Loading...
HomeMy WebLinkAboutNCG020113_COMPLETE FILE - HISTORICAL_20170706STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /V CC�UaU DOC TYPE R"'HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ ��)I� V �_� YYYYMMDD ROY COOPER Gowrnot MICHAEL S. REGAN Secretary Environmental Quallty July 6, 2017 CHRIS BARRFTT - MANAGER ALLEGHANY STONE, LLC P.O BOX 1794 SPARTA, NC 28675 Subject: Multimedia Compliance Inspection Alleghany Stone, LLC Alleghany County Dear PenTiittee: Department of Environmental Quality staff from the Winston-Salem Regional Office conducted a multimedia compliance inspection of Alleghany Stone, LLC on June 14, 2017 for permits and programs administered by the following Divisions: Division of Air Division of Energy, Division of Water Division of Waste Quality Mineral, and Land Resources . Management Resources We appreciate your cooperation during the inspection and hope that you have enjoyed the benefit of our initiative to provide a single inspector capable of handling multiple areas of environmental compliance at your facility. The results of each applicable inspection and any associated response actions or necessary corrective measures are detailed in the inspection letters/reports attached to this transmittal sheet. If a Division report is not attached, you may assume compliance with that Division's rules and regulations at the time of inspection. If you have any questions regarding this multimedia inspection, please contact Ryan Swaim at (336) 776- 9659 or ryan.swaim@ncdenr.gov. Thank you for your cooperation. encl: Air Quality Inspection Report DEMC.R Inspection Report Stormwater Inspection Report cc: DAQ WSRO Files DEMLR WSRO Files DWR WSRO Files DWM WSRO Files state of North Carolina I Fnvlronmental Quallty Winston-Salem Regional office 1 450 West Banes Mill Road, Sulte 300 1 Winston-salem. North Carolina 27105-7407 336 776 9800 T 1 336 776 9797 F 0 3{ NORTH CAROLINA DIVISION OF AIR QUALITY . Inspection Report Date: 06/28/2017 Facility Data Alleghany Stone, LLC 367 Arbor Lane Glade Valley, NC 28627 Lat: 36d 27.3960m Long: 81d 1.8240m SIC: 1429 / Crushed And Broken Stone Nec NAICS: 2123191 Other Crushed and Broken Stone Mining and Quarrying Winston-Salem Regional Office Alleghany Stone, LLC NC Facility ID 0300033 County/FiPS: Alleghany/005 Permit Data Permit 07832 I R04 Issued 3/712014 Expires 2/28/2022 Classification Small Permit Status Active Current Permit Application(s) None Contact Data Program Applicability Facility Contact. Authorized Contact Technical Contact SIP Chris Barrett Chris Barrett Chris Barrett NSPS: Subpart 000 Manager Manager Manager (336) 372-5222 (336) 372-5222 (336) 372-5222 Compliance Data Comments: Inspection Date 06/14/2017 Inspector's Name Ryan Swairn Inspector's Signature: �_ Operating Status Operating Compliance Code Compliance - inspection Action Code FCE Date of Signature: RS On -Site Inspection Result Compliance Total Actual emis_aiens in TONSIYF.AR- TSP S02 NOX VOC CO PM10 * HAP 2012 0.2000 0.1700 3.39 0.1900 0.7800 0.1400 1.53 2003 0.0000 — --- -- -- --- -- Five Year Violation Histon: Date Letter Tyne Rule Violated 09/11/2012 NOV Part 60 - NSPS Subpart 000 Nonmetallic Mineral Processing Plants Performed Stack Tests since -lost FC : None Date Test Results Test Method(sl * Highest HAP Emitted Violation Resolution Date 09/06/2013 Sources) Tested a Permitted Sources 2 Non-metallic mineral processing plant utilizing water suppression, with no other control devices ES- CrushCrushing operations ES -Screen Screening operations NIA I NIA 1rS-Convey Conveyuig operations Insignificant / Exempt Activities -�.-.._, u..,.,....r.. •_•_ : .r•._ r.rF.a�iyi prr .. ' • .. if iji3:: r.irhih:,::n ��?ri....i!=r:'i•, i. i. - n ,; � isi lS :�' i .�•r=i�tii?i _...:t�Fa' �: -- ea�8'' :3;..; ::i:�:r.:. � ...r r... :Jii.u" _�' i .»#` ,i € .,.-.,,ur, S3 ` �. . f o...'', TES-1 — Diesel- fired portable generator it .l Jiei:ifa ,�vi:3s I...•p.• _ F+�u -recz r au•...�._res:rr-. _J.€:�&° : :nli!'. ;:.:i..15'i'? iA �- i:x3'?JiFn : =i!f'73';•_i'i Fy,�F,',,,� �eti�n��la��fl„ - - .. _ r I F. a,t� r,„rJ r .;j ;..__1, vtr.-_-• _.: .r?!r; l �!:o'F�iv dT'r-e �£..r}3 h1 . 3 i._ � ;il- _t-rr f>r. ...», -U'IM1i: nr: ..J�?'-a It .:c '��F::Sb:u. ,. �i�.Fta » l�#an J�1.;E• is qu��i n t�. (510 kW maximum rated capacity output; approximately 635 hp rated capacity 2Q .0102(c)(1)(LXiii) No engine) IES-2 — Aboveground storage tank Yes containing diesel fuel (500 gallons capacity) 2Q Yes IES-4 — Aboveground storage tank .0102(c)(1)(D)(i) containing diesel fuel (2,500 gallons ... ... ... .capacity) ....... _ ...... ... � � ... .., .... _.._ _ ._ ...._ .... . . Introduction On June 14, 2017, Mr. Ryan Swaim, NCDEQ Multimedia Inspector with the Division of Energy, Mining and Land Resources of the Winston-Salem Regional Office contacted Mr. Chris Barrett, Plant Manager at Alleghany Stone, LLC .for the purpose of conducting a multimedia compliance inspection. The facility was previously inspected on September 8, 2016 by Mr. Chuck Kirchner and Mr. Shannon Leonard DEMLRIWSRO. The facility quarries and crushes blue granite and currently operates 8 hrsJday, 5 days/wk. except in the winter months when weather is not conducive to mining operations. Mr. Barrett stated that he planned to operate a 36 FHC Telsmith skid mounted secondary cone crusher (manufactured in 1968, which pre -dates NSPS 000) within the next 60 days. It is almost installed, but not operational. An updated flow diagram and equipment list will be submitted shortly to WSRO-DAQ based on conversation with Mr. Barrett. 113EAM contacts were confirmed to be accurate. Safety Equipment Safety shoes, hard hat; reflective vest, ear and eye protection are required within production areas. Inspectors are required to bring wheel chocks when visiting this facility. Applicable Regulations According to permit Condition A.1, the facility is subject to the following regulations: Title 15A North Carolina Administrative Code (NCAC), Subchapter 2D .0202, 2D .0501, 2D .0510, 2D .0521, 2D .0524 (40 CFR 60, Subpart 000), 2D .0535, 2D .0540, 2D .1806 and 2Q .0309. The facility is not subject to the RMP requirements of the 112(r) program since it does not use or store any of the regulated chemicals in quantities above the threshold in the rule. The facility is only subject to the General Duty clause of the Section 112(r) program. Discussion This facility is a crushed granite quarrying and sales operation, with a majority of its product being sold to the construction industry. The facility is permitted for crushing (ES -Crush), screening (ES -Screen) and conveying (ES - Conveying) operations. The facility was not in operation on the day of this inspection, though Mr. Barrett did lead the inspector on a tour of the facility. The inspector did observe the exempt diesel -fired portable generator (IES-1) and 2 records of its required movement that occurred on 3-27-17. The 500-gallon aboveground diesel fuel tank (IES-2) and the . 2,500-gallon aboveground diesel storage tank were also observed. The 2,500-gallon aboveground diesel storage tank is currently empty and not in use. Mr. Barrett also informed of the mine possibly using local electrical power grid sources to run some of the mining equipment instead of the diesel -powered engine (fES-1);however this was still in the discussion stages with facility and local power utility company. Permit Conditions/ Applicable Regulations Condition A.2 contains the 15A NCAC 2D .0202 permit renewal and emissions inventory requirements. The permit expires February 28, 2022 and the facility is required to submit a renewal request and emission inventory report for the 2020 calendar year 90 days prior to the expiration of the permit. This condition was discussed with Mr. Barrett and compliance with this condition is anticipated. Condition A.3 contains the 2D .0501(c) equipment reporting requirements. The permittee shall maintain an on -site equipment list and flow diagram of all equipment used covered under this permit. The equipment list and flow diagram are also required to include the revision date_ The equipment list and plant flow diagram are kept in the main office and had not changed from the previous inspection. The flow diagram is consistent with the information on file at DAQ WSRO. Compliance with this condition is indicated. Condition AA contains the requirements for 2D .0510 particulate control requirements for particles from sand, gravel or crushed stone operations. This condition requires the facility to take steps to reduce, to a minimum, any particulate matter from becoming airborne to prevent exceeding the ambient air quality standards beyond the property line. This facility will make use of wet suppression to control process particulate matter. The wet suppression systems were not observed in operating, during this inspection, since the facility was not in active production. Compliance with this condition is anticipated. Condition AS contains the primary crusher specifications. This condition requires the facility to submit a permit application if any changes are made to the primary crusher other than like -for -like replacement. The primary crusher is listed as having a maximum rated- throughput of 150 tons per hour, at a 3- inch jaw setting. Mr. Barrett stated that the crusher was currently set at 3" or slightly less. Compliance with this condition is anticipated. Condition A.6 contains the 15A NCAC 2D .0521 visible emissions control requirement. This facility is limited to 20% opacity visible emissions, for sources manufactured after July 1, 1971, when averaged over a six -minute period. No visible emissions were observed during this inspection. Compliance with this condition is anticipated. Condition A.7 contains the 15A NCAC 2D .0521 visible emissions control requirement. This facility is. limited to 40% opacity visible emissions, for sources manufactured as of July 1, 1971, when averaged over a six -minute period. No visible emissions were observed during this inspection. Compliance with this condition is anticipated. Condition A.9 contains the 15A NCAC 2D .0535 rule which requires the permittee to notify the director of any excess emissions lasting longer than four hours resulting from a malfunction, breakdown of process or control equipment or any other abnormal conditions. Mr. Barrett stated that no such malfunctions have occurred since the prior inspection. Compliance with this condition is indicated. Condition A.10 contains the 15A NCAC 2D .0540 fugitive dust control requirement. No fugitive dust was observed traveling beyond the property boundaries during this inspection. According to the DAQ IBEAM database, no complaints have been received regarding fugitive dust emissions at this facility since the previous inspection. Mr. Barrett stated that the facility uses water tankers to wet the drive areas during dry periods. Compliance with this condition is indicated. Condition A.11 contains the requirements for 2D .1806 control and prohibition of odorous emissions requirements. No objectionable odors were detected during the approach to the facility or at the property boundaries. The facility does not have any previous odor complaints in IBEAM. Compliance with this condition is indicated. Condition A.12 contains the sources exempted from air permitting requirements. This condition states that the portable internal combustion engine is exempt from federal stationary source standards (NSPS and NESHAP) due to being defined as non -road engines. The condition pertains to 510 kW diesel -fired portable generator (IES-1). In order to remain exempt, the source must: • Must be moved at least once in a twelve-month period. • Facility must maintain records that document each time the location of a portable engine is changed, and shall document the reason that the engine is re -located. if any of the portable engines remain at the same location for more than twelve consecutive months, that engine shall be considered a stationary engine and shall no longer be exempt from 40 CFR 63, Subpart ZZZZ. Mr. Barrett provided records which indicated that IES-1 had been moved March 27, 2017. The generator was moved to comply with this condition. Compliance with this condition is indicated. NSPS/NESHAP Condition A.8 contains the requirements for 2D .0524 New Source Performance Standards (NSPS), for the nonmetallic mineral processing equipment, as promulgated in 40 CFR 60, Subpart 000, including Subpart A "General Provisions". Under this condition the following conditions are set: • Notify the Regional Supervisor, in writing, of the startup of an affected facility. • A 15% opacity limit is set for any crusher and 10% opacity for conveyor belts, screening operations and other affected facilities constructed, modified or re -constructed after August 31, 1983, but before April 22, 2008. • A 12% opacity limit is set for any crusher and 7% opacity for conveyor belts, screening operations and other affected facilities constructed, modified or re -constructed on or after April 22, 2008. • The facility is required to perform monthly inspections of the wet suppression systems and must record these inspections within a logbook. The plant was not operating during this inspection and no visible emissions were observed. Mr. Barrett provided the inspectors with maintenance inspection records of the wet suppression system. These records appeared to be complete and showed thorough records from today's inspection all the way back to the September 8, 2016 inspection. Compliance with condition A.8 is indicated. This facility does not appear to be subject to any other NSPSINESHAP rules at this time. Facility Wide Emissions Actual emissions from permit review 04 for Alleghany Stone, LLC (Christopher W. Lewter, P.E., March 6, 2014). ---..._..._...... ............. ...... .... - -- ............... x:eacxi::��t � ie.i�:: I ��'��r..^�.•�i ^i ����.' �� s'-.��-•'."" 'rr :iili: {}�{r =:.� I... '[IfE III•:: _i=water. �� t:€tll:ll::,� µ�w�i 71:—�i.. 1 Kt3..aC.ls[IMllY�iiWi=V:4ui - - - far i_ ii: .': ••' u- m na:=ffiu ' ,'ii' �� I i "' i �: �y �i .lav Gl�i�iM"5.�' [ F 'Y�'.'�= �."li :.:::a�i;��:€�:w:::� ^FMCQ1.3HiiiWR4R>�Flu PM 0.20 PM10..... 0.14 PM2.5 0.11 SOZ .... 0.17 - -�— 3.39 CO 0.78 a{ii F'x-liry��a n'i`:�lliaa _.rai'7�'' 'k ` f.i. s :_OR jjF�'li:7fu'-=-.r--I •:: S' ='F-? ��'Mlla`:e>_ -_�:«^... dies;++., ,",--,,^`I!, _dill Yfi�.:::N J Ij , _ llxa-.'-'.'}s�..._�'�'x. l�li'IF�I:s'r� Uzi ::3:5�c!i='e>_:. !.!'�.:�:"::=^s _ �s3+':-',,,a' ram 6 4 7=.''••:. T::• - - VOC 0.19 HAFT W [lb/yr.] 2.62 HAPxaeht [lb/yr.) ..................._....... _ ......_..._.............._..........1.53 (benzene)........,..... Permit Issues There do not appear to be any permit issues at this time. Compliance History On September 15, 2014, this facility was sent a NOD for failing to properly maintain inspection records of their wet suppression system, a deficiency of Subpart 000 and Condition A.8 of permit 07832R04. The NOD was resolved on September 26, 2014. On September 11, 2012, this facility was sent a NOV for failing to conduct performance tests for three NSPS conveyor belts within 180 days after start-up, a violation of Subpart 000 and Condition A.8 of permit 07832R04. The NOV was resolved on'September 6, 2013 when the facility provided documentation that these tests were completed on August 28, 2013. Conclusion Based on visual observations and review of records, Alleghany Stone, LLC appears to be operating in compliance with all applicable Air Quality standards and regulations at the time of this inspection. North Carolina Department of Environment and Natural Resources, Division of Energy, Mineral, and Land Resources, Land Quality Section MINE INSPECTION REPORT ® PERNUTTED MINE SITE ❑ UNPERNE=D MINE SITE 1. MINE NAME: Alleghany Stone, LLC Bull Head Quarry 2. MINE LOCATION: 367 Arbor Ln Glade ValI N..0 3. COUNTY: Alleghany 4. RIVER BASIN: New River 5. CASE: NA 6. OPERATOR: Chris H. Barrett, Alleghany Stone, LLC 7. ADDRESS: PO Boa 1794 Sparta, NC 28675 8. MINING PERMIT #: 03-02 ❑ N/A 9. PERMIT EXPIRATION DATE: 04-15-2026 NIA 10. PERSON(S) CONTACTED. AT SITE: Chris Barrett 11. PICTURES? ❑ Yes E No TAKEN BY: NA 12. TYPE OF INSPECTION: ❑ A. Initial Inspection (Unpermitted Mine Sites) 1. Size of affected land: NA ac. (attach sketch map) 2. How was this area measured? NA Measured by: NA E B. Routine Inspection (Permitted Mine Sites) II C. Follow-up Inspection 13. Date of last Inspection: 09-08-2016 14. Any mining since that date? E Yes 0 No If yes, cite evidence of such mining activity: It appeared that the site was still actively mined with stone still being sold but -no mining activities were observed at time of inspection. 15. Was mine operating at time of inspection? E Yes No If yes, explain: No mining activities were observed but stone was being sold at time of inspection. 16..Is the mine in compliance with the Operating Conditions of the Permit? Yes Z 'No ❑ NIA If no, explain: Operating condition 4B shall be conducted according to the mines 6-15-16_mining permit. _SB-01 was nearly completely full of sediment at time of inspection and in need of removal and restoration back to functioning status per the approved 6-15-16 mining permit. Operating condition 6A keeping all slopes_at 214:1, adequately stabilized and or protected. Slopes adjacent to ST-04 where observed to be bare and eroding and in need of repair and stabilization. 17. Is the mine in compliance with the Reclamation Conditions of the Permit? ❑ Yes EJ No E NIA If no, explain: 19. Is there any off -site damage? A. Yes B. ❑ No C. 0 None observed If A, describe the type and severity of the damage: NA If B or C, is there potential for offsite damage? ® Yes ❑ No Explain: At time of inspection there was an increased potential for offsite damage due to SB-01 being full of sediment and having little to no sediment capturing capacity. 19. Corrective measures needed and/or taken: Remove excess sediment from SB-01 as discussed in field and ensure all skimmer, riser and baffle s stems are functioning r pljLn. Re air and stabilize the eroded ditch line adjacent to ST-04 with geotextile liner and class B riprap o_r___e_quivalent. 20. Other recommendations and comments: Take. steps to keep woody vegetation out of the basins. SB-02 had large trees growing inside of the basin interior and needs to be cut back. Take steps to stabilize the basin as needed with a maintainable grassy vegetation and regular mowing. Ensure all slopes in the mine are kept no greater than 2H: l V including all over burden slopes. A few small eroded areas within some of the mine roads needed repair where they had washed but where being protected by a measure. 21. Is the Annual Reclamation Report +/- map accurate? Yes No (Explain) El Not Reviewed ❑ N/A 22. Follow-up inspection needed? LJ Yes Q9 No Proposed date 23. No. of additional pages of Inspection Report 24. Copy of Report sent to operator INSPECTED BY: Ryan Swaim DATE 6-14-16 Telephone No: 336-776-9659 Copy to file Copy to operator Copy to Mining Specialist Compliance Inspection Report Permit: NCG020113 Effective: 100/15 Expiration: 09/30/20 owner: Allegheny CI Partners LLC SOC: Effective: Expiration: Facility: Allegheny Stone, LLC County: Allegharly 367 Arbor Ln Region: Winston-Salem Glade Valley NC 26627 Contact Person: Chris H Barrett Title: Phone: 336-372-5222 Directions to Facility: System Classifications: Primary ORC: certification: Phone: Secondary ORC(s): On -Sits Representative(s): Related Permits: Inspection Date: 06/14/2017 Entry Time: 09:OOAM Exit Time: 12:OOPM Primary Inspector: Glen White Phone: 338-776-9800 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Aclivitles Stormwater Discharge COC Facility Status: Compliant C1 Not Compliant Question Areas: ' Storm Water (See attachment summary) Page: 1 p9mft NCGO20113 Owner - Faclllty:+vbGhRnY CI Partners LLC Inapecdon Dab: 00/1412017 Inspactlan Type : Compliance Evaluation Reason for Visit Routine Inspedon Summary: Page: 2 11 psi NCG020113 Owner - Facility: Alleghany Cl Pafters LLC h+spscUan Data: 0611412017 hrspectbn Type: Compliance EveluaUon Reason for Visit: Routine sir Pollution Prevention Plan Yes No NA NE Does the site have a Stomtwater Pollutlon Prevention Plan? ❑ ❑ ® ❑ # Does the Plan Include a General Locallon (USGS) map? ❑ ❑ M❑ # Does the Plan include a "Narrative Description of Practices ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant Spills occurring during the past 3 years? ❑ ❑ �. ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ M ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan Include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ 0 ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ E ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ® ❑ Has the Slonrrwater Pollution Prevention Plan been Implemented? ❑ ❑ ® ❑ Comment: Qualitative Monitorinn Yet No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ■ ❑ ❑ ❑ Comment: Records were reviewed d it appears that gualitativeitorin is being conducted but not g1l outfalls were being reviewed. Instruction was given to monitor all Points at which site stormwater wwa leaving the site. SB701 and SB-02 were idendtied as dicha[ge taints and will need to be 5219121ed accordingly W or existing outfalls. Anntvtical ManitorinQ Ysr-No NA NE Has the facility conducted its AnatAlcal monitoring? ❑ IN 1113 # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? Comment: The site was instructed to begin its analytical monggdng requirements to stay incompliance with its stormwater permit. Permit and 0Wail Is Yas No NA NE # la a copy of the Permit and the Certificate of Coverage available at the site? ®❑ ❑ ❑ # Were all wdells observed during the inspection? ■ ❑ ❑ ❑ # If the facility has representative cutfall status, Is it properly documented by the Division? ❑ ❑ ❑ # Has the fadilty.evaluated all Illicit (non stormwater) discharges? ❑ ❑ ❑ Comment:- The site currently has been exempted from having to _have a Stormweierpollution Prevention__ tan. However, the site cannot comply h the analytcal sarriRling rectuiremenis of thg sotes NCG permit it may be required to provide a SPPP with other potential Permit Leouirements. Page: 3 Energy, Mineral & Land Resources ENVIRONMENTAL QUAL" Chris Barrett Alleghany Stone, LLC P.O. Box 1794 Sparta, NC 28675 September 19, 2016 Subject: Compliance Evaluation Inspection Permit No. -NCG 020113 Alleghany Stone, LLC Alleghany County Dear Mr. Barrett: PAT McCRORY Governor DONALD R. VAN DER VAART Secretary TRACY DAVIS DUrdor On September 13, 2016 Glen'V4rhite of the North Carolina Department of Environmental Quality; Department.of Energy, Minerals, and Land Resources met with you at the facility located at 367 Arbor Lane in Glade Valley, to conduct a compliance inspection per the Industrial Stormwater Permit requirements. This inspection consists of review of the Stormwater Pollution Prevention Plan, training, monitoring and spills records as well as observation of the general condition of the site, the outfalls and any possible exposures to downstream stormwater. Your assistance with the inspection was greatly appreciated. Permit: This facility holds General Stormwater Permit NCG020113 to discharge stormwater from industrial activity associated with Stormwater, Mine Dewatering and Process Wastewater under the National Pollutant Discharge Elimination System (NPDES). The permit became effective October 1, 2015 and expires on September 30, 2020. A copy of the current permit is required to be maintained with the Stormwater Pollution Prevention Plan (SPPP) documents. The current permit was not available at time -of inspection. A copy of the permit is attaclied to this letter for your files. RecordslReports: This facility was required to develop and maintain a (Stormwater Pollution Prevention Plan) SPPP in accordance with Part II, Section A of the permit. Part Ill, Paragraph 1 allows the division to exempt a permittee from this requirement. This facility is covered under multiple permits for stormwater and mining. Therefore, DEMLR will Exempt this facility from the requirement to prepare a Stormwater Pollution Prevention Plan. Monitoring will continue to be required to be conducted per the permit. State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Winston-Salem Regional Office -1 450 Hanes Mill Road, Suite 300 1 Winston-Salem, NC 27103 336 776 9800 Facifitv Site Review: This facility is a quarry that mines granite and produces granite rock, gravel and stone of various grade for varied application. The facilities outfalls include vegetated sediment basins. The process water basin was inundated with rock at the time of inspection. This was following a new blast completed days earlier. Effluent ReceivinjZ Waters: Effluent from this facility drains to Little Glade Creek and Brush Creek, Class C; Trout waters of the New River Basin, Self-Monitorin Program: Part IVof the permit requires semi-annual qualitative and analytical monitoring. The mining permit also requires qualitative and analytical monitoring. Monitoring should be conducted per the permit. See Part IV, Sections A„ C & D for specific parameters. If you have questions or need additional information, please contact Glen White at (336) 776- 9660. Sincerely, Matthew E. Gantt, P.E. Regional Engineer Land Quality Section Winston-Salem Regional Office Enclosures: Inspection Report CC: File Copy Division of Energy, Mineral and Land Resources (WSRO) State of North Carolina I Environmental Quality I Energy. Mineral and Land Resources Whxston-Salem Regional Office 1 450 Hanes Mill Road._ Suite 300_ j Winston-Salem. NC 27103 336 776 9800 Comuliance Inspection Report Permit: NCG020113 Effective: 10/01/15 Expiration: 09/30/20 Owner: Alleghany Cl Partners Ll_C SOC: Effective: Expiration: Facility: Alleghany Stone, LLC County: Alleghany 367 Arbor Ln Region: Winston-Salem Glade Valley NC 28627 Contact Person: Chris H Barrett Title: Phone: 336-372-5222 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 09/13/2016 Primary Inspector: Glen White Secondary Inspector(s): Certification: Phone: EntryTime: 11:00AM Exit Time: 12:OOPM Phone: 336-776-9800 Reason for Inspection: Follow-up Inspection Type: Technical Assistance Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: ® Compliant Not Compliant Question Areas: ® Storm Water (See attachment summary) Page: 1 Permit: NCG020113 Owner • Facility: Alleghany Cl Partners LLC Inspection Date: 09113/2016 Inspection Type : Technical Assistance Reason for Visit: Follow-up Inspection Summary: (Technical Assistance Fallow -up) Page: 2 "r - Permit: NCG020113 Owner - Facility:Alfeghany CI Partners LLC inspection Date: 0911312016 tnspection Type : Technical Assistance Reason for visit: Follow-up Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ N ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ® ❑ Comment: If the facility has a discharge to stormwater Analytical Monitoring will be required twice annually- If process water is kept down by usinq it to wet soils and stone to keep dust down there may be no discharge. Permit and Outfalls # is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, is it property documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Comment: A copv of the permit is included with this report. Please keep the Permit with the monitorin records and have available for review at time of inspections. Qualitative Monitoring Has the facility conducted its Qualitative Monitoring semi-annually? Yes No NA NE ❑ ® ❑ ❑ ® ❑ ❑ ❑ ❑ ❑ ® ❑ ® ❑ ❑ ❑ Yes No NA N£ ❑ E ❑ ❑ Comment: Qualitative Monitoring forms are attached with this submission. Make copies of these forms and fill out one for each outfall twice each year. A photo should be taken of each outfall at inspection. Attach the photo to the monitoring form and keep documents together for a minimum of five years. Stormwater Pollution Prevention Plan Does the site have a Slomlwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? 0 Yas No NA NE ❑ -❑ ❑-® ❑ ❑ ❑ ❑ ❑ ❑ ■ ❑ ❑ ❑ ❑❑❑■ ❑❑❑■ ❑❑❑® ❑ ❑ ❑ ❑❑❑■ ❑❑❑■ Page: 3 Permit: NCG020113 Owner - Facility:AlleghanyClPartnersLLC Inspection Date: 09/13/2016 Inspection Type : Technical Assistance Stormwater Pollution Prevention Plan # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Reason for visit: Follow-up Yes No NA NE ❑❑❑® ❑❑❑■ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: This facility has been "Exemptihe D" by DEMLR for the requirement to have a Stormwater Pollution Prevent ion Plan_ SPPP). This exemption is_allowed per NCG020000, Part III, Paragraph 1. This exemp tion is contin ent on the facility maintaining monitoring per the permit. NCDEQ - DEMLR reserves the right to revoke the exemption at any time. Page: 4 4 . i Compliance Inspection Report Permit: NCG020113 Effective: 10/01/15 Expiration: 09/30120 Owner; Allegheny Cl Partners LLC SOC: Effective: Expiration: Facility: Allegheny Stone, LLC County: Alleghany 367 Arbor Ln Region: Winston-Salem Glade Valley NC 28627 Contact Person: Chris H Barrett Title: Phone: 336-372-5222 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 09108/2016 Entry Time: 09:45AM Primary Inspector: Charles E Kirchner Secondary Inspector(s): Certification: Phone: Exlt Time: 02:OOPM Phone: 336-776-9655 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: 0 Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page: 1 Permit: NCG020113 Owner • Facility: Alleghany Cl Partners LLC inspection Date: 09/08/2016 Inspection Type : Compliance Evalualbn Reason for Visit: Routine Inspection Summary: Page: 2 Permit: NC1302(3113 Owner - Facility:Aileghany Cl Partners LLC Inspection Date: 09/08/2016 Inspection Type : Compliance Evaluation Reason for visit: Routine Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ E 1111 # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ® ❑ ❑ Comment: No Analytical Monitoring available for review during Multimedia Inspection. Glen White, Industrial Stormwater Inspector with the Division of Energy, Mining and Land Resources will schedule re -inspection to determine facility requirements under this permit. Permit and Outfalls # Is a copy of the Permit and the Certificate of Coverage available at the site? # Were all outfalls observed during the inspection? # If the facility has representative outfall status, ds it properly documented by the Division? Yea No NA NE ❑ ❑ ❑ ® ❑ ❑ ❑ ❑ ❑ M ❑ # Has the facility evaluated all illicit (nor) stormwater) discharges? ❑ ® ❑ ❑ Comment: No Permit and Outfall data available for review during Multimedia Inspection. Glen White, Industrial Stormwater Inspector with the Division of Energy, Mining and Land Resources will schedule re -inspection to determine facility requirements under this permit. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 11000 Comment: No Qualitative Monitoring available for review during Multimedia Inspection. Glen White, Industrial Stormwater Inspector with the Division of Energy, Mining and Land Resources will schedule re -inspection to determine facility requirements under this permit. Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ® ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ® ❑ ❑ # Does the Plan include a "Narrative Description of Practices"?- ❑ -®- ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ® ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ E ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ® ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ® ❑ ❑ # Does the Plan include a BMP summary? ❑ S ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ® ❑ ❑ # Does the Plan include a Preventative Maintenance and. Good Housekeeping Plan? ❑ ®❑ ❑ # Does the facility provide and document Employee Training? ❑ N ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ S ❑ ❑ Page: 3 Permit: NCG020113 Owner • Facility:Alleghany C1 Partners LLC Inspection 0ais: 09108/2016 Inspection Type :Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE At Is the Plan reviewed and updated annually? ❑ ❑ ❑ # hoes the Plan include a Stormwater Facility Inspection Program? ❑ O ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ M ❑ ❑ Comment: No SWPPP plan available For review during Multimedia Inspection, Glen White Industrial Stormwater Inspector with the Division of Energy, Mining and Land Resources will schedule re -ins ection to determine'facility requirements under this permit. Page: 4 Stormwater Inspection Date of Inspection: Lun-z 13; a00 Inspector: c- e0r14 r 30 Yo Entry Time: 7 Pti Exit Time lD 4m Permit Number: Iy C 6- 0), 0/ 13 Activity: _ ,S�bn: 2 U k)'y`� Facility Name: 4 I /t Th xny �S2'0 n - LLC, 1%,lailing Address: P, 0. . , k 7 City: potrr4a state:yG zip: 2 Q 7,5 County: _ �l/-cy�iany I . ■ .. ■ a a . a a a a a a . ■ ■ a a . f a . a a a . a a ■ . ■ a a .. . a . l .. ■ .... 1 .... 1 . ■ .. ■ . r i . . a 1 ■ .. ■ . . . . ■ .. ■ .. ■ a . r a .. a a 1 ■ Facility Location: 3% Aor Ln Facility Representative: I � C� Bt p r t Title: 6y0-c1^ Telephone Number: ( 7o L) 5 7 7- SY 7S e el I .. ■ a a .... a. a. a a .. a s .. a a■ .. ■ ... r■ .. r■ .. ■ a a r■ .. r .. r i a a a a a. a a a. r a a. r■ .. a a. a a■ .. a a a r. r a■ Implement SPPP Analytical Monitoring Qualitative Monitoring On -site Vehicle Maint. a.■ .. i■ .. ... .. ■ a .. a a a. a a a i■ .. a■ .. ... ■. f a a. a a a. 1 .. l■ .. ■. e .. f a a a i. f a.. 1 1 R.■ .. • a a .. a a a a. a. a. a 3c �7 (Y AJ el 0l `f� w Permit Number NCG020113 Program Category NPDES SW Permit Type Mining Activities Stormwater Discharge COC Primary Reviewer aisha.lau Coastal 5W Rule Permitted Flow 0 Central Files: APS SWP 06/12/13 Permit Tracking Slip Status Project Type Active Renewal Version Permit Classification 3.00 COC Permit Contact Affiliation 7 CdtVTTi�: Me♦fott C h r r 5 1J d f ►"Grp 4g5.deRea_w.effy.4,,�_. Po Qa & 1 7 qN ,earrbere, NC 27516- a el 7J Facility Facility Name Major/Minor Region Alleghany Stone, LLC Minor Winston-Salem Location Address County 367 Arbor Ln Alleghany Glade Valley NC 28627 Facility Contact Affiliation Chris Barrett PO Box 1 7 7y Owner weed— Sp.,c-,C. NC 28675 Owner Name Owner Type Alleghany Gi-Ra 6 LLC Non -Government 15,0&e Owner Affiliation ttase--Lean- 1464-isabet-Way Dates/Events -Riney-Creek-NG'28663---- Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 06/25/93 07/30/09 01/01/10 01/01/10 12/31/14 Regulated Activities Requested/Received Events g RO staff report received Mining & material processing RO staff report requested Mining closed loop recycle system Outfail 001 Waterbady Name Stream Index Number Current Class Subbasin Glade Creek 10-9-9 C;Tr 05-07-03 Owner Payment History Alleghany CI Partners LLC 111-A 191 Permit Facility Invoice Number Fee Type Invoice Dl Payment Dt Payor Amount Check Number Batch Number NCG020113 Alleghany Stone, LLC 2012PR010817 Permit Annual Fee 11/06/12 NCG020113 Alleghany Stone, LLC 2011PR009801 Permit Annual Fee 11/02/11 11/16/11 ALLEGHANY $100.00 2522 PR2011111601 NCG020113 Alleghany Stone, LLC 2010PR010930 Permit Annual Fee 11/09/10 12/06/10 ALLEGHANY $100.00 1984 PR2010120601 NCG020113 Alleghany Stone, LLC 2O09PR012224 Permit Annual Fee 12/08/09 12/28/09 ALLEGHANY $100.00 1434 PR2009122803 NCG020113 Alleghany Stone, LLC 2009PR000639 Permit Annual Fee 01/23/09 02/12/09 BULLHEAD $100.00 142 PR2009021201 NCG020113 Alleghany Stone, LLC 2008PR000716 Permit Annual Fee 01/23/08 02/25/08 C A MELLOTT $100.00 137 PR2008022501 NCG020113 Alleghany Stone, LLC 2007PR000657 Permit Annual Fee 01/17/07 02/14/07 C Mellott $80.00 133 PR2007021402 NCG020113 Alleghany Stone, LLC 2006PR000718 Permit Annual Fee 01/21106 02/17106 CA MELLOTT $80,00 128 PR2006021704 NCG020113 Alleghany Stone, LLC 2005PR000249 Permit Annual Fee 01/11/05 02/01105 C A MELLOTT $80.00 123 PR2005020101 NCG020113 Alleghany Slone, LLC 2004PR000191 Permit Annual Fee 01/14/04 03122/04 C A MELLOTT $80.00 115 NCG020113 Alleghany Stone, LLC 2003PR000190 Permit Annual Fee OV22103 02/04/03 C A MELLOTT $80,00 110 NCG020113 Alleghany Stone, LLC 2002PR000190 Permit Annual Fee 01/23/02 03/07/02 C A MELLOTT $80.00 027710 NCG020113 Alleghany Stone, LLC 2001 PR000187 Permit Annual Fee 01/18/01 02/15/01 C A MELLOTT $80,00 26239 �MVPA% MCDEMR North Carolina Department of Environment and Division of Water Quality Pat McCrory Thomas A. Reeder Governor Acting Director June 20, 2013 Mr. Chris Barrett Alleghany Stone P.O. Box 1794 Sparta, NC 28675 Subject: Compliance Evaluation Inspection Permit 4 NCG020113 Alleghany County Dear Mr. Barrett: Natural Resources John E. Skvarla, III Secretary A Compliance Evaluation Inspection was performed on June 13, 2013 by George Smith, of this office. Mr. Chris Barrett, Owner was present for the records review and site inspection. Permit The NPDES general permit became effective on October 1, 2009 and expires on September 30, 2014. Below you will see the references for the permit requirements that apply to your facility: 1. Stormwater Pollution Prevention Plan (SPPP) is required per Part III, Section A. 2. Analytical Monitoring is required semiannually per Part III, Section B, Tables 1&2. Qualitative Monitoring is required per Part II1, Section D, Table 6. It is my understanding that you purchased the facility during the last year and it was not operational. Also, our database shows an incorrect address and contact. Currently, the stormwater permit fee of $100 is past due. When our database is corrected an invoice will be mailed. Records & Reports Some of the basic elements of the Stormwater Pollution Prevention Plan (SPPP) were developed. Attached you will find the monitoring forms for recording qualitative and analytical monitoring. Facility Site Review A facility site inspection showed one (1) Stormwater Outfall Discharge (SDO), which discharges to an unnamed tributary . to Little Glade Creek, Class C; Trout waters of the State. North Carolina Division of Water Quality. Winston-Salem Regional Office Location: 585 Waughtown Street, Winston-Salem, North Carolina 27107 Phone: 336-771-50001 FAX: 336-771-4630 Internet: www.nmaterauality.ora Nne orthCarolina Vatzmallf An Equal Opportunity 1 Affirmative Action Employer Alleghany Stone June 20, 2013 Page 2 of 2 There is a 500 gallon diesel fuel tank. There was no evidence of a spill. Please insure that secondary containment is adequate to contain any release. There is no mine dewater at this site. The closed loop recycle system receives water from the rock crushing operation and dust suppressant control. The system is not designed to be discharged unless it is pumped. No analytical monitoring is required for this closed loop system since it is designed to operate with 2-feet of freeboard. The facility does not meet the -requirement for on -site vehicle maintenance. Therefore, analytical monitoring is not required for this area. Install a rain gauge on the site. Self -Monitoring Program The following monitoring for one (1) Outfall is shown below: 1. Per Part Ill, Section B, Table 1: semi-annual monitoring for Settleable Solids, Total Suspended Solids; Turbidity, and Total Rainfall. 2. Per Part 111, Section D, Table 6: semi-annual qualitative monitoring for the discharge characteristics listed. (see attached form) 3. Install rain gauge and report total rainfall semi-annually. Below you will find four certified labs that are capable of performing the stormwater analysis for pH, Total Petroleum Hydrocarbons, and Total Suspended Solids (TSS). Please.perform these tests twice a year. (See Table 2 in the permit) Pace Analytical Services, Inc. Meritech, Inc Water Quality Lab & Operations, Inc. Blue Ridge Labs 205 East Meadow Road — Suite A 642 Tamco Rd, PO Box 27 PO Box 1167 P.O. Box 2940 Eden, NC 27288 Reidsville, NC 27320 Banner Elk, NC ' 28604 Lenoir, NC 28645 336-623-8921 336-342-4748 828-898-6277 The inspection is considered satisfactory. If you have any questions or need assistance, please contact George Smith or me at (336) 771-5000. Sincerely, 4 1,' W. Corey Basinger Regional Supervisor cc: WSRO Files t� C®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Thomas A. Reeder John E. Skvarla, III Governor Acting Director Secretary June A 2013 Mr. Chris Barrett Alleghany Stone P.O. Box 1794 Sparta, NC 28675 Subject: Compliance Evaluation Inspection Permit 4 NCG020113 Alleghany County Dear Mr. Barrett: A Compliance Evaluation Inspection was performed on June 13, 2013 by George Smith, of this office. Mr. Chris Barrett, Owner was present for the records review and site inspection. Permit The NPDES general permit became effective on October 1, 2009 and expires on September 30, 2014. Below you will see the references for the permit requirements that apply to your facility: 1. Stormwater Pollution Prevention Plan (SPPP) is required per Part IU, Section A. 2. Analytical Monitoring is required semiannually per Part III, Section B, Tables 1&2. Qualitative Monitoring is required per Part III, Section D, Table 6. It is my understanding that -you purchased the facility during the last year and it was not operational. Also, our database shows an incorrect address and contact. Currently, the stormwater permit fee of $100 is past due. When our database is corrected an invoice will be mailed. Records & Reports Some of the basic elements of the Stormwater Pollution Prevention Plan (SPPP) were developed. Attached you will find the monitoring forms for recording qualitative and analytical monitoring. Facility Site Review A facility site inspection showed one (1) Stormwater Outfall Discharge (SDO), which discharges to an unnamed tributary to Little Glade Creek, Class C; Trout waters of the State. North Carolina Division of Water Quality, Winston-Salem Regional Office Location: 585 Waughtown Street, Winston-Salem, North Carolina 27107 Phone: 336-771-50001 FAX: 336-771-4630 . Internet: www.ncwatergualiity.org NorthCarohna ;Vault llff An Equal Opportunity 1 Affirmative Action Employer Compliance Inspection Report Permit: NCG020113 Effective: 01/01/10 Expiration: 12/31/14 Owner: Alleghany Cl Partners LLC SOC: Effective: Expiration: Facility: Alleghany Stone, LLC County: Alleghany 367 Arbor Ln Region: Winston-Salem Glade Valley NC 28627 Contact Person: Calvin A Mellott Title: Phone: 919-967-2241 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Certification: Phone: Inspection Date: 0611312013 Entry Time: 09:30 AM Exit Time: 10:40 AM Primary Inspector: George S Smith Phone: 336-771-5000 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: IS Compliant ❑ Not Compliant Question Areas: ® Storm Water (See attachment summary) Page: 1 Permit: NCG020113 Owner • Facility: Alleghany CI Partners LLC Inspection Date: 06/13/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ® n n n # Does the Plan include a General Location (USGS) map? ® n n n # Does the Plan include a "Narrative Description of Practices"? ® n n n # Does the Plan include a detailed site map including outfall locations and drainage areas? ® n n n # Does the Plan include a list of significant spills occurring during the past 3 years? ® n n n # Has the facility evaluated feasible alternatives to current practices? ®n n n # Does the facility provide all necessary secondary containment? ® n n n # Does the Plan include a BMP summary? ® ❑ n Q # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ® n n n # Does the Plan include a Preventative Maintenance and Good Housekeeping Pfan? An n n n # Does the facility provide and document Employee Training? ® n ❑ n # Does the Plan include a list of Responsible Party(s)? ®❑ n n # Is the Plan reviewed and updated annually? ® n n n # Does the Plan include a Stormwater Facility Inspection Program? ® n n n Has the Stormwater Pollution Prevention Plan been implemented? ® n In n Comment: report is being developed and a rough draft is available Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? n Is fl n Comment: Mine became operational in the last year Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? Q ®❑ n # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 0 n M n Comment: Mine became operational last year. Page: 2 Y ANNUAL SUMMARY DMR - STORMWATER M STORMWATER DISCHARGE OUTFALLS (SDO) GENERAL PERMIT NO. NCG020000 CERTIFICATE OF COVERAGE NO. NCG02 SAMPLE COLLECTION YEAR: FACILITY NAME: COUNTY PERSON COLLECTING SAMPLES PHONE NO. CERTIFIED LABORATORY Lab # ADD TO LISTSERVE? YES ❑ NO ❑ EMAIL: Lab # 'art A: Jtormwater 1v1on1torin2 Requirements 'if "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here and the Date Range. z PerNCG02: Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range 3 if a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. 4 TSS benchmark values are 100 mg/I except in ORW, HWQ, trout, and PNA waters where they are 50 mg/1. 'The discharge shall not cause an instantaneous measurement of the turbidity of the receiving water to exceed: 10 NTU for freshwater streams, lakes, and reservoirs designated as trout waters; 25 NTU for all lakes and reservoirs, and all salt waters; 50 NTU for all other streams and surface waters. Turbidity may be monitored at the SDO. Alternatively, the permittee may choose to monitor turbidity in the receiving water, directly upstream and downstream of the SDO. Permit Date: 1/1/20I0-12/31/2014 Last Revised 02-02-11 Page] of 2 AV NCDENR Stormwater Discharge Outfall (SD®) Qualitative Monitoring Report Forguidance on filling out this form, please visit: http://portal.ncdenr org/web"wa/ws/su/npdessw#tab-4 Permit No.: N/C/_/_/_/_/_/_/_/ or Certificate of Coverage No.: Facility Name: County: Inspector: Date of Inspection: Time of Inspection: Total Event Precipitation (inches): Phone No. Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ❑ Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event"or `measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) Page 1 of 2 SWU-242, Lastmodified 10/26/2012 1. . Outfall Description: Outfall No. Structure (pipe, ditch, etc.) Receiving Stream: Describe the industrial activities. that occur within the outfall drainage area: 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): 4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 4. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Page 2 of 2 SNIU-242, Last modified 10/25/2012 Corporations Division https://www.sosnc.gov/Search/profcorpY9033914 Click Here To: North Carolina Elaine F Marshall DEPARTMENT OF THE Secretary S EC R ETARY aF STATE PO Box 29M Raleigh, NC 27626-0622 (919)BD7-2000 Account Login Register View Document Filings File an Annual Report Amend a Previous Annual Report Print a Pre -Populated Annual Report form Corporate Names Legal: Alleghany Stone, L.L.C. Limited Liability Company Information Sosld: 1078633 Status: Current -Active Annual Report Status: Current Citizenship: Domestic Date Formed: 1/8/2009 Fiscal Month: December State of Incorporation: NC Registered Agent: Parker, Poe, Adams and Bernstein, L.L.P. Corporate Addresses Principal Office: 367 Arbor Lane Glade Valley, NC 28627-9003 Reg Office: 367 Arbor Lane Glade Valley, NC 28627-9003 Reg Mailing: PO Box 1794 Sparta, NC 28675-1794 Mailing: PO Box 1794 Sparta, NC 28675-1794 Company Officials All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20. Manager: Christopher H Barrett , Mr PO Box 1794 Sparta NC 28675 1 of 1 9/14/2016 11:54 AM