Loading...
HomeMy WebLinkAboutNCG020747_COMPLETE FILE - HISTORICAL_20161215STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /v DOC TYPE AHISTORICAL FILE 0 MONITORING REPORTS DOC DATE ❑ f/1Ui YYYYMMDD Energy, Mineral & Land Resources RNVTRONMENTAL OUALIW December 15, 2016 Jake Billings - Operations Supervisor 873 Cove Creek Drive North Wilkesboro, NC 28659 Subject: Compliance Inspection . Permit No. NCG 020747 Mathis Quarries, Inc. Wilkes County Dear Mr. Billings: PAT M C C RO RY Governor DONALD R. VAN DER VAART Secretary T_RACY DAVIS Dlrectar On December 15, 2016 Glen White and Tim Latham, inspectors with the North Carolina Department of Environmental Quality — Department of Energy, Minerals & Land Resources met with you (Operations Supervisor) and Bart Mathis (President) at the subject facility, located at 873 Cove Creek Drive in North Wilkesboro, to conduct a compliance inspection as required per the facilities Industrial Stormwater Permit. Permit: This facility holds General Stormwater Permit NCG020747 to discharge stormwater, mine dewatering wastewater and process wastewater to surface waters of North Carolina under the National Pollutant Discharge Elimination System (NPDES). The permit became effective October 1, 2015 and expires on September 30, 2020..A copy of the current permit is required to be maintained with the Stormwater Pollution Prevention Plan (SPPP) documents. A copy of the current permit was available for review at the time of inspection. RecordslRenorts: This facility was required to develop and maintain a Stormwater Pollution Prevention Plan (SPPP) in accordance with Part III, items 1 thru 9 of the permit. Inspector reviewed the SPPP and each of its components. The SPPP is being updated annually as required. All certifications are current and responsible parties are as indicated in the plan. Qualitative monitoring is conducted on a bi-annual basis. Analytical Monitoring is also performed bi-annually and tested by Statesville Analytical. Samples appear to have been consistently collected about April and December of each year. All records were complete and accurate. No deficiencies noted. - Facility Site Review: This facility is a rock quarry. The quarry has three (3) sediment basins that drain toward the wet pond. The pond water is only used for irrigation to keep dust down and improve air quality. The facilities appear to be well maintained and managed. No deficiencies were observed. State of North Carolina 1 Environmental Quality. I Energy, Mineral and Land Resources Winston-Salem Regional Offlcr 1 450 Manes NO Road, Suite 300 1 Wlnston-Salem,_ NC 27.103 336 776 9800 Effluent Receiving Waters: Effluent from this facility drains to an unnamed tributary of Fishing Creek, Class "C" waters of the Yadkin Pee -Dee River Basin. No discharge was evident at the time of inspection. Self-Monitorin Program: Part III, Sections B & D of the permit require this facility to perform qualitative and analytical monitoring on a semi-annual basis unless a Tiered Response is triggered. Monitoring is performed as required and records remain with the SPPP as per the permit. Records include chain of custody. Samples are collected from all three sediment basins. Sample results are consistently within all required parameters. Analytical test include Total Suspended Solids, Settleable Solids, Turbidy and rainfall record. No deficiency. This facility was found to be compliant with the requirements of its General Stormwater Permit. If you have further questions or require assistance please contact Glen White ofNCDEQ at 336- 776-9660. Enclosures: Inspection Report Sincerely, Matthew E. Gantt, P.E. Regional Engineer Land Quality Section Winston-Salem Regional Office cc: Division of Mineral and Land Resources (WSRO) State of North Carolina 1. Environmental Quality k Energy. Mineral and Land Resources Winston-Salem Regional Office 1450 Hanes Mill Road, Suite 300. 1 Winston-Salem.. NC 27103 336 776 9600 Permit: NCG020747 SOC: County: Wilkes Region: Winston-Salem Contact Person: Bart Mathis Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Compliance Inspection Repo Effective: 10/01/15 Expiration: 09/30/20 Owner : Mathis Quarries Inc Effective: Expiration: Facility: Mathis Quarries, Inc. 873 Cove Creek Dr North Wilkesboro NC 28659 Title: Phone: 336-984-3261 Inspection Date: 12/15/2016 Primary Inspector: Glen White Secondary Inspector(s): Certification: Phone: EntryTime: 10:00AM Exit Time: 12:OOPM Phone: 336-776-9800 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page: 1 Permit: NCG020747 Owner -Facility: Math{s Quarries Inc A Inspection Date: 12115/2016 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: Stormwater inspection conducted at Mathis Quarry in North Wilkesboro, on 12/15/2016 by Glen White and Tim Lathem of NCDEQ. Jake Billings maintains the Stormwater Pollution Prevention Plan, Mining Permit, etc. Records are well maintained and current. Monitoring performed consistently about April and December each year. Bart Mathis assist inspectors with site inspection. Three sediment basins and one wet pond were observed. All basins drain to the pond. Pond water is only used for irrigation to keep dust down and improve air quality. The site appears well maintained as well. No issues observed. Page: 2 Permit: NCG020747 Owner- Facility: Mathis Quarries Inc Inspection Date: 12115/2016 Inspection Type : Compliance Evaluation Reason for Visit: Routine Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: Analytical monitoring performed at 3 basin outfalls twice annually. Samples tested by Statesville Analytical. Results well within required parameter limits. Samples appear to be collected consistently about April and December. No deficiency. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0000 Comment: Permit in SPPP is current. Three sediment basins and oneermanent pond observed during inspection. Facility appears well maintained. Qualitative Monitoring Has the facility conducted its Qualitative Monitoring semi-annually? Comment: Monitoring twice annually as per permit. No deficiency, Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives 10 current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Yes No NA NE 0❑❑❑ Yes No NA NE ■❑❑❑ 0❑❑❑ ❑❑0❑ ■❑❑❑ ❑❑❑0 ■❑❑❑ It❑❑❑ 0❑❑❑ ❑ ❑ ❑ Page: 3 Permit: NCG020747 Owner - Facility: Mathis Quarries Inc L Inspection Date: 12/15/2016 Inspection Type : Compliance Evaluation Stormwater Pollution Prevention Plan Reason for Visit: Routine Has the Stormwater Pollution Prevention Plan been implemented? Comment: Records are complete and current. Well maintained in one 3" 3 ring binder. No deficiency. Yes No NA NE ® 1111 ❑ Page: 4 CDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director April 1, 2010 Mr. Bart Mathis, President Mathis Quarry 873 Cove Creek Drive North Wilkesboro, NC 28659 Subject: Compliance Evaluation Inspection North Wilkesboro Quarry NPDES Permit # NCG020747 Wilkes County Dear Mr. Mathis: Dee Freeman Secretary On March 12, 2010 a Compliance Inspection was performed by George Smith, of this office. The follov ing personnel mere present for the inspection: Mr. Bart Mathis and Mr. Jake Billings. Permit The quarry just opened, therefore, permit compliance is judged with the NCG020000 permit that became effective on January 1, 2010. Attached you,,vill find a copy of this permit. The following Sections of the NPDES permit, which are applicable to Mathis Quarry must be implemented: 1. Part III, Section A - Stormwater Pollution and Prevention Plan (SPPP) 2. Part III, Section B, Table 1 — Analytical Monitoring 3. Part III, Section D, Table 6 - Qualitative Monitoring Records & Reports Part I1I, Section A - Stormwater Pollution and Prevention Plan (SPPP) The SPPP is currently being developed and is in a 3-ring binder. Please insure that all nine (9) requirements of this plan are addressed. North Carolina Division of Water Quality, Winston-Salem Regional Office Location! 585 Waughtown St. Winston-Salem, North Carolina 27107 Phone: 336-771-50001 FAX: 336-771-46301 Customer Service 1-877-623-6748 Internet: www.navaterquallty.org An Equal Opportunity 1 Affirmative Action Employer One NorthCarolina Naturally a CEI April 1, 2010 Page 2 of 2 Part III, Section B, Table I — Analytical Monitoring Settleable solids, Total Suspended Solids and Turbidity are required to be sampled at each Outfall. Once during the Ist six months and once during the 2nd six months. These must be sampled during a representative storm event. Part III, Section D, Table 6 - Qualitative Monitoring The discharge characteristics are required to be sampled at each Outfall. Once during the lst six months, and once during the 2A six months. These must be sampled during a representative storm event. Facilitv Site Review_ The quarry just opened during the month of March 2010. There is no washing operation, no recycle pond, or mine dewater discharges at this time. Laboratory Analytical tests, such as, Settleable solids, Total Suspended Solids, Turbidity must be performed using approved analytical methods by a certified lab. All tests are properly performed and documented with a chain of custody. The Town of North Wilkesboro and Town of Wilkesboro use Meritech, Inc. located in Reidsville, and can be reached at 336-342-4748. Self -Monitoring Program Please insure that the analytical and qualitative monitoring are performed. Also a rain gauge must be located on site and the rainfall records must be maintained. Effluent/Receiving Waters The effluent from the Outfalls to an Unnamed Tributary to Fishing Creek, Class C waters of the State was not discharging at the time of the inspection. The compliance evaluation inspection is satisfactory. If you have any questions please contact George Smith or me at (336) 771-5000. Sincerely, Steve W. Tedder Regional Supervisor cc: WSRO=Files, Compliance Inspection Report Permit: NCG020747 Effective: 09/11/09 Expiration: 12131/09 Owner: Mathis Quarries Inc SOC: Effective: Expiration: Facility: Mathis Quarries, Inc. County: Wilkes 873 Cove Creek Dr Region: Winston-Salem North Wilkesboro NC 28659 Contact Person: Bart Mathis Title: Phone: 336-984-3261 Directions to Facility: - System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Certification: Phone: Inspection Date: 03112/2010 Entry Time: 09:30 AM Exit Time: 11700 AM Primary Inspector: George S Smith Phone: 336-771-5000 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: M Compliant ❑ Not Compliant Question Areas: E2 Storm Water (See attachment summary) Page:1 Permit: NCG020747 Owner - Facility: Mathis Quames Inc Inspection bate: 0311212010 Inspection Type: Compkance Evaluation Reason for Visit: Routine Inspection Summary: Page: 2 r Permit: NCG020747 Owner - Facility: Mathis Quarries Inc Inspection Date: 03/12/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ® n n n # Does the Plan include a General Location (USGS) map? I® n n n # Does the Plan include a "Narrative Description of Practices"? n ® n n # Does the Plan include a detailed site map including outfalf locations and drainage areas? ®f_l Cl Cl # Does the Pian include a fist of significant spills occurring during the past 3 years? n n ® n # Has the facility evaluated feasible alternatives.to current practices? n ® n n # Does the facility provide all necessary secondary containment? n n n # Does the Plan include a BMP summary? n ® n n # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ® n n n # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? n ® n n # Does the facility provide and document Employee Training? ® In In n # Does the Plan include a list of Responsible Party(s)? ® n n n # Is the Plan reviewed and updated annually? n n ® n # Does the Plan include a Stormwater Facility Inspection Program? ®n n n Has the Stormwater Pollution Prevention Plan been implemented? ® n n n Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? n n ® n Comment: The Quarry just opened. Analytical Monitoring Yes No NA NE Has the facility conducted its Analyticaf monitoring? n n 00 # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? n n ® n Comment: The Quarry just opened Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ® n n n # Were all outfalls observed during the inspection? ® n n n # If the facility has representative cutfall status, is it properly documented by the Division? n n ® n # Has the facility evaluated all illicit (non stormwater) discharges? n n ® n Comment: Page: 3 +� NCDENR- North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director September 11, 2009 Bart Mathis Mathis Quarries, Inc. 873 Cove Creek Drive N. Wilkesboro, NC 28659 N.0 Deat. of ERR SEP 2 1 �a Winston -sal.,., Regional C"Ce Subject: General Permit No. NCG020000 Mathis Quarries, Inc. COC NCG020747 Wilkes County Dear Mr. Mathis: Dee Freeman Secretary In accordance with your application for a discharge permit received on February 26, 2009, we are forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute_143-215.1-and the-Memorandum.of Agreement_between_North,Caro.lina_and-the.US, _. EnMFori ental Protection Agency dated October 15, 2007 (or as subsequently amended). Please take notice that this certificate of coverage is not transferable except after notice to the Division of Water Quality. The Division of Water Quality may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other federal or local governmental, permit that may be required. Please note that the attached permit expires on December 31, 2009. Your COC will be automatically renewed to cover the full 5 year term of the soon to be reissued permit. In the interim you must abide by the terms of the expiring permit. You can review the proposed draft general permit at www.ncwaterguality.org/su/publicnotice.htm once it is posted. If you have any questions concerning this permit, please contact Cory Larsen at (919) 807- 6365 or cory.larsen@ncdenr.gov. Sincerely, ORIGINAL SIGNED BY for ::oleen��s�d��� cc: Winston-Salem Regional Office, Mr. George Smith Central Files Stormwater Permitting Unit Files Encl. Wetlands and Stonmvater Branch 1617 Mail Service Center, Ralegh, North Carolina 27699-1617 Location: 512 N. Salisbury St Raleigh, North Carolina 27604 Phone: 919-807-63001 FAX: 919-807-64941 Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity 1 Affirmative Action Employer NorthCarolina STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG020000 CERTIFICATE OF COVERAGE No. NCG020747 STORM WATER AND PROCESS WATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-2I 5.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, ivir11 nip QutiRjclr,J, is hereby authorized to discharge stormwater, construct and operate a process wastewater treatment system, and discharge process wastewater from a facility located at Mathis Quarries, Inc. 873 Cove Creek Drive North Wilkesboro Wilkes County to receiving waters designated as Fishing Creek, a class C water in the Yadkin-PeeDee River Basin, in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, I1, III, IV, V, and VI of General Permit No. NCG020000 as attached. This certificate of coverage shall become effective September 11, 2009. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day September 11, 2009.' ORIGINAL SIGNED BY KEN PICKLE for Coleen H. Sullins., Director Division of Water Quality By the Authority of the Environmental Management Commission LOCATION MAP: s ''�,7'/ ! i• �Li!"1 i yayw 'j.r�ss 1 l a '•�sr \; y j fE '� Zi t �'-`.: �` ^3 Ij �"i i l .. i.�3,:�1 !rl �w,,,PJ^'� rf f'�?�� `/.% �\ � *��+t ,.}.:' /���•�:'r'-" .��� 1 f`-i'i ��, J%� T } h -.'� �z J � �, � S._:� l' �`� }w-�`- Cl ♦ } ;�`. �� �i �. > r�.��� 7 � y ! �r � iJ,; �" ��s (.; � r +J' ;y r r `v� � + ` � f r- t+ p1y'I �'r '�cl,y S ti �.i�44Le `s✓J f r,. ;.4,: +r.� `t f�� ' \ f5'.l qs. y ' 1S�1E�= _•SM i F "/a h i r FI i`� 0�1. 3ff��.� n' ,� _,�`-�,�r p4g��; t <<., �.�.�„'�_. -y�.j � u'-::;� .�f.-:� L, ��"�^��� \•, ,..`,, I • `J I '�! �' t��G+��i I ,i I �/ �'� �l �! �f :ri l.` 1 �+ �rF,�r ! r fA�� I �f,,.—, ��';� � 7.• ��,�% T�I `f �� `<dA$i i �{'�-+','<, s ry� l '.�t}f,�.yr,1�ti`4\i - f-�`' �.'�`v._'S". r,-:_f:1 �1 v ..�,r`��.% � ,"+•1.� �" (/ �.`� SI t J r, !N. r, tI ' i � t ,, _.Iv\' \ � �t P, •��=' Ij - I • �.. _.--.,., t+ � Gp�"°Y}'��i}�p r^'^ i.Ss ; ��• 1i29r W�'�-�'"�✓�� r�� J4y'� `^� f y 4 �- � L�. k ���s• �..! -; ,la r\-."� (.+ C. 4 •7 �`..r= J iYC -•"_ , j�,Ys,/`, y....�u /}T 1. < r... •} 'w y, 1 E.� .✓ �i -: 4 '�ts�.r�`.�'�li'q/J� j r` � � ti;:•-f'slb� -��! i--i� `� t'ir r'. t r`-`ti+ *' f 1r 4}1 14art����` ')p ✓r fF.l'( _�\ �Jt MBhI ryvj? !tr •'+i ♦� kk�P r .%' ! r �'`�• d. 1`+�,4i ti i f!$r 1� �, - „c=Y ' %.�r a'k"'•..! �+r'" ' aZ, — ♦�� \ € ' ;j i5 (. �..�-•'-i]'4r''7�•Z l�r� �' t•n l;♦ +I J ! T'� r.l�l�.., r� Gt+^� �r;.ti INN Se .�-.-' 5.,• 1 �� �yw�i� ftin� •'��y y �'�;''���. :••�%;f. <!rr `7�rr�r'' f J ° r I,i +' f.�o� i�'''�! .��,�'"'���L•'�v�`' ;' i t� �-l7 �a • J •—a 1•Tf.✓ �. •r C•#r'r I r y ./ : s i' -�i• �^' Jhf # '_ /��f u•/ ? i f1. i .�' i 5,�, :tit::,.r r( /I r 1,.>f { �^ 1r•-� 1 ( / 3 S ` ♦ :.. / Eti `4- -''. ]a` t, / c, —f �r£ T•k��r'—.'ti..�. �(/j�#/I�'« � ! r I�(`���- rs_�.. ,� � V`.e � Jf� :< .F`'..- i� ]'4``f.''tiiiC<`' i,I -y5� t 1.,, J-•ti�'9�i_:+"♦ .1 `iyl y. L••r,�.€'-^!'1 11 ��_� •�1a/ . v .i .�` ti # ..�- l# '• i `'t) f}trr �''it>/�ti=.cr'> ,`�'`. -�, d f� * \',c_T�-.../• �'t_—•� yi... j�ff/� �, �. ,r ff i✓��+.ufi� ."` t f�-_ >� f lair r,.-.(3�,�=r��� f�`..-w.4;! �l��je' �!"`^ !l-�� ��/ �\ �� ��fY'=��; �'�--•�..,`H�`"^=^ t'ti`" `'" i{1�"i' s.i''� _� >�,lds'-�.'.'.IC--.-:.• `6�1r,,y� �`v.•:l �,f-\.� "�' (ri ,}1'^.�"t>P�•-�°'34;°-�' `�•,+,• l 7 �•? e# s t� - .;',^•�.r '" < y,�' . y � �'�`v < --. � , F'` _.�.� 1 ✓ ! K ��' �i � d�,r'-i�.,fl�.t -j` '�rf �---.. RAO 'f'.•W'j',"'•s7�J� i � r"'�"`-• X�' ?e/% \ jsl`f <r { " �� lty t���.EC j 3r �1 � ~`! Ua .ti.1,,..` (..��-�'; � j,�7�, � r �%��, 7�"III*�,�,<1r���'�ir'�Ir✓=`�• r ` ✓.� {' � % � •.'� ��:. �t..4.,< � � .� ^��, r ^} '� f^.17l.fr +pjS,yI<; v'• fff ✓1, r { f1{r /r�. r%�' ��`�' �r jj fi r� r �.�.. !< ate f ✓g s {f�" s 1 a,.. y �..w,. `i (� 3 i 4 . '.; `�'"�� �• ,"t, � �/Jr�f/''`�� • 'F �J•!:','J S �.11 :�L� E ��S L, �' yp ��>` '��'♦^•._....��•�� '�'� 1 I �.. ice,. ,Y - +>>cI "1'rLL fi / ✓� Q rn� "� i f f ! i s,• .y.f;.\,.�-: ., I✓ f.♦"�,w..Jf-.;�i ter1: c+;<'1.;, •., -t ! ,�r'/ r L`t'9�`� , iy ''J'�--C�..,.✓ + r lg `1 P ! r•� •�`(1'j���. 31�'� } .�f � J,'���,',-� ��.�� fir; Mathis Quarries K (; 'INi r {?,ri 3 a. f `{� w v �. 'EJj}1 ti4, l/� r t r\ ti...•.-!Ni 9{�/<,( 't q t f /' +. T ��—�1 # j1 I E T� 1Yt__ ` Yr'i!1 t C§� f! JON, .) diy t I '�i iY�ti✓r r\ J /4' 0��'{� R` rx. ! f f ✓e lAi d 1:'+ ivli 1 ,I r •y , f�ry....�•t�J r L J0NN'111� �t`fJ'w�j'r` t y4,•;aa;.:p�4'.n�(.f t' tj �Ri• \''♦ SIJ,r".✓' �:1\� ! 1+.•.'•a5..`1 R.,�✓f\ri YJ,:I.i '[ ..'?,.�,`, 'ten",`\-`+,'..,� 1..� Itl{t.'.'�;\ ,�7iI �f � �. .�Ir.J r�f�%�I• f,•gS'JX t .5-- i��!"�.,r �;;�,1`,�t� ;��"y' t� k � �..f,��i��Ir+ !�'�. "�'1L�-�`."f �'��9���"'tL. '���s l r _%j ' 117 kl_ / . � �- ,� Q rr��'rER;i ,,.ti. :3\ t+. 'L r-�i'S ;_5ti� ii !' tr 11'fi r' ,_.�� -� i � ; - 3- � '4�s y' 1 J ! r � rfJu [ 1r✓ y• J � � xAN ,I 1/��•r'rfi •. 1. J�� T[31�t _ ka`•�..ti�`!1 .,� �1 '(.... a �. : � �� , /• m'V :i�_.J^..i ,I i !e 4� ,� 4�`,`I R� 7 P - '��—'�''••�r7W.1 f 3 r tom_ 7 . ✓!q ��i r�"vim �4rS��_ i { �. #f`. r ,-•�t !_ � r �' � I _ ML�ini+ Gh� � ',� �G�r• 1f <,,. afj 4 • '',? s' .S� 11'jj: - hhls•-v.Y'rrr£"`�. f �Zlf «'���•`, r �i(._. Y_ +.- ": 9-- >.+', y� { 1 +{{s � �, 5'�i+). IIItr ,�i�, t}S •"n �+ i> .,.1 �`� r >�i`-.7' ♦•1. �' v'^•r is .0 ... �.� i , �f ../ti i f 11�1 EiS �„ � � 1 i � t' i �I( tiihL{•C��gq� w^ `� 'L-.�':"'W'�✓Jar�l�f Vo r = , I rY ��, �R> '�' t _��_ ✓� � s ✓ L s,�^"` a.S'I�.y.-' �� ^� +\ �*..� f �X.✓.:J� {��jS,U�ir e��w } jf' .re ':.� 1�. ti df i ''v It fF '.� ."l' _ 11%J°' ♦ L r {e 4 I x.. '`. • r+� r�1?171,, '.�'r.kw rrGV - y.,p(� 1 �, 1 �, I �`,--' -_r psd --1;i/ T'w4• '"•'-`+` 1 f r�• y(tti{, ,:ra, r"_: i,,,-,::,,_y.� , Wit,. ., . u, r+'_ _��.����'1il�it�t t�' t�':r ,tti�:"f. ,,ti.' _ _..=tr,1t .1�. r_�� �•�4'*'w�,..�j t��/tii�1♦f;.c".�.-_-.� w..-... � . NCG020747 rl ti Ab,o Scale 1: 20, 000 Mathis Quarries, Inc. Lati tude: 360 08' 36" N Longitude: 811101` 46" W Gounty: Wilkes Receiving Stream: Fishing Creek Stream Gass: C Sub -basin: 03-07-01 (Yadkin Pe¢Gee River Basin) Facility Location Division! of Water Quality / Surface Water Protection 7Aj__ 1 National Pollutant Discharge Elimination System NC�E NCG020000 NOTICE OF INTENT National Pollutant Discharge Elimination System application for coverage under General Permit NCG020000: STORMWATER DISCHARGES associated with activities classified as: SIC (Standard Industrial Classification) Code - 14XX Mineral Mining Industry (except as specified below) The following ao • Active or ins ept for NCDOT borrow pits) that discharge stormwater any overburden, raw material, intermediate products, fir — IV, -j') 4 -rt-.�L, N ed on the site of such operations; • Stormwater ttions; • Overflowfr( -- ��\V1'- t�2.t7� '. SA yt kLl1 )1vi t- • Mine dewat ` �-� [�.. J'✓c?T,+�' G? Est :1 /�.. pg .�, The following a to ; under this General Permit: • Stormwatei r0a., 44 V'4`�Z g and metal mining; • Stormwatef Mixed on site with stormwater from asphalt operations U.Gf'G �4 �% t • Stormwate operations; and • 5tormwate • NCDOT be vf"�OO. i . The following (_ it NCG520000 instead of NCG020000: • Paint sour( 11{{ 'f I t-stream sand mining operations i.e., sand dredging a NC) ) f1y0G- ksS �ii }d For new mini —I'? 057 �1��ds i` ��% Lf/%�T � 1�"1)1�S t (ATC) wastewater treatment facilities: This NOI is also an F=&? ;.4 ,^�,�}xt, 1� treatment facilities. ATC requests must be submitted at Ic For e_xisting In ��. rate (ATO) wastewater treatment facilities: This NOI is alE treatment facilities in place. Construction, ' r` nt components at an existing site requires an ATC. (If the , request may be submitted without an NOI). Some wastewater treatment facilities usecl to treat or recycle process wastewater (ever] if commingled with sionuwater) at mining sites will require an ATC prior to construction per 15A NCAC 2H .0138. Please see the NCG020000 General Permit for details about which treatment facilities require an ATC (summarized in Table l at the end of this form). For example, an ATC is required for treatment of mine deNvatering discharge from cia), psis and non -closed -loop wastewater recycle systems. The authorization to construct or continue to operate will be issued at the same time as the Certificate of Coverage (COC) for the NCG02 permit. Design of treatment facilities must comply with rcquiremcnls of 15A NCAC 2H .0138 & .0139. Page 1 of 7 IAs per 15A NCAC 2H .0106 2Unless treatment taciti los are designed, constructed, and put into operation by employees internal to the company who are qualified to perform such work for their respective companies in accordance with General Statutes, 89C-25 (7), plans and specifications must be signed and seated by a P.E. SWU-217-071408 1-ast revised 7/14/08 NCG020000 N.0.1. Construction of wastewater treatment facilities subject to the ATC/ATO requirements in the NCG02 permit at new or existing mining sites requires submission of three (3) sets of plans and specifications signed and sealed by a Professional Engineer (P.E.) or qualified staff2 along with this application. A copy of the design calculations should be included. Please see questions 18 & 19. Table 1: Wastewater Permit ATClATO Requirements Mine Dewatering Yes No Quarries — 6 Sand Pits — 6 Clay Pits 6 _ Any Dewatering with Chemical Treatment 6 — Process Wastewater Sand/Gravel -- 6 Closed -Loop Recycle — 6 Other Recycle 6 f For questions, please contact the DWO Regional Office for your area. (See page 7) (Please print or type) 1) Mailing address of owner/operator (address to which all permit correspondence wil 2) Name s pozi /`'i 4'%f- 5 Street Address ta-13 coo £ Gv_cc K DYz iy_E City [�li�GiV'E5 ohoState NG ZIP Code 965-fl Telephone No_ 3 3 �i �I �• `7t - 3 2 G Fax: 33 pJ' - E E-mail Address /t1/5 5aN W 1 Z.-KE_S_. nl E ^ Location of facility producing discharge - Facility Name /A 14- S -Oo. TZ (£ Facility Contact . A f S Street Address e eyc Ci_E_1EK _DR r J1F City rJ • fit} i L-K&SJFor-o State�Va ZIP Code 'L196S`9 County Telephone No.3G _ Contact E-mail 3) Physical Location Information: Please provide a narrative description of how to get to the facility (use street n mes, state road numbers, and distance and direction from a roadway intersec .on). JS q2i AJOEI-I! 2`77,_ fZiGl+FWF7 or 6X{f, tzr6,EF oN GoJ£ CYz6C-'K Tzo6;V ZqqD) i46f A} Latitude. 0$ • `36 Longitude g(• 0Lqty (degrees, minutes, seconds) 5) This NPDES Permit NOI Application applies to which of the following: ) IJ New or Proposed Facility Date operation is to begin V u l_y '�7601 ❑ Existing ❑ New Permit not applicable - ATC request only. NPDES Permit Number Page 2 of 7 SWu-217-071408 Last revised 7/14/08 1* �73. NCG020000 N.OJ. 6) Standard Industrial Classification: Provide the 4 digit Standard Industrial Classification Code (SIC Code) that describes the primary industrial activity al this facility SIC Code: i L4 7) Provide a narrative description of the �� GCZ tJSt#-FD 5 8) Discharge Points: of minerals mined at this facility: _ - 12-1 P r2*f=>. (Awn"-4-r� r+F_ Number of discharge points (ditches, pipes, channels, etc. that convey discharges from the property): Stormwater:�_ Mine dewatering: Process Wastewater Overflow: 2 Discharge points should be clearly narked on the submitted site plan. .j Please provide short narrative description of discharges: W al IFF S*P-11 ",-1L7Z nth i "1G . T" E w `` '>n VSirJG S3✓['P "PbAIVS A4D >disC,FfAr2G,Er> frJ F [ -r t- ( Z+i✓ %:i3ft ' t rJ Nt Con/ v V Sr IJ G -"or' R•1 R AA) D 9) Receiving waters: lM 4l-6%4- ^16-1 What is the name of the body or bodies of water (creek, stream, river, lake, etc.) that the facility stormwa er i and/or wastewater discharges end up in? V-T iSt ,JG C-42"g (17-- Y4) If the site stormwater discharges to a separate storm sewer system, name the operator of the separate storm sewer system (e.g. City of Raleigh municipal storm sewer). Receiving water classification (if known): G Note: Discharge of process wastewater to receiving waters classified as WS-II to WS-V or SA must be approved by the N.G. Dept. of Environmental Health. If DEH does not approve, coverage under NCG020000 cannot be granted. No new discharges of process wastewater are permitted in receiving waters classified as WS-1 or freshwater ORW. 10) Will mining operations require dewatering near wetlands or impact dny stream, groundwater, or wetlands? Fl"�N0 ❑ Yes If yes, please provide information about any 404/401 Certification permits. Note: Wetlands must be CLEARLY DELINEATED on the site plan. Mine dewatering activities that have the potential to drain wetlands or otherwise impact surface water or groundwater MUST develop and implement an Operation and Monitoring (0&M) Plan that has been approved by the division. The O&M Plan should be submitted to the Regional Office and must be approved prior to operation. The plan shall include, but is not limited to: (1) Groundwater monitoring strategies to demonstrate the effect of pumping and to establish any pumping regime necessary to reduce impacts, and (2) Detailed plans to maintain surrounding hydrology and respective monitoring to demonstrate compliance, 11) Does this facility already have a valid Mining Permit from the Division of Land Resources (DLR)?_ dNo (It not, please indicate the status of the Mining Permit application: )r-t FaDCE55 Or ) ❑ Yes It yes, please provide the Mining Permit number and include a copy with your application: Note: DWO cannot issue a COC for the NCGO20000 General Permit until a Mining Permit is issued or renewed by the Division of Land Resources (DLR). Page 3 of 7 SWU-217-071408 Last revised 7/14109 NCG020000 N.O.I. 12) Will this mining operation precede development activities at this site? R"'N o ❑ Yes 13) Does this facility have any other NPDE5 permits? 1�(No ❑ Yes If yes, list the permit numbers for all current NPDES permits for this facility: 14) Does this facility have any Non -Discharge permits (ex: recycle permits)? 19"�No ❑ Yes If yes, list the permit numbers for all current Non -Discharge permits for this facility: 15) Does this facility employ any best management practices for stormwater control? ❑l No LEI Yes �p If yes, please briefly describe:�N�P CD►r L V c.A N 16) Does this facility have a Stormwater Pollution Prevention Plan? I"No ❑ Yes If yes, when was it implemented? 17) Will vehicle maintenance activities occur at this facility? 2/No ❑ Yes 9n3y . Sa was i vrJ TUM3 Wastewater Treatment Facilities: 18) Will mine dewatering discharges occur? (ATC/ATO required for clay pits or dewatering with Chem. treatment) CR No ❑ Yes 19) Will discharges of overflows from process wastewater treatment systems occur? (ATC or ATO required, unless sand/gravel mining or closed -loop recycle system) Lit" No ❑ Yes If yes, answer the following questions on the wastewater treatment system: a. Please describe the type of process used to treat and/or recycle the process wastewater. Give design specifics (i.e. design volume, retention time, surface area, elc.). Existing treatment facilities should be described in detail, and design criteria or operational data should be provided (including calculations) to ensure that the facility can comply with requirements of the General Permit. [Use separate sheet(s)] b. Does this facility employ chemical additives to flocculate suspended solids? ❑ No ❑ Yes If yes, please state the name, manufacturer and the quantity of average daily usage of the chemical additive Note: Please see httpJ/h2o.enr.state.nc.us/ws/PAMS list.htm for a list of approved polyacrylamide (DAMS) products for use in North Carolina. Page 4 of 7 SWU-217-071408 Last revised 7I14M NCG020000 N.O.I. Does this facility overflow only during rainfall events exceeding the 10-yr, 24-hr rainfall event? ❑ No ❑ Yes 20) Are wastewater treatment facilities (including recycle systems) planned in the 100-year flood plain? Q No ❑ Yes If so, include information to demonstrate protection from flooding. (Minimum design requirements for treatment works include protection from the 100-year flood, per 15A NCAC 2H .0219.) 21) Hazardous Waste: a) Is this facility a Hazardous Waste Treatment, Storage, or Disposal Facility? Q"No ❑ Yes b) Is this facility a Small Quantity Generator (less than 1000 kg. of hazardous waste generated per month) of hazardous waste? 2 No ❑ Yes c) Is this facility a Large Quantity Generator (1000 kg. or more of hazardous waste generated per month) of hazardous waste? C"No ❑ Yes d) If you answered yes to questions b. or c., please provide the following information: Type(s) of waste: How is material stored: Where is material stored: How many disposal shipments per year: Name of transport 1 disposal vendor: _ Vendor address: 22) Certification: North Carolina General Statute 143-215.6 b (i) provides that: Any pOrson who knowingly makes any false statement, representation, or certification in any application, record, report, plan, of other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a lalse statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the (Environmental Management) Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000), hereby request coverage under the referenced General Permit. I understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. I agree to abide by the following as a part of coverage under this General Permit: 1. 1 agree to abide by the approved Mining Permit for this mining activity. (A copy of the valid mining permit must be attached to this request. 2. 1 agree to not discharge any sanitary wastewater from this mining activity except under the provisions of another NPDES permit specifically issued therefore. 3. 1 agree that bulk storage of petroleum products and other chemicals shall have adequate protection so as to contain all spills on the site. 4. 1 agree that solid wastes will be disposed of in accordance with N.C. statutes and rules governing solid waste disposal. 5. 1 agree that maintenance activities for vehicles and heavy equipment will be performed so as to not result in contamination of the surface or ground waters. Page 5 of 7 SWU-217-071408 Last revised V14108 NCG020000 N.O.I. I agree to abide by the provisions as listed above and recognize that the provisions are to be considered as enforceable requirements of the General Permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: Title: C wti6rz - Ar v (3-t i TrJG. -- - 13 �✓�- and - / - 3 C>- 02 (Signature of Applicant) (Date Signed) Notice of Intent must be accompanied by a check or money order for $100.00 made payable to NCDENR. Final Checklist This application will be returned as incomplete unless all of the following items have been included: B"' Check for $100 made payable to NCDENR" W ThiS completed applicatiori and all supporting documents• 2r Copy of the valid approved mining permit (MP) for the facility or indication of MP application status -- f" Copy of a county map or other general location map that shows the mining site and nearest major roads" Q1" Copy of USGS topographic map showing the mining site and surrounding areas, or other map that clearly shows site location in relation to nearby streams, wetlands, and other waters, etc. d Copy of mining site plan with all wetlands clearly delineated — Cx If the mine is near wetlands, or may otherwise impact surface water or groundwater, contact the regional office about an O&M Plan (contact information on the next page). Please refer to this O&M Plan checklist: ✓ Site map with wetlands, ditches, well -placements, borrow areas, overburden storage, stormwater controls/BMPs, vehicle maintenance areas, settling basins, product process areas, and access roads. ✓ Well information (design, depths, maintenance) ✓ Physical monitoring for the wetlands areas ✓ Settling pond sizing information, it applicable ✓ Level spreader design, if applicable ✓ Details about dewatering method ✓ Description of measures to prevent erosion and flooding ❑ If an ATC or ATO is required, three (3) sets of plans, specifications, and design calculations, signed, sealed, and dated by a P.E. ATC and ATO requirements in NCGO2000 are summarized in Table 1 on Page 2 of this NOI (see the permit text for more details). Plans shall show all pertinent design features, including the location of the outfall(s). If stormwater is flowing off -site, the plan must show that stormwater will not be mixed with wastewater. Mail the entire package to: Stormwater and General Permits Unit Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Note The submission of this document does not guarantee the issuance of an NPDES permit. Page 6 of 7 SWU-217-071408 Last revised 7114/08 NCG020000 N.O.I. For questions, please contact the DWO Regional Office for your area. OWO Regional Office Contact Information: Asheville Office ...... (828) 296-4500 Fayetteville Office ... (910) 433-3300 Mooresviile Office... (704) 663-1699 Raleigh Office ........ (919) 791-4200 Washington Office ...(252) 946-6481 Wilmington Office ... (910) 796-7215 Winston-Salem ...... (336) 771-5000 Central Office .........(919) 807-6300 Page 7 of 7 SWO-217-071408 Lasi revised 7/14108 _f - V ' :1i[{ �,.1°'S .� f r 7-•. � r1'. 4 ,}-, - J� ;�w l«,a _ ��� - '�_ / f.•�'„ r�. � _ �•. _11 ' _ �' .- r i 9 � 3 _ �• jlyy 4 • ��' �.'F �c. A_''r �� it �`..�r[�., �r [ ` j �T. -. c, 'i' � ! -. t y -•� �'- -�� J,'77 1r �. ;l•Af- t� (''. 3 _fin ,....; fr•.'i.' V ) tF,� ir'-. k- -�;,, i ;� f } �ti:A,4�`, /r. 5 � �L ,. t i�i4 �,j' , H �t4 ! ?• _ - r,•`'\ j �'t 'F- � r. '3 hr. _.��--_: S ••L rl..:+ ,ri _ \js'. \r L iK'`-' r ) " . f _ !r f 1 s # _..�,$-' [ - .�,.--'-'•ra% t� L''1 F 1, -, 'mayl -._ �,^r�pF 4 i . t t -. 11 - ! z a t .: L, .,• • . i •/-f7'j.c # _ - ° #} • -•-•' .y i"��y� \ _� � i; � ���� c� "1 �"t ��,:; C� e4 1 V i � � '! <_- � - ..1 • i � A 1f;,fS' +� '. ' '• - _•r ��y.�,f� � ... �fF ri iLL -i� fir- ,r l�,Y •� t u .='r - sr `_a 4... •' �• i !{ 'i: r r rf :iti _'{i-v ra. 3 -'r L i"� -^y -�f� . n- - - •iy • �! ' a"-y •r-' `-� {•,�. F `vt S J • ry„� , i� - � y —'} � _ , r � j '� ' r•'F � � .. r' - �. � � \ 'Fr .. �J',_,_.;, i �ti..+.y .. `4 ••n�,r', ! �; �T �� ���_{- F �.;,- ,•` �}r� w grr"`M�'r•" ,.. al`� ',s ti.' �i _ :.' _ � � ' .r:? � -,ir � �. � I�, '\t5 ,� , , r -1 t .,r i ;. i t � � r � i iteti_ .r•' , �" t �• r . _ '.� _ Si y . • fii,+►r sla i'ir� '.+/t✓r .tit. ~\ f ;lT: s _ !r ,. . • x jar l Tl.�r,.� `t� j - yjj 1 i ',%� I t+ �. .� Z- ) R. !'. N� r !3 .J � ", s sue_ T - - t, J'7 • ri � y � ;-�1 r '+'`"" �, - �["'' �i �s t �''�' s F••'- __ -,,. a Ot- 'ff A. -, 1' Y C..r .;� � � �� ,..;� f `,{*�._`,, ; ,;: 77 ..} r✓t, :s. 'a`!. }' �`3• -ram } f'1 ki.r._S .'A``Y ; 4` .� .j- T,F ` • Ali t�r,Cf!� '� s t r�F ^--�' t -r .W,�-�. � r i� �l� rtt � °y - aS �. �iat�� � V.4 i5� �I .. I �_ "� ,y li .- / BEY r`{ '✓`✓f 7€,fl' L'- -^� � -w SAS ((� ,��i _ ,p � e � \\� � � � y tif< lil ,� ! r.,r� •i4 F e 7.. :l s••^•:iS .'~5 - '� _ -'•.,� � -,r: 1` y r, c�,.,,fi1- r 'r4 ,���i,. �}� '�°.i E. _ i -T ""`a'4i� � R�- ��1-s�-�-^ ��} -��r`s.r� .r -tip• , .:..tR _•� +,� ,y J<.,,'_ - P L_5., :!'.`" , r g 7N'S ..c.1 -.'s• ,� -:. �'" l f ..1 .. yty r..- - ' v „t� _o ."3e�(, w ,,t�•'•••-'--rr�:� F-?'Srin9" �"J '�'c...� *•sue .'"� _;`.1� s�' 4a""- r i-Vr y, n r. [At {" y�^- -•^i r`r.' -f .. '"r.*'. •7.i C ,�Y r�.�-►'. T`?`..--•-^w:: `F �} 1- j ii' r� -a�`'^'�+- .. •;+.�" `{ -t, [:i: ^1°'txl, ! r [ - a t a� r r - nE 4 -•.•,. ,� f S .n �---' (. •,'^� r �=,•—! `.}' ,tr. r E »�� C 1�`� iF ""' �� .O �Z _ *F ! ._ g� Fi ;Y { _t �"�. 1 �'�.'•. i r . e'4Z. �-��,...,� t .� ,;• J!,5. _^ �'� i f :. f �s q � � ,.f' L £� _ � ' lry : - � .t a 'R�s � [ r .. '%�"".�� u 7 �.�1 ces"w/, ,.P Ll�x t � . r s j i #' .. -' ;,� �l •� i L _ - � r. 'i �y�� �1] . �,, �.a , r- (�.; Y �� - ��,., _ _ yr .-:,�•�-. f M ,�'. ✓ J_' �f �. �'w� �.. t„�.,: •� �t I • I ; � R � g�'� - %.r' .'} ?' r �j.„ �r. •*�„( ilj;}�I r _F �- ti3>� � _ ����: !' i'•'y "f }�?- -ice `�s,.��y5 '� ,il :r°^y�,,, f.1 t (r �.,: � - ."'. �"� V'i `�.�i #.- ; t � ?'. ; r�' ,t. i:-ry�` • r� � �� �,i, ry,,�7r c.-'•�rA. ;i,;l � -¢� �. 1'�+`� �;F- �f�i 1.?,1 � � .`� /•,� - ,,y,t.�+.._:-�,'_�._ � i -. _ }��r L` � � .�H-rb,,� ,e' �1 ; r j1r�• �i4 • ,.t J �- ; �j_ yti � 4�r� r,��,v,•�,.��"s� F l.`�`A....-.�.t R r5 `.• [ 5 K1� �, �K�,S ��.%:�; V ti .\ <y \-r "''rJ • •fPb ; '� t j .'!; :"'eyi� -ti' � � �+ ' �� � . '''`!� `'- �:I`.�v?'?'a}=� i �L „� _ ',%f.1,•. _a� .7 j� '."' �''''~ r� ' ! :;,-- , :( ,.� � 1 ,�.. •:>",'a >77�� ;r�.[ � ~ "•�- ;���r. r.>L� �".� � �• r�f' } 'ii�'.�, :�J' i� .._r "r?'. `� r tiJ {'±�1' - '�i / ,i .��- t �- 7. oll iM.- L `f41 l�,,i.- �" _ � 'Lr'k`"� '� �,�6r � FFe � ✓, d l r - � ^ 'r•'•'[ti'a+4' ,+r9 .`-sit."ti F T1 _ .�.Ta t_,: f '`_ -4•-.`-''SL,.Y "�``` .f ;',t_ yi.w'4 yl`r. .� . .. - r - r - _ `1 e •_i.� -•�= r f 1 ';',ay ��� ' I[, r,i S_7 T•S, - vo~3'.r''. , w T f �' r� "�;Y.a::uf�.' t'.^ -y,[a' 1 F �.Ja, .��i�! `. -s' :E.' x'—V �' - ~P"\Jt - , ' y �..• n ; }�''�a`•.1 zi: j r ` ` 4- l r it ? _ s.l[ •-•�.< .� ' x t„� ;, r- r _.- r 6.. #f. _ . �-.. -'- •�, .•^w•f1' Z'�. 101 `i 1 _ f.. F. [_a�J 'r,fT t:R...f'rr !.� -,, -=.v_.ri,1'L.+��•�=-r^. �• , . _;`-'!-t•k;�l .. p_ 149 7 jar4"-'-�^^-`�-r F- tti;. «.t,t- `5.� L 1�w w `-,. ��•-��.,,�.�,. r. '�'�^?s AK;��- Y r.'% r+�': t� f{ as-.\. t '/. L" 'by'.•.'5,71 'r.-'P i" �T i q�w .E.: `iv✓: :��,;� _�' t =%7 ` ��.�i!"-f . ( ) '4 r�', � R�?-' `'-'�-�T r �:: r ..r-'. _ ...y.�.e.'.'rs-1�;•�,zE•...�r(y +--�-.::�.. ,_..-=,���ir�=�-� ;..'i 4 - !.1- `I;'��_" .�s't"..'"i!c;« El t RDGE B� PLLC 5n M&N USGS - 7.5 Minufe Quad MoD MATHIS QUARRIES SW &SB-2500 FEBRiUARY 20, 2009 873 COVE CREEK DRIVE BLLE RIDGE OW 838-4n PAX NORTH WILKESBORO, NC 28659 ENGINEERING SCALE I' - 2000r 2328 2328 2327 --}" 23712318 2� 2396 1 . `' Vim' � t 2318 �-+ �• a� '��;r;� �� 4a -,.. ► 2325 326 O 2 NORTH �d �. - ��N ,� ♦ �r� 2324 WILKESBORO 1 2342 is - #' r _ i ♦ ' 2607 •' — 2341 �s 2344 _ C� .4 2351 ' l 2343 � �' 2346 1 � 232�►- i' % 2340 7 �355 �� 2 " " ► Q 2355 Antfach 2345 s • _ - - i N 421 2339 244 . f 0 ` 1 �� i A 12 1.4 .7" a ie •' 11 Call 2356 3.0 �1.0 24332576/ 232325 40�.a a21 q 18, 2537 �2439 2666 421 1.s 251 A „ a 2418 2439 .2, �2 2547432 0BE +� 1 T 1.7 2433 ' o f ' 2441 2340 2418 0 34 2418 1J N f is �' 232, 2549 SITE 2431 .4 2430 1.6 1 2503 f 2474 StJJE PLLc 529 MAN STREET NC DOT - Wilkes Count Ni hwa Ma MATHIS QUARRIES N WL O NC zmw cxw FEB2UA2Y 20, 2009 8%3 COVE CREEK DRIVE BLUE RIDGE me a3a4 FAx SCALE, I' - 5000' NORTH WILKESBORO, NC 28654 ENGINEERING +mob -w— HCDENR North Carolina Department of Environment and Natural Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director July 17, 2009 Mr. Bart Mathis Mathis Quarries, Inc. 873 Cove Creek Drive N. Wilkesboro, North Carolina 28659 Resources Dee Freeman Secretary RECEIVED N.C. Deot of ENR JUL 2 2 2009 Winston•Sale-�- I Regional 041 c: Subject: Request for Additional Information General Permit COC No. NCG020747 Mathis Quarries, Inc Wilkes County Dear Mr. Mathis: The Division of Water Quality's Stormwater Permitting Unit is currently reviewing your application for coverage under NPDES General Permit NCG020000. A preliminary review has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please provide design criteria, calculations, basin sizing information and drawings to demonstrate how compliance with process wastewater effluent limits (Table 9 in NCG020000 Permit text) will be achieved for Basin #2. 2. Please provide a water balance for process water operations and describe what water source will be utilized. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to August 18, 2009, or the application may be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. Please reference COC No. NCG0747 on all correspondence. If you have any questions concerning this matter feel free to contact me at (919) 807-6365 or cory.larsen@ncdenr.gov Sincerely, ns mental Engineer cc: George Smith, Winston-Salem Regional Office Stormwater Permitting Unit Files Wetlands and Stormwater Branch One 7 1617 Mail Service Center, Rafeigh, North Carolina 27699-1617 North Cal 01 i..iia Location:512 N. Salisbury St Raleigh, North Carolina 27604/�+ryrl Phone: 919-807-63001 FAX: 9IM07- 4941 Customer Service: 1-877-623-6748 r��`il `i! i y Internet www.ncwaterguality.ora f Smith, Geor e From: Larsen, Cory Sent: Thursday, July 16, 2009 12:04 PM To: Smith, George Subject: Mathis Quarries NCG020747 Attachments: NCG02 NOI.pdf; Mathis.pdf Hi George, The applicant sent me a copy of their mining permit today so I am beginning to process their application (see attached). I have a set of plans here that I've reviewed but can't scan in. They will have to meet effluent limits for pH and TSS, and it is unclear how they plan on doing that (no talcs or design basis). Also not sure where the process water is coming from. Other than that I don't have any other issues with the application. Are you familiar with this site and the planned operations? Would you like us to issue the permit or hold off until you have a chance to make a visit? Thanks. Cory From: George Smith[mailto:George.Smith@ncmail.net] Sent: Monday, March 16, 2009 3:19 PM To: Cory Larsen Cc: Ken Pickle Subject: fie: Mining permit? Cory, I called Jon Swain, Engineer, and informed him that he must call you when the mine permit is issued. I gave him your phone number. George George Smith NC DENR Winston-Salem Regional Office Division of Water Quality, Water Quality Section 585 Waughtown Street Winston-Salem, NC 27107 Voice: (336) 771-4968 FAX: (336) 771-4630 E-mail. correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. On 3/16/2009 9:21 AM, Cory Larsen wrote: George, The NCG02 application is in my office. Their mining permit has not been approved as of yet but when it is, I 1 f will process the application. Cory Ken Pickle wrote: George, I see in BIMS that on February 26, 2009, we received an NOI for Mathis Quarries in North Wilkesboro, and that it was assigned application number NCG020747. BIMS shows that Cory Larsen is the staff member processing the application. Cory - status for George's return call? Ken George Smith wrote: Ken, A consultant called and said he sent a NCG020000 mining NOI for Bart Mathis in Wilkes county. Did you receive this NOI? I need to call him back. They applied for the mining permit with LQ. Hope all is well. George George Smith NC DENR Winston-Salem Regional Office Division of Water Quality, Water Quality Section 585 Waughtown Street Winston-Salem, NC 27107 Voice: (336) 771-4968 FAX: (336) 771-4630 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Cory Larsen Environmental. Engineer NCDENR I DWQ I Stormwater Permitting Unit 1617 Mail Service Center, Raleigh, NC 27699-1617 512 N. Salisbury St, Raleigh, NC 27604 Phone: (919) 807-6365 Fax: (919) 807-6494 2 North Carolina Beverly Eaves Perdue Governor Bart Mathis Mathis Quarries, Inc 873 Cove Creek Drive North Wilkesboro, NC 28659 A NC®ENR Department of Environment and Natural Resources Division of Water Quality Coleen H. Sullins Director March 4, 2009 Subject: NPDES Permit NCG020000 Mathis Quarry - Located off Cove Creek Drive Wilkes County Dear Mr. Mathis: Dee Freeman Secretary The Division of Land Resources has informed our office that you have applied for a mining permit. You are required by North Carolina General Statute 143-215.1 (a)(1) to obtain a General Permit (NCG020000) to discharge stormwater under the National Pollutant Discharge Elimination System (NPDES) in accordance with Title 15A North Carolina Administrative Code 2B .0100. The General Permit requires that you: implement a stormwater plan, perform and document monitoring of the outfall discharge(s), and comply with record keeping requirements. During annual inspections, records must be made available when, requested by staff from the Division of Water Quality. Also, further information can be obtained at the Following web site: http: //h2o. enr.state. nc. us/su/Forms_Documents. htm Please complete the Notice of Intent (Application enclosed), and send it to ".the Stormwater and' Gerieral Permits Unit located in,Raleigh.' Also, prior.to any land -disturbance, any potential wetland, impacts must'be�"' addressed by the:U.S. Army Corps of Engineers. If,.you. have any questions or need-assistan6e,`please contact George Smith at (336) 771-5000. Sincerely, Steve W. Tedder Regional Supervisor ATTACHMENT cc: WSRO Land Quality Section WSRO Files North Carolina Oivision of Water Quality, Winston-Salem Regional Office Location: 585 Waughtown St. Winston-Salem, North Carolina 27107 Phone: 336-771-50001 FAX: 336-771.46301 Customer Service: 1-877-623.6748 Intemet: www.ncwaterquality.org An Equal Opportunity 1 Affirmative Action Employer Nne orthCarolina Naturally MINING PERMIT APPLICATION REVIEW FORM for the DIVISION OF WATER QUALITY Projec;/Number: � County: -Due Date for Comments Back to Land Quality Section: � � Will the operation, as Proposed, violate standards of water quality? IVO Comments: Watershed/Stream Name & Classification: 1< n ZF-,, A"1,2 (. ,k CLcis L'- YES NO NFOES permit re-gired NPDES permit existing (Permit: �j ✓ Nondischarge permit required f✓ Nondischarge permit existing (Permit,,______) - 7 Wetlands disturbed 401 Wetland Cert. required 401 Wetland Cert. existing (Permit 1 _) Reviewed by: ' Date: 3 - Y-o 9 Print Name: (;Zo rj e Sr+ Uh central once Revie.ver, APPLICATION FOR A MINING PERMIT NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES LAND QUALITY SECTION APPLICATION FOR A MINING PERMIT (PLEASE PRINT OR TYPE) 1. Name of Mine. Mathis Quarries. Inc. _ County Wilkes River Basin Yadkin/PeeDee Latitude (dd.mm.ss) 36.08.36 Longitude (dd.mm.ss) 81.01,46 Name of Applicant* Mathis Quarries , -Inc. 3. Permanent address for receipt of official mail" 873 Cove Creek Drive North Wilkesboro, NC 28659 Telephone (336 )984-3261� Alternate No. (336 )984-1279 4. Mine Office Address 873 Cove Creek Drive, North Wilkesboro, NC 28659 _ Telephone (336 , 981 4-3261 _ 5, Mine Manager Bart Mathis _ We hereby certify that all details contained in this Permit Application are true and correct to the best of our knowledge. We fully understand that any willful misrepresentation of facts will be cause for permit revocation. * * * Signature_ A! ���� _ Date I - 3 o - o q Print Name Bart Mathis Title Owner * This will be the name that the mining permit will be issued to and the name that must be indicated Qn the reclamation bond (securiW that corresponds to this site. ** The Land Quality Section must be notified of any changes in the permanent address or telephone number. * * * Si ature of com an officer required. G.S. 74-51 provides that the Department shall grant or deny an application for a permit within 60 days of receipt of a complete application or, if a public hearing is held, within 30 days following the hearing and the filing of any supplemental information required by the Department. All questions must be addressed and all required maps provided before this application can be considered complete. Attach additional sheets as needed. - I - Revised 2/2007 APPLICATION FOR A MINING PERMIT G. LAND ENTRY AGREEMENT We hereby grant to the Department or its appointed representatives the right of entry and travel upon our lands or operation during regular business hours for the purpose of making necessary field inspections or investigations as may be reasonably required in the administration of the Mining Act of 1971. We further grant to the Department or its appointed representatives the right to make whatever entries on the land as may be reasonably necessary and to take whatever actions as may be reasonably necessary in order to carry out reclamation which the operator has failed to complete in the event a bond forfeiture is ordered pursuant to G.S. 74-59. LANDOWNER: APPLICANT: Signature: /, �'" ' M4•.�� Signature:*� 13 •...J'�'� N� _ Print Name: Bart Mathis Address: 873 Cove Creek Drive North Wilkesboro, NC 28659 Telephone: (336) 984-3261 Print Name: Bart Mathis Title: Owner Company: Mathis Quarries, Inc. Mine Name: Mathis Ouarry Telephone: (336) 984-3261 _ *Signature must be the same as the individual who signed Page 1 of this application. and reclamation mays and the aipprouriate Processing fee (see next page for fee schedule) in the form a check or money order payable to the North Carolina Department of Environment and Natural Resources must be sent to the Land Quality Section Central Office at the address listed on the front cover of this application form. Inquiries regarding the status of the review of this application should be directed to the Mining Program staff at (919)7334574. - ] 8 - Revised 2/2007 US MW 421 WY` VICINITY MAP SC LE, NTS Mm TO 1 MORY COUNTY VICINITY MAP SCALE i NTS STATE VICINITY MAP SCALE 1 NTS MINING PLAN FOR MATHIS QUAPPIES, INC. ANTIOCH TOWNSHIP, VVILKES COUNTY, NC STREET ADDRESS 873 COVE CREEK DRIVE NORTH WILKESBORO, NC 28659 CONTACTS WNER MATNIS QUARRIES, INC. BART MATNIS, PRESIDENT 873 COVE CREEK DRIVE NORTH WILKESBORO, NC 28659 (336) 984-3261 (336) 984-4361 FAX EROSION CONTROL NCDENR TIM LATHAM LAND QUALITY SECTION 585 WAUGHTOWN STREET WINSTON-SALEM, NC 27107 (336) 771-5000 MINING SPECIALIST NCDENR JUDY WEHNER LAND QUALITY SECTION 1612 MAIL SERVICE CENTER RALEIGH, NC 27699-1612 (919) 733-4574 SURFACE WATERS NCDENR GEORGE SMITH DIVISION OF WATEP QUALITY 585 WAUGHTOWN STREET WINSTON-SALEM, NC 27107 (336) 771-4968 AIR QUALITY NCDENR JALAL ADOULI 585 WAUGHTOWN STREET WINSTON-SALEM, NC 27107 (336) 771-5000 CIVIL ENGINEER BLUE RIDGE ENGINEERING PLLC C. NEIL SHEPHERD, PE 529 MAIN STREET NORTH WILKESBORO, NC 28659 (336) 838-2500 (336) 838-4179 FAX SURVEYING / STAKING MAIN STREET SERVICES PLLC DANNY LONG 529 MAIN STREET NORTH WILKESBORO, NC 28659 (336) 838-2500 (336) 838-4179 FAX ZONING COUNTY OF WILKES EDDIE BARNES, PLANNING DIRECTOR 110 NORTH STREET WILKESBORO, NC 28697 Nor Cu�`U611a One -Cali Cer i i �l ULOCO 800-632-4949 CALL 48 1IOlM 861011E DIGGNG N NORTH CAROLNA Call BEFORE you DIGI "It's The Law" DRAWING INDEX # DATE TITLE Q-1 02-20-09 COVER SHEET Q-2 02-20-09 OVERALL MINE MAP 0-3 02-20-09 EROSION CONTROL - PHASE I Q-4 02-20-09 EROSION CONTROL - PHASE 2 Q-5 02-20-09 MINE RECLAMATION PLAN Q-6 02­20-09 EROSION CONTROL DETAILS Q-7 04-15-09 EROSION CONTROL DETAILS Approved Stormwater Permit Documents Construction n, accordance with these documents is required by the stormwater permit. North Carolina rules require that the stormwater gstem designer Inspect during conslructicn; certify conformity with the plans and specs' and certify compliance with the stormwater rules. Permit #_NCB 02�� Date 7/ � by r"! _ NC Division of Water Quality Sheet # Revision Date &/ 11 II • 1 l f RECI■■■. CV E OU 8 �O 0�`' a NV� z EE s a ao co ON c° i° o M In UJ (D Uz oU pl LLJ UJ LU z �0 �z M LU 1\ L •j� U> z Q[ F-- �U. LU CO W Z LI LU W Q1 Z ry C1� a U 0 �W� rL > 11J LU co 0 V -T O l-__ U aIQ �E co z PROJECT a SI-EIET 8062 DATE 2-20-09 QC3 SCALE NTS DPAWN BY OF 7 JCS Yti� •r =1 � _ a� c•: NG PLLC, ALL PO4TS RED. THIS PLAN MAY NOT BE RED, SOLD, LOAD OR GIVEN TO OTHERS. OR PHOTOCOPYNG OF THIS PLAN WITHOUT THE WOTTBV CONSENT OF BLUE RAGE ENGINEERING PLLC IS PROIOTED AND IS A VIOLATION OF FEDERAL i MI\E CONSTRUCTION-_- 1. INSTALL TEMPORARY CONSTRUCTION ENTRANCE, EXTEND PRIMARY ACCESS ROAD FROM COVE CREEK DRIVE TO PROCESSING AREA. 2. CONSTRUCT BASINS 2 AND 3, AND TAILINGS BASIN. CONSTRUCT CORRESPONDING DIVERSION DITCHES. 3. CONSTRUCT SCALENOUSE PAD. 4. GRADE AND GRAVER_ STOCKPILE YARD, PROCESSING AREA, CLEAR AND GRADE AS NEEDED FOR WASTE AREA, CONSTRUCT TAILINGS BASIN. 5. BEGIN GRADING HAUL ROADS FOR PHASE I MINING OPERATIONS 6. CONSTRUCT BASIN I AS ROAD GRADING PROGRESSES. 7. CONSTRUCT ONSTRUC SCALEHOUSE AND COMPLETE STOCKPILE YARD AND ACCESS ROAD ENTRANCE. 8. COMPLETE FINAL GRADE AND GRAVEL FOR PROCESSING AREA. 9. CONTINUE WITH CONSTRUCTION OF HAUL ROADS AND BEGIN MINING EXCAVATION. 10. SEED E MULCH ALL DISTURBED AREAS WITHIN 15 DAYS OF COMPLETION OF GROUND DISTURBING ACTIVITIES. II. EROSION CONTROL FABRIC SHALL BE INSTALLED ON STEEP SOL SLOPES AS NEEDED. 12. II` CLUDE ALL NECESSARY EROSION CONTROL MEASURES AS NEEDED DURING CONSTRUCTION SECUENCE - TEMPORARY SILT FENCING AND SILT FENCE STONE OUTLETS, MET PROTECTION FOR ALL EXISTING INLETS, TEMPORARY DIVERSION DITCH -ES, TEMPORARY SEDIMENT TRAPS. 13. UPON TERMINATION OF MINING OPERATIONS PROCEED WITH RECLAMATION PLAN FOR FINAL STABILIZATION. ,. - --.__ - ... - - - - .- _ _ - _. --- - ._ / / , -_ .. - - _ ... _ -_,'--,----,1_---I---­---.-.. -- ..---..­.--. ... -.------ - --------. -,---,-.- 1-----.-..-1,... - -..-1. -,.11-,. .. ,.. . I-- -..N,...- . ,-I ,-"..\,.1..- ...,I 1. , .'.'.. ..., ,.\- -., 1..\_.. . %. -%--I,1.,"...-..,'I -- -I1---. \.-,-.I i,-.. . ,-,.....- .1. .-. 1.--\ -.\., 1 \,., . ...,.-',..1.�...,I-1.. .-,1 ..-\- \ ." .,-,-,,..,-,,,- .-. I1,.,1,I .1 . ---, -- .\\ ,.., \ -.,.-.I.`I.--.'11.1.1.II.,1," -.-.. .....- ..-- .\ - 1I..,.1. ", I- -,.- ." ,,',-. - ,-.,, \-1.. ,--1,'-- 1,- .I-,-..-1-1I.-.-I1I---..--\. -"-,.-- --.-.---..-,,-,--...- - '-, --, -.-.--.-.-.-.---. .-.-_-­-.-1- 1. _--1--- .--.--,-.,.,-- .----. -.,. -.---.-.-- , , . ..--.. --.. -.-...-- --,- . -.- . ...-.--- I -.-.-. -I.-.- . -- -.-.I I-1 .- --.- ..-, . -.---- - --.---. ..-,-1 --.--.- ,-,--..-----.---1-"-1---.. . ­ -. I-, " -. ,.. .- "..,. -I..,..,-., I -, --I­'.-I-­ . .I..- I ---,I -.-"- I -.., ..I - .. I.. .. 1."- .- --. . -. . --I II - -, ,- 1 '-.-,- 1..-1--1.- ..-II 1. .. I1-.--. .-1,..11.1, .. .1I.11 .-1.I .-.-..1" 1..-.I'1 -.---, ,- - . -.---- 1.--11 �--.-I- -. -.�--..-- .-1 .I -.--- --.-.---.--.--.�-.--- .I. --..-.--- -..-.-.------- 1.--.--..--1.1-.-.-.- --,\-.---",- -- ,-. -.- -, -.\ \ ---.----....--- . - -.,I- -- - -.�-- -...-1 --,-,1-, .-.--, -,,--,- --.,- -.. .. -.... . - .'-,.".-'-."-.. -. .- 11-.I-...--- .. -, -.- ,..-. .- - -- - I, ...N 1 ,1-- ..-.-'..--. ...-.".7.--1--. -1--.I-.- -_--.-­- -. . ----.I ,1...-.---...---..--�--I.-�----------.- - .-.-' --' .-., ---t�-.,'-"--.­--.9-I---- ...-.-,.-O. ..0 --�-- - i\I- ,'\ - �( --1--.�- -, '.- ' ,---"I 1-.- - -(,-,4-j .,�-I---I,-,-,-..- --. -----PI-.I- ..-m-----,- ,- I- , .-,- . -­_- , r - I-( '--..- . .. I--. --... I- -- .II,, --. ---..--",. .-. --- -.--",- , .-.I.-T.../-./.11.I-1 !r��-: �--I --. "-.�- -1.- ,/7-.-. I =�,/.7.--1-/--:1--;-1i I --, � "I,d ,o ,(,- - .". I�r-.'! ,,.5 /,,-,,K,-'1-1-//, (--.-f- �,I,-,/-,&" -U --I'I -:-ir., �.. -- -.., . ..- M,- ' ?/II /.. .'� '/, "".7 i - ) /,,//, 1, /- , ,, -.� .-/ -../-"\ -\ , .�. (-- .'1.1"-..11 -'. ,,-''I- .,- '. ". /-". ..-- ,, -.,-",/1"1-I--,'--' -",1-1. '-1.,.--I-...-I- -./ -....',-. I----1- I )(1 ./ -I . I / ­ v$(.1 I-/"I"I (// /,, .I' ./ i r - . - _ - .. _ _ • _ - : _ 1 I J / 1 - / i � / j :.- - ..,, - _.. .- . _ -. -_- -- _.. �, ----- ----•- -- - _ -•.� - of - `: ! _ _ �% :.\ r \ r r t w .- . - -,. / _ . i _..._-. _ _ - - - 1 - ,l ' _ _ _ i�RS GRAB L VE _. ' I __- Q - �. • DB 4 ; ,, NW.ACC ,_ BILLY MATHIS _ _.. _ _.._ __. �-. �. -.__ 1 -- - - __ __ _ ...__.- D9.153 PG 663 -_ --- / - , I / - -- - i - -- -- - - _ b -Q4 78) 8 �T (ADJOIN? r' _ -. - - --- f - -_ - __ ._... __ - 1 - `�---�. / .� ACRES `( .._ / I , r` ' ._...... ----- -- .- , ..-.--- ---. /' ---.. , .. _. _._ _ _. r r - - - -- - - _ / f I ,, .ice �•1i / _ �•.._� _ _. -_ _._ . �`8 . _. _ . _.__ __.. � BOUND ING I _ �NNMVG�AC:TIbITY� ARYL � � C�IN LNVC � FEINC - �J I • . _-. _ _ -' __.._ _._- - / / \ .. - _ �. _ .: w _(�E ALL r AREA __ .•-. . , . AROUND F�GW W - -- - �, ", i - \, --- . YY . �R AU y -- _ .- .- . - - ---. ._ : ' _ •� .� _.._ _ f i - l - `, ! ,� - _ ' i -- -- - --- - - --- - - - - f -\ CHAIN ,Lf�NC' - ,� - -- - -- __ ..._ ._.__ / - - --.... ARouND W - .. ALL AREA` - - r _ (TYPIC -) • _ • • !l BILLY e BRITT .MAC _ -33 .r 1 1, - / i ` ,' _ - BILLY E MAGGE -MA74S ' I 1./�• 1 ;' i �' 21 r / , i 389 98 60 _ _ _ . DB 881 PG 538 _ __ _ ,.. f (A I�R) _ _ __.. - _ i ; - _ _ / / /l ,r, DJO - .- - _ 4 / ROAD-- - : - �f ilia l - -- - ' 807 18 4186 - . -1 / - __._.. _. , --- - , _ f - ; (ADJOhER) . <. � f i i r ! i l I- � / \ fd/I/ I/ % l _ -_ - / > ( r - _ - E ACTT rT�M 25' - / T .. . _ - 1 \\ -- - I I r j f� i ! \ ` I __ ___ _, . /,. \ .I " , .I .- 11- "..11.I/ f/".- /" 1.I/ , II�1 I I"//,I I I, Li, ..l I/I .1I 1I ! I !" 1,..- I,.. .f I.... ,, II ., I�/' /II jI I- iI/ \I , /I I�.II �.� I� I, \ I - .I,. . ,. .'/-.:1i III .1� .1,. I ,, " �., II l. I I. . ,I .\ I 1 IIIi -.II )'iII. .� ,I /, 1. ,I)I. . II I II.1 .,� / .. . ..I. / ,\ ,!II/I ?I�. t,�.../ .1. , I.;'1fI."II x i! I 1111,.I� I­�,I.I, .,,./, - , I / -..-I "-",, 1,'� �, /-.t,-I-- N-.,---1I .\ 11,1 I 1.,.4\, ,� ,� II \\1.., 1I..I, ,, " \,\ 1\ 1 . ��-\11,; \-..-"-- \-1�,.1".% -,.� I 11 ., AI1. ,I .\, 'i...-/,I .- I. ,x /\.-­, ,. . ,I . 1,.-i )� 11.. -Ji" --, \I. -. . . .1. .I/.I - ;Ic-I/ , .--. . --". / I- - ,1/ .'I. I,,- I ,I . iII ( I,/ /I ,- L . I. � , ; I ..)./".� . i �I .j -I 11 , I�. � �-.I/ � ) I , I I II rI .,--L .Ii-I 1 - I , I.- /...I/ / .I -I II I II ",1...I- I I . ...­ I I-iI I- I.1--I.! :Ii .( .;,"/f(- II� i I II .. ,.I IZvII .-.. 1".. ,1. I/ -.. 1 I1I I ., I. \ ,.\. -. ... I.I. %:II!� . h1m I \ . -1 , \I !( III\ ,; I,I ... _I- I,I I � t , - "I1.-I, --.-.%-.r- I -I. -- . /-11- (,.1.�!1 -... -.., -\ ,. . .1.II1. -I1I 1-%-- .- )\ I -. \.. . '-�-,� 1-\\� , I 1.-.- - - -, \-- 1..-.--�I I III . /-/�.-^ . ','/ ,;(, /1�- , . ZI-11,.1,.I.-/A. -. ,/'I-./- �-\1, /-,.I.../...,I-., I1 ,- P 6. , , ,I.,1/ ./. ' . I. , - -) -/ .',/ ., --- �I ,'.11". I - -�.II / , 1I�1.-�/1- .-. ..I.'-)1 .-1- -.10 \ __ _ �� 25 \ 41� A r . , (( , .. .---1�--\ I.. , .( /-',,Io 1/-.. -I -! 1--./ % 1-?1,\ I \ \ �ERMT� TMW _. - / l - BUFFED?" .h A - - }, / ,/ - -` - -,,. \ �� - I , ti _- - , t r ' _ , 1 /' --- � ) �� - 1 i -\ \ _ . :\ I. _ _ \ 1 \ 1 ve►A Y % `, 1 , , _ _- -_ i I I I ( : / / �\ E MINNG AG r IVIT BOUNDARY I W" ROADJ I j ) / 1.._; 1 l f ! J \ r -- / / �\ ti \ /.�III r .,35.0 ""ACRES= r { -.. r 1. I , `I / �/ �. ,f � \ ,.. .,.- _ -jI \ , �i / '� , r,/�: 11, , , " - - - - .// '; i l ! / I/ I U4AMED TRBUT ' ,\ j I , '\.- ( ))/, I t. / ,. \ ~ - , 6'', CHAN LhK EFJVC�16 ; f , I I I FHsi W C.REEiC-f `'/ % i .-. I x i AROI�ND HIGH, WALL :AREA ' I I 1 `` I (i YP1cAu ; , 1 , + I ., / .. - . , + 6 IN LI K SIG - - - I r � s - I i I _ _ ! /." 1 . t , Af7pUND HIGH WALL AREA wlu. aoac __ _ , J I % , I I - ) PROPERTY LINE' r" 1 -" i \ I r , (T'�PIC U _ . r r ' r + / ( I f .. - _ - _ A -. - ••._ -�_,y� MATHLS GI-i.)ARRIE` � c 1 % J ( - - _ / 31.10 , MIEtD �T Y . I I I _� / FI HI CI?EEI� / 1 l -' � --- ! - ' / 1 - %' i + f 31.10� �40RES I ,Ii r t / J 1 -- N- 6PERTY _ _ . - ., ._ r _ - -- i 1 . - _ - , l . ��v1EE , (RUN WI � cRE�) ! _ _ ;� f - t ` , _ TAtLWGS ( _ .._ . I / A __ � / : • ,i I / 7 1 ► II ' 1 ; ! CRIbF•f•X�/YYAS�i'�Bl �eoNe�r / : • w 1 I . , `,_ : • - 1 2�5' I vVm+ 2�6 AazeS 2 Z� & / c isr`t>Fe - i` r 1 `, ' ) I i � r l EX. BARN\ - - -.- -.- ®0 UND SYURBED �/ \ L 5' UNf STl1R8ED MINING 1 I 1 T IVI ' 1MIf A TIVITY r/ l PERMI E; C^T ., ( F,. C i I l i - \ % � STCNE / .,. - r • 1� J / 4 n ACRES W _ a17 'ACREs ,. . I W - II - ,I r ' i I I i % _. ! (_ _ ---- ( , "/ t 1 <� UNNAMED TRIBUTARY ! i It `I • 1II /. I - L - - / FL. ,, / �, 0 50 ; APD DISTURBA /AND CREEc /, 1 . r--- -- - . _ NATURAL WA OUR _ - „a / I I ___1 ,� - % - / / _ .._ � I I , _. NQ DISTURBi4NCE AND 1 - I G _ �1 ' " I 2 CRESS' _ ',�! ! - 50 I • - -_ I � I �` I i _ �'` j , TacosE / I 1 I 1 1 , , IN.�ADIS DER J / - i Ii 1 1 J \ 1 J , - ow , ! i I - �. PROPERTY LI�JE 82 J? 1 I 1 j ROBE?T NF=WM4,N E ! i. i � .,' EXISTING � P ' TO J • / " } ` f A, � , t I . WATER , 60UR 'Z FOF STOPS ,_ � '- ) sroaMe YARD //-EXITNG.(RUNSSWITH CREED) I f.i . j i ` C�LAE2A O.I PE-Rk iN. l 1 ! i` I 1 I` WASHI�lG PRC SS 'VIA P11Mp / 2AS ACRES � ,CU.VIB?T / , ! I , \ ,` 1-- _-_ i f i _ // f Ti REMAIN ',\ L 389T88--60321 f ( ! _.._.� / / . ; ' / I, , . j t ( , >F. .... - ;'' i ` i I I UNNAMED TREUTARY i i `�.\ -- j IST ING !' , f t -- FHNNG 1 i' I I ..•:._. --- MATH IS & SON GRADING 1 t I r'� \ ` /• \� / ;! ,' BI BRITT MATT-IIS - / -I __ { ;'� ( ILLY _ .. _. __ ..... - �. ..0x(//1,. I, ,1* ) k 0�.,1� /,. \ (I (. "-I - .,,II -\..,1-.-,I,.",. ..1I,,. - - __ _.. / f1:I-.)1/.I. - .-.1 .-. N,--.1/,11 I .-...-. -1 .,,-I'- I ; - ---- 1. ` n\" - , I/ \,- I,-, /\,- ., • _." -1-/ I _ 1-�.-I -, ,./1.-I --.11-) ,.1, . ,I.I-. - \-// t:\' rI /.- .-� I- - ,I- II-/r -.--,F ., )\"- 'I, / o, ._,\\ i .\I I / I / -\ ,-, /-1 DB 887 PG 360 i ,, 4807 08 4159 `, ,. EXISTING FARM ROAD �'r i 3897-98-6021 / I 30.295 ACRES I I , a j ) I (ADJON R) I\N �, , I ! * 9CA EWXM j '1 \ , 1 I 1. _. r \ - I a N� iII i BILLY & MAGG : MAT S / - . ,� - t J DB 881 PG 538 , ' 'N i ;, . -- - -`--------- \ , ` / I t 48Cj7-18-41e� > / : ` '= , ' % &ISTI' T - ! \ . I r 1 �.. 1 + � � ! / - 1 (ADJOINER�, / % \ �� I I 11 .� _ , - ) ) il I 1( / I / / 4 / - / '' / f / ' 1-1,XJSE � (\ I I I I f r;; EX. HOUSE , \ I �, I \ I / 1 I' I I I EXISTING ACCESS ROAD - ,I /11 I } - ,, > I I � I - ) / ki I i (EASEME T) - / l , � I "." / II I , ) / I ,,.,. / / /L - / ,. ' I i OBIT573 PG 4 i `� ' ./ - ------ --- --:'' ------.__ ,,, EXISTING STRUC _ _ - ! - i I I ! / \ MING PERMIT AR 3897-98-9s54 , 7 { / / ( TNS C�ADIN� .� *. , ; � , - j I I / / `� / / / ( I ,` MI�NG ACTIVItY BOL�DARY (AD•lO�FJ?),. - '� �^;;, (-` _ _ _ ___. _ ... E �! _ -- - - - --" j; I 35 O A , / I i f J ( I \ I \ = \ 1, � _. i f- ,'X.- 1,,- 00121 RT NEWMAN E I t I '/ Ur�VAA�ED ! . = / ' 1 �r�r `_ ,, Ci_ARA O. PtPKINS t Y ! f l - - - - /, ' DI 786 PG 528 r r I / r i IlIJF 64nG ^� f / / /,, (/ / - -' / ; ,. ! -, � I z / / I f _ � , ! �, i' , ; J � �� r 3897.88 6032 - . -.-,- / I If �. / I , t ;� ,� 1 1 , ,' - .� {4y f= - -/ -/--/,- -�- - -- - , - -- ,-,...- Il :' �/ ®lam 1 25' MINING �` / r �' ��__ _ ! �;� - , . _ - -- - - I ( - , l ( ---- - -- -- - ( PERMIT Et ACTIVITY f •-- `" 440i/ ___ I / ) V r -(-....,.r- -- R V I i I / / 1 \ � I . \ r i. / p 1 _- � \ .-oFEK r0 PRELIMINARY QUANTITY REPORT DESCRIPTION EST. QTY TOTAL VOLUME , , CY TOPSOIL 21,610 CY OVERBURDEN SOIL 216,106 CY GRANITE 4r123r CY 81349, 417 TONS MINE AREA SUMMARY DESCRIPTION AREA (AC.) SEDIMENT PONDS 1.25 STOCKPILES 2.43 WASTEPILES 1.22 PROCESSING/HAUL ROADS 2.76 MINE EXCAVATION 22.35 TOTAL DISTURBED AREA • ,,, 30.01 25' BUFFER AREAS 4.17 50' BUFFER AREAS 0.82 TOTAL PERMITTED AREA 35.0 s i CV _� � E Qz� t]c 2 � cD ao a 3: I--,' c8 c8 i CV Cq (f) IF W0 Uz Q [)L pv LIJ W Wz 0 I m uj O\ 0 >(N ci Q u u- � Di - W a (B co 0- � � o\ 0\ �1 3:1 r Q mco2(-0 Q L7 `0 00 Lu (j W > () z z Q( Cz G � J ti DC O ___l u u UW m J Q D C)>� J (-L W O l.Ll = U 01 O Q :2 co GO z WOMCT a SHEET 8062 DATE 2-20-09 QC32 SCALE 1"-150' DRAWN BY OF 7 JCS (oCOPYRO-9 2009 BY SLLIE RIDGE E4aaMM PLLC. ALL RIGMS RESERVED. THIS PLAN MAY NOT BE REUSED. SOLD. LOANED OR GIVEN TO OTi ERS. OffQOM=ION OR P140TOCOPYM CF THIS PLAN WM-IOUT THE WRITTEN CONSENT OF BLLE RIDGE ENGINE1344 PLLC IS PRO MIED AND IS A VIOLATION OF FEDE12AL COPIRKW LAWS. RJNI%IABLE BY FINES LF TO SI00.000 PER OFFENSE. It,. .I '. I PILL .+•.,r. _- .. .��!-..,.i _.1.1' 1 t .,; ,, t.. 6 '. . EROSION CONTROL NOTES L LAND DISTU 28M ACTIVITIES SHALL NOT COMMENCE UNTIL APPROVAL TO DO SO HAS BEEN RECEIVED BY GOVERNING AUTHORITIES. 2 NO LAND CLEARING, DEMOLITIOR OR GRADING SHALL BE'GN UNTIL ALL PERIMETER EROSION AND SEDIMENT CONTROL MEASURES HAVE BM INSTALLED. 3, ALL EXPOSED AREAS SHALL BE SEEDED AS SPECS WITHIN 15 DAYS OF FINAL GRADING. 4. SHOULD CONSTRUCTION STOP FOR LONGER. THAN 14 DAY THE SHALL BE A . S, SITE SEEDED S SPECIFIED 5. ION SHALL SEDIMENT AND EROSION CONTROL MEASLES BE INSPECTED AT LEAST ONCE EVERY SEVEN (7) DAYS AND WITHIN 24 HOURS OF A RAINFALL EXCEEDING 0.5 NCI -ES DURING A 24-HOUR PERIOD OR MORE FREaueNTLY P REaJ w BY GOVERNING NPDES GENERAL PERMIT. ALL MAINTENANCE REQUIRED BY NSPECTION SHALL COMMENCE WITHIN 24 HOURS AND BE COMPLETED WITHIN 48 HOURS OF REPORT. 6 THIS PLAN SHALL NOT BE CONSIDERED ALL. INCLUSIVE AS THE GENERAL CONTRACTOR SHALL ARY PREVENT TAKE ALL NECESSARY PRECAUTIONS TO SOL SEDIMENT FROM LEAVING THE SITE 7. THE CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOCAL ORDINANCES THAT APPLY. 8. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED IF DEEMED NECESSARY BY ON SITE INSPECTION. . 9. P INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD 19E INTERRUPT® BY WEATi-BR OR NIGHTFALL, THE PPE ENDS SHALL BE COVERED WITH FILTER FABRIC. 10. GENERAL CONTRACTOR SHALL BE. RESPONSIBLE TO TAKE VO4ATEVER MEANS NECESSARY TO ESTABLISH PERMANENT SOL STABILIZATION. II. SEDIMENT SHALL BE REMOVED FROM THE SEDIMENT BASIN BEFORE IT IS 25% FULl. AND FROM SILT FENCE BEFORE IT IS 33% FULL. M THE CONTRACTOR IS RESPONSIBLE FOR ALL SAFETY, METHODS. PROCEDURES AND SECU94(ES OF ITS OPERATIONS. 13. NO WORK SHALL BE PERFORMED OUTSIDE THE DISTURBED LIMITS SHOWN ON THIS PLAN. 14. CONTRACTOR SHALL OBTAIN ALL PERMITS AND APPROVALS ASSOCIATED WITH THIS WORK 15. EXISTING DRAINAGE PATTERNS SHALL BE MAINTAINED LN ESS OTHERWISE SHOWN ON THE PLANS ALL AREAS OF THE SITE SHALL BE SHAPED TO DRAIN TO EROSION CONTROL DEVICES. 16. CONTRACTOR SHALL PROVIDE ADEQUATE TRAFFIC CONTROL FOR ITS OPERATIONS. U. CONTRACTOR SHALL OBTAIN APPROVAL FROM NCDOT PRIOR TO DISTURBING ANY STATE MAINTAINED ROADWAY. 18. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIND VERPY THE EXISTENCE AND ACTUAL LOCATION OF ALL EXISTING UTILITY LINES. t9. THE CONTRACTOR SHALL Imo' ALL STREETS AND ROADWAYS CLEAR THIS SHALL BE ACCOMPLISHED BY STREET SWEEPING AND WASHING AS NECESSARY CAI A DALY BASIS. 20. SILT FENCE STONE OUTLETS SHALL BE INSTALLED AT LEAST EVERY IOOLF AND N LOW LYING LOCATIONS ALONG THE SILT FENCE. EROSION CONTROL SEQUENCE L INSTALL TEMPORARY CONSTRUCTION ENTRANICE 2 INSTAL. TEtiPCRARY SILT FENCING AND SILT FENCE STONE OUTLETS. S INSTALL N-ET PROTECTION FOR ALL NETS. 4. INSTALL TEMPORARY SEDIMENT TRAPS AS EARTH WORK PROGRESSES. MARKED AS BASINS L 2 3, AND TAILINGS BASIN. 5. INSTALL TEMPORARY DIVERSION DITCHES AS SPEC PRIOR TO EARTH MOVING OPERATIONS. 6 ANY EROSION CONTROL MEASURES AFFECTED BY FILL MATERIAL. SHALL BE REINSTALLED AS SPECM. FILL OPERATIONS SHALL NOT TAKE PLACE WHEN A RAINFALL EVENT IS ANTICIPATED WIT>-N 24 HOURS. 7. TEMPORARY SEDIMENT BASINS SHALL REMAIN N PLACE FOR AS LONG AS POSSIBLE DURING MHNG OPERATIONS. EXISTING DISCHARGE PIPES SERVING THE SEDIMENT BASINS SHALL BE REMOVED WITH SEDIMENT BASINS. & SEED E MULCH ALL DISTURBED AREAS WHIN 5 DAYS OF COMPLETION OF GROUND D61U PSM ACTIVITIES. 9. EROSION CONTROL DEVICES MAY NOT BE REMOVED WITHOUT PRIOR PERMISSION FROM A NCDENR LAND QUALITY REPRESENTATIVE AFTER A SITE NSPECTQR EROSION CONTROL DEVICES SHALL BE REMOVED ONLY AFTER ESTABL84AE IT OF GROUND COVER AND STABILIZATION OF ALL DISTURBED AREAS. 10. REMOVAL OF DEVICES SHALL BE SCHEDULED SUCH THAT ALL WORK CAN BE COMPLETED DUI&IG DRY WEATHER. 2S-yr Runoff Flow (cfs 19.85 Trapezoidal Ditch Ca aciI Roughness ooeAdent, n (w/ straw net) Slope (m .__ _ . I Ditch depth (R) _- .. I ._. 00 Ditch bottom wldlh (R) Ditch side slopes (x:1)_ _ ' Cross sec8onal area (sfj 18.00 Ditch tlow cepsdty (cis) 402.36 a W i Rp 25Runoff Flow cis 86 2. Tra zoidal Ditch Ca aci Roughness coelAdent, n (wl straw net) t §tope (MR) . - - Ditch depth (R) Ditch bottom wldlh {R)-I. r Pitch aide slopes (0). Cross eectlonal area (so . 18.00 Ditch Row capacity (cis) 482.30 Ce ed > Runoff i II 25- Rutort Flow cft 22.88 :IV. ... Trapezoidal Ditch Ca ad Roughness coe8ldent, n (w/ straw net) §lope (R/R) - Ditch depth (It) Ditch bottom wldlh (ft)- . Dltchsids slopes (x i) Cross eeotlonel area js' 16.00 Ditch Row cepscity (cis) 229.24 Ce aci> Runoff t9 25- Runof Flow cis 22.86 Trapezoidal Ditch Ca aci Roughness coef dent, n (w4 straw net) , Slope (") Ditch depth (R) _ - - Ditch Ditch bottom width (R) 0 ' Ditch side slopes (x:1) _ �� e I rea a 16.00 Cross Sta (i) Ditch flow eepaclty (cis) 237.99 Oe ecl > Runoff WA 25 Runof Flow cis 8.48 Tra oidal Ditch Ca aci Roughness coefficient, n (w/ straw net) lj Slope (1t/R) 4 Ditch depth (R) i-, d Ditch bottom width (it) I •1 d Ditch side slopes (x:1) zla. Wry Cross sectional area (sf) 4.00 Ditch flow capacity (cis) 20.14 Ca aci > Runoff +%E� f. Roughnesscoefficient,n(w/straw net) ':i,- Slope (ftrn) Ditch depth (R) fJ0 Ditch bottom width (tt) i' (I�6 ,., Ditch side slopes (x:1) 1 Cross sectional area Of) i 4.00 Ditch flow capacity (erg) { 27 44 Capacity>Runof Ls' Wl ' n \;a ;; 25- RunofFbw cis 44.77 Trapezoidal Ditch Ca aci Roughnesscoefflclent,n(w/strawnet) . 3 Slope (R/R) °A Ditch depth (R) , -00 Ditch bottom width (fl) '� .6 Ditch side slopes (x 1) . ' Cross sectional area (ef) 16 00 Ditch flow capacity (cis) 237.99 Ca acf > Runoff � to . I, " 1 ., ) .O 1, /1r. " ( - 1"1 - . -r..r cf- 1,1�t,1 I I-I - - r ' " I. . ",* I'l .1 / . _.N *) � ,-­ I Z-I ,­-- - -- I _.1I­/.. . r1' 1I I, . .L,, ," , `1`1/4.I1,1"­41) �.'­� ". . . ," -,/' JII ....r ` - ...._ Actual F a m st 025 ,I..--­�)\'-­D8­ ­ , ­1, .)I -.­ .)- i .I ., .-G G"I /­ - ,­, /- 1/ E�-!­ .. -1 ...') ­"­..6! I. ) ,.../ I-",­1.­ /-I-I .1­ ­/ "—,-�./.r/S.-..­1­.--..".­- . `1-).-1I.I,.1.-..-,.1 I 1. / 1 a"/-." . r. \­" . ') I. 1II i. Ir rlI i tow D %'' , I , _� ,-SIT .. �.� - ,r Trapezoidal Ditch Ca aci , __ t - - ;- - ` 1 ` I `N ----- ---_. Roughness coef crvt, n (wl stew neq . _ ._. . .._. - f /J , / �• - _-- -'---- 0033 ,, AREA f NI-•IB f y_ _ ._. __. _ .._ L VE 'r MR GhAC O Sloe 7 P O. 2 .0% Ditch de fh R) _ d _ 6 400 +� 3.9 E`J 1 �, - . _. p .( -_ , .. _ MR GRACE LOVE /' I 8 ,ACf� 5 Ditch bottom width 3.f10 ,_ - _. -,-- f� / (,� DB 26� PG 443- .--- - - 1 Ditc. ti d es (x 1). _ 3 -' _ - - - t _ - ---- -� f 4807 •.04 7828 ,j �� 25' U�IDI T REED I MINING " /` ./ / ,:,,• ` '9'745- 633 Cross sectonal area (80 1.82 . -. _.-.. _.. - - ;,. r i / ! -- -- - _ . _. 1-1. _ ;f � ,' Ditdllowedusl cis 19.85 - /� ' / / l�J i / _.(ADJOINER)._ 'OFF=SITE T TIVI , N . (�D JOINERS` _.._ -,l '.- / ,/ 'e I / f E (EMI A� TY ; , .1 ,_ _ -_. t -- A 1F - ,1 . RED PHI-2B OF E / _ -- - _._ 1-ACRES . ���/ 4�17 , ES i � i. ,. __ . ActuN Flow De th at Q25 - .. _ - -. - .. _..- _.._: -_ -_ _ i r iJ � ", ' \� \ r Tre ezoidal Ditch Ce ad 1' r, -~ . 1` ., ,-_..__ - ;- ! \ _ Ro a oo-­I- ­-\--- \ _ , T ' Ditch de R Actual 6:411a I< K 1 V { NV f �R _ .., '41t - - :� \ i pfi O MINE. JGE IT ; OU _ - _=- �. ��+ .L 6/.,iJ IE\ z r 1, Ditchbottomwes(x..I) 3.00 \ NAI LINK FENCING E MINING,` ACTIVITY BOUNDA Y ' - - - - , Ditch side slopes (x:1) 3 •, ` j i _- Croassectlonelarea (eQ � 2.01 ,-. -.; 1'`''., \` r_... - - �__. _ � � /� / , � i • I . - Cros Rowaofaal re 22.8E r '35:CS A-CR S, __ 'AROUND NIGH WALL AREA i 1 r _ - �•' , w S ) I I r (T�'PICAL) r _..._ - _ i � � � DRAH/�GE AREA � � �--r . � r / i - T _ DELNEA ION / 1 1 ' , _ - .-- ._ i i" ' .� II 4.. ,----- PROPERTY LiNB - .� `-_ i. ..._ ..- f _ '- - i / -,- v " LI 9 A >5 = ; -- -- - ; i �' t = 3O / ((rr .... - \ ��, ._ice Actual Flow De th at Q25 . i �-- .� f�L I / 1 ( �.�-.^ ` [l /� �-� % r' _ i r \ \ ' 1'JRAI ��Ll, / i _ `. �i / Tre emidalDltchCa ad ,. `�,. -.--._ - .-'• : _... --. •...' : � �, � !t t! -- -.. ._.__ - _. _.___ \\ __. Roughness coeffent, n (W stew net) 0 033 ` 1` - ( _ / -E - I?I-\)), I ;! _%- DITCH I (BA -- A ,� s�v n r s a ov° • / % _ W/ N. ANRICAN S75 I �/ _._-_ _- __ �,R PNII Ditch de th R Actrral a�S7di _ - Ditchbottomwidth 2.00 / / / - _._-� / �_..__ f - - - 99 �- EQUAL ,-DITCH LINF..R r �� Ditch side slopes (x:1) 3 - :* _ / / t __. _ _ - _ - - -- v, Crossaectlonalerea(s4___ ... 2.89 6 CHAIN LINK FENCING .,. r ---_._..____...-- I f .' ,, ,, _ / , _- -,-. Ditch flow scaral cis ': 22.88 ------ T- -_ -- _. --.------ �/ _ JJ CCK DAM AR ND NIGH : WALK AREA ----- i I ! y- . .. i... "- .,.­ �` OU , i - r . tTYP. 10� ,(3.C,) IT , . _- _ R T r % BILLY � � B T MA � ` - ._ - , - tTYPICA) �' _ . _ , r } _. _ - -- ' , -_ _� i : - _ % / _r ...i - / - / / ._ I; // f ` . l - . � 1 389 98 6021 B ILLY MA G E MATNI - i i , . x \ / Actual Fbw Depth at Q25/ �,. I l ! r f r / ':: r.. � , ! / Tra ezoidel Ditch Ce ad DB 881 PG 538 r- I ( / r \'` �_ ram" / ,� / _._... I ` J / r - r` ` ` Ro s coelicrlt n w4atrew ne 0.033 \ / u�nea ( _ _ I HAUL ROAD - �\\-00._. / % ____r[�Slope (Rrt) 9.7% 4807 418E : % r _ _ - Pf EVlou . / I I� (7-_ �/ Ditch depth (R) Actual 0 amb - I %, ✓' .�f/r�,' r:'f t ,, \ i p I - C AR15A / - j1Ditchbortomwidfh(R, 2.00 (ADJOINER) �' .'` . ` -' �1. ,A�/­".. , ­1-� �1.I 1".­, , S, /' r I Dltchsideslo tie x:1 3 \\ �- ` -- - //rir 1 ,� --- Cross sectional areas 2.ei - " ; r �� + -, _ _- % !i,"- , ' .,'','j, \�. (0 1 v - - - - i - r- DitchRowachral cis 22,88 i . /U�c� .... r , I .f' 'r _, r DIS I 1 \ \ - -- - . -.---� i 1 r 14 -._ -- i HA ' ' 1� AD ' r UL O ' _ - - - , �J PER�VILT TIVIT�' _ --_ . A 25 UNDISTURBED _...� - � ' f \ \ `;'\ 1 i - . - -- - / _ -r FRI 4.1�1 ACRE°S .-. t �(� �``� } I I I -\- T , IVIfiY , �, - BUF Actual Fbw Depth at 025 , ra z I i h a aci ) "� I - T oida D tc C _ 1 � Roughness coeftcrx, n (wr straw net o.033 4 . �. _ , , i � ( \ r Slo" IHR : 2.8% ; ___ ! pe _ ._.. . F 1 -11­I,1/-,;I1) ­, ", " I' f.,--..,'­ .. 1". � -I ,.�V, Z I1..­.r-.I... . s Ditch depth (R) Actual 0.8f2 f a > . .- Ditch bottom Math (n) ; 1.00 � v -- I CH "I (BASH -_:. - } , I 1 /� ' 'r / i Ditch side slopes (x 1) 3 , ; \\ ;, EXCAVAfiION ARF�4' } TE P AIRY W(�STEPiLES , INI 1 ;''` ;' l Cross sectional area (SO NIj -\1 , I I 1 .,I I I 2.10 ---.11005 ` / . r I W/ N. AMB21CAN s75._. f ' .' ACRE 1 V S F OVEi "DEN �° Ditch Row actual cis 8.48 _" . -'� \ OR EQUAL DITCH I. . -- ` - _ .,. , .. I � ..11 1 - t 1.22 ACRES , 00 v T r � TYI B _ i _ . - / I HAUL RO - - - NgAf� rr / / ; r - A RE _ . \ 1 . r ; _� i 35 O C _ .. 1 , r I I s _. I. �.L.I,.IL. Z ,I . "" .� .Ir 11I-_" \I 1 1" -1, ),, 1 r _ I _ } 1 i , r 1 1 -,I .I- —,;. -1.e,1j.--.'.- - . I--..- .—.- I.-.1,-..,I, . . ,I -. .. UNNAMED. TR .�UTAP.`Y DRA NAGS Actual Fbw Depth at 025 . I ( _ ` _ - Tra ezoldalDltchCa ac - ` v AREA-'- PNI 2A ASIN� � - tt CNA LINK CIN /' \ - ,- I Rougtnesscoeffontn(w/stowlet) 0.033 --,- ... r -. -i ..\ --.._. xl2 X r f FISHING CREEK, � I _ �0 5, 6 PEEP, a f §b NR i 5.2% , --- • / (, ; • 6.63 ACRE '� N, BEN G _` I C ,. Oitch depth (R) Actual 1�5.6§i ., ,= , ,� ,, r • � -- _ ____. _- J _.,.._ _ _,, -' - , _ ! I - 24 Cn� RISER, •. 1 � AROUN6 NIGH � WALL AREA / n�.. Ditch bottom width (ft) 1.00 , - -. 4 FAIRCLO SKIMMER ` "' j , - - "' r -- / r Ditch aide slopes (x_,, ` ---r_ (TYPICAL) 3 11 t - -- WITH 3 DI ARGE /, ! Crosa-sectionalarea(sQ 6 CHAIN LINK FENCING Ditch lbw actual (cia i 8.48 `- ! / r I s I-?1�UL ROAD ''`�, �, r/ ' r / - AROUND NIGH WALL AREA � .,.. I 's: �, / / _....__ - \ . ROPLPTY' LINE � /, ; / / (TYPICAL) I 31109 ACR (..�I , .. ._ _ rr; �I_E / t , AdualFbwDe atQ25 r Hi UA I _ Ir ) N a _ 11�� MAT S Q RUES ; - Tra ezoidal Ditch C d ,' ET / UN AMED RI Rougfnesseoetlent,n(w4strawnet) 0.033 y j - -31.109 ACRES 1 PROTECTION 41 ! Sb tuft 9.7% -- . p�( - _ - _ -- FI If� RE , �1 EK , N �G C r. ., i 24 CnnP ;. � _ � I Drtchdepth(R)Actual I tlsgi - F� , �, r 1 ::, ,. (SEE DETAIL) \ Ditchtwttomwrdth(R) 2.00 ;` a` ,' , .,.. ' !II/, ./,.­'. .)I . II. ,,.-., "/ .­ /...­,­..4 /..,,,1­// ,- .1,.- '1I/,-­ -I,7­ _ 2.0� - ') 1/' .- PROPERT Y LINE Ditch sidesbpes(xa) 1 3 ;:� � `. _-, `. 1` \. ,,- ­, Dteh ttL (BO9k1 s�2) ( _-.. Cross sectional area (so 4.61 �. r (• / - �i _ ,,x. , j - DIT - _ CH _BASIN �2) 1� Ditchlbwactual cta 44,77 (k J� WITH CREEK) _ 1 f/'.-.-/). 4I -/­I/I"1 - '.. . , "- _ 1 �; : - t 5 ,° \ / - _. - a \ �, `\ BASIN `' >;2 -- TAB B _., -` - 4 � OR EOUAL DITCH L I .- . y - _- .__- ... - _ I II .I1-' ..i­)-IL.. 11\ _-,�.I-- .-I,I-F. !­-I1 .,_- "..1I ­"N ­ y­... 1, . �� _­I ­ ­­ - I1\. - '� ...90' x1�5' x7' Dom, DIcCyAR �,. ING5 ASIN f', L I - . ' (i !! - Pi - 1. / ' 4 i 3o CW RISER, : WA ` $ PROCESSING AREA . _ ! r �: F�AIRCLOTH SKI ) (STOW CO-l" NG/WASHING) _ _ 1 ..._ ®0 25' UNDISTURBED MINING %/ WIfH 4' IDISCHA 2GE 2.76 ACRES / t; ' 1 � & -- _ _ �. 25 UNDISTURBED MINING - & PERMIT CTIVITY ,� \N, i _ - ,��` ,i 6, ACTIVITY Mov�Aal.e' *SE ST ® -. F' ERMIrt l BUFFER ,, 4.17 ACRES , / �I > WASHNVG wP o , . _ , CRIES . BUFFER. •-� 4.17 A ... I / I. __ A _ I � \ , �+ BUTARY' , � 4 r a ` 24' CMP It ` f 1 L U AMED TRI p 50' LAND DISTURBA C_ E . AND/ -- _ _ - -- - • 3.0% - FISHING CREEK __ - NATUfAL I�VATE COURSE. _ _., 4 ,;­- �Z 1-.""- ­', _ -:: ,...-_ - l .. /,. , r UNDISTURBE BUFFER 3o CMP 1 . ,. / 0. 2 ACRES • �:o� �, ' / - 1 6"\l­rr J _- ._ . N• 50' L ND DISTURBANCE AND 1 , , -'- N AT AL ,, WATT , COURSE ; /' OUTLET _ � PROTECTION tt2 r / ' t ,, � • � `1 ri 7 . _ \ UNDIS ' URBED 'B FER �, (SEE ` DETAIL) i / L , It / , BED _' � 0.82 .ORES j .., t I FO _.. EXISTING ,FAR , POND;' TO B i I {) __ . PROPERTY LINE _ , � / / I�, WATER uOUR I L FOB STONE I�� sTocILE YARD EXI SWING - : , / CLAD. / (RUNS..WITH CREEK) / \ WASHING PRO ESS -VIA PUMP �� 2.43 ACRES / CULVERT ,, ' ��B i . ` / , . / /• DITCH 39I (BASH 43 - . ' i ~ \38 1�T. I T.,� REiV1AIN �c:...- -."- OUT /��w/ N. ANERICAN r f r ,.% G jd EC ION #3 ;r , PI . T % / OR EQUAL DITCH L 1 M ! (SEE DETAIL) = / f DRAINAGE , // , D TRIBUNARY , _ / I �/ __� - ( . . �c. i / �� ' �' � ARE PNi � i / � �`\\ . Ci(:ISTING' r / i ` / 3.17 ACRES ` DNING CREEK - t � CU�VERT'S ,,� 1 � ' / , BAs�v n3 j MATNIS SON ° GRADING - • / f 40'x81'x4'DEER / \ > B - D p " - , " J I , 1 - B 87 PG 36 - __ __-_ �� sr r DEJ 753 cn/► RI -' 1 i WITH 2 D RGE I ' 1- .._ _, IB CMP - I , ! 3897-98-6( ,- _ . ; 1 \ 30.295 ACRES I • 2.0% /1 6,�� I I JCJINEI ,,�. PROPossr _ ( (AD / ,`sCALEI-�r�usE '; . -4, ' DITCH n2 333) \ , BILLY E MAGGIE. MATHIS DB 881 PG ' 538 - 4807-18-4186 i (ADJOINER�� i r =Y &� )i IC= i + I f ' . . 1 , . " , ­ " , I 1 . " - " I ­ I I I . . - I ) ­ P * . . - . " - ­ w/ S76 / ti � I.� r OR EQUAL P Lmw l / , r . / /\ \r ._ . \ t / � / EXISTI ,\� - T , • /� / , / j / .­Z.. " 1 \ i / -„/. . .01�`' -_ - / 7� f ( rj/ � a / , - . i _ r ( / ) ( I i i .1..- MINE AREA SUMMARY Rp 25Runoff Flow cis 86 2. Tra zoidal Ditch Ca aci Roughness coelAdent, n (wl straw net) t §tope (MR) . - - Ditch depth (R) Ditch bottom wldlh {R)-I. r Pitch aide slopes (0). Cross eectlonal area (so . 18.00 Ditch Row capacity (cis) 482.30 Ce ed > Runoff i II 25- Rutort Flow cft 22.88 :IV. ... Trapezoidal Ditch Ca ad Roughness coe8ldent, n (w/ straw net) §lope (R/R) - Ditch depth (It) Ditch bottom wldlh (ft)- . Dltchsids slopes (x i) Cross eeotlonel area js' 16.00 Ditch Row cepscity (cis) 229.24 Ce aci> Runoff t9 25- Runof Flow cis 22.86 Trapezoidal Ditch Ca aci Roughness coef dent, n (w4 straw net) , Slope (") Ditch depth (R) _ - - Ditch Ditch bottom width (R) 0 ' Ditch side slopes (x:1) _ �� e I rea a 16.00 Cross Sta (i) Ditch flow eepaclty (cis) 237.99 Oe ecl > Runoff WA 25 Runof Flow cis 8.48 Tra oidal Ditch Ca aci Roughness coefficient, n (w/ straw net) lj Slope (1t/R) 4 Ditch depth (R) i-, d Ditch bottom width (it) I •1 d Ditch side slopes (x:1) zla. Wry Cross sectional area (sf) 4.00 Ditch flow capacity (cis) 20.14 Ca aci > Runoff +%E� f. Roughnesscoefficient,n(w/straw net) ':i,- Slope (ftrn) Ditch depth (R) fJ0 Ditch bottom width (tt) i' (I�6 ,., Ditch side slopes (x:1) 1 Cross sectional area Of) i 4.00 Ditch flow capacity (erg) { 27 44 Capacity>Runof Ls' Wl ' n \;a ;; 25- RunofFbw cis 44.77 Trapezoidal Ditch Ca aci Roughnesscoefflclent,n(w/strawnet) . 3 Slope (R/R) °A Ditch depth (R) , -00 Ditch bottom width (fl) '� .6 Ditch side slopes (x 1) . ' Cross sectional area (ef) 16 00 Ditch flow capacity (cis) 237.99 Ca acf > Runoff � to . I, " 1 ., ) .O 1, /1r. " ( - 1"1 - . -r..r cf- 1,1�t,1 I I-I - - r ' " I. . ",* I'l .1 / . _.N *) � ,-­ I Z-I ,­-- - -- I _.1I­/.. . r1' 1I I, . .L,, ," , `1`1/4.I1,1"­41) �.'­� ". . . ," -,/' JII ....r ` - ...._ Actual F a m st 025 ,I..--­�)\'-­D8­ ­ , ­1, .)I -.­ .)- i .I ., .-G G"I /­ - ,­, /- 1/ E�-!­ .. -1 ...') ­"­..6! I. ) ,.../ I-",­1.­ /-I-I .1­ ­/ "—,-�./.r/S.-..­1­.--..".­- . `1-).-1I.I,.1.-..-,.1 I 1. / 1 a"/-." . r. \­" . ') I. 1II i. Ir rlI i tow D %'' , I , _� ,-SIT .. �.� - ,r Trapezoidal Ditch Ca aci , __ t - - ;- - ` 1 ` I `N ----- ---_. Roughness coef crvt, n (wl stew neq . _ ._. . .._. - f /J , / �• - _-- -'---- 0033 ,, AREA f NI-•IB f y_ _ ._. __. _ .._ L VE 'r MR GhAC O Sloe 7 P O. 2 .0% Ditch de fh R) _ d _ 6 400 +� 3.9 E`J 1 �, - . _. p .( -_ , .. _ MR GRACE LOVE /' I 8 ,ACf� 5 Ditch bottom width 3.f10 ,_ - _. -,-- f� / (,� DB 26� PG 443- .--- - - 1 Ditc. ti d es (x 1). _ 3 -' _ - - - t _ - ---- -� f 4807 •.04 7828 ,j �� 25' U�IDI T REED I MINING " /` ./ / ,:,,• ` '9'745- 633 Cross sectonal area (80 1.82 . -. _.-.. _.. - - ;,. r i / ! -- -- - _ . _. 1-1. _ ;f � ,' Ditdllowedusl cis 19.85 - /� ' / / l�J i / _.(ADJOINER)._ 'OFF=SITE T TIVI , N . (�D JOINERS` _.._ -,l '.- / ,/ 'e I / f E (EMI A� TY ; , .1 ,_ _ -_. t -- A 1F - ,1 . RED PHI-2B OF E / _ -- - _._ 1-ACRES . ���/ 4�17 , ES i � i. ,. __ . ActuN Flow De th at Q25 - .. _ - -. - .. _..- _.._: -_ -_ _ i r iJ � ", ' \� \ r Tre ezoidal Ditch Ce ad 1' r, -~ . 1` ., ,-_..__ - ;- ! \ _ Ro a oo-­I- ­-\--- \ _ , T ' Ditch de R Actual 6:411a I< K 1 V { NV f �R _ .., '41t - - :� \ i pfi O MINE. JGE IT ; OU _ - _=- �. ��+ .L 6/.,iJ IE\ z r 1, Ditchbottomwes(x..I) 3.00 \ NAI LINK FENCING E MINING,` ACTIVITY BOUNDA Y ' - - - - , Ditch side slopes (x:1) 3 •, ` j i _- Croassectlonelarea (eQ � 2.01 ,-. -.; 1'`''., \` r_... - - �__. _ � � /� / , � i • I . - Cros Rowaofaal re 22.8E r '35:CS A-CR S, __ 'AROUND NIGH WALL AREA i 1 r _ - �•' , w S ) I I r (T�'PICAL) r _..._ - _ i � � � DRAH/�GE AREA � � �--r . � r / i - T _ DELNEA ION / 1 1 ' , _ - .-- ._ i i" ' .� II 4.. ,----- PROPERTY LiNB - .� `-_ i. ..._ ..- f _ '- - i / -,- v " LI 9 A >5 = ; -- -- - ; i �' t = 3O / ((rr .... - \ ��, ._ice Actual Flow De th at Q25 . i �-- .� f�L I / 1 ( �.�-.^ ` [l /� �-� % r' _ i r \ \ ' 1'JRAI ��Ll, / i _ `. �i / Tre emidalDltchCa ad ,. `�,. -.--._ - .-'• : _... --. •...' : � �, � !t t! -- -.. ._.__ - _. _.___ \\ __. Roughness coeffent, n (W stew net) 0 033 ` 1` - ( _ / -E - I?I-\)), I ;! _%- DITCH I (BA -- A ,� s�v n r s a ov° • / % _ W/ N. ANRICAN S75 I �/ _._-_ _- __ �,R PNII Ditch de th R Actrral a�S7di _ - Ditchbottomwidth 2.00 / / / - _._-� / �_..__ f - - - 99 �- EQUAL ,-DITCH LINF..R r �� Ditch side slopes (x:1) 3 - :* _ / / t __. _ _ - _ - - -- v, Crossaectlonalerea(s4___ ... 2.89 6 CHAIN LINK FENCING .,. r ---_._..____...-- I f .' ,, ,, _ / , _- -,-. Ditch flow scaral cis ': 22.88 ------ T- -_ -- _. --.------ �/ _ JJ CCK DAM AR ND NIGH : WALK AREA ----- i I ! y- . .. i... "- .,.­ �` OU , i - r . tTYP. 10� ,(3.C,) IT , . _- _ R T r % BILLY � � B T MA � ` - ._ - , - tTYPICA) �' _ . _ , r } _. _ - -- ' , -_ _� i : - _ % / _r ...i - / - / / ._ I; // f ` . l - . � 1 389 98 6021 B ILLY MA G E MATNI - i i , . x \ / Actual Fbw Depth at Q25/ �,. I l ! r f r / ':: r.. � , ! / Tra ezoidel Ditch Ce ad DB 881 PG 538 r- I ( / r \'` �_ ram" / ,� / _._... I ` J / r - r` ` ` Ro s coelicrlt n w4atrew ne 0.033 \ / u�nea ( _ _ I HAUL ROAD - �\\-00._. / % ____r[�Slope (Rrt) 9.7% 4807 418E : % r _ _ - Pf EVlou . / I I� (7-_ �/ Ditch depth (R) Actual 0 amb - I %, ✓' .�f/r�,' r:'f t ,, \ i p I - C AR15A / - j1Ditchbortomwidfh(R, 2.00 (ADJOINER) �' .'` . ` -' �1. ,A�/­".. , ­1-� �1.I 1".­, , S, /' r I Dltchsideslo tie x:1 3 \\ �- ` -- - //rir 1 ,� --- Cross sectional areas 2.ei - " ; r �� + -, _ _- % !i,"- , ' .,'','j, \�. (0 1 v - - - - i - r- DitchRowachral cis 22,88 i . /U�c� .... r , I .f' 'r _, r DIS I 1 \ \ - -- - . -.---� i 1 r 14 -._ -- i HA ' ' 1� AD ' r UL O ' _ - - - , �J PER�VILT TIVIT�' _ --_ . A 25 UNDISTURBED _...� - � ' f \ \ `;'\ 1 i - . - -- - / _ -r FRI 4.1�1 ACRE°S .-. t �(� �``� } I I I -\- T , IVIfiY , �, - BUF Actual Fbw Depth at 025 , ra z I i h a aci ) "� I - T oida D tc C _ 1 � Roughness coeftcrx, n (wr straw net o.033 4 . �. _ , , i � ( \ r Slo" IHR : 2.8% ; ___ ! pe _ ._.. . F 1 -11­I,1/-,;I1) ­, ", " I' f.,--..,'­ .. 1". � -I ,.�V, Z I1..­.r-.I... . s Ditch depth (R) Actual 0.8f2 f a > . .- Ditch bottom Math (n) ; 1.00 � v -- I CH "I (BASH -_:. - } , I 1 /� ' 'r / i Ditch side slopes (x 1) 3 , ; \\ ;, EXCAVAfiION ARF�4' } TE P AIRY W(�STEPiLES , INI 1 ;''` ;' l Cross sectional area (SO NIj -\1 , I I 1 .,I I I 2.10 ---.11005 ` / . r I W/ N. AMB21CAN s75._. f ' .' ACRE 1 V S F OVEi "DEN �° Ditch Row actual cis 8.48 _" . -'� \ OR EQUAL DITCH I. . -- ` - _ .,. , .. I � ..11 1 - t 1.22 ACRES , 00 v T r � TYI B _ i _ . - / I HAUL RO - - - NgAf� rr / / ; r - A RE _ . \ 1 . r ; _� i 35 O C _ .. 1 , r I I s _. I. �.L.I,.IL. Z ,I . "" .� .Ir 11I-_" \I 1 1" -1, ),, 1 r _ I _ } 1 i , r 1 1 -,I .I- —,;. -1.e,1j.--.'.- - . I--..- .—.- I.-.1,-..,I, . . ,I -. .. UNNAMED. TR .�UTAP.`Y DRA NAGS Actual Fbw Depth at 025 . I ( _ ` _ - Tra ezoldalDltchCa ac - ` v AREA-'- PNI 2A ASIN� � - tt CNA LINK CIN /' \ - ,- I Rougtnesscoeffontn(w/stowlet) 0.033 --,- ... r -. -i ..\ --.._. xl2 X r f FISHING CREEK, � I _ �0 5, 6 PEEP, a f §b NR i 5.2% , --- • / (, ; • 6.63 ACRE '� N, BEN G _` I C ,. Oitch depth (R) Actual 1�5.6§i ., ,= , ,� ,, r • � -- _ ____. _- J _.,.._ _ _,, -' - , _ ! I - 24 Cn� RISER, •. 1 � AROUN6 NIGH � WALL AREA / n�.. Ditch bottom width (ft) 1.00 , - -. 4 FAIRCLO SKIMMER ` "' j , - - "' r -- / r Ditch aide slopes (x_,, ` ---r_ (TYPICAL) 3 11 t - -- WITH 3 DI ARGE /, ! Crosa-sectionalarea(sQ 6 CHAIN LINK FENCING Ditch lbw actual (cia i 8.48 `- ! / r I s I-?1�UL ROAD ''`�, �, r/ ' r / - AROUND NIGH WALL AREA � .,.. I 's: �, / / _....__ - \ . ROPLPTY' LINE � /, ; / / (TYPICAL) I 31109 ACR (..�I , .. ._ _ rr; �I_E / t , AdualFbwDe atQ25 r Hi UA I _ Ir ) N a _ 11�� MAT S Q RUES ; - Tra ezoidal Ditch C d ,' ET / UN AMED RI Rougfnesseoetlent,n(w4strawnet) 0.033 y j - -31.109 ACRES 1 PROTECTION 41 ! Sb tuft 9.7% -- . p�( - _ - _ -- FI If� RE , �1 EK , N �G C r. ., i 24 CnnP ;. � _ � I Drtchdepth(R)Actual I tlsgi - F� , �, r 1 ::, ,. (SEE DETAIL) \ Ditchtwttomwrdth(R) 2.00 ;` a` ,' , .,.. ' !II/, ./,.­'. .)I . II. ,,.-., "/ .­ /...­,­..4 /..,,,1­// ,- .1,.- '1I/,-­ -I,7­ _ 2.0� - ') 1/' .- PROPERT Y LINE Ditch sidesbpes(xa) 1 3 ;:� � `. _-, `. 1` \. ,,- ­, Dteh ttL (BO9k1 s�2) ( _-.. Cross sectional area (so 4.61 �. r (• / - �i _ ,,x. , j - DIT - _ CH _BASIN �2) 1� Ditchlbwactual cta 44,77 (k J� WITH CREEK) _ 1 f/'.-.-/). 4I -/­I/I"1 - '.. . , "- _ 1 �; : - t 5 ,° \ / - _. - a \ �, `\ BASIN `' >;2 -- TAB B _., -` - 4 � OR EOUAL DITCH L I .- . y - _- .__- ... - _ I II .I1-' ..i­)-IL.. 11\ _-,�.I-- .-I,I-F. !­-I1 .,_- "..1I ­"N ­ y­... 1, . �� _­I ­ ­­ - I1\. - '� ...90' x1�5' x7' Dom, DIcCyAR �,. ING5 ASIN f', L I - . ' (i !! - Pi - 1. / ' 4 i 3o CW RISER, : WA ` $ PROCESSING AREA . _ ! r �: F�AIRCLOTH SKI ) (STOW CO-l" NG/WASHING) _ _ 1 ..._ ®0 25' UNDISTURBED MINING %/ WIfH 4' IDISCHA 2GE 2.76 ACRES / t; ' 1 � & -- _ _ �. 25 UNDISTURBED MINING - & PERMIT CTIVITY ,� \N, i _ - ,��` ,i 6, ACTIVITY Mov�Aal.e' *SE ST ® -. F' ERMIrt l BUFFER ,, 4.17 ACRES , / �I > WASHNVG wP o , . _ , CRIES . BUFFER. •-� 4.17 A ... I / I. __ A _ I � \ , �+ BUTARY' , � 4 r a ` 24' CMP It ` f 1 L U AMED TRI p 50' LAND DISTURBA C_ E . AND/ -- _ _ - -- - • 3.0% - FISHING CREEK __ - NATUfAL I�VATE COURSE. _ _., 4 ,;­- �Z 1-.""- ­', _ -:: ,...-_ - l .. /,. , r UNDISTURBE BUFFER 3o CMP 1 . ,. / 0. 2 ACRES • �:o� �, ' / - 1 6"\l­rr J _- ._ . N• 50' L ND DISTURBANCE AND 1 , , -'- N AT AL ,, WATT , COURSE ; /' OUTLET _ � PROTECTION tt2 r / ' t ,, � • � `1 ri 7 . _ \ UNDIS ' URBED 'B FER �, (SEE ` DETAIL) i / L , It / , BED _' � 0.82 .ORES j .., t I FO _.. EXISTING ,FAR , POND;' TO B i I {) __ . PROPERTY LINE _ , � / / I�, WATER uOUR I L FOB STONE I�� sTocILE YARD EXI SWING - : , / CLAD. / (RUNS..WITH CREEK) / \ WASHING PRO ESS -VIA PUMP �� 2.43 ACRES / CULVERT ,, ' ��B i . ` / , . / /• DITCH 39I (BASH 43 - . ' i ~ \38 1�T. I T.,� REiV1AIN �c:...- -."- OUT /��w/ N. ANERICAN r f r ,.% G jd EC ION #3 ;r , PI . T % / OR EQUAL DITCH L 1 M ! (SEE DETAIL) = / f DRAINAGE , // , D TRIBUNARY , _ / I �/ __� - ( . . �c. i / �� ' �' � ARE PNi � i / � �`\\ . Ci(:ISTING' r / i ` / 3.17 ACRES ` DNING CREEK - t � CU�VERT'S ,,� 1 � ' / , BAs�v n3 j MATNIS SON ° GRADING - • / f 40'x81'x4'DEER / \ > B - D p " - , " J I , 1 - B 87 PG 36 - __ __-_ �� sr r DEJ 753 cn/► RI -' 1 i WITH 2 D RGE I ' 1- .._ _, IB CMP - I , ! 3897-98-6( ,- _ . ; 1 \ 30.295 ACRES I • 2.0% /1 6,�� I I JCJINEI ,,�. PROPossr _ ( (AD / ,`sCALEI-�r�usE '; . -4, ' DITCH n2 333) \ , BILLY E MAGGIE. MATHIS DB 881 PG ' 538 - 4807-18-4186 i (ADJOINER�� i r =Y &� )i IC= i + I f ' . . 1 , . " , ­ " , I 1 . " - " I ­ I I I . . - I ) ­ P * . . - . " - ­ w/ S76 / ti � I.� r OR EQUAL P Lmw l / , r . / /\ \r ._ . \ t / � / EXISTI ,\� - T , • /� / , / j / .­Z.. " 1 \ i / -„/. . .01�`' -_ - / 7� f ( rj/ � a / , - . i _ r ( / ) ( I i i .1..- MINE AREA SUMMARY 25 Runof Flow cis 8.48 Tra oidal Ditch Ca aci Roughness coefficient, n (w/ straw net) lj Slope (1t/R) 4 Ditch depth (R) i-, d Ditch bottom width (it) I •1 d Ditch side slopes (x:1) zla. Wry Cross sectional area (sf) 4.00 Ditch flow capacity (cis) 20.14 Ca aci > Runoff +%E� f. Roughnesscoefficient,n(w/straw net) ':i,- Slope (ftrn) Ditch depth (R) fJ0 Ditch bottom width (tt) i' (I�6 ,., Ditch side slopes (x:1) 1 Cross sectional area Of) i 4.00 Ditch flow capacity (erg) { 27 44 Capacity>Runof Ls' Wl ' n \;a ;; 25- RunofFbw cis 44.77 Trapezoidal Ditch Ca aci Roughnesscoefflclent,n(w/strawnet) . 3 Slope (R/R) °A Ditch depth (R) , -00 Ditch bottom width (fl) '� .6 Ditch side slopes (x 1) . ' Cross sectional area (ef) 16 00 Ditch flow capacity (cis) 237.99 Ca acf > Runoff � to . I, " 1 ., ) .O 1, /1r. " ( - 1"1 - . -r..r cf- 1,1�t,1 I I-I - - r ' " I. . ",* I'l .1 / . _.N *) � ,-­ I Z-I ,­-- - -- I _.1I­/.. . r1' 1I I, . .L,, ," , `1`1/4.I1,1"­41) �.'­� ". . . ," -,/' JII ....r ` - ...._ Actual F a m st 025 ,I..--­�)\'-­D8­ ­ , ­1, .)I -.­ .)- i .I ., .-G G"I /­ - ,­, /- 1/ E�-!­ .. -1 ...') ­"­..6! I. ) ,.../ I-",­1.­ /-I-I .1­ ­/ "—,-�./.r/S.-..­1­.--..".­- . `1-).-1I.I,.1.-..-,.1 I 1. / 1 a"/-." . r. \­" . ') I. 1II i. Ir rlI i tow D %'' , I , _� ,-SIT .. �.� - ,r Trapezoidal Ditch Ca aci , __ t - - ;- - ` 1 ` I `N ----- ---_. Roughness coef crvt, n (wl stew neq . _ ._. . .._. - f /J , / �• - _-- -'---- 0033 ,, AREA f NI-•IB f y_ _ ._. __. _ .._ L VE 'r MR GhAC O Sloe 7 P O. 2 .0% Ditch de fh R) _ d _ 6 400 +� 3.9 E`J 1 �, - . _. p .( -_ , .. _ MR GRACE LOVE /' I 8 ,ACf� 5 Ditch bottom width 3.f10 ,_ - _. -,-- f� / (,� DB 26� PG 443- .--- - - 1 Ditc. ti d es (x 1). _ 3 -' _ - - - t _ - ---- -� f 4807 •.04 7828 ,j �� 25' U�IDI T REED I MINING " /` ./ / ,:,,• ` '9'745- 633 Cross sectonal area (80 1.82 . -. _.-.. _.. - - ;,. r i / ! -- -- - _ . _. 1-1. _ ;f � ,' Ditdllowedusl cis 19.85 - /� ' / / l�J i / _.(ADJOINER)._ 'OFF=SITE T TIVI , N . (�D JOINERS` _.._ -,l '.- / ,/ 'e I / f E (EMI A� TY ; , .1 ,_ _ -_. t -- A 1F - ,1 . RED PHI-2B OF E / _ -- - _._ 1-ACRES . ���/ 4�17 , ES i � i. ,. __ . ActuN Flow De th at Q25 - .. _ - -. - .. _..- _.._: -_ -_ _ i r iJ � ", ' \� \ r Tre ezoidal Ditch Ce ad 1' r, -~ . 1` ., ,-_..__ - ;- ! \ _ Ro a oo-­I- ­-\--- \ _ , T ' Ditch de R Actual 6:411a I< K 1 V { NV f �R _ .., '41t - - :� \ i pfi O MINE. JGE IT ; OU _ - _=- �. ��+ .L 6/.,iJ IE\ z r 1, Ditchbottomwes(x..I) 3.00 \ NAI LINK FENCING E MINING,` ACTIVITY BOUNDA Y ' - - - - , Ditch side slopes (x:1) 3 •, ` j i _- Croassectlonelarea (eQ � 2.01 ,-. -.; 1'`''., \` r_... - - �__. _ � � /� / , � i • I . - Cros Rowaofaal re 22.8E r '35:CS A-CR S, __ 'AROUND NIGH WALL AREA i 1 r _ - �•' , w S ) I I r (T�'PICAL) r _..._ - _ i � � � DRAH/�GE AREA � � �--r . � r / i - T _ DELNEA ION / 1 1 ' , _ - .-- ._ i i" ' .� II 4.. ,----- PROPERTY LiNB - .� `-_ i. ..._ ..- f _ '- - i / -,- v " LI 9 A >5 = ; -- -- - ; i �' t = 3O / ((rr .... - \ ��, ._ice Actual Flow De th at Q25 . i �-- .� f�L I / 1 ( �.�-.^ ` [l /� �-� % r' _ i r \ \ ' 1'JRAI ��Ll, / i _ `. �i / Tre emidalDltchCa ad ,. `�,. -.--._ - .-'• : _... --. •...' : � �, � !t t! -- -.. ._.__ - _. _.___ \\ __. Roughness coeffent, n (W stew net) 0 033 ` 1` - ( _ / -E - I?I-\)), I ;! _%- DITCH I (BA -- A ,� s�v n r s a ov° • / % _ W/ N. ANRICAN S75 I �/ _._-_ _- __ �,R PNII Ditch de th R Actrral a�S7di _ - Ditchbottomwidth 2.00 / / / - _._-� / �_..__ f - - - 99 �- EQUAL ,-DITCH LINF..R r �� Ditch side slopes (x:1) 3 - :* _ / / t __. _ _ - _ - - -- v, Crossaectlonalerea(s4___ ... 2.89 6 CHAIN LINK FENCING .,. r ---_._..____...-- I f .' ,, ,, _ / , _- -,-. Ditch flow scaral cis ': 22.88 ------ T- -_ -- _. --.------ �/ _ JJ CCK DAM AR ND NIGH : WALK AREA ----- i I ! y- . .. i... "- .,.­ �` OU , i - r . tTYP. 10� ,(3.C,) IT , . _- _ R T r % BILLY � � B T MA � ` - ._ - , - tTYPICA) �' _ . _ , r } _. _ - -- ' , -_ _� i : - _ % / _r ...i - / - / / ._ I; // f ` . l - . � 1 389 98 6021 B ILLY MA G E MATNI - i i , . x \ / Actual Fbw Depth at Q25/ �,. I l ! r f r / ':: r.. � , ! / Tra ezoidel Ditch Ce ad DB 881 PG 538 r- I ( / r \'` �_ ram" / ,� / _._... I ` J / r - r` ` ` Ro s coelicrlt n w4atrew ne 0.033 \ / u�nea ( _ _ I HAUL ROAD - �\\-00._. / % ____r[�Slope (Rrt) 9.7% 4807 418E : % r _ _ - Pf EVlou . / I I� (7-_ �/ Ditch depth (R) Actual 0 amb - I %, ✓' .�f/r�,' r:'f t ,, \ i p I - C AR15A / - j1Ditchbortomwidfh(R, 2.00 (ADJOINER) �' .'` . ` -' �1. ,A�/­".. , ­1-� �1.I 1".­, , S, /' r I Dltchsideslo tie x:1 3 \\ �- ` -- - //rir 1 ,� --- Cross sectional areas 2.ei - " ; r �� + -, _ _- % !i,"- , ' .,'','j, \�. (0 1 v - - - - i - r- DitchRowachral cis 22,88 i . /U�c� .... r , I .f' 'r _, r DIS I 1 \ \ - -- - . -.---� i 1 r 14 -._ -- i HA ' ' 1� AD ' r UL O ' _ - - - , �J PER�VILT TIVIT�' _ --_ . A 25 UNDISTURBED _...� - � ' f \ \ `;'\ 1 i - . - -- - / _ -r FRI 4.1�1 ACRE°S .-. t �(� �``� } I I I -\- T , IVIfiY , �, - BUF Actual Fbw Depth at 025 , ra z I i h a aci ) "� I - T oida D tc C _ 1 � Roughness coeftcrx, n (wr straw net o.033 4 . �. _ , , i � ( \ r Slo" IHR : 2.8% ; ___ ! pe _ ._.. . F 1 -11­I,1/-,;I1) ­, ", " I' f.,--..,'­ .. 1". � -I ,.�V, Z I1..­.r-.I... . s Ditch depth (R) Actual 0.8f2 f a > . .- Ditch bottom Math (n) ; 1.00 � v -- I CH "I (BASH -_:. - } , I 1 /� ' 'r / i Ditch side slopes (x 1) 3 , ; \\ ;, EXCAVAfiION ARF�4' } TE P AIRY W(�STEPiLES , INI 1 ;''` ;' l Cross sectional area (SO NIj -\1 , I I 1 .,I I I 2.10 ---.11005 ` / . r I W/ N. AMB21CAN s75._. f ' .' ACRE 1 V S F OVEi "DEN �° Ditch Row actual cis 8.48 _" . -'� \ OR EQUAL DITCH I. . -- ` - _ .,. , .. I � ..11 1 - t 1.22 ACRES , 00 v T r � TYI B _ i _ . - / I HAUL RO - - - NgAf� rr / / ; r - A RE _ . \ 1 . r ; _� i 35 O C _ .. 1 , r I I s _. I. �.L.I,.IL. Z ,I . "" .� .Ir 11I-_" \I 1 1" -1, ),, 1 r _ I _ } 1 i , r 1 1 -,I .I- —,;. -1.e,1j.--.'.- - . I--..- .—.- I.-.1,-..,I, . . ,I -. .. UNNAMED. TR .�UTAP.`Y DRA NAGS Actual Fbw Depth at 025 . I ( _ ` _ - Tra ezoldalDltchCa ac - ` v AREA-'- PNI 2A ASIN� � - tt CNA LINK CIN /' \ - ,- I Rougtnesscoeffontn(w/stowlet) 0.033 --,- ... r -. -i ..\ --.._. xl2 X r f FISHING CREEK, � I _ �0 5, 6 PEEP, a f §b NR i 5.2% , --- • / (, ; • 6.63 ACRE '� N, BEN G _` I C ,. Oitch depth (R) Actual 1�5.6§i ., ,= , ,� ,, r • � -- _ ____. _- J _.,.._ _ _,, -' - , _ ! I - 24 Cn� RISER, •. 1 � AROUN6 NIGH � WALL AREA / n�.. Ditch bottom width (ft) 1.00 , - -. 4 FAIRCLO SKIMMER ` "' j , - - "' r -- / r Ditch aide slopes (x_,, ` ---r_ (TYPICAL) 3 11 t - -- WITH 3 DI ARGE /, ! Crosa-sectionalarea(sQ 6 CHAIN LINK FENCING Ditch lbw actual (cia i 8.48 `- ! / r I s I-?1�UL ROAD ''`�, �, r/ ' r / - AROUND NIGH WALL AREA � .,.. I 's: �, / / _....__ - \ . ROPLPTY' LINE � /, ; / / (TYPICAL) I 31109 ACR (..�I , .. ._ _ rr; �I_E / t , AdualFbwDe atQ25 r Hi UA I _ Ir ) N a _ 11�� MAT S Q RUES ; - Tra ezoidal Ditch C d ,' ET / UN AMED RI Rougfnesseoetlent,n(w4strawnet) 0.033 y j - -31.109 ACRES 1 PROTECTION 41 ! Sb tuft 9.7% -- . p�( - _ - _ -- FI If� RE , �1 EK , N �G C r. ., i 24 CnnP ;. � _ � I Drtchdepth(R)Actual I tlsgi - F� , �, r 1 ::, ,. (SEE DETAIL) \ Ditchtwttomwrdth(R) 2.00 ;` a` ,' , .,.. ' !II/, ./,.­'. .)I . II. ,,.-., "/ .­ /...­,­..4 /..,,,1­// ,- .1,.- '1I/,-­ -I,7­ _ 2.0� - ') 1/' .- PROPERT Y LINE Ditch sidesbpes(xa) 1 3 ;:� � `. _-, `. 1` \. ,,- ­, Dteh ttL (BO9k1 s�2) ( _-.. Cross sectional area (so 4.61 �. r (• / - �i _ ,,x. , j - DIT - _ CH _BASIN �2) 1� Ditchlbwactual cta 44,77 (k J� WITH CREEK) _ 1 f/'.-.-/). 4I -/­I/I"1 - '.. . , "- _ 1 �; : - t 5 ,° \ / - _. - a \ �, `\ BASIN `' >;2 -- TAB B _., -` - 4 � OR EOUAL DITCH L I .- . y - _- .__- ... - _ I II .I1-' ..i­)-IL.. 11\ _-,�.I-- .-I,I-F. !­-I1 .,_- "..1I ­"N ­ y­... 1, . �� _­I ­ ­­ - I1\. - '� ...90' x1�5' x7' Dom, DIcCyAR �,. ING5 ASIN f', L I - . ' (i !! - Pi - 1. / ' 4 i 3o CW RISER, : WA ` $ PROCESSING AREA . _ ! r �: F�AIRCLOTH SKI ) (STOW CO-l" NG/WASHING) _ _ 1 ..._ ®0 25' UNDISTURBED MINING %/ WIfH 4' IDISCHA 2GE 2.76 ACRES / t; ' 1 � & -- _ _ �. 25 UNDISTURBED MINING - & PERMIT CTIVITY ,� \N, i _ - ,��` ,i 6, ACTIVITY Mov�Aal.e' *SE ST ® -. F' ERMIrt l BUFFER ,, 4.17 ACRES , / �I > WASHNVG wP o , . _ , CRIES . BUFFER. •-� 4.17 A ... I / I. __ A _ I � \ , �+ BUTARY' , � 4 r a ` 24' CMP It ` f 1 L U AMED TRI p 50' LAND DISTURBA C_ E . AND/ -- _ _ - -- - • 3.0% - FISHING CREEK __ - NATUfAL I�VATE COURSE. _ _., 4 ,;­- �Z 1-.""- ­', _ -:: ,...-_ - l .. /,. , r UNDISTURBE BUFFER 3o CMP 1 . ,. / 0. 2 ACRES • �:o� �, ' / - 1 6"\l­rr J _- ._ . N• 50' L ND DISTURBANCE AND 1 , , -'- N AT AL ,, WATT , COURSE ; /' OUTLET _ � PROTECTION tt2 r / ' t ,, � • � `1 ri 7 . _ \ UNDIS ' URBED 'B FER �, (SEE ` DETAIL) i / L , It / , BED _' � 0.82 .ORES j .., t I FO _.. EXISTING ,FAR , POND;' TO B i I {) __ . PROPERTY LINE _ , � / / I�, WATER uOUR I L FOB STONE I�� sTocILE YARD EXI SWING - : , / CLAD. / (RUNS..WITH CREEK) / \ WASHING PRO ESS -VIA PUMP �� 2.43 ACRES / CULVERT ,, ' ��B i . ` / , . / /• DITCH 39I (BASH 43 - . ' i ~ \38 1�T. I T.,� REiV1AIN �c:...- -."- OUT /��w/ N. ANERICAN r f r ,.% G jd EC ION #3 ;r , PI . T % / OR EQUAL DITCH L 1 M ! (SEE DETAIL) = / f DRAINAGE , // , D TRIBUNARY , _ / I �/ __� - ( . . �c. i / �� ' �' � ARE PNi � i / � �`\\ . Ci(:ISTING' r / i ` / 3.17 ACRES ` DNING CREEK - t � CU�VERT'S ,,� 1 � ' / , BAs�v n3 j MATNIS SON ° GRADING - • / f 40'x81'x4'DEER / \ > B - D p " - , " J I , 1 - B 87 PG 36 - __ __-_ �� sr r DEJ 753 cn/► RI -' 1 i WITH 2 D RGE I ' 1- .._ _, IB CMP - I , ! 3897-98-6( ,- _ . ; 1 \ 30.295 ACRES I • 2.0% /1 6,�� I I JCJINEI ,,�. PROPossr _ ( (AD / ,`sCALEI-�r�usE '; . -4, ' DITCH n2 333) \ , BILLY E MAGGIE. MATHIS DB 881 PG ' 538 - 4807-18-4186 i (ADJOINER�� i r =Y &� )i IC= i + I f ' . . 1 , . " , ­ " , I 1 . " - " I ­ I I I . . - I ) ­ P * . . - . " - ­ w/ S76 / ti � I.� r OR EQUAL P Lmw l / , r . / /\ \r ._ . \ t / � / EXISTI ,\� - T , • /� / , / j / .­Z.. " 1 \ i / -„/. . .01�`' -_ - / 7� f ( rj/ � a / , - . i _ r ( / ) ( I i i .1..- MINE AREA SUMMARY f. Roughnesscoefficient,n(w/straw net) ':i,- Slope (ftrn) Ditch depth (R) fJ0 Ditch bottom width (tt) i' (I�6 ,., Ditch side slopes (x:1) 1 Cross sectional area Of) i 4.00 Ditch flow capacity (erg) { 27 44 Capacity>Runof Ls' Wl ' n \;a ;; 25- RunofFbw cis 44.77 Trapezoidal Ditch Ca aci Roughnesscoefflclent,n(w/strawnet) . 3 Slope (R/R) °A Ditch depth (R) , -00 Ditch bottom width (fl) '� .6 Ditch side slopes (x 1) . ' Cross sectional area (ef) 16 00 Ditch flow capacity (cis) 237.99 Ca acf > Runoff � to . I, " 1 ., ) .O 1, /1r. " ( - 1"1 - . -r..r cf- 1,1�t,1 I I-I - - r ' " I. . ",* I'l .1 / . _.N *) � ,-­ I Z-I ,­-- - -- I _.1I­/.. . r1' 1I I, . .L,, ," , `1`1/4.I1,1"­41) �.'­� ". . . ," -,/' JII ....r ` - ...._ Actual F a m st 025 ,I..--­�)\'-­D8­ ­ , ­1, .)I -.­ .)- i .I ., .-G G"I /­ - ,­, /- 1/ E�-!­ .. -1 ...') ­"­..6! I. ) ,.../ I-",­1.­ /-I-I .1­ ­/ "—,-�./.r/S.-..­1­.--..".­- . `1-).-1I.I,.1.-..-,.1 I 1. / 1 a"/-." . r. \­" . ') I. 1II i. Ir rlI i tow D %'' , I , _� ,-SIT .. �.� - ,r Trapezoidal Ditch Ca aci , __ t - - ;- - ` 1 ` I `N ----- ---_. Roughness coef crvt, n (wl stew neq . _ ._. . .._. - f /J , / �• - _-- -'---- 0033 ,, AREA f NI-•IB f y_ _ ._. __. _ .._ L VE 'r MR GhAC O Sloe 7 P O. 2 .0% Ditch de fh R) _ d _ 6 400 +� 3.9 E`J 1 �, - . _. p .( -_ , .. _ MR GRACE LOVE /' I 8 ,ACf� 5 Ditch bottom width 3.f10 ,_ - _. -,-- f� / (,� DB 26� PG 443- .--- - - 1 Ditc. ti d es (x 1). _ 3 -' _ - - - t _ - ---- -� f 4807 •.04 7828 ,j �� 25' U�IDI T REED I MINING " /` ./ / ,:,,• ` '9'745- 633 Cross sectonal area (80 1.82 . -. _.-.. _.. - - ;,. r i / ! -- -- - _ . _. 1-1. _ ;f � ,' Ditdllowedusl cis 19.85 - /� ' / / l�J i / _.(ADJOINER)._ 'OFF=SITE T TIVI , N . (�D JOINERS` _.._ -,l '.- / ,/ 'e I / f E (EMI A� TY ; , .1 ,_ _ -_. t -- A 1F - ,1 . RED PHI-2B OF E / _ -- - _._ 1-ACRES . ���/ 4�17 , ES i � i. ,. __ . ActuN Flow De th at Q25 - .. _ - -. - .. _..- _.._: -_ -_ _ i r iJ � ", ' \� \ r Tre ezoidal Ditch Ce ad 1' r, -~ . 1` ., ,-_..__ - ;- ! \ _ Ro a oo-­I- ­-\--- \ _ , T ' Ditch de R Actual 6:411a I< K 1 V { NV f �R _ .., '41t - - :� \ i pfi O MINE. JGE IT ; OU _ - _=- �. ��+ .L 6/.,iJ IE\ z r 1, Ditchbottomwes(x..I) 3.00 \ NAI LINK FENCING E MINING,` ACTIVITY BOUNDA Y ' - - - - , Ditch side slopes (x:1) 3 •, ` j i _- Croassectlonelarea (eQ � 2.01 ,-. -.; 1'`''., \` r_... - - �__. _ � � /� / , � i • I . - Cros Rowaofaal re 22.8E r '35:CS A-CR S, __ 'AROUND NIGH WALL AREA i 1 r _ - �•' , w S ) I I r (T�'PICAL) r _..._ - _ i � � � DRAH/�GE AREA � � �--r . � r / i - T _ DELNEA ION / 1 1 ' , _ - .-- ._ i i" ' .� II 4.. ,----- PROPERTY LiNB - .� `-_ i. ..._ ..- f _ '- - i / -,- v " LI 9 A >5 = ; -- -- - ; i �' t = 3O / ((rr .... - \ ��, ._ice Actual Flow De th at Q25 . i �-- .� f�L I / 1 ( �.�-.^ ` [l /� �-� % r' _ i r \ \ ' 1'JRAI ��Ll, / i _ `. �i / Tre emidalDltchCa ad ,. `�,. -.--._ - .-'• : _... --. •...' : � �, � !t t! -- -.. ._.__ - _. _.___ \\ __. Roughness coeffent, n (W stew net) 0 033 ` 1` - ( _ / -E - I?I-\)), I ;! _%- DITCH I (BA -- A ,� s�v n r s a ov° • / % _ W/ N. ANRICAN S75 I �/ _._-_ _- __ �,R PNII Ditch de th R Actrral a�S7di _ - Ditchbottomwidth 2.00 / / / - _._-� / �_..__ f - - - 99 �- EQUAL ,-DITCH LINF..R r �� Ditch side slopes (x:1) 3 - :* _ / / t __. _ _ - _ - - -- v, Crossaectlonalerea(s4___ ... 2.89 6 CHAIN LINK FENCING .,. r ---_._..____...-- I f .' ,, ,, _ / , _- -,-. Ditch flow scaral cis ': 22.88 ------ T- -_ -- _. --.------ �/ _ JJ CCK DAM AR ND NIGH : WALK AREA ----- i I ! y- . .. i... "- .,.­ �` OU , i - r . tTYP. 10� ,(3.C,) IT , . _- _ R T r % BILLY � � B T MA � ` - ._ - , - tTYPICA) �' _ . _ , r } _. _ - -- ' , -_ _� i : - _ % / _r ...i - / - / / ._ I; // f ` . l - . � 1 389 98 6021 B ILLY MA G E MATNI - i i , . x \ / Actual Fbw Depth at Q25/ �,. I l ! r f r / ':: r.. � , ! / Tra ezoidel Ditch Ce ad DB 881 PG 538 r- I ( / r \'` �_ ram" / ,� / _._... I ` J / r - r` ` ` Ro s coelicrlt n w4atrew ne 0.033 \ / u�nea ( _ _ I HAUL ROAD - �\\-00._. / % ____r[�Slope (Rrt) 9.7% 4807 418E : % r _ _ - Pf EVlou . / I I� (7-_ �/ Ditch depth (R) Actual 0 amb - I %, ✓' .�f/r�,' r:'f t ,, \ i p I - C AR15A / - j1Ditchbortomwidfh(R, 2.00 (ADJOINER) �' .'` . ` -' �1. ,A�/­".. , ­1-� �1.I 1".­, , S, /' r I Dltchsideslo tie x:1 3 \\ �- ` -- - //rir 1 ,� --- Cross sectional areas 2.ei - " ; r �� + -, _ _- % !i,"- , ' .,'','j, \�. (0 1 v - - - - i - r- DitchRowachral cis 22,88 i . /U�c� .... r , I .f' 'r _, r DIS I 1 \ \ - -- - . -.---� i 1 r 14 -._ -- i HA ' ' 1� AD ' r UL O ' _ - - - , �J PER�VILT TIVIT�' _ --_ . A 25 UNDISTURBED _...� - � ' f \ \ `;'\ 1 i - . - -- - / _ -r FRI 4.1�1 ACRE°S .-. t �(� �``� } I I I -\- T , IVIfiY , �, - BUF Actual Fbw Depth at 025 , ra z I i h a aci ) "� I - T oida D tc C _ 1 � Roughness coeftcrx, n (wr straw net o.033 4 . �. _ , , i � ( \ r Slo" IHR : 2.8% ; ___ ! pe _ ._.. . F 1 -11­I,1/-,;I1) ­, ", " I' f.,--..,'­ .. 1". � -I ,.�V, Z I1..­.r-.I... . s Ditch depth (R) Actual 0.8f2 f a > . .- Ditch bottom Math (n) ; 1.00 � v -- I CH "I (BASH -_:. - } , I 1 /� ' 'r / i Ditch side slopes (x 1) 3 , ; \\ ;, EXCAVAfiION ARF�4' } TE P AIRY W(�STEPiLES , INI 1 ;''` ;' l Cross sectional area (SO NIj -\1 , I I 1 .,I I I 2.10 ---.11005 ` / . r I W/ N. AMB21CAN s75._. f ' .' ACRE 1 V S F OVEi "DEN �° Ditch Row actual cis 8.48 _" . -'� \ OR EQUAL DITCH I. . -- ` - _ .,. , .. I � ..11 1 - t 1.22 ACRES , 00 v T r � TYI B _ i _ . - / I HAUL RO - - - NgAf� rr / / ; r - A RE _ . \ 1 . r ; _� i 35 O C _ .. 1 , r I I s _. I. �.L.I,.IL. Z ,I . "" .� .Ir 11I-_" \I 1 1" -1, ),, 1 r _ I _ } 1 i , r 1 1 -,I .I- —,;. -1.e,1j.--.'.- - . I--..- .—.- I.-.1,-..,I, . . ,I -. .. UNNAMED. TR .�UTAP.`Y DRA NAGS Actual Fbw Depth at 025 . I ( _ ` _ - Tra ezoldalDltchCa ac - ` v AREA-'- PNI 2A ASIN� � - tt CNA LINK CIN /' \ - ,- I Rougtnesscoeffontn(w/stowlet) 0.033 --,- ... r -. -i ..\ --.._. xl2 X r f FISHING CREEK, � I _ �0 5, 6 PEEP, a f §b NR i 5.2% , --- • / (, ; • 6.63 ACRE '� N, BEN G _` I C ,. Oitch depth (R) Actual 1�5.6§i ., ,= , ,� ,, r • � -- _ ____. _- J _.,.._ _ _,, -' - , _ ! I - 24 Cn� RISER, •. 1 � AROUN6 NIGH � WALL AREA / n�.. Ditch bottom width (ft) 1.00 , - -. 4 FAIRCLO SKIMMER ` "' j , - - "' r -- / r Ditch aide slopes (x_,, ` ---r_ (TYPICAL) 3 11 t - -- WITH 3 DI ARGE /, ! Crosa-sectionalarea(sQ 6 CHAIN LINK FENCING Ditch lbw actual (cia i 8.48 `- ! / r I s I-?1�UL ROAD ''`�, �, r/ ' r / - AROUND NIGH WALL AREA � .,.. I 's: �, / / _....__ - \ . ROPLPTY' LINE � /, ; / / (TYPICAL) I 31109 ACR (..�I , .. ._ _ rr; �I_E / t , AdualFbwDe atQ25 r Hi UA I _ Ir ) N a _ 11�� MAT S Q RUES ; - Tra ezoidal Ditch C d ,' ET / UN AMED RI Rougfnesseoetlent,n(w4strawnet) 0.033 y j - -31.109 ACRES 1 PROTECTION 41 ! Sb tuft 9.7% -- . p�( - _ - _ -- FI If� RE , �1 EK , N �G C r. ., i 24 CnnP ;. � _ � I Drtchdepth(R)Actual I tlsgi - F� , �, r 1 ::, ,. (SEE DETAIL) \ Ditchtwttomwrdth(R) 2.00 ;` a` ,' , .,.. ' !II/, ./,.­'. .)I . II. ,,.-., "/ .­ /...­,­..4 /..,,,1­// ,- .1,.- '1I/,-­ -I,7­ _ 2.0� - ') 1/' .- PROPERT Y LINE Ditch sidesbpes(xa) 1 3 ;:� � `. _-, `. 1` \. ,,- ­, Dteh ttL (BO9k1 s�2) ( _-.. Cross sectional area (so 4.61 �. r (• / - �i _ ,,x. , j - DIT - _ CH _BASIN �2) 1� Ditchlbwactual cta 44,77 (k J� WITH CREEK) _ 1 f/'.-.-/). 4I -/­I/I"1 - '.. . , "- _ 1 �; : - t 5 ,° \ / - _. - a \ �, `\ BASIN `' >;2 -- TAB B _., -` - 4 � OR EOUAL DITCH L I .- . y - _- .__- ... - _ I II .I1-' ..i­)-IL.. 11\ _-,�.I-- .-I,I-F. !­-I1 .,_- "..1I ­"N ­ y­... 1, . �� _­I ­ ­­ - I1\. - '� ...90' x1�5' x7' Dom, DIcCyAR �,. ING5 ASIN f', L I - . ' (i !! - Pi - 1. / ' 4 i 3o CW RISER, : WA ` $ PROCESSING AREA . _ ! r �: F�AIRCLOTH SKI ) (STOW CO-l" NG/WASHING) _ _ 1 ..._ ®0 25' UNDISTURBED MINING %/ WIfH 4' IDISCHA 2GE 2.76 ACRES / t; ' 1 � & -- _ _ �. 25 UNDISTURBED MINING - & PERMIT CTIVITY ,� \N, i _ - ,��` ,i 6, ACTIVITY Mov�Aal.e' *SE ST ® -. F' ERMIrt l BUFFER ,, 4.17 ACRES , / �I > WASHNVG wP o , . _ , CRIES . BUFFER. •-� 4.17 A ... I / I. __ A _ I � \ , �+ BUTARY' , � 4 r a ` 24' CMP It ` f 1 L U AMED TRI p 50' LAND DISTURBA C_ E . AND/ -- _ _ - -- - • 3.0% - FISHING CREEK __ - NATUfAL I�VATE COURSE. _ _., 4 ,;­- �Z 1-.""- ­', _ -:: ,...-_ - l .. /,. , r UNDISTURBE BUFFER 3o CMP 1 . ,. / 0. 2 ACRES • �:o� �, ' / - 1 6"\l­rr J _- ._ . N• 50' L ND DISTURBANCE AND 1 , , -'- N AT AL ,, WATT , COURSE ; /' OUTLET _ � PROTECTION tt2 r / ' t ,, � • � `1 ri 7 . _ \ UNDIS ' URBED 'B FER �, (SEE ` DETAIL) i / L , It / , BED _' � 0.82 .ORES j .., t I FO _.. EXISTING ,FAR , POND;' TO B i I {) __ . PROPERTY LINE _ , � / / I�, WATER uOUR I L FOB STONE I�� sTocILE YARD EXI SWING - : , / CLAD. / (RUNS..WITH CREEK) / \ WASHING PRO ESS -VIA PUMP �� 2.43 ACRES / CULVERT ,, ' ��B i . ` / , . / /• DITCH 39I (BASH 43 - . ' i ~ \38 1�T. I T.,� REiV1AIN �c:...- -."- OUT /��w/ N. ANERICAN r f r ,.% G jd EC ION #3 ;r , PI . T % / OR EQUAL DITCH L 1 M ! (SEE DETAIL) = / f DRAINAGE , // , D TRIBUNARY , _ / I �/ __� - ( . . �c. i / �� ' �' � ARE PNi � i / � �`\\ . Ci(:ISTING' r / i ` / 3.17 ACRES ` DNING CREEK - t � CU�VERT'S ,,� 1 � ' / , BAs�v n3 j MATNIS SON ° GRADING - • / f 40'x81'x4'DEER / \ > B - D p " - , " J I , 1 - B 87 PG 36 - __ __-_ �� sr r DEJ 753 cn/► RI -' 1 i WITH 2 D RGE I ' 1- .._ _, IB CMP - I , ! 3897-98-6( ,- _ . ; 1 \ 30.295 ACRES I • 2.0% /1 6,�� I I JCJINEI ,,�. PROPossr _ ( (AD / ,`sCALEI-�r�usE '; . -4, ' DITCH n2 333) \ , BILLY E MAGGIE. MATHIS DB 881 PG ' 538 - 4807-18-4186 i (ADJOINER�� i r =Y &� )i IC= i + I f ' . . 1 , . " , ­ " , I 1 . " - " I ­ I I I . . - I ) ­ P * . . - . " - ­ w/ S76 / ti � I.� r OR EQUAL P Lmw l / , r . / /\ \r ._ . \ t / � / EXISTI ,\� - T , • /� / , / j / .­Z.. " 1 \ i / -„/. . .01�`' -_ - / 7� f ( rj/ � a / , - . i _ r ( / ) ( I i i .1..- MINE AREA SUMMARY ' n \;a ;; 25- RunofFbw cis 44.77 Trapezoidal Ditch Ca aci Roughnesscoefflclent,n(w/strawnet) . 3 Slope (R/R) °A Ditch depth (R) , -00 Ditch bottom width (fl) '� .6 Ditch side slopes (x 1) . ' Cross sectional area (ef) 16 00 Ditch flow capacity (cis) 237.99 Ca acf > Runoff � to . I, " 1 ., ) .O 1, /1r. " ( - 1"1 - . -r..r cf- 1,1�t,1 I I-I - - r ' " I. . ",* I'l .1 / . _.N *) � ,-­ I Z-I ,­-- - -- I _.1I­/.. . r1' 1I I, . .L,, ," , `1`1/4.I1,1"­41) �.'­� ". . . ," -,/' JII ....r ` - ...._ Actual F a m st 025 ,I..--­�)\'-­D8­ ­ , ­1, .)I -.­ .)- i .I ., .-G G"I /­ - ,­, /- 1/ E�-!­ .. -1 ...') ­"­..6! I. ) ,.../ I-",­1.­ /-I-I .1­ ­/ "—,-�./.r/S.-..­1­.--..".­- . `1-).-1I.I,.1.-..-,.1 I 1. / 1 a"/-." . r. \­" . ') I. 1II i. Ir rlI i tow D %'' , I , _� ,-SIT .. �.� - ,r Trapezoidal Ditch Ca aci , __ t - - ;- - ` 1 ` I `N ----- ---_. Roughness coef crvt, n (wl stew neq . _ ._. . .._. - f /J , / �• - _-- -'---- 0033 ,, AREA f NI-•IB f y_ _ ._. __. _ .._ L VE 'r MR GhAC O Sloe 7 P O. 2 .0% Ditch de fh R) _ d _ 6 400 +� 3.9 E`J 1 �, - . _. p .( -_ , .. _ MR GRACE LOVE /' I 8 ,ACf� 5 Ditch bottom width 3.f10 ,_ - _. -,-- f� / (,� DB 26� PG 443- .--- - - 1 Ditc. ti d es (x 1). _ 3 -' _ - - - t _ - ---- -� f 4807 •.04 7828 ,j �� 25' U�IDI T REED I MINING " /` ./ / ,:,,• ` '9'745- 633 Cross sectonal area (80 1.82 . -. _.-.. _.. - - ;,. r i / ! -- -- - _ . _. 1-1. _ ;f � ,' Ditdllowedusl cis 19.85 - /� ' / / l�J i / _.(ADJOINER)._ 'OFF=SITE T TIVI , N . (�D JOINERS` _.._ -,l '.- / ,/ 'e I / f E (EMI A� TY ; , .1 ,_ _ -_. t -- A 1F - ,1 . RED PHI-2B OF E / _ -- - _._ 1-ACRES . ���/ 4�17 , ES i � i. ,. __ . ActuN Flow De th at Q25 - .. _ - -. - .. _..- _.._: -_ -_ _ i r iJ � ", ' \� \ r Tre ezoidal Ditch Ce ad 1' r, -~ . 1` ., ,-_..__ - ;- ! \ _ Ro a oo-­I- ­-\--- \ _ , T ' Ditch de R Actual 6:411a I< K 1 V { NV f �R _ .., '41t - - :� \ i pfi O MINE. JGE IT ; OU _ - _=- �. ��+ .L 6/.,iJ IE\ z r 1, Ditchbottomwes(x..I) 3.00 \ NAI LINK FENCING E MINING,` ACTIVITY BOUNDA Y ' - - - - , Ditch side slopes (x:1) 3 •, ` j i _- Croassectlonelarea (eQ � 2.01 ,-. -.; 1'`''., \` r_... - - �__. _ � � /� / , � i • I . - Cros Rowaofaal re 22.8E r '35:CS A-CR S, __ 'AROUND NIGH WALL AREA i 1 r _ - �•' , w S ) I I r (T�'PICAL) r _..._ - _ i � � � DRAH/�GE AREA � � �--r . � r / i - T _ DELNEA ION / 1 1 ' , _ - .-- ._ i i" ' .� II 4.. ,----- PROPERTY LiNB - .� `-_ i. ..._ ..- f _ '- - i / -,- v " LI 9 A >5 = ; -- -- - ; i �' t = 3O / ((rr .... - \ ��, ._ice Actual Flow De th at Q25 . i �-- .� f�L I / 1 ( �.�-.^ ` [l /� �-� % r' _ i r \ \ ' 1'JRAI ��Ll, / i _ `. �i / Tre emidalDltchCa ad ,. `�,. -.--._ - .-'• : _... --. •...' : � �, � !t t! -- -.. ._.__ - _. _.___ \\ __. Roughness coeffent, n (W stew net) 0 033 ` 1` - ( _ / -E - I?I-\)), I ;! _%- DITCH I (BA -- A ,� s�v n r s a ov° • / % _ W/ N. ANRICAN S75 I �/ _._-_ _- __ �,R PNII Ditch de th R Actrral a�S7di _ - Ditchbottomwidth 2.00 / / / - _._-� / �_..__ f - - - 99 �- EQUAL ,-DITCH LINF..R r �� Ditch side slopes (x:1) 3 - :* _ / / t __. _ _ - _ - - -- v, Crossaectlonalerea(s4___ ... 2.89 6 CHAIN LINK FENCING .,. r ---_._..____...-- I f .' ,, ,, _ / , _- -,-. Ditch flow scaral cis ': 22.88 ------ T- -_ -- _. --.------ �/ _ JJ CCK DAM AR ND NIGH : WALK AREA ----- i I ! y- . .. i... "- .,.­ �` OU , i - r . tTYP. 10� ,(3.C,) IT , . _- _ R T r % BILLY � � B T MA � ` - ._ - , - tTYPICA) �' _ . _ , r } _. _ - -- ' , -_ _� i : - _ % / _r ...i - / - / / ._ I; // f ` . l - . � 1 389 98 6021 B ILLY MA G E MATNI - i i , . x \ / Actual Fbw Depth at Q25/ �,. I l ! r f r / ':: r.. � , ! / Tra ezoidel Ditch Ce ad DB 881 PG 538 r- I ( / r \'` �_ ram" / ,� / _._... I ` J / r - r` ` ` Ro s coelicrlt n w4atrew ne 0.033 \ / u�nea ( _ _ I HAUL ROAD - �\\-00._. / % ____r[�Slope (Rrt) 9.7% 4807 418E : % r _ _ - Pf EVlou . / I I� (7-_ �/ Ditch depth (R) Actual 0 amb - I %, ✓' .�f/r�,' r:'f t ,, \ i p I - C AR15A / - j1Ditchbortomwidfh(R, 2.00 (ADJOINER) �' .'` . ` -' �1. ,A�/­".. , ­1-� �1.I 1".­, , S, /' r I Dltchsideslo tie x:1 3 \\ �- ` -- - //rir 1 ,� --- Cross sectional areas 2.ei - " ; r �� + -, _ _- % !i,"- , ' .,'','j, \�. (0 1 v - - - - i - r- DitchRowachral cis 22,88 i . /U�c� .... r , I .f' 'r _, r DIS I 1 \ \ - -- - . -.---� i 1 r 14 -._ -- i HA ' ' 1� AD ' r UL O ' _ - - - , �J PER�VILT TIVIT�' _ --_ . A 25 UNDISTURBED _...� - � ' f \ \ `;'\ 1 i - . - -- - / _ -r FRI 4.1�1 ACRE°S .-. t �(� �``� } I I I -\- T , IVIfiY , �, - BUF Actual Fbw Depth at 025 , ra z I i h a aci ) "� I - T oida D tc C _ 1 � Roughness coeftcrx, n (wr straw net o.033 4 . �. _ , , i � ( \ r Slo" IHR : 2.8% ; ___ ! pe _ ._.. . F 1 -11­I,1/-,;I1) ­, ", " I' f.,--..,'­ .. 1". � -I ,.�V, Z I1..­.r-.I... . s Ditch depth (R) Actual 0.8f2 f a > . .- Ditch bottom Math (n) ; 1.00 � v -- I CH "I (BASH -_:. - } , I 1 /� ' 'r / i Ditch side slopes (x 1) 3 , ; \\ ;, EXCAVAfiION ARF�4' } TE P AIRY W(�STEPiLES , INI 1 ;''` ;' l Cross sectional area (SO NIj -\1 , I I 1 .,I I I 2.10 ---.11005 ` / . r I W/ N. AMB21CAN s75._. f ' .' ACRE 1 V S F OVEi "DEN �° Ditch Row actual cis 8.48 _" . -'� \ OR EQUAL DITCH I. . -- ` - _ .,. , .. I � ..11 1 - t 1.22 ACRES , 00 v T r � TYI B _ i _ . - / I HAUL RO - - - NgAf� rr / / ; r - A RE _ . \ 1 . r ; _� i 35 O C _ .. 1 , r I I s _. I. �.L.I,.IL. Z ,I . "" .� .Ir 11I-_" \I 1 1" -1, ),, 1 r _ I _ } 1 i , r 1 1 -,I .I- —,;. -1.e,1j.--.'.- - . I--..- .—.- I.-.1,-..,I, . . ,I -. .. UNNAMED. TR .�UTAP.`Y DRA NAGS Actual Fbw Depth at 025 . I ( _ ` _ - Tra ezoldalDltchCa ac - ` v AREA-'- PNI 2A ASIN� � - tt CNA LINK CIN /' \ - ,- I Rougtnesscoeffontn(w/stowlet) 0.033 --,- ... r -. -i ..\ --.._. xl2 X r f FISHING CREEK, � I _ �0 5, 6 PEEP, a f §b NR i 5.2% , --- • / (, ; • 6.63 ACRE '� N, BEN G _` I C ,. Oitch depth (R) Actual 1�5.6§i ., ,= , ,� ,, r • � -- _ ____. _- J _.,.._ _ _,, -' - , _ ! I - 24 Cn� RISER, •. 1 � AROUN6 NIGH � WALL AREA / n�.. Ditch bottom width (ft) 1.00 , - -. 4 FAIRCLO SKIMMER ` "' j , - - "' r -- / r Ditch aide slopes (x_,, ` ---r_ (TYPICAL) 3 11 t - -- WITH 3 DI ARGE /, ! Crosa-sectionalarea(sQ 6 CHAIN LINK FENCING Ditch lbw actual (cia i 8.48 `- ! / r I s I-?1�UL ROAD ''`�, �, r/ ' r / - AROUND NIGH WALL AREA � .,.. I 's: �, / / _....__ - \ . ROPLPTY' LINE � /, ; / / (TYPICAL) I 31109 ACR (..�I , .. ._ _ rr; �I_E / t , AdualFbwDe atQ25 r Hi UA I _ Ir ) N a _ 11�� MAT S Q RUES ; - Tra ezoidal Ditch C d ,' ET / UN AMED RI Rougfnesseoetlent,n(w4strawnet) 0.033 y j - -31.109 ACRES 1 PROTECTION 41 ! Sb tuft 9.7% -- . p�( - _ - _ -- FI If� RE , �1 EK , N �G C r. ., i 24 CnnP ;. � _ � I Drtchdepth(R)Actual I tlsgi - F� , �, r 1 ::, ,. (SEE DETAIL) \ Ditchtwttomwrdth(R) 2.00 ;` a` ,' , .,.. ' !II/, ./,.­'. .)I . II. ,,.-., "/ .­ /...­,­..4 /..,,,1­// ,- .1,.- '1I/,-­ -I,7­ _ 2.0� - ') 1/' .- PROPERT Y LINE Ditch sidesbpes(xa) 1 3 ;:� � `. _-, `. 1` \. ,,- ­, Dteh ttL (BO9k1 s�2) ( _-.. Cross sectional area (so 4.61 �. r (• / - �i _ ,,x. , j - DIT - _ CH _BASIN �2) 1� Ditchlbwactual cta 44,77 (k J� WITH CREEK) _ 1 f/'.-.-/). 4I -/­I/I"1 - '.. . , "- _ 1 �; : - t 5 ,° \ / - _. - a \ �, `\ BASIN `' >;2 -- TAB B _., -` - 4 � OR EOUAL DITCH L I .- . y - _- .__- ... - _ I II .I1-' ..i­)-IL.. 11\ _-,�.I-- .-I,I-F. !­-I1 .,_- "..1I ­"N ­ y­... 1, . �� _­I ­ ­­ - I1\. - '� ...90' x1�5' x7' Dom, DIcCyAR �,. ING5 ASIN f', L I - . ' (i !! - Pi - 1. / ' 4 i 3o CW RISER, : WA ` $ PROCESSING AREA . _ ! r �: F�AIRCLOTH SKI ) (STOW CO-l" NG/WASHING) _ _ 1 ..._ ®0 25' UNDISTURBED MINING %/ WIfH 4' IDISCHA 2GE 2.76 ACRES / t; ' 1 � & -- _ _ �. 25 UNDISTURBED MINING - & PERMIT CTIVITY ,� \N, i _ - ,��` ,i 6, ACTIVITY Mov�Aal.e' *SE ST ® -. F' ERMIrt l BUFFER ,, 4.17 ACRES , / �I > WASHNVG wP o , . _ , CRIES . BUFFER. •-� 4.17 A ... I / I. __ A _ I � \ , �+ BUTARY' , � 4 r a ` 24' CMP It ` f 1 L U AMED TRI p 50' LAND DISTURBA C_ E . AND/ -- _ _ - -- - • 3.0% - FISHING CREEK __ - NATUfAL I�VATE COURSE. _ _., 4 ,;­- �Z 1-.""- ­', _ -:: ,...-_ - l .. /,. , r UNDISTURBE BUFFER 3o CMP 1 . ,. / 0. 2 ACRES • �:o� �, ' / - 1 6"\l­rr J _- ._ . N• 50' L ND DISTURBANCE AND 1 , , -'- N AT AL ,, WATT , COURSE ; /' OUTLET _ � PROTECTION tt2 r / ' t ,, � • � `1 ri 7 . _ \ UNDIS ' URBED 'B FER �, (SEE ` DETAIL) i / L , It / , BED _' � 0.82 .ORES j .., t I FO _.. EXISTING ,FAR , POND;' TO B i I {) __ . PROPERTY LINE _ , � / / I�, WATER uOUR I L FOB STONE I�� sTocILE YARD EXI SWING - : , / CLAD. / (RUNS..WITH CREEK) / \ WASHING PRO ESS -VIA PUMP �� 2.43 ACRES / CULVERT ,, ' ��B i . ` / , . / /• DITCH 39I (BASH 43 - . ' i ~ \38 1�T. I T.,� REiV1AIN �c:...- -."- OUT /��w/ N. ANERICAN r f r ,.% G jd EC ION #3 ;r , PI . T % / OR EQUAL DITCH L 1 M ! (SEE DETAIL) = / f DRAINAGE , // , D TRIBUNARY , _ / I �/ __� - ( . . �c. i / �� ' �' � ARE PNi � i / � �`\\ . Ci(:ISTING' r / i ` / 3.17 ACRES ` DNING CREEK - t � CU�VERT'S ,,� 1 � ' / , BAs�v n3 j MATNIS SON ° GRADING - • / f 40'x81'x4'DEER / \ > B - D p " - , " J I , 1 - B 87 PG 36 - __ __-_ �� sr r DEJ 753 cn/► RI -' 1 i WITH 2 D RGE I ' 1- .._ _, IB CMP - I , ! 3897-98-6( ,- _ . ; 1 \ 30.295 ACRES I • 2.0% /1 6,�� I I JCJINEI ,,�. PROPossr _ ( (AD / ,`sCALEI-�r�usE '; . -4, ' DITCH n2 333) \ , BILLY E MAGGIE. MATHIS DB 881 PG ' 538 - 4807-18-4186 i (ADJOINER�� i r =Y &� )i IC= i + I f ' . . 1 , . " , ­ " , I 1 . " - " I ­ I I I . . - I ) ­ P * . . - . " - ­ w/ S76 / ti � I.� r OR EQUAL P Lmw l / , r . / /\ \r ._ . \ t / � / EXISTI ,\� - T , • /� / , / j / .­Z.. " 1 \ i / -„/. . .01�`' -_ - / 7� f ( rj/ � a / , - . i _ r ( / ) ( I i i .1..- MINE AREA SUMMARY . I, " 1 ., ) .O 1, /1r. " ( - 1"1 - . -r..r cf- 1,1�t,1 I I-I - - r ' " I. . ",* I'l .1 / . _.N *) � ,-­ I Z-I ,­-- - -- I _.1I­/.. . r1' 1I I, . .L,, ," , `1`1/4.I1,1"­41) �.'­� ". . . ," -,/' JII ....r ` - ...._ Actual F a m st 025 ,I..--­�)\'-­D8­ ­ , ­1, .)I -.­ .)- i .I ., .-G G"I /­ - ,­, /- 1/ E�-!­ .. -1 ...') ­"­..6! I. ) ,.../ I-",­1.­ /-I-I .1­ ­/ "—,-�./.r/S.-..­1­.--..".­- . `1-).-1I.I,.1.-..-,.1 I 1. / 1 a"/-." . r. \­" . ') I. 1II i. Ir rlI i tow D %'' , I , _� ,-SIT .. �.� - ,r Trapezoidal Ditch Ca aci , __ t - - ;- - ` 1 ` I `N ----- ---_. Roughness coef crvt, n (wl stew neq . _ ._. . .._. - f /J , / �• - _-- -'---- 0033 ,, AREA f NI-•IB f y_ _ ._. __. _ .._ L VE 'r MR GhAC O Sloe 7 P O. 2 .0% Ditch de fh R) _ d _ 6 400 +� 3.9 E`J 1 �, - . _. p .( -_ , .. _ MR GRACE LOVE /' I 8 ,ACf� 5 Ditch bottom width 3.f10 ,_ - _. -,-- f� / (,� DB 26� PG 443- .--- - - 1 Ditc. ti d es (x 1). _ 3 -' _ - - - t _ - ---- -� f 4807 •.04 7828 ,j �� 25' U�IDI T REED I MINING " /` ./ / ,:,,• ` '9'745- 633 Cross sectonal area (80 1.82 . -. _.-.. _.. - - ;,. r i / ! -- -- - _ . _. 1-1. _ ;f � ,' Ditdllowedusl cis 19.85 - /� ' / / l�J i / _.(ADJOINER)._ 'OFF=SITE T TIVI , N . (�D JOINERS` _.._ -,l '.- / ,/ 'e I / f E (EMI A� TY ; , .1 ,_ _ -_. t -- A 1F - ,1 . RED PHI-2B OF E / _ -- - _._ 1-ACRES . ���/ 4�17 , ES i � i. ,. __ . ActuN Flow De th at Q25 - .. _ - -. - .. _..- _.._: -_ -_ _ i r iJ � ", ' \� \ r Tre ezoidal Ditch Ce ad 1' r, -~ . 1` ., ,-_..__ - ;- ! \ _ Ro a oo-­I- ­-\--- \ _ , T ' Ditch de R Actual 6:411a I< K 1 V { NV f �R _ .., '41t - - :� \ i pfi O MINE. JGE IT ; OU _ - _=- �. ��+ .L 6/.,iJ IE\ z r 1, Ditchbottomwes(x..I) 3.00 \ NAI LINK FENCING E MINING,` ACTIVITY BOUNDA Y ' - - - - , Ditch side slopes (x:1) 3 •, ` j i _- Croassectlonelarea (eQ � 2.01 ,-. -.; 1'`''., \` r_... - - �__. _ � � /� / , � i • I . - Cros Rowaofaal re 22.8E r '35:CS A-CR S, __ 'AROUND NIGH WALL AREA i 1 r _ - �•' , w S ) I I r (T�'PICAL) r _..._ - _ i � � � DRAH/�GE AREA � � �--r . � r / i - T _ DELNEA ION / 1 1 ' , _ - .-- ._ i i" ' .� II 4.. ,----- PROPERTY LiNB - .� `-_ i. ..._ ..- f _ '- - i / -,- v " LI 9 A >5 = ; -- -- - ; i �' t = 3O / ((rr .... - \ ��, ._ice Actual Flow De th at Q25 . i �-- .� f�L I / 1 ( �.�-.^ ` [l /� �-� % r' _ i r \ \ ' 1'JRAI ��Ll, / i _ `. �i / Tre emidalDltchCa ad ,. `�,. -.--._ - .-'• : _... --. •...' : � �, � !t t! -- -.. ._.__ - _. _.___ \\ __. Roughness coeffent, n (W stew net) 0 033 ` 1` - ( _ / -E - I?I-\)), I ;! _%- DITCH I (BA -- A ,� s�v n r s a ov° • / % _ W/ N. ANRICAN S75 I �/ _._-_ _- __ �,R PNII Ditch de th R Actrral a�S7di _ - Ditchbottomwidth 2.00 / / / - _._-� / �_..__ f - - - 99 �- EQUAL ,-DITCH LINF..R r �� Ditch side slopes (x:1) 3 - :* _ / / t __. _ _ - _ - - -- v, Crossaectlonalerea(s4___ ... 2.89 6 CHAIN LINK FENCING .,. r ---_._..____...-- I f .' ,, ,, _ / , _- -,-. Ditch flow scaral cis ': 22.88 ------ T- -_ -- _. --.------ �/ _ JJ CCK DAM AR ND NIGH : WALK AREA ----- i I ! y- . .. i... "- .,.­ �` OU , i - r . tTYP. 10� ,(3.C,) IT , . _- _ R T r % BILLY � � B T MA � ` - ._ - , - tTYPICA) �' _ . _ , r } _. _ - -- ' , -_ _� i : - _ % / _r ...i - / - / / ._ I; // f ` . l - . � 1 389 98 6021 B ILLY MA G E MATNI - i i , . x \ / Actual Fbw Depth at Q25/ �,. I l ! r f r / ':: r.. � , ! / Tra ezoidel Ditch Ce ad DB 881 PG 538 r- I ( / r \'` �_ ram" / ,� / _._... I ` J / r - r` ` ` Ro s coelicrlt n w4atrew ne 0.033 \ / u�nea ( _ _ I HAUL ROAD - �\\-00._. / % ____r[�Slope (Rrt) 9.7% 4807 418E : % r _ _ - Pf EVlou . / I I� (7-_ �/ Ditch depth (R) Actual 0 amb - I %, ✓' .�f/r�,' r:'f t ,, \ i p I - C AR15A / - j1Ditchbortomwidfh(R, 2.00 (ADJOINER) �' .'` . ` -' �1. ,A�/­".. , ­1-� �1.I 1".­, , S, /' r I Dltchsideslo tie x:1 3 \\ �- ` -- - //rir 1 ,� --- Cross sectional areas 2.ei - " ; r �� + -, _ _- % !i,"- , ' .,'','j, \�. (0 1 v - - - - i - r- DitchRowachral cis 22,88 i . /U�c� .... r , I .f' 'r _, r DIS I 1 \ \ - -- - . -.---� i 1 r 14 -._ -- i HA ' ' 1� AD ' r UL O ' _ - - - , �J PER�VILT TIVIT�' _ --_ . A 25 UNDISTURBED _...� - � ' f \ \ `;'\ 1 i - . - -- - / _ -r FRI 4.1�1 ACRE°S .-. t �(� �``� } I I I -\- T , IVIfiY , �, - BUF Actual Fbw Depth at 025 , ra z I i h a aci ) "� I - T oida D tc C _ 1 � Roughness coeftcrx, n (wr straw net o.033 4 . �. _ , , i � ( \ r Slo" IHR : 2.8% ; ___ ! pe _ ._.. . F 1 -11­I,1/-,;I1) ­, ", " I' f.,--..,'­ .. 1". � -I ,.�V, Z I1..­.r-.I... . s Ditch depth (R) Actual 0.8f2 f a > . .- Ditch bottom Math (n) ; 1.00 � v -- I CH "I (BASH -_:. - } , I 1 /� ' 'r / i Ditch side slopes (x 1) 3 , ; \\ ;, EXCAVAfiION ARF�4' } TE P AIRY W(�STEPiLES , INI 1 ;''` ;' l Cross sectional area (SO NIj -\1 , I I 1 .,I I I 2.10 ---.11005 ` / . r I W/ N. AMB21CAN s75._. f ' .' ACRE 1 V S F OVEi "DEN �° Ditch Row actual cis 8.48 _" . -'� \ OR EQUAL DITCH I. . -- ` - _ .,. , .. I � ..11 1 - t 1.22 ACRES , 00 v T r � TYI B _ i _ . - / I HAUL RO - - - NgAf� rr / / ; r - A RE _ . \ 1 . r ; _� i 35 O C _ .. 1 , r I I s _. I. �.L.I,.IL. Z ,I . "" .� .Ir 11I-_" \I 1 1" -1, ),, 1 r _ I _ } 1 i , r 1 1 -,I .I- —,;. -1.e,1j.--.'.- - . I--..- .—.- I.-.1,-..,I, . . ,I -. .. UNNAMED. TR .�UTAP.`Y DRA NAGS Actual Fbw Depth at 025 . I ( _ ` _ - Tra ezoldalDltchCa ac - ` v AREA-'- PNI 2A ASIN� � - tt CNA LINK CIN /' \ - ,- I Rougtnesscoeffontn(w/stowlet) 0.033 --,- ... r -. -i ..\ --.._. xl2 X r f FISHING CREEK, � I _ �0 5, 6 PEEP, a f §b NR i 5.2% , --- • / (, ; • 6.63 ACRE '� N, BEN G _` I C ,. Oitch depth (R) Actual 1�5.6§i ., ,= , ,� ,, r • � -- _ ____. _- J _.,.._ _ _,, -' - , _ ! I - 24 Cn� RISER, •. 1 � AROUN6 NIGH � WALL AREA / n�.. Ditch bottom width (ft) 1.00 , - -. 4 FAIRCLO SKIMMER ` "' j , - - "' r -- / r Ditch aide slopes (x_,, ` ---r_ (TYPICAL) 3 11 t - -- WITH 3 DI ARGE /, ! Crosa-sectionalarea(sQ 6 CHAIN LINK FENCING Ditch lbw actual (cia i 8.48 `- ! / r I s I-?1�UL ROAD ''`�, �, r/ ' r / - AROUND NIGH WALL AREA � .,.. I 's: �, / / _....__ - \ . ROPLPTY' LINE � /, ; / / (TYPICAL) I 31109 ACR (..�I , .. ._ _ rr; �I_E / t , AdualFbwDe atQ25 r Hi UA I _ Ir ) N a _ 11�� MAT S Q RUES ; - Tra ezoidal Ditch C d ,' ET / UN AMED RI Rougfnesseoetlent,n(w4strawnet) 0.033 y j - -31.109 ACRES 1 PROTECTION 41 ! Sb tuft 9.7% -- . p�( - _ - _ -- FI If� RE , �1 EK , N �G C r. ., i 24 CnnP ;. � _ � I Drtchdepth(R)Actual I tlsgi - F� , �, r 1 ::, ,. (SEE DETAIL) \ Ditchtwttomwrdth(R) 2.00 ;` a` ,' , .,.. ' !II/, ./,.­'. .)I . II. ,,.-., "/ .­ /...­,­..4 /..,,,1­// ,- .1,.- '1I/,-­ -I,7­ _ 2.0� - ') 1/' .- PROPERT Y LINE Ditch sidesbpes(xa) 1 3 ;:� � `. _-, `. 1` \. ,,- ­, Dteh ttL (BO9k1 s�2) ( _-.. Cross sectional area (so 4.61 �. r (• / - �i _ ,,x. , j - DIT - _ CH _BASIN �2) 1� Ditchlbwactual cta 44,77 (k J� WITH CREEK) _ 1 f/'.-.-/). 4I -/­I/I"1 - '.. . , "- _ 1 �; : - t 5 ,° \ / - _. - a \ �, `\ BASIN `' >;2 -- TAB B _., -` - 4 � OR EOUAL DITCH L I .- . y - _- .__- ... - _ I II .I1-' ..i­)-IL.. 11\ _-,�.I-- .-I,I-F. !­-I1 .,_- "..1I ­"N ­ y­... 1, . �� _­I ­ ­­ - I1\. - '� ...90' x1�5' x7' Dom, DIcCyAR �,. ING5 ASIN f', L I - . ' (i !! - Pi - 1. / ' 4 i 3o CW RISER, : WA ` $ PROCESSING AREA . _ ! r �: F�AIRCLOTH SKI ) (STOW CO-l" NG/WASHING) _ _ 1 ..._ ®0 25' UNDISTURBED MINING %/ WIfH 4' IDISCHA 2GE 2.76 ACRES / t; ' 1 � & -- _ _ �. 25 UNDISTURBED MINING - & PERMIT CTIVITY ,� \N, i _ - ,��` ,i 6, ACTIVITY Mov�Aal.e' *SE ST ® -. F' ERMIrt l BUFFER ,, 4.17 ACRES , / �I > WASHNVG wP o , . _ , CRIES . BUFFER. •-� 4.17 A ... I / I. __ A _ I � \ , �+ BUTARY' , � 4 r a ` 24' CMP It ` f 1 L U AMED TRI p 50' LAND DISTURBA C_ E . AND/ -- _ _ - -- - • 3.0% - FISHING CREEK __ - NATUfAL I�VATE COURSE. _ _., 4 ,;­- �Z 1-.""- ­', _ -:: ,...-_ - l .. /,. , r UNDISTURBE BUFFER 3o CMP 1 . ,. / 0. 2 ACRES • �:o� �, ' / - 1 6"\l­rr J _- ._ . N• 50' L ND DISTURBANCE AND 1 , , -'- N AT AL ,, WATT , COURSE ; /' OUTLET _ � PROTECTION tt2 r / ' t ,, � • � `1 ri 7 . _ \ UNDIS ' URBED 'B FER �, (SEE ` DETAIL) i / L , It / , BED _' � 0.82 .ORES j .., t I FO _.. EXISTING ,FAR , POND;' TO B i I {) __ . PROPERTY LINE _ , � / / I�, WATER uOUR I L FOB STONE I�� sTocILE YARD EXI SWING - : , / CLAD. / (RUNS..WITH CREEK) / \ WASHING PRO ESS -VIA PUMP �� 2.43 ACRES / CULVERT ,, ' ��B i . ` / , . / /• DITCH 39I (BASH 43 - . ' i ~ \38 1�T. I T.,� REiV1AIN �c:...- -."- OUT /��w/ N. ANERICAN r f r ,.% G jd EC ION #3 ;r , PI . T % / OR EQUAL DITCH L 1 M ! (SEE DETAIL) = / f DRAINAGE , // , D TRIBUNARY , _ / I �/ __� - ( . . �c. i / �� ' �' � ARE PNi � i / � �`\\ . Ci(:ISTING' r / i ` / 3.17 ACRES ` DNING CREEK - t � CU�VERT'S ,,� 1 � ' / , BAs�v n3 j MATNIS SON ° GRADING - • / f 40'x81'x4'DEER / \ > B - D p " - , " J I , 1 - B 87 PG 36 - __ __-_ �� sr r DEJ 753 cn/► RI -' 1 i WITH 2 D RGE I ' 1- .._ _, IB CMP - I , ! 3897-98-6( ,- _ . ; 1 \ 30.295 ACRES I • 2.0% /1 6,�� I I JCJINEI ,,�. PROPossr _ ( (AD / ,`sCALEI-�r�usE '; . -4, ' DITCH n2 333) \ , BILLY E MAGGIE. MATHIS DB 881 PG ' 538 - 4807-18-4186 i (ADJOINER�� i r =Y &� )i IC= i + I f ' . . 1 , . " , ­ " , I 1 . " - " I ­ I I I . . - I ) ­ P * . . - . " - ­ w/ S76 / ti � I.� r OR EQUAL P Lmw l / , r . / /\ \r ._ . \ t / � / EXISTI ,\� - T , • /� / , / j / .­Z.. " 1 \ i / -„/. . .01�`' -_ - / 7� f ( rj/ � a / , - . i _ r ( / ) ( I i i .1..- MINE AREA SUMMARY DESCRIPTION AREA (AC.) SEDIMENT PONDS 1.25 STOCKPILES 2.43 WASTEPILES 1.22 PROCESSING/HAUL ROADS 2.76 MINE EXCAVATION 22.35 TOTAL DISTURBED AREA 30.01 25' BLFFER AREAS 4.17 �O ` BUFFER AREAS 0.82 TOTAL PERMITTED AREA 35.0 ��� 0 2 tV 0 0� E W, 0 �Z N < co� a 22 L � Z e-% 1-% Z8� !0 0) W0 Uz C) N LU W Wz D QD I M LU o[ of � Q 11- 0 - - C] W O `O W - U �C oc Q� I I C �%-ONON � CY 3: - a- mQMM W coW 20 W 60 Q Z a_ I ON O .>N QL U z�U p-y Z O Wiz Ot U Cc Dt Ot o z Q U0 O c� W > W W O U) OJ W��� �' oZ PRO.IECT it SHOT 8062 DATE 2-20-09Qc=3 SCALE 1"-1001 DRAWN BY OF 7 JCS OC COPYRIGHIT 2009 BY BLUE RIDGE ENGNEERNG PLLC. ALL MG14TS RESERVED. THIS PLAN MAY NOT BE RED, SOLD. LOAD OR GIVEN TO OTHERS. REPRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT THE WRITTEN CONISBYT OF BLUE RIDGE ENGNEERNG PLLC IS PROHIBITED AND IS A VIOLATION OF FEDERAL COPYRIGHT LAWS. PUNISHABLE BY FINES UP TO $100.000 PER OFFENSE. r ..I . I r . ....... ...-`� ... "0 -t - - 1- EROSION CONTROL NOTE 1 LAND DISTURBING AACTIVITIES SMALL. NOT COMMENCE DEL(NEAT ON - -A I f DRAINAGE ARE I. LAND �\ �. � _ 1 / .. • WAS _ UNRL APPROVAL TO DO SO S BEEN RECEIVED - BY GOVERNING GOVERNING Aurti-IomTIEs. _ l - , 2 NO LAND CLVE EARNC', DEMOUTKA OR GRADING SMALL _- . -:._ _ _ __-___- _ -_ i _ " - MRS Eaos10N _ - _ _ ALL PERn�ETER _ _.-- -_ . _ - _ ._ ^,. AND sEDluevT _. RFA ,PH212f� � BEGIN UNTIL V / GRACE.- - ._ ._ IV�IRS -_. � � LO - BEEN TALL®. _ HAVE NS � y CONTROL MEASURES - _. - .8 � � / ILLY fV1ATHl -^ � ` � �G 43 / ' t 48 7-04-7828 B S - _ _-- - , _.__..._ _ _ --- -_. _" -- - � 25 U I I INS _ -, O-- -� D T 12 ED MIN % 745-�633 --- - - / r 3. ALL E FOSED AREAS SHALL BE � As 6�3._ -- -� % / / WITHN 15 DAYS of FINAL GRADING. _ �i . _ i , _��-(ADJOINER).. - -- E>�MI A�TIVITY / / � ( D�JOINER� 4807--16=b432 - -_ - - THAN __ _� _ 4. SI-IDU.D CONSTRUCTION STOP FOR LONGER _- _... _ ._ r -� � _ ---- -----' ----- - - - -- �• - _ ------ -_. _..----_--------- _ " BE AS _ AY THE SITE SMALL ' --� _ • - .______-_ DAYS, -- a, _ MEASURES SHALL - - „ , _ - ,- 5. AND EROSION CONTROL BE INSPECTED AT LEAST ONCE EVERY SEVEN - -- - - _. ._ _ - AY AND WITHIN 24 HOURS OF A RAINFALL - / '-��/ _ ._.... ]� - A \ - .- R IT . , MINhJG E III �)t7N� EXCEEDING Ob NCI -ES OIRINC A 2444OUR PERIOD --- - _ ...,<- FREQLSYTLY P RGaum BY GOVERNING - - - - - - _ . - - _ OR MORE - _ �,_ `:. _4 - 6' I LINO FENCING % MINING ACTIVITY .BOUNDARY ` A AL PERMIT. ALL �"! - , NPDES GENET? � - " f REGLOW BY INSPECTION swa.L wmaN - AROL�VD HIGH WALL AREA - ' WITHIN 48 HOURS 24 HODS COMPLETED - . - _ _. _ - - AND BE CAMPLETED - _. ir' _ ' / ' .... ,% `�5 O ACRES - w I , OF REPORT. - - , ,. T 6. THIS PLAN SMALL NOT BE CONSIDERED _- a-'- PR FsE LIN _ . __. _ ... STY .,. - _ -- AL ACTOR SMALL _ " ,. A THE GENET CONTRACTOR - INCLUSIVE S - --- -.. _ - i RE EN �. r -- _ .... _ _._. .....----- TAKE ALL NECESSARY PRECAurIONs To - � - 31.IO9 . - AC(�ES _ �� .- _ .. . FROM LEAVING THE SITE .: _ SOL SEDIMENT '. ,. � `r i ALL STATE - - / �` ���yyy......��� - i 7: THE CONTRACTOR SHALL COMPLY WITH CJ''-s f iV• ' AND LOCAL ORDINANCES THAT APPLY. _ �.i�REE i r �N � .r 8 ADDITIONAL EROSION AND SEDMA94T CONTROL �� _ _ ► - -- a � n BE INSTALLED IF DEEMED j b CHAIN LIME' FNCING - r- -- - - f i' - - - NEASIaRES SMALL ALLY �_ ,` , NECESSARY BY ON SITE NSPECT0NL - .. /- .: AROUND _ . NIGH- _-' WALL AREA --� -- -' -_ - r - H16 9. P INSTALLATION OF STORM DRAINAGE SYSTEM _ - BILLY �B- _ , f:. WEATHER OR Y SHOULD BE INTERRUPTED _ ,- .. .. _ __ _ ,. -.---- aoo �.�-- , , , , : -- r- - _753 PG - 603 THE PPE ENDS SHALL BE COVERED / _ _ F , WITH FILTER - - , _ ... _ r - FABRIC. BILLY 6 MAGGIE MATHIS ,. ; f. � / _ � �'','', ;' , i , } TO . 10 GENERAL CONTRACTOR SHALL BE RESPONSBLE , '`r o - ,� DB 881 PG 538 • 1 (AD JOINER) - BIBLE TAKE WHATEVER MEANS NECESSARY TO ESTABLISH _ - - / l G: _ - 1 1 P:I..K�� J PERMANENT SOIL STABLIZATON. - - 4807 IS 418E �1T"'I. i •-'� ,•" - --= - / - - f , i AREA THE s�MevT I (ADJOINER) 1 - N. SEDNvEIVT SI-IALL BE R�TAOV� FROM BASIN BEFORE R IS 25>< FULL AND FROM SL T _ f :l f , rr Is 33>s FULL .. - • , I . _ __ , ,, �,��. -- t;,- ;, , 25' IUNDISTIJRBED MINING D - FENCE BEFORE .. ,: • ---. _ ..'.= _' .. i - ACT IS RESPONSIBLE FOR ALL ,,. - f / �;''r n. THE CONTRACTOR .. � - , j , . ;: � � ER �' •- F' �/IIT 1� AdTIViT _e SAFETY, METHODS �IRocEDLs AND sEGxsvcEs d 25 UNDI TURBED (NINE s I S �--. -•- - B FF�R, 4. �1 14CR OF ITS OPERATIONS. ( / - �( � U I 1 t TIVI'f Y F�ERMIT A 13. NO WORK SHALL BE PERFORMED OUTSIDE THE I 1 BUFFER[A'QOE� ,: `4.17 _ LIMIT'S SHOWN ON THIS PLAN - DISTURBED- - _ - ' t , 14. CONTRACTCR SHALL OBTAIN ALL PERMITS AND 1 2) - _ _ , f APPROVALS ASSOCIATED WITH THIS WORK. J_ IN # _. ` 1 .... NNW. EXCAVATION ARF EMPORARY , ' 1005' I IGAN 75 - ��`' / 2236 ACRES i FOR OV \ / ' -t '' 15. EXISTING DRAINAGE PATTERNS SHALL BE MANTAI� 1 -� - / f .. L \ \� .22/''ACRES _ 0I UNLESS OTHERWISE SHOWN ON THE PLANS. ALL ,- •• ,;, - _.. = �� i MINING J ACTIVITY B UNDAOY AREAS OF THE SITE SHALL BE SHAPED TO DRAIN 35O ACRE TO EROSION CONTROL DEVICES. _ ' ' i:. _ t ' I 16. CONTRACTOR SHALL PROV IDE ADEGIUATE TRAFFIC -f r CONTROL FOR $ `•., -.. �� ti - .. ..... _ �, • - - ., f i UNNAMED TRIBUTARY �� �. 6 , CHAIN,, LINKf ' B Z I7. COW12ACTCR SHALL OBTAIN APPROVAL FROM FISHINC7 CREEK - _ T PRIOR TO DISTURBING ANY STATE f µ / ti �A - ROADWAY. _ .... DRAINAGE I-aIG ; MANTAA� ROAD [ / _ - j L / AR D W . YPI AL) ti� AP. EA - PH2`--2A_ / 18. R SHALL BE THE CONTRACTOR'S RESPONS61-ITY TO ` •-�. - _ _. .. � I MAIN LINK PENCIfvG �' - THE EX AND ACTUAL - • - r' FELD VERIFY EXISTENCE C S ---- LOCATION OF ALL EXISTING UTILITY LINES. AROUND NIGH WALL AREA ; - - ' - ; ` OPERTY 6 _ y � = PR LIfV THE CONTRACTOR SNAIL. KEEP ALL STREETS AND (TYPICAL) 19. - ROADWAYS CLEAR CLEAN. THIS SHALL BE ACCOMPLISHED - -- � _ - , .. ;. � _ _ .._ .� ` 31.109- ACRE 1 � •,:__. •'• -_ - �•-_ ,=`,; ,�' ;. U NAMED �TRI�UTARY BY STREET AND WASHING As - �r' �- -__-.. MATHIS. QUARRIES INC. f - ARY ON A DALY BASIS. r `, FI HI G CREED I NECESSARY f , 31.109 ACRES '` ' SHALL. INSTALLED 20. SILT FENCE STONE OUTLET- _ ;t , r LYINGLINE� - AT LEAST EVERY IOOLF AND N O- - _ PR PET - O R Y LOCATIONS ALONG THE SILT FENCE: ' �, BASIN (RUNS WITH ` CREAK) e - l / 90 x185 x7 DEEP, - w/ CH 5 ; �3 (BASIN GREBV _ AIvA=RICAN - • R _._ - i 30 CMP / FAIRCLOTH .SKI - - _..:._._ - ' -' TAILINGSBASINi OR EQUAL-" DITG��r/'4 TN ' DISCWAR (C',S POINT FOR _ WASh-fib STONE WWOFF) PROLE (TYP G'J ., CSC AM _ (Sf Of4E CRUSHING A814ING) • : /VN ' ,' / \ 2• T D M , / L 5 ` UNDIS U BE MINING, EX. BARN 25 UNDISTURBED MINING . �.�6 ACRES - 1 MOVEABLE DISI1-IAIME - -- - _ f. , -- 0ERMIT ACTIVITY ` EROSION CONTROL SEQUENCE PERMIT CfIVITY SE _ L INSTALL TEMPORARY CONSTRUCTION ENTRANCE ` AA % / RCS fN0 FOR STONE BUFFER 4.17 ACRES �O _ - � ' WAS{-NNG , < ,,. ' � - W - ._BUFFER - ='�417 ' AC ` 2 INSTALL TEMPORARY SILT FENCING AND SILT FENCE ` STONE OUTLETS. 3. INSTALL INLET PROTECTION FOR ALL INLETS. 4. INSTALL TEMPORARY SEDIMENT TRAPS AS EARTH WORK PROGRESSES, MARKED AS BASINS I. 2. 31 AND TAILINGS BASH. 5. INSTALL TEMPORARY DNB?SION DITCHES AS SPECIFIED PRIOR TO EARTH MOVING OPBZATCMS. 6. ANY EROSION CONTROL MEASURES AFFECTED BY FILL MATERIAL SHALL BE REINSTALLED AS SPECIFIED. FIN- OPERATONS SHALL NOT TAKE PLACE WHEN A RAINFALL EVENT IS ANTICIPATED IMTI-N 24 HOURS. 7. TEMPORARY SEDIMENT BASINS SHALL REMAIN N PLACE FOR AS LONG AS POSSBLE DURING MINING OPERATIONS. EXISTING DISCHARGE PIPES SERVING THE SEDIMENT BASINS SHALL BE REMOVED WITH SEDIMENT BASINS. 8. SEED i MULCH ALL DISTURBED AREAS WITHIN 15 DAYS OF COMPLETION OF GROUND DISTURBING ACTIVITIES. 9. EROSION CONTROL DEVICES MAY NOT BE REMOVED WITHOUT PRIOR PERMISSION FROM A NOD" LAND CUALITY REPRESENTATIVE AFTER A SfTE NSPECTION, EROSION CONTROL DEVICES SHALL BE REMOVED ONLY AFTER ESTABLISHMENT OF GROUND COVET? AND STABILIZATION OF ALL DISTURBED AREAS 10. REMOVAL OF DEVICES SHALL BE SCHEOLLED SUCH THAT ALL WORK CAN BE COMPLETED DURING DRY WEATHER. i 50' LAND DISTURBA NATUQAL WATE UNDISTURBEd 24' CW ' �` �' UNNAMED TRIBUTARY ` - < FISHING EE ; • K _ F 1 L ND DIS URB NCE �ND,& , NATURAL WATERCOURSE iY ' UND IS URBED ' BUFFER , 0.82 CRES OBERT N =WM�4N , �- ,,�-PROPERTY LINE / ��LARA O. \ PERIINS STOCKPILE YARD EXI�`rING 2.43 ACRES I (RUNS WITH CREEK) �' i CULVERT` ! �\ ��B i 86 PG 528 / / ( 9'7 I 7 ' Tt') REMAIN - - DITCH ssl (BASIN 43) 0 ./, w/ N. AMERICAN GREEN S7 2 �. OR EQUAL DII-64 I-Mm r .. / / BASINA3 ;� r M THIS Z SON GRADING f 40'x81',WDE BILLY Z BRITT MATHIS DB 887 PG S60 ----__,,� i/ ' • IS Cnk als�a. •. ,�, � DES 753 PG E�03 2• FA,IRCLO1`H SKI 4807-08-4159 ` t _ F CmwP NTH 2• DI GE � � ( 3897-98-6021 J \ / ; \ 30.295 ' ACRES 2.0% �� l JOINER) (AD • PROPOSEr1 DITCH #2 #3) . , t\ w/ GREEN S75 - �: OR EQUAL LAW? ] ESXISTI ,. T ; 3 SCALE IN FEET ON Lo t8 LU o o � cy ON U) 3 ? a NQ K I cc)co 20 L(7 L v v UJ (D Uz Q L_1L p� uj uj Wz �0 Jz m LL1 Lo 0 p Q U- qO� LL W �UmC4 co qqt Of 0 ON ON a. Q mco��cv N W Cn Q nZ 1_.1_ O, Lo I 0 00 O >z g R: o z O ww0 0 °C U cyDim z � U W J 0 C3 > 3; O U)0 =vim Lu Qr"0 2 co z PROJECT x SHEET 8062 DATE 2-20-09 QC34 SCALE i 100, DRAWN BY OF 7 JCS MCOPYRIGHT 2009 BY BLUE RDGE ENGINEERING PLLC. ALL RODS RESERVED. THIS PLAN MAY NOT BE REUSED, SOLD, LOANED OR GNEN TO OTHERSREPRODUCTION OR PHOTOCOPYNO Cr- THIS PLAN WITHOUT THE WRITTEN CONSENT OF BLLE RIDGE ENMMRNG PLLC IS M0419 TID AND IS A VIOLATION OF FED82AL COPYRIGHT LAWS. RN84ABLE BY FINES LP TO $100,000 PE 2 OFFENSE. -- �. ,'. . /�».`'l�������������������������������/��J.��'1���'�-���'��������[�i��������,�L�'������5�|.�l��i��� ~ ~ ~ MINE CONSTRUICTIQU 1. INSTALL TEMPORARY CONSTRUCTION ENT'RANCE, EXTEND PRIMARY ACCESS 120AD F920M COVE CREEK DRIVE TO PROCESSING AREA. 2. CONSTRUCT SCALEHOUSE PAD. 3. G12ADE AND GRAVEL STOCKPILE YARD, P120CESSNG AREA, a -EAR AND G12ADE AS NEEDED FOR WASTE AREA. 1 4. CONSTPLICT BASINS 2 AND 3 AND CORRESPONDING DIVERSION DITCHES. 6. CONSTRUCT BASIN I AS ROAD G12ADNG PROGRESSES. 7. CONSTRUCT SCALEHOLGSE AND COMPLETE STOCKPILE YARD AND ACCESS 120AD ENTRANCE. 8. COMPLETE FINAL GRADE AND GRAVEL FOR PROCESSING AREA. 9. CONTINUE WITH CONSTRUCTION OF WALL ROADS AND BEGIN MINING EXCAVATION. 10. SEED E MULCH ALL DISTURBED AREAS MT14N 6 DAYS OF COMPLETION OF GROUND DISTURBING ACTIVITIES. fl. EROSION CONT120L FABRIC SHALL BE INSTALLED ON STEEP SOL SLOPES AS NEEDED. 12. INCLUDE ALL NECESSARY EROSION CONTROL MEASURES AS NEEDED DURING CONSTRUICTION . -.-.-- --. .. ... SEOUENCE - TEMPCQARY SILT FENCING AND SILT FENCE STONE OUTLETS, INLET PROTECTION ... --.-. -, -,.. ---- -. .1 ,., 'I--- -1 FOR ALL EXISTING INLETS, TEMPORARY DIVERSION DITCHES, TEMPORARY SEDIMENT TRAPS. ...'... -- I.." - . I .. . � .,..�- - --- . , ( / \ \ �. 1� , . . ". - --. \ \."ll . � I - "I ".-.--",\ '-,, \.1 \ I \\ .,--� - I.- -...." . -... - I'- " .11" ---- � I '� , ) I . I . I . � i . � � - '11. . .1 , I I I ) - - � .- I I -, . - I I I ) , I �l I I �l .. -. I . .. I I 11 'N � . - -1, � .1 �11 �. �.. I I -- - I j ! I/ I J ) 1, ,,, I - . . I � ; ... \ \ ( / - � , 11 . , .77- - --- -=-----.:-,-,-,- _ . I ,.-- / . - .. I I I � �. ) � ) � � I - . . 11 . - . I r ) " ,�, -1 . I " I I / , I ) j "'. , I., �. � \ \ 1, I . 1\ I o. It / � I It I / � 11 ..... %, \ \ , I 1 x ) I ; / i . / I I . I ) I k I � \ / 11 . 11 ; -� .1. / I I � i . I 1 ( ( - I . . . . � � �/ I !I k .) ; ? I f .1 / . I., ., I / / . / . i / I I I . I �/ - . I \ I j i . ,� . I / I .1 ! .. .1 , / ( � t I ) . " I I � � I (I \ �� . �, / '. '. I . .,. " .- " I -.-. � ,,- , .1 " � . '. , 1� \ . \ / I / I I � � / / . �.11 - -1 ".1 /I ,/ /,--- - ---.-.- - " - ....... .. , � � " / I/ / / .,- � I � \ I/� % \` � / - , .1 ,. , ,� / ., � .-- -1 - .- / , , . I � \ \ ---. - -1 11 / .. - - - - .. --- - '..- - . -, , I \ . ,� ,/ / / / ,. I I I - ". �'ll / / ", - .. � --- "". � ---,*' / / ,' . / . " / .."N k � �- --.-, ,/ / � I � �`l , ­`- - ,- --''- - - ... '. '. \\\ 11 \�-, � - - .... I . 1- / I ,- " . - . / I � . � 1. - ---- .--" " , - --- .- - - - � " " \ , �, , � I, . / . 11 --- .,� I / V � , ". " - - ... --- - .- , " - . - - . - . ...- .1, .�. . \ " \ '. \ -- -1. , � /" Z , . , , � � � -.- - , . - . z - // , ,// // / " � - --, / / / / / /-' ,-",.-- - " '-, , I / /' I , /, I ;, , / I � � \ \ , \ - ...-- / / / / I -)---i-,------... .1 1\ ` ...-, / 'o / / . . \ -,,�" // � / 'I I - , / ) - ,- .---.-.--- - N � -/ . I . � I � / ) I / I ., I -- - - - ------ ------,-.---- --'- �,�,:I�t-l' -- I -.;.- -, ,,, , .., , / . ? / -",-.- -- --,�� 11 / / " -- \' - N�*\ \ / 11 I . 11 1. / � 1\ 11 ,..-- - - . "---- ------ .,/ / 1, / / / / i (1- - I ,-., - - ---.-, -,- , -, 1.�-\ " ll� \ \ X- .. -�- . .- 11 - - -� --,- .,-- 11 ./ , / -- - ,- .--.I- �,/ / t / / /-- \ \ \ , � \ \ \ , 1�, I --- --.. - --- -- - - -1/ ", / , I / / . I / / I / I / 1 I it ( - - --..- I - \ 11 ." � . ,, � / /- ,- - - , 1, \.- ( ---.- - \.,\., *�l - -1, I --, '. - � - --, - --.-..,, / " / , - //--\ � � \ \--."// / / / / 11 , , \ ---- ------ ------ -.-.-- ---- .--- ---.- ---- /` 'l-, 1---1 I - ---- --- I I 11 -/ / / / / / , . . -_. )). I \ . ,x/ I / / / / / \\\ \�\l \\ -- ",---.- - ----.-.- -- --.- -- ---� - ­.- , / 11 ,, / j / / ,� / . / - I ,", � � ,,.�\'-,� - 1, - -.1 / , '. t ----.,.--.-----I'- I--,,/ // -1 ICOLt I L- I I I / /� \ \ 'I..-- ----.-I,. - , 1-.1 �� ,�"/ I/ , / I / / , . /--- \\ '\\, -\ ..---- , ,- /I ,/ "'. '. // // I... .., , / / I �---ll /./ / / � , ,-�, --�,-- ---- ------.. - --- '.I ,,, . " / / , / .. . 11 \ \ \ . -::f'� - . .... .1�1111111111 . I J / / 6'\6-�N` LINK FENCING 11 .,-" --''- ..-.".- / / / // / \ \ ,\ \ \,.�, = =:::- �-- I , � � �-1 1--� I . , (TTPIOAL')--- . ---- � , -- ---- -,---- .,-­ / ) / (------., " . , . . \- , . -,� ,.� ..,- -.-I-- ---. - - - - " . "I il J, / / , , \ \ \ I \ " � \ , " " -=:: - - ... �� ,-� � 11 11 . I / / --l-l- ..-... -.---- 1, �,�' I - -- ---- ---. ----' ----- --­.- - ''. - -"., .. , " // / / -, ) ) ) ) � , - . ,::�--_:� ������ . .� // / / �-- --I- - ------.- ---- -,, -�, - .,..-- -.- -.---,-.,-. ,- .11- . ---- ��/ /,/ i ) ) I ; �_�::_--,� _ , , ) / I -,-.. f / ( --------- -- --------,- " / .. I / / " � --- .. I ,.,., I / / ( � / ( I-- -----. - ,- - I - , . I / ./ / / ( '--.- - / , � 11 . , / � �, ,-�-- -.-- ------- -- - - - -..- -.-. � -1,' , ) / ) ) � I / '--. .1 * . � I TALL 2' EDL AND ESTABLISH . --- - . -,.- -,.,/ / / ) / /,-,------ - - - - � / // ( ( , \ ", '11�.. --l. __.-, ---- --- -- GROUNDCOVER UPCI COMPLETION OF MIN14G -.--.-,-.. I ,-..-- - I /I , / / , / / "I ) � / ,--, - -11/1 / / , � I\\ ,-\,-'l- '- ��,\ - ,---,.-. "'. N"4 Pa�MIT so",�Jy / / I I � (I \ , ,�, \ - _,- "I, / . ,% I I I ( � , � ) I , .�,., 1, 35.0 ACPE6 I'll' / ".". '"'. -, �'/ ,,, �/� I , I ) \ I /1" I I ", , /I - --,, ,,, ,---.- m m ow /,� 1, .1-, . / f / I/ 111 ) I , �) 1� ,/ \ 1-Z / - �l �� 6'� CHAN LNK' Mff,r,m . - , - ) / / I. ,�, 1 ..., // / / �., 1. . ��- . �-, I A126" -* Hr44,.'WALL AREA ) / // .,,- / / 11 , /"' i ,,, / ; , "/.- -/ / , ,/ " � " ./ I , / I ( , Ix .� .� \1 I, �-.,- - - ------ - - - ""' .,,"'/�/ , "� --1 I ' I � I , I � / / / ( � \l., "I'' 1-11.11 . ,�,,/ \ , 1�,--- / , I/ / ) a / , / , I . , �,� I"- --l-l".. lll�l ,,­--- -1-- / I ALL UNCONSOLIDATED (NON -ROCK) SURFACE . ...l.. - . I - - .. - ..1.1 -- "". I .1, I / '1/1 � / � ( ( ( ( I �- 1, �,l / ALLOWED TO REVEGITATE NATURALLY. - I -- . - - - --.1 I - I-_,_--,- .1 - .11 1-..., c I � � \�- ,,.-, -,,� � - // --/1 ',- -," --.., .-I ,,, � , ) '. / 11 - I i ,- � 11 � � / I " � � � ,/ , , 1 I ",- ---- � * ­- - . I / , � � ) "�/ ,tl , 'I � / / / ( 1\ I / / I � -1, . � ,---,. ��'. .,., I /, ,-. a-.1 � I , I- I / / / . "�, I �.. I "I , -.-1 . -- . . - - --�,� --,/ / f I / � I If 11 ", I Z "I ,l / ,. ,.�-/- / 1�, 1. .,.� N � I ( f - - "' - ­­ ( ( , , I .,., , . / 'I � I ) / -1 .I-- ""Ili - // / 11 Ili / - , , ,,, " ,� - ----.--., � � � I I ( ( I �'. I , .,` ,, I I . - ,- . . - --1 -. -- I.. I % t. I ( I 11 . , -. 11 � �l - . , il ." 1 / , ill . I '. ; / ( / j I 1, I , " � \ � \ , , MAN" - . ,.-- . \ ( /I ( I " - I I , ) / // J \- - / I \ \ , ) *' ) / /I /I.., �,-- --- ,.-----, ,� .. 1. .-, � - -- I- / , ) / / / / , - \ - - i , . ) f ) /I/., , � ... I-,' I ,/ I- , / I j / ( ( . ( I , , / " , I � I j , I � I I / .-- -,,, 1. / ( ---- -- ,- I , " / / � . I � ,. 1. -1.1 \\. ".., 11 11 11 1 ,., '-AREA. 11 SLI12FACE WILL � 1. / ( ..%.-, � - - . -1 - -I'. '_1 �1� I ,�- l-, �". I . i � � � � I �,� ,,, , / - IE .1 . - - .. . - � \-..\. " - � � � � \ \ ",..\ , ) � / , , , t \ ASIPHALt.," X,l i I / "' - ---__ '---. I ".. 1, , �, N-L� ) � � \ Cl� � \, � .,� " � / / 1, \ . 1�� ."-" � I "I' - -- ---.-.---,. -.*� I - ." \1 , .1 " % I" I �-- - - . -Z � ) � \ , - , � , 'l/ / / 0 � Ill.., \--.- --- --- .�., . 1) ) 1) I I , //, - I ,.� .... .. 1". - �,/. I 11;1__----.--,-,-. \ ,,"'. \ " \ � \ \ ""�. � 1�1\ \ \ ,.\...- 1. - --l/ i / /11 ) � \ . �. . -t / / / / / :/ - - .,.-.- --� �, -,_,_. -....-.- �, / \ I . ---,-" ( .1, \\ `�,l ! - - EXI�Tilld ACCESS/ / / � . I .,. �' � . --. - `. I 0 " ( \ 1­ --- / / � � I � - -,` -� ... . .... -- -)l . ", ,...-- - I \ ") 1. ) ) II I � I/ �'. I- .1 " . -1 - - - / " - -.- ----------------1 ) / -- ---.-.-.-- ----- --.----- ----- �"/ / % ' \ "-,. 35.0. ACRES, ' , . I � - , , �'l - - -------- 7 ..- - -- 1, " I I . 1� .� x ., ,--, . -. / / , j I - - - ,--.. / - --7�� . " - . --/ . .--. - --... - - ...J�..." ,, -'. I �-- " \ , - " - - I 11 I --- ll'- - . k-. - . --- -�-�-`-__'_-�� - - � -- ' ' \ ` I / \ ' --- --- 1. \ \ \ � `� \ `` ' -- . ` ` � - > ` --' ~- -- __~~-- ` `-- --' / � ' ` ` . �_� ` � \ -- -- ' ' i- -�� -�^,---- -----------7---- ---=r- \ '-� -^ - '- --' - ' ~~ '�-' --__=�'� ------'------'-�� ' �� - -�- - _ - _ -'-`~ / \ ' / / / / � ,'''___'.'' � /� -~~- - f--'--- ~ �~_-� `` ' ` `' �`- `` / / / / ' `., � --/, / / / � / � ` ' � '/__ -- ~ -/ � - ' �` ` ' ` / \_' _----- '' - --~� - ` - _ '- ' �-___ \ / ` ` ^ ^' '�' ~/ ) / ' / --_-~ ' -- _~' ` ~_�' -___--�.� / `� `~ ' `-` ``'-'~-- '�� / ' ( --- ----- '-� '-- -_ -` -'-'' ^� ' / .\ ) \ ` `-, '� ` _ - � `-_~' ------ '~- �� \ \ \ /''- // / / ` s�_-` \`�_ __, ' `` - .~ '�``` ``` `.� --- --` .� -' _' -~'' { _'�_~_ , / \ / ' / ~~/~ ' `~ -� `\ \` \_ '-� _- --- / -- ~- \-/ -- -- | ` / / / �` - -� / ~-_� - - -Y `` / ^- ' � \ -�, / ' ~ .� �` _ _- _- ~. ___- -� -_ `` ~' ', /y / ' .` `'_ `' `` _ `\ \, __ __ _- ' -- - ,',-- -- -- --' - ' -~ ) '' /, / � \ / - \ / �\ ~/ - / ( ` \ � ` -- -- - / | -- -- -- - \ /' -' /r / � /� ' \ / 1. '. , ,' ' - ` `^ .-- - ,,' � -- ��---'- /' ','' / / � ' �--`. | ` `-'- '- - �-\ / ' ' ~' -�- ^-- ---� -^ - - - �'' ----' -- -- - /^ '' ~- ^--- / / ' ` i -` / ' �� ' � '- -� - - --- ------- ` ,. ' /' , / / ------------ ` / - /' `-- � -' -- -- --' ' /~ -- -- -- ���' -- ��=~--� > / ^/^ \ / < } | � , / / / \ 300 Ao \ / ,~' / , -- - - ' ` - ---'� _ (- ~-- -- --- --` -- � _ -- -- �- -- � -- - / ' / ' '/ \ / ) / \ | '� , / � / \ |SCALE IN FEET ON i �8 (] �� ' LL I �� `` Lo ` 0 co NN ���� � � 0� ���� �� ���� �m L� �� �� L� Lu uj ��NN__ �- _� _� �� � .� � 0 �� 00 ��� � ON . 0 ~- - (] '� =- *4 8- DL < > 11 l o or, -- | - ��(l m co` 1-1 11 z Lo �� ~� C114 � � u < z 2 Z� 01 (-) ~ �� �� � 0 �� ~~ cy = NN �� �~�l LU � L)m � -~ �� ~� ~_ �: �� NN _�� 000 �� � �� @CCPYR03HT 2009 BY SLLE RME ENGNIERM PLLC. ALL RIGHTS RESERVED. THIS PLAN MAY NOT BE QE4JSED, SOLD, LOANED OR WEN TO OTHERS. REIVMJCTION OR P140TOCMym cr- Twe PL.m wm4ouT THE vaTTeN ocNsEw cr- sLuE RIDGE BC449MM; PLILC IS PRO149ITEID AND IS A VIOLATION Or- FEDERAL COPYMW LAYM PLIN84ABLE BY FINES LP TO $100,000 PER OFFENSE. TEMPORARY SEEDING SCHEDULE SEASON TYPE PLANTING RATE LATE WINTER RYE (grdn) 120 LBSJACRE AND EARLY SPRING SUMMER GERMAN MILLET 40 LBS./ACRE FALL RYE (grdn) 120 LBS./ACRE ALL SEASONS AGRICULTURAL LIMESTONE 2000 LBSJACRE FERTILIZER 10-10-10 1000 LBSJACRE STRAW MUCH 4000 LBSJACRE PERMANENT SEEDING SCHEDULE (311 OR FLATTER) DATES TYPE PLANTING RATE FEB OI -MAY OI TALL FESCUE 200 LBSJACRE AND AGRICULTURAL LIMESTONE 4000 LBS./ACRE AUG 20 - OCT 25 FERTILIZER 10-10-C 1000 LBSJACRE STRAW MULCH 4000 LBSJACRE PERMANENT SEEDING SCHEDULE (SLOPES 311 TO 20) DATES TYPE PLANTNG RATE FEB OI - APR 15 TALL FESCUE 100 LBSJACRE AUG 20 OCT 25 AGRICULTURAL LIMESTONE 4000 LBSJACRE FERTILIZER 10-10-10 1000 LBSJACRE STRAW MUCH 4000 LBSJACRE PEE no SEEDING SPECIFICA, SCALE Ms ISOMETRIC VIEW PLAN La SLOPEOt SECTION A -A TIONS A, RP -RAP Jo - PIPE DIA. .a - APRON LENGTH N - APRON WIDTH 3 x PIPE 0 MN.) i - APRON DEPTH TER SLAWET RIPRAP APRONS MIN. DIMENSIONS APRON DIA. W 3Do L, LENGTH STOKE SIZE THICKNESS ttl 24' 15' 6.0' 13' CL. B 18" " F::in3 18" 146' 46' 13' CL. 1 1 18' NCDOT RIPRAP CLASSIFICATIONS CLASS dMIN d,50 dMAX APRON THICKNESS A 2' 4' 6" 9' " 5" 10' 17' 26' RIP RAP OUTLET PROTECTION. SCALE+ NTS NOTES' SEE APPROPRIATE PLAN OR SCE-EDU_E FOR DIMENSIONS I. La IS THE LENGTH OF THE RIP RAP APRON. 2. d - 16 TWS THE MAXIMM STONE DIAMETER BUT NOT LESS THAN 6'. 3. A FILTER BLANKET OR FLTE12 FABRIC SHOULD BE INSTALLED BETWEEN THE RP -RAP AND SOIL FOUNDATION. ..AND VERTICAL W-. I54ALL -GAUGE- TOP AND BOTTOM STRAND SHALL ■_—�P�i1if1 4�Izl1n�APl�+m'N��,�rt��,mi�!I ��� av, l 10 GAUGE MIN. NOTES WRE FILTER ABRIC 1. WRE SHALL BE A MINIMUM OF 37 IN WIDTH AM SHALL HAVE A MINIMUM OF WIRES FABRIC -- . 2. E. FABRIC S14ALL BE COMPACTED OF D. SHALL FASTENED ADEOUATELY TO THE WIRE gwiWA-p4' 3. STEEL POST SHALL BE 5*-a IN L \,STEEL POST 2'-Or I -EIGHT AND BE OF SELF —FASTENER C :E EXTENSIONOF •-- - • - ./ • SILT FENCE DETAIL SLOPE PERMANENTLY STABLVED ACCORDING TYPICAL CUT/FILL SLOPE GRADE SCALE, NTS 6' CHAN LINK FENCE TYPICAL PIGPWALL/HARDROCK EXCAVATION SCALEt NTS :iol.g... EXISTING txIS 1 rqk:� FILTER--J GROUND CLOTH SIDE ELEVATION TRANSITION BET-- STABILIZED CONSTRUCTION ENTRANCE / PL13LIC•r 1'11_R- /=:dirt_=���i=i�Rt.=�•�i/=:�ii�i�ii=i�ii�i�ii •i/ • ! EXISTING n ii ii - n i t/.' • t/.' • t/•' • t/' • t/' • t/ • t/' • t/ • t/.' • Z! frn'I,�I'iiuiiili r1j,/1j`/Ij•/•j''/•j'/•j'"/•j'"/1j•'/1j1'/ PAVEMENT u d Ti—ii a /'• t/'• t/.'• t/'• t/'• t/.'• t/.'• t/,'• t/'• t/ u Il,�tlii1 = t[111 jji]t/'i • PLAN STONE �r CONSTRUCTION SPECIFI• 2. LENGTH AS EFFECTIVE, BUT NOT LESS THAN 100 FEET. 3. THICKNESS - L STONE USE COAl2SE AGGREGATE (2 3 INCH STONE) 4. I. NOT LESS • FULL . OF ALL POINTS OFW--QESS OR EGRESS. 5. WA • -Y, V4-EMS SWALL BE CLEANED • REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC -C • WHEN .9 IS REQUIRED, IT SHALLBE DONE ON AN •- • STABILIZED WIT14 CRUSHED STONE VV14CH DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASK ALL SEDIMENT SHALL BE PREVENTED FROM ENTERING ANY STORM DRAN, DITCH, OR WATERCOURSE TH12OUG14OF BOAl2DS OR OTHER APP12OVED METHODS. 6. MANTENANCE - THE ENTRANCE SHALL BE • . • IC PREVENTWILL - • • - FLOWING OF . r ONTO PUBLIC STONERIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL AS • -. • DEMAND • . -E- • - • . • - CLEANOUT OF IMMEDIATELY.MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WAS14ED OR T12ACKED ONTO PUBLIC RIG14TS-OF-WAY MUST BE REMOVED 7. 12' X 24' METAL GRATE MAY BE USED. GRATE SHALL BE 25' AWAY -. • PAVEMENT AND APPROPRIATE SEDIMENT CONTROL TRAPPING DEVICE SHALL BE USED AT - • OUTLET POINT. STABILIZED•ENTRANCE SCALE t NTS ' MIN. SLOPE 211 MAX. OR LIF ARE OR C� COMPACTED FILL BERM "t-L _4� DITCH ' M iF1.Ow BERM/DITCH NOTES t 1. POSITIVE GRAPE MUST BE PROVIDED TO ASSURE DRANAGE. F SLOPE EXCEEDS 2%, SEED AND MUCH DIVERSION, TRY NOT TO EXCEED 5% (HIGH RUNOFF VELOCITIES RESULT). MAXKM D12ANAGE AREA IS 5.00 ACRES WITHOUT SUPPORTING CALCULATIONS FOR PERMANENT CHANNEL. DIVERSIONS AT THE TOPS OF SLOPES MUST EMPTY INTO AN APPROVED SLOPS DRAIN (SEE DETAILS). THE BERM/ DITCH IS THE MOST COMMONLY USED DIVERSION. 2. MACHINE COWACTION OF ALL FILL IS REQUIRED. 3. DIVERSIONS SLFFICIEN'T TO DIRECT ALL SEDIMENT -LADEN STORMWATER INTO SEDIMENT CONTROL DEVICE MUST BE NSTALL.ED PRIOR TO CLEARING AND GRUBBING OF AREA (OR IN CONJUNCTION WITH THIS OPERATION IF SEDIMENT CONTROLS AND DIVERSIONS ARE, NSTAH ED AT EACH CRITICAL PONT AS INDICATED). 4. DIVERSIONS SHOULD BE LOCATED TO MINIMIZE DAMAGES BY CONSTRUCTION OPERATIONS. 5. DIVERSIONS D BE SEEDED AND MULCHED IF THEY ARE TO REMAIN N PLACE OVER 14 DAYS. 6. CHECK DIVERSIONS AFTER EACH RAIN, OR ONCE PER WEEK WHICH EVER IS THE SHORTER DURATION. REPAIR AS NEEDED TO MAINTAIN FUNCTION. TEMPORARY DIVERSION BERM/DITCH 0 SCALE t NTS 11 11 lj it O Ov O 0► s 1� CQ V V1 N C4 (9 _`0 Of �,.. N v� cD UC-4 Z O ou�� L1J ,0. V I U O[Q 00aID N W CD z C)W � W Wz Jz m W all Lo tV DC 0 Q 0 U) LL LL Q Q "o0 w�.o O. cl- �N U7 Q LJ Ol L 0 co N �L I— > U Z z 0 Z _o( u 0 w u wm oc z (() W 0 0 (!� 0 U7 =v7 O W QUO co 01 z PRO.ECT a SHEET 8062 DATE 2-20-09 o O SCALE NTS D (- cBY OF 7 r ©COPYRI%ff 2007 BY SUE RAGE ENGI EERM PLLC. ALL RIG1 f9S RESET ED. THIS PLAN MAY NOT BE READ, SOLD, LOANED OR GIVEN TO OTC-E M REIRODUCTION OR PHOTOCOPYING OF THIS PLAN WITHOUT T1 E WRITTEN CONSEW OF Bldg RCQE ENG*�RIC IS PROH18FED AND IS A VIOLATION OF FEDERAL COPYR04T LAWS. Pll494AM BY FINES LP TO $100,000 PER OFFM i RISER PPE FOR PRHCPAL SPILLWAY W K 1.25 X BARREL) EMERGENCY NATL92AL EARTH 111111111111i EMBANKMENT 11 II Il II � kr 1.111 1II11II1111II1� .— —. WITH VEGETATION 111111111all 1I11 t ,1.1110 11 ;k__ , _ SELECTED FLL PLACE N LAYERS III ANTI —SOB" PRNCPAL COLLAR 25� CLEAN T AND COMPACTED SPILLWAY STABLIZEED OUT LEVEL OTATION BARRH. n DIAa p Jr� 2' OUTLET (STAKE N FIELD) BLOC K DEEP / BLOCK SIZG1 /--� RISER DETAIL ANTI -FLOTATION ANCHOR PRINCIPAL SPILLWAY (A.K.A RISER PIPE) NOT TO SCALE N M- I DOWNWARD FORCE - 1.1 x UPWARD FORCE 1) BASIN DEWATERNG MUST OCCUR WITHIN 2 TO 7 DAYS. REQUIRED NET - 1.1 X 7.Ott x (24712"At)2 x Tr x 62.4 I WO - 1509 bs 2) INLET PROTECTION MUST BE PROVIDED AT RISER. 4 WASHED STONE ON PPE, GRAVEL HORSESHOE, SKIMMER USE CONCRETE I c.y. - 2280 be. OR ALTERNATE METHOD OF DEWATERNG BASIN MUST BE I os. - x - 0.66 c.y. CONCRETE ANCHOR 2280 bs. USE 1.0 cs, CONCRETE 1509 AINCHQR PVC END CAP PVC TEE ARM ASSEMBLY WATER ENTRY UNIT PERSPECTIVE VEW PVC PVC ELBOW VENT SSCWEDULE PPE 40 PVC PPE SURFACE PVC END PVC PPE CAP EP40 i " HOLES IN ORIFICE UNDERSIDE PVC TEE PLATe FLEXIBLE HOSE e BOTTOM SURFACE pip VIEW FRONT VIEW FAIRCLOTH SKIMMER DETAIL SCALE 1 NTS FAIRCLOTH SKIMMER TABLE POND >x SKIMMER SIZE ORIFICE all 4" 3.0" D #2 5" 4.1" D "3 2' 1.9" D NOTE, . FAMOTH SKUM57S SHALL BE INSTALLED AS SPECIFIED WRH INLETS FULLY OPENED A© Nil ll_Il_l._.I-ILILII 11 11 IL1LIl tl 11Lll—iLIL NOTES: FLTER FABRIC ; L FILTER FABRIC SHALL BE A MIN11MUM OF 36' IN WIDTH AND SHALL BE FILTER FABRIC FASTENED ADEQUATELY TO THE POSTS. COMPACTED FILL 2. STEEL POST SHALL BE 5' -O` IN HEIGHT AND BE OF TI-E VIM SELF -FASTENER ANGLE STEEL TYPE 3. FABRIC SHALL HAVE 5%-101 OPENINGS L STEEL POST - 2'-a DEPTH N THE WEAVE EXTENSION OF FABRIC INTO TRENCH BAFFLE DETAIL o SCALE, NTS S .TY0:' EARTHEN ENS 7 7,,*: 31. � � 0 tA.ET :ZONE 5' CREST., '' • . . ,.3p% OF SURFACE AREA CLASS I RP RAP 25% OF SURFACE AREA SECOND 6WAM� • 25% OF . SURFACE AREA OUTLET: ZONE :15% CF SURFACE AREA ok n SEDIMENT BASIN W/ BAFFLES o SCALE 1 NTS INSTALL 2' SOL AND ESTABLISH GW^UNDCOVER UPON COMPLETION OF MINING OPERATIONS — 942'± FINAL RE �J SCALE( MS �57 WASHED STONE (YY MN.) DESIGN SETTLED TOP ALL ROCK SURFACES TO REMAIN EXPOSED. ALL UNCONSOLIDATED "-R=) SURFACE AREAS TO BE PERMANENTLY STABILIZED PER THE SEEDING SPECFICATIONS PROVIDED, AND ALLOWED TO REVEGETATE NATURALLY. I CLAMATION AND HIGH WALL CROSS SECTION o® RCLLAS Sd 5' MAX. ' �--- FILTER FABRIC PROFILE SECTION RP RAP OVERFILL 6" FOR SETTLEMENT ?,W A ° EMERGENCY BY-PASS 6" 5' MAX. BELOW SETTLED TOP OF DAM 0 0 0 0 3' MIN. NATURAL GROUND —r\-- FLTE12 FABRIC FOR POOR DEFINED CHANNELS CROSS SECTION BAFFLE NOTES 1 I. GRADE BASIN SO THAT THE BOTTOM IS LEVEL FRONT TO BACK AND SIDE TO SIDE 2. INSTALL POSTS FOR BAFFLES ACROSS ENTIRE WIDTH. 3. STEEL POSTS SHALL BE DRIVEN TO A DEPTH OF 2', SPACED 4' APART, AND INSTALLED UP THE SIDES OF THE BASIN. TOP OF FABRIC SHOULD BE 6 HIGHER THAN THE NVE12T OF THE SPLLWAY. 4. FABRIC SHALL HAVE 5%-10% OPENINGS IN THE WEAVE. 5. THE BOTTOM AND SIDES OF TI-E FABRIC SHOULD BE ANCHORED IN A TRENCH OR PINNED WITH 8' EROSION CONTROL MATTING STAPLES. 6. FABRIC SHALL NOT BE SPLICED ACROSS THE BASIN. 7. SEDIMENT SHALL BE REMOVED FROM BASIN AS NEEDED TO ENSURE PERFORMANCE. TAILINGS BASIN o® SCALE 1 NTS 6' CHAIN PERMIT LINK FENCE -2O'± f - BOL NDA12Y J 310'± 11 II r r • � I tl t1 o`Imom� L. a8 — 0 � � U �t Q Q c �3 ^^ Uz �W �W Wz Jz Mill (ON Z8 CV Q[ O Q o(� W O' ol Q Lu ON Lo J co 0 QL � U 1—z � z z _ 0 O o (r;Vcy U wWm z � U W 0 c� ; U� cr) 0 = 0 fE Q01 �0 Lu 2 Go z PRO.ECT a SE$T 8062 DATE 2-20-09 p SCALE NTS DRAWN BY ®� a JCS .r OCCOPYRIGI IT =7 BY BLUE RIDGE ENGINEERING PLLC. ALL RIGWS RESERVED. THIS PLAN MAY NOT 6E RED, 5OLD, LOADED OR Cv V TU OTF' Z Wetj jLAjC; l wlv VK rl-iV i wvr l Ur I KO r1.Fvv YVI I Mw I i rc WVKI I I ov yr CL4= Ka ."I-- CIYVN'4;V— cl" rU6%.o K7 r-KVrlCM I I--W 01MW 1.7 r V MA.M I IVIv yr rr�r& vvr l KIWM I 1.MWVQ v 1 1 11=0 Ut- I V WW UW t-M VrTt145C.