HomeMy WebLinkAboutNCG020660_COMPLETE FILE - HISTORICAL_20150104STORMWATER DIVISION CODING -SHEET -
RESCISSIONS .
PERMIT NO.
�C &OaD�p�U
DOC TYPE
0 COMPLETE FILE -HISTORICAL
DATE OF
RESCISSION
p,00 I O'I
YYYYMMDD
DEPARTMENT OF ENVIRONMENT
AND NATURAL RESOURCES
DIVISION OF LAND RESOURCES
LAND QUALITY SECTION
PERMIT
for the operation of a mining activity
In accordance with the provisions of G.S. 74-46 through 68, "The Mining
Act of 1971," Mining Permit Rule 15A NCAC 5 B, and other applicable
laws, rules and regulations
Permission is hereby granted to:
Glover Materials, Inc.
Meherrin Mine
Hertford County - Permit No. 46-10
for the operation of a
Sand Mine
which shall provide that the usefulness, productivity and scenic values of
all lands and waters affected by this mining operation will receive the
greatest practical degree of protection and restoration.
MINING PERMIT EXPIRATION DATE: Janua 4 2015
Page 2
In accordance with the application for this mining permit, which is hereby approved by the
Department of Environment and Natural Resources, hereinafter referred to as the Department,
and in conformity with the approved Reclamation Plan attached to and incorporated as part of
this permit, provisions must be made for the protection of the surrounding environment and for
reclamation of the land and water affected by the permitted mining operation. This permit is
expressly conditioned upon compliance with all the requirements of the approved Reclamation
Plan. However, completed performance of the approved Reclamation Plan is a separable
obligation, secured by the bond or other security on file with the Department, and may survive
the expiration, revocation or suspension of this permit.
This permit is not transferable by the permittee with the following exception: If another
operator succeeds to the interest of the permittee in the permitted mining operation, by virtue
of a sale, lease, assignment or otherwise, the Department may release the permittee from the
duties imposed upon him by the conditions of his permit and by the Mining Act with reference
to the permitted operation, and transfer the permit to the successor operator, provided that
both operators have complied with the requirements of the Mining Act and that the successor
operator agrees to assume the duties of the permittee with reference to reclamation of the
affected land and posts a suitable bond or other security.
In the event that the Department determines that the permittee or permittee's successor is not
complying with the Reclamation Plan or other terms and conditions of this permit, or is failing
to achieve the purposes and requirements of the Mining Act, the Department may give the
operator written notice of its intent to modify, revoke or suspend the permit, or its intent to
modify the Reclamation Plan as incorporated in the permit. The operator shall have right to a
hearing at a designated time and place on any proposed modification, revocation or
suspension by the Department. Alternatively and in addition to the above, the Department
may institute other enforcement procedures authorized by law.
Definitions
Wherever used or referred to in this permit, unless the context clearly indicates otherwise,
terms shall have the same meaning as supplied by the Mining Act, N.C.G.S. 74-49.
Expiration Date
This permit shall be effective from the date of its issuance until January 4, 2016.
Conditions
This permit shall be subject to the provisions of the Mining Act, N.C.G.S. 74-46, et. seq., and to
the following conditions and limitations:
OPERATING CONDITIONS:
A. Any wastewater processing or mine dewatering shall be in accordance with the
permitting'requirements and rules promulgated by the N.C. Environmental
Management Commission.
Page 3
B. Any stormwater runoff from the affected areas at the site shall be in accordance
with any applicable permit requirements and regulations promulgated by the
Environmental Protection Agency and enforced by the N.C. Environmental
Management Commission. It shall be the permittee's responsibility to contact the
Division of Water Quality to secure any necessary stormwater permits or other
approval documents.
C. No dewatering or artificial lowering of the ground water elevation shall occur
without prior approval from the Land Quality Section, the Division of Water
Quality, and the N.C. Environmental Management Commission.
2. A. Any mining process producing air contamination emissions shall be subject to the
permitting requirements and rules promulgated by the N.C. Environmental
Management Commission and enforced by the Division of Air Quality.
B. During mining operations, water trucks or other means that may be necessary
shall be utilized to prevent dust from leaving the permitted area.
3. A. Sufficient buffer (minimum 50 foot undisturbed) shall be maintained between any
affected land and any adjoining waterway or wetland to prevent sedimentation of
that waterway or wetland from erosion of the affected land and to preserve the
integrity of the natural watercourse or wetland.
B. Buffer zones shall be maintained as indicated on the mine map last revised
November 15, 2004.
C. Any mining activity affecting waters of the State, waters of the U. S., or wetlands
shall be in accordance with the requirements and regulations promulgated and
enforced by the N. C. Environmental Management Commission.
4. A. Adequate mechanical barriers including but not limited to diversions, earthen
dikes, check dams, sediment retarding structures, rip rap pits, or ditches shall be
provided in the initial stages of any land disturbance and maintained to prevent
sediment from discharging onto adjacent surface areas or into any lake, wetland
or natural watercourse in proximity to the affected land.
B. All drainage from the affected area around the mine excavation shall be diverted
internal to said excavation or into the sediment basin, as indicated on the mine
map last revised November 15, 2004.
C. Mining activities shall be conducted as indicated on the mine map last revised
November 15, 2004.
D. No mine dewatering activities shall occur at this site.
Page 4
5. All mining permit boundaries (44.3 acres) shall be permanently marked at the site on
100-foot intervals unless the line of sight allows for larger spacing intervals.
6. The angle for graded slopes and fills shall be no greater than the angle which can be
retained by vegetative cover or other adequate erosion control measure, structure, or
device. In any event, exposed slopes or any excavated channels, the erosion of which
may cause off -site damage because of siltation, shall be planted or otherwise provided
with ground cover, devices or structures sufficient to restrain such erosion.
7. The affected land shall be graded so as to prevent collection of pools of water that are,
or likely to become, noxious or foul. Necessary structures such as drainage ditches or
conduits shall be constructed or installed when required to prevent such conditions.
8. A. Existing vegetation -or vegetated earthen berms shall be maintained between the
mine and public thoroughfares whenever practical to screen the operation from
the public.
B. A minimum four (4) foot high woven wire fence shall be installed along the permit
boundary between lots 1 and 12 to prevent inadvertent public access.
9. A. Sufficient buffer (minimum of 50 foot undisturbed, with the exception of the
Stockpile Topsoil area and the Type A Silt Basin, which shall be an unexcavated
buffer) shall be maintained between any excavation and any mining permit
boundary to protect adjacent property.
B. Buffer zones shall be maintained as indicated on the mine map last revised
November 15, 2004.
10. A. No on -site disposal of refuse or other solid waste that is generated outside of the
mining permit area shall be allowed within the boundaries of the mining permit
area unless authorization to conduct said disposal has first been obtained from
both the Division of Waste Management and the Land Quality Section,
Department of Environment and Natural Resources. The method of disposal
shall be consistent with the approved reclamation plan.
B. Mining refuse as defined by G.S. 74-49 (14) of The Mining Act of 1971 generated
on -site and directly associated with the mining activity may be disposed of in a
designated refuse area. All other waste products must be disposed of in a
disposal facility approved by the Division of Waste Management. No petroleum
products, acids, solvents or their storage containers or any other material that
may be considered hazardous shall be disposed of within the permitted area.
C. For the purposes of this permit, the Division of Land Resources considers the
following materials to be "mining refuse" (in addition to those specifically listed
under G.S. 74-49 (14) of the N.C. Mining Act of 1971):
1. on -site generated land clearing debris
Page 5
2.
conveyor belts
3.
wire cables
4.
v-belts
5.
steel reinforced air hoses
6.
drill steel
D. If mining refuse is to be permanently disposed within the mining permit boundary,
the following information must be provided to and approved by the Division of
Land Resources prior to commencement of such disposal:
1. the approximate boundaries and size of the refuse disposal area;
2. a list of refuse items to be disposed;
3. verification that a minimum of 4 feet of cover will be provided over the .
refuse;
4. verification that the refuse will be disposed at least 4 feet above the
seasonally high water table; and,
5. verification that a permanent vegetative groundcover will be established.
11. An Annual Reclamation Report shall be submitted on a form supplied by the
Department by February 1 of each year until reclamation is completed and approved.
12. The operator shall notify the Department in writing of the desire to delete, modify or
otherwise change any part of the mining, reclamation, or erosion/sediment control plan
contained in the approved application for a mining permit or any approved revision to it.
Approval to implement such changes must be obtained from the Department prior to on -
site implementation of the revisions.
13. The security, which was posted pursuant to N.C.G.S. 74-54 in the form of a $40,700.00
Surety Bond, of which $27,600.00 is needed for this site, is sufficient to cover the
operation as indicated in the approved application. This security must remain in force
for this permit to be valid. The total affected land shall not exceed the bonded acreage.
14. A. Authorized representatives of the Division of Archives and History shall be
granted access to the site to determine the presence of significant archaeological
resources.
B. Pursuant to N. C. G. S. 70 Article 3, "The Unmarked Human Burial and Human
Skeletal Remains Protection Act," should the operator or any person in his
employ encounter human skeletal remains, immediate notification shall be
provided to the county medical examiner and the chief archaeologist, North
Carolina Division of Archives and History.
Page 6
APPROVED RECLAMATION PLAN
The Mining Permit incorporates this Reclamation Plan, the performance of which is a condition
on the continuing validity of that Mining Permit. Additionally, the Reclamation Plan is a
separable obligation of the permittee, which continues beyond the terms of the Mining Permit.
The approved plan provides:
Minimum Standards As Provided By G.S. 74-53
1. The final slopes in all excavations in soil, sand, gravel and other unconsolidated
materials shall be at such an angle as to minimize the possibility of slides and be
consistent with the future use of the land.
2. Provisions for safety to persons and to adjoining property must be provided in all
excavations in rock.
3. All overburden and spoil shall be left in a configuration which is in accordance with
accepted conservation practices and which is suitable for the proposed subsequent use
of the land.
4. No small pools of water shall be allowed to collect or remain on the mined area that are,
or are likely to become noxious, odious or foul.
5. The revegetation plan shall conform to accepted and recommended agronomic and
reforestation practices as established by the North Carolina Agricultural Experiment
Station and the North Carolina Forest Service.
6. Permittee shall conduct reclamation activities pursuant to the Reclamation Plan herein
incorporated. These activities shall be conducted according to the time schedule
included in the plan, which shall to the extent feasible provide reclamation simultaneous
with mining operations and in any event, provide reclamation at the earliest practicable
time. after completion or termination of mining on any segment of the permit area and
shall be completed within two years after completion or termination of mining.
RECLAMATION CONDITIONS:
1. Provided further, and subject to the Reclamation schedule, the planned reclamation
shall be to restore the mine excavation to a lake area and to grade and revegetate the
adjacent disturbed areas.
2. The specifications for surface gradient restoration to a surface suitable for the planned
future use are as follows:
A. The lake area shall be excavated to maintain a minimum water depth of four feet
measured from the low water table elevation.
Page 7
B. The side slopes to the lake excavation shall be graded to a 3 horizontal to 1
vertical or flatter to the water line and 2 horizontal to 1 vertical or flatter below the
water line.
C. Any areas used for wastepiles, screening, stockpiling or other processing shall
be leveled and smoothed.
D. No contaminants shall be permanently disposed of at the mine site. On -site
disposal of waste shall be in accordance with Operating Condition Nos. 10A
through 1OD.
E. The affected land shall be graded to prevent the collection of noxious or foul
water.
3. Revegetation Plan:
After site preparation, all disturbed land areas shall be revegetated as per the following:
Permanent Seedinq Specifications
Dates Species Rate, Lbs/Acre
February 15 - April 1 Kobe Lespedeza 10
Bahiagrass 50
Redtop 1
Winter rye (grain) 15
April 1 - July 31 Common Bermuda 50
August 1 - October 25 Lespedeza (unscarified) 30
German millet . 40
October 25 - February 15 Rye (grain- temporary) 120
Soil Amendments
Lime: 2000 Ibslacre or follow recommendations from a soil test.
Fertilizer: 1000 Ibslacre 8-8-8 or 10-10-10, or follow recommendations from a soil
test.
Mulch: All seeded areas shall be mulched using small grain straw at a rate of
2000 lbslacre and anchored appropriately.
Whenever possible, disturbed areas should be vegetated with native warm season
grasses such as switch grass, Indian grass, bluestem and gamma grass.
Page 8
In addition, the permittee shall consult with a professional wildlife biologist with the N.C.
Wildlife Resources Commission to enhance post -project wildlife habitat at the site.
4. Reclamation Plan:
Reclamation shall be conducted simultaneously with mining to the extent feasible. In
any event, reclamation shall be initiated as soon as feasible after completion or
termination of mining of any mine segment under permit. Final reclamation, including
revegetation, shall be completed within two years of completion or termination of
mining.
This permit, issued December 1, 1994 is hereby renewed this 5th day of January 2005
pursuant to G.S. 74-52.
yr James D. Simons, Director
Division of Land Resources
By Authority of the Secretary
Of the Department of Environment and Natural Resources
Michael F. Easley, Governor
William G. Ross Jr., secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E, Director
Division or Water Quality
July 5, 2006
Mr. Matt Glover
Glover Materials, Inc.
4493 US Highway 301, P.O. Box 40
Pleasant Hill, NC 27866
Subject: General Permit No. NCG020000
Meherrin Mine
COC NCG020660
Hertford County
Dear Mr. Glover:
In accordance with your application for a discharge permit received on June 16, 2006 we
are forwarding herewith the subject certificate of coverage to discharge under the subject state —
NPDES general permit. This permit is issued pursuant to the requirements of North Carolina
General Statute 143-215 .1 and the Memorandum of Agreement between North Carolina and the
US Environmental Protection agency dated December 6, 1983.
Please take notice that this certificate of coverage is not transferable except after notice to
the Division of Water Quality. The Division of Water Quality may require modification or
revocation and reissuance of the certificate of coverage.
This permit has specific limits on pH, settleable solids, total suspended solids, and
turbidity as shown in Part II1, Section C of your permit. Discharging mine dewatering or other
wastewaters from your facility that exceed the permit limits constitutes a violation of your
permit.
This permit does not affect the legal requirements to obtain other permits which may be
required by the Division of Water Quality or permits required by the Division of Land
Resources, Coastal Area Management Act or any other Federal or Local governmental permit
that may be required.
If you have any questions concerning this permit, please contact Aisha Lau at telephone
number (919) 733-5083 ext. 578.
Sinter l&NAL SIGNED BY
KEN PICKLE
Alan W. Klimek, P.E.
Attachments
cc: Washington Regional Office
Central Files
St6rmwater and General Permits Unit Files
NorthCarolina
,Xatura!!y
North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service
Internet: h2o.enr.state.nc.us 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-2496 1-877-623-6748
-An Equal Opportunity/Af irmative Action Employer -- 50% Recycledl101% Post Consumer Paper
STATE OF NORTH CAROLINA
DEPARTMENT OF -ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
GENERAL PERMIT NO. NCG020000
CERTIFICATE OF COVERAGE No. NCG020660
STORMWATER, MINE DEWATERING, AND/OR OVERFLOW FROM
PROCESS WATER RECYCLE SYSTEMS DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and
regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the
Federal Water Pollution Control Act, as amended,
Glover Materials, Inc.
is hereby authorized to discharge stormwater and to operate or continue operation of treatment systems and
discharges associated with mine dewatering from a facility located at
Meherrin Mine
Private road off State Road 1339 (Rose Rd.).
Murfreesboro
Hertford County
to receiving waters designated as the Meherrin River, class C NSW water, in the Pasquotank River Basin in
accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts 1, II, II1, IV,
V, VI and V1I of General Permit No. NCG020000 as attached.
This certificate of coverage shall become effective July 5, 2006.
This Certificate of Coverage shall remain in effect for the duration of the General Permit.
Signed this day July 5, 2006.
ORIGINAL SIGNED BY
KFN PICKLE
Alan W. Klimek, Director
Division of Water Quality
By Authority of the Environmental Management Commission