Loading...
HomeMy WebLinkAboutNCG030013_COMPLETE FILE - HISTORICAL_20150112STORMWATER DIVISION CODING SHEET RESCISSIONS- PERMIT NO. DOC TYPE ❑COMPLETE FILE -HISTORICAL DATE OF RESCISSION YYYYMMDD Semi-annual Stormwater Discharee Monitorine Resort for North Carolina Division of Water Quality General Permit No. NCG030000 0 0 �(� � Date submitted: January 15, 2015 6-03 CERTIFICATE OF COVERAGE NO. NCG 0000 SAMPLE COLLECTION YEAR 2014 FACILITY NAME TT&E Iron & Metal SAMPLE PERIOD ❑ Jan -June ❑ July -Dec COUNTY Wake �lC n %EI [) or ® Monthly' November & December(month�+ DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA PERSON COLLECTING SAMPLES. LABORATORYESC Lab Sciences Lab Cert. # ENV375 R� V 12 Z015 ❑Zero -flow ❑Water Supply [:]SA Comments on sample collection or analysis:.. JAN []Other CENTRAL FILES ()WR SECTION PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 Part A: Stormwater Benchmarks and Monitoring Results ® No discharge this period?Z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/Total Total Petroleum Hydrocarbons Toxic Organics Benchmarks =__> _ - 100 mg/L or 50 mg/L° 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3 The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31), Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the Stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches; Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks =__> _ 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: if you report a sample value in excess of the benchmark, you must implement Tier S, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART 8 MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Danny Smith, Surface Water Regional Supervisor - sent letter and left voicemail in early March 2013. Moil an original and one copy of this DMR, including all "No Dischae" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to: T Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date-.11/1/2012-10/31/2017 1-2--f5 (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 L'dtil".1 ly� I m January 8, 2015 North Carolina Department of Environment and Natural Resources Division of Water Resources 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Attention: Central Files Reference: Tier Two Stormwater Discharge Outfall Monitoring Report (November and December 2014) TT&E Iron and Metal, Inc. 1529 West Garner Road Garner, Wake County, North Carolina Permit No. NCG030000, Certificate of Coverage No. NCG030013 S&ME Project No. 4305-14-178 To Whom It May Concern: S&ME Inc. (S&ME) is submitting the attached Tier Two Stormwater Discharge Outfall (SDO) Monitoring Report on behalf of TT&E Iron and Metal, Inc. (TT&E). TT&E is currently permitted to discharge stormwater consistent with General Permit No. NCG030000 and Certificate of Coverage No. NCG030013. The stormwater discharge outfall (SDO) monitoring report for November and December 2014 is attached. No stormwater event that produced a measurable discharge from either level spreader at either of the two outfalIs occurred Monday through Saturday during working hours in November and December 2014. Therefore, no analytical data is available for November or December 2014. The November and December 2014 sampling events and the corresponding Tier Two response will be documented in TT&E's Stormwater Pollution Prevention Plan. If you have any questions, please call Claudia Irvin with S&ME, Inc. at (919) 872-2660. Sincerely, S&ME, Inc. I x �-' 41A Claudia B. Irvin Staff Professional Enclosures: SDO Discharge Monitoring Report cc: Ronnie Thompson - TT&E Iron & Metal Edmund Woloszyn Jr., R.E.M. Senior Consultant S&ME, INC. / 3201 Spring Forest Road 1 Raleigh, NC 276161 p 919.872.2660 / (919.876,39581 www.smeinc.com November 19, 2014 North Carolina Department of Environment and Natural Resources RECEIVED Division of Water Quality NOV 2 4 20i4 1617 Mail Service Center Raleigh, North Carolina 27699-1617 CENTRAL FILES Attention: Central Files DWR SECTION Reference: Tier Two Stormwater Discharge Outfall Monitoring Report (October 2014) TT&E Iron and Metal, Inc. 1529 West Garner Road Garner, Wake County, North Carolina Permit No. NCG030000, Certificate of Coverage No. NCG030013 S&ME Project No. 4305-14-178 To Whom It May Concern: S&ME Inc. (S&ME) is submitting the attached Tier Two Stormwater Discharge Outfall (SDO) Monitoring Report on behalf of TT&E Iron and Metal, Inc. (TT&E). TT&E is currently permitted to discharge stormwater consistent with General Permit No. NCG030000 and Certificate of Coverage No. NCG030013. The stormwater discharge outfall (SDO) monitoring report for October 2014 is attached. No stormwater event that produced a measurable discharge from either level spreader at either of the two outfalls occurred Monday through Saturday during working hours during October 2014. Therefore no analytical data is available for October 2014. The October 2014 sampling event and the corresponding Tier Two response will be documented in TT&E's Stormwater Pollution Prevention Plan. If you have any questions, please call Claudia Irvin with S&ME, Inc. at (919) 872-2660. Sincerely, S&ME, Inc. Claudia B. Irvin Staff Professional Enclosures: SDO Discharge Monitoring Report cc: Ronnie Thompson - TT&E Iron & Metal Edmund Woloszyn Jr., R.E.M. Senior Consultant SWE, INC. / 3201 Spring Forest Road / Raleigh, NC27616/p919.872.2660/f9l9.876.3958/www.smeinc.com Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted: October 6, 2014 CERTIFICATE OF COVERAGE NO. NCG030000 SAMPLE COLLECTION YEAR 2014 FACILITY NAME TT&E Iron & Metal SAMPLE PERIOD ❑ Jan -June ❑ July -Dec COUNTY Wake or ® Monthly' October (month) PERSON COLLECTING SAMPLES. DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORYESC Lab Sciences Lab Cert. # ENV375 ❑Zero -flow ❑Water Supply [:]SA Comments on sample collection or analysis:.. ❑Other Part A: Stormwater Benchmarks and Monitoring Results PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ® No discharge this period?Z Outfall No. Date Sample Collected (mo/dd/yr) 24-hour rainfall amount, Inches' Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/Total Total Petroleum Hydrocarbons Toxic Organics Benchmarks ===> - - 100 mg/L or 50 mg/L° 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. ' The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. S Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: I1/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks =__> _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Danny Smith, Surface Water Regional Supervisor - sent letter and left voicemall in early -March 2013. Moil an original and one tabu of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reportsl to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permi"ee) Permit Date:11/1/2012-10/31/2017 (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 A Semi-annual Stormwater Discharige Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted: October 6. 2014 CERTIFICATE OF COVERAGE NO. NCG030000 SAMPLE COLLECTION YEAR 2014 FACILITY NAME TT&E Iron & Metal SAMPLE PERIOD ❑ Jan -June ❑ July -Dec COUNTY Wake or ® Monthly" October lmonthl PERSON COLLECTING SAMPLES. DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORYESC Lab Sciences Lab Cert. # ENV375 ❑Zero -flow ❑Water Supply ❑SA Comments on sample collection or analysis:.. —]Other PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 Part A: Stormwater Benchmarks and Monitoring Results ® No discharge this period?' outfall No. Date Sample Collected" (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/Total Total Petroleum Hydrocarbons Toxic Organicss Benchmarks ===> - - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 'Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here, 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date:11/1/2012-10/31/2017 5WU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TT'O monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (Tf0), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reed in the format, "<XX me/L where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Danny Smith, Surface Water Rexional Supervisor - sent letter and left voicemail in early March 2013. Mail an original and one copy of this DMR includJma all "No Discharge! -reports within 30 days of receipt of the lob results for at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based an my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date: 11/1/2012-10/31/2017 _a - I ( - ( � (Date] SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted: October 6. 2014 CERTIFICATE OF COVERAGE NO. NCG030000 SAMPLE COLLECTION YEAR 2014 FACILITY NAME TT&E Iron & Metal SAMPLE PERIOD ❑ Jan -June ❑ July -Dec COUNTY Wake or ® Monthly', September (month) PERSON COLLECTING SAMPLES. RECEIVED VE® DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORYESC Lab Sciences Lab Cert. # ENV375 ` ' []Zero -flow []WaterSupply ❑SA Comments on sample collection or analysis%. NOV 0 5 Z014 ❑Other CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 DWR SECTION Part A: Stormwater Benchmarks and Monitoring Results ® No dischorge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxic Organicss Benchmarks =_=> _ 100 mg/L or 50 mg/L° 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be resorted in the format. "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?z Outfall No. Date Sample Collected (mo/dd/yr) 24-hour rainfall amount, Inches; Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks =__> - - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part 8 * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ®NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Danny Smith, Surface Water Regional Supervisor - sent letter gnd left voicemail In early March 2013. Mail an original and one copy of this DM R Including all "No Discharge" renor% within 30 days of receipt of the lab results !ar at end of monitoring period In the case oL"No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "i certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my Inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am'aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Rom a. - ra.� (Signature of Permittee) Permit Date-11/1/2012-10/31/2017 )v-8- ) 4 (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 October 31, 2014 North Carolina Department of Environment and Natural Resources Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Attention: Central Files Reference: Tier Two Stormwater Discharge Outfall Monitoring Report (September 2014) TT&E Iron and Metal, Inc. 1529 West Garner Road Garner, Wake County, North Carolina Permit No. NCG030000, Certificate of Coverage No. NCG030013 S&ME Project No. 4305-14-178 To Whom It May Concern: S&ME Inc. (S&ME) is submitting the attached Tier Two Stormwater Discharge Outfall (SDO) Monitoring Report on behalf of TT&E Iron and Metal, Inc. (TT&E). TT&E is currently permitted to discharge stormwater consistent with General Permit No. NCG030000 and Certificate of Coverage No. NCG030013. The stormwater discharge outfali (SDO) monitoring report for September 2014 is attached.. No stormwater event that produced a measurable discharge from either level spreader at either of the two outfalls occurred Monday through Saturday during working hours during September 2014 Therefore no analytical data is available for September 2014. The September 2014 sampling event and the corresponding Tier Two response will be documented in TT&E's Stormwater Pollution Prevention Plan. If you have any questions, please call Claudia Irvin with S&ME, Inc. at (919) 872-2660. Sincerely, S&ME, Inc. Claudia B. Irvin Staff Professional Enclosures: SDO Discharge Monitoring Report cc: Ronnic Thompson - TT&E iron & Metal Edmund Woloszyn Jr., R.E.M. Senior Consultant S&NEE, INC./ 3201 Spring Forest Road/ Raleigh, NC 276161 p 919.872.26601(919.876.39581 www.smeinc.wm Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted: CERTIFICATE OF COVERAGE NO. N00030000 FACILITY NAME TT&E Iron & Metal ! COUNTY Wake PERSON COLLECTING SAMPLES Victor Navaro LABORATORYESC Lab Sciences Lab Cert. # ENV375 Comments on sample collection or analysis: Parking Lot and Upstream Samples are not permitted outfalls, both actually located upstream of SDO-1, but are reporting it, as required by permit. Part A: Stormwater Benchmarks and Monitoring Results September 18. 2014 SAMPLE COLLECTION YEAR 2014 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or ® Monthly' August (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA [_]zero -flow [:]WaterSupply ❑SA ❑Other PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ❑ No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/Total Total Petroleum Hydrocarbons Toxic Organics Benchmarks ===> - - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-1 9/18/2014 0.5 5o 6.88 0.11 0.025 0.095 < 5.1 NA SDO-2 8/18/2014 0.5 74 7.44 0.034 0.11 0.89 < 5.6 NA 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date:11/1/2012-10/31/2017 RECEIVED SEP 2 6 2014 CENTRAL FILES DWR SECTION SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the ail the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format. "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?Z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, inches 3 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks =__> _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier Z, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A 1ENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. IN TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Danny Smith, Surface Water Regional Supervisor - sent letter and left voicemail In early March 2013. Mail an -original and one copy -of this DMR, including oll "No Discharge" reports, within 30 doKLaLr—eceipt-of the lab results or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YQU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my Inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." &h:n� o' 9-2� (Signature of Permittee) (Date) Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 rek � September 24, 2014 North Carolina Department of Environment and Natural Resources Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Attention: Central Files Reference: Tier Two Stormwater Discharge Outfall Monitoring Report (August 2014) TT&E iron and Metal, Inc. 1529 West Garner Road Garner, Wake County, North Carolina Permit No. NCG030000, Certificate of Coverage No. NCG030013 S&ME Project No. 4305-14-178 To Whom it May Concern: S&ME Inc. (S&ME) is submitting the attached Tier Two Stormwater Discharge Outfall (SDO) Monitoring Reports on behalf of TT&E Iron and Metal, Inc. (TT&E). TT&E is currently permitted to discharge stormwater consistent with General Permit No. NCG030000 and Certificate of Coverage No. NCG030013. The stormwater discharge outfall (SDO) monitoring report for August 2014 is attached. The August 2014 sampling event and the corresponding Tier Two response will be documented in TT&E's Stormwater Pollution Prevention Plan. TT&E has requested bid from two engineering firms to prepare design plans for a stormwater reuse system at the facility to eliminate the discharge of any Stormwater that comes into contact with the industrial activities occurring onsite. If you have any questions, please call Claudia Irvin with S&ME, Inc. at (919) 872-2660. Sincerely,. S&ME, Inc. Claudia B. Irvin Edmund Woloszyn Jr., R.E.M. Staff Professional Senior Consultant Enclosures: August 2014 SDO Discharge Monitoring Report cc: Ronnie Thompson - TT&E Iron & Metal S&ME, INC. / 3201 Spring Forest Road I Raleigh, NC 276161 p 919.872.26601 f 919.876.39581 www_smeinc.00m Semi-annual Stormwater Discharee Monitorine Report for North Carolina Division of Water Quality General Permit No. NCG030000 C�3 00 �3 Date submitted: September 8, 2014 CERTIFICATE OF COVERAGE O. NC 30000 SAMPLE COLLECTION YEAR 2014 FACILITY NAME TT&E Iron & etal SAMPLE PERIOD ❑ Jan -June ® July -Dec COUNTY Wake c� I�py or ❑ Monthly' July 2014 (month) R��� PERSON COLLECTING SAMPLES Victor Navaro G V DDISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORYESC Lab Sciences Lab Cert. # ENV375 SEP 10 2014 ❑Zero -flow ❑Water Supply [:]SA Comments on sample collection or analysis: July 2014 Semi- ❑Other Annual/Tier 11 Monthly Sample for SDO-1 and SDO-2 only. CENTRAL FILES DWR SECTION PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 3 ^art A: Stormwater Benchmarks and Monitoring Results ❑ No discharge this period?z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/Total Total Petroleum Hydrocarbons Toxic Organicss Benchmarks =__> _ - 100 mg/L or 50 mg/L4 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L SDO-1 7/15/2014 2.25 170 6.53 0.12 0.040 0.23 < 6.7 NA SDO-2 7/15/2014 2.25 10 7.20 0.02 0.014 0.68 < 5.1 NA ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. ° See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 N. Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?Z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks =__> _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 zi Note: if you report a sample value in excess of the benchmark, you must implement Tier 3, Tier Z, or Tier responses, See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART li SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART I I SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO ❑ REGIONAL OFFICE CONTACT NAME: Danny Smith, Surface Water Regional Supervisor - sent letter and left voicemail in early March 2013. Mail an original and one copy of this DMR, including all "No Discharge"reports, within 30 days of receipt of the lab results for at end of_monitorina period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 September 8, 2014 North Carolina Department of Environment and Natural Resources Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Attention: Central Files Reference: Tier Two Stormwater Discharge Outfall Monitoring Report (July 2014) TT&E Iron and Metal, Inc. 1529 West Garner Road Garner, Wake County, North Carolina Permit No. NCG030000, Certificate of Coverage No. NCG030013 S&ME Project No. 4305-14-178 To Whom It May Concern: S&ME Inc. (S&ME) is submitting the attached Tier Two Stormwater Discharge Outfall (SDO) Monitoring Reports on behalf of TT&E Iron and Metal, Inc. (T'I'&E). TT&E is currently permitted to discharge stormwater consistent with General Permit No. NCG030000 and Certificate of Coverage No. NCG030013. "The stormwater discharge outfall (SDO) monitoring report for July 2014 is attached. The July 2014 sampling event and the corresponding Tier'I'wo response will be documented in TT&E's Stormwater Pollution Prevention Plan. TT&E has contracted with "Timmons Group to prepare design plans for a stormwater reuse system at the facility to eliminate the discharge of any storniNvater that comes into contact with the industrial activities occurring onsite. If you have any questions, please call Claudia Irvin with S&ME, Inc. at (919) 872-2660. Sincerely,. S&ME, Inc. Claudia B. Irvin Staff Professional Edmund Woloszyn Jr., R.E.M. Senior Consultant Enclosures: July 2014 SDO Discharge Monitoring Rcport cc: Ronnie Thompson - "T"I'&E Iron & Metal S&ME, INC.13201 Spring Forest Road I Raleigh, NIC 276161 p 919.872.2660If919.876.39581www.smeinc.com