Loading...
HomeMy WebLinkAboutNCG020441_MONITORING INFO_20190218STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. DaCTYPE 0 HISTORICAL FILE eMONITORING REPORTS DOC DATE ❑ ��/IgUa�p YYVYMMDD ANNUAL SUMMARY DISCHARGE MONITORING REPORT (DMR) — STORMWATER II SUBMIT TO CENTRAL OFFICE* II General Permit No. NCG020000 Calendar Year 2018 'Report ALL STORMWATER monitoring data on this form (include "No Flow"/"No Discharge" and Benchmark Exceedances) from the previous calendar year to the DEQ by MARCH 1 of each year. Certificate of Coverage No. NCG020441 FEB 18 2019 Facility Name: Vulcan Construction Materials, LP/South Fork Quarry CENTRAL FILES County: Forsyth CENTRAL SECTION Phone Number: (336) 767-0911 Total no. of SDOs monitored 1 Certified Laboratory Research & Analytical Laboratories Lab # 34 Lab # Stormwater Discharge Outfall (SDO) No. 001 VMA Outfall? Yes ❑ No Is this outfall currently in Tier 2 for any parameter? Yes ❑ No Was this outfall ever in Tier 2 during the past year? Yes ❑ No If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ No, turbidity benchmark exceedances did not require monthly monitoring ❑ Other ❑ Permit Date 10/112015 — 9/30/2020 Last Revised 10-2-2015 Certificate of Coverage No. NCG020441 Additional Outfall Attachment (make copies as needed for additional outfalls) Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMI-R to reduce monitoring frequency ❑ No, turbidity benchmark exceedances did not require monthly monitoring ❑ Other ❑ Outfall No. Total Rainfall, inches TSS, mg/I SS, ml/I Turbidity, NTU Upstream (U) Turbidity, NTU Downstream (D) Turbidity, NTU Non -polar O&G, mg/I (VMA)(gal/Mo.) New Motor Oil Usage Stormwater Benchmarks lndicare NO FLOW it a ficable Circle"cle Benchmark 100/50 0.1 Benchmark 50/25/1 0 N/A Water Quality Standard applies N/A Water Quality Standard applies 15 �55gallmo. average requires TSS and Non -polar Q&G monitoring Date Sample Collected, mo/dd/yr Permit Date 10/1/2015 — 9/30/2020 Last Revised 10-2-2015 Certificate of Coverage No. NCG020441 Additional Outfall Attachment (make copies as needed for additional outfalls) Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ No, turbidity benchmark exceedances did not require monthly monitoring ❑ Other ❑ Outfall No. Total Rainfall, inches TSS, mgll SS, ml/I Turbidity, NTU Upstream (U) Turbidity, NTU Downstream (D) Turbidity, NTU Non -polar O&G, mg/l (VMA) New Motor Oil Usage al/mo.) Sformwafer Benchmarks Indicate NO FLOW it a Iicable Circle Benchmark 100/50 0.1 Circle Benchmark 50/25/10 NIA Water Quality Standard applies NIA Water Quality Standard applies 1 rJ >55 gal/Mo. average requires TSS and Non -polar O&G monitoring Date Sample Collected, mo/ddlyr Permit Date 10/112015 — 9/30/2020 Last Revised 10-2-2015 Certificate of Coverage No. NCG020441 CERTIFICATION °I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." [Required by 40 CFR § 122.22] Signature Date _ February 5, 2019 Mail Annual Summary Stormwater DMR to the NCDEQ Central Office: Note the address is correct — Central Files is housed in DWR (not DEMLR) N.C. Department of Environmental Quality (DEQ) Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Central Files Telephone (919) 807-6300 Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at: (919) 707-9220 Permit Date 1011I2015 — 9/30/2020 Last Revised 10-2-2015 ANNUAL SUMMARY DISCHARGE MONITORING REPORT (DMR) — STORMWATER SUBMIT TO CENTRAL OFFICE* General Permit No. NCG020000 Calendar Year 2017 'Report ALL STORMWATER monitoring data on this form (include "No FlowTNo Discharge" and Benchmark Exceedances) from the previous calendar year to the DEQ by MARCH 1 of each year. Certificate of Coverage No. NCG020441 Facility Name: Vulcan Construction Materials LP/South Fork Quar County: Forsyth Phone Number: (336) 767-0911 Total no. of SDOs monitored 1 Certified Laboratory Research & Analytical Laboratories Lab # 34 Lab # Stormwater Discharge Outfall (SDO) No. 001 VMA Outfall? Yes ❑ No Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ No, turbidity benchmark exceedances did not require monthly monitoring ❑ Other ❑ Permit Date 10/112015 — 9/30/2020 Last Revised 10-2-2015 Certificate of Coverage No. NCG020441 Additional Outfall Attachment (make copies as needed for additional outfalls) Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ No, turbidity benchmark exceedances did not require monthly monitoring ❑ Other ❑ Permit Date 101112015 — 9/30/2020 Last Revised 10-2-2015 Certificate of Coverage No. NCG020441 Additional Outfall Attachment (make copies as needed for additional outfalls) Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ No, turbidity benchmark exceedances did not require monthly monitoring ❑ Other ❑ OutfallTotal inches Turbidity, UpstreamDownstream ift • • • (VMA) ------ Now Usage • • Bet rk •rmwate Indicate N • • ®®® , tanclard ap lies Standard applies MMSTVIll'i-, Date Sam. MID x, Permit Date 1011/2015 — 9/3012020 Last Revised 10-2-2015 Certificate of Coverage No. NCG020441 CERTIFICATION "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." [Required by 40 CFR §122.221 Signature Date _January 29. 2018 Mail Annual Summary Stormwater DMR to the NCDEQ Central Office: Note the address is correct - Central Files is housed in DWR (not DEMLR) N.C. Department of Environmental Quality (DEQ) Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Central Files Telephone (919) 807-6300 Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at: (919) 707-9220 Permit Date 1011/2015 -- 9/30/2020 Last Revised 10-2-2015 ANNUAL SUMMARY DISCHARGE MONITORING REPORT (DMR) — STORMWATER SUBMIT TO CENTRAL OFFICE* General Permit No. NCG020000 Calendar Year 2016 "Report ALL STORMWATER monitoring data on this form (include "No FlowTNo Discharge" and Benchmark Exceedances) from the previous calendar year to the DEQ by MARCH 1 of each year. Certificate of Coverage No. NCG020441 iRS `iD , Facility Name: Vulcan Construction Materials, LP/South Fork Quarry ��� v County: Forsyth FEB 0 8 2017 Phone Number: (336) 767-0911 Total no. of SDOs monitored 1 CENTRAL Ff LLtS Certified Laboratory Research & Analytical Laboratories Lab # 34 O SECTION Lab # Stormwater Discharge Outfall (SDO) No. 001 VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ No, turbidity benchmark exceedances did not require monthly monitoring ❑ Other ❑ Permit Date 101112015 — 9/30/2020 Last Revised 10-2-2015 Certificate of Coverage No. NC; 00441 Additional Outfall Attachment (make copies as needed for additional outfalls) Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ No, turbidity benchmark exceedances did not require monthly monitoring ❑ Other ❑ Permit Date 10/1/2015 — 9/30/2020 Last Revised 10-2-2015 Certificate of Coverage No. NCG020441 Additional Outfall Attachment (make copies as needed for additional outfalls) Stormwater Discharge Outfall (SDO) No. VMA Outfall? Yes ❑ No ❑ Is this outfall currently in Tier 2 for any parameter? Yes ❑ No ❑ Was this outfall ever in Tier 2 during the past year? Yes ❑ No ❑ If this outfall was in Tier 2 last year, was monthly monitoring discontinued? Yes, enough consecutive samples below benchmarks to decrease frequency ❑ Yes, received approval from DEMLR to reduce monitoring frequency ❑ No, turbidity benchmark exceedances did not require monthly monitoring ❑ Other ❑ Outfall No. Total Rainfall, inches TSS, mgll SS, mill Turbidity, NTU Upstream (U) Turbidity, NTU Downstream (D) Turbidity, NTU Non -polar O&G, mgll (VMA) New Motor Oil Usage gallmo. Stormwater Benchmarks lndicateNO FLOW if applicable Circe Benchmark 100150 0.1 circle Benchmark 50/25/10 NIA water Quality Standard applies N/A water Quality Standard applies 15 >55 . averagea requires TSS and Non -polar O&G monitoring Date Sample Collected, molddlyr�e _.r'i T` d' h f R ?c".(Y irJC %A�F /vv 'R ,-e�, .^^ }`a�`+$aq,n V' b' �K`'b 3e.' j d F' // /J'AP f' ✓ i Permit Date 101112015 — 9/30/2020 Last Revised 10-2-2015 Certificate of Coverage No. NCC,32;;441 CERTIFICATION "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for, knowing violations." [Required by 40 CFR §122.22] Signature Date February 5, 2017 Mail Annual Summary Stormwater DMR to the NCDEQ Central Office: Note the address is correct — Central Files is housed in DWR (not DEMLR) N.C. Department of Environmental Quality (DEQ) Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Central Files Telephone (919) 807-6300 a Questions? Contact DEMLR Stormwater Permitting Staff in the Central Office at: . (919) 707-9220 Permit Date 10/112015 — 9/30/2020 Last Revised 10-2-2015 ANNUAL SUMMARY DMR - STORMWATER I 11 SEND TO CENTRAL OFFICE * II STORMWATER DISCHARGE OUTFALLS (SDO) GENERAL PERMIT NO. NCG020000 *Report ALL STOR1lM4,ATER Monitoring Data on this form (including No Flow and No Discharge and Permit Limit Violations) by MARCH 1 of each year. I CERTIFICATE OF COVERAGE NO. NCG020441 SAMPLE COLLECTION YEAR: 2015 FACILITY NAME: Vulcan Construction Materials, LP/South Fork Ouarry COUNTY Forsyth PERSON COLLECTING SAMPLES: JustinUpchurch PHONE NO. (336) 767-0911 CERTIFIED LABORATORY:Research & Analvtical Labs Lab #34 ADD TO LISTSERVE? YES ❑ NO ❑ EMAIL: Lab # Part A: Stormwater Monitoring Requirements Outfall No. Date Sample Collected (molddl r OR Y NO FLOW) In Tier 2 Monthly Monitoring? g. (yln) # of Months in Tier 2 Sampling z Total Flow (MG) Total Suspended Solids (mg/1) Turbidity (NTU) Settleable Solids (mlll) Total Rainfall (in) Event Duration (minutes) - - - - - l00" See Footnote' 0.1 001 No flow for 2015 MCA- FER I CENT L)WR • EC ' If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or=`NO DISCHARGE" for each outfall here and the Date Range. ` Per NCG02: Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range a If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. 4 TSS benchmark values are 100 mg/l except in ORW, I-IWQ, trout, and PNA waters where they are 50 mg/l. 5 The discharge shall not cause an instantaneous measurement of the turbidity of the receiving water to exceed: 10 NTU for freshwater streams, lakes, and reservoirs designated as trout waters; 25 NTU for all lakes and reservoirs, and all salt waters; 50 NTU for all other streams and surface waters. Turbidity may be monitored at the SDO. Alternatively, the permittee may choose to monitor turbidity in the receiving water, directly upstream and downstream of the SDO. Permit Date: 1/1/2010-12131/2014 Last Revised 02-02-1 1 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month on average Outfall No. Date Sample Collected (molddlyr OR NO FLOW)t In Tier 2 Monthly Monitorin g'• (yln) # of Months in Tier 2 z Sampling New Motor Oil Usage (al/month) Total Flow (MG) TPH using method 1664A SGT-1IEM m 11) Total Suspended Solids m /I) pH (Standard Units} Total Rainfall in Event Duration minutes - - 15 1003, 6-9' HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO X HAVE YOU CONTACTED THE REGION? WHO ATTHE REGION HAVE YOU SPOKEN WITH? YES ❑ NO ❑ MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE" & LIMIT VIOLATIONS) BY MARCH I OF EACH YEAR TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6300 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penally of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." February S, 2016 Permit Date: 1/1/2010-12/31/2014 Last Revised 02-02-1 1 Page 2 of 2