Loading...
HomeMy WebLinkAboutNCG030148_MONITORING INFO_20150212STORMWATER-DIVISION CODING SHEET RESCISSIONS . PERMIT NO. DOC TYPE ❑COMPLETE FILE -HISTORICAL DATE OF RESCISSION ❑ (%fU��U� �0� YYYYMMDD Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 t\1 r r"', A , , (9ete submitted r L) of CERTIFICATE OF COVERAGE NO. NCG03 O 0 O 0 SAMPLE COLLECTION YEAR 6;20I�Z Cop— FACILITY NAME Neptco Inc. Lenoir NC COUNTY Caldwell PERSON COLLECTING SAMPLES Kevin Poovey LABORATORY Blue Ridge Labs Inc. Lab Cert Comments on sample collection or analysis: KtF-LIN/SAMPLEPERIOD ❑Jan -June EJuly-Dec or E] Monthly' (month) �L6 J�i]i;DISCHARGING TO CLASS ❑ORW ❑HQW [:]Trout ❑PNA # 275 CENTRAL FILES ❑Zero -flow ❑Water Supply ❑SA DWR SECTION ❑® Other LIT to Gunpower Creek Class W5-IV Part A: Stormwater Benchmarks and Monitoring Results PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 —> oN l �]—No discharge this period?' K 11s Xt 1J Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/Total Total Petroleum Hydrocarbons Toxic Organics5 Benchmarks =__> /�.a1r lfF - 100 mg/L or 50 mg/L4 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 12-Z3'!i� O . '� < s. G +.•.� �- L a.ol �jc f f��� �. parr 2 r% A 7-,l o•ol "-JL �., 7>,4-4-t cic � • I , ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 i' J � facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: - "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Kevin Poovey Name (Print name) Plant Engineer Title (Print titlel / 2 (Sigr aturG} (DAte) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier z, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period:2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) -_ Total Suspended Solids pH Benchmarks =__> - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Nate: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART I€ SECTION B. TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO Q IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" rep_ort_s,_within 30 days of receipt of the lab results (or at end of monitorin_g_per_iod in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or {persons who manage the system, or those persons directly responsible for gathering the information, the information Submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date: 11/1/2012.10/31/2017 (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for Nort Carolina Division of Water Quality General Permit No. NCG030000 Nc1.11)IN P) Date submitted -gyp-,Zola CERTIFICATE OF COVERAGE II NO. NC"3 - O Q O FACILITY NAME r�C1nC. COUNTY LA e PERSON COLLECTING SAMPLES I&VIb-+ PCIDWV LABORATORY f31uw� ;4e It_6S Tom.. Lab Cert. ## a 7S Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 0 1 SAMPLE PERIOD ,Jan -June ❑ July -Dec or ❑ Monthly'_ (month) RECEpQl�-k#�GING TO CLASS ❑ORW ❑HQW [:]Trout❑PNA r �O ❑Zero -flow ❑Water Supply ❑SA JUL 31 2014 ®Other_Ttc 6u.+rwdcr ereok c1451 ws- lv CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 DWQIBQG ❑ No discharge this period:2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Nan -Polar O&G/Tatal Total Petroleum Hydrocarbons Toxic Organics Benchmarks - 100 mg/L or 50 mg/L4 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L (0- AD- ! ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 • �.: h- r� �� � . .. `� i ' ,. .. . 7 -----Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." 16r_Q I V\ Re, vt vL Name (Print name) ?la%Vj- et- vt* ALY, Title (Print title _ G ;7- (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format. "<XX me/L". where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?Z Outfall No. Date Sample 1 Collected (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks 15 mg/L 100 mg/L or 50 mg/L* 6.0 - 9.0 SU Footnotes from Part A also apply to this Part B. * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Vote: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware that there Zares'ifica alties far submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted /- 30 _.20IzI CERTIFICATE OF COVERAGE NO. NCG03 4 0- O 0 I v 6&_eo 30 ! SAMPLE COLLECTION YEAR .2c> 13 FACILITY NAME Ne_0+C.0 . Mv%c.. COUNTY_ C.a.ld.ua4L'tl PERSON COLLECTING SAMPLES X"L." Pooye.A , LABORATORY Blest R� �� 1"S Mvt. Lab Cert. tt ;t7S Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE PERIOD ❑ Jan -June IN July -Dec or ❑ Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA RECEIVED ❑Zero -flow ❑Water Supply ❑SA ®Other (AT Av 6,Ab-w 4&-- Cv ak W.S— IV FEB 0 3 2014 CENTRAL FILESPLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 DINQ/BOG ❑ No discharge this period?Z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organics Benchmarks ===> _ - 100 mg/L or 50 mg/L4 6.0 - 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L i Jz/1q 1130. 7S L. 5-a rns 11 y. a L o.o! 0-s/ .7. 3 a it 114 13 0.1 S L S. 2 ek-i / 1 4.4 Z0.01 r^51L b. s- 3 Iz ICI Z13 0.175 [ S Z "'s A q . ri 4 0 .ol V-5 /L 11. 3 y MIN 113 0.75 10.2 ,S 1 4D•0I-5/L- 12•6 ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." KLU►tin ?aoVc Name (Print name) Pr 1 ' Qn-k Ly d N,.,&-y, Title (Print title) (Signature) i— aq-aojq (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note. If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 1, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. + TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality T Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." C-1 2�_ (Signature of Permittee) (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3