Loading...
HomeMy WebLinkAboutSW3191101_Supplement-EZ Form_20191223SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name 2 Project Area ac Cambridge Village Multifamily 11.5 3 Coastal Wetland Area ac 0 4 Surface Water Area ac 0 5 Is this project High or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet 10 8 Will the vegetated setback remain vegetated? Yes 9 Is BUA other that as listed in .1 0034 c-d out of the setback? Yes 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 2 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Ba filter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Steve Farmartino, Project Manager 28 Organization: Bohler Engineering 29 Street address: 1927 South Tryon St Suite 310 30 City, State, Zip: Charlotte, NC 28204 31 Phone numbers : 980 272-3400 32 Email: sfarmartino@bohlereng.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. oQ �ool SEAL - 8 047366 o I N 00000000000cc 'YG Signature of Designer Seal Date DRAINAGE AREAS 1 Is this a high density ro�ect? Yes 2 If so, number of drainage areas/SCMs 2 3 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION A Entire Site 1 2 4 Type of SCM Wet Pond Wet Pond 5 Total BUA in project (sq ft 288109 sf 89722 sf 198387 sf 6permitting) New BUA on subdivided lots (subject to s ft N/A N/A N/A 7permitting) New BUA outside of subdivided lots (subject to s 288109 sf 89722 sf 198387 sf 8 JOffsite - total area (sq ft 114127 sf sf 114127 sf 9 Offsite BU(sq ft sf sf sf 10 Breakdown of new BUA outside subdivided lots: Parking (sq ft 153830 sf 49276 sf 104554 sf Sidewalk (sq ft 22119 sf 5923 sf 16196 sf Roof (sq ft 103250 sf 34523 sf 68727 sf Roadway s ft sf sf sf Future sq ft sf sf sf Other, please specify in the comment box below (sq ft 11 New infiltrating permeable pavement on subdivided lots (sq ft sf sf sf 12 New infiltrating permeable pavement outside of Isubdivided lots (sq ft sf sf sf 13permitting) Exisitng BUA that will remain (not subject to s ft sf sf sf 14 Existing BUA that is already permitted (sq ft sf sf sf 15 Existing BUA that will be removed (sq ft sf sf 8910 sf 16 Percent BUA 58% 66% 30% 17 Design storm inches 1 in 1 in 1 in 18 1 Design volume of SCM cu ft 98490 cf 29433 cf 69057 cf 19 Calculation method for design volume SA/DA DITIONA FORMATION Please use this space to provide any additional information about the r2O drainage area(s): SA/DA SA/DA WET POND 1 Drainage area number Prop DA-1 Prop DA-2 2 Design volume of SCM (cu ft) 48718 cf 113807 cf L MUCTROM 02H.1050 Is the SCM sized to treat the SW from all surfaces at build -out? Yes NO. 3 4 Is the SCM located away from contaminated soils? Yes Yes 5 'What are the side slopes of the SCM (H:V)? 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes No 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC (8)? Yes Yes 12 Does the drainage easement comply with General MDC (9)? Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes Yes 16 Does the SCM follow the device specific MDC? Yes Yes 17 Was the SCM designed by an NC licensed professional? D MDC FROM 02H .1053 Yes SA/DA Yes SA/DA 18 Method used 19 Has a stage/storage table been provided in the calculations? Yes Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl) 781.00 770.00 21 Elevation of the main pool bottom -(top of sediment removal) (fmsl) 782.00 771.00 22 Elevation of the bottom of the vegetated shelf (fmsl) 787.00 776.00 23 Elevation of the permanent pool (fmsl) 787.50 776.50 24 Elevation of the top of the vegetated shelf (fmsl) 788.00 777.00 25 Elevation of the temporary pool (fmsl) 788.50 777.25 26 Surface area of the main permanent pool (square feet) 5852:1 6548:1 27 Volume of the main permanent pool (cubic feet) 20834 cf 24570 cf 28 Average depth of the main pool (feet) 4.20 ft 4.30 ft 29 Average depth equation used Equation 3 Equation 3 30 If using equation 3, main pool perimeter (feet) 306.0 ft 315.0 ft 31 If using equation 3, width of submerged veg. shelf (feet) 3.0 ft 3.0 ft 32 Volume of the forebay (cubic feet) 3575 cf 4428 cf 33 Is this 15-20 % of the volume in the main pool? Yes Yes 34 Clean -out depth for forebay (inches) 12 in 12 in 35 Design volume of SCM (cu ft) 48718 cf 113807 cf 36 Is the outlet an orifice or a weir? Orifice Orifice 37 If orifice, orifice diameter (inches) 2 in 3 in 38 If weir, weir height (inches) 39 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days) 2.81 2.68 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? No Yes 42 Are berms or baffles provided to improve the flow path? Yes No 43 Depth of forebay at entrance (inches) 66 in 66 in 44 Depth of forebay at exit (inches) 54 in 54 in 45 Does water flow out of the forebay in a non -erosive manner? Yes Yes 46 Width of the vegetated shelf (feet) 6 ft 6 ft 47 Slope of vegetated shelf (H:V) 6:1 6:1 48 Does the orifice drawdown from below the top surface of the permanent pool? No No 49 Does the pond minimize impacts to the receiving channel from the 1 yr, 24-hr storm? Yes Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC(9) is met.) No No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 iALthe dam and embankment planted in non -clumping turf grass? Yes Yes 53 Species of turf that will be used on the dam and embankment Bermuda Bermuda 54 Has a planting plan been provided for the vegetated shelf? Yes Yes ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Wet Pond 3 9:37 AM 12/23/2019