Loading...
HomeMy WebLinkAboutNCG020266_COMPLETE FILE - HISTORICAL_20180220STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. NCGW&()aoc � (� DOC TYPE kHISTORICAL FILE DOC DATE ❑ 2�13Q0,13 6 YYYYM M DD ROY COOPER Governor MICHAEL S. REGAN Secretary WILLIAM E. (TOBY) VINSON, JR. Interim Director Energy. Mineral and Land Resources ENVIRONMENTAL QUALITY February 20, 2018 Statesville Brick Co - Gold Hill Attention: Michael B. Foster, Owner Post Office Box 471 Statesville, North Carolina 28687 Subject: Compliance Evaluation Inspection NPDES Stormwater Certificate of Coverage- NCG020266 Rowan County, North Carolina Dear Mr. Foster: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspections we conducted at the Statesville Brick Co - Gold Hill located on Highway 52 on February 15, 2018. The report should be self- explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (704) 663-1699 or by email at Ousmane.Sidibe@ncdenr.gov. Sincerely, , ort A s- Zahid S. Khan, CPM, CPESC, CPSWQ Regional Engineer Land Quality Section Enclosed: Inspection report c: Stormwater Permitting Branch Compliance Inspection Report Permit: NCG020266 Effective: 10/01/15 Expiration: 09/30/20 owner: Statesville Brick Co SOC: Effective: Expiration: Facility: Statesville Brick Co -Gold Hil County: Rowan Hwy 52 Region: Mooresville Staiesvi€le NC 28687 Contact Person: Michael B Foster Title: Phone: 704-872-4123 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 02/15/2018 Primary Inspector: Ousmane Sidibe Secondary Inspector(s): Certification: Phone: EntryTime: 10:OOAM Exit Time: 11:30AM Phone: Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit inspection Type: Mining Activities Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm water (See attachment summary) Page: 1 Permit: NCG020266 Owner - Facility: Statesville Brick Co Inspection Date: 02/15/201 a Inspection Type: Compliance Evaluation Inspection Summary: Reason for Visit: Routine The stormwater inspection was conducted with the mine inspection. We heve met with Steve Moose from Statesville brick company, Went over all file and discussed a potential representative outfall status change. Comment will be made once the application for the reppresentative outfall status change is received by this division. The site appears to be in compliance with the NCG020266. Page: 2 �, permit NCG020266 Owner - Facility: Statesville Brick Co Inspection Date: 02/15/2018 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ® ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ■ ❑ # Has the facility evaluated feasible alternatives to current practices? E ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ■ ❑ # Does the Plan include a BMP summary? N ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ 0 ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ■ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? . ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ E ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ■ ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: Steve Moose attested that the facility was conducting employee training, but no documentation - were provided during the inspection. Please keep the records up to date. The last revision documennted was dated back in 2016 please update the plan annually per your permit. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? E ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ® ❑ Comment: Permit and Outfalls Yes No NA NE # is a copy of the Permit and the Certificate of Coverage available at the site? ®❑ ❑ ❑ # Were all outfalls observed during the inspection? ® ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ 0 ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Comment: Page: 3 A MCDENR. North Carolina Department of Environment and Natural Resources Pat McCrory Governor Mr. Johnny Meredith, VP of Production Statesville Brick Company P.O Box 471 Statesville, North Carolina 28687-4123 Dear Mr. Meredith: John E. Skvarla, III Secretary September 5, 2014 Subject: Compliance Evaluation Inspection General Stormwater Permit NCG020266 General Stormwater Permit NCG020761 General Stormwater Permit NCG070112 Rowan and Iredell County, NC Enclosed are copies of the Compliance Evaluation Inspection (CEI) reports for the inspections conducted on September 4, 2013 by Mr. Samar Bou-Ghazale of this Office. The reports should be self-explanatory; however, should you have any questions concerning the reports, please do not hesitate to contact Mr. Bou-Ghazale at (704) 663-1699 Ext.2199. Sincerely, Zahid S. Khan, CPM, CPESC, CPSWQ Land Quality Regional Supervisor Attachment Division of Energy, Mineral, and Land Resources Land Quality Section - Mooresville Regional office 610 East Center Avenue, Suite 301, Mooresville, North Carolina 28115 Telephone: 704-663-16991 FAX: 704-663-6040 a Internet: http:llportal.nodenr.org/web/Ir/land-quality An Equal Opportunity I Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper 1I 144 �I A I Permit: NCG020761 SOC: County: Iredell Region: Mooresville Contact Person: Steve Moose Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Compliance Inspection Report Effective: 01/22/10 Expiration: 12/31/14 owner: Statesville Brick Co Effective: Expiration: Facility: Statesville Brick Co-Iredell 391 Brick Yard Rd Title: Inspection Date: 09/04/2014 Entry Time: 11:45AM Primary Inspector: Samar E Bou Ghazale Secondary Inspector(s): Statesville NC 28677 Phone: 704-872-4123 Ext.119 Certification: Phone: Exit Time: 12:50PM Phone: 704-663-1699 Ext.2199 Reason for Inspection:' Complaint Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: ® Compliant Not Compliant Question Areas: ® Storm Water (See attachment summary) Page: 1 Permit: NCG020761 Owner - Facility: Statesville Brick Co Inspection Date: 09104/2014 Inspection Type : Compliance Evaluation Reason for Visit: Complaint Inspection Summary: Site is in compliance with the permit requirements. No mining activities are taking place at the mine site. Basin is covered with vegetation. Please review and update the stormwater pollution prevention plan annually, Page: 2 r Perrnit: NGG020761 Owner - Facility: Statesville Brick Co Inspection Dale: 09104I2014 Inspection Type : Compliance Evaluation Reason for visit: Complaint Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 91 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 5 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ® ❑ # Has the facility evaluated feasible alternatives to current practices? ® ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ® ❑ ❑ ❑ # Does the Plan include a BMP summary? ® ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? B ❑ ❑ [] # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? El ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ig ❑ ❑ ❑ # Is the Plan reviewed and updated annually? EM ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? Ea ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ® ❑ ❑ ❑ Comment: Please review the plan and updated it annuall (Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ® ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ®❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ® ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ® ❑ ❑ ❑ # Were all outfalls observed during the inspection? 99 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ON ❑ # Has the facility evaluated all illicit (non stonnwater) discharges? ® ❑ ❑ ❑ Comment: Page: 3 0 Compliance inspection Report Permit: NCG020266 Effective: 01/01/10 Expiration: 12/31/14 Owner: Statesville Brick Co SOC: Effective: Expiration: Facility: Statesville Brick Co -Gold Hit County: Rowan Hwy 52 Region: Mooresville Statesville NC 28687 Contact Person: Michael B Foster Title: Phone: 704-872-4123 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 09/04/2014 Entry Time: 09:30AM Primary Inspector: Samar E Bou Ghazate Secondary Inspector(s): Certification: Phone: Exit Time: 11:OOAM Phone: 704-663-1699 Ext.2199 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: UZ Compliant ❑ Not Compliant Question Areas: IM Storm Water (See attachment summary) Page: 1 Permit: 'NCG020266 Owner - Facility: Statesville Brick Co Inspection Date: 09/0412014 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: Site is in compliance with the permit. Analytical monitoring as well as the qualitative monitoring are being conducted per the permit requirements. Please update the stormwater pollution prevention plan annually. Page: 2 a Permit: NCG020266 Owner - Facility: Statesville Brick Co Inspection Date: 0910412014 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ®❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 19 ❑ ❑ ❑ # Does the Plan include a fist of significant spills occurring during the past 3 years? ❑ ❑ ® ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ® ❑ ❑ ❑ # Does the Plan include a 8MP summary? ®❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? N ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 1B ❑ ❑ ❑ # Does the facility provide and document Emp€ogee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? BE ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? M ❑ ❑ ❑ Has the Stormwater Poilution Prevention Plan been implemented? M ❑ ❑ ❑ Comment: Please review and update the stormwater polution prevention plan annually. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ®❑ ❑ ❑ Comment: Analytical Monitoring Yea No NA NE Has the facility conducted its Analytical monitoring? ® 110 ❑ # Has the facility conducted its Analyticaf monitoring from Vehicle Maintenance areas? ❑ ❑ ® ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? M 111111 ' # Were all outfalis observed during the inspection? ®❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ BE ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Page: 3 Compliance Inspection Report Permit: NCG070112 Effective: 06/01/13 Expiration: 05/31/18 Owner: Statesville Brick Co SOC: Effective: Expiration: Facility: Statesville Brick Co-Iredell County: Iredell 391 Brick Yard Rd Region: Mooresville Statesville NC 28677 Contact Person: William Brad Brown Title: Phone: 704-872-4123 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Rep rosentative(s): Related Permits: Inspection Date: 09/04/2014 Entry Time: 12:50PM Primary. Inspector: Samar E Bou Ghazale Secondary Inspector(s): Certification: Phone: Exit Time: 01:15PM Phone: 704-663-1699 Ext.2199 Reason for Inspection: Complaint Inspection Type: Compliance Evaluation Permit Inspection Type: Stone, Clay, Glass, and Concrete Products Stormwater Discharge COG Facility Status: ® Compliant [] Not Compliant Question Areas: ® Storm Water (See attachment summary) Page: 1 Permit: NCG070112 Owner - Facility: Statesville Brick Cc Inspection Date: 09/0412014 Inspection Type : Compliance Evaluation Reason for Visit: Complaint Inspection Summary: Site is in compliance. We suggest that you clear a path to the outfall discharges. Page: 2 permit: NGG070112 Owner - Facility: Statesville Brick Co Inspection Date: 09/0412014 Inspection Type: Compliance Evaluation Reason for Visit: Complaint Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Slormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ® ❑ ❑ ❑ # floes the Plan include a "Narrative Description of Practices'? ®❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? � ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ®❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan includb a BMP summary? ®❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Pian (SPRP)? M ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 93 ❑ ❑ ❑ # Does the facility provide and document Employee Training? 91 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ® ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ® ❑ ❑ ❑ Has the Stormwater Pollution Prevention. Plan been implemented? ® ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? E ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ® ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ® ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 9 ❑ ❑ ❑ # Were all outfalls observed during the inspection? ®❑ 1113 # If the facility has representative outfall status, is it property documented by the Division? ❑ ❑ ❑ # Has the facility evacuated all illicit (non stormwater) discharges? ® ❑ ❑ ❑ Comment: Please provide a clear path for all outlets discharges. Page: 3 AITT-WAA 'ria NCDENR North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources Land Quality Section Tracy E. Davis, PE, CPM Director Mr. Johnny Meredith, VP of Production Statesville Brick Company P.O Box 471 Statesville, North Carolina 28687-4123 Dear Mr. Meredith: Pat McCrory, Governor John E. Skvarla,111, Secretary August 28, 2013 Subject: Compliance Evaluation Inspection General Stormwater Permit NCG020266 Rowan County, NC Enclosed is a copy of the Compliance Evaluation Inspection (CEI) report for the inspection conducted on September 20, 2013 by Mr. Samar Bou-Ghazale of this Office. Also, please find attached a representative outfall application for your use. The report should be self-explanatory; however, should you have any questions concerning the report, please do not hesitate to contact Mr. Bou-Ghazale at (704) 663-1699 Ext.2199. Sincerely, Zahid Khan Land Quality Regional Supervisor Attachment Mooresville Regional Office 610 East Center Avenue, Suite 301, Mooresville, North Carolina 28115 Telephone 704-663-16991 FAX: 704-663-6040 • Internet: http://portal.nedenr.org/web/lr/landgua€i An Equal Opportunity 1 Affirmative Action Employer— 50% Recycled 110% Post Consumer Paper r Compliance Inspection Report Permit: NCG020266 Effective: 01/01/10 Expiration: 12/31/14 Owner: Statesville Brick Co SOC: Effective: Expiration: Facility: Statesville Brick Co -Gold Hit County: Rowan Hwy 52 Region: Mooresville Statesville NC 28687 Contact Person: Michael B Foster Title: Phone: 704-872-4123 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 09/20/2013 Entry Time: 09:30 AM Exit Time: 11:15 AM Primary Inspector: Samar E Bou Ghazale Phone: 704.663-1699 Secondary Inspector(s): Ext.2199 Reason for Inspection: Routine Inspection Type: Technical Assistance Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: ■ Compliant 1=f Not Compliant Question Areas: Storm Water (See attachment summary) Page: t Permit: NCG020266 Owner -Facility: Statesvifle Brick Co Inspection Date: 09/20/2013 . Inspection Type: Technical Assistance Reason for Visit: Routine Inspection Summary: Site is in compliance with the permit. Since outfall 002 is discharging to outfall 003, it is recommended that you apply for the outfall 003 to be a representative outfall. Also, it is suggested that you build a fore bay in front of the pond in order to minimize sediment loss into the pond. Page: 2 Permit: NCG020266 Owner - Facility: Statesville Brick Co Inspection Date: 09/20/2013 Inspection Type: Technical Assistance Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ n n n # Does the Plan include a General Location (USGS) map? ■ n ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ■ n n n # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ n n n # Does the Plan include a list of significant spills occurring during the past 3 years? n n ■ n # Has the facility evaluated feasible alternatives to current practices? n n n # Does the facility provide all necessary secondary containment? n Cl ■ n # Does the Plan include a BMP summary? ■ n n E) # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ■ n n n # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ n n n # Does the facility provide and document Employee Training? ■ n n n # Does the Plan include a list of Responsible Party(s)? ■ n n n # Is the Plan reviewed and updated annually? n ■ o o # Does the Plan include a Stormwater Facility Inspection Program? ■ 00 n Has the Stormwater Pollution Prevention Plan been implemented? ■ n n n Comment: According to Mr. Moose, the plan is reviewed annually, but there is no need to update since no change was being made. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ■ n n n Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ■ n n n # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? n n ■ n Comment. - Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non Stormwater) discharges? Comment: Page: 3 kGow? �mA Division of Water Quality /Surface Water Protection NCDENRNational Pollutant Discharge Elimination System Norm Una — Dwxn+ _ 0, E REPRESENTATIVE OUTFALL STATUS (ROS) REQUEST FORM FOR AGENCY USE ONLY Date Received Year Month Day If a facility is required to sample multiple discharge locations with very similar stormwater discharges, the permittee may petition the Director for Representative Outfall Status (ROS). DWQ may grant Representative Outfall Status if stormwater discharges from a single outfall are representative of discharges from multiple outfalls. Approved ROS will reduce the number of outfalls where analytical sampling requirements apply. If Representative Outfall Status is granted, ALL outfalls are still subject to the qualitative monitoring requirements of the facility's permit —unless otherwise allowed by the permit (such as NCG020000) and DWQ approval. The approval letter from DWQ must be kept on site with the facility's Stormwater Pollution Prevention Plan. The facility must notify DWQ in writing if any changes affect representative status. For questions, please contact the DWQ Regional Office for your area (see page 3). (Please print or type) 1) Enter the permit number to which this ROS request applies: Individual Permit (or) Certificate of Coverage NC 5 F.N Ct�G 2) Facility Information: Owner/Facility Name Facility Contact Street Address City County Telephone No. State ZIP Code E-mail Address Fax: 3) List the representative outfalls) information (attach additional sheets if necessary): Outfall(s) is representative of Outfall(s) Outfalls' drainage areas have the same or similar activities? ❑ Yes ❑ No Outfalls' drainage areas contain the same or similar materials? ❑ Yes ❑ No Outfalls have similar monitoring results? ❑ Yes ❑ No ❑ No data* Outfall(s) is representative of Outfall(s) Outfalls' drainage areas have the same or similar activities? ❑ Yes ❑ No Outfalls' drainage areas contain the same or similar materials? ❑ Yes ❑ No Outfalls have similar monitoring results? ❑ Yes ❑ No ❑ No data* Outfall(s) is representative of Outfall(s) _ Outfalls' drainage areas have the same or similar activities? ❑ Yes ❑ No Outfalls' drainage areas contain the same or similar materials? ❑ Yes a No Outfalls have similar monitoring results? ❑ Yes ❑ No ❑ No data* *Non-compliance with analytical monitoring prior to this request may prevent ROS approval. Specific circumstances will be considered by the Regional Office responsible for review. Page 1 of 3 SWU-ROS-2009 Last revised 12/30/2009 Representative Outfall Status Request 4) Detailed explanation about why the outfalls above should be granted Representative Status: (Or, attach a letter or narrative to discuss this information.) For example, describe how activities and/or materials are similar. 5) Certification: North Carolina General Statute 143-215.6 e(i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the [Environmental Management] Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). I hereby request Representative Outfall Status for my NPDES Permit. I understand that ALL outfalls are still subject to the qualitative monitoring requirements of the permit, unless otherwise allowed by the permit and regional office approval. I must notify DWQ in writing if any changes to the facility or its operations take place after ROS is granted that may affect this status. if ROS no longer applies, I understand I must resume monitoring of all outfalls as specified in my NPDES permit. I certify that I am familiar with the information contained in this application and that to the best of my knowledge and belief such information is true, complete, and accurate. Printed Name of Person Signing: Title: (Signature of Applicant) (Date Signed) Please note: This application for Representative Outfall Status is subject to approval by the NCDENR Regional Office. The Regional Office may inspect your facility for compliance with the conditions of the permit prior to that approval. Final Checklist for ROS Request This application should include the following items: ❑ This completed form. Q Letter or narrative elaborating on the reasons why specified outfalls should be granted representative status, unless all information can be included in Question 4. ❑ Two (2) copies of a site map of the facility with the location of all outfalls clearly marked, including the drainage areas, industrial activities, and raw materials/finished products within each drainage area. ❑ Summary of results from monitoring conducted at the outfalls listed in Question 3. ❑ Any other supporting documentation. Page 2 of 3 SWU-ROS-2009 Last revised 12/30/2009 Representative Outfall Status Request Mail the entire package to: NC DENR Division of Water Quality Surface Water Protection Section at the appropriate Regional Office (See map and addresses below) Notes The submission of this document does not guarantee Representative Outfall Status (ROS) will be granted as requested. Analytical monitoring as per your current permit must be continued, at all outfalls, until written approval of this request is granted by DWQ. Non-compliance with analytical monitoring prior to this request may prevent ROS approval. Specific circumstances will be considered by the Regional Office responsible for review. For questions, please contact the DWQ Regional Office for your area. Asheville Regional Office 2090 U.S. Highway 70 Swannanoa, NC 28778 Washington Regional Office 943 Washington Square Mall Phone (828) 296-4500 Washington, NC 27889 FAX (828) 299-7043 Phone (252) 946-6481 Fayetteville Regional Office FAX (252) 975-3716 Systel Building, 225 Green St., Suite 714 Wilmington Regional Office Fayetteville, NC 28301-5094 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 433-3300 FAX 910/486-0707 Phone (910) 796-7215 FAX (910) 350-2004 Mooresville Regional Office 610 East Center Ave. Winston-Salem Regional Office Mooresville, NC 28115 585 Waughtown Street Winston-Salem, NC 27107 Phone (704) 663-1699 Phone (336) 771-5000 FAX (704) 663-6040 Water Quality Main FAX (336) 771-4630 Raleigh Regional Office Central Office 1628 Mail Service Center 1617 Mail Service Center Raleigh, NC 27699-1628 Raleigh, NC 27699-1617 Phone (919) 791-4200 Phone (919) 807-6300 FAX (919) 571-4718 FAX (919) 807-6494 Page 3 of 3 SWU-ROS-2009 Last revised 12l3012009 Compliance Inspection Repo Permit: NCG020266 Effective: 10/01/15 Expiration: 09/30120 Owner : Statesville Brick Co SOC: Effective: • Expiration: Facility: Statesville Brick Co -Gold Hit County: Rowan Hwy 52 Region: Mooresville Statesville NC 28687 Contact Person: Michael B Foster Title: Phone: 704-872-4123 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 08/25/2016 Primary Inspector: James D Moore Secondary Inspector(s): Certification: Phone: Entry Time: 09:OOAM Exit Time: 10:30AM Phone: David A Hill Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: m Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page: 1 t, Permit: NCG020266 Owner - Facility: Statesville Brick Co Inspection bate: 08/2512016 inspection Type; Compliance Evaluation Reason for Visit: Routine Inspection Summary: The stormwater inspection was conducted with the mine inspection. There is no office or records on site. The only mining is stock pile removal. The last land disturbance activity was in 2014. We called the Statesville Brick environmental manager when we were onsite and he scanned amnd emailed resent sampling data indicating compliance. All records are kept at the Statesville Brick Plant.Efforts to reduce TSS have been successful. Page: 2 I- 'L. 16 Analytical Results;: Statesville Brick Company, PO Box 471 Statesville, NC 28687 �* Receive Date: 03/25/2015 T� Reported: 03/27/21015 For: _ Dutfalls Gold,Hill Comments: --- Sample Number Parameter Sample ID Result Unit Method Analyzed Analyst 150325-22-01 Settleable Solids OF#1 0.5 mI1L SM254OF-1997 03/26/2015 MD 150325-22-01 TSS OF#1 32.125 mg/L SM254OD-1997 03/26/2015 WL 150325-22-01 Turbidity OF#1 20 NTU EPA 180.1 03126/2015 MD 150325-22-02 Settleable Solids OF#2 0.1 ml/L SM2540E-1997 03/2612015 MD 150325-22-02 TSS OF#2 17 mg/L SM254OD-1997 0312612015 WL 150325-22-02 Turbidity OF#2 5 NTU EPA 180.1 03/2612015 MD 150325-22-03 Settleable Solids OF#3 <0.1 mlIL SM254OF-1997 03/26/2015 MD 150325-22-03 TSS OF#3 3.444 mg/L SM25400-1997 03126/2015 WL 150325-22-03 Turbidity OF#3 8 NTU EPA 180.1 03126/2015 MD Respectfully Dena Myers NC Cert #440, NCDW Cert #37755, EPA #NC00909 PO Box 228 • Statesville, NC 28687 • 704/872/4697 Page 1 of 2 ,'t 6 Sample ID Ie Solids Outfaill Outfalll Eb�dltY : Out -fall'! 5ettieable Solids Out€all? TSS : Outfal12 urbidity Outfal12 Settleable Solids Outfall3 TSS Outfal13 Turbidity Outfal13 V,g5-,M--,7,4,-nars ;:L ,?:NC Cert #440, "`�NCD..W Cert #37755, �.. EPA #NC00909 gal Results Result Emit Method Analyzed Analyst 0.1• � ml/L SM254OF-1997 11/07/2014 WL 6.67 mg1L - SM25400-1997 11/06/2014 JM 5 — NTU EPA 180.1 11/07/2014 MD 0.1 - mlIL SIv12540E-1997 11/07/2014 WL 6.83 mglL SM254OD-1997 11/06/2014 JM 2 NTU EPA 180.1 11/07/2014 MD 0.1 mVL SM254OF-1997 11/0712014 WL 3.60 mg1L SM254OD-1997 11/0612014 JM 2 NTU EPA 180.1 11107/2014 MD PO Box 228 • Statesville, NC 28687 • 704/872/4697 Page 1 of 2 A 0rC=3z=s s�so® = ��ICyi•;� ■� zwmv ■'#1 �� �■■rrrrr.�. Ff�3fS7 bfr � sta�A�o s �i�» rNrr■1�■■I �'>� ■rases■ EM9G== TOM To: Robert B. Krebs Regional Office Supervisor Surface Water Protection Section Mooresville Regional Office Subject: In response of Notice of Violation Tracking No. Nov.-2009-PC-0487 Compliance Evaluation Inspection Statesville Brick Company -Rowan Mine COC Number NCG020266 Rowan County Mr. Krebs, RECEIVED DIVISION OF W . 7 _ 1, QUALITY SEP 2 3 �.:?q1 SWP SEC :':^-A MOORESVILLE REG1G,:AL OFFICE Statesville Brick Company intends to stay in compliance with existing permit . . requirements. We have taken corrective action of non compliant issues listed in the . _ compliance evaluation that occurred on August 10, 201 i.'StatesviIle Brick has put . together a plan to address outstanding issues which are.listed below. 1. Monitoring outfall # I on a monthly basis until in compliance with turbidity levels and report levels to the Mooresville Regional office. 2. We are working with Bobby Starling with Hanes Geo Components a distributer of HaloKlear. After running tests we have decided to use two components .k which are environmentally friendly. These products are listed on the North Carolina DOW approved DAMS/Flocculants list. 3. Statesville Brick installed a pipe as recommended by Barbara Sifford this will help control water flow into the catch basin. This pipe will also direct water flow through.the treatment socks_which have been placed inside the pipe. The socks are held in place'by using metal snaps and nylon ropes. The socks will be monitored to see if .replacement is necessary. This will drop turbidity,levels.over time. P. 0. Box 471 Statesville, NC 28687-0471 Phone: 704-872-4123 Fax: 704-872-4125 Toll Free: 800.522.4716 www.statesvillebrick.com 4. We evaluated water runoff on the mine site and made changes to help slow water flow. Silt fence and berms were put in key locations. Grass was planted in some areas to help with controlling erosion. Overall this will help control and decrease the amount of material runoff into the catch basin. 5. We are looking at portable turbidity meters for monitoring levels to ensure that we are moving in the right direction to meet compliance levels. This would be for our use only and would not affect permit required testing and sending of results to the Mooresville Regional Office. As of September 20, 2011 all parts of this plan have been completed and will be - - — monitored to see if changes are necessary. If you have any questions please contact Steve Moose at Statesville Brick Company. Steve Moose Statesville Brick Company 704-872-4123 %�- M Beverly Eaves Perdue Governor Mr. Victor Shive w vo': I - L E, Y NCEN North Carolina Department of Environment and Natural Resources Division of Water Quality Coleen H. Sullins Director Dee Freeman Secretary - ____.September 2, 2011 -- - - -- - - -- Director of Engineering and Technical Services Statesville Brick Company P.O. Box 471 Statesville, North Carolina 28687 Subject: Notice of Violation Tracking No. NOV-2009-PC-0487 Compliance Evaluation Inspection Statesville Brick Company -- Rowan Mine COC Number NCG020266 Rowan County, NC Dear Mr. Shive: Enclosed is a copy of the Compliance Evaluation Inspeetion (CEI) report for the inspection conducted at the subject facility on August 10, 2011, by Ms. Barbara Sifford of this Office. Thank you for your assistance and cooperation during the inspection. This report is being issued as a Notice of Violation (NOV) due to the facility-s failures to implement the Stormwater Pollution Prevention Plan, and comply with all monitoring requirements, all violations of the subject StormNvater Permit and North Carolina General Statute (G.S.) 143-215.1, are detailed its the Storniwater Pollution Prevention Plan, QnalitatiN,e 1'ionitot-ing, Analytical Monitoring and Permit & Outfalls Sections of the attached report. Pursuant to G.S. 143-215.6A, a civil penalty of not more than twenty-five thousand doliars($25,000.00) may be assessed against any person Nvho violates or fails to act in accordance with the terns, conditions, or requirements of any permit issued pursuant to G.S. 1113-215.1. It is requested that a written response be'subrnitted to this Office by September 30, 2011, addressing the above -noted violations in the attached report and detailing the corrective action plan that is to be implemented to address the non-compliance issues of the permit. In responding to the violations, please address your comments to the attention of Ms. Marcia Allocco. biooresvIe Regional Office Location: 610 East Center Ave., Suite 301 Mooresville, NC 28t15 Phone: (704) 663-1699 ! Fax: (704) 663-6040 ti Customer Service: 1-877-623-6748 tnternet mm.nmatenquality.org One @IordxCaroliila An Eoual Opnortunily 1.Atumative Action tm.aloyer— 50% Recycle„?10% Past Consumer Paper Page to j3 Statesville Brick CEt August 201t The report should be self-explanatory; however, should you have any questions concerning the report, please do not hesitate to contact Ms. Marcia Aliocco or Ms. Sifford at (704) 663-1699. Sincerely, � � ( __ fog• Robert B. Krebs Regional Office Supervisor Surface Water Protection Section Mooresville Regional Office Enclosures: CEl PAM and Flocculant list Representative outfall cc: Shelton Sullivan, NPS-ACO Unit ` Compliance Inspection Report Permit. NCG020266 Effective: 01/01/10 Expiration: 12/31/14 . Owner: Statesville Brick Co SOC: Effective: Expiration: Facility: Statesville Brick Co -Gold Hil County: Rowan Hwy 52 Region: Mooresville Contact Person: Michael B Foster Directions -to -Facility: _T___. System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Title: Certification Statesville NC 28687 Phone: 704-872-4123 Phone: Inspection Date: 08110/2011 Entry Time: 02:00 PM Exist Time: 04:00 PM Primary Inspector: Barbara Sifford phone: 704-663-1699 Secondary Inspector(s): Ext.2196 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater discharge COC Facility Status: n Compliant M Not Compliant Question Areas: Storm Water (See attachment summary) Page: 1 e Permit NCG020266 Owner - Facility: Statesvilie Brick Co Inspection Date: 08/1012011 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: The permittee was given the DWQ approved PAMS and Flocculants list and immediately began researching the various products listed to determine which polymers were most applicable to this sb&rnent and erosion issue. Samples have been submittted to them which have resulted great laboratory setting reductions in turbidity. A design application is under consideration with a new inlet to the pond being constructed to raise the roadway and prevent disturbing the soils at that location. _ This-fall.additional_seeding will_be-done-to_stabilize-some_of.the_mined.area._,Floc logs will be -placed. in the ditch_ line to the pond with additional brick bat dams to slow the water and settle the solids. With these corrective actions taken over the next six months a drastic reduction in turbidity and TSS should be noticed at this outfall. This facility will require a follow up visit in the next several months. Page: 2 0 Permit: NCG020266 Owner - Facility: Statesville Brick Co Inspection Date: 08/10/2011 Inspection Type: Compliance Evaluation Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Preventlon Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? -----------# Does the-Plaminclude-a-detailed-site-map-including outfall- locations -and -drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Reason for Visit: Routine Comment: The site is divided by Hwy 52. Two outfalls are on the north side and one is on the south side behind the Periite plant to Old Salsibury Hwy (dirt road). This site has not been mined in 8-9 years and is vegetated. The discharge from outfall 002 is sheet flow and goes to Hwy 52 drainage ditch. Yes No NA NE ® n n n ®nnn ®nnn nn®n n ® n n ® n n n I3nnn MOOD p n n n ®nnn' nnn ®nnn nnn nnn Qualitative Moni!2Einq Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ® n n n Comment: Outfall 001 has been noted as cloudy. The inspector would note this pond as very turbid at the highest level at the time of the inspection no discharge was occurring. Analytical Monitoring . Yes No NA NE Has the facility conducted its Analytical monitoring? ® F1 n # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? n n Comment: Analytical monitoring indicates that 001 has not met the benchmarks of the mining permit, therefore the facility should be in tier monthly monitoring. Past records and observations indicate that this area which is currently being mined has always had high solids and turbidity. The permittee will start monthly monitoring and check up and downstream water quality each month after a rainfall event. Review the permit for conditions of turbidity compliance as it has changed with the new permit issued in 2010. Permit and Outfalls vex M, un ur Page: 3 h Permit: NCG020266 Owner - Facility: Statesville Brick Co Inspection Date: 0811012011 Inspection Type: Compliance Evaluation Reason for Visit: Routine # Is a copy of the Permit and the Certificate of Coverage available at the site? MI n n # Were all outfalls observed during the inspection? ®n ❑ n # If the facility has representative outfall status, is it properly documented by the Division? rl fl 8 11 # Has the facility evaluated all illicit (non stormwater) discharges? rl fl fl Comment—Outfa€Is 002--and-003-may-qualify -for -representative-outfall-status-based-on--- -- past analytical data. A form requesting this is included with the inspection report this is to be submitted by the permittee. See notes in summary. Page: 4 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W, Klimek_ P.E. Director Division of Water Quality February 7, 2005 Michael B Foster Statesville Brick Co PO Box 471 Statesville, NC 28687 Subject: NPDES Stormwater Permit Coverage Renewal Statesville Brick Co -Gold Hil COC Number NCG020266 Rowan County Dear Permittee: In response to your renewal application for continued coverage under general permit NCG020000 the Division of Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. Please review the new permit to familiarize yourself with the changes in the reissued permit. The general permit authorizes discharges of stormwater and some types of wastewater. You must meet the provisions of the permit for the types of discharges present at your facility. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983. The following information is included with your permit package: • A new Certificate of Coverage • A copy of General Stormwater Permit NCG020000 • A copy of a Technical Bulletin for the general permit • Five copies of Discharge Monitoring Report (DMR) Forms - wastewater and stormwater • Five copies of Qualitative Monitoring Report Form Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package please contact Bethany Georgoulias of the Central Office Stormwater Permitting Unit at (919) 733-5083, ext.529. Sincerely, for Alan W. Klimek, P.E. pC DEPT. OF F-NVIRONFAET AND NAT�>!-^":t RESOURCES'' SWRESWU F10E cc: Central Files^ Stormwater & General Permits Unit Files Mooresville Regional Office �• FEB 2 1 2005 k NorthCarolina �.• {" North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 - Phone (919) 733-7015 Customer Service Internet: h2o.enr.state.nc.uslsulstormwater.html 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-9612 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer — 50°% Recycledl40°% Past Consumer Paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG020000 CERTIFICATE OF COVERAGE No. NCG020266 STORMWATER AND PROCESS WASTEWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Statesville Brick Co is hereby authorized to discharge stormwater and to operate treatment systems and discharges associated with mine dewatering wastewater and process wastewater from a facility located at Statesville Brick Co -Gold Hil Hwy 52 Statesville Rowan County to receiving waters designated as Riles Creek, a class C stream in the Yadkin -Pee Dee River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III, IV, V, and VI of General Permit No. NCG020000 as attached. This certificate of coverage shall become effective February 7, 2005. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day February 7, 2005 for Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission ''State of North Carolina Department of Environment and Natural Resources Division of Water Quality James B. Hunt, Jr., Governor Bill Holman, Secretary Kerr T. Stevens, Director December 17, 1999 MICHAEL B. FOSTER STATESVILLE BRICK COMPANY - GOLD HILL MINE PO BOX 471 STATESVILLE, NC 28687 Dear Permittee: Avomw% own% woo ML NCDENR NORTH CAROUNA DEPARTMENT OF ENVIRONMENT ANR NATURAL- RESOURCES Subject: Reissue - NPDES Stormwater Permit Statesville Brick Company - Gold Hill Mine COC Number NCG020266 Rowan County In response to your renewal application for continued coverage under general permit NCG020000, the Division of Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983. The following information is included with your permit package: * A copy of general stormwater permit NCG020000 * Five copies of the Analytical Monitoring form and five copies of the Qualitative Monitoring form * A copy of a Technical Bulletin on this permit which outlines permit components and addresses frequently asked questions * A Certificate of Coverage for your facility * DWQ fee schedule Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law rule, standard, ordinance, order, judgment, or decree. Please note that in 1998 Senate Bill 1366 established changes to the permit fee structure for DWQ permits effective January 1, 1999. This change requires that you pay an annual fee to assure continued coverage under this permit. You will be invoiced for this fee beginning next year. A copy of the current fee schedule is included with this letter. If you have any questions regarding this permit package please contact Tony Evans of the Central Office Stormwater and General Permits Unit at (919) 733-5083, ext. 584 Sincerely, for Kerr T. Stevens Director, Division of Water Quality cc: Central Files Mooresville Regional Office 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 FAX 919-733-9919 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post -consumer paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NO. NCG020000 CERTIFICATE OF COVERAGE No. NCG020266 STORMWATER AND PROCESS WASTEWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, STATESVILLE BRICK COMPANY is hereby authorized to discharge stormwater and to operate or continue operation of treatment systems and discharges associated with mine dewatering and process wastewater from a facility located at STATESVILLE BRICK COMPANY - GOLD HILL MINE HIGHWAY 52 GOLD HILL ROWAN COUNTY to receiving waters designated as Riles Creek in the Yadkin - Pee Dee River Basin in accordance with the effluent limitations. monitoring requirements, and other conditions set forth in Parts 1, I1, II1, IV, V, and VI of General Permit No. NCG020000 as attached. This certificate of coverage shall become effective December 17, 1999. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day December 17, 1999. for Kerr T. Stevens. Director Division of Water Quality By Authority of the Environmental Management Commission State of North Carolina Department of Environment, Health and Natural Resources Division of Environmental Management James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary A. Preston Howard, Jr., P.E., Director - October 21, 1994 Michael B. Foster Statesville Brick Co. -Gold Hit P.O.Box 471 Statesville, NC 28687 4• ®FE N.C. ' DEFT. OF ENVIRONMENT, HRM,TH, & NATURAL RE5OU12CES Orr 26 199A DIVISION OF ENVIRONMENTAL MANAGUIENT MOORESVILLE REGIONAL OFFICE Subject: General Permit No. NCG020000 Statesville Brick Co. -Gold Hit COC NCG020266 Rowan County Dear Michael B. Foster: In accordance with your application for discharge permit received on 05/26/94, we are forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .l and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983. If any parts, measurement frequencies or sampling requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, this certificate of coverage shall be final and binding. Please take notice that this certificate of coverage is not transferable except after notice to the Division of Environmental Management. The Division of Environmental Management may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Environmental Management or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required - If you have any question concerning this permit, please contact Ms. Aisha Lau at telephone number 919/733-5083. Sincerely, Original Signed By David A. Goodrich A. Preston Howard, Jr. P.E. cc: Mooresville Regional Office P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-7015 FAX 919-733-2496 An Equal Opportunity Alirmalive Action Employer 50% recycled/ 10% post -consumer paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES DMSION OF ENVIRONMENTAL MANAGEMENT GENERAL PERMIT NO. NCG020000 CERTIFICATE OF COVERAGE No. NC 020266 STORMWATER, MINE DEWATERING, AND/OR OVERFLOW FROM PROCESS WATER RECYCLE SYSTEMS DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Statesville Brick Company is hereby authorized discharge storinwater from a facility located at Gold Hill Mine Highway 52 Gold Hill Rowan County to receiving waters designated as Riles Creek in the Yadkin -Pee Dee River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, 111 and IV of General Permit No. NCG020OW as attached. This certificate of coverage shall become effective October 21, 1994 This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day October 21, 1994 Original Signed By oamid A. Goodrich A. Preston Howard, Jr., P.E., Director Division of Environmental Management By Authority of the Environmental Management Commission V� ,�, .`15 I ;/ • _ � jam` �� -% �� `� \•-, `� ;: � 's tip, �•' _ � � �, �• . / �,� ,� u o --- _ � .�==w 695 1,10 .755 721 Or 6 - if !1 It ri . --- _ -`\fir: � '�"- � l.� � � I- �� _- H• - �. 739 ,cam �'� • . � ___- L `. _ I Pilgrim.-. '-- - / - `i�j =em! Ii •' _,� �767 4 2C 1 Gr�O L D H `-`•. Lrri� C�arr[41 J Jn{ "`` �' i \ ]d Hill J Jf OLD Gold Hiil.�'- - -- -�� J �� 0Ch C.T ,f t ed. and published by the Geoiooica# Survey