
2 Sampling
-
-
6-9
100 ,
-
-
-
-
001
NO FLOW
y
28
c
'
1 Cliib
L� n.._
SAL Fit cc,
r•VrX
:)L-crroni
If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
a TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/l.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B. Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No,
Date Sample
Collected
(mo/dd/yr}1
PH
(Standard
Units
TPH using method
I664ASGT-HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
a
Rainfall
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monitoring?
(y/n}
#; of Months
in Tier 2
2
Sampling
6-9
1S
100 ,
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Orieinal and one coov of this DMR (includine all "No Flow" & "No Discharve" reports) within 30 days of receipt of sample (or at end of monitoriniz period
in case of "No Flow" to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
1 a-111; . 2G� 9/12/2016
(Signature of Permittee) (Date)
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 3 of 2
0
. , ,a
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_
PERSON COLLECTING SAMPLES Kevin Kelt
CERTIFIED LABORATORY ESC Lab # ENV 375_
Lab #
OPTIONAL INFO: November Monitoring Event
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2016
SAMPLING PERIOD: ® July -December ❑ January -June
COUNTY Wake
PHONE NO. (919) 828-4403
ADD TO LISTSERVE? DYES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HCfW ❑PNA ❑Trout ❑Other,
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)1
PH
(Standard
Units)
T55
(mg/L)
Event
Duration
(minutes)
Total
a
Rainfall
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in Tier
2
2 Sampling
-
-
6-9
100 ,
-
-
-
001
NO FLOW
y
31
11
•
a� v +�. i V L— 1
.t
JAIL 12 20V
ITO A I , H
1 R SECTinm
1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected
(mo/dd/yr]'
PH
(standard
Units)
TPH using method
I664A SGT-HEM
{mg/L}
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
a
Rainfall
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monitoring?
{y/n)
# of Months
in Tier 2
Z
Sampling
6-9
15
100 ,
-
-
-
-
.1
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NOFJ
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Orieinal and one coov of this DMR fincludina all "No Flow" & "No DischarRe" reports) within 30 days of receipt of sample (or at end of monitoring period
in case of "No Flow") -to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
a4111 Zlri 11/30/2016
(Signature of Permittee) (Date)
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 3 of 2
PROCESS WASTEWATER -- Quarterly Discharge Monitoring Report
GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: _Thomas Concrete of Carolina- Raleigh Plant
PERSON COLLECTING SAMPLES: Susan Bostian
CERTIFIED LABORATORY:_ESC Lab # ENV375
June WW Samples Lab #
LIMIT VIOLATIONS? YES []NO
Part A: Wastewater Monitorine Requirements
SAMPLE COLLECTION YEAR: 2016
SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec Dian -March ®April -June
COUNTY: Wake
PHONE NO. (_919 _)828-4403
ADD TO LISTSERVE? []YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other
OPTIONAL INFO:
Outfali No.
Date Sample
Collected
(mm/dd/yr)
Type of Wastewater
(VEz
, RM, MD]
pH
(standard]
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH usingDischarge
method 1664A
5G/L) 6
(mg/L)
Duration
(minutes)
Total Flow
7
(gallons/day}
-
-
-
6-93'4
303,5
53
(15)6
-
-
001
No discharge
' If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 1 of 2
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE"} WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919)807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations."
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 2 of 2
(Signature of Permittee)
6/30/2016
(Date)
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 3 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_
PERSON COLLECTING SAMPLES Kevin Kelt
CERTIFIED LABORATORY ESC Lab # ENV 375`
Lab #
OPTIONAL INFO: July Monitoring Event
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2016 j
SAMPLING PERIOD: ® July -December ❑ January -June//
COUNTY Wake v
PHONE NO. (919) 828-4403
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: [—]SA ®HQW
❑PNA ❑Trout
❑Other
Outfall No.
Date Sample Collected
(mo/dd/yr OR
NO FLOW)'
PH
(Standard
Units)
TSS
(mg/L)
Event
Duration
(minutes]
Total
4
Rainfall
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in Tier
2
2 Sampling
-
-
6-9
100 2,3-
-
-
-
001
NO FLOW
y
27
r-• i r
'
L- L
AUG 19 J E6
r
T
D
_
R .S f-m
' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfali here. Please make sure to mark the sample period above.
Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B. Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected 1
(mo/dd/yr)
pH
(Standard
Units)
TPH using method
I664A SGT-HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
a
Rainfall
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monthly
Monitoring?
(y/n)
# of Months
Tier 2
Sampling2
6-9
15
1002,
-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANYONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Orieinal and one coov of this DMR (includine all "No Flow" & "No Discharee" reports) within 30 days of receipt of sample (or at end of monitorine period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
0
1 am, � 8/16/2016
(Signature of Permittee) (Date)
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 3 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORINGIORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_
PERSON COLLECTING SAMPLES Kevin Kelt
CERTIFIED LABORATORY ESC Lab # ENV 375
Lab #
OPTIONAL INFO: June Monitoring Event
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2016
SAMPLING PERIOD: ❑ July -December ® January -June
COUNTY Wake
PHONE NO. (919) 828-4403
ADD TO LISTSERVE? [—]YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA []Trout ❑Other.
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)1
pH
(Standard
Units)
TSS
(mg/L)
Event
Duration
(minutes)
Total
4
Rainfall
(in)
In Tier 2
Monthly
Monitoring?
n
(y/ )
# of Months in Tier
2
2 Sampling
-
-
6-9
100 '
-
-
-
-
001
6/28/2016
10.88
233
120
1.25
y
27
NE
10 i'
' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l.
For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
N
M
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected
(mo/dd/yr}'
PH
(Standard
Units)
TPH using method
1664A SGT HfM
[mg/L]
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
a
Rainfall
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
z
Sampling
6-9
is
100 ,
-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Orieinal and one coov of this DMR fincludine all "No Flow" & "No Discharee" reports) within 30 days of receipt of sample for at end of monitorine period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete
am aware th�e�e�ificant pe Ities f submittinUZ-g false information, including the possibility of fines and imprisonment for knowing violations."
v
-mature of Permittee)
Permit Date: 7/1/2011-60/30/2015
7/13/2016
(Date)
Last Revised 7/13/11
Page 2 of 2
AQ=
NCDENR
Stormwater Discharge Outfall (SDO)
Qualitative Monitoring Report
Forguidance on filling out this form, please visit: hap;.//portal.ncdenr.org/web/Ir/nodes-stormwaterl
Permit No.: �I/C/_/_/_/_ /_/�/�/ or Certificate of Coverage No.:
Facility Name: Thomas Concrete of Carolina -Raleigh Plant
County: Wake Phone No. (919) 828-4403
Inspector: Kevin Kelt
Date of Inspection: 06/28/2016
Time of Inspection: 1245
Total Event Precipitation (inches): _1.25"
Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit?
(See information below.) RECEIVED
® Yes ❑ No JUL 19 2016
CENTRAL FILES
Please verify whether Qualitative Monitoring ,estl$errf�f�r#d during a "representative storm
event" or "measureable storm event" (requirements vary, depending on the permit).
Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be
performed during a "representative storm event" or during a "measureable storm event." However,
some permits do not have this requirement. Please refer to these definitions, if applicable.
A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall
and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than
0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no
precipitation.
A "measurable storm event" is a storm event that results in an actual discharge from the
permitted site outfall. The previous measurable storm event must have been at least 72 hours
prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter
interval is representative for local storm events during the sampling period, and the permittee
obtains approval from the local DWQ Regional Office,
By this signature, I certify that this report is accurate and complete to the best of my knowledge:
(Signature of Permittee dYDesignee)
Page 1 of 2
SWU-242, Last modified 7/31/2013
F
1. Outfall Description:
Outfall No. 01 Structure (pipe, ditch, etc.) Pipe
Receiving Stream: Unnamed tributary to Crabtree Creek
Describe the industrial activities that occur within the outfall drainage area: Bulk storage
of raw materials, vehicle. transport, wastewater treatment.
2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint
(light, medium, dark) as descriptors:. light brown tint
3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil,
weak chlorine odor, etc.): No distinct odor
4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is
clear and 5 is very cloudy:
1 2 3 4 5
5. Floating Solids: Choose the number which best describes the amount of floating solids in
the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids:
1 2 3 4 5
6. Suspended Solids: Choose the number which best describes the amount of suspended
solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy:
1 2 3 4 5
7. Is there any foam in the stormwater discharge? Yes No
8. Is there an oil sheen in the stormwater discharge? Yes No
9. Is there evidence of erosion or deposition at the outfall? Yes No
10. Other Obvious Indicators of Stormwater Pollution:
List and describe pH: 10.88
Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition
may be indicative of pollutant exposure. These conditions warrant further investigation.
Page 2 of 2
SWU-242, Last modified 7/31/2013
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_
PERSON COLLECTING SAMPLES Kevin Kelt
CERTIFIED LABORATORY ESC Lab # ENV 375�
Lab #
OPTIONAL INFO: May Monitoring Event
Part A: Stormwater Monitoring Requirements
xzo
SAMPLE COLLECTION YEAR: 2016
SAMPLING PERIOD: ❑ July -December ® January -June
COUNTY Wake
PHONE NO. (919) 828-4403
ADD TO LISTSERVE? YES ONO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other
ov—
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)t
pH
(Standard
Units)
TSS
{mg/L)
Event
Duration
(minutes)
Total
a
Rainfall
(in)
In Tier 2
Monthly
Monitoring
(y/n)
# of Months in Tier
2
2 Sampling
-
-
6-9
100 ,
-
-
-
-
001
No discharge
Click here to
enter text.
Click here to
enter text.
Click here to
enter text.
Click here to
enter text.
y
26
Q +I ,rr•-
a r L—
UN 14 ZOIe
r'FNTRai qjj c.t
DWR SECTION
1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
z If a value is in excess of the benchmark, or outside the benchmark range (far pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected 1
(mo/dd/yr)
PH
(Standard
Units)
TPH using method
1664A SGT-HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
a
Rainfall
(in)
New Motor Oil
Usage
(gal/month)
in Tier 2
Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
Sampling2
6-9
15
300 '
-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Original and one coov of this DMR fincludine all "No Flow" & "No Discharge" reoorts) within 30 days of receipt of sample for at end of monitoring period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
am aware that there are siggflcant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
�1 Za4N,
(Signature of Permittee)
Permit Date: 7/1/2011-60/30/2015
6/7/2016
(Date)
Last Revised 7/13/11
Page 3 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001 SAMPLE COLLECTION YEAR: 2016
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ SAMPLING PERIOD: ❑ July -December ® January -June
PERSON COLLECTING SAMPLES Kevin Kelt COUNTY Wake
CERTIFIED LABORATORY ESC Lab # ENV 375 PHONE NO. (919) 828-4403
Lab # ADD TO LISTSERVE? ❑YES ®NO EMAIL:
OPTIONAL INFO: April Monitoring Event DISCHARGING TO CLASS: []SA ®HQW ❑PNA ❑Trout []Other
Part A: Stormwater Monitoring Requirements
Outfall No.
Date Sample
Collected
( mo/dd/yr OR
NO FLOW)1
PH
(Standard
units)
TSS
(mg/L)
Event
Duration
(minutes)
Total
4
Rainfall
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in Tier
2
2 Sampling
-
-
6-92
1002.3
-
-
-
-
001
04/12/16
10.28
255
60
0.85"
y
25
y
D WR L�Z=CILES
N
1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit, Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I.
° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected 1
(mo/dd/yr)
pH
(Standard
Units
TPH using method
1664A SGT HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
)
Total
a
Rainfall
in
( )
New Motor Oil
Usage
{gal/month)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
2
Sampling
6-9
15
100 ,
-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ®NO ❑
HAVE YOU CONTACTED THE REGION? YES []NO[]
REGIONAL OFFICE CONTACT NAME:
Mail Original and one copv of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitorins period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete,
am aware that there are signifi nt penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
�G'rn� 4/26/2016
(Signature of Permittee) V (Date)
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: _Thomas Concrete of Carolina- Raleigh Plant
PERSON COLLECTING SAMPLES: Susan Bostian
CERTIFIED LABORATORY: ESC Lab # ENV375
Lab #
LIMIT VIOLATIONS? YES ❑ NO
Part A: Wastewater Monitorine Reauirements
SAMPLE COLLECTION YEAR: 2016
SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ®Jan -March ❑April -June
COUNTY: Wake
PHONE NO. (^919 _) 828-4403
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA []Trout ❑Other
OPTIONAL INFO:
Outfall No.
Date Sample
1
Collected
(mm/dd/yr)
Type of Wastewater
z
(VE, RM, MD)
pH
(standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH usingDischarge
method 1664A
SGT-HFMG
(mg/L)
Duration
(minutes)
Total Flow
(gallons/day)
-
-
-
6-93'4
303.5
53
(15)6
-
-
001
No discharge
MAY 1:4
;.
i!%&1jn none-
LEA'
1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
s TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 1 of 2
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HOW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE(OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality _
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
Violations."
(Signature of Permittee)
Permit Date:7/1/2010-06/30/2015
4/30/2016
(Date)
Last Revised 07/13/11
Page 2 of 2
RECEIVED
OCT 14 206
CENTRAL FILES
DWR SECTION
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERM NO. NCG140DDO
CERTIFICATE OF COVERAGE NO. NCG140O01
FACJLITY NAME: Thomas Concrete of Caranna-Ralelgh Plant.
PERSON COLLECTING SAMPLES Kevin Kett
CERTIFIED LABORATORY ESC Lab ff ENV 375_
lab N
OPTIONAL INFO: _September Monitoring Evart
Part A. Stormwatm Monkorina Reauirements
SAMPLE COLLECTION YEAR: W16
SAMPLING PERIOD- ® July-Decanber ❑ January -June
COUNTY Wake
PHONE NO. (919) 828�403
ADD TO LISTSERVE7 ❑YES ®NO EMAIL -
DISCHARGING _
DISCHARGING TO CLASS: []SA ®HQW PNA ❑Trout ❑Other
mIIIIINE, , ! , il, �,
0
�
" •
000
`tl'NO FLOW or 'NO DISCHARGE, Enter "NO FLOW or 'NO DISCHARGE" for each outfall here. Please make sure to mark the Sample period above.
= Ka value Is In excess of the benchmark, or outside the benchmark range (for pH), you must Implement the Tier 1 or Tier 2 responses In the General Permit Per 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
TSS benchmark values are 100 mgp, except when d4chareng to ORW, HQW, Trout, and PNA waters where they are 50 mg/I.
4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Permit Date: 7/i/2011fi0/3012015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Malrtlenance Activity Monitoring Requirements for facllides using > 55 gal of new motor oil/month — averaged over a calendar year.
IMMMEMMEMM
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES ❑ NO ED
REGIONAL OFFICE CONTACT NAME:
Will OrlRinal and one copy of this DMR linclud[nR all "No Flow & "No 01scharite" reports) within 30 days of receipt of sample (or aien . of monftgrinit Period
in case of "No Flow") to
DNision of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
"I certlfy, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qu personnel /o—jjerly gather an ftvaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
thossposilfis directly respon —le6 or gathers t nformatlon, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
pAvTware that there are sl c4 penal tieVar ttrnirtlng false Information, Including the possibility of fines and Imprisonment for knowing violations."
10/31/2026
/�
t5wromr—eaf Pemart") (Date)
Permit Date:7/1/2011-60/30/2015
Last Revised 7/13111
Page 2 of 2
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES ❑ NO ED
REGIONAL OFFICE CONTACT NAME:
Will OrlRinal and one copy of this DMR linclud[nR all "No Flow & "No 01scharite" reports) within 30 days of receipt of sample (or aien . of monftgrinit Period
in case of "No Flow") to
DNision of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
"I certlfy, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qu personnel /o—jjerly gather an ftvaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
thossposilfis directly respon —le6 or gathers t nformatlon, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
pAvTware that there are sl c4 penal tieVar ttrnirtlng false Information, Including the possibility of fines and Imprisonment for knowing violations."
10/31/2026
/�
t5wromr—eaf Pemart") (Date)
Permit Date:7/1/2011-60/30/2015
Last Revised 7/13111
Page 2 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCC3140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_
PERSON COLLECTING SAMPLES Kevin Kelt
CERTIFIED LABORATORY ESC Lab # ENV 375
Lab #
OPTIONAL INFO: March Monitoring Event
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2015 RECEIVED
SAMPLING PERIOD: ❑ July -December ® January-JunAPR 11 ZU)b
COUNTY Wake CENTRAL FILES
PHONE NO. (919) 828-4403 ^' vR SECTION
ADD TO LISTSERVE? DYES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)1
PH
(Standard
Units)
TS5
(mg/L)
Event
Duration
(minutes)
Total
4
Rainfall
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in Tier
Z
2 Sampling
-
-
6-9
1002.
-
-
-
-
001
No Discharge
y
24
If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I.
For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
r)
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected
(mo/dd/yr)1
pH
(Standard
Units)
TPH using method
1664A SGT-HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
a
Rainfall
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
2
Sampling
6-9
15
1002,3
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitorine period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
Permit Date: 7/1/2011-60/30/2015
4/4/2016
(Date)
Last Revised 7/13/11
Page 2 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG 140001
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_
PERSON COLLECTING SAMPLES Kevin Kelt
CERTIFIED LABORATORY ESC Lab # ENV 375_
Lab #
OPTIONAL INFO: January Monitoring Event
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2016
SAMPLING PERIOD: ❑ July -December ® January -June
COUNTY Wake
PHONE NO. (919) 828-4403
ADD TO LISTSERVE? []YES ®NO EMAIL:
DISCHARGING TO CLASS: []SA ®HQW ❑PNA ❑Trout ❑Other
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)1
PH
(Standard
Units)
TS5
(mg/L)
Event
Duration
(minutes)
Total
4
Rainfall
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
4 of Months in Tier
Z
2 Sampling
-
6-9
100Z'
-
-
-
001
1/15/16
10.61
347
60
0.5"
y
22
Reentwo
t r"
, E -
MAR- I a
CENTRAL FI
S
FILES
DWR SECTION
iL
' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/i.
4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected
(mo/dd/yr)1
PH
(Standard
Units)
TPH using method
1664A 5G%HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
s
Rainfall
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
Sampling2
6-92
15
100 '
-
-
-
-
-
r
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
am aware that there are sign' 'cant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
1�7a4ltl 2121 2/29/2016
,(Signature of Permittee)
Permit Date:7/1/2011-60/30/2015
(Date)
Last Revised 7/13/11
Page 2 of 2
-a
STORMWATER DISCHARGE OUTFAtt (SDO) - Semi -Annual MONITORING FORM
CERTIFICATE OF COVERAGE NO. NCG140001
GENERAL PERMIT NO. NCG140000
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_
PERSON COLLECTING SAMPLES Kevin Kelt
CERTIFIED LABORATORY ESC Lab # ENV 375_
Lab #
OPTIONAL INFO: February Monitoring Event
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2016
SAMPLING PERIOD: ❑ July -December ® January -June
COUNTY Wake
PHONE NO. (919) 828-4403
ADD TO LISTSERVE? []YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout
❑Other,
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)1
pH
{Standard
Units)
TS5
(mg/L)
Event
Duration
(minutes)
Total
Rainfall a
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in Tier
2 Sampling:
-
6-9
100 '
-
-
-
-
001
No Discharge
y
23
RE
CEIVpn-
CENMAL
F((. R
--QTION
1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TS5 benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are SO mg/I.
4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month —averaged over a calendar year.
Outfall
No.
Date Sample
Collected 1
(mo/dd/yr)
PH
(Standard
Units)
TPH using -method
1664A SGT-HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
a
Rainfall
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
Samplingz
6-9
152
1002,
-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Original and one copv of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
am aware that there are si nificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
uz 3/31/2016
15ipature of Permittee)
Permit Date:7/1/2011-60/30/2015
(Date)
Last Revised 7/13/11
Page 2 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_
PERSON COLLECTING SAMPLES NA
CERTIFIED LABORATORY ESC Lab # ENV 37S—
La b #
OPTIONAL INFO: _December Monitoring Event
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2015
SAMPLING PERIOD: ® July -December ❑ January -June
COUNTY Wake
PHONE NO. (919) 828-4403
ADD TO LISTSERVE? []YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA []Trout
❑Other,
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)1
pH
(Standard
Units)
TSS
(mg/L)
Event
Duration
(minutes)
Total
Rainfall
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in Tier
2 Sampling
-
-
6-9
100 '
-
-
-
-
001
12/17/15
9.65
65.0
1.25
y
21
MA . ME
J1r_K11rPA1
Pil Fq
DWR SECTIO
1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I.
"For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected
(mo/dd/yrjl
pH
(Standard
Units)
TPH using method
1664A SGT HEM
{mg/L}
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
Rainfallo
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2 Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
2
Sampling
6-9
15
100 ,
-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Original and one copv of this DMR {including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete
am aware that there are signif' nt penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
�amn 1/31/2016
(Signature of Permittee) (Date)
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 2 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_
PERSON COLLECTING SAMPLES NA
CERTIFIED LABORATORY ESC Lab # ENV 375_
Lab #
OPTIONAL INFO: April Monitoring Event
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2015
SAMPLING PERIOD: ❑ July -December ® January -June
COUNTY Wake
PHONE NO. (919) 828-4403
ADD TO LISTSERVE? DYES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)'
PH
(Standard
Units}
TSS
(mg/L)
Event
Duration
(minutes}
Total
Rainfall 4
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in Tier
2 Sampling2
-
-
6-92
1002"
-
-
-
-
001
No Discharge
y
13
1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I.
° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected
(mo/dd/yr)1
pH
(Standard
Units)
TPH using method
1664A SGT-HEM
(mg/L)
Total Suspend
Solids
(mg/L)
Event
Duration
(minutes)
Total
Rainfall a
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2ed
Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
2
Sampling
6-9Z
is
1002•3
-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Original and one coov of this DMR {including all "No Flow" & "No Discharge" reportsl within 30 days of receipt of sample for at end of monitoring period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
am aware that there f."ignificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
6/8/2015
(Signature of Permittee) (Date)
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 2 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_
PERSON COLLECTING SAMPLES .. _.. _ _NA
CERTIFIED LABORATORY ESC Lab # ENV 375_
Lab #
OPTIONAL INFO: _November Monitoring Event
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2015
SAMPLING PERIOD: ® July -December ❑ January -June
COUNTY Wake
PHONE NO. (919) 828-4403
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout
RECEIVED
JAN 0 4 2016
CENTRAL FILES
DWR SECTION
[—]Other
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)t
pH
(Standard
Units)
TSS
(mg/L)
Event
Duration
(minutes)
Total
Rainfall 4
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in 2 Tier
2 Sampling
-
-
6-92
100 ,
001
11/09/15
9.23
65.0
1.25
y
20
' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I.
For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
l
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected 1
(mo/dd/yr)
pH
(Standard
Units)
TPH using method
1664A SGT-HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
a
Rainfall
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
Sampling2
6-9
15
1002,3
-
-
-
-
-
r
_y
� K
i
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Original and one coon of this DMR (including all "No Flow" & "No Discharge" reoortsi within 30 darts of receipt of sample (or at end of monitoring period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFIG4TION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
am aware thathere are significant e�naltiiesjfor submitting false information, including the possibility of fines and imprisonment for knowing violations."
12/28/2015
(Signature of Permittee) (Date)
Permit Date: 7/1/2011-60/30/2015 Last Revised 7113/11
Page 2 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_
PERSON COLLECTING SAMPLES NA
CERTIFIED LABORATORY ESC Lab # ENV 375_
Lab #
OPTIONAL INFO: _October Monitoring Event
Part A: Stormwater Monitoring Requirements
FORM,
SAMPLE COLLECTION YEAR: 2015
SAMPLING PERIOD: ® July -December ❑ January -June
COUNTY Wake
PHONE NO. (919) 828-4403
ADD TO LISTSERVE? []YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout
❑Other
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)1
pH
(Standard
Units)
TSS
(mg/L)
Event
Duration
(minutes)
Total
Rainfall a
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in Tier
z
2 Sampling
-
-
6-9 21002,3
_
-
001
10/28/15
9.6
196
60
0.46
y
19
tea.
r L �,►
JAN
n k .fir.
VLI E 1
� t
i If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l.
"For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
EI V ED
) 4 '1016
4L FILES
ECTION
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected
(mo/dd/yr}1
pH
(Standard
Units)
TPH using method
1664A SGT-HEM
(mg/L)
Total Suspended
Solids
(mg/! }
Event
Duration
(minutest
Total
a
Rainfall
(in]
New Motor Oil
Usage
{gal/month]
In Tier 2
Monthly
Monitoring?
(y/n]
# of Months
in Tier 2
z
Sampling
6-9
15 2
100 '
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Orieinal and one coov of this DMR (includine all "No Flour' & "No Discharee" reoortsl within 30 days of receipt of sample (or at end of monitorine period
in case of "No Flow") to
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system; or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete, it
am aw�that there are si nificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
Q C . C 1)�
12/2$/2015
(Signature of Permittee) (Date)
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: Thomas Concrete of Carolina- Raleigh Plant
PERSON COLLECTING SAMPLES: Susan Bostian
CERTIFIED LABORATORY:_ESC,
Lab # ENV375
Lab #
LIMIT VIOLATIONS? YES ❑ NO
Part A: Wastewater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2015
SAMPLE QUARTER: [_]Jul -Sept ®Oct -Dec ❑Jan -March
COUNTY: Wake
PHONE NO. (_919 _) 828-4403
ADD TO LISTSERVE? []YES ®NO EMAIL:
DISCHARGING TO CLASS: [:]SA ®HQW ❑PNA ❑Trout ❑Other
OPTIONAL INFO:
lm
(9��
❑April -June
rU
Outfall No.
Date Sample
Collected'
(mm/dd/yr)
Type of Wastewater
(VE, RM, MD} 2
pH
(standard}
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL
7PH usingDischarge
method 1664A
(mmg/L)%L) S g/L)1G
Duration
(minutes)
Total Flow
7
gallons/dayj
-
-
-
6-93,4
303.5
53
(15}6 6
Cam= I
lc -
s
001
No discharge
l❑7016
r'tN
I RAL F
ILES
1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RQ staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 1 of 2
b Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VNIA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
_MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQCentral Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations."
� 0"SZ , G Aa
(Signature of Permittee)
Permit Date:7/1/2010-06/30/2015
12/28/2015
(Date)
0-ne:
Loth
Last Revised 07/13/11 W&J
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: _Thomas Concrete of Carolina- Raleigh Plant
PERSON COLLECTING SAMPLES: Susan Bostian
CERTIFIED LABORATORY:_ESC Lab # ENV375
Lab #
LIMIT VIOLATIONS? YES ❑ NO
Part A: Wastewater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2015
SAMPLE QUARTER: ®Jul -Sept ❑Oct -Dec ❑Jan -March ❑April -June
COUNTY: Wake
PHONE NO. (_919 _) 828-4403
ADD TO LISTSERVE? OYES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other,
OPTIONAL INFO:
Outfall No.
Date Sample
Collected)
(mm/dd/yr)
Type of Wastewater
z
(VE, RM, MD)
pit
[standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH usingDischarge
method 1664A
SG g/L) a
{m/L}
Duration
(minutes)
Total Flow
7
{gallons/day}
-
-
-
6-93,4
303,5
53
001
No discharge
REGEN
i Y U
1
TI
N
1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
Permit Date:7/1/2010-06/30/2015
Last Revised 07/13/11
—L7
Page 1 of 2
s Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
'-'Frow rateecan be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919)807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and 'imprisonment for knowing
violations."
(Signature of Permittee)
Permit Date: 7/1/2010-06/30/2015
10/30/2015
(Date)
Last Revised 07/13/11
Page 2 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001 SAMPLE COLLECTION YEAR: 2015
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ SAMPLING PERIOD: ® July -December ❑ January -June
PERSON COLLECTING SAMPLES NA
CERTIFIED LABORATORY ESC Lab # ENV 375�
Lab #
OPTIONAL INFO: _September Monitoring Event
Part A: Stormwater Monitoring Requirements
COUNTY
PHONE NO. (919) 828-4403
ADD TO LISTSERVE? []YES ®NO EMAIL:
DISCHARGING TO CLASS: []SA ®HQW ❑PNA ❑Trout
❑Other.
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)'
pH
(Standard
Units}
TSS
(mg/L)
Event
Duration
(minutes}
Total 4
Rainfall
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in Tier
2 Sampling2
-
-
6-92
1002,3
-
-
_
-
001
9/25/15
8.1
87.5
45
0.875
y
18
r— r
\lam I
Nov 10 20
CENTRAL F:Iil
DWR SECTI
1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I.
4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
R;
A
i= -1,
�7
r�
15
s
N
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
an-rt s: vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected
(mo/dd/yr)'
pH
(Standard
Units)
TPH using method
1664A SGT-HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
Rainfalla
(in)
New Motor Oil
Usage
[gal/month]
In Tier 2 Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
Samplingz
6-92
152
1002.3
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Original and one copy of this DMR (includinp, all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MU5T SIGN TH15 CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
am aware that thepe'�re sig ' ica�t pepalties forsubmitting false information, including the possibility of fines and imprisonment for knowing violations."
(� , 10/30/2015
(Signature of Permittee) (Date)
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 2 of 2
�� STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_
PERSON COLLECTING SAMPLES
CERTIFIED LABORATORY
NA
ESC Lab # ENV 375_
Lab #
OPTIONAL INFO: July Monitoring Event
Part A: Stormwater Monitoring Requirements
RECEIVED
SAMPLE COLLECTION YEAR: 2015 SF� ���
SAMPLING PERIOD: ® July -December ❑ January -June
COUNTY Wake CENTRAL FILES
PHONE NO. (919) 828-4403 DWR SECTION
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: [:]SA ®HQW ❑PNA ❑Trout ❑Other
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
1
NO FLOW)
pH
[standard
Units}
TSS
(mg/L)
Event
Duration
{minutes}
Total
,
Rainfall
(in]
In Tier 2
Monthly
Monitoring.?
(y/n)
# of Months in Tier
2
2 Sampling
-
-
6-4
100 '
-
-
-
-
001
7/23/15
8.87
218.0
y
16
1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
2 If a value is in excess of the benchmark, or outside the benchmark range (far pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/i.
For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Id�
U
U
j
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected
{ma/dd/yr}1
pH
{Standard
Units}
TPH using method
1664A SGT-HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
a
Rainfall
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monitoring?
(y/n}
# of Months
in Tier 2
z
Sampling
6-9
15
100 ,
-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Orieinal and one coov of this DMR (includine all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring; period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted_ Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete
am aware that theta are significant
{Signature of Permlttee}
nalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
A
9/9/2415
(Date)
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 2 of 2
A�
NCDENR
Stormwater Discharge Outfall (SDO)
Qualitative Monitoring Report
For guidance on filling out this form, please visit: http://pottal,,_ncdenr.orE/web/lrinpdC5-stormwater/
Permit No.: N/C/_/_/�/Y/_/_/_/ or Certificate of Coverage No.:
Facility Name: Thomas Concrete of Carolina -Raleigh Plant
County: Wake Phone No. (919) 828-4403
Inspector: Susan Bostian
Date of Inspection: 23 15
Time of Inspection: 1100
Total Event Precipitation (inches): _1.0".
Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit?
(See information below.)
® Yes ❑ No
Please verify whether Qualitative Monitoring must be performed during a "representative storm
event" or "measureable storm event" (requirements vary, depending on the permit).
Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be
performed during a "representative storm event" or during a "measureable storm event." However,
some permits do not have this requirement. Please refer to these definitions, if applicable.
A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall
and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than
0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no
precipitation.
A "measurable storm event" is a storm event that results in an actual discharge from the
permitted site outfall. The previous measurable storm event must have been at least 72 hours
prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter
interval is representative for local storm events during the sampling period, and the permittee
obtains approval from the local DWQ Regional Office.
By this signature, I certify that this report is accurate and complete to the best of my knowledge:
(Signature of Permittee or Designee)
Pagel of 2
SWU-242, Last modified 7/31/2013
1. Outfall Description:
Outfall No. 01_ Structure (pipe, ditch, etc.) Pipe
Receiving Stream: Unnamed tributary to Crabtree Creek
Describe the industrial activities that occur within the outfall drainage area: Bulk storage
of raw material v hi 1 transport, wastewater treatment.
2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint
(light, medium, dark) as descriptors: very light brown tint
3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil,
weak chlorine odor, etc.): No distinct odor
4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is
clear and 5 is very cloudy:
1 2 3 4 5
S. Floating Solids: Choose the number which best describes the amount of floating solids in
the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids:
1 2 3 4 5
6. Suspended Solids: Choose the number which best describes the amount of suspended
solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy:
1 2 3 4 5
7. Is there any foam in the stormwater discharge? Yes No
8. Is there an oil sheen in the stormwater discharge? Yes No
9. Is there evidence of erosion or deposition at the outfall? Yes No
10. Other Obvious Indicators of Stormwater Pollution:
List and describe pH: 8.87
Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition
may be indicative of pollutant exposure. These conditions warrant further investigation.
Page 2 of 2
SWU-242, Last modified 7/31/2013
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
T GENERAL PERMIT NO. NCG140000
RECEIVED
CERTIFICATE OF COVERAGE NO. NCG140001 SAMPLE COLLECTION YEAR: 2015
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ SAMPLING PERIOD: ® July -December ❑ January -June SEP 17 ?M5
PERSON COLLECTING SAMPLES NA COUNTY Wake CENTRAL FILES
CERTIFIED LABORATORY ESC Lab # ENV 375 PHONE NO. (919) 828-4403 DWR SECTION
Lab # ADD TO LISTSERVE? []YES ®NO EMAIL:
OPTIONAL INFO: August Monitoring Event DISCHARGING TO CLASS: []SA ®HQW ❑PNA ❑Trout [:]Other
Part A: Stormwater Monitoring Requirements
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)
PH
(Standard
Units)
TSS
(mg/L)
Event
Duration
(minutes)
Total a
Rainfall
(in)
In Tier 2
Monthly
Monitoring?
n
# of Months in Tier
Z
2 Sampling
-
-
6-9
100 ,
-
-
-
-
001
No Discharge
y
17
1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/l.
"For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
M
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
.V
Part B: ,Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month -- averaged over a calendar year.
Outfall
No.
Date Sample
Collected 1
(mo/dd/yr)
pH
(Standard
Units)
TPH using method
1664A SGT-HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
Rainfall'
(in)
New Motor Oil
Usage
(gal/month)
In In Tier 2
2 Tier
Monitoring?
(y/n)
# of Months
in Tier 2
Sampling2
6-9
15
100 ,
-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Orieinal and one copy of this DMR fincludina all "No Flow" & "No Discharee" reports) within 30 days of receipt of sample (or at end of monitorine period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
G�l 9/9/2015
(Signature of Permittee)! (Date)
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report R5Cr=1 /ED
GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: Thomas Concrete of Carolina- Raleigh Plant
PERSON COLLECTING SAMPLES: Susan Bastian
CERTIFIED LASORATORY:_ESC Lab # ENV375
Lab #
LIMIT VIOLATIONS? YES ❑ NO
Part A: Wastewater Monitoring Requirements
AUG 0 7 201.5 1__�
CENTRAL FILES
SAMPLE COLLECTION YEAR: 2015 l7WR SECTION FU9
SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ❑Jan -March ®April -June
COUNTY: Wake
PHONE NO. (_919 _)828-4403
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: [—]SA ®HQW ❑PNA []Trout ❑Other c�
OPTIONAL INFO:
Outfall No.
Date Sample
Collected
(mm/dd/yr)
Type of Wastewater
(VE, RM, MD)2
pH
(standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH usingDischarge
method 1664A
S {�HLM6
Duration
(minutes)
Total Flow
(gallons/day)'
-
-
-
6-93'4
303,5
53
(15)6
-
-
001
No discharge
1 If wastewater systems have not discharged in this quarter— report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 1 of 2
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to'benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
' Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
tN AC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
cobtain_a Summer•7Q10;flow for the receiving waters at the discharge location, the permittee shall notify DWQ and the DWQ Regional Office may require an annual flow
report on a case-by-case'basis.
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations."
(Signature of Permittee)
Permit Date: 711/2010-06/30/2015
7/31/2015
(Date)
Last Revised 07/13/11
Page 2 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_
PERSON COLLECTING SAMPLES NA
CERTIFIED LABORATORY ESC Lab # ENV 375_
#
OPTIONAL INFO: June Monitoring Event
Part A: Stormwater Monitoring Requirements
RECEIVED
SAMPLE COLLECTION YEAR: 2015 AUG 0 7 2015
SAMPLING PERIOD: ❑ July -December ® January -June
COUNTY Wake CENTRAL FILES
PHONE NO. (91.9) 828-4403 DWR SECTION
ADD TO LISTSERVE? []YES ®NO EMAIL:
DISCHARGING TO CLASS: []SA ®HQW ❑PNA [—]Trout ❑Other
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)'
pH
(Standard
Units)
TSS
(mg/L)
Event
Duration
(minutes)
Total
Rainfall 4
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in Tier
2 Sampling'
-
-
6-9'
1002.3-
001
No Discharge
y
15
If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I.
° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
ME
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
outfall
No.
Date Sample
C61lected 1
(mo/dd/yr)
pH
(Standard
Units)
TPH using method
1664A SGT-HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
Rainfall a
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
Sampling=
6_92
152
1002,3
r�
i�
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES [:]NON
REGIONAL OFFICE CONTACT NAME:
Mail Original and one coDv of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of samDle for at end of monitoring period
in case of "No Flow") to
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete
am awa"r t there are siggqicant
�penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
7/31/2015
(Signature of Permittee) (Date)
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 2 of 2
.1 171__V PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: Thomas Concrete of Carolina- Raleigh Plant
PERSON COLLECTING SAMPLES: Andrew Rodak
CERTIFIED LABORATORY: ESC
Lab # ENV375
Lab #
LIMIT VIOLATIONS? YES ❑ NO
Part A: Wastewater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2015
SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ®Jan -March ❑April -June
COUNTY: Wake
PHONE NO. (_919 _)828-4403
ADD TO LISTSERVE? DYES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA ❑Trout ❑Other
OPTIONAL INFO:
Outfall No.
Date Sample
1
Collected
(mm/dd/yr]
Type of Wastewater
z
(VE, RM, MD)
pH
(standard)
Total Suspended
Solids
(mg/L]
SettleableTPH
Solids
(mL/L}
usingDischarge
method 1664A
6
SGT-HEM
(mg/L)
Duration
(minutes}
Total Flow
(gallons/day.]
-
-
-
6-93.4
303.s
53
(15)6
-
-
001
No discharge
C
NT
dR SE rr
1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
Permit Date: 7/1/2010-06/30/2015
Last Revised 07/13/11
6
Page 1 of 2
6 Process 4;astewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
h
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow For the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW, "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations." _
(Signature of Permittee)
Permit Date:7/1/2010-06/30/2015
3/31/2015
(Date)
Last Revised 07/13/11
Page 2 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001 SAMPLE COLLECTION YEAR: 2015
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ SAMPLING PERIOD: ❑ July -December ® January -June
PERSON COLLECTING SAMPLES NA
CERTIFIED LABORATORY ESC Lab # ENV 375_
Lab #
OPTIONAL INFO: January Monitoring Event
Part A: Stormwater Monitoring Requirements
COU NTY
l
In Tier 2
Date Sample
Collected
pH
TS5
DEvent uration
1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TS5 benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I.
° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part 04 Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
p
Collected
(mo/dd/yr)1
pH
(Standard
Units)
TPH using method
1664A SGT-HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
Rainfalla
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
Z
Sampling
6-9
15
100 ,
-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports)_within 30 days of receipt of sample (or at end of monitoring period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am -aware that there$ are OgpificanY-Ptnalties for subhitting false information, including the possibility of fines and imprisonment for knowing violations."
tti
(Signature of Permittee)
3/31/2015
(Date)
Permit Date:7/1/2011-60/30/2015
Last Revised 7/13/11
Page 2 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_
PERSON COLLECTING SAMPLES NA
CERTIFIED LABORATORY ESC Lab # ENV 375�
Lab #
OPTIONAL INFO: February Monitoring Event
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2015
SAMPLING PERIOD: ❑ July -December ® January -June
COUNTY Wake
PHONE NO. (919) 828-4403
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: ❑SA ®HQW ❑PNA
❑Trout ❑Other
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)t
pH
(Standard
Units)
TSS
(mg/L)
Event
Duration
{minutes)
Total
Rainfall a
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in Tier
2 Sampling'
-
-
6-9
100 ,
-
-
-
-
001
No Discharge
y
11
1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
s T5S benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I.
"For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected
(mo/dd/yr}1
PH
(Standard
Units)
TPH using method
1664A SGT-HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
Rainfalla
(in)
New Motor Oil
Usage
{gat/month}
2 Tier
In InTierMonthly
Monitoring?
(y/n'
# of Months
in Tier 2
2
Sampling
6-4
15
100 ,
-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Original and one copy of this DMR (including; all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample for at end of monitorine period
in case of "No Flow') to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
aware that theme are significarft nalties foFsubmYtting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
3/31/2015
(Date)
Permit Date: 7/1/2011-60/30/2015
Last Revised 7/13/11
Page 2 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001 SAMPLE COLLECTION YEAR: 2015
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ SAMPLING PERIOD: ❑ Juiy-December ® January -June
PERSON COLLECTING SAMPLES NA COUNTY Wake
CERTIFIED LABORATORY ESC Lab # ENV 375_
OPTIONAL INFO:
Lab #
March Monitoring Event
Part A: Stormwater Monitoring Requirements
PHONE NO. (919) 828-4403
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: [:]SA ®HQW ❑PNA ❑Trout ❑Other
Outfall No.
Date Sample
Collected
{mo/dd/yr OR
NO FLOW)1
pH
(Standard
Units)
TSS
{mg/L}
Event
Duration
(minutes)
Total
4
Rainfall
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in Tier
Z
2 Sampling
-
-
6-9
100,
-
-
-
-
001
03-05-2015
10.42
180
45
0.5
y
12
1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I.
4 For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Permit Date: 7/l/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected 1
(mo/dd/yr)
pH
(standard
Units)
TPH using method
I1564A SGT HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
a
Rainfall
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
Samplingz
6-9
15
100 ,
-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
aTL�iware that t "e are siggificant peValties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
3/31/2015
(Date)
Permit Date: 7/1/2011-60/30/2015
Last Revised 7/13/11
Page 2 of 2
As
NCDENR
Stormwater Discharge Outfall (SDO)
Qualitative Monitoring Report
Forguidance on filling out this form, please visit: htt ortal.ncdenr. r web Ir n des-stormwater
Permit No.: N/C/_/_/_/_/_/_/_/ or Certificate of Coverage No.:
Facility Name: Thomas Concrete of Carolina -Raleigh Plant
County: Wake Phone No. (919) 828-4403
Inspector: Susan Bostian
Date of Inspection: 03 0`.
Time of Inspection: 1245
Total Event Precipitation (inches): _0.50_
Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit?
(See information below.)
® Yes ❑ No
Please verify whether Qualitative Monitoring must be performed during a "representative storm
event" or "measureablestorm event" (requirements vary, depending on the permit).
Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be
performed during a "representative storm event" or during a "measureable storm event." However,
some permits do not have this requirement. Please refer to these definitions, if applicable.
A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall
and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than
0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no
precipitation.
A "measurable storm event" is a storm event that results in an actual discharge from the
permitted site outfall. The previous measurable storm event must have been at least 72 hours
prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter
interval is representative for local storm events during the sampling period, and the permittee
obtains approval from the local DWQ Regional Office.
By this signature, I certify that this report is accurate and complete to the best of my knowledge:
C_ . ( A0.9 V,
(Signature of Permittee or Designee)
Pagel of 2
SWU-242, Last modified 7/31/2013
1. Outfall Description:
Outfall No. 01 Structure (pipe, ditch, etc.) Pine
Receiving Stream: Unnamed tributary to Crabtree Creek
Describe the industrial activities that occur within the outfall drainage area: Bulk storage
of raw materials, vehicle transport, wastewater treatment.
2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint
(light, medium, dark) as descriptors: very light brown tint
3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil,
weak chlorine odor, etc.): No distinct odor
4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is
clear and 5 is very cloudy:
1 2 3 4 5
5. Floating Solids: Choose the number which best describes the amount of floating solids in
the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids:
1 2 3 4 5
6. Suspended Solids: Choose the number which best describes the amount of suspended
solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy:
1 2 3 4 5
7. Is there any foam in the stormwater discharge? Yes No
8. Is there an oil sheen in the stormwater discharge? Yes No
9. Is there evidence of erosion or deposition at the outfall? Yes No
10. Other Obvious Indicators of Stormwater Pollution:
List and describe pH: 10.42
Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition
may be indicative of pollutant exposure. These conditions warrant further investigation.
Page 2 of 2
SWU-242, Last modified 7/31/2013
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_
PERSON COLLECTING SAMPLES NA
CERTIFIED LABORATORY ESC Lab # ENV 375_
Lab #
OPTIONAL INFO: December 2014
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2014
SAMPLING PERIOD: N July -December ❑ January -June
COUNTY Wake
PHONE NO. (919) 828-4403
ADD TO LISTSERVE? ❑YES ENO EMAIL:
DISCHARGING TO CLASS: NSA ❑HQW ❑PNA []Trout
[—]Other.
Outfal! No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)'
pH
(Standard
Units)
TSS
(mg/L)
Event
Duration
(minutes]
Total
Rainfall
(in)
In Tier 2
Monthly
Monitoring?
Wn)
# of Months in Tier
2 Samplings
-
-
6-9
i
-
_
_
-
001
12-29-2014
9.6
430
45
0.5
y
9
E N I t=.7
n%n R car i
' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I.
`For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Permit Date: 7/l/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected
(mo/dd/yr)'
PH
(Standard
Units )
TPH using method
1664A 5GT-HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
.
Rainfall
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monitoring?
(y/ni
q of Months
in Tier 2
Sampling i
6-9
15
1001,-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Orieinal and one coov of this DMR [includine all "No Flow" & "No Discharee" reports) within 30 days of receipt of sample (or at end of monitorine period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and ail attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the i formation, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
armor ,alw�e that ther re significantIties for su fitting false information, including the passibility of fines and imprisonment for knowing violations."
} ri�'1 0 3/10/2015
(Signature of Permittee) (Date)
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 2 of 2
A��
MCDENR
Stormwater Discharge Outfall (SDO)
Qualitative Monitoring Report
For guidance on filling out this farm, please visit: r n
Permit No.: �I/�/ /�/_/_/_/_/^/ or Certificate of Coverage No.: NV/0j/ 1 /4_/ 0 / Q/ 0/_1
Facility Name: Thomas Concrete„of Carolina -Raleigh Plant
County: Wake Phone No. [219) 828-4403
Inspector: Susan Bostian
Date of Inspection: 12/29/14
Time of Inspection•. 0900
Total Event Precipitation (inches): _0.50_
Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit?
(See information below.)
® Yes ❑ No
Please verify whether Qualitative Monitoring must be performed during a "representative storm
event" or "measureable storm event" (requirements vary, depending on the permit).
Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be
performed during a "representative storm event" or during a "measureable storm event." However,
some permits do not have this requirement. Please refer to these definitions, if applicable.
A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall
and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than
0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no
precipitation.
A "measurable storm event" is a storm event that results in an actual discharge from the
permitted site outfall. The previous measurable storm event must have been at least 72 hours
prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter
interval is representative for local storm events during the sampling period, and the permittee
obtains approval from the local DWQ Regional Office.
By this signature, I certify that this report is accurate and complete to the best of my knowledge:
�;". 01
(Signature of Permittee or Designee)
Page 1 of 2
5WU-242, last modified 7/31/2013
1. Outfall Description:
Outfall No. 01 Structure (pipe, ditch, etc.) Pine
Receiving Stream: Unnamed tributary to Crabtree Creek
Describe the industrial activities that occur within the outfall drainage area:
of raw materials, vehicle transport, wastewater treatment,
Bulk storage
2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint
(light, medium, dark) as descriptors: very light brown tint
3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil,
weak chlorine odor, etc.): No distinct odor
4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is
clear and 5 is very cloudy:
1 2 3 4 5
5. Floating Solids: Choose the number which best describes the amount of floating solids in
the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids:
1 2 3 4 5
6. Suspended Solids: Choose the number which best describes the amount of suspended
solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy:
1 2 3 4 5
7. Is there any foam in the stormwater discharge? Yes No
8. Is there an oil sheen in the stormwater discharge? Yes No
9. Is there evidence of erosion or deposition at the outfall? Yes No
10. Other Obvious Indicators of Stormwater Pollution:
List and describe pH: 9.60
Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition
may be indicative of pollutant exposure. These conditions warrant further investigation.
Page 2 of 2
SWU-242, Last mndified 7/31/2013
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: _Thomas Concrete of Carolina- Raleigh Plant
PERSON COLLECTING SAMPLES: Andrew Rodak
CERTIFIED LABORATORY: ESC Lab # ENV375
Lab #
LIMIT VIOLATIONS? YES ❑ NO
Part A: Wastewater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2024
SAMPLE QUARTER: ❑Jul -Sept ®Oct -Dec [_]Jan -March
COUNTY: Wake
PHONE NO. (_919 _) 828-4403
ADD TO LISTSERVE? []YES ®NO EMAIL:
DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout
OPTIONAL INFO:
❑Apra' a e
[]Other,
Outfall No.
Date Sample
1
Collected
(mm/dd/yr)
Type of Wastewater
z
RMMD]
(VE, ,
pH
(standard]
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH usingDischarge
method 1664A
S
g/L)96
(mg/L)
Duration
(minutes)
Total Flow
7
(gallons/day]
-
-
6-93,4
303,5
53
(15),
-
-
001
No discharge
V
'AN 0
n
CENTRAL
F
S
CTION
1 If wastewater systems have not discharged in this quarter — report "No Flow' or "No Discharge" here. Please make sure to mark the sample quarter above.
z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3 if an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
Permit Date: 7/l/2010-06/30/2015 Last Revised 07/13/11
Page 1 of 2
a Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is 'subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
' Flow rate cari be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on.a case -by -case basis.
a•
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919)807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
vinintinnc."
(Signature of Permittee)
Permit Date:7/1/2010-06/30/2015
12/29/2014
(Date)
Last Revised 07/13/11
Page 2 of 2
��%L
RECEIVED
NOV 07 2014
CENTRAL FILES
DWR SECTION
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001 SAMPLE COLLECTION YEAR: _2014
FACILITY NAME: _Thomas Concrete of Carolina- Raleigh Plant SAMPLE QUARTER: ®JUI-Sept Oct -Dec Dan -March April -June
PERSON COLLECTING SAMPLES: Susan Bostian COUNTY: Wake
CERTIFIED LABORATORY:_ESC Lab N ENV375 PHONE NO. (W919-_,_} 828-4403
Lab# ADD TOLISTSERVE? DYES ®NO EMAIL:
LIMIT VIOLATIONS? YES ❑ NO M DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA QTrout ❑Other
OPTIONAL INFO:
Part A: Wastewater Monitoring Requirements
Outfall No.
Date Sample
Collected'
(mm/dd/yr)
Type of Wastewater
z
(VE, RM, MD)
pH
(standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH using
method 1669A
SGT-HErvT`
(mg/L)
Discharge
Duration
(minutes)
Total Flow
�
(gallons/day(
6.93,4
30"'
53
(15),
001
No discharge
If wastewater systems have not discharged In this quarter —report "No flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD), Report more than one type if the waste -stream is commingled.
° If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
pH limits are 6.9 S.U. for wastewater discharges to freshwaters, and 62-8.5 S.U. for discharges to saltwaters.
s TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg1L for all other water Classifications.
Permit Date: 7/1/2010-06/30/2015 Last Revised 07/13/11
Page 1 of 2
ti
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action,
Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall beset to 50% of the Summer 7Q10 Flow as per 1SA
NCAC 028.0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this Information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permiuee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case- -case basis.
Division of Water Quality
Ann: DWQCentfal'Files
1617 Mail Service Center
Raleigh, North Carolina
(919)807-6379
YOU MUST SIGN THIS CER77FICAIION FQR ANY INFORMATNN REPORTEID.
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my Inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the Information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and
complete.. I am aware that there are significant penalties for submitting false information, Including the possibility of fines and Imprisonment for knowing
viol �/;y� J�S�F
� -\J/ / A✓.1 11/4/2014
(Signature of Peimittee) 0 (Date)
Permit Date: 711/2010-06/30/2015 Cast Revised 07/13/11
Page 2 of 2
7
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001 SAMPLE COLLECTION YEAR: 2014
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_ SAMPLING PERIOD: ® July -December ❑ January -June
PERSON COLLECTING SAMPLES NA COUNTY Wake
CERTIFIED LABORATORY ESC Lab # ENV 375 PHONE NO. (919) 828-4403
Lab # ADD TO LISTSERVE? ❑YES ®NO EMAIL:
OPTIONAL INFO: August 2014 DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout ❑Other
Part A: Stormwater Monitoring Requirements
Outfall No.
Date Sample
Collected
{me/dd/yr OR
NO FLOW)1
PHI
(Standard
Units)
TSS
(mg/L)
Event
Duration
(minutes)
Total
a
Rainfall
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in Tier
2 samplingz
-
-
6-9
100 '
-
-
-
-
001
No Discharge
-
y
5
i?EG-ERIED
J:
NTF7AL FILE
iON
1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
2 if a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I.
A For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected
(mo/dd/yr}i
pH
(Standard
Units)
TPH using method
1664A 5GT-HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
a
Rainfall
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monitoring?
(y/n)
#1 of Months
in Tier 2
z
Sampling
6-9
15
100 2,3
-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUSTSIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly r onsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
a are that there V(�Isignifint enaltie7fFpr submitting false information, including the possibility of fines and imprisonment for knowing violations."
9/15/2014
(Signature of Permittee) (Date)
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 2 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_
PERSON COLLECTING SAMPLES NA
CERTIFIED LABORATORY ESC Lab # ENV 375_
Lab #
OPTIONAL INFO: July 2014
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2014
SAMPLING PERIOD: ® July -December ❑ January -June
COUNTY Wake
PHONE NO. (919) 828-4403
ADD TO LISTSERVE? []YES ®NO EMAIL:
DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout ❑Other
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
1
NO FLOW)
PH
(Standard
Units)
TSS
(mg/L)
Event
Duration
{minutes]
Total
4
Rainfall
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in Tier
2 Samplingz
-
-
5-9
100 '
-
-
-
-
001
No Discharge
-
-
y
4
tr.
CENTRAL F
ILES
SIP 6
DWR
1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/l.
° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected
{mo/dd/yr}i
pH
(Standard
Units
TPH using method
1664A SGT-HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
Rainfalla
{in}
New Motor Oil
Usage
{gal/month}
In Tier 2 Monthly
Monitoring?
(v/n}
# of Months
in Tier 2
2
Sampling
6-9
is
100 '
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ®NO
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Oripinal and one copv of this DMR (including all "No Flow" & "No Discharee" reports) within 30 days of receipt of sample (or at end of monitorine period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly re onsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
arp•avrrargthat there angnic penaws--fi submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
9/15/2014
(Date)
Permit Date:7/1/2011-60/30/2015
Last Revised 7/13/11
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: Thomas Concrete of Carolina- Raleigh Plant
PERSON COLLECTING SAMPLES: Andrew Rodak
CERTIFIED LABORATORY:_ESC Lab # ENV375
Lab #
LIMIT VIOLATIONS? YES ❑ NO
Part A: Wastewater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2014
SAMPLE QUARTER: [_]Jul -Sept ❑Oct -Dec Dian -March ®April -June
COUNTY: Wake
PHONE NO. (_919 _) 828-4403
ADD TO LISTSERVE? DYES ®NO EMAIL:
DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout ❑Other
OPTIONAL INFO:
Outfall No.
Date Sample
Collected'
(mm/dd/yr)
Type of Wastewater
( VE, RM, MD)'
pH
(standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH usingDischarge
method 1664A
SGT-HEM'
(mg/L)
(minutes)
Total Flow
7
(gallons/day )
-
-
-
6-93.A
3035
53
(15)6
-
-
001
No discharge
n
JUL
11 ES
' If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
° pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
Permit Date: 7/1/2010-06/30/2015
Last Revised 07/13/11
Page 1 of 2
b Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. if the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE") WITHIN 30 DAYS_ OF RECEIPT OF SAMPLE OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED.
N certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. l am aware that there are significant pen ties for submitting false information, including the possibility of fines and imprisonment for knowing
violations." w /l
I?
(Slgnatureof Permittee)
Permit Date.,7/1/2010-06/30/2015
6/30/2014
(Date)
Last Revised 07/13/11
Page 2 of 2
RECEIVED
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report JUL 0 7 2014
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140218
FACILITY NAME: _Thomas Concrete of Carolina- Durham Plant
PERSON COLLECTING SAMPLES: Susan Bostian
CERTIFIED LABORATORY: ESC Lab # ENV375
Lab #
LIMIT VIOLATIONS? YES ❑ NO
Part A: Wastewater Monitoring Requirements
CENTRAL FILES
DWQ/80G
SAMPLE COLLECTION YEAR: 2014
SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec Dian -March
COUNTY: Durham
PHONE NO. (_919.—) 598-0456
ADD TO LISTSERVE? [—]YES ®NO EMAIL:
®April -June
DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout ❑Other
OPTIONAL INFO:
Outfail No.
Date Sample
1
Collected
(mm/dd/yr)
Type of Wastewater
a
(VE, RM, MD)
pH
(standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
(mL/L)
TPH usingDischarge
method 1664A
S `mlAe
Duration
(minutes)
Total Flow
(gallons/day),
-
-
-
6-93,4
303,5
53
(15)6
-
001
NA
No Discharge
NA
NA
NA
NA
' If wastewater systems have not discharged in this quarter — report "No Flow' or "No Discharge" here. Please make sure to mark the sample quarter above.
2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
" pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TS5 limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
Permit Date: 7/1/2010-06/30/2015
Last Revised 07/13/11
Page 1 of 2
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA'areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 1SA
NCAC 0213 .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR_
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919)807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am ware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations." � _ /'1 r
(Signature of Permittee)
Permit Date:7/1/2010-06/30/2015
6/30/2024
(Date)
Last Revised 07/13/11
Page 2 of 2
R
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_
PERSON COLLECTING SAMPLES NA
CERTIFIED LABORATORY ESC Lab # ENV 375_
Lab #
OPTIONAL INFO: May 2014
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2014
SAMPLING PERIOD: ❑ July -December ® January -June
COUNTY Wake
PHONE NO. (919) 828-4403
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout
❑Other
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)'
PH
(standard
Units)
TSS
(mg/L)
Event
Duration
(minutes)
Total
a
Rainfall
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in Tier
2 Sampling�
-
-
6-9
100 '
-
-
-
-
001
No Discharge
-
y
3
IfI i
t►
L FILES
2 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/l.
"For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Permit Date:7/1/2011-60/30/2015
Last Revised 7/13/11
Page 1 of 2
9- ..1.
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 5S gal of new motor oil/month -- averaged over a calendar year.
Outfall
No.
Date Sample
Collected 1
(mo/dd/yr)
PH
(Standard
Units)
TPH using method
I664A SGT HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
a
Rainfall
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
Sampling=
6-9
15
100 ,
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mai! Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons dir tly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
a�llyare that ere are �nificaryt penalties for Submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
Permit Date: 7/1/2011-60/30/2015
6/30/2014
(Date)
Last Revised 7/13/11
Page 2 of 2
STORMWATER DISCHARGE DUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_
PERSON COLLECTING SAMPLES Susan Bostian
CERTIFIED LABORATORY ESC Lab # ENV 375_
Lab #
OPTIONAL INFO:
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: %. 2014
SAMPLING PERIOD: ❑ July -December ® January -June
COUNTY Wake
PHONE NO. (919).828-4403
ADD TO LISTSERVE? DYES ®NO EMAIL:
DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA ❑Trout ❑Other
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)'
PH
(Standard
Units]
TS5
(mg/L)
Event
Duration
(minutes)
aa
Rainfall'
infall
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in Tier
2 Sampling=
-
6-92
3002,3
-
-
-
-
-001
04/07/14
10.76
89
480
1.42
y
3
r-1r-'P-% V
A V fl
1. t 114 I KAI
LYp V(j
' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I.
For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
WED
2014
. FILES
:OG
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
PartB: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month —averaged over a calendar year.
Outfall
No.
Date Sample
Collected
(mo/dd/yr)j
pH
(standard
Units)
TPH using method
1664A SGT-HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
Rainfall'
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
2
Sampling
6-92
152
1002,3
-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO ❑
HAVE YOU CONTACTED THE REGION? YES []NO
REGIONAL OFFICE CONTACT NAME:
Mail Original and one coov of this DMR (including all "No Flow" & "No Discharge' reports) within 30 days of receipt of sample for at end of monitoring period
in case of "No Flow") to:
Division of Energy, Mineral and Land Resources
Attn: DWQ Central Files
1612 Mail Service Center
Raleigh, North Carolina 27699- 1612
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete.
mare that theAare significant Wnalties for suhmitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
Permit Date:7/1/2011-60/30/2015
4/30/2014
(Date)
Last Revised 7/13/11
Page 2 of 2
PROCESS WASTEWATER — Quarterly Discharge Monitoring Report
GENERAL PERMIT No. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001 SAMPLE COLLECTION YEAR: 2014
FACILITY NAME: _Thomas Concrete of Carolina- Raleigh Plant SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ®Jan -March ❑April -June
PERSON COLLECTING SAMPLES: Andrew Rodak COUNTY: Wake
CERTIFIED LABORATORY:_ESC Lab q ENV375 PHONE NO. (_919 _) 828-4403
Lab # ADD TO LISTSERVE? ❑YES ®NO EMAIL:
LIMIT VIOLATIONS? YES []NO ® DISCHARGING TO CLASS: ®SA ❑HQW
OPTIONAL INFO:
Part A: Wastewater Monitoring Requirements
❑PNA ❑Trout ❑Other
Outfall No.
Date Sample
Collected 1
(mm/dd/yr)
Type of Wastewater
(VE, RM, MD)2
pH
(standard)
Total Suspended
Solids
(mg/L)
Settleable
Solids
[mL/L)
TPH usingDischarge
method 1664A
SGT-HEM6
(mg/L)
Duration
(minutes)
Total Flow
(gallons/day)'
-
-
-
6-93.4
303.5
53
(15)6
-
-
001
No discharge
' If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above.
2 Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum
Cleanout (MD). Report more than one type if the waste -stream is commingled.
3If an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff
notifies you to continue monitoring.
4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters.
5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications.
Permit Date: 7/1/2010-06/30/2015
Last Revised 07/13/11
Page 1 of 2
2;-7D,
6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VIVA areas. TPH does not have a limit for wastewater,
but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action.
Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A
NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot
obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow
report on a case -by -case basis.
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR
AT END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6379
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing
violations." /-N i
(Signature of Permittee)
Permit Date: 7/1/2010-06/30/2015
(date)
Last Revised 07/13/11
Page 2 of 2
�,... ENVIRONMENTAL GEOLOGISTS & ENGINEERSDrVfEE
511 KEISLER DRIVE — SUITE 102
if & D ,�N H" OFFICE:
NORTH CAROLINA 27518
1 � OFFICE: (919) 858-9898
WW W. DUNCKLEEDUN IiAM.COM
LETTER OF TRANSMITTAL
To: Central Files, NC DEMLR
From: Andrew Rodak
Date: March 24, 2014
The following document is attached:
❑ Draft Letter / Report
❑ Laboratory Report
❑ Contract or Change Order
For the following action:
❑ For Your Review / Information
❑ As You Requested
Comments:
Re: Thomas Concrete Durham Plant- NCG 140218
Final Letter 1 Report
Certification Forms
Other: SW Tier II SDO Rpt
Quarterly WW Rat
For Your Signature & Return
Other:
MAILING AD[}RI:sS — PosT Ol7r[('l: Box 639 — CARY, Nom"i i CAR(A.[�'N" A 2 75I2
NORTFI C:AROHNA BOARD OF I \A%T1NF:kS l (1R i NGNrU7RS AND S1)RV[:Y0R5 LICrNsI_ C-3 ii9
No 'il CAROUNA R( Mltl) FOR LICE\1,1NQ UI' C1:0[ (x11S'I'S Lici.Nsr C-261
NC i)[_NR RLGiSTF.RF.D EtVIAs)\\1r:NT:\l. Cti\SUI,TANT,V1)\1131 R 0F106
STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG140001
FACILITY NAME: Thomas Concrete of Carolina -Raleigh Plant_
PERSON COLLECTING SAMPLES Andrew Rodak
CERTIFIED LABORATORY ESC Lab # ENV 375_
Lab #
OPTIONAL INFO:
Part A: Stormwater Monitoring Requirements
SAMPLE COLLECTION YEAR: 2014
SAMPLING PERIOD: ❑ July -December ® January -June
COUNTY Wake
PHONE NO. (919) 828-4403
ADD TO LISTSERVE? ❑YES ®NO EMAIL:
DISCHARGING TO CLASS: ®SA ❑HQW ❑PNA [—]Trout ❑Other
Outfall Na.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW);
pH
(Standard
Units)
TSS
(mg/L)
Event
Duration
(minutes)
Total
4
Rainfall
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in Tier
2 Sampling:
-
-
6-92
1002.3
-
-
-
-
001
02/21/14
8.95
14
Click here to
enter test.
Click here to
enter text.
y
3
' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HOW, Trout, and PNA waters where they are 50 mg/I.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
i
° For each sampled measurable storm event the total precipitation must be recorded using data from an on -site rain gauge.
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 2 of 2
Part e: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected
(mo/dd/yr)l
pH
(Standard
Units)
TPH using method
1664ASGT-HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
Rainfall a
(in)
New Motor Oil
Usage
{gal/month)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
Sampline
6-92
152
1002,3
-
-
-
-
-
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ® NO
HAVE YOU CONTACTED THE REGION? YES ONO
REGIONAL OFFICE CONTACT NAME:
Mail Orieinal and one copy of this DMR (includins all "No Flow" & "No Discharse" reoorts) within 30 days of receipt of sample for at end of monitoring oeriod
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
aware that there aAsignificant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
(Signature of Permittee)
Permit Date: 7/1/2011-60/30/201S
(Date)
Last Revised 7/13/11
Page 3 of 2
DT 7T�T�-( EE ENVIRONMENTAL GEOLOGISTS & CNGINFERS
y lJ 1 V C 511 KEISLER DRIVE — SUITE 102
C RY, NORTH CAROLINA 27518& DUNriTyM OFFICE: (939) 858-9698 WWW 1D
LETTER OF TRANSMITTAL
To: Central Files
From: Andrew Rodak
Date: March 24, 2014
The following document is attached:
❑ Draft Letter / Report
❑ Laboratory Report
❑ Contract or Change Order
For the following action:
❑ For Your Review / Information
❑ As You Requested
Comments:
I
❑ Final Letter / Report
❑ Certification Forms
® Other: Monthlv Tier H SDO R12
Quarterly WW Rptt
❑ For Your Signature & Return
❑ Other:
Re: Thomas Concrete -Raleigh (West St.) plant-NCG140001
filft2wo
MAR32014
014
$�D��rc.RQUkL;�Y
MAILING ADDRESS — POST OFFICE Box 6�9 — CARY. NOR'Cl I CAR01,11"'A 27512 �CFf
NORTH CAROLINA ROARD OF ENAMINFRS FOR ENGINEERS AND SUR\TYORS I,1('F\SF C:-35S9
NORTH CAROUN a BOARD FUR L1Cr:NSING OF GFOIAK',ISTS LICENSC C.'-261
NC. DEER RT_Gis'rrRFD EM IRO)NMENTAL C.()NSIiLTANT NtjmBFR 00061