Loading...
HomeMy WebLinkAboutNCG020173_COMPLETE FILE - HISTORICAL_20080508STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. DOC TYPE 19/HISTORICALFILE ❑ MONITORING REPORTS DOC DATE ❑ aDOXOSOe YYYYMMDD William G. Ross Jr., secretary North Carolina Department of Environment and Natural Resources V' '`Y C� Q --1 0 � Ms Julia Andoe, Environmental Engineer Martin Marietta Materials 8701 Red Oak Blvd., Suite 540 Charlotte, North Carolina 28217 Subject: Dear Ms. Andoe: Coleen H. Sullins, Director Division of Water Quality May 8, 2008 Compliance Evaluation Inspection Martin Marietta Materials — Mallard Creek Quarry Stormwater Permit Number COC NCG020173 Mecklenburg County,'NC . Enclosed is a copy of the Compliance Evaluation Inspection (CEI) report for the inspection conducted at the subject facility on March 25, 2008, by Mr. Ron Eubanks of Charlotte -Mecklenburg Storm Water Services. This inspection was conducted as part of a cooperative working agreement between Mecklenburg County and the Division of Water Quality. In addition, the inspection was conducted on behalf of the City of Charlotte in compliance with the City's NPDES Permit, NCS000240, Part 11 Section H. Thank you for your assistance and cooperation during the inspection. Overall, the inspection found that the Mallard Creek Quarry operated by Martin Marietta Materials has developed and implemented a Stormwater Management program and this Office commends the permittee's efforts to ensure compliance with your NPDES permit. The enclosed report should be self-explanatory; however should you have any questions concerning this report or have any questions regarding your permit, please do not hesitate to contact Ms. Marcia Allocco of this Office at (704) 663-1699. Sincerely, for Robert B. Krebs Regional Supervisor Surface Water Protection Section Mooresville Regional Office Enclosure cc: NPS-ACO Unit Rusty Rozzelle, Mecklenburg County Craig Miller, City of Charlotte Mr. Bobby Martin, Plant Manager Martin Marietta Materials Mallard Creek Quarry 575 E. Mallard Creek Church Road Charlotte, NC 28282 one NCNorthCarolVAma /1�lltllrl7!!J DENR Mooresville Regional Office Division of Water Quality Phone 704-663-1699 Customer service lntemet. ,v%vw.ncwaterquaH1y.or 610 East Center Ave, Suite 301 Mooresville, NC 28115 Fax 704-663-6040 1-877-623-6748 An Equal OpportunitylAfBrmative Action Employer— 50% Recycled110% Post Consumer Paper Compliance Inspection Report Permit: NCG020173 Effective: 01/19/05 Expiration: 12/31/09 Owner: Martin Marietta Materials tnc SOC: Effective: Expiration! Facility: Martin Marietta -Mallard Creek County: Mecklenburg 575 E Mallard Creek Church Rd Region: Mooresville Charlotte NC 28213 Contact Person: Brian K North Title: Phone: 704-409-1475 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representatives): Related Permits: Inspection Date: 03/24/2008 Entry Time: 01:30 PM Exit Time: 03:00 PM Primary Inspector: Water Quality Program Mecklenburg County Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Faciiity'Status: ■ Compliant ❑ Not Compliant Question Areas: 0 Storm water (See attachment summary) Page: 1 I" Permit: NCG020173 Owner - Facility: Martin Marietta Materials Inc Inspection Date: 03/24/2008 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Facility Description: Martin Marietta Aggregates, a Division of Martin Marietta Materials, operates the Mallard Creek Quarry for the purpose of producing crushed aggregate for use in the construction industry. The quarry is located at 575 E. Mallard Creek Church Road in Charlotte, North Carolina, Compliance History: Charlotte -Mecklenburg Storm Water Services personnel responded to a discharge from the Martin Marietta Mallard Creek Quarry on December 22, 2004. A Notice of Violation was not issued for the discharge. The permitteelfacility does not have any prior compliance issues with the NC Division of Water Quality. Industrial Operations/City of Charlotte Stormwater Ordinance Review: Quarry/Pit Sump — All discharges at the site are either stormwater discharges or a combination of groundwater seepage and stormwater runoff. Groundwater seepage collects in the pit sump prior to being discharged. The sump also collects the majority of the stormwater runoff. All other discharges at the site are the result of stormwater runoff. Pit dewatering is a typical quarry activity and is authorized under the NPDES permit. The implementation of diversion ditches, rock check dams, and sediment basins are used to manage stormwater runoff at the site. Pit expansion is to be conducted in a manner so as to divert all stormwater runoff from disturbed areas to the pit, which allows sediment to settle out prior to discharging. Detention Pond — The detention pond at the site is used to collect runoff from the aggregate wash area. The water in the detention pond is recycled at the facility. Therefore, there is no discharge from the detention pond. Storage Tank Area - There are several aboveground storage tanks (ASTs) located at the facility; there are no records of any underground storage tanks (USTs) at the site. The ASTs contain petroleum products used to service mobile and plant equipment. The tanks included a 6,000-gallon diesel AST, a 530-gallon gasoline AST, a 1,000-gallon bulk oil AST, a 2,000-gallon bulk oil AST, and a 500-gallon waste oil tank. In addition to the ASTs, there are also several 55-gallon bulk oil drums located in the storage tank area. Secondary containment was provided for all of the ASTs and drums, except a small waste oil container. The waste oil container should be moved into the secondary containment area in case there is a spill. Page: 2 Permit: NCG020173 Owner - Facility: Martin Marietta Materials Inc Inspection Date: 03/24/2008 Inspection Type: Compliance Evaluation Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Pian include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention.and Response Pan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Comment: Qualitative Monitorin Has the facility conducted its Qualitative Monitoring semi-annually? Comment: Analytical Monitoring Has the facility conducted its Analytical monitoring? # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Comment: Permit and Qutfalls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Comment: Reason for Visit: Routine Yes No NA NE ■nnn ■ n n n ■nnn ■nnn ■ n n n ■nnn ■ n n n ■nnn ■ n n n ■nnn ■nnn ■ ❑ ❑ ❑ ■nnn ■ n n n ■ n n n ■nnn Yes No NA NE ■nnn nn■n Yes No NA NE Page: 3 n